BE1015524A4 - The rail anchor and rail stand as temporary rail in achieving the structure. - Google Patents
The rail anchor and rail stand as temporary rail in achieving the structure. Download PDFInfo
- Publication number
- BE1015524A4 BE1015524A4 BE2003/0302A BE200300302A BE1015524A4 BE 1015524 A4 BE1015524 A4 BE 1015524A4 BE 2003/0302 A BE2003/0302 A BE 2003/0302A BE 200300302 A BE200300302 A BE 200300302A BE 1015524 A4 BE1015524 A4 BE 1015524A4
- Authority
- BE
- Belgium
- Prior art keywords
- handrail
- anchor
- rail
- post
- railing
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3219—Means supported by the building wall, e.g. security consoles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
Abstract
Het doel is een collectieve valbeveiliging (leuning) bij bouwwerken aan te brengen in muren, die snel aangebracht en verwijdert kan worden zonder bijkomende risico's te veroorzaken. Het leuningsysteem bestaat uit een leuninganker en een leuningstaander. Het leuninganker wordt ingemetseld. De leuningstaander wordt na uitharding van het metselwerk op het leuninganker bevestigd. De verankering van het leuninganker in het metselwerk, en de bevestiging van de leuningstaander op het leuninganker, wordt gekenmerkt door de snelheid van uitvoering, en dit op een veilige manier.The aim is to install a collective fall protection (railing) on structures in walls that can be quickly installed and removed without causing additional risks. The handrail system consists of a handrail anchor and a handrail post. The handrail anchor is bricked in. The railing post is fixed on the railing anchor after the brickwork has hardened. The anchoring of the handrail anchor in the brickwork, and the attachment of the handrail post to the handrail anchor, is characterized by the speed of execution, and this in a safe manner.
Description
<Desc/Clms Page number 1>
Titel: Het Leuninganker en de leuningstaander als tijdelijke leuning bij de verwezenlijking van bouwwerken.
Beschrijving van de uitvinding.
Het leuningsysteem bestaat uit twee delen.
- Het leuninganker: Het waarborgt de verbinding tussen het metselwerk en de leuningstaander. Het leuninganker is vervaardigd uit inox. Deze materiaalkeuze waarborgt een stevige roestvrije verankering. Het is ongevoelig voor de inwerking van cement en water en is bijgevolg veel beter zuiver te houden. Het waarborgt de verbinding tussen het metselwerk en de leuningstaander. Het leuninganker wordt ingemetseld voor de leuningstaander hierop bevestigd wordt.
- de leuningstaander De leuningstaander schuift over het leuninganker. Op de staander zijn de plankhouders voorzien. De leuningstaander kan van model vanëren maar de bevestiging is steeds dezelfde.
Gebruik en toepassing van het leuninganker en de leuningstaander Voor het inmetselen wordt een betonschroefhuls vemo type 1140 volledig op de draadstang ( zie stuknr 17 ) geschroefd. Het leuninganker wordt vervolgens op de gevelsteen geplaatst zodanig dat de bus ( zie stuknr. 15 ) tegen het gevelmetselwerk komt en de draadstang doorloopt in de binnenmuur.
Door de bus volledig tegen de gevelsteen te plaatsen en het glijstuk ( stuknr. 16 ) volledig tegen de bus aan te schuiven komt het plaatje ( stuknr.14 ) van de ankerarm ( stuknr. 13 ) in de langsvoeg van het parement te zitten. De draadstang met de betonschroefhuls wordt hierbij achteraan in de kopvoeg van het binnenspouwblad gemetseld. De ankerarm zorgt ervoor dat het verbindingsstuk ( stuknr. 09 ) niet kan roteren. Na het op hoogte metselen en uitharden van de specie kan de leuningstaander op het leuninganker bevestigd worden. De leuningstaander schuift over het leuninganker tot tegen het glijstuk. De verbindingspen ( stuknr. 19 ) zorgt ervoor dat zowel de leuningstaander als de ankerarm van het leuninganker onmogelijk kan achteruitschuiven en geen rotatie meer mogelijk is.
De snapper ( stuknr. 12 ) grijpt in de ankerarm zodat de speling tussen het verbindingsstuk ( stuknr. 09 ) en steunstuk 4 ( stuknr. 10 ) minimaal is. Het demonteren van de leuningstaander gebeurt door de verankeringspen te verwijderen en de leuningstaander van het leuninganker te schuiven. Bij het verwijderen van de leuningstaander kan het glijstuk van het leuninganker vrij naar achteren ( weg van de muur ) schuiven tot tegen de aanslag ( stuknr. 18). Het plaatje aan de ankerarm komt hierbij uit de voeg van het parement waardoor er een roterende beweging mogelijk is. Bij het uitdraaien van het leuninganker blijft de betonschroefhuls in het metselwerk zitten.
<Desc / Clms Page number 1>
Title: The handrail anchor and the handrail post as a temporary handrail in the construction of buildings.
Description of the invention.
The handrail system consists of two parts.
- The handrail anchor: It guarantees the connection between the brickwork and the handrail post. The handrail anchor is made of stainless steel. This choice of materials guarantees a sturdy stainless steel anchor. It is insensitive to the effects of cement and water and can therefore be kept much better pure. It guarantees the connection between the brickwork and the railing post. The handrail anchor is bricked in before the handrail post is attached to it.
- the handrail post The handrail post slides over the handrail anchor. The shelf holders are provided on the stand. The handrail upright can model, but the attachment is always the same.
Use and application of the handrail anchor and the handrail upright For cementing in, a concrete screw sleeve vemo type 1140 is screwed completely onto the threaded rod (see item no. 17). The handrail anchor is then placed on the facing brick in such a way that the bush (see item no. 15) comes against the brickwork and the threaded rod extends into the inner wall.
By placing the bush completely against the facing brick and sliding the sliding piece (piece no. 16) completely against the bush, the plate (piece no.14) of the anchor arm (piece no. 13) sits in the longitudinal joint of the parement. The threaded rod with the concrete screw sleeve is then bricked in the rear joint of the inner cavity leaf. The anchor arm ensures that the connecting piece (piece no. 09) cannot rotate. After bricklaying and hardening at a height, the handrail can be mounted on the handrail anchor. The handrail slides over the handrail anchor against the sliding piece. The connecting pin (item no. 19) ensures that both the handrail upright and the anchor arm of the handrail anchor cannot slide backwards and rotation is no longer possible.
The snapper (part no. 12) engages in the anchor arm so that the play between the connecting piece (part no. 09) and support piece 4 (part no. 10) is minimal. Disassembly of the handrail is done by removing the anchor pin and sliding the handrail off the handrail anchor. When removing the handrail support, the sliding part of the handrail anchor can slide freely backwards (away from the wall) up to the stop (item no. 18). The plate on the anchor arm comes from the joint of the parement, so that a rotating movement is possible. The concrete screw sleeve remains in the masonry when the handrail anchor is unscrewed.
Claims (1)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BE2003/0302A BE1015524A4 (en) | 2003-05-20 | 2003-05-20 | The rail anchor and rail stand as temporary rail in achieving the structure. |
EP04447127A EP1479851A1 (en) | 2003-05-20 | 2004-05-19 | Railing anchor and accompanying railing support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BE2003/0302A BE1015524A4 (en) | 2003-05-20 | 2003-05-20 | The rail anchor and rail stand as temporary rail in achieving the structure. |
Publications (1)
Publication Number | Publication Date |
---|---|
BE1015524A4 true BE1015524A4 (en) | 2005-05-03 |
Family
ID=33034885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BE2003/0302A BE1015524A4 (en) | 2003-05-20 | 2003-05-20 | The rail anchor and rail stand as temporary rail in achieving the structure. |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP1479851A1 (en) |
BE (1) | BE1015524A4 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE1017137A3 (en) * | 2006-05-12 | 2008-03-04 | Appelen Kurt | Anchor for securing safety railing supports in wall, includes connectors at both ends for securing inside wall and to railing support stand |
GB2464787B (en) * | 2009-07-18 | 2011-02-09 | Anne Marie Heister | A wall with a ladder anchor |
ITMO20110207A1 (en) * | 2011-08-10 | 2013-02-11 | Imitata | ANCHORAGE ELEMENT AND ITS SAFETY APPARATUS, PARTICULARLY FOR THE SAFETY OF OPERATORS DURING DETECTION. |
GB201318569D0 (en) * | 2013-10-21 | 2013-12-04 | Singleleaf Ltd | A method of constructing a building |
CN107165431A (en) * | 2017-06-08 | 2017-09-15 | 中国建筑第六工程局有限公司 | A kind of dedicated fastener that connection is installed for steel structure protective railing |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1591648A (en) * | 1923-10-25 | 1926-07-06 | Herman W Sittig | Scaffold bracket |
FR2050180A7 (en) * | 1969-06-04 | 1971-04-02 | Guillo Michel | |
US6003630A (en) * | 1997-06-24 | 1999-12-21 | Construction Systems, Inc. | Unilateral scaffold system |
DE20001948U1 (en) * | 2000-02-03 | 2000-03-23 | Baumann Verwertungs Gmbh | Protective scaffold to be used in construction |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1601449A (en) * | 1925-06-05 | 1926-09-28 | Mckelvey Clyde | Scaffold bracket |
AUPO346696A0 (en) * | 1996-11-06 | 1996-12-05 | Charlesworth, Bruce Roy | Safety rail system |
DE20018398U1 (en) * | 2000-10-27 | 2002-03-07 | Hauser Juergen | Console scaffolding anchor |
DE10120897A1 (en) * | 2001-04-27 | 2002-11-21 | Thomas Lehnert | Side protective post for scaffolding, is in two parts with forked anchor rails bearing on building and wedged home plus fitted straps for railings and stringers. |
-
2003
- 2003-05-20 BE BE2003/0302A patent/BE1015524A4/en not_active IP Right Cessation
-
2004
- 2004-05-19 EP EP04447127A patent/EP1479851A1/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1591648A (en) * | 1923-10-25 | 1926-07-06 | Herman W Sittig | Scaffold bracket |
FR2050180A7 (en) * | 1969-06-04 | 1971-04-02 | Guillo Michel | |
US6003630A (en) * | 1997-06-24 | 1999-12-21 | Construction Systems, Inc. | Unilateral scaffold system |
DE20001948U1 (en) * | 2000-02-03 | 2000-03-23 | Baumann Verwertungs Gmbh | Protective scaffold to be used in construction |
Also Published As
Publication number | Publication date |
---|---|
EP1479851A1 (en) | 2004-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BE1015524A4 (en) | The rail anchor and rail stand as temporary rail in achieving the structure. | |
BRPI0819422A2 (en) | "building block, building structure using building blocks and method of laying bricks on a wall using a building block" | |
GB919971A (en) | Adjustable scaffold bracket | |
US2916245A (en) | Adjustable scaffold bracket | |
AU2014100911A4 (en) | A system for precast concrete construction for residential buildings including single detached dwellings, sheds and garages. | |
FR2570951A1 (en) | Artificial climbing structure made from prefabricated panels | |
AU2009100112A4 (en) | Formquick | |
US8950152B2 (en) | Adjustable anchor system | |
ES2152098T3 (en) | Aqueous silicone resin emulsion for water repellent construction materials | |
CN213838015U (en) | Building construction safety control rail | |
BE1017137A3 (en) | Anchor for securing safety railing supports in wall, includes connectors at both ends for securing inside wall and to railing support stand | |
JP2009144379A (en) | Building collapse preventing device | |
CN216276189U (en) | A shock attenuation combination formula connection structure for architectural design engineering | |
CN216238592U (en) | Slope reinforcing apparatus for building municipal works | |
CN220814526U (en) | Assembled building ALC wallboard | |
CN214090376U (en) | Masonry and column tie bar pre-buried steel plate support | |
AU2004101091A4 (en) | Geelong quick prop | |
CN113047524B (en) | Concrete lintel construction structure and construction method thereof | |
CN208347439U (en) | A kind of construction safety guide rail | |
KR200383477Y1 (en) | Support apparatus of wood pillars for building | |
YU298U (en) | System for facade coating by profiled concrete elements | |
PL37660B1 (en) | ||
RU108517U1 (en) | THREADED FASTENERS | |
UA138161U (en) | METHOD OF MOUNTING THE SUPPORT RACK OF THE LAUNDRY FENCE | |
JPS5965159A (en) | Panel attaching tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RE | Patent lapsed |
Effective date: 20080531 |