AU2010240899B2 - Dredging vessel and method for loading the dredging vessel with dredged material - Google Patents

Dredging vessel and method for loading the dredging vessel with dredged material Download PDF

Info

Publication number
AU2010240899B2
AU2010240899B2 AU2010240899A AU2010240899A AU2010240899B2 AU 2010240899 B2 AU2010240899 B2 AU 2010240899B2 AU 2010240899 A AU2010240899 A AU 2010240899A AU 2010240899 A AU2010240899 A AU 2010240899A AU 2010240899 B2 AU2010240899 B2 AU 2010240899B2
Authority
AU
Australia
Prior art keywords
overflow
mixture
settled
control parameter
hold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2010240899A
Other versions
AU2010240899A1 (en
Inventor
Mark Van Den Broeck
Erik Van Nieuwenhuijzen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dredging International NV
Original Assignee
Dredging International NV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dredging International NV filed Critical Dredging International NV
Publication of AU2010240899A1 publication Critical patent/AU2010240899A1/en
Application granted granted Critical
Publication of AU2010240899B2 publication Critical patent/AU2010240899B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F7/00Equipment for conveying or separating excavated material
    • E02F7/06Delivery chutes or screening plants or mixing plants mounted on dredgers or excavators
    • E02F7/065Delivery chutes or screening plants or mixing plants mounted on dredgers or excavators mounted on a floating dredger
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/8833Floating installations
    • E02F3/8841Floating installations wherein at least a part of the soil-shifting equipment is mounted on a ladder or boom
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/8833Floating installations
    • E02F3/885Floating installations self propelled, e.g. ship
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • E02F3/902Component parts, e.g. arrangement or adaptation of pumps for modifying the concentration of the dredged material, e.g. relief valves preventing the clogging of the suction pipe
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • E02F3/907Measuring or control devices, e.g. control units, detection means or sensors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F7/00Equipment for conveying or separating excavated material
    • E02F7/04Loading devices mounted on a dredger or an excavator hopper dredgers, also equipment for unloading the hopper

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Treatment Of Sludge (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The invention relates to a method for loading a dredging vessel (1) with dredged material in a hold (2) provided for this purpose and having a height-adjustable overflow (10). In the method a dredged material/water mixture is carried via an inlet (3) into the hold (2), wherein the mixture forms a settled layer (20) therein due to settling of the heavier dredged material particles. The height position of the overflow (10) above the settled layer (20) is adjusted subject to a value of a control parameter measured during filling of the hold (2), in particular the average horizontal velocity of the non-settled dredged material/water mixture above the settled layer (20) between the inlet (3) and the overflow (10). The quality of the dredged mixture can be better controlled using the invented method. The invention likewise relates to a dredging vessel particularly equipped for performing the invented method.

Description

I Dredging vessel and method for loading the dredging vessel with dredged material The invention relates to a method for loading a dredging vessel with dredged material, and a dredging vessel equipped for performing this method. 5 During dredging with a dredging vessel, such as for instance a trailing suction hopper dredger, a mixture of dredged material and water is suctioned up in known manner via a drag head connected to a suction conduit and moving over the water bottom, and carried via an inlet into a hold (or hopper) of the dredging vessel until the hold is completely 10 filled. The maximum filling height of the hold is determined by the height position of an overflow which is present in the hold of the dredging vessel and which forms an open connection with the water, for instance via the underside of the dredging vessel. The heavier dredged material particles collected in the hold will settle after a period of 15 time and thus form in the hold a settled layer of more or less closely packed coarser particles, this layer increasing in height as the dredging progresses. On top of the settled layer fonns a non-settled layer of substantially finer particles free-floating in water. In the known method the overflow is placed in a highest position to enable maximum possible filling of the hold and to avoid non-settled particles re-entering the water via 20 the overflow. This latter must be avoided because there is the chance of the turbidity of the water then increasing too much. This has an adverse effect on the flora and fauna at the location. As soon as the level of the suctioned-up dredged material/water mixture reaches the 25 upper side of the overflow, mixture runs via the overflow back to the water. During overflow the draught of the dredging vessel can however still increase since an increasing number of heavier particles settle while a mixture of finer particles and water disappears through the overflow. In the known method, as described in US 4 245 932 A and US 4 172 617 A for instance, the overflow remains for a while in the highest 30 position until the trailing suction hopper dredger has reached its maximum allowable draught (also referred to as dredge mark). From this moment the dredge mark is kept constant by optionally lowering the overflow. Dredging is ended at the moment there is no further net settlement of material. The same amount of material then disappears through the overflow as is added to the hold. The dredged material/water mixture 2 entering the water via the overflow can, depending for instance on the current, settle once again (fall back onto the water bottom), erode (fall back onto the water bottom and then be carried away by the current) and/or be transported (carried away by the current without settling). As stated above, it is necessary to ensure that the turbidity of the water 5 is not allowed to increase too much. US 4 365 509 A discloses a method for measuring the amount of mire and mud present in a dredged mixture collected in the hold of a dredger. The method comprises measuring the height of the settled sand layer of the mixture by a plump weight and 10 measuring the position of the upper surface of the mixture with an acoustic level guide. By combining this (volume) measurement with a number of density measurements taken over the height of the mixture, the total amount of mire is obtained in the dredged mixture. 15 US 4 206 057 A discloses a dredging vessel, the overflow of which is equipped with a telescopically arranged level-adjustable outlet conduit provided under the vessel. When the head water is polluted, the telescopical part is extended to underneath the main current such that polluted sludge remains on the bottom and is not carried away with the current. 20 NL 9 201 853 A discloses a method for loading a dredging vessel wherein the dredged slurry is partly contaminated. Dredged slurry collected in the holds is allowed to phase separate in a heavy (clean) fraction and a light (contaminated) fraction. The light fraction is then off-loaded to one dumping site and the heavy fraction to another. 25 Although the known method delivers a maximum dredging efficiency, the quality of the dredged material which settles in the hold is open to improvement, in particular being not readily controllable. 30 Preferred embodiments of the present invention may provide a method for loading a dredging vessel with dredged material which does not have this and other drawbacks, or does so to lesser extent, along with a dredging vessel particularly equipped for performing the improved method.
3 According to the present invention there is provided a method for loading a dredging vessel with dredged material in a hold provided for this purpose and having a height adjustable overflow, wherein a dredged material/water mixture is carried via an inlet into the hold and forms a settled layer therein due to settling of the heavier dredged 5 material particles, and wherein the height position of the overflow above the settled layer is adjusted subject to a value of a control parameter measured during filling of the hold, the control parameter relating to the average horizontal velocity of the non-settled dredged material/water mixture above the settled layer between the inlet and the overflow. 10 It has been found that by defining a suitable control parameter the quality of the dredged material settled in the hold can be favourably affected. This can be understood as follows. In contrast to the known method, in the disclosed method the overflow will not be placed in the highest position at the start of dredging, but rather in a lower position. 15 Dredged material mixture, and in particular the finer fraction of the dredged material mixture (since the heavier fraction settles), will hereby overflow via the overflow at a relatively early stage after the start of dredging. It has been found that by adjusting the height position of the overflow the average particle size of the dredged material mixture which overflows via the overflow can be influenced, and therefore also the average 20 particle size of the dredged mixture remaining behind in the hold. Settled material is in this way obtained with a better controlled particle size distribution, in particular a higher average particle size and/or narrower particle size distribution, than is the case in the known method. Such a material has an improved quality. The disclosed method has the additional advantage that the degree of contamination of the dredged material in the 25 hold and/or of the overflowing dredged material can be influenced. The height position of the overflow is preferably set subject to the momentary value of the control parameter. A preferred embodiment of the method is characterized in that the height position of the 30 overflow above the settled layer is adjusted so that the measured value of the control parameter remains substantially constant. This embodiment allows a dredged material remaining behind in the hold to be obtained with a predetermined desired average particle size.
4 The parameter for use in the method according to the invention relates to the average horizontal velocity of the non-settled dredged material/water mixture above the settled layer between the inlet and the overflow. It has been found that this control parameter has a high sensitivity to the average particle size of the dredged material mixture 5 overflowing via the overflow, and therefore also for the average particle size of the settled dredged material remaining behind in the hold. In the case of a fixed height position of the overflow above the settled layer it is found for instance that at a higher average horizontal velocity dredged material mixture of a higher average particle size is flushed away via the overflow. A typical average horizontal velocity of the non-settled 10 dredged material/water mixture in the hold amounts to in the order of magnitude of 1 m/sec. The invention is however not limited to such velocities. The average horizontal velocity of the non-settled dredged material/water mixture in the hold is preferably adjusted within a range of 0.1 to 5 m/sec, more preferably within a range of 0.3 to 3 m/sec, and most preferably within a range of 0.5 to 1.5 m/sec. 15 The invention is based on the insight that the dredged material particles carried via the inlet into the hold will settle (sediment) partially and form a settled layer and, subject to the strength of the current generated above the settled layer, will partially erode (fall back onto the settled layer and then be carried away by the current) and/or will be 20 transported (carried away by the current to the overflow without settling). The horizontal velocity above the settled layer of the non-settled mixture flowing from the inlet to the overflow can be determined in simple manner by measuring the incoming flow rate of the suctioned-up mixture and dividing it by the width of the 25 hopper and the height of the non-settled mixture. This horizontal velocity is preferably compared to the average fall velocity of the solid particles in the suctioned-up mixture. This fall velocity can easily be determined experimentally, for instance by a sedimentation measurement. It is in principle possible in this way to determine which particles will flow out via the overflow and which particles will settle at the set height 30 (or horizontal velocity of the mixture). The average horizontal velocity v is preferably defined by the following formula: V= Q B.h 5 wherein Q is the flow rate of the dredged material/water mixture measured at the position of the inlet, B is the width of the hold and h is the height position of the overflow above the settled layer. The flow rate Q at the position of the inlet can be measured in known manner by incorporating a flow meter, for instance in the inlet. The 5 flow rate Q can be controlled by adjusting the dredge pump which pumps the dredged material/water mixture up from the water bottom. A further preferred embodiment of the method is characterized in that the height position h of the overflow above the settled layer is adjusted to a substantially constant 10 value, and that the flow rate Q is adjusted so that the average horizontal velocity w acquires the desired value. The flow rate Q can be adjusted by providing a feedback of the measured flow rate Q to the control of the dredge pump which pumps the dredged material/water mixture up from the water bottom. 15 An alternative preferred embodiment of the method is characterized in that flow rate Q is adjusted to a substantially constant value (by the pump control), and that the height position h of the overflow above the settled layer is adjusted so that the average horizontal velocity o acquires the desired value. 20 Preferably, overflow is generally not placed in the highest position at the start of dredging in the disclosed method, but rather in a lowest position of the overflow. The lowest position of the overflow corresponds to a low load factor of the hold, preferably 25%, more preferably 20%, still more preferably 15%, still more preferably 10% and most preferably 5%. It will be apparent that the lowest position of the overflow will 25 preferably not be lower than the water level outside the dredging vessel, since otherwise water from outside could flow into the hold. Because contaminants in dredged material are generally bound mainly to the finer particles, for instance to particles with a dimension < 63 tm, and these are preferably 30 discharged via the overflow, the settled layer of dredged material comprises fewer contaminants. An additional advantage of the disclosed method is that the preferably discharged smaller particles are generally carried away more easily with the current, so that they do not settle but, on the contrary, are carried away with the current by erosion and/or transport. The disclosed method provides the option of adjusting the particle size 6 of the dredged material discharged via the overflow such that such an erosion and/or transport can take place taking into account the strength of the current at the location. In areas with strong current it will generally be possible to discharge an average larger particle size via the overflow without this resulting in an unacceptable increase in 5 turbidity. In areas with a weak current the height of the overflow will preferably be set such that dredged material of an average smaller particle size is discharged via the overflow. In a preferred embodiment of the method the hold is filled with water to the level of the 10 overflow in the lowest position before dredging begins. Dredged material/water mixture will hereby overflow via the overflow almost immediately after dredging has started. It is advantageous that in the method according to the invention the control parameter relates to the height of the settled layer and that the overflow is kept above the settled 15 layer, and is more preferably kept at substantially constant height above the settled layer. In this variant the overflow as it were co-displaces with the height of the settled layer, whereby a mixture with well controlled particle size distribution remains behind in the hold. The constant height depends on the conditions at the location and can, if desired, be determined experimentally. It is also possible to arrive at a suitable value for 20 the constant height on the basis of theoretical considerations. The height of the settled layer can be measured in a number of ways. The simplest methods are by measuring the draught of the dredging vessel and/or using a dipstick. It is however also possible to apply other methods. 25 Yet another preferred embodiment of the method has the feature that the control parameter relates to the particle size distribution of the overflowing mixture close to the overflow. The particle size distribution of a dredged material/water mixture can be determined in different ways. Suitable methods include concentration measurement by photography or film, particle distribution determination of samples taken by means of 30 screening and/or sedimentation scales, x-ray extinction measurement, extinction measurement of light with one or more wavelengths and/or by means of sound waves. The method is preferably characterized in that the control parameter relates to the density of the overflowing mixture close to the overflow. The density can be measured 7 in a manner known to the skilled person, for instance with an extinction measurement. In such a measurement a radioactive source is placed on one side of the mixture flow. A (-detector placed on the other side of the mixture flow measures the amount of radiation passing through the mixture. The (-radiation detected depends on the quantity of solid 5 particles between the source and the detector counter. Devices for measuring density in this way are commercially available, for instance from the firm Berthold Technologies N.V. of Vilvoorde, Belgium. In a particularly advantageous method the turbidity of the overflowing mixture close to 10 the overflow is applied as control parameter. The turbidity can also be easily measured by means of a density measurement as briefly described above. Turbidity resulting from the removal of the silt has a great ecological effect. Owing to the turbidity less light penetrates to the bottom of the water. The flora and fauna present on the bottom hereby have less opportunity to develop. A very common requirement in dredging operations is 15 that the turbidity during dredging may not rise above 1000 mg per litre. The method according to the present preferred variant provides the option of adjusting the overflow height such that the turbidity (increase) remains below a determined desired value. It will be apparent that it is likewise possible to apply as control parameter a 20 combination of the above stated control parameters. The position of the overflow can for instance thus be determined in first approximation by the height of the settled layer, wherein corrections to this first approximation are made subject to the value of another control parameter, such as for instance the measured mixture density at inlet and overflow. 25 For even better control of the particle size distribution of the overflowing mixture, and therefore also of the settled mixture, the overflow is preferably provided with a filter of predetermined mesh width, preferably for the purpose of sampling the particle size distribution of the outflowing mixture. 30 According to the invention there is also provided a dredging vessel provided with a hold with height-adjustable overflow for loading with a dredged material/water mixture, wherein the dredging vessel is further provided with means for measuring a control parameter, the control parameter relating to the average horizontal velocity of the non- 8 settled dredged material/water mixture above the settled layer between the inlet and the overflow, and with a control device which adjusts the height position of the overflow subject to the measured value of the control parameter. The advantages of the dredging vessel according to the invention have already been elucidated at length above with 5 reference to the invented method, and will not therefore be repeated here. In a preferred variant of the dredging vessel the measuring means are chosen from the group comprising means for measuring the height of the settled layer, means for measuring the average horizontal velocity of the non-settled mixture between the inlet 10 and the overflow, means for measuring the particle size distribution of the suctioned-up mixture close to the inlet and/or the particle size distribution of the overflowing mixture close to the overflow, means for measuring the density of the suctioned-up mixture close to the inlet and/or the density of the overflowing mixture close to the overflow, means for measuring the turbidity of the overflowing mixture close to the overflow 15 and/or in the water, or combinations of the above stated measuring means. A particularly advantageous preferred variant relates to a dredging vessel, the measuring means of which comprise a densimeter disposed at the position where the overflowing mixture runs into the overflow. 20 The method and dredging vessel according to the invention will now be further elucidated on the basis of the following figure, without the invention being limited thereto. Figure 1 shows a schematic side view of a dredging vessel; and 25 Figure 2 shows schematically the particle size distribution of a dredged material mixture obtainable with the described method and dredging vessel, compared to the particle size distribution of a dredged material mixture obtainable with the known method. The trailing suction hopper dredger according to a preferred embodiment of the 30 invention comprises a vessel 1 with a hold 2 and a suction conduit which is constructed from a loading pipe 3 debouching into hold 2, a pump 4, and a suction pipe 5 which is pivotable about an axis 30 relative to vessel 1 and which has on its bottom end a drag head 6 and which is dragged over the bottom 8 located under water 7 while vessel 1 sails in the direction of arrow 9 and bottom material 16, for instance sand, is suctioned 9 up together with water 7 as a suspension from bottom 8 via conduit 5 and carried into hold 2. Drag head 6 is provided with a visor 12 which can be pivoted about a shaft 11 relative to drag head 6 by means of a hydraulic cylinder 13. 5 Hold 2 is suitable for receiving the mixture of water bottom material and water suctioned up through conduit 5 by means of pump 4. After a time the mixture present in hold 2 will settle and form herein a settled layer 20 with a height 40 relative to the bottom of hold 2. Present on settled layer 20 is a layer 21 comprising an aqueous suspension of non-settled bottom material. The height 41 of layer 21 is determined by 10 the height position of a height-adjustable overflow 10 with conical upper outer end 14. Overflow 10 has an open lower outer end 15 along which mixture overflowing in the direction of arrow 31 can be carried in the direction of arrow 32 to the water 7 via the underside of the trailing suction hopper dredger. 15 The variant of a trailing suction hopper dredger shown in figure 1 is further provided with means for measuring a control parameter, subject to which value the height position of overflow 10 is adjusted. The measuring means comprise a first densimeter 25 which is arranged in the vicinity of the inlet or loading pipe 3 and there measures the density of the suctioned-up mixture. A per se known flow meter 28 is also arranged at 20 substantially the same position. This measures the flow rate of the suctioned-up water, from which the average horizontal velocity of the non-settled part 21 can be determined. The densimeter comprises a radioactive concentration meter obtainable from the firm Berthold Technologies N.V. of Vilvoorde, Belgium. A second densimeter 26 of the same type is arranged at the position of overflow 10 and measures the density of the 25 overflowing mixture. If desired, a third densimeter 27 can be arranged in the water in the vicinity of the trailing suction hopper dredger in order to enable measurement of the turbidity of the overflowing mixture or of the surrounding water. The signals from the above mentioned measuring means are stored in a central computer (not shown), this computer forming part of the control equipment of the trailing suction hopper dredger.
9a In a preferred method the above described trailing suction hopper dredger is employed to dredge material present in or on water bottom 8. In the method a mixture of water bottom material and water is suctioned up via drag head 6 connected to suction conduit 5 and moving over water bottom 8, and carried into hold 2 via the inlet or suction pipe 5 3. In a preferred method overflow 10 is set in the lowest position at the start of the method. This preferably corresponds to a load factor of hold 2 of about 10% (of the overall available load in M 3 ). In figure 1 the lowest position of overflow 10 is indicated schematically by the level 100 of the top side of overflow 10. At this position 100 a relatively large amount of suctioned-up mixture will be carried in the direction of arrow 10 31 through overflow 10 in the direction of arrow 32 to the water 7. This overflow is formed particularly by the finer particles of the suctioned-up mixture, since the coarser fraction has already moved below level 100 under the influence of gravitational force and remains behind in hold 2 as settled layer 20. During dredging the height 40 of settled layer 20 will gradually increase. In the shown variant the height position of 15 overflow 10 is adjusted subject to the height 40 of settled layer 20, this such that overflow 10 is kept at substantially constant height above settled layer 20. This means that the height 41 will have a constant value during a great part of the dredging. The WO 2010/122093 PCT/EP2010/055329 10 precise value depends on the conditions on location and can amount to for instance 0.75 m. If the suction flow rate measured by flow meter 28 is held constant, the average horizontal velocity of the non-settled part 21 will then also be substantially constant. 5 Because the height 40 of settled layer 20 increases over time, the height of overflow 10 will also rise until overflow 10 reaches the highest position 101. The highest position 101 is reached when the trailing suction hopper dredger has reached its maximum allowable draught or dredge mark. This situation is shown in figure 1. 10 The invented method is particularly suitable for dredging access channels for urban areas which run out into the sea or other large stretch of water, and/or for dredging sand, more preferably fine sand, and most preferably fine silt-containing sand. Sand has 65% by volume of particles larger than 63 tm and 50% by volume of particles smaller than 2 mm. Fine sand has between 5-15 % by volume of particles with a grain size lying 15 between 2 and 63 pm. Using the invented method more bottom material, and particularly the finer fraction thereof, runs back via the overflow to the water at a low load factor of the hopper than is the case in the known method. This so-called agitation process can be controlled well with the invented method, this being a great advantage in respect of the requirements set for the turbidity of the water. The overflowed finer 20 fraction can be carried away by the current in the access channel from the location of the dredging operations to for instance the sea. In addition, the settled material in the hold has a higher quality, so that it can advantageously be used for sand supply and the like, optionally in the immediate vicinity of the dredging location. 25 Figure 2 shows schematically the particle size distribution (50) of a dredged material mixture obtained using the invented method and dredging vessel. The obtained particle size distribution is compared to the particle size distribution (51) of a dredged material mixture obtained using the known method. In the shown graphic representation a percentage by weight (52) is plotted against the particle size (53). By allowing a part 30 (54) of the supplied particle size distribution (51) to overflow via overflow (10) during dredging a particle size distribution (50) is obtained which not only has a narrower distribution but also has a larger average particle size (55) than the supplied particle size distribution (56).
11 The invention is not limited to the above described exemplary embodiments, and modifications can be made hereto to the extent they fall within the scope of the appended claims. 5 Throughout this specification and the claims which follow, unless the context requires otherwise, the word "comprise", and variations such as "comprises" and "comprising", will be understood to imply the inclusion of a stated integer or step or group of integers or steps but not the exclusion of any other integer or step or group of integers or steps. 10 The reference in this specification to any prior publication (or information derived from it), or to any matter which is known, is not, and should not be taken as an acknowledgment or admission or any form of suggestion that that prior publication (or information derived from it) or known matter forms part of the common general 15 knowledge in the field of endeavour to which this specification relates.

Claims (14)

1. Method for loading a dredging vessel with dredged material in a hold provided for this purpose and having a height-adjustable overflow, wherein a dredged 5 material/water mixture is carried via an inlet into the hold and forms a settled layer therein due to settling of the heavier dredged material particles, and wherein the height position of the overflow above the settled layer is adjusted subject to a value of a control parameter measured during filling of the hold, the control parameter relating to the average horizontal velocity of the non-settled dredged material/water mixture above 10 the settled layer between the inlet and the overflow.
2. Method as claimed in claim 1, wherein the height position of the overflow above the settled layer is adjusted so that the measured value of the control parameter remains substantially constant. 15
3. Method as claimed in claim 1 or 2, wherein the average horizontal velocity v is defined by the following formula: V=Q B.h wherein Q is the flow rate of the dredged material/water mixture measured at the 20 position of the inlet, B is the width of the hold and h is the height position of the overflow above the settled layer.
4. Method as claimed in claim 3, wherein the height position h of the overflow above the settled layer is adjusted to a substantially constant value, and that the flow 25 rate Q is adjusted so that the average horizontal velocity v acquires the desired value.
5. Method as claimed in claim 3, wherein the flow rate Q is adjusted to a substantially constant value and that the height position h of the overflow above the settled layer is adjusted so that the average horizontal velocity v acquires the desired 30 value. 13
6. Method as claimed in any of the foregoing claims, wherein the control parameter further relates to the particle size distribution of the overflowing mixture close to the overflow. 5
7. Method as claimed in any of the foregoing claims, wherein the control parameter further relates to the density of the overflowing mixture close to the overflow.
8. Method as claimed in any of the foregoing claims, wherein the control parameter further relates to the turbidity of the overflowing mixture close to the overflow or in the 10 water.
9. Method as claimed in any of the foregoing claims, wherein the control parameter further is a combination of the stated control parameters. 15
10. Dredging vessel provided with a hold with height-adjustable overflow for loading with a dredged material/water mixture, wherein the dredging vessel is further provided with means for measuring a control parameter, the control parameter relating to the average horizontal velocity of the non-settled dredged material/water mixture above the settled layer between the inlet and the overflow, and with a control device 20 which adjusts the height position of the overflow subject to the measured value of the control parameter.
11. Dredging vessel as claimed in claim 10, wherein the measuring means are chosen from the group comprising means for measuring the height of the settled layer, 25 means for measuring the average horizontal velocity of the non-settled mixture between the inlet and the overflow, means for measuring the particle size distribution of the suctioned-up mixture close to the inlet and/or the particle size distribution of the overflowing mixture close to the overflow, means for measuring the density of the suctioned-up mixture close to the inlet and/or the density of the overflowing mixture 30 close to the overflow, means for measuring the turbidity of the overflowing mixture close to the overflow and/or in the water, or combinations of the above stated measuring means. 14
12. Dredging vessel as claimed in claim 11, wherein the measuring means comprise a densimeter disposed at the position where the overflowing mixture runs into the overflow. 5
13. Method for loading a dredging vessel substantially as hereinbefore described with reference to the accompanying drawings.
14. Dredging vessel substantially as hereinbefore described with reference to the accompanying drawings. 10
AU2010240899A 2009-04-22 2010-04-22 Dredging vessel and method for loading the dredging vessel with dredged material Ceased AU2010240899B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
BE2009/0253 2009-04-22
BE2009/0253A BE1018577A4 (en) 2009-04-22 2009-04-22 Dredging vehicle and method for loading the dredging vehicle with dredging spoil.
PCT/EP2010/055329 WO2010122093A1 (en) 2009-04-22 2010-04-22 Dredging vessel and method for loading the dredging vessel with dredged material

Publications (2)

Publication Number Publication Date
AU2010240899A1 AU2010240899A1 (en) 2011-11-17
AU2010240899B2 true AU2010240899B2 (en) 2016-01-21

Family

ID=41165700

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2010240899A Ceased AU2010240899B2 (en) 2009-04-22 2010-04-22 Dredging vessel and method for loading the dredging vessel with dredged material

Country Status (6)

Country Link
EP (1) EP2422019B1 (en)
AR (1) AR076993A1 (en)
AU (1) AU2010240899B2 (en)
BE (1) BE1018577A4 (en)
TW (1) TWI525236B (en)
WO (1) WO2010122093A1 (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2008273C2 (en) * 2012-02-10 2013-08-14 Ihc Holland Ie Bv Overflow device for a vessel.
NL2013004B1 (en) * 2014-06-16 2016-07-05 Ihc Holland Ie Bv Filter overflow device.
NL2013368B1 (en) 2014-08-26 2016-09-26 Ihc Holland Ie Bv Adjustable overflow system.
NL2014509B1 (en) * 2015-03-24 2017-01-19 Ihc Holland Ie Bv Overflow system.
RU2603810C1 (en) * 2015-09-21 2016-11-27 Федеральное государственное бюджетное образовательное учреждение высшего образования "Астраханский государственный университет" (Астраханский государственный университет) Vessel for transportation of soil during dredging
CN107012901B (en) * 2016-01-28 2019-05-10 宋文华 Dredging managing and control system
EP3333327A1 (en) * 2016-12-10 2018-06-13 Imotec Holding B.V. Autonomous dredging vehicle for dredging a dam reservoir
RU2705457C2 (en) * 2017-11-01 2019-11-07 Федеральное государственное бюджетное образовательное учреждение высшего образования "Астраханский государственный университет" Floating facility for soil transportation during production of dredging works
AU2019225774B2 (en) * 2018-02-22 2021-10-28 Michael Detering Device for a sediment transfer in waters, and also a method for a transfer of sediment in waters
CN109610539B (en) * 2018-11-30 2020-12-25 中船重工中南装备有限责任公司 Track chassis cutter-suction type dredging robot with self-deviation correction function
CN112049174A (en) * 2020-09-16 2020-12-08 沙群 Decontamination cleaning device for aquaculture
NL2029628B1 (en) * 2021-11-04 2023-06-02 Ihc Holland Ie Bv Discharging system for a hopper
CN117027810B (en) * 2023-09-28 2024-03-12 长沙矿冶研究院有限责任公司 Rotary jet type deep sea polymetallic nodule collecting apparatus

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4206057A (en) * 1977-06-08 1980-06-03 Ballast-Nedam Groep N.V. Dredging vessel
US4245932A (en) * 1977-07-12 1981-01-20 Ingenieursbureau voor Systemen en Octrooien "Spanstaal" B. V. Suction dredger and method of loading the same
US4365509A (en) * 1980-02-20 1982-12-28 Ihc Holland N.V. System and method for determining the well load of a hopper suction dredge

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB671172A (en) * 1949-05-04 1952-04-30 Aannemersbedrijf Voorheen T De Vessel for transporting mud or similar water-bearing matter
NL163288C (en) * 1968-11-01 1980-08-15 Ihc Holland Nv HOPPER VESSEL.
GB1244558A (en) * 1969-05-13 1971-09-02 Hollandsche Aanneming Mij N V Self-propelled hopper dredgers and method of operation
US3957009A (en) * 1974-10-25 1976-05-18 James Di Perna Ship ballast, oil and water separation system
US4172617A (en) * 1975-11-12 1979-10-30 Ingenieursbureau voor Systemem en Octrooien "Spanstaal" B.V. Suction dredger vessel and method of loading the hold of the same
DE2755125A1 (en) * 1977-12-10 1979-06-13 Cassella Ag METHODS FOR REMOVING SLUDGE FROM AQUATIC AQUATIC ENVIRONMENT
BE1005478A3 (en) * 1991-10-30 1993-08-03 Dredging Int Procedure and equipment for selective removal of contaminated anduncontaminated dredged material

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4206057A (en) * 1977-06-08 1980-06-03 Ballast-Nedam Groep N.V. Dredging vessel
US4245932A (en) * 1977-07-12 1981-01-20 Ingenieursbureau voor Systemen en Octrooien "Spanstaal" B. V. Suction dredger and method of loading the same
US4365509A (en) * 1980-02-20 1982-12-28 Ihc Holland N.V. System and method for determining the well load of a hopper suction dredge

Also Published As

Publication number Publication date
WO2010122093A1 (en) 2010-10-28
TWI525236B (en) 2016-03-11
EP2422019A1 (en) 2012-02-29
BE1018577A4 (en) 2011-04-05
AU2010240899A1 (en) 2011-11-17
TW201114987A (en) 2011-05-01
AR076993A1 (en) 2011-07-27
EP2422019B1 (en) 2013-04-03

Similar Documents

Publication Publication Date Title
AU2010240899B2 (en) Dredging vessel and method for loading the dredging vessel with dredged material
JP5679633B2 (en) Apparatus and method for slurry dewatering
EA004721B1 (en) Apparatus and method for high speed dewatering of slurries
NL2013368B1 (en) Adjustable overflow system.
Barnard Prediction and control of dredged material dispersion around dredging and open-water pipeline disposal operations
EP2978904B1 (en) Measurement device for performing measurement on a mixture of water and collected material
JPH05505004A (en) Method and apparatus for removing coarse sandstone from sewage
JP2008259943A (en) Apparatus for treating earth and sand slurry
CA3141890A1 (en) Enhanced mechanical dewatering of a slurry
US6848860B2 (en) Maintenance apparatuses for permeability improvement in fluid containment basins
Nakai Turbidity generated by dredging projects
WO2002057551A1 (en) Method for hydraulic subsea dredging
JP5988206B2 (en) Thin layer method
NL2013770B1 (en) Hopper dredger with flocculant injection system.
CA1115436A (en) Method of removing mud from mud-water suspensions
JP2007217991A (en) Dredging device and dredging method
BE1020654A4 (en) METHOD AND DEVICE FOR DETERMINING THE HYDROSTATIC PRESSURE IN A LIQUID MASS.
JP2017002534A (en) System and method for recovering bottom mud
KR200233363Y1 (en) Device for removing sediment
NL9201853A (en) METHOD AND APPARATUS FOR SELECTIVE REMOVAL OF INSULATED AND UNSAFEED DREDGING SPECIES
US20050123352A1 (en) Maintenance apparatuses for permeability improvement in fluid containment basins
KR20110117453A (en) Dredge device for sludge in the sea
CN116356910A (en) Method for filtering and draining slurry in drag suction dredger cabin and implementation device thereof
JPH01180255A (en) Classifier for dredged sediment
KR20020071343A (en) Method and Device for removing sediment

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired