AT70926B - Method of grading excavation pits. - Google Patents

Method of grading excavation pits.

Info

Publication number
AT70926B
AT70926B AT70926DA AT70926B AT 70926 B AT70926 B AT 70926B AT 70926D A AT70926D A AT 70926DA AT 70926 B AT70926 B AT 70926B
Authority
AT
Austria
Prior art keywords
tubes
hook
excavation pits
grading
way
Prior art date
Application number
Other languages
German (de)
Original Assignee
Siemens Schuckertwerke Wien
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Schuckertwerke Wien filed Critical Siemens Schuckertwerke Wien
Priority to AT70926D priority Critical patent/AT70926B/en
Application granted granted Critical
Publication of AT70926B publication Critical patent/AT70926B/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Verfahren zum Ab8tufen von Baugruben. 



   Im Stammpatent Nr.   48591 ist   an mehreren Ausführungsbeispielen gezeigt, in welcher Weise man erfindungsgemäss an den zur Absteifung der Baugruben eingebrachten Röhren Halter befestigen kann, gegen die sich die   Schalungshölzer   legen. 



   Eine weitere Ausführungsform erhält man, wenn man die als   Bundpfähle   benutzten Röhren in ihrer Längsrichtung mit zwei Reihen länglicher Löcher versieht und die Bohlen an den Röhren mit Hakenschrauben befestigt, deren hakenförmige Enden in die   länglichen   Löcher in der Weise eingreifen, dass die Röhren aus dem Boden gezogen werden können. Diese Anordnung bietet den grossen Vorteil, dass die zur Absteifung benutzten Röhren nach Vollendung des Banes aus dem Boden entfernt uad in gleicher Weise von neuem verwendet werden können. 



   Die Fig. 1 bis 4 zeigen eine derartige Ausführung. Fig. 1 zeigt einen Schnitt durch das Rohr. Fig. 2 ist die Ansicht durch die fertige Schalungswand von der Baugrube aus. 



  Fig. 3 stellt das in den Erdboden zu treibende Rohr dar. Fig. 4 ist ein Schnitt durch die   Bohlenwand. 1   ist das Rohr, welches mit den   länglichen   Löchern 2 versehen ist. Die Bohlen 3 sind an ihren Stirnflächen etwas abgeschrägt und legen sich mit diesen Flächen gegen die Röhren. 4 sind die Verbindungsschrauben, deren in das Rohr eingreifende Enden hakenförmig umgebogen sind. Die umgebogenen Enden liegen dabei   waagerecht.   



   Zieht man das Rohr aus der Erde heraus, so werden bei Beginn der Aufwärts- 
 EMI1.1 
 um ihre Achse so gedreht, dass die Haken schliesslich nach oben stehen und aus den Löchern heraustreten. Die vollständige Entfernung der Röhren ist dann ohneweiters zu bewerkstelligen. Es ist zweckmässig, unter den Schraubenmuttern Laschen anzubringen, durch welche dio Bohlen eventuell bis zu ihrer ganzen Breite unterstützt werden. Um die Drehung der Schrauben um ihre Achse bei dem Herausziehen der Rohre zu erleichtern, wird man die Schrauben zweckmässig auf der einen Seite mit Rechts- und auf der anderen mit Linksgewinde ausführen und sie derartig einsetzen, dass die Drehung um ihre Achse beim Entfernen der Rohre ein Lockern der Schraubenmuttern zur Folge hat. 



   Ein besonderer Vorteil des Verfahrens gegenüber dem Verfahren mit   T-Trägern, in   welche die Bohlen unter Spielraum eingeschoben werden, liegt noch darin, dass an den Stirnflächen der Schalungsbohlen keine Hohlräume entstehen und daher die Abdichtung   eine vollkommene ist. vollkommene ist.   

**WARNUNG** Ende DESC Feld kannt Anfang CLMS uberlappen**.



   <Desc / Clms Page number 1>
 



  Procedure for sinking construction pits.



   The parent patent no. 48591 shows in several exemplary embodiments the way in which, according to the invention, brackets can be attached to the tubes used to stiffen the construction pits, against which the formwork timber is placed.



   Another embodiment is obtained if the tubes used as collar piles are provided with two rows of elongated holes in their longitudinal direction and the planks are fastened to the tubes with hook bolts, the hooked ends of which engage in the elongated holes in such a way that the tubes rise from the ground can be drawn. This arrangement offers the great advantage that the tubes used for stiffening can be removed from the ground after completion of the banes and can be used again in the same way.



   FIGS. 1 to 4 show such an embodiment. Fig. 1 shows a section through the pipe. Fig. 2 is the view through the finished formwork wall from the excavation.



  Fig. 3 shows the pipe to be driven into the ground. Fig. 4 is a section through the pile wall. 1 is the pipe which is provided with the elongated holes 2. The planks 3 are slightly beveled at their end faces and lie with these faces against the tubes. 4 are the connecting screws, the ends of which engaging in the tube are bent over like a hook. The bent ends are horizontal.



   If you pull the pipe out of the earth, at the beginning of the upward
 EMI1.1
 rotated around its axis so that the hooks finally stand up and emerge from the holes. The complete removal of the tubes can then be accomplished without further ado. It is advisable to attach brackets under the screw nuts through which the planks can be supported up to their entire width. In order to facilitate the rotation of the screws around their axis when pulling out the pipes, the screws will expediently be executed on one side with right-hand thread and on the other with left-hand thread and they will be inserted in such a way that the rotation around their axis when removing the pipes causes the nuts to loosen.



   A particular advantage of the method compared to the method with T-beams, into which the planks are inserted with space, is that there are no cavities on the end faces of the formwork planks and therefore the seal is perfect. is perfect.

** WARNING ** End of DESC field may overlap beginning of CLMS **.

 

Claims (1)

PATENT-ANSPRUCH : Verfahren zum Absteifen von Baugruben nach Patent Nr. 48591 unter Verwendung von Röhren, welche mit Löchern versehen sind, gekennzeichnet durch die Verwendung von Hakenschrauben in der Weise, dass die Haken in wagcreohter Lage in die länglichen T eingreifen, zu dem Zwecke, ein Herausziehen der Hohru unter Drehung der Haken in eine nach oben geneigte Lage zu ermöglichen. *) Erstes Zusatzpatent Nr. 70985. **WARNUNG** Ende CLMS Feld Kannt Anfang DESC uberlappen**. PATENT CLAIM: Method for bracing construction pits according to patent no. 48591 using tubes which are provided with holes, characterized by the use of hook bolts in such a way that the hooks engage in the oblong T in the horizontal position for the purpose of pulling out the Allow Hohru to tilt upward while rotating the hook. *) First additional patent No. 70985. ** WARNING ** End of CLMS field may overlap beginning of DESC **.
AT70926D 1910-05-20 1914-03-07 Method of grading excavation pits. AT70926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT70926D AT70926B (en) 1910-05-20 1914-03-07 Method of grading excavation pits.

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AT48591T 1910-05-20
DE70926X 1914-01-21
AT70926D AT70926B (en) 1910-05-20 1914-03-07 Method of grading excavation pits.

Publications (1)

Publication Number Publication Date
AT70926B true AT70926B (en) 1916-01-10

Family

ID=27150135

Family Applications (1)

Application Number Title Priority Date Filing Date
AT70926D AT70926B (en) 1910-05-20 1914-03-07 Method of grading excavation pits.

Country Status (1)

Country Link
AT (1) AT70926B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3815369A (en) * 1971-06-23 1974-06-11 J Meredith Shoring system components
US5244316A (en) * 1991-05-17 1993-09-14 Wright William M Borer-resistant waterfront retaining bulkhead

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3815369A (en) * 1971-06-23 1974-06-11 J Meredith Shoring system components
US5244316A (en) * 1991-05-17 1993-09-14 Wright William M Borer-resistant waterfront retaining bulkhead

Similar Documents

Publication Publication Date Title
AT70926B (en) Method of grading excavation pits.
DE292984C (en)
DE3603238A1 (en) Method of renewing sewage lines and apparatus for carrying out the method
CH367130A (en) Gravel basket
DE895277C (en) Rammable steel post
AT61209B (en) Method of reinforcing concrete piles.
DE677458C (en) Driving pipe for the production of concrete piles in the ground
DE625897C (en) Multi-part drive core for driving in sheet metal sleeves for location posts
DE530862C (en) Filling pipe, which is composed of detachable pipe sections and is suspended at the lowest pipe section, for site posts and underwater concrete work
DE69223503T2 (en) Method and device for building and dismantling light bridges
AT134430B (en) Enclosure made of wire mesh or mesh.
AT73015B (en) Device for motorized soil cultivation.
DE957469C (en) Piping of wells, especially of great depth and large diameter
DE646400C (en) Iron founding stake
DE1944256C3 (en) Method and form for making a mast from concrete
AT151478B (en) Earth silo for receiving fermenting goods.
AT70925B (en) Method of grading excavation pits.
AT225889B (en) Process for the creation of a reinforced concrete structure and structure created according to this process
DE81758C (en)
DE1059359B (en) Method and device for bracing progressively excavated construction pits, for example by excavators
AT296130B (en) Method and device for the production of concrete poles
DE721062C (en) Method and devices for overcoming the resistance when pulling out components, in particular jacking pipes, piles and the like. like
AT68555B (en) Reinforced concrete attachment for wooden posts.
AT69455B (en) Method of making well bores and pile holes.
DE556304C (en) Sheet pile wall made of corrugated sheets overlapping in the joint