YU84191A - TECHNOLOGICAL PROCEDURE FOR ORE EXCAVATION OF BLOCK-RELEASED DAMAGE WITH MAGAZINATION OF ORE IN THE CONCRETE ENVIRONMENT - Google Patents

TECHNOLOGICAL PROCEDURE FOR ORE EXCAVATION OF BLOCK-RELEASED DAMAGE WITH MAGAZINATION OF ORE IN THE CONCRETE ENVIRONMENT

Info

Publication number
YU84191A
YU84191A YU84191A YU84191A YU84191A YU 84191 A YU84191 A YU 84191A YU 84191 A YU84191 A YU 84191A YU 84191 A YU84191 A YU 84191A YU 84191 A YU84191 A YU 84191A
Authority
YU
Yugoslavia
Prior art keywords
ore
excavation
loading
block
mining
Prior art date
Application number
YU84191A
Other languages
Serbo-Croatian (sh)
Other versions
YU48174B (en
Inventor
R. Kojdić
Original Assignee
Rtb Bor, Institut Za Bakar - Bor
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rtb Bor, Institut Za Bakar - Bor filed Critical Rtb Bor, Institut Za Bakar - Bor
Priority to YU84191A priority Critical patent/YU48174B/en
Publication of YU84191A publication Critical patent/YU84191A/en
Publication of YU48174B publication Critical patent/YU48174B/en

Links

Landscapes

  • Earth Drilling (AREA)
  • Revetment (AREA)

Abstract

TEHNOLOŠKI POSTUPAK ZA OTKOPAVANJE RUDE BLOKOVSKO-PODETAŽNIM ZARUŠAVANJEM SA MAGAZINIRANJEM RUDE U STEŠNJENOJ SREDINI. Da bi se sprečila maksimalna koncentracija pritiska pri otkopavanju na velikim dubinama ovim tehnološkim postupkom otkopavanja rasterećuje se stenski masiv, povećava se iskorišćenje rudne supstance i ukupna ekonomičnost otkopavanja rude formiranjem originalne konstruktivne jedinice od minimalno tri otkopna bloka unutar kojih se grade etažni hodnici (1), hodnici bušenja (2), hodnici utovara (3) i buše lepeze (4, 5) koje se aktiviraju u pojasevima od po četiri istovremeno. Dužina sektora za miniranje za sva tri otkopna bloka iznosi 12 m. U otkopnom bloku s čeonim utovarom taj interval postiže iz dva miniranja od po 6 m, dok otkopavanje rude u bloku sa bočnim utovarom napreduje ispred otkopavanja u bloku sa čeonim utovarom za 6 m.Pre miniranja sledećeg sektora u otkopima sa bočnim utovarom rude, količina od 15-20% od minirane rude se istoči da bi se obezbedila rastresitost i uslovi za stešnjenu sredinu za naredno rniniranje. Zavrsetkom miniranja rude po sektorima u sva tri otkopna bloka vrši se utovar rude izuzev samog početka otkopavanja kada se najpre vrši utovar rude u blokovima sa boćnim utovatrom, a potom u bloku sa Čeonim utovarom rude.Radi boljeg iskorišćenja rude elipsoidi točenja treba da se presecaju.TECHNOLOGICAL PROCEDURE FOR ORE EXCAVATION OF BLOCK-RELEASED POLLUTION WITH MAGAZINATION OF THE ORE IN THE COMPRESSED ENVIRONMENT. In order to prevent the maximum concentration of pressure at high-depth excavation, this rock excavation process relieves the rock mass, increases the utilization of the ore substance and the overall economy of the ore excavation by forming an original structural unit of at least three excavation blocks within which the storey corridors are constructed (1). drill corridors (2), loading aisles (3) and auger bushings (4, 5) that are activated in belts of four at a time. The length of the mining sector for all three excavation units is 12 m. In the front loading mine, this interval is reached by two mines of 6 m each, while the ore excavation in the side loading unit advances before the excavation in the front loading block by 6 m. Before the next sector is mined in the side ore excavations, the amount of 15-20% of the mined ore is drained to provide distraction and conditions for a tightened environment for subsequent mining. The completion of ore mining by sectors in all three digging units is done by loading the ore, except at the beginning of the digging, when the ore is first loaded in the side loading blocks and then in the block with the front loading of the ore.

YU84191A 1991-05-14 1991-05-14 PROCEDURE FOR EXCAVATION OF ORE BLOCK-RELEASE DAMAGES WITH MAGAZINATION OF THE ORE IN THE CONCRETE ENVIRONMENT YU48174B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
YU84191A YU48174B (en) 1991-05-14 1991-05-14 PROCEDURE FOR EXCAVATION OF ORE BLOCK-RELEASE DAMAGES WITH MAGAZINATION OF THE ORE IN THE CONCRETE ENVIRONMENT

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
YU84191A YU48174B (en) 1991-05-14 1991-05-14 PROCEDURE FOR EXCAVATION OF ORE BLOCK-RELEASE DAMAGES WITH MAGAZINATION OF THE ORE IN THE CONCRETE ENVIRONMENT

Publications (2)

Publication Number Publication Date
YU84191A true YU84191A (en) 1996-10-09
YU48174B YU48174B (en) 1997-07-31

Family

ID=47558818

Family Applications (1)

Application Number Title Priority Date Filing Date
YU84191A YU48174B (en) 1991-05-14 1991-05-14 PROCEDURE FOR EXCAVATION OF ORE BLOCK-RELEASE DAMAGES WITH MAGAZINATION OF THE ORE IN THE CONCRETE ENVIRONMENT

Country Status (1)

Country Link
YU (1) YU48174B (en)

Also Published As

Publication number Publication date
YU48174B (en) 1997-07-31

Similar Documents

Publication Publication Date Title
CN103527196B (en) Method for recovery of room-type coal pillar through loess filling
ES8706226A1 (en) Underground mining method for mineral deposits.
Tulkin et al. Application of belt conveyors and determination of the main parameters of mobile complexes for the transportation of overburden rocks of the Angren coal mine
YU84191A (en) TECHNOLOGICAL PROCEDURE FOR ORE EXCAVATION OF BLOCK-RELEASED DAMAGE WITH MAGAZINATION OF ORE IN THE CONCRETE ENVIRONMENT
US2846205A (en) Mining method for supporting geological structures
RU2693806C1 (en) Method of driving mine workings
RU2345219C1 (en) Layer development method of deep diamond leads with diamond ore cavities available in mine take circuits
Gerçek Stability considerations for underground excavation intersections
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2391507C2 (en) Pilarless development method of coal beds
SU1677312A1 (en) Method for tunneling twin workings
Bilim et al. Fully mechanized excavation system in underground coal mining
SU1024596A1 (en) Method of carrying-out along-seam mine workings on seams inclined to sudden outbursts of coal and gas
SU1408069A1 (en) Method of mining twin longwalls by longwall set of equipment
SU591586A1 (en) Method of mining slightly inclined thin orebodies with filling mined-out space with blasted rock
SU794222A1 (en) Method of constructing underground workings
SU1789020A3 (en) Method for mining gently dipping mineral beds
SU1188326A1 (en) Method of mining bedded deposits
SU636393A1 (en) Method of relieving mined-out mineral seams from excess stresses
SU705127A1 (en) Chamber filling machine
Bedarev et al. Improving the Stability of the Rock Massif by Choosing Rational Configurations of Workings and Methods of Their Support
CN118622364A (en) Coal mine filling mining method based on fluidized solid waste filling
RU1792487C (en) Method for mining gently sloping ore bodies of small and medium thickness
SU1032840A1 (en) Method of excavating steep ore bodies
Иванова Technical and economic feasibility study of the road tunnel construction method (on the example of the road tunnel as part of the Central highway in Sochi" Relief road of Kurortny prospect")