AU2009216245A1 - Hot-water storage type hot-water supply device - Google Patents

Hot-water storage type hot-water supply device Download PDF

Info

Publication number
AU2009216245A1
AU2009216245A1 AU2009216245A AU2009216245A AU2009216245A1 AU 2009216245 A1 AU2009216245 A1 AU 2009216245A1 AU 2009216245 A AU2009216245 A AU 2009216245A AU 2009216245 A AU2009216245 A AU 2009216245A AU 2009216245 A1 AU2009216245 A1 AU 2009216245A1
Authority
AU
Australia
Prior art keywords
hot water
water supply
tank
hot
bathtub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU2009216245A
Other versions
AU2009216245B2 (en
Inventor
Hideyasu Kamioka
Kenji Okuzawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanden Corp
Original Assignee
Sanden Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanden Corp filed Critical Sanden Corp
Publication of AU2009216245A1 publication Critical patent/AU2009216245A1/en
Application granted granted Critical
Publication of AU2009216245B2 publication Critical patent/AU2009216245B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1051Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
    • F24D19/1054Arrangement or mounting of control or safety devices for water heating systems for domestic hot water the system uses a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D17/00Domestic hot-water supply systems
    • F24D17/02Domestic hot-water supply systems using heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/12Heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/06Heat exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/08Storage tanks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/20Heat consumers
    • F24D2220/209Sanitary water taps

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Control For Baths (AREA)

Description

1 DESCRIPTION STORAGE-TYPE HOT WATER SUPPLIER Technical Field The invention relates to a storage-type hot water supplier 5 that stores and uses hot water heated by a heat pump. Background Art A storage-type hot water supplier has been lately introduced, which stores in a hot water tank the hot water heated and boiled by means of a high-efficiency heat pump during hours when an 10 electric utility rate is relatively low, and uses the stored water to supply hot water, fill a bathtub, reheat bathtub water, to thereby save energy. The hot water tank of the storage-type hot water supplier is generally supplied with water from the lower part and with 15 boiled hot water from the upper part. The hot water in the tank is stored in layers of high and low temperature waters. During the reheating of bathtub water or the like, the supplier executes heat exchange between the high temperature water and the bathtub water. Medium temperature water whose temperature is decreased 20 by the heat exchange is returned to a middle part of the tank and forms a medium temperature water layer. However, because of its low temperature, the medium temperature water cannot be reused for heat exchange with the bathtub water or the like. Moreover, there is a problem that 25 the heat pump has the characteristic that its COP (Coefficient of Performance) is decreased when boiling the medium temperature water than when boiling the low temperature water. In consideration of this problem, a storage-type hot water supplier has first and second hot water tanks, returns the medium 30 temperature water produced by heat exchange carried out during the bathtub water reheating or the like to the upper part of the first hot water tank, and preferentially uses high or medium temperature water in the first hot water tank when supplying 2 hot water, to thereby consume the medium temperature water (for example, see Unexamined Japanese Patent Publication No. 2004-101134). In the storage-type hot water supplier, when a reduction 5 in hot water within the hot water tank is detected, the heat pump performs an additional boiling operation such as the adding and boiling of water. This boiling operation is executed when the amount of hot water left in the hot water tank is reduced by hot water supply or bathtub filling or when the temperature 10 of the remaining hot water is decreased. Especially, during bathtub filling, a large quantity of hot water is supplied over a long time as compared to during simple hot water supply. For that reason, the boiling operation and the hot water supply operation are often carried out at the 15 same time. In general, the boiling operation is an operation of feeding hot water into the hot water tank from the upper part of the hot water tank, whereas the hot water supply operation is an operation of discharging the hot water in the hot water tank 20 from the upper part of the hot water tank. These two operations create two oppositely-directed hot water flows within the hot water tank. Such oppositely-directed hot water flows disturb a hot water distribution formed in layers of high, medium, and low temperature waters aligned in this order within the hot water 25 tank, enlarge the medium temperature water layer, and thus increase the amount of medium temperature water. During the bathtub filling, hot water is supplied by opening/closing an electromagnetic valve. Compared with the simple hot water supply, the flow rate and velocity of the hot 30 water moving in the hot water tank are increased. As a result, a disturbance of the hot water distribution in the hot water tank, namely, an increase of themediumtemperaturewater, becomes more pronounced.
3 The above-mentioned conventional technology, however, has no particular method for coping with the increase of the medium temperature water. Although the medium temperature water is preferentially consumed, the boiling of the remaining medium 5 temperature water, which is low in COP, has to be carried out whenthe late-night boiling is finishednext time. Consequently, there occurs a problem that the COP of the storage-type hot water supplier is decreased. Disclosure of the Invention 10 The invention has been made in light of the above-mentioned issue. It is an object of the invention to provide a storage-type hot water supplier in which COP is greatly enhanced by preventing a disturbance of a hot water distribution in a hot water tank and thus preventing an increase of medium temperature water. 15 In order to achieve the object, the storage-type hot water supplier of the invention is a storage-type hot water supplier that stores and uses hot water boiled by means of a heat pump. The storage-type hot water supplier includes a hot water tank having a first end from which high temperature water boiled by 20 the heat pump is fed and a second end from which low temperature water is fed, the tank in which hot water inside is stored in layers of hot temperature water, medium temperature water whose temperature is lower than the high temperature water but is higher than low temperature water, and the low temperature water, in 25 the order named; hot water supply means that discharges the hot water in the hot water tank from the first end of the hot water tank; hot water supply amount-detecting means that detects a supply amount of hot water that is supplied by the hot water supply means; and a control unit that withholds execution of 30 a hot water boiling operation using the heat pump when the hot water supply amount detected by the hot water supply amount-detecting means is equal to or more than prescribed hot water supply amount.
4 The storage-type hot water supplier is capable of preventing a disturbance of a hot water distribution in the hot water tank, which occurs when the hot water boiling operation and the hot water supply operation are simultaneously carried out, and thus 5 preventinganincreaseof themediumtemperature water, to thereby greatly enhance COP of the storage-type hot water supplier. According to a preferred aspect, in the storage-type hot water supplier, the control unit executes the boiling operation after a lapse of predetermined time after the hot water supply 10 of the hot water supply means is finished. With this configuration, it is possible to start the boiling operation after the disturbance of a hot water distribution in the hot water tank, which occurs due to hot water supply, is cleared. For that reason, the increase of the medium temperature 15 water can be more effectively prevented, which greatly enhances the COP of the storage-type hot water supplier. According to a preferred aspect, in the storage-type hot water supplier, the control unit stops the boiling operation when the hot water supply amount detected by the hot water supply 20 amount-detecting means during the boiling operation is equal to or more than the prescribed hot water supply amount. With this configuration, even during the boiling operation, if there is a possibility of a disturbance of the hot water distribution in the hot water tank as a result of an increase 25 of the hot water supply amount, it is possible to prevent such a disturbance and more effectively prevent the increase of the medium temperature water. This greatly improves the COP of the storage-type hot water supplier. According to a preferred aspect, in the storage-type hot 30 water supplier, the hot water supply means supplies hot water to a bathtub according to a bathtub filling process carried out by the control unit. The control unit withholds the execution of the boiling operation until the bathtub filling process is 5 finished, and executes the boiling operation after the bathtub filling process is finished. With this configuration, during the bathtub filling time when the flow rate and velocity of hot water moving within the 5 hot water tank are increased, it is possible to reliably prevent a disturbance of a hot water distribution in the hot water tank and more effectively prevent an increase of the medium temperature water. This further improves the COP of the storage-type hot water supplier. 10 Brief Description of the Drawings FIG. 1 is a schematic configuration view of a storage-type hot water supplier according to one embodiment of the invention; FIG. 2 is a flowchart showing a control routine of boiling control in case that the routine executes a hot water boiling 15 operation during hot water supply or bathtub filling in the storage-type hot water supplier shown in FIG. 1; and FIG. 3 is a flowchart showing a control routine of boiling control in case that the routine starts the hot water boiling operation during hot water boiling or bathtub filling in the 20 storage-type hot water supplier shown in FIG. 1. Best Mode of Carrying out the Invention An embodiment of the invention will be described below with reference to the attached drawings. FIG. 1 showsaschematicconfigurationviewofastorage-type 25 hot water supplier according to the invention. A hot water supplier 1 includes a heat pump 2 that heats hot water and a tank unit 6 having a hot water tank 4 that stores hot water. The hot water supplier 1 stores in the hot water tank 4 the hot water heated and boiled by means of the heat pump 2. The hot 30 water supplier 1 uses the stored hot water to carry out the filling of a bathtub, the reboiling of bathtub water, hot water supply toa hot water tap, not shown, of the bathroom, kitchen, lavatory, shower or the like.
6 A detailed description of the heat pump 2 will be omitted as the heat pump 2 is a publicly-known device in which a refrigerant circulates through a compressor, a condenser, an expansion valve and an evaporator, not shown, and the hot water in the hot water 5 tank4 isheatedandboiledthroughheatexchangewitha refrigerant flowing through the condenser. The tank unit 6 has a high temperature tank 4a and a low temperature tank 4b, which serve as the hot water tank 4. The high temperature tank 4a and the low temperature tank 4b have 10 the same shape. A lower end of the high temperature tank 4a and an upper end of the low temperature tank 4b are serially connected to each other through a connecting path 12. In other words, the hot water tank 4 has an integral structure in which an upper part of the high temperature tank 4a forms a first end of the 15 hot water tank 4, and a lower part of the low temperature tank 4b forms a second end of the hot water tank 4. In the high temperature tank 4a and the low temperature tank 4b, there are disposed thermistor groups 14a and 14b vertically arranged at given intervals. The thermistor groups 20 14a and 14b detect hot water temperatures at their positions. Connected to a lower end of the low temperature tank 4b is a water supply path 18 extending from an external water supply source 16 such as a city's water supply source. A boiling circulation path 20 provided with the heat pump 25 2 is connected to the lower end of the low temperature tank 4b and an upper end of the high temperature tank 4a. The boiling circulation path 20 is provided with a boiling circulation pump 22 interposed between the low temperature tank 4b and the heat pump 2, and a boiling thermistor 23 that detects temperature 30 of hot water flowing through the boiling circulation path 20. The boiling circulation pump 22 functions to discharge hot water existing in the lower end side in the low temperature tank 4b through the boiling circulation path 20 and feed the hot water 7 into the upper end side in the high temperature tank 4a via the heat pump 2. A reboiling circulation path 26 provided with a reboiling heat exchanger 24 is connected to the upper end of the high 5 temperature tank 4a and a vertically middle part of a lateral surfaceofthelowtemperature tank4b. Thereboilingcirculation path26isprovidedwithareboilingcirculationpump28 interposed between the reboiling heat exchanger 24 and the low temperature tank4b. The reboilingcirculationpump28 functions todischarge 10 hot water existing in the upper end side in the high temperature tank 4a through the reboiling circulation path 26 and feed the hot water into the middle part in the low temperature tank 4b via the reboiling heat exchanger 24. The reboiling heat exchanger 24 is also interposed in a 15 bathwater circulation path 30 and functions to carry out heat exchange between hot water flowing through the bathwater circulation path 30 and hot water flowing through the reboiling circulation path 26. The bathwater circulation path 30 is connected to a bathtub 20 in a bathroom 8 and designed to circulate hot water in the bathtub. The bathwater circulation path 30 is provided with not only the reboiling heat exchanger 24 but also a water level sensor 32 that detects a water level of the bathtub, a bathwater thermistor 34 for detecting temperature of hot water flowing through the 25 bathwater circulation path 30, namely hot water temperature in the bathtub, and a bathwater circulation pump 36. The bathwater circulation pump 36 functions to discharge the hot water in the bathtub through the bathwater circulation path 30 and feed the hot water into the bathtub again via the reboiling heat exchanger 30 24. A high temperature water discharging path 38 is connected to the upper end of the high temperature tank 4a, and a low temperature water discharging path 40 to the upper end of the 8 low temperature tank 4b. The high temperature water discharging path 38 and the low temperature water discharging path 40 are made of pipe members. The high temperature water discharging path 38 and the low 5 temperature water discharging path 40 join together through a tank-side mixing valve (hot water supply means) 42 at a predetermined junction, and are then connected to a combined water discharging path 44. The combined water discharging path 44 is made of a pipe member as with the high temperature water 10 discharging path 38 and the low temperature water discharging path 40. The combined water discharging path 44 is provided with a combined water discharging thermistor 46 that detects temperature of hot water flowing through the combined water discharging path 44. 15 The combined water discharging path 44 is divided into two parts in the downstream side of the combined water discharging thermistor 46. One of the parts is connected to a bathroom-side mixing valve (hot water supply means) 48, and the other to a hot water supply-side mixing valve (hot water supply means) 50. 20 The bathroom-side mixing valve 48 and the hot water supply-side mixing valve 50 are connected with the water supply path 18. A bathtub filling path 52 and a hot water supply path 54 are connected to the bathroom-side mixing valve 48 and the hot water supply-side mixing valve 50, respectively. The 25 bathroom-sidemixingvalve48 and thehotwatersupply-sidemixing valve 50 function to adjust a mixing ratio of hot water from the combined water discharging path 44 and water from the water supply path 18 and discharge hot water into the bathtub filling path 52 and the hot water supply path 54. The water supply path 30 18 is provided with a water supply thermistor 56 that detects temperature of water passing through the water supply path. The bathtub filling path 52 is connected to the bathwater circulation path 30 and provided with a bathtub filling thermistor 9 58 that detects temperature of hot water flowing through the bathtub filling path 52, an electromagnetic valve 60 that is opened/closed to open/close the bathtub filling path 52, and a bathtub filling flow sensor (hot water supply amount-detecting 5 means) 62 that detects a flow rate of hot water supplied from the bathtub filling path 52 to the bathwater circulation path 30. The hot water supply path 54 is connected to a hot water tap 10 and provided with a hot water supply thermistor 64 that 10 detects temperature of hot water flowing through the hot water supply path 54 and a hot water flow sensor (hot water supply amount-detecting means) 66 that detects a flow rate of hot water supplied from the hot water supply path 54 to the hot water tap 10. 15 The hot water supplier 1 is provided with a control unit, not shown. Thecontrolunitcontrols theheatpump2, circulation pumps 22, 28 and 36, the mixing valves 42, 48 and 50, the electromagnetic valve 60 and the like according to arbitrary conditions on the basis of information detected by the thermistors 20 14a, 14b, 23, 34, 46, 56, 58 and 64, the water level sensor 32, the flow sensors 62 and 66 and the like. Actuation of the hot water supplier 1 according to the invention thus configured will be described below. The high temperature tank 4a and the low temperature tank 25 4b are always filled with hot water. The hot water is layered by temperature. When the hot water in the tank is discharged by hot water supply, low temperature water having relatively low temperature (ranging from 0 to 20*C, for example) is replenished from the 30 water supply source 16 to the low temperature tank 4b. A low temperature water layer is thus formed in a lower part of the low temperature tank 4b. The boiling operation in the hot water supplier 1 is carried 10 out by actuating the heat pump 2 and the boiling circulation pump 22. The actuation of the boiling circulation pump 22 delivers the low temperature water from the lower end side in the low 5 temperature tank 4b through the boiling circulation path 20 to the heat pump 2. High temperature water that is heated and boiled to high temperature (ranging from about 65 to 90*C, for example) by the heat pump 2 is delivered to the upper end side in the high temperature tank 4a. 10 Thehotwatercirculationbyusingtheheatpump2 iscontinued for predetermined time, and a high temperature water layer is therefore expanded from an upper part to a lower part of the high temperature tank 4a, and is further expanded from an upper part to the lower part of the low temperature tank 4b through 15 the connecting path 12. Amount of the high temperature water, or amount of remaining hot water, is detected from a temperature distribution detectedby the thermistor groups 14a and 14b located in the tanks 4a and 4b. The boiling operation is carried out mainly during predetermined late night hours when electricity 20 is relatively less expensive. The reboiling operation in the hot water supplier 1 is carried out by actuating the reboiling circulation pump 28 and the bathwater circulation pump 36 when the water level of the bathtub in the bathroom 8, which is detected by the water level sensor 25 32, is equal to or higher than prescribed water level. To be more specific, as a result of the actuation of the reboiling circulation pump 28, the high temperature water is delivered from the upper end side of the high temperature tank 4a through the reboiling circulation path 26 to the reboiling 30 heat exchanger 24. Medium temperature water that is reduced in temperature (rangingfrom40to60*C, forexample) byheat exchange with the bathwater in the reboiling heat exchanger 24 flows into the middle part of the low temperature tank 4b.
11 Such circulation of hot water using the reboiling heat exchanger 24 forms a medium temperature water layer in the middle part of the low temperature tank 4b, that is, between the high and low temperature water layers. The medium temperature water 5 layer is also produced, for example, when the high temperature water is left for long hours and decreased in temperature. As a result of the actuation of the bathwater circulation pump 36, the hot water in the bathtub of the bathroom8 is delivered through the bathwater circulation path 30 to the reboiling heat 10 exchanger 24. The hot water heated by heat exchange with the high temperature water in the reboiling heat exchanger 24 is returned into the bathtub, to thereby carry out the reboiling operation. The hot water supplier 1 starts to fill the bathtub in the 15 bathroom 8 when the electromagnetic valve 60 is opened, and supplies hot water when the hot water tap 10 is turned on. To be more concrete, the opening of the electromagnetic valve 60 discharges hot water from the bathtub filling path 52 to the bathwater circulation path 30, and delivers the hot water 20 into the bathtub through the bathwater circulation path 30, thereby filling the bathtub. The hot water tap 10 is turned on to discharge the hot water of the hot water supply path 54 out of the hot water tap 10, to thereby supply hot water. A mixing ratio of the hot water from the combined water 25 discharging path 44 and the low temperature water from the water supply path 18 is adjusted by controlling the tank-side mixing valve 42, the bathroom-side mixing valve 48 and the hot water supply-side mixing valve 50 according to the control of the control unit so that the hot water discharged during the bathtub filling 30 and the hot water supply, that is, the hot water passing though the bathtub filling path 52 and the hot water supply path 54, has arbitrary prescribed temperature. The hot water passing through the combined water discharging 12 path 44 is a mixture of the hot water passing through the high temperature water discharging path 38 and the hot water passing through the low temperature water discharging path 40. Since the high temperature water discharging path 38 is 5 connected to the upper end of the high temperature tank 4a, into which the high temperature water is delivered, the hot water discharged from the high temperature water discharging path 38 is the high temperature water stored in the upper end side of the high temperature tank 4a. The hot water discharged from the 10 low temperature water discharging path 40 is the hot water stored in the upper end side of the low temperature tank 4b. This hot water is occasionally low or high temperature water, but most of the time is medium temperature water since medium temperature water in the middle part of the low temperature tank 4b enters 15 into the low temperature water discharging path 40. In this manner, hot water boundary layers including high, medium and low temperature water layers are formed in the order from the top within the hot water tank 4 consisting of the high temperature tank 4a and the low temperature tank 4b. 20 In the present embodiment, the control unit controls the temperature and flow rate of the hot water discharged from the hot water tank 4 during the bathtub filling and the hot water supply as described above, and also implements hot water boiling control in the heat pump 2 according to the flow rate of hot 25 water discharged from the hot water tank 4, namely the hot water supply amount. With reference to a flowchart shown in FIG. 2, a control routine of the boiling control implemented by the control unit will be described below in detail. 30 First of all, when there is a demand of the boiling operation using the heat pump 2 due to a decrease in amount or temperature of remaining hot water stored in the hot water tank 4, the boiling control is implemented, and the routine proceeds to Sl 13 (hereinafter, "S" means a step). Si makes a determination as to whether hot water is being supplied to the hot water tap 10. If the result is YES, and it is determined that the hot water supply is being in process, 5 the routine advances to S2. If the result is NO, and it is determined that the hot water supply is not being in process, the routine moves to S3. If the routine advances to S2, a flow rate F of hot water supplied to the hot water tap 10, which is detected by the hot 10 water supply flow sensor 66, becomes equal to or higher than a prescribed flow rate Fs, andadeterminationismadeas towhether F Fs is true. If the result is YES, and it is determined that F Fs is true, the routine proceeds to S4. If the result is NO, and it is determined that FFs is not true, the routine moves 15 to S7. If the routine advances to S4, hot water supply time T when F Fs is true is continued for or longer than predetermined time Ts. A determination is made as to whether T Ts is true. If the result is YES, and it is determined that T Ts is true, the routine 20 proceeds to S5. If the result is NO, and it is determined that T Ts is not true, the routine moves to S7. If the routine moves from Sl to S3, a determination is made as to whether the bathtub filling of the bathroom 8 is being in process. If the result is YES, and it is determined that the 25 bathtub filling is being in process, the routine advances to S5. If the result is NO, and it is determined that the bathtub filling is not being in process, the routine proceeds to S7. If the routine moves from S3 or S4 to S5, a determination is made, on the basis of information detected by the flow sensors 30 62 and 66 and the like, as to whether the hot water supply or the bathtub filling has been finished. If the result is YES, and it is determined that the hot water supply or the bathtub filling has been finished, the routine proceeds to S6. If the 14 result is NO, and it is determined that the hot water supply or the bathtub filling has not been finished, the present step is taken again. Completion of the bathtub filling is determined specifically by whether the bathtub filling process carried out 5 by the control unit has been finished. If the routine advances to S6, standby time Ti of the boiling operation after thehot water supplyor thebathtub fillingbecomes equal to or more than predetermined time Tsi. A determination is then made as to whether Ti Tsi is true. If the result is YES, 10 and it is determined that Ti Tsi is true, the routine proceeds to S7. If the result is NO, and it is determined that Ti Tsi is not true, the present step is taken again. If the routine moves from S3, S4 or S6 to S7, the boiling operation is executed, and the pump 2 starts to boil the hot 15 water in the hot water tank 4. A flowchart of FIG. 3 shows a control routine of the boiling control in case that the hot water supply or the bathtub filling is started in the middle of the boiling operation. In this case, the routine first moves to Sll. 20 Sll makes a determination as to whether the hot water supply has been started. If the result is YES, and it is determined that the hot water supply has been started, the routine advances to S12. If the result is NO, and it is determined that the hot water supply has not been started, the routine proceeds to S13. 25 If the routine moves to S12, a determination is made, as in S2, as to whether F Fs is true. If the result is YES, and it is determined that F Fs is true, the routine advances to S14. If the result is NO, and it is determined that FFs is not true, the routine returns to Sll. 30 If the routine moves to S14, as in S4, a determination is made as to whether T Ts is true. If the result is YES, and it is determined that T Ts is true, the routine advances to S15. If the result is NO, and it is determined that T Ts is not true, 15 the routine returns to S11. If the routine moves from S11 to S13, a determination is made as to whether the bathtub filling has been started. If the result is YES, and it is determined that the bathtub filling 5 has been started, the routine advances to S15. If the result is NO, and it is determined that the bathtub filling has not been started, the routine returns to Sll. If the routine moves from S13 or S14 to S15, the hot water boilingoperationusingtheheatpump2 is stopped, and the routine 10 proceeds to S16. As with S5, S16 makes a determination as to whether the hot water supply or the bathtub filling has been finished. If the result is YES, and it is determined that the hot water supply or the bathtub filling has been finished, the routine proceeds 15 to S17. If the result is NO, and it is determined that the hot water supply or the bathtub filling has not been finished, the present step is taken again. If the routine moves to S17, a determination is made, as in S6, as to whether Ti>=Tsi is true. If the result is YES, and 20 it is determined that Ti>=Tsi is true, the routine advances to S18. If the result is NO, and it is determined that Ti>=Tsi is not true, the present step is taken again. If the routine moves to S18, the boiling operation is re-executed, and the hot water boiling is started again. 25 As described above, in the present embodiment, the boiling control is implemented so that the hot water supply operation including the bathtub filling and the boiling operation using the heat pump 2 are not simultaneously carried out on predetermined conditions. This effectively prevents a disturbance of the hot 30 water boundary layers, or that of the hot water distribution, and thus suppresses an increase of the medium temperature water. More concretely, if the flow rate F of the hot water supplied to the hot water tap 10, which is detected by the hot water supply 16 flow sensor 66, becomes equal to or higher than the prescribed flow rate Fs, and moreover, if the hot water supply time T of the hot water supply carried out on the above condition is continued for or longer than the predetermined time Ts, the control unit 5 withholds the execution of the hot water boiling operation using the heat pump 2, and executes the boiling operation when the standby time Ti after the hot water supply is finished becomes equal to or more than the predetermined time Tsi. By multiplying the prescribed flow rate Fs by the 10 predetermined time Ts, prescribed hot water supply amount Vs that does not disturb the hot water boundary layers in the hot water tank 4 as a volumetric flow rate of the hot water discharged from the hot water tank 4. For this reason, if the execution of the hot water boiling operation using the heat pump 2 is held 15 off when hot water supply amount V calculated by multiplying the flow rate F and the time T becomes equal to or more than the prescribed hot water supplyamount V, it is possible toprevent a disturbance of the hot water distribution in the hot water tank 4, which occurs as a result of simultaneous hot water boiling 20 and supply operations, and suppress an increase of the medium temperature water. However, if the boiling operation is executed after a lapse of the predetermined time Tsi after the hot water supply is finished, the boiling operation can be started once the disturbance of 25 the hot water distribution in the hot water tank 4, which occurs due to the hot water supply, is cleared. It is then possible to minimally lessen the boiling operation of the medium temperature water, in which COP is low. Consequently, the COP of the hot water supplier 1 is greatly enhanced. 30 When the bathtub filling is in process, and the hot water supplier 1 operates according to the bathtub filling process carried out by the control unit, the control unit withholds the execution of the boiling operation until the bathtub filling 17 process is finished. The control unit executes the boiling operation when the standby time T after the bathtub fillingprocess is finished becomes equal to or more than the predetermined time Tsi. With this configuration, during the bathtub filling of the 5 bathroom 8, in which the flow rate and velocity of the hot water moving within the hot water tank 4 are increased, it is possible to reliably prevent the disturbance of the hot water distribution in the hot water tank 4 and more effectively prevent an increase of the medium temperature water. This further enhances the COP 10 of the hot water supplier 1. If the hot water supply in which the flow rate F is equal to or higher than the prescribed flow rate Fs is continued for or longer than the predetermined time Ts during the boiling operation, and the hot water supply amount V thus becomes equal 15 to or more than the prescribed hot water supply amount Vs or the bathtub filling is started, the control unit stops the boiling operation and then re-executes the boiling operation after a lapse of the predetermined time Tsi after the hot water supply or the bathtub filling is finished. With this configuration, 20 even during the boiling operation, it is possible to prevent the disturbance of the hot water distribution in the hot water tank 4, which occurs due to an increase of the hot water supply amount V, and suppress the increase of the medium temperature water. This enhances the COP of the hot water supplier 1. 25 Although the description of one embodiment of the invention will be finished here, the invention is not limited to the above embodiment, and may be modified in various ways without deviating from the gist of thereof. For example, the embodiment executes the boiling operation 30 after a lapse of the predetermined time Tsi after the hot water supply or the bathtub filling is finished. However, the predetermined time Tsi may be set at zero, and the boiling operation may be executed immediately after the hot water supply or the 18 bathtub filling is finished. In this case, it is possible at least to prevent the hot water boiling and supply operations from being carried out at the same time. This prevents the disturbance of the hot water distribution in the hot water tank 5 4, and suppresses the increase of the medium temperature water. Although the embodiment has the high temperature tank 4a and the low temperature tank 4b which serve as the hot water tank 4, the invention does not have to include two tanks as in the embodiment, and for example, may include a single tank. If 10 the hot water tank is formed of a single tank, it is preferable that the low temperature water discharging path should be connected to the tank so as to be located above the reboiling circulation path 26 in order to discharge the medium temperature water from the low temperature water discharging path at the 15 time of discharging hot water.

Claims (4)

1. A storage-type hot water supplier that stores and uses hot water boiled by means of a heat pump, comprising: 5 a hot water tank having a first end fromwhich high temperature water boiled by the heat pump is fed and a second end from which low temperature water is fed, the tank in which hot water inside is stored in layers of hot temperature water, medium temperature water whose temperature is lower than the high temperature water 10 but is higher than low temperature water, and the low temperature water, in the order named; hot water supply means that discharges the hot water in the hot water tank from the first end of the hot water tank; hot water supply amount-detecting means that detects a 15 supply amount of hot water that is supplied by the hot water supply means; and a control unit that withholds execution of a hot waterboiling operation using the heat pump when the hot water supply amount detected by the hot water supply amount-detecting means is equal 20 to or more than prescribed hot water supply amount.
2. The storage-type hot water supplier according to claim 1, wherein the control unit executes the boiling operation after a lapse of predetermined time after the hot water supply of the 25 hot water supply means is finished.
3. The storage-type hot water supplier according to either one of claims 1 and 2, wherein the control unit stops the boiling operation when the hot water supply amount detected by the hot 30 water supply amount-detecting means during the boiling operation is equal to or more than the prescribed hot water supply amount.
4. The storage-type hot water supplier according to any 20 one of claims 1 to 3, wherein:the hot water supply means supplies hot water to a bathtub according to a bathtub filling process carried out by the control unit; and the control unit withholds the execution of the boiling 5 operation until the bathtub filling process is finished, and executes the boiling operation after the bathtub filling process is finished.
AU2009216245A 2008-02-22 2009-02-18 Hot-water storage type hot-water supply device Ceased AU2009216245B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2008041435A JP5138414B2 (en) 2008-02-22 2008-02-22 Hot water storage water heater
JP2008-041435 2008-02-22
PCT/JP2009/052797 WO2009104642A1 (en) 2008-02-22 2009-02-18 Hot-water storage type hot-water supply device

Publications (2)

Publication Number Publication Date
AU2009216245A1 true AU2009216245A1 (en) 2009-08-27
AU2009216245B2 AU2009216245B2 (en) 2012-07-26

Family

ID=40985520

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2009216245A Ceased AU2009216245B2 (en) 2008-02-22 2009-02-18 Hot-water storage type hot-water supply device

Country Status (5)

Country Link
EP (1) EP2249097A1 (en)
JP (1) JP5138414B2 (en)
CN (1) CN101952666A (en)
AU (1) AU2009216245B2 (en)
WO (1) WO2009104642A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113669775A (en) * 2021-07-07 2021-11-19 国网江苏省电力有限公司电力科学研究院 Low-entropy-increase double-gradient efficient comprehensive heating system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014173808A (en) * 2013-03-12 2014-09-22 Sanden Corp Hot water supply apparatus
JP6252762B2 (en) * 2014-02-25 2017-12-27 株式会社ノーリツ Hot water storage hot water system

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3812461B2 (en) * 2002-03-01 2006-08-23 松下電器産業株式会社 Hot water storage water heater
JP4030394B2 (en) 2002-09-12 2008-01-09 株式会社コロナ Hot water storage water heater
JP2005016759A (en) * 2003-06-24 2005-01-20 Hitachi Home & Life Solutions Inc Heat pump type water heater
JP2005076964A (en) * 2003-08-29 2005-03-24 Hitachi Home & Life Solutions Inc Heat pump hot water supplier
JP4084272B2 (en) * 2003-09-17 2008-04-30 松下電器産業株式会社 Heat pump water heater
JP2005195211A (en) * 2004-01-05 2005-07-21 Matsushita Electric Ind Co Ltd Heat pump water heater
JP4338690B2 (en) * 2005-09-14 2009-10-07 三洋電機株式会社 Cooling system
JP4605008B2 (en) * 2005-10-27 2011-01-05 株式会社デンソー Hot water supply device and control device for hot water supply device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113669775A (en) * 2021-07-07 2021-11-19 国网江苏省电力有限公司电力科学研究院 Low-entropy-increase double-gradient efficient comprehensive heating system

Also Published As

Publication number Publication date
CN101952666A (en) 2011-01-19
JP2009198111A (en) 2009-09-03
EP2249097A1 (en) 2010-11-10
AU2009216245B2 (en) 2012-07-26
WO2009104642A1 (en) 2009-08-27
JP5138414B2 (en) 2013-02-06

Similar Documents

Publication Publication Date Title
JP5103567B2 (en) Heat pump type water heater
JP5228605B2 (en) Water heater
KR102057367B1 (en) Heat pump heat supply system
JP2008025980A (en) Heat pump water heater
JP4525820B2 (en) Water heater
JP5120057B2 (en) Water heater
AU2009216245B2 (en) Hot-water storage type hot-water supply device
JP2004333008A (en) Hot water storage type water heater
JP4752347B2 (en) Hot water storage water heater
JP3976319B2 (en) Water heater
JP4379385B2 (en) Water heater
JP2011094922A (en) Heat pump type water heater
JP2009002599A (en) Heat pump type water heater
JP2006308178A (en) Hot-water supplier
JP3869426B2 (en) Hot water storage water heater
JP4290659B2 (en) Operation method of hot water supply system
US20110174463A1 (en) Water Heating System
JP4424265B2 (en) Hot water storage water heater
JP2004245459A (en) Hot water supply device
JP4151615B2 (en) Hot water storage water heater
JP2007321998A (en) Hot water storage type water heater
JP2002206808A (en) Hybrid water heater
JP2005016758A (en) Heat pump type water heater
JP2004232898A (en) Water heater
JP4444170B2 (en) Hot water storage water heater

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired