CN105184519A - Standardized safety operation tracing management system - Google Patents
Standardized safety operation tracing management system Download PDFInfo
- Publication number
- CN105184519A CN105184519A CN201510692395.0A CN201510692395A CN105184519A CN 105184519 A CN105184519 A CN 105184519A CN 201510692395 A CN201510692395 A CN 201510692395A CN 105184519 A CN105184519 A CN 105184519A
- Authority
- CN
- China
- Prior art keywords
- client
- module
- management system
- security operation
- normalized security
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention belongs to the technical field of electricity and particularly relates to a standardized safety operation tracing management system. The standardized safety operation tracing management system is characterized by comprising a server side, a first client side, a second client side, a monitoring terminal, a network and a standardized safety operation tracing management system module, wherein the second client side is used for acquiring information from the server side, the server side can be used for sending information and instructions to the first client side, the first client side is used for sending the task executing condition to the server side, and the server side can be used for receiving the monitoring signal sent by the monitoring terminal and sending the monitoring instruction to the monitoring terminal; the standardized safety operation tracing management system module consists of a logging-in module, a page display module, an authority management module, a task operation management module, a task monitoring management module and a report module installed in the server side, and a task executing module installed in the first client side. The system has the advantages of high standardized field acceptability, comprehensive coverage of checking, real-time monitoring by videos and zero violation of laws.
Description
Technical field
The invention belongs to technical field of electric power, especially relate to a kind of normalized security operation vestige management system of power industry.
Background technology
In prior art, the operation of power industry, except the record of papery, seldom leaves vestige, therefore, tests later maintenance, decision-making, diagnosis etc. and all brings hidden danger.Therefore, at present cannot according to before construction, in construction, the safety of rear three links of constructing is as the monitoring and the real time inspection that carry out overall process, construction responsible official can not be effectively effectively avoided to break rules and regulations, the management can not carrying out on-the-spot risk and control and relevant examine carry out, can not reduce manual work's intensity of the inspection such as remote transformer station and mountain route, safety supervision target cannot be monitored in real time and manage.Safety as: the scene of " security risk at the scene, security incident in building site " cannot management and control, effectively can not avoid the generation of security incident, even if after occurring, also cannot accurately trace thing because of, therefore, bring many troubles to management, also cause unnecessary loss to enterprise simultaneously.
Summary of the invention
In order to solve the problem, the object of the invention is to disclose a kind of normalized security operation vestige management system, it realizes by the following technical solutions.
In first embodiment of the present invention, normalized security operation vestige management system, is characterized in that it includes server end, the first client, the second client, monitor terminal, network and normalized security operation vestige management system module; Second client by network from server end obtaining information, server end can send information and instruction to the first client, tasks carrying situation is sent to server end by the first client, server end can receive the pilot signal that monitor terminal sends, and server end can send monitored instruction to monitor terminal; Described normalized security operation vestige management system module is made up of the log-in module be arranged in server end, page display module, authority management module, task operating administration module, Mission Monitor administration module, Reports module and the task execution module be arranged in the first client.
In second embodiment of the present invention, normalized security operation vestige management system, is characterized in that it includes the first client, the second client, monitor terminal, network and normalized security operation vestige management system module; Second client can send information and instruction to the first client, and tasks carrying situation is sent to the second client by the first client, and the second client can receive the pilot signal that monitor terminal sends, and the second client can send monitored instruction to monitor terminal; Described normalized security operation vestige management system module is made up of the log-in module be arranged in the second client, page display module, authority management module, task operating administration module, Mission Monitor administration module, Reports module and the task execution module be arranged in the first client.
In 3rd embodiment of the present invention, normalized security operation vestige management system, is characterized in that it includes the first client, the second client, network and normalized security operation vestige management system module; Second client can send information and instruction to the first client, and tasks carrying situation is sent to the second client by the first client; Described normalized security operation vestige management system module is made up of the log-in module be arranged in the second client, page display module, authority management module, task operating administration module, Mission Monitor administration module, Reports module and the task execution module be arranged in the first client.
Normalized security operation vestige management system described above, is characterized in that described first client is mobile phone.
Normalized security operation vestige management system described above, is characterized in that described second client is common office machine.
Normalized security operation vestige management system described above, is characterized in that described server end is the server being provided with database.
Normalized security operation vestige management system described above, it is characterized in that described network is wired or wireless, is cable or optical cable time wired, is 2G or 3G or 4G or 5G network time wireless.
The present invention has that the on-the-spot qualification rate of standardization is high, inspection all standing, photographic technique, accomplish that zero violating the regulationsly waits Advantageous Effects.
Accompanying drawing explanation
Fig. 1 is the structural principle block diagram of the invention process example 1.
Fig. 2 is the structural principle block diagram of the invention process example 2.
Fig. 3 is the structural principle block diagram of the invention process example 3.
Fig. 4 is the structural principle block diagram of the normalized security operation vestige management system module in the invention process example 1.
Fig. 5 is the structural principle block diagram of the normalized security operation vestige management system module in the invention process example 2 and 3.
Embodiment
embodiment 1
Ask for an interview Fig. 1 and Fig. 4, normalized security operation vestige management system, it is characterized in that it includes server end 1, first client 2, second client 3, monitor terminal 4, network and normalized security operation vestige management system module; Second client by network from server end obtaining information, server end can send information and instruction to the first client, tasks carrying situation is sent to server end by the first client, server end can receive the pilot signal that monitor terminal sends, and server end can send monitored instruction to monitor terminal; Described normalized security operation vestige management system module is made up of the log-in module 101 be arranged in server end 1, page display module 102, authority management module 103, task operating administration module 104, Mission Monitor administration module 105, Reports module 106 and the task execution module 107 be arranged in the first client 2.
embodiment 2
Ask for an interview Fig. 2 and Fig. 5, normalized security operation vestige management system, it is characterized in that it includes the first client 2, second client 3, monitor terminal 4, network and normalized security operation vestige management system module; Second client can send information and instruction to the first client, and tasks carrying situation is sent to the second client by the first client, and the second client can receive the pilot signal that monitor terminal sends, and the second client can send monitored instruction to monitor terminal; Described normalized security operation vestige management system module is made up of the log-in module 101 be arranged in the second client 3, page display module 102, authority management module 103, task operating administration module 104, Mission Monitor administration module 105, Reports module 106 and the task execution module 107 be arranged in the first client 2.
embodiment 3
Ask for an interview Fig. 3 and Fig. 5, normalized security operation vestige management system, it is characterized in that it includes the first client 2, second client 3, network and normalized security operation vestige management system module; Second client can send information and instruction to the first client, and tasks carrying situation is sent to the second client by the first client; Described normalized security operation vestige management system module is made up of the log-in module 101 be arranged in the second client 3, page display module 102, authority management module 103, task operating administration module 104, Mission Monitor administration module 105, Reports module 106 and the task execution module 107 be arranged in the first client 2.
Normalized security operation vestige management system described above, is characterized in that described first client is mobile phone; And described mobile phone can have camera function.
Normalized security operation vestige management system described above, is characterized in that described second client is common office machine.
Normalized security operation vestige management system described above, is characterized in that described server end is the server being provided with database.
Normalized security operation vestige management system described above, it is characterized in that described network is wired or wireless, is cable or optical cable time wired, is 2G or 3G or 4G or 5G network time wireless.
Normalized security operation vestige management system described above, is characterized in that having camera in described monitor terminal.
Normalized security operation vestige management system described above, is characterized in that described task execution module is present in mobile phone with the form of APP.
In above-mentioned embodiment 2 and embodiment 3, the second client is also computing machine, is wherein provided with server; The mobile phone of the first client in above-mentioned embodiment 3 has camera function.
Normalized security operation vestige management system described above, is characterized in that described log-in module comprises username and password input item, jumps to page display module after logining successfully; Page indicating template exists in the form of a web page; Can add in authority management module, revise personal information, can also forbid or activate the personnel specified; Task operating administration module comprises operation class (of an amplifying stage), task status, worksheet category management; Operation class (of an amplifying stage) has 5: the equipment construction operation in scheduled overhaul, breakdown repair, projects, hot line job, inoperative; Task status has 3: do not perform, perform, complete; Work ticket type: the first work ticket, Second Working Ticket, hot line job ticket, construction safety working bill, accident emergency repairing list; In Mission Monitor administration module, refer to that inspector informs by telephone work responsible official and prepares capture video; Work responsible official selects corresponding task, Engage of standard safety work vestige management system task list, and click video monitoring realizes mobile phone terminal APP and enables and enable camera or open monitor terminal; Reports module refers to: after all working task completes, and can generate and reconnoitre record sheet, and then generate the first work ticket according to the data of workmen's submission.
In the present invention, write " Safety standardization operation field vestige management system " program at mobile phone (app end) and computer (pc end); Work responsible official uses " Safety standardization operation field vestige management system " from formulation construction plan, site inspection, on-the-spot risk management and control, until a whole set of site operation flow process of construction termination, enterprising line operate is held item by item, normative operation human behavior at mobile phone A PP; Achieve long-distance video to monitor in real time, by working-yard image, picture and text information Real-time Feedback on safety supervision inspector computer, thus effectively carry out on-the-spot risk management and control and examination; System APP holds application program can realize playing window function, accompanying drawing function of taking pictures, handwriting function and other application and embeds function; By using normalized security operation vestige management system, tight site inspection, prepare before sufficient construction, tissue, technical measures that working-yard is strict, expection will realize the workflow management of normalized security operation field, and form work responsible official intellectuality, MIT, every Security Administration of numerous and complicated is integrated, work responsible official's terminal at the construction field (site), by flow operations, realizes that whole process can be supervised, checked, retrospective " vestige " management; Work responsible official uses " on-the-spot vestige checking and administration system "; from formulation construction plan, carry out site inspection etc.; until a whole set of site operation flow process of construction termination; item by item at the enterprising line operate of panel computer; and by coherent video, picture and text information Real-time Feedback on safety supervision inspector computer; thus effectively avoid construction responsible official to break rules and regulations, carry out the management and control of on-the-spot risk and carrying out of relevant examination.Decrease manual work's intensity of the inspection such as remote transformer station and mountain route simultaneously, make the safety supervision target that originally cannot realize become reality, this is that anti-work violating the regulations provides powerful guarantee from technological layer.Standard construction planning management, all construction informations, outage information are very clear, reduce random, alleviate work responsible official burden simultaneously, work order is assigned, plan examination & approval, information reporting, pre-shift meeting, work ticket are handled etc. completes at a platform, and each flow process has video or picture can check, can review.By setting up long-range inspection center in the present invention, transformer station's picture control, portable picture control and wireless video system are used in anti-inspecting violating the regulations, compensate for the deficiency of inspection manpower, and telesecurity inspection can be realized, an inspector even can be made can to monitor multiple working-yard, and linked up by system and work on the spot responsible official.Utilize transformer station's frequency image monitoring system, remote real-time monitoring can be carried out to the operation in transformer station, working-yard in real time.By the portable frequency image monitoring system such as cell-phone customer terminal, field camera, can monitor line construction scene in real time.Applied in anti-violating the regulations inspecting by above system and greatly improve anti-work actual effect violating the regulations, make overall process, comprehensive, all standing safety supervision becomes possibility.
The present invention makes the on-the-spot qualification rate 100% of standardization, inspection all standing 100%, construction plan are formulated, report, completion rate of the plan, examination 100%, photographic technique, accomplish that zero breaks rules and regulations, realizes the performance appraisal of specialized management and control.
Therefore, the present invention has that the on-the-spot qualification rate of standardization is high, inspection all standing, photographic technique, accomplish that zero violating the regulationsly waits Advantageous Effects.
Claims (8)
1. normalized security operation vestige management system, is characterized in that it includes server end, the first client, the second client, monitor terminal, network and normalized security operation vestige management system module; Second client by network from server end obtaining information, server end can send information and instruction to the first client, tasks carrying situation is sent to server end by the first client, server end can receive the pilot signal that monitor terminal sends, and server end can send monitored instruction to monitor terminal; Described normalized security operation vestige management system module is made up of the log-in module be arranged in server end, page display module, authority management module, task operating administration module, Mission Monitor administration module, Reports module and the task execution module be arranged in the first client.
2. normalized security operation vestige management system, is characterized in that it includes the first client, the second client, monitor terminal, network and normalized security operation vestige management system module; Second client can send information and instruction to the first client, and tasks carrying situation is sent to the second client by the first client, and the second client can receive the pilot signal that monitor terminal sends, and the second client can send monitored instruction to monitor terminal; Described normalized security operation vestige management system module is made up of the log-in module be arranged in the second client, page display module, authority management module, task operating administration module, Mission Monitor administration module, Reports module and the task execution module be arranged in the first client.
3. normalized security operation vestige management system, is characterized in that it includes the first client, the second client, network and normalized security operation vestige management system module; Second client can send information and instruction to the first client, and tasks carrying situation is sent to the second client by the first client; Described normalized security operation vestige management system module is made up of the log-in module be arranged in the second client, page display module, authority management module, task operating administration module, Mission Monitor administration module, Reports module and the task execution module be arranged in the first client.
4. the normalized security operation vestige management system according to claim 1-3 any one, is characterized in that described first client is mobile phone; And described mobile phone can have camera function.
5. the normalized security operation vestige management system according to claim 1-3 any one, is characterized in that described second client is common office machine.
6. the normalized security operation vestige management system according to claim 1-3 any one, is characterized in that described server end is the server being provided with database.
7. the normalized security operation vestige management system according to claim 1-3 any one, it is characterized in that described network is wired or wireless, is cable or optical cable time wired, is 2G or 3G or 4G or 5G network time wireless.
8. the normalized security operation vestige management system according to claim 1-3 any one, is characterized in that having camera in described monitor terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510692395.0A CN105184519A (en) | 2015-10-23 | 2015-10-23 | Standardized safety operation tracing management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510692395.0A CN105184519A (en) | 2015-10-23 | 2015-10-23 | Standardized safety operation tracing management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105184519A true CN105184519A (en) | 2015-12-23 |
Family
ID=54906582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510692395.0A Pending CN105184519A (en) | 2015-10-23 | 2015-10-23 | Standardized safety operation tracing management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105184519A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106896749A (en) * | 2017-03-10 | 2017-06-27 | 中铁四局集团有限公司 | construction management client based on BIM technology |
CN106991214A (en) * | 2017-03-10 | 2017-07-28 | 中铁四局集团有限公司 | The informatization management method of high speed railway prefabricating Liang Chang based on BIM |
CN107025516A (en) * | 2017-03-10 | 2017-08-08 | 中铁四局集团有限公司 | The KXG of high speed railway prefabricating Liang Chang based on BIM |
CN107563635A (en) * | 2017-08-29 | 2018-01-09 | 国网福建省电力有限公司 | The long-range audit system of distribution line engineering construction quality and method |
CN107798489A (en) * | 2017-12-01 | 2018-03-13 | 国网河南省电力公司鹤壁供电公司 | A kind of electric network operation site safety management method based on wechat platform |
CN108848337A (en) * | 2018-06-12 | 2018-11-20 | 中国联合网络通信集团有限公司 | Long-range auditing method, device, terminal and the computer storage medium of line project |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004287584A (en) * | 2003-03-19 | 2004-10-14 | Hitachi Ltd | Method for displaying operation schedule chart and method and system for managing operation |
CN103559786A (en) * | 2013-09-29 | 2014-02-05 | 西安祥泰软件设备系统有限责任公司 | Monitoring method and system for transformer station |
CN104166901A (en) * | 2014-08-08 | 2014-11-26 | 上海交通大学 | Fault urgent repair site auxiliary mobile platform based on distribution network |
CN104683471A (en) * | 2015-03-11 | 2015-06-03 | 北京呈创科技股份有限公司 | Commanding and dispatching on-site terminal, desktop terminal and system |
-
2015
- 2015-10-23 CN CN201510692395.0A patent/CN105184519A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004287584A (en) * | 2003-03-19 | 2004-10-14 | Hitachi Ltd | Method for displaying operation schedule chart and method and system for managing operation |
CN103559786A (en) * | 2013-09-29 | 2014-02-05 | 西安祥泰软件设备系统有限责任公司 | Monitoring method and system for transformer station |
CN104166901A (en) * | 2014-08-08 | 2014-11-26 | 上海交通大学 | Fault urgent repair site auxiliary mobile platform based on distribution network |
CN104683471A (en) * | 2015-03-11 | 2015-06-03 | 北京呈创科技股份有限公司 | Commanding and dispatching on-site terminal, desktop terminal and system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106896749A (en) * | 2017-03-10 | 2017-06-27 | 中铁四局集团有限公司 | construction management client based on BIM technology |
CN106991214A (en) * | 2017-03-10 | 2017-07-28 | 中铁四局集团有限公司 | The informatization management method of high speed railway prefabricating Liang Chang based on BIM |
CN107025516A (en) * | 2017-03-10 | 2017-08-08 | 中铁四局集团有限公司 | The KXG of high speed railway prefabricating Liang Chang based on BIM |
CN107563635A (en) * | 2017-08-29 | 2018-01-09 | 国网福建省电力有限公司 | The long-range audit system of distribution line engineering construction quality and method |
CN107798489A (en) * | 2017-12-01 | 2018-03-13 | 国网河南省电力公司鹤壁供电公司 | A kind of electric network operation site safety management method based on wechat platform |
CN108848337A (en) * | 2018-06-12 | 2018-11-20 | 中国联合网络通信集团有限公司 | Long-range auditing method, device, terminal and the computer storage medium of line project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105184519A (en) | Standardized safety operation tracing management system | |
CN110971878B (en) | Engineering field management system | |
CN112508417A (en) | Civil aviation professional engineering general contract project management system based on BIM technology | |
CN105564465B (en) | A kind of railway electric signal plant maintenance operation control system and method | |
CN110599007A (en) | Project progress management system | |
KR101683441B1 (en) | Mobile based completion inspection method and system | |
CN103544739A (en) | B/S (Browser/Server) architecture-based polling method of visual subway equipment polling management system | |
CN106485298A (en) | A kind of equipment routing inspection maintaining method based on Quick Response Code | |
KR102131656B1 (en) | Cloud service platform system to manage for fire-fighting facilities | |
CN112163746A (en) | Building engineering project management system based on BIM and GIS | |
CN109117526A (en) | One kind being suitable for mechanical system maintenance of equipment and guides data record and analysis system | |
KR102438757B1 (en) | Smart Safety Platform | |
JP2007042014A (en) | System and method for monitoring plant condition | |
KR20170097468A (en) | DlAGNOSTIC AND MANAGING METHOD OF NEW RENEWABLE ENERGY APPATUS USING MOBILE DEVICE AND THE SYSTEM THEREOF | |
CN108846771A (en) | Operation management system and method | |
CN109872090A (en) | A kind of operating point identifying system and method | |
Sarshar et al. | Challenges and proposals for managing major accident risk through the planning process | |
CN111932113A (en) | Environment supervision and management method, platform and storage medium | |
Thomas et al. | A Business Case for Advanced Outage Management | |
Alejandrino et al. | Audit pattern optimization in service industry using six sigma methodology | |
CN114881549A (en) | Job management method, apparatus, terminal device, and storage medium | |
CN114022125A (en) | Engineering quantity calculation method, storage medium, and apparatus | |
CN113570083A (en) | Operation and maintenance flow determination method and device for equipment, electronic equipment and storage medium | |
KR101390888B1 (en) | System with risk evaluation system associated with technical specification to manage plant risk | |
Monitoring et al. | The Challenge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: Suizhou Power Co., Ltd. Hubei Power Co., Ltd. Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant before: State Grid Corporation of China Applicant before: STATE GRID HUBEI ELECTRIC POWER COMPANY SUIZHOU POWER SUPPLY COMPANY |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151223 |
|
RJ01 | Rejection of invention patent application after publication |