WO2024094286A1 - Système de câble pour un élément structural et de tension et procédé de remplacement des éléments de traction et son utilisation - Google Patents

Système de câble pour un élément structural et de tension et procédé de remplacement des éléments de traction et son utilisation Download PDF

Info

Publication number
WO2024094286A1
WO2024094286A1 PCT/EP2022/080387 EP2022080387W WO2024094286A1 WO 2024094286 A1 WO2024094286 A1 WO 2024094286A1 EP 2022080387 W EP2022080387 W EP 2022080387W WO 2024094286 A1 WO2024094286 A1 WO 2024094286A1
Authority
WO
WIPO (PCT)
Prior art keywords
main cable
cable
tensile elements
pipe
cable system
Prior art date
Application number
PCT/EP2022/080387
Other languages
English (en)
Inventor
Rachid Annan
Michael SIGG
Original Assignee
Vsl International Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vsl International Ag filed Critical Vsl International Ag
Priority to PCT/EP2022/080387 priority Critical patent/WO2024094286A1/fr
Publication of WO2024094286A1 publication Critical patent/WO2024094286A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges

Definitions

  • Present invention relates to the field of civil engineering involving structural elements e.g., building, or tensioning elements e.g., bridge cable.
  • the invention can be applied to the load-bearing structures or elements.
  • the invention also relates to a method of installing said system on the load bearing structural- and tensioning element.
  • Cables for stayed bridges, footbridges or suspension bridges are used to safely support bridge loads and traffic loads. Similarly, the cables are applicable in extended roofs for stadium or arena.
  • a suspension bridge can be viewed as an upside-down arch in tension with only the towers in compression. Because the deck is hung in the air, care must be taken to ensure that it does not move excessively under loading. The deck therefore must be either heavy or stiff or both.
  • a conventional suspension bridge comprises pylons, decks, main cables, hangers and clamps for hanging the hanger to the main cable.
  • the hangers can be either vertically arranged or inclined (cf. Figures 1A and 1 B, respectively).
  • the main cable is typically anchored at each end to the ground. It is generally made up of a plurality of tensile elements which are closely arranged next to each other. Depending on its purpose, a main cable may have a mean diameter of a few centimetres to a few metres. Due to its indispensable function in the entire bridge system, the replacement of a main cable has to overcome a myriad of difficulties. It is often the case that the traffic flow must be reduced or even stopped completely when a main cable is to be replaced. Nevertheless, most of the main cables to date are either not replaceable, or when its replacement is necessary and possible, it may be extremely cumbersome, costly, and usually cause a massive disruption to the traffic flows.
  • clamps in the state of the art are usually connected directly to the tensile elements of the main cable, such connection induces rapid aging and degradation of the bridge components, or known as fatigue corrosion fretting.
  • the inventors of the present invention have found out effective remedies for the above-discussed problems with the current engineering and architecture knowledge and thereby proposed a new cable system and a method thereof.
  • the cable system proposed herein is more durable as the tensile elements are not directly and radially compressed by a friction clamp which tends to increase wear.
  • present invention relates to a cable system for a tensioning elements such as suspension bridges and/or structural elements such as extended roofs of buildings, comprising main cables, hangers, and clamps, wherein the main cable comprises a pipe as a housing, one or more tensile elements provided within the pipe for carrying longitudinal tensile force along the main cable, preferably the tensile elements are replaceable easily when needed; and a compressing element provided surrounding at least partly the tensile elements for taking radial compression and possibly longitudinal compression, wherein the hanger is connected to the main cable through the clamp, configured in such a way that the hanger force is introduced only into the compressing element and is further transferred radially from the compressing element to the tensile elements.
  • the main cable comprises a pipe as a housing, one or more tensile elements provided within the pipe for carrying longitudinal tensile force along the main cable, preferably the tensile elements are replaceable easily when needed; and a compressing element provided surrounding at least partly the tensile elements for taking
  • the second aspect of the invention relates to a method of providing a cable system for a structural element and/or tensioning element according to the claimed cable system, comprising the steps of a) Providing tensile elements within a pipe of a main cable; b) Providing a compressing element to surround at least partly the tensile elements for taking radial compression and possibly longitudinal compression
  • the third aspect of the invention relates to the use of the cable system according to the claims for accommodating one or more tensile elements located within a pipe of a main cable.
  • one or more cavities and/or ducts are provided to accommodate the tensile elements.
  • the said ducts can be formed by e.g., cavities; the cavities may comprise ducts and other voids for accommodating components or elements related to the cable system.
  • the cavities and/or ducts are provided within the pipe of the main cable for housing the tensile elements, and possibly other components and elements related to the cable system.
  • the cavities can also be created by tubing elements, either acting as inner formwork inside the compressing element and/or retired before introducing the tensile elements or left in place.
  • the tensile elements can be replaced easily whenever needed as they are not “buried” or “cemented” to the main cable.
  • the proposed cable system according to this variant allows an easy replacement of the main cable (e.g., the tensile elements). Thanks to the cavities and/or ducts provided within the pipe of the main cable, tensile elements can be positioned inside their cavities or individual duct. This allows for an easy replacement of the main cable as each single tensile element can be detensioned separately and be replaced, not needing to replace the entire main cable at once. Consequently, this ensures a lower maintenance cost as well as minimizes the disturbance on the traffic.
  • the main cable e.g., the tensile elements
  • the compressing element is provided to surround at least partly the tensile elements for taking radial compression and possibly longitudinal compression.
  • the compressing elements are provided peripherally around the tensile elements to a certain part (or section) of the main cable and not necessarily extended in the entire length of the tensile elements (and main cable).
  • tubing elements are provided for the introduction of cavities and/or ducts, or one or more tubing elements are provided inside the main cable for acting as removable formworks for the introduction of the compressing element in between the tubing elements, thereby forming one or more cavities and/or ducts for accommodating the tensile elements.
  • such tubing elements can be used to maintain their shape for the installation of the compressing element.
  • Such tubing elements can furthermore advantageously contribute to the compressing element as a compressing component.
  • tubing elements are left in place and maintaining the shape inside the compressing element, then used as cavities to introduce ducts or tensile elements.
  • tubing elements acting as removable formwork and extracted once the compressing element has set In this case, the created cavity in the concrete is used to introduce duct or tensile element.
  • the tubing elements are made out of metal, they could contribute and serve as additional function of the compressing element.
  • tubing elements are provided for the introduction of cavities and/or ducts, or one or more tubing elements are provided inside the main cable for acting as removable formworks for the introduction of the compressing element in between the tubing elements, thereby forming one or more cavities and/or ducts for accommodating the tensile elements.
  • the cavities may be left void to provide for inspection ports to be accessed by endoscopes or other inspection equipment.
  • the tensile elements and the compressing element are arranged coaxially within the pipe. That is, they are arranged such that the respective centres of gravity of their cross sections are coincident.
  • a filler material is provided to the cavities, or is provided to a space between the tensile element and the tube, wherein the filler material is preferably a soft or a liquid filler material. This allows the filler material to be introduced to the main cable easily.
  • the compressing element comprises a rigid filler matrix such as mortar, concrete, polymer-concrete, ashcrete or timbercrete.
  • the compressing element has a compressive strength of at least about 5 MPa or between about 10 MPa and 100 MPa, preferably about 50 MPa.
  • the compressing element is provided only to a corresponding part of the main cable e.g., where the clamps are located or on the deviation areas on top of the towers. This advantageously reduces the weight of the main cable while maintaining its function.
  • a plug and a sealing device are provided, wherein the filler material provided to the duct is confined by the plug with a sealing device, creating a leak-tight joint between the individual ducts and the duct.
  • compressing element may be provided in the zones of the clamps and also on top of the towers.
  • At least a part of the remaining part of the main cable is provided with a non-structural void filler material such as soft matrix, liquid, foam, air, expanded polymer and etc.
  • the filler material provided to a space within the pipe and between the duct is confined by a plug with a sealing device, creating a leak-tight joint between the individual ducts.
  • a part of the clamp comprises a first part, comprising a substantially ring shape for encasing or attaching to the main cable, wherein its diameter is slightly larger than the pipe of the main cable; and/or the clamp comprises a second part which is a lug plate where the hangers can be attached thereto.
  • Such clamp not only avoids the hanger to be permanently fixed to the clamp (which causes problems such as rapid aging and degradation of the bridge components, or known as fatigue corrosion fretting), it also allows the hangers to be replaced easily.
  • the main cable is provided with several sections having injection vents and sealed ends for the injection of grout. This allows the filler material to be introduced to the main cable.
  • the tensile elements are installed in the ducts before providing the compressing element to the main cable.
  • one or more tubing elements are provided inside the main cable to act as removable inner formworks, leaving cavities for the introduction of the compressing element.
  • one or more cavities and/or ducts are provided to the pipe for accommodating the tensile elements, preferably prior to the step of providing tensile elements within a pipe of a main cable.
  • the tensile elements are installed in the cavities and/or ducts prior to providing the compressing element to the pipe of the main cable.
  • the cable system is used for replacing existing tensile element of the main cable, wherein the existing tensile element is detached from its anchoring termination and is removed from its individual cavity prior to being replaced by a new tensile element, followed by anchoring at their extremities.
  • structural element refers to a basic component of a building structure which forms a structural frame building structure such as beams, pillars, roof terraces, slabs, columns, girders and/or other structural members and connections.
  • tensioning element refers to an element which carries tension and no compression.
  • the tensioning element may be provided to a structural element in order to support the load.
  • the tensioning element described herein may for instance be used in a bridge cable, comprising tensile elements (or known as tendon).
  • compressing element refers to an element which is subject to axial compressive forces, and that the element is being pushed, or carry a load. Compression force occurs when a physical force presses inward on an object, causing it to become compacted.
  • clamp refers a structural item, designed to transfer the force FECI from the hanger to the main cable.
  • Figure 1A shows a schematic view of a suspension bridge having vertical hanger arrangement.
  • Figure 1 B shows a schematic view of a suspension bridge having inclined hanger arrangement.
  • Figure 2 shows a schematic view of tensile elements of a main cable according to prior art.
  • Figure 3 shows an embodiment of the main cable according to the present invention.
  • Figure 4A shows a clamp according to an embodiment of the present invention in the case of connecting main cable and hanger in a vertical hanger arrangement.
  • Figure 4B illustrates the mechanism of force transfer according to an embodiment of the present invention in the case of connecting main cable and hanger in a vertical hanger arrangement.
  • Figure 4C shows a clamp installed on the main cable according to an embodiment of the present invention in the case of connecting the main cable and hanger in a vertical hanger arrangement.
  • Figure 5A, 5B and 5C show respectively a clamp, the mechanism of force transfer and a clamp installed on the main cable according to an embodiment of the present invention for connecting main cable and hanger in an inclined hanger arrangement.
  • Figure 6 shows an example of a plug with sealing device to be installed at the extremity of the portion of the main cable.
  • the inventors of the present invention propose a cable system, a method, and a more durable usage as the tensile elements are not directly compressed by a friction clamp radially which tends to increase wear. Moreover, according to a preferred variant of the invention, it allows easy replacement of the tensile elements of a cable. The cables are able to be replaced in a more effective manner, thereby ensuring lower maintaining cost. Moreover, the current method also ensures a minimal traffic disturbance.
  • Figures 1A and 1 B show two different suspension bridges having main cables 12, piers 21 , hangers 22, towers 23, a deck 30 and anchorages 33.
  • the main cables 12 are placed over the towers 23 and anchored at their extremities with the anchorages 33.
  • the weight of the deck 30 and the traffic loads are supported predominantly through the main cables 12 by using intermediate connecting hangers 22.
  • These hangers 22 can either be vertically arranged (as illustrated in the Figure 1A) or inclined (as shown in the Figure 1 B), wherein the former is more prevalent than the latter.
  • one or more main cables 12 are provided on the left and right sides of the bridge and the main span length can range from several metres to several hundred metres.
  • small suspension bridges often use single cables as their main cables 12, either a single cable on each side or a monocable.
  • the cables themselves, also known as tendons, are formed predominantly by many tensile elements (which comprised of a plurality of wires or strands). These tensile elements are usually highly redundant as they are designed in such a way that the failure of a limited number of individual strands or wires will not reduce the overall safety of the bridge.
  • a commonly used tensile element can be formed by a plurality of wires or by 7-wire steel strands which are standard tensile elements for cables. Because of their high strength and widespread use, they are probably the cheapest means to carry a given tension load.
  • Figure 2 demonstrates an example of a main cable 12 in the prior art where the individual tensile elements 15 are tightly arranged next to each other, forming a main cable 12 which is suitable to be used in a structural element or tensioning element.
  • the tensile elements 15 are arranged in a parallel pattern, covered by an external wrapping 31 and tightly held by steel bands 32.
  • the hangers 22 are connected to the main cable 12 by means of a clamp 24 that transfers the loads to the main cable 12.
  • Such main cables 12 are difficult to be replaced and often the hangers 22, clamps 24 and bridge deck 30 have to be removed before the main cables 12 can be replaced.
  • a new type of cable is proposed, which is illustrated in the Figure 3 and the following figures.
  • the main cable 12 comprises a pipe 11 as a housing. Within the pipe 11 , a plurality of cavities 17, which are arranged substantially parallel to the longitudinal direction of the main cable 12, are provided within the pipe 11.
  • the configuration generally proposed in the present invention is a channel like structure which is suitable for accommodating an object e.g., tensile elements in the present case.
  • the ducts 18 are provided within the pipe 11 , creating individual cavities 17 before introducing the tensile elements 15 .
  • the space between the ducts 18 and the pipe 11 can be filled up with a compressing element 16, which is predominantly made up of as cementcomprising mortar.
  • each of the tensile elements 15 is located within its own cavity 17, it can be replaced individually without compromising the primary function of the main cable 12.
  • the individual tensile elements 15 shown on figure 3 are bare strands with or without galvanization, but the invention is also applicable to polyethylene sheathed strands, providing an additional layer of corrosion protection.
  • the compressing element 16 which is usually provided initially in form of a grout, is only injected into the main cable 12 once the individual ducts 18 and preferably all of the tensile elements 15 have been installed inside the pipe 11 .
  • the compressing element 16 can be filled up throughout the entire length of the main cable 12. As the compressing element 16 is a rigid (solid) filler material such as mortar, this unavoidably increases the weight of the main cable 12. Alternatively, it may be possible in some situations to introduce the compressing element 16 only to some sections of the main cable 12, such as the areas where clamps 24 are being placed for attaching the hangers 22 to the main cable 12 or the cable deviation areas on top of the towers 23. In this embodiment, the remaining part of the main cable, instead of compressing element 16, can be left void without filler or alternatively filled up with other lighter-weight material such as foam material in order to fill up the space and maintain the parallel pattern of the individual ducts 18.
  • lighter-weight material such as foam material
  • FIG 4A shows an example of the clamps 24 that can be provided to connect the main cable 12 and the hangers 22 (cf. Figure 4B).
  • the clamp 24 according to this invention is a structural item, designed to transfer the force FECI from the hanger 22 to the main cable 12.
  • the main cable 12 comprises two main components arranged longitudinally.
  • the first component being tensile elements 15, serves to carry longitudinal tensile force.
  • the second component being a compressing element 16 serves to carry compressing force.
  • the compressing element 16 is made of a rigid material. It is disclosed herein that the two components are not directly linked, for instance in the longitudinal direction. Nevertheless, they may transfer the forces on the transverse direction, for instance at the position where the clamps 24 are situated.
  • the compressing element 16 may be a cement mortar, comprising standard or ultra-high-performance concrete (LIHPC).
  • Figures 4A, 4B and 4C demonstrate an embodiment of the present invention how the hanger 22 may be attached to the main cable 12 through a clamp 24 in a vertical hanger arrangement.
  • the clamp 24 comprises a first part 24a having a substantially cylindrical shape, wherein its diameter is slightly larger than the pipe 11 of the main cable 12.
  • This first part 24a of the clamp 24 is a structural tube 24e for encasing the pipe 11 and transfer the transverse component of the force FECI.-L by bearing to the compression component of the main cable 12.
  • the clamp 24 further comprises a second part 24b which may be a lug plate 24f where hangers 22 can be attached thereto. Thanks to this configuration of the clamp 24, the connection between the hanger 22 and the main cable 12 is capable of transferring longitudinal and transverse loads.
  • a transverse plate 24c may be provided to the first part 24a in order to stiffen the structural tube 24e and transferring the longitudinal component of the load FECI,
  • a transverse plate 24d having a plurality of holes may be provided in the clamp 24 for threading the ducts 18 and maintaining the parallel pattern of tensile elements 15 within the main cable 12 ( Figure 4A).
  • the clamp 24 may be encased on a pipe 11 , as shown in the Figure 4C.
  • the clamp 24 having a transverse plate 24c may be used to join longitudinally two sections of the pipe 11 .
  • a transverse plate 24c or a transverse plate having a plurality of holes 24d according to the Figure 4A may be provided to the clamp 24.
  • a transverse plate 24d can be firstly placed transversally to the main cable 12 in a certain location of the free length of the said main cable 12 (that is, in the part of the main cable 12 between two consecutive clamps 24 or between a clamp and the deviation areas on top of the towers 23).
  • the transverse plate 24d comprises a plurality of holes to allow the ducts 18 to be placed longitudinally along the main cable 12. Multiple transverse plates 24d can be placed at different location of the main cable 12 to support the placement of the ducts 18. Then tensile elements 15 can be placed inside the ducts 18, and followed by the injection of a compressing element 16 within the space between the ducts 18 and the pipe 11 , whereby the compressing element 16 is usually being injected in the form of a grout comprising cement material. Once the compressing element 16 has reached the necessary strength, the tensile elements 15 can be stressed and locked at the anchorages 33.
  • cavities 17 can furthermore be filled up with a soft filler material 19, for instance liquid injection such as wax or grease. This liquid injection serves to improve the corrosion protection of the tensile elements 15.
  • Figures 5A, 5B and 5C demonstrate another embodiment of the present invention how the hanger 22 may be attached to the main cable 12 through a clamp 24’ in an inclined hanger arrangement.
  • the clamp 24’ according to this embodiment comprises a first part 24a’ having a raindrop transversal section which serves to encase the pipe 11 .
  • This first part 24a’ of the clamp 24’ is a structural tube 24e’ which has a slightly larger diameter than the pipe 11 .
  • the clamp 24’ further comprises a second part 24b’ which has a connection component where hangers 22 can be attached thereto. Due to this configuration of the clamp 24’, the connection between the hanger 22 and the main cable 12 is capable of transferring only transverse loads and not longitudinal loads.
  • Figure 6 shows an example of a plug with sealing device 25 to be installed at the extremity of the portion of the main cable 12 that is injected with a compressing element 16 to fill the space between the ducts 18 (part of the inside of the pipe 11 ).
  • the figure 6 shows a possible configuration of the plug with sealing device 25 that can be made out of elastic material creating a leak-tight joint with the ducts 18 and the inside of pipe 11 .
  • the plug with sealing device 25 can be made out of rigid polymeric material and be equipped with watertight seals on its external part and with individual sealing rings around each duct 18 and tensile element 15.
  • the plug with sealing device 25 can be made by a stuffing box formed by two cylindrical layers of polymeric material such as LIHMW polyethylene, polyamide, etc. equipped with bolts that allow to compress a deformable cylindrical layer of highly deformable material such as neoprene.
  • the tubing element 20 may be able to be removed in order to create cavities 17 or introduce the ducts 18. Alternatively, the tubing elements 20 may be left intact to guide the ducts 17 when the injection of the compressing element has hardened.
  • the main cable 12 has a higher durability as the tensile elements are not compressed directly by the clamp.
  • the compressing element 16 provides a hydrophobic environment to the tensile elements 15, thereby reducing the corrosion rate of the tensile elements 15.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

La présente invention concerne un système de câble (10), un procédé et son utilisation pour un élément de tension tel que des ponts de suspension et/ou un élément structural tel que des toits étendus de bâtiments, comprenant des câbles principaux (12), des ferrures de suspension (22) et des pinces (24), le câble principal (12) comprenant un tuyau (11) en tant que boîtier, un ou plusieurs éléments de traction (15) disposés à l'intérieur du tuyau (11) pour transporter une force de traction longitudinale le long du câble principal (12) ; et un élément de compression (16) disposé de manière à entourer au moins partiellement les éléments de traction (15) pour effectuer une compression radiale et éventuellement une compression longitudinale, la ferrure de suspension (22) étant reliée au câble principal (12) par le biais de la pince (24), configurée de telle sorte qu'une force de ferrure de suspension est introduite uniquement dans l'élément de compression (16) et est en outre transférée radialement de l'élément de compression (16) aux éléments de traction (15).
PCT/EP2022/080387 2022-10-31 2022-10-31 Système de câble pour un élément structural et de tension et procédé de remplacement des éléments de traction et son utilisation WO2024094286A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/EP2022/080387 WO2024094286A1 (fr) 2022-10-31 2022-10-31 Système de câble pour un élément structural et de tension et procédé de remplacement des éléments de traction et son utilisation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/EP2022/080387 WO2024094286A1 (fr) 2022-10-31 2022-10-31 Système de câble pour un élément structural et de tension et procédé de remplacement des éléments de traction et son utilisation

Publications (1)

Publication Number Publication Date
WO2024094286A1 true WO2024094286A1 (fr) 2024-05-10

Family

ID=84362769

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2022/080387 WO2024094286A1 (fr) 2022-10-31 2022-10-31 Système de câble pour un élément structural et de tension et procédé de remplacement des éléments de traction et son utilisation

Country Status (1)

Country Link
WO (1) WO2024094286A1 (fr)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4505081A (en) * 1981-08-21 1985-03-19 Freyssinet International (Stup) Curved device for connection between two rectilinear portions of a stretched cable
US6301735B1 (en) * 1998-06-19 2001-10-16 Freyssinet International Stup Method and device for attaching a load-transmitting element to a cable, and suspension bridge comprising such devices
CA2628364A1 (fr) * 2007-04-14 2008-10-14 Werner Brand Cable de tension pour structures et son procede de fabrication
CN110438900A (zh) * 2019-07-03 2019-11-12 中铁十二局集团有限公司 聚氨脂填充式斜拉索外置阻尼器施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4505081A (en) * 1981-08-21 1985-03-19 Freyssinet International (Stup) Curved device for connection between two rectilinear portions of a stretched cable
US6301735B1 (en) * 1998-06-19 2001-10-16 Freyssinet International Stup Method and device for attaching a load-transmitting element to a cable, and suspension bridge comprising such devices
CA2628364A1 (fr) * 2007-04-14 2008-10-14 Werner Brand Cable de tension pour structures et son procede de fabrication
CN110438900A (zh) * 2019-07-03 2019-11-12 中铁十二局集团有限公司 聚氨脂填充式斜拉索外置阻尼器施工方法

Similar Documents

Publication Publication Date Title
US8266751B2 (en) Method to compress prefabricated deck units by tensioning supporting girders
CN1152995C (zh) 用于构造锚定装置的方法、构件和钢索
US8316495B2 (en) Method to compress prefabricated deck units with external tensioned structural elements
EP1629154B9 (fr) Procede d'ancrage de cables metalliques paralleles
US20050144890A1 (en) Structure and method of connecting I-type prestressed concrete beams using steel brackets
KR100991869B1 (ko) 단경간 및 다경간 피에스씨 거더교 및 그 시공방법
Daly et al. Strengthening of bridges using external post-tensioning
PL197020B1 (pl) Sposób mocowania i urządzenie mocujące element, przenoszący obciążenie na linę oraz most wiszący zawierający takie urządzenia
KR101198812B1 (ko) 프리플렉스 거더를 이용한 합성형 라멘교의 시공방법
KR20110111907A (ko) 사장교 주탑쪽의 사장 케이블용 새들 구조체
EA018421B1 (ru) Легкие несущие конструкции, армированные элементами сердечника, выполненными из сегментов, и способ бетонирования таких конструкций
CN102296829A (zh) 三向索网幕墙施工方法以及用于该方法的节点接驳件
KR101346344B1 (ko) 콘크리트 내부에 긴장재 고정 정착부를 구비한 비부착식 psc i 빔 및 그 제조 방법
JP6517122B2 (ja) T桁橋の上部構造
US20160305140A1 (en) Method and apparatus for repairing post-tensioned concrete
WO2024094286A1 (fr) Système de câble pour un élément structural et de tension et procédé de remplacement des éléments de traction et son utilisation
KR20120050940A (ko) 내부힌지를 활용한 복합트러스 거더교의 시공법
KR101664997B1 (ko) 프리캐스트 t 타입 모듈형 합성 라멘교의 시공 방법 및 그 시공방법에 의해 시공된 합성 라멘교, 그리고 그 합성 라멘교를 시공하기 위한 구조물
JP2002332610A (ja) 橋梁類の塔頂サドル構造および橋梁類の塔頂サドル施工法
EP3317471B1 (fr) Ensemble d'ancrage pour une structure, structure en béton comprenant un tel ensemble, et procédé de fabrication d'une telle structure en béton
KR101001443B1 (ko) 탈부착 가능한 정착장치를 이용한 합성거더교량의 주거더 연속화 공법
WO2006065085A1 (fr) Procede de fabrication d'une poutre mixte en acier precontraint et poutre mixte en acier precontraint obtenue
JP2003138523A (ja) 張弦桁橋の構築方法
AU2016202790A1 (en) A silo
RU2689009C1 (ru) Способ реконструкции пролетного строения моста с металлической двухконсольной аркой