The content of the invention
It is an object of the invention to provide a kind of informatization management method of the high speed railway prefabricating Liang Chang based on BIM, with
Solve the problem of existing railway prefabricated beam management information transmission is inaccurate.
To realize object above, the technical solution adopted by the present invention is:A kind of high speed railway prefabricating beam based on BIM is provided
The informatization management method of field, this method includes:
Based on BIM technology, the BIM models of box beam in high speed railway prefabricating beam are set up;
Server end is set a roof beam in place according to Liang Chang applies group information, generation beam working procedure task;
Server end sends the process task of generation to client so that client is initiated the process task received
Or closed procedure;
Received server-side client send to process tasks carrying initiate or closed procedure information and according to numbering correspondence
The information is articulated on the BIM models of reference numeral box beam by principle.
Compared with prior art, there is following technique effect in the present invention:The present invention is by using BIM
(Building Information Modeling, BIM), the server end and client of beam actual production management are built, by
Server end is realized the push of unjointed beam production schedule task and issued, the production schedule that client the reception server end is sent
Task, the synchronizing information initiated by client or closed per procedure task and every procedure is initiated and closed to server
The information, is articulated on corresponding BIM models by end by server.Construction production information is met to pass on accurately and rapidly
Need.Compared with the way to manage of traditional " people's pipe people ", not only reduce the error of information transmission, greatly improve information
The accuracy of transmission, and accelerate construction speed, save human cost.
Embodiment
With reference to shown in Fig. 1 to Fig. 2, the present invention is described in further detail.
As shown in figure 1, present embodiment discloses a kind of information system management side of the high speed railway prefabricating Liang Chang based on BIM
Method, this method comprises the following steps S1 to S4:
S1, based on BIM technology, set up the BIM models of box beam in high speed railway prefabricating beam;
S2, server end are set a roof beam in place according to Liang Chang applies group information, generation beam working procedure task;
S3, server end send the process task of generation to client so that client is sent out the process task received
Rise or closed procedure;
S4, received server-side client send to process tasks carrying initiate or closed procedure information and according to numbering pair
Answer principle that the information is articulated on the BIM models of reference numeral box beam.
It should be noted that the client in the present embodiment includes but is not limited to smart mobile phone, personal digital assistant
(PDA), tablet personal computer, notebook computer, vehicle-mounted computer(carputer), the client such as intelligent watch.
Further, step S1 is specifically included:
Based on BIM technology, high speed railway prefabricating beam two-dimensional design drawing is handled, obtains high speed railway prefabricating Liang Chang's
BIM models;
Server end reads the data on the BIM models.
Further, as shown in Fig. 2 step S2 specifically includes following fine division step S21 to S23:
S21, server end apply group information according to being set a roof beam in place according to Liang Chang, generation beam construction plan task;
S22, server end determine adjacent step lasts time, one Pin box beams of production according to the beam construction plan task of generation
Construction the duration and per procedure structural data;
Wherein, the structural data per procedure mainly includes the pass between document required in production process, working procedure
Involved structural data in the whole production procedure such as system, mission dispatching interval.
S23, the packing of the structural data of every procedure task is stored in server end.
Specifically, the client in the present embodiment can realize steel reinforcement cage colligation in the process in beam actual production,
Wear rubber pulling rod rod, template cleaning, support plate is installed, lifting steel reinforcement cage, internal model are installed, install other built-in fittings, pour coagulation
Soil, health, tear internal model, pre- initial tensioning open, rise and move the process tasks such as beam, whole tensioning, mud jacking end-blocking, beam-ends waterproof, finished product beam outbound
Receiving and initiation, while being synchronized to server end.
Further, in step S4, client send to process tasks carrying initiate or closed procedure information, specifically
Including beam number, commencement date, working procedure, job location, detail design amount, construction actual amount and construction deadline.
Explanation is needed exist for, client is when initiating or closing working procedure task, and client can be chosen
The information related to working procedure task, including:" ×× # beams ", " ×× process ", " job location ", " course of event " etc. are believed
Breath.These information contain the space attribute and physical attribute of working procedure task.Such as:Beam number:173# beams, commencement date:
On December 16th, 2016 working procedure:Casting concrete, job location:5# beam making bench, design flow:317m3, actual amount:320
Cubic meter, pour the deadline:8 a.m. 50 grades.
Further, method disclosed in this implementation also includes:
After the completion of per pass working procedure task, the image money for the road working procedure task that received server-side client is sent
Expect and image data is articulated on the BIM models of reference numeral box beam.
It should be noted that image data when server end can construct to the per pass working procedure task that client is uploaded
Stored, in order to which the later stage is when there is mistake, review cause of accident.
Further, in above-mentioned steps S23:" the structural data packing of every procedure task is stored in server end "
Before, in addition to:
Whether the data on detection BIM models meet the actual production flow of default Pin numbers box beam.
It should be noted that the data on BIM models include all work equipments for being related to of beam place and equipment here
Parameter.
Specifically, in actual applications, when the data on BIM can not meet the Liang Chang of specific Pin numbers construction needs,
In order to ensure that the quality and safety of construction can not implement construction plan, therefore, in the structuring number to every procedure task
According to carrying out before packing storage, it is necessary to detected to the data on BIM models, to judge whether the data on BIM models expire
The need for a sufficient Pin or number Pin box beam actual production flows.
Further, method disclosed in the present embodiment also includes:
With reference to BIM technology and informationization technology, described BIM models are managed.
Because in actual applications, the change according to railway prefabricated beam actual conditions, and to the three-dimensional of railway beam
Model is that BIM models are modified, the need for meeting actual production management.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.