ATE310984T1 - Zustandsschätzung und einteilung für ein herstellungssystem - Google Patents

Zustandsschätzung und einteilung für ein herstellungssystem

Info

Publication number
ATE310984T1
ATE310984T1 AT02778248T AT02778248T ATE310984T1 AT E310984 T1 ATE310984 T1 AT E310984T1 AT 02778248 T AT02778248 T AT 02778248T AT 02778248 T AT02778248 T AT 02778248T AT E310984 T1 ATE310984 T1 AT E310984T1
Authority
AT
Austria
Prior art keywords
manufacturing system
classification
condition estimate
uncertainty values
candidate schedules
Prior art date
Application number
AT02778248T
Other languages
English (en)
Inventor
Alexander Pasadyn
Original Assignee
Advanced Micro Devices Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Advanced Micro Devices Inc filed Critical Advanced Micro Devices Inc
Application granted granted Critical
Publication of ATE310984T1 publication Critical patent/ATE310984T1/de

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32297Adaptive scheduling, feedback of actual proces progress to adapt schedule
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
AT02778248T 2001-09-13 2002-09-12 Zustandsschätzung und einteilung für ein herstellungssystem ATE310984T1 (de)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US31879201P 2001-09-13 2001-09-13
US10/210,753 US6738682B1 (en) 2001-09-13 2002-07-31 Method and apparatus for scheduling based on state estimation uncertainties
PCT/US2002/028872 WO2003023538A2 (en) 2001-09-13 2002-09-12 State estimation and scheduling for a manufacturing system

Publications (1)

Publication Number Publication Date
ATE310984T1 true ATE310984T1 (de) 2005-12-15

Family

ID=26905483

Family Applications (1)

Application Number Title Priority Date Filing Date
AT02778248T ATE310984T1 (de) 2001-09-13 2002-09-12 Zustandsschätzung und einteilung für ein herstellungssystem

Country Status (9)

Country Link
US (1) US6738682B1 (de)
EP (1) EP1425642B1 (de)
JP (1) JP2005502947A (de)
KR (1) KR100931708B1 (de)
CN (1) CN100380261C (de)
AT (1) ATE310984T1 (de)
DE (1) DE60207588T2 (de)
TW (1) TWI223761B (de)
WO (1) WO2003023538A2 (de)

Families Citing this family (102)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002123530A (ja) * 2000-10-12 2002-04-26 Hitachi Ltd 多次元データの可視化方法及び装置
EP1444631A2 (de) * 2001-11-07 2004-08-11 SAP Aktiengesellschaft Mehrzweck-konfigurationsmodell
US7031787B2 (en) * 2002-03-21 2006-04-18 Sap Aktiengesellschaft Change management
EP1523716A2 (de) * 2002-03-21 2005-04-20 Sap Ag Synchronisieren von benutzern auf gemeinsamen daten mit sperren
US20030182167A1 (en) * 2002-03-21 2003-09-25 Wolfgang Kalthoff Goal management
US7133878B2 (en) 2002-03-21 2006-11-07 Sap Aktiengesellschaft External evaluation processes
US20040230404A1 (en) * 2002-08-19 2004-11-18 Messmer Richard Paul System and method for optimizing simulation of a discrete event process using business system data
US7533008B2 (en) * 2002-08-19 2009-05-12 General Electric Capital Corporation System and method for simulating a discrete event process using business system data
US8185230B2 (en) * 2002-08-22 2012-05-22 Advanced Micro Devices, Inc. Method and apparatus for predicting device electrical parameters during fabrication
US7509326B2 (en) * 2002-09-03 2009-03-24 Sap Ag Central master data management
US7236973B2 (en) * 2002-11-27 2007-06-26 Sap Aktiengesellschaft Collaborative master data management system for identifying similar objects including identical and non-identical attributes
US8438238B2 (en) 2002-10-16 2013-05-07 Sap Ag Master data access
US20050021384A1 (en) * 2002-12-02 2005-01-27 Pershing Investments, Llc Capacity planning method and system with approved accuracy and confidence indication
US6912433B1 (en) * 2002-12-18 2005-06-28 Advanced Mirco Devices, Inc. Determining a next tool state based on fault detection information
US7653515B2 (en) * 2002-12-20 2010-01-26 Lam Research Corporation Expert knowledge methods and systems for data analysis
US9691053B1 (en) 2003-02-13 2017-06-27 Sap Se System and method of master data management
US7194320B2 (en) 2003-06-05 2007-03-20 Neuco, Inc. Method for implementing indirect controller
US6985825B1 (en) * 2003-07-15 2006-01-10 Advanced Micro Devices, Inc. Method and apparatus for adaptive sampling based on process covariance
US8639489B2 (en) * 2003-11-10 2014-01-28 Brooks Automation, Inc. Methods and systems for controlling a semiconductor fabrication process
US20070282480A1 (en) * 2003-11-10 2007-12-06 Pannese Patrick D Methods and systems for controlling a semiconductor fabrication process
US10086511B2 (en) 2003-11-10 2018-10-02 Brooks Automation, Inc. Semiconductor manufacturing systems
US8639365B2 (en) * 2003-11-10 2014-01-28 Brooks Automation, Inc. Methods and systems for controlling a semiconductor fabrication process
US20050130329A1 (en) * 2003-12-16 2005-06-16 Yushan Liao Method for the prediction of the source of semiconductor part deviations
US7930149B2 (en) * 2003-12-19 2011-04-19 Sap Aktiengesellschaft Versioning of elements in a configuration model
US20050149474A1 (en) * 2003-12-30 2005-07-07 Wolfgang Kalthoff Master data entry
US7272776B2 (en) * 2003-12-30 2007-09-18 Sap Aktiengesellschaft Master data quality
US6898471B1 (en) * 2003-12-31 2005-05-24 Taiwan Semiconductor Manufacturing Company Multivariate RBR tool aging adjuster
US7107112B2 (en) * 2004-05-17 2006-09-12 Brown Peter G Method and system for simulating and modeling a batch manufacturing facility
US7502715B1 (en) * 2004-09-21 2009-03-10 Asml Netherlands B.V Observability in metrology measurements
US7519447B1 (en) * 2004-10-05 2009-04-14 Advanced Micro Devices, Inc. Method and apparatus for integrating multiple sample plans
JP2006108474A (ja) * 2004-10-07 2006-04-20 Canon Inc 露光装置及びそれを用いたデバイス製造方法
US20060111858A1 (en) * 2004-11-22 2006-05-25 Yucai Zhu Computer method and apparatus for online process identification
US8180664B2 (en) * 2004-12-01 2012-05-15 Hewlett-Packard Development Company, L.P. Methods and systems for forecasting with model-based PDF estimates
GB2437894B (en) * 2005-02-28 2011-04-13 Advanced Micro Devices Inc Automated Throughput Control System And Method Of Operating The Same
WO2007001252A1 (en) * 2005-06-13 2007-01-04 Carnegie Mellon University Apparatuses, systems, and methods utilizing adaptive control
DE102005030586A1 (de) * 2005-06-30 2007-01-11 Advanced Micro Devices, Inc., Sunnyvale Verfahren und System für eine fortschrittliche Prozesssteuerung unter Anwendung der Messunsicherheit als Steuerungseingang
JP4772401B2 (ja) * 2005-07-06 2011-09-14 株式会社東芝 最適化方法、最適化システム、及び、装置を製造する方法
DE102005046972A1 (de) * 2005-09-30 2007-04-05 Advanced Micro Devices, Inc., Sunnyvale Verfahren und System für eine fortschrittliche Prozesssteuerung unter Anwendung einer Kombination aus gewichteten relativen Voreinstellungswerten
US8515567B2 (en) 2005-12-21 2013-08-20 Globalfoundries Inc. Enhanced state estimation based upon information credibility
US7840287B2 (en) 2006-04-13 2010-11-23 Fisher-Rosemount Systems, Inc. Robust process model identification in model based control techniques
US20080059290A1 (en) * 2006-06-12 2008-03-06 Mcfaul William J Method and system for selecting a candidate for a position
GB0613955D0 (en) * 2006-07-13 2007-01-10 Bae Systems Plc Controller
ATE552543T1 (de) * 2006-07-14 2012-04-15 Siemens Ag Anordnung und verfahren zum speichern von messwerten, insbesondere zur überwachung von energieübertragungssystemen
AU2007282234B8 (en) * 2006-08-09 2011-11-24 Auckland Uniservices Limited Process control of an industrial plant
US20080065447A1 (en) * 2006-08-29 2008-03-13 International Business Machines Corporation Interactive and Incremental Event Scheduling
US7769080B2 (en) * 2006-09-07 2010-08-03 Telefonaktiebolaget Lm Ericsson (Publ) Method for covariance matrix update
US7738984B2 (en) * 2006-09-12 2010-06-15 International Business Machines Corporation System for and method of interpolation for supply chain planning
US7738986B2 (en) * 2006-10-09 2010-06-15 GlobalFoundries, Inc. Method and apparatus for compensating metrology data for site bias prior to filtering
DE102006051495B4 (de) * 2006-10-31 2017-11-02 Globalfoundries Inc. Verfahren und System zur zufälligen Verteilung von Scheiben in einer komplexen Prozesslinie
US7912746B2 (en) * 2006-11-14 2011-03-22 Raytheon Company Method and system for analyzing schedule trends
EP2019367A1 (de) * 2007-06-28 2009-01-28 Siemens Aktiengesellschaft Verfahren zum Verbessern der Leistung eines verteilten Schedulers
US7761179B2 (en) * 2007-09-24 2010-07-20 Intel Corporation Method for consistent updates to automated process control (APC) models with partitioning along multiple components
US8364404B2 (en) * 2008-02-06 2013-01-29 Schlumberger Technology Corporation System and method for displaying data associated with subsurface reservoirs
US8055470B2 (en) * 2008-02-14 2011-11-08 Yahoo!, Inc. Simulated bucket testing
US20100076898A1 (en) * 2008-07-03 2010-03-25 Aspect Software Inc. Method of Scheduling a Workforce Constrained By Work Rules and Labor Laws
EP2161637B1 (de) * 2008-09-04 2015-05-20 Siemens Aktiengesellschaft Verfahren zur Aktualisierung der Fertigungsplanungsdaten für einen Fertigungsprozess
US8090456B2 (en) 2008-11-03 2012-01-03 United Technologies Corporation System and method for design and control of engineering systems utilizing component-level dynamic mathematical model
US8131384B2 (en) * 2008-11-03 2012-03-06 United Technologies Corporation Design and control of engineering systems utilizing component-level dynamic mathematical model with multiple-input multiple-output estimator
NL2003919A (en) * 2008-12-24 2010-06-28 Asml Netherlands Bv An optimization method and a lithographic cell.
US9768082B2 (en) * 2009-02-13 2017-09-19 Hermes Microvision Inc. Method and machine for examining wafers
US20100211202A1 (en) * 2009-02-13 2010-08-19 Hermes Microvision, Inc. Method and machine for examining wafers
US8315741B2 (en) 2009-09-02 2012-11-20 United Technologies Corporation High fidelity integrated heat transfer and clearance in component-level dynamic turbine system control
US8668434B2 (en) 2009-09-02 2014-03-11 United Technologies Corporation Robust flow parameter model for component-level dynamic turbine system control
EP2365410B1 (de) * 2010-03-09 2018-06-27 Siemens Aktiengesellschaft Steuerung eines Herstellungsverfahrens
JP6044977B2 (ja) * 2011-06-30 2016-12-14 国立大学法人 筑波大学 最適指標生成装置、最適指標生成方法、最適指標生成プログラム及び最適指標生成サーバ
US9677493B2 (en) 2011-09-19 2017-06-13 Honeywell Spol, S.R.O. Coordinated engine and emissions control system
US20130111905A1 (en) 2011-11-04 2013-05-09 Honeywell Spol. S.R.O. Integrated optimization and control of an engine and aftertreatment system
US9650934B2 (en) 2011-11-04 2017-05-16 Honeywell spol.s.r.o. Engine and aftertreatment optimization system
DE202012011690U1 (de) 2012-03-09 2013-03-13 Schneider Gmbh & Co. Kg Anlage zum Bearbeiten optischer Linsen
US10161313B2 (en) 2013-03-15 2018-12-25 United Technologies Corporation Compact aero-thermo model based engine material temperature control
JP5977207B2 (ja) * 2013-07-04 2016-08-24 株式会社神戸製鋼所 状態推定装置、該方法及び該プログラム
US9897984B2 (en) * 2014-08-05 2018-02-20 Mitsubishi Electric Research Laboratories, Inc. Model predictive control with uncertainties
US10074142B1 (en) * 2014-08-18 2018-09-11 Algonyx LLC Computational architecture and method for a time-varying control system
EP3051367B1 (de) 2015-01-28 2020-11-25 Honeywell spol s.r.o. Ansatz und system zur handhabung von einschränkungen für gemessene störungen mit unsicherer vorschau
EP3056706A1 (de) 2015-02-16 2016-08-17 Honeywell International Inc. Ansatz zur nachbehandlungssystemmodellierung und modellidentifizierung
EP3091212A1 (de) 2015-05-06 2016-11-09 Honeywell International Inc. Identifikationsansatz für verbrennungsmotor-mittelwertmodelle
EP3734375B1 (de) 2015-07-31 2023-04-05 Garrett Transportation I Inc. Quadratischer programmlöser für mpc mit variabler anordnung
US10272779B2 (en) 2015-08-05 2019-04-30 Garrett Transportation I Inc. System and approach for dynamic vehicle speed optimization
DE102015015040A1 (de) 2015-11-12 2017-05-18 Schneider Gmbh & Co. Kg Verfahren, Anlage und System zur Bearbeitung optischer Linsen
US10394973B2 (en) * 2015-12-18 2019-08-27 Fisher-Rosemount Systems, Inc. Methods and apparatus for using analytical/statistical modeling for continued process verification (CPV)
US10415492B2 (en) 2016-01-29 2019-09-17 Garrett Transportation I Inc. Engine system with inferential sensor
JP6350554B2 (ja) * 2016-02-03 2018-07-04 横河電機株式会社 設備診断装置、設備診断方法及び設備診断プログラム
US10124750B2 (en) 2016-04-26 2018-11-13 Honeywell International Inc. Vehicle security module system
US10036338B2 (en) 2016-04-26 2018-07-31 Honeywell International Inc. Condition-based powertrain control system
DE102016007837A1 (de) 2016-05-25 2017-11-30 Schneider Gmbh & Co. Kg Verfahren und System zur Bearbeitung optischer Linsen
JP6383384B2 (ja) * 2016-06-24 2018-08-29 ウィンボンド エレクトロニクス コーポレーション 半導体装置、半導体装置の製造方法および固有情報の生成方法
US11263545B2 (en) * 2016-06-30 2022-03-01 Microsoft Technology Licensing, Llc Control of cyber-physical systems under uncertainty
US10372114B2 (en) * 2016-10-21 2019-08-06 Kla-Tencor Corporation Quantifying and reducing total measurement uncertainty
US11199120B2 (en) 2016-11-29 2021-12-14 Garrett Transportation I, Inc. Inferential flow sensor
DE102016123699A1 (de) * 2016-12-07 2018-06-07 Endress+Hauser Conducta Gmbh+Co. Kg Verfahren zur Bestimmung einer Messunsicherheit eines Messwerts eines Feldgeräts
CN107291061B (zh) * 2017-02-22 2018-03-27 贵州北盘江电力股份有限公司董箐发电厂 一种基于量化评估的水电机组健康状态评估方法
US20180341876A1 (en) * 2017-05-25 2018-11-29 Hitachi, Ltd. Deep learning network architecture optimization for uncertainty estimation in regression
DE102017111926A1 (de) * 2017-05-31 2018-12-06 Infineon Technologies Ag Prozesssteuerschaltung und Verfahren zum Steuern einer Bearbeitungsanordnung
TWI639925B (zh) * 2017-08-28 2018-11-01 Powerchip Technology Corporation 統計多維變數而推算生產力的方法、統計多維變數而排程優先順序的方法與統計多維變數進行最佳化配置的方法
US11057213B2 (en) 2017-10-13 2021-07-06 Garrett Transportation I, Inc. Authentication system for electronic control unit on a bus
US11042148B2 (en) 2017-11-23 2021-06-22 Taiwan Semiconductor Manufacturing Company, Ltd. System and method for scheduling semiconductor lot to fabrication tool
US11501193B2 (en) 2017-12-18 2022-11-15 Mitsubishi Electric Research Laboratories, Inc. Model-based control under uncertainty
CN108268730B (zh) * 2018-01-23 2021-06-04 北京航空航天大学 一种面向产品可靠性退化的tbe控制图系统优化设计方法
DE102019100636A1 (de) * 2019-01-11 2020-07-16 Osram Opto Semiconductors Gmbh Verfahren zur kapazitätsgrenzenermittlung, vorrichtung zur datenverarbeitung und computerprogramm
CN110794788B (zh) * 2019-11-18 2021-06-08 国机工业互联网研究院(河南)有限公司 一种生产排程装置、方法、设备及计算机可读存储介质
WO2022033740A1 (en) * 2020-08-13 2022-02-17 Universitat Politecnica De Catalunya Automatically evolving a process model
KR102543488B1 (ko) * 2021-04-19 2023-06-13 재단법인대구경북과학기술원 시스템 상태 추정 장치 및 방법

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5115391A (en) 1990-01-26 1992-05-19 At&T Bell Laboratories Kalman filter-based optimizer and method and optimizing
US5687077A (en) * 1991-07-31 1997-11-11 Universal Dynamics Limited Method and apparatus for adaptive control
FI922031A0 (fi) 1991-10-23 1992-05-05 Antti Aarne Ilmari Lange Foerfarande foer kalman-filter i stora system.
US5918200A (en) 1992-08-31 1999-06-29 Yamatake-Honeywell Co., Ltd. State estimating apparatus
US5682309A (en) 1995-04-28 1997-10-28 Exxon Chemical Patents Inc. Feedback method for controlling non-linear processes
US5953229A (en) * 1996-09-24 1999-09-14 Environmental Research Institute Of Michigan Density-based emergent scheduling system
JPH10207939A (ja) * 1997-01-17 1998-08-07 Nec Corp ワークフローシステム
US5865665A (en) 1997-02-14 1999-02-02 Yueh; William In-situ endpoint control apparatus for semiconductor wafer polishing process
US6092033A (en) 1997-04-16 2000-07-18 Uhlmann; Jeffrey K. Method and apparatus for fusing mean and covariance estimates
US6163730A (en) 1997-08-11 2000-12-19 Motorola, Inc. Method and control system for changing the state of a plant
US5991525A (en) 1997-08-22 1999-11-23 Voyan Technology Method for real-time nonlinear system state estimation and control
US6633782B1 (en) * 1999-02-22 2003-10-14 Fisher-Rosemount Systems, Inc. Diagnostic expert in a process control system
EP1052558B1 (de) 1999-05-14 2002-08-07 Abb Research Ltd. Verfahren und Einrichtung zur Zustandsschätzung
US6745089B2 (en) * 2000-02-01 2004-06-01 California Institute Of Technology Adaptable state based control system
US6584369B2 (en) * 2000-02-02 2003-06-24 Texas Instruments Incorporated Method and system for dispatching semiconductor lots to manufacturing equipment for fabrication
US6519498B1 (en) * 2000-03-10 2003-02-11 Applied Materials, Inc. Method and apparatus for managing scheduling in a multiple cluster tool

Also Published As

Publication number Publication date
WO2003023538A3 (en) 2003-10-23
EP1425642B1 (de) 2005-11-23
US6738682B1 (en) 2004-05-18
WO2003023538A2 (en) 2003-03-20
CN100380261C (zh) 2008-04-09
DE60207588D1 (de) 2005-12-29
EP1425642A2 (de) 2004-06-09
DE60207588T2 (de) 2006-11-30
CN1552006A (zh) 2004-12-01
KR20040033315A (ko) 2004-04-21
KR100931708B1 (ko) 2009-12-14
TWI223761B (en) 2004-11-11
JP2005502947A (ja) 2005-01-27

Similar Documents

Publication Publication Date Title
ATE310984T1 (de) Zustandsschätzung und einteilung für ein herstellungssystem
ATE481030T1 (de) System und methode zur vorhersage der menschlichen kognitiven leistung anhand von aktigraph-daten
ATE302976T1 (de) Anlage und verfahren zum vorhersagen von menschlichen kognitiven leistungen unter verwendung von aktigraphdaten
DE60134692D1 (de) Beleuchtungsanordnung für Tastaturen und die dynamische bzw. individuelle Beleuchtung der Tasten sowie Verfahren zu ihrer Verwendung
ATE496350T1 (de) System zur verwaltung des lebenszyklus einer dienstorientierten architektur
ATE413056T1 (de) System und verfahren zur kompetenzbasierten anrufverteilung in einer anrufzentrale
MY150399A (en) System and method for topology-aware job scheduling and backfilling in an hpc environment
DE60228861D1 (de) Verfahren und vorrichtung zur einplanung von anforderungen unter verwendung geordneter stufen von einplanungskriterien
DE602004032326D1 (de) Verwaltung von aufgaben in einer datenverarbeitungsumgebung
DE60313361D1 (de) Planung von datenübertragung für kommunikationsendgeräte mit variabler planungsverzögerung
JP2005502947A5 (de)
ATE387663T1 (de) Verfahren und vorichtungen zur erzielung der thermischen verwaltung unter verwendung von verarbeitungs-task-einteilung
ATE422748T1 (de) Datenübertragung mit ungleichförmiger verteilung von datenraten für ein system mit mehreren eingängen und mehreren ausgängen
ATE321450T1 (de) Spitzensystem und verfahren für ein solches
ATE388552T1 (de) Kommunikationsnetzwerk und verfahren zur steuerung des kommunikationsnetzwerks
DE69931302D1 (de) Zeitbasierte Ablaufsteuerungsarchitektur und Verfahren für ATM Netzwerke
DE602004005765D1 (de) Messenger Assistent für Personal Information Manager
ATE444377T1 (de) Nukleinsäurecharakterisierung
DE60233174D1 (de) Verfahren und system zur schätzung der position einer mobilen einrichtung
ATE433638T1 (de) Verfahren zum betrieb eines kommunikationssystems und vorrichtungen für ein solches system
DE60317136D1 (de) Immuntestverfahren, Reagenz für Immuntestverfahren und Verfahren zu dessen Herstellung
DE50302268D1 (de) Mikroskopiesystem und Mikroskopieverfahren für mehrere Beobachter
WO2004090683A3 (en) System and method for efficient scheduling of periodic phenomena
WO2006083652A3 (en) Scheduler
WO2003038648A3 (en) A backtracking resources planning algorithm

Legal Events

Date Code Title Description
RER Ceased as to paragraph 5 lit. 3 law introducing patent treaties