AU2014271301B2 - Longwall Mining Roof Supports - Google Patents

Longwall Mining Roof Supports Download PDF

Info

Publication number
AU2014271301B2
AU2014271301B2 AU2014271301A AU2014271301A AU2014271301B2 AU 2014271301 B2 AU2014271301 B2 AU 2014271301B2 AU 2014271301 A AU2014271301 A AU 2014271301A AU 2014271301 A AU2014271301 A AU 2014271301A AU 2014271301 B2 AU2014271301 B2 AU 2014271301B2
Authority
AU
Australia
Prior art keywords
support
roof
base
coupled
engaging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2014271301A
Other versions
AU2014271301A1 (en
Inventor
Holme John
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Joy Global Underground Mining LLC
Original Assignee
Joy Global Underground Mining LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2010271330A external-priority patent/AU2010271330B2/en
Application filed by Joy Global Underground Mining LLC filed Critical Joy Global Underground Mining LLC
Priority to AU2014271301A priority Critical patent/AU2014271301B2/en
Publication of AU2014271301A1 publication Critical patent/AU2014271301A1/en
Application granted granted Critical
Publication of AU2014271301B2 publication Critical patent/AU2014271301B2/en
Assigned to JOY GLOBAL UNDERGROUND MINING LLC reassignment JOY GLOBAL UNDERGROUND MINING LLC Request for Assignment Assignors: JOY MM DELAWARE, INC.
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A main gate roof support comprising a pair of elongated base members laterally spaced apart from one another, each base member including a first portion, a second portion, a first support pivotally coupled to the first portion, and a second support pivotally coupled to the second portion; a first shield pivotally coupled to the first portion of each base member; a first beam for engaging a roof, the first beam coupled to the first portions of the base members by the first supports, the first beam pivotally coupled to the shield; a second beam for engaging the roof, the second beam coupled to the second portions of the base members by the second supports; and a bridge member pivotally coupled between each of the base members to permit movement of the base members relative to one another. 6011207_1 (GHMatters) P94050.AU.1 PETAK CCo cl

Description

1 LONGWALL MINING ROOF SUPPORTS Technical Field [0001] This disclosure relates to a system including a machine for winning mining material, a forward conveyor, and a roof support. More particularly, this disclosure relates to such a system that also includes a rear conveyor. This disclosure also relates to a main gate roof support. Background Art [0002] A variety of different apparatuses exist for mining coal and other materials from underground seams. One apparatus that is commonly used in underground mining operations comprises a mining machine used in instances where extended portions or longwalls of seam are to be mined. Such longwalls may, depending upon the seam configuration, extend for distances of 1200-1500 feet. It is standard practice in this type of mining to mine parallel entries into the seam to be mined and connect those entries with one or more primary passages. This procedure defines the longwall pillar(s) to be mined. The roof of the primary passages is then supported by movable roof supports during the mining of the exposed "face" of the longwall pillar. [0003] Conventional longwall mining techniques employ a mining machine that is known in the industry as a longwall shearer. In alternate arrangements, a plough is used instead of a longwall shearer. [0004] A longwall shearer typically has an elongated mobile frame that is supported on floor-mounted tracks that are adjacent and substantially parallel to the mine face. Rotary driven toothed drums are operably supported on arms on each end of the elongated frame for winning the coal as the frame passes back and forth before the mine face. The won material falls onto a face conveyor that is attached to the floor-mounted tracks and extends parallel to the longwall face. face conveyor discharges the material onto other conveying apparatuses to transport the material from the seam. As the mine face recedes, the conveyor and track assembly is advanced forward to enable the shearer to continue mining. [0005] Figure 1 illustrates a conventional longwall system 10 having a mining machine in the form of a shearer 12 (carried on a face conveyor 14) and a 7438650 1 (GHMatters) P94050.AU.1 PETAK 2 cantilevered roof support 16. As the longwall system 10 advances through the panel 18, the self-advancing roof supports 16 advance toward the face 20 in a well known manner. [0006] More particularly, the cantilevered roof support 16 is a chock roof engaging beam support unit having a floor-engaging base 42 and a shield 24 supported by two hydraulically operable support legs or rams 28 (only one of which is shown) spaced from the face conveyor to define an access travelling way 30. A roof-engaging beam 32 is pivotally attached at 34, to the shield 24 and the shield 24 is connected by cantilevered linkage 40 to the base 42. The roof-engaging beam 32 also carries at its front end a face sprag assembly 48 including a contact plate 50 that is shown in a face-supporting mode, where the plate 50 is extended from its stowed position by a hydraulic cylinder 54 to a position where it abuts a part of the face. The face sprag assembly's fully extended position is shown in ghost in Figure 1. [0007] The shearer 12 has a mining machine support in the form of an elongated mobile frame 60 with a skid-type shoe 64 that is movably supported on a race 68 that is substantially parallel with the longwall face. A laterally extending rotary drum 70 which has a plurality of mining bits 74 attached thereto is pivotally attached to each end of the elongated mobile frame 60 by a corresponding boom member 78. The operation of the shearer 12 is well known in the mining art and, as such, will not be discussed in detail herein. However, the skilled artisan will appreciate that the shearer 12 is moved back and forth on the race 68 such that the mining bits 74 on the rotating drums 70 can be brought into engagement with the mine face to dislodge material there from. As the face recedes, the race 68 and shearer 12 are advanced towards the face to enable the mining process to be continued. [0008] In some mining operations, as shown in Figure 2, a longwall operation includes an armored face conveyor 100 in front of the roof supports 104, and an armored face conveyor 108 behind the roof supports 104. The armored face conveyor 108 behind the roof supports 104 collects coal falling from above the roof supports, as the roof supports 104 advance. This form of mining is known as top coal or sub level caving. The tailgate roof support 104 used in such an operation includes a floor-engaging base 112, a pair of support legs 116 supporting a middle 7438650 1 (GHMatters) P94050.AU.1 PETAK 3 roof-engaging beam 118, a forward roof-engaging beam 120 pivotally connected to the middle roof-engaging beam 116, and a two-piece rearward roof-engaging beam 124 supported by another pair of support legs 128. The two-piece roof-engaging beam 124 at the rear of the roof support 104 covers the armored face conveyor 108 behind the roof support 104. [0009] At the roadway or main gate end of the longwall, an extra wide and extra long roof support assembly 129 is required, and is illustrated in Figure 3. The roof support assembly 129 includes two spaced apart roof supports 130. Each main gate end roof support 130 includes a rearward floor-engaging base or pontoon 134, a forward floor-engaging base or pontoon 138, and spaced apart support legs 142 are connected between each of the pontoons 134 and 138 and a respective roof engaging beam 146 and 150. The rearward pontoon 138 also includes a shield 152 pivotally connected to the roof-engaging beam 146, and linkage 154 connects the shield 152 to the rearward pontoon 134. The forward pontoon 138 also includes a shield 158 pivotally connected to the roof-engaging beam 150, and linkage 164 connects the shield 158 to the forward pontoon 138. In other words, the main gate roof support 130 includes a forward facing roof support at one end, and a rearward facing roof support at the other end, with the two supports joined in the middle at 159. At the point of adjoining, each roof support carries a ram 168 and 172 that extends up to the respective roof support roof-engaging beam. [0010] To assist in supporting the roof, each of the two roof supports 130 also include spaced apart middle plates 176 that extend between the two adjacent roof supports 130, creating an overlap. The overlapping middle plates 176 are not connected. The two adjacent roof supports 130 are used because each roof support has its own pontoons, for the floor of the mine is irregular as the roof support 130 advances. The pontoon of each roof support needs to be able to move vertically independently of the adjacent pontoon. Because the adjacent roof supports are not connected, it is difficult to maintain, as the roof support assembly 129 advances, the same roof support adjacent positions. [0011] In the above-described typical top coal caving longwall mining operation, there are two drilling entries and a wall face across between the entries, with mining then being backwards along the entries. In a different form of mining, illustrated in Figures 4A and 4B, known as an advancing longwall system, the entire mining 7438650 1 (GHMatters) P94050.AU.1 PETAK 4 operation moves forward into the coal face. Only a single forward conveyor is used in such a system. A roadway 180, known as a gate road end, supporting the mining operation, needs to be cut and maintained separate from the longwall face. Construction of the gate road end adds complexity to the overall mining operation. When the gate road end 180 is being cut, a wall 184 has to be made to prevent the falling roof from entering the roadway. The difficulty of creating and supporting such a wall is significant. In order to reduce the amount of goaf pressure bearing against the man-made wall 184, fully roof-engaging beamed buttress supports 188 are provided at the gate road end 180 to reduce the goaf pressure on the man-made wall 184. Disclosure of Invention [0012] In an embodiment of the invention, there is provided a main gate roof support comprising: a pair of elongated base members laterally spaced apart from one another, each base member including a first portion, a second portion, a first support pivotally coupled to the first portion, and a second support pivotally coupled to the second portion; a first shield pivotally coupled to the first portion of each base member; a first beam for engaging a roof, the first beam coupled to the first portions of the base members by the first supports, the first beam pivotally coupled to the shield; a second beam for engaging the roof, the second beam coupled to the second portions of the base members by the second supports; and a bridge member pivotally coupled between each of the base members to permit movement of the base members relative to one another. [0012a] In another embodiment of the invention, there is provided a main gate roof support comprising: a first base portion for engaging a ground, the first base portion including a first support leg; a second base portion for engaging the ground and coupled to the first base portion, the second base portion including at least one second support leg; a third base portion for engaging the ground proximate a mine face and coupled to the second base portion, the third base portion including a third support leg; a first shield pivotally coupled to the first base portion; a first beam for engaging a mine roof, the first beam pivotally coupled to the first shield and coupled to the first support leg; a second beam for engaging the mine roof, the second beam pivotally attached to the first beam and coupled to the at least one second support 7438650 1 (GHMatters) P94050.AU.1 PETAK 5 leg; and a third beam for engaging the mine roof proximate a mine face, the third beam pivotally coupled to the second beam and coupled to the third support leg, wherein the first base portion, the second base portion, and the third base portion are defined by a first pontoon and a second pontoon spaced apart from the first pontoon, the main gate roof support further comprising a bridge pivotally coupled between the first pontoon and the second pontoon. [0012b] In another embodiment of the invention, there is provided a main gate roof support comprising: two spaced apart pontoons, each pontoon including a hydraulically operable rearward support leg, a hydraulically operable forward support leg, and at least one hydraulically operable middle support leg; a rearward shield pivotally coupled to the pontoons by at least one rearward linkage; a rearward bridge pivotally coupled to each of the pontoons; a rearward roof-engaging beam pivotally coupled to the shield; the rearward roof-engaging beam coupled to the pontoons by the rearward support legs; a middle roof-engaging beam pivotally coupled to the rearward roof-engaging beam, the middle roof-engaging beam coupled to the pontoons by the at least one middle support legs; a middle bridge pivotally coupled to each of the pontoons; a forward roof-engaging beam pivotally coupled to the rearward roof-engaging beam, the forward roof-engaging beam coupled to the pontoons by the forward support legs; and a forward bridge pivotally coupled to each of the pontoons. [0012c] In another embodiment of the invention, there is provided a longwall mining system comprising: a main gate roof support including a pair of elongated base members laterally spaced apart from one another, each base member including a first portion, a second portion, a first support pivotally coupled to the first portion, and a second support pivotally coupled to the second portion, a first shield pivotally coupled to the first portion of each base member, a first beam coupled to the first portions of the base members by the first supports, the first beam pivotally coupled to the shield, a second beam coupled to the second portions of the base members by the second supports, and a bridge member pivotally coupled between each of the base members; a face end roof support positioned adjacent the main gate roof support, the face end support including a rear base, a rear shield pivotally connected to the rear base by a rear linkage, a rear beam for engaging the roof, the rear beam pivotally attached to the shield, a pair of spaced-apart rear support legs 7438650 1 (GHMatters) P94050.AU.1 PETAK 6 connected between the rear base and the rear beam, a forward base, a forward shield pivotally connected to the forward base by a forward linkage, a forward beam for engaging the roof, the forward beam pivotally connected to the rear beam, and a pair of spaced apart forward support legs connected between the forward base and the forward beam; a forward conveyor including a forward conveyor drive pivotally connected the forward base of the face end roof support; and a rear conveyor including a rear conveyor drive pivotally connected to the rear base of the face end roof support. Technical Problem [0012d] It is an advantage of this disclosure to provide an improved roof support for a top coal caving longwall operation. [0013] Another advantage of this disclosure is to provide an improved top coal caving system with reduced goaf pressure on the end gates. [0014] Another advantage of this disclosure is to provide improved top coal caving equipment. [0015] Another advantage of this disclosure is to provide an improved main gate roof support with better shielding and operation. Technical Solution [0016] This disclosure thus provides a longwall mining system including at least one face end roof support having a longitudinal length, and at least one near end roof support adjacent the face end roof support. The near end roof support has a longitudinal length substantially shorter than the face end roof support longitudinal length. There is also at least one face roof support adjacent the near end roof support, and the face roof support has a longitudinal length substantially shorter than the near end roof support longitudinal length. There is also a forward conveyor extending forward to and attached to the face end roof support, the at least one near end roof support, and the at least one face roof support, and a rearward conveyor extending rearward of and attached to the face end roof support, the at least one near end roof support, and the at least one face roof support. 7438650 1 (GHMatters) P94050.AU.1 PETAK 7 [0017] This disclosure also provides a roof support including a first floor engaging base, a first shield, a first roof-engaging beam pivotally attached to the first shield, and a first hydraulically operable support leg connected between the first floor-engaging base and the first roof-engaging beam. First linkage pivotally connects the first shield to the first base. The roof support also includes a second floor-engaging base, adjacent but spaced apart from the first floor-engaging base, a second shield, a second roof-engaging beam pivotally attached to the second shield, and a second hydraulically operable support leg connected between the second floor-engaging base and the second roof-engaging beam. Second linkage pivotally connects the second shield to the second base, and a bridge is pivotally connecting to the first base and is pivotally connected to the second base. Description of Drawings [0018] Figure 1 is a side view of a conventional roof support. [0019] Figure 2 is a side view of a conventional tailgate end roof support. [0020] Figure 3 is a perspective view of a conventional main gate roof support. [0021] Figure 4A is a schematic perspective view of a prior art longwall mining method known as an advancing longwall. Figure 4B is a top schematic view of the prior art longwall advancing mining method shown in Figure 4A. [0022] Figure 5 is a top schematic view of a longwall mining system according to this disclosure. [0023] Figure 6 is a schematic perspective view of the longwall mining system shown in Figure 5. [0024] Figure 7A is a side view of a conventional top coal caving face roof support. Figure 7B is a side view of a near end roof support according to this disclosure. Figure 7C is a side view of a end face roof support according to this disclosure. [0025] Figure 8 is a side view of a longwall main gate roof support assembly according to this disclosure. 7438650 1 (GHMatters) P94050.AU.1 PETAK 8 [0026] Figure 9A is a top view of the longwall main gate face support shown in figure 8. Figure 9B is an end view of the longwall main gate roof support assembly shown in figure 8. [0027] Figure 10 is an unassembled perspective view of the legs of the bridge portion of the main gate roof support assembly shown in Figure 8. [0028] Figure 11 is a schematic perspective view of the main gate roof support assembly shown in Figure 8, without a sloughing plate. [0029] Figure 12A is an alternate embodiment of the main gate roof assembly shown in figure 11. Figure 12B is a perspective view of the main gate roof support assembly shown in figure 12A, with the roof support assembly shown in a web advanced position. [0030] Before one embodiment of the disclosure is explained in detail, it is to be understood that the disclosure is not limited in its application to the details of the construction and the arrangements of components set forth in the following description or illustrated in the drawings. The disclosure is capable of other embodiments and of being practiced or being carried out in various ways. Also, it is to be understood that the phraseology and terminology used herein is for the purpose of description and should not be regarded as limiting. Use of "including" and "comprising" and variations thereof as used herein is meant to encompass the items listed thereafter and equivalents thereof as well as additional items. Use of "consisting of' and variations thereof as used herein is meant to encompass only the items listed thereafter and equivalents thereof. Further, it is to be understood that such terms as "forward", "rearward", "left", "right", "upward" and "downward", etc., are words of convenience and are not to be construed as limiting terms. Best Mode [0031] Figure 5 is a schematic illustration of various roof supports that make up a longwall system according to this disclosure. The longwall mining system 200 includes at least one face end cantilevered roof support 204, a near end cantilevered roof support 208 adjacent the face end roof support 204, and at least one conventional face cantilevered roof support 212 adjacent the near end roof support 208. More particularly, in the illustrated embodiment, the longwall system 7438650 1 (GHMatters) P94050.AU.1 PETAK 9 includes three face end roof supports 204, one near end roof support 208, and at least one roof support 212. Several of the roof supports 212 typically present beside the roof support 212 are not shown, but are understood to be present. A main gate roof support 216 is also present, adjacent the longwall system end with the three face end supports 204. [0032] In the illustrated embodiment of Figure 5, the face end roof support 204 has a longitudinal length 205, and the near end roof support 208 has a longitudinal length 209 substantially shorter than the face end roof support longitudinal length 205. The face roof support 212 also has a longitudinal length 213, and it is substantially shorter than the near end roof support longitudinal length 209. This creates an effective cave line 211 at an angle to the coal face, that helps reduce the goaf pressure on the face end, thereby increasing the stability of the main gate roof support 216. [0033] A perspective schematic view of the roof supports is illustrated in Figure 6, showing forward armored face conveyors 211, and rearward armored face conveyors 220. Figures 7A, 7B and 7C illustrate side views of the three different kinds of face end supports shown in figure 4. The conventional face support 212 is shown in Figure 7A, and is essentially the same as that described in connection with Figure 1, only with the addition of a tailpiece 218 that covers the rearward armored conveyor 220. In Figure 7B is the near end roof support 208, and in Figure 7C is the face end support 204, according to this disclosure. [0034] Figure 8 is a side view of the main gate roof support 216. The main gate support is similar to a conventional main gate support, but with a couple of important differences. As in the conventional support, the main gate support includes at one pair of separate but adjacent floor-engaging bases or pontoons 230 and 232 (see Figures 9A and 9B). Each of the pontoons 230 and 232 carries a support leg 234 and 234' (see Figure 8) that is pivotally attached to the pontoon and pivotally attached to a roof roof-engaging beam. Unlike in the conventional main gate support, the two adjacent but spaced apart pontoons 230 and 232 support a single roof roof-engaging beam system 240 (see Figures 9B and 11) that spans both of the pontoons 230 and 232. In order to permit up and down movement of the pontoons 230 and 232 relative to each other, but to keep the pontoons adjacent to one 7438650 1 (GHMatters) P94050.AU.1 PETAK 10 another in the forward and reward movement directions, a pivotally attached bridge 244 spans the pontoons 230 and 232. [0035] More particularly, the bridge 244 extends across the front of the pontoons, midway along the pontoons, and across the rear of the pontoons, as shown in Figures 8 and 9A. Each bridge 244 is attached to each pontoon at a joint 250, as shown in Figure 10. More particularly, the bridge 244 is pivotally connected to each pontoon (for example, pontoon 230) by the rigid joint 250, and this joint 250 maintains the adjacent pontoons in side-by-side relationship, while at the same time permitting up and down movement of the pontoons relative to each other. Still more particularly, each end of the bridges 244 includes a leg or male member 254 received in a female member or pocket 270 attached to a pontoon. The pocket 270 comprises two spaced apart rigid plates 262 and 268, and two spaced apart walls 272 and 276, that extend perpendicular to the plates 262 and 268, and between the plates 262 and 268. The combination of the plates and walls form the pocket 270 that receives the bridge leg 254. An opening 280 extends through the joint walls 272 and 276, and a corresponding opening 284 in the bridge leg 254 aligns with the openings 280 in the joint walls when the bridge leg 254 is received in the pocket 270. A bolt 288 is provided for extending through the openings 280 and 284 securing the bridge leg 254 within the pocket 270. Means for securing the bolt 288 in the pocket 270 in the form of a Cotter pin 290 is provided at the end of the bolt 288 to secure the bolt 288 in the joint 250. When received in the pocket 270, the leg 254 is spaced apart from the pontoon 230, so that the leg 254 can rotate about the bolt 288 in the pocket 270. [0036] A jointed sloughing plate 294 (see Figure 8) attached to the outward pontoon of the main gate roof support 216, and away from the other roof supports, provides a further enhancement. The sloughing plate extends the full-length of the main gate roof support 216, and provides extra protection to the roadway. [0037] Turning now to the details of the various roof supports shown in Figures 5 through 10, the face end roof support 204 includes a rearward floor-engaging base 300, a rearward shield 304, a rearward roof-engaging beam 308 pivotally attached to the shield 304, and two spaced apart hydraulically operable rearward support legs 312 (only one is shown) connected between the rearward floor-engaging base 300 and the rearward roof-engaging beam 308. The face end roof support further 7438650 1 (GHMatters) P94050.AU.1 PETAK 11 includes rearward linkage 316 pivotally connecting the rearward shield 304 to the rearward base 300, a forward floor-engaging base 320, a forward shield 324, and a forward roof-engaging beam 328 pivotally connected to the rearward roof-engaging beam 308. Four spaced apart hydraulically operable forward support legs spaced apart in pairs 332 and 333 forward and rearward are connected between the forward floor-engaging base 320 and the forward roof-engaging beam 328, and cantilevered linkage 336 pivotally connects the rearward shield 324 to the forward base 320. [0038] The near end cantilevered roof support 208 includes a floor-engaging base 340, a shield 344, a roof-engaging beam 348 pivotally attached to the shield 344, and four spaced apart hydraulically operable forward support legs 352 connected between the floor-engaging base 340 and the roof-engaging beam 348. The near end roof support 208 also includes cantilevered linkage 356 pivotally connecting the shield 344 to the base 340, and two spaced apart hydraulically operable rearward support legs 353 connected between the floor-engaging base 340 and the roof-engaging beam 348. The rearward support legs 364 are spaced apart from the two spaced apart hydraulically operable forward support legs 352. [0039] The near end roof support 208 also includes a rearward conveyor drive 370 pivotally connected to the floor-engaging base 340, the floor-engaging base 340 being pivotally connected to the rearward conveyor drive 370, and a forward conveyor drive 374, the floor-engaging base 340 also being pivotally connected to the forward conveyor drive 374. The near end roof support also includes a short pivoting roof-engaging beam or tailpiece 380 at the rear of the unit. [0040] The face support comprises a floor-engaging base 384, a shield 388, a roof-engaging beam 392 pivotally attached to the shield 388, and two spaced apart hydraulically operable support legs 396 (only one is shown) connected between the floor-engaging base 384 and the roof-engaging beam 392. Cantilevered linkage 398 pivotally connects the shield 388 to the base 384. [0041] The main gate roof support 216 includes two spaced apart sides 500 and 504 (see Figure 9B), with each side comprising a rearward floor-engaging base 508, a hydraulically operable rearward support leg 234 connected to the rearward floor-engaging base 508, and a rearward shield 516. Rearward cantilevered linkage 520 pivotally connects the rearward shield 516 to the rearward base 508. A middle floor-engaging base 524 is connected to the rearward floor-engaging base 508, and 7438650 1 (GHMatters) P94050.AU.1 PETAK 12 hydraulically operable middle support legs 528 are connected to the middle floor engaging base 524. A forward floor-engaging base 530 is pivotally connected to the middle floor-engaging base 524, and a hydraulically operable forward support leg 234' is connected to the forward floor-engaging base 530. [0042] The main gate roof support 216 further includes a rearward roof engaging beam 540 pivotally attached to the rearward shield 516, and the spaced apart hydraulically operable rearward support legs 234 of the sides are connected between the rearward floor-engaging bases 508 and the rearward roof-engaging beam 540. A middle roof-engaging beam 550 is pivotally connected to the rearward roof-engaging beam 540, and the spaced apart hydraulically operable middle support legs 528 of the sides are connected between the middle floor-engaging bases 524 and the middle roof-engaging beam 550. A forward roof-engaging beam 560 is pivotally attached to middle roof-engaging beam 550, and the spaced apart hydraulically operable forward support legs 234' of the sides are connected between the forward floor-engaging bases 530 and the forward roof-engaging beam 560. The forward, middle and rearward floor-engaging bases of each side combine to form each of the pontoons of the main gate support 216. [0043] In an alternate main gate roof support assembly 400, as shown in Figures 12A and 12B, a first cantilevered roof support 404 includes two spaced apart sides, with each side having a first floor-engaging base 408, a first shield 412, a first roof-engaging beam 416 pivotally attached to the first shield 412, and a first hydraulically operable support leg 420 connected between the first floor-engaging base 408 and the first roof-engaging beam 416. The first cantilevered roof support 404 also includes a first cantilevered linkage 420 pivotally connecting the first shield 412 to the first base 408. Facing the first roof support 404 is a second cantilevered roof support 424 including a second floor-engaging base 428, a second shield 432, and a second roof-engaging beam 436 pivotally attached to the second shield 432. The second roof-engaging beam 436 is adjacent the first roof-engaging beam 416 and interspersed within the first roof-engaging beam 416. A second hydraulically operable support leg 440 is connected between the second floor-engaging base 428 and the second roof-engaging beam 436, and a second cantilevered linkage 444 is pivotally connecting the second shield 428 to the second base 428. In the illustrated embodiment, another hydraulic hydraulically operable support leg is also connected between the second floor-engaging base 428 and the second roof-engaging beam 7438650 1 (GHMatters) P94050.AU.1 PETAK 13 436. The roof-engaging beams and shields of each side of the roof supports 404 and 424 are integral plates that span and are connected to both sides of the roof supports. [0044] More particularly, the first roof-engaging beam 416 comprises two spaced apart plates 450, and the second roof-engaging beam 436 comprises a plate 454 positioned between the first roof-engaging beam spaced apart plates 450. By virtue of being separate, not connected roof supports 404 and 424, the main gate roof support assembly 400 can advance one roof support, and then advance the other, to aid the longwall mining process. [0045] Various other features of this disclosure are set forth in the following claims. [0046] It is to be understood that, if any prior art publication is referred to herein, such reference does not constitute an admission that the publication forms a part of the common general knowledge in the art, in Australia or any other country. 7438650 1 (GHMatters) P94050.AU.1 PETAK

Claims (25)

1. A main gate roof support comprising: a pair of elongated base members laterally spaced apart from one another, each base member including a first portion, a second portion, a first support pivotally coupled to the first portion, and a second support pivotally coupled to the second portion; a first shield pivotally coupled to the first portion of each base member; a first beam for engaging a roof, the first beam coupled to the first portions of the base members by the first supports, the first beam pivotally coupled to the shield; a second beam for engaging the roof, the second beam coupled to the second portions of the base members by the second supports; and a bridge member pivotally coupled between each of the base members to permit movement of the base members relative to one another.
2. The main gate roof support of claim 1, wherein the base members further include a third portion positioned between the first portion and the second portion, and further comprising a third beam for engaging the roof, the third beam pivotally coupled to the first beam and pivotally coupled to the second beam.
3. The main gate roof support of claim 2, wherein each base member includes a third support pivotally coupled to the third portion, and wherein the third beam is coupled to the third portions of the base members by the third supports.
4. The main gate roof support of any one of claims 1 - 3, wherein the bridge member is a first bridge member pivotally coupled between the first portions of the base members, and further comprising a second bridge member pivotally coupled between the second portions of the base members. 7438650_1 (GHMatters) P94050.AU.1 PETAK 15
5. The main gate roof support of any one of claims 1 - 4, wherein the bridge member includes a bracket having an opening positioned adjacent a slot on one of the base members, the bridge being rotatably coupled to the base member by a bolt extending through the opening and the slot.
6. The main gate roof support of any one of claims 1 - 5, further comprising a sloughing plate pivotally coupled to one of the base members and extending at least partially between the base member and at least one of the first beam and the second beam.
7. The main gate roof support of claim 6, wherein the sloughing plate extends the entire length of the one base member.
8. The main gate roof support of any one of claims 1 - 7, wherein the first portion and the second portion of each base member are separated by a gap, and further comprising: a first plate coupled to the first beam and positioned above the gap, and a second plate coupled to the second beam and positioned above the gap adjacent the first plate.
9. The main gate roof support of claim 8, further comprising a third plate coupled to the first beam and positioned above the gap, the third plate laterally spaced apart from the first plate, wherein the second plate is positioned between the first plate and the third plate.
10. The main gate roof support of any one of claims 1 - 9, wherein the first shield is pivotally coupled to the first portion by a linkage.
11. A main gate roof support comprising: a first base portion for engaging a ground, the first base portion including a first support leg; 7438650_1 (GHMatters) P94050.AU.1 PETAK 16 a second base portion for engaging the ground and coupled to the first base portion, the second base portion including at least one second support leg; a third base portion for engaging the ground proximate a mine face and coupled to the second base portion, the third base portion including a third support leg; a first shield pivotally coupled to the first base portion; a first beam for engaging a mine roof, the first beam pivotally coupled to the first shield and coupled to the first support leg; a second beam for engaging the mine roof, the second beam pivotally attached to the first beam and coupled to the at least one second support leg; and a third beam for engaging the mine roof proximate a mine face, the third beam pivotally coupled to the second beam and coupled to the third support leg, wherein the first base portion, the second base portion, and the third base portion are defined by a first pontoon and a second pontoon spaced apart from the first pontoon, further comprising a bridge pivotally coupled between the first pontoon and the second pontoon.
12. The main gate roof support of claim 11, wherein the pontoons are movable relative to each other.
13. The main gate roof support of claim 11 or 12, wherein the bridge includes a leg, and wherein each of the pontoons includes a pocket configured to receive the leg, the leg being rotatably supported in one of the pockets.
14. The main gate roof support of claim 13, further comprising a second bridge pivotally coupled between the first pontoon and the second pontoon.
15. The main gate roof support of any one of claims 11 - 14, further comprising a sloughing plate coupled to at least one side of the main gate roof 7438650_1 (GHMatters) P94050.AU.1 PETAK 17 support, the sloughing plate extending at least partially between the first base portion and the first beam.
16. The main gate roof support of any one of claims 11 - 15, wherein the first, second, and third support legs are extendable by a hydraulic actuator.
17. A main gate roof support comprising: two spaced apart pontoons, each pontoon including a hydraulically operable rearward support leg, a hydraulically operable forward support leg, and at least one hydraulically operable middle support leg; a rearward shield pivotally coupled to the pontoons by at least one rearward linkage; a rearward bridge pivotally coupled to each of the pontoons; a rearward roof-engaging beam pivotally coupled to the shield; the rearward roof-engaging beam coupled to the pontoons by the rearward support legs; a middle roof-engaging beam pivotally coupled to the rearward roof engaging beam, the middle roof-engaging beam coupled to the pontoons by the at least one middle support legs; a middle bridge pivotally coupled to each of the pontoons; a forward roof-engaging beam pivotally coupled to the rearward roof engaging beam, the forward roof-engaging beam coupled to the pontoons by the forward support legs; and a forward bridge pivotally coupled to each of the pontoons.
18. The main gate roof support of claim 17, wherein each bridge includes a leg that is received in a pocket on one of the pontoons, each leg being rotatably coupled to the pocket.
19. The main gate roof support of claim 17 or 18, wherein the pontoons are movable relative to one another. 7438650_1 (GHMatters) P94050.AU.1 PETAK 18
20. The main gate roof support of any one of claims 17 - 19, further comprising a sloughing plate coupled to at least one of the pontoons.
21. A longwall mining system comprising: a main gate roof support including a pair of elongated base members laterally spaced apart from one another, each base member including a first portion, a second portion, a first support pivotally coupled to the first portion, and a second support pivotally coupled to the second portion, a first shield pivotally coupled to the first portion of each base member, a first beam coupled to the first portions of the base members by the first supports, the first beam pivotally coupled to the shield, a second beam coupled to the second portions of the base members by the second supports, and a bridge member pivotally coupled between each of the base members; a face end roof support positioned adjacent the main gate roof support, the face end support including a rear base, a rear shield pivotally connected to the rear base by a rear linkage, a rear beam for engaging the roof, the rear beam pivotally attached to the shield, a pair of spaced-apart rear support legs connected between the rear base and the rear beam, a forward base, a forward shield pivotally connected to the forward base by a forward linkage, a forward beam for engaging the roof, the forward beam pivotally connected to the rear beam, and 7438650_1 (GHMatters) P94050.AU.1 PETAK 19 a pair of spaced apart forward support legs connected between the forward base and the forward beam; a forward conveyor including a forward conveyor drive pivotally connected the forward base of the face end roof support; and a rear conveyor including a rear conveyor drive pivotally connected to the rear base of the face end roof support.
22. The longwall mining system of claim 21, wherein the bridge member includes a leg that is received in a slot on one of the base members such that the bridge is rotatable relative to the base member.
23. The longwall mining system of claim 21 or 22, wherein the base members of the main gate support further includes a third portion positioned between the first portion and the second portion, a third support pivotally coupled to the third portion, and a third beam for engaging the roof, the third beam pivotally coupled to the first beam and pivotally coupled to the second beam.
24. The longwall mining system of any one of claims 21 - 23, wherein the main gate support further includes a sloughing plate pivotally coupled to one of the base members and extending at least partially between the base member and the first beam.
25. The longwall mining system of any one of claims 21 - 24 further comprising: at least one near end roof support adjacent the face end roof support, the near end roof support having a longitudinal length substantially shorter than a longitudinal length of the face end roof support; and at least one face roof support adjacent the near end roof support, the face roof support having a longitudinal length substantially shorter than the longitudinal length of the near end roof support, 7438650_1 (GHMatters) P94050.AU.1 PETAK 20 wherein the forward conveyor is connected to the at least one near end roof support and the at least one face roof support, and wherein the rear conveyor is connected to the at least one near end roof support and the at least one face roof support. 7438650_1 (GHMatters) P94050.AU.1 PETAK
AU2014271301A 2009-07-10 2014-12-04 Longwall Mining Roof Supports Ceased AU2014271301B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2014271301A AU2014271301B2 (en) 2009-07-10 2014-12-04 Longwall Mining Roof Supports

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US61/224,762 2009-07-10
AU2010271330A AU2010271330B2 (en) 2009-07-10 2010-07-09 Longwall mining roof supports
AU2014271301A AU2014271301B2 (en) 2009-07-10 2014-12-04 Longwall Mining Roof Supports

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
AU2010271330A Division AU2010271330B2 (en) 2009-07-10 2010-07-09 Longwall mining roof supports

Publications (2)

Publication Number Publication Date
AU2014271301A1 AU2014271301A1 (en) 2015-01-15
AU2014271301B2 true AU2014271301B2 (en) 2016-03-17

Family

ID=52346883

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2014271301A Ceased AU2014271301B2 (en) 2009-07-10 2014-12-04 Longwall Mining Roof Supports

Country Status (1)

Country Link
AU (1) AU2014271301B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4065929A (en) * 1976-03-08 1978-01-03 Atlantic Richfield Company Mine roof support and method in longwall mining of thick mineral seams
US4092831A (en) * 1975-06-05 1978-06-06 Becorit Grubenausbau Gmbh Roof bar for surface support elements

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4092831A (en) * 1975-06-05 1978-06-06 Becorit Grubenausbau Gmbh Roof bar for surface support elements
US4065929A (en) * 1976-03-08 1978-01-03 Atlantic Richfield Company Mine roof support and method in longwall mining of thick mineral seams

Also Published As

Publication number Publication date
AU2014271301A1 (en) 2015-01-15

Similar Documents

Publication Publication Date Title
US9670777B2 (en) Longwall mining roof supports
RU2441155C1 (en) Mining tunnelling combine
US7896444B2 (en) Conveyor pan with improved edge shaping
US4065929A (en) Mine roof support and method in longwall mining of thick mineral seams
US20100276982A1 (en) Method and apparatus for maintaining longwall face alignment
RU2646259C2 (en) Mining machine gathering head
AU2016228182A1 (en) Shield for sumping frame of mining machine
US4029361A (en) Longwall mining roof support for double deck machines
AU2022200412A1 (en) Conveyor pan
AU2014271301B2 (en) Longwall Mining Roof Supports
AU2002302577B2 (en) Trough pan for a face conveyor with a loading ramp
EP0795680B1 (en) Shortwall mining equipment for extraction of pillars in underground coal mines
US4679856A (en) Mine self-advancing roof support and method of relocating a mine winning face equipped with self-advancing roof support
US3856356A (en) Method of mining mineral
US4505517A (en) Self-advancing mine roof supports
US20070035173A1 (en) Low Profile Mining Machine
RU2103507C1 (en) Method and cutter-loader machine for development of seam deposits of minerals
CA2615801C (en) Narrow bench mining system
US4183700A (en) Walking mine support
RU2172410C2 (en) Powered tunneling and stoping complex (unit)
RU2130121C1 (en) Aggregated support (versions)
RU2312988C1 (en) Method for selective hollow coal bed cutting
RU1834974C (en) Potassium salts mining extracting equipment
RU2773833C2 (en) Screen for cutting frame of mining machine
SU1243634A3 (en) Szield for entry driving of underground winning faces

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
PC Assignment registered

Owner name: JOY GLOBAL UNDERGROUND MINING LLC

Free format text: FORMER OWNER(S): JOY MM DELAWARE, INC.

MK14 Patent ceased section 143(a) (annual fees not paid) or expired