Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to DEL48501ApriorityCriticalpatent/DE1225024B/de
Application filedfiledCritical
Priority to BE656659Aprioritypatent/BE656659A/fr
Publication of BE656659ApublicationCriticalpatent/BE656659A/fr
B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
B23K35/00—Rods, electrodes, materials, or media, for use in soldering, welding, or cutting
B23K35/40—Making wire or rods for soldering or welding
B23K35/406—Filled tubular wire or rods
B—PERFORMING OPERATIONS; TRANSPORTING
B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
B23K35/00—Rods, electrodes, materials, or media, for use in soldering, welding, or cutting
B23K35/02—Rods, electrodes, materials, or media, for use in soldering, welding, or cutting characterised by mechanical features, e.g. shape
B23K35/0222—Rods, electrodes, materials, or media, for use in soldering, welding, or cutting characterised by mechanical features, e.g. shape for use in soldering, brazing
Procede pour preparer un melange contenant une phase solide et une phase liquide d'un alliage metallique et dispositif pour mettre en oeuvre le procede
Procede de fabrication en continu, a partir d'un materiau fondu, d'un fil metallique de tres petit diametre, y compris dans l'etat vitreux, et dispositif pour executer ledit procede