ZA202204496B - Working face layout method with coal pillar interval staggered forms for weakening development of mining-induced ground fissure from the source - Google Patents

Working face layout method with coal pillar interval staggered forms for weakening development of mining-induced ground fissure from the source

Info

Publication number
ZA202204496B
ZA202204496B ZA2022/04496A ZA202204496A ZA202204496B ZA 202204496 B ZA202204496 B ZA 202204496B ZA 2022/04496 A ZA2022/04496 A ZA 2022/04496A ZA 202204496 A ZA202204496 A ZA 202204496A ZA 202204496 B ZA202204496 B ZA 202204496B
Authority
ZA
South Africa
Prior art keywords
weakening
mining
development
source
working face
Prior art date
Application number
ZA2022/04496A
Inventor
Hengzhong Zhu
Shaojie Chen
Chuanwei Zang
Dawei Yin
Guangchao Zhang
Original Assignee
Univ Shandong Science & Tech
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Univ Shandong Science & Tech filed Critical Univ Shandong Science & Tech
Publication of ZA202204496B publication Critical patent/ZA202204496B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
ZA2022/04496A 2021-08-16 2022-04-22 Working face layout method with coal pillar interval staggered forms for weakening development of mining-induced ground fissure from the source ZA202204496B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110937672.5A CN113464139B (en) 2021-08-16 2021-08-16 Coal pillar interval staggered working face layout method for weakening mining ground crack development from source

Publications (1)

Publication Number Publication Date
ZA202204496B true ZA202204496B (en) 2022-07-27

Family

ID=77866875

Family Applications (1)

Application Number Title Priority Date Filing Date
ZA2022/04496A ZA202204496B (en) 2021-08-16 2022-04-22 Working face layout method with coal pillar interval staggered forms for weakening development of mining-induced ground fissure from the source

Country Status (2)

Country Link
CN (1) CN113464139B (en)
ZA (1) ZA202204496B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370281A (en) * 2015-10-10 2016-03-02 天地科技股份有限公司 Layout method for lower slice of close distance coal seam group and low layer structure
CN205135632U (en) * 2015-10-10 2016-04-06 天地科技股份有限公司 Lower leaf structure of coal seam group closely
CN109139013A (en) * 2018-08-24 2019-01-04 大同煤矿集团有限责任公司 Ultra close distance coal seam exploits country rock roadway layout method
CN110374600B (en) * 2019-07-29 2020-07-14 中国矿业大学(北京) Non-offset arrangement method for mining roadway of extremely-close coal seam group

Also Published As

Publication number Publication date
CN113464139B (en) 2023-08-22
CN113464139A (en) 2021-10-01

Similar Documents

Publication Publication Date Title
AU2017405410A1 (en) Networked preferential gas migration passage construction and gas diversion drainage method
MX2018009069A (en) Well treatment methods and compositions.
MX356144B (en) Fracture monitoring and characterisation.
MX2016002248A (en) Apparatus and method for applying a soil treatment beneath the surface of the ground.
BR102014012028A8 (en) ore removal production line, twin ramps and ground support installation method
RU2441160C1 (en) Method for underground mining of coal beds
ZA202204496B (en) Working face layout method with coal pillar interval staggered forms for weakening development of mining-induced ground fissure from the source
EP3998395A4 (en) Design method for mine without leaving coal pillar and without roadway tunneling
ZA202109624B (en) Method for mining shallow coal seam with minimized impact
MY176815A (en) Process for mining alluvial deposits
RU2013125335A (en) METHOD FOR PREVENTION AND CONTROL OF SUDDEN ZONE EMISSIONS OF COAL AND GAS
MX2017012264A (en) Fluid injection process for hydrocarbon recovery from a subsurface formation.
BR112017006799A2 (en) method of treating an underground formation, process for the synthesis of a compound, and system for carrying out the method.
MX2017012267A (en) Flooding process for hydrocarbon recovery from a subsurface formation.
ZA202102300B (en) Grouting quality testing method for weak floor of coal mine rock roadway
RU2553121C1 (en) Method of determining gas recovery of mined seam in stopping face
Hadzi-Nikolova et al. Noise Induced Hearing Loss (NIHL) in mining
PL3936418T3 (en) Caterpillar track of work machine
RU2005125532A (en) METHOD FOR UNDERGROUND DEVELOPMENT OF MINERAL MINERAL STRESSES
ZA202104224B (en) Method for grouting reinforcement of fault fracture zone of coal mining working face
UA113903U (en) METHOD OF PROTECTION OF EXCEPTIONAL PRODUCTS
RU2473806C1 (en) Method to mine steep beds by well hydraulic production with ancillary mining of methane
UA105324C2 (en) Method to control bottom heaving in mine workings
GB202305187D0 (en) Tracer method for hydraulically fractured hydrocarbon wells
UA113116C2 (en) METHOD OF DEGGATION OF GASONATED MOUNTAINS