WO2025009185A1 - 建築図面作成支援システム - Google Patents
建築図面作成支援システム Download PDFInfo
- Publication number
- WO2025009185A1 WO2025009185A1 PCT/JP2023/032277 JP2023032277W WO2025009185A1 WO 2025009185 A1 WO2025009185 A1 WO 2025009185A1 JP 2023032277 W JP2023032277 W JP 2023032277W WO 2025009185 A1 WO2025009185 A1 WO 2025009185A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- elements
- edit
- element information
- information
- changed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/27—Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/60—Software deployment
- G06F8/65—Updates
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/445—Program loading or initiating
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/451—Execution arrangements for user interfaces
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T13/00—Animation
Definitions
- the present invention relates to a system that supports the creation of architectural drawings, and in particular to an architectural drawing creation support system that is suitable for adapting editable elements in architectural drawings to the specifications of a finishing table.
- Patent Document 1 includes a table storage unit that extracts legal judgment elements related to numerical values from laws and regulations and stores a legal judgment table composed of the legal judgment elements for each law; an assignment element extraction unit that uses AI to extract assignment elements containing numerical values that can be substituted for the legal judgment elements from the initial layout data; an appropriateness judgment unit that assigns the assignment elements extracted by the assignment element extraction unit to the legal judgment table stored in the table storage unit and judges it to be appropriate if it satisfies the conditions in the legal judgment table and judges it to be inappropriate if it does not; and an judgment result creation unit that records the judgment results made by the appropriateness judgment unit and creates a floor plan judgment document including the judgment results.
- a table storage unit that extracts legal judgment elements related to numerical values from laws and regulations and stores a legal judgment table composed of the legal judgment elements for each law
- an assignment element extraction unit that uses AI to extract assignment elements containing numerical values that can be substituted for the legal judgment elements from the initial layout data
- an appropriateness judgment unit that assigns the assignment elements extracted by the assignment element
- plans and detailed floor plans are created based on the finish table, but the dimensions and other specifications listed on the plans must match those listed on the finish table. Also, the tags listed on the detailed floor plans must match those listed on the finish table. Since the designer performs these tasks while checking the finish table, mistakes are likely to occur.
- Patent Document 1 can determine whether editable elements in architectural drawings comply with architectural laws, it cannot make the editable elements conform to the specifications of a finishing table.
- the present invention was made with a focus on these unresolved issues in the conventional technology, and aims to provide an architectural drawing creation support system that is suitable for adapting editable elements in an architectural drawing to the specifications of a finishing table.
- the architectural drawing creation support system of invention 1 comprises an element information acquisition means for acquiring finishing element information on finishing elements described in a finishing schedule and editing element information on editable editing elements in an architectural drawing, and an estimation means for estimating the matching element information from the finishing element information and editing element information acquired by the element information acquisition means, using a trained model that has been trained based on information on the finishing elements described in the finishing schedule and matching element information on matching elements described in the architectural drawing that match the specifications of the finishing elements.
- the finishing element information can be configured, for example, as information for identifying the finishing element (for example, a name, a number, an ID, a code, link information such as a URL). Also, the finishing element information can be configured, for example, as letters, numbers, figures, codes, symbols, images, sounds, and other information. Also, the finishing element information can be configured as keywords relating to the finishing element (for example, one or more keywords indicating part of the name of the finishing element). The same applies to other element information below.
- the element information acquisition means may, for example, input element information from an input device or the like, acquire or receive element information from an external terminal or the like, read element information from a storage device or storage medium or the like, or generate or calculate element information by information processing or the like. Therefore, acquisition includes at least input, acquisition, reception, reading (including search), generation and calculation. The same concept of acquisition applies below.
- this system may be realized as a single device, terminal, or other equipment, or may be realized as a network system in which multiple devices, terminals, or other equipment are communicatively connected.
- each component may belong to any one of the multiple devices, etc., as long as they are communicatively connected to each other.
- the architectural drawing creation support system of Invention 2 further includes an output means for outputting information about edited elements related to edited element information acquired by the element information acquisition means based on the matching element information estimated by the estimation means in the architectural drawing creation support system of Invention 1.
- the architectural drawing creation support system of invention 3 is an architectural drawing creation support system of either invention 1 or 2, in which the trained model has been trained based on information on the finishing elements described in the finishing table and on matching element information on matching elements and their contents described in the architectural drawing that match the specifications of the finishing elements, and is equipped with a modification means for modifying an edited element related to the edited element information acquired by the element information acquisition means based on the matching element information estimated by the estimation means.
- the architectural drawing creation support system of Invention 4 further includes an element information acquisition means for acquiring changed element information relating to an edit element that has been changed among editable edit elements in an architectural drawing, and an estimation means for estimating the related element information from the changed element information acquired by the element information acquisition means, using a trained model that has been trained based on information relating to the editable edit elements in the architectural drawing and related element information relating to other edit elements that should be changed or have been changed in conjunction with the change to the edit element.
- the architectural drawing creation support system of invention 5 further includes an output means for outputting information about other edit elements related to the related element information based on the related element information estimated by the estimation means in the architectural drawing creation support system of invention 4.
- the architectural drawing creation support system of invention 6 is the architectural drawing creation support system of either invention 4 or 5, in which the trained model has been trained based on information on editable editing elements in architectural drawings, and related element information on other editing elements that should be changed or have been changed in conjunction with a change to the edit element and their contents, and is equipped with a modification means for modifying other editing elements related to the related element information based on the related element information estimated by the estimation means.
- the architectural drawing creation support system of invention 7 further comprises an element information acquisition means for acquiring changed element information on edit elements that have been changed among editable edit elements in an architectural drawing, and an estimation means for estimating the judgment necessity information from the changed element information acquired by the element information acquisition means, using a trained model that has been trained based on information on the editable edit elements in the architectural drawing and judgment necessity information on whether a human judgment is required to change other edit elements that should be changed or have been changed due to the change in the edit element.
- the architectural drawing creation support system of invention 8 further includes an output means for outputting information on whether or not a change to another editing element related to the judgment necessity information is required, based on the judgment necessity information estimated by the estimation means, in the architectural drawing creation support system of invention 7.
- the architectural drawing creation support system of invention 9 further comprises an element information acquisition means for acquiring changed element information relating to an edit element that has been changed among editable edit elements in an architectural drawing, and an estimation means for estimating the related element information and the judgment necessity information from the changed element information acquired by the element information acquisition means, using a trained model that has been trained based on information on the editable edit elements in the architectural drawing, related element information relating to other edit elements that should be changed or have been changed due to the change in the edit element and their contents, and judgment necessity information relating to whether or not a human judgment is required to change the other edit elements.
- the architectural drawing creation support system of invention 10 is the architectural drawing creation support system of invention 9, and when it is determined that a human judgment is required to change another edit element related to the related element information based on the judgment necessity information estimated by the estimation means, the system includes an output means for outputting information about the other edit element based on the related element information estimated by the estimation means.
- the architectural drawing creation support system of invention 11 is the architectural drawing creation support system of either invention 9 or 10, and when it is determined that no human judgment is required to change other edit elements related to the related element information based on the judgment necessity information estimated by the estimation means, the architectural drawing creation support system of invention 11 is provided with a modification means for modifying the other edit elements based on the related element information estimated by the estimation means.
- the architectural drawing creation support system of Invention 1 estimates compatible element information regarding compatible elements that correspond to the finishing elements listed in the finishing table, so it is expected that the edited elements will be adapted to the specifications of the finishing table.
- judgment necessity information is estimated as to whether or not a human judgment is required to change other edit elements related to the edit element that has been changed, so it is possible to know whether or not a human should change the other edit elements that need to be changed.
- FIG. 1 is a diagram illustrating a hardware configuration of a drawing creation support device 100.
- FIG. 13 is a diagram showing the structure of finishing list data.
- FIG. 1 is a diagram showing the structure of CAD data of a plan view.
- FIG. 13 is a diagram showing the structure of CAD data of a detailed plan view.
- Wall type diagram. 13 is a flowchart showing a trained model generation process.
- FIG. 1 is a block diagram showing the process of generating and using a trained model. 13 is a flowchart showing a matching element estimation process. This is a plan view before changing the editing element.
- FIG. 11 is a plan view after changing the editing element.
- FIG. 13 is a plan view detail before changing the editing element.
- FIG. 13 is a plan view detail after changing the editing element.
- FIG. 13 is a plan view detail after changing the editing element.
- FIG. 1 is a block diagram showing the process of generating and using a trained model. 13 is a flowchart showing a related element estimation process.
- FIG. 1 is a block diagram showing the process of generating and using a trained model. 13 is a flowchart showing a related element estimation process.
- FIG. 1 is a diagram showing a hardware configuration of a drawing creation support device 100. As shown in FIG. 1
- the drawing creation support device 100 is composed of a CPU (Central Processing Unit) 30 that controls calculations and the entire system based on a control program, a ROM (Read Only Memory) 32 in which the control program etc. of the CPU 30 is stored in advance in a specified area, a RAM (Random Access Memory) 34 for storing data read from the ROM 32 etc. and calculation results required in the calculation process of the CPU 30, and an I/F (InterFace) 38 that mediates the input and output of data to external devices.
- a bus 39 which is a signal line for transferring data.
- an input device 40 consisting of a keyboard, mouse, etc. that can input data as a human interface
- a storage device 42 that stores data, tables, etc. as files
- a display device 44 that displays a screen based on an image signal.
- the storage device 42 has installed therein CAD (Computer Aided Design) software and BIM (Building Information Modeling) software (hereinafter collectively referred to as "CAD software").
- CAD software is software that assists in the creation of drawings in response to user operations.
- the CPU 30 starts a CAD program stored in a specified area of the ROM 32 and executes processing according to the program.
- a designer can start the CAD software to create plan drawings, detailed floor plans, and other architectural drawings.
- FIG. 2 is a diagram showing the structure of finishing list data.
- the storage device 42 stores finishing table data relating to finishing tables.
- the finishing table is a table that summarizes the finishes of each part of a building. There is an exterior finishing table that shows the finishes of the roof and exterior walls, and an interior finishing table that shows the finishes of the walls, floors, ceilings, etc. of each room.
- the finishing table data one row is registered for each finishing element.
- the finishing element "internal corridor", "tile carpet (A), border” is registered as the floor finish
- "vinyl cloth (A)” is registered as the wall finish
- “vinyl cloth (A)” is registered as the ceiling finish.
- FIG. 3 is a diagram showing the structure of CAD data of a plan view.
- the storage device 42 stores CAD data and BIM data of plan views (hereinafter collectively referred to as "CAD data").
- a rectangular plan is a detailed drawing of the cross section of a building.
- CAD data for a rectangular plan is created by a designer using CAD software.
- a designer creates a rectangular plan in the CAD software by adding, editing, or deleting editable elements in the rectangular plan.
- the edit elements of the floor, wall, and ceiling of the area labeled "internal corridor" are arranged, as are the edit elements of the floor, wall, and ceiling of the area labeled "windbreak room.” These correspond to the finishing elements in the third and ninth rows of the finishing table data in Figure 2.
- Corresponding finishing elements and editing elements may be associated by setting the same ID within the finishing table data and the CAD data.
- FIG. 4 is a diagram showing the structure of CAD data of a detailed plan view.
- FIG. 5 is a diagram showing wall types.
- the storage device 42 stores CAD data of detailed plan views, as shown in FIG.
- a detailed plan drawing is a drawing that draws the plan of a building in detail.
- CAD data of the detailed plan drawing is created by a designer using CAD software.
- the designer creates the detailed plan drawing by adding, editing, or deleting editable editing elements in the detailed plan drawing in the CAD software.
- a tag is placed for the editing element of the wall so that the wall type can be identified.
- the tag is a three- or four-digit alphanumeric character surrounded by a square or ellipse, and the designer sets the value by referring to the wall type diagram in FIG. 5.
- FIG. 5 In the example of FIG.
- the tag "L4DA” is placed in the area displayed as "LD”
- the tag "L4JA” is placed in the area displayed as "Bathroom/Dressing Room”.
- the storage device 42 stores CAD data of other architectural drawings, and data of trained models.
- the trained models are trained based on information about the finishing elements listed in the finishing schedule and information about compatible elements listed in the architectural drawings that fit the specifications of those finishing elements.
- the finishing schedule data and CAD data for plan drawings, detailed floor plans, and other architectural drawings are used for AI training, so the storage device 42 stores a large amount of data that was created in the past.
- This CAD data is in which each editing element in the architectural drawings fits the specifications of the finishing schedule data, and serves as training data for the AI training.
- FIG. 6 is a flowchart showing the trained model generation process.
- FIG. 7 is a block diagram showing the process of generating and using a trained model.
- the trained model generation process is a process executed to generate a trained model, and when executed by the CPU 30, the process proceeds to step S100 to execute a finishing table data analysis process, as shown in Fig. 6.
- the finishing table data analysis process the finishing table data is read from the storage device 42, and information on the finishing elements is extracted from the read finishing table data.
- step S102 a CAD data analysis process is executed.
- CAD data analysis process CAD data of the plan, detailed floor plan, and other architectural drawings is read from the storage device 42, and information regarding the editing elements is extracted from the read CAD data.
- step S104 a training dataset is generated based on the information extracted in steps S100 and S102, and the process proceeds to step S106, where the generated training dataset is input to a training program and a trained model is generated by the training program.
- the training program includes pre-learning parameters and hyperparameters, and performs training based on the input training dataset and hyperparameters to update the pre-learning parameters.
- the trained model is then output as the training result.
- the trained model includes trained parameters in which pre-trained parameters have been updated by training, and an inference program.
- the inference program inputs finishing table data and edit elements, and based on the trained parameters, estimates the finishing elements of the finishing table data and the matching elements corresponding to the edit elements (edit elements that match the specifications of the finishing elements) from the input finishing table data and edit elements, and outputs the estimated matching elements.
- the input to the inference program is not limited to the finishing table data itself, and may be made by extracting finishing elements of the finishing table data that correspond to the input edit elements, as long as the correspondence can be specified by ID or the like.
- the relationship between the input edit elements and the matching elements is determined by AI training, and therefore, although it shows a similar tendency to the contents of past finishing table data and CAD data, there is ambiguity in that they do not necessarily match exactly. However, this ambiguity can be reduced by the amount of training data and the training accuracy.
- FIG. 8 is a flowchart showing the matching element estimation process.
- the matching element estimation process is executed in response to a request from a user, and when executed by the CPU 30, the process first proceeds to step S150 as shown in Fig. 8.
- step S150 the CAD software determines whether or not any of the editable elements in the architectural drawing has been designated by a user operation, and if it is determined that an edit element has been designated (YES), the process proceeds to step S152.
- step S152 the finishing table data corresponding to the CAD data currently being edited is read from the memory device 42, the edit elements specified in step S150 are obtained, and the process proceeds to step S154, where the trained model in the memory device 42 is used to estimate matching elements from the read finishing table data and the obtained edit elements.
- the estimation is performed by inputting the finishing table data and edit elements into the trained model and obtaining the matching elements output from the trained model.
- step S156 it is determined whether the edited element specified in step S150 and the matching element estimated in step S154 are inconsistent in terms of identification or content. If it is determined that they are inconsistent (YES), the process proceeds to step S158, where a message is displayed on the display device 44 indicating that there is a defect in the edited element, and the process ends.
- step S156 if it is determined in step S156 that the edit element and the matching element do not mismatch (NO), or if it is determined in step S150 that an edit element is not specified (NO), the process ends.
- FIG. 9 is a plan view before the editing elements are changed.
- FIG. 10 is a plan view after the editing element has been changed.
- edit element 400 for the floor of the area marked "internal corridor" in the plan of FIG. 9.
- edit element 400 is set as "vinyl floor tile (C),” whereas the corresponding specification element (third line) in the finishing schedule data of FIG. 2 is "tile carpet (A), bordered.” Therefore, when the finishing schedule data of FIG. 2 and edit element 400 are input into the trained model, the matching element "tile carpet (A), bordered” is estimated, and a message 402 is displayed indicating that there is a defect in edit element 400. Following the message 402, the designer changes edit element 400 to "tile carpet (A), bordered," as shown in FIG. 10.
- edit element 404 for the wall of the area marked "internal corridor" in the plan of FIG. 9.
- edit element 404 is set to "vinyl cross (B)," whereas the corresponding specification element (third line) in the finishing schedule data of FIG. 2 is “vinyl cross (A).” Therefore, when the finishing schedule data of FIG. 2 and edit element 404 are input into the trained model, the matching element "vinyl cross (A)" is estimated, and a message 406 is displayed indicating that there is a defect in edit element 404. The designer follows the message 406 and changes edit element 404 to "vinyl cross (A)," as shown in FIG. 10.
- edit element 408 for the ceiling of the area marked "internal corridor" in the plan of FIG. 9.
- edit element 408 is set as “vinyl cloth (B),” whereas the corresponding specification element (third line) in the finishing schedule data of FIG. 2 is “vinyl cloth (A).” Therefore, when the finishing schedule data of FIG. 2 and edit element 408 are input into the trained model, the matching element "vinyl cloth (A)” is estimated, and a message 406 is displayed indicating that there is a defect in edit element 408. The designer follows the message 406 and changes edit element 408 to "vinyl cloth (A)," as shown in FIG. 10.
- the designer specifies the ceiling height (edit element) 410 of the ceiling in the area marked "Windbreak" in the plan of Figure 9. Since the ceiling height 410 also does not conform to the specifications of the finishing schedule data in Figure 2, a message 412 is displayed indicating that there is a defect in the ceiling height 410. Following the message 412, the designer changes the ceiling height 410 to 2450 [mm], as shown in Figure 10.
- the designer specifies the effective dimension 414 of the area marked "shared corridor" in the plan of FIG. 9 in the CAD software. Since the effective dimension 414 does not comply with building-related laws and regulations, a message 416 is displayed indicating that the effective dimension 414 is incomplete. Whether or not it complies with building-related laws and regulations can be determined, for example, by the technology of Patent Document 1.
- the effective dimension 414 can be changed by adjusting the position of the right wall or the left wall, but since it is difficult for AI to determine which should be prioritized, such editing elements 414 are editing elements that require human judgment to change, and are not changed automatically by AI, but are left to the designer's judgment and the designer changes the position of the right or left wall.
- FIG. 11 is a detailed plan view before the editing element is changed.
- FIG. 12 is a plan view detail after the editing element has been changed.
- the designer specifies the tag (edit element) 420 of the area displayed as "Bathroom/Dressing Room” in the detailed floor plan of FIG. 11.
- the tag 420 is set as “L4JB”
- the designer specifies the wall tag 424 of the area displayed as "LD” in the detailed plan view of FIG. 11.
- the tag 424 is set as "L4LA”
- the corresponding specification element (line 13) in the finishing table data of FIG. 2 is "L4"
- "GBt12.5 * Surface base is waterproof GB”
- finishing schedule data and edited elements are acquired, and a trained model is used to estimate suitable elements from the acquired finishing schedule data and edited elements, which has been trained based on information about the finishing elements listed in the finishing schedule and information about suitable elements listed in the architectural drawings that match the specifications of the finishing elements. If there is a mismatch between the acquired edited elements and the estimated suitable elements, a message is displayed indicating that there is a defect in the edited elements.
- step S152 corresponds to the element information acquisition means of the first or second invention
- step S154 corresponds to the estimation means of the first or second invention
- step S158 corresponds to the output means of the second invention.
- This embodiment differs from the first embodiment in that it displays other edit elements that should be changed when an edit element is changed.
- other edit elements may no longer conform to the specifications of the finishing table.
- the ceiling height 410 in FIG. 9 is changed, it becomes necessary to change the height of the space above the ceiling, etc.
- the other edit elements that should be changed when an edit element is changed are displayed, thereby aiming to support the designer in making changes to the other edit elements that should be changed as well.
- the memory device 42 stores CAD data for plan views, detailed floor plans, and other architectural drawings, including CAD data before an editing element is changed (hereinafter referred to as "CAD data before change”) and CAD data after an editing element is changed (hereinafter referred to as "CAD data after change").
- CAD data before change CAD data before an editing element is changed
- CAD data after change CAD data after an editing element is changed
- the storage device 42 stores data of the trained model.
- the trained model is trained based on information about editable elements in architectural drawings and information about other editable elements that have been changed as a result of changing those editable elements.
- the pre-change CAD data and post-change CAD data are used for training the AI, so the storage device 42 stores a large amount of data that has been created in the past.
- FIG. 13 is a block diagram showing the process of generating and using a trained model.
- the trained model generation process is a process executed to generate a trained model, and when executed by the CPU 30, the pre-change CAD data and the post-change CAD data are read from the storage device 42, and information regarding the edited elements is extracted from the read CAD data.
- a learning dataset is generated based on the extracted information, the generated learning dataset is input to a learning program, and a trained model is generated by the learning program.
- the inference program of the trained model inputs an edit element that has been changed among the editable edit elements in the architectural drawing, estimates from the input edit element other edit elements that should be changed in conjunction with the change to that edit element based on the trained parameters, and outputs the estimated edit elements as related elements.
- FIG. 14 is a flowchart showing the related element estimation process.
- the related element estimation process is executed in response to a request from a user, and when executed by the CPU 30, the process first proceeds to step S200 as shown in Fig. 14.
- step S200 it is determined whether or not any of the editable elements in the architectural drawing has been changed in the CAD software, and if it is determined that the edit element has been changed (YES), the process proceeds to step S202.
- step S202 the changed edited element is acquired, and the process proceeds to step S204, where the related element is estimated from the acquired edited element using the trained model in the storage device 42.
- the estimation is performed by inputting the edited element into the trained model and acquiring the related element output from the trained model.
- step S206 where other editing elements to be changed are displayed in a specific manner (e.g., highlighted) based on the estimated related elements, and the process ends.
- step S200 determines whether the edit element has not been changed (NO). If it is determined in step S200 that the edit element has not been changed (NO), the process ends.
- the edited element that has been changed is obtained, and related elements are estimated from the obtained edited element using a trained model that has been trained based on information about editable edited elements in an architectural drawing and information about other edited elements that have been changed as a result of the change to that edited element, and the other edited elements that should be changed are displayed in a specific manner based on the estimated related elements.
- step S202 corresponds to the element information acquisition means of invention 4
- step S204 corresponds to the estimation means of invention 4 or 5
- step S206 corresponds to the output means of invention 5.
- This embodiment differs from the second embodiment in that it estimates editing elements that require human judgment to change.
- an editing element is changed, it is desirable to automatically change other editing elements in conjunction with the change, but editing elements that require human judgment to change must be excluded from the targets of automatic change.
- the designer decides whether to change the right or left wall position.
- other editing elements that should be changed in conjunction with a change in an editing element are automatically changed, and editing elements that require human judgment to change are excluded from the targets of automatic change, with the aim of supporting the user in understanding whether or not other editing elements and their contents should be changed by a human.
- the storage device 42 stores judgment necessity data in which edit elements are registered in association with information on whether a change requires human judgment. Edit elements that require human judgment for change may be set by human judgment. Also, edit elements that have two or more change patterns before and after the change may be extracted based on the pre-change CAD data and the post-change CAD data, and the extracted edit elements may be set as edit elements that require human judgment for change.
- the storage device 42 stores data of the trained model.
- the trained model is trained based on information about editable editing elements in architectural drawings, information about other editing elements and their contents that have been changed as a result of changing the editing elements, and judgment necessity information about whether or not a human judgment is required to change the other editing elements.
- the pre-change CAD data, post-change CAD data, and judgment necessity data are used for training the AI, so the storage device 42 stores a large amount of data created in the past.
- FIG. 15 is a block diagram showing the process of generating and using a trained model.
- the trained model generation process is a process executed to generate a trained model, and when executed by the CPU 30, the pre-change CAD data, post-change CAD data, and judgment necessity data are read from the storage device 42, and information regarding the edit elements and judgment necessity information are extracted from the read CAD data and judgment necessity data.
- a learning dataset is generated based on the extracted information
- the generated learning dataset is input to a learning program
- a trained model is generated by the learning program.
- the inference program of the trained model inputs an edit element that has been changed among the editable edit elements in the architectural drawing, and estimates from the input edit element, based on the trained parameters, other edit elements that should be changed in conjunction with the change to that edit element and information on whether or not a decision is required, and outputs the estimated edit elements as related elements.
- FIG. 16 is a flowchart showing the related element estimation process.
- the related element estimation process is executed in response to a request from a user, and when executed by the CPU 30, the process first proceeds to step S250 as shown in Fig. 16.
- step S250 it is determined whether or not any of the editable elements in the architectural drawing has been changed in the CAD software, and if it is determined that the edit element has been changed (YES), the process proceeds to step S252.
- step S252 the changed edited element is acquired, and the process proceeds to step S254, where the related elements and the decision necessity information are estimated from the acquired edited element using the trained model in the storage device 42.
- the estimation is performed by inputting the edited element into the trained model, and acquiring the related elements and the decision necessity information output from the trained model.
- step S256 it is determined based on the estimated judgment necessity information whether or not human judgment is required to change the estimated related elements. If it is determined that human judgment is not required to change the related elements (NO), the process proceeds to step S258, where the other edited elements to be changed are changed based on the estimated related elements so that their contents become the contents of the related elements, and the process ends.
- step S256 determines whether changing the related elements requires human judgment (YES)
- step S260 determines whether changing the related elements requires human judgment.
- step S250 determines whether the edit element has been changed (NO). If it is determined in step S250 that the edit element has not been changed (NO), the process ends.
- an edit element that has been changed among editable edit elements in an architectural drawing is obtained, and related elements and judgment necessity information are estimated from the obtained edit element using a trained model that has been trained based on information about the editable edit element in the architectural drawing, information about other edit elements and their contents that have been changed as a result of the change to that edit element, and judgment necessity information regarding whether human judgment is required to change the other edit elements. If it is determined based on the estimated judgment necessity information that human judgment is required to change the related element, the other edit elements are displayed in a specific manner based on the estimated related elements, and if it is determined that human judgment is not required to change the related elements, the other edit elements are changed based on the estimated related elements.
- step S252 corresponds to the element information acquisition means of invention 7 or 9
- step S254 corresponds to the estimation means of inventions 7 to 11
- step S258 corresponds to the change means of invention 11
- step S260 corresponds to the output means of invention 8 or 10.
- defects were displayed for edit elements specified by user operation, but this is not limited to this. It is also possible to adopt a configuration in which all edit elements in the drawing are scanned and defects are displayed all at once for edit elements that have defects.
- a message is displayed indicating that there is a defect in the edited element, but this is not limiting, and a configuration can also be adopted in which the indicated edited element is changed based on the estimated matching element.
- the trained model used is one that has been trained based on information about the finishing element listed in the finishing table, as well as information about matching elements and their contents that are listed in the architectural drawing and that match the specifications of the finishing element.
- the other edit elements to be changed are displayed in a specific manner based on the estimated related elements, but this is not limiting, and a configuration in which the other edit elements to be changed are changed based on the estimated related elements can also be adopted.
- the trained model used is one that has been trained using a trained model that has been trained based on information about editable edit elements in architectural drawings and information about other edit elements and their contents that have been changed as a result of the change in the edit element.
- the trained model can be one that has been trained based on information about editable edit elements in architectural drawings, information about other edit elements that have been changed as a result of the change to that edit element, and judgment necessity information regarding whether or not human judgment is required to change the other edit elements.
- the trained model can be one that has been trained based on information about editable edit elements in architectural drawings and judgment necessity information regarding whether or not human judgment is required to change the other edit elements that have been changed as a result of the change to that edit element).
- a trained model is used that has been trained based on information about editable edit elements in architectural drawings and information about other edit elements that have been changed as a result of changes to those edit elements.
- this is not limiting, and a trained model that has been trained based on information about editable edit elements in architectural drawings and information about other edit elements that should be changed as a result of changes to those edit elements can also be used.
- correspondence information such as changing edit element B when edit element A is changed, can be used to train the AI.
- a trained model is generated and the trained model is used, but this is not limiting, and a configuration that utilizes a large language model can also be adopted. Specifically, for example, the following configuration can be adopted.
- the drawing creation support device 100 is connected to a large-scale language model server having a large-scale language model via a network.
- the large-scale language model server is configured with the same hardware configuration as the drawing creation support device 100.
- the large-scale language model is a deep learning model that pre-learns from a huge amount of data what is called a language model that models human spoken words based on their occurrence probability.
- the large-scale language model server receives a request, it uses the large-scale language model to statistically estimate the generation probability of the next word from the sentence included in the received request, and transmits the estimation result to the request source.
- the following inventions A1 to A3 or B1 to B8 can be applied to the drawing creation support device 100.
- the language model further includes an element information acquiring means for acquiring matching element information output from the large-scale language model in response to the request.
- invention A2 In Invention A1, The system further comprises an output means for outputting information on an edited element related to the edited element information based on the adapted element information acquired by the element information acquisition means.
- the drawing creation support device 100 sends a request to the large-scale language model server.
- the request includes the finishing schedule data and edit element 400 of FIG. 2, and also includes a request to generate a matching element for the edit element 400.
- the large-scale language model server outputs matching element information.
- a message 402 is displayed indicating that there is a defect in the edit element 400 based on the received matching element information.
- the request includes finish element information on a finish element described in a finish schedule and edit element information on an editable edit element in an architectural drawing, and includes a request to generate conforming element information on a conforming element and its contents that conforms to the specifications of the finish element and is described in the architectural drawing;
- the system further includes a change means for changing an edit element related to the edit element information based on the suitable element information acquired by the element information acquisition means.
- the drawing creation support device 100 sends a request to the large-scale language model server.
- the request includes the finishing schedule data and edit element 400 of FIG. 2, and also includes a request to generate a matching element for the edit element 400.
- the large-scale language model server outputs matching element information.
- the drawing creation support device 100 receives the matching element information, it changes the edit element 400 based on the received matching element information.
- the method further comprises: acquiring element information about the related elements output from the large-scale language model in response to the request.
- the device further comprises an output means for outputting information on other edit elements related to the related element information based on the related element information acquired by the element information acquisition means.
- the drawing creation support device 100 sends a request to the large-scale language model server.
- the request includes the edit element 400, and also includes a request to generate related elements of the edit element 400.
- the large-scale language model server outputs related element information.
- the drawing creation support device 100 receives the related element information, other edit elements that should be changed in conjunction with the change to the edit element 400 are displayed in a specific manner based on the received related element information.
- the request includes changed element information on an edit element that has been changed among editable edit elements in the architectural drawing, and includes a request to generate other edit elements that should be changed in conjunction with the change in the edit element and related element information on the contents of the other edit elements;
- the editing device further includes a change means for changing, based on the related element information acquired by the element information acquisition means, another edit element related to the related element information.
- the drawing creation support device 100 sends a request to the large-scale language model server.
- the request includes the edit element 400, and also includes a request to generate related elements of the edit element 400.
- the large-scale language model server outputs related element information.
- the drawing creation support device 100 receives the related element information, it changes other edit elements that should be changed in conjunction with the change to the edit element 400 based on the received related element information.
- a request input means for inputting a request including changed element information on an edited element among editable edit elements in an architectural drawing that has been changed, and a request for generating judgment necessity information on whether a human judgment is required for changing other edit elements that should be changed in conjunction with the change of the edited element, into a large-scale language model;
- the system further comprises a judgment necessity information acquisition means for acquiring judgment necessity information output from the large-scale language model in response to the request.
- the apparatus further comprises an output means for outputting information on whether or not a human judgment is required for changing another editing element related to the judgment necessity information, based on the judgment necessity information acquired by the judgment necessity information acquisition means.
- a request input means for inputting a request including changed element information on an edited element that has been changed among editable edit elements in an architectural drawing, and also including a request for generating other edit elements that should be changed in conjunction with the change in the edited element and related element information on the contents of the other edit elements, and judgment necessity information on whether or not human judgment is required to change the other edit elements, into the large-scale language model;
- the method further comprises an element information acquiring means for acquiring related element information and judgment necessity information outputted from the large-scale language model in response to the request.
- Invention B7 Invention B6, If it is determined based on the judgment necessity information acquired by the element information acquisition means that human judgment is required to change other editing elements related to the related element information, the device is provided with an output means for outputting information regarding the other editing elements based on the related element information acquired by the element information acquisition means.
- Invention B8 Invention B6 or B7, If it is determined based on the judgment necessity information acquired by the element information acquisition means that no human judgment is required to change other editing elements related to the related element information, a modification means is provided for changing the other editing elements based on the related element information acquired by the element information acquisition means.
- step S254 is replaced with a process of acquiring related element information and judgment necessity information from a large-scale language model server.
- the drawing creation support device 100 sends a request to the large-scale language model server.
- the request includes the edit element 400, and also includes a request to generate related elements of the edit element 400 and judgment necessity information regarding whether human judgment is required to change the related elements.
- the large-scale language model server outputs the related element information and the judgment necessity information.
- the drawing creation support device 100 receives the related element information and the judgment necessity information, it determines whether human judgment is required to change the related elements based on the received related element information. As a result, if it is determined that human judgment is required, the related elements are displayed in a specific manner based on the received related element information. On the other hand, if it is determined that human judgment is not required, the related elements are changed based on the received related element information.
- the device is realized as a single device, but the present invention is not limited to this and can also be realized as a network system.
- a network system some or all of the functions of the drawing creation support device 100 can be configured as a virtual server on a server that provides cloud computing services.
- the drawing creation support device 100 is configured to use the storage device 42, but this is not limiting, and it can also be configured to use an external storage device such as a database server.
- storage media refers to semiconductor storage media such as RAM and ROM, magnetic storage media such as FD and HD, optically readable storage media such as CD, CDV, LD and DVD, and magnetic storage/optically readable storage media such as MO, and includes any storage media that can be read by a computer, regardless of the reading method (electronic, magnetic, optical, etc.).
- first to third embodiments and the modifications thereof can be applied to each other.
- present invention is not limited to the above-described first to third embodiments and their modifications, but can also be applied to other cases without departing from the spirit of the present invention.
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Software Systems (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Human Computer Interaction (AREA)
- Computer Security & Cryptography (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Civil Engineering (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Medical Informatics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202380100161.5A CN121444097A (zh) | 2023-07-05 | 2023-09-04 | 建筑图面创建支持系统 |
| AU2023305022A AU2023305022A1 (en) | 2023-07-05 | 2023-09-04 | Architectural drawing creation support system |
| AU2026204854A AU2026204854A1 (en) | 2023-07-05 | 2026-06-23 | Architectural drawing creation support system |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023110766A JP7341580B1 (ja) | 2023-07-05 | 2023-07-05 | 建築図面作成支援システム |
| JP2023-110766 | 2023-07-05 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2025009185A1 true WO2025009185A1 (ja) | 2025-01-09 |
Family
ID=87934758
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2023/032277 Ceased WO2025009185A1 (ja) | 2023-07-05 | 2023-09-04 | 建築図面作成支援システム |
Country Status (4)
| Country | Link |
|---|---|
| JP (2) | JP7341580B1 (enExample) |
| CN (1) | CN121444097A (enExample) |
| AU (2) | AU2023305022A1 (enExample) |
| WO (1) | WO2025009185A1 (enExample) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7672667B1 (ja) | 2024-09-12 | 2025-05-08 | ガイア アーキテクト シドニー ピーティーワイ エルティーディー | 設計支援システム |
| JP7672666B1 (ja) * | 2024-09-12 | 2025-05-08 | ガイア アーキテクト シドニー ピーティーワイ エルティーディー | 設計支援システム、学習データ生成システム、学習済みモデル生成システム及び学習済みモデル |
| JP7645024B1 (ja) | 2024-10-28 | 2025-03-13 | ガイア アーキテクト シドニー ピーティーワイ エルティーディー | 設計支援システム |
| JP7645023B1 (ja) | 2024-10-28 | 2025-03-13 | ガイア アーキテクト シドニー ピーティーワイ エルティーディー | 設計支援システム |
| JP7696191B1 (ja) * | 2025-03-03 | 2025-06-20 | ガイア アーキテクト シドニー ピーティーワイ エルティーディー | 設計支援システム |
| JP7748150B1 (ja) * | 2025-03-03 | 2025-10-02 | ガイア アーキテクト シドニー ピーティーワイ エルティーディー | 設計支援システム、学習データ生成システム及び学習済みモデル生成システム |
| JP7748151B1 (ja) * | 2025-03-07 | 2025-10-02 | ガイア アーキテクト シドニー ピーティーワイ エルティーディー | 設計支援システム、学習データ生成システム及び学習済みモデル生成システム |
| JP7748152B1 (ja) * | 2025-03-07 | 2025-10-02 | ガイア アーキテクト シドニー ピーティーワイ エルティーディー | 設計支援システム |
| KR102984164B1 (ko) * | 2025-03-26 | 2026-06-29 | 김영범 | Ai 기반 bim을 이용한 건축 설계 및 입찰서비스가 연계된 플랫폼서비스를 제공하는 방법 및 이를 수행하는 서비스서버 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004110659A (ja) * | 2002-09-20 | 2004-04-08 | Taisei Corp | 仕上げ数量算出システム |
| JP2004139241A (ja) * | 2002-10-16 | 2004-05-13 | Taisei Corp | 施工用図面の作成方法および作成支援用cadシステム |
| JP2015162025A (ja) * | 2014-02-26 | 2015-09-07 | 株式会社コンピュータシステム研究所 | 建築計画支援システム、建築計画支援プログラム、および、記憶媒体 |
| JP2019215761A (ja) * | 2018-06-13 | 2019-12-19 | 株式会社竹中工務店 | 設計支援装置及び設計支援モデル学習装置 |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7141583B2 (ja) * | 2017-03-24 | 2022-09-26 | 博克 柳▲瀬▼ | 衣服設計支援装置、衣服設計支援プログラム、衣服設計支援システム、衣服設計支援方法、及び衣服製造方法 |
| US11048482B2 (en) * | 2019-07-26 | 2021-06-29 | X Development Llc | Automated identification of code changes |
-
2023
- 2023-07-05 JP JP2023110766A patent/JP7341580B1/ja active Active
- 2023-08-23 JP JP2023135902A patent/JP7908680B2/ja active Active
- 2023-09-04 CN CN202380100161.5A patent/CN121444097A/zh active Pending
- 2023-09-04 AU AU2023305022A patent/AU2023305022A1/en not_active Abandoned
- 2023-09-04 WO PCT/JP2023/032277 patent/WO2025009185A1/ja not_active Ceased
-
2026
- 2026-06-23 AU AU2026204854A patent/AU2026204854A1/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004110659A (ja) * | 2002-09-20 | 2004-04-08 | Taisei Corp | 仕上げ数量算出システム |
| JP2004139241A (ja) * | 2002-10-16 | 2004-05-13 | Taisei Corp | 施工用図面の作成方法および作成支援用cadシステム |
| JP2015162025A (ja) * | 2014-02-26 | 2015-09-07 | 株式会社コンピュータシステム研究所 | 建築計画支援システム、建築計画支援プログラム、および、記憶媒体 |
| JP2019215761A (ja) * | 2018-06-13 | 2019-12-19 | 株式会社竹中工務店 | 設計支援装置及び設計支援モデル学習装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2025008527A (ja) | 2025-01-20 |
| AU2023305022A1 (en) | 2025-01-23 |
| JP7341580B1 (ja) | 2023-09-11 |
| JP7908680B2 (ja) | 2026-08-20 |
| AU2026204854A1 (en) | 2026-07-09 |
| JP2025009635A (ja) | 2025-01-20 |
| CN121444097A (zh) | 2026-01-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7341581B1 (ja) | 建築図面作成支援システム | |
| JP7341580B1 (ja) | 建築図面作成支援システム | |
| Bortoluzzi et al. | Automating the creation of building information models for existing buildings | |
| JP6608403B2 (ja) | 建築設備図面作成支援システム | |
| EP1225522A1 (en) | Remote order acceptance design system and elevator remote order acceptance method | |
| EP3776283A1 (en) | Digital design tools for building construction | |
| CN108897969B (zh) | 一种基于bim的设施维护自动调度的方法 | |
| CN114972659A (zh) | 一种二维图纸转换三维模型用于图纸审查的方法及系统 | |
| CN118967013B (zh) | 一种基于数据模拟的建筑项目协同设计方法及系统 | |
| CN115169679A (zh) | 建筑室内点云数据采集站点自动规划方法、装置及设备 | |
| CN115081087A (zh) | 基于物联网的装修云设计方法、装置、设备及存储介质 | |
| CN118551434A (zh) | 一种基于数字孪生的钢箱提篮拱桥施工模拟方法及系统 | |
| CN117521221A (zh) | 一种建筑模型的转换方法、装置、设备及存储介质 | |
| Gil et al. | On the discovery of urban typologies | |
| KR102260969B1 (ko) | 딥러닝 알고리즘을 이용한 건축 정보 모델의 객체 유형 정보 인식 장치 및 방법 | |
| JP7160295B1 (ja) | 学習モデルの生成方法、情報処理装置、情報処理方法、コンピュータプログラム | |
| CN120217493A (zh) | 一种cad转bim的自动设计方法、装置及相关介质 | |
| HK40136838A (en) | Architectural drawing creation support system | |
| HK40136839A (en) | Architectural drawing creation support system | |
| US20230053656A1 (en) | Machine-Learning-Based Identification of Drawing Attributes | |
| JP7748129B1 (ja) | 設計支援システム | |
| JP7672666B1 (ja) | 設計支援システム、学習データ生成システム、学習済みモデル生成システム及び学習済みモデル | |
| JP7672667B1 (ja) | 設計支援システム | |
| JP2025084449A (ja) | 付加情報配置システム、付加情報配置方法及びプログラム | |
| WO2026004425A1 (ja) | 設計支援システム |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| ENP | Entry into the national phase |
Ref document number: 2023305022 Country of ref document: AU Date of ref document: 20230904 Kind code of ref document: A |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23944432 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 23944432 Country of ref document: EP Kind code of ref document: A1 |