IMPROVEMENTS TO LIFTING EQUIPMENT

Info

Publication number
BE857055A
BE857055A BE179562A BE179562A BE857055A BE 857055 A BE857055 A BE 857055A BE 179562 A BE179562 A BE 179562A BE 179562 A BE179562 A BE 179562A BE 857055 A BE857055 A BE 857055A
Authority
BE
Belgium
Prior art keywords
load
chain
lifting
rope
pulleys
Prior art date
Application number
BE179562A
Other languages
French (fr)
Original Assignee
Bucknall Arthur Hilston
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bucknall Arthur Hilston filed Critical Bucknall Arthur Hilston
Priority to BE179562A priority Critical patent/BE857055A/en
Publication of BE857055A publication Critical patent/BE857055A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Description

       

  "Perfectionnements apportés aux engins de levage"

  
La présente invention est relative à des perfectionnements apportés aux engins de levage.

  
Lorsqu'on emploie des moufles à chaîne et

  
des engins ou poulies à chape dans le but de lever des

  
poutres et poutrelles jusqu'à la position voulue et pour

  
élever des charges, on éprouve des difficultés du fait

  
de l'oscillation des moufles, ce qui entraine le déplacement des chaînes ou câbles; de plus, les poutres ou

  
poutrelles doivent être mises en position après l'élévation.

  
La présente invention a pour objectif d'établir un engin pouvant être disposé rigidement sur l'aile

  
d'une poutre et qui soit capable d'élever la charge avec précision jusqu'à une position voulue quelconque. 

  
 <EMI ID=1.1> 

  
 <EMI ID=2.1> 

  
entrée en contact avec la face inférieure d'une poutre ou poutrelle à section en I et faisant partie d'une structure, ce procédé comprenant les dispositions qui consistent : à monter sur l'aile supérieure de la poutre en I des potences entaillées, disposées par paires; à faire passer une corde ou une chaîne sur deux poulies

  
de chaque potence de la paire, une extrémité de la corde ou de la chaîne pendant à partir de chaque potence; à fixer la charge à une extrémité pendante de la corde ou de la chaîne; et à élever la charge jusqu'à ce qu'elle entre

  
en contact avec l'aile inférieure de la poutre en I, en appliquant une traction à l'autre extrémité de la corde

  
ou chaîne.

  
Un engin de levage pour la mise en oeuvre du procédé suivant l'invention comprend trois paires de potences montées sur l'aile supérieure d'une poutre ou poutrelle, chaque potence comprenant des flasques latéraux évidés

  
de manière à constituer une entaille en V, le bord supérieur de l'entaille étant sensiblement horizontal, dans

  
le but de s'appliquer fermement sur la surface supérieure de l'aile supérieure de la poutre ou poutrelle, ainsi qu'une paire de poulies montées sur un arbre traversant

  
les flasques, une corde ou chaîne passant sur les poulies de la paire de potences, une extrémité de la corde ou chaîne pendant de chaque potence, en vue de la fixation

  
de la charge à une extrémité de la corde ou chaîne et

  
de l'application d'une traction à l'autre extrémité pendante, dans le but d'élever la charge.

  
L'invention sera décrite ci-après, en se référant aux dessins annexés :

  
La fig. 1 est une vue perspective montrant des tubes en cours d'élévation jusqu'à une position située au-dessous de la poutre;

  
La fig. 2 est une vue en coupe transversale montrant un tube élevé jusqu'à une position située audessous de la poutre; 

  
La fig. 3 est une vue perspective d'une potence de levage; 

  
La fig. 4 est une vue en élévation latérale de deux potences de levage disposées sur une poutre
(représentée en coupe);

  
La fig. 5 est une vue en plan correspondant à la fig. 4;

  
La fig. 6 est une vue en coupe d'une potence appliquée sur une poutre en bois.

  
Suivant l'invention, un engin de levage comprend deux potences 1, 2, dont chacune présente deux flasques latéraux 3, entre lesquels sont montées, à pivotement sur un arbre 4, deux poulies à chaîne ou câble 5,5<1> de même diamètre, disposées côte à côte.

  
Les flasques latéraux sont espacés par

  
une ou plusieurs entretoises 6, la face inférieure 7 des flasques latéraux étant de préférence conformée en vue

  
de reposer dans un plan horizontal. L'entretoise 6 est

  
de préférence formée d'une pièce avec les flasques. A titre de variante, les plaques formant flasques peuvent

  
 <EMI ID=3.1> 

  
également comme guides de câbles.

  
Un bord des flasques latéraux 3 est évidé en vue de constituer une entaille 8 en V, le bord supérieur de chaque entaille étant horizontal, en vue de s'engager

  
 <EMI ID=4.1> 

  
étant montées sur cette poutre de telle façon que leurs entailles respectives 8 en V sont engagées sur les bords

  
 <EMI ID=5.1> 

  
gent de préférence sous un angle de 35[deg.], par exemple, une dépouille étant formée au sommet de l'angle entre les

  
deux branches du flasque.

  
La fig. 6 représente la potence appliquée sur une poutre en bois, dans laquelle la branche inférieure du flasque latéral 3 forme un angle de 90[deg.].avec la branche supérieure et est dentelée en vue d'agripper le bois.

  
L'entretoise 6 agit comme guide ou garde, pour retenir le câble ou la chaîne 9 sur les poulies 5, 5 .

  
 <EMI ID=6.1> 

  
à partir des potences en passant au contact d'une tige cylindrique ou d'un rouleau 10, qui empêche le câble ou la chaîne de se détériorer lors de la levée ou de la descente de la charge W.

  
 <EMI ID=7.1> 

  
l'avant au-delà de l'autre flasque 3, pour permettre aux potences de s'imbriquer mutuellement, afin qu'elles puissent être employées sur de petites poutres, comme représenté dans la fig. 4. Compte tenu de la largeur et de l'épaisseur de l'aile, la branche inférieure sera en contact avec

  
un point de la face inférieure de l'aile et exécutera

  
un pivotement autour de ce point, en vue de maintenir la face horizontale de la branche supérieure en contact

  
intime avec la face supérieure de l'aile.

  
Dans l'application pratique, les potences

  
 <EMI ID=8.1> 

  
d'une poutre A d'un bâtiment, la disposition étant telle que le câble ou la chaîne 9, destinée à élever la charge, est suspendue à partir d'une potence 2 et passe sur une poulie 51 de la première potence 2 et une poulie 52 de la seconde potence 1, se dirige vers le bas et passe sous

  
 <EMI ID=9.1> 

  
lement et passer sur la seconde poulie 54 de la potence 1 et pendre verticalement à partir de cette dernière poulie.

  
Lorsqu'on attache une charge W à une des extrémités pendantes du câble ou de la chaîne 9 et que l'on exerce une traction sur l'autre extrémité pendante du câble ou de la chaîne, les deux paires de poulies ont

  
 <EMI ID=10.1> 

  
d'une force égale à trois fois le poids de la charge en cours de levage, de sorte que les bords des entailles sont maintenus fermement en contact avec l'aile de la poutre grâce à l'action de pivotement sur le bord inférieur de l'aile, la charge étant ainsi élevée.

  
Pour élever une seconde poutre ou un tube w _jusqu'au contact avec la poutre A déjà en place, on peut employer deux jeux d'engins 1,2, chacun à proximité d'une des extrémités de la poutre ou du tube à élever; on peut cependant employer trois jeux d'engins ou plus, comme indiqué dans la fig. 1.

  
A titre de variante, un moufle à câble ou

  
à chaîne peut être fixé à une extrémité pendante du câble ou de la chaîne et être actionné en vue dëlever la charge. Cette construction est particulièrement applicable lorsqu'il s'agit d'élever des charges lourdes, où la potence est supportée par un châssis reposant sur l'aile supérieure a de la poutre A et s'étendant au-dessous de cette ail&#65533;,

  
Le câble ou la chaîne pour l'élévation de la charge est fixée au crochet d'un moufle ou palan à chaîne, des

  
moyens étant prévus pour maintenir la charge dans la position élevée. 

  
Lorsque la charge est élevée jusqu'au contact avec la poutre A occupant-la position voulue, elle peut être maintenue dans cette position, à la main ou autrement, pendant la fixation d'une seconde poutre à la première poutre.

  
La position des potences 1,2 peut être déterminée avec précision, avant la levée de la charge,

  
en faisant glisser les potences le long de l'aile de la première poutre A, jusqu'à la position requise.

  
A titre de variante, les potences peuvent

  
 <EMI ID=11.1> 

  
ou analogues.

  
Les potences sont montées au-dessus de l'aile supérieure de la première poutre et peuvent être appliquées avec une poutre en I de n'emporte quelles dimensions.

  
Le fait qu'il soit également possible d'élever une charge à un niveau plus élevé que la face inférieure de la poutre ou poutrelle, à partir de laquelle a lieu l'élévation de cette charge, contribue grandement à la facilité avec laquelle cette charge peut être fixée à la poutre ou la poutrelle, un tel résultat ne pouvant pas être obtenu en utilisant un engin de levage normal.

  
La construction d&.rite ci-dessus peut également être utilisée en vue d'élever des charges légères, par exemple des tronçons de tube ou des poutrelles. Les tubes peuvent être assemblés les uns aux autres avant la levée et, en utilisant deux ou plusieurs jeux de potences et en affectant un engin de levage à chaque tronçon, les tubes peuvent être élevés jusqu'à la face inférieure d'une poutre ou poutrelle A en acier laminé, comme représenté dans la fig. 1.

REVENDICATIONS

  
1. Procédé pour élever une charge jusqu'à son entrée en contact avec la face inférieure d'une poutre ou poutrelle à section en I et faisant partie d'une structure, caractérisé par les dispositions qui consistent : à monter sur l'aile supérieure de la poutre

  
 <EMI ID=12.1> 

  
à faire passer une corde ou une chaîne sur deux poulies de chaque potence de la paire, une extrémité de la corde ou de la chaîne pendant à partir de chaque potence; à fixer la charge à une extrémité pendante de la corde

  
ou de la chaîne; et à élever la charge jusqu'à ce qu'elle entre en contact avec l'aile inférieure de la poutre en I, en appliquant une traction à l'autre extrémité de la corde ou chaîne.

  
2. Engin de levage pour la mise en oeuvre



  "Improvements to lifting equipment"

  
The present invention relates to improvements made to lifting devices.

  
When using chain mittens and

  
clevis gear or pulleys for the purpose of lifting

  
beams and joists to the desired position and for

  
lifting weights, one experiences difficulties because

  
the oscillation of the mittens, which causes the chains or cables to move; in addition, the beams or

  
joists must be placed in position after lifting.

  
The present invention aims to establish a device that can be rigidly arranged on the wing.

  
beam and capable of lifting the load accurately to any desired position.

  
 <EMI ID = 1.1>

  
 <EMI ID = 2.1>

  
coming into contact with the underside of an I-section beam or joist and forming part of a structure, this method comprising the arrangements consisting in: mounting on the upper flange of the I-beam notched jib cranes arranged in pairs; to pass a rope or chain over two pulleys

  
from each gallows in the pair, one end of the rope or chain hanging from each gallows; securing the load to a dangling end of the rope or chain; and raise the load until it enters

  
in contact with the lower flange of the I-beam, applying traction to the other end of the rope

  
or string.

  
A lifting device for implementing the method according to the invention comprises three pairs of brackets mounted on the upper flange of a beam or joist, each bracket comprising hollowed out side flanges.

  
so as to form a V-notch, the upper edge of the notch being substantially horizontal, in

  
the purpose of resting firmly on the upper surface of the upper flange of the beam or joist, as well as a pair of pulleys mounted on a through shaft

  
the flanges, a rope or chain passing over the pulleys of the pair of brackets, one end of the rope or chain hanging from each bracket, for the purpose of fixing

  
the load at one end of the rope or chain and

  
the application of traction to the other hanging end, in order to raise the load.

  
The invention will be described below, with reference to the accompanying drawings:

  
Fig. 1 is a perspective view showing tubes being raised to a position below the beam;

  
Fig. 2 is a cross-sectional view showing a tube raised to a position below the beam;

  
Fig. 3 is a perspective view of a lifting bracket;

  
Fig. 4 is a side elevational view of two lifting jibs arranged on a beam
(shown in section);

  
Fig. 5 is a plan view corresponding to FIG. 4;

  
Fig. 6 is a sectional view of a gallows applied to a wooden beam.

  
According to the invention, a lifting device comprises two jib cranes 1, 2, each of which has two lateral flanges 3, between which are mounted, to pivot on a shaft 4, two chain pulleys or cable 5.5 <1> of the same diameter, arranged side by side.

  
The side shields are spaced by

  
one or more spacers 6, the lower face 7 of the side flanges preferably being shaped in view

  
to rest in a horizontal plane. Spacer 6 is

  
preferably formed integrally with the flanges. As an alternative, the plates forming the flanges can

  
 <EMI ID = 3.1>

  
also as cable guides.

  
One edge of the side flanges 3 is hollowed out in order to form a V-shaped notch 8, the upper edge of each notch being horizontal, in order to engage

  
 <EMI ID = 4.1>

  
being mounted on this beam in such a way that their respective V-notches 8 are engaged on the edges

  
 <EMI ID = 5.1>

  
preferably at an angle of 35 [deg.], for example, a draft being formed at the apex of the angle between the

  
two branches of the flange.

  
Fig. 6 shows the gallows applied to a wooden beam, in which the lower branch of the side flange 3 forms an angle of 90 [deg.] With the upper branch and is serrated in order to grip the wood.

  
The spacer 6 acts as a guide or guard, to retain the cable or chain 9 on the pulleys 5, 5.

  
 <EMI ID = 6.1>

  
from the jib cranes by passing in contact with a cylindrical rod or roller 10, which prevents the cable or chain from deteriorating when lifting or lowering the load W.

  
 <EMI ID = 7.1>

  
the front beyond the other flange 3, to allow the jib cranes to interlock with each other, so that they can be used on small beams, as shown in fig. 4. Considering the width and thickness of the wing, the lower branch will be in contact with

  
a point on the underside of the wing and will perform

  
a pivoting around this point, in order to keep the horizontal face of the upper branch in contact

  
intimate with the upper surface of the wing.

  
In practical application, the gallows

  
 <EMI ID = 8.1>

  
of a beam A of a building, the arrangement being such that the cable or chain 9, intended to lift the load, is suspended from a bracket 2 and passes over a pulley 51 of the first bracket 2 and a pulley 52 of the second stem 1, goes down and goes under

  
 <EMI ID = 9.1>

  
lement and pass over the second pulley 54 of the stem 1 and hang vertically from this last pulley.

  
When a load W is attached to one of the hanging ends of the rope or chain 9 and pulling on the other hanging end of the rope or chain, the two pairs of pulleys have

  
 <EMI ID = 10.1>

  
with a force equal to three times the weight of the load being lifted, so that the edges of the notches are kept firmly in contact with the flange of the beam by the pivoting action on the lower edge of the wing, the load thus being high.

  
To raise a second beam or a tube w _ until contact with the beam A already in place, we can use two sets of gear 1,2, each near one end of the beam or of the tube to be raised; however, three or more sets of gear can be used, as shown in fig. 1.

  
Alternatively, a cable block or

  
Chain can be attached to a dangling end of the cable or chain and operated to lift the load. This construction is particularly applicable when it comes to lifting heavy loads, where the jib crane is supported by a frame resting on the upper wing a of the A-beam and extending below this wing &#65533; ,

  
The rope or chain for lifting the load is attached to the hook of a block or chain hoist,

  
means being provided for maintaining the load in the raised position.

  
When the load is raised until contact with the beam A occupying the desired position, it can be held in that position, by hand or otherwise, while attaching a second beam to the first beam.

  
The position of the jib cranes 1,2 can be determined with precision, before the lifting of the load,

  
sliding the jib cranes along the flange of the first A-beam to the required position.

  
Alternatively, the jib cranes can

  
 <EMI ID = 11.1>

  
or the like.

  
The jib cranes are mounted above the top flange of the first beam and can be applied with an I-beam of any size.

  
The fact that it is also possible to raise a load to a level higher than the underside of the beam or joist, from which the lifting of that load takes place, greatly contributes to the ease with which this load can be fixed to the beam or the joist, such a result cannot be obtained using a normal lifting device.

  
The construction described above can also be used for lifting light loads, for example pipe sections or joists. The tubes can be assembled to each other before lifting and, by using two or more sets of jib cranes and assigning a lifting device to each section, the tubes can be lifted to the underside of a beam or joist A in rolled steel, as shown in fig. 1.

CLAIMS

  
1. Method for raising a load until it comes into contact with the underside of an I-section beam or joist and forming part of a structure, characterized by the arrangements consisting of: mounting on the upper flange of the beam

  
 <EMI ID = 12.1>

  
passing a rope or chain over two pulleys of each gallows of the pair, one end of the rope or chain hanging from each gallows; to secure the load to a hanging end of the rope

  
or chain; and raising the load until it contacts the lower flange of the I-beam, applying traction to the other end of the rope or chain.

  
2. Lifting gear for the implementation


    

Claims (1)

du procédé suivant la revendication 1, caractérisé en of the method according to claim 1, characterized in ce que trois paires de potences sont montées sur l'aile supérieure d'une poutre ou poutrelle en I, chaque potence comprenant des flasques latéraux évidés de manière à constituer une entaille en V, le bord supérieur de l'entaille étant sensiblement horizontal, dans le but de s'appliquer fermement sur la surface supérieure de l'aile supérieure that three pairs of brackets are mounted on the upper flange of a beam or I-beam, each bracket comprising side flanges hollowed out so as to constitute a V-notch, the upper edge of the notch being substantially horizontal, in the purpose of applying firmly to the upper surface of the upper wing de la poutre ou poutrelle, ainsi qu'une paire de poulies montées sur un arbre traversant les flasques, une corde the beam or joist, as well as a pair of pulleys mounted on a shaft crossing the flanges, a rope ou chaîne passant sur les poulies de la paire de potences, <EMI ID=13.1> or chain passing over the pulleys of the pair of stems, <EMI ID = 13.1> potence, en vue de la fixation de la charge à une extrémité de la corde ou chaîne et de l'application d'une traction à l'autre extrémité pendante, dans le but d'élever la charge. jib crane, for securing the load at one end of the rope or chain and applying traction to the other hanging end, for the purpose of lifting the load. 3. Engin de levage suivant la revendication 2, caractérisé en ce que les flasques de chaque potence sont réunis l'un à l'autre au moyen d'une entretoise 3. Lifting device according to claim 2, characterized in that the flanges of each bracket are joined to one another by means of a spacer ou de barres d'espacement, qui maintiennent la corde ou or spacers, which hold the rope or la chaîne sur les poulies. the chain on the pulleys. 4. Engin de levage suivant la revendication 2 ou 3, caractérisé en ce qu'un flasque latéral de chaque potence se prolonge vers l'avant par rapport à l'autre flasque, afin de permettre aux potences de chaque paire 4. Lifting device according to claim 2 or 3, characterized in that a lateral flange of each bracket extends forwardly relative to the other flange, in order to allow the brackets of each pair de s'imbriquer mutuellement ou d'être assemblées sur to overlap or to be assembled on de petites poutres. small beams. 5. Engin de levage suivant les revendications 2 à 4, caractérisé en ce que deux ou plusieurs paires de potences sont prévues dans le but d'élever la charge. 5. Lifting device according to claims 2 to 4, characterized in that two or more pairs of brackets are provided for the purpose of raising the load. 6. Engin de levage, en substance comme décrit en se référant aux dessins annexés. 6. Lifting gear, substantially as described with reference to the accompanying drawings. 7. Procédé pour élever une poutre ou un 7. Method for raising a beam or a tube jusqu'au contact avec la poutre d'une structure A, comme décrit ci-dessus. tube until contact with the beam of a structure A, as described above.
BE179562A 1977-07-22 1977-07-22 IMPROVEMENTS TO LIFTING EQUIPMENT BE857055A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BE179562A BE857055A (en) 1977-07-22 1977-07-22 IMPROVEMENTS TO LIFTING EQUIPMENT

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BE857055 1977-07-22
BE179562A BE857055A (en) 1977-07-22 1977-07-22 IMPROVEMENTS TO LIFTING EQUIPMENT

Publications (1)

Publication Number Publication Date
BE857055A true BE857055A (en) 1977-11-14

Family

ID=25650189

Family Applications (1)

Application Number Title Priority Date Filing Date
BE179562A BE857055A (en) 1977-07-22 1977-07-22 IMPROVEMENTS TO LIFTING EQUIPMENT

Country Status (1)

Country Link
BE (1) BE857055A (en)

Similar Documents

Publication Publication Date Title
EP0802145B1 (en) Hoisting yoke
EP0635450B1 (en) Method and device for mounting the jibs of tower cranes
FR2912450A1 (en) WIND TURBINE WITH FOLDING MAT AND METHOD OF USING SUCH A WINDMILL.
FR2465835A1 (en) METHOD FOR CONSTRUCTING A BRIDGE-SUSPENDED BRIDGE OR SUSPENSION BRIDGE
FR2639929A1 (en) PUSH-SUPPORT OF PULLEYS OF TRACTION CABLES FOR ELEVATOR
FR3035134A1 (en) FORMWORK, METHOD FOR DECREASING, AND METHOD FOR MANUFACTURING A PORTION OF BUILDING
FR2487410A1 (en) Climbing shutter for casting concrete wall - has single jack to raise brackets retaining shutter sections on shoes detachably fixed to wall
BE857055A (en) IMPROVEMENTS TO LIFTING EQUIPMENT
FR2652113A1 (en) Modulable structure for shelter and the like. With system for recovering condensation water and retractable roof
WO2019102078A1 (en) Portable hoisting device
EP1975339A1 (en) Device for stabilising and supporting form panels
FR2536058A1 (en) TIPPING BENCH
FR2700797A1 (en) Lifting jib apparatus for building works
FR2467816A1 (en) Hoist for lifting articles in window - has adjustable supports in window and horizontal sliding beam fixed inboard to vertical support
FR2626932A1 (en) DOUBLE SCALE
EP1245756B1 (en) Hollow slab and its manufacturing process
BE834005A (en) SCAFFOLDING ASSEMBLY
FR2853924A1 (en) Device for stabilizing and handling cement form panels in building and public works, has double-parallelograms with lower arms, where each arm is provided at its end with extension having sling fastening device for sling
CA1067063A (en) Lifting tackle
FR2571407A2 (en) Truss girders made of pipes assembled by lashings
FR2470081A1 (en) Hook and jaw type pulley block - has suspension hook carried on parallel arms and with locking jaw type fixing arrangement
FR2593162A1 (en) RETRACTORS FOR LIFTING HEAVY LOADS.
FR3109935A1 (en) Spreader to distribute gripping points on a fragile load.
EP2949616A1 (en) Telescopic mast with built-in safety device for lifting apparatus, and lifting apparatus provided with such a telescopic mast
FR2679892A1 (en) Lifting device