ZA200908972B - Continuous cast method - Google Patents
Continuous cast method Download PDFInfo
- Publication number
- ZA200908972B ZA200908972B ZA200908972A ZA200908972A ZA200908972B ZA 200908972 B ZA200908972 B ZA 200908972B ZA 200908972 A ZA200908972 A ZA 200908972A ZA 200908972 A ZA200908972 A ZA 200908972A ZA 200908972 B ZA200908972 B ZA 200908972B
- Authority
- ZA
- South Africa
- Prior art keywords
- melt
- mould
- splash shield
- ports
- nozzle
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 33
- 239000000155 melt Substances 0.000 claims description 41
- 238000005266 casting Methods 0.000 claims description 26
- 241000196435 Prunus domestica subsp. insititia Species 0.000 claims description 9
- 230000000149 penetrating effect Effects 0.000 claims description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 6
- 229910052802 copper Inorganic materials 0.000 description 6
- 239000010949 copper Substances 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000005452 bending Methods 0.000 description 2
- 239000000919 ceramic Substances 0.000 description 2
- 230000001939 inductive effect Effects 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 239000000161 steel melt Substances 0.000 description 2
- 229910000851 Alloy steel Inorganic materials 0.000 description 1
- 229910000975 Carbon steel Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 239000000498 cooling water Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 229910001338 liquidmetal Inorganic materials 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000003595 mist Substances 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
- 210000003625 skull Anatomy 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 238000010415 tidying Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D41/00—Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
- B22D41/50—Pouring-nozzles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D7/00—Casting ingots, e.g. from ferrous metals
- B22D7/12—Appurtenances, e.g. for sintering, for preventing splashing
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
Description
. 1M
CONTINUOUS CAST METHOD
The invention relates to a continuous cast method, wherein a melt is supplied into a frame-shaped mould through a top opening of the mould by a nozzle having at least two opposing ports, until a surface level of the melt reaches a : 5 steady state position above the ports, and wherein in a steady state condition, an at least superficially solidified casting is drawn through a bottom opening of ) the mould opposite to the top opening, at a velocity corresponding to the flow rate of the melt, thus basically keeping the surface level in the steady state position.
The continuous strip cast process is well-known since the mid of the 19% century and is currently employed with the major part of steel production world-wide, including plain carbon, alloy and stainless steel grades in different shapes and sizes. These include large rectangular “slabs” (having cross sections from 0.5 cm x 50 cm up to 25 cm x 220 cm) and basically square “blooms” (up to 40 cm x 60 cm), small square or circular “billets” (10 cm up to 20 cm of diameter) as well as other, e.g. “"dog-bone” shapes. -
The melt flows from a ladle to a tundish and further through a ceramic nozzle that is attached to the tundish into the mould. Once in the mould, the melt freezes against the water-cooled walls of the bottomless copper mould to form a thin solidified shell of the casting. After exiting the mould, the shell forms a container supporting the remaining liquid melt in the casting. While the tundish provides a continuous stream of melt to the mould, even during exchange of the ladle, the process runs in steady state.
In modern continuous slab cast assemblies, the mould is assembled from four separate copper walls: Two broad walls are fixed to the assembly and two narrow walls are movable towards an axis of symmetry of the mould, thus allowing adjustment of the slab width even during the cast process. After . machining and assembly of the mould, the gaps between the broad and the narrow walls are limited to about 0.3 mm. In operation, thermal deformation as well as wearing of the copper walls allow these gaps to increase up to 1.5 mm without impacting the cast process. In steady state condition of the continuous cast process, the melt surface as well as the surface of the thin shell of the casting is covered by liquid slag, both thermally insulating the copper walls from the steel melt and lubricating the gap between the mould and the casting. - 5 The nozzle has lateral ports, forcing the melt stream to protrude at basically right angles to the narrow walls of the mould, thus inducing a forced flow in the melt. ) Opposing pairs of drive rolls underneath the bottom opening of the mould continuously both withdraw the casting from the mould at a velocity (or “casting speed”) corresponding the flow rate of the melt into the mould and bend the casting from the initially vertical to a horizontal direction. Further solidification of the casting is driven by cooling water or air mist sprays between the rolls.
For starting the cast process, the bottom opening is plugged with a “dummy bar” and the empty mould is filled with melt like in a conventional mould cast. While the surface level of the melt rises to a previously defined steady state position above the ports of the nozzle (also SEN, “Submerged Entry Nozzle”), the shell begins to solidify both on top of the dummy bar and on the walls of the mould.
After the surface level reaches the steady state position, the dummy bar is withdrawn from the bottom opening carrying along the casting by means of the drive rolls.
The most critical phase of the starting procedure of the known process is the initial filling of the empty mould through up to 1.5 m of plain air: The melt splatters into the mould and spills onto the cooled copper walls, primarily to the narrow walls of the mould. Striking the cold walls, small spillings of melt abruptly become solid, forming sharp-edged shapes that above all firmly adhere to the walls. A similar effect regularly occurs in “flying” tundish change during the cast process as provided by modern cast processes in order to significantly reduce downtime of the assembly: While the melt surface inside the mould falls below the ports level, the newly starting melt stream again falls up to 1.2 m through plain air.
Because these solidified spillings are mainly embedded to the insulating slag instead of the streaming melt in the continuous cast process, they mostly do not melt, but instead not only obstruct the relative movement between the mould and the casting, but they are scratching the thin solidifying shell. Failing to close, the resulting notches extend over the length of the casting. Apart from the : visible quality defect, these notches are severe weakness points in the thin shell of the casting: In particular when bending the casting from vertical to horizontal direction, the thin shell may burst open in these notches, spilling the liquid metal : from inside both over the drive rolls and over nearby parts of the casting assembly. This dreaded accident (“breakout accident”) regularly involves not only interruption of the cast process, but damages the assembly, requires repair and tidying and overall causes serious loss of productivity.
Furthermore, the above mentioned solidified spilling mostly occur around the narrow walls and in particular near the mechanically delicate gaps between the narrow and the broad walls of the mould. Spillings to the gaps not only boost wearing of the mould when adjusting the siab width but are in particular initial nuclei for formation of skull inside the mould.
Problem To Be Solved
The invention intends to reduce spillings and related drawbacks during the starting procedure.
Based on the previously known continuous cast method, the invention suggests that a splash shield is mounted to the nozzle and prevents spillings of the melt protruding from the ports from hitting the mould, and that the splash shield is molten by the surrounding melt at least in the steady state condition. The “lost” splash shield of the invention is effective only during the most critical phase of the starting procedure, namely while the melt is initially filling the mould through plain air. In this period, it shields the walls of the mould from melt spillings protruding from the nozzle ports. While the melt rises over the ports, the splash shield is molten and itself becomes unrecognizable part of the melt. For the following continuous process, the ports of the nozzle are unshielded, thus inducing the necessary flow into the melt in the mould.
In a preferred embodiment of the invention, the splash shield deflects a melt stream basically protruding from one of the ports at right angles to a wall of the : 5 mould, to a direction basically parallel to the wall. The stream of melt thus is guided towards the dummy bar at the bottom of the mould, where spillings forming notches do not impact the thin shell of the casting. :
Preferably the splash shield further deflects the melt stream to an axis of symmetry of the mould. Streams of melt protruding from different ports of the nozzle thus are guided towards each other, and are mutually reducing flow rate and impetus. The resulting steadied stream of melt produces less spillings and rather flows than splatters into the mould.
In a further preferred embodiment of the invention, the nozzle is attached to a bottom of a tundish, that is filled with the melt from a ladle. Using a tundish instead of filling the mould directly from the ladle allows for providing a continuous stream of melt to the mould, even during exchange of the ladle.
In another preferred embodiment of the invention, the casting is drawn vertically from the mould and bent to a horizontal direction through paired support rolls. In this inventive cast method the initial casting direction equals to the direction of gravitational force, providing uniformity of the forced flow of melt inside the mould and the of the final casting.
The invention further suggests a splash shield for use with one of the above described methods, comprising a bar for penetrating the opposing ports of the nozzle and thus mounting the splash shield to the nozzle. After inserting the bar through the nozzle, the splash shield is firmly attached to the nozzle in a very simple manner.
In a preferred embodiment of the invention, the bar has a tubular shape with a centred inlet opening for the melt and outlet openings for the melt at both ends.
The melt thus flows through the bar. Where the bar only forms the splash shield,
handling, in particular mounting of the shield to the nozzle is significantly simplified.
In a further preferred embodiment of the invention, the splash shield has an annular ring for surrounding the nozzle above the ports, and further has : 5 deflectors being attached to the annular ring, wherein in a mounted position of the splash shield the deflectors are assigned to the ports for deflecting melt ) streams from the ports to an axis of symmetry of the mould. This splash shield provides for significantly steadying the stream of melt as described above.
The invention not only provides for better surface quality of the casting product and enhances the productivity of the process by reducing the risk of shell bursts, but also significantly eases the starting of a continuous strip cast process.
Apart from the starting of the continuous strip cast process, the splash shield of , the invention may also be effectively applied with “flying” tundish change, wherein the surface level of the melt is allowed to fall below the top edge of the ports of the nozzle.
Exemplary Embodiments
In the following, the invention will be illustrated in exemplary embodiments. As shown in
Fig. 1a a sketch view of a continuous cast assembly,
Fig. 1b a sketch detail of the cast assembly, showing the nozzle inside the mould and
Fig. 1c a perspective detail of the nozzle inside the mould, :
Fig. 2a a first inventive splash shield,
Fig. 2b the first splash shield mounted to the nozzle and
Fig. 2c a flow view of the melt through the first splash shield, - Fig. 3a a second inventive splash shield,
Fig. 3b the second splash shield mounted to the nozzle and
Fig. 3c a flow view of the melt through the second splash shield.
The continuous cast assembly shown in figure 1a and in detail in figures 1b and 1c includes a ladle 2 and a tundish 3 underneath the ladle 2. The ladle 2 provides steel melt 4 to the tundish 3. A ceramic nozzle 5 is mounted to the tundish 3 and protruding through a top opening 6 of a frame-shaped mould 7, ending between the copper, water-cooled walls 8 of the mould 7.
From the tundish 3, the melt 4 is provided into the mould 7 through two opposing ports 9 of the nozzle 5. In steady state condition of the cast process (as shown in figures 1a and 1b), the surface level 10 of the melt 4 is basically kept in a defined steady state position above the ports 9. Inside the mould 7, at the cold surface 11 of the walls 8, the melt 4 solidifies to form a thin shell 12 of the casting 13.
Underneath a bottom opening 14 of the mould 7, the assembly 1 includes a sequence of paired drive rolls 15 for withdrawing the casting 13 from the mould 7, and for bending it from vertical to horizontal direction. Along with the drive rolls 15, the casting 13 is cooled by means of water sprays (not shown in the drawing). -
The first embodiment of a splash shield 16 as shown in figure 2a is welded from steel sheets of 3 mm thickness to form a bar 17 with tubular shape. The shield 16 has a length 18 of 40 cm and a squared cross-section of 64 mm of height 19 and 54 mm of width 20. The splash shield 16 has a brick-shaped stopper 21 welded to its upper surface 22, an inlet opening 23 in the upper surface 22 and two outlet openings 24 in the lower surface 25 at both ends 26.
a.
Before starting the cast process, the splash shield 16 is inserted through the ports 9 into the nozzle 5 until the stopper 21 hits the surface 27 of the nozzle 5 as shown in figure 2b. After assembly, a slide gate (not shown) underneath the tundish 3 is opened, the melt 4 flows through the inlet opening 23 into the shield 16 and flows out of the shield 16 through the outlet openings 24 as shown : in figure 2c. ) The alternative second embodiment of a splash shield 28 as shown in figure 3a is evenly welded from steel sheets of 3 mm thickness. The second splash shield 28 has an annular ring 29 having a diameter 30 of about 14 cm and carrying two deflectors 31. The deflectors 31 are box-shaped having a height 32 of 16 cm and width 33 of 15 cm. The outward surfaces 34 of the deflectors 31 are arranged to have a distance of about 33 cm. The second splash shield 28 has a separate bar 35 from a bevelled steel sheet of 3 mm thickness and 5 cm width 36. The deflectors 31 have slits 37 for inserting the bar 35 to the splash shield 28.
Before starting the cast process, the nozzle 5 is positioned into the annular ring 29 of the alternative splash shield 28 and the bar 35 is inserted through the : slits 37 and through the ports 9 into the nozzle 5 until a stopper 38 of the bar 35 hits the outward surface of the deflector 31 as shown in figure 3b. After assembly, the melt 4 first is guided by the bar 35 to flow into the deflectors 31 and afterwards to flow out of the splash shield 28 as shown in figure 3c.
Both the first splash shield 16 and the alternative second splash shield 28 are molten at least after they are below surface level 10 of the melt 4, thus becoming part of the melt 4 themselves.
In the figures there are 1 Assembly 2 ladle 3 Tundish . 4 Melt
Nozzle ) 6 Top opening 7 Mould 8 Wall 9 Port
Surface level 11 Surface : 12 Thin shell 13 Casting 14 Bottom opening :
Drive roll 16 Splash shield 17 Bar 18 Length 19 Height
Width 21 Stopper 22 Upper surface 23 Inlet opening 24 Outlet opening : 25 Lower surface 26 End 27 Surface 28 Splash shield 29 Annular ring
Diameter 31 Deflector 32 Height
33 Width 34 Outward surface
Bar 36 Width 37 Slit : 38 Stopper
Claims (10)
1. Continuous cast method, wherein a melt (4) is supplied into a frame-shaped mould (7) through a top opening (6) of the mould (7) by a nozzle (5) having at least two opposing ports (9), until a surface level (10) of the ; melt (4) reaches a steady state position above the ports (9), and wherein in a steady state condition, an at least superficially solidified casting (13) is ) drawn through a bottom opening (14) of the mould (7) opposite to the top opening (6), at a velocity corresponding to the flow rate of the melt (4), thus basically keeping the surface level (10) in the steady state position, characterized in that a splash shield (16, 28) is mounted to the nozzle (5) : and prevents spillings of the melt (4) protruding from the ports (9) from hitting the mould (7), and that the splash shield (16, 28) is molten by the surrounding melt (4) at least in the steady state condition.
2. Continuous cast method as claimed in the preceding claim, characterized in that the splash shield (16, 28) deflects a melt (4) stream basically protruding from one of the ports (9) at right angles to a wall (8) of the mould (7), to a direction basically parallel to the wall (8).
3. Continuous cast method as claimed in the preceding claim, characterized in that the splash shield (28) further deflects the melt (4) stream to an axis of symmetry of the mould (7). :
4. Continuous cast method as claimed in one of the preceding claims, characterized in that the nozzle (5) is attached to a bottom of a tundish (3), that is filled with the melt (4) from a ladle (2).
5. Continuous cast method as claimed in one of the preceding claims, characterized in that the casting (13) is drawn vertically from the mould (7) and bent to a horizontal direction by means of paired support roils (15).
6. Splash shield (16, 28) for use with one of the above claimed methods, comprising a bar (17, 35) for penetrating the opposing ports (9) of the nozzle (5) and thus mounting the splash shield (16, 28) to the nozzle (5).
7. Splash shield (16) as claimed in the preceding claim, characterized in that the bar (17) has a tubular shape with a centred inlet opening (23) for the melt (4) and outlet openings (24) for the melt (4) at both ends (26).
8. Splash shield (28) as claimed in claim 6 or 7, characterized by an annular ’ ring (29) for surrounding the nozzle (5) above the ports (9), and further characterized by deflectors (31) being attached to the annular ring (29), ) wherein in a mounted position of the splash shield (28) the deflectors (31) are assigned to the ports (9) for deflecting melt (4) streams from the ports (9) to an axis of symmetry of the mould (7).
9. Continuous cast method substantially as hereinbefore described and illustrated with reference to the accompanying schematic drawings.
10. Splash shield substantially as hereinbefore described and illustrated with reference to the accompanying schematic drawings. Date: 17 December 2009 John Spicer DR GERNTHOQLTZ INC Patent Attorneys of Applicant(s) P O Box 8; Cape Town 8000; South Africa Union Road; Milnerton 7441; South Africa Tel: (021) 551 2650 Fax: (021) 551 2960 DrG Ref.: 681814 t:\files\14\681814\681814 spec.doc
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP08106006A EP2100676B1 (en) | 2008-12-17 | 2008-12-17 | Continuous cast method |
Publications (1)
Publication Number | Publication Date |
---|---|
ZA200908972B true ZA200908972B (en) | 2010-08-25 |
Family
ID=40578935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ZA200908972A ZA200908972B (en) | 2008-12-17 | 2009-12-17 | Continuous cast method |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP2100676B1 (en) |
EA (1) | EA018656B1 (en) |
ES (1) | ES2388900T3 (en) |
PL (1) | PL2100676T3 (en) |
SI (1) | SI2100676T1 (en) |
SK (1) | SK5440Y1 (en) |
ZA (1) | ZA200908972B (en) |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3189315A (en) * | 1962-12-28 | 1965-06-15 | Ralph A Verna | Teeming gate with consumable anti-splash shield |
DE1959097C2 (en) * | 1969-11-20 | 1973-10-04 | Mannesmann Ag, 4000 Duesseldorf | Device in continuous casting for distributing eggs molten steel |
IT1267242B1 (en) * | 1994-05-30 | 1997-01-28 | Danieli Off Mecc | UNLOADER FOR THIN SLABS |
FR2740367B1 (en) * | 1995-10-30 | 1997-11-28 | Usinor Sacilor | NOZZLE FOR THE INTRODUCTION OF A LIQUID METAL INTO A CONTINUOUS CASTING LINGOTIERE OF METAL PRODUCTS, THE BOTTOM OF WHICH HAS ORIFICES |
DE19724232C2 (en) * | 1997-06-03 | 1999-04-15 | Mannesmann Ag | Method and device for producing slabs |
US6016941A (en) * | 1998-04-14 | 2000-01-25 | Ltv Steel Company, Inc. | Submerged entry nozzle |
RU2247625C1 (en) * | 2003-09-01 | 2005-03-10 | Хлопонин Виктор Николаевич | Method for acting upon chemical composition of melt steel before continuous casting process and during such process and crater formation preventing apparatus for performing the method |
-
2008
- 2008-12-17 SI SI200830707T patent/SI2100676T1/en unknown
- 2008-12-17 EP EP08106006A patent/EP2100676B1/en active Active
- 2008-12-17 ES ES08106006T patent/ES2388900T3/en active Active
- 2008-12-17 PL PL08106006T patent/PL2100676T3/en unknown
-
2009
- 2009-08-03 SK SK50063-2009U patent/SK5440Y1/en unknown
- 2009-12-17 EA EA200901560A patent/EA018656B1/en not_active IP Right Cessation
- 2009-12-17 ZA ZA200908972A patent/ZA200908972B/en unknown
Also Published As
Publication number | Publication date |
---|---|
EA018656B1 (en) | 2013-09-30 |
SK5440Y1 (en) | 2010-05-07 |
EA200901560A1 (en) | 2010-08-30 |
ES2388900T3 (en) | 2012-10-19 |
SK500632009U1 (en) | 2009-11-05 |
EP2100676B1 (en) | 2012-06-06 |
EP2100676A1 (en) | 2009-09-16 |
PL2100676T3 (en) | 2012-11-30 |
SI2100676T1 (en) | 2012-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH0340654B2 (en) | ||
JP2007523745A (en) | Continuous casting method | |
JP6947737B2 (en) | Continuous steel casting method | |
EP2100676B1 (en) | Continuous cast method | |
CA1130981A (en) | Continuous cast steel bar and the method to produce same | |
JPH0255642A (en) | Method and device for continuously casting strip steel | |
US11148192B2 (en) | Shroud for billet casting | |
CN1011867B (en) | Method and apparatus for continuous casting of metal band esp. of steel band | |
US4298050A (en) | Process for continuous casting of a slightly deoxidized steel slab | |
US4100960A (en) | Method and apparatus for casting metals | |
USRE30979E (en) | Method and apparatus for casting metals | |
RU2315681C2 (en) | Rectangular steel ingots continuous casting method and apparatus for performing the same | |
SK166399A3 (en) | Method and device for producing slabs | |
GB2040197A (en) | Continuous cast steel product having reduced microsegregation | |
JPH0390261A (en) | Continuous casting method | |
JPH06503274A (en) | Continuous casting method and continuous casting equipment for thin strips or slabs | |
Dutta et al. | Continuous casting (concast) | |
SU1118478A1 (en) | Intermediate device for continuous casting of steel | |
RU2111081C1 (en) | Method of continuous casting of steels of various grades and device for its realization | |
JP7068628B2 (en) | Casting method | |
Kumar et al. | Continuous Casting of Steel and Simulation for Cost Reduction | |
CA1108373A (en) | Method and apparatus for casting metals | |
KR910008748Y1 (en) | Horizental continuous caster for sheet making | |
JP2015085386A (en) | Manufacturing method of rolling roll made by centrifugal casting and centrifugal casting device | |
EP0036777A1 (en) | Horizontal continuous casting machine |