CN106845935A - A kind of method and system of engineering project flow template - Google Patents
A kind of method and system of engineering project flow template Download PDFInfo
- Publication number
- CN106845935A CN106845935A CN201710019845.9A CN201710019845A CN106845935A CN 106845935 A CN106845935 A CN 106845935A CN 201710019845 A CN201710019845 A CN 201710019845A CN 106845935 A CN106845935 A CN 106845935A
- Authority
- CN
- China
- Prior art keywords
- template
- self
- module
- stl
- engineering project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000011156 evaluation Methods 0.000 claims abstract description 21
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 8
- 238000009415 formwork Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
Abstract
The present invention relates to a kind of engineering project flow template system, including edit model module, task management module, expert's evaluation module, template analysis module, STL and self-defined template storehouse;The invention further relates to a kind of engineering project flow template method, comprise the following steps:Step 1, by edit model module, the template that will be put in order is preserved into STL;Step 2:User calls the template in STL using task management module, directly creates task from the user-defined flow of template;Step 3:Expert carries out comprehensive assessment to self-defined template by template evaluation module, and by assessment result record in self-defined template storehouse;Step 4:Template analysis module carries out comprehensive analysis according to the assessment result of self-defined template, obtains optimal flow template, and be saved in STL.The present invention can carry out Accurate Analysis and assessment to construction formwork, allow the design and construction of engineering project flow more efficiently to carry out.
Description
Technical field
The present invention relates to construction-engineering project administrative skill field, more particularly to a kind of engineering project flow template method
And system.
Background technology
In the project management of building engineering field, because building engineering structure is mostly more complicated, the specialty being related to
Various, work progress is deep-rooted, careless slightly to can bring about the quality problems for building even whole engineering, ultimately results in work
Journey is done over again, project delay, it is impossible to be delivered for use on time, is that construction unit brings loss difficult to the appraisal.Therefore, it is badly in need of in industry
A kind of instrument that construction enterprises' lifting process can be helped to manage, in the case where engineering staff lacks experience, also can guarantee that item
Mesh is smoothly implemented.Therefore, it is proposed that a kind of engineering project flow template method and system solves the above problems.
The content of the invention
A kind of engineering project flow template method for being proposed the invention aims to solve background technology and it is
System.
The present invention proposes a kind of engineering project flow template system, including edit model module, task management module,
Expert's evaluation module, template analysis module, STL and self-defined template storehouse;
The template that the edit model module is used to have put in order forms structural data, and preserves to standard form
In storehouse;
The input of the task management module is connected with the first output end of the edit model module, and task management
Module is used to call the template in STL, and directly from the user-defined flow establishment task of template;
The input of expert's evaluation module is connected with the first output end of the task management module, and expert assesses
Module is used to carry out comprehensive assessment to the self-defined template that task management module is produced, and assessment result is stored to self-defined mould
In plate storehouse;
The input of the template analysis module is connected with the first output end of expert's evaluation module, and template analysis
Module is used to carry out comprehensive analysis to the self-defined template in self-defined template storehouse, obtains optimal flow template, and be saved in
In STL;
The first input end of the STL and the second input with respectively with edit model module and template analysis
The second output end connection of module, the first input end and the second input in the self-defined template storehouse respectively with task management mould
Block and the output end of expert's evaluation module second are connected;
3rd input of the STL is connected with the output end in self-defined template storehouse, and analysis obtains optimal stream
Journey template is saved in STL.
On the basis of above-mentioned technical proposal, there can be technical scheme further below:
The original template storehouse that the edit model module is provided using system, and engineering project classification is pressed in original template storehouse
It is divided into the corresponding original template of various scenes therewith.
By in industry, specially self-defined template of the timing on schedule to being produced by edit model module enters expert's evaluation module
Row analysis and assessment.
The STL and self-defined template storehouse are stored in the database of remote server.
The invention allows for a kind of engineering project flow template method, comprise the following steps:
Step 1:By edit model module, the template that will have been put in order forms structural data, preserves to master die
In plate storehouse;
Step 2:User calls the template in STL using task management module, is directly made by oneself from the flow of template
Adopted establishment task, when the template in STL can not express task definition completely, user can be with self-defined template;
Step 3:Expert is by template evaluation module to carrying out comprehensive assessment, system record using degree self-defined template high
The result of expert's assessment, and store in self-defined template storehouse;
Step 4:User's frequency of use, expert's assessment knot using the template analysis module in system to self-defined template
Really, the dimension such as flow degree of coupling carries out generalized analysis, forms optimal flow template, and is saved in STL,
Recommended during user's use simultaneously.
On the basis of above-mentioned technical proposal, there can be technical scheme further below:
STL in the step 1 provides the set of standard form for the industry.
STL in the step 1 includes standard form corresponding with all kinds of engineering project scenes.
Score and weight of the result that expert is assessed self-defined template in the step 4 comprising the template.
The present invention enters edlin by setting edit model module in systems to the standard form in STL,
It can be made to meet under most of engineering project scenes the need for;By the task management module for setting, user can directly from template
User-defined flow create task, when the template in STL can not express task definition completely, user can be to mould
Plate carries out sufficiently self-defined so that template is more suitable for the demand of various tasks;By the expert's evaluation module and mould that set
Plate analysis module carries out comprehensive analysis come the template to User Defined editor, and changes into mark by self-defined template high is evaluated
Quasi-mode plate for users to use, to realize automatically updating for system;Additionally, the system operation methods are easy, effectively reduce
The threshold of construction process management, while Accurate Analysis and assessment to construction formwork, can allow the design of engineering project flow
More efficiently carried out with construction.
Brief description of the drawings
Fig. 1 is a kind of engineering project flow template system block diagram proposed by the present invention;
Fig. 2 is a kind of engineering project flow template method flow diagram proposed by the present invention.
Specific embodiment
With reference to specific embodiment, the present invention is further described.
Reference picture 1, a kind of engineering project flow template system, including edit model module, task management module, expert
Evaluation module, template analysis module, STL and self-defined template storehouse;
The template that the edit model module is used to have put in order forms structural data, and preserves to standard form
In storehouse, the original template storehouse that the edit model module is provided using system, and by engineering project classification point in original template storehouse
Into various original templates corresponding with construction scene, it is available for user to select;
The input of the task management module is connected with the first output end of the edit model module, and task management
Module is used to calling template in STL, and user can directly from the user-defined flow establishment task of template, and by user
Customized template is stored in self-defined template storehouse in real time;
The input of expert's evaluation module is connected with the first output end of the task management module, and expert assesses
Module is used to carry out comprehensive assessment to the self-defined template that task management module is produced, and assessment result is stored to self-defined mould
In plate storehouse, self-defined template of the expert's evaluation module by row expert timing on schedule to being produced by edit model module enters
Row analysis and assessment;
The input of the template analysis module is connected with the first output end of expert's evaluation module, and template analysis
Module is used to carry out the self-defined template in self-defined template storehouse comprehensive analysis, and the template stored in self-defined template storehouse meets
In specific condition, can be automatically imported into STL by system control, be expanded template in STL
Number, more selects with to user;
The first input end of the STL and the second input with respectively with edit model module and template analysis
The second output end connection of module, the first input end and the second input in the self-defined template storehouse respectively with task management mould
Block and the output end of expert's evaluation module second are connected.
3rd input of the STL is connected with the output end in self-defined template storehouse, and self-defined template is commented in storehouse
Valency self-defined template high is transferred in STL, and the STL and self-defined template storehouse are stored in far
In the database of journey server, user can remotely access the system by internet, breach the limitation of region and time so that
The more quick access system in family, expands the use scope of the system.
A kind of reference picture 2, engineering project flow template method, comprises the following steps:
Step 1:By the edit model module in system, the template that will have been put in order forms structural data, preserves
Into STL, STL provides the set of standard form for the industry, and STL include with it is all kinds of
The corresponding standard form of engineering project scene, standard form is editable template, and user can as needed on standard form basis
On it is further edited and is changed;
Step 2:After user enters system, the mould in STL can be called by the task management module in system
Plate, directly creates task from the user-defined flow of template, when the template in STL can not express task definition completely,
The Template Editors that user can be re-called in system carry out quick self-defined template as needed;
Step 3:After row expert enters system, can be by the template evaluation module in system to being made by oneself using degree is high
Adopted template carries out comprehensive assessment, and system records the result of expert's assessment automatically, and stores in self-defined template storehouse;Wherein, specially
Result score and weight comprising the template of the family to self-defined template assessment;
Step 4:User's frequency of use, expert's assessment result, the stream of template analysis module in system to self-defined template
The dimensions such as the journey degree of coupling carry out generalized analysis, form optimal flow template, and are saved in STL, while
Recommended during user's use.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto,
Any one skilled in the art the invention discloses technical scope in, technology according to the present invention scheme and its
Inventive concept is subject to equivalent or change, should all be included within the scope of the present invention.
Claims (8)
1. a kind of engineering project flow template system, it is characterised in that including edit model module, task management module, specially
Family's evaluation module, template analysis module, STL and self-defined template storehouse;
The template that the edit model module is used to have put in order forms structural data, and preserves to STL
In;
The input of the task management module is connected with the first output end of the edit model module, and task management module
For calling the template in STL, and directly from the user-defined flow establishment task of template;
The input of expert's evaluation module is connected with the first output end of the task management module, and expert's evaluation module
Self-defined template for being produced to task management module carries out comprehensive assessment, and assessment result is stored to self-defined template storehouse
In;
The input of the template analysis module is connected with the first output end of expert's evaluation module, and template analysis module
For carrying out comprehensive analysis to the self-defined template in self-defined template storehouse, optimal flow template is obtained, and be saved in standard
In ATL;
The first input end of the STL and the second input with respectively with edit model module and template analysis module
The connection of the second output end, the first input end and the second input in the self-defined template storehouse respectively with task management module and
The output end of expert's evaluation module second is connected;
3rd input of the STL is connected with the output end in self-defined template storehouse, and analysis obtains optimal flow mould
Plate is saved in STL.
2. a kind of engineering project flow template system according to claim 1, it is characterised in that:The edit model mould
The original template storehouse that block is provided using system, and it is corresponding by engineering project classification to be divided into various scenes therewith in original template storehouse
Original template.
3. a kind of engineering project flow template system according to claim 1, it is characterised in that:The expert assesses mould
By in industry, specially self-defined template of the timing on schedule to being produced by edit model module is analyzed and assesses block.
4. a kind of engineering project flow template system according to claim 1, it is characterised in that:The STL
It is stored in the database of remote server with self-defined template storehouse.
5. a kind of engineering project flow template method, it is characterised in that comprise the following steps:
Step 1:By edit model module, the template that will have been put in order forms structural data, preserves to STL
In;
Step 2:User calls the template in STL using task management module, and directly from the user-defined flow of template
Establishment task, when the template in STL can not express task definition completely, user can be with self-defined template;
Step 3:Expert is by template evaluation module to carrying out comprehensive assessment, system record expert using degree self-defined template high
The result of assessment, and store in self-defined template storehouse;
Step 4:Using the template analysis module in system to user's frequency of use of self-defined template, expert's assessment result, stream
The dimensions such as the journey degree of coupling carry out generalized analysis, form optimal flow template, and are saved in STL, while
Recommended during user's use.
6. a kind of engineering project flow template method according to claim 5, it is characterised in that:In the step 1
STL provides the set of standard form for the industry.
7. a kind of engineering project flow template method according to claim 5, it is characterised in that:In the step 1
STL includes standard form corresponding with all kinds of engineering project scenes.
8. a kind of engineering project flow template method according to claim 5, it is characterised in that:Step 4 special secondary school
Result score and weight comprising the template of the family to self-defined template assessment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710019845.9A CN106845935A (en) | 2017-01-12 | 2017-01-12 | A kind of method and system of engineering project flow template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710019845.9A CN106845935A (en) | 2017-01-12 | 2017-01-12 | A kind of method and system of engineering project flow template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106845935A true CN106845935A (en) | 2017-06-13 |
Family
ID=59117254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710019845.9A Pending CN106845935A (en) | 2017-01-12 | 2017-01-12 | A kind of method and system of engineering project flow template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106845935A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108764610A (en) * | 2018-04-12 | 2018-11-06 | 福建工程学院 | Standard technology construction management of project method based on big data, storage medium |
CN109711799A (en) * | 2018-12-06 | 2019-05-03 | 圆通科技股份有限公司 | Guide the teaching software and its operation method of the standardization office of administration hilllock |
CN109741018A (en) * | 2018-12-17 | 2019-05-10 | 广州天越电子科技有限公司 | The method and system of the customized management of business are realized by custom field |
CN109978476A (en) * | 2017-12-27 | 2019-07-05 | 南京策问信息技术有限公司 | Restrain institute's project task template generation method, device, system and introduction method |
CN111401022A (en) * | 2020-03-11 | 2020-07-10 | 中国计量大学 | Management standard template rapid generation system and method |
CN112948564A (en) * | 2021-04-15 | 2021-06-11 | 苏州数海长云数据信息科技有限公司 | Computer question-answering method and system based on artificial intelligence technology |
CN116993296A (en) * | 2023-08-15 | 2023-11-03 | 深圳市中联信信息技术有限公司 | Intelligent supervision management system and method applied to engineering design interaction platform |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102486730A (en) * | 2010-12-06 | 2012-06-06 | 上海协讯软件有限公司 | Workflow realization method and workflow system capable of customizing flow in user-defined manner |
CN103294475A (en) * | 2013-06-08 | 2013-09-11 | 北京邮电大学 | Automatic service generating system and automatic service generating method both of which are based on imaging service scene and field template |
CN105373880A (en) * | 2015-10-13 | 2016-03-02 | 国网福建省电力有限公司 | Power grid engineering project scheme feedback evaluation and scheme decision system |
-
2017
- 2017-01-12 CN CN201710019845.9A patent/CN106845935A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102486730A (en) * | 2010-12-06 | 2012-06-06 | 上海协讯软件有限公司 | Workflow realization method and workflow system capable of customizing flow in user-defined manner |
CN103294475A (en) * | 2013-06-08 | 2013-09-11 | 北京邮电大学 | Automatic service generating system and automatic service generating method both of which are based on imaging service scene and field template |
CN105373880A (en) * | 2015-10-13 | 2016-03-02 | 国网福建省电力有限公司 | Power grid engineering project scheme feedback evaluation and scheme decision system |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109978476A (en) * | 2017-12-27 | 2019-07-05 | 南京策问信息技术有限公司 | Restrain institute's project task template generation method, device, system and introduction method |
CN108764610A (en) * | 2018-04-12 | 2018-11-06 | 福建工程学院 | Standard technology construction management of project method based on big data, storage medium |
CN108764610B (en) * | 2018-04-12 | 2022-04-01 | 福建工程学院 | Standard process engineering project construction management method based on big data and storage medium |
CN109711799A (en) * | 2018-12-06 | 2019-05-03 | 圆通科技股份有限公司 | Guide the teaching software and its operation method of the standardization office of administration hilllock |
CN109741018A (en) * | 2018-12-17 | 2019-05-10 | 广州天越电子科技有限公司 | The method and system of the customized management of business are realized by custom field |
CN111401022A (en) * | 2020-03-11 | 2020-07-10 | 中国计量大学 | Management standard template rapid generation system and method |
CN112948564A (en) * | 2021-04-15 | 2021-06-11 | 苏州数海长云数据信息科技有限公司 | Computer question-answering method and system based on artificial intelligence technology |
CN116993296A (en) * | 2023-08-15 | 2023-11-03 | 深圳市中联信信息技术有限公司 | Intelligent supervision management system and method applied to engineering design interaction platform |
CN116993296B (en) * | 2023-08-15 | 2024-04-16 | 深圳市中联信信息技术有限公司 | Intelligent supervision management system and method applied to engineering design interaction platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106845935A (en) | A kind of method and system of engineering project flow template | |
CN104680320A (en) | BIM-based project management system and method | |
SG115362A1 (en) | Asset management and scheduling graphical user interface for media streamer | |
CN108322475A (en) | A kind of equipment remote collaboration method for maintaining and system based on MR live streamings | |
TW201624467A (en) | Meeting minutes device and method thereof for automatically creating meeting minutes | |
CN109491735B (en) | Integrated data generation and verification integrated monitoring human-computer interface configuration implementation method | |
CN105719049B (en) | Method and system for realizing intelligent log | |
CN108764610A (en) | Standard technology construction management of project method based on big data, storage medium | |
CN105635835B (en) | A kind of method that micro- class production storage plays | |
KR102239962B1 (en) | Platform providing apparaus based document form | |
CN110837501A (en) | User-defined form system, form manufacturing method and storage medium | |
CN110826123A (en) | BIM component resource system and BIM component calling method | |
CN105868196A (en) | Method for generating industrial data report in server | |
CN107436785B (en) | Revit software information interaction system and interaction method based on information system | |
MXPA05010439A (en) | System and method for automatically generating a slate using metadata. | |
CN114638232A (en) | Method and device for converting text into video, electronic equipment and storage medium | |
CN106227597A (en) | Task priority treating method and apparatus | |
CN109710747B (en) | Information processing method and device and electronic equipment | |
CN111046189A (en) | Modeling method of power distribution network knowledge graph model | |
CN104794179B (en) | A kind of the video fast indexing method and device of knowledge based tree | |
CN104636397B (en) | Resource allocation methods, calculating accelerated method and device for Distributed Calculation | |
CN100419769C (en) | System and method for managing primitive attribute | |
CN106156927A (en) | A kind of foreign trade based on intelligent mobile terminal management system and management method | |
KR101814981B1 (en) | Web-based Interactive Image Production System | |
CN101576981A (en) | Scene-type service system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |
|
RJ01 | Rejection of invention patent application after publication |