US9500058B2
(en)
*
|
2004-05-28 |
2016-11-22 |
Schlumberger Technology Corporation |
Coiled tubing tractor assembly
|
US7617873B2
(en)
|
2004-05-28 |
2009-11-17 |
Schlumberger Technology Corporation |
System and methods using fiber optics in coiled tubing
|
KR100924149B1
(ko)
*
|
2006-10-31 |
2009-10-28 |
한국지질자원연구원 |
저온 열 균열 현상을 이용한 암반 내 초기응력 측정방법
|
US8368553B2
(en)
*
|
2006-11-01 |
2013-02-05 |
Halliburton Energy Services, Inc. |
Fracturing monitoring within a treatment well
|
US9477002B2
(en)
*
|
2007-12-21 |
2016-10-25 |
Schlumberger Technology Corporation |
Microhydraulic fracturing with downhole acoustic measurement
|
US8607864B2
(en)
*
|
2008-02-28 |
2013-12-17 |
Schlumberger Technology Corporation |
Live bottom hole pressure for perforation/fracturing operations
|
GB2459457B
(en)
*
|
2008-04-22 |
2012-05-09 |
Swelltec Ltd |
Downhole apparatus and method
|
CA2725088C
(fr)
*
|
2008-05-20 |
2017-03-28 |
Oxane Materials, Inc. |
Procede de fabrication et d'utilisation d'un agent fonctionnel de soutenement de fissures pour determiner des geometries de fracture souterraines
|
CN101434836B
(zh)
*
|
2008-12-12 |
2010-12-15 |
中国石油集团川庆钻探工程有限公司 |
压裂液连续混配方法
|
US8490693B2
(en)
*
|
2009-02-17 |
2013-07-23 |
Schlumberger Technology Corporation |
Determining fracture orientation using wellbore acoustic radial profiles
|
CN104314552B
(zh)
*
|
2009-05-27 |
2017-09-26 |
光学感应器控股有限公司 |
压裂监测
|
US8682102B2
(en)
*
|
2009-06-18 |
2014-03-25 |
Schlumberger Technology Corporation |
Cyclic noise removal in borehole imaging
|
US8655104B2
(en)
*
|
2009-06-18 |
2014-02-18 |
Schlumberger Technology Corporation |
Cyclic noise removal in borehole imaging
|
US9176245B2
(en)
*
|
2009-11-25 |
2015-11-03 |
Halliburton Energy Services, Inc. |
Refining information on subterranean fractures
|
US8386226B2
(en)
*
|
2009-11-25 |
2013-02-26 |
Halliburton Energy Services, Inc. |
Probabilistic simulation of subterranean fracture propagation
|
US8898044B2
(en)
|
2009-11-25 |
2014-11-25 |
Halliburton Energy Services, Inc. |
Simulating subterranean fracture propagation
|
US8392165B2
(en)
*
|
2009-11-25 |
2013-03-05 |
Halliburton Energy Services, Inc. |
Probabilistic earth model for subterranean fracture simulation
|
US8886502B2
(en)
*
|
2009-11-25 |
2014-11-11 |
Halliburton Energy Services, Inc. |
Simulating injection treatments from multiple wells
|
US8437962B2
(en)
*
|
2009-11-25 |
2013-05-07 |
Halliburton Energy Services, Inc. |
Generating probabilistic information on subterranean fractures
|
CN101818633B
(zh)
*
|
2010-01-18 |
2012-11-14 |
大庆福斯特科技开发有限公司 |
深层水平气井裸眼分段压裂后更换管柱井下关井工艺
|
US9069099B2
(en)
*
|
2010-02-02 |
2015-06-30 |
Schlumberger Technology Corporation |
Method and apparatus for monitoring acoustic activity in a subsurface formation
|
US8960313B2
(en)
*
|
2010-03-15 |
2015-02-24 |
Schlumberger Technology Corporation |
Packer deployed formation sensor
|
US8511400B2
(en)
*
|
2010-04-05 |
2013-08-20 |
Schlumberger Technology Corporation |
Apparatus and method for acoustic measurements while using a coring tool
|
BR112013017767A2
(pt)
*
|
2010-12-22 |
2016-10-11 |
Maurice B Dusseault |
processo de injeção multi-estácio para produção de recurso aperfeiçoada a partir de xisto
|
US10001003B2
(en)
*
|
2010-12-22 |
2018-06-19 |
Maurice B. Dusseault |
Multl-stage fracture injection process for enhanced resource production from shales
|
WO2012083429A1
(fr)
*
|
2010-12-22 |
2012-06-28 |
Nexen Inc. |
Procédé de fracturation à la demande d'hydrocarbures à haute pression et processus associé
|
AU2012271016B2
(en)
*
|
2011-06-13 |
2014-12-04 |
Shell Internationale Research Maatschappij B.V. |
Hydraulic fracture monitoring using active seismic sources with receivers in the treatment well
|
US9945970B1
(en)
*
|
2011-08-29 |
2018-04-17 |
Seismic Innovations |
Method and apparatus for modeling microseismic event location estimate accuracy
|
US11774616B2
(en)
|
2011-08-29 |
2023-10-03 |
Seismic Innovations |
Method and system for microseismic event location error analysis and display
|
US9140102B2
(en)
|
2011-10-09 |
2015-09-22 |
Saudi Arabian Oil Company |
System for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well
|
US8800652B2
(en)
|
2011-10-09 |
2014-08-12 |
Saudi Arabian Oil Company |
Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well
|
CN102518426A
(zh)
*
|
2011-12-31 |
2012-06-27 |
中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 |
水力压裂井底压力监测工艺
|
US8342246B2
(en)
*
|
2012-01-26 |
2013-01-01 |
Expansion Energy, Llc |
Fracturing systems and methods utilyzing metacritical phase natural gas
|
US9316098B2
(en)
|
2012-01-26 |
2016-04-19 |
Expansion Energy Llc |
Non-hydraulic fracturing and cold foam proppant delivery systems, methods, and processes
|
US20150003199A1
(en)
*
|
2012-01-26 |
2015-01-01 |
Bernard Widrow |
Methods and apparatus for determining stimulated volume of oil and gas reservoirs
|
US20130194892A1
(en)
*
|
2012-01-29 |
2013-08-01 |
Daniel Golparian |
Autonomous System for Hydrofracture Monitoring
|
US9201157B2
(en)
*
|
2012-04-26 |
2015-12-01 |
Farrokh Mohamadi |
Monitoring of wells to detect the composition of matter in boreholes and propped fractures
|
EP2847424B1
(fr)
|
2012-05-07 |
2023-07-05 |
Packers Plus Energy Services Inc. |
Procédé et système de surveillance d'opérations de forage
|
US9739139B2
(en)
|
2012-05-18 |
2017-08-22 |
Schlumberger Technology Corporation |
Intervention operations with high rate telemetry
|
CN102828741A
(zh)
*
|
2012-05-21 |
2012-12-19 |
中国石油天然气集团公司 |
一种水平井旋转磁场定位中的滤波方法及装置
|
CN104131799A
(zh)
*
|
2013-05-03 |
2014-11-05 |
梁红 |
自流井封堵装置
|
CN104215934B
(zh)
*
|
2013-06-05 |
2016-09-07 |
中国石油天然气集团公司 |
一种利用井口检波器进行水力压裂微地震监测的方法
|
US20150075784A1
(en)
*
|
2013-09-19 |
2015-03-19 |
Shell Oil Company |
Phased stimulation methods
|
US20160250812A1
(en)
*
|
2013-10-14 |
2016-09-01 |
United Technologies Corporation |
Automated laminate composite solid ply generation
|
US9217808B2
(en)
*
|
2013-11-07 |
2015-12-22 |
Schlumberger Technology Corporation |
Wellbore signal monitor with tangential seismic sensors for tube-wave noise reduction
|
WO2015094159A1
(fr)
*
|
2013-12-16 |
2015-06-25 |
Halliburton Energy Services, Inc. |
Systèmes et procédés d'augmentation de la complexité de fracture en utilisant l'énergie acoustique
|
US10428644B2
(en)
*
|
2013-12-17 |
2019-10-01 |
Hifi Engineering Inc. |
Sound baffle device and system for detecting acoustic signals
|
AU2013409457B2
(en)
*
|
2013-12-31 |
2016-11-17 |
Halliburton Energy Services, Inc. |
Rotating sensor mechanism for seismic while drilling sensors
|
US9683435B2
(en)
|
2014-03-04 |
2017-06-20 |
General Electric Company |
Sensor deployment system for a wellbore and methods of assembling the same
|
US10436026B2
(en)
*
|
2014-03-31 |
2019-10-08 |
Schlumberger Technology Corporation |
Systems, methods and apparatus for downhole monitoring
|
CA2946184C
(fr)
*
|
2014-06-04 |
2022-04-05 |
Halliburton Energy Services, Inc. |
Analyse de traitement de fracture sur la base de donnees de reflexion sismique
|
US10001613B2
(en)
*
|
2014-07-22 |
2018-06-19 |
Schlumberger Technology Corporation |
Methods and cables for use in fracturing zones in a well
|
US10738577B2
(en)
|
2014-07-22 |
2020-08-11 |
Schlumberger Technology Corporation |
Methods and cables for use in fracturing zones in a well
|
US10392916B2
(en)
|
2014-08-22 |
2019-08-27 |
Baker Hughes, A Ge Company, Llc |
System and method for using pressure pulses for fracture stimulation performance enhancement and evaluation
|
US9976402B2
(en)
*
|
2014-09-18 |
2018-05-22 |
Baker Hughes, A Ge Company, Llc |
Method and system for hydraulic fracture diagnosis with the use of a coiled tubing dual isolation service tool
|
TWI629456B
(zh)
*
|
2014-12-01 |
2018-07-11 |
財團法人國家實驗研究院 |
環境監測系統與震動感測裝置
|
WO2016089418A1
(fr)
*
|
2014-12-05 |
2016-06-09 |
Halliburton Energy Services, Inc. |
Structures organométalliques traçables destinées à être utilisées dans des formations souterraines
|
US10062202B2
(en)
|
2014-12-22 |
2018-08-28 |
General Electric Company |
System and methods of generating a computer model of a composite component
|
US10253598B2
(en)
*
|
2015-05-07 |
2019-04-09 |
Baker Hughes, A Ge Company, Llc |
Diagnostic lateral wellbores and methods of use
|
WO2017039605A1
(fr)
*
|
2015-08-31 |
2017-03-09 |
Halliburton Energy Services, Inc. |
Procédés et systèmes utilisant un modèle de prédiction de débit qui est fonction de la géométrie en grappes des perforations, des caractéristiques de fluide, et de l'activité acoustique
|
GB2558810A
(en)
|
2015-10-09 |
2018-07-18 |
Darkvision Tech Inc |
Devices and methods for imaging wells using phased array ultrasound
|
CN108350728B
(zh)
|
2015-11-05 |
2021-02-19 |
沙特阿拉伯石油公司 |
在储层中进行空间定向化学诱导脉冲压裂的方法及设备
|
CA3001550C
(fr)
|
2015-11-05 |
2020-04-07 |
Saudi Arabian Oil Company |
Declenchement d'une reaction exothermique pour reservoirs au moyen de micro-ondes
|
CN105525916B
(zh)
*
|
2016-01-07 |
2018-05-25 |
陕西师范大学 |
一种主动式噪声压裂效果检测方法
|
US10619470B2
(en)
*
|
2016-01-13 |
2020-04-14 |
Halliburton Energy Services, Inc. |
High-pressure jetting and data communication during subterranean perforation operations
|
US11530606B2
(en)
|
2016-04-07 |
2022-12-20 |
Bp Exploration Operating Company Limited |
Detecting downhole sand ingress locations
|
EP3670830B1
(fr)
|
2016-04-07 |
2021-08-11 |
BP Exploration Operating Company Limited |
Détection d'événements de fond de trou à l'aide de caractéristiques de domaine de fréquence acoustique
|
WO2017222679A1
(fr)
*
|
2016-06-24 |
2017-12-28 |
Baker Hughes Incorporated |
Système d'isolation de puits de forage à lignes de communication
|
CN105927266B
(zh)
*
|
2016-07-01 |
2018-05-08 |
山东唐口煤业有限公司 |
一种高压水力致裂煤层注水系统及注水自动化监控方法
|
US10598011B2
(en)
*
|
2016-08-15 |
2020-03-24 |
Baker Hughes Incorporated |
Segmented wireless production logging
|
CA3180983A1
(fr)
*
|
2016-08-18 |
2018-03-22 |
Seismos, Inc. |
Procede d'evaluation et de surveillance du traitement d'une fracture de formation a l'aide d'ondes de pression de fluide
|
WO2018136050A1
(fr)
*
|
2017-01-18 |
2018-07-26 |
Halliburton Energy Services, Inc. |
Détermination d'attribution de fluide dans un puits avec un système de détection de température distribué utilisant des données provenant d'un système de détection acoustique distribué
|
US11365626B2
(en)
|
2017-03-01 |
2022-06-21 |
Proptester, Inc. |
Fluid flow testing apparatus and methods
|
US10612356B2
(en)
|
2017-03-01 |
2020-04-07 |
Proptester, Inc. |
Fracture fluid and proppant transport testing systems and methods of using same
|
US11215044B2
(en)
*
|
2017-03-03 |
2022-01-04 |
Cold Bore Technology Inc. |
Adaptive noise reduction for event monitoring during hydraulic fracturing operations
|
EP3583296B1
(fr)
|
2017-03-31 |
2021-07-21 |
BP Exploration Operating Company Limited |
Surveillance de puits et de surcharge à l'aide de capteurs acoustiques distribués
|
AU2018321150A1
(en)
|
2017-08-23 |
2020-03-12 |
Bp Exploration Operating Company Limited |
Detecting downhole sand ingress locations
|
EP3695099A2
(fr)
|
2017-10-11 |
2020-08-19 |
BP Exploration Operating Company Limited |
Détection d'événements à l'aide de caractéristiques acoustiques de domaine fréquentiel
|
CN109931042B
(zh)
*
|
2017-12-18 |
2022-03-01 |
中国石油天然气股份有限公司 |
一种定向水力喷砂射孔压裂装置及方法
|
CN109025939B
(zh)
*
|
2018-07-27 |
2019-11-12 |
中国石油大学(北京) |
超声波致密油渗吸实验装置
|
CA3053791A1
(fr)
|
2018-09-04 |
2020-03-04 |
High-Definition Seismic Corporation |
Reseau de capteurs sismiques de trou de forage et methodes connexes
|
US20210389486A1
(en)
|
2018-11-29 |
2021-12-16 |
Bp Exploration Operating Company Limited |
DAS Data Processing to Identify Fluid Inflow Locations and Fluid Type
|
GB201820331D0
(en)
|
2018-12-13 |
2019-01-30 |
Bp Exploration Operating Co Ltd |
Distributed acoustic sensing autocalibration
|
US11111781B2
(en)
*
|
2019-02-20 |
2021-09-07 |
Tubel Llc |
Instrumenting unconventional wells for real time in situ frac height determination, reservoir fluid movement, production monitoring and well integrity in fractured stages
|
CN109973051B
(zh)
*
|
2019-04-11 |
2019-12-06 |
中国地质科学院地质力学研究所 |
一种高压水转换控制装置和应力测量系统
|
CN109899050A
(zh)
*
|
2019-04-15 |
2019-06-18 |
武汉理工大学 |
形成复杂裂缝网络的煤层气藏压裂方法
|
EP4045766A1
(fr)
|
2019-10-17 |
2022-08-24 |
Lytt Limited |
Caractérisation de débits entrants de fluide au moyen de mesures de das/dts hybrides
|
CA3154435C
(fr)
|
2019-10-17 |
2023-03-28 |
Lytt Limited |
Detection d'ecoulement entrant en utilisant de caracteristiques dts
|
WO2021093974A1
(fr)
|
2019-11-15 |
2021-05-20 |
Lytt Limited |
Systèmes et procédés d'améliorations du rabattement dans des puits
|
CN111350496A
(zh)
*
|
2020-03-19 |
2020-06-30 |
西安石油大学 |
一种用于井下水力压裂过程的裂缝表征的系统及方法
|
CA3180595A1
(fr)
|
2020-06-11 |
2021-12-16 |
Lytt Limited |
Systemes et procedes de caracterisation de flux de fluide souterrain
|
EP4168647A1
(fr)
|
2020-06-18 |
2023-04-26 |
Lytt Limited |
Formation de modèle d'événement à l'aide de données in situ
|
CN112112619A
(zh)
*
|
2020-09-16 |
2020-12-22 |
贵州大学 |
一种页岩气井下岩层水力压裂方法及其设备
|
RU2758263C1
(ru)
*
|
2020-12-05 |
2021-10-27 |
Общество с ограниченной ответственностью «Сигма» |
Способ сейсмического мониторинга процессов гидроразрыва пласта при разработке месторождений углеводородов и процессов теплового воздействия при разработке высоковязких углеводородов
|
US11474270B2
(en)
|
2021-01-04 |
2022-10-18 |
Saudi Arabian Oil Company |
Three-component seismic data acquisition while fracking
|