AU2020385750A1 - Maintenance plan assistance method and maintenance plan assistance device - Google Patents
Maintenance plan assistance method and maintenance plan assistance device Download PDFInfo
- Publication number
- AU2020385750A1 AU2020385750A1 AU2020385750A AU2020385750A AU2020385750A1 AU 2020385750 A1 AU2020385750 A1 AU 2020385750A1 AU 2020385750 A AU2020385750 A AU 2020385750A AU 2020385750 A AU2020385750 A AU 2020385750A AU 2020385750 A1 AU2020385750 A1 AU 2020385750A1
- Authority
- AU
- Australia
- Prior art keywords
- maintenance
- menu
- timing
- information
- damage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0283—Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL]
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24001—Maintenance, repair
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24019—Computer assisted maintenance
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2024203343A AU2024203343A1 (en) | 2019-11-21 | 2024-05-20 | Maintenance plan assistance method and maintenance plan assistance device |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019210365A JP7271400B2 (ja) | 2019-11-21 | 2019-11-21 | 保全計画支援方法および保全計画支援装置 |
| JP2019-210365 | 2019-11-21 | ||
| PCT/JP2020/038904 WO2021100371A1 (ja) | 2019-11-21 | 2020-10-15 | 保全計画支援方法および保全計画支援装置 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AU2024203343A Division AU2024203343A1 (en) | 2019-11-21 | 2024-05-20 | Maintenance plan assistance method and maintenance plan assistance device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AU2020385750A1 true AU2020385750A1 (en) | 2022-06-09 |
Family
ID=75965328
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AU2020385750A Abandoned AU2020385750A1 (en) | 2019-11-21 | 2020-10-15 | Maintenance plan assistance method and maintenance plan assistance device |
| AU2024203343A Abandoned AU2024203343A1 (en) | 2019-11-21 | 2024-05-20 | Maintenance plan assistance method and maintenance plan assistance device |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AU2024203343A Abandoned AU2024203343A1 (en) | 2019-11-21 | 2024-05-20 | Maintenance plan assistance method and maintenance plan assistance device |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20220405717A1 (https=) |
| EP (1) | EP4064142A4 (https=) |
| JP (1) | JP7271400B2 (https=) |
| AU (2) | AU2020385750A1 (https=) |
| WO (1) | WO2021100371A1 (https=) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7626689B2 (ja) * | 2021-09-16 | 2025-02-04 | 株式会社日本製鋼所 | 寿命推定方法、寿命推定装置及びコンピュータプログラム |
| JP2023170258A (ja) * | 2022-05-18 | 2023-12-01 | 株式会社ブリヂストン | 情報処理装置、情報処理システム、プログラム、及び情報処理方法 |
| US20240419164A1 (en) * | 2023-06-19 | 2024-12-19 | International Business Machines Corporation | Iot and sensor feed analysis based machine maintenance |
| WO2024262030A1 (ja) * | 2023-06-23 | 2024-12-26 | 三菱電機株式会社 | 保全スケジュール管理システム、保全スケジュール管理装置、制御方法及び制御プログラム |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4176596B2 (ja) | 2003-09-11 | 2008-11-05 | 中国電力株式会社 | 設備運用計画作成システム |
| JP4588530B2 (ja) | 2005-05-20 | 2010-12-01 | 鹿島建設株式会社 | 資産運用管理支援システム、資産運用管理支援方法、プログラム、記録媒体 |
| JP4977064B2 (ja) | 2008-03-12 | 2012-07-18 | 株式会社東芝 | 保守計画支援システム |
| US9959514B2 (en) * | 2014-11-24 | 2018-05-01 | International Business Machines Corporation | Optimized asset maintenance and replacement schedule |
| US20160292652A1 (en) * | 2015-04-03 | 2016-10-06 | Chevron Pipe Line Company | Predictive analytic reliability tool set for detecting equipment failures |
| KR101683242B1 (ko) * | 2015-10-15 | 2016-12-07 | 주식회사 카이즈 | 차량 상태 진단 및 운전자 정보 제공 시스템 |
| JP6926008B2 (ja) * | 2018-01-31 | 2021-08-25 | 株式会社日立製作所 | 保守計画装置、及び保守計画方法 |
| JP6865189B2 (ja) | 2018-03-16 | 2021-04-28 | 株式会社日立製作所 | 故障確率評価システム及び方法 |
| CN108549769A (zh) * | 2018-04-13 | 2018-09-18 | 中国人民解放军火箭军工程大学 | 一种维修设备剩余寿命预测方法及系统 |
-
2019
- 2019-11-21 JP JP2019210365A patent/JP7271400B2/ja active Active
-
2020
- 2020-10-15 EP EP20889701.7A patent/EP4064142A4/en not_active Withdrawn
- 2020-10-15 AU AU2020385750A patent/AU2020385750A1/en not_active Abandoned
- 2020-10-15 US US17/777,979 patent/US20220405717A1/en not_active Abandoned
- 2020-10-15 WO PCT/JP2020/038904 patent/WO2021100371A1/ja not_active Ceased
-
2024
- 2024-05-20 AU AU2024203343A patent/AU2024203343A1/en not_active Abandoned
Also Published As
| Publication number | Publication date |
|---|---|
| JP2021082115A (ja) | 2021-05-27 |
| AU2024203343A1 (en) | 2024-06-06 |
| JP7271400B2 (ja) | 2023-05-11 |
| WO2021100371A1 (ja) | 2021-05-27 |
| EP4064142A1 (en) | 2022-09-28 |
| EP4064142A4 (en) | 2023-12-20 |
| US20220405717A1 (en) | 2022-12-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11836487B2 (en) | Computer-implemented methods and systems for measuring, estimating, and managing economic outcomes and technical debt in software systems and projects | |
| AU2024203343A1 (en) | Maintenance plan assistance method and maintenance plan assistance device | |
| US10628292B2 (en) | Methods and systems for predicting estimation of project factors in software development | |
| US9141920B2 (en) | Project modeling using iterative variable defect forecasts | |
| JP4237610B2 (ja) | 保守支援方法及びプログラム | |
| US8631384B2 (en) | Creating a test progression plan | |
| US9530256B2 (en) | Generating cumulative wear-based indicators for vehicular components | |
| Ramasubbu et al. | Managing technical debt in enterprise software packages | |
| US20140052489A1 (en) | Time derivative-based program management systems and methods | |
| US20210055995A1 (en) | Method and Apparatus for Predicting Errors in To-Be-Developed Software Updates | |
| Exner et al. | Proactive maintenance as success factor for use-oriented Product-Service Systems | |
| Ke et al. | Software reliability prediction and management: A multiple change‐point model approach | |
| EP3942416B1 (en) | Estimating treatment effect of user interface changes using a state-space model | |
| EP3706369B1 (en) | Sequence, frequency, and time interval based journey recommendation | |
| Koziolek et al. | A large-scale industrial case study on architecture-based software reliability analysis | |
| JPWO2020157927A1 (ja) | 診断システムおよび診断方法 | |
| JP5200678B2 (ja) | サービシステム、サービスシステム管理方法、及びプログラム | |
| CN116384876A (zh) | 基于维纳过程的备件动态库存-生产控制方法、系统及介质 | |
| Okumoto | Customer-perceived software reliability predictions: Beyond defect prediction models | |
| AU2020225753A1 (en) | Improved computer-implemented event forecasting and information provision | |
| US20220180256A1 (en) | Forecasting model accuracy date identification | |
| CN120612746A (zh) | 用于飞行器部件的逐飞行严重性预测的框架 | |
| Alghamdi | CUMULATIVE DELAY DURATION EQUATION (CDDE) FOR MEASURING SOFTWARE PROJECT DELAYS AND COST IMPACT | |
| Gopal et al. | Improving estimation accuracy by using case based reasoning and a combined estimation approach | |
| Pettersson | A study on software management approaches: proposing a project support tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MK5 | Application lapsed section 142(2)(e) - patent request and compl. specification not accepted |