AT519622B1 - HOLDING DEVICE FOR ATTACHING BARRAIL ELEMENTS - Google Patents

HOLDING DEVICE FOR ATTACHING BARRAIL ELEMENTS Download PDF

Info

Publication number
AT519622B1
AT519622B1 ATA50116/2017A AT501162017A AT519622B1 AT 519622 B1 AT519622 B1 AT 519622B1 AT 501162017 A AT501162017 A AT 501162017A AT 519622 B1 AT519622 B1 AT 519622B1
Authority
AT
Austria
Prior art keywords
holding device
fastening
profile
parapet
profile carrier
Prior art date
Application number
ATA50116/2017A
Other languages
German (de)
Other versions
AT519622A1 (en
Inventor
Harra Stefan
Original Assignee
Harra Stefan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harra Stefan filed Critical Harra Stefan
Priority to ATA50116/2017A priority Critical patent/AT519622B1/en
Publication of AT519622A1 publication Critical patent/AT519622A1/en
Application granted granted Critical
Publication of AT519622B1 publication Critical patent/AT519622B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3223Means supported by building floors or flat roofs, e.g. safety railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/12Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members
    • E04C3/14Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members with substantially solid, i.e. unapertured, web

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

Die Erfindung betrifft eine Haltevorrichtung (1) aus Metall, zum Befestigen von Brüstungselementen (2) wie Brüstungsplatten, mit zumindest einem durch einen ersten Profilträger (201) gebildeten Aufnahmeelement (1a) zur Aufnahme von mindestens einem Brüstungselement (2) und mit zumindest einem Befestigungselement (1b) zum Befestigen an einem Gebäude (50), wobei der erste Profilträger (201) zumindest einen ersten Gurt (201a) und zumindest einen dazu normal angeordneten ersten Steg (201c) aufweist, und wobei eine erste Längsachse (101) des Aufnahmeelementes (1a) im Wesentlichen normal zu einer zweiten Längsachse (201) des Befestigungselementes (1b) verläuft. Eine Verbindung mit hoher Stabilität zum Gebäude (50) lässt sich dadurch erreichen, dass das Befestigungselement (1b) durch einen zweiten Profilträger (202) gebildet ist, wobei der zweite Profilträger (202) dazu ausgebildet ist, um in den Deckenbeton einer Betondecke einbetoniert zu werden und zumindest einen zweiten Gurt (202a, 202b) und zumindest einen normal auf diesen ausgebildeten zweiten Steg (202c) aufweist, wobei der zweite Profilträger (202) ein H-Profil mit zwei zweiten Gurten (202a, 202b) – nämlich einem Untergurt (202a) und einem Obergurt (202b)– und einem zweiten Steg (202c) aufweist, wobei die beiden zweiten Gurte (202a, 202b) durch den zweiten Steg (202c) miteinander verbunden sind, dass die Breite (b1) des Untergurtes (202a) des zweiten Profilträgers (202) zumindest abschnittsweise größer ist als die Breite (b2) des Obergurtes (202b), und dass der erste Profilträger (201) ein T-Profil mit einem ersten Gurt (201a) und einen ersten Steg (201c) aufweist.The invention relates to a metal holding device (1) for fastening parapet elements (2) such as parapet panels, with at least one receiving element (1a) formed by a first profile carrier (201) for receiving at least one parapet element (2) and with at least one fastening element (1b) for fastening to a building (50), wherein the first profile carrier (201) has at least one first belt (201a) and at least one first web (201c) arranged normal thereto, and wherein a first longitudinal axis (101) of the receiving element ( 1a) essentially normal to a second longitudinal axis (201) of the fastening element (1b). A connection with high stability to the building (50) can be achieved in that the fastening element (1b) is formed by a second profiled beam (202), the second profiled beam (202) being designed to be concreted into the ceiling concrete of a concrete ceiling and at least one second chord (202a, 202b) and at least one second web (202c) formed normal to this, the second profile carrier (202) having an H-profile with two second chords (202a, 202b) - namely a lower chord ( 202a) and an upper chord (202b) and a second web (202c), the two second chords (202a, 202b) being connected to one another by the second web (202c) such that the width (b1) of the lower chord (202a) of the second profiled beam (202) is at least partially larger than the width (b2) of the upper flange (202b), and that the first profiled beam (201) has a T-profile with a first flange (201a) and a first web (201c).

Description

Beschreibungdescription

[0001] Die Erfindung betrifft eine Haltevorrichtung aus Metall, zum Befestigen von Brüstungselementen wie Brüstungsplatten, mit zumindest einem durch einen ersten Profilträger gebildeten Aufnahmeelement zur Aufnahme von mindestens einem Brüstungselement und mit zumindest einem Befestigungselement zum Befestigen an einem Gebäude, wobei der erste Profilträger zumindest einen ersten Steg und zumindest einen dazu normal angeordneten ersten Gurt aufweist, und wobei eine erste Längsachse des Aufnahmeelementes im Wesentlichen normal zu einer zweiten Längsachse des Befestigungselementes verläuft. The invention relates to a holding device made of metal, for fastening parapet elements such as parapet panels, with at least one receiving element formed by a first profile carrier for receiving at least one parapet element and with at least one fastening element for fastening to a building, the first profile carrier having at least one first web and at least one first chord disposed normal thereto, and wherein a first longitudinal axis of the receiving member is substantially normal to a second longitudinal axis of the fastener.

[0002] Um Brüstungen an Gebäuden aufbauen zu können sind bereits Systeme bekannt, die im Wesentlichen durch Brüstungselemente wie Tafeln oder Platten sowie Haltevorrichtungen aufgebaut sind, wobei die Haltevorrichtungen zwischen den Tafeln oder Platten angeordnet werden und diese aufnehmen. Unter Brüstungen versteht man im allgemeinen Sprachgebrauch Begrenzungen von Balkonen, Dächern, Deckenteilen, Terrassen und dergleichen. Es ist meist wünschenswert, Brüstungen beim Bau von Gebäuden während des Bauprozesses so bald wie möglich an einem Stockwerk anzubringen, um sofort eine Absturzsicherung zu schaffen, damit die Arbeiten am Gebäude schnell fortgesetzt werden können. Darum ist es vorteilhaft, Befestigungselemente leicht und schnell an neu angefertigten Bauelementen anbringen zu können. Im Falle vergossener Decken ist es besonders vorteilhaft, die Befestigungselemente schon mit dem Vergießen der Decken anbringen zu können. In order to be able to build parapets on buildings, systems are already known which are constructed essentially by parapet elements such as panels or panels and holding devices, the holding devices being arranged between the panels or panels and receiving them. Balustrades are generally understood to mean the borders of balconies, roofs, ceiling parts, terraces and the like. When constructing buildings, it is often desirable to attach parapets to a floor as soon as possible during the construction process to provide immediate fall protection so that work on the building can proceed quickly. Therefore, it is advantageous to be able to easily and quickly attach fasteners to newly manufactured components. In the case of cast ceilings, it is particularly advantageous to be able to attach the fastening elements when the ceiling is cast.

[0003] In der US 2011/0210299 A1 ist eine derartige Haltevorrichtung beschrieben, welche an der unteren Seite über einen Flansch verfügt, der eine Schraubverbindung zum Gebäude herstellt. Dies stellt jedoch eine oft nicht ausreichend starke Verbindung dar, da hohe Brüstungen großen Biegemomenten, beispielsweise durch Wind oder menschliches Einwirken, ausgesetzt sein können und dies die Schraubverbindung nahe dem Befestigungselement schädigen kann. Außerdem sind sie erst ab Aushärten einer Decke an diese anbringbar, wodurch eine zusätzliche Absturzsicherung bis zur Fertigstellung der Brüstung aufgestellt werden muss, wenn in diesem Geschoss weitergearbeitet werden will. Ein weiterer Nachteil ist, dass diese Lösung den nutzbaren Wohnraum am Balkon bzw. auf der Terrasse verringert und architektonisch nicht mehr zeitgemäß ist. Darüber hinaus sind Abdichtungen, welche von Schrauben durchdrungen werden, bauphysikalisch problematisch. In US 2011/0210299 A1 such a holding device is described, which has a flange on the lower side, which produces a screw connection to the building. However, this is often not a sufficiently strong connection, since high parapets can be subjected to large bending moments, for example from wind or human action, and this can damage the screw connection near the fastener. In addition, they can only be attached to a ceiling after it has hardened, which means that additional fall protection must be set up until the parapet is completed if work is to continue on this floor. Another disadvantage is that this solution reduces the usable living space on the balcony or terrace and is no longer architecturally up-to-date. In addition, seals that are penetrated by screws are problematic in terms of building physics.

[0004] Aus der WO 2016/015065 A1 ist ein Bausatz für einen Brüstungsaufbau bekannt, welcher Befestigungsvorrichtungen für Brüstungsplatten vorsieht, wobei die Befestigungsvorrichtungen in einer Ausführung durch Dorne an dem Gebäude angebracht werden. Diese in einem Befestigungsabschnitt der Befestigungsvorrichtung angeordneten Dorne werden in der Regel in den Deckenbeton einbetoniert, um eine stabile Verbindung mit dem Gebäude zu schaffen. Eine Befestigung durch Schrauben oder dergleichen ohne Einbetonieren ist bei Dornen nicht möglich. Außerdem müssen die Befestigungsvorrichtungen bereits bei Verguss der Decke an der Baustelle in genügender Zahl vorhanden und auf richtige Art und Weise positioniert werden, da eine nachträgliche Korrektur oder Veränderung kaum möglich ist. Aus Stabilitätsgründen müssen die Dorne vollständig in die Decke einbetoniert werden. Die Dorne erlauben somit auf Grund der mangelnden Stabilität keinen von der Decke distanzierten bzw. vorragenden Einbau der Befestigungsvorrichtung zur Erhöhung der nutzbaren Wohnfläche. Da aus Festigkeitsgründen pro Befestigungsabschnitt zwei Dorne distanziert übereinander vorgesehen werden müssen, ist eine relativ große Höhenerstreckung der Gebäudedecke erforderlich, welche mit vertretbaren Aufwand nur durch Ortsbetondecken realisiert werden kann. Für Elementdecken mit geringer Bauhöhe sind Befestigungsvorrichtungen mit Dornen nicht geeignet. [0004] WO 2016/015065 A1 discloses a kit for a parapet structure which provides fastening devices for parapet panels, with the fastening devices being attached to the building by mandrels in one embodiment. These spikes, which are arranged in a fastening section of the fastening device, are usually concreted into the ceiling concrete in order to create a stable connection with the building. Fastening with screws or the like without embedding in concrete is not possible with thorns. In addition, the fastening devices must already be available in sufficient numbers at the construction site when the ceiling is grouted and must be positioned in the correct way, since subsequent corrections or changes are hardly possible. For reasons of stability, the mandrels must be concreted completely into the ceiling. Due to the lack of stability, the mandrels therefore do not allow the fastening device to be installed at a distance or protruding from the ceiling in order to increase the usable living space. Since, for reasons of strength, two mandrels must be provided spaced one above the other for each attachment section, the building ceiling must have a relatively large height, which can only be achieved with reasonable effort using in-situ concrete ceilings. Fastening devices with spikes are not suitable for element ceilings with a low construction height.

[0005] In einer zweiten Ausführungsvariante wird in der WO 2016/015065 A1 eine L- förmige Befestigungsvorrichtung vorgeschlagen, welches einen vertikalen Halteabschnitt mit H-förmigem Querschnitt und einen dazu normal angeordneten horizontalen Befestigungsabschnitt aufweist, welcher durch eine Befestigungsplatte gebildet ist. Die Befestigungsplatte weist Öffnungen auf und kann an die Decke angeschraubt werden. Die Befestigungsplatte ist zur Versteifung über In a second embodiment variant, WO 2016/015065 A1 proposes an L-shaped fastening device which has a vertical holding section with an H-shaped cross section and a horizontal fastening section which is arranged normal to it and is formed by a fastening plate. The mounting plate has openings and can be screwed to the ceiling. The mounting plate is over for stiffening

eine dreieckige Querstrebe zusätzlich mit dem Halteabschnitt der Befestigungsvorrichtung verbunden, was einen zusätzlichen Fertigungsaufwand erfordert. Die Befestigungsplatte kann auf dem Gebäude bzw. einen Unterbau aufgesetzt werden, ohne dass dabei der Halteabschnitt der Befestigungsvorrichtung in die Nutzfläche des Gebäudes ragt, indem der Halteabschnitt mit im Bereich einer das Gebäude begrenzenden Gebäudekante angebracht wird. Aus Stabilitätsgründen ist auch diese Befestigungsvorrichtung nicht geeignet, distanziert zur oder vorragend von der Gebäudedecke bzw. Kante der Gebäudedecke befestigt bzw. in diese einbetoniert zu werden. Durch die Querstrebe wird weiters das Abdichten erheblich erschwert und führt zu Zusatzkosten. Darüber hinaus ist die zweite Ausführung der Befestigungsvorrichtung für niedrige Bodenaufbauten nicht geeignet, da Bodenaufbauten, welche eine geringere Höhe als die Querstrebe aufweisen, aus dem Fußboden herausragen würden. a triangular cross brace is additionally connected to the holding portion of the fastening device, which requires additional manufacturing effort. The fastening plate can be placed on the building or a substructure without the holding section of the fastening device protruding into the usable area of the building, in that the holding section is attached in the area of a building edge delimiting the building. For reasons of stability, this fastening device is also not suitable for being fastened at a distance from or projecting from the building ceiling or the edge of the building ceiling or for being concreted into it. The cross brace also makes sealing considerably more difficult and leads to additional costs. In addition, the second embodiment of the fastening device is not suitable for low floor structures, since floor structures which have a lower height than the cross brace would protrude from the floor.

[0006] In der EP 0 586 639 B1 werden L-förmige Halteteile beschrieben, welche Schaltafeln, Brüstungen und ähnliches halten. Diese sind im Wesentlichen aus polymeren Werkstoff hergestellt, was nachteilig für die Belast- und Haltbarkeit des Halteteils ist. Jeder Halteteil weist einen nach oben offenen, hohl ausgeführten vertikalen Schenkel auf, in welchen eine Brüstungsstange eingeführt werden kann, welche Brüstungselemente aufnimmt. Dadurch wird ein weiterer Bauteil eingefügt, was einerseits zu Stabilitätsverlusten führen kann, und andererseits den Aufbau verkompliziert. Da um Kosten zu sparen versucht wird, die Arbeitsschritte vor Ort am Gebäude und die damit gebrauchte Arbeitszeit so gering wie möglich zu halten, sind Arbeitsvorgänge mit vielen Schritten unvorteilhaft. Die L-förmigen Halteteile sind ausschließlich für Deckenrandschalungen geeignet, nicht aber für im Baukörper verbleibende Brüstungen, welche den statischen Anforderungen bzw. Normen gerecht werden. [0006] EP 0 586 639 B1 describes L-shaped holding parts which hold formwork panels, parapets and the like. These are essentially made of polymer material, which is disadvantageous for the load and durability of the holding part. Each holding part has an upwardly open, hollow vertical leg, into which a parapet rod can be inserted, which receives parapet elements. As a result, another component is inserted, which on the one hand can lead to a loss of stability and on the other hand complicates the structure. Since an attempt is made to save costs by keeping the work steps on site at the building and the working time required as low as possible, work processes with many steps are disadvantageous. The L-shaped retaining parts are only suitable for slab edge formwork, but not for parapets remaining in the structure, which meet the structural requirements and standards.

[0007] Aus der CH 625 589 A5 ist ein Verfahren und eine Anordnung zum Anbringen einer Randschalung bekannt, wobei diese Schalungen durch im Querschnitt L-förmige Winkeleisen angebracht werden. Dieses L-förmige Winkeleisen ist aus zwei L-Profilen gefertigt. Die Verwendung von L-Profilen ist allerdings nachteilig, da L- Profile wenig verwindungssteif sind. Insbesondere während des Aufbaus der Brüstung ist dies problematisch, da es zum Beispiel durch die Bearbeitung, oder das Anbringen leicht zum Verwinde und Verbiegen kommen kann. Auch diese Lösung ist ausschließlich für Deckenrandschalungen geeignet, nicht aber für im Baukörper verbleibende Brüstungen, welche den statischen Anforderungen bzw. Normen gerecht werden. [0007] CH 625 589 A5 discloses a method and an arrangement for attaching an edge formwork, with this formwork being attached by angle irons with an L-shaped cross section. This L-shaped angle iron is made from two L-profiles. However, the use of L-profiles is disadvantageous since L-profiles are not very torsion-resistant. This is particularly problematic during the erection of the parapet, since, for example, processing or attachment can easily lead to twisting and bending. This solution is also only suitable for slab edge formwork, but not for parapets remaining in the structure, which meet the structural requirements and standards.

[0008] Die CN 106193481 A beschreibt ein Verfahren zur Schaffung einer einfachen lösbaren Verbindung eines vertikalen Geländerpfostens mit einem horizontalen I- Träger einer temporären Absturzsicherung für Fußgänger. Dabei wird eine Basisplatte mit zwei beidseitigen Halteklauen aus einem |-Träger gefertigt und über den horizontalen I-Träger geschoben, wobei die Halteklauen den Obergurt des horizontalen I-Trägers untergreifen. Mit der Basisplatte ist ein ebenfalls l-förmiger Geländerpfosten verschweißt. Konzeptbedingt muss ein Spiel zwischen dem Obergurt des I-trägers und der Basisplatte vorhanden, um das Verschieben der Basisplatte auf dem Obergurt bei der Montage und Demontage zu ermöglichen. Dadurch ist - ohne weitere Fixierungsmaßnahmen - eine starre Verbindung mit dem Geländerpfosten nicht gewährleistet, es besteht die Gefahr, dass die Geländerpfosten wackeln und unstabil werden. Für dauerhafte und hochbelastbare Brüstungselemente an Gebäuden ist diese Anordnung nicht geeignet. The CN 106193481 A describes a method for creating a simple detachable connection of a vertical railing post with a horizontal I-beam of a temporary fall protection for pedestrians. A base plate with two holding claws on both sides is made from a |-beam and pushed over the horizontal I-beam, with the holding claws gripping under the top chord of the horizontal I-beam. An L-shaped railing post is also welded to the base plate. Due to the concept, there must be play between the top chord of the I-beam and the base plate to allow the base plate to be moved on the top chord during assembly and disassembly. As a result - without further fixing measures - a rigid connection with the railing post is not guaranteed, there is a risk that the railing posts will wobble and become unstable. This arrangement is not suitable for permanent and heavy-duty parapet elements on buildings.

[0009] Aufgabe der vorliegenden Erfindung ist somit, die beschrieben Nachteile zu vermeiden und eine möglichst flexibel positionierbare Haltevorrichtung bereitzustellen, die eine Verbindung mit hoher Stabilität zum Gebäude gewährleistet und so schnell wie möglich aufgebaut werden kann. The object of the present invention is therefore to avoid the disadvantages described and to provide a holding device that can be positioned as flexibly as possible, which ensures a connection with high stability to the building and can be set up as quickly as possible.

[0010] Dies wird erfindungsgemäß dadurch gelöst, dass das Befestigungselement durch einen zweiten Profilträger gebildet ist oder einen zweiten Profilträger aufweist, wobei der zweite Profilträger dazu ausgebildet ist, um in den Deckenbeton einer Betondecke einbetoniert zu werden und zumindest einen zweiten Gurt und zumindest einen normal auf diesen ausgebildeten zweiten Steg aufweist, wobei der zweite Profilträger ein H-Profil mit zwei zweiten Gurten - nämlich einem Untergurt und einem Obergurt - und einem zweiten Steg aufweist, wobei die beiden zweiten Gurte durch den vorzugsweise in einer zweiten Symmetrieebene des zweiten Profilträgers angeordne-According to the invention, this is achieved in that the fastening element is formed by a second profile support or has a second profile support, the second profile support being designed to be concreted into the ceiling concrete of a concrete ceiling and at least one second flange and at least one normal has a second web formed on this, the second profile carrier having an H-profile with two second chords—namely a lower chord and an upper chord—and a second web, the two second chords being arranged by the preferably in a second plane of symmetry of the second profile carrier

ten zweiten Steg miteinander verbunden sind, dass die Breite des Untergurtes des zweiten Profilträgers zumindest abschnittsweise größer ist als die Breite des Obergurtes, und dass der erste Profilträger ein T-Profil mit einem ersten Gurt und einen vorzugsweise in einer ersten Symmetrieebene des ersten Profilträgers angeordneten ersten Steg aufweist. th second web are connected to each other, that the width of the bottom chord of the second profiled beam is at least in sections greater than the width of the top chord, and that the first profiled beam has a T-profile with a first chord and a first, preferably arranged in a first plane of symmetry of the first profiled beam web has.

[0011] Dies erlaubt eine sehr niedrige Bauweise des Befestigungselementes, in Verbindung mit einem äußerst stabilen und Biegesteifen vertikalen Element. This allows a very low construction of the fastener, in conjunction with an extremely stable and rigid vertical element.

[0012] Das Befestigungselement kann in den Deckenbeton eingegossen oder auf die feste Betondecke angeschraubt werden. Somit ist das Befestigungselement flexibel einsetzbar und geeignet, sowohl mit Befestigungsschrauben montiert zu werden, als auch mit Beton eingefasst zu werden. Die niedrige Bauform des Befestigungselementes erlaubt es auch ohne nennenswerten Mehraufwand, auf eine bereits vergossene Decke verschraubt zu werden. Das erfindungsgemäße Befestigungselement kann dabei auch bei niedrigen Bodenaufbauten eingesetzt werden. Im Vergleich zur WO 2016/015065 A1 ist ein wesentlich geringerer Aufwand zur Versteifung erforderlich. The fastener can be cast into the ceiling concrete or screwed onto the solid concrete ceiling. The fastening element can thus be used flexibly and is suitable both for mounting with fastening screws and for enclosing it in concrete. The low design of the fastening element also allows it to be screwed onto an already cast ceiling without any significant additional effort. The fastening element according to the invention can also be used with low floor structures. Compared to WO 2016/015065 A1, much less effort is required for stiffening.

[0013] Das Aufnahmeelement wird also durch einen ersten Profilträger und das Befestigungselement durch einen zweiten Profilträger gebildet oder weist einen zweiten Profilträger auf. Dabei wird unter einem Profilträger ein einen bestimmten Querschnitt aufweisender Träger - insbesondere aus Profilstahl - verstanden, dessen Querschnitt in Richtung seiner Längsachse konstant ist. Derartige Profilträger können als Stangenmaterial sehr kostengünstig hergestellt werden, was ein besonders gutes Kosten/Nutzen-Verhältnis erlaubt. Durch die Verwendung eines Profilträgers sind Stabilität und Verwindungssteifigkeit des Aufnahmeelementes und des Befestigungselementes trotz leichter Bauweise sehr hoch. The receiving element is thus formed by a first profile carrier and the fastening element by a second profile carrier or has a second profile carrier. In this context, a profiled beam is understood to mean a beam having a specific cross section, in particular made of profile steel, the cross section of which is constant in the direction of its longitudinal axis. Such profile supports can be produced very inexpensively as rod material, which allows a particularly good cost/benefit ratio. Due to the use of a profile carrier, the stability and torsional rigidity of the receiving element and the fastening element are very high, despite the light construction.

[0014] Das Aufnahmeelement weist einen ersten Profilträger auf, dessen Querschnitt unterschiedlich ausgeführt sein kann. Jedenfalls vorteilhaft ist jedoch eine längliche Ausführungsform, die sich entlang je einer Seitenfläche der Brüstungselemente erstreckt. Dies wird vorzugsweise eine im Wesentlichen vertikale Erstreckung bedingen, wobei sich der Aufnahmeabschnitt über die gesamte oder nur einen Teil der Seitenfläche der Brüstungselemente entlang erstrecken kann. Vorteilhaft hat sich ein erster Profilträger mit offenem Querschnitt erwiesen, welcher zumindest einen ersten Steg und zumindest einen dazu normal angeordneten Gurt aufweist, wobei vorzugsweise der erste Gurt parallel und der erste Steg normal zur Haupterstreckungsebene der Brüstungselemente verläuft. The receiving element has a first profile carrier whose cross section can be designed differently. In any case, however, an elongate embodiment that extends along one side face of the parapet elements is advantageous. This will preferably necessitate a substantially vertical extension, in which case the receiving section can extend over the entire or only part of the side surface of the parapet elements. A first profile beam with an open cross-section has proven advantageous, which has at least one first web and at least one chord arranged normal thereto, with the first chord preferably running parallel and the first web normal to the main plane of extension of the parapet elements.

[0015] Eine bevorzugte Ausführungsvariante der Erfindung sieht vor, dass in den ersten Gurt zumindest eine erste Befestigungsöffnung eingeformt ist. Durch das T-Profil können sehr einfach Verbindungen zwischen der Haltevorrichtung und Brüstungselementen hergestellt werden. Wenn das T-Profil so angeordnet ist, dass der erste Gurt im Wesentlichen parallel zur Haupterstreckungsebene der Brüstungselemente verläuft, und die Brüstungselemente am ersten Gurt eben anliegen, so steigert dies zusätzlich die Stabilität der Konstruktion, da nicht nur die Biege- und Torsionssteifigkeit der Haltevorrichtung erhöht wird, sondern auch eine zusätzliche Verbindung mit den Brüstungselementen hergestellt wird. Dadurch ergibt sich ein synergetischer Effekt des T-Profils, da es nicht nur stabilitätserhöhend wirkt, was das Aufnahmeelement selbst betrifft, sondern auch in Bezug auf die Verbindung zu den Brüstungselementen. Anders als bei der Verwendung von H-Profilen müssen die Brüstungselemente aber nicht schon während des Einbaus der Halteelemente angeordnet werden, oder nach Positionierung der Halteelemente auf umständliche Art und Weise von oben eingeschoben werden, sondern können nach dem Arrangement der Halteelemente leicht frontal und über die ersten Befestigungsöffnungen beispielsweise angeschraubt werden, was der gesamten Brüstung zusätzliche Stabilität gibt. Die an der Haltevorrichtung anliegenden Brüstungselemente werden im Idealfall nur durch den Steg des T-Profils getrennt, wodurch eine sehr kompakte Bauweise ermöglicht wird. Gegebenenfalls können auch abgewinkelte Profile verwendet werden, um nicht geradlinig verlaufende Brüstungen leicht ausgestalten zu können. A preferred embodiment of the invention provides that at least one first fastening opening is formed in the first belt. The T-profile makes it very easy to create connections between the holding device and parapet elements. If the T-profile is arranged in such a way that the first chord runs essentially parallel to the main extension plane of the parapet elements, and the parapet elements lie flat on the first chord, this also increases the stability of the construction, since not only the bending and torsional rigidity of the holding device is increased, but also an additional connection with the parapet elements is made. This results in a synergetic effect of the T-profile, since it not only increases stability in terms of the receiving element itself, but also in relation to the connection to the parapet elements. In contrast to the use of H-profiles, however, the parapet elements do not have to be arranged during the installation of the retaining elements, or after the positioning of the retaining elements they have to be pushed in from above in a cumbersome manner, but can easily be pushed in from the front and via the after the arrangement of the retaining elements screwed into the first fastening openings, for example, which gives the entire parapet additional stability. Ideally, the parapet elements that are in contact with the holding device are only separated by the web of the T-profile, which enables a very compact design. If necessary, angled profiles can also be used in order to be able to easily design parapets that are not running in a straight line.

[0016] Die Anordnung von ersten Befestigungsöffnungen an dem Aufnahmeelement der Haltevorrichtung, insbesondere entlang der Längserstreckung des T-Profils am ersten Gurt, erleichtert The arrangement of the first fastening openings on the receiving element of the holding device, in particular along the longitudinal extent of the T-profile on the first belt, is facilitated

das Anbringen der Brüstungselemente an der Haltevorrichtung und ermöglicht Schraubverbindungen zwischen Brüstungselement und Haltevorrichtung. Hierzu können kreisrunde Bohrungen oder Langlöcher oder andere übliche Öffnungen dienlich sein. Jedoch kann die Verbindung auch auf jede andere erdenkliche Weise hergestellt werden. Es ist beispielsweise auch denkbar, dass die Brüstungselemente mit den Haltevorrichtungen verklebt oder vernietet werden. the attachment of the parapet elements to the holding device and enables screw connections between the parapet element and the holding device. Circular bores or elongated holes or other conventional openings can be useful for this. However, the connection can also be established in any other conceivable way. It is also conceivable, for example, for the parapet elements to be glued or riveted to the holding devices.

[0017] Dadurch, dass nicht nur das Aufnahmeelement, sondern auch das Befestigungselement durch jeweils einen Profilträger gebildet wird, kann eine sehr stabile Verbindung zum Gebäude hergestellt werden. Der zweite Profilträger kann dabei entweder in dem Deckenbeton eingegossen und somit unlösbar mit der Betondecke verbunden werden, oder auf den festen Deckenbeton aufgesetzt und durch Schrauben an der Betondecke befestigt werden. Bei beiden Befestigungsarten ist die niedrige Bauweise des Befestigungsabschnittes von großem Vorteil und ermöglicht einen universellen Einsatz. Haltevorrichtungen dieser Art können somit in der Betondecke einbetoniert oder auch an bereits bestehenden Gebäuden, bzw. an bereits gegossenen Elementen nachgerüstet werden. Dies ermöglicht somit eine flexible Anwendung. The fact that not only the receiving element, but also the fastening element is formed by a profile carrier, a very stable connection to the building can be made. The second profile carrier can either be cast into the ceiling concrete and thus inextricably connected to the concrete ceiling, or it can be placed on the solid ceiling concrete and fastened to the concrete ceiling with screws. With both types of fastening, the low construction of the fastening section is a great advantage and enables universal use. Holding devices of this type can thus be concreted into the concrete ceiling or retrofitted to existing buildings or elements that have already been cast. This enables flexible use.

[0018] Das Befestigungselement kann eine Verbindung zu verschiedenen Elementen des Gebäudes herstellen. Besonders vorteilhaft ist jedoch, wenn eine Verbindung zu einer Decke des Gebäudes vorgesehen ist, da es sich meist um ein Element hoher Stabilität und gleichmäßiger im Wesentlichen waagrechter Erstreckung bezogen auf den Grund des Gebäudes handelt. Das Befestigungselement ist insbesondere für verschiedene Untergründe wie Ziegel, Mantelbeton, fertigteilwänden oder Ortbeton einsetzbar. The fastener can connect to various elements of the building. However, it is particularly advantageous if a connection to a ceiling of the building is provided, since this is usually an element of high stability and a uniform, essentially horizontal extension in relation to the base of the building. The fastening element can be used in particular for various substrates such as bricks, jacket concrete, prefabricated walls or in-situ concrete.

[0019] Insbesondere wenn bereits bekannt ist, wie die Brüstung ausgestaltet werden soll und wo die Brüstungselemente positioniert werden, kann das Befestigungselement so gestaltet sein, dass es möglichst einfach zumindest teilweise in eine Betondecke miteinbetoniert werden kann. Dadurch kann auf Verschraubungen verzichtet werden, jedoch kann es auch vorteilhaft sein, trotzdem Verschraubungen vorzusehen. Beim Einbetonieren wird auch sofort während der Bildung der Decke ein wichtiger Teil des Brüstungsaufbaus erledigt, und es können sofort nach Aushärten des Betons die Brüstungselemente angebracht werden, wodurch sehr rasch eine Absturzsicherung aufgestellt werden kann. Alternativ dazu können die Haltevorrichtungen aber auch gemeinsam mit den Brüstungselementen montiert werden. In particular, if it is already known how the parapet is to be designed and where the parapet elements are positioned, the fastening element can be designed in such a way that it can be at least partially concreted into a concrete slab as simply as possible. As a result, screw connections can be dispensed with, but it can also be advantageous to provide screw connections anyway. When embedding in concrete, an important part of the parapet construction is also completed immediately during the formation of the ceiling, and the parapet elements can be attached immediately after the concrete has hardened, which means that a fall protection system can be set up very quickly. Alternatively, the holding devices can also be mounted together with the parapet elements.

[0020] Die festgelegten Brüstungselemente können unterschiedlich ausgeformt sein. Sie können in Form von Holzzementplatten, Geländern, Glasplatten oder jeder anderen geeigneten Tafel, Platte oder Verkleidungselement gestaltet sein. Gegebenenfalls können sie mit Putzträgerplatten und/oder anderen Schichten, wie einer Verputzschicht verkleidet werden. The specified parapet elements can be shaped differently. They may be designed in the form of wood cement panels, railings, glass panels or any other suitable panel, plate or trim element. If necessary, they can be clad with plaster base plates and/or other layers, such as a layer of plaster.

[0021] In einer Ausführungsvariante der Erfindung ist vorgesehen, dass in den Untergurt zumindest eine zweite Befestigungsöffnung eingeformt ist. In one embodiment variant of the invention it is provided that at least one second fastening opening is formed in the lower chord.

[0022] Die zumindest teilweise Ausführung des zweiten Profilträgers durch ein H-Profil weist eine besonders hohe Biege- und Verwindungssteifigkeit auf. Dadurch kann eine sehr einfache, leichte und gleichzeitig stabile Bauweise realisiert werden. Auch hier sind - bezogen auf die Einbaulage - die beiden zweiten Gurte bevorzugt parallel zur vorhandenen oder erst zu gießenden Deckenoberfläche und der zweite Steg normal dazu ausgerichtet. Insbesondere wenn das Befestigungselement zumindest teilweise mit dem Gebäude über Verschraubungen verbunden werden soll, erfolgt die Befestigung an der Betondecke über beispielsweise kreisrunde oder längliche zweite Befestigungsöffnungen in dem der Deckenoberfläche zugewandten Untergurt. Über die zweiten Befestigungsöffnungen kann die Haltevorrichtung fest mit der Betondecke verschraubt werden, bzw. die genaue Position der Haltevorrichtung für das Einbetonieren im Deckenbeton fixiert werden. Dabei kann das Befestigungselement oberhalb oder unterhalb jenes Elements des Gebäudes verlaufen, an dem es angebracht werden soll. Um eine einfache Handhabung der Befestigungsschrauben zu ermöglichen, ist es vorteilhaft, wenn der Untergurt zumindest teilweise breiter, vorzugsweise mindestens 1.5-mal so breit, besonders vorzugsweise mindestens doppelt so breit, wie der Obergurt ausgeführt ist. Dies trifft insbesondere dann zu, wenn eine große Auflagefläche des zweiten Profilträgers an der Decke gewünscht und/oder eine besonders hohe Steifigkeit bei möglichst geringem Gewicht und Materialeinsatz erforderlich ist. Durch die unterschied-The at least partial execution of the second profile carrier by an H-profile has a particularly high bending and torsional rigidity. As a result, a very simple, light and at the same time stable construction can be implemented. Here, too, the two second chords are preferably aligned parallel to the existing ceiling surface or the ceiling surface that is to be poured, and the second web is aligned perpendicularly thereto, based on the installation position. In particular, if the fastening element is to be at least partially connected to the building via screw connections, it is fastened to the concrete ceiling via, for example, circular or elongated second fastening openings in the bottom chord facing the ceiling surface. The holding device can be firmly screwed to the concrete ceiling via the second fastening openings, or the precise position of the holding device can be fixed for embedding in concrete in the ceiling. The fastener can run above or below that element of the building to which it is to be attached. In order to enable easy handling of the fastening screws, it is advantageous if the lower chord is at least partially wider, preferably at least 1.5 times as wide, particularly preferably at least twice as wide, as the upper chord. This applies in particular when a large contact surface of the second profile support on the ceiling is desired and/or a particularly high rigidity with the lowest possible weight and use of materials is required. Due to the different

lich breiten zweiten Gurte können Material, Gewicht und Kosten eingespart werden. Durch den schmäler ausgeführten Obergurt wird außerdem die Zugänglichkeit, Handhabung und Montage von durch die zweiten Befestigungsöffnungen gesteckten Befestigungsschrauben wesentlich erleichtert. Material, weight and costs can be saved due to the fact that the second belts are much wider. The narrower top chord also makes it much easier to access, handle and assemble the fastening screws that are inserted through the second fastening openings.

[0023] Wenn der zweite Profilträger einbetoniert wird, so dienen die zweiten Befestigungsöffnungen zur zusätzlichen Verankerung im Beton, indem sich durch die Befestigungsöffnungen Betonbrücken ausbilden. Die zweiten Befestigungsöffnungen dienen also in diesem Fall dazu, eine zusätzliche formschlüssige Verbindung mit dem Deckenbeton einzugehen, wenn das Befestigungselement in diesen einbetoniert wird. Beispielsweise können diese Öffnungen entlang eines Stegs am Befestigungselement angeordnet werden. Beim Vergießen werden diese mit Beton gefüllt, wodurch sich ein das Befestigungselement durchdringender Betonkern ergibt und für eine noch stabile Verbindung sorgt. Alternativ dazu oder zusätzlich kann das Befestigungselement zumindest ein Ankerelement zur formschlüssigen Verankerung in einer Ortbetondecke aufweisen, wobei vorzugsweise zumindest ein Ankerelement durch eine den zweiten Steg durchdringende Öffnung gebildet ist. If the second profile beam is cast in concrete, the second fastening openings are used for additional anchoring in the concrete by forming concrete bridges through the fastening openings. In this case, the second fastening openings are used to create an additional form-fitting connection with the ceiling concrete when the fastening element is concreted into it. For example, these openings can be arranged along a web on the fastening element. When casting, these are filled with concrete, resulting in a concrete core that penetrates the fastener and ensures an even more stable connection. Alternatively or additionally, the fastening element can have at least one anchor element for positive anchoring in an in-situ concrete ceiling, with at least one anchor element preferably being formed by an opening penetrating the second web.

[0024] Um eine gleichmäßige Lastaufteilung und Stabilität gegen Verwindung oder Biegung zu erzielen ist es vorteilhaft, wenn erster und zweiter Profilträger so angeordnet sind, dass die erste Symmetrieebene und die zweite Symmetrieebene zusammenfallen und eine Hauptsymmetrieebene der Haltevorrichtung ausbilden. Die Hauptsymmetrieebene befindet sich vorzugsweise normal zur Haupterstreckungsebene der Brüstungsebene und ist in Einbaulage vertikal ausgerichtet. In order to achieve an even load distribution and stability against torsion or bending, it is advantageous if the first and second profile beams are arranged such that the first plane of symmetry and the second plane of symmetry coincide and form a main plane of symmetry of the holding device. The main plane of symmetry is preferably located normal to the main extension plane of the parapet plane and is aligned vertically in the installed position.

[0025] Eine weitere vorteilhafte Ausführungsvariante der Erfindung sieht vor, dass der zweite Profilträger zumindest einen Quersteg aufweist, dessen Flächenerstreckung im Wesentlichen normal zur Längsachse des Befestigungselements verläuft. Der Quersteg erfüllt hier mehrere Funktionen: Zum einen bildet der Quersteg eine zusätzliche formschlüssige Verbindung mit dem Deckenbeton und somit zusätzliche Verankerung für die Haltevorrichtung, wenn der zweite Profilträger praktisch zur Gänze einbetoniert wird. Insbesondere wird dabei der zweite Profilträger in Zugrichtung in der Betondecke fixiert. Zum anderen dient der Quersteg als Feuchtigkeitssperre, insbesondere dann, wenn ein Teil des zweiten Profilträgers aus der Betondecke herausragt bzw. gegenüber der Betondecke frei gestellt ist. Darüber hinaus wirkt sich der Quersteg vorteilhaft auf die Steifigkeit der Haltevorrichtung aus. Dabei kann beidseits des zweiten Stegs jeweils ein Quersteg vorgesehen sein. Die beidseits des zweiten Stegs angeordneten Querstege dienen weiters der schnellen Abschalung für das Vergießen der Decke. A further advantageous embodiment variant of the invention provides that the second profile carrier has at least one transverse web whose surface extension is essentially normal to the longitudinal axis of the fastening element. The crosspiece fulfills several functions here: On the one hand, the crosspiece forms an additional form-fitting connection with the ceiling concrete and thus additional anchoring for the holding device when the second profile carrier is concreted in almost completely. In particular, the second profiled beam is fixed in the concrete ceiling in the direction of pull. On the other hand, the transverse web serves as a moisture barrier, in particular when a part of the second profiled beam protrudes from the concrete ceiling or is exposed relative to the concrete ceiling. In addition, the transverse web has an advantageous effect on the rigidity of the holding device. A transverse web can be provided on both sides of the second web. The crossbars arranged on both sides of the second bar also serve to quickly form the formwork for grouting the ceiling.

[0026] In jeweils eine hohe Stabilität gewährleistenden Ausführungsvarianten der Erfindung ist vorgesehen, dass ein Endbereich des zweiten Profilträgers mit einem Endbereich des ersten Profilträgers verbunden ist, wobei erster und zweiter Profilträger - in einer Richtung normal auf den ersten oder zweiten Steg betrachtet - einen L-Winkel bilden. Diese Anordnung ist für normale Anforderungen und Belastungen üblicherweise ausreichend. In each embodiment variant of the invention that ensures high stability, it is provided that an end area of the second profile support is connected to an end area of the first profile support, with the first and second profile support - as viewed in a direction normal to the first or second web - having an L -Make angles. This arrangement is usually sufficient for normal requirements and loads.

[0027] Bei besonders hohen Anforderungen an die Stabilität und Belastbarkeit der Brüstung ist es vorteilhaft, wenn ein Endbereich des zweiten Profilträgers mit einem Mittelbereich des ersten Profilträgers verbunden ist, wobei erster und zweiter Profilträger - in einer Richtung normal auf die Stege betrachtet - einen T-Winkel bilden. Dabei ist es günstig, wenn die Haltevorrichtung zwei in Richtung der ersten Längsachse fluchtend relativ zueinander angeordnete Aufnahmeelemente aufweist und das Befestigungselement im Übergangsbereich der beiden Aufnahmeelemente angeordnet ist. Somit setzt sich der erste Profilträger - in Einbaulage betrachtet - unterhalb des zweiten Profilträgers fort. An beiden Seiten des Befestigungselements - also sowohl unterhalb, als auch oberhalb des Befestigungselementes - ist somit ein Aufnahmeelement für Brüstungselemente ausgebildet. Dies ermöglicht eine besonders hohe Stabilität der Brüstung. Wenn das Aufnahmeelement unterhalb des Befestigungselements Verbindungen mit Brüstungselementen oder sonstigen Elementen, die unterhalb der Decke liegen, eingeht, so kann die Haltevorrichtung stockwerkübergreifend stabilisierend wirken. In the case of particularly high demands on the stability and load-bearing capacity of the parapet, it is advantageous if an end area of the second profile girder is connected to a middle area of the first profile girder, with the first and second profile girders - viewed in a direction normal to the webs - forming a T -Make angles. It is advantageous if the holding device has two receiving elements arranged in alignment relative to one another in the direction of the first longitudinal axis and the fastening element is arranged in the transition region of the two receiving elements. Thus, the first profile carrier - considered in the installation position - continues below the second profile carrier. A receiving element for parapet elements is thus formed on both sides of the fastening element—ie both below and above the fastening element. This enables a particularly high stability of the parapet. If the receiving element below the fastening element is connected to parapet elements or other elements that are below the ceiling, the holding device can have a stabilizing effect across floors.

[0028] Um auf der Baustelle eine rasche Montage zu ermöglichen, ist es vorteilhaft, wenn Auf-In order to enable rapid assembly on the construction site, it is advantageous if Auf-

nahmeelement und Befestigungselement vormontiert oder einteilig ausgeführt sind. Zwischen dem Aufnahmeelement und dem Befestigungselement kann dabei eine Schraub- oder Nietverbindung, oder eine Schweißverbindung bestehen. receiving element and fastening element are pre-assembled or made in one piece. There can be a screw or rivet connection or a welded connection between the receiving element and the fastening element.

[0029] Bei Bereitstellen eines Bausatzes für eine Brüstung wird der Aufbau einer solchen weiter vereinfacht und ist schneller ausführbar. Besonders durch Abstimmung der einzelnen Elemente der Brüstung wie der Haltevorrichtung und den Brüstungselementen werden die Arbeitsschritte vor Ort am Gebäude reduziert und somit Kosten gespart. Werden beispielsweise bereits vorgefertigte Brüstungselemente verwendet, die gegebenenfalls nur zugeschnitten werden müssen, so wird der Aufbau erleichtert und die Fehlerwahrscheinlichkeit gesenkt. When providing a kit for a parapet, the construction of such is further simplified and can be carried out more quickly. Especially by coordinating the individual elements of the parapet, such as the holding device and the parapet elements, the work steps on site on the building are reduced and costs are saved. If, for example, already prefabricated parapet elements are used, which may only have to be cut to size, assembly is made easier and the probability of errors is reduced.

[0030] Für freiliegende Brüstungen kann bei dem Bausatz dabei vorgesehen sein, dass in einem an das Aufnahmeelement grenzenden Freistellungsbereich des Befestigungselementes eine Rinne auf dem Befestigungselement aufliegt. Uber die Rinne lässt sich auf einfache, zeit- und kostensparende Weise eine zuverlässige Drainage der Betondecke und der Brüstung erreichen. For exposed parapets can be provided in the kit that rests in a bordering on the receiving element release area of the fastener a channel on the fastener. Reliable drainage of the concrete ceiling and the parapet can be achieved in a simple, time- and cost-saving manner via the channel.

[0031] In der Folge wird die vorliegende Erfindung anhand der in den Figuren dargestellten nicht einschränkenden Ausführungsvarianten näher erläutert. Es zeigen: The present invention is explained in more detail below with reference to the non-restrictive embodiment variants shown in the figures. Show it:

[0032] Fig. 1 eine Brüstung mit einer erfindungsgemäßen Haltevorrichtung in einer ersten Ausführungsvariante der Erfindung in einer Schrägansicht; [0032] FIG. 1 shows a balustrade with a holding device according to the invention in a first embodiment variant of the invention in an oblique view;

[0033] Fig. 2 eine dieser Haltevorrichtungen in einem Anwendungsbeispiel in einer Seitenansicht; [0033] FIG. 2 one of these holding devices in an application example in a side view;

[0034] Fig. 3 eine dieser Haltevorrichtungen in einem alternativen Anwendungsbeispiel in einer Seitenansicht; und [0034] FIG. 3 one of these holding devices in an alternative application example in a side view; and

[0035] Fig. 4 eine Brüstung mit einer erfindungsgemäßen Haltevorrichtung in einer zweiten Ausführungsvariante der Erfindung in einer Schrägansicht. 4 shows a parapet with a holding device according to the invention in a second embodiment of the invention in an oblique view.

[0036] Funktionsgleiche Elemente sind in den Ausführungsvarianten mit gleichen Bezugszeichen versehen. [0036]Functionally identical elements are provided with the same reference symbols in the embodiment variants.

[0037] Fig. 1 zeigte eine Brüstung 20 für ein Gebäude 50, wobei zwei Haltevorrichtungen 1 mit je einem Aufnahmeelement 1a und einem Befestigungselement 1b gezeigt sind, welche zur Befestigung von Brüstungselementen 2 am Gebäude 50 dienen. Das Aufnahmeelement 1a ist durch einen ersten Profilträger 201 und das Befestigungselement 1b durch einen direkt an den ersten Profilträger 201 angeschweißten zweiten Profilträger 202 gebildet. Die Längsachse 101 des Aufnahmeelements 1a bzw. des ersten Profilrohres 201 ist im Wesentlichen normal zur Längsachse 102 des Befestigungselements 1b bzw. zweiten Profilrohres 202 angeordnet. Das Befestigungselement 1b ist am unteren Endsegment des Aufnahmeabschnitts 1a angeordnet, wodurch sich bei seitlicher Betrachtung eine L- Form der gesamten Haltevorrichtung 1 ergibt. Die durch erste Profilrohre 201 gebildeten Aufnahmeelemente 1a weisen jeweils ein T-Profil mit ersten Gurten 201a und ersten Stegen 201c auf, wobei die dem Brüstungselement 2 zugewandte Seite der ersten Gurte 201a an den Flächen 2b des Brüstungselements 2 anliegen. Die ersten Gurte 201a der ersten Profilrohre 201 sind im Wesentlichen parallel zu einer Haupterstreckungsebene 2a und die ersten Stege 201c normal dazu ausgerichtet und symmetrisch in Bezug auf eine erste Symmetrieebene 203 des ersten Profilrohres 201 ausgebildet, welche die erste Längsachse 101 beinhaltet. In Einbaulage sind die Längsachse 101 des ersten Profilrohres 201 vertikal und die Längsachse 102 des zweiten Profilrohres 202 vertikal ausgerichtet. Pro Aufnahmeelement 1a können zwei Brüstungselemente 2 wie beispielsweise Holzzementtafeln angeordnet werden. Es sind erste Befestigungsbohrungen 15 vorgesehen, durch die die Brüstungselemente 2 mit den Aufnahmeelementen 1a verschraubbar sind. Diese Bauweise ergibt eine sehr stabile Verbindung zwischen Brüstungselement 2 und Haltevorrichtung 1 und erleichtert das Verbinden der beiden. Des Weiteren sind zwei nur teilweise dargestellte Putzträgerplatten 3 an den dem Gebäude 50 zugewandten und abgewandten Seiten des Brüstungselements 2 befestigt. Im Bereich der unteren Seite des Brüstungselements 2 verläuft eine Rinne 4, die Regenwasser der Terrassenoberfläche 6 sammelt. Die Rinne 4 ist dabei in einem an das Aufnahmeelement 1a grenzenden Frei-Fig. 1 showed a parapet 20 for a building 50, wherein two holding devices 1 are shown, each with a receiving element 1a and a fastener 1b, which are used to attach parapet elements 2 to the building 50. The receiving element 1a is formed by a first profiled support 201 and the fastening element 1b by a second profiled support 202 welded directly to the first profiled support 201. The longitudinal axis 101 of the receiving element 1a or the first profile tube 201 is arranged essentially normal to the longitudinal axis 102 of the fastening element 1b or the second profile tube 202. The fastening element 1b is arranged on the lower end segment of the receiving section 1a, resulting in an L-shape of the entire holding device 1 when viewed from the side. The receiving elements 1a formed by first profile tubes 201 each have a T-profile with first chords 201a and first webs 201c, the side of the first chords 201a facing the parapet element 2 resting against the surfaces 2b of the parapet element 2 . The first chords 201a of the first profile tubes 201 are essentially parallel to a main extension plane 2a and the first webs 201c are aligned normal thereto and symmetrically in relation to a first plane of symmetry 203 of the first profile tube 201, which includes the first longitudinal axis 101. In the installed position, the longitudinal axis 101 of the first profile tube 201 is vertical and the longitudinal axis 102 of the second profile tube 202 is vertical. Two parapet elements 2, such as wood cement panels, can be arranged for each receiving element 1a. First fastening bores 15 are provided, through which the parapet elements 2 can be screwed to the receiving elements 1a. This construction results in a very stable connection between the parapet element 2 and the holding device 1 and facilitates the connection of the two. Furthermore, two plaster base plates 3 , only partially shown, are fastened to the sides of the parapet element 2 that face and face away from the building 50 . In the area of the lower side of the parapet element 2 there is a channel 4 which collects rainwater from the terrace surface 6 . The channel 4 is in a free space adjoining the receiving element 1a.

stellungsbereich 17 des Befestigungselementes 1b, welcher nicht einbetoniert ist und aus der Betondecke 5 herausragt, angeordnet und liegt auf dem Befestigungselement 1b auf. Die Befestigungselemente 1b sind durch zweite Profilrohre 202 gebildet und weisen im Ausführungsbeispiel über ihre gesamte Länge ein H-Profil mit konstantem Querschnitt auf, wobei die zweiten Profilrohre 202 zwei zweite Gurte 202a, 202b - nämlich einen Untergurt 202a und einen Obergurt 202b - aufweisen, welche durch einen zweiten Steg 202c miteinander verbunden sind. Die zweiten Gurte 202a, 202b und der zweite Steg 202c sind symmetrisch in Bezug auf eine die zweite Längsachse 102 beinhaltende zweite Symmetrieebene 204 des zweiten Profilträgers 202 ausgebildet. Die zweiten Gurte 201a, 202b verlaufen dabei normal auf die zweite Symmetrieebene 204, der zweite Steg 202c verläuft parallel zur zweiten Symmetrieebene 204. Die erste Symmetrieebene 203 und die zweite Symmetrieebene 204 fallen in den dargestellten Ausführungsbeispielen zusammen und bilden eine Hauptsymmetrieebene 205 der Haltevorrichtung 1. Dies ist eine besonders bevorzugte Ausbildung, da so eine besonders hohe Stabilität der Haltevorrichtung 1 bei äußerst geringer Bauhöhe erreicht werden kann. Position area 17 of the fastening element 1b, which is not embedded in concrete and protrudes from the concrete cover 5, is arranged and rests on the fastening element 1b. The fastening elements 1b are formed by second profile tubes 202 and in the exemplary embodiment have an H profile with a constant cross section over their entire length, the second profile tubes 202 having two second flanges 202a, 202b - namely a lower flange 202a and an upper flange 202b - which are connected to one another by a second web 202c. The second chords 202a, 202b and the second web 202c are embodied symmetrically in relation to a second plane of symmetry 204 of the second profile beam 202, which plane contains the second longitudinal axis 102. The second straps 201a, 202b run normal to the second plane of symmetry 204, the second web 202c runs parallel to the second plane of symmetry 204. The first plane of symmetry 203 and the second plane of symmetry 204 coincide in the exemplary embodiments shown and form a main plane of symmetry 205 of the holding device 1. This is a particularly preferred embodiment, since in this way a particularly high stability of the holding device 1 can be achieved with an extremely low overall height.

[0038] Im dargestellten Ausführungsbeispiel ist die Breite b2 des Obergurtes 202b geringer als die Breite b1 des Untergurtes 202a, wodurch die Haltevorrichtungen 1 bei Befestigung großflächig auf dem Untergrund - beispielsweise einer Betondecke 5 - aufliegen und so einfach einbaubar sind. Die zweiten Profilträger 202 sind in dieser Ausführungsform dazu bestimmt in den Deckenbeton der Betondecke 5 einbetoniert zu werden. Dazu werden die Haltevorrichtungen 1 entlang der Deckenschalung 7 in definiertem Abstand zueinander positioniert, danach wird gegebenenfalls weiter verschalt und dann der Deckenbeton für die Betondecke 5 gegossen und mit dem Wandaufbau 8 in Form von Ziegeln, Mantelbeton, Ortbeton oder anderen geeigneten Materialien verbunden. Nach dem Aushärten wird gegebenenfalls die Schalung oder Teile der Schalung wie beispielsweise die Deckenschalung 7 - entfernt. Mit Bezugszeichen 6 ist oberhalb der Betondecke 5 eine begehbare Terrassenoberfläche bezeichnet. Sie kann beispielsweise als Holzlattenschicht ausgebildet sein, sodass das Regenwasser über die Rinne 4 unterhalb der Terrassenoberfläche 6 abrinnen kann. Des Weiteren ist ein Abdeckbrett 9 als Abschluss der Brüstung 20 vorgesehen, welche leicht abgeschrägt ist um Regenwasser abzuführen. In the illustrated embodiment, the width b2 of the upper chord 202b is less than the width b1 of the lower chord 202a, whereby the holding devices 1 when attached over a large area on the ground - rest and are so easy to install - for example, a concrete surface 5. In this embodiment, the second profiled beams 202 are intended to be concreted into the ceiling concrete of the concrete ceiling 5 . For this purpose, the holding devices 1 are positioned along the ceiling formwork 7 at a defined distance from one another, then further boarding is carried out if necessary and then the ceiling concrete for the concrete ceiling 5 is poured and connected to the wall structure 8 in the form of bricks, jacket concrete, in-situ concrete or other suitable materials. After curing, the formwork or parts of the formwork, such as the ceiling formwork 7, is removed if necessary. A walk-on terrace surface is denoted by reference number 6 above the concrete cover 5 . It can be designed, for example, as a layer of wooden slats, so that the rainwater can run off via the channel 4 below the terrace surface 6 . Furthermore, a cover board 9 is provided as the end of the parapet 20, which is slightly slanted to drain rainwater.

[0039] In Fig. 2 zeigt eine Haltevorrichtung 1 in einer Seitenansicht in eingebautem Zustand. Unterhalb der Deckenschalung 7 ist ein Schalungsaufbau 10 zur Fixierung der Deckenschalung 7 dargestellt. Wie ersichtlich ist, wird durch das Einbetten und Auflegen der Rinne 4 auf dem Befestigungselement 1b nur ein Teil des Befestigungselements 1b in den Deckenbeton der Betondecke 5 einbetoniert. Des Weiteren ist eine Dichtungsschicht 11 dargestellt, welche die leicht geneigte Oberfläche der Betondecke 5 abdichtet und Regenwasser in die Rinne 4 ableitet. Diese Rinne 4 kann an ihrer unteren Seite an den Stellen, an dem Sie auf den Befestigungselementen 1b aufliegt, unterschiedlich hohe Abstandselemente (nicht weiter dargestellt) aufweisen, damit sich so für die Rinne 4 ein Gefälle entlang der Brüstung 20 ergibt, und das Regenwasser effektiv entlang der Brüstung 20 zu einem entsprechenden - nicht weiter dargestellten - Ablauf geleitet werden kann. Es sind außerdem im Befestigungselement 1b zwei Öffnungen 14 sowie ein Quersteg 13 erkennbar. Diese dienen einerseits zur zusätzlichen Verankerung des Befestigungselements 1b in der Betondecke 5, wobei durch Anordnung der Rinne 4 lediglich die der Haltevorrichtung 1 fernere Öffnung 14 in dieser Anwendungsform Verwendung findet. Andererseits bildet der Quersteg 13 eine Feuchtigkeitssperre, welche Eindringen von Wasser entlang des zweiten Profilrohres 202 in die Betondecke 5 hemmt bzw. verhindert. Darüber hinaus erleichtern beidseits des zweiten Stegs 202c angeordnete Querstege 13 das Abschalen für das Vergießen der Betondecke 5. shows a holding device 1 in a side view in the installed state. A formwork structure 10 for fixing the ceiling formwork 7 is shown below the ceiling formwork 7 . As can be seen, by embedding and placing the channel 4 on the fastening element 1b, only a part of the fastening element 1b is concreted into the ceiling concrete of the concrete ceiling 5. Furthermore, a sealing layer 11 is shown, which seals the slightly inclined surface of the concrete cover 5 and drains rainwater into the channel 4 . This gutter 4 can have spacers (not shown) of different heights on its lower side at the points where it rests on the fastening elements 1b, so that the gutter 4 has a gradient along the parapet 20 and the rainwater is effective along the parapet 20 to a corresponding - can be routed - not shown. Two openings 14 and a transverse web 13 can also be seen in the fastening element 1b. These serve on the one hand for additional anchoring of the fastening element 1b in the concrete cover 5, with the arrangement of the channel 4 only the opening 14 further away from the holding device 1 being used in this application. On the other hand, the crossbar 13 forms a moisture barrier, which inhibits or prevents water from penetrating along the second profile tube 202 into the concrete ceiling 5 . In addition, transverse webs 13 arranged on both sides of the second web 202c facilitate shuttering for the pouring of the concrete cover 5.

[0040] Fig. 3 offenbart eine alternative Verwendungsform, bei der das Befestigungselement 1b durch einen direkt an das Aufnahmeelement 1a angeschweißten zweiten Profilträger 202 gebildet ist und an die Betondecke 5 angeschraubt ist. Die Dichtungsschicht 11 ummantelt auch die deckenbetonnahen Teile der Haltevorrichtung 1 um sie zu schützen. Das Brüstungselement 2 ist im Vergleich zur in Fig. 2 gezeigten Ausführung - kürzer ausgeführt, sodass sich das Aufnahmeelement 1a fast über deren ganze Höhe erstreckt. Dafür ist am oberen Abschnitt des Brüstungselements 2 ein zusätzliches Geländerteil 12 angebracht. Aus der Gegenüberstellung Fig. 2 und Fig. 3 discloses an alternative form of use, in which the fastening element 1b is formed by a directly welded to the receiving element 1a second profile beam 202 and is screwed to the concrete ceiling 5. The sealing layer 11 also encases the parts of the holding device 1 close to the concrete ceiling in order to protect them. The parapet element 2 is shorter than the embodiment shown in FIG. 2, so that the receiving element 1a extends almost over its entire height. An additional railing part 12 is attached to the upper section of the parapet element 2 for this purpose. From the comparison of Fig. 2 and

3 werden die vielfältigen Verwendungsmöglichkeiten derselben Ausführungsform offensichtlich. Die Haltevorrichtung 1 kann sowohl einbetoniert als auch nachträglich auf einen Gebäudeteil wie die Betondecke 5 aufgebracht werden, ebenso ist die weitere Ausführung der Brüstung 20 sehr unterschiedlich. So stellen die Ausführungen der Brüstungen 20 von Fig. 2 und Fig. 3 nur zwei von vielen dar. Es kann beispielsweise auf einem Brüstungselement 2 wie einer Holzzementtafel eine Glastafel aufgesetzt werden, oder das Brüstungselement 2 selbst nur durch eine Glastafel oder ein Geländer gebildet werden. 3, the diverse possible uses of the same embodiment become apparent. The holding device 1 can either be concreted in or subsequently applied to a part of the building such as the concrete ceiling 5, and the further design of the parapet 20 is also very different. The designs of the parapets 20 of FIGS. 2 and 3 represent only two of many. For example, a glass panel can be placed on a parapet element 2 such as a wood cement panel, or the parapet element 2 itself can only be formed by a glass panel or a railing .

[0041] In Fig. 4 wird eine alternative Ausführungsform dargestellt, welche zwei Aufnahmeelemente 1a aufweist, welche - wie in den bisher beschriebenen Ausführungen - durch einen ersten Profilträger 201 gebildet sind. Die Haltevorrichtungen 1 weisen jeweils ein Befestigungselement 1b in Form eines direkt an den ersten Profilträger 1a angeschweißten zweiten Profilrohres 202 auf, welches im Übergangsbereich zwischen den beiden Aufnahmeelementen 1a angeordnet ist. Diese Befestigungselemente 1b sind im Deckenbeton 5 einbetoniert. Die Aufnahmeelemente 1a erstrecken sich sowohl oberhalb, als auch unterhalb der Anbindung des zweiten Profilträgers 20 an den ersten Profilträger 201 und können so Verbindungen mit Brüstungselementen 2 unterhalb der Deckenebene 5a sowie oberhalb der Deckenebene 5a der Betondecke 5 eingehen. Jede Haltevorrichtung 1 weist somit - von der Seite betrachtet - eine T-Form auf. Zusammen mit den Brüstungselementen 2 bietet diese Ausführung eine besonders belastbare und stabile Brüstung 20. In Fig. 4 an alternative embodiment is shown, which has two receiving elements 1a, which - are formed by a first profile carrier 201 - as in the previously described embodiments. The holding devices 1 each have a fastening element 1b in the form of a second profile tube 202 which is welded directly to the first profile carrier 1a and is arranged in the transition region between the two receiving elements 1a. These fastening elements 1b are cast in concrete in the ceiling concrete 5 . The receiving elements 1a extend both above and below the connection of the second profile carrier 20 to the first profile carrier 201 and can thus enter into connections with parapet elements 2 below the ceiling level 5a and above the ceiling level 5a of the concrete ceiling 5 . Each holding device 1 thus has—viewed from the side—a T-shape. Together with the parapet elements 2, this version offers a particularly resilient and stable parapet 20.

Claims (16)

Patentansprüchepatent claims 1. Haltevorrichtung (1) aus Metall, zum Befestigen von Brüstungselementen (2) wie Brüstungsplatten, mit zumindest einem durch einen ersten Profilträger (201) gebildeten Aufnahmeelement (1a) zur Aufnahme von mindestens einem Brüstungselement (2) und mit zumindest einem Befestigungselement (1b) zum Befestigen an einem Gebäude (50), wobei der erste Profilträger (201) zumindest einen ersten Gurt (201a) und zumindest einen dazu normal angeordneten ersten Steg (201c) aufweist, und wobei eine erste Längsachse (101) des Aufnahmeelementes (1a) im Wesentlichen normal zu einer zweiten Längsachse (102) des Befestigungselementes (1b) verläuft, dadurch gekennzeichnet, dass das Befestigungselement (1b) durch einen zweiten Profilträger (202) gebildet ist oder einen zweiten Profilträger (202) aufweist, wobei der zweite Profilträger (202) dazu ausgebildet ist, um in den Deckenbeton einer Betondecke einbetoniert zu werden und zumindest einen zweiten Gurt (202a, 202b) und zumindest einen normal auf diesen ausgebildeten zweiten Steg (202c) aufweist, wobei der zweite Profilträger (202) ein H-Profil mit zwei zweiten Gurten (202a, 202b) - nämlich einem Untergurt (202a) und einem Obergurt (202b)- und einem zweiten Steg (202c) aufweist, wobei die beiden zweiten Gurte (202a, 202b) durch den vorzugsweise in einer zweiten Symmetrieebene (204) des zweiten Profilträgers (202) angeordneten zweiten Steg (202c) miteinander verbunden sind, dass die Breite (b1) des Untergurtes (202a) des zweiten Profilträgers (202) zumindest abschnittsweise größer ist als die Breite (b2) des Obergurtes (202b), und dass der erste Profilträger (201) ein T-Profil mit einem ersten Gurt (201a) und einen vorzugsweise in einer ersten Symmetrieebene (203) des ersten Profilträgers (201) angeordneten ersten Steg (201c) aufweist. 1. Holding device (1) made of metal, for fastening parapet elements (2) such as parapet panels, with at least one receiving element (1a) formed by a first profile carrier (201) for receiving at least one parapet element (2) and with at least one fastening element (1b ) for fastening to a building (50), wherein the first profile carrier (201) has at least one first belt (201a) and at least one first web (201c) arranged normal thereto, and wherein a first longitudinal axis (101) of the receiving element (1a) runs essentially normal to a second longitudinal axis (102) of the fastening element (1b), characterized in that the fastening element (1b) is formed by a second profile carrier (202) or has a second profile carrier (202), the second profile carrier (202 ) is designed to be concreted into the ceiling concrete of a concrete ceiling and at least one second belt (202a, 202b) and at least one normal to this formed second web (202c), wherein the second profile carrier (202) has an H-profile with two second chords (202a, 202b) - namely a lower chord (202a) and an upper chord (202b) - and a second web (202c). , the two second chords (202a, 202b) being connected to one another by the second web (202c), which is preferably arranged in a second plane of symmetry (204) of the second profiled beam (202), so that the width (b1) of the lower chord (202a) of the second profile beam (202) is at least partially larger than the width (b2) of the upper chord (202b), and that the first profile girder (201) is a T-profile with a first chord (201a) and a preferably in a first plane of symmetry (203) of the first profile carrier (201) arranged first web (201c). 2. Haltevorrichtung (1) nach Anspruch 1, dadurch gekennzeichnet, dass der erste Profilträger (201) und/oder der zweite Profilträger (202) über seine in Richtung der ersten (101) bzw. zweiten Längsachse (102) betrachteten Längserstreckung einen konstanten Querschnitt aufweist. 2. Holding device (1) according to claim 1, characterized in that the first profiled support (201) and/or the second profiled support (202) has a constant cross-section over its longitudinal extension viewed in the direction of the first (101) or second longitudinal axis (102). having. 3. Haltevorrichtung (1) nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass in den ersten Gurt (201a) zumindest eine erste Befestigungsöffnung (15) eingeformt ist. 3. Holding device (1) according to claim 1 or 2, characterized in that in the first belt (201a) at least one first fastening opening (15) is formed. 4. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass in den Untergurt (202a) zumindest eine zweite Befestigungsöffnung (16) eingeformt ist. 4. Holding device (1) according to one of claims 1 to 3, characterized in that in the lower flange (202a) at least one second fastening opening (16) is formed. 5. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass der Untergurt (202a) mindestens 1.5-mal so breit, besonders vorzugsweise mindestens doppelt so breit, wie der Obergurt (202b) ausgeführt ist. 5. Holding device (1) according to one of claims 1 to 4, characterized in that the lower chord (202a) is at least 1.5 times as wide, particularly preferably at least twice as wide as the upper chord (202b). 6. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass der erste Profilträger (201) und der zweite Profilträger (202) so angeordnet sind, dass die erste Symmetrieebene (203) und die zweite Symmetrieebene (204) zusammenfallen und eine Hauptsymmetrieebene (205) der Haltevorrichtung (1) ausbilden. 6. Holding device (1) according to one of claims 1 to 5, characterized in that the first profile carrier (201) and the second profile carrier (202) are arranged such that the first plane of symmetry (203) and the second plane of symmetry (204) coincide and form a main plane of symmetry (205) of the holding device (1). 7. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass das Befestigungselement (1b) zumindest ein Ankerelement zur formschlüssigen Verankerung in einer Betondecke (5) aufweist, wobei vorzugsweise zumindest ein Ankerelement durch eine den zweiten Steg (202c) durchdringende Öffnung (14) gebildet ist. 7. Holding device (1) according to one of Claims 1 to 6, characterized in that the fastening element (1b) has at least one anchor element for form-fitting anchoring in a concrete ceiling (5), with at least one anchor element preferably being secured by a second web (202c) penetrating opening (14) is formed. 8. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass der zweite Profilträger (202) zumindest einen Quersteg (13) aufweist, dessen Flächenerstreckung im Wesentlichen normal zur zweiten Längsachse (102) des Befestigungselements (1b) verläuft. 8. Holding device (1) according to one of claims 1 to 7, characterized in that the second profile carrier (202) has at least one transverse web (13) whose surface extension is essentially normal to the second longitudinal axis (102) of the fastening element (1b). 9. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass ein Endbereich des zweiten Profilträgers (202) mit einem Mittelbereich des ersten Profilträgers (201) verbunden ist, wobei erster (201) und zweiter Profilträger (202) - in einer Richtung normal auf die Stege (201c, 202c) betrachtet - einen T-Winkel bilden. 9. Holding device (1) according to one of claims 1 to 8, characterized in that an end region of the second profile carrier (202) is connected to a central region of the first profile carrier (201), the first (201) and second profile carrier (202) - viewed in a direction normal to the webs (201c, 202c) - form a T-angle. 10. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass die Haltevorrichtung (1) zwei in Richtung der ersten Längsachse (101) fluchtend relativ zueinander angeordnete Aufnahmeelemente (1a) aufweist und das Befestigungselement (1b) im UÜbergangsbereich der beiden Aufnahmeelemente (1a) angeordnet ist. 10. Holding device (1) according to one of Claims 1 to 9, characterized in that the holding device (1) has two receiving elements (1a) arranged in alignment relative to one another in the direction of the first longitudinal axis (101) and the fastening element (1b) in the U transition area of the both receiving elements (1a) is arranged. 11. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass ein Endbereich des zweiten Profilträgers (202) mit einem Endbereich des ersten Profilträgers (201) verbunden ist, wobei erster (201) und zweiter Profilträger (202) - in einer Richtung normal auf den ersten (201c) oder zweiten Steg (202c) betrachtet - einen L-Winkel bilden. 11. Holding device (1) according to one of claims 1 to 10, characterized in that an end region of the second profile carrier (202) is connected to an end region of the first profile carrier (201), the first (201) and second profile carrier (202) - viewed in a direction normal to the first (201c) or second land (202c) - form an L-angle. 12. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, dass zumindest ein Aufnahmeelement (1a) zusammen mit dem Befestigungselement (1b) einteilig ausgeführt ist. 12. Holding device (1) according to any one of claims 1 to 11, characterized in that at least one receiving element (1a) is designed in one piece together with the fastening element (1b). 13. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass zwischen dem Aufnahmeelement (1a) und dem Befestigungselement (1b) eine Schweißverbindung besteht. 13. Holding device (1) according to one of claims 1 to 12, characterized in that there is a welded connection between the receiving element (1a) and the fastening element (1b). 14. Haltevorrichtung (1) nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass zwischen dem Aufnahmeelement (1a) und dem Befestigungselement (1b) eine Schraubverbindung und/oder eine Nietverbindung besteht. 14. Holding device (1) according to one of claims 1 to 12, characterized in that there is a screw connection and/or a rivet connection between the receiving element (1a) and the fastening element (1b). 15. Bausatz für eine Brüstung (20) an einem Gebäude (50) mit zumindest einer Haltevorrichtung (1) und zumindest zwei Brüstungselementen (2), wobei die Haltevorrichtung (1) zumindest ein Aufnahmeelement (1a) zum Befestigen der mindestens zwei Brüstungselemente (2) und zumindest ein Befestigungselement (1b) zum Anbringen an das Gebäude (50) aufweist, dadurch gekennzeichnet, dass die Haltevorrichtung (1) nach einem der Ansprüche 1 bis 14 ausgebildet ist. 15. Kit for a parapet (20) on a building (50) with at least one holding device (1) and at least two parapet elements (2), wherein the holding device (1) has at least one receiving element (1a) for fastening the at least two parapet elements (2 ) and at least one fastening element (1b) for attachment to the building (50), characterized in that the holding device (1) is designed according to one of claims 1 to 14. 16. Bausatz nach Anspruch 15, dadurch gekennzeichnet, dass in einem an das Aufnahmeelement (1a) grenzenden - nicht von Beton umgebenden - Freistellungsbereich (17) des Befestigungselementes (1b) eine Rinne (4) auf dem Befestigungselement (1b) aufliegt. 16. Kit according to claim 15, characterized in that a channel (4) rests on the fastening element (1b) in a release region (17) of the fastening element (1b) which adjoins the receiving element (1a) and is not surrounded by concrete. Hierzu 4 Blatt Zeichnungen 4 sheets of drawings
ATA50116/2017A 2017-02-13 2017-02-13 HOLDING DEVICE FOR ATTACHING BARRAIL ELEMENTS AT519622B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ATA50116/2017A AT519622B1 (en) 2017-02-13 2017-02-13 HOLDING DEVICE FOR ATTACHING BARRAIL ELEMENTS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ATA50116/2017A AT519622B1 (en) 2017-02-13 2017-02-13 HOLDING DEVICE FOR ATTACHING BARRAIL ELEMENTS

Publications (2)

Publication Number Publication Date
AT519622A1 AT519622A1 (en) 2018-08-15
AT519622B1 true AT519622B1 (en) 2022-01-15

Family

ID=63142237

Family Applications (1)

Application Number Title Priority Date Filing Date
ATA50116/2017A AT519622B1 (en) 2017-02-13 2017-02-13 HOLDING DEVICE FOR ATTACHING BARRAIL ELEMENTS

Country Status (1)

Country Link
AT (1) AT519622B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH625589A5 (en) * 1979-11-16 1981-09-30 Maegert Bautechnik Process and arrangement for fitting an edge shuttering for a concrete floor
WO2016015065A1 (en) * 2014-08-01 2016-02-04 Sebastian Hilscher Kit for a parapet construction on a building
CN106193481A (en) * 2016-07-01 2016-12-07 中交第二航务工程局有限公司 Utilize the method that interim People's Bank of China guardrail prepared by channel-section steel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH625589A5 (en) * 1979-11-16 1981-09-30 Maegert Bautechnik Process and arrangement for fitting an edge shuttering for a concrete floor
WO2016015065A1 (en) * 2014-08-01 2016-02-04 Sebastian Hilscher Kit for a parapet construction on a building
CN106193481A (en) * 2016-07-01 2016-12-07 中交第二航务工程局有限公司 Utilize the method that interim People's Bank of China guardrail prepared by channel-section steel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Edelstahlgeländer R Line 6 Stäbe rund D12 waagerecht. Steckwelt Modulsysteme by M. Schänzer [online]. 08.12.2016 [ermittelt am 11.01.2018]. Ermittelt im Internet: https://web.archive.org/web/20161208055833/ http://www.steckwelt.eu/Edelstahlgelaender-R-Line-6-Staebe-rund-D12-waagerecht *

Also Published As

Publication number Publication date
AT519622A1 (en) 2018-08-15

Similar Documents

Publication Publication Date Title
EP3508668A1 (en) Formwork clamp
DE202004004965U1 (en) Shuttering element, uses connector parts between shuttering boards to hold concrete reinforcement structure at distance from these boards
EP0164330B1 (en) Reinforced-concrete floor
EP1736605B1 (en) Balcony frame, balcony and manufacturing process for a prefabricated balcony
AT15902U1 (en) HOLDING DEVICE FOR FIXING EASY ELEMENTS
EP0350525B1 (en) Method for producing building-walls and a shuttering system
EP2405070A2 (en) Steel beam for prefabricated floors
AT519622B1 (en) HOLDING DEVICE FOR ATTACHING BARRAIL ELEMENTS
DE9409626U1 (en) Balcony construction
DE2319190A1 (en) DEVICE FOR PRODUCING RECESSES IN CAST CONCRETE
EP1606466B1 (en) Method for the production of a balcony or a terrace, precast concrete unit, and system of precast concrete units
DE102007017612A1 (en) Frame for a balcony or a terrace and method for its production
AT518239B1 (en) DEVICE FOR DETACHABLE ATTACHMENT TO AT LEAST A BRUSH OR SCOOP CONSOLE
WO2000011279A2 (en) Prefabricated house system
AT524142B1 (en) BARRIER FOR A BUILDING
AT412359B (en) FORMWORK
DE20214157U1 (en) Modular system for the production of carports
DE102015220431A1 (en) Concrete precast ceiling slab for use in wooden structures
DE102016103981B4 (en) An element
DE10205205A1 (en) Wall unit, for construction, has a concrete shell with integrated reinforcements to carry projecting bonding structures at a gap from an insulation shell, for concrete to be poured between them
EP2876224A1 (en) Roof or ceiling panel in the form of concrete-steel composite structure
AT17289U1 (en) PARASTER FOR A BUILDING
AT524141A1 (en) BARRIER FOR A BUILDING
DE19802130B4 (en) Drempelstütze
EP4314433A1 (en) Mounting system for railings and antifall devices