WO2023206447A1 - 数据传输的方法、装置、计算机设备和存储介质 - Google Patents

数据传输的方法、装置、计算机设备和存储介质 Download PDF

Info

Publication number
WO2023206447A1
WO2023206447A1 PCT/CN2022/090517 CN2022090517W WO2023206447A1 WO 2023206447 A1 WO2023206447 A1 WO 2023206447A1 CN 2022090517 W CN2022090517 W CN 2022090517W WO 2023206447 A1 WO2023206447 A1 WO 2023206447A1
Authority
WO
WIPO (PCT)
Prior art keywords
resources
resource
pdsch
pusch
indication information
Prior art date
Application number
PCT/CN2022/090517
Other languages
English (en)
French (fr)
Inventor
付喆
林亚男
石聪
Original Assignee
Oppo广东移动通信有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oppo广东移动通信有限公司 filed Critical Oppo广东移动通信有限公司
Priority to PCT/CN2022/090517 priority Critical patent/WO2023206447A1/zh
Publication of WO2023206447A1 publication Critical patent/WO2023206447A1/zh

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation

Definitions

  • the present application relates to the field of data transmission technology, and in particular to a data transmission method, device, computer equipment and storage medium.
  • the Extended Reality (XR) business supports the transmission of services such as Augmented Reality (AR)/Virtual Reality (VR)/Cloud Gaming (CG).
  • AR Augmented Reality
  • VR Virtual Reality
  • CG Cloud Gaming
  • These services generally have ultra-reliable and low-latency requirements, and the services supported by URLLC's XR can be pseudo-periodic, that is, there is jitter in the service arrival time. It can be understood that the service will not be at a certain point, but will It arrives at any time within a range, and the arrival times of different service flows of the same service may vary greatly.
  • the period of XR business can be a non-integer period.
  • the packet size and data rate are variable.
  • embodiments of the present application provide a data transmission method, which method includes:
  • the first device sends indication information to the second device, where the indication information is used to indicate whether to use the target resource for data transmission.
  • a data transmission device which includes:
  • the instruction information sending module is used to send instruction information, and the instruction information is used to indicate whether to use the target resource for data transmission.
  • embodiments of the present application provide a computer device, including a memory and a processor.
  • the memory stores a computer program.
  • the processor executes the computer program, the steps of the method provided in the embodiment of the first aspect are implemented.
  • embodiments of the present application provide a computer-readable storage medium on which a computer program is stored.
  • the computer program is executed by a processor, the steps of the method provided in the embodiment of the first aspect are implemented.
  • embodiments of the present application provide a computer program product on which a computer program is stored.
  • the computer program is executed by a processor, the steps of the method provided in the embodiment of the first aspect are implemented.
  • This application provides a data transmission method, device, computer equipment and storage medium that sends instruction information to the second device through the first device.
  • the first device notifies the second device of the usage of the target resource in a timely manner.
  • the second device can determine which resources to use, which resources to receive or decode, which resources to not receive or decode, which resources to terminate, etc. based on the instruction information. Equivalently, the second device can determine which resources to use based on the instruction information.
  • the transmission resources between the two devices are reasonably allocated. In this way, while ensuring normal business data transmission between the first device and the second device, the transmission resources are also reasonably utilized and waste of resources is avoided.
  • Figure 1 is an application environment diagram of a data transmission method provided by an embodiment
  • Figure 2 is a schematic flow chart of a data transmission method provided by an embodiment
  • Figure 3 is an interactive schematic diagram of a data transmission method provided by an embodiment
  • Figure 4 is an interactive schematic diagram of a data transmission method provided by another embodiment
  • Figure 5 is an interactive schematic diagram of a data transmission method provided by another embodiment
  • Figure 6 is a schematic flow chart of a data transmission method provided by another embodiment
  • Figure 7 is an interactive schematic diagram of a data transmission method provided by another embodiment
  • Figure 8 is an interactive schematic diagram of a data transmission method provided by another embodiment
  • Figure 9 is an interactive schematic diagram of a data transmission method provided by another embodiment.
  • Figure 10 is a schematic flowchart of a data transmission method provided by another embodiment
  • Figure 11 is a schematic structural diagram of a data transmission device according to an embodiment
  • Figure 12 is a schematic diagram of the internal structure of a computer device according to an embodiment.
  • VR Up Link (UL) pose information (Uplink posture information) + Downlink (Down Link, DL) video stream (Downlink video stream information);
  • CG UL control information (uplink control information) + DL video stream;
  • AR UL(pose information+video stream)+DLvideo stream.
  • the services supported by URLLC's XR need to support services with a minimum delay of 0.5ms and a reliability of 99.999%.
  • the arrival time of different service flows of the same service may be very different, and the data packet sizes of different services of the same service are also different.
  • the cycle of ULcontrol information or ULpose information can be 4ms, but the cycle of UL video stream can be 16.67ms.
  • the packet size requirement for ULcontrol information or ULpose information can be 100bytes, while the packet size requirement for UL video stream is approximately 0.67Mbps.
  • XR services have characteristics such as non-integer service cycles, pseudo-cycles, variable data packet sizes, and variable data rates.
  • Embodiments of the present application provide a data transmission method, device, computer equipment and storage medium, which can improve data transmission defects, ensure reasonable transmission of services, and avoid too much waste of resources. It should be noted that the data transmission method provided by the embodiment of the present application is not limited to achieving the above technical effects, but can also achieve other technical effects. For example, the data transmission method provided by the embodiment of the present application can also avoid Unnecessary power consumption on the UE side or the base station side improves resource utilization, and is not limited to this in the embodiments of the present application.
  • this scenario includes a first device 01 and a second device 02, and the first device 01 and the second device 02 can communicate with each other.
  • the first device 01 can be any one of user equipment (User Equipment, UE), network equipment and base station.
  • UE User Equipment
  • the second device 02 is a network device or a base station; if the first device 01 is a network device or a base station, the second device 02 is a UE.
  • the UE may be, but is not limited to, various personal computers, notebook computers, smartphones, tablet computers, portable wearable devices, and other devices, and may also be other network devices, which are not limited in the embodiments of the present application.
  • Network equipment includes, but is not limited to, equipment with modules such as Policy Control Function (Policy Control Function, PCF), Session Management Function (Session Management Function, SMF), and User Plane Function (UPF).
  • Policy Control Function Policy Control Function
  • PCF Policy Control Function
  • Session Management Function Session Management Function
  • UPF User Plane Function
  • Base stations include, but are not limited to, macro base stations, micro base stations, radio frequency remotes, repeaters, and indoor distribution systems. It should be noted that actual applications may include a larger number of UEs and are not limited to Figure 1.
  • FIG. 2 is a flow chart of a data transmission method provided in one embodiment. This embodiment relates to a specific implementation method of obtaining instruction information sent by a first device to a second device. As shown in Figure 2, this embodiment includes the following steps:
  • the first device sends indication information to the second device.
  • the indication information is used to indicate whether to use the target resource for data transmission.
  • the first device and the second device are not limited to specific device types, and their implementation is as described above.
  • the second device is a network device or a base station. Then, the UE sends indication information to the network device or base station.
  • the indication information is used to inform the network device or base station whether the target resource is used, that is, to inform the network device or base station whether the target resource is used for data transmission or not.
  • the second device is a UE. Then the network device or base station sends indication information to the UE.
  • the indication information is used to inform the UE whether the target resource is used, that is, to inform the UE whether the target resource is used for data transmission or not.
  • the above-mentioned whether to use the target resource for data transmission includes: whether to use the target resource for data transmission, and/or whether to use the target resource for data reception.
  • the data transmission process includes data transmission and data reception. Therefore, indicating whether to use the target resource for data transmission includes whether to use the target resource for data transmission, or whether to use the target resource for data reception, or whether to use the target resource for data transmission. Data is also received while sending.
  • the above-mentioned whether to use the target resource for data transmission also includes at least one of: whether the target resource is used for data transmission, whether the target resource is terminated, and whether the target resource is used.
  • Data transmission not only refers to whether data transmission is performed, but also refers to whether the target resource is terminated or needs to be terminated, whether it needs to be suspended, is suspended, whether the target resource is used, etc.
  • termination means drop, or it can also mean stop.
  • the above indication information is used to instruct at least one of the target resources to perform data transmission or not to be terminated, all of the target resources to perform data transmission or not to be terminated, and at least one of the target resources not to perform data transmission. At least one of data transmission or being terminated and all resources in the target resource are not transmitting data or are terminated.
  • the target resource can be not only one resource, but also multiple resources.
  • the indication information sent by the first device to the second device may indicate one, multiple or all of the target resources. Further, what can be instructed is that one resource in the target resource performs data transmission or is not dropped, multiple resources in the target resource performs data transmission or is not dropped, all resources in the target resource performs data transmission or is not dropped, One resource in the target resource does not perform data transmission or is dropped, multiple resources in the target resource do not perform data transmission or is dropped, and all resources in the target resource do not perform data transmission or are dropped.
  • the above target resources may also refer to at least one of the following: resources in the first cycle, resources in the second cycle after the first cycle, resources in the configured PUSCH resource pattern, and after the indication information.
  • the target resource may be a resource within the first cycle, and the first cycle generally refers to any cycle, for example, this cycle, the next cycle of this cycle, the next cycle of this cycle, a cycle with a specific identification, etc.
  • the target resource can also refer to the resource in the second period after the first period. For example, if the first period is this period, the second period is the period after this period. If the first period is the next period of this period, cycle, the second cycle can be the cycle after the next cycle of this cycle.
  • the target resource can also be a resource within a configured PUSCH resource pattern.
  • the configured PUSCH resource pattern is an uplink physical shared channel (Physical Uplink Shared Channel, PUSCH) pattern pre-configured for the UE by the uplink process network equipment or the base station, that is, the target resource can be Resources within the preconfigured PUSCH pattern.
  • the target resource may also be a resource in one or more cycles after the indication information, that is, the target resource is a resource in any one or more cycles after the first device sends the indication information.
  • the target resource may also be a resource within one or more PUSCH resource patterns following the indication information.
  • the target resource may also be one or more configured grant (Configured Grant, CG) resources, and one or more CG resources within at least one cycle, and so on.
  • the target resource can also be an uplink dynamically scheduled resource.
  • the target resource can be the resource within the configured Physical Downlink Shared Channel (PDSCH) resource pattern, that is, the resource within the PDSCH pattern pre-configured for the UE by the network or base station.
  • the target resource may also be one or more resources within the PDSCH pattern after the sent indication information, one or more Semi-Persistent Scheduling (SPS) resources, one or more SPS resources within at least one cycle, etc. wait.
  • SPS Semi-Persistent Scheduling
  • the target resource can also be a downlink dynamically scheduled resource, etc.
  • the target resources are only examples, and the embodiments of this application do not limit the target resources.
  • the target resource indicated in the indication information can be any location, any identifier, any type of resource, and the source of the indication information.
  • the method can also be any method, as long as the purpose of the first device informing the second device whether to use the target resource or not is achieved by sending instruction information.
  • the embodiment of the present application provides a data transmission method, in which the first device sends instruction information to the second device.
  • the first device promptly informs the second device of the usage of the target resource.
  • the second device After the second device receives the After receiving the indication information, it can determine which resources to use, which resources to receive or decode, which resources to not receive or decode, which resources to terminate, etc., which is equivalent to the second device can use the indication information to determine the transmission between the two.
  • the resources are reasonably allocated, so that while ensuring normal business data transmission between the first device and the second device, the transmission resources are also reasonably utilized and waste of resources is avoided.
  • the method for the first device to send the indication information to the second device includes at least one of the following: the first device sends the first indication information to the second device, and the first indication information is sent together with the first PUSCH resource; A device sends the second indication information to the second device, and the second indication information is sent before the second PUSCH resource; the first device sends the first indication information to the second device, and the first indication information is sent within the first CG period or the first Sent within the PUSCH resource pattern; the first device sends the second indication information to the second device, and the second indication information is sent within the second CG period or before the second PUSCH resource pattern; the first device sends the third indication information to the second device , the third indication information is sent together with the first PDSCH resource; the first device sends the fourth indication information to the second device, and the fourth indication information is sent before the second PDSCH resource.
  • the first device sends the third indication information to the second device, and the third indication information is sent within the first SPS period or the first PDSCH resource pattern; the first device sends the fourth indication information to the second device, and the fourth indication information is sent in the first SPS period or the first PDSCH resource pattern.
  • the first device sends the first indication information to the second device, and the first indication information is sent together with the first dynamic scheduling resource; the first device sends the second indication to the second device information, the second indication information is sent before the first dynamic scheduling resource; the first device sends the third indication information to the second device, and the third indication information is sent together with the second dynamic scheduling resource; the first device sends the third indication information to the second device.
  • the fourth indication information is sent before the second dynamically scheduled resource.
  • the first indication information, the second indication information, the third indication information and the fourth indication information are used to distinguish the indication information under different indication information sending modes.
  • the indication information may have the same content or part of the indication information. The same or completely different. The embodiments of the present application are not limited to this.
  • the first indication information refers to the uplink process sent together with the uplink transmission resources, including: sent with the first PUSCH resource, sent within the first CG period or the first PUSCH pattern, and with the first dynamic scheduling Resources are sent together, etc.
  • the second indication information refers to the scenario of sending in advance during the uplink process, including: sending before the second PUSCH resource, sending within the second CG period or before the second PUSCH pattern, sending before the second dynamic scheduling resource, etc.
  • the third indication information refers to the scenario where the downlink process is sent together with the downlink transmission resources, including being sent together with the first PDSCH resource, being sent within the first SPS period or the first PDSCH pattern, and being sent together with the second dynamic scheduling resource.
  • the fourth indication information refers to the scenario of sending in advance during the downlink process, including: sending before the second PDSCH resource, sending within the second SPS period or before the second PDSCH pattern, sending before the second dynamic scheduling resource, etc.
  • the first PUSCH resource and the second PUSCH resource generally refer to any PUSCH resource, and they may be the same PUSCH resource or different PUSCH resources.
  • the first PDSCH resource and the second PDSCH resource generally refer to any PDSCH resource, and they may be the same PDSCH resource or different PDSCH resources.
  • the first dynamic scheduling resource is an uplink dynamic scheduling resource
  • the second dynamic scheduling resource is a downlink dynamic scheduling resource.
  • first indication information second indication information
  • third indication information fourth indication information
  • the uplink process is for the UE to send indication information to the network device or base station.
  • the indication information is used to inform the network device or base station whether to use the target resource for data transmission.
  • the uplink data transmission process involves the above-mentioned first indication information and second indication information.
  • the UE sends the above-mentioned first indication information to the network device or base station.
  • the first indication information is carried in at least one of the following: the first indication information is carried in CG uplink control information; the first indication information is carried in a new MAC control unit; the first indication information is carried in radio resource control in the message.
  • the first indication information can be sent together with PUSCH resources (simultaneous indication).
  • the first indication information may be carried in CG-uplink control information (UCI), that is, CG-UCI is used to transmit the first indication information.
  • the first indication information may be carried in a new MAC Control Element (Control Element, CE), that is, the MAC CE is used to transmit the first indication information.
  • the first indication information may be carried in a Radio Resource Control (Radio Resource Control, RRC) message.
  • RRC Radio Resource Control
  • the first indication information can be carried and sent in a variety of resources or messages or configurations, which improves the flexibility of sending the first indication information.
  • the CG-UCI of the first PUSCH informs the network equipment or base station of the usage of the following PUSCHs by sending the first indication information.
  • the CG-UCI of the first PUSCH informs the network equipment or base station of the usage of the following PUSCHs by sending the first indication information.
  • all PUSCHs are not transmitted, or subsequent PUSCHs are not transmitted, or PUSCH is no longer used to transmit data from which position, or which specific PUSCH no longer transmits data, etc.
  • it can refer to one cycle or multiple cycles.
  • a specific PUSCH may refer to a specific cycle (such as this cycle) or other cycles.
  • the network device or base station can schedule these unused PUSCH resources to other UEs. Furthermore, the UCI of each PUSCH can carry first indication information to inform the network device or the base station that the PUSCH behind it is no longer used, so that the network device or the base station can schedule these unused PUSCHs to other UEs.
  • CG-UCI of 4 PUSCHs For another example, assume that 4 PUSCHs are configured in a CG cycle. If more bytes need to be transmitted in a certain CG cycle, the CG-UCI of 4 PUSCHs, or one of the 4 PUSCHs, needs to be transmitted. CG-UCI of PUSCH, or MAC CE in each CG of 4 PUSCHs, or MAC CE in a CG of 4 PUSCHs, or one or more of CG-UCIs of 4 PUSCHs, Alternatively, one or more of the MAC CEs in the 4 PUSCH CGs send the first indication information to the network device or base station to inform the network device or base station whether to use subsequent PUSCH.
  • the first indication information can also be sent to the network device or base station through the CG-UCI of a specific PUSCH among the four PUSCHs, or the MAC CE in a specific CG of the four PUSCHs, so as to Inform network equipment or base station whether subsequent PUSCH is used.
  • it can refer to one cycle or multiple cycles.
  • it can refer to a specific cycle (such as this cycle) or other cycles.
  • the first instruction information is sent to the network device or the base station, so that the network device or the base station can allocate resources according to the usage of UE resources, so that the data transmission resources can be reasonably utilized, which improves the rationality of service transmission and avoids waste of resources.
  • the data transmission method provided by the embodiment of the present application further includes: when the first condition is met, triggering the generation of the first indication information, and/or triggering the reporting of the first indication information.
  • a triggering condition for the generation or reporting of the first indication information which is the first condition. Only when the first condition is met, the generation or reporting of the first indication information or the operation of both generation and reporting will be triggered.
  • the operation that triggers the generation or reporting of the first instruction information only refers to triggering this operation, but it is not certain whether this operation is executed, so after this operation is triggered, further execution is also required.
  • Set conditions Based on this, in one embodiment, if the first condition is met and/or if uplink transmission resources are available, the UE sends the first indication information to the network device or base station.
  • the process of the UE sending the first indication information to the network device or base station also needs to meet the first condition and/or have available uplink transmission resources.
  • the first condition followed to trigger the operation of generating or reporting the first execution information and the first condition followed by the UE to send the first indication information to the network device or base station may be exactly the same, or may have partially the same content.
  • the first condition includes at least one of the following: an amount of data, a number of bytes, or a number of bits greater than a preset amount needs to be transmitted within one cycle; an amount of data, a number of bytes, or a number of bits greater than the preset amount needs to be transmitted Transmitted within a transmission pattern; the amount of data greater than the first threshold is transmitted in one cycle; the amount of data less than the second threshold is transmitted in one cycle; CG uplink control information is configured or activated; DG uplink control information is configured or activated ;Uplink control information configuration is disabled; uplink resources are preconfigured resources; support new MAC control unit triggering or reporting; network or base station activation or enablement indication information reporting; support indication information reporting; uplink resources include multiple PUSCH resources; Multiple transmission resources are configured in one transmission cycle; the preconfigured PUSCH resource pattern includes multiple PUSCH resources; multiple PUSCHs are required for data transmission in one cycle; multiple PUSCHs are required for data transmission in the preconfigured PUSCH resource pattern
  • the amount of data or the number of bytes or the number of bits that is greater than the preset amount means that more data or bytes need to be transmitted within one cycle.
  • the amount of data greater than the first threshold is transmitted in one cycle, and the amount of data less than the second threshold is transmitted in one cycle.
  • the first threshold and the second threshold may be different threshold values.
  • the conditions set in the uplink resources include but are not limited to the existence of multiple PUSCH resources, multiple CG resources configured in one CG cycle, the preconfigured PUSCH pattern including multiple PUSCH resources, multiple PUSCHs that need to be used in one cycle, and to be transmitted.
  • the amount of data and the transport block size (TBS) of PUSCH satisfy a certain relationship, etc., which can be one of the first conditions mentioned above.
  • the size of the data to be transmitted and the TBS of the PUSCH satisfy a certain relationship, which can be: the size of the data to be transmitted is greater than the TBS of one PUSCH or a specific PUSCH, and the size of the data to be transmitted is greater than the TBS of multiple PUSCHs, but smaller than the TBS of all PUSCHs. , the size of the data to be transmitted is smaller than the TBS of all PUSCHs of the UL resources, etc.
  • the specific PUSCH may be the first PUSCH, the last PUSCH, a PUSCH with a specific identifier, etc.
  • the CG uplink control information that is, CG-UCI
  • CG-UCI is configured or activated, which refers to the UCI information carried on the CG and is used to transmit the above indication information.
  • DG uplink control information DG-UCI is configured or activated, which refers to the UCI information carried on the Dynamic Grant (DG) and is used to transmit the above indication information.
  • the specific content in the first condition in the embodiment of this application can be set based on actual resources, resources, control information, registration information, etc. When applied, as long as at least one of the first conditions is met, it means that the first condition is met. . In this way, multiple conditions are set as the first condition, which improves the flexibility, timeliness and comprehensiveness of the first instruction information sending method.
  • the UE sends the first indication information to the network device or the base station, including: the UE sends the first indication information to the network device or the base station on the first PUSCH resource; the first indication information is used to indicate after the first PUSCH resource resources are used.
  • the first PUSCH may be a CG PUSCH or a DG PUSCH.
  • the first indication information is used to indicate whether the resources after the first PUSCH resource can be used by the network device or the base station.
  • the first PUSCH resource generally refers to any one or more PUSCH resources, and the resources after the first PUSCH resource can be understood. It only needs to be after the first PUSCH resource.
  • the first PUSCH resource can be the first PUSCH in this cycle, or it can be a specific PUSCH in the next cycle, where the specific PUSCH is the first PUSCH, or the first X PUSCHs, or the PUSCH index with the smallest PUSCH index. It's Y's. Wherein, X and Y may be predefined or preconfigured by the base station, or configured by the network, which is not limited in the embodiment of the present application.
  • the resources after the first PUSCH resource are at least one of the following: PUSCH resources in the third cycle; PUSCH resources within the configured PUSCH resource pattern; multiple dynamically scheduled PUSCH resources; PUSCH resources after the first PUSCH resource.
  • the third period is the same period as the first period or the second period in the previous embodiment, or may be different periods.
  • the resources after the first PUSCH resource are at least one of the following: all PUSCH resources after the first PUSCH resource; at least one or a specific number of PUSCH resources after the first PUSCH resource; One PUSCH resource; multiple consecutive PUSCH resources after the first PUSCH resource; multiple discontinuous PUSCH resources after the first PUSCH resource.
  • the number of PUSCH resources included in the resources after the first PUSCH resource is not limited, and may be one or multiple, and the multiple may be continuous or discontinuous.
  • the plurality is also a specific number of PUSCH resources.
  • the resources after the first PUSCH resource are PUSCH resources in the third cycle, and the resources after the first PUSCH resource are all PUSCH resources after the first PUSCH resource, it means that the resources after the first PUSCH resource are the first All PUSCH resources in the third cycle after the PUSCH resources.
  • the above-mentioned limitations on the resources after the first PUSCH resource can be combined with each other or separated separately to determine which resources the resources after the first PUSCH resource specifically refer to.
  • the UE sends the first indication information to inform the network device or the base station of the usage of the resources after the first PUSCH resource. For example, the UE notifies the network device or the base station that the resources after the first PUSCH resource are not used, or the resources after the first PUSCH resource are not used. From which position in the PUSCH will no longer be used to transmit data, or which specific PUSCH will no longer transmit data, so that after receiving the first indication information, the network equipment or base station can schedule these no longer used PUSCH resources to other For UE use.
  • the resources after the first PUSCH resource may refer to one cycle or multiple cycles.
  • the resources after the first PUSCH resource may refer to a specific cycle (such as this cycle) or other cycles.
  • the first indication information shows whether other PUSCHs after the current PUSCH of this cycle are transmitted. For example, if the other PUSCH drop (termination or stop) is indicated, it means that the subsequent PUSCH is dropped. transmission.
  • the other PUSCH can be one PUSCH or multiple PUSCHs.
  • the above-mentioned first indication information is used to indicate at least one of the following: whether all resources in the resources after the first PUSCH resource perform data transmission; whether each resource in the resources after the first PUSCH resource performs data transmission. ;Whether multiple resources among the resources after the first PUSCH resource perform data transmission; whether one of the resources after the first PUSCH resource performs data transmission; a specific PUSCH resource among the resources after the first PUSCH resource; the first PUSCH The first resource after the resource; the latest specific data resource after the first PUSCH resource; whether all target resources perform data transmission; whether one or a specific one of the target resources performs data transmission; multiple or specific target resources Whether multiple data transfers are performed; whether each of the target resources performs data transmission.
  • the first indication information sent by the UE to the network device or base station may specifically indicate all resources, each resource, multiple resources, one resource, specific resources, etc. in the resources after the first PUSCH resource, or it may be the target resource. all, any one or a specific one, any multiple or a specific plurality, each, etc.
  • the embodiments of the present application are not limited to this.
  • the first indication information is also used to indicate at least one of the following: indicating whether the next PUSCH after the first PUSCH performs data transmission; indicating whether all PUSCHs in the CG period after the first PUSCH perform data transmission; indicating whether the third PUSCH performs data transmission. Whether all PUSCHs in the PUSCH resource pattern after the first PUSCH perform data transmission; indicating whether the PUSCH at the designated position after the first PUSCH performs data transmission.
  • the next PUSCH after the first PUSCH may be the next one in the position dimension of the first PUSCH, or may be the next one in the transmission sequence dimension.
  • the CG cycle and PUSCH pattern are pre-configured to the UE by the network equipment or base station, so the first indication information sent by the UE to the network equipment or base station can be all resources in the CG cycle after the first PUSCH or within the PUSCH pattern.
  • the first indication information indicates a designated position after the first PUSCH, for example, a resource after the first PUSCH that is at a preset offset position from the first PUSCH.
  • the PUSCH at the specified location may be one location or multiple locations.
  • the first PUSCH resource in the above embodiment may be one or multiple.
  • the first indication information is carried on one first PUSCH resource, but if there are multiple first PUSCH resources, the first indication information is carried on multiple first PUSCH resources, or, multiple first PUSCH resources on at least part of the first PUSCH resources.
  • the first indication information may be carried on one PUSCH resource, or the first indication information may be carried on each of multiple PUSCH resources.
  • the UE sending the first indication information to the network device or the base station includes one of the following: the UE sends the first indication information to the network device or the base station on one first PUSCH; the UE sends the first indication information to the network device or the base station on multiple first PUSCHs. Send the first indication information to the network device or the base station; the UE sends the first indication information to the network device or the base station on each PUSCH; the UE sends the first indication information to the network device or the base station on a specific first PUSCH.
  • the base station only needs to send the first indication information on a first PUSCH.
  • the first indication information may be sent by the UE on multiple first PUSCHs, may be sent on each PUSCH, or may be sent on a specific first PUSCH. It may be sent on the PUSCH, or it may be sent on the PUSCH of each transmission, or it may be sent on the first PUSCH of multiple transmissions. In this way, under different circumstances, the first indication information is sent in different carrying modes, so that after receiving the first indication information, the network equipment or base station can reasonably allocate transmission resources in a more targeted and flexible manner, thereby avoiding Waste of resources.
  • the UE sends indication information to the network device or base station.
  • the UE sends second indication information to the network device or base station.
  • the second indication information is in the target transmission resource or target transmission.
  • the target transmission resource or target transmission information may be a physical uplink control channel (Physical Uplink Control Channel, PUCCH) resource, UCI, Scheduling Request (Scheduling Request, SR), PUSCH, MAC CE, or Radio Resource Control RRC.
  • PUCCH Physical Uplink Control Channel
  • UCI can be a new UCI
  • the "new" refers to: new type, name, index, configuration cycle, configuration resources, etc.
  • the UE sends the second indication information to the network device or the base station, and the second indication information is carried in the target transmission resource or the target transmission information before the second PUSCH resource; or, the UE sends the second indication to the network device or the base station. information, the second indication information is sent on the target transmission resource or target transmission information before the second PUSCH resource.
  • the second indication information is still carried in the target transmission resource or target transmission information, or is sent using the target transmission resource or target transmission information.
  • the target transmission resource or target transmission information is a resource before the second PUSCH resource. or information.
  • the target transmission resource in the above embodiment may be one or multiple. If it is one target transmission resource, the second indication information is carried on one target transmission resource, but if there are multiple target transmission resources, the second indication information is carried on multiple target transmission resources, or multiple target transmission resources. on at least some of the target transport resources. For example, the second indication information may be carried on one target transmission resource, and the second indication information may also be carried on each of multiple target transmission resources. If the second indication information is carried on a target transmission resource, then the base station only needs to send the first indication information on a target transmission resource.
  • the second indication information may be sent by the UE on multiple target transmission resources, may be sent on each target transmission resource, or may be sent on a specific third It may be sent on one target transmission resource, or it may be sent on the target transmission resource of each transmission, or it may be sent on the first target transmission resource of multiple transmissions.
  • the first indication information is sent in different carrying modes, so that after the network device or base station receives the second indication information, it can reasonably allocate transmission resources in a more targeted and flexible manner, thereby avoiding Waste of resources.
  • the UE After the UE sends the second indication information to the network equipment or base station, it informs the network equipment or base station of the usage status of which PUSCHs are later. For example, all PUSCHs are not transmitted, or the subsequent PUSCHs are not transmitted, or the position from which they are no longer used.
  • PUSCH transmits data, or which specific PUSCH no longer transmits data, etc.
  • it can refer to one cycle or multiple cycles.
  • a specific PUSCH may refer to a specific cycle (such as this cycle) or other cycles.
  • the CG-UCI of 4 PUSCHs can be used, or the CG-UCI of one of the 4 PUSCHs, or 4
  • One or more of the CG-UCIs of the PUSCH, or one or more of the MAC CEs in the CGs of the 4 PUSCHs, or the MAC CE in a CG of the 4 PUSCHs sends the third 2.
  • Indication information to inform the network equipment or base station of subsequent PUSCH usage. For example, whether the subsequent PUSCH is used, whether the PUSCH after this PUSCH (in this cycle) is used, whether the subsequent PUSCH is used to perform continuous transmission, etc.
  • the second PUSCH resource may refer to any PUSCH resource.
  • the second PUSCH resource is at least one of the following: PUSCH resources before the CG cycle; PUSCH resources before the PUSCH resource pattern; PUSCH resources before the specific CG cycle; PUSCH resources before the specific PUSCH resource pattern; the first PUSCH resources at a specific location; PUSCH resources at a specific location; multiple PUSCH resources dynamically scheduled.
  • the second PUSCH may be the PUSCH of the CG or the PUSCH of the DG.
  • the CG cycle and PUSCH pattern are pre-configured for the UE by the network equipment or base station.
  • the second PUSCH resource can be the PUSCH resource before the current CG cycle or the PUSCH pattern, or the PUSCH resource before the specific CG cycle or the specific PUSCH.
  • PUSCH resource before pattern The specific CG cycle before or the specific PUSCH pattern may be the previous one, the next one, etc. This is not limited in the embodiment of the present application. It can also be the PUSCH resource at the first location or a specific location, etc.
  • the above target transmission resource or target transmission information is before the second PUSCH resource, and there is a certain positional relationship between the two.
  • the fixed offset may be a preconfigured amount.
  • the target transmission resource is a resource that is earlier than the second PUSCH resource by the fixed offset.
  • the uplink resource configuration refers to the configuration corresponding to the second PUSCH resource, so the target transmission resource may also be a resource that is earlier than the uplink resource configuration by the fixed offset.
  • Optional, fixed offset which can be configured, indicated, or predefined.
  • the above-mentioned second indication information is used to indicate whether resources within the CG cycle or PUSCH resource pattern perform data transmission; or, the second indication information is used to indicate whether multiple dynamically scheduled PUSCH resources perform data transmission.
  • the resources within the CG cycle or PUSCH pattern, as well as multiple dynamically scheduled PUSCH resources, can be considered as resources indicated by the second indication information.
  • the resources indicated by the second indication information are explained from different dimensions.
  • the resources indicated by the second indication information are at least one of the following: resources within the CG cycle or PUSCH resource pattern closest to the target transmission resource or target transmission information; the target transmission resource or the resource after the target transmission information.
  • the main distinction is the location of the resource indicated by the second indication information.
  • it may be within the CG cycle or PUSCH pattern closest to the target transmission resource or target transmission information. It may be the target transmission resource or target transmission information.
  • the second PUSCH resource corresponds to the CG cycle or PUSCH pattern, and so on.
  • the resources indicated by the second indication information include at least one of the following: one PUSCH resource within the CG cycle or PUSCH resource pattern; multiple PUSCH resources within the CG cycle or PUSCH resource pattern; CG cycle or PUSCH Specific PUSCH resources within the resource pattern; multiple continuous PUSCH resources within the CG cycle or PUSCH resource pattern; multiple discontinuous PUSCH resources within the CG cycle or PUSCH resource pattern; dynamic scheduling of all PUSCH resources within the CG cycle or PUSCH resource pattern One or more PUSCH resources within multiple PUSCH resources; a specific PUSCH resource within multiple dynamically scheduled PUSCH resources; whether all target resources are performing data transmission; whether one or a specific one of the target resources is performing data transmission; target Whether multiple or specific multiple resources in the resource perform data transmission; whether each of the target resources perform data transmission.
  • the main purpose is to distinguish the specific resources in the corresponding positions indicated by the second indication information, for example, one PUSCH resource, multiple PUSCH resources, specific PUSCH resources, multiple continuous PUSCH resources, multiple PUSCH resources within the CG cycle or PUSCH resource pattern. discontinuous PUSCH resources and so on.
  • the resource indicated by the second indication information may also be an indication of the target resource, for example, all the target resources, part of the target resources, a specific resource, one resource or every resource in the target resources, etc.
  • the resource indicated by the second indication information may refer to one period or multiple periods.
  • the resources indicated by the second indication information may refer to a specific cycle (such as this cycle) or other cycles.
  • the resources indicated by the second indication information may include resources indicated in different dimensions.
  • the network device or the base station can more accurately determine the information indicated by the UE.
  • the resource usage situation can be more rationally allocated to the resources indicated by the UE, ensuring the rationality of service transmission.
  • the second indication information is used to indicate any of the following: whether all resources in the CG period or the PUSCH resource pattern perform data transmission; the CG period or Whether each resource in the PUSCH resource pattern performs data transmission; whether the CG period or multiple resources in the PUSCH resource pattern perform data transmission; whether the CG period or one of the resources in the PUSCH resource pattern performs data transmission Data transmission; whether specific resources among the resources within the CG cycle or PUSCH resource pattern perform data transmission; whether multiple resources among the multiple dynamically scheduled PUSCH resources perform data transmission; whether specific resources among the multiple dynamically scheduled PUSCH resources Perform data transmission; whether one of the multiple dynamically scheduled PUSCH resources performs data transmission; whether each of the dynamically scheduled multiple PUSCH resources performs data transmission; whether all of the dynamically scheduled multiple PUSCH resources perform data transmission Data transmission; whether the next uplink resource carries out data transmission; whether the resources of the fourth cycle or resource pattern are transmitted.
  • the resources indicated by the second indication information in this embodiment correspond to the above-mentioned embodiments.
  • the specific resources indicated by the second indication information are limited.
  • the second indication information may indicate the CG cycle or the PUSCH pattern. All resources may also be each resource, multiple resources, etc., and may indicate each resource, all resources, specific resources, etc. among multiple dynamically scheduled PUSCH resources. Further, the second indication information may also indicate the next uplink resource, the fourth cycle, or the resource within the PUSCH pattern, etc.
  • the second indication information can refer to resources in any location, any period, and any type of configuration, which can enable network equipment or base stations to more comprehensively grasp the UE's resource usage, and can greatly increase the rationality of subsequent resource allocation.
  • the UE sending the second indication information to the network device or base station is the same as sending the first indication information to the network device or base station in the above embodiment. It needs to trigger the generation or reporting of the second indication information, and set the requirements for sending the second indication information. conditions of.
  • the UE sends the second indication information to the network device or the base station, including: when the second condition is met, the UE triggers the second indication information, the UE reports the second indication information, and the UE sends the second indication information to the network device or the base station. Send at least one of the second indication information.
  • the second condition includes at least one of the following: an amount of data, a number of bytes, or a number of bits greater than a preset amount needs to be transmitted within one cycle; an amount of data, a number of bytes, or a number of bits greater than the preset amount needs to be transmitted Transmitted within a transmission pattern; the amount of data greater than the third threshold is transmitted in one cycle; the amount of data less than the fourth threshold is transmitted in one cycle; the resource configuration for transmitting the second indication information is allowed or disabled; the network or base station activates or Enable indication information reporting; support indication information reporting; support new MAC control unit triggering or reporting; uplink resources are preconfigured resources; uplink resources include multiple PUSCH resources; multiple transmission resources are configured in one transmission cycle; preconfigured The PUSCH resource pattern includes multiple PUSCH resources; multiple PUSCHs are required for data transmission in one cycle; multiple PUSCHs are required for data transmission in the preconfigured PUSCH resource pattern; dynamically scheduled resources include multiple PUSCH resources; second indication information Generated or
  • the differences and conditions for triggering the generation or reporting of the second indication information and sending the second indication information can be found in the description of the embodiment of sending the first indication information, and will not be described again here.
  • the second condition is the same as the aforementioned first condition. For details, please refer to the description in the first condition.
  • the method further includes: the UE receives the uplink resource configuration sent by the network device or the base station.
  • the uplink resource configuration includes preconfigured resources or dynamically scheduled resources.
  • dynamically scheduled resources include multiple PUSCH resources.
  • the preconfigured resources include CG or preconfigured PUSCH resource patterns.
  • the uplink resource configuration indicates that one CG cycle includes multiple PUSCH resources, and/or one PUSCH resource pattern includes multiple PUSCH resources.
  • the UE After receiving the uplink resource configuration sent by the network device or the base station, the UE will send the first indication information or the second indication information to the network device or the base station based on the uplink resource configuration.
  • the uplink resource configuration includes at least one of the following: CG identification; CG period; the number of PUSCH resources in the CG period; resource information of at least one PUSCH resource in a CG period; uplink control information in a CG period.
  • the UE receives the CG configuration pre-configured from the base station.
  • the CG configuration includes CG index (i.e. identification), CG period, and the number of resources in the CG period, such as PUSCH or the number of CG PUSCH resources.
  • the UE receives the PUSCH pattern preconfigured from the base station.
  • the PUSCH pattern includes the PUSCH pattern identifier; the periodicity or aperiodicity of the PUSCH pattern; the number of PUSCH resources in the PUSCH pattern, etc.
  • a preconfigured PUSCH pattern includes multiple PUSCH resources. The intervals between the multiple PUSCH resources can be equally spaced or non-equally spaced.
  • the preconfigured PUSCH pattern can be periodic or aperiodic. of.
  • dynamic scheduling it may also include at least one PUSCH resource information of multiple dynamically scheduled PUSCH resources; the number of PUSCH resources of multiple dynamically scheduled PUSCH resources, and so on.
  • the uplink resource configuration also includes resource information of at least one PUSCH resource within the CG cycle or resource information of at least one PUSCH resource within the PUSCH resource pattern.
  • the resource information includes location information, time domain and frequency domain resource information, resource offset, redundancy version information (RedundancyVersion, RV), RV offset, Hybrid Automatic Repeat-reQuest (HARQ) process Information, HARQ process information offset, numbering information, specific resources, etc.
  • the location information includes the starting location of at least one PUSCH resource, the ending location of at least one PUSCH resource, the location of the first PUSCH resource in the at least one PUSCH resource, the location of a specific PUSCH resource in the at least one PUSCH resource, etc. .
  • the time domain and frequency domain resource information includes time domain and frequency domain resource information of at least one PUSCH resource.
  • the resource offset includes the resource offset of each PUSCH resource in at least one PUSCH resource relative to the first PUSCH resource, the resource offset of each PUSCH resource in at least one PUSCH resource relative to a specific PUSCH resource, and the resource offset of each PUSCH resource in at least one PUSCH resource relative to the first PUSCH resource.
  • the RV information includes the redundancy version information RV of at least one PUSCH resource.
  • the RV offset includes the RV offset of each PUSCH resource in the at least one PUSCH resource relative to a specific PUSCH resource; each PUSCH resource in the at least one PUSCH resource is relative to the last one. RV offset of PUSCH resource.
  • the HARQ process information includes the HARQ process information of at least one PUSCH resource; the HARQ process information offset includes the HARQ process information offset of each PUSCH resource in the at least one PUSCH resource relative to the first PUSCH resource; each PUSCH resource in the at least one PUSCH resource The HARQ process information offset of the PUSCH resource relative to a specific PUSCH resource; the HARQ process information offset of each PUSCH resource in at least one PUSCH resource relative to the last PUSCH resource.
  • the numbering information includes the number of the first PUSCH resource in the at least one PUSCH resource and the number of the specific PUSCH resource in the at least one PUSCH resource.
  • Specific resources include the first resource or the last resource or a specific resource in at least one PUSCH resource.
  • the CG configuration also includes uplink control information within an inner CG period, CG PUSCH resources, a PUSCH resource pattern, PUSCH resources within a PUSCH resource pattern, dynamically scheduled multiple PUSCH resources, etc.
  • the uplink control information is used to indicate at least one of the following: whether to include indication information; content of the indication information; resources carrying the indication information; PUSCH resources indicated by the indication information; designated PUSCH resources; location of the indication information; indication information occupancy byte size; disable flag or enable flag; resource status or resource usage conditions.
  • whether the indication information is included refers to whether the uplink control information includes the indication information or does not include the indication information.
  • the content of the indication information the content in the first indication information or the content in the second indication information.
  • Resources carrying indication information for example, PUSCH resources, MAC CE, new UCI, etc.
  • PUSCH resources indicated by the indication information for example, resources after the first PUSCH resource indicated in the first indication information, etc.
  • the configuration information of CG-UCI can indicate a specific CG PUSCH, or it can indicate each CG PUSCH.
  • the specific CG PUSCH can be the first resource in the cycle, or the last resource, or the resource with the smallest CG PUSCH index, etc.
  • the CG-UCI configuration information may refer to the location and/or occupied bit size of the first indication information, as well as the location and occupancy of the second indication information. /Or occupy bit size.
  • CG-UCI configuration information can also include enable or disable instructions.
  • the resource situation or resource usage conditions include: multiple PUSCH resources are configured in one CG cycle; multiple PUSCH resources are configured in one PUSCH resource pattern; multiple PUSCH resources are used for data transmission; The amount of data to be transmitted is greater than the transmission block size of one PUSCH or a specified PUSCH; the amount of data to be transmitted is less than the transmission block size of all PUSCHs in the uplink resources.
  • the resource situation or resource usage conditions are: multiple CG resources are configured in one CG cycle, and/or multiple PUSCHs need to be used, and/or the amount of data to be transmitted is larger than one PUSCH or the TBS of a specific PUSCH, and/or Or, the amount of data to be transmitted is smaller than the TBS of all PUSCHs of the UL resources, etc.
  • the usage conditions here are only an example. In actual applications, the resource usage conditions may be the same as the first condition or the second condition in the aforementioned embodiments, that is, the first condition or the second condition in the aforementioned embodiments. The conditions in the second condition are also applicable to the resource situation or resource usage conditions here, and will not be described again in the embodiments of this application.
  • the method further includes: the UE performs uplink data transmission based on the uplink resource configuration.
  • the UE performing uplink data transmission based on the uplink resource configuration includes: the UE performs data transmission on all PUSCH resources based on the uplink resource configuration; or the UE performs data transmission on part of the PUSCH resources based on the uplink resource configuration; or, the UE The PUSCH resources of the termination part are configured based on the uplink resources.
  • the UE After receiving the uplink resource configuration, the UE can use all PUSCH resources or part of the PUSCH resources. For other unused PUSCH resources, the UE can terminate (i.e., drop) them.
  • the UE performs data transmission on all PUSCH resources based on the uplink resource configuration.
  • All PUSCH resources represent different resources in different situations. For example, it can be determined based on the CG cycle that all PUSCH resources refer to all of the resources, or it can be determined based on the PUSCH pattern that all PUSCH resources refer to all of the resources. It can also be Determine which resources all PUSCH resources refer to based on the multiple dynamically scheduled PUSCH resources.
  • the UE performs data transmission on all PUSCH resources based on the uplink resource configuration, including:
  • the UE Based on the uplink resource configuration, the UE performs data transmission on all PUSCH resources within a CG cycle; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on the PUSCH resources corresponding to a specific location or identity within a CG cycle; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on all PUSCH resources within a PUSCH resource pattern; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on the PUSCH resource corresponding to a specific location or identifier within a PUSCH resource pattern; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on all PUSCH resources within the dynamically scheduled multiple PUSCH resources; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on all PUSCH resources corresponding to specific locations or identifiers within multiple dynamically scheduled PUSCH resources; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on all PUSCH resources within multiple CG cycles; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on the PUSCH resources corresponding to specific locations or identities within multiple CG cycles; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on all PUSCH resources in multiple PUSCH resource patterns; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on PUSCH resources corresponding to specific positions or identifiers within multiple PUSCH resource patterns.
  • the specific location or identifier may be one location or multiple locations.
  • all PUSCH resources refer to all resources in one or more CG cycles, all resources corresponding to specific positions or identities in one or more CG cycles, all resources in one or more PUSCH patterns, a or all resources corresponding to specific positions or identifiers within multiple PUSCH patterns, all resources corresponding to multiple dynamically scheduled PUSCH resources, and all resources corresponding to specific locations or identifiers within multiple dynamically scheduled PUSCH resources.
  • the UE performs data transmission on part of the PUSCH resources based on the uplink resource configuration, some of the PUSCH resources represent different resources in different situations. Consistent with all the above resource conditions, in one embodiment, the UE performs data transmission on part of the PUSCH resources based on the uplink resource configuration, including:
  • the UE Based on the uplink resource configuration, the UE performs data transmission on part of the PUSCH resources within a CG cycle; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on part of the PUSCH resources corresponding to a specific location or identity within a CG cycle; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on part of the PUSCH resources within a PUSCH resource pattern; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on some PUSCH resources corresponding to a specific location or identifier in a PUSCH resource pattern; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on some PUSCH resources within the dynamically scheduled multiple PUSCH resources; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on some PUSCH resources corresponding to specific locations or identifiers within multiple dynamically scheduled PUSCH resources; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on part of the PUSCH resources in multiple CG cycles; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on some PUSCH resources corresponding to specific locations or identities within multiple CG cycles; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on some PUSCH resources in multiple PUSCH resource patterns; or,
  • the UE Based on the uplink resource configuration, the UE performs data transmission on some PUSCH resources corresponding to specific positions or identifiers in multiple PUSCH resource patterns.
  • the UE When the UE sends indication information to the network device or base station, it is to inform the network device or base station whether subsequent resources will be used. Therefore, the UE needs to first determine the resources to be used and the resources not to be used. Based on the resources to be used and the resources not to be used, the UE can It is determined to generate the first indication information and the second indication information.
  • the method further includes:
  • S202 Determine the first indication information or the second indication information according to the used PUSCH resources and/or the unused PUSCH resources.
  • the UE determines the CG PUSCH resources to be used or not to use. Based on the determined CG PUSCH resources to be used or not to use, it generates first indication information or second indication information and reports it to the network equipment or base station, so that the network equipment or base station can Keep track of the UE's resource usage.
  • the indication information is used to instruct the network or the base station to perform at least one of the following: determine whether to receive PUSCH transmission; determine the PUSCH that needs to be received or decoded; determine PUSCHs that do not need to be received or decoded; determine PUSCHs that need to be terminated.
  • the network device or the base station determines which PUSCH resources are available or which PUSCH resources are unavailable based on the first indication information and the second indication information.
  • the base station can receive or decode on the corresponding resource.
  • the base station may not perform reception or decoding on the corresponding resource, or the base station may reconfigure the resource location to other UEs or schedule the resource location to other UEs. In this way, the resources used by the UE can be scheduled or allocated to other UEs, thereby avoiding waste of resources.
  • the method further includes: performing data transmission on used PUSCH resources, and/or not performing data transmission on unused PUSCH resources, and/or terminating unused PUSCH resources.
  • the UE After determining that in addition to the used PUSCH resources and/or the unused PUSCH resources, it performs data transmission on the used PUSCH resources and does not perform data transmission on the unused PUSCH resources. In addition, the UE can also terminate unused PUSCH resources.
  • the method further includes: if there is PUSCH resource conflict or multiplexing processing, determining the unused PUSCH resources as low-priority resources.
  • the UE may consider the unused resources as low-priority resources. In this way, unused resources are set as low priority and low-priority resources are avoided to alleviate the phenomenon of PUSCH resource conflict or multiplexing.
  • the method further includes: based on instructions from the network device or base station, determining whether to perform at least one of the following: reporting the first indication information; reporting the second indication information; triggering or generating the first indication information; Trigger or generate the second indication information; trigger the reporting of the first indication information; trigger the reporting of the second indication information; determine whether to perform resource termination; trigger or determine the PUSCH resources used; trigger or determine the transmission of unused PUSCH resources; trigger Uplink data transmission.
  • all operations involving the UE such as reporting, triggering or generating the first indication information and the second indication information, as well as resource termination, non-use, uplink data transmission, etc., are set to be in It is executed under the instruction of the network device or base station, which can improve the interactivity between the UE and the network device or base station.
  • another implementation method for whether the PUSCH is transmitted is that the base station indicates whether the target PUSCH is transmitted through the PDCCH or DCI.
  • the base station can carry the first indication information or the second indication information on the PDCCH; the DCI format carries the first domain (the first domain can carry the second indication information or the second indication information).
  • PDCCH or DCI format can be used to carry dynamic scheduling, or to activate/deactivate CG, or to activate/deactivate pre-configured PUSCH, or for other purposes.
  • the UE determines the PUSCH to transmit or not to transmit based on the base station instruction, and/or performs transmission or drop.
  • the above is the description of the data transmission method in the uplink data transmission process.
  • the following is the description of the data transmission method in the downlink data transmission process.
  • the downlink process is for the network device or base station to send indication information to the UE.
  • the indication information is used to inform the UE whether to use the target resource for data transmission. That is, the UE decides which resources to use or which resources not to use after receiving the indication information.
  • the downlink data transmission process involves the above-mentioned third indication information and fourth indication information, that is, the third downlink indication information corresponds to the uplink first indication information, and the fourth downlink indication information corresponds to the uplink second indication information.
  • the definitions in each embodiment involved in the downlink data transmission process are the same as those in the uplink data transmission process, and will not be described again in the following embodiments. Please refer to the foregoing embodiments.
  • the difference is that the relevant limitations of the indication information during downlink data transmission are carried in downlink-related resources, such as physical downlink control channel (Physical Downlink Control Channel, PDCCH), downlink dynamically scheduled PDSCH, SPS, etc.
  • the first device sending the third indication information to the second device means that the network device or the base station sends the third indication information to the UE.
  • the third indication information is carried in at least one of the following: the third indication information is carried in the PDCCH; the third indication information is carried in the SPS; the third indication information is carried in the PDSCH of downlink dynamic scheduling; the third indication information It is carried in the SPS downlink control information; the third indication information is carried in the new MAC control unit; the third indication information is carried in the radio resource control message.
  • the method further includes: triggering the generation of third indication information and/or triggering the issuance of the third indication information when the third condition is met.
  • the network device or the base station sending the third indication information to the UE includes: if the third condition is met, and/or if downlink transmission resources are available, the network device or the base station sends the third indication to the UE. information.
  • the third condition includes at least one of the following: the amount of data, the number of bytes, or the number of bits greater than the preset amount needs to be transmitted within one cycle; the amount of data, the number of bytes, or the number of bits greater than the preset amount needs to be transmitted within one cycle.
  • Transmitted within a transmission pattern the amount of data greater than the first threshold is transmitted in one cycle; the amount of data less than the second threshold is transmitted in one cycle; SPS downlink control information is configured or activated; dynamic scheduling downlink control information is configured or activated ; Downlink control information configuration is disabled; downlink resources are preconfigured resources; support new MAC control unit triggering or delivery; network or base station activation or enablement indication information delivery; support indication information delivery; downlink resources include multiple PDSCH resources; multiple transmission resources are configured in one transmission cycle; the preconfigured PDSCH resource pattern includes multiple PDSCH resources; multiple PDSCHs are required for data transmission in one cycle; multiple PDSCHs are required for data transmission in the preconfigured PDSCH resource pattern.
  • the amount of data to be transmitted is greater than the transmission block size of one PDSCH resource or a designated PDSCH resource; the amount of data to be transmitted is less than the transmission block size of all PDSCH resources; the amount of data to be transmitted is greater than the TBS of multiple PDSCHs, but smaller than the TBS of all PDSCHs;
  • the amount of data to be transmitted changes; the resources to be transmitted or the transmission resources to be used change; the dynamically scheduled resources include multiple PDSCH resources; the third indication information is generated or triggered or pending; the PDCCH carries the third indication information; DCI format Bearing the first domain (the first domain can carry the third indication information); PDSCH-DCI is activated or available (can carry the third indication information); SPS-DCI is activated or available (can carry the third indication information); SPS or PDSCH can Carrying third instruction information.
  • PDCCH or DCI format can be used to carry dynamic scheduling, or to activate/deactivate SPS, or to activate/deactivate preconfigured PDSCH, or
  • the network device or base station sending the third indication information to the UE includes: the network device or the base station sending the third indication information to the UE on the first PDSCH resource; the third indication information is used to indicate the third indication information after the first PDSCH resource. Whether the resource is used.
  • the first PDSCH may be the PDSCH of the SPS or the PDSCH of the DG.
  • the resources after the first PDSCH resource are at least one of the following: PDSCH resources in the third cycle; PDSCH resources within the configured PDSCH resource pattern; multiple dynamically scheduled PDSCH resources; and the first PDSCH resource.
  • the resources after the first PDSCH resource may also be at least one of the following: all PDSCH resources after the first PDSCH resource; at least one or a specific number of PDSCH resources after the first PDSCH resource; One PDSCH resource after the PDSCH resource; multiple consecutive PDSCH resources after the first PDSCH resource; multiple discontinuous PDSCH resources after the first PDSCH resource.
  • the above-mentioned third indication information is used to indicate any of the following: whether all resources in the resources after the first PDSCH resource perform data transmission; whether each resource in the resources after the first PDSCH resource performs data transmission. ;Whether multiple resources among the resources after the first PDSCH resource perform data transmission; whether one of the resources after the first PDSCH resource performs data transmission; a specific PDSCH resource among the resources after the first PDSCH resource; the first PDSCH The first resource after the resource; the latest specific data resource after the first PDSCH resource; whether all target resources perform data transmission; whether one or a specific one of the target resources performs data transmission; multiple or specific target resources Whether multiple data transfers are performed; whether each of the target resources performs data transmission.
  • the third indication information is carried on one first PDSCH resource or on multiple first PDSCH resources.
  • the network device or the base station sends the third indication information to the UE, including: the network device or the base station sends the third indication information to the UE on one first PDSCH; the network device or the base station sends the third indication information to the UE on multiple first PDSCHs.
  • the third indication information is carried on one first PDSCH resource, but if there are multiple first PDSCH resources, the third indication information is carried on multiple first PDSCH resources, or, multiple first PDSCH resources on at least part of the first PDSCH resources.
  • the third indication information may be carried on one PDSCH resource, or the third indication information may be carried on each of multiple PDSCH resources.
  • the base station only needs to send the third indication information on a first PDSCH.
  • the third indication information may be carried on multiple first PDSCH resources, the third indication information may be sent by the UE on multiple first PDSCHs, may be sent on each PDSCH, or may be sent on a specific first PDSCH. It may be sent on the PDSCH, or it may be sent on the PDSCH of each transmission, or it may be sent on the first PDSCH of multiple transmissions. In this way, under different circumstances, the first indication information is sent in different carrying modes, so that after receiving the third indication information, the network equipment or base station can reasonably allocate transmission resources in a more targeted and flexible manner, thereby avoiding Waste of resources.
  • the above third indication information is used to indicate at least one of the following: indicating whether the next PDSCH after the first PDSCH performs data transmission; indicating whether all PDSCHs in the SPS period after the first PDSCH perform data transmission; indicating whether the next PDSCH performs data transmission. Whether all PDSCHs in the PDSCH resource pattern after one PDSCH perform data transmission; indicating whether the PDSCH at a designated position after the first PDSCH performs data transmission.
  • the PDSCH at the specified location may be one location or multiple locations.
  • the network device or base station sends fourth indication information to the UE, and the fourth indication information is carried in the target transmission resource or target transmission information.
  • the network device or the base station sends fourth indication information to the UE, and the fourth indication information is carried in the target transmission resource or target transmission information before the second PDSCH resource; or, the network device or the base station sends the fourth indication information to the UE,
  • the fourth indication information is sent on the target transmission resource or target transmission information before the second PDSCH resource.
  • the target transmission resource or target transmission information includes at least one of the following: PDCCH resources, downlink control information, scheduling request, PDSCH, MAC control unit, and radio resource control.
  • the downlink resource is configured as a downlink resource corresponding to the second PDSCH resource. configuration.
  • the second PDSCH resource is at least one of the following: PDSCH resources before the SPS cycle; PDSCH resources before the PDSCH resource pattern; PDSCH resources before a specific SPS cycle; PDSCH resources before the specific PDSCH resource pattern; first PDSCH resources at a location; PDSCH resources at a specific location; multiple PDSCH resources dynamically scheduled.
  • the fourth indication information is used to indicate whether resources within the SPS cycle or PDSCH resource pattern perform data transmission; or, the fourth indication information is used to indicate whether multiple dynamically scheduled PDSCH resources perform data transmission.
  • the resource indicated by the fourth indication information is at least one of the following: the SPS cycle closest to the target transmission resource or target transmission information or the resource within the PDSCH resource pattern; the target transmission resource or one SPS cycle after the target transmission information.
  • resources within the PDSCH resource pattern target transmission resources or resources within multiple SPS cycles or PDSCH resource patterns after the target transmission information; the second PDSCH resource corresponds to resources within the SPS cycle or PDSCH resource pattern; target transmission resources or target transmission Resources within multiple dynamically scheduled PDSCH resources following the information; resources within multiple dynamically scheduled PDSCH resources corresponding to the second PDSCH resource.
  • the resources indicated by the fourth indication information also include at least one of the following: one PDSCH resource within the SPS cycle or PDSCH resource pattern; multiple PDSCH resources within the SPS cycle or PDSCH resource pattern; SPS cycle or PDSCH resource Specific PDSCH resources within the pattern; multiple continuous PDSCH resources within the SPS cycle or PDSCH resource pattern; multiple discontinuous PDSCH resources within the SPS cycle or PDSCH resource pattern; all PDSCH resources within the SPS cycle or PDSCH resource pattern; dynamic scheduling One or more PDSCH resources within multiple PDSCH resources; a specific PDSCH resource within multiple dynamically scheduled PDSCH resources; whether all target resources perform data transmission; whether one or a specific one of the target resources perform data transmission; target Whether multiple or specific multiple resources in the resource perform data transmission; whether each of the target resources perform data transmission.
  • the fourth indication information is used to indicate any of the following: whether all resources in the SPS cycle or the PDSCH resource pattern perform data transmission; whether each resource in the SPS cycle or the PDSCH resource pattern performs data transmission. Perform data transmission; whether multiple resources in the SPS cycle or the PDSCH resource pattern perform data transmission; whether one resource in the SPS cycle or the PDSCH resource pattern performs data transmission; whether the resources in the SPS cycle or the PDSCH resource pattern perform data transmission Whether the specific resources in the dynamically scheduled multiple PDSCH resources perform data transmission; whether multiple resources in the dynamically scheduled multiple PDSCH resources perform data transmission; whether specific resources in the dynamically scheduled multiple PDSCH resources perform data transmission; in the dynamically scheduled multiple PDSCH resources Whether one of the resources in the dynamically scheduled PDSCH resources performs data transmission; whether each of the multiple dynamically scheduled PDSCH resources performs data transmission; whether all of the dynamically scheduled multiple PDSCH resources perform data transmission; whether the next downlink resource performs data transmission; Whether the resources of the fourth cycle or resource pattern
  • the network device or the base station sends the fourth indication information to the UE, including: when the third condition is met, the network device or the base station triggers the fourth indication information, the network device or the base station issues the fourth indication information, The network device or the base station sends at least one of the fourth indication information to the UE.
  • the third condition includes at least one of the following: an amount of data, a number of bytes, or a number of bits greater than a preset amount needs to be transmitted within one cycle; an amount of data, a number of bytes, or a number of bits greater than the preset amount needs to be transmitted Transmitted within a transmission pattern; the amount of data greater than the third threshold is transmitted in one cycle; the amount of data less than the fourth threshold is transmitted in one cycle; the resource configuration for transmitting the fourth indication information is allowed or disabled; the network or base station activates or Enables the delivery of indication information; supports the delivery of indication information; supports the triggering or delivery of new MAC control units; downlink resources are preconfigured resources; downlink resources include multiple PDSCH resources; multiple transmission resources are configured in one transmission cycle; The preconfigured PDSCH resource pattern includes multiple PDSCH resources; multiple PDSCHs are required for data transmission in one cycle; multiple PDSCHs are required for data transmission in the preconfigured PDSCH resource pattern; the dynamically scheduled resources include multiple PDSCH
  • the method further includes: the network device or the base station sends the downlink resource configuration to the UE.
  • the network device or the base station sends the third indication information or the fourth indication information to the UE based on the downlink resource configuration.
  • the downlink resource configuration includes preconfigured resources or dynamically scheduled resources.
  • the dynamically scheduled resources include multiple PDSCH resources.
  • the preconfigured resources include SPS or preconfigured PDSCH resource patterns.
  • the downlink resource configuration indicates that one SPS cycle includes multiple PDSCH resources, and/or one PDSCH resource pattern includes multiple PDSCH resources.
  • the downlink resource configuration includes at least one of the following: SPS identification; SPS cycle; the number of PDSCH resources in the SPS cycle; resource information of at least one PDSCH resource in one SPS cycle; downlink control information in one SPS cycle.
  • SPS Downlink control information of PDSCH resources; PDSCH resource pattern identification; PDSCH resource pattern periodic or non-periodic; number of PDSCH resources in a PDSCH resource pattern; resource information of at least one PDSCH resource in a PDSCH resource pattern; a PDSCH resource pattern downlink control information within the PDSCH resource pattern; downlink control information of the PDSCH resources within the PDSCH resource pattern; downlink control information of multiple dynamically scheduled PDSCH resources; at least one PDSCH resource information of dynamically scheduled multiple PDSCH resources; dynamically scheduled multiple PDSCH The number of PDSCH resources for the resource.
  • the resource information of at least one PDSCH resource includes at least one of the following: a starting position of at least one PDSCH resource; an ending position of at least one PDSCH resource; time domain and frequency domain resource information of at least one PDSCH resource; at least one The resource offset of each PDSCH resource in the PDSCH resource relative to the first PDSCH resource; the resource offset of each PDSCH resource in at least one PDSCH resource relative to a specific PDSCH resource; the resource offset of each PDSCH resource in at least one PDSCH resource relative to the last The resource offset of the PDSCH resource; the first resource or the last resource or a specific resource in at least one PDSCH resource; the number of at least one PDSCH resource; the redundancy version information RV of at least one PDSCH resource; each of the at least one PDSCH resource The RV offset of each PDSCH resource relative to the first PDSCH resource; the RV offset of each PDSCH resource in at least one PDSCH resource relative to a specific PDSCH resource; the RV offset
  • the downlink control information indicates at least one of the following: whether the indication information is included; content of the indication information; resources carrying the indication information; PDSCH resources indicated by the indication information; designated PDSCH resources; location of the indication information; occupation of the indication information. Byte size; disable flag or enable flag; resource status or resource usage conditions.
  • the resource situation or resource usage conditions include: multiple PDSCH resources are configured in one SPS cycle; multiple PDSCH resources are configured in one PDSCH resource pattern; multiple PDSCH resources are used for data transmission; the amount of data to be transmitted is greater than one PDSCH or Specify the transport block size of PDSCH; the amount of data to be transmitted is less than the transport block size of all PDSCHs in the downlink resources.
  • the method further includes: network equipment or base station performing downlink data transmission.
  • the network device or base station performs downlink data transmission, including: the network device or base station performs data transmission on all PDSCH resources; or the network device or base station performs data transmission on part of the PDSCH resources; or the network device Or the base station terminates part of the PDSCH resources.
  • the network equipment or base station performs data transmission on all PDSCH resources, including: the network equipment or base station performs data transmission on all PDSCH resources within an SPS cycle; or, the network equipment or base station performs data transmission on all PDSCH resources within an SPS cycle; Data transmission is performed on the PDSCH resource corresponding to the specific location or identification, or the network equipment or base station performs data transmission on all PDSCH resources within a PDSCH resource pattern; or the network equipment or base station performs data transmission at a specific location within a PDSCH resource pattern.
  • the network equipment or base station performs data transmission on all PDSCH resources within the dynamically scheduled multiple PDSCH resources; or, the network equipment or base station performs data transmission within the dynamically scheduled multiple PDSCH resources.
  • Data transmission is performed on the PDSCH resources corresponding to the location or identification, or the network equipment or base station performs data transmission on all PDSCH resources within multiple PDSCH resource patterns; or the network equipment or base station performs data transmission at a specific location within multiple PDSCH resource patterns. Or perform data transmission on the PDSCH resource corresponding to the identifier.
  • the network equipment or the base station performs data transmission on part of the PDSCH resources, including: the network equipment or the base station performs data transmission on part of the PDSCH resources within an SPS cycle; or, the network equipment or the base station performs data transmission on part of the PDSCH resources within an SPS cycle.
  • Data transmission is performed on a part of the PDSCH resources corresponding to a specific location or identification, or the network equipment or base station performs data transmission on a part of the PDSCH resources within a PDSCH resource pattern; or the network equipment or base station performs data transmission on a specific part of the PDSCH resource pattern within a PDSCH resource pattern.
  • Data transmission is performed on part of the PDSCH resources corresponding to the location or identification; alternatively, the network equipment or base station performs data transmission on part of the PDSCH resources within the dynamically scheduled multiple PDSCH resources; alternatively, the network equipment or base station performs data transmission on multiple dynamically scheduled PDSCH resources.
  • Data transmission is performed on part of the PDSCH resources corresponding to a specific location or identifier within the resource; or, the network equipment or base station performs data transmission on part of the PDSCH resources within multiple SPS cycles; or, the network equipment or base station performs data transmission on part of the PDSCH resources within multiple SPS cycles.
  • the method further includes: the network device or the base station performs downlink data transmission based on the downlink resource configuration.
  • the network device or the base station performs downlink data transmission based on the downlink resource configuration, including: the network device or the base station performs data transmission on all PDSCH resources based on the downlink resource configuration; or, the network device or the base station performs data transmission on some of the PDSCH resources based on the downlink resource configuration. Data transmission is performed on PDSCH resources; or, the network equipment or base station configures the terminated part of PDSCH resources based on downlink resources.
  • the network device or base station performs data transmission on all PDSCH resources based on downlink resource configuration, including: the network device or base station performs data transmission on all PDSCH resources within an SPS cycle based on downlink resource configuration; or, Based on the downlink resource configuration, the network equipment or base station performs data transmission on the PDSCH resources corresponding to a specific location or identifier within an SPS cycle, or based on the downlink resource configuration, the network equipment or base station performs data transmission on all PDSCH resources within a PDSCH resource pattern.
  • the network equipment or base station performs data transmission; or, based on the downlink resource configuration, the network equipment or base station performs data transmission on the PDSCH resource corresponding to a specific location or identification within a PDSCH resource pattern; or, based on the downlink resource configuration, the network equipment or base station performs data transmission on the dynamically scheduled Data transmission is performed on all PDSCH resources within multiple PDSCH resources; or, based on the downlink resource configuration, the network equipment or base station performs data transmission on all PDSCH resources corresponding to specific locations or identifiers within multiple dynamically scheduled PDSCH resources; or , the network equipment or base station performs data transmission on all PDSCH resources within multiple SPS cycles based on the downlink resource configuration; or, the network equipment or base station performs data transmission on the PDSCH corresponding to specific locations or identifiers within multiple SPS cycles based on the downlink resource configuration.
  • Data transmission is performed on resources, or the network equipment or base station performs data transmission on all PDSCH resources in multiple PDSCH resource patterns based on downlink resource configuration; or the network equipment or base station performs data transmission on all PDSCH resources in multiple PDSCH resource patterns based on downlink resource configuration.
  • Data transmission is performed on the PDSCH resource corresponding to a specific location or identifier within the device.
  • the network device or base station performing data transmission on part of the PDSCH resources based on the downlink resource configuration includes: the network device or the base station performing data transmission on part of the PDSCH resources within an SPS cycle based on the downlink resource configuration; or, the network Based on the downlink resource configuration, the equipment or base station performs data transmission on part of the PDSCH resources corresponding to a specific location or identifier within an SPS cycle. Alternatively, the network equipment or base station performs data transmission on part of the PDSCH resources within a PDSCH resource pattern based on the downlink resource configuration.
  • the network equipment or base station performs data transmission; or, based on the downlink resource configuration, the network equipment or base station performs data transmission on part of the PDSCH resources corresponding to a specific location or identification within a PDSCH resource pattern; or, based on the downlink resource configuration, the network equipment or base station performs data transmission on dynamic scheduling Data transmission is performed on some PDSCH resources within multiple PDSCH resources; or, based on the downlink resource configuration, the network equipment or base station performs data transmission on some PDSCH resources corresponding to specific locations or identifiers within multiple dynamically scheduled PDSCH resources; Or, based on the downlink resource configuration, the network equipment or base station performs data transmission on part of the PDSCH resources in multiple SPS cycles; or, based on the downlink resource configuration, the network equipment or base station performs data transmission on specific locations or identifiers corresponding to multiple SPS cycles.
  • Data transmission is performed on part of the PDSCH resources, or the network equipment or base station performs data transmission on part of the PDSCH resources in multiple PDSCH resource patterns based on the downlink resource configuration; or the network equipment or base station performs data transmission on multiple PDSCH resources based on the downlink resource configuration.
  • Data transmission is performed on some PDSCH resources corresponding to specific positions or identifiers in the resource pattern.
  • the method further includes at least one of the following:
  • S302 Determine the third indication information or the fourth indication information according to the used PDSCH resources and/or the unused PDSCH resources.
  • the method further includes: performing data transmission on used PDSCH resources, and/or not performing data transmission on unused PDSCH resources, and/or terminating unused PDSCH resources.
  • the method further includes: if there is PDSCH resource conflict or multiplexing processing, determining the unused PDSCH resources as low-priority resources.
  • the method further includes: determining whether to perform at least one of the following: delivering the third indication information; delivering the fourth indication information; triggering or generating the third indication information; triggering or generating the fourth indication information; triggering the third indication information. Issuance of the third indication information; triggers the issuance of the fourth indication information; determines whether to terminate resources; triggers or determines the PDSCH resources used; triggers or determines the transmission of unused PDSCH resources; triggers the transmission of downlink data.
  • the network determines whether to perform at least one of the following: delivering the third indication information; delivering the fourth indication information; triggering or generating the third indication information; triggering or generating the fourth indication information.
  • Instruction information triggers the delivery of the third indication information; triggers the delivery of the fourth indication information; determines whether to perform resource termination; triggers or determines the PDSCH resources used; triggers or determines the transmission of unused PDSCH resources; triggers the transmission of downlink data transmission.
  • the indication information is used by the UE to perform at least one of the following: determine whether to receive PDSCH transmission; determine the PDSCH that needs to be received or decoded; determine the PDSCH that does not need to be received or decoded; determine the PDSCH that needs to be terminated.
  • another implementation method for whether the PDSCH is transmitted is to indicate whether the target PDSCH is transmitted through the PDCCH or DCI.
  • the base station can carry the fourth indication information or the third indication information on the PDCCH; the DCI format carries the first domain (the first domain can carry the third indication information or the fourth indication information).
  • PDCCH or DCI format can be used to carry dynamic scheduling, or to activate/deactivate CG, or to activate/deactivate preconfigured PDSCH, or for other purposes, etc.
  • the UE determines the PDSCH to transmit or not to transmit based on the base station instruction, and/or performs transmission or drop.
  • each step in the flow chart of the above embodiment is shown in sequence as indicated by the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated in this article, there is no strict order restriction on the execution of these steps, and these steps can be executed in other orders. Moreover, at least some of the steps in the above embodiments may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but may be executed at different times. The order of execution is not necessarily sequential, but may be performed in turn or alternately with other steps or sub-steps of other steps or at least part of the stages.
  • the embodiments of this application also provide the following different data transmission methods.
  • Embodiment 1 This embodiment is directed to a process in which a UE instructs a network device or a base station to instruct a network device or a base station with first indication information.
  • the first indication information is used to indicate whether subsequent resources are used.
  • the first indication information may be sent together with PUSCH resources (simultaneous indication).
  • this embodiment specifically implements uplink preconfiguration transmission as an example, but it is also applicable to other uplink PUSCH transmission situations.
  • the logic or implementation of this embodiment is also applicable to the case of SPS PDSCH or DG PDSCH transmission (corresponding to DL, the network sends indication information to indicate whether the location of the UE is transmitted or dropped.
  • the indication is carried
  • the channel or information of the information is a DL channel or DL information.
  • the base station may not transmit data at the location.
  • the UE determines whether to receive and/or decode at the location according to the indication) .
  • the UE receives the UL resource configuration. Specifically, it includes at least one of the following:
  • UL resource configuration can be preconfigured resources, such as CG configuration, or preconfigured PUSCH pattern.
  • UL resources include multiple PUSCH resources. For example, there are multiple PUSCH resources in a CG cycle, or there are multiple PUSCH resources in a preconfigured PUSCH pattern.
  • the UE uses the configured UL resources for transmission. Specifically, the UE indicates first indication information to the network (such as a base station), and the first indication information is used to indicate whether subsequent resources are used. Include at least one of the following:
  • the first instruction information indicates transmission or drop.
  • the first indication information indicates whether the PUSCH resources in this cycle are transmitted or used, or indicates whether the PUSCH resources in the subsequent cycle (such as the next most recent cycle) are transmitted or used, or indicates whether the PUSCH resources in this preconfigured PUSCH pattern are transmitted or used. Whether the resource is transferred or used.
  • the first indication information can be sent together with PUSCH resources (simultaneous indication).
  • the first indication information is carried in the CG-UCI (CG-UCI is used to transmit the first indication information), or it can be carried in the new MAC CE (the MAC CE is used to transmit the first indication information).
  • the first indication information indicates whether a subsequent PUSCH is transmitted, or indicates whether subsequent consecutive PUSCH resources are transmitted.
  • the first indication information is used to indicate whether subsequent PUSCH resources in this cycle or this pattern are transmitted.
  • the first indication information is carried on a specific PUSCH, for example, on the first PUSCH, or on a certain PUSCH.
  • the first indication information indicates whether other PUSCHs after the specific PUSCH (for example, in this cycle, this pattern, or the most recent next cycle) are transmitted (transmitted or dropped).
  • the indication may be common (that is, for all related PUSCHs), or it may be indicated individually for each PUSCH. There can be one or more other PUSCHs.
  • the first indication information is carried on each PUSCH.
  • the first indication information indicates whether to transmit the next PUSCH. or,
  • the first indication information indicates whether other PUSCHs (in this cycle, this pattern, or the most recent next cycle) after the specific PUSCH are transmitted (transmitted or dropped). There can be multiple other PUSCHs.
  • the UE uses PUSCH for transmission.
  • the UE does not use PUSCH for transmission.
  • the UE When the first condition is met, the UE indicates the first indication information to the network (such as the base station).
  • the first condition includes at least one of the following: more data or bytes need to be transmitted in one cycle; the amount of data greater than the threshold is transmitted in one cycle; the amount of data less than the threshold is transmitted in one cycle; CG-UCI configuration is enabled; UL
  • the resources are preconfigured resources; support new MAC CE triggering or reporting; UL resources include multiple PUSCH resources; multiple CG resources are configured in one CG cycle; the preconfigured PUSCH pattern includes multiple PUSCH resources; multiple PUSCH resources in one cycle Need to use; TBS whose data volume to be transmitted is larger than one PUSCH or a specific PUSCH (such as the first one); TBS whose data volume to be transmitted is smaller than all PUSCHs of UL resources.
  • Embodiment 1 ensures the service transmission requirements of XR or gaming services. Furthermore, waste of resources can also be avoided. It should be noted that the above-mentioned Embodiment 1 takes UL as an example, but all its limitations also apply to downlink DL. The difference is that all uplink channels, configuration cycles, scheduling requests, scheduling information, etc. correspond to downlink channels, Configuration cycle, scheduling request, and scheduling information.
  • Embodiment 2 This embodiment is directed to the UE instructing the network with second indication information, and the second indication information is used to indicate whether subsequent resources are used.
  • the second indication information may be sent before the PUSCH resource is sent (early indication).
  • the logic or implementation method of this embodiment is also applicable to SPS PDSCH or DG PDSCH transmission situations (corresponding to DL is indication information sent by the network to indicate to the UE whether to transmit or drop at the location.
  • the channel or information carrying the indication information is the DL channel or DL information.
  • the base station may not send data at the location.
  • the UE determines whether to perform reception and/or decoding at the location according to the indication):
  • the UE receives the UL resource configuration. Specifically, it includes at least one of the following:
  • UL resource configuration can be preconfigured resources, such as CG configuration, or preconfigured PUSCH pattern
  • UL resources include multiple PUSCH resources. For example, there are multiple PUSCH resources in a CG cycle, or there are multiple PUSCH resources in a preconfigured PUSCH pattern.
  • the UE uses the configured UL resources for transmission. Specifically, the UE indicates second indication information to the network (such as a base station), and the second indication information is used to indicate whether subsequent resources are used. It includes at least one of the following:
  • the second instruction information indicates transmission or drop.
  • the second indication information indicates whether the PUSC H resources in this cycle are transmitted or used, or indicates whether the PUSCH resources in the subsequent cycle (such as the next most recent cycle) are transmitted or used, or indicates whether the PUSCH resources in this preconfigured PUSCH pattern are transmitted or used. Whether subsequent resources are transferred or used.
  • the second indication information can be sent before the PUSCH resource is sent (early indication).
  • the second indication information is transmitted using a new UCI, or SR, or PUSCH.
  • the PUSCH can be used to transmit the second information, such as the PUSCH carrying MAC CE, or CG-UCI .
  • the new UCI, or SR, or PUSCH is a resource with a fixed offset before the UL resource configuration.
  • the second indication information indicates whether the latest UL resource is transmitted, or whether the PUSCH of the latest cycle is transmitted, or whether the subsequent PUSCH is transmitted, or whether subsequent consecutive PUSCH resources are transmitted.
  • the second indication information is used to indicate whether the PUSCH or UL resource configured PUSCH resources of the latest cycle are transmitted.
  • PUSCH may be one or more PUSCH resources, and the first indication information may be common information, or may be indicated separately for at least one PUSCH.
  • Other PUSCHs may be PUSCH resources after the specific PSUCH.
  • the UE uses PUSCH for transmission.
  • the UE does not use PUSCH for transmission.
  • the UE When the second condition is met, the UE indicates the second indication information to the network (such as the base station).
  • the second condition includes at least one of the following: more data or bytes need to be transmitted in one cycle; the amount of data greater than the threshold is transmitted in one cycle; the amount of data less than the threshold is transmitted in one cycle; resource configuration for transmitting the second indication information Be configured or enabled; support new MAC CE triggering or reporting; UL resources are preconfigured resources; UL resources include multiple PUSCH resources; multiple CG resources are configured in one CG cycle; the preconfigured PUSCH pattern includes multiple PUSCH resources ; Multiple PUSCHs need to be used in one cycle; TBS where the size of the data to be transmitted is greater than one PUSCH or a specific PUSCH (such as the first one); TBS where the size of the data to be transmitted is less than all PUSCHs of the UL resource.
  • the above embodiments ensure the service transmission requirements of XR or gaming services. Furthermore, waste of resources can also be avoided.
  • the above-mentioned second embodiment is the same as the above-mentioned embodiment one, taking UL as an example, but all its limitations also apply to downlink DL. The difference is that all uplink channels, configuration cycles, scheduling requests, scheduling information, etc. correspond to downlink Channel, configuration cycle, scheduling request, scheduling information.
  • Embodiment 3 This embodiment is aimed at illustrating the implementation process of resource configuration. (Take the CG configuration in UL as an example. It can be applied to downlink SPS, and it can also be applied to the case of uplink and downlink preconfigured patterns. Optionally, it can also be applied to DG scheduling cases, such as one DCI scheduling multiple PUSCH, and/or, the case of scheduling multiple PDSCHs; another example is the case of one PDCCH scheduling multiple PUSCHs, and/or, the case of scheduling multiple PDSCHs, and another example is the case of one PDCCH activating or deactivating multiple PUSCHs, and/or activating Or deactivate multiple PDSCH cases)
  • DG scheduling cases such as one DCI scheduling multiple PUSCH, and/or, the case of scheduling multiple PDSCHs
  • another example is the case of one PDCCH scheduling multiple PUSCHs, and/or, the case of scheduling multiple PDSCHs
  • another example is the case of one PDCCH activating or deactivating multiple PU
  • multiple resources are configured in one CG/SPS cycle, such as multiple PUSCH resources or multiple PDSCH resources; among them, a preconfigured PUSCH pattern also includes multiple PUSCH resources, and the interval between multiple PUSCH resources can be Equally spaced or non-equally spaced.
  • the preconfigured pattern can be periodic or non-periodic.
  • the following configurations or parameters can be modified to be specific to the preconfigured pattern (for example, CG cycle -> preconfigured pattern cycle.)
  • the UE receives CG configuration, including at least one of the following:
  • the UE receives the CG configuration from the base station.
  • CG configuration includes at least one of the following:
  • the number of resources within the CG cycle such as the number of PUSCH or CG PUSCH resources.
  • the starting positions and/or ending positions of multiple PUSCH or CG PUSCH resources are referred to.
  • time domain and/or frequency domain resource information of multiple PUSCH or CG PUSCH resources For example, the time domain and/or frequency domain resource information of a PUSCH or CG PUSCH resource; the time domain and/or frequency domain resource information of other PUSCH or CG PUSCH resources for the offset of the first PUSCH or CG PUSCH resource; or, each Time domain and/or frequency domain resource information of a PUSCH or CG PUSCH resource.
  • multiple PUSCH or CG PUSCH resources which PUSCH or CG PSUCH resource is the first resource, or which PUSCH or CG PSUCH resource is the last resource, or which PUSCH or CG PSUCH resource is serial number.
  • RV information of multiple PUSCH or CG PUSCH resources For example, the RV information of each one, or the RV information of the first one and the offset information of each subsequent one for the first one.
  • HARQ process information of multiple PUSCH or CG PUSCH resources For example, the HARQ process information of each one, or the HARQ process information of the first one and the offset information of each subsequent one for the first one.
  • CG-UCI configuration information For a CG cycle, CG-UCI configuration information. Include at least one of the following:
  • (2) CG UCI configuration includes the location and/or occupied bit size of the first indication information.
  • the CG UCI configuration includes the location and/or occupied bit size of the second indication information.
  • the CG-UCI configuration includes enable or disable instructions, or includes usage conditions; where the usage conditions are, for example: multiple CG resources are configured in one CG cycle, and/or multiple PUSCHs need to be used, and/or,
  • the size of the data to be transmitted is larger than the TBS of one PUSCH or a specific PUSCH, and/or the size of the data to be transmitted is smaller than the TBS of all PUSCHs of the UL resource.
  • the UE uses CG configuration to perform UL transmission. Include at least one of the following:
  • the base station determines which CG PUSCH resources are available or which PUSCH resources are unavailable based on the reported information. When it is determined that it is available, the base station can receive or decode on the corresponding resource. When it is determined that the resource is unavailable, the base station may not perform reception or decoding on the corresponding resource or configure the resource location to other UEs or schedule the resource location to other UEs.
  • the UE may consider unused resources as low-priority resources.
  • the above embodiments ensure the service transmission requirements of XR or gaming services. Furthermore, waste of resources can also be avoided.
  • this embodiment of the present application also provides a data transmission device, which includes:
  • the instruction information sending module is used to send instruction information, and the instruction information is used to indicate whether to use the target resource for data transmission.
  • whether to use the target resource for data transmission includes at least one of the following: whether the target resource is used for data transmission; whether the target resource is terminated; whether to use the target resource.
  • the indication information is used to indicate at least one of the following: at least one resource among the target resources performs data transmission or is not terminated; all resources among the target resources perform data transmission or is not terminated; At least one resource does not perform data transmission or is terminated; all resources in the target resource do not perform data transmission or are terminated.
  • the target resource is at least one of the following: resources in the first cycle; resources in the second cycle after the first cycle; resources in the configured PUSCH resource pattern; one or more resources after the indication information. resources in one cycle; resources in one or more PUSCH resource patterns after the indication information; resources in the configured PDSCH resource pattern; resources in one or more PDSCH resource patterns after the indication information; one or more configuration grants CG resources; one or more CG resources for at least one period; one or more semi-persistent scheduling SPS resources; one or more SPS resources for at least one period; dynamic scheduling resources.
  • whether to use the target resource for data transmission includes: whether to use the target resource for data transmission, and/or whether to use the target resource for data reception.
  • the indication information sending module is also configured to at least one of the following: send first indication information, and the first indication information is sent together with the first PUSCH resource; send second indication information, and the second indication information is sent in the second PUSCH resource.
  • the resource pattern is sent before; the third indication information is sent, and the third indication information is sent together with the first PDSCH resource; the fourth indication information is sent, and the fourth indication information is sent before the second PDSCH resource; the third indication information is sent, and the third indication is sent
  • the information is sent in the first SPS period or the first PDSCH resource pattern; the fourth indication information is sent, and the fourth indication information is sent in the second SPS period or before the second PDSCH resource pattern; the first indication information is sent, the first indication The information is sent together with the first dynamic scheduling
  • the indication information sending module includes a first indication information sending unit, configured to send the first indication information to the network device or base station.
  • the first indication information is carried in at least one of the following: the first indication information is carried in the CG uplink control information; the first indication information is carried in the new MAC control unit; the first indication information is carried in the wireless in resource control messages.
  • the device further includes: a triggering module, configured to trigger the generation of the first indication information and/or trigger the reporting of the first indication information when the first condition is met.
  • a triggering module configured to trigger the generation of the first indication information and/or trigger the reporting of the first indication information when the first condition is met.
  • the first indication information sending unit is further configured to send the first indication information to the network device or the base station when the first condition is met and/or when uplink transmission resources are available.
  • the first condition includes at least one of the following: an amount of data, a number of bytes, or bits greater than a preset amount needs to be transmitted within one cycle; an amount of data, a number of bytes, or bits greater than a preset amount.
  • the data needs to be transmitted within a transmission pattern; the amount of data greater than the first threshold is transmitted in one cycle; the amount of data less than the second threshold is transmitted in one cycle; CG uplink control information is configured or activated; DG uplink control information is configured or activated; uplink control information configuration is disabled; uplink resources are preconfigured resources; support new MAC control unit triggering or reporting; network or base station activation or enablement indication information reporting; support indication information reporting; uplink resources include multiple PUSCH Resources; multiple transmission resources are configured in one transmission cycle; the preconfigured PUSCH resource pattern includes multiple PUSCH resources; multiple PUSCHs are required for data transmission in one cycle; multiple PUSCHs are required for data transmission in the preconfigured PUSCH resource pattern; The amount of data to be transmitted is greater than the transmission block size of one PUSCH resource or a designated PUSCH resource; the amount of data to be transmitted is less than the transmission block size of all PUSCH resources; the amount of data to be transmitted changes; the resources to be transmitted or the transmission resources to be used
  • the first indication information sending unit is also configured to send the first indication information to the network device or base station on the first PUSCH resource; the first indication information is used to indicate whether the resources after the first PUSCH resource are used. .
  • the resources after the first PUSCH resource are at least one of the following: PUSCH resources in the third cycle; PUSCH resources within the configured PUSCH resource pattern; multiple dynamically scheduled PUSCH resources; the first PUSCH Multiple dynamically scheduled PUSCH resources after the resource; PUSCH resources in multiple cycles; PUSCH resources in multiple configured PUSCH resource patterns; PUSCH resources in multiple cycles after the first PUSCH resource; After the first PUSCH resource The PUSCH resources in the configured multiple PUSCH resource patterns; the PUSCH resources after the first PUSCH resource in the third cycle; the PUSCH resources after the first PUSCH resource in the configured PUSCH resource pattern.
  • the resources after the first PUSCH resource are at least one of the following: all PUSCH resources after the first PUSCH resource; at least one or a specific number of PUSCH resources after the first PUSCH resource; the first PUSCH One PUSCH resource after the resource; multiple consecutive PUSCH resources after the first PUSCH resource; multiple discontinuous PUSCH resources after the first PUSCH resource.
  • the first indication information is used to indicate at least one of the following: whether all resources in the resources after the first PUSCH resource perform data transmission; whether each resource in the resources after the first PUSCH resource performs data transmission. Transmission; whether multiple resources among the resources after the first PUSCH resource perform data transmission; whether one of the resources after the first PUSCH resource performs data transmission; a specific PUSCH resource among the resources after the first PUSCH resource; target resource Whether all of the target resources perform data transmission; whether one or a specific one of the target resources performs data transmission; whether multiple or specific ones of the target resources perform data transmission; whether each of the target resources performs data transmission.
  • the first indication information is carried on one first PUSCH resource or on multiple first PUSCH resources.
  • the first indication information sending unit is also used for one of the following: sending the first indication information to the network device or base station on one first PUSCH; sending the first indication information to the network device or base station on multiple first PUSCHs. Send the first indication information; send the first indication information to the network device or the base station on each PUSCH; send the first indication information to the network device or the base station on the specific first PUSCH;
  • the first indication information is used to indicate at least one of the following: indicating whether the next PUSCH after the first PUSCH performs data transmission; indicating whether all PUSCHs in the CG period after the first PUSCH perform data transmission; indicating whether the third PUSCH performs data transmission. Whether all PUSCHs in the PUSCH resource pattern after the first PUSCH perform data transmission; indicating whether the PUSCH at the designated position after the first PUSCH performs data transmission.
  • the indication information sending module includes a second indication information sending unit, configured to send the second indication information to the network device or base station, and the second indication information is carried in the target transmission resource or the target transmission information.
  • the second indication information sending unit is also configured to send second indication information to the network device or base station, and the second indication information is carried in the target transmission resource or target transmission information before the second PUSCH resource; or, Second indication information is sent to the network device or the base station, and the second indication information is sent on the target transmission resource or target transmission information before the second PUSCH resource.
  • the second PUSCH resource is at least one of the following: PUSCH resources before a CG cycle; PUSCH resources before a PUSCH resource pattern; PUSCH resources before a specific CG cycle; PUSCH resources before a specific PUSCH resource pattern; PUSCH resources at the first position; PUSCH resources at a specific position; multiple PUSCH resources dynamically scheduled.
  • the target transmission resource or target transmission information includes at least one of the following: PUCCH resources, uplink control information, scheduling request, PUSCH, MAC control unit, and radio resource control.
  • the uplink resource is configured to correspond to the second PUSCH resource. uplink resource configuration.
  • the second indication information is used to indicate whether resources within the CG cycle or PUSCH resource pattern perform data transmission; or, the second indication information is used to indicate whether multiple dynamically scheduled PUSCH resources perform data transmission.
  • the resources indicated by the second indication information are at least one of the following: resources within the CG cycle or PUSCH resource pattern closest to the target transmission resource or target transmission information; the target transmission resource or the resource after the target transmission information.
  • the resources indicated by the second indication information include at least one of the following: one PUSCH resource within the CG cycle or PUSCH resource pattern; multiple PUSCH resources within the CG cycle or PUSCH resource pattern; CG cycle or PUSCH Specific PUSCH resources within the resource pattern; multiple continuous PUSCH resources within the CG cycle or PUSCH resource pattern; multiple discontinuous PUSCH resources within the CG cycle or PUSCH resource pattern; dynamic scheduling of all PUSCH resources within the CG cycle or PUSCH resource pattern One or more PUSCH resources within multiple PUSCH resources; a specific PUSCH resource within multiple dynamically scheduled PUSCH resources; whether all target resources are performing data transmission; whether one or a specific one of the target resources is performing data transmission; target Whether multiple or specific multiple resources in the resource perform data transmission; whether each of the target resources perform data transmission.
  • the second indication information is used to indicate any of the following: whether all resources in the CG cycle or the PUSCH resource pattern perform data transmission; each of the resources in the CG cycle or the PUSCH resource pattern Whether the resource performs data transmission; whether multiple resources in the CG cycle or PUSCH resource pattern perform data transmission; whether one of the resources in the CG cycle or PUSCH resource pattern performs data transmission; whether within the CG cycle or PUSCH resource pattern Whether specific resources among the dynamically scheduled resources perform data transmission; whether multiple resources among the dynamically scheduled multiple PUSCH resources perform data transmission; whether specific resources among the dynamically scheduled multiple PUSCH resources perform data transmission; whether multiple dynamically scheduled PUSCH resources perform data transmission Whether one of the resources performs data transmission; whether each of the multiple dynamically scheduled PUSCH resources performs data transmission; whether all of the dynamically scheduled multiple PUSCH resources perform data transmission; whether the next uplink resource performs data transmission Transmission; whether the resources in the fourth cycle or resource pattern perform data transmission.
  • the second indication information sending unit is also used to trigger the second indication information, report the second indication information, and send the second indication information to the network device or base station when the second condition is met. at least one.
  • the second condition includes at least one of the following: an amount of data or a number of bytes or a number of bits greater than a preset amount needs to be transmitted within one cycle; an amount of data or a number of bytes greater than the preset amount or The number of bits needs to be transmitted within a transmission pattern; the amount of data greater than the third threshold is transmitted in one cycle; the amount of data less than the fourth threshold is transmitted in one cycle; the resource configuration for transmitting the second indication information is allowed or disabled; the network or Base station activation or enablement indication information reporting; supports indication information reporting; supports new MAC control unit triggering or reporting; uplink resources are preconfigured resources; uplink resources include multiple PUSCH resources; multiple transmission resources are configured in one transmission cycle; The preconfigured PUSCH resource pattern includes multiple PUSCH resources; multiple PUSCHs are required for data transmission in one cycle; multiple PUSCHs are required for data transmission in the preconfigured PUSCH resource pattern; the dynamically scheduled resources include multiple PUSCH resources; 2.
  • Instruction information is generated or triggered or pending; the amount of data to be transmitted is greater than the transmission block size of one PUSCH resource or a designated PUSCH resource; the amount of data to be transmitted is less than the transmission block size of all PUSCH resources; the amount of data to be transmitted changes; the resources to be transmitted Or the transmission resources to be used change; there are available uplink transmission resources; there are available new transmission resources.
  • the device further includes: a receiving module, configured to receive the uplink resource configuration sent by the network device or the base station.
  • the receiving module is further configured to send the first indication information or the second indication information to the network device or the base station based on the uplink resource configuration.
  • the uplink resource configuration includes preconfigured resources or dynamically scheduled resources.
  • the dynamically scheduled resources include multiple PUSCH resources.
  • the preconfigured resources include CG or preconfigured PUSCH resource patterns.
  • the uplink resource configuration indicates that one CG cycle includes multiple PUSCH resources, and/or one PUSCH resource pattern includes multiple PUSCH resources.
  • the uplink resource configuration includes at least one of the following: CG identification; CG cycle; the number of PUSCH resources in the CG cycle; resource information of at least one PUSCH resource in a CG cycle; uplink information in a CG cycle Control information; CG PUSCH resource uplink control information; PUSCH resource pattern identification; PUSCH resource pattern periodic or non-periodic; the number of PUSCH resources in a PUSCH resource pattern; resource information of at least one PUSCH resource in a PUSCH resource pattern; a PUSCH Uplink control information in the resource pattern; uplink control information of the PUSCH resources in the PUSCH resource pattern; uplink control information of multiple dynamically scheduled PUSCH resources; information of at least one PUSCH resource of dynamically scheduled multiple PUSCH resources; dynamically scheduled multiple PUSCH resources The number of PUSCH resources for each PUSCH resource.
  • the resource information of at least one PUSCH resource includes at least one of the following: a starting position of at least one PUSCH resource; an ending position of at least one PUSCH resource; time domain and frequency domain resource information of at least one PUSCH resource; The resource offset of each PUSCH resource in at least one PUSCH resource relative to the first PUSCH resource; the resource offset of each PUSCH resource in at least one PUSCH resource relative to a specific PUSCH resource; the relative offset of each PUSCH resource in at least one PUSCH resource The resource offset of the last PUSCH resource; the first resource or the last resource or a specific resource in at least one PUSCH resource; the number of at least one PUSCH resource; the redundancy version information RV of at least one PUSCH resource; at least one PUSCH resource The RV offset of each PUSCH resource in at least one PUSCH resource relative to the first PUSCH resource; the RV offset of each PUSCH resource in at least one PUSCH resource relative to a specific PUSCH resource; the RV
  • the uplink control information indicates at least one of the following: whether to include indication information; content of the indication information; resources carrying the indication information; PUSCH resources indicated by the indication information; designated PUSCH resources; location of the indication information; indication information occupancy byte size; disable flag or enable flag; resource status or resource usage conditions.
  • the resource situation or resource usage conditions include: multiple PUSCH resources are configured in one CG cycle; multiple PUSCH resources are configured in one PUSCH resource pattern; multiple PUSCH resources are used for data transmission; the amount of data to be transmitted is greater than one PUSCH or specify the transport block size of PUSCH; the amount of data to be transmitted is less than the transport block size of all PUSCH in the uplink resources.
  • the device further includes: a transmission module, configured to perform uplink data transmission based on uplink resource configuration.
  • the uplink transmission module includes a first transmission unit configured to transmit data on all PUSCH resources based on the uplink resource configuration; or a second transmission unit configured to perform data transmission on some PUSCH resources based on the uplink resource configuration. Data transmission is performed on the PUSCH resources; or, the termination part of the PUSCH resources is configured based on the uplink resources.
  • the first transmission unit is also configured to perform data transmission on all PUSCH resources within a CG cycle based on the uplink resource configuration; or, based on the uplink resource configuration, at a specific location within a CG cycle or Data transmission is performed on the PUSCH resource corresponding to the identifier, or, based on the uplink resource configuration, data transmission is performed on all PUSCH resources within a PUSCH resource pattern; or, based on the uplink resource configuration, data is transmitted at a specific location or identifier within a PUSCH resource pattern.
  • Data transmission is performed on the corresponding PUSCH resources; or, based on the uplink resource configuration, data transmission is performed on all PUSCH resources within the dynamically scheduled multiple PUSCH resources; or, based on the uplink resource configuration, within the dynamically scheduled multiple PUSCH resources
  • Data transmission is performed on all PUSCH resources corresponding to the specific location or identification; or, based on the uplink resource configuration, data transmission is performed on all PUSCH resources within multiple CG cycles; or, based on the uplink resource configuration, data is transmitted within multiple CG cycles
  • Data transmission is performed on the PUSCH resource corresponding to a specific location or identification, or, based on the uplink resource configuration, data transmission is performed on all PUSCH resources in multiple PUSCH resource patterns; or, based on the uplink resource configuration, data is transmitted on multiple PUSCH resource patterns.
  • Data is transmitted on the PUSCH resource corresponding to a specific location or identifier within the device.
  • the second transmission unit is also used to perform data transmission on part of the PUSCH resources within a CG cycle based on the uplink resource configuration; or, based on the uplink resource configuration, at a specific location within a CG cycle or Data transmission is performed on part of the PUSCH resources corresponding to the identifier, or, based on the uplink resource configuration, data transmission is performed on part of the PUSCH resources within a PUSCH resource pattern; or, based on the uplink resource configuration, data is transmitted at a specific location within a PUSCH resource pattern or Data transmission is performed on some PUSCH resources corresponding to the identifier; or, based on the uplink resource configuration, data transmission is performed on some PUSCH resources within the dynamically scheduled multiple PUSCH resources; or, based on the uplink resource configuration, data is transmitted on multiple dynamically scheduled PUSCH resources.
  • Data transmission is performed on part of the PUSCH resources corresponding to a specific location or identifier within the resource; or, based on the uplink resource configuration, data transmission is performed on part of the PUSCH resources in multiple CG cycles; or, based on the uplink resource configuration, data is transmitted on multiple CGs.
  • Data transmission is performed on some PUSCH resources corresponding to specific positions or identifiers within the cycle, or, based on the uplink resource configuration, data transmission is performed on some PUSCH resources in multiple PUSCH resource patterns; or, based on the uplink resource configuration, data is transmitted on multiple PUSCH resource patterns.
  • Data transmission is performed on part of the PUSCH resources corresponding to a specific location or identifier in the PUSCH resource pattern.
  • the device further includes a first determining module for determining used PUSCH resources and/or unused PUSCH resources; and determining the first indication based on the used PUSCH resources and/or unused PUSCH resources. information or secondary instruction information.
  • the device further includes: a first execution module, configured to perform data transmission on used PUSCH resources, and/or not perform data transmission on unused PUSCH resources, and/or terminate. Unused PUSCH resources.
  • the device further includes a second determination module, configured to determine that unused PUSCH resources are low-priority resources if there is PUSCH resource conflict or multiplexing processing.
  • the apparatus further includes a third determination module, configured to determine whether to perform at least one of the following based on instructions from the network device or the base station: reporting the first indication information; reporting the second indication information; triggering or generating the third indication information.
  • the indication information is used to instruct the network or the base station to perform at least one of the following: determining whether to receive a PUSCH transmission; determining a PUSCH that needs to be received or decoded; determining a PUSCH that does not need to be received or decoded; determining a PUSCH that needs to be received or decoded; TERMINATED PUSCH.
  • the indication information sending module includes a third indication information sending unit, configured to send the third indication information to the UE.
  • the third indication information is carried in at least one of the following: the third indication information is carried in the PDCCH; the third indication information is carried in the SPS; the third indication information is carried in the PDSCH of downlink dynamic scheduling; The third indication information is carried in the SPS downlink control information; the third indication information is carried in the new MAC control unit; and the third indication information is carried in the radio resource control message.
  • the third indication information sending unit is further configured to trigger the generation of the third indication information and/or trigger the issuance of the third indication information when the third condition is met.
  • the third indication information sending unit is further configured to send the third indication information to the UE if the third condition is met and/or if downlink transmission resources are available.
  • the third condition includes at least one of the following: an amount of data, a number of bytes, or bits greater than a preset amount needs to be transmitted within one cycle; an amount of data, a number of bytes, or bits greater than a preset amount.
  • the data needs to be transmitted within a transmission pattern; the amount of data greater than the first threshold is transmitted in one cycle; the amount of data less than the second threshold is transmitted in one cycle; the SPS downlink control information is configured or activated; the dynamic scheduling downlink control information is Configuration or activation; downlink control information configuration is disabled; downlink resources are preconfigured resources; support new MAC control unit triggering or delivery; network or base station activation or enablement indication information delivery; support indication information delivery; downlink resources Including multiple PDSCH resources; multiple transmission resources are configured in one transmission cycle; the preconfigured PDSCH resource pattern includes multiple PDSCH resources; multiple PDSCHs are required for data transmission in one cycle; multiple PDSCHs are required in the preconfigured PDSCH resource pattern.
  • the amount of data to be transmitted is greater than the transmission block size of one PDSCH resource or a designated PDSCH resource; the amount of data to be transmitted is less than the transmission block size of all PDSCH resources; the amount of data to be transmitted changes; the resources to be transmitted or the transmission that needs to be used Resources change; dynamically scheduled resources include multiple PDSCH resources; third indication information is generated or triggered or pending.
  • the third indication information sending unit is further configured to send third indication information to the UE on the first PDSCH resource; the third indication information is used to indicate whether resources after the first PDSCH resource are used.
  • the resources after the first PDSCH resource are at least one of the following: PDSCH resources in the third cycle; PDSCH resources within the configured PDSCH resource pattern; multiple dynamically scheduled PDSCH resources; the first PDSCH Multiple dynamically scheduled PDSCH resources after the resource; PDSCH resources in multiple cycles; PDSCH resources in multiple configured PDSCH resource patterns; PDSCH resources in multiple cycles after the first PDS CH resource; first PDSCH resource PDSCH resources in the subsequent configured PDSCH resource patterns; PDSCH resources after the first PDSCH resource in the third cycle; PDSCH resources after the first PDSCH resource in the configured PDSCH resource pattern.
  • the resources after the first PDSCH resource are at least one of the following: all PDSCH resources after the first PDSCH resource; at least one or a specific number of PDSCH resources after the first PDSCH resource; the first PDSCH One PDSCH resource after the resource; multiple consecutive PDSCH resources after the first PDSCH resource; multiple discontinuous PDSCH resources after the first PDSCH resource.
  • the third indication information is used to indicate any of the following: whether all resources in the resources after the first PDSCH resource perform data transmission; whether each resource in the resources after the first PDSCH resource performs data transmission. Transmission; whether multiple resources among the resources after the first PDSCH resource perform data transmission; whether one of the resources after the first PDSCH resource performs data transmission; a specific PDSCH resource among the resources after the first PDSCH resource; target Whether all resources are subject to data transmission; whether one or a specific one of the target resources is subject to data transmission; whether multiple or specific ones of the target resources are subject to data transmission; whether each of the target resources is subject to data transmission.
  • the third indication information is carried on one first PDSCH resource or on multiple first PDSCH resources.
  • the third indication information sending unit is also configured to send the third indication information to the UE on one first PDSCH; to send the third indication information to the UE on multiple first PDSCHs; on each PDSCH Send the third indication information to the UE on the specific first PDSCH; send the third indication information to the UE on the specific first PDSCH.
  • the third indication information is used to indicate at least one of the following: indicating whether the next PDSCH after the first PDSCH performs data transmission; indicating whether all PDSCHs in the SPS period after the first PDSCH perform data transmission; indicating whether Whether all PDSCHs in the PDSCH resource pattern after the first PDSCH perform data transmission; indicating whether the PDSCH at a designated position after the first PDSCH performs data transmission.
  • the indication information sending module includes a fourth indication information sending unit, configured to send the fourth indication information to the UE, where the fourth indication information is carried in the target transmission resource or the target transmission information.
  • the fourth indication information sending unit is also configured to send fourth indication information to the UE, and the fourth indication information is carried in the target transmission resource or the target transmission information before the second PDSCH resource; or, to send the fourth indication information to the UE.
  • the fourth indication information is sent on the target transmission resource or target transmission information before the second PDSCH resource.
  • the second PDSCH resource is at least one of the following: PDSCH resources before the SPS cycle; PDSCH resources before the PDSCH resource pattern; PDSCH resources before a specific SPS cycle; PDSCH resources before the specific PDSCH resource pattern; PDSCH resources at the first position; PDSCH resources at a specific position; multiple PDSCH resources dynamically scheduled.
  • the target transmission resource or target transmission information includes at least one of the following: PDCCH resources, downlink control information, scheduling request, PDSCH, MAC control unit, and radio resource control.
  • the downlink resource is configured to correspond to the second PDSCH resource. Downlink resource configuration.
  • the fourth indication information is used to indicate whether resources within the SPS cycle or PDSCH resource pattern perform data transmission; or, the fourth indication information is used to indicate whether multiple dynamically scheduled PDSCH resources perform data transmission.
  • the resources indicated by the fourth indication information are at least one of the following: resources within the SPS cycle or PDSCH resource pattern closest to the target transmission resource or target transmission information; the target transmission resource or the resource after the target transmission information.
  • Resources within one SPS cycle or PDSCH resource pattern; target transmission resources or resources within multiple SPS cycles or PDSCH resource patterns after the target transmission information; the second PDSCH resource corresponds to resources within the SPS cycle or PDSCH resource pattern; target transmission resources Or resources within multiple dynamically scheduled PDSCH resources after the target transmission information; resources within multiple dynamically scheduled PDSCH resources corresponding to the second PDSCH resource.
  • the resources indicated by the fourth indication information include at least one of the following: one PDSCH resource within the SPS cycle or PDSCH resource pattern; multiple PDSCH resources within the SPS cycle or PDSCH resource pattern; SPS cycle or PDSCH Specific PDSCH resources within the resource pattern; multiple continuous PDSCH resources within the SPS cycle or PDSCH resource pattern; multiple discontinuous PDSCH resources within the SPS cycle or PDSCH resource pattern; all PDSCH resources within the SPS cycle or PDSCH resource pattern; dynamic One or more PDSCH resources within multiple scheduled PDSCH resources; a specific PDSCH resource within multiple dynamically scheduled PDSCH resources; whether all target resources perform data transmission; whether one or a specific one of the target resources perform data transmission; Whether multiple or specific multiple target resources perform data transmission; whether each of the target resources perform data transmission.
  • the fourth indication information is used to indicate any of the following: whether all resources in the SPS cycle or the PDSCH resource pattern perform data transmission; each of the resources in the SPS cycle or the PDSCH resource pattern Whether the resource carries out data transmission; whether multiple resources in the SPS cycle or PDSCH resource pattern carry out data transmission; whether one of the resources in the SPS cycle or PDSCH resource pattern carries out data transmission; whether within the SPS cycle or PDSCH resource pattern Whether specific resources among the dynamically scheduled resources perform data transmission; whether multiple resources among the dynamically scheduled multiple PDSCH resources perform data transmission; whether specific resources among the dynamically scheduled multiple PDSCH resources perform data transmission; whether multiple dynamically scheduled PDSCH resources perform data transmission Whether one of the resources is performing data transmission; whether each of the multiple dynamically scheduled PDSCH resources is performing data transmission; whether all of the dynamically scheduled multiple PDSCH resources are performing data transmission; whether the next downlink resource is performing data transmission Transmission; whether the resources in the fourth cycle or resource pattern perform data transmission.
  • the fourth indication information sending unit is further configured to perform at least one of triggering the fourth indication information, delivering the fourth indication information, and sending the fourth indication information to the UE when the fourth condition is satisfied. .
  • the fourth condition includes at least one of the following: an amount of data or a number of bytes or a number of bits greater than a preset amount needs to be transmitted within one cycle; an amount of data or a number of bytes greater than the preset amount or The number of bits needs to be transmitted within a transmission pattern; the amount of data greater than the third threshold is transmitted in one cycle; the amount of data less than the fourth threshold is transmitted in one cycle; the resource configuration for transmitting the fourth indication information is allowed or disabled; the network or The base station activates or enables the delivery of indication information; supports the delivery of indication information; supports the triggering or delivery of new MAC control units; downlink resources are preconfigured resources; downlink resources include multiple PDSCH resources; multiple PDSCH resources are configured in one transmission cycle Transmission resources; the preconfigured PDSCH resource pattern includes multiple PDSCH resources; multiple PDSCHs are required for data transmission in one cycle; multiple PDSCHs are required for data transmission in the preconfigured PDSCH resource pattern; dynamically scheduled resources include multiple PDSCHs
  • the device further includes a configuration sending module, configured to send downlink resource configuration to the UE.
  • the configuration sending module is further configured to send the third indication information or the fourth indication information to the UE based on the downlink resource configuration.
  • the downlink resource configuration includes preconfigured resources or dynamically scheduled resources.
  • the dynamically scheduled resources include multiple PDSCH resources.
  • the preconfigured resources include SPS or preconfigured PDSCH resource patterns.
  • the downlink resource configuration indicates that one SPS cycle includes multiple PDSCH resources, and/or one PDSCH resource pattern includes multiple PDSCH resources.
  • the downlink resource configuration includes at least one of the following: SPS identification; SPS cycle; the number of PDSCH resources in the SPS cycle; resource information of at least one PDSCH resource in one SPS cycle; downlink information in one SPS cycle Control information; SPS downlink control information of PDSCH resources; PDSCH resource pattern identification; PDSCH resource pattern periodic or non-periodic; the number of PDSCH resources in a PDSCH resource pattern; resource information of at least one PDSCH resource in a PDSCH resource pattern; a PDSCH Downlink control information in the resource pattern; downlink control information of the PDSCH resources in the PDSCH resource pattern; downlink control information of multiple dynamically scheduled PDSCH resources; information of at least one PDSCH resource of dynamically scheduled multiple PDSCH resources; dynamically scheduled multiple The number of PDSCH resources of PDSCH resources.
  • the resource information of at least one PDSCH resource includes at least one of the following: a starting position of at least one PDSCH resource; an ending position of at least one PDSCH resource; time domain and frequency domain resource information of at least one PDSCH resource; The resource offset of each PDSCH resource in at least one PDSCH resource relative to the first PDSCH resource; the resource offset of each PDSCH resource in at least one PDSCH resource relative to a specific PDSCH resource; the relative resource offset of each PDSCH resource in at least one PDSCH resource The resource offset of the last PDSCH resource; the first resource or the last resource or a specific resource in at least one PDSCH resource; the number of at least one PDSCH resource; the redundancy version information RV of at least one PDSCH resource; at least one PDSCH resource The RV offset of each PDSCH resource in at least one PDSCH resource relative to the first PDSCH resource; the RV offset of each PDSCH resource in at least one PDSCH resource relative to a specific PDSCH resource; the
  • the downlink control information indicates at least one of the following: whether to include indication information; content of the indication information; resources carrying the indication information; PDSCH resources indicated by the indication information; designated PDSCH resources; location of the indication information; indication information occupancy byte size; disable flag or enable flag; resource status or resource usage conditions.
  • the resource situation or resource usage conditions include: multiple PDSCH resources are configured in one SPS cycle; multiple PDSCH resources are configured in one PDSCH resource pattern; multiple PDSCH resources are used for data transmission; the amount of data to be transmitted is greater than one The transport block size of PDSCH or specified PDSCH; the transport block size of all PDSCHs where the amount of data to be transmitted is less than the downlink resource.
  • the device further includes: a downlink transmission module, configured to perform downlink data transmission, or perform downlink data transmission based on downlink resource configuration.
  • a downlink transmission module configured to perform downlink data transmission, or perform downlink data transmission based on downlink resource configuration.
  • the downlink transmission module includes a third transmission unit for performing downlink data transmission on all PDSCH resources; or performing data transmission on all PDSCH resources based on downlink resource configuration; or a fourth transmission The unit is used for downlink data transmission on part of the PDSCH resources; or, the data transmission is performed on part of the PDSCH resources based on the downlink resource configuration; or the fifth transmission unit is used for terminating part of the PDSCH resources based on the downlink resource configuration.
  • the third transmission unit is also used to perform data transmission on all PDSCH resources within an SPS cycle, or perform data transmission on all PDSCH resources within an SPS cycle based on downlink resource configuration; or, Data transmission is performed on the PDSCH resource corresponding to a specific position or identifier within an SPS cycle, or data is transmitted based on the downlink resource configuration on the PDSCH resource corresponding to a specific location or identifier within an SPS cycle; within a PDSCH resource pattern Data transmission is performed on all PDSCH resources in a PDSCH resource pattern, or data transmission is performed on all PDSCH resources in a PDSCH resource pattern based on downlink resource configuration; data transmission is performed on PDSCH resources corresponding to a specific location or identifier in a PDSCH resource pattern, Or, perform data transmission on the PDSCH resource corresponding to a specific location or identifier in a PDSCH resource pattern based on the downlink resource configuration; perform data transmission on all PDSCH resources within multiple dynamically scheduled PDSCH resources,
  • Data transmission is performed on all PDSCH resources corresponding to specific positions or identifiers within multiple scheduled PDSCH resources; data transmission is performed on all PDSCH resources within multiple SPS cycles, or based on downlink resource configuration within multiple SPS cycles. Data transmission is performed on all PDSCH resources; data transmission is performed on PDSCH resources corresponding to specific locations or identities within multiple SPS cycles, or based on downlink resource configuration on PDSCH resources corresponding to specific locations or identities within multiple SPS cycles.
  • the fourth transmission unit is also used to perform data transmission on part of the PDSCH resources within an SPS cycle, or to perform data transmission on part of the PDSCH resources within an SPS cycle based on the downlink resource configuration; in Data transmission is performed on part of the PDSCH resources corresponding to a specific position or identification within an SPS cycle, or data is transmitted on part of the PDSCH resources corresponding to a specific location or identification within an SPS cycle based on the downlink resource configuration; in a PDSCH resource pattern Perform data transmission on part of the PDSCH resources within a PDSCH resource pattern, or perform data transmission on part of the PDSCH resources within a PDSCH resource pattern based on downlink resource configuration; perform data transmission on part of the PDSCH resources corresponding to a specific location or identifier within a PDSCH resource pattern.
  • Data transmission is performed on part of the PDSCH resources within the cycle; data transmission is performed on part of the PDSCH resources corresponding to specific locations or identities within multiple SPS cycles, or based on downlink resource configuration corresponding to specific locations or identities within multiple SPS cycles.
  • Data transmission is performed on part of the PDSCH resources corresponding to specific positions or identifiers in the PDSCH resource pattern, or data is transmitted on part of the PDSCH resources corresponding to specific positions or identifiers in multiple PDSCH resource patterns based on downlink resource configuration.
  • the device further includes a fourth determining module, configured to determine used PDSCH resources and/or unused PDSCH resources; and determine a third indication based on the used PDSCH resources and/or unused PDSCH resources. information or fourth instruction information.
  • the device further includes a second execution module, configured to perform data transmission on used PDSCH resources, and/or not perform data transmission on unused PDSCH resources, and/or terminate the PDSCH resources used.
  • a second execution module configured to perform data transmission on used PDSCH resources, and/or not perform data transmission on unused PDSCH resources, and/or terminate the PDSCH resources used.
  • the device further includes a fifth determination module, configured to determine that unused PDSCH resources are low-priority resources if there is PDSCH resource conflict or multiplexing processing.
  • the device further includes a sixth determination module, used to determine whether to perform at least one of the following: delivering third indication information; delivering fourth indication information; triggering or generating third indication information; triggering or Generate fourth indication information; trigger the delivery of the third indication information; trigger the delivery of the fourth indication information; determine whether to perform resource termination; trigger or determine the use of PDSCH resources; trigger or determine the transmission of unused PDSCH resources; trigger Transmission of downlink data.
  • a sixth determination module used to determine whether to perform at least one of the following: delivering third indication information; delivering fourth indication information; triggering or generating third indication information; triggering or Generate fourth indication information; trigger the delivery of the third indication information; trigger the delivery of the fourth indication information; determine whether to perform resource termination; trigger or determine the use of PDSCH resources; trigger or determine the transmission of unused PDSCH resources; trigger Transmission of downlink data.
  • the instruction information is used by the UE to perform at least one of the following: determine whether to receive a PDSCH transmission; determine a PDSCH that needs to be received or decoded; determine a PDSCH that does not need to be received or decoded; determine a PDSCH that needs to be terminated .
  • Each module in the above-mentioned data transmission device can be implemented in whole or in part by software, hardware, and combinations thereof.
  • Each of the above modules may be embedded in or independent of the processor of the computer device in the form of hardware, or may be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
  • a computer device is provided.
  • the computer device may be a server, and its internal structure diagram may be as shown in Figure 12.
  • the computer device includes a processor, memory, network interface, and database connected through a system bus. Wherein, the processor of the computer device is used to provide computing and control capabilities.
  • the memory of the computer device includes non-volatile storage media and internal memory.
  • the non-volatile storage medium stores operating systems, computer programs and databases. This internal memory provides an environment for the execution of operating systems and computer programs in non-volatile storage media.
  • the computer device's database is used to store data for data transmission.
  • the network interface of the computer device is used to communicate with external terminals through a network connection.
  • the computer program when executed by the processor, implements a method of data transmission.
  • Figure 12 is only a block diagram of a partial structure related to the solution of the present application, and does not constitute a limitation on the computer equipment to which the solution of the present application is applied.
  • Specific computer equipment can May include more or fewer parts than shown, or combine certain parts, or have a different arrangement of parts.
  • a computer device including a memory and a processor.
  • a computer program is stored in the memory.
  • the processor executes the computer program, it implements the following steps:
  • Send instruction information which is used to indicate whether to use the target resource for data transmission.
  • a computer-readable storage medium is provided, with a computer program stored thereon.
  • the computer program is executed by a processor, the following steps are implemented:
  • Send instruction information which is used to indicate whether to use the target resource for data transmission.
  • a computer program product is provided, on which a computer program is stored.
  • the computer program is executed by a processor, the following steps are implemented:
  • Send instruction information which is used to indicate whether to use the target resource for data transmission.
  • Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM), or flash memory.
  • Volatile memory may include random access memory (RAM) or external cache memory.
  • RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous chain Synchlink DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.
  • SRAM static RAM
  • DRAM dynamic RAM
  • SDRAM synchronous DRAM
  • DDRSDRAM double data rate SDRAM
  • ESDRAM enhanced SDRAM
  • SLDRAM synchronous chain Synchlink DRAM
  • Rambus direct RAM
  • DRAM direct memory bus dynamic RAM
  • RDRAM memory bus dynamic RAM

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer And Data Communications (AREA)
  • Communication Control (AREA)

Abstract

本申请涉及一种数据传输的方法、装置、计算机设备和存储介质,通过第一设备(01)向第二设备(02)发送指示信息,这样,第一设备(01)及时地将目标资源的使用情况告知第二设备(02),在第二设备(02)接收到该指示信息后,可以根据该指示信息确定使用哪些资源、接收或解码哪些资源、不接收或解码哪些资源以及终止哪些资源等等,相当于,第二设备(02)可以根据该指示信息对两者间的传输资源进行合理调配,如此,在保证第一设备(01)和第二设备(02)之间正常进行业务数据传输的同时,还对传输资源进行了合理利用,避免了资源的浪费。

Description

数据传输的方法、装置、计算机设备和存储介质 技术领域
本申请涉及数据传输技术领域,特别是涉及一种数据传输的方法、装置、计算机设备和存储介质。
背景技术
随着通信技术的发展,一些超可靠低延迟通信(Ultra Reliable Low Latency Communication,URLLC)的业务在5G系统中应用广泛。
其中,扩展现实(Extended Reality,XR)业务支持增强现实技术(Augmented Reality,AR)/虚拟现实(virtual reality,VR)/云游戏(Cloud Gaming,CG)等业务传输。这些业务普遍存在超可靠低延迟的要求,而URLLC的XR所支持的业务可以是伪周期的,即业务到达时间存在抖动(jitter),可以理解为业务不会在一个确定的点,而是会在一个范围内的任一个时刻到达,且同一个业务的不同业务流到达的时间差别可能很大。同时,XR业务的周期可以是非整数周期。此外,对XR业务来说,其数据包大小和数据速率是可变的。
然而,XR业务在传输过程中会产生一些资源浪费。
发明内容
基于此,有必要提供一种数据传输的方法、装置、计算机设备和存储介质。
第一方面,本申请的实施例提供一种数据传输的方法,该方法包括:
第一设备向第二设备发送指示信息,所述指示信息用于指示是否使用目标资源进行数据传输。
第二方面,本申请的实施例提供一种数据传输的装置,该装置包括:
指示信息发送模块,用于发送指示信息,指示信息用于指示是否使用目标资源进行数据传输。
第三方面,本申请的实施例提供一种计算机设备,包括存储器和处理器,存储器存储有计算机程序,处理器执行计算机程序时实现第一方面实施例中所提供的方法的步骤。
第四方面,本申请的实施例提供一种计算机可读存储介质,其上存储有计算机程序,计算机程序被处理器执行时实现第一方面实施例中所提供的方法的步骤。
第五方面,本申请的实施例提供一种计算机程序产品,其上存储有计算机程序,计算机程序被处理器执行时实现第一方面实施例中所提供的方法的步骤。
本申请提供的一种数据传输的方法、装置、计算机设备和存储介质,通过第一设备向第二设备发送指示信息,这样,第一设备及时地将目标资源的使用情况告知第二设备,在第二设备接收到该指示信息后,可以根据该指示信息确定使用哪些资源、接收或解码哪些资源、不接收或解码哪些资源以及终止哪些资源等等,相当于,第二设备可以根据该指示信息对两者间的传输资源进行合理调配,如此,在保证第一设备和第二设备之间正常进行业务数据传输的同时,还对传输资源进行了合理利用,避免了资源的浪费。
附图说明
图1为一个实施例提供的一种数据传输的方法的应用环境图;
图2为一个实施例提供的一种数据传输的方法的流程示意图;
图3为一个实施例提供的一种数据传输的方法的交互示意图;
图4为另一个实施例提供的一种数据传输的方法的交互示意图;
图5为另一个实施例提供的一种数据传输的方法的交互示意图;
图6为另一个实施例提供的一种数据传输的方法的流程示意图;
图7为另一个实施例提供的一种数据传输的方法的交互示意图;
图8为另一个实施例提供的一种数据传输的方法的交互示意图;
图9为另一个实施例提供的一种数据传输的方法的交互示意图;
图10为另一个实施例提供的一种数据传输的方法的流程示意图;
图11为一个实施例提供的一种数据传输的装置的结构示意图;
图12为一个实施例提供的计算机设备内部结构示意图。
具体实施方式
为了使本申请的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本申请进行进一步详细说明。应当理解,此处描述的具体实施例仅仅用以解释本申请,并不用于限定本申请。
相关技术中,对XR业务中的AR/VR/CG业务来说,其可能的业务模型包括以下:
VR:上行链路(Up Link,UL)pose information(上行姿态信息)+下行链路(Down Link,DL)video stream(下行视频流信息);
CG:UL control information(上行控制信息)+DLvideo stream;
AR:UL(pose information+video stream)+DLvideo stream。
(1)一些场景中对URLLC的XR所支持的业务需要支持最小时延是0.5ms,可靠性达99.999%需求的业务。
(2)这些业务可以是伪周期的,同时,业务周期可以是非整数周期,例如,16.67ms。
(3)同一个业务的不同业务流到达的时间差别可能很大,同一个业务的不同业务的数据包大小也不同。例如,以UL的一个周期内有pose information和video information两种业务流为例,ULcontrol information或ULpose information的可以为4ms,但是ULvideo stream的周期可以为16.67ms。ULcontrol information或ULpose information的数据包的大小需求可以为100bytes,而UL video stream的数据包的大小需求大概为0.67Mbps。
因此,XR业务存在的非整数的业务周期、伪周期、数据包大小是可变、数据速率是可变的等特征。
本申请实施例提供一种数据传输的方法、装置、计算机设备和存储介质,可以改善数据传输的缺陷,保证业务的合理传输,也避免太多的资源浪费。需要说明的是,本申请实施例提供的一种数据传输的方法,并不仅限于达到上述技术效果,还可以达到其他技术效果,例如,本申请实施例提供的一种数据传输的方法还可以避免UE端或者基站端不必要的功耗,提高资源利用率,本申请实施例中不以此为限。
本申请实施例提供的数据传输的方法,可以应用于图1所示意的应用场景中。如图1所示,该场景包括第一设备01和第二设备02,第一设备01和第二设备02之间可以通信。其中,第一设备01可以为用户设备(User Equipment,UE)、网络设备和基站中任一种。相应地,若第一设备01为UE,则第二设备02为网络设备或基站;若第一设备01为网络设备或基站,则第二设备02为UE。其中,UE可以但不限于是各种个人计算机、笔记本电脑、智能手机、平板电脑和便携式可穿戴设备等设备,还可以是其他网络设备,本申请实施例对此不作限定。网络设备包括但不限于有策略控制功能(Policy Control Function,PCF)、会话管理功能(Session Management Function,SMF)、用户面功能(User Plane Function,UPF)等模块的设备。基站包括但不限定是宏基站、微基站、射频拉远、直放站和室内分布系统等。需要说明的是,实际应用中可以包括更多数量的UE,并不以图1为限。
图2为一个实施例提供的数据传输的方法流程图,该实施例涉及的是获取第一设备向第二设备发送指示信息的具体实现方式。如图2所示,该实施例包括以下步骤:
S101,第一设备向第二设备发送指示信息,指示信息用于指示是否使用目标资源进行数据传输。
本实施例中,第一设备和第二设备并不限于具体的设备类型,其实现方式如上述说明。
例如,若第一设备为UE,第二设备为网络设备或基站。则是UE向网络设备或基站发送指示信息,该指示信息用于告知网络设备或基站目标资源是否使用,即通知网络设备或基站目标资源是进行数据传输还是不进行数据传输。
若第一设备为网络设备或基站,第二设备为UE。则是网络设备或基站向UE发送指示信息,该指示信息用于告知UE目标资源是否使用,即通知UE目标资源是进行数据传输还是不进行数据传输。
一个实施例中,上述是否使用目标资源进行数据传输包括:是否使用目标资源进行数据发送,和/或,是否使用目标资源进行数据接收。
数据传输过程包括数据的发送和数据的接收,因此,指示是否使用目标资源进行数据传输包括的就是是否使用目标资源进行数据发送,或者是否使用目标资源进行数据接收,或者,是否使用目标资源进行数据发送的同时也进行数据接收。
一个实施例中,上述是否使用目标资源进行数据传输还包括:目标资源是否进行数据传输、目标资源是否终止、是否使用目标资源中至少一个。
数据传输除了指的是是否进行数据传输还可以是指目标资源是否被终止或需要终止、是否需要挂起、被挂起、是否使用该目标资源等等。其中,终止即为drop,也可以是停止等意思。
在一个实施例中,上述指示信息用于指示目标资源中的至少一个资源进行数据传输或不被终止、目标资源中的全部资源进行数据传输或不被终止、目标资源中的至少一个资源不进行数据传输或被终止和目标资源中的全部资源不进行数据传输或被终止中至少一项。
实际应用中,目标资源可以不止是一个资源,还可以是多个资源。那么,第一设备向第二设备发送的指示信息可以指示的是目标资源中的一个、多个或全部资源。进一步地,可以指示的是目标资源中的一个资源进行数据传输或不被drop、目标资源中的多个资源进行数据传输或不被drop、目标资源中的全部资源进行数据传输或不被drop、目标资源中的一个资源不进行数据传输或被drop、目标资源中的多个资源不进行数据传输或被drop、目标资源中的全部资源不进行数据传输或被drop。
在一个实施例中,上述目标资源还可以指的是以下至少一种:第一周期内的资源、第一周期之后的第二周期内的资源、配置的PUSCH资源图样内的资源、指示信息之后的一个或多个周期的资源、指示信息之后的一个或多个PUSCH资源图样内的资源、配置的PDSCH资源图样内的资源、指示信息之后的一个或多个PDSCH资源图样内的资源、一个或多个配置授权CG资源、至少一个周期的一个或多个CG资源、一个或多个半持续调度SPS资源、至少一个周期的一个或多个SPS资源、动态调度资源。
其中,目标资源可以是第一周期内的资源,该第一周期泛指任何一个周期,例如,本周期、本周期的下一个周期、本周期的下一个周期、特定标识的周期等等。目标资源也可以是指第一周期之后的第二周期内的资源,例如,若第一周期是本周期,则第二周期即为本周期之后的周期,若第一周期为本周期的下一个周期,则第二周期可以为本周期的下一个周期之后的周期。目标资源还可以是配置的PUSCH资源图样内的资源,配置的PUSCH资源图样为上行过程网络设备或基站对UE预先配置的上行物理共享信道(Physical Uplink Shared Channel,PUSCH)pattern,即目标资源可以是预配置的PUSCH pattern内的资源。目标资源还可以是指示信息之后的一个或多个周期的资源,即目标资源为第一设备发送指示信息后的任何一个或多个周期内的资源。目标资源还可以是指示信息之后的一个或多个PUSCH资源图样内的资源。目标资源还可以是一个或多个配置授权(Configured Grant,CG)资源,以及至少一个周期内的一个或多个CG资源等等。目标资源还可以是上行动态调度资源。对于下行过程,目标资源可以是配置的物理下行共享信道(Physical Downlink Shared Channel,PDSCH)资源图样内的资源,即网络或基站对UE预配置的PDSCH pattern内的资源。目标资源还可以是发送的指示信息之后的一个或多个PDSCH pattern内的资源、一个或多个半持续调度(Semi-Persistent Scheduling,SPS)资源、至少一个周期内的一个或多个SPS资源等等。当然目标资源还可以是下行动态调度资源等。
上述目标资源仅是一种举例,本申请实施例对目标资源不加以限定。无论是UE到网络设备或基站的上行过程,还是网络设备或基站到UE的下行过程,指示信息中所指示的目标资源都可以是任何位置、任何标识、任何类型的资源,以及发送指示信息的方式也可以是任何一种方式,只要达到第一设备通过发送指示信息告知第二设备目标资源使用还是不使用的目的即可。
因此,本申请实施例中提供数据传输的方法,通过第一设备向第二设备发送指示信息,这样,第一设备 及时地将目标资源的使用情况告知第二设备,在第二设备接收到该指示信息后,可以根据该指示信息确定使用哪些资源、接收或解码哪些资源、不接收或解码哪些资源以及终止哪些资源等等,相当于,第二设备可以根据该指示信息对两者间的传输资源进行合理调配,如此,在保证第一设备和第二设备之间正常进行业务数据传输的同时,还对传输资源进行了合理利用,避免了资源的浪费。
一种实施例中,第一设备向第二设备发送指示信息的方式包括以下至少之一:第一设备向第二设备发送第一指示信息,第一指示信息与第一PUSCH资源一起发送;第一设备向第二设备发送第二指示信息,第二指示信息在第二PUSCH资源之前发送;第一设备向第二设备发送第一指示信息,第一指示信息在第一CG周期内或第一PUSCH资源图样内发送;第一设备向第二设备发送第二指示信息,第二指示信息在第二CG周期内或第二PUSCH资源图样之前发送;第一设备向第二设备发送第三指示信息,第三指示信息与第一PDSCH资源一起发送;第一设备向第二设备发送第四指示信息,第四指示信息在第二PDSCH资源之前发送。第一设备向第二设备发送第三指示信息,第三指示信息在第一SPS周期内或第一PDSCH资源图样内发送;第一设备向第二设备发送第四指示信息,第四指示信息在第二SPS周期内或第二PDSCH资源图样之前;第一设备向第二设备发送第一指示信息,第一指示信息与第一动态调度资源一起发送;第一设备向第二设备发送第二指示信息,第二指示信息在第一动态调度资源之前发送;第一设备向第二设备发送第三指示信息,第三指示信息在第二动态调度资源一起发送;第一设备向第二设备发送第四指示信息,第四指示信息在第二动态调度资源之前发送。
其中,第一指示信息、第二指示信息、第三指示信息和第四指示信息是用于区分不同的指示信息发送方式下的指示信息,这些指示信息可以是指示的内容完全相同、也可以部分相同、也可以是完全不相同。本申请实施例对此不加以限定。
具体地,第一指示信息指的是上行过程在与上行传输资源一起发送的,包括:与第一PUSCH资源一起发送、在第一CG周期内或第一PUSCH pattern内发送、与第一动态调度资源一起发送等等。第二指示信息指的是上行过程中提前发送的场景,包括:在第二PUSCH资源之前发送、在第二CG周期内或第二PUSCH pattern之前发送、在第二动态调度资源之前发送等等。第三指示信息指的是下行过程与下行传输资源一起发送的场景,包括与第一PDSCH资源一起发送、在第一SPS周期内或第一PDSCH pattern内发送、与第二动态调度资源一起发送。第四指示信息指的是下行过程中提前发送的场景,包括:在第二PDSCH资源之前发送、在第二SPS周期内或第二PDSCH pattern之前发送、在第二动态调度资源之前发送等等。
其中,第一PUSCH资源和第二PUSCH资源均泛指任何一个PUSCH资源,两者可以是同一个PUSCH资源,也可以是不同的PUSCH资源。同样,第一PDSCH资源和第二PDSCH资源均泛指任何一个PDSCH资源,两者可以是同一个PDSCH资源,也可以是不同的PDSCH资源。第一CG周期内或第一PUSCH pattern、第二CG周期内或第二PUSCH pattern、第一SPS周期内或第一PDSCH pattern以及第二SPS周期内或第二PDSCH pattern同理,在此不再赘述。其中,第一动态调度资源为上行动态调度资源,第二动态调度资源为下行动态调度资源。
下面分别从上行过程和下行过程对上述第一指示信息、第二指示信息、第三指示信息和第四指示信息进行说明。
先对上行数据传输过程的数据传输的方法进行说明。上行过程为UE向网络设备或基站发送指示信息,该指示信息用于告知网络设备或基站是否使用目标资源进行数据传输。上行数据传输过程涉及的是上述第一指示信息和第二指示信息。一个实施例中,如图3所示,UE向网络设备或基站发送上述第一指示信息。
可选地,该第一指示信息携带于以下至少一个中:第一指示信息携带于CG上行控制信息中;第一指示信息携带于新的MAC控制单元中;第一指示信息携带于无线资源控制消息中。
第一指示信息是可以和PUSCH资源一起发送(simultaneous indication)的。具体地,第一指示信息可以携带在CG-上行控制信息(uplink control information,UCI)中,即CG-UCI用于传输第一指示信息。或者,第一指示信息可以携带在新的MAC控制单元(Control Element,CE)中,即所述MAC CE用于传输第一指示信息。或者,第一指示信息可以携带在无线资源控制(Radio Resource Control,RRC)消息中。本实施例中第一指示信息可以携带于多种资源或消息或配置中发送,提高了发送第一指示信息的灵活性。
例如,以第一指示信息携带在CG-UCI中为例,假设一个周期内有4个PUSCH,第一个PUSCH的CG-UCI通过发送第一指示信息告知网络设备或基站后面哪些PUSCH的使用情况,比如,所有PUSCH都不传输,或者,后面的PUSCH都不传输,或者从哪个位置开始不再使用PUSCH传输数据,或者哪个特定的PUSCH不再传输数据了等等。可选的,可以指一个周期的,也可以指多个周期的。可选的,特定的PUSCH可以指特定周期(如本周期),也可以指其他周期。这样,网络设备或基站收到该第一指示信息后,可以将这些不再使用的PUSCH资源调度给其他UE用。进一步地,每个PUSCH的UCI都可以携带第一指示信息,以告知网络设备或基站后面的PUSCH自己不再使用了,方便网络设备或基站可以将这些不使用的PUSCH调度给其他UE用。
又例如,假设一个CG周期配置4个PUSCH,若在某一个CG周期内,有更多的字节(byte)需要传输,通过4个PUSCH的CG-UCI,或者,4个PUSCH中的某个PUSCH的CG-UCI,或者,4个PUSCH的每个CG中的MAC CE,或者,4个PUSCH的某个CG中的MAC CE,或者,4个PUSCH的CG-UCI中的一个或多个,或者,4个PUSCH的CG中的MAC CE的一个或多个,向网络设备或基站发送第一指示信息,以告知网络设备或基站后续的PUSCH是否使用。又例如,仍以上述假设为前提,还可以通过4个PUSCH中的特定PUSCH的CG-UCI,或者,4个PUSCH的特定CG中的MAC CE,向网络设备或基站发送第一指示信息,以告知网络设备或基站后续的PUSCH是否使用。可选的,可以指一个周期的,也可以指多个周期的。可选的,可以指特定周期(如本周期),也可以指其他周期。
发送第一指示信息给网络设备或基站,使得网络设备或基站根据UE资源的使用情况进行资源调配,这样数据传输资源可以合理被利用,提高了业务传输的合理性,避免了资源的浪费。
一个实施例中,本申请实施例提供的数据传输的方法还包括:在满足第一条件的情况下,触发第一指示 信息生成,和/或,触发第一指示信息上报。
第一指示信息的生成或上报是存在触发条件的,该触发条件即为第一条件,只有在满足第一条件时才会触发第一指示信息的生成或上报或既生成又上报的操作。
需要理解的是,触发第一指示信息的生成或上报或既生成又上报的操作,仅仅指的是触发此操作,但此操作是否执行并不一定,所以触发了此操作后,进一步执行也是需要设定条件。基于此,一个实施例中,在满足第一条件的情况下,和/或,有可用上行传输资源的情况下,UE向网络设备或基站发送第一指示信息。
即触发了第一执行信息生成或上报后,UE向网络设备或基站发送第一指示信息的过程是也是需要满足第一条件和/或有可用上行传输资源的情况的。
其中,触发第一执行信息生成或上报的操作所遵循的第一条件,和UE向网络设备或基站发送第一指示信息所遵循的第一条件可以完全相同,也可以部分内容相同。
一个实施例中,第一条件包括以下至少一项:大于预设量的数据量或字节数或比特数需要在一个周期内传输;大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;大于第一门限的数据量在一个周期内传输;小于第二门限的数据量在一个周期内传输;CG上行控制信息被配置或激活;DG上行控制信息被配置或激活;上行控制信息配置被禁用;上行资源为预配置的资源;支持新的MAC控制单元触发或上报;网络或基站激活或使能指示信息上报;支持指示信息上报;上行资源包括多个PUSCH资源;一个传输周期内配置多个传输资源;预配置的PUSCH资源图样包括多个PUSCH资源;一个周期内需要多个PUSCH进行数据传输;预配置的PUSCH资源图样内需要多个PUSCH进行数据传输;待传输数据量大于一个PUSCH资源或指定PUSCH资源的传输块大小;待传输数据量小于所有PUSCH资源的传输块大小;待传输数据量发生变化;待传输的资源或需使用的传输资源发生变化;动态调度的资源内包括多个PUSCH资源;第一指示信息生成或触发或待定;有可用上行传输资源;PUCCH携带第一指示信息;UCI format承载第一域(第一域可以携带第一指示信息);PUSCH-UCI激活或可用(可以携带第一指示信息);CG-UCI激活或可用(可以携带第一指示信息);CG或PUSCH携带第一指示信息;PDCCH携带第一指示信息;DCI format承载第一域(第一域可以携带第一指示信息)。可选的,PDCCH或DCI format,可以是承载动态调度的,或者是激活/去激活CG的,或者,是激活/去激活预配置PUSCH的,或者是其他用途等。
其中,大于预设量的数据量或字节数或比特数表示的是更多的数据或byte需要在一个周期内传输。大于第一门限的数据量在一个周期内传输,小于第二门限的数据量在一个周期内传输中的第一门限和第二门限可以是不同的门限值。
而上行资源中设定的条件包括但不限于是存在多个PUSCH资源、一个CG周期配置多个CG资源、预配置的PUSCH pattern包括多个PUSCH资源、一个周期内多个PUSCH需要使用、待传输数据量大小与PUSCH的传输块大小(Transport Block Size,TBS)满足一定的关系等等,这些都可以为上述第一条件中的之一。
其中,待传输数据量大小与PUSCH的TBS满足一定的关系可以是:待传输数据量大小大于一个PUSCH或特定PUSCH的TBS,待传输数据量大小大于多个PUSCH的TBS,但是小于全部PUSCH的TBS,待传输数据量大小小于UL资源的全部PUSCH的TBS等等,本申请实施例对此不加以限定。其中,特定PUSCH可以是第一个PUSCH、最后一个PUSCH、具有特定标识的PUSCH等等。
其中,CG上行控制信息即CG-UCI被配置或激活,指的是承载在CG上的UCI信息,用于传输上述指示信息。DG上行控制信息DG-UCI被配置或激活,指的是承载在动态授权(Dynamic Grant,DG)上的UCI信息,用于传输上述指示信息。
本申请实施例中第一条件中的具体内容可以是根据实际的资源、资源、控制信息、配准信息等设定,在应用时,只要满足第一条件中的至少一个均表示满足第一条件。这样,设置多个条件均为第一条件,提高了第一指示信息发送方式的灵活性、及时性和全面性,
在一个实施例中,UE向网络设备或基站发送第一指示信息,包括:UE在第一PUSCH资源上向网络设备或基站发送第一指示信息;第一指示信息用于指示第一PUSCH资源后的资源是否使用。可选的,第一PUSCH可以是CG的PUSCH,也可以是DG的PUSCH。
该第一指示信息用于指示网络设备或基站第一PUSCH资源之后的资源是否可以使用,该第一PUSCH资源指的泛指任何一个或多个PUSCH资源,而第一PUSCH资源后的资源可以理解为只要是在第一PUSCH资源之后即可。例如第一PUSCH资源可以是本周期内的第一个PUSCH,也可以是下一周期的特定PUSCH,其中,特定PUSCH为第一个PUSCH,或前X个PUSCH,或PUSCH index最小的、PUSCH index是Y的。其中,X和Y可以是预定义或者基站预配置的,或者网络配置的,本申请实施例对此不加以限定。
可选地,第一PUSCH资源后的资源为以下中的至少一个:第三周期内的PUSCH资源;配置的PUSCH资源图样内的PUSCH资源;动态调度的多个PUSCH资源;第一PUSCH资源之后的动态调度的多个PUSCH资源;多个周期内的PUSCH资源;配置的多个PUSCH资源图样内的PUSCH资源;第一PUSCH资源之后的多个周期内的PUSCH资源;第一PUSCH资源之后的配置的多个PUSCH资源图样内的PUSCH资源;第三周期内第一PUSCH资源之后的PUSCH资源;配置的PUSCH资源图样内第一PUSCH资源后的PUSCH资源。其中,第三周期与前述实施例中的第一周期或第二周期为同一个周期,也可以是不同周期。
可选地,第一PUSCH资源后的资源为以下中的至少一个:第一PUSCH资源后的全部PUSCH资源;第一PUSCH资源后的至少一个或特定个数的PUSCH资源;第一PUSCH资源后的一个PUSCH资源;第一PUSCH资源后的多个连续的PUSCH资源;第一PUSCH资源后的多个不连续的PUSCH资源。
即第一PUSCH资源后的资源包括的PUSCH资源数量不限定,可以是一个、多个,该多个可以是连续的或不连续的。该多个也是特定个数的几个PUSCH资源。
例如,假设第一PUSCH资源后的资源为第三周期内的PUSCH资源,且第一PUSCH资源后的资源为第一PUSCH资源后的全部PUSCH资源,则表示第一PUSCH资源后的资源为第一PUSCH资源后的第三周期内的全部PUSCH资源。
在应用时,可对上述对第一PUSCH资源后的资源的限定之间相互结合或者单独拆开,来确定第一 PUSCH资源后的资源所具体指代的资源是哪些。
例如,UE发送第一指示信息告知网络设备或基站第一PUSCH资源后的资源的使用情况,比如,告知网络设备或基站第一PUSCH资源后的资源都不使用,或者第一PUSCH资源后的资源中从哪个位置开始不再使用PUSCH传输数据,或者哪个特定的PUSCH不再传输数据了,这样网络设备或基站收到后该第一指示信息后,可以将这些不再使用的PUSCH资源调度给其他UE用。可选的,第一PUSCH资源后的资源,可以指一个周期的,也可以指多个周期的。可选的,第一PUSCH资源后的资源,可以指特定周期(如本周期),也可以指其他周期。
又例如,第一PUSCH资源为本周期的本PUSCH,则第一指示信息展示本周期的本PUSCH之后的其他PUSCH是否传输,例如,若指示其他PUSCH drop(终止或停止),则表示drop后续PUSCH传输。其中,其他PUSCH可以是一个PUSCH,也可以是多个PUSCH。
一个实施例中,上述第一指示信息用于指示以下中至少一个:第一PUSCH资源后的资源中的全部资源是否进行数据传输;第一PUSCH资源后的资源中的每一个资源是否进行数据传输;第一PUSCH资源后的资源中的多个资源是否进行数据传输;第一PUSCH资源后的资源中的一个资源是否进行数据传输;第一PUSCH资源后的资源中的特定PUSCH资源;第一PUSCH资源后的第一个资源;第一PUSCH资源后的最近的特定数据的资源;目标资源全部是否进行数据传输;目标资源中的一个或特定一个是否进行数据传输;目标资源中的多个或特定多个是否进行数据传输;目标资源中的每一个是否进行数据传输。
UE向网络设备或基站发送的第一指示信息具体指示的可以是第一PUSCH资源后的资源中的全部资源、每一个资源、多个资源、一个资源、特定资源等等,也可以是目标资源的全部、任意一个或特定的一个、任意多个或特定的多个、每一个等等。本申请实施例对此不加以限定。
一个实施例中,第一指示信息还用于指示以下至少一个:指示第一PUSCH之后的下一个PUSCH是否进行数据传输;指示第一PUSCH之后的CG周期内全部的PUSCH是否进行数据传输;指示第一PUSCH之后的PUSCH资源图样内全部的PUSCH是否进行数据传输;指示第一PUSCH之后的指定位置的PUSCH是否进行数据传输。
其中,第一PUSCH之后的下一个PUSCH可以是与第一PUSCH位置维度的下一个,也可以是传输顺序维度的下一个。其中,CG周期和PUSCH pattern是网络设备或基站预先配置给UE的,所以UE向网络设备或基站发送的第一指示信息可以是第一PUSCH之后的CG周期内或PUSCH pattern内的全部资源。或者第一指示信息指示的是第一PUSCH之后的指定位置,例如,第一PUSCH之后的与第一PUSCH相距预设偏移量位置的资源。
其中,指定位置的PUSCH可以是一个位置,或者,多个位置。
可选地,上述实施例中的第一PUSCH资源可以是一个,也可以是多个。
若是一个第一PUSCH资源,则第一指示信息携带在一个第一PUSCH资源上,但若第一PUSCH资源是多个,则第一指示信息携带在多个第一PUSCH资源上,或者,多个第一PUSCH资源的至少部分第一PUSCH资源上。
例如,可以在一个PUSCH资源上带,可也在多个PUSCH资源上各自带第一指示信息。
基于此,一个实施例中,UE向网络设备或基站发送第一指示信息包括以下之一:UE在一个第一PUSCH上向网络设备或基站发送第一指示信息;UE在多个第一PUSCH上向网络设备或基站发送第一指示信息;UE在每一个PUSCH上向网络设备或基站发送第一指示信息;UE在特定第一PUSCH上向网络设备或基站发送第一指示信息。
本实施例中,若第一指示信息携带在一个第一PUSCH资源上,那么基站在一个第一PUSCH上发送第一指示信息即可。若第一指示信息携带在多个第一PUSCH资源上,那么第一指示信息既可以是UE在多个第一PUSCH上发送,也可以是在每一个PUSCH上发送,还可以是在特定第一PUSCH上发送,也可以是在每一个传输的PUSCH上发送,也可以在多个传输第一PUSCH上发送。这样,在不同情况下,以不同的携带方式发送第一指示信息,使得网络设备或基站接收到该第一指示信息后,可以更加针对性的、灵活地对传输资源进行合理调配,从而避免了资源的浪费。
对于上行过程,如图4所示,UE向网络设备或基站发送指示信息在另一个实施例中为UE向网络设备或基站发送第二指示信息,该第二指示信息在目标传输资源或目标传输信息承载。可选地,该目标传输资源或目标传输信息可以是物理上行控制信道(Physical Uplink Control Channel,PUCCH)资源、UCI、调度请求(Scheduling Request,SR)、PUSCH、MAC CE、无线资源控制RRC中。其中,UCI可以是新的UCI,该“新的”是指:新的类型,名称,index,配置周期,配置资源等等。
一种实施例中,UE向网络设备或基站发送第二指示信息,第二指示信息在第二PUSCH资源之前的目标传输资源或目标传输信息承载;或者,UE向网络设备或基站发送第二指示信息,第二指示信息在第二PUSCH资源之前的目标传输资源或目标传输信息上发送。
本实施例中第二指示信息仍然是承载在目标传输资源或目标传输信息中,或者采用目标传输资源或目标传输信息发送,但是,该目标传输资源或目标传输信息为第二PUSCH资源之前的资源或信息。
可选地,上述实施例中的目标传输资源可以是一个,也可以是多个。若是一个目标传输资源,则第二指示信息携带在一个目标传输资源上,但若目标传输资源是多个,则第二指示信息携带在多个目标传输资源上,或者,多个目标传输资源的至少部分目标传输资源上。例如,可以在一个目标传输资源上带,可也在多个目标传输资源上各自带第二指示信息。若第二指示信息携带在一个目标传输资源上,那么基站在一个目标传输资源上发送第一指示信息即可。若第一指示信息携带在多个目标传输资源上,那么第二指示信息既可以是UE在多个目标传输资源上发送,也可以是在每一个目标传输资源上发送,还可以是在特定第一目标传输资源上发送,也可以是在每一个传输的目标传输资源上发送,也可以在多个传输第一目标传输资源上发送。这样,在不同情况下,以不同的携带方式发送第一指示信息,使得网络设备或基站接收到该第二指示信息后,可以更加针对性的、灵活地对传输资源进行合理调配,从而避免了资源的浪费。
UE发送第二指示信息给网络设备或基站后,告知网络设备或基站后面哪些PUSCH的使用情况,比如, 所有PUSCH都不传输,或者,后面的PUSCH都不传输,或者从哪个位置开始不再使用PUSCH传输数据,或者哪个特定的PUSCH不再传输数据了等等。可选的,可以指一个周期的,也可以指多个周期的。可选的,特定的PUSCH可以指特定周期(如本周期),也可以指其他周期。
例如,以CG配置为例,假设一个CG周期配置有4个PUSCH。若在某一个CG周期内,有更多的byte(字节)需要传输,则可以通过4个PUSCH的CG-UCI,或者,4个PUSCH中的某个PUSCH的CG-UCI,或者,4个PUSCH的CG-UCI中的一个或多个,或者,4个PUSCH的CG中的MAC CE的一个或多个,或者,4个PUSCH的某个CG中的MAC CE,向网络设备或基站发送第二指示信息,以告知网络设备或基站后续的PUSCH的使用情况。例如,后续的PUSCH是否使用、(本周期的)本PUSCH之后的PUSCH是否使用、是否使用后续PUSCH执行连续传输等等。
其中,第二PUSCH资源可以指的是任一个PUSCH资源。可选地,第二PUSCH资源为以下中的至少一个:CG周期前的PUSCH资源;PUSCH资源图样前的PUSCH资源;特定CG周期前的PUSCH资源;特定PUSCH资源图样前的PUSCH资源;第一个位置的PUSCH资源;特定位置的PUSCH资源;动态调度的多个PUSCH资源。可选的,第二PUSCH可以是CG的PUSCH,也可以是DG的PUSCH。
其中,CG周期和PUSCH pattern为网络设备或基站对UE预配置的,在UE端,第二PUSCH资源可以是本CG周期前或者是本PUSCH pattern的PUSCH资源,或者是特定CG周期前或特定PUSCH pattern前的PUSCH资源。其中特定CG周期前或特定PUSCH pattern可以是上一个,可以是下一个等等,本申请实施例对此不做限定。还可以是第一个位置或者特定位置的PUSCH资源等等。
上述目标传输资源或目标传输信息是在第二PUSCH资源之前,两者之间存在一定的位置关系。一个实施例中,目标传输资源与第二PUSCH资源之间存在固定偏移量;或者,目标传输资源与上行资源配置之间存在固定偏移量;上行资源配置为与第二PUSCH资源对应的上行资源配置。
该固定偏移量可以是预先配置的量。目标传输资源是比第二PUSCH资源提前该固定偏移量的资源。其中,上行资源配置指的是第二PUSCH资源对应的配置,所以目标传输资源还可以是比上行资源配置提前该固定偏移量的资源。可选的,固定偏移量,可以是配置的,或者指示的,或者,是预定义的。
在一个实施例中,上述第二指示信息用于指示CG周期或PUSCH资源图样内的资源是否进行数据传输;或者,第二指示信息用于指示动态调度的多个PUSCH资源是否进行数据传输。
该CG周期或PUSCH pattern内的资源以及动态调度的多个PUSCH资源均可认为是第二指示信息指示的资源。而对于第二指示信息指示的资源从不同维度来说明。
在其中一个实施例中,第二指示信息指示的资源为以下中的至少一个:与目标传输资源或目标传输信息最近的CG周期或PUSCH资源图样内的资源;目标传输资源或目标传输信息之后的一个CG周期或PUSCH资源图样内的资源;目标传输资源或目标传输信息之后的多个CG周期或PUSCH资源图样内的资源;第二PUSCH资源对应CG周期或PUSCH资源图样内的资源;目标传输资源或目标传输信息之后的动态调度的多个PUSCH资源内的资源;第二PUSCH资源对应的动态调度的多个PUSCH资源内的资源。
本实施例中,主要区分的是第二指示信息指示的资源所在的位置,例如,可以是与目标传输资源或目标传输信息最近的CG周期或PUSCH pattern内,可以是目标传输资源或目标传输信息之后的一个CG周期或PUSCH pattern内或者多个CG周期或PUSCH pattern内,第二PUSCH资源对应CG周期或PUSCH pattern内等等。
在另一个实施例中,第二指示信息指示的资源包括以下中的至少一个:CG周期或PUSCH资源图样内的一个PUSCH资源;CG周期或PUSCH资源图样内的多个PUSCH资源;CG周期或PUSCH资源图样内的特定PUSCH资源;CG周期或PUSCH资源图样内的多个连续PUSCH资源;CG周期或PUSCH资源图样内的多个不连续PUSCH资源;CG周期或PUSCH资源图样内的全部PUSCH资源动态调度的多个PUSCH资源内的一个或多个PUSCH资源;动态调度的多个PUSCH资源内的特定的PUSCH资源;目标资源全部是否进行数据传输;目标资源中的一个或特定一个是否进行数据传输;目标资源中的多个或特定多个是否进行数据传输;目标资源中的每一个是否进行数据传输。
本实施例中,主要是区分第二指示信息指示的对应位置内具体资源,例如,CG周期或PUSCH资源图样内的一个PUSCH资源、多个PUSCH资源、特定PUSCH资源、多个连续PUSCH资源、多个不连续PUSCH资源等等。
第二指示信息指示的资源还可以是对目标资源的指示,例如,目标资源全部资源、目标资源中的部分资源、特定资源、目标资源中的一个资源或每一个资源等等。
可选地,第二指示信息指示的资源可以指一个周期的,也可以指多个周期的。可选的,第二指示信息指示的资源可以指特定周期(如本周期),也可以指其他周期的。
上述实施例中,对第二指示信息指示的资源可以包括不同维度下指示的资源,这样将第二指示信息发送至网络设备或基站后,可以使得网络设备或基站更加准确地确定出UE所指示的资源的使用情况,可以更加合理地对UE所指示的资源进行调配,保证了业务传输的合理性。
基于上述第二指示信息所指示的资源,在一个实施例中,第二指示信息用于指示以下中任一个:CG周期或PUSCH资源图样内的资源中的全部资源是否进行数据传输;CG周期或PUSCH资源图样内的资源中的每一个资源是否进行数据传输;CG周期或PUSCH资源图样内的资源中的多个资源是否进行数据传输;CG周期或PUSCH资源图样内的资源中的一个资源是否进行数据传输;CG周期或PUSCH资源图样内的资源中的特定资源是否进行数据传输;动态调度的多个PUSCH资源中的多个资源是否进行数据传输;动态调度的多个PUSCH资源中的特定资源是否进行数据传输;动态调度的多个PUSCH资源中的一个资源是否进行数据传输;动态调度的多个PUSCH资源中的每一个资源是否进行数据传输;动态调度的多个PUSCH资源中的全部资源是否进行数据传输;下一个上行资源是否进行数据传输;第四周期或资源图样的资源是否传输。
本实施例中第二指示信息指示的资源与上述实施例对应,此处,是对第二指示信息指示的具体哪些资源进行了限定,例如,第二指示信息可以指示CG周期或PUSCH pattern内的全部资源,也可以是每一个资源,多个资源等等,以及可以指示的是动态调度的多个PUSCH资源中的每一个资源、全部资源或特定资源等等。 进一步地,第二指示信息还可以是指示的是下一个上行资源、第四周期或PUSCH pattern内的资源等等。这样,第二指示信息可以指代任何位置、任何周期、任何类型配置中的资源,可以使得网络设备或基站更加全面的掌握UE的资源使用情况,可极大地增加后续资源调配的合理性。
UE向网络设备或基站发送第二指示信息和上述实施例中向网络设备或基站发送第一指示信息一样,需要触发第二指示信息的生成或上报,以及设定发送第二指示信息所需满足的条件。则一个实施例中,UE向网络设备或基站发送第二指示信息,包括:在满足第二条件的情况下,执行UE触发第二指示信息、UE上报第二指示信息、UE向网络设备或基站发送第二指示信息中至少一个。可选地,第二条件包括以下中的至少一个:大于预设量的数据量或字节数或比特数需要在一个周期内传输;大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;大于第三门限的数据量在一个周期传输;小于第四门限的数据量在一个周期传输;传输第二指示信息的资源配置被允许或者被禁用;网络或基站激活或使能指示信息上报;支持指示信息上报;支持新的MAC控制单元触发或上报;上行资源为预配置的资源;上行资源包括多个PUSCH资源;一个传输周期内配置多个传输资源;预配置的PUSCH资源图样包括多个PUSCH资源;一个周期内需要多个PUSCH进行数据传输;预配置的PUSCH资源图样内需要多个PUSCH进行数据传输;动态调度的资源内包括多个PUSCH资源;第二指示信息生成或触发或待定;待传输数据量大于一个PUSCH资源或指定PUSCH资源的传输块大小;待传输数据量小于所有PUSCH资源的传输块大小;待传输数据量大小大于多个PUSCH的TBS,但是小于全部PUSCH的TBS;待传输数据量发生变化;待传输的资源或需使用的传输资源发生变化;存在可用的上行传输资源;存在可用的新传输资源;PUCCH携带第二指示信息;UCI format承载第一域(第一域携带第二指示信息);PUSCH-UCI激活或可用(可以携带第二指示信息);CG-UCI激活或可用(可以携带第二指示信息);CG或PUSCH携带第二指示信息,PDCCH携带第二指示信息;DCI format承载第一域(第一域可以携带第二指示信息)。可选的,PDCCH或DCI format,可以是承载动态调度的,或者是激活/去激活CG的,或者,是激活/去激活预配置PUSCH的,或者是其他用途等。
本实施例中,触发第二指示信息的生成或上报和发送第二指示信息的区别和条件可刹参见发送第一指示信息的实施例中的说明,这里将不再赘述。其中,第二条件与前述第一条件相同,具体可参见第一条件中的说明。
下面通过具体的实施例对上述实施例中涉及的上行资源配置进行说明。
一个实施例中,如图5所示,该方法还包括:UE接收网络设备或基站发送的上行资源配置。
其中,上行资源配置包括预配置资源或动态调度的资源。可选地,动态调度的资源包括多个PUSCH资源。可选地,预配置资源包括CG或预配置的PUSCH资源图样。且对于上行资源配置,在一个实施例中,上行资源配置指示一个CG周期内包括多个PUSCH资源,和/或,一个PUSCH资源图样内包括多个PUSCH资源。
UE接收到网络设备或基站发送的上行资源配置后,会基于上行资源配置向网络设备或基站发送第一指示信息或第二指示信息。
一个实施例中,上行资源配置包括以下至少一项:CG标识;CG周期;CG周期内的PUSCH资源的数量;一个CG周期内的至少一个PUSCH资源的资源信息;一个CG周期内的上行控制信息;CG PUSCH资源的上行控制信息;PUSCH资源图样标识;PUSCH资源图样周期或非周期;PUSCH资源图样内的PUSCH资源的数量;一个PUSCH资源图样内的至少一个PUSCH资源的资源信息;一个PUSCH资源图样内的上行控制信息;PUSCH资源图样内的PUSCH资源的上行控制信息;动态调度的多个PUSCH资源的上行控制信息;动态调度的多个PUSCH资源的至少一个PUSCH资源信息;动态调度的多个PUSCH资源的PUSCH资源的数量。
其中,以CG配置为例,UE接收来自基站预配置的CG配置,CG配置包括CG index(即标识)、CG周期、CG周期内的资源个数,例如,PUSCH或CG PUSCH资源个数等。
以PUSCH pattern为例,UE接收来自基站预配置的PUSCH pattern,该PUSCH pattern包括PUSCH pattern标识;PUSCH pattern的周期或非周期;PUSCH pattern内的PUSCH资源的数量等等。例如,一个预配置的PUSCH pattern包括多个PUSCH资源,该多个PUSCH资源之间的间隔可以是等间隔,也可以是非等间距的,该预配置PUSCH pattern的可以是周期的,也可以是非周期的。
以动态调度为例,还可以包括动态调度的多个PUSCH资源的至少一个PUSCH资源信息;动态调度的多个PUSCH资源的PUSCH资源的数量等等。
上行资源配置中还包括CG周期内的至少一个PUSCH资源的资源信息或PUSCH资源图样内的至少一个PUSCH资源的资源信息。其中,该资源信息包括位置信息、时域频域资源信息、资源偏移量、冗余版本信息(RedundancyVersion,RV)、RV偏移量、混合自动重传请求(HybridAutomatic Repeat-reQuest,HARQ)进程信息、HARQ进程信息偏移量、编号信息、具体的资源等等。
可选地,位置信息包括至少一个PUSCH资源的起始位置、至少一个PUSCH资源的终止位置、至少一个PUSCH资源中的第一个PUSCH资源的位置、至少一个PUSCH资源中的特定PUSCH资源的位置等。时域频域资源信息包括至少一个PUSCH资源的时域和频域资源信息。资源偏移量包括至少一个PUSCH资源中每个PUSCH资源相对第一个PUSCH资源的资源偏移量、至少一个PUSCH资源中每个PUSCH资源相对特定PUSCH资源的资源偏移量、至少一个PUSCH资源中每个PUSCH资源相对最后一个PUSCH资源的资源偏移量。RV信息包括至少一个PUSCH资源的冗余版本信息RV,RV偏移量包括至少一个PUSCH资源中每个PUSCH资源相对特定PUSCH资源的RV偏移量;至少一个PUSCH资源中每个PUSCH资源相对最后一个PUSCH资源的RV偏移量。HARQ进程信息包括至少一个PUSCH资源的HARQ进程信息;HARQ进程信息偏移量包括至少一个PUSCH资源中每个PUSCH资源相对第一个PUSCH资源的HARQ进程信息偏移量;至少一个PUSCH资源中每个PUSCH资源相对特定PUSCH资源的HARQ进程信息偏移量;至少一个PUSCH资源中每个PUSCH资源相对最后一个PUSCH资源的HARQ进程信息偏移量。编号信息包括至少一个PUSCH资源中的第一个PUSCH资源的编号、至少一个PUSCH资源中的特定PUSCH资源的编号。具体的资源包括至少一个PUSCH资源中的第一个资源或者最后一个资源或者特定资源。
该CG配置中还包括一个内CG周期、CG PUSCH资源、一个PUSCH资源图样内、PUSCH资源图样内的PUSCH资源、动态调度的多个PUSCH资源等等的上行控制信息。可选地,该上行控制信息用于指示以下至少一项:是否包括指示信息;指示信息的内容;承载指示信息的资源;指示信息指示的PUSCH资源;指定PUSCH资源;指示信息的位置;指示信息的占用字节大小;禁用标识或者启用标识;资源情况或资源使用条件。
具体地,是否包括指示信息:指的是上行控制信息中包括指示信息或不包括指示信息。
指示信息的内容;第一指示信息中的内容或第二指示信息中的内容。
承载指示信息的资源:例如,PUSCH资源、MAC CE、新的UCI等等。
指示信息指示的PUSCH资源:例如,第一指示信息中指示的第一PUSCH资源之后的资源等等。
指定PUSCH资源:以CG配置为例,对一个CG周期来说,CG-UCI(上行控制信息)的配置信息可以是指示特定CG PUSCH的,也可是指示每一个CG PUSCH的。其中,特定CG PUSCH可以是周期内首个资源的,或,最后一个资源的,或,CG PUSCH index最小的资源等等。
指示信息的位置和指示信息的占用字节大小:仍以CG配置为例,CG-UCI配置信息可以指的是第一指示信息的位置和/或占用bit大小,以及第二指示信息的位置和/或占用bit大小。
禁用标识或者启用标识:CG-UCI配置信息还可以包括enable或disable指示。
对于资源情况或资源使用条件,一个实施例中,资源情况或资源使用条件包括:一个CG周期内配置多个PUSCH资源;一个PUSCH资源图样内配置多个PUSCH资源;多个PUSCH资源进行数据传输;待传输数据量大于一个PUSCH或指定PUSCH的传输块大小;待传输数据量小于上行资源的全部PUSCH的传输块大小。
具体地,资源情况或资源使用条件为:一个CG周期配置多个CG资源,和/或,多个PUSCH需要使用,和/或,待传输数据量大小大于一个PUSCH或特定PUSCH的TBS,和/或,待传输数据量大小小于UL资源的全部PUSCH的TBS等等。需要说明的是,这里的使用条件仅是一种举例,实际应用中,该资源使用条件可以与前述实施例中的第一条件或第二条件相同,即前述实施例中的第一条件或第二条件中的条件也适用于这里的资源情况或资源使用条件,本申请实施例在此不再赘述。
一个实施例中,继续参见上述图5所示,在UE接收到上行资源配置后,该方法还包括:UE基于上行资源配置进行上行数据传输。
可选地,UE基于上行资源配置进行上行数据传输包括:UE基于上行资源配置在所有的PUSCH资源上进行数据传输;或者,UE基于上行资源配置在部分的PUSCH资源上进行数据传输;或者,UE基于上行资源配置终止部分的PUSCH资源。
其中,UE在接收到上行资源配置后,可以使用所有的PUSCH资源,也可以使用部分PUSCH资源。对于不使用的另外一部分PUSCH资源,UE可以对其终止(即drop)。
其中,UE基于上行资源配置在所有的PUSCH资源上进行数据传输中的所有的PUSCH资源在不同情况所表示的资源也不同。例如,可以是根据CG周期内的来确定所有的PUSCH资源指的是哪些资源中的所有资源,也可以是根据PUSCH pattern来确定所有的PUSCH资源指的是哪些资源中的所有资源,还可以是根据动态调度的多个PUSCH资源来确定所有的PUSCH资源指的是哪些资源中的所有资源。
基于此,提供一个实施例对所有情况进行说明。则在一个实施例中,UE基于上行资源配置在所有的PUSCH资源上进行数据传输,包括:
UE基于上行资源配置,在一个CG周期内的所有PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在一个CG周期内的特定位置或标识对应的PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在一个PUSCH资源图样内的所有PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在一个PUSCH资源图样内的特定位置或标识对应的PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在动态调度的多个PUSCH资源内的所有PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在动态调度的多个PUSCH资源内的特定位置或标识对应的所有PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在多个CG周期内的所有PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在多个CG周期内的特定位置或标识对应的PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在多个PUSCH资源图样内的所有PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在多个PUSCH资源图样内的特定位置或标识对应的PUSCH资源上进行数据传输。
其中,特定位置或标识可以是一个位置,或者,多个位置。
本实施例中,所有PUSCH资源指的是一个或多个CG周期内所有资源、一个或多个CG周期内的特定位置或标识对应的所有资源、一个或多个PUSCH pattern内的所有资源、一个或多个PUSCH pattern内特定位置或标识对应的所有资源、动态调度的多个PUSCH资源对应的所有资源和动态调度的多个PUSCH资源内特定位置或标识对应的所有资源。
同样,UE基于上行资源配置在部分的PUSCH资源上进行数据传输中的部分的PUSCH资源在不同情况所表示的资源也不同。与上述所有的资源情况一致,则在一个实施例中,UE基于上行资源配置在部分的PUSCH资源上进行数据传输,包括:
UE基于上行资源配置,在一个CG周期内的部分PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在一个CG周期内的特定位置或标识对应的部分PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在一个PUSCH资源图样内的部分PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在一个PUSCH资源图样内的特定位置或标识对应的部分PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在动态调度的多个PUSCH资源内的部分PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在动态调度的多个PUSCH资源内的特定位置或标识对应的部分PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在多个CG周期内的部分PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在多个CG周期内的特定位置或标识对应的部分PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在多个PUSCH资源图样内的部分PUSCH资源上进行数据传输;或者,
UE基于上行资源配置,在多个PUSCH资源图样内的特定位置或标识对应的部分PUSCH资源上进行数据传输。
本实施例中,部分的PUSCH资源所区分的情况与前述所有的PUSCH资源的情况相同,在此不再赘述。
UE向网络设备或基站发送指示信息时,是为了告知网络设备或基站后续的资源是否使用,所以UE需要先确定要使用的资源和不使用的资源,基于要使用的资源和不使用的资源可确定生成第一指示信息和第二指示信息。
则在一个实施例中,如图6所示,该方法还包括:
S201,确定使用的PUSCH资源和/或不使用的PUSCH资源;
S202,根据使用的PUSCH资源和/或不使用的PUSCH资源,确定第一指示信息或第二指示信息。
以CG为例,UE确定使用或不使用的CG PUSCH资源,根据确定的使用或不使用的CG PUSCH资源,生成第一指示信息或第二指示信息上报给网络设备或基站,以便网络设备或基站及时掌握UE的资源使用情况。
在第一指示信息和第二指示信息发送给网络设备或基站后,该指示信息用于指示网络或基站执行以下中至少一项:确定是否接收PUSCH传输;确定需要执行接收或解码的PUSCH;确定不需要执行接收或解码的PUSCH;确定需要被终止的PUSCH。
具体地,网络设备或基站根据第一指示信息和第二指示信息,确定哪些PUSCH资源可用,或者,哪些PUSCH资源不可用。在确定可用的时候,基站可以在相应的资源进行接收或解码。在确定不可用的时候,基站可以在相应的资源不进行接收或解码,或者,基站可重新配置该资源位置给其他UE或调度该资源位置给其他UE。这样,UE使用的资源可以被调度或被调配给其他UE使用,避免了资源的浪费。
在一个实施例中,该方法还包括:在使用的PUSCH资源上进行数据传输,和/或,在不使用的PUSCH资源上不进行数据传输,和/或,终止不使用的PUSCH资源。
对于UE本身来说,其在确定除了使用的PUSCH资源和/或不使用的PUSCH资源后,在使用的PUSCH资源上进行数据传输,在不使用的PUSCH资源上不进行数据传输。除此之外,UE还可以终止不使用的PUSCH资源。
一个实施例中,该方法还包括:若存在PUSCH资源冲突或复用处理,确定不使用的PUSCH资源为低优先级的资源。
在一些场景中,若UE发现存在PUSCH资源冲突或复用处理,UE可以认为不使用的资源为低优先的资源。这样,将不使用的资源定为低优先级,避开低优先级的资源,以减缓PUSCH资源冲突或复用的现象。
对于前面所有的实施例中涉及的第一指示信息、第二指示信息以及确定使用的PUSCH资源、不使用的PUSCH资源的传输,进行上行数据传输等等这些操作,在一些场景中,都可以是由网络设备或基站的指示进行。基于此,在一个实施例中,该方法还包括:基于网络设备或基站的指示,确定是否执行以下中至少一个:上报第一指示信息;上报第二指示信息;触发或生成第一指示信息;触发或生成第二指示信息;触发第一指示信息的上报;触发第二指示信息的上报;确定是否进行资源终止;触发或确定使用的PUSCH资源;触发或确定不使用的PUSCH资源的传输;触发上行数据的传输。
本实施例中,将UE涉及的到的所有操作,例如,第一指示信息和第二指示信息的上报、触发或生成,以及资源的终止、不使用、上行数据的传输等等都设置为在网络设备或基站的指示下执行,这样可提高UE与网络设备或基站的交互性。
在申请本实施例中,针对PUSCH是否传输,另一种实现方式是基站通过PDCCH或DCI指示目标PUSCH是否传输。
可选的,基站可以在PDCCH携带第一指示信息或者第二指示信息;DCI format承载第一域(第一域可以携带第二指示信息或第二指示信息)。可选的,PDCCH或DCI format,可以是承载动态调度的,或者是激活/去激活CG的,或者,是激活/去激活预配置PUSCH的,或者是其他用途等。
相应的,UE基于基站指示,确定传输或不传输的PUSCH,和/或,执行传输或drop。
以上是对上行数据传输过程的数据传输的方法过程的说明,下面对下行数据传输过程的数据传输的方法进行说明。下行过程为网络设备或基站向UE发送指示信息,该指示信息用于告知UE是否使用目标资源进行数据传输。即UE在收到指示信息后决定哪些资源使用或者哪些资源不使用。
下行数据传输过程涉及的是上述第三指示信息和第四指示信息,即下行的第三指示信息对应与上行的第一指示信息,下行的第四指示信息对应于上行的第二指示信息。需要说明的是,下行数据传输过程中涉及的各实施例中与上行数据传输过程的限定均相同,在下述实施例中将不再赘述,可参见前述实施例。区别在于:下行数据传输过程中指示信息的相关限定均是携带在下行相关的资源中,例如,物理下行控制信道(Physical Downlink Control Channel,PDCCH)、下行动态调度的PDSCH、SPS等等。
一个实施例中,如图7所示,第一设备向第二设备发送第三指示信息即为网络设备或基站向UE发送第三指示信息。可选地,第三指示信息携带于以下至少之一:第三指示信息携带于PDCCH中;第三指示信息携带于SPS中;第三指示信息携带于下行动态调度的PDSCH中;第三指示信息携带于SPS下行控制信息中;第三指示信息携带于新的MAC控制单元中;第三指示信息携带于无线资源控制消息中。
一个实施例中,该方法还包括:在满足第三条件的情况下,触发第三指示信息生成,和/或,触发第三指示信息下发。一个实施例中,网络设备或基站向UE发送第三指示信息包括:在满足第三条件的情况下, 和/或,有可用下行传输资源的情况下,网络设备或基站向UE发送第三指示信息。可选地,第三条件包括以下至少一项:大于预设量的数据量或字节数或比特数需要在一个周期内传输;大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;大于第一门限的数据量在一个周期内传输;小于第二门限的数据量在一个周期内传输;SPS下行控制信息被配置或激活;动态调度下行控制信息被配置或激活;下行控制信息配置被禁用;下行资源为预配置的资源;支持新的MAC控制单元触发或下发;网络或基站激活或使能指示信息下发;支持指示信息下发;下行资源包括多个PDSCH资源;一个传输周期内配置多个传输资源;预配置的PDSCH资源图样包括多个PDSCH资源;一个周期内需要多个PDSCH进行数据传输;预配置的PDSCH资源图样内需要多个PDSCH进行数据传输;待传输数据量大于一个PDSCH资源或指定PDSCH资源的传输块大小;待传输数据量小于所有PDSCH资源的传输块大小;待传输数据量大小大于多个PDSCH的TBS,但是小于全部PDSCH的TBS;待传输数据量发生变化;待传输的资源或需使用的传输资源发生变化;动态调度的资源内包括多个PDSCH资源;第三指示信息生成或触发或待定;PDCCH携带第三指示信息;DCI format承载第一域(第一域可以携带第三指示信息);PDSCH-DCI激活或可用(可以携带第三指示信息);SPS-DCI激活或可用(可以携带第三指示信息);SPS或PDSCH可以携带第三指示信息。可选的,PDCCH或DCI format,可以是承载动态调度的,或者是激活/去激活SPS的,或者,是激活/去激活预配置PDSCH的,或者是其他用途等。
一个实施例中,上述网络设备或基站向UE发送第三指示信息包括:网络设备或基站在第一PDSCH资源上向UE发送第三指示信息;第三指示信息用于指示第一PDSCH资源后的资源是否使用。可选的,第一PDSCH可以是SPS的PDSCH,也可以是DG的PDSCH。
一个实施例中,上述第一PDSCH资源后的资源为以下中的至少一个:第三周期内的PDSCH资源;配置的PDSCH资源图样内的PDSCH资源;动态调度的多个PDSCH资源;第一PDSCH资源之后的动态调度的多个PDSCH资源;多个周期内的PDSCH资源;配置的多个PDSCH资源图样内的PDSCH资源;第一PDSCH资源之后的多个周期内的PDSCH资源;第一PDSCH资源之后的配置的多个PDSCH资源图样内的PDSCH资源;第三周期内第一PDSCH资源之后的PDSCH资源;配置的PDSCH资源图样内第一PDSCH资源后的PDSCH资源。
一个实施例中,上述第一PDSCH资源后的资源还可以为以下中的至少一个:第一PDSCH资源后的全部PDSCH资源;第一PDSCH资源后的至少一个或特定个数的PDSCH资源;第一PDSCH资源后的一个PDSCH资源;第一PDSCH资源后的多个连续的PDSCH资源;第一PDSCH资源后的多个不连续的PDSCH资源。
一个实施例中,上述第三指示信息用于指示以下中任一个:第一PDSCH资源后的资源中的全部资源是否进行数据传输;第一PDSCH资源后的资源中的每一个资源是否进行数据传输;第一PDSCH资源后的资源中的多个资源是否进行数据传输;第一PDSCH资源后的资源中的一个资源是否进行数据传输;第一PDSCH资源后的资源中的特定PDSCH资源;第一PDSCH资源后的第一个资源;第一PDSCH资源后的最近的特定数据的资源;目标资源全部是否进行数据传输;目标资源中的一个或特定一个是否进行数据传输;目标资源中的多个或特定多个是否进行数据传输;目标资源中的每一个是否进行数据传输。
一个实施例中,第一PDSCH资源为一个或者多个;则第三指示信息携带在一个第一PDSCH资源上或者携带在多个第一PDSCH资源上。则在一个实施例中,网络设备或基站向UE发送第三指示信息,包括:网络设备或基站在一个第一PDSCH上向UE发送第三指示信息;网络设备或基站在多个第一PDSCH上向UE发送第三指示信息;网络设备或基站在每一个PDSCH上向UE发送第三指示信息;网络设备或基站在特定第一PDSCH上向UE发送第三指示信息。若是一个第一PDSCH资源,则第三指示信息携带在一个第一PDSCH资源上,但若第一PDSCH资源是多个,则第三指示信息携带在多个第一PDSCH资源上,或者,多个第一PDSCH资源的至少部分第一PDSCH资源上。例如,可以在一个PDSCH资源上带,可也在多个PDSCH资源上各自带第三指示信息。本实施例中,若第三指示信息携带在一个第一PDSCH资源上,那么基站在一个第一PDSCH上发送第三指示信息即可。若第三指示信息携带在多个第一PDSCH资源上,那么第三指示信息既可以是UE在多个第一PDSCH上发送,也可以是在每一个PDSCH上发送,还可以是在特定第一PDSCH上发送,也可以是在每一个传输的PDSCH上发送,也可以在多个传输第一PDSCH上发送。这样,在不同情况下,以不同的携带方式发送第一指示信息,使得网络设备或基站接收到该第三指示信息后,可以更加针对性的、灵活地对传输资源进行合理调配,从而避免了资源的浪费。
一个实施例中,上述第三指示信息用于指示以下至少一个:指示第一PDSCH之后的下一个PDSCH是否进行数据传输;指示第一PDSCH之后的SPS周期内全部的PDSCH是否进行数据传输;指示第一PDSCH之后的PDSCH资源图样内全部的PDSCH是否进行数据传输;指示第一PDSCH之后的指定位置的PDSCH是否进行数据传输。其中,指定位置的PDSCH可以是一个位置,或者,多个位置。
一个实施例中,如图8所示,网络设备或基站向UE发送第四指示信息,第四指示信息在目标传输资源或目标传输信息承载。可选地,网络设备或基站向UE发送第四指示信息,第四指示信息在第二PDSCH资源之前的目标传输资源或目标传输信息承载;或者,网络设备或基站向UE发送第四指示信息,第四指示信息在第二PDSCH资源之前的目标传输资源或目标传输信息上发送。可选地,目标传输资源或目标传输信息包括以下至少之一:PDCCH资源、下行控制信息、调度请求、PDSCH、MAC控制单元、无线资源控制。可选地,目标传输资源与第二PDSCH资源之间存在固定偏移量;或者,目标传输资源与下行资源配置之间存在固定偏移量;下行资源配置为与第二PDSCH资源对应的下行资源配置。
一个实施例中,第二PDSCH资源为以下中的至少一个:SPS周期前的PDSCH资源;PDSCH资源图样前的PDSCH资源;特定SPS周期前的PDSCH资源;特定PDSCH资源图样前的PDSCH资源;第一个位置的PDSCH资源;特定位置的PDSCH资源;动态调度的多个PDSCH资源。
一个实施例中,第四指示信息用于指示SPS周期或PDSCH资源图样内的资源是否进行数据传输;或者,第四指示信息用于指示动态调度的多个PDSCH资源是否进行数据传输。可选地,第四指示信息指示的资源为以下中的至少一个:与目标传输资源或目标传输信息最近的SPS周期或PDSCH资源图样内的资源;目标 传输资源或目标传输信息之后的一个SPS周期或PDSCH资源图样内的资源;目标传输资源或目标传输信息之后的多个SPS周期或PDSCH资源图样内的资源;第二PDSCH资源对应SPS周期或PDSCH资源图样内的资源;目标传输资源或目标传输信息之后的动态调度的多个PDSCH资源内的资源;第二PDSCH资源对应的动态调度的多个PDSCH资源内的资源。
一个实施例中,第四指示信息指示的资源还包括以下中的至少一个:SPS周期或PDSCH资源图样内的一个PDSCH资源;SPS周期或PDSCH资源图样内的多个PDSCH资源;SPS周期或PDSCH资源图样内的特定PDSCH资源;SPS周期或PDSCH资源图样内的多个连续PDSCH资源;SPS周期或PDSCH资源图样内的多个不连续PDSCH资源;SPS周期或PDSCH资源图样内的全部PDSCH资源;动态调度的多个PDSCH资源内的一个或多个PDSCH资源;动态调度的多个PDSCH资源内的特定的PDSCH资源;目标资源全部是否进行数据传输;目标资源中的一个或特定一个是否进行数据传输;目标资源中的多个或特定多个是否进行数据传输;目标资源中的每一个是否进行数据传输。
一个实施例中,第四指示信息用于指示以下中任一个:SPS周期或PDSCH资源图样内的资源中的全部资源是否进行数据传输;SPS周期或PDSCH资源图样内的资源中的每一个资源是否进行数据传输;SPS周期或PDSCH资源图样内的资源中的多个资源是否进行数据传输;SPS周期或PDSCH资源图样内的资源中的一个资源是否进行数据传输;SPS周期或PDSCH资源图样内的资源中的特定资源是否进行数据传输;动态调度的多个PDSCH资源中的多个资源是否进行数据传输;动态调度的多个PDSCH资源中的特定资源是否进行数据传输;动态调度的多个PDSCH资源中的一个资源是否进行数据传输;动态调度的多个PDSCH资源中的每一个资源是否进行数据传输;动态调度的多个PDSCH资源中的全部资源是否进行数据传输;下一个下行资源是否进行数据传输;第四周期或资源图样的资源是否进行数据传输。
一个实施例中,网络设备或基站向UE发送第四指示信息,包括:在满足第三条件的情况下,执行网络设备或基站触发第四指示信息、网络设备或基站下发第四指示信息、网络设备或基站向UE发送第四指示信息中至少一个。可选地,第三条件包括以下中的至少一个:大于预设量的数据量或字节数或比特数需要在一个周期内传输;大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;大于第三门限的数据量在一个周期传输;小于第四门限的数据量在一个周期传输;传输第四指示信息的资源配置被允许或者被禁用;网络或基站激活或使能指示信息下发;支持指示信息下发;支持新的MAC控制单元触发或下发;下行资源为预配置的资源;下行资源包括多个PDSCH资源;一个传输周期内配置多个传输资源;预配置的PDSCH资源图样包括多个PDSCH资源;一个周期内需要多个PDSCH进行数据传输;预配置的PDSCH资源图样内需要多个PDSCH进行数据传输;动态调度的资源内包括多个PDSCH资源;第四指示信息生成或触发或待定;待传输数据量大于一个PDSCH资源或指定PDSCH资源的传输块大小;待传输数据量小于所有PDSCH资源的传输块大小;待传输数据量大小大于多个PDSCH的TBS,但是小于全部PDSCH的TBS;待传输数据量发生变化;待传输的资源或需使用的传输资源发生变化;存在可用的下行传输资源;存在可用的新传输资源;PDCCH携带第四指示信息;DCI format承载第一域(第一域可第四指示信息);PDSCH-DCI激活或可用(可以携带第四指示信息);SPS-DCI激活或可用(可以携带第四指示信息);SPS或PDSCH可以携带第四指示信息。可选的,PDCCH或DCI format,可以是承载动态调度的,或者是激活/去激活SPS的,或者,是激活/去激活预配置PDSCH的,或者是其他用途等。
一个实施例中,如图9所示,该方法还包括:网络设备或基站向UE发送下行资源配置。可选地,网络设备或基站基于下行资源配置向UE发送第三指示信息或第四指示信息。可选地,下行资源配置包括预配置资源或动态调度的资源。可选地,动态调度的资源包括多个PDSCH资源。可选地,预配置资源包括SPS或预配置的PDSCH资源图样。可选地,下行资源配置指示一个SPS周期内包括多个PDSCH资源,和/或,一个PDSCH资源图样内包括多个PDSCH资源。
一个实施例中,下行资源配置包括以下至少一项:SPS标识;SPS周期;SPS周期内的PDSCH资源的数量;一个SPS周期内的至少一个PDSCH资源的资源信息;一个SPS周期内的下行控制信息;SPS PDSCH资源的下行控制信息;PDSCH资源图样标识;PDSCH资源图样周期或非周期;PDSCH资源图样内的PDSCH资源的数量;一个PDSCH资源图样内的至少一个PDSCH资源的资源信息;一个PDSCH资源图样内的下行控制信息;PDSCH资源图样内的PDSCH资源的下行控制信息;动态调度的多个PDSCH资源的下行控制信息;动态调度的多个PDSCH资源的至少一个PDSCH资源信息;动态调度的多个PDSCH资源的PDSCH资源的数量。
一个实施例中,至少一个PDSCH资源的资源信息包括以下至少一项:至少一个PDSCH资源的起始位置;至少一个PDSCH资源的终止位置;至少一个PDSCH资源的时域和频域资源信息;至少一个PDSCH资源中每个PDSCH资源相对第一个PDSCH资源的资源偏移量;至少一个PDSCH资源中每个PDSCH资源相对特定PDSCH资源的资源偏移量;至少一个PDSCH资源中每个PDSCH资源相对最后一个PDSCH资源的资源偏移量;至少一个PDSCH资源中的第一个资源或者最后一个资源或者特定资源;至少一个PDSCH资源的编号;至少一个PDSCH资源的冗余版本信息RV;至少一个PDSCH资源中每个PDSCH资源相对第一个PDSCH资源的RV偏移量;至少一个PDSCH资源中每个PDSCH资源相对特定PDSCH资源的RV偏移量;至少一个PDSCH资源中每个PDSCH资源相对最后一个PDSCH资源的RV偏移量;至少一个PDSCH资源的混合自动重传请求HARQ进程信息;至少一个PDSCH资源中每个PDSCH资源相对第一个PDSCH资源的HARQ进程信息偏移量;至少一个PDSCH资源中每个PDSCH资源相对特定PDSCH资源的HARQ进程信息偏移量;至少一个PDSCH资源中每个PDSCH资源相对最后一个PDSCH资源的HARQ进程信息偏移量;至少一个PDSCH资源中的第一个PDSCH资源的位置;至少一个PDSCH资源中的第一个PDSCH资源的编号;至少一个PDSCH资源中的特定PDSCH资源的位置;至少一个PDSCH资源中的特定PDSCH资源的编号。
一个实施例中,下行控制信息指示以下至少一项:是否包括指示信息;指示信息的内容;承载指示信息的资源;指示信息指示的PDSCH资源;指定PDSCH资源;指示信息的位置;指示信息的占用字节大小;禁用标识或者启用标识;资源情况或资源使用条件。
一个实施例中,资源情况或资源使用条件包括:一个SPS周期内配置多个PDSCH资源;一个PDSCH资源图样内配置多个PDSCH资源;多个PDSCH资源进行数据传输;待传输数据量大于一个PDSCH或指定PDSCH的传输块大小;待传输数据量小于下行资源的全部PDSCH的传输块大小。
一个实施例中,该方法还包括:网络设备或基站进行下行数据传输。
一个实施例中,网络设备或基站进行下行数据传输,包括:网络设备或基站在所有的PDSCH资源上进行数据传输;或者,网络设备或基站在部分的PDSCH资源上进行数据传输;或者,网络设备或基站终止部分的PDSCH资源。
一个实施例中,网络设备或基站在所有的PDSCH资源上进行数据传输,包括:网络设备或基站在一个SPS周期内的所有PDSCH资源上进行数据传输;或者,网络设备或基站在一个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,网络设备或基站在一个PDSCH资源图样内的所有PDSCH资源上进行数据传输;或者,网络设备或基站在一个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输;或者,网络设备或基站在动态调度的多个PDSCH资源内的所有PDSCH资源上进行数据传输;或者,网络设备或基站在动态调度的多个PDSCH资源内的特定位置或标识对应的所有PDSCH资源上进行数据传输;或者,网络设备或基站在多个SPS周期内的所有PDSCH资源上进行数据传输;或者,网络设备或基站在多个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,网络设备或基站在多个PDSCH资源图样内的所有PDSCH资源上进行数据传输;或者,网络设备或基站在多个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输。
一个实施例中,网络设备或基站在部分的PDSCH资源上进行数据传输,包括:网络设备或基站在一个SPS周期内的部分PDSCH资源上进行数据传输;或者,网络设备或基站在一个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,网络设备或基站在一个PDSCH资源图样内的部分PDSCH资源上进行数据传输;或者,网络设备或基站在一个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输;或者,网络设备或基站在动态调度的多个PDSCH资源内的部分PDSCH资源上进行数据传输;或者,网络设备或基站在动态调度的多个PDSCH资源内的特定位置或标识对应的部分PDSCH资源上进行数据传输;或者,网络设备或基站在多个SPS周期内的部分PDSCH资源上进行数据传输;或者,网络设备或基站在多个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,网络设备或基站在多个PDSCH资源图样内的部分PDSCH资源上进行数据传输;或者,网络设备或基站在多个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输。
一个实施例中,该方法还包括:网络设备或基站基于下行资源配置进行下行数据传输。
一个实施例中,网络设备或基站基于下行资源配置进行下行数据传输包括:网络设备或基站基于下行资源配置在所有的PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置在部分的PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置终止部分的PDSCH资源。
一个实施例中,网络设备或基站基于下行资源配置在所有的PDSCH资源上进行数据传输,包括:网络设备或基站基于下行资源配置,在一个SPS周期内的所有PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在一个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,网络设备或基站基于下行资源配置,在一个PDSCH资源图样内的所有PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在一个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在动态调度的多个PDSCH资源内的所有PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在动态调度的多个PDSCH资源内的特定位置或标识对应的所有PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在多个SPS周期内的所有PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在多个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,网络设备或基站基于下行资源配置,在多个PDSCH资源图样内的所有PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在多个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输。
一个实施例中,网络设备或基站基于下行资源配置在部分的PDSCH资源上进行数据传输包括:网络设备或基站基于下行资源配置,在一个SPS周期内的部分PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在一个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,网络设备或基站基于下行资源配置,在一个PDSCH资源图样内的部分PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在一个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在动态调度的多个PDSCH资源内的部分PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在动态调度的多个PDSCH资源内的特定位置或标识对应的部分PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在多个SPS周期内的部分PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在多个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,网络设备或基站基于下行资源配置,在多个PDSCH资源图样内的部分PDSCH资源上进行数据传输;或者,网络设备或基站基于下行资源配置,在多个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输。
一个实施例中,如图10所示,该方法还包括以下至少之一:
S301,确定使用的PDSCH资源和/或不使用的PDSCH资源。
S302,根据使用的PDSCH资源和/或不使用的PDSCH资源,确定第三指示信息或第四指示信息。
一个实施例中,该方法还包括:在使用的PDSCH资源上进行数据传输,和/或,在不使用的PDSCH资源上不进行数据传输,和/或,终止不使用的PDSCH资源。
一个实施例中,该方法还包括:若存在PDSCH资源冲突或复用处理,确定不使用的PDSCH资源为低优先级的资源。
一个实施例中,该方法还包括:确定是否执行以下中至少一个:下发第三指示信息;下发第四指示信息;触发或生成第三指示信息;触发或生成第四指示信息;触发第三指示信息的下发;触发第四指示信息的下发; 确定是否进行资源终止;触发或确定使用的PDSCH资源;触发或确定不使用的PDSCH资源的传输;触发下行数据的传输。
进一步的,可以在UE请求网络发送指示的情况下,网络确定是否执行以下中至少一个:下发第三指示信息;下发第四指示信息;触发或生成第三指示信息;触发或生成第四指示信息;触发第三指示信息的下发;触发第四指示信息的下发;确定是否进行资源终止;触发或确定使用的PDSCH资源;触发或确定不使用的PDSCH资源的传输;触发下行数据的传输。
一个实施例中,指示信息用于UE执行以下中至少一项:确定是否接收PDSCH传输;确定需要执行接收或解码的PDSCH;确定不需要执行接收或解码的PDSCH;确定需要被终止的PDSCH。
在申请本实施例中,针对PDSCH是否传输,另一种实现方式是通过PDCCH或DCI指示目标PDSCH是否传输。
可选的,基站可以在PDCCH携带第四指示信息或者第三指示信息;DCI format承载第一域(第一域可以携带第三指示信息或第四指示信息)。可选的,PDCCH或DCI format,可以是承载动态调度的,或者是激活/去激活CG的,或者,是激活/去激活预配置PDSCH的,或者,是其他用途的等。相应的,UE基于基站指示,确定传输或不传输的PDSCH,和/或,执行传输或drop。
应该理解的是,虽然上述实施例的流程图中的各个步骤按照箭头的指示依次显示,但是这些步骤并不是必然按照箭头指示的顺序依次执行。除非本文中有明确的说明,这些步骤的执行并没有严格的顺序限制,这些步骤可以以其它的顺序执行。而且,上述实施例中的至少一部分步骤可以包括多个子步骤或者多个阶段,这些子步骤或者阶段并不必然是在同一时刻执行完成,而是可以在不同的时刻执行,这些子步骤或者阶段的执行顺序也不必然是依次进行,而是可以与其它步骤或者其它步骤的子步骤或者阶段的至少一部分轮流或者交替地执行。
另外,本申请实施例还提供如下几种不同的数据传输的方法。
实施例一:本实施例针对是UE指示网络设备或基站第一指示信息,该第一指示信息用于指示后续资源是否使用的过程。本实施例中第一指示信息可以和PUSCH资源一起发送(simultaneous indication)。其中,本实施例具体实现以上行预配置传输为例,但也适用其他上行PUSCH传输的情况。此外,可选的,本实施例的逻辑或实现方式也适用于SPS PDSCH或DG PDSCH传输的情况(对应DL,是网络发送指示信息,指示UE所述位置是否传输或drop。相应的,携带指示信息的信道或信息为DL信道或DL信息。可选的,基站在所述位置可以不进行数据发送。可选的,UE根据所述指示,确定是否在所述位置进行接收和/或解码)。
1、UE接收UL资源配置。具体地,包括以下至少之一:
a)、UL资源配置可以为预配置的资源,例如CG配置,或,预配置的PUSCH pattern。
b)、对于UL资源配置,UL资源包括多个PUSCH资源。例如,一个CG周期内有多个PUSCH资源,或者,一个预配置的PUSCH pattern内有多个PUSCH资源。
2、UE使用配置的UL资源进行传输。具体地,UE向网络(如基站)指示第一指示信息,第一指示信息用于指示后续资源是否使用。包括以下至少之一:
a)、第一指示信息指示传输或drop。
b)、第一指示信息指示本周期内的PUSCH资源是否传输或使用,或者,指示后续周期(如下一个最近的周期)的PUSCH资源是否传输或使用,或者,指示本预配置的PUSCH pattern内后续资源是否传输或使用。
c)、第一指示信息可以和PUSCH资源一起发送(simultaneous indication)。第一指示信息,携带在CG-UCI中(CG-UCI用于传输第一指示信息),或者,可以携带在新的MAC CE中(MAC CE用于传输第一指示信息)。
d)、第一指示信息指示后续一个PUSCH是否传输,或者,指示后续连续的PUSCH资源是否传输。
e)、第一指示信息用于指示本周期或本pattern内的后续PUSCH资源是否传输。
f)、第一指示信息携带在特定PUSCH上,例如,首个PUSCH上,或者,某一个PUSCH上。
i、可选的,第一指示信息指示特定PUSCH后的其他PUSCH(例如,本周期、本pattern的,或者,最近的下一个周期的)是否传输(传输或drop)。其指示可以是common的(即针对所有的相关PUSCH的),也可以是针对每一个PUSCH单独指示的。其他PUSCH可以是一个,也可以是多个。
g)、第一指示信息携带在每一个PUSCH上。
i、可选的,第一指示信息指示下一个PUSCH是否传输。或者,
ii、可选的,第一指示信息指示特定PUSCH后的其他PUSCH(本周期,本pattern的,或者,最近的下一个周期的)是否传输(传输或drop)。其他PUSCH可以是多个。
h)、对于指示传输的PUSCH,UE使用PUSCH进行传输
i)、对于指示drop的PUSCH,UE不使用PUSCH进行传输
j)、在满足第一条件的情况下,UE向网络(如基站)指示第一指示信息。第一条件包括以下至少之一:更多的数据或byte需要在一个周期内传输;大于门限的数据量在一个周期传输;小于门限的数据量在一个周期传输;CG-UCI配置被enable;UL资源为预配置的资源;支持新的MAC CE触发或上报;UL资源包括多个PUSCH资源;一个CG周期配置多个CG资源;预配置的PUSCH pattern包括多个PUSCH资源;一个周期内多个PUSCH需要使用;待传输数据量大小大于一个PUSCH或特定PUSCH(如首个)的TBS;待传输数据量大小小于UL资源的全部PUSCH的TBS。
上述实施例中保证了XR或gaming业务的业务传输需求。进一步的,也可以避免资源浪费。需要说明的是,上述实施例一中是以UL为例,但其所有的限定也适用于下行DL,区别在于所有上行的信道、配置周期、调度请求、调度信息等均对应为下行的信道、配置周期、调度请求、调度信息。
实施例二:本实施例针对是UE指示网络第二指示信息,第二指示信息用于指示后续资源是否使用。其中,第二指示信息可以在PUSCH资源发送前发送(early indication)。
具体实现流程如下(以上行预配置传输为例,但也适用其他上行PUSCH传输的情况。此外,可选的, 本实施例的逻辑或实现方式也适用于SPS PDSCH或DG PDSCH传输的情况(对应DL,是网络发送指示信息,指示UE所述位置是否传输或drop。相应的,携带指示信息的信道或信息为DL信道或DL信息。可选的,基站在所述位置可以不进行数据发送。可选的,UE根据所述指示,确定是否在所述位置进行接收和/或解码):
1、UE接收UL资源配置。具体地,包括以下至少之一:
a)、UL资源配置可以为预配置的资源,如CG配置,或,预配置的PUSCH pattern
b)、对UL资源配置,UL资源包括多个PUSCH资源。例如,一个CG周期内有多个PUSCH资源,或者,一个预配置的PUSCH pattern内有多个PUSCH资源。
2、UE使用配置的UL资源进行传输。具体地,UE向网络(如基站)指示第二指示信息,第二指示信息用于指示后续资源是否使用。其包括以下至少之一:
a)、第二指示信息指示传输或drop。
b)、第二指示信息指示本周期内的PUSC H资源是否传输或使用,或者,指示后续周期(如下一个最近的周期)的PUSCH资源是否传输或使用,或者,指示本预配置的PUSCH pattern内后续资源是否传输或使用。
c)、第二指示信息可以在PUSCH资源发送前发送(early indication)。第二指示信息使用新的UCI,或者,SR,或者PUSCH传输,假设UL资源的至少一个周期前有一个PUSCH资源,可以使用该PUSCH传输第二信息,如在PUSCH携带MAC CE,或CG-UCI。其中,新的UCI,或者,SR,或者PUSCH为与UL资源配置之前存在固定offset的资源。
d)、第二指示信息指示最近一个UL资源是否传输,或者,指示最近一个周期的PUSCH是否传输,或者,指示后续一个PUSCH是否传输,或者,指示后续连续的PUSCH资源是否传输。
e)、第二指示信息用于指示最近一个周期的PUSCH或者UL资源配置的PUSCH资源是否传输。PUSCH可以是一个或多个PUSCH资源,则第一指示信息可以是common的信息,也可是针对至少一个PUSCH分别指示的。其他PUSCH可以是特定PSUCH之后的PUSCH资源。
f)、对于指示传输的PUSCH,UE使用PUSCH进行传输。
g)、对于指示drop的PUSCH,UE不使用PUSCH进行传输。
h)、在满足第二条件的情况下,UE向网络(如基站)指示第二指示信息。第二条件包括以下至少之一:更多的数据或byte需要在一个周期内传输;大于门限的数据量在一个周期传输;小于门限的数据量在一个周期传输;传输第二指示信息的资源配置被配置或被enable;支持新的MAC CE触发或上报;UL资源为预配置的资源;UL资源包括多个PUSCH资源;一个CG周期配置多个CG资源;预配置的PUSCH pattern包括多个PUSCH资源;一个周期内多个PUSCH需要使用;待传输数据量大小大于一个PUSCH或特定PUSCH(如首个)的TBS;待传输数据量大小小于UL资源的全部PUSCH的TBS。
上述实施例中保证了XR或gaming业务的业务传输需求。进一步的,也可以避免资源浪费。上述实施例二与上述实施例一相同,均是以UL为例,但其所有的限定也适用于下行DL,区别在于所有上行的信道、配置周期、调度请求、调度信息等均对应为下行的信道、配置周期、调度请求、调度信息。
实施例三:本实施例针对的是资源配置的实现过程的说明。(以UL为例中的CG配置为例,可以适用于下行SPS,也同样适用于上行和下行预配置pattern的情况。可选的,也可以适用于DG调度的case,如一个DCI调度多个PUSCH,和/或,调度多个PDSCH的case;又如一个PDCCH调度多个PUSCH,和/或,调度多个PDSCH的case,又如一个PDCCH激活或去激活多个PUSCH,和/或,激活或去激活多个PDSCH的case)
其中,一个CG/SPS周期中配置多个资源,如多个PUSCH资源,或多个PDSCH资源;其中,一个预配置的PUSCH pattern也包括多个PUSCH资源,多个PUSCH资源之间的间隔可以是等间隔,也可以是非等间距的,预配置pattern的可以是周期的,也可以是非周期的。其中,下述实现过程中,若使用的是预配置pattern的情况,则下述配置或参数均修改为是针对预配置pattern的即可(例如,CG周期->预配置pattern周期。)
1、UE接收CG配置,包括以下至少之一:
a)、UE接收来自基站的CG配置。CG配置包括以下至少之一:
i、CG index。
ii、CG周期。
iii、CG周期内的资源个数,如PUSCH或CG PUSCH资源个数。
iv、对一个CG周期,多个PUSCH或CG PUSCH资源的起始位置,和/或,终止位置。或者,多个PUSCH或CG PUSCH资源的时域和/或频域资源信息。例如,一个PUSCH或CG PUSCH资源的时域和/或频域资源信息;其他PUSCH或CG PUSCH资源的时域和/或频域资源信息针对第一个PUSCH或CG PUSCH资源的offset;或者,每一个PUSCH或CG PUSCH资源的时域和/或频域资源信息。
v、对一个CG周期,多个PUSCH或CG PUSCH资源,哪个PUSCH或CG PSUCH资源是第一个资源,或者,哪个PUSCH或CG PSUCH资源是最后一个资源,或者,每个PUSCH或CG PSUCH资源的编号。
vi、对一个CG周期,多个PUSCH或CG PUSCH资源的的RV信息。例如,每一个的RV信息,或者,第一个的RV信息以及后面每个针对第一个的offset信息。
vii、对一个CG周期,多个PUSCH或CG PUSCH资源的HARQ进程信息。例如,每一个的HARQ进程信息,或者,第一个的HARQ进程信息以及后面每个针对第一个的offset信息。
viii、对一个CG周期,CG-UCI的配置信息。包括以下至少之一:
(1)可以是针对特定CG PUSCH的(如周期内首个资源的,或,最后一个资源的,或,CG PUSCH index最小的资源的等等),也可是针对每一个CG PUSCH的。
(2)CG UCI配置包括第一指示信息的位置和/或占用bit大小。
(3)CG UCI配置包括第二指示信息的位置和/或占用bit大小。
(4)CG-UCI配置包括enable或disable指示,或者,包括,使用条件;其中,使用条件例如为:一个 CG周期配置多个CG资源,和/或,多个PUSCH需要使用,和/或,待传输数据量大小大于一个PUSCH或特定PUSCH的TBS,和/或,待传输数据量大小小于UL资源的全部PUSCH的TBS。
2、UE使用CG配置,进行UL传输。包括以下至少之一:
a)、使用所有的PUSCH资源进行传输。
i、使用所有的PUSCH资源进行传输,针对一个周期,或,针对该CG index(即该CG配置)进行传输。
b)、使用部分的PUSCH资源进行传输。
i、使用部分的PUSCH资源进行传输,针对一个周期,或,针对该CG index(即该CG配置)进行传输。
ii、确定使用或不使用的CG PUSCH资源,并上报给网络设备或基站。
可选的,基站根据该上报信息,确定哪些CG PUSCH资源可用,或者,那些PUSCH资源不可用。在确定可用的时候,基站可以在相应的资源进行接收或解码。在确定不可用的时候,基站可以在相应的资源不进行接收或解码或配置该资源位置给其他UE或调度该资源位置给其他UE。
iii、可选的,在资源冲突或复用处理时,UE可以认为不使用的资源为低优先的资源。
上述实施例中保证了XR或gaming业务的业务传输需求。进一步的,也可以避免资源浪费。
在一种实施例中,如图11所示,本申请实施例还提供了一种数据传输的装置,该装置包括:
指示信息发送模块,用于发送指示信息,指示信息用于指示是否使用目标资源进行数据传输。
在一种实施例中,是否使用目标资源进行数据传输包括以下至少之一:目标资源是否进行数据传输;目标资源是否终止;是否使用目标资源。
在一种实施例中,指示信息用于指示以下至少之一:目标资源中的至少一个资源进行数据传输或不被终止;目标资源中的全部资源进行数据传输或不被终止;目标资源中的至少一个资源不进行数据传输或被终止;目标资源中的全部资源不进行数据传输或被终止。
在一种实施例中,目标资源为以下至少一种:第一周期内的资源;第一周期之后的第二周期内的资源;配置的PUSCH资源图样内的资源;指示信息之后的一个或多个周期的资源;指示信息之后的一个或多个PUSCH资源图样内的资源;配置的PDSCH资源图样内的资源;指示信息之后的一个或多个PDSCH资源图样内的资源;一个或多个配置授权CG资源;至少一个周期的一个或多个CG资源;一个或多个半持续调度SPS资源;至少一个周期的一个或多个SPS资源;动态调度资源。
在一种实施例中,是否使用目标资源进行数据传输,包括:是否使用目标资源进行数据发送,和/或,是否使用目标资源进行数据接收。
在一种实施例中,指示信息发送模块还用于以下至少之一:发送第一指示信息,第一指示信息与第一PUSCH资源一起发送;发送第二指示信息,第二指示信息在第二PUSCH资源之前发送;发送第一指示信息,第一指示信息在第一CG周期内或第一PUSCH资源图样内发送;发送第二指示信息,第二指示信息在第二CG周期内或第二PUSCH资源图样之前发送;发送第三指示信息,第三指示信息与第一PDSCH资源一起发送;发送第四指示信息,第四指示信息在第二PDSCH资源之前发送;发送第三指示信息,第三指示信息在第一SPS周期内或第一PDSCH资源图样内发送;发送第四指示信息,第四指示信息在第二SPS周期内或第二PDSCH资源图样之前发送;发送第一指示信息,第一指示信息与第一动态调度资源一起发送;发送第二指示信息,第二指示信息在第一动态调度资源之前发送;发送第三指示信息,第三指示信息与第二动态调度资源一起发送;发送第四指示信息,第四指示信息在第二动态调度资源之前发送。
在一种实施例中,指示信息发送模块包括第一指示信息发送单元,用于向网络设备或基站发送第一指示信息。
在一种实施例中,第一指示信息携带于以下至少之一:第一指示信息携带于CG上行控制信息中;第一指示信息携带于新的MAC控制单元中;第一指示信息携带于无线资源控制消息中。
在一种实施例中,该装置还包括:触发模块,用于在满足第一条件的情况下,触发第一指示信息生成,和/或,触发第一指示信息上报。
在一种实施例中,第一指示信息发送单元,还用于在满足第一条件的情况下,和/或,有可用上行传输资源的情况下,向网络设备或基站发送第一指示信息。
在一种实施例中,第一条件包括以下至少一项:大于预设量的数据量或字节数或比特数需要在一个周期内传输;大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;大于第一门限的数据量在一个周期内传输;小于第二门限的数据量在一个周期内传输;CG上行控制信息被配置或激活;DG上行控制信息被配置或激活;上行控制信息配置被禁用;上行资源为预配置的资源;支持新的MAC控制单元触发或上报;网络或基站激活或使能指示信息上报;支持指示信息上报;上行资源包括多个PUSCH资源;一个传输周期内配置多个传输资源;预配置的PUSCH资源图样包括多个PUSCH资源;一个周期内需要多个PUSCH进行数据传输;预配置的PUSCH资源图样内需要多个PUSCH进行数据传输;待传输数据量大于一个PUSCH资源或指定PUSCH资源的传输块大小;待传输数据量小于所有PUSCH资源的传输块大小;待传输数据量发生变化;待传输的资源或需使用的传输资源发生变化;动态调度的资源内包括多个PUSCH资源;第一指示信息生成或触发或待定。
在一种实施例中,第一指示信息发送单元,还用于在第一PUSCH资源上向网络设备或基站发送第一指示信息;第一指示信息用于指示第一PUSCH资源后的资源是否使用。
在一种实施例中,第一PUSCH资源后的资源为以下中的至少一个:第三周期内的PUSCH资源;配置的PUSCH资源图样内的PUSCH资源;动态调度的多个PUSCH资源;第一PUSCH资源之后的动态调度的多个PUSCH资源;多个周期内的PUSCH资源;配置的多个PUSCH资源图样内的PUSCH资源;第一PUSCH资源之后的多个周期内的PUSCH资源;第一PUSCH资源之后的配置的多个PUSCH资源图样内的PUSCH资源;第三周期内第一PUSCH资源之后的PUSCH资源;配置的PUSCH资源图样内第一PUSCH资源后的PUSCH资源。
在一种实施例中,第一PUSCH资源后的资源为以下中的至少一个:第一PUSCH资源后的全部PUSCH资源;第一PUSCH资源后的至少一个或特定个数的PUSCH资源;第一PUSCH资源后的一个PUSCH资源; 第一PUSCH资源后的多个连续的PUSCH资源;第一PUSCH资源后的多个不连续的PUSCH资源。
在一种实施例中,第一指示信息用于指示以下中至少一个:第一PUSCH资源后的资源中的全部资源是否进行数据传输;第一PUSCH资源后的资源中的每一个资源是否进行数据传输;第一PUSCH资源后的资源中的多个资源是否进行数据传输;第一PUSCH资源后的资源中的一个资源是否进行数据传输;第一PUSCH资源后的资源中的特定PUSCH资源;目标资源全部是否进行数据传输;目标资源中的一个或特定一个是否进行数据传输;目标资源中的多个或特定多个是否进行数据传输;目标资源中的每一个是否进行数据传输。
在一种实施例中,第一PUSCH资源为一个或者多个;则第一指示信息携带在一个第一PUSCH资源上或者携带在多个第一PUSCH资源上。
在一种实施例中,第一指示信息发送单元,还用于以下之一:在一个第一PUSCH上向网络设备或基站发送第一指示信息;在多个第一PUSCH上向网络设备或基站发送第一指示信息;在每一个PUSCH上向网络设备或基站发送第一指示信息;在特定第一PUSCH上向网络设备或基站发送第一指示信息;
一种实施例中,第一指示信息用于指示以下至少一个:指示第一PUSCH之后的下一个PUSCH是否进行数据传输;指示第一PUSCH之后的CG周期内全部的PUSCH是否进行数据传输;指示第一PUSCH之后的PUSCH资源图样内全部的PUSCH是否进行数据传输;指示第一PUSCH之后的指定位置的PUSCH是否进行数据传输。
在一种实施例中,指示信息发送模块包括第二指示信息发送单元,用于向网络设备或基站发送第二指示信息,第二指示信息在目标传输资源或目标传输信息承载。
在一种实施例中,第二指示信息发送单元,还用于向网络设备或基站发送第二指示信息,第二指示信息在第二PUSCH资源之前的目标传输资源或目标传输信息承载;或者,向网络设备或基站发送第二指示信息,第二指示信息在第二PUSCH资源之前的目标传输资源或目标传输信息上发送。
在一种实施例中,第二PUSCH资源为以下中的至少一个:CG周期前的PUSCH资源;PUSCH资源图样前的PUSCH资源;特定CG周期前的PUSCH资源;特定PUSCH资源图样前的PUSCH资源;第一个位置的PUSCH资源;特定位置的PUSCH资源;动态调度的多个PUSCH资源。
在一种实施例中,目标传输资源或目标传输信息包括以下至少之一:PUCCH资源、上行控制信息、调度请求、PUSCH、MAC控制单元、无线资源控制。
在一种实施例中,目标传输资源与第二PUSCH资源之间存在固定偏移量;或者,目标传输资源与上行资源配置之间存在固定偏移量;上行资源配置为与第二PUSCH资源对应的上行资源配置。
在一种实施例中,第二指示信息用于指示CG周期或PUSCH资源图样内的资源是否进行数据传输;或者,第二指示信息用于指示动态调度的多个PUSCH资源是否进行数据传输。
在一种实施例中,第二指示信息指示的资源为以下中的至少一个:与目标传输资源或目标传输信息最近的CG周期或PUSCH资源图样内的资源;目标传输资源或目标传输信息之后的一个CG周期或PUSCH资源图样内的资源;目标传输资源或目标传输信息之后的多个CG周期或PUSCH资源图样内的资源;第二PUSCH资源对应CG周期或PUSCH资源图样内的资源;目标传输资源或目标传输信息之后的动态调度的多个PUSCH资源内的资源;第二PUSCH资源对应的动态调度的多个PUSCH资源内的资源。
在一种实施例中,第二指示信息指示的资源包括以下中的至少一个:CG周期或PUSCH资源图样内的一个PUSCH资源;CG周期或PUSCH资源图样内的多个PUSCH资源;CG周期或PUSCH资源图样内的特定PUSCH资源;CG周期或PUSCH资源图样内的多个连续PUSCH资源;CG周期或PUSCH资源图样内的多个不连续PUSCH资源;CG周期或PUSCH资源图样内的全部PUSCH资源动态调度的多个PUSCH资源内的一个或多个PUSCH资源;动态调度的多个PUSCH资源内的特定的PUSCH资源;目标资源全部是否进行数据传输;目标资源中的一个或特定一个是否进行数据传输;目标资源中的多个或特定多个是否进行数据传输;目标资源中的每一个是否进行数据传输。
在一种实施例中,第二指示信息用于指示以下中任一个:CG周期或PUSCH资源图样内的资源中的全部资源是否进行数据传输;CG周期或PUSCH资源图样内的资源中的每一个资源是否进行数据传输;CG周期或PUSCH资源图样内的资源中的多个资源是否进行数据传输;CG周期或PUSCH资源图样内的资源中的一个资源是否进行数据传输;CG周期或PUSCH资源图样内的资源中的特定资源是否进行数据传输;动态调度的多个PUSCH资源中的多个资源是否进行数据传输;动态调度的多个PUSCH资源中的特定资源是否进行数据传输;动态调度的多个PUSCH资源中的一个资源是否进行数据传输;动态调度的多个PUSCH资源中的每一个资源是否进行数据传输;动态调度的多个PUSCH资源中的全部资源是否进行数据传输;下一个上行资源是否进行数据传输;第四周期或资源图样的资源是否进行数据传输。
在一种实施例中,第二指示信息发送单元,还用于在满足第二条件的情况下,执行触发第二指示信息、上报第二指示信息、向网络设备或基站发送第二指示信息中至少一个。
在一种实施例中,第二条件包括以下中的至少一个:大于预设量的数据量或字节数或比特数需要在一个周期内传输;大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;大于第三门限的数据量在一个周期传输;小于第四门限的数据量在一个周期传输;传输第二指示信息的资源配置被允许或者被禁用;网络或基站激活或使能指示信息上报;支持指示信息上报;支持新的MAC控制单元触发或上报;上行资源为预配置的资源;上行资源包括多个PUSCH资源;一个传输周期内配置多个传输资源;预配置的PUSCH资源图样包括多个PUSCH资源;一个周期内需要多个PUSCH进行数据传输;预配置的PUSCH资源图样内需要多个PUSCH进行数据传输;动态调度的资源内包括多个PUSCH资源;第二指示信息生成或触发或待定;待传输数据量大于一个PUSCH资源或指定PUSCH资源的传输块大小;待传输数据量小于所有PUSCH资源的传输块大小;待传输数据量发生变化;待传输的资源或需使用的传输资源发生变化;存在可用的上行传输资源;存在可用的新传输资源。
在一种实施例中,该装置还包括:接收模块,用于接收网络设备或基站发送的上行资源配置。
在一种实施例中,接收模块还用于基于上行资源配置向网络设备或基站发送第一指示信息或第二指示信 息。
在一种实施例中,上行资源配置包括预配置资源或动态调度的资源。
在一种实施例中,动态调度的资源包括多个PUSCH资源。
在一种实施例中,预配置资源包括CG或预配置的PUSCH资源图样。
在一种实施例中,上行资源配置指示一个CG周期内包括多个PUSCH资源,和/或,一个PUSCH资源图样内包括多个PUSCH资源。
在一种实施例中,上行资源配置包括以下至少一项:CG标识;CG周期;CG周期内的PUSCH资源的数量;一个CG周期内的至少一个PUSCH资源的资源信息;一个CG周期内的上行控制信息;CG PUSCH资源的上行控制信息;PUSCH资源图样标识;PUSCH资源图样周期或非周期;PUSCH资源图样内的PUSCH资源的数量;一个PUSCH资源图样内的至少一个PUSCH资源的资源信息;一个PUSCH资源图样内的上行控制信息;PUSCH资源图样内的PUSCH资源的上行控制信息;动态调度的多个PUSCH资源的上行控制信息;动态调度的多个PUSCH资源的至少一个PUSCH资源信息;动态调度的多个PUSCH资源的PUSCH资源的数量。
在一种实施例中,至少一个PUSCH资源的资源信息包括以下至少一项:至少一个PUSCH资源的起始位置;至少一个PUSCH资源的终止位置;至少一个PUSCH资源的时域和频域资源信息;至少一个PUSCH资源中每个PUSCH资源相对第一个PUSCH资源的资源偏移量;至少一个PUSCH资源中每个PUSCH资源相对特定PUSCH资源的资源偏移量;至少一个PUSCH资源中每个PUSCH资源相对最后一个PUSCH资源的资源偏移量;至少一个PUSCH资源中的第一个资源或者最后一个资源或者特定资源;至少一个PUSCH资源的编号;至少一个PUSCH资源的冗余版本信息RV;至少一个PUSCH资源中每个PUSCH资源相对第一个PUSCH资源的RV偏移量;至少一个PUSCH资源中每个PUSCH资源相对特定PUSCH资源的RV偏移量;至少一个PUSCH资源中每个PUSCH资源相对最后一个PUSCH资源的RV偏移量;至少一个PUSCH资源的混合自动重传请求HARQ进程信息;至少一个PUSCH资源中每个PUSCH资源相对第一个PUSCH资源的HARQ进程信息偏移量;至少一个PUSCH资源中每个PUSCH资源相对特定PUSCH资源的HARQ进程信息偏移量;至少一个PUSCH资源中每个PUSCH资源相对最后一个PUSCH资源的HARQ进程信息偏移量;至少一个PUSCH资源中的第一个PUSCH资源的位置;至少一个PUSCH资源中的第一个PUSCH资源的编号;至少一个PUSCH资源中的特定PUSCH资源的位置;至少一个PUSCH资源中的特定PUSCH资源的编号。
在一种实施例中,上行控制信息指示以下至少一项:是否包括指示信息;指示信息的内容;承载指示信息的资源;指示信息指示的PUSCH资源;指定PUSCH资源;指示信息的位置;指示信息的占用字节大小;禁用标识或者启用标识;资源情况或资源使用条件。
在一种实施例中,资源情况或资源使用条件包括:一个CG周期内配置多个PUSCH资源;一个PUSCH资源图样内配置多个PUSCH资源;多个PUSCH资源进行数据传输;待传输数据量大于一个PUSCH或指定PUSCH的传输块大小;待传输数据量小于上行资源的全部PUSCH的传输块大小。
在一种实施例中,该装置还包括:传输模块,用于基于上行资源配置进行上行数据传输。
在一种实施例中,上行传输模块包括第一传输单元,用于还用于基于上行资源配置在所有的PUSCH资源上进行数据传输;或者,第二传输单元,用于基于上行资源配置在部分的PUSCH资源上进行数据传输;或者,基于上行资源配置终止部分的PUSCH资源。
在一种实施例中,第一传输单元,还用于基于上行资源配置,在一个CG周期内的所有PUSCH资源上进行数据传输;或者,基于上行资源配置,在一个CG周期内的特定位置或标识对应的PUSCH资源上进行数据传输,或者,基于上行资源配置,在一个PUSCH资源图样内的所有PUSCH资源上进行数据传输;或者,基于上行资源配置,在一个PUSCH资源图样内的特定位置或标识对应的PUSCH资源上进行数据传输;或者,基于上行资源配置,在动态调度的多个PUSCH资源内的所有PUSCH资源上进行数据传输;或者,基于上行资源配置,在动态调度的多个PUSCH资源内的特定位置或标识对应的所有PUSCH资源上进行数据传输;或者,基于上行资源配置,在多个CG周期内的所有PUSCH资源上进行数据传输;或者,基于上行资源配置,在多个CG周期内的特定位置或标识对应的PUSCH资源上进行数据传输,或者,基于上行资源配置,在多个PUSCH资源图样内的所有PUSCH资源上进行数据传输;或者,基于上行资源配置,在多个PUSCH资源图样内的特定位置或标识对应的PUSCH资源上进行数据传输。
在一种实施例中,第二传输单元,还用于基于上行资源配置,在一个CG周期内的部分PUSCH资源上进行数据传输;或者,基于上行资源配置,在一个CG周期内的特定位置或标识对应的部分PUSCH资源上进行数据传输,或者,基于上行资源配置,在一个PUSCH资源图样内的部分PUSCH资源上进行数据传输;或者,基于上行资源配置,在一个PUSCH资源图样内的特定位置或标识对应的部分PUSCH资源上进行数据传输;或者,基于上行资源配置,在动态调度的多个PUSCH资源内的部分PUSCH资源上进行数据传输;或者,基于上行资源配置,在动态调度的多个PUSCH资源内的特定位置或标识对应的部分PUSCH资源上进行数据传输;或者,基于上行资源配置,在多个CG周期内的部分PUSCH资源上进行数据传输;或者,基于上行资源配置,在多个CG周期内的特定位置或标识对应的部分PUSCH资源上进行数据传输,或者,基于上行资源配置,在多个PUSCH资源图样内的部分PUSCH资源上进行数据传输;或者,基于上行资源配置,在多个PUSCH资源图样内的特定位置或标识对应的部分PUSCH资源上进行数据传输。
在一种实施例中,该装置还包括第一确定模块,用于确定使用的PUSCH资源和/或不使用的PUSCH资源;根据使用的PUSCH资源和/或不使用的PUSCH资源,确定第一指示信息或第二指示信息。
在一种实施例中,该装置还包括:第一执行模块,用于在使用的PUSCH资源上进行数据传输,和/或,在不使用的PUSCH资源上不进行数据传输,和/或,终止不使用的PUSCH资源。
在一种实施例中,该装置还包括第二确定模块,用于若存在PUSCH资源冲突或复用处理,确定不使用的PUSCH资源为低优先级的资源。
在一种实施例中,该装置还包括第三确定模块,用于基于网络设备或基站的指示,确定是否执行以下中 至少一个:上报第一指示信息;上报第二指示信息;触发或生成第一指示信息;触发或生成第二指示信息;触发第一指示信息的上报;触发第二指示信息的上报;确定是否进行资源终止;触发或确定使用的PUSCH资源;触发或确定不使用的PUSCH资源的传输;触发上行数据的传输。
在一种实施例中,指示信息用于指示网络或基站执行以下中至少一项:确定是否接收PUSCH传输;确定需要执行接收或解码的PUSCH;确定不需要执行接收或解码的PUSCH;确定需要被终止的PUSCH。
在一种实施例中,指示信息发送模块包括第三指示信息发送单元,用于向UE发送第三指示信息。
在一种实施例中,第三指示信息携带于以下至少之一:第三指示信息携带于PDCCH中;第三指示信息携带于SPS中;第三指示信息携带于下行动态调度的PDSCH中;第三指示信息携带于SPS下行控制信息中;第三指示信息携带于新的MAC控制单元中;第三指示信息携带于无线资源控制消息中。
在一种实施例中,第三指示信息发送单元,还用于在满足第三条件的情况下,触发第三指示信息生成,和/或,触发第三指示信息下发。
在一种实施例中,第三指示信息发送单元,还用于在满足第三条件的情况下,和/或,有可用下行传输资源的情况下,向UE发送第三指示信息。
在一种实施例中,第三条件包括以下至少一项:大于预设量的数据量或字节数或比特数需要在一个周期内传输;大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;大于第一门限的数据量在一个周期内传输;小于第二门限的数据量在一个周期内传输;SPS下行控制信息被配置或激活;动态调度下行控制信息被配置或激活;下行控制信息配置被禁用;下行资源为预配置的资源;支持新的MAC控制单元触发或下发;网络或基站激活或使能指示信息下发;支持指示信息下发;下行资源包括多个PDSCH资源;一个传输周期内配置多个传输资源;预配置的PDSCH资源图样包括多个PDSCH资源;一个周期内需要多个PDSCH进行数据传输;预配置的PDSCH资源图样内需要多个PDSCH进行数据传输;待传输数据量大于一个PDSCH资源或指定PDSCH资源的传输块大小;待传输数据量小于所有PDSCH资源的传输块大小;待传输数据量发生变化;待传输的资源或需使用的传输资源发生变化;动态调度的资源内包括多个PDSCH资源;第三指示信息生成或触发或待定。
在一种实施例中,第三指示信息发送单元,还用于在第一PDSCH资源上向UE发送第三指示信息;第三指示信息用于指示第一PDSCH资源后的资源是否使用。
在一种实施例中,第一PDSCH资源后的资源为以下中的至少一个:第三周期内的PDSCH资源;配置的PDSCH资源图样内的PDSCH资源;动态调度的多个PDSCH资源;第一PDSCH资源之后的动态调度的多个PDSCH资源;多个周期内的PDSCH资源;配置的多个PDSCH资源图样内的PDSCH资源;第一PDS CH资源之后的多个周期内的PDSCH资源;第一PDSCH资源之后的配置的多个PDSCH资源图样内的PDS CH资源;第三周期内第一PDSCH资源之后的PDSCH资源;配置的PDSCH资源图样内第一PDSCH资源后的PDSCH资源。
在一种实施例中,第一PDSCH资源后的资源为以下中的至少一个:第一PDSCH资源后的全部PDSCH资源;第一PDSCH资源后的至少一个或特定个数的PDSCH资源;第一PDSCH资源后的一个PDSCH资源;第一PDSCH资源后的多个连续的PDSCH资源;第一PDSCH资源后的多个不连续的PDSCH资源。
在一种实施例中,第三指示信息用于指示以下中任一个:第一PDSCH资源后的资源中的全部资源是否进行数据传输;第一PDSCH资源后的资源中的每一个资源是否进行数据传输;第一PDSCH资源后的资源中的多个资源是否进行数据传输;第一PDSCH资源后的资源中的一个资源是否进行数据传输;第一PDSC H资源后的资源中的特定PDSCH资源;目标资源全部是否进行数据传输;目标资源中的一个或特定一个是否进行数据传输;目标资源中的多个或特定多个是否进行数据传输;目标资源中的每一个是否进行数据传输。
在一种实施例中,第一PDSCH资源为一个或者多个;则第三指示信息携带在一个第一PDSCH资源上或者携带在多个第一PDSCH资源上。
在一种实施例中,第三指示信息发送单元,还用于在一个第一PDSCH上向UE发送第三指示信息;在多个第一PDSCH上向UE发送第三指示信息;在每一个PDSCH上向UE发送第三指示信息;在特定第一PDSCH上向UE发送第三指示信息。
在一种实施例中,第三指示信息用于指示以下至少一个:指示第一PDSCH之后的下一个PDSCH是否进行数据传输;指示第一PDSCH之后的SPS周期内全部的PDSCH是否进行数据传输;指示第一PDSCH之后的PDSCH资源图样内全部的PDSCH是否进行数据传输;指示第一PDSCH之后的指定位置的PDSCH是否进行数据传输。
在一种实施例中,指示信息发送模块包括第四指示信息发送单元,用于向UE发送第四指示信息,第四指示信息在目标传输资源或目标传输信息承载。
在一种实施例中,第四指示信息发送单元,还用于向UE发送第四指示信息,第四指示信息在第二PDSCH资源之前的目标传输资源或目标传输信息承载;或者,向UE发送第四指示信息,第四指示信息在第二PDSCH资源之前的目标传输资源或目标传输信息上发送。
在一种实施例中,第二PDSCH资源为以下中的至少一个:SPS周期前的PDSCH资源;PDSCH资源图样前的PDSCH资源;特定SPS周期前的PDSCH资源;特定PDSCH资源图样前的PDSCH资源;第一个位置的PDSCH资源;特定位置的PDSCH资源;动态调度的多个PDSCH资源。
在一种实施例中,目标传输资源或目标传输信息包括以下至少之一:PDCCH资源、下行控制信息、调度请求、PDSCH、MAC控制单元、无线资源控制。
在一种实施例中,目标传输资源与第二PDSCH资源之间存在固定偏移量;或者,目标传输资源与下行资源配置之间存在固定偏移量;下行资源配置为与第二PDSCH资源对应的下行资源配置。
在一种实施例中,第四指示信息用于指示SPS周期或PDSCH资源图样内的资源是否进行数据传输;或者,第四指示信息用于指示动态调度的多个PDSCH资源是否进行数据传输。
在一种实施例中,第四指示信息指示的资源为以下中的至少一个:与目标传输资源或目标传输信息最近的SPS周期或PDSCH资源图样内的资源;目标传输资源或目标传输信息之后的一个SPS周期或PDSCH资 源图样内的资源;目标传输资源或目标传输信息之后的多个SPS周期或PDSCH资源图样内的资源;第二PDSCH资源对应SPS周期或PDSCH资源图样内的资源;目标传输资源或目标传输信息之后的动态调度的多个PDSCH资源内的资源;第二PDSCH资源对应的动态调度的多个PDSCH资源内的资源。
在一种实施例中,第四指示信息指示的资源包括以下中的至少一个:SPS周期或PDSCH资源图样内的一个PDSCH资源;SPS周期或PDSCH资源图样内的多个PDSCH资源;SPS周期或PDSCH资源图样内的特定PDSCH资源;SPS周期或PDSCH资源图样内的多个连续PDSCH资源;SPS周期或PDSCH资源图样内的多个不连续PDSCH资源;SPS周期或PDSCH资源图样内的全部PDSCH资源;动态调度的多个PDSCH资源内的一个或多个PDSCH资源;动态调度的多个PDSCH资源内的特定的PDSCH资源;目标资源全部是否进行数据传输;目标资源中的一个或特定一个是否进行数据传输;目标资源中的多个或特定多个是否进行数据传输;目标资源中的每一个是否进行数据传输。
在一种实施例中,第四指示信息用于指示以下中任一个:SPS周期或PDSCH资源图样内的资源中的全部资源是否进行数据传输;SPS周期或PDSCH资源图样内的资源中的每一个资源是否进行数据传输;SPS周期或PDSCH资源图样内的资源中的多个资源是否进行数据传输;SPS周期或PDSCH资源图样内的资源中的一个资源是否进行数据传输;SPS周期或PDSCH资源图样内的资源中的特定资源是否进行数据传输;动态调度的多个PDSCH资源中的多个资源是否进行数据传输;动态调度的多个PDSCH资源中的特定资源是否进行数据传输;动态调度的多个PDSCH资源中的一个资源是否进行数据传输;动态调度的多个PDSCH资源中的每一个资源是否进行数据传输;动态调度的多个PDSCH资源中的全部资源是否进行数据传输;下一个下行资源是否进行数据传输;第四周期或资源图样的资源是否进行数据传输。
在一种实施例中,第四指示信息发送单元,还用于在满足第四条件的情况下,执行触发第四指示信息、下发第四指示信息、向UE发送第四指示信息中至少一个。
在一种实施例中,第四条件包括以下中的至少一个:大于预设量的数据量或字节数或比特数需要在一个周期内传输;大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;大于第三门限的数据量在一个周期传输;小于第四门限的数据量在一个周期传输;传输第四指示信息的资源配置被允许或者被禁用;网络或基站激活或使能指示信息下发;支持指示信息下发;支持新的MAC控制单元触发或下发;下行资源为预配置的资源;下行资源包括多个PDSCH资源;一个传输周期内配置多个传输资源;预配置的PDSCH资源图样包括多个PDSCH资源;一个周期内需要多个PDSCH进行数据传输;预配置的PDSCH资源图样内需要多个PDSCH进行数据传输;动态调度的资源内包括多个PDSCH资源;第四指示信息生成或触发或待定;待传输数据量大于一个PDSCH资源或指定PDSCH资源的传输块大小;待传输数据量小于所有PDSCH资源的传输块大小;待传输数据量发生变化;待传输的资源或需使用的传输资源发生变化;存在可用的下行传输资源;存在可用的新传输资源。
在一种实施例中,该装置还包括配置发送模块,用于向UE发送下行资源配置。
在一种实施例中,配置发送模块,还用于基于下行资源配置向UE发送第三指示信息或第四指示信息。
在一种实施例中,下行资源配置包括预配置资源或动态调度的资源。
在一种实施例中,动态调度的资源包括多个PDSCH资源。
在一种实施例中,预配置资源包括SPS或预配置的PDSCH资源图样。
在一种实施例中,下行资源配置指示一个SPS周期内包括多个PDSCH资源,和/或,一个PDSCH资源图样内包括多个PDSCH资源。
在一种实施例中,下行资源配置包括以下至少一项:SPS标识;SPS周期;SPS周期内的PDSCH资源的数量;一个SPS周期内的至少一个PDSCH资源的资源信息;一个SPS周期内的下行控制信息;SPS PDSCH资源的下行控制信息;PDSCH资源图样标识;PDSCH资源图样周期或非周期;PDSCH资源图样内的PDSCH资源的数量;一个PDSCH资源图样内的至少一个PDSCH资源的资源信息;一个PDSCH资源图样内的下行控制信息;PDSCH资源图样内的PDSCH资源的下行控制信息;动态调度的多个PDSCH资源的下行控制信息;动态调度的多个PDSCH资源的至少一个PDSCH资源信息;动态调度的多个PDSCH资源的PDSCH资源的数量。
在一种实施例中,至少一个PDSCH资源的资源信息包括以下至少一项:至少一个PDSCH资源的起始位置;至少一个PDSCH资源的终止位置;至少一个PDSCH资源的时域和频域资源信息;至少一个PDSCH资源中每个PDSCH资源相对第一个PDSCH资源的资源偏移量;至少一个PDSCH资源中每个PDSCH资源相对特定PDSCH资源的资源偏移量;至少一个PDSCH资源中每个PDSCH资源相对最后一个PDSCH资源的资源偏移量;至少一个PDSCH资源中的第一个资源或者最后一个资源或者特定资源;至少一个PDSCH资源的编号;至少一个PDSCH资源的冗余版本信息RV;至少一个PDSCH资源中每个PDSCH资源相对第一个PDSCH资源的RV偏移量;至少一个PDSCH资源中每个PDSCH资源相对特定PDSCH资源的RV偏移量;至少一个PDSCH资源中每个PDSCH资源相对最后一个PDSCH资源的RV偏移量;至少一个PDSCH资源的混合自动重传请求HARQ进程信息;至少一个PDSCH资源中每个PDSCH资源相对第一个PDSCH资源的HARQ进程信息偏移量;至少一个PDSCH资源中每个PDSCH资源相对特定PDSCH资源的HARQ进程信息偏移量;至少一个PDSCH资源中每个PDSCH资源相对最后一个PDSCH资源的HARQ进程信息偏移量;至少一个PDSCH资源中的第一个PDSCH资源的位置;至少一个PDSCH资源中的第一个PDSCH资源的编号;至少一个PDSCH资源中的特定PDSCH资源的位置;至少一个PDSCH资源中的特定PDSCH资源的编号。
在一种实施例中,下行控制信息指示以下至少一项:是否包括指示信息;指示信息的内容;承载指示信息的资源;指示信息指示的PDSCH资源;指定PDSCH资源;指示信息的位置;指示信息的占用字节大小;禁用标识或者启用标识;资源情况或资源使用条件。
在一种实施例中,资源情况或资源使用条件包括:一个SPS周期内配置多个PDSCH资源;一个PDSCH资源图样内配置多个PDSCH资源;多个PDSCH资源进行数据传输;待传输数据量大于一个PDSCH或指定PDSCH的传输块大小;待传输数据量小于下行资源的全部PDSCH的传输块大小。
在一种实施例中,该装置还包括:下行传输模块,用于进行下行数据传输,或者基于下行资源配置进行下行数据传输。
在一种实施例中,下行传输模块包括第三传输单元,用于在所有的PDSCH资源上进行下行数据传输;或者,基于下行资源配置在所有的PDSCH资源上进行数据传输;或者,第四传输单元,用于在部分的PDSCH资源上进行下行数据传输;或者,基于下行资源配置在部分的PDSCH资源上进行数据传输;或者,第五传输单元,用于基于下行资源配置终止部分的PDSCH资源。
在一种实施例中,第三传输单元,还用于在一个SPS周期内的所有PDSCH资源上进行数据传输,或者基于下行资源配置在一个SPS周期内的所有PDSCH资源上进行数据传输;或者,在一个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,基于下行资源配置在一个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输;在一个PDSCH资源图样内的所有PDSCH资源上进行数据传输,或者,基于下行资源配置在一个PDSCH资源图样内的所有PDSCH资源上进行数据传输;在一个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,基于下行资源配置在一个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输;在动态调度的多个PDSCH资源内的所有PDSCH资源上进行数据传输,或者,基于下行资源配置在动态调度的多个PDSCH资源内的所有PDSCH资源上进行数据传输;在动态调度的多个PDSCH资源内的特定位置或标识对应的所有PDSCH资源上进行数据传输,或者,基于下行资源配置在动态调度的多个PDSCH资源内的特定位置或标识对应的所有PDSCH资源上进行数据传输;在多个SPS周期内的所有PDSCH资源上进行数据传输,或者,基于下行资源配置在多个SPS周期内的所有PDSCH资源上进行数据传输;在多个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,基于下行资源配置在多个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输;在多个PDSCH资源图样内的所有PDSCH资源上进行数据传输,或者,基于下行资源配置在多个PDSCH资源图样内的所有PDSCH资源上进行数据传输;在多个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,基于下行资源配置在多个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输。
在一种实施例中,第四传输单元,还用于在一个SPS周期内的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在一个SPS周期内的部分PDSCH资源上进行数据传输;在一个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在一个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输;在一个PDSCH资源图样内的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在一个PDSCH资源图样内的部分PDSCH资源上进行数据传输;在一个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在一个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输;在动态调度的多个PDSCH资源内的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在动态调度的多个PDSCH资源内的部分PDSCH资源上进行数据传输;在动态调度的多个PDSCH资源内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在动态调度的多个PDSCH资源内的特定位置或标识对应的部分PDSCH资源上进行数据传输;在多个SPS周期内的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在多个SPS周期内的部分PDSCH资源上进行数据传输;在多个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在多个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输;在多个PDSCH资源图样内的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在多个PDSCH资源图样内的部分PDSCH资源上进行数据传输;在多个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,基于下行资源配置在多个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输。
在一种实施例中,该装置还包括第四确定模块,用于确定使用的PDSCH资源和/或不使用的PDSCH资源;根据使用的PDSCH资源和/或不使用的PDSCH资源,确定第三指示信息或第四指示信息。
在一种实施例中,该装置还包括第二执行模块,用于在使用的PDSCH资源上进行数据传输,和/或,在不使用的PDSCH资源上不进行数据传输,和/或,终止不使用的PDSCH资源。
在一种实施例中,该装置还包括第五确定模块,用于若存在PDSCH资源冲突或复用处理,确定不使用的PDSCH资源为低优先级的资源。
在一种实施例中,该装置还包括第六确定模块,用于确定是否执行以下中至少一个:下发第三指示信息;下发第四指示信息;触发或生成第三指示信息;触发或生成第四指示信息;触发第三指示信息的下发;触发第四指示信息的下发;确定是否进行资源终止;触发或确定使用的PDSCH资源;触发或确定不使用的PDSCH资源的传输;触发下行数据的传输。
在一种实施例中,指示信息用于UE执行以下中至少一项:确定是否接收PDSCH传输;确定需要执行接收或解码的PDSCH;确定不需要执行接收或解码的PDSCH;确定需要被终止的PDSCH。
关于数据传输的装置的具体限定可以参见上文中对于数据传输的方法的限定,在此不再赘述。上述数据传输的装置中的各个模块可全部或部分通过软件、硬件及其组合来实现。上述各模块可以硬件形式内嵌于或独立于计算机设备中的处理器中,也可以以软件形式存储于计算机设备中的存储器中,以便于处理器调用执行以上各个模块对应的操作。
在一种实施例中,提供了一种计算机设备,该计算机设备可以是服务器,其内部结构图可以如图12所示。该计算机设备包括通过系统总线连接的处理器、存储器、网络接口和数据库。其中,该计算机设备的处理器用于提供计算和控制能力。该计算机设备的存储器包括非易失性存储介质、内存储器。该非易失性存储介质存储有操作系统、计算机程序和数据库。该内存储器为非易失性存储介质中的操作系统和计算机程序的运行提供环境。该计算机设备的数据库用于存储数据传输的数据。该计算机设备的网络接口用于与外部的终端通过网络连接通信。该计算机程序被处理器执行时以实现一种数据传输的方法。
本领域技术人员可以理解,图12中示出的结构,仅仅是与本申请方案相关的部分结构的框图,并不构成对本申请方案所应用于其上的计算机设备的限定,具体的计算机设备可以包括比图中所示更多或更少的部 件,或者组合某些部件,或者具有不同的部件布置。
在一种实施例中,提供了一种计算机设备,包括存储器和处理器,存储器中存储有计算机程序,该处理器执行计算机程序时实现以下步骤:
发送指示信息,指示信息用于指示是否使用目标资源进行数据传输。
上述实施例提供的一种计算机设备,其实现原理和技术效果与上述方法实施例类似,在此不再赘述。
在一种实施例中,提供了一种计算机可读存储介质,其上存储有计算机程序,计算机程序被处理器执行时实现以下步骤:
发送指示信息,指示信息用于指示是否使用目标资源进行数据传输。
上述实施例提供的一种计算机可读存储介质,其实现原理和技术效果与上述方法实施例类似,在此不再赘述。
在一种实施例中,提供了一种计算机程序产品,其上存储有计算机程序,计算机程序被处理器执行时实现以下步骤:
发送指示信息,指示信息用于指示是否使用目标资源进行数据传输。
上述实施例提供的一种计算机程序产品,其实现原理和技术效果与上述方法实施例类似,在此不再赘述。
本领域普通技术人员可以理解实现上述实施例方法中的全部或部分流程,是可以通过计算机程序来指令相关的硬件来完成,所述的计算机程序可存储于一非易失性计算机可读取存储介质中,该计算机程序在执行时,可包括如上述各方法的实施例的流程。其中,本申请所提供的各实施例中所使用的对存储器、存储、数据库或其它介质的任何引用,均可包括非易失性和/或易失性存储器。非易失性存储器可包括只读存储器(ROM)、可编程ROM(PROM)、电可编程ROM(EPROM)、电可擦除可编程ROM(EEPROM)或闪存。易失性存储器可包括随机存取存储器(RAM)或者外部高速缓冲存储器。作为说明而非局限,RAM以多种形式可得,诸如静态RAM(SRAM)、动态RAM(DRAM)、同步DRAM(SDRAM)、双数据率SDRAM(DDRSDRAM)、增强型SDRAM(ESDRAM)、同步链路(Synchlink)DRAM(SLDRAM)、存储器总线(Rambus)直接RAM(RDRAM)、直接存储器总线动态RAM(DRDRAM)、以及存储器总线动态RAM(RDRAM)等。
以上实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。以上所述实施例仅表达了本申请的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本申请构思的前提下,还可以做出若干变形和改进,这些都属于本申请的保护范围。因此,本申请专利的保护范围应以所附权利要求为准。

Claims (93)

  1. 一种数据传输的方法,其特征在于,所述方法包括:
    第一设备向第二设备发送指示信息,所述指示信息用于指示是否使用目标资源进行数据传输。
  2. 根据权利要求1所述的方法,其特征在于,所述是否使用目标资源进行数据传输包括以下至少之一:
    所述目标资源是否进行数据传输;
    所述目标资源是否终止;
    是否使用所述目标资源。
  3. 根据权利要求1或2所述的方法,其特征在于,所述指示信息用于指示以下至少之一:
    所述目标资源中的至少一个资源进行数据传输或不被终止;
    所述目标资源中的全部资源进行数据传输或不被终止;
    所述目标资源中的至少一个资源不进行数据传输或被终止;
    所述目标资源中的全部资源不进行数据传输或被终止。
  4. 根据权利要求1或2所述的方法,其特征在于,所述目标资源为以下至少一种:
    第一周期内的资源;
    所述第一周期之后的第二周期内的资源;
    配置的PUSCH资源图样内的资源;
    所述指示信息之后的一个或多个周期的资源;
    所述指示信息之后的一个或多个PUSCH资源图样内的资源;
    配置的PDSCH资源图样内的资源;
    所述指示信息之后的一个或多个PDSCH资源图样内的资源;
    一个或多个配置授权CG资源;
    至少一个周期的一个或多个CG资源;
    一个或多个半持续调度SPS资源;
    至少一个周期的一个或多个SPS资源;
    动态调度资源。
  5. 根据权利要求1-4任一项所述的方法,其特征在于,所述是否使用目标资源进行数据传输,包括:是否使用所述目标资源进行数据发送,和/或,是否使用所述目标资源进行数据接收。
  6. 根据权利要求1-5任一项所述的方法,其特征在于,所述第一设备向第二设备发送指示信息,包括以下至少之一:
    所述第一设备向所述第二设备发送第一指示信息,所述第一指示信息与第一PUSCH资源一起发送;
    所述第一设备向所述第二设备发送第二指示信息,所述第二指示信息在第二PUSCH资源之前发送;
    所述第一设备向所述第二设备发送所述第一指示信息,所述第一指示信息在第一CG周期内或第一PUSCH资源图样内发送;
    所述第一设备向所述第二设备发送所述第二指示信息,所述第二指示信息在第二CG周期内或第二PUSCH资源图样之前发送;
    所述第一设备向所述第二设备发送第三指示信息,所述第三指示信息与第一PDSCH资源一起发送;
    所述第一设备向所述第二设备发送第四指示信息,所述第四指示信息在第二PDSCH资源之前发送;
    所述第一设备向所述第二设备发送所述第三指示信息,所述第三指示信息在第一SPS周期内或第一PDSCH资源图样内发送;
    所述第一设备向所述第二设备发送所述第四指示信息,所述第四指示信息在第二SPS周期内或第二PDSCH资源图样之前发送;
    所述第一设备向所述第二设备发送所述第一指示信息,所述第一指示信息与第一动态调度资源一起发送;
    所述第一设备向所述第二设备发送所述第二指示信息,所述第二指示信息在所述第一动态调度资源之前发送;
    所述第一设备向所述第二设备发送所述第三指示信息,所述第三指示信息与第二动态调度资源一起发送;
    所述第一设备向所述第二设备发送所述第四指示信息,所述第四指示信息在所述第二动态调度资源之前发送。
  7. 根据权利要求6所述的方法,其特征在于,所述第一设备向所述第二设备发送第一指示信息,包括:
    UE向网络设备或基站发送所述第一指示信息。
  8. 根据权利要求7所述的方法,其特征在于,所述第一指示信息携带于以下至少之一:
    所述第一指示信息携带于CG上行控制信息中;
    所述第一指示信息携带于新的MAC控制单元中;
    所述第一指示信息携带于无线资源控制消息中。
  9. 根据权利要求1-8任一项所述的方法,其特征在于,所述方法还包括:
    在满足第一条件的情况下,触发所述第一指示信息生成,和/或,触发所述第一指示信息上报。
  10. 根据权利要求1-9任一项所述的方法,其特征在于,所述UE向网络设备或基站发送所述第一指示信息,包括:
    在满足第一条件的情况下,和/或,有可用上行传输资源的情况下,所述UE向所述网络设备或基站发送所述第一指示信息。
  11. 根据权利要求9或10所述的方法,其特征在于,所述第一条件包括以下至少一项:
    大于预设量的数据量或字节数或比特数需要在一个周期内传输;
    大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;
    大于第一门限的数据量在一个周期内传输;
    小于第二门限的数据量在一个周期内传输;
    CG上行控制信息被配置或激活;
    DG上行控制信息被配置或激活;
    上行控制信息配置被禁用;
    上行资源为预配置的资源;
    支持新的MAC控制单元触发或上报;
    网络或基站激活或使能所述指示信息上报;
    支持所述指示信息上报;
    上行资源包括多个PUSCH资源;
    一个传输周期内配置多个传输资源;
    预配置的PUSCH资源图样包括多个PUSCH资源;
    一个周期内需要多个PUSCH进行数据传输;
    预配置的PUSCH资源图样内需要多个PUSCH进行数据传输;
    待传输数据量大于一个PUSCH资源或指定PUSCH资源的传输块大小;
    待传输数据量小于所有PUSCH资源的传输块大小;
    待传输数据量发生变化;
    待传输的资源或需使用的传输资源发生变化;
    动态调度的资源内包括多个PUSCH资源;
    所述第一指示信息生成或触发或待定。
  12. 根据权利要求7-11任一项所述的方法,其特征在于,所述UE向所述网络设备或基站发送所述第一指示信息,包括:
    所述UE在所述第一PUSCH资源上向所述网络设备或基站发送所述第一指示信息;所述第一指示信息用于指示所述第一PUSCH资源后的资源是否使用。
  13. 根据权利要求12所述的方法,其特征在于,所述第一PUSCH资源后的资源为以下中的至少一个:
    第三周期内的PUSCH资源;
    配置的PUSCH资源图样内的PUSCH资源;
    动态调度的多个PUSCH资源;
    所述第一PUSCH资源之后的动态调度的多个PUSCH资源;
    多个周期内的PUSCH资源;
    配置的多个PUSCH资源图样内的PUSCH资源;
    所述第一PUSCH资源之后的多个周期内的PUSCH资源;
    所述第一PUSCH资源之后的配置的多个PUSCH资源图样内的PUSCH资源;
    第三周期内所述第一PUSCH资源之后的PUSCH资源;
    配置的PUSCH资源图样内所述第一PUSCH资源后的PUSCH资源。
  14. 根据权利要求13所述的方法,其特征在于,所述第一PUSCH资源后的资源为以下中的至少一个:
    所述第一PUSCH资源后的全部PUSCH资源;
    所述第一PUSCH资源后的至少一个或特定个数的PUSCH资源;
    所述第一PUSCH资源后的一个PUSCH资源;
    所述第一PUSCH资源后的多个连续的PUSCH资源;
    所述第一PUSCH资源后的多个不连续的PUSCH资源。
  15. 根据权利要求12-14任一项所述的方法,其特征在于,所述第一指示信息用于指示以下中至少一个:
    所述第一PUSCH资源后的资源中的全部资源是否进行数据传输;
    所述第一PUSCH资源后的资源中的每一个资源是否进行数据传输;
    所述第一PUSCH资源后的资源中的多个资源是否进行数据传输;
    所述第一PUSCH资源后的资源中的一个资源是否进行数据传输;
    所述第一PUSCH资源后的资源中的特定PUSCH资源;
    所述目标资源全部是否进行数据传输;
    所述目标资源中的一个或特定一个是否进行数据传输;
    所述目标资源中的多个或特定多个是否进行数据传输;
    所述目标资源中的每一个是否进行数据传输。
  16. 根据权利要求6-15任一项所述的方法,其特征在于,所述第一PUSCH资源为一个或者多个;则所述第一指示信息携带在一个所述第一PUSCH资源上或者携带在多个所述第一PUSCH资源上。
  17. 根据权利要求6-16所述的方法,其特征在于,所述UE向所述网络设备或基站发送第一指示信息,包括以下之一:
    所述UE在一个所述第一PUSCH上向所述网络设备或基站发送所述第一指示信息;
    所述UE在多个所述第一PUSCH上向所述网络设备或基站发送所述第一指示信息;
    所述UE在每一个所述PUSCH上向所述网络设备或基站发送所述第一指示信息;
    所述UE在特定第一PUSCH上向所述网络设备或基站发送所述第一指示信息。
  18. 根据权利要求6-17所述的方法,其特征在于,所述第一指示信息用于指示以下至少一个:
    指示所述第一PUSCH之后的下一个PUSCH是否进行数据传输;
    指示所述第一PUSCH之后的CG周期内全部的PUSCH是否进行数据传输;
    指示所述第一PUSCH之后的PUSCH资源图样内全部的PUSCH是否进行数据传输;
    指示所述第一PUSCH之后的指定位置的PUSCH是否进行数据传输。
  19. 根据权利要求6所述的方法,其特征在于,所述第一设备向所述第二设备发送第二指示信息,包括:
    UE向网络设备或基站发送所述第二指示信息,所述第二指示信息在目标传输资源或目标传输信息承载。
  20. 根据权利要求6或19所述的方法,其特征在于,所述第一设备向所述第二设备发送第二指示信息,包括:
    UE向网络设备或基站发送所述第二指示信息,所述第二指示信息在所述第二PUSCH资源之前的目标传输资源或目标传输信息承载;或者,
    所述UE向所述网络设备或基站发送所述第二指示信息,所述第二指示信息在所述第二PUSCH资源之前的目标传输资源或目标传输信息上发送。
  21. 根据权利要求20所述的方法,其特征在于,所述第二PUSCH资源为以下中的至少一个:
    CG周期前的PUSCH资源;
    PUSCH资源图样前的PUSCH资源;
    特定CG周期前的PUSCH资源;
    特定PUSCH资源图样前的PUSCH资源;
    第一个位置的PUSCH资源;
    特定位置的PUSCH资源;
    动态调度的多个PUSCH资源。
  22. 根据权利要求20或21所述的方法,其特征在于,所述目标传输资源或所述目标传输信息包括以下至少之一:PUCCH资源、上行控制信息、调度请求、PUSCH、MAC控制单元、无线资源控制。
  23. 根据权利要求20-22任一项所述的方法,其特征在于,所述目标传输资源与所述第二PUSCH资源之间存在固定偏移量;或者,所述目标传输资源与上行资源配置之间存在固定偏移量;所述上行资源配置为与所述第二PUSCH资源对应的上行资源配置。
  24. 根据权利要求19-23任一项所述的方法,其特征在于,所述第二指示信息用于指示CG周期或PUSCH资源图样内的资源是否进行数据传输;或者,所述第二指示信息用于指示动态调度的多个PUSCH资源是否进行数据传输。
  25. 根据权利要求24所述的方法,其特征在于,所述第二指示信息指示的资源为以下中的至少一个:
    与所述目标传输资源或目标传输信息最近的CG周期或PUSCH资源图样内的资源;
    所述目标传输资源或目标传输信息之后的一个CG周期或PUSCH资源图样内的资源;
    所述目标传输资源或目标传输信息之后的多个CG周期或PUSCH资源图样内的资源;
    所述第二PUSCH资源对应CG周期或PUSCH资源图样内的资源;
    所述目标传输资源或目标传输信息之后的动态调度的多个PUSCH资源内的资源;
    所述第二PUSCH资源对应的动态调度的多个PUSCH资源内的资源。
  26. 根据权利要求24或25所述的方法,其特征在于,所述第二指示信息指示的资源包括以下中的至少一个:
    所述CG周期或PUSCH资源图样内的一个PUSCH资源;
    所述CG周期或PUSCH资源图样内的多个PUSCH资源;
    所述CG周期或PUSCH资源图样内的特定PUSCH资源;
    所述CG周期或PUSCH资源图样内的多个连续PUSCH资源;
    所述CG周期或PUSCH资源图样内的多个不连续PUSCH资源;
    所述CG周期或PUSCH资源图样内的全部PUSCH资源所述动态调度的多个PUSCH资源内的一个或多个PUSCH资源;
    所述动态调度的多个PUSCH资源内的特定的PUSCH资源;
    所述目标资源全部是否进行数据传输;
    所述目标资源中的一个或特定一个是否进行数据传输;
    所述目标资源中的多个或特定多个是否进行数据传输;
    所述目标资源中的每一个是否进行数据传输。
  27. 根据权利要求19-26任一项所述的方法,其特征在于,所述第二指示信息用于指示以下中任一个:
    所述CG周期或PUSCH资源图样内的资源中的全部资源是否进行数据传输;
    所述CG周期或PUSCH资源图样内的资源中的每一个资源是否进行数据传输;
    所述CG周期或PUSCH资源图样内的资源中的多个资源是否进行数据传输;
    所述CG周期或PUSCH资源图样内的资源中的一个资源是否进行数据传输;
    所述CG周期或PUSCH资源图样内的资源中的特定资源是否进行数据传输;
    所述动态调度的多个PUSCH资源中的多个资源是否进行数据传输;
    所述动态调度的多个PUSCH资源中的特定资源是否进行数据传输;
    所述动态调度的多个PUSCH资源中的一个资源是否进行数据传输;
    所述动态调度的多个PUSCH资源中的每一个资源是否进行数据传输;
    所述动态调度的多个PUSCH资源中的全部资源是否进行数据传输;
    下一个上行资源是否进行数据传输;
    第四周期或资源图样的资源是否进行数据传输。
  28. 根据权利要求19所述的方法,其特征在于,所述UE向网络设备或基站发送所述第二指示信息,包括:
    在满足第二条件的情况下,执行所述UE触发所述第二指示信息、所述UE上报所述第二指示信息、所述UE向网络设备或基站发送所述第二指示信息中至少一个。
  29. 根据权利要求28所述的方法,其特征在于,所述第二条件包括以下中的至少一个:
    大于预设量的数据量或字节数或比特数需要在一个周期内传输;
    大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;
    大于第三门限的数据量在一个周期传输;
    小于第四门限的数据量在一个周期传输;
    传输所述第二指示信息的资源配置被允许或者被禁用;
    网络或基站激活或使能所述指示信息上报;
    支持所述指示信息上报;
    支持新的MAC控制单元触发或上报;
    上行资源为预配置的资源;
    上行资源包括多个PUSCH资源;
    一个传输周期内配置多个传输资源;
    预配置的PUSCH资源图样包括多个PUSCH资源;
    一个周期内需要多个PUSCH进行数据传输;
    预配置的PUSCH资源图样内需要多个PUSCH进行数据传输;
    动态调度的资源内包括多个PUSCH资源;
    所述第二指示信息生成或触发或待定;
    待传输数据量大于一个PUSCH资源或指定PUSCH资源的传输块大小;
    待传输数据量小于所有PUSCH资源的传输块大小;
    待传输数据量发生变化;
    待传输的资源或需使用的传输资源发生变化;
    存在可用的上行传输资源;
    存在可用的新传输资源。
  30. 根据权利要求6所述的方法,其特征在于,所述方法还包括:
    UE接收网络设备或基站发送的上行资源配置。
  31. 根据权利要求30所述的方法,其特征在于,所述UE接收网络设备或基站发送的上行资源配置,包括:
    所述UE基于所述上行资源配置向所述网络设备或基站发送所述第一指示信息或所述第二指示信息。
  32. 根据权利要求30所述的方法,其特征在于,所述上行资源配置包括预配置资源或动态调度的资源。
  33. 根据权利要求32所述的方法,其特征在于,所述动态调度的资源包括多个PUSCH资源。
  34. 根据权利要求32或33所述的方法,其特征在于,所述预配置资源包括CG或预配置的PUSCH资源图样。
  35. 根据权利要求34所述的方法,其特征在于,所述上行资源配置指示一个CG周期内包括多个PUSCH资源,和/或,一个PUSCH资源图样内包括多个PUSCH资源。
  36. 根据权利要求34所述的方法,其特征在于,所述上行资源配置包括以下至少一项:
    CG标识;
    CG周期;
    CG周期内的PUSCH资源的数量;
    一个CG周期内的至少一个PUSCH资源的资源信息;
    一个CG周期内的上行控制信息;
    CG PUSCH资源的上行控制信息;
    PUSCH资源图样标识;
    PUSCH资源图样周期或非周期;
    PUSCH资源图样内的PUSCH资源的数量;
    一个PUSCH资源图样内的至少一个PUSCH资源的资源信息;
    一个PUSCH资源图样内的上行控制信息;
    PUSCH资源图样内的PUSCH资源的上行控制信息;
    动态调度的多个PUSCH资源的上行控制信息;
    动态调度的多个PUSCH资源的至少一个PUSCH资源信息;
    动态调度的多个PUSCH资源的PUSCH资源的数量。
  37. 根据权利要求36所述的方法,其特征在于,所述至少一个PUSCH资源的资源信息包括以下至少一项:
    至少一个PUSCH资源的起始位置;
    至少一个PUSCH资源的终止位置;
    至少一个PUSCH资源的时域和频域资源信息;
    至少一个PUSCH资源中每个PUSCH资源相对第一个PUSCH资源的资源偏移量;
    至少一个PUSCH资源中每个PUSCH资源相对特定PUSCH资源的资源偏移量;
    至少一个PUSCH资源中每个PUSCH资源相对最后一个PUSCH资源的资源偏移量;
    至少一个PUSCH资源中的第一个资源或者最后一个资源或者特定资源;
    至少一个PUSCH资源的编号;
    至少一个PUSCH资源的冗余版本信息RV;
    至少一个PUSCH资源中每个PUSCH资源相对第一个PUSCH资源的RV偏移量;
    至少一个PUSCH资源中每个PUSCH资源相对特定PUSCH资源的RV偏移量;
    至少一个PUSCH资源中每个PUSCH资源相对最后一个PUSCH资源的RV偏移量;
    至少一个PUSCH资源的混合自动重传请求HARQ进程信息;
    至少一个PUSCH资源中每个PUSCH资源相对第一个PUSCH资源的HARQ进程信息偏移量;
    至少一个PUSCH资源中每个PUSCH资源相对特定PUSCH资源的HARQ进程信息偏移量;
    至少一个PUSCH资源中每个PUSCH资源相对最后一个PUSCH资源的HARQ进程信息偏移量;
    至少一个PUSCH资源中的第一个PUSCH资源的位置;
    至少一个PUSCH资源中的第一个PUSCH资源的编号;
    至少一个PUSCH资源中的特定PUSCH资源的位置;
    至少一个PUSCH资源中的特定PUSCH资源的编号。
  38. 根据权利要求36所述的方法,其特征在于,所述上行控制信息指示以下至少一项:
    是否包括所述指示信息;
    所述指示信息的内容;
    承载所述指示信息的资源;
    所述指示信息指示的PUSCH资源;
    指定PUSCH资源;
    所述指示信息的位置;
    所述指示信息的占用字节大小;
    禁用标识或者启用标识;
    资源情况或资源使用条件。
  39. 根据权利要求38所述的方法,其特征在于,所述资源情况或资源使用条件包括:
    一个CG周期内配置多个PUSCH资源;
    一个PUSCH资源图样内配置多个PUSCH资源;
    多个PUSCH资源进行数据传输;
    待传输数据量大于一个PUSCH或指定PUSCH的传输块大小;
    待传输数据量小于上行资源的全部PUSCH的传输块大小。
  40. 根据权利要求30所述的方法,其特征在于,所述方法还包括:
    所述UE基于所述上行资源配置进行上行数据传输。
  41. 根据权利要求40所述的方法,其特征在于,所述UE基于所述上行资源配置进行上行数据传输,包括:
    所述UE基于所述上行资源配置在所有的PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置在部分的PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置终止部分的PUSCH资源。
  42. 根据权利要求40或41所述的方法,其特征在于,所述UE基于所述上行资源配置在所有的PUSCH资源上进行数据传输,包括:
    所述UE基于所述上行资源配置,在一个CG周期内的所有PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在一个CG周期内的特定位置或标识对应的PUSCH资源上进行数据传输,或者,
    所述UE基于所述上行资源配置,在一个PUSCH资源图样内的所有PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在一个PUSCH资源图样内的特定位置或标识对应的PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在动态调度的多个PUSCH资源内的所有PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在动态调度的多个PUSCH资源内的特定位置或标识对应的所有PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在多个CG周期内的所有PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在多个CG周期内的特定位置或标识对应的PUSCH资源上进行数据传输,或者,
    所述UE基于所述上行资源配置,在多个PUSCH资源图样内的所有PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在多个PUSCH资源图样内的特定位置或标识对应的PUSCH资源上进行数据传输。
  43. 根据权利要求40-42任一项所述的方法,其特征在于,所述UE基于所述上行资源配置在部分的PUSCH资源上进行数据传输,包括:
    所述UE基于所述上行资源配置,在一个CG周期内的部分PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在一个CG周期内的特定位置或标识对应的部分PUSCH资源上进行数据传输,或者,
    所述UE基于所述上行资源配置,在一个PUSCH资源图样内的部分PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在一个PUSCH资源图样内的特定位置或标识对应的部分PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在动态调度的多个PUSCH资源内的部分PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在动态调度的多个PUSCH资源内的特定位置或标识对应的部分PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在多个CG周期内的部分PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在多个CG周期内的特定位置或标识对应的部分PUSCH资源上进行数据传输,或者,
    所述UE基于所述上行资源配置,在多个PUSCH资源图样内的部分PUSCH资源上进行数据传输;或者,
    所述UE基于所述上行资源配置,在多个PUSCH资源图样内的特定位置或标识对应的部分PUSCH资源上进行数据传输。
  44. 根据权利要求40-43任一项所述的方法,其特征在于,所述方法还包括以下至少之一:
    确定使用的PUSCH资源和/或不使用的PUSCH资源;
    根据所述使用的PUSCH资源和/或所述不使用的PUSCH资源,确定所述第一指示信息或所述第二指示信息。
  45. 根据权利要求44所述的方法,其特征在于,所述方法还包括:
    在所述使用的PUSCH资源上进行数据传输,和/或,在所述不使用的PUSCH资源上不进行数据传输,和/或,终止所述不使用的PUSCH资源。
  46. 根据权利要求44或45所述的方法,其特征在于,所述方法还包括:
    若存在PUSCH资源冲突或复用处理,确定所述不使用的PUSCH资源为低优先级的资源。
  47. 根据权利要求44-46任一项所述的方法,其特征在于,所述方法还包括:
    基于所述网络设备或基站的指示,确定是否执行以下中至少一个:
    上报所述第一指示信息;
    上报所述第二指示信息;
    触发或生成所述第一指示信息;
    触发或生成所述第二指示信息;
    触发所述第一指示信息的上报;
    触发所述第二指示信息的上报;
    确定是否进行资源终止;
    触发或确定所述使用的PUSCH资源;
    触发或确定所述不使用的PUSCH资源的传输;
    触发所述上行数据的传输。
  48. 根据权利要求1-47任一项所述的方法,其特征在于,所述指示信息用于指示网络或基站执行以下中至少一项:
    确定是否接收PUSCH传输;
    确定需要执行接收或解码的PUSCH;
    确定不需要执行接收或解码的PUSCH;
    确定需要被终止的PUSCH。
  49. 根据权利要求6所述的方法,其特征在于,所述第一设备向所述第二设备发送第三指示信息,包括:
    网络设备或基站向UE发送所述第三指示信息。
  50. 根据权利要求49所述的方法,其特征在于,所述第三指示信息携带于以下至少之一:
    所述第三指示信息携带于PDCCH中;
    所述第三指示信息携带于SPS中;
    所述第三指示信息携带于下行动态调度的PDSCH中;
    所述第三指示信息携带于SPS下行控制信息中;
    所述第三指示信息携带于新的MAC控制单元中;
    所述第三指示信息携带于无线资源控制消息中。
  51. 根据权利要求49或50所述的方法,其特征在于,所述方法还包括:
    在满足第三条件的情况下,触发所述第三指示信息生成,和/或,触发所述第三指示信息下发。
  52. 根据权利要求49-51任一项所述的方法,其特征在于,所述网络设备或基站向UE发送所述第三指示信息,包括:
    在满足第三条件的情况下,和/或,有可用下行传输资源的情况下,所述网络设备或基站向所述UE发送所述第三指示信息。
  53. 根据权利要求52所述的方法,其特征在于,所述第三条件包括以下至少一项:
    大于预设量的数据量或字节数或比特数需要在一个周期内传输;
    大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;
    大于第一门限的数据量在一个周期内传输;
    小于第二门限的数据量在一个周期内传输;
    SPS下行控制信息被配置或激活;
    动态调度下行控制信息被配置或激活;
    下行控制信息配置被禁用;
    下行资源为预配置的资源;
    支持新的MAC控制单元触发或下发;
    网络或基站激活或使能所述指示信息下发;
    支持所述指示信息下发;
    下行资源包括多个PDSCH资源;
    一个传输周期内配置多个传输资源;
    预配置的PDSCH资源图样包括多个PDSCH资源;
    一个周期内需要多个PDSCH进行数据传输;
    预配置的PDSCH资源图样内需要多个PDSCH进行数据传输;
    待传输数据量大于一个PDSCH资源或指定PDSCH资源的传输块大小;
    待传输数据量小于所有PDSCH资源的传输块大小;
    待传输数据量发生变化;
    待传输的资源或需使用的传输资源发生变化;
    动态调度的资源内包括多个PDSCH资源;
    所述第三指示信息生成或触发或待定。
  54. 根据权利要求49-53任一项所述的方法,其特征在于,所述网络设备或基站向所述UE发送所述第三指示信息,包括:
    所述网络设备或基站在所述第一PDSCH资源上向所述UE发送所述第三指示信息;所述第三指示信息用于指示所述第一PDSCH资源后的资源是否使用。
  55. 根据权利要求54所述的方法,其特征在于,所述第一PDSCH资源后的资源为以下中的至少一个:
    第三周期内的PDSCH资源;
    配置的PDSCH资源图样内的PDSCH资源;
    动态调度的多个PDSCH资源;
    所述第一PDSCH资源之后的动态调度的多个PDSCH资源;
    多个周期内的PDSCH资源;
    配置的多个PDSCH资源图样内的PDSCH资源;
    所述第一PDSCH资源之后的多个周期内的PDSCH资源;
    所述第一PDSCH资源之后的配置的多个PDSCH资源图样内的PDSCH资源;
    第三周期内所述第一PDSCH资源之后的PDSCH资源;
    配置的PDSCH资源图样内所述第一PDSCH资源后的PDSCH资源。
  56. 根据权利要求54所述的方法,其特征在于,所述第一PDSCH资源后的资源为以下中的至少一个:
    所述第一PDSCH资源后的全部PDSCH资源;
    所述第一PDSCH资源后的至少一个或特定个数的PDSCH资源;
    所述第一PDSCH资源后的一个PDSCH资源;
    所述第一PDSCH资源后的多个连续的PDSCH资源;
    所述第一PDSCH资源后的多个不连续的PDSCH资源。
  57. 根据权利要求49-56任一项所述的方法,其特征在于,所述第三指示信息用于指示以下中任一个:
    所述第一PDSCH资源后的资源中的全部资源是否进行数据传输;
    所述第一PDSCH资源后的资源中的每一个资源是否进行数据传输;
    所述第一PDSCH资源后的资源中的多个资源是否进行数据传输;
    所述第一PDSCH资源后的资源中的一个资源是否进行数据传输;
    所述第一PDSCH资源后的资源中的特定PDSCH资源;
    所述目标资源全部是否进行数据传输;
    所述目标资源中的一个或特定一个是否进行数据传输;
    所述目标资源中的多个或特定多个是否进行数据传输;
    所述目标资源中的每一个是否进行数据传输。
  58. 根据权利要求49-57任一项所述的方法,其特征在于,所述第一PDSCH资源为一个或者多个;则所述第三指示信息携带在一个所述第一PDSCH资源上或者携带在多个所述第一PDSCH资源上。
  59. 根据权利要求58所述的方法,其特征在于,所述网络设备或基站向所述UE发送第三指示信息,包括:
    所述网络设备或基站在一个所述第一PDSCH上向所述UE发送所述第三指示信息;
    所述网络设备或基站在多个所述第一PDSCH上向所述UE发送所述第三指示信息;
    所述网络设备或基站在每一个所述PDSCH上向所述UE发送所述第三指示信息;
    所述网络设备或基站在特定第一PDSCH上向所述UE发送所述第三指示信息。
  60. 根据权利要求49-59所述的方法,其特征在于,所述第三指示信息用于指示以下至少一个:
    指示所述第一PDSCH之后的下一个PDSCH是否进行数据传输;
    指示所述第一PDSCH之后的SPS周期内全部的PDSCH是否进行数据传输;
    指示所述第一PDSCH之后的PDSCH资源图样内全部的PDSCH是否进行数据传输;
    指示所述第一PDSCH之后的指定位置的PDSCH是否进行数据传输。
  61. 根据权利要求6所述的方法,其特征在于,所述第一设备向所述第二设备发送第四指示信息,包括:
    网络设备或基站向UE发送所述第四指示信息,所述第四指示信息在目标传输资源或目标传输信息承载。
  62. 根据权利要求6或61所述的方法,其特征在于,所述第一设备向所述第二设备发送第四指示信息,包括:
    网络设备或基站向UE发送所述第四指示信息,所述第四指示信息在所述第二PDSCH资源之前的目标传输资源或目标传输信息承载;或者,
    网络设备或基站向UE发送所述第四指示信息,所述第四指示信息在所述第二PDSCH资源之前的目标传输资源或目标传输信息上发送。
  63. 根据权利要求61所述的方法,其特征在于,所述第二PDSCH资源为以下中的至少一个:
    SPS周期前的PDSCH资源;
    PDSCH资源图样前的PDSCH资源;
    特定SPS周期前的PDSCH资源;
    特定PDSCH资源图样前的PDSCH资源;
    第一个位置的PDSCH资源;
    特定位置的PDSCH资源;
    动态调度的多个PDSCH资源。
  64. 根据权利要求61-63任一项所述的方法,其特征在于,所述目标传输资源或所述目标传输信息包括以下至少之一:PDCCH资源、下行控制信息、调度请求、PDSCH、MAC控制单元、无线资源控制。
  65. 根据权利要求61-64任一项所述的方法,其特征在于,所述目标传输资源与所述第二PDSCH资源之间存在固定偏移量;或者,所述目标传输资源与下行资源配置之间存在固定偏移量;所述下行资源配置为与所述第二PDSCH资源对应的下行资源配置。
  66. 根据权利要求61-65任一项所述的方法,其特征在于,所述第四指示信息用于指示SPS周期或PDSCH资源图样内的资源是否进行数据传输;或者,所述第四指示信息用于指示动态调度的多个PDSCH资源是否进行数据传输。
  67. 根据权利要求66所述的方法,其特征在于,所述第四指示信息指示的资源为以下中的至少一个:
    与所述目标传输资源或目标传输信息最近的SPS周期或PDSCH资源图样内的资源;
    所述目标传输资源或目标传输信息之后的一个SPS周期或PDSCH资源图样内的资源;
    所述目标传输资源或目标传输信息之后的多个SPS周期或PDSCH资源图样内的资源;
    所述第二PDSCH资源对应SPS周期或PDSCH资源图样内的资源;
    所述目标传输资源或目标传输信息之后的动态调度的多个PDSCH资源内的资源;
    所述第二PDSCH资源对应的动态调度的多个PDSCH资源内的资源。
  68. 根据权利要求66或67所述的方法,其特征在于,所述第四指示信息指示的资源包括以下中的至少一个:
    所述SPS周期或PDSCH资源图样内的一个PDSCH资源;
    所述SPS周期或PDSCH资源图样内的多个PDSCH资源;
    所述SPS周期或PDSCH资源图样内的特定PDSCH资源;
    所述SPS周期或PDSCH资源图样内的多个连续PDSCH资源;
    所述SPS周期或PDSCH资源图样内的多个不连续PDSCH资源;
    所述SPS周期或PDSCH资源图样内的全部PDSCH资源;
    所述动态调度的多个PDSCH资源内的一个或多个PDSCH资源;
    所述动态调度的多个PDSCH资源内的特定的PDSCH资源;
    所述目标资源全部是否进行数据传输;
    所述目标资源中的一个或特定一个是否进行数据传输;
    所述目标资源中的多个或特定多个是否进行数据传输;
    所述目标资源中的每一个是否进行数据传输。
  69. 根据权利要求61-68任一项所述的方法,其特征在于,所述第四指示信息用于指示以下中任一个:
    所述SPS周期或PDSCH资源图样内的资源中的全部资源是否进行数据传输;
    所述SPS周期或PDSCH资源图样内的资源中的每一个资源是否进行数据传输;
    所述SPS周期或PDSCH资源图样内的资源中的多个资源是否进行数据传输;
    所述SPS周期或PDSCH资源图样内的资源中的一个资源是否进行数据传输;
    所述SPS周期或PDSCH资源图样内的资源中的特定资源是否进行数据传输;
    所述动态调度的多个PDSCH资源中的多个资源是否进行数据传输;
    所述动态调度的多个PDSCH资源中的特定资源是否进行数据传输;
    所述动态调度的多个PDSCH资源中的一个资源是否进行数据传输;
    所述动态调度的多个PDSCH资源中的每一个资源是否进行数据传输;
    所述动态调度的多个PDSCH资源中的全部资源是否进行数据传输;
    下一个下行资源是否进行数据传输;
    第四周期或资源图样的资源是否进行数据传输。
  70. 根据权利要求61-69任一项所述的方法,其特征在于,所述网络设备或基站向UE发送所述第四指示信息,包括:
    在满足第四条件的情况下,执行所述网络设备或基站触发所述第四指示信息、所述网络设备或基站下发所述第四指示信息、所述网络设备或基站向UE发送所述第四指示信息中至少一个。
  71. 根据权利要求70所述的方法,其特征在于,所述第四条件包括以下中的至少一个:
    大于预设量的数据量或字节数或比特数需要在一个周期内传输;
    大于预设量的数据量或字节数或比特数需要在一个传输图样内传输;
    大于第三门限的数据量在一个周期传输;
    小于第四门限的数据量在一个周期传输;
    传输所述第四指示信息的资源配置被允许或者被禁用;
    网络或基站激活或使能所述指示信息下发;
    支持所述指示信息下发;
    支持新的MAC控制单元触发或下发;
    下行资源为预配置的资源;
    下行资源包括多个PDSCH资源;
    一个传输周期内配置多个传输资源;
    预配置的PDSCH资源图样包括多个PDSCH资源;
    一个周期内需要多个PDSCH进行数据传输;
    预配置的PDSCH资源图样内需要多个PDSCH进行数据传输;
    动态调度的资源内包括多个PDSCH资源;
    所述第四指示信息生成或触发或待定;
    待传输数据量大于一个PDSCH资源或指定PDSCH资源的传输块大小;
    待传输数据量小于所有PDSCH资源的传输块大小;
    待传输数据量发生变化;
    待传输的资源或需使用的传输资源发生变化;
    存在可用的下行传输资源;
    存在可用的新传输资源。
  72. 根据权利要求6所述的方法,其特征在于,所述方法还包括:
    网络设备或基站向UE发送下行资源配置。
  73. 根据权利要求71所述的方法,其特征在于,所述网络设备或基站向UE发送下行资源配置,包括:
    所述网络设备或基站基于所述下行资源配置向所述UE发送所述第三指示信息或所述第四指示信息。
  74. 根据权利要求72所述的方法,其特征在于,所述下行资源配置包括预配置资源或动态调度的资源。
  75. 根据权利要求74所述的方法,其特征在于,所述动态调度的资源包括多个PDSCH资源。
  76. 根据权利要求74或75所述的方法,其特征在于,所述预配置资源包括SPS或预配置的PDSCH资源图样。
  77. 根据权利要求76所述的方法,其特征在于,所述下行资源配置指示一个SPS周期内包括多个PDSCH资源,和/或,一个PDSCH资源图样内包括多个PDSCH资源。
  78. 根据权利要求72-77任一项所述的方法,其特征在于,所述下行资源配置包括以下至少一项:
    SPS标识;
    SPS周期;
    SPS周期内的PDSCH资源的数量;
    一个SPS周期内的至少一个PDSCH资源的资源信息;
    一个SPS周期内的下行控制信息;
    SPS PDSCH资源的下行控制信息;
    PDSCH资源图样标识;
    PDSCH资源图样周期或非周期;
    PDSCH资源图样内的PDSCH资源的数量;
    一个PDSCH资源图样内的至少一个PDSCH资源的资源信息;
    一个PDSCH资源图样内的下行控制信息;
    PDSCH资源图样内的PDSCH资源的下行控制信息;
    动态调度的多个PDSCH资源的下行控制信息;
    动态调度的多个PDSCH资源的至少一个PDSCH资源信息;
    动态调度的多个PDSCH资源的PDSCH资源的数量。
  79. 根据权利要求78所述的方法,其特征在于,所述至少一个PDSCH资源的资源信息包括以下至少一项:
    至少一个PDSCH资源的起始位置;
    至少一个PDSCH资源的终止位置;
    至少一个PDSCH资源的时域和频域资源信息;
    至少一个PDSCH资源中每个PDSCH资源相对第一个PDSCH资源的资源偏移量;
    至少一个PDSCH资源中每个PDSCH资源相对特定PDSCH资源的资源偏移量;
    至少一个PDSCH资源中每个PDSCH资源相对最后一个PDSCH资源的资源偏移量;
    至少一个PDSCH资源中的第一个资源或者最后一个资源或者特定资源;
    至少一个PDSCH资源的编号;
    至少一个PDSCH资源的冗余版本信息RV;
    至少一个PDSCH资源中每个PDSCH资源相对第一个PDSCH资源的RV偏移量;
    至少一个PDSCH资源中每个PDSCH资源相对特定PDSCH资源的RV偏移量;
    至少一个PDSCH资源中每个PDSCH资源相对最后一个PDSCH资源的RV偏移量;
    至少一个PDSCH资源的混合自动重传请求HARQ进程信息;
    至少一个PDSCH资源中每个PDSCH资源相对第一个PDSCH资源的HARQ进程信息偏移量;
    至少一个PDSCH资源中每个PDSCH资源相对特定PDSCH资源的HARQ进程信息偏移量;
    至少一个PDSCH资源中每个PDSCH资源相对最后一个PDSCH资源的HARQ进程信息偏移量;
    至少一个PDSCH资源中的第一个PDSCH资源的位置;
    至少一个PDSCH资源中的第一个PDSCH资源的编号;
    至少一个PDSCH资源中的特定PDSCH资源的位置;
    至少一个PDSCH资源中的特定PDSCH资源的编号。
  80. 根据权利要求78所述的方法,其特征在于,所述下行控制信息指示以下至少一项:
    是否包括所述指示信息;
    所述指示信息的内容;
    承载所述指示信息的资源;
    所述指示信息指示的PDSCH资源;
    指定PDSCH资源;
    所述指示信息的位置;
    所述指示信息的占用字节大小;
    禁用标识或者启用标识;
    资源情况或资源使用条件。
  81. 根据权利要求80所述的方法,其特征在于,所述资源情况或资源使用条件包括:
    一个SPS周期内配置多个PDSCH资源;
    一个PDSCH资源图样内配置多个PDSCH资源;
    多个PDSCH资源进行数据传输;
    待传输数据量大于一个PDSCH或指定PDSCH的传输块大小;
    待传输数据量小于下行资源的全部PDSCH的传输块大小。
  82. 根据权利要求72所述的方法,其特征在于,所述方法还包括:
    所述网络设备或基站进行下行数据传输,或者,基于所述下行资源配置进行下行数据传输。
  83. 根据权利要求82所述的方法,其特征在于,所述方法还包括:
    所述网络设备或基站在所有的PDSCH资源上进行下行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在所有的PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在部分的PDSCH资源上进行下行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在部分的PDSCH资源上进行数据传输;或者,
    所述网络设备或基站终止部分的PDSCH资源;或者,
    所述网络设备或基站基于所述下行资源配置,终止部分的PDSCH资源。
  84. 根据权利要求83所述的方法,其特征在于,所述在所有的PDSCH资源上进行数据传输,包括:
    所述网络设备或基站在一个SPS周期内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在一个SPS周期内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在一个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,
    所述网络设备或基站基于所述下行资源配置,在一个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,
    所述网络设备或基站在一个PDSCH资源图样内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在一个PDSCH资源图样内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在一个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在一个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在动态调度的多个PDSCH资源内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在动态调度的多个PDSCH资源内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在动态调度的多个PDSCH资源内的特定位置或标识对应的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在动态调度的多个PDSCH资源内的特定位置或标识对应的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在多个SPS周期内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在多个SPS周期内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在多个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,
    所述网络设备或基站基于所述下行资源配置,在多个SPS周期内的特定位置或标识对应的PDSCH资源上进行数据传输,或者,
    所述网络设备或基站在多个PDSCH资源图样内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在多个PDSCH资源图样内的所有PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在多个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在多个PDSCH资源图样内的特定位置或标识对应的PDSCH资源上进行数据传输。
  85. 根据权利要求83所述的方法,其特征在于,所述在部分的PDSCH资源上进行数据传输,包括:
    所述网络设备或基站在一个SPS周期内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在一个SPS周期内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在一个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,
    所述网络设备或基站基于所述下行资源配置,在一个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,
    所述网络设备或基站在一个PDSCH资源图样内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在一个PDSCH资源图样内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在一个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在一个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在动态调度的多个PDSCH资源内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在动态调度的多个PDSCH资源内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在动态调度的多个PDSCH资源内的特定位置或标识对应的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在动态调度的多个PDSCH资源内的特定位置或标识对应的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在多个SPS周期内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在多个SPS周期内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在多个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,
    所述网络设备或基站基于所述下行资源配置,在多个SPS周期内的特定位置或标识对应的部分PDSCH资源上进行数据传输,或者,
    所述网络设备或基站在多个PDSCH资源图样内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在多个PDSCH资源图样内的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站在多个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输;或者,
    所述网络设备或基站基于所述下行资源配置,在多个PDSCH资源图样内的特定位置或标识对应的部分PDSCH资源上进行数据传输。
  86. 根据权利要求83-85任一项所述的方法,其特征在于,所述方法还包括以下至少之一:
    确定使用的PDSCH资源和/或不使用的PDSCH资源;
    根据所述使用的PDSCH资源和/或所述不使用的PDSCH资源,确定所述第三指示信息或所述第四指示信息。
  87. 根据权利要求86所述的方法,其特征在于,所述方法还包括:
    在所述使用的PDSCH资源上进行数据传输,和/或,在所述不使用的PDSCH资源上不进行数据传输,和/或,终止所述不使用的PDSCH资源。
  88. 根据权利要求86所述的方法,其特征在于,所述方法还包括:
    若存在PDSCH资源冲突或复用处理,确定所述不使用的PDSCH资源为低优先级的资源。
  89. 根据权利要求86-88任一项所述的方法,其特征在于,所述方法还包括:确定是否执行以下中至少一个:
    下发所述第三指示信息;
    下发所述第四指示信息;
    触发或生成所述第三指示信息;
    触发或生成所述第四指示信息;
    触发所述第三指示信息的下发;
    触发所述第四指示信息的下发;
    确定是否进行资源终止;
    触发或确定所述使用的PDSCH资源;
    触发或确定所述不使用的PDSCH资源的传输;
    触发所述下行数据的传输。
  90. 根据权利要求48-89任一项所述的方法,其特征在于,所述指示信息用于所述UE执行以下中至少一项:
    确定是否接收PDSCH传输;
    确定需要执行接收或解码的PDSCH;
    确定不需要执行接收或解码的PDSCH;
    确定需要被终止的PDSCH。
  91. [根据细则91更正 19.07.2022]
    一种数据传输的装置,其特征在于,所述装置包括:
    指示信息发送模块,用于发送指示信息,所述指示信息用于指示是否使用目标资源进行数据传输。
  92. [根据细则91更正 19.07.2022]
    一种计算机设备,包括存储器和处理器,所述存储器存储有计算机程序,其特征在于,所述处理器执行所述计算机程序时实现权利要求1至90中任一项所述方法的步骤。
  93. [根据细则91更正 19.07.2022]
    一种计算机可读存储介质,其上存储有计算机程序,其特征在于,所述计算机程序被处理器执行时实现权利要求1至90中任一项所述的方法的步骤。
PCT/CN2022/090517 2022-04-29 2022-04-29 数据传输的方法、装置、计算机设备和存储介质 WO2023206447A1 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2022/090517 WO2023206447A1 (zh) 2022-04-29 2022-04-29 数据传输的方法、装置、计算机设备和存储介质

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2022/090517 WO2023206447A1 (zh) 2022-04-29 2022-04-29 数据传输的方法、装置、计算机设备和存储介质

Publications (1)

Publication Number Publication Date
WO2023206447A1 true WO2023206447A1 (zh) 2023-11-02

Family

ID=88516774

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/090517 WO2023206447A1 (zh) 2022-04-29 2022-04-29 数据传输的方法、装置、计算机设备和存储介质

Country Status (1)

Country Link
WO (1) WO2023206447A1 (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060176845A1 (en) * 2005-01-05 2006-08-10 Nokia Corporation User equipment-based resource management method and system
CN107295678A (zh) * 2016-04-01 2017-10-24 夏普株式会社 基站、用户设备和相关方法
CN110958689A (zh) * 2018-09-26 2020-04-03 维沃移动通信有限公司 资源分配方法和设备
WO2020227868A1 (zh) * 2019-05-10 2020-11-19 Oppo广东移动通信有限公司 传输数据的方法、终端设备和网络设备
CN113261359A (zh) * 2018-12-13 2021-08-13 捷开通讯(深圳)有限公司 预分配资源的管理

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060176845A1 (en) * 2005-01-05 2006-08-10 Nokia Corporation User equipment-based resource management method and system
CN107295678A (zh) * 2016-04-01 2017-10-24 夏普株式会社 基站、用户设备和相关方法
CN110958689A (zh) * 2018-09-26 2020-04-03 维沃移动通信有限公司 资源分配方法和设备
CN113261359A (zh) * 2018-12-13 2021-08-13 捷开通讯(深圳)有限公司 预分配资源的管理
WO2020227868A1 (zh) * 2019-05-10 2020-11-19 Oppo广东移动通信有限公司 传输数据的方法、终端设备和网络设备

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
GUANGDONG OPPO MOBILE TELECOM: "eMBB data transmission to support dynamic resource sharing between eMBB and URLLC", 3GPP TSG RAN WG1 MEETING #87 R1-1611700, 13 November 2016 (2016-11-13), XP051175670 *

Similar Documents

Publication Publication Date Title
JP7031017B2 (ja) アップリンク伝送方法及び装置
WO2020094107A1 (zh) 发送数据的方法、发送数据的装置、以及终端设备
TWI699132B (zh) 用於行動通訊系統之基地台及使用者裝置
WO2020063469A1 (zh) 资源配置方法、基站及终端
WO2020119195A1 (zh) 一种数据传输方法及装置
JP7343587B2 (ja) 通信方法及び装置、端末、ネットワークデバイス、並びに記憶媒体
JP2020504515A (ja) データ伝送方法、機器およびシステム
JP6271019B2 (ja) リソース割当て方法、装置及びシステム
WO2018171695A1 (zh) 无线连接建立方法及装置
US20170303307A1 (en) Method and Apparatus for Generating Buffer Status Report and Communication System
BR112018002768B1 (pt) Métodos de transmissão de dados, aparelho, dispositivo de rede aplicável a um sistema d2d e meio de armazenamento legível por computador
WO2020143773A1 (zh) 传输资源选择方法及装置
WO2020164477A1 (zh) Harq反馈的方法和终端
WO2018082424A1 (zh) 数据传输的方法和装置
JP2022532021A (ja) データ送信方法及び関連装置
CN107113821A (zh) 上行数据传输的方法和装置
CN109756986B (zh) 一种上行数据包资源分配方法和用户终端
WO2021155517A1 (zh) 资源指示方法、装置和终端
WO2018082467A1 (zh) 一种调度方法、终端及基站
CN111148225B (zh) 资源调度方法、装置及设备
WO2014040268A1 (zh) 一种传输方法、系统和终端
WO2018202043A1 (zh) 数据传输方法、设备和系统
JP7307855B2 (ja) 無線通信ネットワークにおける設定ダウンリンク送信および動的ダウンリンク送信をハンドリングする方法および装置
JP6804556B2 (ja) データ送信方法及び装置
WO2023206447A1 (zh) 数据传输的方法、装置、计算机设备和存储介质

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22939295

Country of ref document: EP

Kind code of ref document: A1