WO2025205477A1 - プラントモジュールの設置方法、基礎の施工方法及びモジュール基礎 - Google Patents

プラントモジュールの設置方法、基礎の施工方法及びモジュール基礎

Info

Publication number
WO2025205477A1
WO2025205477A1 PCT/JP2025/011156 JP2025011156W WO2025205477A1 WO 2025205477 A1 WO2025205477 A1 WO 2025205477A1 JP 2025011156 W JP2025011156 W JP 2025011156W WO 2025205477 A1 WO2025205477 A1 WO 2025205477A1
Authority
WO
WIPO (PCT)
Prior art keywords
foundation
foundations
module
site
carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
PCT/JP2025/011156
Other languages
English (en)
French (fr)
Inventor
憲 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JGC Corp
Original Assignee
JGC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JGC Corp filed Critical JGC Corp
Publication of WO2025205477A1 publication Critical patent/WO2025205477A1/ja
Pending legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/16Foundations formed of separate piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories

Definitions

  • the present invention relates to technology for constructing plants.
  • Patent Document 1 shows that an LNG plant that processes LNG (Liquefied Natural Gas) is equipped with a pipe rack to support a large number of pipes. It also describes how the pipe rack is constructed and transported in a divided form, for example, into four modules, and each module is then installed on a number of pre-constructed foundations.
  • LNG Liquefied Natural Gas
  • the foundations which are installed in advance at the construction site, are set apart from one another within the plant construction site and are each joined to the lower ends of the columns (hereinafter, the lower end areas of the columns are also referred to as "pedestals") attached to the framework that makes up the module.
  • the module's pedestals are positioned above the foundation, and then the module is lowered to place each pedestal on the foundation, after which the columns are joined. For this reason, high precision is required in the construction position of each foundation.
  • Patent Document 1 does not mention any of the above points.
  • the present invention provides a method for installing a plant module having a frame structure supported by a plurality of columns, comprising the steps of: a step of fixing a plurality of lower foundations spaced apart from one another at positions corresponding to the plurality of columns on a site on which the plant module is to be installed; fixing upper foundations for supporting the columns on the plurality of lower foundations; placing the support column on the upper foundation; a step of restraining and supporting the support column on the upper foundation so as to restrain movement of the support column relative to the upper foundation;
  • the present invention is characterized by comprising:
  • the method for installing the plant module may include the following features.
  • (a) The lower foundation and the upper foundation, and the upper foundation and the support column are fastened to each other using fastening members.
  • (b) In (a), the fastening members fastening the upper foundation and the support are arranged inside a rectangle circumscribing the cross section of the support member.
  • the present invention also provides a method for constructing a foundation for a plant module installed by the plant module installation method, comprising: When a carriage carrying the plant module moves along a predetermined moving path on the site where the plurality of foundations are provided, and some of the plurality of foundations are arranged in a position that interferes with the carriage, constructing the foundation in a non-interference area where the foundation will be provided so as not to interfere with the carriage moving on the site; Next, a step of causing the carriage to enter the site along the travel route and wait at a preset waiting position including the site; Thereafter, constructing the foundation in an interference area where the foundation interfering with the carriage is to be provided;
  • the present invention is characterized by having the following.
  • the step of constructing the foundation includes attaching the upper foundation on the lower foundation.
  • the upper foundation is carried in by the cart together with the plant module.
  • the carriage passes through a part of the interference area and waits at the waiting position set so that the upper foundation carried in by the carriage is positioned above the lower foundation;
  • the upper foundation is lowered from the carriage and attached to the lower foundation.
  • the foundation for connecting the multiple columns that support the plant module frame structure is constructed as a separate lower foundation and upper foundation.
  • the lower foundations are then fixed at a distance from each other in positions corresponding to the columns on the site where the module is to be installed, the upper foundation is placed and fixed on top of the lower foundation, and the columns are restrained and supported on the upper foundation. This allows the foundation to be constructed in the specified position with precision and reduces the difficulty of foundation construction and module installation.
  • the site on which multiple foundations for supporting the plant module are installed is divided into an interference area where the cart will interfere with the foundations and a non-interference area where no interference will occur. Then, after constructing the foundations in the non-interference areas, the cart carrying the plant module is driven into the site and left waiting in a standby position, after which the foundations for the interference areas are constructed, thereby improving the degree of freedom in setting travel paths even on small sites.
  • FIG. 10 is a vertical cross-sectional side view showing a joint state between a foundation and a pedestal according to a first modified example of the first embodiment. This shows the C-C' cross section of Figure 8. This shows the D-D' cross section of Figure 8. This shows the E-E' cross section of Figure 8.
  • FIG. 10 is a vertical cross-sectional side view showing the joint state between the foundation and the pedestal according to a second modified example of the first embodiment.
  • FIG. 12B is an enlarged vertical cross-sectional side view showing the upper fastening member in FIG. 12A.
  • FIG. 10 is a sixth plan view showing a method of loading a module according to the second embodiment.
  • This is a vertical cross-sectional side view showing the foundation and lower foundation in the non-interference area before the upper foundation is constructed.
  • FIG. 22 is a plan view showing the lower foundation in FIG. 21 .
  • FIG. 20 is a vertical cross-sectional side view showing the base of the non-interference area and the base of the interference area in FIG. 19 .
  • FIG. 21 is a vertical cross-sectional side view showing the base of the non-interference area and the base of the interference area in FIG. 20 .
  • FIG. 10 is a first plan view showing another procedure for loading the module.
  • FIG. 10 is a second plan view showing another procedure for loading the module.
  • FIG. 10 is a first plan view showing another procedure for loading the module.
  • FIG. 10 is a vertical cross-sectional side view showing another example of the foundation of the interference area.
  • 10 is a first longitudinal side view showing a procedure for forming a protective member that protects the lower foundation of the interference area.
  • FIG. 10A to 10C are second vertical cross-sectional side views showing a procedure for forming the protective member.
  • 10A to 10C are vertical sectional side views showing a procedure for forming another protective member.
  • 10A to 10C are first to third longitudinal side views showing other construction procedures for the upper foundation.
  • 4A to 4E are fourth to sixth longitudinal side views showing other construction procedures for the upper foundation.
  • FIG. 10 is a longitudinal side view showing the foundation of an interference area provided on a sloping site.
  • plant 100 may be installed alongside the various plants mentioned above that process various fluids, or may be installed independently, and may be a utility plant such as a boiler plant or power plant that handles fuel fluids, steam, or hot oil used for energy supply and power generation, or a seawater supply plant that supplies refrigerants.
  • a utility plant such as a boiler plant or power plant that handles fuel fluids, steam, or hot oil used for energy supply and power generation, or a seawater supply plant that supplies refrigerants.
  • "fluid” includes not only gases and liquids, but also fluid granular materials (powders, granules, pellets, etc.).
  • the modules 10 that make up such a plant 100 are equipped with multiple pieces of equipment for performing various types of fluid processing, as well as portions of large pieces of equipment that are divided into multiple pieces.
  • the modules 10 house these pieces of equipment within a frame structure made up of, for example, multiple supports and beams. For the sake of simplicity, individual illustrations and descriptions of these pieces of equipment are omitted for the modules 10 shown in the drawings of this application.
  • the lower end of the module 10 of the frame structure is made up of multiple beams (hereinafter also referred to as "bottom beams 11"; see also Figure 21).
  • multiple pedestals (supports) 12 are formed at the lower end of this module 10, each extending downward.
  • These multiple pedestals 12 are arranged spaced apart from each other in a lattice pattern on the bottom surface of the module 10, for example, at positions where the bottom beams 11 intersect.
  • the pedestals 12 are then respectively placed on multiple foundations 2 that have been pre-installed to protrude from the site S1, which is the installation area for the module 10, and then connected to each other ( Figures 1 and 2). Therefore, when viewed in plan, the foundations 2 and pedestals 12 are arranged in the same arrangement.
  • each foundation 2 when the modules 10 are placed in the appropriate installation position, the foundations 2 must be appropriately positioned so that the pedestals 12 and the foundations 2 that are joined to each other face each other. For this reason, when constructing each foundation 2, the position of the base plate 13 ( Figure 2), which is the joint between each pedestal 12 and the foundation 2, is measured in advance in a module yard or a backyard where the modules 10 are stored before installation. Based on the measurement results, each foundation 2 is constructed with strict positional control so that the joint part of the foundation 2 (in the first embodiment, the upper plate 52) is positioned in accordance with the position of the corresponding base plate 13.
  • each foundation 2 the modules 10, which are placed on a self-propelled modular transporter (SPMT) 3 (described below) above each foundation 2, are appropriately positioned at the installation position, and the modules 10 are then lowered so that each base plate 13 is in contact with the upper surface of the footings 25b of all foundations 2.
  • the pedestal 12 is attached to the foundation 2 so that multiple anchor bolts 25a, which protrude upward from the top surface of the footing 25b, pass through mounting holes 13a formed on the base plate 13.
  • the modules 10 are transported onto the site S1 by multiple SPMTs 3, which are carts, via a transport path within the plant 100, and installed on the foundation 2.
  • the SPMTs 31 (see also Figure 2) are arranged in multiple rows (three rows in the example shown in Figure 1) with spaces between them.
  • the modules 10 are loaded across the loading platforms 31 (see also Figure 2) and transported while still loaded onto these multiple SPMTs 3.
  • the SPMT3 comprises a plate-shaped loading platform 31 that can be raised and lowered, and multiple wheels that are arranged below the loading platform 31 and support the loading platform 31 via support shafts.
  • the multiple sets of wheels are arranged in pairs across the width of the loading platform 31 and are arranged along the longitudinal direction of the loading platform.
  • the foundation 2m is configured as an integrated structure including piles (not shown) driven into the ground and a footing 25b, which forms part of the pile and is a connecting portion formed with multiple anchor bolts 25a protruding upward.
  • the anchor bolts 25a and footing 25b are exposed above the ground.
  • the anchor bolts 25a are inserted through mounting holes 13a formed in the base plate 13 attached to the lower end of the pedestal 12. The pedestal 12 and foundation 2m are then fixed together by tightening nuts onto the anchor bolts 25a.
  • the module 10 when adjusting the position of the module 10 using the SPMT 3, the module 10 needs to be transported at a height sufficiently distant from the anchor bolts 25a to prevent the pedestals 12 from coming into contact with and damaging the anchor bolts 25a ( Figure 2).
  • the anchor bolts 25a and the base plate 13 are far apart, making it more difficult to adjust the placement of the module 10.
  • the studs 12 When the studs 12 are positioned at a height farther away from the anchor bolts 25a in this manner, the higher the position of the studs 12 during transport, the higher the position of the platform 31 of the SPMT 3 carrying the module 10. As a result, when placing the studs 12 on the 2m foundation, the amount of descent of the platform 31 from the transport height of the module 10 to the placement height of the studs 12 relative to the 2m foundation also increases.
  • the placement of the studs 12 on the 2m foundation includes accurately inserting the anchor bolts 25a into the mounting holes 13a formed in the base plate 13 at the bottom of the studs 12. However, because a large module 10 is equipped with numerous studs 12, each of these studs 12 must be placed on the 2m foundation.
  • the pedestal 12 immediately before installing the module 10, there is a constraint that the pedestal 12 must be leveled at a height sufficiently distant from the anchor bolts 25a, which may affect the configuration of the module 10 (in the example described below, the overall length of the module 10).
  • the module 10 is to be installed on a sloping site S1 ( Figure 32).
  • the SPMT 3 temporarily holds the module 10 in a state in which the lower side of the loading platform 31 is raised high and the upper side of the loading platform 31 is lowered low.
  • the greater the difference in height between the one end of the loading platform 31 on the lower side and the other end on the upper side of the slope i.e., the amount of lift and lowering of the loading platform 31), the longer the overall length of the module 10.
  • the pedestal 12 is made of, for example, a circular steel pipe, and at its bottom is a base plate 13 made of a circular plate with a larger diameter than the bottom end of the circular steel pipe, which is provided to close the bottom end of the circular steel pipe.
  • the base plate 13 is placed on the upper surface of the footing 25b.
  • the mounting holes 13a are located on the peripheral side of the base plate 13 so that they can be accessed from outside the circular steel pipe to tighten the anchor bolts 25a.
  • the inner diameter D3 of the mounting hole 13a is set to a size that allows an anchor bolt 25a with an outer diameter d1 to pass through and that allows a nut to be fastened to the anchor bolt 25a to secure the pedestal 12 to the foundation 2m.
  • the gap (D3-d1) between the mounting hole 13a and the anchor bolt 25a is within the allowable range, the pedestal 12 can be fastened to the foundation 2m even if the position of the base plate 13 is misaligned horizontally.
  • this gap is tiny compared to the relatively large pedestal 12 that supports the enormous module 10, alignment during module 10 installation requires a very high level of precision and is therefore highly difficult.
  • One possible way to alleviate this difficulty is to enlarge the diameter of the mounting hole 13a.
  • enlarging the diameter of the mounting hole 13a would require further enlarging the diameter of the base plate 13. Further enlarging the diameter of the base plate 13 would reduce the working space required for module 10 installation and would impose various constraints on the module 10 installation, such as reducing the width of the SPMT 3 to prevent contact with it.
  • the above-mentioned constraints are not limited to circular steel pipes, as mentioned above, but also arise when the cross section of the pedestal 12 is, for example, an H-section steel.
  • the base plate 13 attached to the end of the H-section steel is placed directly on the foundation 2m, and as with circular steel pipes, the mounting holes 13a must be enlarged. After fastening the anchor bolts 25a using washers, a working space accessible from the outside is required for welding around the washers, etc.
  • the mounting holes 13a and anchor bolts 25a are generally located on the outside of the base plate 13, which further enlarges the base plate 13.
  • the integrated foundation 2m described in the comparative example presents a high level of difficulty in construction and module 10 installation.
  • the foundation 2 is separated into a lower foundation 23 and an upper foundation 24, making installation easier.
  • the lower end of the pedestal 12 is made of an H-beam extending vertically, with a rectangular base plate 13 connected to the lower end of the H-beam ( Figures 4 and 6).
  • the base plate 13 is slightly larger than the lower end surface of the H-beam (i.e., the cross section of the H-beam), and slightly smaller than the upper plate 52 (described below) provided on the upper foundation 24 side.
  • Figure 4 is a longitudinal side view showing the connection between the foundation 2 and the pedestal 12 according to the first embodiment.
  • Figure 5 shows a cross section taken along line A-A' in Figure 4
  • Figure 6 shows a cross section taken along line B-B' in Figure 4.
  • the two-dot chain lines in Figures 5 and 6 indicate the contour of a square area SS circumscribing the cross section of the H-beam portion of the pedestal 12. However, for the sake of convenience, the contour of the position where this square area SS partially overlaps with the pedestal 12 is shown slightly outward from the pedestal 12.
  • the pedestal 25b is, for example, poured concrete and is, for example, rectangular in plan view.
  • the anchor bolts 25a are located outside the rectangular area SS described above, that is, outside the H-beam portion of the pedestal 25b, on the peripheral edge of the pedestal 25b, when viewed in plan view ( Figure 5).
  • a recessed keyway 25c is preferably formed in the center of the top surface of the pedestal 25b.
  • the keyway 25c has a sloped portion 25d on the top surface of the pedestal 25b that becomes shallower, for example, from the center toward the periphery, and the opening on the top surface of the keyway 25c extends from the center toward the periphery of the pedestal 25b.
  • This allows for the injection of fixing members 26b, such as concrete or grout, from the peripheral side of the upper opening of the keyway 25c, even when a height adjustment member 26a (described below) is placed on the pedestal 25b.
  • the sloped portion 25d is positioned further back than the anchor bolt 25a, and therefore the bottom surface of the sloped portion 25d is shown with a dashed line in the figure.
  • a shear key 51a (described below) provided in the upper foundation 24 is inserted into the keyway 25c.
  • the gap between the shear key 51a and the keyway 25c is filled with injected fixing material 26b, and the shear key 51a is fixed in the keyway 25c by the hardened fixing material 26b.
  • This fixing structure makes it possible to withstand the horizontal load that occurs between the upper foundation 24, which is subject to horizontal loads that occur after the plant begins operation, and the lower foundation 23. This reduces the horizontal load applied to the anchor bolt 25a, preventing damage to the anchor bolt 25a.
  • the upper foundation 24 is placed on top of the pedestal 25b, with height adjustment members 26a laid on top.
  • the height adjustment members 26a are composed of members that can withstand the load from the upper foundation 24 that supports the modules 10 and have adjustable thickness.
  • the height adjustment members 26a are composed of mortar pads, whose height can be adjusted by the number of layers stacked, or grout, which is an amorphous material whose height can be adjusted by molding. By adjusting the thickness of the height adjustment members 26a in this way, it is possible to adjust the height position of each upper foundation 24.
  • the height adjustment members 26a are placed on the upper surface of the pedestal 25b, excluding the areas where the anchor bolts 25a and shear keys 51a are provided, and are placed so as to contact almost the entire underside of the base plate 51 (described later) of the upper foundation 24.
  • the anchor bolts 25a and shear keys 51a penetrate the height adjustment members 26a and protrude upward and downward.
  • the upper foundation 24 is made of, for example, steel, and comprises a base plate 51 and an upper plate 52 attached to its lower and upper ends, respectively, and an intermediate portion 53 attached to connect these plates 51, 52.
  • the base plate 51 and upper plate 52 are rectangular plates in plan view, and are arranged parallel to each other and horizontally via the intermediate portion 53.
  • the base plate 51 is configured as a rectangle slightly smaller than the pedestal 25b in plan view.
  • the base plate 51 is not limited to this rectangular shape, and may be another shape such as a square, as long as it is rectangular and smaller than the pedestal 25b in plan view.
  • the lower surface of the base plate 51 is positioned opposite the upper surface of the pedestal 25b via the height adjustment member 26a. It is preferable to provide the aforementioned shear key 51a, which protrudes downward, in the center of the lower surface of the base plate 51.
  • the shear key 51a and key groove 25c are positioned at the centers of the base plate 51 and pedestal 25b, respectively, but their positions do not have to be limited to the center.
  • the upper plate 52 is rectangular in plan view, specifically a square, and is smaller than the base plate 51.
  • the upper plate 52 is not limited to a square, and may have other shapes, such as a rectangle, as long as it is rectangular in plan view and smaller than the base plate 51.
  • the upper plate 52 is disposed above the central region of the base plate 51.
  • the Y direction is also referred to as the front-to-back direction.
  • the base end of the Y axis is the front direction
  • the tip end of the Y axis is the rear direction.
  • the X direction is also referred to as the left-to-right direction.
  • the tip end of the X axis is the right direction, and the base end of the X axis is the left direction.
  • the Z direction is also referred to as the height direction, and in this case, the tip end of the Z axis is the upward direction, and the base end of the Z axis is the downward direction.
  • the middle section 53 is composed of one main plate 54 and four side plates 55.
  • the main plate 54 and side plates 55 are arranged to extend vertically from the base plate 51 toward the upper plate 52.
  • the main plate 54 is arranged along the left and right edges of the base plate 51 and the upper plate 52.
  • Two side plates 55 are arranged on each of the front and rear surfaces of the main plate 54, facing in the front-to-rear direction.
  • the upper end of the main plate 54 is located below the web 12a (described below) of the stud 12, and has a width sufficient to fit within the underside of the upper plate 52.
  • the width of the main plate 54 increases from the upper end to the lower end, and the shape of the main surface when viewed from the front-to-rear direction is trapezoidal.
  • the upper ends of the two side plates 55 are located below the flange 12b (described below) of the stud 12, and have a width sufficient to fit within the underside of the upper plate 52. Like the main plate 54, the width of the side plate 55 increases from the top to the bottom, and the main surface of the two plates together forms a trapezoid when viewed from the left and right.
  • the four left and right end areas each have two sides open to the outside, facing either forward or backward, or left or right.
  • the two central areas have one side open to the outside, facing either forward or backward.
  • the underside of the upper plate 52 is divided into two by the upper end of the main plate 54. Each area on the underside of these upper plate 52 is open to the outside, facing either forward or backward. In this way, each divided area of the upper surface area of the base plate 51 and the underside area of the upper plate 52 allows access from the outside via the respective open sides.
  • Mounting holes 51b are provided in four areas on the left and right ends of the base plate 51. In a plan view, the mounting holes 51b are located outside the rectangular area SS ( Figures 5 and 6) described above. Because the rectangular area SS is an area that circumscribes the cross-sectional shape of the H-beam portion of the pedestal 12, the mounting holes 51b are located further outward than the pedestal 12. Furthermore, as shown in Figure 4, the inner diameter D1 of the mounting holes 51b is larger than the diameter of the anchor bolt 25a. As a result, when the base plate 51 is placed on the top surface of the pedestal 25b, horizontal misalignment is permitted within the range of the gap between the anchor bolt 25a and the mounting holes 51b. The position of the central axis of these mounting holes 51b coincides with the position of the central axis of the anchor bolt 25a in design.
  • the inner diameter D1 of the mounting hole 51b may be set to, for example, the diameter d1 of the body of the anchor bolt 25a + 20 mm; in this case, this 20 mm gap will allow for horizontal positional deviation of the base plate 51. Note that, if it is within the divided upper surface area of the base plate 51, the inner diameter D1 of the mounting hole 51b can be further enlarged to increase the gap. Conversely, if the upper surface area is relatively small, the inner diameter D1 of the mounting hole 51b may be set to approximately diameter d1 + 10 mm.
  • a nut is fastened from above to the tip of the anchor bolt 25a, which protrudes upward through the mounting hole 51b, via a washer 26c.
  • the washer 26c has an outer diameter such that its underside contacts the entire periphery of the mounting hole 51b in the base plate 51. After the nut is fastened, the periphery of the washer 26c and the base plate 51 are joined, for example, by welding.
  • the configuration of the upper plate 52 will be described.
  • two mounting holes 52a for attaching set bolts 26d are provided in each of two adjacent regions on the underside of the upper plate 52.
  • the mounting holes 52a are located inside the rectangular region SS described above.
  • the set bolts 26d are used to fasten the base plate 13 to the upper plate 52; for example, the set bolts 26d are attached from below the mounting holes 52a and tightened with their heads in contact with the underside of the upper plate 52.
  • the diameter D2 of the mounting holes 52a is the diameter d2 of the body of the set bolt 26d + 2 to 3 mm.
  • the base plate 13 on the pedestal 12 side is placed on the upper surface of the upper plate 52.
  • the pedestal 12 is an H-beam equipped with two flanges 12b and a web 12a connecting the two flanges 12b.
  • the web 12a is positioned left and right in the center of the top surface of the base plate 13, dividing the top surface of the base plate 13 into two, front and back.
  • the two flanges 12b are also positioned inside the left and right edges of the base plate 13.
  • Each of the two divided areas of the top surface of the base plate 13 has one side open to the outside, facing either the front or the back, allowing access from the outside via each open side.
  • the two regions of the base plate 13 are each provided with, for example, two mounting holes 13a for attaching the set bolts 26d.
  • the mounting holes 13a are located inside the region defined by the pedestals 12, i.e., inside the rectangular region SS.
  • the inner diameter D3 of the mounting holes 13a is larger than the inner diameter D2 of the mounting holes 52a.
  • the central axes of these mounting holes 13a are the same as the designed central axes of the multiple mounting holes 52a in the upper plate 52 (i.e., the designed central axes of the set bolts 26d).
  • the inner diameter D3 of the mounting hole 13a may be set to, for example, the diameter d2 of the set bolt 26d + 20 mm. In this case, this 20 mm gap allows for horizontal misalignment of the base plate 13. Similarly, the gap between the mounting hole 52a and the set bolt 26d also allows for horizontal misalignment of the base plate 13. Note that the inner diameter D3 of the mounting hole 13a can be further enlarged to increase this gap within the divided upper surface area of the base plate 13 overlapping the upper plate 52. Conversely, if the upper surface area is relatively narrow, the inner diameter D3 of the mounting hole 13a may be set to approximately d2 + 10 mm.
  • the above-mentioned examples of the inner diameter D3 of the mounting hole 13a and the inner diameter D2 of the mounting hole 52a may be interchanged.
  • the set bolt 26d is attached from the mounting hole 52a side ( Figure 12A).
  • Figure 12A Figure 12A
  • a nut is fastened from above to the tip of the set bolt 26d protruding from the mounting hole 13a via a washer 26e.
  • the washer 26e has an outer diameter such that its lower surface contacts the entire periphery of the mounting hole 13a on the upper surface of the base plate 13.
  • the inner diameter of the washer 26e is, for example, the diameter d2 of the set bolt 26d + 1 [mm].
  • the anchor bolts 25a for securing the upper foundation 24 to the lower foundation 23 and the multiple sets of lower fastening members each consisting of a washer 26c and a nut are arranged outside the rectangular area SS.
  • the connection form in which the lower fastening members are dispersed and arranged outside the rectangular area SS can be said to be a "rigid connection" compared to the connection between the upper foundation 24 and base plate 13 described below.
  • This rigid connection is designed to withstand horizontal loads and rotational forces, but as mentioned above, the number of anchor bolts 25a in the base plate 51 may be limited by the shape of the mounting holes 13a and the space available for subsequent work. However, in this disclosure, the shear key 51a is able to withstand horizontal loads, so the foundation 2 can maintain sufficient strength even with the above constraints.
  • the upper fastening members consisting of set bolts 26d, washers 26e, and nuts for restraining and supporting the base plate 13 against the upper foundation 24, are arranged inside the square area SS.
  • the joint configuration in which the upper fastening members are concentrated inside the narrow square area SS is in a "pin joint" state compared to the joint between the pedestal 25b and base plate 51.
  • the installation work for the module 10 according to the first embodiment will be explained using Figures 7A to 7E.
  • the position of the base plates 13 is measured by measuring the relative position with respect to the reference position (module-side reference position) of each base plate 13, which is set in advance as a reference when the module 10 is designed, for example.
  • the relative position of each base plate 13 is, for example, the amount of deviation in the horizontal and vertical directions with respect to the reference position.
  • the lower foundation 23 is constructed based on the measured relative position of the base plate 13 ( Figure 7A, process of fixing the lower foundation). Constructing the lower foundation 23 based on the relative position of the base plate 13 means making fine adjustments to the horizontal and vertical positions (height) of the lower foundation 23 based on the measurement results of the position of the base plate 13 relative to the reference position on the module side.
  • the position of each lower foundation 23 can be individually adjusted using the height adjustment members 26a, as described below, so the height of the lower foundations 23 can be made standard even if the height position of the bottom beams 11 of the modules 10 or the length of the pedestals 12 are different. Note that if the height adjustment members 26a are not provided, each lower foundation 23 (pedestal 25b) is constructed to match its respective height.
  • the pedestal 25b When constructing the lower foundation 23, concrete is poured to form the pedestal 25b, matching the reference position of each module and enclosing the upper parts of the piles (not shown) buried in the ground and the lower parts of the anchor bolts 25a placed in the specified positions.
  • the concrete is poured to form the predetermined shape of the pedestal 25b, including the key grooves 25c.
  • One example of a method for forming the pedestal 25b is to pour a footing below it in advance, and then pour the concrete onto the footing.
  • a height adjustment member 26a is formed on each pedestal 25b ( Figure 7B).
  • the height adjustment member 26a is formed, for example, by placing a mortar pad on the lower foundation 23 according to the height (Z coordinate) of the base plate 13 measured for the module 10, or by placing an iron plate on top if the weight of the module 10 is relatively large.
  • the upper foundation 24 is then placed on top of the height-adjusting members 26a whose heights have been adjusted on each lower foundation 23 ( Figure 7C).
  • this upper foundation 24 placement is easier because the relatively small upper foundations 24 are placed one by one.
  • the upper foundation 24 is placed by first inserting the shear key 51a into the key groove 25c and passing the anchor bolt 25a through the mounting hole 51b.
  • the upper foundation 24 is then shifted horizontally to adjust its position within the allowable clearance of the mounting hole 51b. In this way, the installation of the upper foundation 24 can be performed manually without the use of large transport equipment or mounting jigs, and the workload is relatively light.
  • the installation position of the module 10 at this time is, for example, a position set on the site side that corresponds to the module-side reference position; for example, a position where each mounting hole 13a of the base plate 13 provided on the pedestal 12 is correctly positioned above the mounting holes 52a of the upper plate 52 on the upper foundation 24 side.
  • the height and horizontal position of the upper foundation 24 are adjusted in advance according to the actually measured relative position of the base plate 13. Therefore, after transporting the module 10 to the installation position, by lowering it vertically, the base plates 13 provided on each pedestal 12 will be positioned so that they can be joined to the corresponding upper foundation 24.
  • the anchor bolts 25a do not protrude from the upper surface of the upper plate 52. This means that the horizontal position of the module 10 can be adjusted with the base plate 13 in close proximity to the upper foundation 24 without the need to worry about damaging the anchor bolts 25a, improving the ease of adjusting the position.
  • the amount of lowering required to place the base plate 13 on the upper foundation 24 from a position close to the upper foundation 24 is shorter than the amount of lowering required to place the base plate 13 on the foundation 2m from an upper position that avoids contact with the anchor bolts 25a, as described in the comparative example, by passing the anchor bolts 25a through the base.
  • restrictions on the overall length of the module 10 can be relaxed, improving the ease of installation and connection of the module 10.
  • each base plate 13 is placed on the corresponding upper foundation 24 so that each mounting hole 13a is connected to the mounting hole 52a.
  • a set bolt 26d is attached from below the mounting hole 52a, and a washer 26e and nut are attached to the set bolt 26d from above the mounting hole 13a and fastened ( Figure 4, support fastening process).
  • the washer 26e is welded to the base plate 13 to restrict horizontal movement between the pedestal 12 and the upper foundation 24.
  • the base plate 13 is restrained from the upper foundation 24, and the pedestal 12 is supported on the upper foundation 24 with its movement restricted, completing the module 10 installation work.
  • the foundation 2 is divided into a lower foundation 23 and an upper foundation 24, and the upper foundation 24 is installed on the lower foundation 23 after construction.
  • This allows the foundation 2 to be constructed with high precision and reduces the difficulty of the foundation 2 construction work.
  • the base plate 13 is placed on the upper foundation 24, damage to the anchor bolts 25a is prevented and position adjustments can be made with the upper foundation 24 and base plate 13 close to each other, contributing to improved workability in position adjustments.
  • Figure 5 of the first embodiment shows an example in which the lower fastening members (sets of anchor bolts 25a, washers 26c, and nuts) are provided in four regions on the left and right ends of the base plate 51, this is not a mandatory requirement.
  • the lower fastening members may be provided in eight locations ( Figure 5), with two sets of lower fastening members in each of these four regions.
  • other numbers of lower fastening members may be provided in other locations.
  • the connection strength between the upper foundation 24 and the lower foundation 23 may be provided in one or more locations near the center of the rectangular area SS.
  • the configuration of the intermediate section 53 is also not limited to the example shown in the first embodiment.
  • a total of two side plates 55 may be provided by arranging them in central positions on the front and back of the main plate 54, as shown in the following first modified example ( Figure 8).
  • a total of six side plates 55 may be provided.
  • the structure of the intermediate section 53 is not limited to that shown in the first embodiment and may have other shapes.
  • the main plate 54 and side plates 55 do not need to be perpendicular to each other, and they do not need to be positioned relative to the pedestal 25b as described above. Two specific modified examples of the intermediate section 53 and pedestal 12 are described below.
  • Fig. 8 is a longitudinal side view showing the connection between the foundation 2 and the pedestal 12 according to the first modified example.
  • Fig. 9 shows the CC' cross section of Fig. 8
  • Fig. 10 shows the DD' cross section of Fig. 8
  • Fig. 11 shows the EE' cross section of Fig. 8.
  • side plates 55 are provided at the center of both sides of the main plate 54 in the front-to-rear direction, forming a cross shape in cross section (Fig. 9).
  • the pedestal 12 connected to the foundation 2 is made of a circular steel pipe 12c, as in the comparative example, and a connection portion 14 is formed at the lower end of the circular steel pipe 12c to connect the pedestal 12 to the base plate 13.
  • the connection portion 14 is composed of a cross plate 14b attached to the lower end of the circular steel pipe 12c and an end plate 14a arranged to close the lower end of the circular steel pipe 12c ( Figures 8 and 11).
  • the cross plate 14b is arranged parallel to the component axis of the circular steel pipe 12c, has a cross-shaped cross section, and is arranged to divide the lower area of the circular steel pipe 12c into four sections.
  • the upper end of the cross plate 14b is inserted into a notch formed in the lower end of the circular steel pipe 12c and welded.
  • the lower end of the cross plate 14b is welded to the upper surface of the base plate 13.
  • the end plate 14a has a shape obtained by dividing the circle that forms the lower edge of the circular steel pipe 12c into four sections by the cross plate 14b. Each end plate 14a is arranged to cover the area divided by the cross plate 14b and is welded to the cross plate 14b and the circular steel pipe 12 to close the lower end of the circular steel pipe 12c.
  • the base plate 13 is formed in a circular shape, but is not limited to this. It may be formed in other shapes, such as a square or octagon, as long as the lower ends of the cross plates 14b can be attached and positioned on the upper plate 52. This also applies to the base plate 13 in other embodiments, such as the first embodiment, and other shapes.
  • the mounting holes 13a of the base plate are provided in each of the four areas of the base plate 13 partitioned by the cross plates 14b.
  • the mounting holes 13a are positioned inside the square area SS.
  • the square area SS is the area circumscribing the lower ends of the cross plates 14b connected to the upper surface of the base plate 13.
  • Fig. 13 is a schematic diagram illustrating a corner of a plant 100 for which a foundation construction method according to a comparative embodiment, which will be described later, is used.
  • the overview of the transport method for the plant 100 and the module 10 that is, matters other than the foundation construction method according to the comparative embodiment, are common to the second embodiment and the comparative embodiment relative to the second embodiment, and therefore the description will be continued with reference to Fig. 13.
  • the bottom and top surfaces of the rectangular parallelepiped module 10 being transported by SPMT3 have significantly different aspect ratios.
  • the width of the transport path S2 and the surrounding area of the site S1 are sufficiently wide, the module 10 can be transported to the site S1 without having to worry about the longitudinal orientation of the bottom surface, etc.
  • the entry angle of the rows of SPMTs 3 must be adjusted so that the wheels of each SPMT 3 can enter between the rows of foundations 2 when entering site S1.
  • the wheels can move each SPMT 3 without interfering with the foundations 2 installed on site S1, and the module 10 can be transported within site S1.
  • Figures 13 and 14 are perspective and plan views illustrating the transport of module 10 to site S1 in a comparative embodiment.
  • the bold arrows in Figure 13 indicate part of the travel path of the illustrated module 10, and this is the same in subsequent figures.
  • the aspect ratios of modules 10 when viewed in plan are significantly different.
  • the travel direction is set so that the short side of module 10 passes within the path width of transport path S2 when viewed from above.
  • the transport path S2 is not limited to the ground through which the SPMT3 passes, but also includes the space above the ground where there are no other structures that may come into contact with the module 10.
  • the width of the transport path S2 may differ between the ground and the space above; for example, it may be relatively narrow on the ground and relatively wide in the space above, or vice versa. Even in these cases, as long as a path width is ensured at each height of the transport path S2 that prevents the SPMT3 and module 10 from interfering with other modules and equipment on either side, the module 10 can pass through the transport path S2.
  • foundation 2 is installed at site S1 in a position that interferes with the movement path of SPMT3, for example, the wheels of SPMT3 may come into contact with foundation 2. In this case, SPMT3 cannot be rotated while entering site S1, and therefore the approach angle of SPMT3 cannot be adjusted.
  • an adjacent area S3 is provided at the back of the site S1 when viewed along the direction of travel of the SPMT3.
  • This adjacent area S3 is used as a waiting position, as described below.
  • the area of the adjacent area S3 is smaller than the aforementioned turning area required for rotating the SPMT3.
  • the site S1 is divided into an interference area, in which foundations 2 are provided in positions that will interfere with the SPMT3 when each SPMT3 travels along a predetermined travel path, and a non-interference area, in which foundations 2 are provided in positions that will not interfere with the SPMT3.
  • non-interference foundations 21 foundations 2 provided in non-interference areas
  • interference foundations 22 foundations 2 provided in interference areas
  • the interference area refers to an area within site S1 where foundations 2 are located that are predicted to come into contact with any part of SPMT3, such as the wheels or body, when SPMT3 is moved along a preset movement path.
  • the movement path is set to include the trajectory of SPMT3 within a normally acceptable error range. For this reason, not all of the interference foundations 22 installed in the interference area will necessarily be positioned to actually interfere with SPMT3 when it moves. Referring to the comparative example in Figure 14, it can be said that the interference area is set as the area into which SPMT3 will turn immediately after entering site S1.
  • the interference foundation 22 is separated into a lower foundation 23, which is the underground portion that does not protrude from the ground of the site S1 within the interference area, and an upper foundation 24, which is the portion above the lower foundation 23 ( Figure 23).
  • the lower foundation 23 and upper foundation 24 are constructed at different times.
  • a protective member is provided above the lower foundation 23 of the interference foundation 22, to protect the lower foundation 23 when the SPMT 3 passes through.
  • a wooden protective member 42 for example, is placed underground, and a steel plate 41 is provided to cover this protective member 42 from above ( Figure 21).
  • the protective member 42 is carried, for example, by a worker and placed above the lower foundation 23.
  • the steel plate 41 is placed above the protective member 42, for example, using heavy machinery.
  • the steel plate 41 is placed so that its upper surface is roughly flush with the ground.
  • each SPMT3 is moved straight toward the non-interference area, entering along the gaps between the rows of non-interference foundations 21. Furthermore, as shown in Figure 17, as each SPMT3 is moved straight, the leading edge of each SPMT3 passes through the non-interference area and moves to a position where it reaches the adjacent area S3 (a process of waiting at a waiting position). In this way, by overrunning the site S1 so to speak and allowing the leading edge of the SPMT3 to reach the adjacent area S3, the trailing edge of the SPMT3 passes through the interference area and reaches the non-interference area. In this way, by setting the waiting position of the SPMT3 in an area that does not include the interference area, construction of the upper foundation 24 can be carried out without interfering with the modules 10 placed on the SPMT3.
  • the upper foundations 24 of the interference foundations 22 are constructed in the interference area after the SPMT 3 has passed (process of constructing foundations in interference areas).
  • the steel plates 41 are removed using heavy machinery, and then the protective members 42 are removed by workers.
  • the upper foundations 24 are then connected to the exposed lower foundations 23.
  • the upper foundations 24 are positioned in a state where they protrude from the ground, just like the non-interference foundations 21, and the interference foundations 22 are completed.
  • the non-interference foundations 21 and interference foundations 22 are installed on site S1 at the same pitch and height as the foundation 2 shown in the comparative example.
  • each SPMT3 is retracted towards the interference area, and the module 10 is placed on site S1.
  • the rear end of each SPMT3 travels through the gaps between the rows of non-interfering foundations 21 and interference foundations 22 and is placed in the interference area.
  • the front end of each SPMT3 travels from the adjacent area S3, where no non-interfering foundations 21 are provided, through the gaps between the rows of non-interfering foundations 21 and is placed in the non-interfering area.
  • each pedestal 12 of the module 10 is placed above the corresponding foundation 2.
  • each SPMT 3 is lowered to a preset height, each pedestal 12 is placed on the corresponding foundation 2 (non-interfering foundation 21, interfering foundation 22), and each foundation 2 is connected to each pedestal 12 ( Figures 20 and 24). After that, the loading platform 31 is further lowered and positioned sufficiently below the bottom beam 11 of the module 10, and each SPMT 3 is moved out from the area directly below the module 10 and removed from site S1.
  • construction of the interference foundation 22 (connecting the upper foundation 24 to the lower foundation 23) is carried out in the interference area after the SPMT 3 has passed.
  • Figure 21 is a longitudinal side view showing the non-interference foundation 21 and lower foundation 23 when the SPMT 3 passes through the interference area before the upper foundation 24 is constructed, and corresponds to the state of the plan view in Figure 16.
  • Figure 21 to clearly show the interference foundation 22, only the underground, steel plate 41, and protective member 42 are shown in cross section, and the SPMT 3 is indicated by a dot-dash line.
  • Figure 22 is an enlarged plan view of the lower foundation 23 in Figure 21, with the steel plate 41 indicated by a dashed line.
  • the non-interference foundation 21 is made of, for example, steel and is composed of a pile 21a and a head 21b that is connected to the upper end of the pile 21a by welding or the like.
  • the pile 21a is buried in the ground at the position where the non-interference foundation 21 is to be formed, for example, so that it extends vertically downward.
  • the head 21b is connected to the upper end of the pile 21a.
  • the lower end of the head 21b is connected to the pile 21a underground.
  • the upper end of the head 21b is positioned to protrude above the ground.
  • the top surface of this upper end is larger than the bottom surface of the pedestal 12 that it supports, and is flat so that the bottom surface rests on it and comes into contact with the underside of the pedestal 12.
  • Between the upper and lower ends of the head 21b are provided multiple rib plates 21d whose diameter increases from bottom to top.
  • the interference foundation 22 is composed of a lower foundation 23 and an upper foundation 24.
  • the lower foundation 23 and upper foundation 24 are made of, for example, steel.
  • the lower foundation 23 is composed of, for example, a pile 22a and a head 22b, for example, welded to the upper end of the pile 22a.
  • the pile 22a is buried in the ground at the position where the interference foundation 22 is to be formed, extending, for example, vertically, to roughly the same depth as the pile 21a on the non-interference foundation 21 side.
  • the upper end of the pile 22a of the interference foundation 22 is positioned deeper underground than the pile 21a on the non-interference foundation 21 side.
  • the head 22b connected to the upper end of the pile 22a of the interference foundation 22 has the same shape as the head 21b on the non-interference foundation 21 side. However, the head 22b on the interference foundation 22 side does not protrude above ground level, but is entirely underground.
  • the upper end of the head 22b is provided with a head plate (support member) 22c on which the upper foundation 24 is placed, multiple through holes (not shown) formed in the head plate 22c, and set bolts 22d that are attached to the through holes and serve as connecting parts for connecting the head 22b to the upper foundation 24.
  • the attached set bolts 22d are arranged at intervals along the periphery of the head plate 22c, which is circular in plan view, for example. Furthermore, each set bolt 22d is arranged to protrude upward from the top surface of the head plate 22c, which forms a horizontal plane when viewed from the side.
  • the protective member 42 comprises a frame-shaped body 44 and a beam 45 arranged to connect the inner wall surfaces of the frame-shaped body 44.
  • the frame-shaped body 44 and the beam 45 are made of wooden members strong enough to withstand the load when the SPMT 3 carrying the module 10 passes above them.
  • the top surfaces of the frame-shaped body 44 and the beam 45 are located at the same height, above the upper end of the set bolt 22d.
  • the frame-shaped body 44 is configured, for example, in a polygonal shape when viewed from above (octagonal in the example shown in Figure 22).
  • the frame-shaped body 44 is placed, for example, on the top surface of the head 22b on the interference footing 22 placed underground, so as to surround the periphery of the head plate 22c, with the outside of the frame buried underground.
  • the beams 45 are arranged so as to intersect in a cross shape when viewed from above.
  • the beams 45 are placed on the head plate 22c, for example, passing through the gaps between adjacent set bolts 22d.
  • the protective member 42 constructed as described above is made of wood, which is strong and lightweight enough to withstand the passage of the SPMT 3 carrying the module 10 above. Furthermore, a steel plate 41 thick enough to withstand the load of the SPMT 3 carrying the module 10 when it passes over the ground, including the top surface of the protective member 42, is placed on the ground.
  • Figure 23 is a vertical side view showing the non-interfering foundation 21 and the interfering foundation 22, and corresponds to the plan view of Figure 19.
  • Figure 24 is a vertical side view showing the non-interfering foundation 21 and the interfering foundation 22, and corresponds to the plan view of Figure 20.
  • the steel plate 41 and protective member 42 are removed to expose the head portion 22b, and the upper foundation 24 is placed on it using, for example, a crane.
  • the upper foundation 24 is configured as a pedestal (stool) that is attached to the head plate 22c.
  • a base plate 24a is provided at the lower end of the upper foundation 24, and the lower surface of the base plate 24a has a horizontal surface that is circular in plan view and can be connected to, for example, the upper surface of the head plate 22c.
  • the base plate 24a has a plurality of through holes (not shown) formed at intervals along its periphery for passing the set bolts 22d described above. With the base plate 24a placed on the head plate 22c, the upper foundation 24 is connected to the lower foundation 23 by tightening each of the set bolts 22d passing through the through holes with a nut.
  • the upper end of the upper foundation 24 has a shape similar to the head 21b on the non-interfering foundation 21 side, and is designed to rest on the pedestal 12 to be supported and to come into contact with the underside of the pedestal 12. After being connected to the lower foundation 23, the upper end of the upper foundation 24 is positioned so that it protrudes above the ground. In this case, the height position of the upper end of the upper foundation 24 is positioned at approximately the same height as the head 21b on the non-interfering foundation 21 side.
  • the foundation 2 can be constructed and the module 10 can be installed on the site S1 even in the narrow transport path S2 and in the surrounding area of the site S1.
  • the structures of the non-interference foundation 21 and interference foundation 22 described using Figures 21, 23, and 24 here are merely examples. Therefore, the structure of the interference foundation 22 may be configured in the same way as the foundation 2 of the first embodiment described above. In that case, the lower foundation 23 is constructed before the SPMT 3 passes, and the upper foundation 24 is constructed after the SPMT 3 has passed. Furthermore, in addition to the pile foundation shown as an example, various structures may be used, such as a spread foundation, and even precast concrete instead of steel, and a structure such as the interference foundation 22M shown as an example later may also be used.
  • the interference foundation 22 in the second embodiment employs a divided structure consisting of a lower foundation 23 and an upper foundation 24, and the non-interference foundation 21 and lower foundation 23 are constructed first before the SPMT 3 passes, thereby streamlining the construction of the foundation 2, but this configuration is not the only option.
  • the interference foundation 22 may have the same integrated structure as the non-interference foundation 21, in which case construction may be carried out from pile driving to connecting the head after the SPMT 3 has passed.
  • the non-interference foundation 21 may also be constructed of a lower foundation 23 and an upper foundation 24, just like the interference foundation 22.
  • pile driving may be performed together with the non-interference foundation 21, with the upper part protected by a steel plate 41, and the head part 21b may be connected to the pile after the SPMT 3 has passed.
  • the structure of the wooden protective member 42 described using Figure 21 is merely one example, and other configurations may be used.
  • the beam 45 does not have to be cross-shaped, and at least one plate-shaped member may be arranged, and it does not have to be arranged in the center of the frame-shaped member 44 in a plan view.
  • it is not essential to place a steel plate 41 on its upper surface.
  • the protective member 42 is not an essential requirement, and the constructed lower foundation 23 may be filled with sand and a steel plate 41 placed on top of it. The sand and steel plate 41 can be removed after the SPMT 3 has passed.
  • the standby position of the SPMT3 is illustrated as adjacent area S3 (including other adjacent area S4, described below using Figures 25A and 25B) along the direction of entry into the site S1, but is not limited to this example.
  • it may be located to the side, offset in the width direction of the site S1 (Y direction in the figure).
  • movement to the standby position on the side is achieved by rotating the rotation axis of the wheels of the SPMT3, which is located next to the standby position, by, for example, 90 degrees.
  • the module 10 is transported so that its short side passes within the width of the transport path S2 when viewed from above, but this is not a necessary requirement.
  • the module 10 may be transported so that its long side, bottom side, passes within the transport path S2.
  • the transport direction of the module 10 can be selected appropriately according to the width of the transport path S2 and the shape of the site S1.
  • the shape of the bottom of the module 10 is not limited to having short and long sides with different aspect ratios, and may also have the same aspect ratio. Even in these cases, by applying the foundation 2 construction method disclosed herein, the module 10 can be easily transported to the site S1 and the foundation can be constructed.
  • the construction method for the foundation 2 disclosed herein may allow the modules 10 to be transported without further downsizing, thereby minimizing the increase in on-site module 10 connection work and reducing the labor required for on-site plant construction.
  • the foundation 2 construction method disclosed herein is not limited to cases where the orientation of the module 10 passing through the transport path S2 differs from the orientation of the site S1, as in the example described using Figure 14, and an area needs to be secured for rotating the SPMT 3.
  • the arrangement area of the irregularly arranged foundations 2 can be set as the interference area, and the foundation 2 construction method disclosed herein can be applied.
  • Figures 25A and 25B are plan views showing other procedures for constructing the foundation 2 and running the SPMT 3.
  • the site S1 is located closer to the transport path S2 than in Figure 14, and therefore the interference area (the area where the interference foundations 22 are located) is wider.
  • the non-interference area is the area where the four non-interference foundations 21 are located at the farthest back, spaced apart from each other along the Y direction.
  • four rows of five interference foundations 22 are arranged along the X direction, spaced apart from each other.
  • each SPMT3 transporting a module 10 passes through the interference area while rotating, then moves straight through the gap between the non-interference foundations 21 and waits at a waiting position that includes the adjacent area S3.
  • the SPMT3 passes through only part of the interference area. Therefore, the waiting position of the SPMT3 includes the part of the interference area that the SPMT3 did not pass through, the non-interference area, and the adjacent area S3.
  • an upper foundation 24 is constructed in each interference area that the SPMT3 has passed through (see the installation position of the upper foundation 24 in Figure 25B).
  • each SPMT3 retreats in the direction from which it began entering site S1 (the base end of the X-axis arrow shown in Figure 25B) and waits away from the interference area where no upper foundation 24 is installed.
  • an adjacent area S4 is also set up in front of the starting position for entering site S1, allowing part of the SPMT3 to wait. Therefore, the waiting position of the SPMT3 includes the interference area where the upper foundation 24 is installed, and the adjacent area S4.
  • Figure 26 is a longitudinal side view showing the configuration of another example of an interference foundation 22M.
  • the lower foundation 23M that constitutes the interference foundation 22M comprises two piles 22a and a footing 22h. Note that the number of piles 22a is not limited to two; one or more piles may be provided, and if the ground allows for stable installation of the module 10, the piles 22a may be omitted.
  • the footing 22h is made of reinforced concrete and has a roughly rectangular parallelepiped shape, and the upper ends of the two piles 22a are inserted into it.
  • a pedestal 22f is formed on the footing 22h, extending upward from the center of its upper end.
  • the pedestal 22f has multiple anchor bolts 22e extending vertically inside it, and a head plate 22c is attached to its upper surface. The upper end of each anchor bolt 22e protrudes upward from the top surface of the head plate 22c.
  • an independent footing is used, with a footing 22h provided for each interference footing 22, but this is not limiting; for example, a strip footing may be used, with a common footing 22h provided for all interference footings 22.
  • Figures 27 and 28 are longitudinal side views showing the procedure for forming the protective member 43. As shown in Figure 27, the soil around the upper surface of the footing 22h is removed to expose the upper surface. Positioning protrusions 22i are provided on the upper surface of the footing 22h to position the anchor bolts 22e and upper foundation 24.
  • protective caps 47 are placed on the anchor bolts 22e and the positioning protrusions 22i, and a wooden frame 48 is placed around them.
  • concrete is poured inside the wooden frame 48, and handles 49 are placed in the concrete to allow for lifting during removal.
  • protective member 43 is formed. Because protective member 43 is heavier than wooden protective member 42, heavy machinery is used to remove it.
  • the protective member 43M does not use a wooden frame 48, but is formed by covering the upper surface of the footing 22h, specifically the area from above the protective cap 47 to the ground around the footing 22h, with, for example, a blue tarp 48M. The protective member 43M may then be formed by pouring concrete on top of the covering blue tarp 48M.
  • FIGS 30(a)-(c) and 31(a)-(c) are longitudinal side views showing other construction procedures for the upper foundation 24.
  • the steel plate 41 is not shown.
  • multiple lifting mechanisms are attached to, for example, the loading platform 31 of the SPMT 3.
  • the multiple lifting mechanisms are arranged, for example, at the rear of the row of SPMTs 3, and include hooks 32 for transporting the protective members 43, and a jack-type lifting mechanism (hereinafter referred to as a jack) (not shown) for suspending and transporting the upper foundation 24.
  • the hooks 32 are arranged further rearward of the row of SPMTs 3 than the upper foundation 24.
  • a train of SPMTs 3 advancing toward the standby position stops, for example, with its tail resting on the lower foundation 23 that is the target of construction of the upper foundation 24. Then, after removing the steel plate 41 using a jack, the hook 32 is positioned above the protective member 43. Next, as shown in Figure 30(c), the end of the rope hooked onto the hook 32 is tied to the handle 49 ( Figure 28, etc.) of the protective member 43, and the protective member 43 is lifted and removed from the lower foundation 23.
  • the SPMT 3 with the protective member 43 and upper foundation 24 suspended is moved slightly in the opposite direction from the standby position, and the upper foundation 24 is positioned above the lower foundation 23.
  • the SPMT 3 is then lowered and connected to the lower foundation 23.
  • each SPMT 3 is moved so that the pier 12 is positioned above the corresponding foundation 2, and the module 10 is installed.
  • the SPMT 3 is then moved out of site S1 with the protective member 43 still suspended from it, and the protective member 43 is also removed.
  • FIG. 32 is a vertical side view showing an example in which an interference foundation 22M is installed on a site S1 with a slope.
  • the interference foundation 22 supports the lower ends of the pedestals 12 at approximately the same height to support the module 10 horizontally on the site S1.
  • each upper foundation 24 connected to a lower foundation 23M is prepared to have a different length depending on the height of the upper end of the lower foundation 23M.
  • a longer upper foundation 24 is connected to a lower foundation 23M placed on the lower side of the slope
  • a shorter upper foundation 24 is connected to a lower foundation 23M placed on the upper side of the slope.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Foundations (AREA)

Abstract

【課題】プラントモジュールの基礎の施工やプラントモジュールの設置を容易化できる方法を提供する。 【解決手段】複数の支柱で支持される架構構造のプラントモジュールの設置方法であって、前記プラントモジュールが設置される敷地に、前記複数の支柱に対応する位置に複数の下部基礎を互いに離間して固定する工程と、前記複数の下部基礎上に、各々、前記支柱を支持するための上部基礎を固定する工程と、前記上部基礎上に前記支柱を載置する工程と、前記上部基礎に対する前記支柱の移動を拘束するように前記上部基礎上で前記支柱を拘束支持する工程と、を備える。

Description

プラントモジュールの設置方法、基礎の施工方法及びモジュール基礎
 本発明は、プラントを建設する技術に関する。
 流体の処理を行うプラントには、天然ガスの液化や天然ガス液の分離、回収などを行う天然ガスプラント、原油や各種中間製品の蒸留や脱硫などを行う石油精製プラント、石油化学製品や中間化学品、ポリマーなどの生産を行う化学プラントなどがある。
 これらのプラントは、例えば塔槽や熱交換器などの静機器、ポンプなどの動機器などの多数の機器を配置した構造となっている。そしてこれら機器の間には、機器の間で流体の授受を行う多数の配管が接続されている。このようなプラントを建設するにあたり、プラントを構成する多数の機器をブロック分けし、各ブロックの機器群を共通の架構構造内に組み込むモジュール化の取り組みがなされている。プラントを複数に分割してモジュール化することにより、建設地とは異なる工場で、各モジュールを並行して建造することが可能となり、現地におけるプラント建設の労力を低減できる。そして、各モジュールを並行して建造することで、プラントの建設期間の短縮を図ることも可能である。工場にて建造された各モジュールは、建設地に搬送され、所定の敷地に設置された後、配管などが互いに接続される。
 例えば特許文献1には、LNG(Liquefied Natural Gas)を製造する処理を行うLNGプラントは、多数の配管を支持するためのパイプラックを備えることが示されている。そして当該パイプラックは、例えば4つのモジュールに分割されて建造及び搬送され、予め施工された複数の基礎上にそれぞれ設置されることが記載されている。
 ところで建設地に予め設けられている基礎は、プラントの建設敷地内に互いに離間して設けられ、モジュールを構成する架構に設けられた支柱の下端部(以下、支柱の下端部の領域を「脚柱」ともいう)とそれぞれ接合される。例えば、各基礎の施工後にモジュールを設置する際には、基礎の上方に位置決めをしてモジュールの各脚柱を配置した後、当該モジュールを降下させることで、それぞれの脚柱を基礎の上に載せ、その後、接合を行う。このため、各基礎の施工位置については、高い精度が要求される。更には、モジュールに設けられている複数の脚柱を、各基礎に対して一括して接合するためには、大型のモジュールの位置を正確に調整しなくてはならず、現場作業の困難性が高い。以上の点については、特許文献1には何ら記載されていない。
 また、基礎が設けられている領域に向けて、複数に分割されたモジュールを搬入するにあたっては、既に設置済みの他のモジュールなどとの干渉を避けつつ、モジュールを移動させる移動経路を設ける必要がある。一方で、建設コスト低減などの観点から、プラントの建設敷地をより狭小化することが求められる場合もある。この点、モジュール方式の建設方法を採用すると、モジュールの移動経路の確保が、よりコンパクトな建設敷地を設定するうえでの制約となってしまうおそれがある。この点、特許文献1には、モジュール搬送時の搬送経路確保の問題点については何ら記載されていない。
国際公開第2021/029051号
 本発明は、上記背景の下になされたものであり、プラントモジュールの基礎の施工やプラントモジュールの設置を容易化する技術を提供する。
 本発明は、複数の支柱で支持される架構構造のプラントモジュールの設置方法であって、
 前記プラントモジュールが設置される敷地に、前記複数の支柱に対応する位置に複数の下部基礎を互いに離間して固定する工程と、
 前記複数の下部基礎上に、各々、前記支柱を支持するための上部基礎を固定する工程と、
 前記上部基礎上に前記支柱を載置する工程と、
 前記上部基礎に対する前記支柱の移動を拘束するように前記上部基礎上で前記支柱を拘束支持する工程と、
を備えることを特徴とする。
 前記プラントモジュールの設置方法は、以下の特徴を備えていてもよい。
(a)前記下部基礎と前記上部基礎、及び前記上部基礎と前記支柱とは、締結部材を用いて互いに締結されること。
(b)(a)において、前記上部基礎と前記支柱とを締結する前記締結部材は、前記支柱の部材断面に外接する方形の内側に配置されること。
(c)(b)において、前記下部基礎と前記上部基礎とを締結する前記締結部材は、前記支柱の部材断面に外接する方形の外側に配置されること。
 また本発明は、前記プラントモジュールの設置方法により設置されるプラントモジュールの基礎の施工方法であって、
 複数の前記基礎が設けられる前記敷地にて、前記プラントモジュールを積載した台車が予め設定された移動経路に沿って前記敷地を移動する際に、当該台車と干渉する位置に前記複数の基礎の一部が配置される場合に、
 前記敷地を移動する前記台車とは干渉しない前記基礎が設けられる不干渉エリアの前記基礎を施工する工程と、
 次いで、前記移動経路に沿って、前記台車を前記敷地に進入させ、前記敷地を含む予め設定された待機位置にて待機させる工程と、
 その後、前記台車と干渉する前記基礎が設けられる干渉エリアの前記基礎を施工する工程と、
を有することを特徴とする。
 前記基礎の施工方法は、以下の特徴を備えていてもよい。
(d)前記不干渉エリアは、前記敷地への進入時の前記台車の進行方向に沿って見て、前記干渉エリアよりも前記移動経路の前方側に位置し、
 前記台車を前記敷地に進入させる際、前記台車は前記干渉エリアの少なくとも一部を通過して、前記待機位置にて待機すること。
(e)(d)において、前記台車は前記干渉エリア全体を通過して、前記干渉エリアを含まない領域に設定された前記待機位置にて待機すること。
(f)(d)において、前記台車は、前記干渉エリアの一部を通過して、当該一部以外の前記干渉エリアを含む領域に設定された前記待機位置にて待機し、
 前記干渉エリアに設けられる基礎を施工する工程では、前記一部の干渉エリアに基礎を施工する工程と、次いで、前記一部の干渉エリア側に前記台車を移動させ、前記待機位置の前記干渉エリアに前記基礎を施工する工程とを有すること。
(g)前記台車を前記敷地に進入させる前に、前記干渉エリアの前記敷地地下に前記下部基礎を施工する工程を、有し、
 前記基礎を施工する工程では、前記下部基礎の上に前記上部基礎を取り付けること。
(h)(g)において、前記上部基礎は、前記プラントモジュールと共に前記台車で搬入されること。
(i)(h)において、前記台車は、前記干渉エリアの一部を通過して、当該台車により搬入した前記上部基礎が前記下部基礎の上方に位置するように設定された前記待機位置にて待機し、
 前記基礎を施工する工程では、前記台車から前記上部基礎を下ろして前記下部基礎に取り付けること。
(j)(g)において、前記下部基礎を施工した後、前記台車が前記下部基礎の上方側を通過する際に、当該下部基礎を保護するための保護部材を、前記下部基礎上に配置する工程を、有すること。
(k)(j)において、前記保護部材は、木製であって、前記下部基礎と前記上部基礎とを接続するために前記下部基礎側に設けられた連結部の周囲を囲むように配置される枠状体と、当該枠状体の内壁面間を繋ぐ梁と、を含むこと。
(l)(k)において、前記下部基礎は、前記上部基礎を支持するための支持部材を有し、前記連結部は、前記支持部材において上方側に突出するように設けられた複数のボルトであり、
 前記梁は、隣り合う前記ボルトの間を通して配置されること。
(m)(j)において、前記保護部材は、前記連結部を覆うように設置した保護キャップと、当該保護キャップ上に打設されたコンクリート蓋と、を含むこと。
(n)(j)において、前記上部基礎を前記下部基礎に取り付ける前に、前記台車が通過する際に前記台車側に設けられた吊り上げ機構によって前記保護部材を取り外し、前記台車により搬送する工程を有すること。
 本方法によれば、架構構造のプラントモジュールを支持する複数の支柱を接合するための基礎を下部基礎と上部基礎とに分けて構成する。そして、当該モジュールを設置する敷地において支柱に対応する位置に下部基礎を互いに離間して固定し、下部基礎上に上部基礎を配置して固定し、上部基礎上で支柱を拘束支持する。これにより、基礎を精度良く所定の位置に施工できると共に、基礎施工やモジュール設置の困難性を軽減できる。
 また、本方法によれば、架構構造のプラントモジュールを台車に積載し、予め設定された移動経路に沿って移動させるにあたり、プラントモジュールを支持するための複数の基礎が設けられる敷地を、台車が基礎と干渉する干渉エリアと、干渉が発生しない不干渉エリアとに分ける。そして、不干渉エリアの基礎を施工した後、プラントモジュールを積載した台車を敷地内に進入させ、待機位置にて待機させた後、干渉エリアの基礎を施工するので、狭小な敷地であっても、移動経路を設定するにあたっての自由度を向上させることができる。
第1実施形態におけるモジュールの設置を示す平面図である。 比較形態におけるモジュールの設置を示す縦断側面図である。 比較形態におけるモジュールの設置を示す拡大縦断側面図である。 第1実施形態に係る基礎2と脚柱12との接合状態を示す縦断側面図である。 図4のA-A’断面を示す。 図4のB-B’断面を示す。 第1実施形態に係るモジュールの設置作業を示す縦断側面図である。 第1実施形態に係るモジュールの設置作業を示す縦断側面図である。 第1実施形態に係るモジュールの設置作業を示す縦断側面図である。 第1実施形態に係るモジュールの設置作業を示す縦断側面図である。 第1実施形態に係るモジュールの設置作業を示す縦断側面図である。 第1実施形態の第1変形例に係る基礎と脚柱との接合状態を示す縦断側面図である。 図8のC-C’断面を示す。 図8のD-D’断面を示す。 図8のE-E’断面を示す。 第1実施形態の第2変形例に係る基礎と脚柱との接合状態を示す縦断側面図である。 図12Aにおける上部締結部材を示す拡大縦断側面図である。 第2実施形態に対する比較形態の基礎の施工方法が用いられたプラントの一角を例示する模式図である。 前記比較形態におけるモジュールの搬入法を示す平面図である。 第2実施形態のモジュールの搬入法を示す第1の平面図である。 第2実施形態のモジュールの搬入法を示す第2の平面図である。 第2実施形態のモジュールの搬入法を示す第3の平面図である。 第2実施形態のモジュールの搬入法を示す第4の平面図である。 第2実施形態のモジュールの搬入法を示す第5の平面図である。 第2実施形態のモジュールの搬入法を示す第6の平面図である。 上部基礎施工前の不干渉エリアの基礎及び下部基礎を示す縦断側面図である。 図21における下部基礎を示す平面図である。 図19における不干渉エリアの基礎及び干渉エリアの基礎を示す縦断側面図である。 図20における不干渉エリアの基礎及び干渉エリアの基礎を示す縦断側面図である。 モジュールの他の手順による搬入を示す第1の平面図である。 モジュールの他の手順による搬入を示す第2の平面図である。 干渉エリアの基礎の他の例を示す縦断側面図である。 干渉エリアの下部基礎を保護する保護部材の形成手順を示す第1の縦断側面図である。 保護部材の形成手順を示す第2の縦断側面図である。 他の保護部材の形成手順を示す縦断側面図である。 上部基礎の他の施工手順を示す第1~第3の縦断側面図である。 前記上部基礎の他の施工手順を示す第4~第6の縦断側面図である。 傾斜敷地に設けられた干渉エリアの基礎を示す縦断側面図である。
 (第1実施形態)
 プラント100を構成するモジュール10の設置方法について図1、図2を用いて説明する。図1は、第1実施形態及び後述の比較形態で共通するプラント100の敷地S1へのモジュール10の設置を示す平面図である、図2は、比較形態におけるモジュール10の設置を示す縦断側面図である。詳細には図1は、敷地S1内へのモジュール10の搬入を示す図であり、図2は、比較形態の敷地S1に配置されたモジュール10の基礎2mへの設置を示しているが、基礎2m以外、第1実施形態の設置と共通する。
 第1実施形態のモジュール10の設置方法を説明する前に、先ず第1実施形態の設置方法が適用されるプラント100としては、流体の処理を行う機能を備えていれば特段の限定はない。天然ガスの液化や天然ガス液の分離、回収などを行う天然ガスプラント、原油や各種中間石油製品の蒸留や脱硫などを行う石油精製プラント、石油化学製品や中間化学品、ポリマーなどの生産を行う化学プラント、薬剤やその中間製品の生産を行う製薬プラント、低レベル放射性廃棄物の廃棄物処理プラントなどを例示することができる。
 またプラント100は、各種流体の処理を行う上述の各種プラントに併設され、または単独で設けられ、エネルギー供給や発電のために用いられる燃料流体や蒸気、ホットオイルを取り扱うボイラープラントや発電プラント、冷媒の供給を行う海水供給プラントなどのユーティリティプラントであってもよい。そして本例における「流体」には、気体、液体に加え、流動性を有する粉粒体(粉体、粒体やペレットなど)も含んでいる。
 このようなプラント100を構成するモジュール10には、流体の各種処理を行うための複数の機器類や、複数に分割された大型の機器類の一部が設置されている。そしてモジュール10は、例えば複数の支柱や梁で構成された架構式構造体の内部にこれらの機器類を収容している。説明の簡略化のため、本願の図面に記載のモジュール10においてはこれら機器類については個別の図示及び説明を省略する。
 後述の第2実施形態の説明に用いられる図13において簡略的に示すように、架構構造のモジュール10の下端部は、複数の梁(以下、「底梁11」ともいう。図21も参照)で構成されている。図1、図2に示すように、このモジュール10の下端部には、それぞれ下方に伸びるように複数の脚柱(支柱)12が形成されている。これら複数の脚柱12は、モジュール10の底面において、例えば底梁11が交差する位置に格子点状に相互に離間して配置されている。そして各脚柱12は、モジュール10の設置領域である敷地S1から突出するように予め設けられた複数の基礎2の上にそれぞれ配置された後、互いに接続される(図1、図2)。このため基礎2及び脚柱12を平面視すると、互いに同一の配列で配置されている。
 ここで基礎2については、モジュール10が適切な設置位置に配置された際、互いに接合される脚柱12と基礎2とが対向する位置に適切に配置されている必要がある。このため、各基礎2の施工にあたっては、モジュールヤードや、設置前のモジュール10が保管されたバックヤード等で予め、各脚柱12における基礎2との接合部分であるベースプレート13(図2)の位置を計測しておく。この計測結果に基づいて、対応するベースプレート13の位置に合わせて、基礎2の接合部分(第1実施形態においては、上部プレート52)が配置されるように、各基礎2は厳密な位置管理の上で施工される。しかる後、各基礎2の上方に、後述するSPMT(Self-Propelled Modular Transporter)3に載置されたモジュール10を設置位置上に適切に配置した後、モジュール10を降下させることにより、全ての基礎2のフーチング25bの上面に対して、各ベースプレート13が接するように配置される。この際、フーチング25bの上面から上方へ向けて突出するように設けられている複数のアンカーボルト25aが、ベースプレート13側に形成されている取付孔13aを貫通するように基礎2に対する脚柱12の取り付けが行われる。
 各基礎2は、上述のように厳密な位置管理によって施工する必要がある。また基礎2は、図1において敷地S1において例えば図中に併記したX方向、及びY方向に沿って互いに間隔を開けて格子点状に多数、設けられる。なお、各図における基礎2や脚柱12の配置は、比較形態や各実施形態を説明するうえでの便宜上の記載であり、実際のモジュール10における配置とは異なっている場合がある。脚柱12及び基礎2は、相互に接続された状態でモジュール10を敷地S1において安定して支持し続けることができるように構成されていれば、その配置数や配置間隔については特段の限定はない。
 モジュール10は、台車である複数のSPMT3によってプラント100内の搬送路を通過して敷地S1に搬入され、基礎2上に設置される。SPMT3の荷台31(図2も参照)は互いに間隔を開けて複数列(図1に示す例では3列)に配置されている。モジュール10は荷台31(図2も参照)上に跨がって積載され、これら複数のSPMT3に積載された状態のまま搬送される。
 この際、モジュール10の下端部から下方へ向けて突出する各脚柱12は、SPMT3との干渉を避けるように、隣り合って配置されたSPMT3の列の間隙や、SPMT3の並びの外方側に配置される。尚、SPMT3の列数や一列あたりのSPMT3の台数については、モジュール10の重量や敷地S1及び搬送路S2の地耐力によって適宜設定される。
 SPMT3について簡単に述べておくと、SPMT3は上下に昇降可能な板状の荷台31と、荷台31の下方に配置されて支持軸を介して荷台31を支持する複数の車輪とを備える。荷台31の幅方向で対に設けられた複数組の車輪は、荷台の長手方向に沿って配置されている。複数組の車輪の回転軸の向きを例えば約90度変化させることでSPMT3は、荷台31の長手方向や幅方向に移動できる。そしてSPMT3は、当該回転軸の向きを適宜変化させることで斜行や旋回も可能である。
 作業者がコントローラーでこれらのSPMTを操作すると、各SPMT3は、走行移動や荷台昇降等の動作を互いに同期して実行する。これにより各SPMT3は、互いに動作がばらつくこと無く、モジュール10を安定して搬送できる。そして図1、図2に示すように、全ての基礎2が予め施工されて配置されている場合、各SPMT3は、X方向に沿って伸びる「基礎2の列」の隙間に進入して進行する。そして、各基礎2の直上に対応する脚柱12が配置される位置まで、モジュール10を搬送する。
 しかる後、モジュール10を垂直に降下させて各基礎2に脚柱12を載置する。このようにモジュール10を載置する際には、全ての組の脚柱12と基礎2とを一括して接合可能な位置に各基礎2が配置されていなくてはならない。
 ここで具体的に、比較形態における基礎2mの構造の一例について、図3を用いて説明する。基礎2mは、地面に打ち込まれた不図示の杭と、杭の一部を構成し、かつ上方に向けて複数のアンカーボルト25aが突出するように形成された接合部分であるフーチング25bとを備えた一体構造物として構成されている。モジュール10を設置する際、アンカーボルト25a及びフーチング25bは、地面から露出して設けられている。モジュール10を接合する際、アンカーボルト25aは、脚柱12の下端部に設けられたベースプレート13に形成されている取付孔13aを貫通させる。しかる後、アンカーボルト25aに対しナットを締結することにより脚柱12と基礎2mとを固定する。
 以上のような比較形態においては、SPMT3でモジュール10の位置を調整する際、脚柱12がアンカーボルト25aに接触して破損させてしまわないように、アンカーボルト25aから充分に離れた高さにてモジュール10の搬送を行う必要がある(図2)。このように高い位置でモジュール10の位置を調整する場合、アンカーボルト25aとベースプレート13とが大きく離れてしまうため、モジュール10の配置を調節する際の困難性が上がってしまう。
 そして、このようにアンカーボルト25aから離れた高さ位置に脚柱12を配置する場合、搬送時の脚柱12の位置を高くするほど、モジュール10を積載したSPMT3の荷台31の位置も高くなる。この結果、脚柱12を基礎2mに載置する作業を実施するにあたっては、モジュール10の搬送高さ位置から、基礎2mに対する脚柱12の載置高さ位置までの荷台31の降下量も大きくなる。ここで、基礎2mに対する脚柱12の載置作業には、脚柱12の下端のベースプレート13に形成された取付孔13aに対し、アンカーボルト25aを正確に貫通させる作業が含まれる。一方で、巨大なモジュール10には多数の脚柱12が設けられているので、これら脚柱12の各々について基礎2mへの載置作業を行わなければならない。この点、降下を開始する前の脚柱12の下端(ベースプレート13)の位置が高くなり、アンカーボルト25aの上端から離れるほど、多数の取付孔13aに同時にアンカーボルト25aを貫通させる作業の困難性は高くなる。
 さらに、モジュール10を設置する直前にアンカーボルト25aから脚柱12が充分に離れた高さ位置にて水平にしなければならない制約があり、モジュール10の構成(以下に説明する例では、モジュール10の全長)にも影響を及ぼす場合がある。例えば、傾斜した敷地S1(図32)にモジュール10を設置するとする。このように傾斜した敷地S1でモジュール10を水平姿勢にした状態を考えると、地面からモジュール10の底面までの高さ距離は、傾斜下方側において相対的に大きく、傾斜上方側において相対的に小さい。このためSPMT3は、荷台31の傾斜下方側を高く上昇させ、荷台31の傾斜上方側を低く降下させた状態にてモジュール10を一時的に保持する。この場合には、これら傾斜下方側の一端と、傾斜上方側の他端との間の荷台31の高さ位置の差(即ち、荷台31の昇降量)が大きいほど、モジュール10の全長はより長くなる。
 しかしながら、実際のSPMT3には、荷台31の昇降可能な範囲(昇降量)に制約がある。このように荷台31の昇降量に制約がある場合において、アンカーボルト25aから充分に離れた高さ位置にてモジュール10を搬送することが要請されると、アンカーボルト25aから脚柱12を離した状態を維持するために、荷台31の昇降量の一部が使われてしまう。この結果、傾斜した敷地S1で基礎2mを用いる場合、アンカーボルト25aに対して脚柱12をより近付ける場合と比較して、モジュール10の全長を短くしなければならない場合がある。このようにモジュール10を短くすると、モジュール10の台数が増え、モジュール10搬送・設置作業や設置後のモジュール10間の繋ぎ込み作業が増加してしまう。
 ここで比較形態における脚柱12は、例えば円形鋼管で構成され、その下部には、円形鋼管の下端よりも径が大きい円板により構成され、かつ円形鋼管の下端を塞ぐように設けられたベースプレート13が設けられている。ベースプレート13は、フーチング25bの上面に載置される。ベースプレート13の周縁側、即ち平面視したとき、脚柱12の本体を成す円形鋼管よりも外側には、ベースプレート13を貫通する複数の取付孔13aが形成されている。ベースプレート13の周縁側に取付孔13aを配置する理由は、円形鋼管の外部からアクセスし、アンカーボルト25aの締結作業をするためである。
 取付孔13aの内径D3は、外径d1のアンカーボルト25aを貫通させることが可能であり、且つアンカーボルト25aにナットを締結して基礎2mに脚柱12を固定可能な大きさに設定される。ここで取付孔13aとアンカーボルト25aとのD3-d1の隙間が許容する範囲内であれば、ベースプレート13の位置が水平方向にずれても、脚柱12と基礎2mとを締結固定できる。しかしこの隙間は、巨大なモジュール10を支持する比較的大きな脚柱12に対して微小であるため、モジュール10の設置作業における位置合わせは、かなり高い精度が要求され、困難性が高い。このように高い困難性を低減するためには、例えば取付孔13aを拡径することが考えられるが、取付孔13aを拡径すればベースプレート13を更に拡径する必要が生じる。ベースプレート13が更に拡径すると、モジュール10設置の際の作業スペースが削減され、SPMT3との接触を防ぐためSPMT3の幅などをサイズダウンする等、モジュール10の設置作業に様々な制約が発生する。
 上記のような制約は、既述したように円形鋼管である場合に限定して生じるものではなく、脚柱12の部材断面が例えばH形鋼の場合であっても発生する。この場合、H鋼の端部に取り付けられたベースプレート13は、基礎2m上に直接載置され、円形鋼管の場合と同様、取付孔13aを大きくする必要がある。そしてアンカーボルト25aを座金を用いて締結した後、座金の周囲を溶接する等、外部からアクセス可能な作業スペースが必要となる。このように上記比較形態においては、いずれの形状の部材形状であっても、取付孔13a及びアンカーボルト25aは原則としてベースプレート13の外側に配置され、更にベースプレート13が拡大することになる。
 以上、比較形態にて説明した一体構造の基礎2mは、施工及びモジュール10設置作業が高難度となる。これに対し、以下に説明する第1実施形態では、基礎2を下部基礎23と上部基礎24とに分離することにより、設置作業の容易化を図っている。また脚柱12の下端部は、鉛直方向に伸びるH鋼で構成し、そのH鋼の下端には矩形のベースプレート13を接続した構成となっている(図4、図6)。平面視するとベースプレート13は、H鋼の下端面(即ちH鋼の断面)よりも僅かに大きく、かつ上部基礎24側に設けられる後述の上部プレート52よりも僅かに小さい。
 図4は、第1実施形態に係る基礎2と脚柱12との接合状態を示す縦断側面図である。また図5は、図4のA-A’位置での断面を示し、図6は、図4のB-B’位置での断面を示す。図5、図6における2点鎖線は、脚柱12のH鋼部分の断面に外接する方形領域SSの輪郭線を示している。但し、この方形領域SSが脚柱12と部分的に重なる位置の輪郭線については、図示の便宜上脚柱12よりも僅かに外方側に示してある。
 下部基礎23は、比較形態にて説明した基礎2mと同様に、ペデスタル25b及びアンカーボルト25aを備える。ペデスタル25bは、例えば打設されたコンクリートであり、例えば平面視において長方形を成している。アンカーボルト25aは、平面視したとき、既述の方形領域SSの外側、即ち、脚柱12のH鋼部分の外側でありペデスタル25bの周縁側に設けられる(図5)。
 ペデスタル25bの上面中央には、凹陥したキー溝25cを形成することが好ましい。キー溝25cは、ペデスタル25bの上面において例えば中央から周縁に向けて浅くなるスロープ部25dを有し、キー溝25cの上面の開口は、ペデスタル25bの中央から周縁に向けて延在している。これにより、ペデスタル25b上に後述の高さ調整部材26aが配置されても、キー溝25cの上方開口の周縁側からコンクリートやグラウト等の固定部材26bを注入できる。なお、図4において、スロープ部25dは、アンカーボルト25aの配置位置よりも奥手に配置されているので、同図においてはスロープ部25dの底面を破線で示してある。
 そしてキー溝25c内には、上部基礎24に設けられた後述のシアキー51aが挿入される。シアキー51aとキー溝25cとの間隙は、注入された固定部材26bで埋められ、硬化した固定部材26bによってシアキー51aはキー溝25c内に固定される。このような固定構造によって、プラント操業開始後に発生する水平方向の負荷を受ける上部基礎24と、下部基礎23との間で発生する水平方向の負荷を受けることができる。これにより、アンカーボルト25aに加わる水平方向の負荷が軽減され、アンカーボルト25aの破壊が抑止される。
 さらにペデスタル25bの上には、高さ調整部材26aを敷いて上部基礎24を配置している。例えば高さ調整部材26aは、モジュール10を支持する上部基礎24からの負荷に耐え、かつ厚みを調整できる部材により構成される。具体的に高さ調整部材26aは、積み重ね枚数により高さ寸法を調整可能なモルタルパッドや、成型により高さ寸法を調節可能な不定形部材であるグラウトによって構成される。このように高さ調整部材26aの厚みを調整することで、上部基礎24毎に高さ方向の位置を調整することが可能となる。高さ調整部材26aは、アンカーボルト25aやシアキー51aが設けられた領域を除いたペデスタル25bの上面に配置されると共に、上部基礎24の後述するベースプレート51の下面の概ね全域に接するように配置される。アンカーボルト25a、シアキー51aは、高さ調整部材26aを貫通して上方、下方に突出している。
 上部基礎24は、例えば鋼鉄製であり、その下端部、上端部に各々設けられたベースプレート51、上部プレート52と、これらのプレート51、52間を繋ぐように設けられた中間部53とを備えている。ベースプレート51、上部プレート52は、平面視矩形の板状体であり、中間部53によって相互に平行かつ共に水平な状態で配置されている。ベースプレート51は、平面視においてペデスタル25bよりもやや小さい長方形に構成されている。尚、ベースプレート51は、平面視においてペデスタル25bよりも小さい矩形であればこのような長方形に限定されず、正方形等他の形状であってもよい。
 そしてベースプレート51の下面は、高さ調整部材26aを介してペデスタル25bの上面に対向配置される。そしてベースプレート51の下面中央には、下方に向けて突出する既述のシアキー51aを設けることが好ましい。尚、シアキー51a、キー溝25cの配置位置は、ベースプレート51、ペデスタル25bの中央にそれぞれ配置されるが、その配置位置は中央に限定しなくてもよい。
 上部プレート52は、ベースプレート51よりも小さい平面視矩形、具体的には正方形に構成されている。尚、上部プレート52は、平面視においてベースプレート51よりも小さい矩形であれば正方形に限定されず、長方形等他の形状であってもよい。そして上部プレート52は、ベースプレート51の中央領域の上方側に配置されている。図4~図6中、Y方向を前後方向とも呼ぶ。この場合、Y軸の基端部側が前方向、Y軸の先端側が後ろ方向である。また同図中、X方向を左右方向とも呼ぶ。この場合、X軸の先端側が右方向、X軸の基端側が左方向である。そして同図中、Z方向を高さ方向とも呼び、この場合、Z軸の先端側が上方向、Z軸の基端側が下方向である。
 例えば中間部53は、1枚の主板54と4枚の側板55とで構成されている。主板54、側板55は、ベースプレート51から上部プレート52に向けて上下方向に伸びるように設けられている。図5に示すように、主板54は、ベースプレート51、上部プレート52の左右方向の辺に沿うように配置されている。側板55は、主板54の前後両面にそれぞれ2枚ずつ、前後方向に向けて設けられている。主板54の上端は、脚柱12の後述のウエブ12aの下方位置に配置されると共に、上部プレート52の下面に収まる程度の幅を有する。そして上端から下端に向かうにつれて主板54の幅が広がり、前後方向から見た主面の形状が台形になっている。また、2枚の側板55の上端は、脚柱12の後述のフランジ12bの下方位置に配置されると共に、その幅は上部プレート52の下面に収まる程度の幅を有する。そして主板54同様、側板55は、幅が上端から下端に向かうにつれて拡張し、2枚合わせて左右方向から見た主面の形状が台形になっている。
 主板54、側板55は、ベースプレート51の上面と上部プレート52の下面とに挟まれた空間を区画するように設けられている。具体的に主板54は、ベースプレート51の上面、上部プレート52の下面を前後方向で2分割するように設けられる。4枚の側板55は、ベースプレート51の上面を左右方向において3分割するように設けられている。さらに図4に示すように、4枚の側板55は、上部プレート52の下面における左右両端の周縁に沿って設けられている。
 図5に示す平面図によれば、このように構成された中間部53によって6分割されたベースプレート51の上面領域のうち、左右端の4領域は、前後、左右それぞれいずれかに向けて各々、2面が外部に向けて開放されている。中央側の2領域は、前後いずれかに向けて1面が外部に向けて開放されている。一方、上部プレート52の下面は、主板54の上端によって2分割されている。これら上部プレート52の下面の各領域は、前後いずれかに向けて外部に開放されている。このようにベースプレート51の上面領域、上部プレート52の下面領域の各分割領域については、それぞれの開放面を介した外部からのアクセスを許容する。
 ベースプレート51における左右端の4領域には、取付孔51bがそれぞれ設けられている。平面視において取付孔51bは、既述した方形領域SS(図5、図6)の外側に配置される。方形領域SSは脚柱12のH鋼部分の断面形状に外接する領域であるので、取付孔51bは、脚柱12よりも外方側に配置されていることになる。さらに図4に示すように、取付孔51bの内径D1は、アンカーボルト25aの径よりも大きく構成されている。この結果、ペデスタル25b上面にベースプレート51が載置された場合に、アンカーボルト25aと取付孔51bとの隙間の範囲内で水平方向の位置ずれを許容する。これら取付孔51bの中心軸の位置は、設計上のアンカーボルト25aの中心軸の位置と一致する。
 詳細には、取付孔51bの内径D1は、例えばアンカーボルト25aの胴部の径d1+20[mm]にすると良く、この場合、当該20mmの隙間がベースプレート51の水平方向の位置ずれを許容する。なおベースプレート51の分割された上面領域内であれば、取付孔51bの内径D1を更に拡径して当該隙間を増やすことも可能である。その逆に、当該上面領域内が比較的小さい場合は、取付孔51bの内径D1を径d1+10[mm]程度にしてもよい。
 取付孔51bを貫通して上方に突出したアンカーボルト25aの先端部には、上方から座金26cを介してナットが締結される。座金26cは、その下面がベースプレート51の取付孔51bの周縁全域に接するような外径を有する。ナット締結後、座金26cの周縁とベースプレート51とは、例えば溶接で接合される。
 次いで、上部プレート52の構成について説明する。図6に示すように、上部プレート52の下面領域において前後に並ぶ2領域には、セットボルト26dを取り付けるための取付孔52aがそれぞれ2つずつ設けられている。平面視において取付孔52aは、既述の方形領域SSの内側に配置される。セットボルト26dは、ベースプレート13を上部プレート52に拘束するために用いられ、例えばセットボルト26dは、取付孔52aの下方から取り付けられ、その頭部が上部プレート52の下面に接した状態で締結される。例えば取付孔52aの孔径D2は、セットボルト26dの胴部の径d2+2~3[mm]である。
 上部プレート52の上面には、脚柱12側のベースプレート13が載置される。ここで、脚柱12は、2つのフランジ12bと、該2つのフランジ12b同志をつなぐウエブ12aとを備えるH鋼である。ウエブ12aは、ベースプレート13上面の中央において左右方向に配置され、ベースプレート13の上面を前後に2分割している。また、2つのフランジ12bは、ベースプレート13における左右の端縁の内側に配置されている。このようにベースプレート13の上面領域の2分割された各領域は、前後いずれかに向けて、1面が外部へ向けて開放されているので、各開放面を介した外部からのアクセスを許容する。
 そしてベースプレート13の2領域には、セットボルト26dを取り付けるための取付孔13aがそれぞれ例えば2つずつ設けられている。但し、各領域の面積が許容し、締結の作業性が担保されていれば、それぞれ3つずつのセットボルト26dが設けられていてもよい。平面視において取付孔13aは、脚柱12で区画された領域の内側、つまり方形領域SSの内側に配置される。さらに図4中に併記した拡大図に示すように、取付孔13aの内径D3は、取付孔52aの内径D2よりも大きく構成されている。これにより、上部プレート52上面にベースプレート13が載置された場合に、取付孔13a、52aがセットボルト26dを挿通可能に重なり合った範囲内で、ベースプレート13の水平方向の位置ずれを許容する。これら取付孔13aの中心軸の位置は、設計上の上部プレート52の複数の取付孔52aの中心軸の位置(即ち、設計上のセットボルト26dの中心軸の位置)と同一である。
 詳細には、取付孔13aの内径D3は、例えばセットボルト26dの径d2+20[mm]にすると良く、この場合、当該20mmの隙間がベースプレート13の水平方向の位置ずれを許容する。これと同様に、取付孔52aとセットボルト26dとの隙間についてもベースプレート13の水平方向の位置ずれを許容する。なお上部プレート52に重なったベースプレート13の分割された上面領域内であれば、取付孔13aの内径D3を更に拡径して当該隙間を増やすことも可能である。その逆に、当該上面領域内が比較的狭い場合は、取付孔13aの内径D3を径d2+10[mm]程度にしてもよい。そして、上述の取付孔13aの内径D3、取付孔52aの内径D2の設定例は、互いに入れ替えてもよい。この場合、セットボルト26dは取付孔52a側から取り付けられる(図12A)。このように、取付孔51b、52a、13aが設けられた上部基礎24を用いることで、上部基礎24、脚柱12の設置においてそれぞれ位置を調整できるので、モジュール10設置の難易度が低減され、作業性が向上する。
 取付孔13aから突出したセットボルト26dの先端部には、上方から座金26eを介してナットが締結される。座金26eは、例えばその下面がベースプレート13の上面における取付孔13aの周縁全域に接する外径を有するものとする。座金26eの内径は、例えばセットボルト26dの径d2+1[mm]にする。
 以上に図4~図6を参照しながら説明した第1実施形態に係る基礎2の構成をまとめると、下部基礎23に対して上部基礎24を固定するためのアンカーボルト25aと、座金26c及びナットで構成される複数組の下部締結部材は、方形領域SSの外側に配置される。このように、下部基礎23を構成するペデスタル25bと、上部基礎24を構成するベースプレート51とが対向して配置される面内において、方形領域SSの外側に下部締結部材を分散して配置する接合形態は、下記に述べる上部基礎24とベースプレート13との接合と比較して「剛接合」であるといえる。
 この剛接合は、水平方向の負荷や回転力を受けるように接合されるが、ベースプレート51におけるアンカーボルト25aの本数は、既述したように取付孔13aの形状やその後の作業スペースの都合により制約を受けることがある。しかしながら本開示においては、シアキー51aによって水平方向の負荷を受けることができるため、上記制約があるとしても基礎2において充分な強度を維持できる。
 そして、上部基礎24に対してベースプレート13を拘束支持するためのセットボルト26dと、座金26e及びナットで構成される上部締結部材は、方形領域SSの内側に配置されている。このように、狭い領域である方形領域SSの内側に上部締結部材を集中して配置する接合形態は、ペデスタル25bと、ベースプレート51との接合と比較して「ピン接合」の状態となっている。
 このように、第1実施形態では、上部基礎24の下面側、上面側の接合状態を使い分けている。すなわち、下面側については、モジュール10を支持する面積が比較的広いベースプレート51と下部基礎23との間の接合において剛接合の状態を採用することにより、回転モーメントに対する耐久力を向上させることができる。一方、上部基礎24の上面側についてはピン接合を採用することで、モジュール10の荷重の支持に十分な程度に脚柱12及びベースプレート13の断面積を削減して作業空間を担保し、設置作業の効率化を図っている。
 第1実施形態に係るモジュール10の設置作業について図7A~図7Eを用いて説明する。先ず、既述したようにモジュール10の架構構造が建造された段階で、全てのベースプレート13の位置を計測する。ベースプレート13の位置計測は、例えばモジュール10の設計の際に基準として予め設定される各ベースプレート13の位置を基準位置(モジュール側基準位置)として、これらの基準位置に対する相対位置を計測する。具体的には各ベースプレート13の相対位置は、例えば前記基準位置に対する水平方向及び鉛直方向へのずれ量である。
 一方、プラント100が建設される敷地S1側では、計測したベースプレート13の相対位置に基づき下部基礎23を施工する(図7A、下部基礎を固定する工程)。ベースプレート13の相対位置に基づく下部基礎23の施工とは、モジュール側基準位置に対し、ベースプレート13の位置の計測結果に基づいて下部基礎23の水平位置及び鉛直位置(高さ)の微調整を行うことである。各下部基礎23の位置は、高さ調整部材26aによって後述のように個別に高さ位置を調整することが可能であるため、下部基礎23の高さはモジュール10の底梁11の高さ位置や脚柱12の長さ等が相異しても共通化することができる。尚、高さ調整部材26aを設けない場合は、各下部基礎23(ペデスタル25b)は、それぞれの高さに合わせて施工する。
 下部基礎23の施工については、それぞれのモジュール側基準位置に合わせて、地面に埋設した不図示の杭の上部と、所定位置に配置したアンカーボルト25aの下部とを内包するようにコンクリートを打設してペデスタル25bを形成する。コンクリートの打設は、キー溝25cを含んだ予め設定されたペデスタル25bの所定形状となるように行われる。尚、ペデスタル25bの形成については、その下方に予めフーチングを打設して形成し、フーチング上に打設することで行う手法を例示できる。
 次いで、各ペデスタル25b上に高さ調整部材26aを形成する(図7B)。高さ調整部材26aは、例えば、モジュール10について計測したベースプレート13に応じて決定される下部基礎23の高さ(Z座標)に応じて、モルタルパッドを積載して形成され、モジュール10の重量が比較的大きい場合、鉄板を載置して形成される。
 このように各下部基礎23上で高さを調整した高さ調整部材26aの上に、上部基礎24を配置する(図7C)。図2を用いて説明した比較形態のように、大型のモジュール10に設けられた多数の脚柱12を直接、基礎2mに接合する場合と比較して、この上部基礎24の配置は、比較的小さな上部基礎24を1つずつ載置するため、容易である。具体的に上部基礎24の載置は、先ずキー溝25c内にシアキー51aを挿入すると共に、取付孔51bに対してアンカーボルト25aを貫通させて行う。そして、取付孔51bの隙間が許容する範囲内で、上部基礎24を水平方向にずらして位置を調節する。このように上部基礎24の設置作業は、大型の搬送機材や取付治具を用いずに人力で行うこともでき、作業負担は比較的軽い。
 上部基礎24を設置した後、各アンカーボルト25aの上端側に座金26c及びナットをそれぞれ締結して溶接し、上部基礎24を下部基礎23に固定する(図7D、上部基礎を固定する工程)。そして、既述のキー溝25cの上面周縁の開口から固定部材26bを注入して硬化させ、シアキー51aをキー溝25c内に固定する。以上のように全ての上部基礎24を下部基礎23に固定した後、SPMT3でモジュール10を敷地S1に搬入し、図2と同様に、モジュール10を上部基礎24の上方で停止させ、モジュール10を設置位置で待機させる(図7D)。
 このときのモジュール10の設置位置は、例えば、モジュール側基準位置に対応付けて敷地側に設定されている位置であり、例えば脚柱12に設けられているベースプレート13の各取付孔13aが、上部基礎24側の上部プレート52の取付孔52aの上方に正しく配置される位置である。そして、既述のように上部基礎24は、実際に測定したベースプレート13の相対位置に応じて、その高さ及び水平方向の位置が予め調整されている。従って、設置位置までモジュール10を搬送した後、鉛直方向に降下させれば各脚柱12に設けられているベースプレート13が、対応する上部基礎24とそれぞれ接合できる位置に配置された状態となる。
 第1実施形態においては、図7Dに示すように、上部プレート52の上面からは、アンカーボルト25aが突出していない。このため、アンカーボルト25aの損傷を警戒する必要無く、ベースプレート13を上部基礎24に近接させた状態で、モジュール10の水平方向の位置調整が可能となり、当該位置調整の作業性を向上できる。
 また、ベースプレート13を上部基礎24の近接位置から上部基礎24に載置する降下量は、比較形態で述べたアンカーボルト25aの接触を避けた上方位置からアンカーボルト25aを貫通させて基礎2mに載置する降下量よりも短い。このため、モジュール10の脚柱12の位置調整が容易になり、モジュール設置作業の負荷が軽減される。また、傾斜する敷地S1にモジュール10を設置する場合は、モジュール10の全長の制限を緩和し、モジュール10の設置や繋ぎ込み等の作業性を向上できる。
 次いで、SPMT3の荷台を降下させることで、設置位置に配置されたモジュール10を鉛直方向に降下させ、各上部基礎24に対してベースプレート13をそれぞれ載置する(図7E、支柱を載置する工程)。これにより、各ベースプレート13は、各取付孔13aと取付孔52aとが連通するように、対応する上部基礎24上にそれぞれ配置される。そして、取付孔52aの下方からセットボルト26dを取り付け、取付孔13aの上方から座金26e及びナットをセットボルト26dに取り付けて締結する(図4、支柱を締結支持する工程)。その後、遅くともプラント操業開始前に、座金26eとベースプレート13とを溶接で接合し、脚柱12と上部基礎24との間の水平移動を拘束する。以上により、ベースプレート13が上部基礎24に拘束されることで、脚柱12は移動が拘束された状態で上部基礎24に支持され、モジュール10の設置作業が完了する。
 以上、第1実施形態の基礎2及びモジュール10の設置方法によれば、基礎2を下部基礎23、上部基礎24に分け、施工後の下部基礎23に上部基礎24を設置する。これにより、基礎2を精度良く施工できると共に、基礎2の施工作業の困難性を軽減できる。そして、上部基礎24にベースプレート13を配置するため、アンカーボルト25aの破損を防ぐと共に、上部基礎24とベースプレート13とを近づけた状態で位置調整を行うことができ、位置調整の作業性向上に寄与する。
 第1実施形態の基礎2は、既述したような構造、形状に限定されず、例えば後述の第2実施形態の干渉基礎22と同様な構造であってもよい。第1実施形態においては、全ての基礎が、下部基礎23、上部基礎24で構成されているが、その一部を比較形態で示した一体の基礎2mで構成してもよい。
 また第1実施形態の図5では、下部締結部材(アンカーボルト25aと、座金26c及びナットのセット)をベースプレート51の左右端の4領域に設けた例を示したが、これは必須の要件ではない。例えば下部締結部材は、これら4領域においてそれぞれ2セットずつ配置して8箇所(図5)に設ける等、他の位置において他の個数で設けられてもよい。下部締結部材と同様、上部締結部材の位置や数についても限定されない。そして、上部基礎24と下部基礎23の接合強度が充分であれば、方形領域SSの中央側で1箇所以上に設けられていてもよい。しかし、下部基礎23と上部基礎24との固定は、剛接合として曲げモーメントに対して強固にすることが好ましいため、2箇所以上で方形領域SSの外側に配置されることが好ましい。そして、上部基礎24の中心軸から離れるように、ペデスタル25bの周縁側に配置されることが更に好ましい。
 そして第1実施形態において、図6に示す例では脚柱12は、H鋼を用いているが、他の形状の鋼材でもよく、様々な形状にした断面形状の鋼材を用いてもよい。この例としては、ウエブ12aの表裏面における2つのフランジ12bの間にそれぞれ補強板を取り付けてもよい。この2つの補強板は、フランジ12bと平行に配置されて、下端がベースプレート13に接続され、隣接する取付孔13aの間に配置される。
 中間部53の構成についても、第1実施形態で示した例に限定されない。例えば、脚柱12の部材断面が例えば比較的小さく、これに合わせて上部プレート52を比較的小さくした場合、次の第1変形例に示すように側板55を、主板54の表裏における中央位置にそれぞれ配置することで、合計2枚設けてもよい(図8)。そして例えば、第1実施形態の図5で説明した主板54の表裏に各2枚ずつ設けた側板55の間に、このような中央位置の側板55を追加配置することで、合計6枚の側板55を設けてもよい。以上のように中間部53の構造は、第1実施形態で示したものに限定されず、他の形状にしてもよい。そして主板54、側板55は、相互に直交していなくてもよく、ペデスタル25bに対して既述したような姿勢に設けられる必要は無い。以上、中間部53、脚柱12の具体的な変形例について以下、2つ説明する。
(第1実施形態の第1変形例)
 図8は、第1変形例に係る基礎2と脚柱12との接合状態を示す縦断側面図であり、図9は、図8のC-C’断面を示し、図10は、図8のD-D’断面を示し、図11は、図8のE-E’断面を示す。第1変形例における基礎2の中間部53Aでは、側板55が主板54の前後方向における両面中央に設けられており、横断面視したとき十字形状になっている(図9)。そして基礎2に接続される脚柱12には、比較形態と同様に円形鋼管12cが用いられ、円形鋼管12cの下端には、脚柱12とベースプレート13とを接続するための接続部14が形成される。
 接続部14は、円形鋼管12cの下端部に取り付けられた交差板14bと、円形鋼管12cの下端を塞ぐように設けられた端部板14aとで構成されている(図8、図11)。交差板14bは、円形鋼管12cの部材軸に平行に設けられ、横断面が十字形状であって、円形鋼管12cの下方領域を4つに区画するように設けられている。交差板14bの上端部は、円形鋼管12cの下端部に形成された切り込みに組み込まれて溶接される。交差板14bの下端は、ベースプレート13の上面に溶接されている。端部板14aは、円形鋼管12cの下方端縁を構成する円を交差板14bで4分割した形状を成す。各端部板14aは、交差板14bにより区画されている領域を覆うように配置され、交差板14bや円形鋼管12に対して溶接により接合されることにより、円形鋼管12cの下端を塞いでいる。
 ベースプレート13は、円形に形成されているが、これに限らない。交差板14bの下端を取り付け、かつ上部プレート52上に配置できれば、四角や八角形等の他の形状に形成されてもよい。このことは、第1実施形態など他の実施形態などのベースプレート13についても同様に他の形状にすることができる。ベースプレートの取付孔13aは、ベースプレート13における交差板14bで区画された4つの領域にそれぞれ設けられている。そして取付孔13aは、方形領域SSの内側に配置される。ここで方形領域SSは、ベースプレート13の上面に接続された交差板14bの下端に外接する領域である。
 方形領域SSは、この第1変形例のように様々な大きさや形状の断面を有する脚柱12である場合、いずれの断面について設定してもよい。いずれの断面の方形領域SSであったとしても、上部締結部材を方形領域SSの内側に配置し、下部締結部材を方形領域SSの外側に配置すればよい。これにより、下部基礎23と上部基礎24との接合状態が剛接合、上部基礎24とベースプレート13との接合状態がピン接合となるように接合できる。
 取付孔52aは、上部プレート52の下面における中間部53Aで4つに区画された領域に設けられている。当該区画された領域は、外部に向けて開放された領域である。また、取付孔52aは、方形領域SSの内側に設けられている。取付孔51bは、ベースプレート51の上面における中間部53Aで4つに区画された領域に設けられている。当該区画された領域は、外部に向けて開放された領域である。また、取付孔51bは、方形領域SSの外側に設けられている(図9)。
 (第1実施形態の第2変形例)
 図12Aは、第2変形例を示す上部基礎24と脚柱12との接合状態を示す縦断側面図であり、図12Bは、図12Aにおける上部締結部材を示す拡大縦断側面図である。第2変形例は、円形鋼管12cに接続部14が設けられておらず、円形鋼管12cの下面に、直接ベースプレート13が設けられている点で第1変形例と相違する。第2変形例では、円形鋼管12cの内側に外部からアクセスできない。このため、取付孔13aに対応させてベースプレート13上面にヘビーナット13bを溶接しておく。そして上部プレート52の下面側から取付孔52a、13aにセットボルト26dを挿入し、ヘビーナット13bと締結する(図12A)。上部プレート52の取付孔52aの内径は、セットボルト26dの胴部に対して20[mm]程度大きいことが好ましい。この構成の場合には、取付孔52aとセットボルト26dとの隙間が、ベースプレート13の水平方向の位置ずれを許容する。
 この場合セットボルト26dの頭部側には、複数の座金26e1、26e2、26e3が取り付けられることが好ましい(図12B)。例えば、座金26e1は、上部プレート52に接して配置され、比較的大きな直径を有する取付孔52aの周縁に接する外径を有し、比較的厚い。座金26e2は、座金26e1、26e3の間に設けられるテンションインジケータワッシャ(Tension Indicator Washer)である。座金26e3は、セットボルト26dの頭部側に配置され、通常の硬度を有する。以上の構成を有することで、上部プレート52及びベースプレート13に対して信頼性の高い状態でセットボルト26dを締結することができる。
 (第2実施形態)
 第2実施形態の基礎2の施工方法が用いられるプラント100及びプラントモジュール(以下、単に「モジュール」ともいう)10の概要について図13を用いて説明する。図13は、後述する比較形態の基礎の施工方法が用いられたプラント100の一角を例示する模式図である。但し、プラント100及びモジュール10の搬送方法の概要、つまり後述する基礎の施工方法以外の事項については、第2実施形態及び第2実施形態に対する比較形態では共通している部分があるので、図13を参照しながら説明を進める。
 比較形態及び第2実施形態に図示した例において敷地S1には、図中に併記したX方向に沿って互いに間隔を開けて6基の基礎2が設けられ、これら6基の基礎2の列が、図中に併記したY方向に沿って、互いに間隔を開けて4列配置された構成となっている。そして、既述のようにモジュール10の底面には、これら基礎2の位置に対応して脚柱12が設けられている。
 モジュール10は、複数のSPMT(Self-Propelled Modular Transporter)3によってプラント100内の搬送路S2を通過して敷地S1に搬入され、基礎2上に設置される。図13に示す例では搬送路S2の両脇に、他のモジュールや機器が配置されており、他の経路を通って敷地S1にプラント100を搬入することは困難な構成となっている。
 図14に示す例では、SPMT3によって搬送される直方体のモジュール10の底面及び平面は、縦横比が大きく異なっている。この場合仮に、搬送路S2の幅や敷地S1の周辺領域が十分に広ければ、当該底面等の長手の向きを気にすること無く、モジュール10を敷地S1まで搬送できる。
 但し、図14に示すように全ての基礎2が予め配置されている場合、敷地S1に進入する際に各SPMT3の車輪が、基礎2の列同士の間に進入できるように、SPMT3の列の進入角度を調節する必要がある。進入角度を調節することにより、車輪が、敷地S1に設けられた基礎2と干渉することなく各SPMT3を移動させ、敷地S1内にモジュール10を搬送できる。
 しかし背景技術で触れたように、近年、プラント100の建設敷地をよりコンパクトにすることが求められている。一方、建設敷地内においては、他のモジュール10や機器の設置が並行して行われ、十分な幅の搬送路S2を設けることができず、敷地S1に対するSPMT3の列の進入角度が制限されてしまうことがある。以上のようなモジュール10の搬入において生じる問題について、比較形態を例に具体的に説明する。
 図13、図14は、比較形態におけるモジュール10の敷地S1への搬入を例示する斜視図、平面図である。図13において示す太線の矢印は、図示されたモジュール10の移動経路の一部を示したものであり、以後の図において同じである。図14に示すように、モジュール10は、平面視したときの縦横比が大きく相違している。一方、搬送路S2は幅が制限されているため、本比較形態では、上方から見てモジュール10の短辺が搬送路S2の路幅の内側を通過するように進行方向を設定する。
 ここで搬送路S2とは、SPMT3が通過する地面に限らず、地面よりも上方の空間であって、モジュール10との接触が懸念される他の構造物の無い空間をも含む概念である。このため搬送路S2の路幅は、地面と上方空間とにおいて相異することがあり、例えば、地面において比較的狭く、上方空間において比較的広い場合があり、その逆の場合もある。これらの場合においても、搬送路S2のそれぞれの高さにおいて、SPMT3やモジュール10が、両脇の他のモジュールや機器と干渉しない路幅が確保されていれば、モジュール10は当該搬送路S2を通過することができる。
 またここで図13、図14に示す例において、敷地S1は、搬送路S2を通過して、左手(図中のX方向)に折れ曲がった方向に沿って長辺が伸びるように設けられている。この場合において、SPMT3を敷地S1に進入させ、敷地S1の向きに進入角度を合わせるためには、搬送路S2から敷地S1に向けて左に旋回させつつ、SPMT3を進入させる必要がある。
 しかしながら、敷地S1には、SPMT3の移動経路と干渉する位置に基礎2が設置されているため、例えばSPMT3の車輪が基礎2に接触することがある。その場合、SPMT3を旋回させつつ敷地S1に進入させることができないため、SPMT3の進入角度を調節することができない。
 この結果、基礎2の列の間隙にSPMT3を進入させるためには、搬送路S2からX方向へと、より離れた領域に敷地S1を配置してSPMT3の旋回領域を確保する必要が生じる。しかしながら、SPMT3の旋回領域を確保することは、プラント100の建設敷地の更なるコンパクト化の要請に反する。尚、以下の説明では、搬送路S2を通過した後の敷地S1への進入順番を基準に、SPMT3の列一端側を「先頭」、他端側を「後尾」ともいう。この際、後述する進行方向の転換に合わせて「先頭、後尾」の言い換えはしない。
 以上の問題点を解消可能な第2実施形態における基礎2の施工及びSPMT3の搬入について、図15~図20の平面図を用いて手順を示す説明をする。これらの図のうち、図19の斜線が付された基礎2は、上方に脚柱12が配置された状態であることを示し、図20の交差線が付された基礎2は、脚柱12が接続された状態であることを示している。
 図15に示すように、SPMT3の進行方向に沿って見て、敷地S1の奥手には、後述の待機位置として利用される隣接領域S3が設けられている。隣接領域S3は、SPMT3を旋回させるために必要となる既述の旋回領域よりも面積が小さい。第2実施形態において、敷地S1は、予め設定された移動経路に沿って各SPMT3を走行させた場合に、SPMT3と干渉することとなる位置に基礎2が設けられる干渉エリアと、SPMT3と干渉しない位置に基礎2が設けられる不干渉エリアとに分けられる。そして、これら干渉エリアと不干渉エリアとで、異なるタイミングで基礎2を設置することにより、プラント100の建設敷地の増大を抑えつつ、SPMT3を旋回させることが可能な状態を確保する。以下、不干渉エリアに設けられる基礎2を「不干渉基礎21」と呼び、干渉エリアに設けられる基礎2を「干渉基礎22」と呼ぶ場合がある。
 干渉エリアは、予め設定された移動経路に沿ってSPMT3を走行させた場合に、車輪及び車体などのSPMT3のいずれかの部位と接触することが予測される基礎2が配置される敷地S1内の領域をいう。移動経路は、通常許容される程度の誤差範囲内でSPMT3が走行する軌道を含むように設定される。このため、干渉エリアに設置される干渉基礎22の全てが、SPMT3の走行時にSPMT3と実際に干渉する位置に配置されるとは限らない。図14の比較形態を参照すると、干渉エリアは、敷地S1へ進入させた直後にSPMT3が旋回する領域に設定されていると言うことができる。
 不干渉エリアは、敷地S1内の干渉エリア以外の領域を指す。また図14を参照すると、不干渉エリアは、SPMT3を旋回させる必要がある領域を通過した後の、進行方向に沿って前方側の領域に設定されていると言うこともできる。
 不干渉基礎21及び干渉基礎22の具体的構成は後述するが、概略、干渉基礎22は、干渉エリア内の敷地S1の地面から突出しない地下部分である下部基礎23と、その上側部分である上部基礎24とに分離されている(図23)。下部基礎23と、上部基礎24とは、異なる時期に施工される。
 図15に示すように第2実施形態において、基礎2については、先ずモジュール10の搬入前に、干渉エリアと不干渉エリアとで異なる内容の施工を実施する。即ち、干渉エリアにおいては、干渉基礎22の下部基礎23のみを施工し、地面から突出する上部基礎24の施工は行わない。一方、不干渉エリアにおいては、不干渉基礎21を施工し、基礎2を完成させる(不干渉エリアの基礎を施工する工程)。
 そして、干渉基礎22の下部基礎23の上方には、SPMT3が通過する際に下部基礎23を保護する保護部材を設ける。第2実施形態においては、図21に示すように、例えば木製の保護部材42を地下に配置し、この保護部材42を上面側から覆うようにスチールプレート41を設けている(図21)。
 保護部材42は、例えば作業員によって運ばれ、下部基礎23の上方に配置される。スチールプレート41は、保護部材42の上方に、例えば重機を用いて配置される。スチールプレート41は、その上面が例えば地面と概ね同一の面になるように配置される。この構成により、敷地S1に進入した各SPMT3は、干渉エリアにおいて下部基礎23と接触せずに旋回し、不干渉基礎21の列同士の間隙に各SPMT3の車輪を進入させることが可能なように、進入角度の調整が実施される。
 次いで図16に示すように、各SPMT3を不干渉エリアへ向けて直進させ、不干渉基礎21の列同士の間隙に沿って各SPMT3を進入させる。さらに図17に示すように、各SPMT3を直進させると、各SPMT3の先頭側は、不干渉エリアを通過して、隣接領域S3に到達する位置まで移動させる(待機位置にて待機させる工程)。このように、いわば敷地S1をオーバーランさせてSPMT3の先頭側を隣接領域S3に到達させることにより、SPMT3の後尾側は、干渉エリアを通過して不干渉エリアに到達した状態となる。このように、干渉エリアを含まない領域にSPMT3の待機位置を設定することにより、SPMT3に載置されたモジュール10と干渉せずに、上部基礎24の施工を実施できる。
 次いで図18に示すように、SPMT3を通過させた後の干渉エリアにおいて干渉基礎22の上部基礎24を施工する(干渉エリアの基礎を施工する工程)。上部基礎24の施工は、先ずスチールプレート41を重機で取り外した後、保護部材42を作業員が取り外す。次いで露出した各下部基礎23上に、上部基礎24を接続する。これにより、上部基礎24は、不干渉基礎21と同様に、地面から突出した状態で配置され、干渉基礎22が完成する。不干渉基礎21及び干渉基礎22は、比較形態で示した基礎2と同じピッチかつ同じ高さで、敷地S1に設けられている。
 次いで図19に示すように干渉エリアに向けて各SPMT3を後退させて、敷地S1にモジュール10を配置する。このとき各SPMT3の後尾側は、不干渉基礎21及び干渉基礎22の列の間隙を走行して干渉エリアに配置される。また各SPMT3の先頭側は、不干渉基礎21が設けられていない隣接領域S3から、不干渉基礎21の列の間隙を走行して不干渉エリアに配置される。この移動動作の結果、モジュール10の各脚柱12は、対応する基礎2の上方に配置される。
 次いで、予め設定された高さまで各SPMT3の荷台31を降下させ、各脚柱12を対応する基礎2(不干渉基礎21、干渉基礎22)上に載置し、各基礎2と各脚柱12を接続する(図20、図24)。しかる後、荷台31を更に下降させ、モジュール10の底梁11から下方に充分に離して配置し、各SPMT3を、モジュール10の直下域から外側に移動させ、敷地S1から退出させる。
 以上のように、第2実施形態における基礎2の施工方法によれば、SPMT3が通過した後の干渉エリアにて干渉基礎22の施工(下部基礎23への上部基礎24の接続)を実施する。これにより、SPMT3の旋回動作を実施する領域として、干渉エリアを活用できるので搬送路S2や敷地S1の周辺領域が狭小化したとしても、基礎2を施工し、かつモジュール10を搬入できる。
 以下、不干渉基礎21、干渉基礎22の具体的な構成例及びモジュール10の設置について図21~図24を用いて説明する。図21は、上部基礎24施工前におけるSPMT3の干渉エリア通過時の不干渉基礎21及び下部基礎23を示す縦断側面図であり、図16の平面図の状態に対応している。また図21においては干渉基礎22を明示するため、地中、スチールプレート41、保護部材42のみ断面で示し、SPMT3を一点鎖線で示している。図22は、図21における下部基礎23を示す拡大平面図であり、スチールプレート41を破線で示している。
 図21に示すように、不干渉基礎21は、例えば、鋼鉄製であり、杭21aと、杭21aの上端部に溶接などで接続される頭部21bとによって構成されている。杭21aは、不干渉基礎21が形成される位置の地盤内に、例えば鉛直方向下方側に伸びるように埋められている。杭21aの上端部には、頭部21bが接続されている。頭部21bの下端部は、地中にて杭21aに接続されている。
 頭部21bの上端部は、地面より上に突出するように配置される。当該上端部の上面は、支持対象の脚柱12の底面よりも大きく、当該底面を載置して当該脚柱12の下面と接するように平坦になっている。頭部21bの上端部と下端部の間には、下から上に向かうにつれて拡径する複数のリブプレート21dが設けられている。
 次いで干渉基礎22について説明する。既述のように干渉基礎22は、下部基礎23、上部基礎24により構成される。不干渉基礎21と同様に、下部基礎23、上部基礎24は、例えば鋼鉄製である。下部基礎23は、例えば杭22aと、杭22aの上端に例えば溶接された頭部22bとによって構成される。杭22aは、干渉基礎22が形成される位置の地盤に、不干渉基礎21側の杭21aと概ね同じ深さまで例えば鉛直方向に伸びて埋められている。一方、干渉基礎22の杭22a上端部は、不干渉基礎21側の杭21aよりも地中深い位置に配置されている。
 干渉基礎22の杭22aの上端部に接続される頭部22bは、不干渉基礎21側の頭部21bと同様の形状を有している。但し、干渉基礎22側の頭部22bは、地面よりも上に突出して配置されることはなく、その全体が地中に設けられている。頭部22bの上端部には、上部基礎24を載置するための頭部プレート(支持部材)22cと、頭部プレート22cに形成された複数の貫通孔(不図示)と、当該貫通孔に取り付けられ、頭部22bと上部基礎24とを接続するための連結部であるセットボルト22dとが設けられている。取り付けられたセットボルト22dは、例えば平面視円形である頭部プレート22cの周縁部に沿って互いに間隔を開けて複数配置されている。また各セットボルト22dは、側面から見て水平面を成す頭部プレート22cの上面から上方に突出するように設けられている。
 保護部材42は、枠状体44と、枠状体44の内壁面間を繋ぐように配置された梁45と、を備えている。枠状体44、梁45は、上方にモジュール10を積載したSPMT3が通過する際の荷重に耐えられる強度を有する木製の部材により構成されている。これら枠状体44、梁45の各上面は、セットボルト22dの上端よりも上方であって、同一の高さに位置している。
 枠状体44は、例えば平面視において多角形状(図22に示す例では八角形状)に構成されている。そして枠状体44は、例えば地中に配置された干渉基礎22側の頭部22bの上面に、頭部プレート22cの周囲を取り囲むように配置された状態でその外側は地中に埋められている。図22に示す例において梁45は、平面視十字状に交差するように配置されている。そして梁45は、例えば隣り合うセットボルト22dの間隙を通って、頭部プレート22c上に配置される。
 以上のように構成される保護部材42は、上方にモジュール10を積載したSPMT3が通過しても耐えられる強度及び軽量性を備えた木材を使用する。そして保護部材42の上面を含む地面には、モジュール10を搬送するSPMT3の通過時の荷重に耐える厚みを有するスチールプレート41が配置される。
 こうして、保護部材42を用いて下部基礎23の頭部22b及びセットボルト22dを保護し、モジュール10を搬送するSPMT3を通過させた後、施工される上部基礎24の形状及びその施工内容について図23、図24を用いて説明する。図23は、不干渉基礎21及び干渉基礎22を示す縦断側面図であり、図19の平面図の状態に対応している。また図24は、不干渉基礎21及び干渉基礎22を示す縦断側面図であり、図20の平面図の状態に対応している。
 図23に示すように、スチールプレート41及び保護部材42が取り外されて露出した頭部22bに対し、例えばクレーンなどを用い上部基礎24が載置される。例えば上部基礎24は、頭部プレート22c上に取り付けられる台座(スツール)として構成されている。上部基礎24の下端部には、ベースプレート24aが設けられ、ベースプレート24aの下面は、例えば頭部プレート22cの上面と接続可能な、平面視円形の水平面を有している。
 そしてベースプレート24aには、既述のセットボルト22dを貫通させるための不図示の貫通孔が、その周縁部に沿って互いに間隔を開けて複数形成されている。ベースプレート24aを頭部プレート22c上に配置した状態で、貫通孔を貫通している各セットボルト22dをそれぞれナットで締結することにより、上部基礎24は下部基礎23に接続される。
 上部基礎24の上端部は、不干渉基礎21側の頭部21bと同様な形状になっており、支持対象の脚柱12を載置して脚柱12の下面と接するようになっている。下部基礎23に接続された後の上部基礎24の上端部は、地面よりも上方に突出するように配置される。この際、上部基礎24の上端部の高さ位置は、不干渉基礎21側の頭部21bとほぼ同じ高さ位置に配置される。
 下部基礎23への上部基礎24の接続を終えたら、図23、図24の順に示すように、各不干渉基礎21、各干渉基礎22の上方に対応する脚柱12を位置決めした後、SPMT3の荷台31を降下する。これにより、各脚柱12が対応する基礎2(不干渉基礎21、干渉基礎22)上に載置され、その後、脚柱12と基礎2とを接続する。第2実施形態の基礎2の施工方法によれば、狭小な搬送路S2及び敷地S1の周辺領域であっても、基礎2を施工し、かつモジュール10を敷地S1に設置できる。
 ここで図21、図23、図24を用いて説明した不干渉基礎21、干渉基礎22の構造は、あくまで一例を示したものである。従って、干渉基礎22の構造は、既述の第1実施形態の基礎2と同様に構成してもよい。その場合、SPMT3の通過前に下部基礎23を施工し、SPMT3の通過後に上部基礎24を施工する。そして、例示した杭基礎以外に例えば直接基礎、さらには鋼鉄製以外にプレキャストコンクリート等、様々な構成を採用したものでもよく、後に例示する干渉基礎22Mのような構造を採用したものでもよい。
 さらにまた第2実施形態における干渉基礎22は、下部基礎23、上部基礎24による分割構造を採用し、SPMT3の通過前に不干渉基礎21及び下部基礎23を先に施工することで、基礎2の施工を効率化しているが、この構成を採用する場合に限らない。例えば干渉基礎22を、不干渉基礎21と同様な一体構造にしてもよく、この場合、SPMT3の通過後に杭打ちから頭部の接続まで施工してもよい。そして不干渉基礎21についても、干渉基礎22と同様に下部基礎23、上部基礎24によって構成してもよい。また、不干渉基礎21と共に杭打ちのみ行ってその上方をスチールプレート41で保護し、SPMT3の通過後に頭部21bを杭に接続してもよい。
 さらに図21を用いて説明した木製の保護部材42の構造も、あくまで一例を示しており、他の構成を採用してもよい。例えば、梁45は十字形状でなくてもよく、少なくとも1本の板状体が少なくとも1つ配置されていてもよく、平面視における枠状体44の中心上に配置されていなくてもよい。また、後述のコンクリート製の保護部材43のように強度が担保できれば、その上面側にスチールプレート41を配置することは必須の要件ではない。そして保護部材42は、必須の要件では無く、施工された下部基礎23を砂で埋めて、その上部にスチールプレート41を配置してもよい。砂及びスチールプレート41は、SPMT3の通過後に除去することができる。
 SPMT3の待機位置は、敷地S1への進入方向に沿った隣接領域S3(図25A、図25Bを用いて後述する他の隣接領域S4の場合を含む)を例示しているが、これらの例に限られない。例えば、敷地S1の幅方向(図中のY方向)側へずれた側方であってもよい。この場合、側方の待機位置への移動は、待機位置横に位置したSPMT3の車輪の回転軸を例えば90度回転させて行う。
 上記の例においては、上方から見てモジュール10の短辺が搬送路S2の路幅の内側を通過するように搬送しているが、これは必須の要件では無い。例えば、搬送路S2の路幅がSPMT3及びモジュール10が通過するのに充分であれば、モジュール10の底面の長辺が搬送路S2の内側を通過するように搬送してもよい。このように、モジュール10の搬送方向は、搬送路S2の路幅や敷地S1の形状に合わせて適宜、選択することができる。また、モジュール10の底面の形状は、縦横比が異なり、短辺と長辺とを有する場合に限定されず、縦横比が同じ場合もある。これらの場合においても、本開示の基礎2の施工方法を適用することで、モジュール10を敷地S1に容易に搬入できると共に、基礎を施工できる。
 ところで、搬送路S2の路幅などの制約から敷地S1にモジュール10を搬入することが困難である場合は、モジュール10を当初の設計から更に細分割することにより小型化して敷地S1に搬入する必要が生じることがある。この点、本開示の基礎2の施工方法によれば、更なる小型化をせずにモジュール10を搬入できる場合があり、現地でのモジュール10の接続作業の増加を抑制してプラントの現地建造の労力を省力化できる。
 本開示の基礎2の施工方法は、図14を用いて説明した例のように搬送路S2を通過するモジュール10の向きと敷地S1の向きとが異なり、SPMT3を旋回させる領域を確保する必要がある場合に限られない。例えば、単に、SPMT3を直進させる場合であっても、SPMT3が進入する領域に、格子状ではなく不規則に基礎2が配置され、SPMT3と不規則な配置の基礎2との干渉が発生する場合においても、不規則に配置される基礎2の配置領域を干渉エリアに設定して、本開示の基礎2の施工方法を適用することができる。
 以上のような第2実施形態のSPMT3の走行及び上部基礎24の施工手順は、あくまで一例であり、本開示の基礎の施工方法を利用して、様々なSPMT3の走行パターンや基礎2の施工手順が考えられる。以下、その一例である変形例について説明する。
 図25A、図25Bは、基礎2の施工及びSPMT3の走行についての他の手順を示す平面図である。本例においては、図14と比較して搬送路S2に近い位置に敷地S1が配置されているため、干渉エリア(干渉基礎22が配置される領域)の範囲が広くなっている。具体的に全基礎2のうち、SPMT3の進入方向の手前側から見て、最も奥手に4基の不干渉基礎21が互いに間隔を開けてY方向に沿って配置されている領域が不干渉エリアである。残る干渉エリア内には、X方向に沿って並ぶ5基の干渉基礎22の列が、互いに間隔を開けて4列配置されることになる。 
 このように広い干渉エリア内に干渉基礎22を設置する手法の例について説明する。図25Aに示すようにモジュール10を搬送する各SPMT3は、干渉エリアを旋回しながら通過した後、不干渉基礎21の間隙を直進して隣接領域S3を含む待機位置で待機する。この際、図25Aに示すように、SPMT3は、干渉エリアの一部のみを通過している。従って、SPMT3の待機位置には、SPMT3が通過していない一部の干渉エリアと、不干渉エリア、及び隣接領域S3を含んでいる。待機位置でSPMT3を待機させている間に、SPMT3が通過した干渉エリアにそれぞれ上部基礎24を施工する(図25Bの上部基礎24の設置位置を参照)。
 次いで、各SPMT3は、敷地S1への進入を開始した方向(図25Bに併記したX軸の矢印の基端側)に向けて後退し、上部基礎24が設置されていない領域の干渉エリアから退避した状態で待機する。図25A、図25Bに示すように、敷地S1への進入開始位置の手前側にも、SPMT3の一部を待機させるための隣接領域S4が設定されている。従って、SPMT3の待機位置には、上部基礎24が設置された干渉エリア、及び隣接領域S4を含んでいる。
 図25Bに示す待機位置でSPMT3を待機させている間に、SPMT3を退避させた後の干渉エリアにそれぞれ上部基礎24を施工する。全ての基礎2が完成したら、各SPMT3は、敷地S1内のモジュール10配置位置へと移動した後、基礎2上にモジュール10を設置する。
 以上、図15~図25Bを用いて説明した実施形態は、あくまで一例として不干渉基礎21、干渉基礎22の構造や施工の手順を示したものである。よって、これらの実施形態で示したものと異なる構造や施工手順で不干渉基礎21、干渉基礎22を設けてもよい。図26は、他の例の干渉基礎22Mの構成を示す縦断側面図である。図23に示す例と異なり、図26に示す例では干渉基礎22Mを構成する下部基礎23Mは、二本の杭22aと、フーチング22hとを備えている。尚、杭22aは、二本に限定されず、一本以上設けられていればよく、モジュール10を安定して設置できる地盤であれば杭22aを省略することも可能である。
 フーチング22hは、略直方体形状を有する鉄筋コンクリートであり、その内部には、二本の杭22aの上端部が挿入されている。フーチング22hは、その上端における中央部から上方に伸びるようにペデスタル22fが形成されている。ペデスタル22fは、内部に上下方向に伸びる複数のアンカーボルト22eが設けられ、上面部に頭部プレート22cが設けられている。頭部プレート22cの上面には、各アンカーボルト22eの上端部が上方に突出して設けられている。本例においては、各干渉基礎22に対して各々フーチング22hを設ける独立基礎にしているが、この例に限らず、例えば全ての干渉基礎22に共通のフーチング22hを設ける布基礎にしてもよい。
 次いで、図21、図22を用いて説明した木製の保護部材42に換えてコンクリート製の保護部材43を設けてフーチング22hのアンカーボルト22eを保護する場合について説明する。図27、図28は、保護部材43の形成手順を示す縦断側面図である。図27に示すように、フーチング22hの上面部周辺の土を除去して当該上面部を露出させる。フーチング22hの上面部には、アンカーボルト22e及び上部基礎24を位置決めする為の位置決め凸部22iが設けられている。
 先ず、アンカーボルト22e及び位置決め凸部22iのそれぞれに保護キャップ47を被せ、その周辺を囲うように木枠48を配置する。次いで図28に示すように、木枠48の内部にコンクリートを打設すると共に、撤去時に吊り上げるための持ち手49を当該コンクリートに配置する。コンクリートが固化することで、保護部材43が形成される。保護部材43は、木製の保護部材42よりも重いため、撤去の際は重機を用いる。
 さらに他の保護部材43Mの形成手順について図29を用いて説明する。保護部材43Mは、木枠48を用いずに、フーチング22hの上面部、詳細には保護キャップ47の上からフーチング22h周辺の地面に亘る領域を例えばブルーシート48Mで覆う。そして、覆ったブルーシート48Mの上にコンクリートを打設することで、保護部材43Mを形成してもよい。
 ここで保護部材43の撤去や上部基礎24の搬入の際には、重機を用いずに、例えばモジュール10を搬送するSPMT3を用いてもよい。図30(a)~(c)、図31(a)~(c)は、上部基礎24の他の施工手順を示す縦断側面図である。図30(a)においては、スチールプレート41の図示を省略している。
 図30(a)に示すように、SPMT3の例えば荷台31には、複数の吊り降ろし機構が取り付けられている。複数の吊り降ろし機構は、例えばSPMT3の列の後尾側に配置され、保護部材43を搬出するためのフック32と、上部基礎24を吊り下げて搬送するための不図示のジャッキ式吊り降ろし機構(以後、ジャッキという)とを含む。フック32は、上部基礎24よりもSPMT3の列の後尾側に配置されている。
 図30(a)、(b)に示すように、待機位置に向けて進行するSPMT3の列は、例えばその後尾側が、上部基礎24の施工対象の下部基礎23上にある状態で停止する。そしてジャッキによりスチールプレート41を撤去した後、保護部材43の上方にフック32を位置させる。次いで図30(c)に示すように、フック32に引っかけたロープの端部を保護部材43の持ち手49(図28等)に結びつけ、保護部材43を吊り上げて下部基礎23から撤去する。
 次いで図31(a)、(b)に示すように、保護部材43及び上部基礎24を吊り下げたSPMT3を、待機位置とは反対方向へ向けて僅かに移動し、上部基礎24を下部基礎23の上方に配置させた後、SPMT3を降下させ、下部基礎23に上部基礎24を接続する。しかる後、図31(c)に示すように、全ての干渉基礎22を完成させたら、対応する基礎2の上方に脚柱12が配置されるように、各SPMT3を移動させ、モジュール10を設置する。その後、SPMT3は、保護部材43を吊り下げたまま敷地S1から退出させることで、保護部材43も搬出される。
 ここで図21、図23等を用いて説明した第2実施形態では平坦な敷地S1に基礎2を設けた例を示した。しかしながらこれらの場合に限らず、例えば傾斜面が形成された敷地S1においてもモジュール10を設置できる。図32は、傾斜面を有する敷地S1に干渉基礎22Mを設けた例を示す縦断側面図である。干渉基礎22は、敷地S1においてモジュール10を水平に支持するため、脚柱12の下端を、ほぼ同一の高さにて支持する。
 このため、下部基礎23Mと接続される各上部基礎24については、下部基礎23Mの上端の高さに応じて異なる長さのものを用意する。即ち、傾斜面の下部側に配置される下部基礎23Mに対しては、長い上部基礎24を接続し、傾斜面の上部側に配置される下部基礎23Mに対しては、短い上部基礎24を接続する。
 この例によれば、上部基礎24の上端部が予め設定された高さに配置されることで、傾斜面が形成された敷地S1においても水平にモジュール10を設置することができる。
2、2m       基礎
3          SPMT
10         モジュール
11         底梁
12         脚柱
12a        ウエブ
12b        フランジ
12c        円形鋼管
13         ベースプレート
13a        取付孔
13b        ヘビーナット
14         接続部
14a        端部板
14b        交差板
21         不干渉基礎
21a、22a    杭
21b、22b    頭部
21d        リブプレート
22、22M     干渉基礎
22c        頭部プレート
22d        セットボルト
22e        アンカーボルト
22f        ペデスタル
22h        フーチング
22i        凸部
23、23M     下部基礎
24         上部基礎
24a        ベースプレート
25a        アンカーボルト
25b        フーチング
25c        キー溝
25d        スロープ部
26a        高さ調整部材
26b        固定部材
26c        座金
26d        セットボルト
26e        座金
26e1~26e3  座金
31         荷台
32         フック
41         スチールプレート
42、43、43M  保護部材
44         枠状体
45         梁
47         保護キャップ
48         木枠
48M        ブルーシート
49         持ち手
51         ベースプレート
51a        シアキー
51b        取付孔
52         上部プレート
52a        取付孔
53、53A     中間部
54         主板
55         側板
100        プラント
S1         敷地
S2         搬送路
S3、S4      隣接領域
SS         方形領域

 

Claims (20)

  1.  複数の支柱で支持される架構構造のプラントモジュールの設置方法であって、
     前記プラントモジュールが設置される敷地に、前記複数の支柱に対応する位置に複数の下部基礎を互いに離間して固定する工程と、
     前記複数の下部基礎上に、各々、前記支柱を支持するための上部基礎を固定する工程と、
     前記上部基礎上に前記支柱を載置する工程と、
     前記上部基礎に対する前記支柱の移動を拘束するように、前記上部基礎上で前記支柱を拘束支持する工程と、
    を備えるプラントモジュールの設置方法。
  2.  前記下部基礎と前記上部基礎、及び前記上部基礎と前記支柱とは、締結部材を用いて互いに締結される、請求項1に記載のプラントモジュールの設置方法。
  3.  前記上部基礎と前記支柱とを締結する前記締結部材は、前記支柱の部材断面に外接する方形の内側に配置される、請求項2に記載のプラントモジュールの設置方法。
  4.  前記下部基礎と前記上部基礎とを締結する前記締結部材は、前記支柱の部材断面に外接する方形の外側に配置される、請求項3に記載のプラントモジュールの設置方法。
  5.  請求項1に記載の設置方法により設置されるプラントモジュールの基礎の施工方法であって、
     複数の前記基礎が設けられる前記敷地にて、前記プラントモジュールを積載した台車が予め設定された移動経路に沿って前記敷地を移動する際に、当該台車と干渉する位置に前記複数の基礎の一部が配置される場合に、
     前記敷地を移動する前記台車とは干渉しない前記基礎が設けられる不干渉エリアの前記基礎を施工する工程と、
     次いで、前記移動経路に沿って、前記台車を前記敷地に進入させ、前記敷地を含む予め設定された待機位置にて待機させる工程と、
     その後、前記台車と干渉する前記基礎が設けられる干渉エリアの前記基礎を施工する工程と、
    を有する基礎の施工方法。
  6.  前記不干渉エリアは、前記敷地への進入時の前記台車の進行方向に沿って見て、前記干渉エリアよりも前記移動経路の前方側に位置し、
     前記台車を前記敷地に進入させる際、前記台車は前記干渉エリアの少なくとも一部を通過して、前記待機位置にて待機する、請求項5に記載の基礎の施工方法。
  7.  前記台車は前記干渉エリア全体を通過して、前記干渉エリアを含まない領域に設定された前記待機位置にて待機する、請求項6に記載の基礎の施工方法。
  8.  前記台車は、前記干渉エリアの一部を通過して、当該一部以外の前記干渉エリアを含む領域に設定された前記待機位置にて待機し、
     前記干渉エリアに設けられる基礎を施工する工程では、前記一部の干渉エリアに基礎を施工する工程と、次いで、前記一部の干渉エリア側に前記台車を移動させ、前記待機位置の前記干渉エリアに前記基礎を施工する工程とを有する、請求項6に記載の基礎の施工方法。
  9.  前記台車を前記敷地に進入させる前に、前記干渉エリアの前記敷地地下に前記下部基礎を施工する工程を、有し、
     前記基礎を施工する工程では、前記下部基礎の上に前記上部基礎を取り付ける、請求項5に記載の基礎の施工方法。
  10.  前記上部基礎は、前記プラントモジュールと共に前記台車で搬入される、請求項9に記載の基礎の施工方法。
  11.  前記台車は、前記干渉エリアの一部を通過して、当該台車により搬入した前記上部基礎が前記下部基礎の上方に位置するように設定された前記待機位置にて待機し、
     前記基礎を施工する工程では、前記台車から前記上部基礎を下ろして前記下部基礎に取り付ける、請求項10に記載の基礎の施工方法。
  12.  前記下部基礎を施工した後、前記台車が前記下部基礎の上方側を通過する際に、当該下部基礎を保護するための保護部材を、前記下部基礎上に配置する工程を、有する、請求項9に記載の基礎の施工方法。
  13.  前記保護部材は、木製であって、前記下部基礎と前記上部基礎とを接続するために前記下部基礎側に設けられた連結部の周囲を囲むように配置される枠状体と、当該枠状体の内壁面間を繋ぐ梁と、を含む、請求項12に記載の基礎の施工方法。
  14. 前記下部基礎は、前記上部基礎を支持するための支持部材を有し、
     前記連結部は、前記支持部材の周縁部に沿って互いに間隔を開けて配置され、前記支持部材の上面よりも上方側に突出するように設けられた複数のボルトであり、
     前記梁は、隣り合う前記ボルトの間を通して配置される、請求項13に記載の基礎の施工方法。
  15.  前記保護部材は、前記連結部を覆うように設置した保護キャップと、当該保護キャップ上に打設されたコンクリート蓋と、を含む、請求項12に記載の基礎の施工方法。
  16.  前記上部基礎を前記下部基礎に取り付ける前に、前記台車が通過する際に前記台車側に設けられた吊り上げ機構によって前記保護部材を取り外し、前記台車により搬送する工程を有する、請求項12に記載の基礎の施工方法。
  17.  請求項5に記載の前記干渉エリアの基礎を施工した後、前記台車を移動させて前記複数の基礎の上方に前記プラントモジュールを配置する工程と、
     次いで、前記台車に設けられた荷台の昇降機構により、前記プラントモジュールを降下させて、当該プラントモジュールを前記複数の基礎に設置する工程と、
    を有するプラントモジュールの設置方法。
  18.  複数の支柱で支持される架構構造のプラントモジュールを載置するための複数のモジュール基礎であって、
     前記複数のモジュール基礎は、前記プラントモジュールが設置される敷地に、前記複数の支柱に対応する位置に互いに離間して設けられ、
     前記複数のモジュール基礎は、各々、前記敷地に固定される下部基礎と、前記下部基礎上に設けられると共に、前記支柱が載置される上部基礎と、を備えるモジュール基礎。
  19.  前記下部基礎と前記上部基礎、及び前記上部基礎と前記支柱とは、締結部材を用いて互いに締結され、
     前記上部基礎と前記支柱とを締結する前記締結部材は、前記支柱の部材断面に外接する方形の内側に配置される、請求項18に記載のモジュール基礎。
  20.  前記下部基礎と前記上部基礎とを締結する前記締結部材は、前記支柱の部材断面に外接する方形の外側に配置される、請求項19に記載のモジュール基礎。
PCT/JP2025/011156 2024-03-26 2025-03-21 プラントモジュールの設置方法、基礎の施工方法及びモジュール基礎 Pending WO2025205477A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JPPCT/JP2024/012040 2024-03-26
PCT/JP2024/012040 WO2025203249A1 (ja) 2024-03-26 2024-03-26 基礎の施工方法、モジュールの設置方法、プラントモジュールの基礎及び保護部材

Publications (1)

Publication Number Publication Date
WO2025205477A1 true WO2025205477A1 (ja) 2025-10-02

Family

ID=97216991

Family Applications (2)

Application Number Title Priority Date Filing Date
PCT/JP2024/012040 Pending WO2025203249A1 (ja) 2024-03-26 2024-03-26 基礎の施工方法、モジュールの設置方法、プラントモジュールの基礎及び保護部材
PCT/JP2025/011156 Pending WO2025205477A1 (ja) 2024-03-26 2025-03-21 プラントモジュールの設置方法、基礎の施工方法及びモジュール基礎

Family Applications Before (1)

Application Number Title Priority Date Filing Date
PCT/JP2024/012040 Pending WO2025203249A1 (ja) 2024-03-26 2024-03-26 基礎の施工方法、モジュールの設置方法、プラントモジュールの基礎及び保護部材

Country Status (1)

Country Link
WO (2) WO2025203249A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004116285A (ja) * 2003-10-23 2004-04-15 Jgc Corp 架構構造物
JP2005282142A (ja) * 2004-03-30 2005-10-13 Daiwa House Ind Co Ltd 鉄骨柱と鋼管杭のジョイント構造
JP2009138363A (ja) * 2007-12-04 2009-06-25 Tasada Kosakusho:Kk 柱状部材接合用ジョイント
JP2018168568A (ja) * 2017-03-29 2018-11-01 千代田化工建設株式会社 プラントの建設方法
JP2019027037A (ja) * 2017-07-26 2019-02-21 新日鐵住金株式会社 基礎構造、鋼管杭の杭頭構造、及び基礎構造の施工方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6532256B2 (ja) * 2015-03-25 2019-06-19 株式会社宝機材 側溝蓋、及び当該側溝蓋を備えた路面構造

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004116285A (ja) * 2003-10-23 2004-04-15 Jgc Corp 架構構造物
JP2005282142A (ja) * 2004-03-30 2005-10-13 Daiwa House Ind Co Ltd 鉄骨柱と鋼管杭のジョイント構造
JP2009138363A (ja) * 2007-12-04 2009-06-25 Tasada Kosakusho:Kk 柱状部材接合用ジョイント
JP2018168568A (ja) * 2017-03-29 2018-11-01 千代田化工建設株式会社 プラントの建設方法
JP2019027037A (ja) * 2017-07-26 2019-02-21 新日鐵住金株式会社 基礎構造、鋼管杭の杭頭構造、及び基礎構造の施工方法

Also Published As

Publication number Publication date
WO2025203249A1 (ja) 2025-10-02

Similar Documents

Publication Publication Date Title
EP2064393B1 (en) Partially prefabricated modular foundation system
CN105283628A (zh) 线缆管架
JP2009243046A (ja) 基礎用ブロック体
JP5221191B2 (ja) 建屋の基礎構造および建屋の施工方法
KR100856723B1 (ko) 캔틸레버형 지지거더를 이용한 철골조 역타설 시스템 및방법
US5119598A (en) Method of construction of top slab for a nuclear containment building
WO2025205477A1 (ja) プラントモジュールの設置方法、基礎の施工方法及びモジュール基礎
US20090120020A1 (en) Composite integrated module
JP6842296B2 (ja) 基礎構造体
CN118563822A (zh) 高桩梁板结构及施工方法
US5305574A (en) Method for erection of absorber towers using jacking system
JP7832415B2 (ja) 設備取付モジュール化ユニット
JP7851098B2 (ja) 構造物、及び構造物の施工方法
JP7738149B1 (ja) 設置台システム、移動方法及びシステム
JP7773912B2 (ja) 鉄筋コンクリート柱と仕口部鉄骨梁との接合構造及び接合方法
TWI835660B (zh) 建築結構及建築結構頂層之鋼桁架之安裝結構
JP2020066910A (ja) ピット構造及びそれの構築方法
JPS596495A (ja) タ−ビン支持架台
JP7510328B2 (ja) 建築方法
JP2009002035A (ja) 折畳み可能な構台およびその組立て方法
JP2008057139A (ja) 杭と上部構造物の接造構造
JP5322506B2 (ja) 重量物の運搬システムおよび運搬方法
JPH0429178Y2 (ja)
WO2025173279A1 (ja) 壁体の構築方法および壁体
JP6721469B2 (ja) 配管設備の設置方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 25779450

Country of ref document: EP

Kind code of ref document: A1