WO2024070283A1 - 実験スケジュールの管理方法および管理装置、ならびに、実験スケジュールの管理用プログラム - Google Patents

実験スケジュールの管理方法および管理装置、ならびに、実験スケジュールの管理用プログラム Download PDF

Info

Publication number
WO2024070283A1
WO2024070283A1 PCT/JP2023/029399 JP2023029399W WO2024070283A1 WO 2024070283 A1 WO2024070283 A1 WO 2024070283A1 JP 2023029399 W JP2023029399 W JP 2023029399W WO 2024070283 A1 WO2024070283 A1 WO 2024070283A1
Authority
WO
WIPO (PCT)
Prior art keywords
schedule
experiment
time period
work
experimental
Prior art date
Application number
PCT/JP2023/029399
Other languages
English (en)
French (fr)
Inventor
理沙 仁村
Original Assignee
株式会社島津製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社島津製作所 filed Critical 株式会社島津製作所
Publication of WO2024070283A1 publication Critical patent/WO2024070283A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1093Calendar-based scheduling for persons or groups

Definitions

  • the present invention relates to the management of experimental schedules.
  • Patent Document 1 Japanese Patent Application Laid-Open No. 06-282446
  • Patent Document 2 Japanese Patent Application Laid-Open No. 08-055036
  • Patent Document 3 discloses a method for creating an experiment schedule in a computer system.
  • Patent Document 3 a schedule is created for appropriately controlling operating devices in a chemical experiment, even when the number of operating devices is small compared to the number of specimens.
  • the elements to be considered in managing the experiment schedule are not limited to experimental equipment such as operating devices.
  • the present invention was conceived in light of the above-mentioned circumstances, and its purpose is to provide technology that enables more efficient management of experiments.
  • a method for managing an experimental schedule is a method for managing an experimental schedule including a first step and a second step, which is implemented by a computer, and in which a time period for the first step includes a time period when no worker work is required, and a time period for the second step includes a time period when worker work is required, and the method includes a step of arranging the second step in a portion of the first step in the experimental schedule, and in the arranging step, the second step is arranged in the experimental schedule such that a time period when the second step requires worker work overlaps only with a time period when the first step does not require worker work.
  • An experiment schedule management device includes one or more processors and a storage device storing a program that, when executed by the one or more processors, causes the one or more processors to implement the above-mentioned experiment schedule management method.
  • the experiment schedule management program when executed by one or more processors, causes the one or more processors to implement the experiment schedule management method described above.
  • the time periods during which workers are required to work are taken into consideration when managing an experiment schedule, thereby enabling more efficient management of experiments.
  • FIG. 1 is a block diagram showing the configuration of an automated experiment system 50 including an experiment schedule management device according to the present disclosure.
  • FIG. 2 is a block diagram showing a hardware configuration of a terminal device 400 in FIG. 1 .
  • FIG. 13 is a diagram illustrating an example of a display screen of an experiment schedule.
  • FIG. 13 is a diagram showing another example of the display screen of the experiment schedule.
  • FIG. 13 is a diagram showing an example of a screen (schedule editing screen) that is displayed when editing of an experiment schedule is started.
  • 13 is a diagram showing an example of a screen (button creation screen) displayed in a process for creating an item button 9D corresponding to an experimental process.
  • FIG. 13 is a diagram for explaining the relationship between the experiment item 7 displayed in the detailed display and the information entered in the button creation screen.
  • FIG. FIG. 13 is a diagram for explaining a process for manually arranging processes in schedule table 1.
  • FIG. 13 is a diagram showing an example of a screen (automatic setting screen) that the terminal device 400 displays on the display 431 in response to an operation of the automatic setting button 16.
  • 4 illustrates a modified example of the simplified display screen shown in FIG. 3 .
  • FIG. 5 is a diagram showing a modified example of the detailed display screen shown in FIG. 4 .
  • FIG. 11 is a diagram showing an example of a simplified display screen including a modified experiment schedule from FIG. 10 .
  • FIG. 12 is a diagram showing an example of a detailed display screen including a modified experiment schedule from FIG.
  • FIG. 11 is a diagram showing another example of a simplified display screen including the experiment schedule corrected from that shown in FIG. 10 .
  • FIG. 12 is a diagram showing another example of a detailed display screen including a modified experiment schedule from FIG. 11 .
  • 3 is a flowchart of a main routine. 17 is a flowchart of a subroutine of step S100 in FIG. 16. 18 is a flowchart of a subroutine of step S160 in FIG. 17. 18 is a flowchart of a subroutine of step S170 in FIG. 17. 17 is a flowchart of a subroutine of step S200 in FIG. 16.
  • Fig. 1 is a block diagram showing the configuration of an automated experiment system 50 including an experiment schedule management device according to the present disclosure.
  • the automated experiment system 50 includes an experiment facility 100 and a terminal device 400.
  • the terminal device 400 is an example of an experiment schedule management device.
  • the terminal device 400 manages the schedule of an experiment using the experiment facility 100.
  • the terminal device 400 includes an input/output unit 430.
  • the input/output unit 430 includes a display 431, a keyboard 432, and a touchpad 433.
  • the terminal device 400 is, for example, a notebook computer, a personal computer, a smartphone, or a tablet.
  • the experimental equipment 100 and the terminal device 400 are connected to each other via a network NW.
  • the network NW includes, for example, the Internet, a WAN (Wan Area Network), or a LAN (Local Area Network).
  • the terminal device 400 connected to the network NW may be realized by two or more information processing devices that work together.
  • the terminal device 400 may manage the schedule of experiments that use each of the multiple experimental equipments.
  • a program for managing experimental protocols (hereinafter referred to as the "management program") is pre-installed in the terminal device 400.
  • the keyboard 432 and touchpad 433 accept GUI (Graphical User Interface) operations on the management program by the user.
  • GUI Graphic User Interface
  • a user of the terminal device 400 can design the sequence of multiple processes performed by one or more experimental devices included in the experimental equipment 100 by GUI operations via the keyboard 432 and touchpad 433.
  • the terminal device 400 can manage the experiment schedule according to the experimental protocol designed by the user, and can control the experimental equipment 100.
  • the experimental equipment 100 includes a control device 110 and a plurality of experimental devices 120.
  • the experimental equipment 100 may further include at least one image capture device that captures images for recognizing the status of the experimental equipment 100.
  • the control device 110 controls the plurality of experimental devices 120 to automatically execute an experimental protocol from a terminal device 400.
  • the plurality of experimental devices 120 include a robot 121, an incubator 122, a pretreatment device 123, a microplate reader 124, a centrifuge 125, a liquid chromatograph mass spectrometer (LCMS) 126, a microscope 127, and a sterilization device 128.
  • LCMS liquid chromatograph mass spectrometer
  • the robot 121 moves the culture container Cn1 (e.g., a petri dish, flask, or well plate) containing the sample to the experimental device corresponding to each of the multiple processes according to the sequence of the multiple processes defined in the experimental protocol.
  • the culture container Cn1 contains, for example, agar containing cultured cells (analyte).
  • the incubator 122 cultures the cells seeded in the culture container Cn1 while controlling the temperature.
  • the pretreatment device 123 automatically distributes (dispenses) a fixed amount of the sample to each of the multiple microplates (wells).
  • the microplate reader 124 measures the optical properties of the sample in the microplate (e.g., absorbance measurement and fluorescence intensity measurement).
  • the centrifuge 125 separates the components of the analyte contained in the container Cn2 by centrifugal force.
  • the LCMS 126 separates the analyte contained in the analytical container Cn3 (e.g., a vial or well plate) by liquid chromatography, and performs mass spectrometry to separate the components of the separated analyte by mass-to-charge ratio (m/z).
  • the microscope 127 magnifies minute analytes (e.g., cells) and allows the analytes to be observed with the naked eye.
  • the sterilization device 128 includes a sterilization chamber that provides a dry, high-temperature environment and sterilizes instruments (e.g., culture vessels) contained in the sterilization chamber.
  • a stock vessel or pipette tip containing new culture medium is placed in a designated location in the pretreatment device 123.
  • the robot 121 takes out the culture vessel Cn1 stored in the incubator 122.
  • the robot 121 transports the culture vessel Cn1 to the pretreatment device 123 and places it in the designated location.
  • the pretreatment device 123 aspirates and removes the culture medium from inside the culture vessel Cn1, and cleans the culture vessel Cn1.
  • the pretreatment device 123 dispenses new culture medium from a stock container into the culture vessel Cn1. After dispensing by the pretreatment device 123 is complete, the robot 121 holds the culture vessel Cn1 and transports it to the incubator 122.
  • the culture vessel Cn1 stored in the incubator 122 is taken out by the robot 121.
  • the robot 121 transports the culture vessel Cn1 to the microscope 127 and places the culture vessel Cn1 on the observation stage of the microscope 127.
  • the microscope 127 adjusts the focal length so that the cells to be observed are in focus, and then photographs the cells. After photographing by the microscope 127 is completed, the robot 121 holds the culture vessel Cn1 and transports it to the incubator 122.
  • the analysis vessel Cn3, the centrifugation vessel Cn2, the standard sample, and the organic solvent for deproteinization are placed in a specified location in the pretreatment device 123.
  • the robot 121 takes out the culture vessel Cn1 stored in the incubator 122, transports it to the pretreatment device 123, and places it in the specified location.
  • the organic solvent is dispensed into the vessel Cn2
  • the culture fluid is dispensed from the culture vessel Cn1 into the vessel Cn2.
  • the robot 121 holds the vessel Cn2 and transports it to the centrifuge 125.
  • the centrifuge 125 rotates at a specified speed for a specified time.
  • the liquid contained in the vessel Cn2 is separated into a layer of organic solvent and a layer of culture fluid.
  • the robot 121 then holds the vessel Cn2 and places it in the specified location in the pretreatment device 123.
  • the pretreatment device 123 dispenses the culture medium supernatant separated in the container Cn2 into the analytical container Cn3, and then dispenses the standard sample into the same location in the container Cn3 as the culture medium supernatant.
  • the robot 121 transports the container Cn3 from the pretreatment device 123 to the LCMS 126 and stores it in the LCMS 126.
  • the LCMS 126 starts automatic analysis of the substance contained in the container Cn3 according to pre-specified analytical conditions.
  • the user cleans the instruments used in the experiment and sets them in the robot 121.
  • the robot 121 transports the instruments to the sterilization device 128.
  • the sterilization device 128 sterilizes the instruments in a manner in accordance with the experiment protocol.
  • the robot 121 removes the sterilized instruments from the sterilization device 128 and returns them to a given position.
  • Hardware configuration of terminal device 400 Fig. 2 is a block diagram showing a hardware configuration of the terminal device 400 in Fig. 1.
  • the terminal device 400 includes a processor 421, a memory 422 and a hard disk 423 as storage units, a communication interface 424, and an input/output unit 430. These are connected to each other via a bus 440 so as to be able to communicate with each other.
  • the hard disk 423 is a non-volatile storage device.
  • the operating system (OS) program 40, the management program 41, and schedule data 42 are stored on the hard disk 423.
  • the schedule data 42 is data used by the management program 41, and represents the experiment schedules of one or more users.
  • the hard disk 423 also stores, for example, settings and output of various applications.
  • the memory 422 is a volatile storage device, and includes, for example, a DRAM (Dynamic Random Access Memory).
  • the processor 421 includes a CPU (Central Processing Unit).
  • the processor 421 loads a program stored on the hard disk 423 into the memory 422 and executes the program.
  • the processor 421 is connected to the network NW via the communication interface 424.
  • FIG. 3 is a diagram showing an example of a display screen of an experiment schedule.
  • the terminal device 400 displays the experiment schedule on the display 431 in two types of display modes, a simple display and a detailed display.
  • a screen 800 shown in Fig. 3 is an example of a simple display screen. The detailed display screen will be described with reference to Fig. 4.
  • the screen 800 includes a schedule table 1, a calendar 2, a person list 3, a display switching button 4, and an edit button 5.
  • Schedule 1 shows the experimental schedule for each day.
  • Schedule 1 includes one or more experimental items 6.
  • One experimental item 6 corresponds to one process.
  • Schedule 1 includes two experimental items for April 5th (Friday) ("Turbidity measurement_Culture analysis” and "Culture preparation”). Schedule 1 also includes two experimental items for April 1st (Monday) ("Culture preparation” and “Reagent preparation”), two experimental items for April 2nd (Tuesday) ("Protein quantification” and “Inoculation”), three experimental items for April 3rd (Wednesday) ("Turbidity measurement", "Culture", and “Plasmid purification”), and three experimental items for April 4th (Thursday) ("Gene recombination", "Inoculation", and "Sterilization work”).
  • the terminal device 400 By operating the calendar 2, the terminal device 400 specifies the period to be displayed in the schedule table 1.
  • the person list 3 displays a list of one or more users whose schedules are managed by the management program. By selecting a user in the person list 3, the terminal device 400 specifies the user to be displayed in the schedule table 1.
  • the display switch button 4 By operating the display switch button 4, the terminal device 400 switches the screen that is actively displayed on the display 431 between a simple display screen and a detailed display screen.
  • the edit button 5 the terminal device 400 starts processing for editing the experiment schedule.
  • "editing an experiment schedule" includes both creating a new experiment schedule and modifying an experiment schedule that has already been created.
  • (Detail View) 4 is a diagram showing another example of the experiment schedule display screen 810.
  • the screen 810 shown in FIG. 4 is an example of a detailed display screen.
  • Screen 810 shown in FIG. 4 differs from screen 800 shown in FIG. 3 in the content displayed in schedule table 1. More specifically, schedule table 1 in screen 810 includes one or more experiment items 7. Each of the one or more experiment items 7 corresponds to one process. Each of the one or more experiment items 7 in screen 810 corresponds to one or more experiment items 6 in screen 800. Screen 810 differs from screen 800 in that the content displayed by each experiment item 7 differs from the content displayed by each experiment item 6.
  • each experiment item 6 displays only the name of each process
  • each experiment item 7 displays, in addition to the name of each process, the time periods during which work by workers is required for each process and the times during which such work is not required.
  • schedule table 1 on screen 810 includes two experimental items 7 ("Protein quantification” and "Inoculation") for Tuesday, April 2nd.
  • experimental item 7 "Protein quantification” includes one block representing the name of the process “Protein quantification”, as well as two blocks representing "Work” and one block representing "Waiting”.
  • the blocks representing "Work” represent time periods when work is required from a worker (e.g., a user of terminal device 400).
  • the blocks representing "Waiting" represent time periods when work is not required from a worker.
  • the blocks representing "Waiting" may represent time periods when experimental equipment is operating.
  • Figure 5 is a diagram showing an example of a screen (schedule editing screen) that is displayed when editing of the experiment schedule is started.
  • the terminal device 400 displays the screen 820 of Figure 5 on the display 431.
  • Screen 820 like screens 800 and 810, includes schedule table 1 and calendar 2. Screen 820 also includes item list 9.
  • the item list 9 includes four types of buttons (an add button 9A, a delete button 9B, an edit button 9C, and seven item buttons 9D). Each of the seven item buttons 9D represents one experimental process.
  • the terminal device 400 creates an item button 9D corresponding to the experimental process by accepting input of information about the experimental process from the user, as described with reference to Figures 6 and 7.
  • the terminal device 400 In response to an operation on the Add button 9A, the terminal device 400 starts creating an item button 9D corresponding to the experimental process. In response to an operation on the Delete button 9B while an item button 9D is specified, the terminal device 400 deletes the specified item button 9D from the item list 9. In response to an operation on the Edit button 9C while an item button 9D is specified, the terminal device 400 starts editing the information associated with the specified item button 9D by performing a process similar to the process described with reference to Figures 6 and 7.
  • FIG. 6 is a diagram showing an example of a screen (button creation screen) displayed during the process of creating an item button 9D corresponding to an experimental process.
  • the terminal device 400 displays the screen 830 shown in FIG. 6 on the display 431.
  • Screen 830 includes a field 12 for accepting input of the name of the process, a table 13 for accepting input of the schedule for that process, a save button 14, and a cancel button 15.
  • Table 13 includes "time” and "content.”
  • “Time” indicates the amount of time that has elapsed since the start of the process.
  • “Content” indicates whether or not worker action is required in the process, using the value “work” or the value “standby.”
  • the value “work” indicates that worker action is required.
  • the value “standby” indicates that no worker action is required.
  • Table 13 has a value of "Work" for the time period from 0:00 to 1:00. This means that worker work is required for one hour from the start of the process.
  • Table 13 also has a value of "Waiting" for the time period from time 1:00 to time 2:00. This means that no operator action is required between 1 hour and 2 hours after the start of the process.
  • Table 13 also has a value of "Work" for the time period from time 2:00 to time 2:30. This means that worker work is required between 2 hours and 2 hours and 30 minutes after the start of the process.
  • Table 13 has the value "Finish” for time 2:30, which means the process will finish in 2 hours and 30 minutes.
  • the terminal device 400 stores the contents entered in column 12 and table 13 in memory 422. Then, when the cancel button 15 is operated, the terminal device 400 discards the contents stored in memory 422 and returns the screen displayed on the display 431 to the schedule editing screen. On the other hand, when the save button 14 is operated, the terminal device 400 returns the screen displayed on the display 431 to the schedule editing screen, and displays an item button 9D representing the name entered in column 12 in the item list 9 of the schedule editing screen. Furthermore, when the save button 14 is operated, the terminal device 400 adds information to the schedule data 42 that associates the item button 9D with column 12 and table 13.
  • FIG. 7 is a diagram for explaining the relationship between the experiment item 7 displayed in the detailed display and the information entered into the button creation screen.
  • FIG. 7 shows the experiment item 7 that is displayed when the information shown in FIG. 6 is entered into the button creation screen.
  • experimental item 7 includes block 7A, which displays the name of the process, as well as three blocks 7B, 7C, and 7D, which display whether or not worker work is required during each of the three time periods that make up the process.
  • Each of blocks 7B, 7C, and 7D displays the value ("Work" or "Wait") entered for each of the time periods 0:00-1:00, 1:00-2:00, and 2:00-2:30 in table 13 of Figure 6.
  • FIG. 8 is a diagram for explaining the process for manually arranging a process in schedule table 1.
  • the user drags and drops item button 9D toward a position in schedule table 1 that corresponds to the intended time.
  • terminal device 400 displays experiment item 7 corresponding to item button 9D at the dropped position.
  • Terminal device 400 further stores information in memory 422 (information representing the created experiment schedule) that the process corresponding to the dragged-and-dropped item button 9D will be arranged at the time corresponding to the dropped position on the experiment schedule.
  • terminal device 400 may erase item button 9D corresponding to experiment item 7 from item list 9.
  • terminal device 400 may edit the information on the experiment item 7 and the process corresponding to experiment item 7 according to the content of the operation. In other words, terminal device 400 may change the shape of experiment item 7 according to the content of the operation, and may also change the length of the period corresponding to the time zone corresponding to the value "work” or value "wait” of the process.
  • the terminal device 400 In response to a drag-and-drop operation on one or more item buttons 9D in the item list 9, the terminal device 400 displays the corresponding experiment item 7 in the schedule table 1 for each item button 9D, as described above, and arranges the corresponding process in the experiment schedule.
  • the screen 820 further includes an automatic setting button 16.
  • the terminal device 400 automatically places, in the experiment schedule (without requiring the user to perform operations such as drag-and-drop), the processes corresponding to each of the one or more item buttons 9D on the item list 9.
  • FIG. 9 shows an example of a screen (automatic setting screen) that the terminal device 400 displays on the display 431 in response to the automatic setting button 16 being operated.
  • the screen 850 shown in FIG. 9 includes an item list 17, an area 18, and an execute button 24.
  • the item list 17 includes four types of buttons including an item button.
  • Area 18 includes table 19, delete button 20, field 21, save button 22, and delete button 23.
  • Table 19 displays the processes that are to be automatically placed in the experiment schedule. More specifically, table 19 includes "item” and “number of times.” More specifically, table 19 includes the name of the process that is to be automatically placed as the value of "item.” "Number of times” represents the set value of the number of times each process is performed in the experiment schedule created by the automatic placement of processes.
  • terminal device 400 When an item button is dropped into area 18 by a drag-and-drop operation, terminal device 400 adds the name of the process corresponding to that item button to table 19.
  • Table 19 displays the names of items that are to be automatically placed in the experiment schedule. In other words, accepting the operation of dropping an item button in item list 17 into area 18 constitutes an example of accepting the designation of a process that is to be automatically placed.
  • Table 19 further includes a check box corresponding to each item.
  • the check box is used to delete an item from table 19. More specifically, when the user operates the delete button 20 with a check mark placed in the check box for an item (process) in table 19, the terminal device 400 deletes that item from table 19.
  • the terminal device 400 accepts input of conditions for arranging each item (step) in table 19 in the experiment schedule.
  • the input conditions specify, for example, the period (date) during which the step is to be arranged, the time of day, and the relationship to other steps (before step A, immediately before step A, after step A, immediately after step A, within 30 minutes after step A is performed, etc.).
  • the user specifies an item in table 19 and inputs the conditions for the specified step in column 21.
  • the save button 22 is input, the conditions input in column 21 are confirmed.
  • the delete button 23 is operated, the conditions input in column 21 are erased.
  • the terminal device 400 When the execute button 24 is operated, the terminal device 400 creates an experiment schedule in which one or more items (steps) in table 19 are arranged so that the conditions determined for all items are satisfied. This determines the arrangement of one or more items (steps) in table 19 in the experiment schedule. Information representing the created experiment schedule is stored in memory 422.
  • the screen 820 further includes a save button 25 and a cancel button 26.
  • the save button 25 When the save button 25 is operated, the information representing the created experiment schedule stored in the memory 422 is stored in the hard disk 423 as schedule data 42. This confirms the information representing the experiment schedule, which has been created manually or automatically.
  • the terminal device 400 can correct the confirmed experiment schedule by editing it. More specifically, the terminal device 400 can manually or automatically correct the manually created experiment schedule in the manner described with reference to FIGS. 5 to 9. The terminal device 400 can also manually or automatically correct the automatically created experiment schedule in the manner described with reference to FIGS. 5 to 9.
  • the terminal device 400 can modify the experiment schedule in accordance with input from the user. Modification of the experiment schedule will be described in more detail with reference to Figs. 12 and 13.
  • FIG. 12 is a diagram showing an example of a simplified display screen including the experiment schedule revised from FIG. 10.
  • FIG. 13 is a diagram showing an example of a detailed display screen including the experiment schedule revised from FIG. 11.
  • the start and end times of the four processes following the process "inoculation" on Wednesday, April 3rd ("culture” from Wednesday, April 3rd to Thursday, April 4th, and "sterilization” and “data analysis” on Thursday, April 4th) are delayed by 30 minutes from the start and end times shown in FIGS. 10 and 11. That is, in response to the user inputting information indicating that the end time of the "inoculation" process on Wednesday, April 3rd was delayed, the terminal device 400 modifies the experiment schedule to delay the above four processes by 30 minutes.
  • the terminal device 400 can also modify the experiment schedule to move forward the placement of processes following that process.
  • the terminal device 400 When the end time of a certain process is changed in the experiment schedule, the terminal device 400 does not need to change the placement in the experiment schedule of processes that follow the process in question and that are not expected to be affected by the process whose end time has been changed.
  • the process "Data Analysis” on Thursday, April 4th does not overlap in time with the process “Sterilization Work” after its placement has been revised in terms of the value "Work.” Therefore, when revising the experiment schedule, the terminal device 400 does not change the placement of the process "Data Analysis” on Thursday, April 4th.
  • the terminal device 400 may modify the experiment schedule according to input from the experimental device 120.
  • each of one or more steps constituting the experimental schedule may be associated with information that identifies the experimental equipment 120 used in that step.
  • the terminal device 400 acquires information that identifies the experimental equipment 120 used in each step by accepting input of information that identifies the experimental equipment 120 to be used along with the value "Wait" on a button creation screen such as that shown in FIG. 6.
  • the terminal device 400 may then output an instruction to the experimental equipment 120 used in each step to start the step according to the experimental schedule, and may also acquire information from the experimental equipment 120 indicating that the step has been completed.
  • the experimental schedule may be modified according to the difference between the timing at which the information was acquired and the end time in the experimental schedule.
  • FIG. 14 is a diagram showing another example of a simplified display screen including an experiment schedule modified from FIG. 10.
  • FIG. 15 is a diagram showing another example of a detailed display screen including an experiment schedule modified from FIG. 11.
  • the screens in Figures 14 and 15 are displayed in response to information being input from the sterilization device 128 associated with the process indicating that the end time of the process "Sterilization Work" on Thursday, April 4th is 30 minutes later than scheduled.
  • Schedule Table 1 shown in Figures 14 and 15 the end time of the process "Sterilization Work” on Thursday, April 4th has been changed from 3:00 p.m. in Figures 10 and 11 to 3:30 p.m. In other words, the end time of the process "Sterilization Work” has been delayed by 30 minutes. Note that in the detailed display in Figure 15, the end time of the period corresponding to the value "Waiting" in the process "Sterilization Work” has been changed from 2:30 p.m. to 3:00 p.m.
  • terminal device 400 modifies the experiment schedule to delay the process "Data Analysis" by 30 minutes as described above.
  • (Main routine) 16 is a flowchart of a main routine.
  • the terminal device 400 realizes the process shown in FIG.
  • step S100 the terminal device 400 creates an experiment schedule as described with reference to FIGS. 5 to 9, and in step S200, adjusts the experiment schedule as described with reference to FIGS. 10 to 15.
  • FIG. 17 is a flowchart of a subroutine of step S100 in FIG.
  • step S110 the terminal device 400 waits until it detects an input to the input/output unit 430 (NO in step S110), and when it detects an input (YES in step S110), it advances control to step S120.
  • step S120 the terminal device 400 determines whether the input detected in step S110 is an input representing editing of the experiment schedule (an operation on the edit button 5), and if so (YES in step S120), proceeds to step S140; if not (NO in step S120), proceeds to step S130.
  • step S130 the terminal device 400 executes processing according to the contents of the detected input, and returns control to step S110.
  • the detected input is an operation of the display switching button 4
  • the terminal device 400 switches the display on the display 431 between simple display and detailed display.
  • the terminal device 400 switches the display on the display 431 from the experimental schedule display screen (e.g., FIG. 3 or FIG. 4) to the schedule editing screen (e.g., FIG. 5).
  • the terminal device 400 stores the arrangement of steps stored in the memory 422 in the hard disk 423 as schedule data 42.
  • step S110 is an input indicating the end of editing the experiment schedule (for example, an input indicating the operation of an end button, not shown)
  • the terminal device 400 may end the process of FIG. 17 and return control to FIG. 16.
  • step S140 the terminal device 400 creates an item button 9D according to the input from the user.
  • step S150 the terminal device 400 determines whether automatic placement has been specified.
  • Automatic placement means creating an experiment schedule by automatically placing items.
  • the terminal device 400 determines that automatic placement has been specified. If the terminal device 400 determines that automatic placement has been specified (YES in step S150), it advances control to step S170. On the other hand, if the terminal device 400 determines that automatic placement has not been specified (NO in step S150), it advances control to step S160.
  • step S160 the terminal device 400 performs manual arrangement and returns control to step S110.
  • Manual arrangement means creating an experiment schedule by arranging steps according to user operations, as described mainly with reference to FIG. 8.
  • step S170 the terminal device 400 performs automatic arrangement and returns control to step S110.
  • Automatic arrangement means creating an experiment schedule by automatically arranging steps, as described mainly with reference to FIG. 9.
  • FIG. 18 is a flowchart of a subroutine of step S160 in FIG.
  • step S161 the terminal device 400 receives an item placement request from the user.
  • an item placement request is the drag and drop of the item button 9D described with reference to FIG. 8.
  • step S162 the terminal device 400 determines whether the placement position of the item specified by the placement request is a position where the time period of the item overlaps with the time period of another item already placed on the experiment schedule.
  • the first item an item already placed on the experiment schedule
  • the second item an item that is the subject of the placement request. If the terminal device 400 determines that the time period requested for the second item overlaps with the time period of the first item (YES in step S162), control proceeds to step S163; if not (NO in step S162), control proceeds to step S165.
  • step S163 the terminal device 400 determines whether the time period for the second item value "work” in the placement request overlaps only with the time period for the first item value "standby". If the terminal device 400 determines that the time period for the second item value "work” in the placement request overlaps only with the time period for the first item value "standby" (YES in step S163), the control proceeds to step S165; otherwise (NO in step S163), the control proceeds to step S164.
  • the terminal device 400 advances control from step S163 to step S165.
  • step S164 the terminal device 400 issues an error notification.
  • the error notification is implemented by displaying an error message (e.g., "The placement is not accepted") and/or by outputting a voice message.
  • the terminal device 400 then advances control to step S168.
  • step S165 the terminal device 400 determines the placement of the item that is the subject of the placement request in accordance with the placement request.
  • step S166 the terminal device 400 stores in the memory 422 the arrangement of the items that are the subject of the arrangement request in accordance with the arrangement request.
  • step S167 the terminal device 400 displays the arrangement according to the arrangement request on the display 431.
  • the arrangement request is a drag-and-drop of the item button 9D
  • step S167 the experiment item 7 corresponding to the item button 9D is displayed at the position in the schedule table 1 where the item button 9D was dropped.
  • step S168 the terminal device 400 determines whether an operation to end manual placement has been performed.
  • This operation is an operation on the save button 25. If the terminal device 400 determines that the above operation has been performed (YES in step S167), it returns control to FIG. 17; if not (NO in step S167), it returns control to step S161.
  • the second item includes the value "Work”
  • an arrangement request is made such that the value "Work” of the second item overlaps with the value "Work” of the first item
  • an error is reported.
  • the second item is arranged in a position in the experiment schedule according to the arrangement request.
  • One example of an arrangement request such that the value "Work” of the second item does not overlap with the value "Work” of the first item is a request that the time period of the second item does not overlap with the first time period.
  • Another example is a request that the value "Work" of the second item only overlaps with the value "Wait" of the first item.
  • FIG. 19 is a flowchart of a subroutine of step S170 in FIG.
  • step S171 the terminal device 400 accepts the designation of the process to be automatically placed.
  • One example of such designation is the operation of dropping an item button in the item list 17 into the area 18, as described with reference to FIG. 9.
  • step S172 the terminal device 400 accepts input of the setting conditions for each of the one or more processes targeted for automatic placement (for example, the conditions to be input in column 21 in FIG. 9).
  • step S173 the terminal device 400 determines the placement of each of the one or more processes that are the target of automatic placement.
  • the control of step S173 is performed in response to the operation of the execute button 24.
  • the terminal device 400 determines the placement for one or more processes in sequence. For example, when three processes are the target of automatic placement, the terminal device 400 first places the first process in the experimental schedule, then adds the placement of the second process to the experimental schedule in which the first process has been placed, and then adds the placement of the third process to the experimental schedule in which the first and second processes have been placed.
  • the terminal device 400 places all the processes in the experimental schedule so that the conditions set for all the processes are satisfied. Furthermore, the terminal device 400 adds the processes to the experimental schedule so that the time period of the "Work" value of the newly added process does not overlap with the time period of the "Work” value of a process that has already been placed in the experimental schedule. At this time, in order to satisfy the conditions set for both the process to be added and the processes already placed in the experimental schedule, the terminal device 400 may change the placement of the processes already placed in the experimental schedule when adding a process.
  • step S174 the terminal device 400 stores the arrangement determined in step S173 in the memory 422.
  • step S175 the terminal device 400 displays the arrangement determined in step S173 on the display 431.
  • the terminal device 400 displays schedule table 1, which shows the experiment schedule according to the determined arrangement, on the display 431. The terminal device 400 then returns control to FIG. 17.
  • FIG. 20 is a flowchart of a subroutine of step S200 in FIG.
  • step S210 the terminal device 400 repeats the control of step S210 until it receives input of information indicating a change in the end time of a process placed on the experimental schedule (NO in step S210). Then, when the terminal device 400 receives input of information indicating a change in the end time of a process placed on the experimental schedule (YES in step S210), it proceeds to control step S220.
  • Such input may be input by a user via the input/output unit 430, as described with reference to FIGS. 12 to 15, or may be input from the experimental device 120 via the communication interface 424.
  • step S220 the terminal device 400 changes the placement in the experiment schedule of the process that follows the process whose end time has been changed, as described with reference to Figures 12 to 15.
  • step S230 the terminal device 400 displays the layout (experiment schedule) changed in step S220 on the display 431.
  • the terminal device 400 then returns control to step S210.
  • a second step is placed in the portion of the first step. This does not only mean that the second step is placed in the experimental schedule so that both its start time and end time coincide with the first step, but also that it may be placed so that it overlaps with at least a portion of the first step.
  • a method for managing an experimental schedule is a method for managing an experimental schedule which is implemented by a computer and includes a first process and a second process, wherein a time period for the first process includes a time period during which no worker work is required, and a time period for the second process includes a time period during which worker work is required, and the method includes a step of arranging the second process in a portion of the first process in the experimental schedule, and in the arranging step, the second process may be arranged in the experimental schedule such that a time period during which the second process requires worker work overlaps only with a time period during which the first process does not require worker work.
  • the method of managing an experimental schedule described in paragraph 1 may further include a step of accepting a request to add the second process to the experimental schedule, and if the request determines that at least a portion of a time period during which an operator is required to work in the second process overlaps with a time period during which an operator is required to work in the first process, a step of notifying an error regarding the request.
  • the person making the request when making a request to add a second process, can easily recognize that at least a portion of the time period during which the second process requires an operator to work overlaps with the time period during which the first process requires an operator to work.
  • the experiment schedule management method described in paragraph 2 may further comprise a step of displaying a time period for the first step.
  • the person who inputs the request to add the second process can input the request while recognizing the time period when the worker of the first process is not required to work, and thus, if an error is reported, the reason for the error can be easily understood.
  • the second process in the method for managing an experimental schedule described in paragraph 2 or 3, in the step of arranging the second process, the second process may be arranged in the experimental schedule in accordance with the request, on condition that the time period during which the second process requires an operator to work does not overlap with the time period during which the first process requires an operator to work.
  • the second step is placed in the experiment schedule in response to a user request.
  • the method for managing an experimental schedule described in any one of paragraphs 1 to 4 further includes a step of accepting input of conditions regarding the placement of at least one of the first step and the second step, and in the step of placing the second step, the second step may be placed according to the conditions.
  • the second process can be placed in the experiment schedule without making a specific placement request.
  • the method of managing an experimental schedule described in any one of paragraphs 1 to 5 may further include a step of determining whether or not there has been a change in the time period of either the first step or the second step, and, when it is determined that there has been a change in the time period of either the first step or the second step, changing the time period of the other of the first step or the second step in the experimental schedule in accordance with the change.
  • the experimental schedule prepared in advance can be adjusted according to the actual progress of each process.
  • the determining step may be performed based on a signal obtained from a device that executes either the first step or the second step.
  • the experiment schedule can be adjusted according to the actual progress of each step, even if the user does not know the actual progress of each step.
  • the determining step may be performed based on an input to an input device of the computer.
  • the experiment schedule when the user recognizes the actual progress of each step, the experiment schedule can be adjusted according to the actual progress of each step by inputting information into the input device according to the actual progress.
  • the experiment schedule management method may further include a step of switching between a simple display in which the time period of the first process is displayed only with the name of the first process, and a detailed display in which the time period of the first process is displayed so as to include the name of the first process and information indicating whether or not an action by an operator is required.
  • the experiment schedule management method described in Section 9 can provide a display of the content desired by the user.
  • An experimental schedule management device may include one or more processors, and a storage device storing a program that, when executed by the one or more processors, causes the one or more processors to implement the experimental schedule management method described in any one of paragraphs 1 to 9.
  • the experiment schedule management device described in paragraph 10 takes into account "time periods when workers are required to work," which was not previously taken into account, in the management of the experiment schedule, making it possible to manage experiments more efficiently.
  • the program for managing an experimental schedule may be executed by one or more processors to cause the one or more processors to implement the method for managing an experimental schedule described in any one of paragraphs 1 to 9.

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

第1の工程および第2の工程を含む実験スケジュールの管理方法が提供される。第1の工程の時間帯は、作業者の作業を必要としない時間帯を含み、第2の工程の時間帯は、作業者の作業を必要とする時間帯を含む。実験スケジュールにおける第1の工程の部分に第2の工程が配置されるとき、第2の工程において作業者の作業を必要とする時間帯が第1の工程において作業者の作業を必要としない時間帯にのみ重なるように、第2の工程が実験スケジュールに配置される。

Description

実験スケジュールの管理方法および管理装置、ならびに、実験スケジュールの管理用プログラム
 本発明は、実験スケジュールの管理に関する。
 従来、コンピュータを用いたスケジュールの管理について、種々の技術が提案されている。たとえば、特開平06-282446号公報(特許文献1)および特開平08-055036号公報(特許文献2)は、コンピュータにおける計算処理について、リソースを効率的に利用するための技術を開示している。特開2005-190318号公報(特許文献3)は、実験のスケジュールをコンピュータシステムにおいて作成する方法を開示している。
特開平06-282446号公報 特開平08-055036号公報 特開2005-190318号公報
 特許文献3では、化学実験において、操作機器が検体の数と比較して少ない場合であっても、適切に操作機器を制御するためのスケジュールが作成される。しかしながら、実験のスケジュール管理において考慮されるべき要素は、操作機器などの実験装置に限定されない。
 本発明は、係る実情に鑑み考え出されたものであり、その目的は、より効率的な実験の管理を可能とするための技術を提供することである。
 本開示のある局面に従う実験スケジュールの管理方法は、コンピュータによって実施される、第1の工程および第2の工程を含む実験スケジュールの管理方法であって、前記第1の工程の時間帯は、作業者の作業を必要としない時間帯を含み、前記第2の工程の時間帯は、作業者の作業を必要とする時間帯を含み、前記実験スケジュールにおいて前記第1の工程の部分に前記第2の工程を配置するステップを備え、前記配置するステップでは、前記第2の工程において作業者の作業を必要とする時間帯が前記第1の工程において作業者の作業を必要としない時間帯にのみ重なるように、前記第2の工程が前記実験スケジュールに配置される。
 本開示のある局面に従う実験スケジュールの管理装置は、1以上のプロセッサと、1以上のプロセッサによって実行されることにより、1以上のプロセッサに、上述の実験スケジュールの管理方法を実施させる、プログラムを格納した記憶装置と、を備える。
 本開示のある局面に従う実験スケジュールの管理用プログラムは、1以上のプロセッサによって実行されることにより、1以上のプロセッサに、上述の実験スケジュールの管理方法を実施させる。
 本開示のある局面に従うと、作業者の作業を必要とする時間帯が実験スケジュールの管理において考慮され、これにより、より効率的な実験の管理が可能になる。
本開示に係る実験スケジュールの管理装置を含む自動実験システム50の構成を示すブロック図である。 図1の端末装置400のハードウェア構成を示すブロック図である。 実験スケジュールの表示画面の一例を表す図である。 実験スケジュールの表示画面の他の例を表す図である。 実験スケジュールの編集が開始される際に表示される画面(スケジュール編集画面)の一例を表す図である。 実験工程に対応する項目ボタン9Dを作成するための処理において表示される画面(ボタン作成画面)の一例を表す図である。 詳細表示に表示される実験項目7とボタン作成画面に入力される情報との関係を説明するための図である。 スケジュール表1において、工程を手動で配置するための処理を説明するための図である。 自動設定ボタン16が操作されたことに応じて端末装置400がディスプレイ431に表示する画面(自動設定画面)の一例を示す図である。 図3に示された簡易表示の画面の変形例を表す。 図4に示された詳細表示の画面の変形例を示す図である。 図10から修正された実験スケジュールを含む、簡易表示の画面の一例を示す図である。 図11から修正された実験スケジュールを含む、詳細表示の画面の一例を示す図である。 図10から修正された実験スケジュールを含む、簡易表示の画面の他の例を示す図である。 図11から修正された実験スケジュールを含む、詳細表示の画面の他の例を示す図である。 メインルーチンのフローチャートである。 図16のステップS100のサブルーチンのフローチャートである。 図17のステップS160のサブルーチンのフローチャートである。 図17のステップS170のサブルーチンのフローチャートである。 図16のステップS200のサブルーチンのフローチャートである。
 以下、本開示の実施の形態について、図面を参照しながら詳細に説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。
 [1.自動実験システムの構成]
 図1は、本開示に係る実験スケジュールの管理装置を含む自動実験システム50の構成を示すブロック図である。図1に示されるように、自動実験システム50は、実験設備100と、端末装置400とを備える。端末装置400は、実験スケジュールの管理装置の一例である。一実現例では、端末装置400は、実験設備100を利用した実験のスケジュールを管理する。
 端末装置400は、入出力部430を含む。入出力部430は、ディスプレイ431と、キーボード432と、タッチパッド433とを含む。端末装置400は、たとえば、ノートパソコン、パーソナルコンピュータ、スマートフォン、およびタブレットである。実験設備100および端末装置400は、ネットワークNWを介して互いに接続されている。ネットワークNWは、たとえばインターネット、WAN(Wan Area Network)、またはLAN(Local Area Network)を含む。なお、ネットワークNWに接続されている端末装置400は、連携する2台以上の情報処理装置によって実現されてもよい。端末装置400は、複数の実験設備のそれぞれを利用した実験のスケジュールを管理してもよい。
 端末装置400には、実験プロトコルを管理するためのプログラム(以下、「管理プログラム」と称する)が予めインストールされている。キーボード432およびタッチパッド433は、ユーザによる管理プログラムへのGUI(Graphical User Interface)操作を受け付ける。端末装置400のユーザは、キーボード432およびタッチパッド433を介するGUI操作によって、実験設備100に含まれる1以上の実験装置によって行われる複数の処理の順序を設計できる。端末装置400は、ユーザによって設計された実験プロトコルに従って、実験のスケジュールを管理することができ、そして、実験設備100を制御できる。
 実験設備100は、制御装置110と、複数の実験装置120とを含む。実験設備100は、さらに、実験設備100の状況を認識するための画像を撮影する、少なくとも1つの撮影装置を含んでいてもよい。制御装置110は、複数の実験装置120を制御して、端末装置400からの実験プロトコルを自動的に実行する。複数の実験装置120は、ロボット121と、インキュベータ122と、前処理装置123と、マイクロプレートリーダ124と、遠心分離機125と、液体クロマトグラフ質量分析装置(LCMS:Liquid Chromatograph Mass Spectrometer)126と、顕微鏡127と、滅菌装置128とを含む。
 ロボット121は、実験プロトコルにおいて規定された複数の処理の順序に従って、サンプルを収容する培養容器Cn1(たとえばシャーレ、フラスコ、またはウェルプレート)を当該複数の処理の各々に対応する実験装置へ移動させる。培養容器Cn1は、たとえば培養された細胞(分析対象)を含む寒天を収容する。インキュベータ122は、温度管理を行いながら、培養容器Cn1において播種された細胞を培養する。前処理装置123は、自動的に、複数のマイクロプレート(ウェル)の各々へ一定量ずつサンプルを分配(分注)する。マイクロプレートリーダ124は、マイクロプレート内のサンプルの光学的性質の測定(たとえば吸光度測定および蛍光強度測定)を行う。遠心分離機125は、遠心力によって容器Cn2に収容されている分析対象の成分を分離する。LCMS126は、分析用の容器Cn3(たとえばバイアルまたはウェルプレート)に収容される分析対象を液体クロマトグラフによって分離し、分離された分析対象の成分を質量電荷比(m/z)毎に分離する質量分析を行う。顕微鏡127は、微少な分析対象(たとえば、細胞)を拡大し、肉眼での当該分析対象の観察を可能にする。滅菌装置128は、乾燥した高熱の環境を提供する滅菌室を含み、当該滅菌室に収容された器具(たとえば、培養容器)を滅菌する。
 培養容器Cn1の培地交換が行われる場合、新しい培地の入ったストック容器またはピペットチップが前処理装置123内の所定の場所に配置される。インキュベータ122内に保管されていた培養容器Cn1をロボット121が取り出す。ロボット121は、培養容器Cn1を前処理装置123へ搬送し、指定の場所へ設置する。
 前処理装置123は、培養容器Cn1内から培地を吸引して除去して、培養容器Cn1を洗浄する。前処理装置123は、新しい培地をストック容器から培養容器Cn1内へ分注する。前処理装置123による分注が完了した後、ロボット121は培養容器Cn1を保持してインキュベータ122へ搬送する。
 培養容器Cn1内の細胞の増殖具合または状態が観察される場合、インキュベータ122内に保管されている培養容器Cn1がロボット121によって取り出される。ロボット121は、培養容器Cn1を顕微鏡127まで搬送し、顕微鏡127の観察ステージ上に培養容器Cn1を設置する。顕微鏡127は、観察対象の細胞にピントが合うように焦点距離を調整した後、当該細胞を撮影する。顕微鏡127による撮影が完了した後、ロボット121は、培養容器Cn1を保持して、インキュベータ122へ搬送する。
 培養容器Cn1の細胞の培地分析が行われる場合、分析用の容器Cn3、遠心分離用の容器Cn2、標準試料、および除タンパク用の有機溶媒等が前処理装置123の所定の場所に設置される。インキュベータ122内に保管されている培養容器Cn1をロボット121が取り出して前処理装置123へと搬送し、指定の場所へ設置する。容器Cn2に有機溶媒が分注された後、培養容器Cn1から培養液が容器Cn2に分注される。培養液と有機溶媒とが十分に撹拌された後、ロボット121が容器Cn2を保持し、遠心分離機125へと搬送する。遠心分離機125は、指定された速度で指定された時間の間だけ回転する。その結果、容器Cn2に含まれる液体が、有機溶媒の層と培養液の層とに分離される。その後、ロボット121は、容器Cn2を保持して、前処理装置123の指定の場所へ設置する。前処理装置123は、容器Cn2において分離された培地上清を分析用の容器Cn3に分注した後、標準試料を培地上清と同じ容器Cn3の箇所に分注する。ロボット121は、容器Cn3を前処理装置123からLCMS126へ搬送し、LCMS126内に収納する。LCMS126は、予め指定された分析条件に沿って容器Cn3に収容されている物質の自動分析を開始する。
 一連の培養実験が終了すると、ユーザは、実験において使用された器具を、洗浄してロボット121にセットする。ロボット121は、器具を滅菌装置128へ搬送する。滅菌装置128は、器具を実験プロトコルに従った態様で滅菌する。ロボット121は、滅菌された器具を、滅菌装置128から取り出し、所与の位置に戻す。
 [2.端末装置400のハードウェア構成]
 図2は、図1の端末装置400のハードウェア構成を示すブロック図である。図2に示されるように、端末装置400は、プロセッサ421と、記憶部としてのメモリ422およびハードディスク423と、通信インターフェース424と、入出力部430とを含む。これらは、バス440を介して相互に通信可能に接続されている。
 ハードディスク423は、不揮発性の記憶装置である。ハードディスク423には、たとえばオペレーティングシステム(OS:Operating System)プログラム40、管理プログラム41、およびスケジュールデータ42が保存されている。スケジュールデータ42は、管理プログラム41において利用されるデータであって、1以上のユーザのそれぞれの実験スケジュールを表すデータである。図2に示されるデータ以外にも、ハードディスク423には、たとえば各種アプリケーションの設定および出力が保存される。メモリ422は、揮発性の記憶装置であり、たとえばDRAM(Dynamic Random Access Memory)を含む。
 プロセッサ421は、CPU(Central Processing Unit)を含む。プロセッサ421は、ハードディスク423に保存されているプログラムをメモリ422に読み込んで実行する。プロセッサ421は、通信インターフェース424を介してネットワークNWに接続する。
 [3.実験スケジュールの表示]
 (簡易表示)
 図3は、実験スケジュールの表示画面の一例を表す図である。端末装置400は、実験スケジュールを、簡易表示と詳細表示の2種類の態様でディスプレイ431に表示する。図3に示された画面800は、簡易表示の画面の一例である。詳細表示の画面は、図4を参照して説明される。
 画面800は、スケジュール表1、カレンダー2、人物一覧3、表示切替ボタン4、および編集ボタン5を含む。
 スケジュール表1は、各日の実験スケジュールを表す。スケジュール表1は、1以上の実験項目6を含む。1つの実験項目6は、1つの工程に対応する。
 図3の例において、スケジュール表1は、4月5日(金)について、2つの実験項目(「濁度測定_培地分析」と「培地作製」)を含む。また、スケジュール表1は、4月1日(月)について2つの実験項目(「培地作製」および「試薬調製」)を含み、4月2日(火)について2つの実験項目(「タンパク質定量」および「植菌」)を含み、4月3日(水)について3つの実験項目(「濁度測定」「培養」および「プラスミド精製」)を含み、そして、4月4日(木)について3つの実験項目(「遺伝子組換え」「植菌」および「滅菌作業」)を含む。
 カレンダー2に対する操作によって、端末装置400は、スケジュール表1において表示対象となる期間を特定する。人物一覧3は、管理プログラムによってスケジュールを管理される1以上のユーザのリストを表示する。人物一覧3におけるユーザの選択によって、端末装置400は、スケジュール表1において表示対象となるユーザを特定する。表示切替ボタン4に対する操作によって、端末装置400は、ディスプレイ431においてアクティブな状態で表示される画面を、簡易表示の画面と詳細表示の画面との間で切り替える。編集ボタン5に対する操作によって、端末装置400は、実験スケジュールの編集のための処理を開始する。本明細書において、「実験スケジュールの編集」は、実験スケジュールを新規に作成することおよび既に作成された実験スケジュールを修正することの双方を含む。
 (詳細表示)
 図4は、実験スケジュールの表示画面の他の例を表す図である。図4に示された画面810は、詳細表示の画面の一例である。
 図4に示された画面810は、図3に示された画面800に対して、スケジュール表1に表示される内容が異なる。より具体的には、画面810のスケジュール表1は、1以上の実験項目7を含む。1以上の実験項目7の各々は、1つの工程に対応する。画面810における1以上の実験項目7のそれぞれは、画面800における1以上の実験項目6のそれぞれに対応する。そして、画面810は、各実験項目7によって表示される内容が各実験項目6によって表示される内容に対して異なることにより、画面800と異なる。
 さらに具体的には、各実験項目6は、各工程の名称のみを表示するのに対し、各実験項目7は、各工程の名称に加えて、各工程における作業者による作業が必要とされる時間帯と当該作業が必要とされない時間とを表示する。
 たとえば、画面810のスケジュール表1は、4月2日(火)について、2つの実験項目7(「タンパク質定量」「植菌」)を含む。このうち、「タンパク質定量」の実験項目7は、「タンパク質定量」という工程の名称を表す1つのブロックに加えて、「作業」を表す2つのブロックと、「待機」を表す1つのブロックとを含む。「作業」を表すブロックは、作業者(たとえば、端末装置400のユーザ)の作業を必要とする時間帯を表す。「待機」を表すブロックは、作業者の作業を必要としない時間帯を表す。「待機」を表すブロックは、実験装置が動作する時間帯を表してもよい。
 [4.実験スケジュールの編集]
 図5~図9を参照して、実験スケジュールの編集について説明する。図5は、実験スケジュールの編集が開始される際に表示される画面(スケジュール編集画面)の一例を表す図である。端末装置400は、たとえば編集ボタン5が操作されたことに応じて、図5の画面820をディスプレイ431に表示する。
 画面820は、画面800および画面810と同様に、スケジュール表1およびカレンダー2を含む。そして、画面820は、項目一覧9を含む。
 項目一覧9は、4種類のボタン(追加ボタン9A、削除ボタン9B、編集ボタン9C、および、7個の項目ボタン9D)を含む。7個の項目ボタン9Dの各々は、1つの実験工程を表す。端末装置400は、図6および図7を参照して説明されるように、ユーザから実験工程についての情報の入力を受け付けることにより、当該実験工程に対応する項目ボタン9Dを作成する。
 追加ボタン9Aに対する操作に応じて、端末装置400は、実験工程に対応する項目ボタン9Dの作成を開始する。項目ボタン9Dが指定された状態で削除ボタン9Bに対して操作がなされたことに応じて、端末装置400は、項目一覧9から指定された項目ボタン9Dを削除する。項目ボタン9Dが指定された状態で編集ボタン9Cに対して操作がなされたことに応じて、端末装置400は、図6および図7を参照して説明される処理と同様の処理を実施することによる、指定された項目ボタン9Dに対応付けられた情報の編集を開始する。
 図6は、実験工程に対応する項目ボタン9Dを作成するための処理において表示される画面(ボタン作成画面)の一例を表す図である。端末装置400は、たとえば図5の画面820において追加ボタン9Aが操作されたことに応じて、図6に示された画面830をディスプレイ431に表示する。
 画面830は、工程の名称の入力を受け付ける欄12と、当該工程のスケジュールの入力を受け付ける表13と、保存ボタン14と、キャンセルボタン15とを含む。
 ユーザは、欄12に工程の名称を入力し、表13に当該工程のスケジュールを入力する。表13は、「時間」と「内容」とを含む。「時間」では、工程の開始からの経過時間が表される。「内容」では、値「作業」または値「待機」によって、工程における作業者の作業が必要とされるか否かが表される。値「作業」は、作業者の作業が必要とされることを表す。値「待機」は、作業者の作用が必要とされないことを表す。
 図6の例では、表13は、時間0:00から時間1:00までの時間帯について、値「作業」を有する。このことは、工程の開始から1時間の間、作業者の作業が必要とされることを意味する。
 また、表13は、時間1:00から時間2:00までの時間帯について、値「待機」を有する。このことは、工程の開始から1時間後から2時間後までの間、作業者の作業が必要とされないことを意味する。
 また、表13は、時間2:00から時間2:30までの時間帯について、値「作業」を有する。このことは、工程の開始から2時間後から2時間30分後の間、作業者の作業が必要とされることを意味する。
 表13は、時間2:30について、値「終了」を有する。このことは、工程が2時間30分で終了することを意味する。
 一実現例では、端末装置400は、欄12および表13に入力された内容をメモリ422に格納する。そして、端末装置400は、キャンセルボタン15が操作されると、メモリ422に格納された内容を破棄して、ディスプレイ431に表示される画面をスケジュール編集画面に戻す。一方、端末装置400は、保存ボタン14が操作されると、ディスプレイ431に表示される画面をスケジュール編集画面に戻し、当該スケジュール編集画面の項目一覧9に、欄12に入力された名称を表す項目ボタン9Dを表示させる。さらに、端末装置400は、保存ボタン14が操作されると、スケジュールデータ42に、項目ボタン9Dに欄12および表13を対応付ける情報を追加する。
 図7は、詳細表示に表示される実験項目7とボタン作成画面に入力される情報との関係を説明するための図である。図7には、ボタン作成画面に図6に示された情報が入力されたことによって表示される実験項目7が示される。
 図7において、実験項目7は、工程の名称を表示するブロック7Aに加えて、工程を構成する3つの時間帯のそれぞれにおいて作業者の作業を必要とされるか否かを表示する3つのブロック7B,7C,7Dを含む。ブロック7B,7C,7Dのそれぞれは、図6の表13において、0:00~1:00,1:00~2:00,2:00~2:30のそれぞれの時間帯について入力された値(「作業」または「待機」)を表示する。
 図8は、スケジュール表1において、工程を手動で配置するための処理を説明するための図である。図8において矢印7Xで示されるように、ユーザは、項目ボタン9Dをスケジュール表1における意図した時間に対応する位置へ向けてドラッグアンドドロップする。これに応じて、端末装置400は、ドロップされた位置に、項目ボタン9Dに対応する実験項目7を表示する。端末装置400は、さらに、ドラッグアンドドロップされた項目ボタン9Dに対応する工程が実験スケジュールのドロップされた位置に対応する時間に配置される情報(作成された実験スケジュールを表す情報)を、メモリ422に格納する。端末装置400は、実験項目7をスケジュール表1に表示したことに応じて、当該実験項目7に対応する項目ボタン9Dを項目一覧9から消去してもよい。
 端末装置400は、スケジュール表1に表示された実験項目7に対して、値「作業」または値「待機」に対応する領域を延ばすまたは縮める操作がなされた場合、操作の内容に従って、実験項目7、および、実験項目7に対応する工程の情報を編集してもよい。すなわち、端末装置400は、操作の内容に従って、実験項目7の形状を変更し、さらに、工程の値「作業」または値「待機」に対応する時間帯が対応する期間の長さを変更してもよい。
 端末装置400は、項目一覧9の1以上の項目ボタン9Dの各々に対するドラッグアンドドロップ操作に応じて、上述したように、それぞれの項目ボタン9Dについて、対応する実験項目7をスケジュール表1に表示し、対応する工程を実験スケジュールにおいて配置する。
 図5に戻って、画面820は、自動設定ボタン16をさらに含む。自動設定ボタン16を操作されると、端末装置400は、項目一覧9上の1以上の項目ボタン9Dのそれぞれに対応する工程を、自動的に(ユーザのドラッグアンドドロップなどの操作を必要とすることなく)、実験スケジュールに配置する。
 図9は、自動設定ボタン16が操作されたことに応じて端末装置400がディスプレイ431に表示する画面(自動設定画面)の一例を示す図である。
 図9に示された画面850は、項目一覧17と、領域18と、実行ボタン24とを含む。項目一覧17は、項目一覧9と同様に、項目ボタンを含む4種類のボタンを含む。
 領域18は、表19と、削除ボタン20と、欄21と、保存ボタン22と、削除ボタン23とを含む。表19は、実験スケジュールへの自動的な配置の対象となる工程を表示する。より具体的には、表19は、「項目」と「回数」とを含む。より具体的には、表19は、自動的な配置の対象となる工程の名称を「項目」の値として含む。「回数」は、工程の自動的な配置によって作成される実験スケジュールにおいて、各工程が実施される回数の設定値を表す。
 端末装置400は、項目ボタンがドラッグアンドドロップ操作によって領域18にドロップされたことに応じて、当該項目ボタンに対応する工程についてその名称を表19に追加する。表19は、実験スケジュールの自動配置の対象とされる項目の名称を表示する。すなわち、項目一覧17内の項目ボタンを領域18にドロップする操作を受け付けることは、自動配置の対象となる工程の指定を受け付けることに一例を構成する。
 表19は、各項目に対応するチェック欄をさらに含む。チェック欄は、表19からの項目の削除に利用される。より具体的には、ユーザが表19内のある項目(工程)についてチェック欄にチェックを入れた状態で削除ボタン20を操作すると、端末装置400は、当該項目を表19から削除する。
 端末装置400は、欄21において、表19内の各項目(工程)に対する、実験スケジュールにおいて配置される際の条件の入力を受け付ける。入力される条件は、たとえば、工程を配置したい期間(日付)、一日における時間帯、他の工程との関係(工程Aよりも前、工程Aの直前、工程Aより後、工程Aの直後、工程Aの実施後30分以内、など)を規定する。一実現例では、ユーザは、表19内の1つの項目を指定し、指定された工程に対する条件を欄21に入力する。保存ボタン22が入力されると、欄21に入力された条件が確定される。削除ボタン23が操作されると、欄21に入力された条件が消去される。
 実行ボタン24を操作されると、端末装置400は、表19内の1以上の項目(工程)が、全ての項目に対して確定された条件が満たされるように配置された、実験スケジュールを作成する。これにより、表19内の1以上の項目(工程)のそれぞれの実験スケジュールにおける配置が決定される。作成された実験スケジュールを表す情報は、メモリ422に格納される。
 図5に戻って、画面820は、保存ボタン25およびキャンセルボタン26をさらに含む。保存ボタン25が操作されると、メモリ422に格納されている、作成された実験スケジュールを表す情報を、スケジュールデータ42として、ハードディスク423に格納する。これにより、手動でまたは自動的に作成された、実験スケジュールを表す情報が確定する。なお、端末装置400は、確定された実験スケジュールを編集によって修正することができる。より具体的には、端末装置400は、手動で作成された実験スケジュールを、図5~図9を参照して説明された態様で、手動でまたは自動的に修正することができる。また、端末装置400は、自動的に作成された実験スケジュールを、図5~図9を参照して説明された態様で、手動でまたは自動的に修正することができる。
 [5.実験スケジュールの変形例]
 図10は、図3に示された簡易表示の画面の変形例を表す。図11は、図4に示された詳細表示の画面の変形例を示す図である。
 図3および図4のそれぞれのスケジュール表1に示された実験スケジュールは、各日における工程が他の日における工程に対して独立していた。図10および図11のそれぞれのスケジュール表1に示された実験スケジュールは、他の日にまで及ぶ工程を含む。たとえば、図10および図11に示された実験スケジュールにおいて、4月3日(水)の11時から開始される工程「培養」は、翌日である4月4日(木)の11時まで続く。
 [6.実験スケジュールの調整]
 端末装置400は、実験スケジュールが確定された後、ユーザからの入力に従って、実験スケジュールを修正することができる。実験スケジュールの修正について、図12および図13を参照して、より具体的に説明する。
 図12は、図10から修正された実験スケジュールを含む、簡易表示の画面の一例を示す図である。図13は、図11から修正された実験スケジュールを含む、詳細表示の画面の一例を示す図である。
 図12および図13の画面は、4月3日(水)の工程「植菌」の終了時間が予定よりも30分遅れたことを表す情報がユーザから入力されたことに応じて表示される画面である。図12および図13のそれぞれに示されたスケジュール表1では、4月3日(水)の工程「植菌」の終了時間が、図10および図11における11時から、11時30分へと変更されている。つまり、工程「植菌」の終了時間が30分遅れている。これに応じて、図12および図13のそれぞれに示されたスケジュール表1では、4月3日(水)の工程「植菌」に続く4つの工程(4月3日(水)から4月4日(木)に亘る「培養」、ならびに、4月4日(木)の「滅菌作業」および「データ解析」)の開始時間および終了時間が、図10および図11に示された開始時間および終了時間から30分遅れている。すなわち、端末装置400は、ユーザから、4月3日(水)の工程「植菌」の終了時間が遅れたことを表す情報を入力されたことに応じて、上記4つの工程を30分遅らせるように、実験スケジュールを修正する。
 端末装置400は、ある工程が予定より早く終了した場合に、当該工程より後の工程の配置を早めるように、実験スケジュールを修正することもできる。
 端末装置400は、実験スケジュールにおいて、ある工程の終了時間が変更された場合、当該工程より後の工程のうち、終了時間が変更された工程によって影響を受けないことが想定される工程については、実験スケジュールにおける配置を変更しなくてもよい。
 たとえば、上述の例において、4月4日(木)の工程「データ解析」は、配置を修正された後の工程「滅菌作業」とは、値「作業」について時間的な重なりを持たない。したがって、端末装置400は、実験スケジュールの修正において、4月4日(木)の工程「データ解析」の配置は変更しない。
 端末装置400は、実験装置120からの入力に従って、実験スケジュールを修正してもよい。
 より具体的には、実験スケジュールを構成する1以上の工程のそれぞれは、当該工程において利用される実験装置120を特定する情報と対応付けられていてもよい。一実現例では、図6に示されたようなボタン作成画面において、値「待機」とともに、利用される実験装置120を特定する情報の入力を受け付けることによって、端末装置400は、各工程で利用される実験装置120を特定する情報を取得する。そして、端末装置400は、各工程で利用される実験装置120に対して、実験スケジュールに従って、工程を開始する指示を出力してもよく、また、当該実験装置120から、工程を終了したことを表す情報を取得してもよい。そして、端末装置400は、実験装置120から工程を終了したことを表す情報を取得したタイミングが、実験スケジュールにおける工程の終了時間と異なる場合に、情報を取得したタイミングと実験スケジュールにおける終了時間との差分に従って、実験スケジュールを修正してもよい。
 図14は、図10から修正された実験スケジュールを含む、簡易表示の画面の他の例を示す図である。図15は、図11から修正された実験スケジュールを含む、詳細表示の画面の他の例を示す図である。
 図14および図15の画面は、4月4日(木)の工程「滅菌作業」の終了時間が予定よりも30分遅れたことを表す情報が、当該工程に対応付けられている滅菌装置128から入力されたことに応じて表示される画面である。図14および図15のそれぞれに示されたスケジュール表1では、4月4日(木)の工程「滅菌作業」の終了時間が、図10および図11における15時から、15時30分へと変更されている。つまり、工程「滅菌作業」の終了時間が30分遅れている。なお、図15の詳細表示では、工程「滅菌作業」のうち、値「待機」に対応する期間の終了時間が、14時30分から15時へと変更されている。
 上記の遅れに応じて、図14および図15のそれぞれに示されたスケジュール表1では、4月4日(木)において、工程「滅菌作業」に続く工程「データ解析」の開始時間および終了時間が、図10および図11に示された開始時間および終了時間から30分遅れている。すなわち、端末装置400は、滅菌装置128から、4月4日(木)の工程「滅菌作業」の終了を示す情報を取得したタイミングが30分遅れたことに応じて、上述のように工程「データ解析」を30分遅らせるように、実験スケジュールを修正する。
 [7.処理の流れ]
 図16~図20を参照して、実験スケジュールの管理について実行される処理の流れを説明する。
 (メインルーチン)
 図16は、メインルーチンのフローチャートである。一実現例では、端末装置400は、図16に示された処理を、たとえばプロセッサ421に管理プログラム41を実行させることによって実現する。
 図16に示されるように、ステップS100にて、端末装置400は、図5~図9を参照して説明されたうように実験スケジュールを作成し、ステップS200にて、図10~図15を参照して説明されたように実験スケジュールを調整する。
 (実験スケジュール編集)
 図17は、図16のステップS100のサブルーチンのフローチャートである。
 図17に示されるように、ステップS110にて、端末装置400は、入出力部430に対する入力を検出するまで待機し(ステップS110にてNO)、入力を検出すると(ステップS110にてYES)、ステップS120へ制御を進める。
 ステップS120にて、端末装置400は、ステップS110において検出された入力が実験スケジュールの編集を表す入力(編集ボタン5に対する操作)であるか否かを判断し、そうであれば(ステップS120にてYES)、ステップS140へ制御を進め、そうでなければ(ステップS120にてNO)、ステップS130へ制御を進める。
 ステップS130にて、端末装置400は、検出された入力の内容に従った処理を実行して、ステップS110へ制御を戻す。たとえば、検出された入力が表示切替ボタン4の操作であった場合、端末装置400は、ディスプレイ431における表示を、簡易表示と詳細表示との間で切り替える。検出された入力が編集ボタン5の操作であった場合、端末装置400は、ディスプレイ431における表示を、実験スケジュールの表示画面(たとえば、図3または図4)から、スケジュール編集画面(たとえば、図5)へと切り替える。手動配置または自動配置で決定された実験スケジュールにおける工程の配置を確定させるための操作であった場合、端末装置400は、メモリ422に格納されている工程の配置をスケジュールデータ42としてハードディスク423に格納する。
 なお、ステップS110において検出された入力が実験スケジュールの編集の終了を表す入力(たとえば、図示されていない終了ボタンの操作を表す入力)であった場合、端末装置400は、図17の処理を終了させて、図16へ制御をリターンさせてもよい。
 ステップS140にて、端末装置400は、ユーザからの入力に従って項目ボタン9Dを作成する。
 ステップS150にて、端末装置400は、自動配置が指定されたか否かを判断する。自動配置は、項目を自動的に配置することによって実験スケジュールを作成することを意味する。一実現例では、自動設定ボタン16が操作された場合に、端末装置400は、自動配置が指定されたと判断する。端末装置400は、自動配置が指定されたと判断すると(ステップS150にてYES)、ステップS170へ制御を進める。一方、端末装置400は、自動配置が指定されていないと判断すると(ステップS150にてNO)、ステップS160へ制御を進める。
 ステップS160にて、端末装置400は、手動配置を実施して、ステップS110へ制御を戻す。手動配置は、図8を主に参照して説明されたように、ユーザの操作に従って工程を配置することにより、実験スケジュールを作成することを意味する。
 ステップS170にて、端末装置400は、自動配置を実施して、ステップS110へ制御を戻す。自動配置は、図9を主に参照して説明されたように、自動的に工程を配置することにより、実験スケジュールを作成することを意味する。
 (手動配置)
 図18は、図17のステップS160のサブルーチンのフローチャートである。
 図18に示されるように、ステップS161にて、端末装置400は、ユーザからの、項目の配置要求を受け付ける。項目の配置要求の一例は、図8を参照して説明された、項目ボタン9Dのドラッグアンドドロップである。
 ステップS162にて、端末装置400は、配置要求によって特定される項目の配置位置が、当該項目の時間帯と既に実験スケジュールに配置される他の項目の時間帯とが重なるような位置であるか否かを判断する。説明の便宜上、既に実験スケジュールに配置されている項目を「第1の項目」と称し、配置要求の対象である項目を「第2の項目」と称する。端末装置400は、第2の項目について要求された時間帯と第1の項目の時間帯とが重なると判断すると(ステップS162にてYES)、ステップS163へ制御を進め、そうでなければ(ステップS162にてNO)、ステップS165へ制御を進める。
 ステップS163にて、端末装置400は、配置要求における第2の項目の値「作業」の時間帯が、第1の項目の値「待機」の時間帯にのみ重なるか否かを判断する。端末装置400は、配置要求における第2の項目の値「作業」の時間帯が、第1の項目の値「待機」の時間帯にのみ重なると判断すると(ステップS163にてYES)、ステップS165へ制御を進め、そうでなければ(ステップS163にてNO)、ステップS164へ制御を進める。
 なお、第2の項目が値「作業」を含まない場合、すなわち、第2の項目が値「待機」のみを含む場合には、端末装置400は、ステップS163からステップS165へと制御を進める。
 ステップS164にて、端末装置400は、エラー報知を実施する。一実現例では、エラー報知は、エラーメッセージ(たとえば、「その配置は受け付けられません」)の表示および/または音声出力によって実現される。その後、端末装置400は、ステップS168へ制御を進める。
 ステップS165にて、端末装置400は、上記配置要求に従って、上記配置要求の対象となった項目の配置を決定する。
 ステップS166にて、端末装置400は、上記配置要求の対象となった項目について、配置要求に従った配置をメモリ422に格納する。
 ステップS167にて、端末装置400は、配置要求に従った配置をディスプレイ431に表示する。たとえば、配置要求が、項目ボタン9Dのドラッグアンドドロップであった場合、ステップS167では、項目ボタン9Dに対応する実験項目7が、スケジュール表1において項目ボタン9Dがドロップされた位置に表示される。
 ステップS168にて、端末装置400は、手動配置を終了するための操作がなされたか否かを判断する。この操作の一例は、保存ボタン25に対する操作である。端末装置400は、上記操作がなされたと判断すると(ステップS167にてYES)、制御を図17へリターンさせ、そうでなければ(ステップS167にてNO)、制御をステップS161に戻す。
 図18の処理によれば、第2の項目が値「作業」を含む場合、第2の項目の値「作業」が第1の項目の値「作業」に重なるような配置要求がなされると、エラーが報知される。一方、第2の項目の値「作業」が第1の項目の値「作業」に重ならないような配置要求がなされると、第2の項目は、実験スケジュールにおいて、配置要求に従った位置に配置される。第2の項目の値「作業」が第1の項目の値「作業」に重ならないような配置要求の一例は、第2の項目の時間帯が第1の時間帯と重ならない要求である。他の例は、第2の項目の値「作業」が第1の項目の値「待機」にのみ重なる要求である。
 (自動配置)
 図19は、図17のステップS170のサブルーチンのフローチャートである。
 図19に示されるように、ステップS171にて、端末装置400は、自動配置の対象となる工程の指定を受け付ける。このような指定の一例は、図9を参照して説明されたように、項目一覧17内の項目ボタンを領域18にドロップする操作である。
 ステップS172にて、端末装置400は、自動配置の対象とされた1以上の工程の各々の設定条件(たとえば、図9の欄21に入力される条件)の入力を受け付ける。
 ステップS173にて、端末装置400は、自動配置の対象となる1以上の工程のそれぞれの配置を決定する。一実現例では、ステップS173の制御は、実行ボタン24が操作されたことに応じて実施される。また、一実現例では、端末装置400は、1以上の工程に対して順に配置を決定する。たとえば、端末装置400は、3つの工程が自動配置の対象とされている場合、まず、1つ目の工程を実験スケジュールに配置し、次に、1つ目の工程を配置された実験スケジュールに2つ目の工程の配置を追加し、次に、1つ目および2つ目の工程を配置された実験スケジュールに3つ目の工程の配置を追加する。
 端末装置400は、全ての工程について設定された条件が満たされるように、全ての工程を実験スケジュールに配置する。さらに、端末装置400は、新たに追加される工程の値「作業」の時間帯が、先に実験スケジュールに配置されている工程の値「作業」の時間帯に重ならないように、実験スケジュールに工程を追加する。このとき、追加される工程と既に実験スケジュールに配置されている工程の双方について設定された条件を満たすために、端末装置400は、工程を追加するときに、既に実験スケジュールに配置されている工程の配置を変更してもよい。
 ステップS174にて、端末装置400は、ステップS173において決定された配置をメモリ422に格納する。
 ステップS175にて、端末装置400は、ステップS173において決定された配置をディスプレイ431に表示する。一実現例では、端末装置400は、決定された配置に従った実験スケジュールを表すスケジュール表1をディスプレイ431に表示する。その後、端末装置400は、図17へ制御をリターンさせる。
 (実験スケジュール調整)
 図20は、図16のステップS200のサブルーチンのフローチャートである。
 図20に示されるように、ステップS210にて、端末装置400は、実験スケジュールに配置されている工程の終了時間の変更を表す情報の入力を受け付けるまで、ステップS210の制御を繰り返す(ステップS210にてNO)。そして、端末装置400は、実験スケジュールに配置されている工程の終了時間の変更を表す情報の入力を受け付けると(ステップS210にてYES)、ステップS220へ制御を進める。このような入力は、図12~図15を参照して説明されたように、入出力部430を介してユーザから入力されてもよいし、通信インターフェース424を介して実験装置120から入力されてもよい。
 ステップS220にて、端末装置400は、図12~図15を参照して説明されたように、終了時間を変更された工程より後の工程の実験スケジュールにおける配置を変更する。
 ステップS230にて、端末装置400は、ステップS220において変更を加えられた配置(実験スケジュール)をディスプレイ431に表示する。その後、端末装置400は、ステップS210へ制御を戻す。
 以上説明された本実施の形態では、第1の工程を含む実験スケジュールにおいて、第1の工程の部分に第2の工程が配置される。このことは、実験スケジュールにおいて、第2の工程が、時間的に、その開始時間および終了時間の双方が第1の工程と一致するように配置されることだけでなく、第1の工程の少なくとも一部と重なるように配置されることも含んでいてもよい。
 [態様]
 上述した複数の例示的な実施形態は、以下の態様の具体例であることが当業者により理解される。
 (第1項)
 一態様にかかる実験スケジュールの管理方法は、コンピュータによって実施される、第1の工程および第2の工程を含む実験スケジュールの管理方法であって、前記第1の工程の時間帯は、作業者の作業を必要としない時間帯を含み、前記第2の工程の時間帯は、作業者の作業を必要とする時間帯を含み、前記実験スケジュールにおける前記第1の工程の部分に前記第2の工程を配置するステップを備え、前記配置するステップでは、前記第2の工程において作業者の作業を必要とする時間帯が前記第1の工程において作業者の作業を必要としない時間帯にのみ重なるように、前記第2の工程が前記実験スケジュールに配置されてもよい。
 第1項に記載の実験スケジュールの管理方法によれば、従来考慮されていない「作業者の作業を必要とする時間帯」が実験スケジュールの管理において考慮され、これにより、より効率的な実験の管理が可能になる。
 (第2項)
 第1項に記載の実験スケジュールの管理方法は、前記実験スケジュールに前記第2の工程を追加する要求を受け付けるステップと、前記要求において、前記第2の工程において作業者の作業を必要とする時間帯の少なくとも一部が前記第1の工程において作業者の作業を必要とする時間帯と重なる場合には、前記要求に対するエラーを報知するステップと、をさらに備えていてもよい。
 第2項に記載の実験スケジュールの管理方法によれば、第2の工程を追加する要求において、第2の工程において作業者の作業を必要とする時間帯の少なくとも一部が第1の工程において作業者の作業を必要とする時間帯と重なることを、当該要求をした者が容易に認識し得る。
 (第3項)
 第2項に記載の実験スケジュールの管理方法は、前記第1の工程の時間帯を表示するステップをさらに備えていてもよい。
 第3項に記載の実験スケジュールの管理方法によれば、第2の工程を追加する要求を入力する者が、第1の工程の作業者の作業を必要としない時間帯を認識しながら上記要求を入力でき、これにより、エラー報知がされた場合にはエラー報知の理由を容易に理解し得る。
 (第4項)
 第2項または第3項に記載の実験スケジュールの管理方法において、前記第2の工程を配置するステップでは、前記要求において、前記第2の工程において作業者の作業を必要とする時間帯が前記第1の工程において作業者の作業を必要とする時間帯と重ならないことを条件として、前記要求に応じて前記第2の工程が前記実験スケジュールに配置されてもよい。
 第4項に記載の実験スケジュールの管理方法によれば、ユーザの要求に応じて、第2の工程が実験スケジュールに配置される。
 (第5項)
 第1項~第4項のいずれか1項に記載の実験スケジュールの管理方法は、前記第1の工程および前記第2の工程の少なくとも一方の配置に関する条件の入力を受け付けるステップをさらに備え、前記第2の工程を配置するステップでは、前記第2の工程は前記条件に従って配置されてもよい。
 第5項に記載の実験スケジュールの管理方法によれば、ユーザは、配置に関する条件を入力しておけば、具体的な配置の要求をすることなく、実験スケジュールに第2の工程を配置させることができる。
 (第6項)
 第1項~第5項のいずれか1項に記載の実験スケジュールの管理方法は、前記第1の工程および前記第2の工程のいずれか一方の時間帯に変更があったか否かを判断するステップと、前記第1の工程および前記第2の工程のいずれか一方の時間帯に変更があったと判断すると、当該変更に従って、第1の工程および前記第2の工程のいずれか他方の前記実験スケジュールに置ける時間帯を変更するステップと、をさらに備えていてもよい。
 第6項に記載の実験スケジュールの管理方法によれば、事前に作成された実験スケジュールが、各工程の実際の進行に従って調整され得る。
 (第7項)
 第6項に記載の実験スケジュールの管理方法において、前記判断するステップは、前記第1の工程および前記第2の工程のいずれか一方を実行する装置から取得する信号に基づいて実施されてもよい。
 第7項に記載の実験スケジュールの管理方法によれば、ユーザが各工程の実際の進行を把握していない場合であっても、実験スケジュールが各工程の実際の進行に従って調整され得る。
 (第8項)
 第6項に記載の実験スケジュールの管理方法において、前記判断するステップは、前記コンピュータの入力装置に対する入力に基づいて実施されてもよい。
 第8項に記載の実験スケジュールの管理方法によれば、ユーザは、各工程の実際の進行を認識した場合、実際の進行に従って情報を入力装置に入力すれば、実験スケジュールが各工程の実際の進行に従って調整され得る。
 (第9項)
 第1項~第8項のいずれか1項に記載の実験スケジュールの管理方法は、前記第1の工程の時間帯を前記第1の工程の名称のみで表示する簡易表示と、前記第1の工程の時間帯を前記第1の工程の名称および作業者の作業を必要とするか否かを表す情報を含むように表示する詳細表示との間で、表示を切り替えるステップをさらに備えていてもよい。
 第9項に記載の実験スケジュールの管理方法によれば、ユーザが所望する内容の表示が提供され得る。
 (第10項)
 一態様にかかる実験スケジュールの管理装置は、1以上のプロセッサと、前記1以上のプロセッサによって実行されることにより、前記1以上のプロセッサに、第1項~第9項のいずれか1項に記載の実験スケジュールの管理方法を実施させる、プログラムを格納した記憶装置と、を備えていてもよい。
 第10項に記載の実験スケジュールの管理装置によれば、従来考慮されていない「作業者の作業を必要とする時間帯」が実験スケジュールの管理において考慮され、これにより、より効率的な実験の管理が可能になる。
 (第11項)
 一態様にかかる実験スケジュールの管理用プログラムは、1以上のプロセッサによって実行されることにより、前記1以上のプロセッサに、第1項~第9項のいずれか1項に記載の実験スケジュールの管理方法を実施させてもよい。
 第11項に記載の実験スケジュールの管理用プログラムによれば、従来考慮されていない「作業者の作業を必要とする時間帯」が実験スケジュールの管理において考慮され、これにより、より効率的な実験の管理が可能になる。
 今回開示された実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本開示の範囲は、上記した実施の形態の説明ではなくて請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。また、実施の形態中の各技術は、単独でも、また、必要に応じて実施の形態中の他の技術と可能な限り組み合わされても、実施され得ることが意図される。
 1 スケジュール表、2 カレンダー、3 人物一覧、4 表示切替ボタン、5,9C 編集ボタン、6,7 実験項目、7A,7B,7C,7D ブロック、7X 矢印、9,17 項目一覧、9A 追加ボタン、9B,20,23 削除ボタン、9D 項目ボタン、13,19 表、18 領域、50 自動実験システム、100 実験設備、110 制御装置、120 実験装置、121 ロボット、400 端末装置、421 プロセッサ、422 メモリ、423 ハードディスク、424 通信インターフェース、430 入出力部、431 ディスプレイ、432 キーボード、433 タッチパッド、440 バス、800,810,820,830,850 画面。

Claims (11)

  1.  コンピュータによって実施される、第1の工程および第2の工程を含む実験スケジュールの管理方法であって、
     前記第1の工程の時間帯は、作業者の作業を必要としない時間帯を含み、
     前記第2の工程の時間帯は、作業者の作業を必要とする時間帯を含み、
     前記実験スケジュールのうち前記第1の工程の部分に前記第2の工程を配置するステップを備え、
     前記配置するステップでは、前記第2の工程において作業者の作業を必要とする時間帯が前記第1の工程において作業者の作業を必要としない時間帯にのみ重なるように、前記第2の工程が前記実験スケジュールに配置される、実験スケジュールの管理方法。
  2.  前記実験スケジュールに前記第2の工程を追加する要求を受け付けるステップと、
     前記要求において、前記第2の工程において作業者の作業を必要とする時間帯の少なくとも一部が前記第1の工程において作業者の作業を必要とする時間帯と重なる場合には、前記要求に対するエラーを報知するステップと、をさらに備える、請求項1に記載の実験スケジュールの管理方法。
  3.  前記第1の工程の作業者の作業を必要としない時間帯を表示するステップをさらに備える、請求項2に記載の実験スケジュールの管理方法。
  4.  前記第2の工程を配置するステップでは、前記要求において、前記第2の工程において作業者の作業を必要とする時間帯が前記第1の工程において作業者の作業を必要とする時間帯と重ならないことを条件として、前記要求に応じて前記第2の工程が前記実験スケジュールに配置される、請求項2に記載の実験スケジュールの管理方法。
  5.  前記第1の工程および前記第2の工程の少なくとも一方の配置に関する条件の入力を受け付けるステップをさらに備え、
     前記第2の工程を配置するステップでは、前記第2の工程は前記条件に従って配置される、請求項1に記載の実験スケジュールの管理方法。
  6.  前記第1の工程および前記第2の工程のいずれか一方の時間帯に変更があったか否かを判断するステップと、
     前記第1の工程および前記第2の工程のいずれか一方の時間帯に変更があったと判断すると、当該変更に従って、第1の工程および前記第2の工程のいずれか他方の前記実験スケジュールに置ける時間帯を変更するステップと、をさらに備える、請求項1に記載の実験スケジュールの管理方法。
  7.  前記判断するステップは、前記第1の工程および前記第2の工程のいずれか一方を実行する装置から取得する信号に基づいて実施される、請求項6に記載の実験スケジュールの管理方法。
  8.  前記判断するステップは、前記コンピュータの入力装置に対する入力に基づいて実施される、請求項6に記載の実験スケジュールの管理方法。
  9.  前記第1の工程の時間帯を前記第1の工程の名称のみで表示する簡易表示と、前記第1の工程の時間帯を前記第1の工程の名称および作業者の作業を必要とするか否かを表す情報を含むように表示する詳細表示との間で、表示を切り替えるステップをさらに備える、請求項1に記載の実験スケジュールの管理方法。
  10.  1以上のプロセッサと、
     前記1以上のプロセッサによって実行されることにより、前記1以上のプロセッサに、請求項1~請求項3のいずれか1項に記載の実験スケジュールの管理方法を実施させる、プログラムを格納した記憶装置と、を備える、実験スケジュールの管理装置。
  11.  1以上のプロセッサによって実行されることにより、前記1以上のプロセッサに、請求項1に記載の実験スケジュールの管理方法を実施させる、実験スケジュールの管理用プログラム。
PCT/JP2023/029399 2022-09-26 2023-08-14 実験スケジュールの管理方法および管理装置、ならびに、実験スケジュールの管理用プログラム WO2024070283A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-152539 2022-09-26
JP2022152539 2022-09-26

Publications (1)

Publication Number Publication Date
WO2024070283A1 true WO2024070283A1 (ja) 2024-04-04

Family

ID=90477217

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/029399 WO2024070283A1 (ja) 2022-09-26 2023-08-14 実験スケジュールの管理方法および管理装置、ならびに、実験スケジュールの管理用プログラム

Country Status (1)

Country Link
WO (1) WO2024070283A1 (ja)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015056015A (ja) * 2013-09-11 2015-03-23 株式会社島津製作所 作業支援管理装置、方法、及びプログラム

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015056015A (ja) * 2013-09-11 2015-03-23 株式会社島津製作所 作業支援管理装置、方法、及びプログラム

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
FUJIKURA, TOSHIYUKI: "Hints for Multitask Design", INTAFESU -INTERFACE, CO SHUPPAN, TOKYO, JP, vol. 39, no. 3, 1 March 2013 (2013-03-01), JP , pages 95 - 96, XP009553707, ISSN: 0387-9569 *
JIN KOGURE: "Task Management", KOGURES.COM/, 29 May 2019 (2019-05-29), pages 1 - 8, XP093154899, Retrieved from the Internet <URL:http://www.kogures.com/hitoshi/webtext/hs-task-kanri/index.html> *

Similar Documents

Publication Publication Date Title
US5737498A (en) Process automation method and apparatus
EP1446649B1 (en) Method and apparatus for automatic tissue staining
JP2018081081A (ja) 実験室機器のための自動スケジューラ
US5839091A (en) Method and apparatus for automatic tissue staining
CN106461690B (zh) 带有呈现单元显示的仪器界面
US8040757B2 (en) Sample analyzing apparatus
CN107850610B (zh) 一种样本测试申请方法、装置及样本分析仪
US20050273272A1 (en) System and method for laboratory-wide information management
JPH04507022A (ja) ロボットインターフェース
WO2003102854A9 (en) System and method for open control and monitoring of biological instruments
EP0596205A2 (en) Bench supervisor system
WO2006101508A1 (en) Operating system launch menu program listing
EP3140761A1 (en) Intelligent service assistant - instrument side software client
EP3645997B1 (en) Method and device for controlling detection-composition preparation instrument
CA2553092A1 (en) Automated media optimization technology
WO2024070283A1 (ja) 実験スケジュールの管理方法および管理装置、ならびに、実験スケジュールの管理用プログラム
DuChez Automated tracking of cell migration with rapid data analysis
JP2006208099A (ja) 自動分析機器の制御装置
WO2020001650A1 (zh) 一种样本的测试方法及样本分析装置
CN102221621B (zh) 检体分析装置及分析控制方法
WO2022004061A1 (ja) 実験プロトコルを設計する方法、システム、および装置
JPWO2019198445A1 (ja) 自動分析装置
US20210237048A1 (en) Reagent storage system
WO2023047738A1 (ja) 複数の実験装置を制御する方法、システム、および装置
JP2010092213A (ja) 医療情報処理装置、医療情報処理方法、および医療情報処理プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23871525

Country of ref document: EP

Kind code of ref document: A1