WO2023193387A1 - Composite pile foundation structure for steel pipe-concrete branch piles, and construction method therefor - Google Patents

Composite pile foundation structure for steel pipe-concrete branch piles, and construction method therefor Download PDF

Info

Publication number
WO2023193387A1
WO2023193387A1 PCT/CN2022/113800 CN2022113800W WO2023193387A1 WO 2023193387 A1 WO2023193387 A1 WO 2023193387A1 CN 2022113800 W CN2022113800 W CN 2022113800W WO 2023193387 A1 WO2023193387 A1 WO 2023193387A1
Authority
WO
WIPO (PCT)
Prior art keywords
extrusion
expansion
steel pipe
pile
pile foundation
Prior art date
Application number
PCT/CN2022/113800
Other languages
French (fr)
Chinese (zh)
Inventor
沈道旭
韩辉
冯金
吴万林
刘灯明
钟浪
曹乾
李剑锋
陈清树
Original Assignee
中铁四局集团第五工程有限公司
中铁四局集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁四局集团第五工程有限公司, 中铁四局集团有限公司 filed Critical 中铁四局集团第五工程有限公司
Publication of WO2023193387A1 publication Critical patent/WO2023193387A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Definitions

  • the invention relates to the field of geotechnical engineering, and in particular to a steel pipe-concrete support plate pile composite pile foundation structure and a construction method thereof.
  • the main methods to improve the bearing capacity of weak foundations include cement cast-in-place piles, immersed tube cast-in-place piles, drilled cast-in-place piles, concrete prefabricated piles and extruded and expanded branch piles.
  • these methods currently have the following shortcomings: the single pile bearing capacity of cement cast-in-place piles is low and the construction quality is difficult to control; sinking tube cast-in-place piles and bored cast-in-place piles are prone to pile failure due to the influence of grouting pressure, uneven grouting and hole walls.
  • the body is necked, and mud treatment is also very inconvenient.
  • the requirements for hole cleaning and concrete pouring are high, and the original soil cannot be fully utilized, causing greater environmental pollution.
  • the site noise is loud during the construction of concrete prefabricated piles, and there is obvious soil squeezing. The effect may easily cause the pile foundation to float or affect the safety of surrounding buildings.
  • extruded and expanded support plate piles mainly use rotary drilling and then use a support plate drill to squeeze and expand the support plate cavity in the appropriate soil layer.
  • concrete is poured to form a cast-in-place pile with a support plate. It can significantly improve the bearing capacity of a single pile and reduce the pile diameter and length. It has been widely used in many cities. However, due to the complex extrusion and expansion process and difficult construction technology, the construction efficiency is low and the construction cost is high.
  • the purpose of the present invention is to provide a steel pipe-concrete support plate pile composite pile foundation structure and a construction method thereof.
  • a steel pipe-concrete support pile composite pile foundation structure including a plurality of concrete support piles and an open steel pipe fixed inside the plurality of concrete support piles;
  • the open steel pipe includes a steel pipe body, and the side of the steel pipe body
  • a plurality of extruded and expanded openings are provided on the circumferential side of the wall;
  • the plurality of concrete support plate piles include a pile body and a plurality of multiple support plates distributed around the pile body, and the multiple support plates are formed from the extruded and expanded openings of the open steel pipes. Mouth extends outward.
  • the plurality of extruded and expanded openings are symmetrically distributed along the cross-section of the steel pipe body; the plurality of support plates are evenly spaced along the circumference of the pile body.
  • the plurality of concrete support and disk piles are obtained by constructing a continuous multi-branch extrusion and expansion device.
  • the continuous multi-branch extrusion and expansion device includes a chassis, and a connecting plate is symmetrically provided above the chassis.
  • the chassis and A telescopic rod is vertically fixed between the connecting plates; a plurality of extruding and expanding arms are installed between the connecting plate and the chassis, and the multiple extruding and expanding arms include at least two groups of mutually hinged extruding and expanding units, wherein: The top end of the extrusion and expansion unit of the connecting plate is hinged with the connecting plate, and the bottom end of the extrusion and expansion unit close to the chassis is hinged with the chassis; the extrusion and expansion unit includes a first extrusion and expansion arm and a second extrusion and expansion arm that are hinged to each other; the telescopic expansion unit A limited support steel ring is slidably connected to the rod, and the limited support steel ring is hingedly connected to the extrusion and expansion unit.
  • the limiting support steel ring includes an inner ring for slidingly fitting with the telescopic rod and an outer ring for hinged connection with the extrusion and expansion unit; the inner ring and the outer ring are fixedly connected through the limiting rod; A connecting lug is fixed on the outside of the outer ring, and a connecting hole is opened in the horizontal direction through the connecting lug.
  • the extrusion and expansion unit is hingedly connected to the outer ring through a pin that is passed through the connecting hole.
  • the first extrusion and expansion arm and the second extrusion and expansion arm are hinged through a rotation limiting device;
  • the rotation limiting device includes a rotating shaft and a first connecting block and a second connecting block that are rotationally connected to the rotating shaft, so
  • the first connecting block and the second connecting block are used to connect with the first extruding and expanding arm and the second extruding and expanding arm respectively;
  • the middle part of one side of the first connecting block has a U-shaped clamping opening, and the first connecting block
  • a pair of sleeves are symmetrically fixed on both sides of the U-shaped clamping opening, and the first connecting block is rotationally connected to the rotating shaft through the sleeves;
  • a limiting clamping block is fixed on one side of the second connecting block, and the limiting clamp
  • the block and the second connecting block are not in the same plane, and the obtuse angle formed by the limiting block and the second connecting block faces the first connecting block;
  • a sleeve for rotational connection with the rotating shaft is fixed on
  • the length of the limiting block is greater than the depth of the U-shaped blocking opening.
  • the present invention also provides the above-mentioned construction method of the steel pipe-concrete support pile composite pile foundation structure, which includes the following steps:
  • the continuous multi-branch extrusion and expansion device When the squeeze and expansion device is pressed, When the target aperture is reached, the continuous multi-branch extrusion and expansion device is stretched by the hydraulic device to reset the continuous multi-branch extrusion and expansion device, that is, the extrusion and expansion at this position is completed; when the open steel pipe has a multi-layer extrusion and expansion opening , change the position of the continuous multi-tube extrusion and expansion device to align it with the corresponding extrusion and expansion opening, repeat step (2) to complete the extrusion and expansion at the corresponding position; until all extrusion and expansion are completed, lift out the continuous multi-tube extrusion and expansion device; pass Using a continuous multi-branch extrusion and expansion device, during the extrusion and expansion process, multiple branches can be extruded and expanded simultaneously within the longitudinal length range of the pile foundation axis and the cross section, which can reduce the number of extrusion and expansion of conventional construction methods and avoid pile extrusion due to extrusion and expansion. The complexity of the expansion
  • the steel pipe-concrete support-disc pile composite pile foundation structure provided by the invention includes a plurality of concrete support-disk piles and an open steel pipe fixed inside the multiple concrete support-disk piles.
  • the open steel pipe can reduce the load of adjacent pile foundations during construction.
  • the resulting soil squeezing effect affects the hole wall and adjacent pile foundations, reducing the collapse of hole walls lacking support and improving the applicability of pile foundations on weak foundations.
  • interrupted openings can greatly save steel and reduce project costs.
  • the steel pipe-concrete supporting and disc pile composite pile foundation provided by the present invention can not only greatly improve the joint bearing performance of the composite pile foundation and the pile quality of the internal rigid piles, but also better exert the effect of supporting and disc piles, and can significantly improve the support and disc pile foundation.
  • the applicable scope of piles provides new technical methods for the treatment of weak foundations, and has certain economic, technical and engineering benefits.
  • Figure 1 is a schematic diagram of the steel pipe-concrete support pile composite pile foundation structure
  • Figure 2 is a schematic structural diagram of an open steel pipe
  • Figure 3 is a schematic diagram of the construction of open steel pipes and continuous multi-branch extrusion and expansion devices
  • Figure 4 is a schematic structural diagram of the continuous multi-branch extrusion and expansion device when it is not extruded and expanded;
  • Figure 5 is a schematic structural diagram of the continuous multi-branch extrusion and expansion device in the extrusion and expansion state
  • Figure 6 is a schematic structural diagram of the limit support steel ring
  • Figure 7 is a schematic structural diagram of the outer ring
  • Figure 8 is a schematic structural diagram of the rotation limiting device
  • Figure 9 is an exploded view of the rotation limiting device
  • a steel pipe-concrete support pile composite pile foundation structure includes a plurality of concrete support piles 1 and an open steel pipe 2 fixed inside the multiple concrete support piles;
  • the open steel pipe 2 includes a steel pipe body 21,
  • a plurality of extruded openings 22 are provided on the side wall of the steel pipe body;
  • the open steel pipe has two layers of extruded openings, and the extruded openings in each layer are distributed symmetrically along the cross section of the steel pipe body; multiple branches
  • the concrete support plate pile 1 includes a pile body 11 and several multi-branch support plates 12 distributed around the pile body.
  • the multi-branch support plates 12 extend outward from the extruded and expanded mouth 22 of the open steel pipe.
  • the positions that need to be squeezed and expanded are determined in advance, and the side walls of the steel pipe body are positioned and opened.
  • the squeezed and expanded openings are symmetrically distributed along the cross section of the steel pipe, and the number, length and The width can be factory-prefabricated according to the design requirements of the pile foundation.
  • the multiple concrete support piles 1 are constructed through the continuous multi-branch extrusion and expansion device 3.
  • the continuous multi-branch extrusion and expansion device 3 includes a chassis 31.
  • a connecting plate 32 is symmetrically provided above the chassis 31.
  • the chassis 31 and A telescopic rod 33 is fixed vertically between the connecting plates 32; a plurality of extruding and expanding arms are installed between the connecting plate 32 and the chassis 31, and the multiple extruding and expanding arms are evenly spaced along the periphery of the chassis 31 and the connecting plate 32. Distribute it so that the multiple branches obtained by extrusion and expansion are evenly distributed around the pile foundation.
  • the positions of the multiple extrusion and expansion arms correspond to the opening direction of the extrusion and expansion opening 22 in the open steel pipe.
  • the expansion units in the multiple extrusion and expansion arms can extend from the extrusion expansion opening 22 and align with the hole wall.
  • the multiple squeezing and expansion arms include at least two groups of mutually hinged squeezing and expansion units 34, wherein: the top of the squeezing and expansion unit close to the connecting plate is hinged to the connecting plate, and the bottom end of the squeezing and expanding unit close to the chassis Hinged with the chassis; the extrusion and expansion unit 34 includes a first extrusion and expansion arm 341 and a second extrusion and expansion arm 342 that are hinged to each other; the telescopic rod 33 is slidably connected to a limited support steel ring 35, and the limit support steel ring 35 and the extrusion and expansion unit 34 Articulated.
  • the number of multi-branch extrusion and expansion arms is two groups, and each multi-branch expansion arm has three sets of extrusion and expansion units. It should be noted that the number of multi-branch extrusion and expansion arms and the number of extrusion and expansion units can be determined according to the opening. The number and size of the extrusion and expansion openings in the open steel pipe 2 are adjusted accordingly so that they match each other. During the extrusion and expansion process, it is only necessary to adjust the positions of the continuous multiple expansion devices at one time to make them match the extrusion expansion openings in the open steel pipe 2. Corresponding to the openings, a certain area can be squeezed and expanded to improve construction efficiency.
  • the limit support steel ring 35 includes an inner ring 351 for slidingly fitting with the telescopic rod 33 and an outer ring 352 for hinged connection with the extrusion and expansion unit 34; the inner ring 351 and the outer ring 352 pass through the limit
  • the rod 353 is fixedly connected;
  • a connecting lug 354 is fixed on the outside of the outer ring 352, and the connecting lug 354 has a connecting hole 355 extending through the connecting lug in the horizontal direction; the extrusion and expansion unit 34 communicates with the outer ring through a pin 356 that is inserted in the connecting hole. 352 Articulated.
  • the number of limiting rods 353 is four, and the four limiting rods are evenly distributed at 90° to each other between the inner ring 351 and the outer ring 352 .
  • the limiting rod 353 serves as a connecting structure between the inner ring 351 and the outer ring 352, which can significantly improve the structural stability of the limiting support steel ring.
  • the first extrusion and expansion arm 341 and the second extrusion and expansion arm 342 are hinged through a rotation limiting device;
  • the rotation limiting device includes a rotating shaft 361 and a first connecting block that is rotationally connected to the rotating shaft. 362 and the second connecting block 363.
  • the first connecting block 362 and the second connecting block 363 are used to connect with the first extruding and expanding arm 341 and the second extruding and expanding arm 342 respectively; the middle part of one side of the first connecting block 362 has a U shape.
  • the first connecting block 364 is symmetrically fixed with a pair of sleeves 365 on both sides of the U-shaped clamping opening 364.
  • the first connecting block 362 is rotationally connected to the rotating shaft 361 through the sleeves; one side of the second connecting block 363 is fixed with a limited number.
  • the limiting blocking block 366 is not in the same plane as the second connecting block 363, and the obtuse angle formed by the limiting blocking block 366 and the second connecting block 363 faces the first connecting block 362; the limiting blocking block 366 A sleeve 365 for rotational connection with the rotating shaft is fixed on one side of the U-shaped stopper 366 .
  • the length of the limiter block 366 is greater than the depth of the U-shaped stopper opening 64 .
  • the present invention also provides the above-mentioned construction method of the steel pipe-concrete support pile composite pile foundation structure, which includes the following steps:
  • the open steel pipe is hoisted to the target depth in the hole to support the hole wall, and then the positions of each extrusion and expansion opening are marked to facilitate the subsequent work of multiple continuous extrusion and expansion devices.
  • the diameter of the open steel pipe is slightly smaller than the hole diameter, making it easy to hoist.
  • the intermittent opening can greatly save steel, reduce project costs, and has good hole wall support functions; in specific applications , according to the design requirements of the support plate pile foundation, the position that needs to be squeezed and expanded can be determined in advance, and the side wall of the steel pipe is positioned and opened.
  • the squeezed and expanded openings are symmetrically distributed along the cross section of the steel pipe, and the number, length and width can be determined according to the pile foundation.
  • the design requires factory prefabricated production.
  • the continuous multi-branch extrusion and expansion device When the squeeze and expansion device is pressed, When the target aperture is reached, the continuous multi-branch extrusion and expansion device is stretched by the hydraulic device to reset the continuous multi-branch extrusion and expansion device, that is, the extrusion and expansion at this position is completed; when the open steel pipe has a multi-layer extrusion and expansion opening , change the position of the continuous multi-tube extrusion and expansion device to align it with the corresponding extrusion and expansion opening, and repeat step (2) to complete the extrusion and expansion at the corresponding position; until all extrusion and expansion are completed, lift out the continuous multi-tube extrusion and expansion device.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Disclosed in the present invention is a composite pile foundation structure for steel pipe-concrete branch piles, and a construction method therefor. The composite pile foundation structure comprises a concrete branch pile with a plurality of branches and an open steel pipe fixed inside the concrete branch pile with a plurality of branches, wherein the open steel pipe comprises a steel pipe body, and a plurality of squeezing and expansion openings are formed in the periphery of a side wall of the steel pipe body. The open steel pipe can reduce the impact of a soil squeezing effect on a hole wall and on an adjacent pile foundation, thereby reducing the collapsing of the hole wall, and improving the applicability of the pile foundation on soft ground; and the construction efficiency is significantly improved, the damage of the soil squeezing effect to a recently formed concrete pile body is reduced, and a hidden hazard of the pile foundation is thus avoided. By means of the composite pile foundation for steel pipe-concrete branch piles provided in the present invention, not only can the common bearing performance of the composite pile foundation and the pile forming quality of an internal rigid pile be greatly improved, so as to make the branch pile play a better role, but also an application range of the branch pile can be significantly extended, thereby providing a new technical method for the treatment of the soft ground.

Description

一种钢管-混凝土支盘桩复合桩基结构及其施工方法A steel pipe-concrete support pile composite pile foundation structure and its construction method 技术领域Technical field
本发明涉及一种涉及岩土工程领域,具体涉及一种钢管-混凝土支盘桩复合桩基结构及其施工方法。The invention relates to the field of geotechnical engineering, and in particular to a steel pipe-concrete support plate pile composite pile foundation structure and a construction method thereof.
背景技术Background technique
我国幅员辽阔,地质条件分布十分复杂,淤泥土、黄土等软弱地基分布广范。随着我国经济的高速发展,地下空间得到极大开发,在经济发达、交通网络密集的地区,软弱地基承载力严重影响了建筑结构和基础设施的发展。软弱地基一般含水率较高、压缩性大、强度低,且土层层状分布复杂,在此类地基上建设密集的铁路、公路、市政及水利工程时,必须进行必要的加固处理,增加地基的稳定性及减小工后沉降。例如高速铁路桥梁的桩基由于受到桥梁等上部结构传来的荷载,产生的沉降直接影响到高速铁路线路的平稳性及其安全运营。Our country has a vast territory, the geological conditions are very complex, and weak foundations such as silt and loess are distributed over a wide range. With the rapid development of my country's economy, underground space has been greatly developed. In areas with developed economies and dense transportation networks, the bearing capacity of weak foundations has seriously affected the development of building structures and infrastructure. Weak foundations generally have high moisture content, high compressibility, low strength, and complex soil layer distribution. When building dense railways, highways, municipal and water conservancy projects on such foundations, necessary reinforcement must be carried out to increase the foundation. stability and reduce post-construction settlement. For example, the pile foundations of high-speed railway bridges are subject to loads from superstructures such as bridges, and the resulting settlement directly affects the stability and safe operation of high-speed railway lines.
目前提高软弱地基承载力的方法主要有水泥灌注桩、沉管灌注桩、钻孔灌注桩、混凝土预制桩和挤扩支盘桩等。但是这些方法目前存在以下不足:水泥灌注桩单桩承载力较低、施工质量难以控制;沉管灌注桩、钻孔灌注桩由于注浆压力、注浆不均和孔壁的影响,容易发生桩身缩颈,泥浆处理也很不方便,对清孔及混凝土浇筑要求较高,不能充分利用原有土体,环境污染较大;混凝土预制桩在施工时场地噪音大,且存在明显的挤土效应,容易导致桩基上浮或者影响周围建筑物的安全。挤扩支盘桩作为一种新型桩基技术,主要采用旋挖钻孔后再使用支盘钻机在合适的土层挤扩形成支盘空腔,最后浇筑混凝土形成带有支盘的灌注桩,可以显著提高单桩的承载力,减小桩径和桩长,已在许多城市广泛应用。然而,由于挤扩工艺复杂,施工技术难,导致施工效率较低,且施工造价较高。其次,由于成孔后需要进行二次挤扩,对孔壁影响较大,且由于二次挤扩不可避免对相邻桩孔产生影响,缺少支护的孔壁易塌陷,而且挤土效应导致孔径发生变化,导致成桩质量不理想,此种现象在软弱地基更为明显。因此,当前由于技术限制,挤扩支盘桩并不适用于大部分软弱地基。At present, the main methods to improve the bearing capacity of weak foundations include cement cast-in-place piles, immersed tube cast-in-place piles, drilled cast-in-place piles, concrete prefabricated piles and extruded and expanded branch piles. However, these methods currently have the following shortcomings: the single pile bearing capacity of cement cast-in-place piles is low and the construction quality is difficult to control; sinking tube cast-in-place piles and bored cast-in-place piles are prone to pile failure due to the influence of grouting pressure, uneven grouting and hole walls. The body is necked, and mud treatment is also very inconvenient. The requirements for hole cleaning and concrete pouring are high, and the original soil cannot be fully utilized, causing greater environmental pollution. The site noise is loud during the construction of concrete prefabricated piles, and there is obvious soil squeezing. The effect may easily cause the pile foundation to float or affect the safety of surrounding buildings. As a new type of pile foundation technology, extruded and expanded support plate piles mainly use rotary drilling and then use a support plate drill to squeeze and expand the support plate cavity in the appropriate soil layer. Finally, concrete is poured to form a cast-in-place pile with a support plate. It can significantly improve the bearing capacity of a single pile and reduce the pile diameter and length. It has been widely used in many cities. However, due to the complex extrusion and expansion process and difficult construction technology, the construction efficiency is low and the construction cost is high. Secondly, due to the need for secondary extrusion and expansion after the hole is formed, it will have a greater impact on the hole wall, and because the secondary extrusion and expansion will inevitably have an impact on adjacent pile holes, the hole wall that lacks support will easily collapse, and the soil squeeze effect will cause the hole diameter to change. Changes lead to unsatisfactory pile quality. This phenomenon is more obvious in weak foundations. Therefore, currently due to technical limitations, extruded expanded branch piles are not suitable for most weak foundations.
鉴于此,目前亟需一种施工质量可靠、承载能力高、经济效益优良的复合桩基。In view of this, there is an urgent need for a composite pile foundation with reliable construction quality, high bearing capacity and excellent economic benefits.
发明内容Contents of the invention
针对现有技术的不足,本发明的目的是提供一种钢管-混凝土支盘桩复合桩基结构及其施工方法。In view of the shortcomings of the existing technology, the purpose of the present invention is to provide a steel pipe-concrete support plate pile composite pile foundation structure and a construction method thereof.
为实现上述目的,本发明采用的技术方案为:In order to achieve the above objects, the technical solutions adopted by the present invention are:
一种钢管-混凝土支盘桩复合桩基结构,包括多支混凝土支盘桩以及固定在多支混凝土支盘桩内部的开口式钢管;所述开口式钢管包括钢管本体,所述钢管本体的侧壁周侧开设有多个挤扩口;所述多支混凝土支盘桩包括桩身以及分布在桩身周侧的若干个多支支盘,所述多支支盘从开口式钢管的挤扩口延伸向外。A steel pipe-concrete support pile composite pile foundation structure, including a plurality of concrete support piles and an open steel pipe fixed inside the plurality of concrete support piles; the open steel pipe includes a steel pipe body, and the side of the steel pipe body A plurality of extruded and expanded openings are provided on the circumferential side of the wall; the plurality of concrete support plate piles include a pile body and a plurality of multiple support plates distributed around the pile body, and the multiple support plates are formed from the extruded and expanded openings of the open steel pipes. Mouth extends outward.
优选的,所述多个挤扩口沿着钢管本体横截面对称分布;所述多支支盘沿桩身周侧均匀间隔分布。Preferably, the plurality of extruded and expanded openings are symmetrically distributed along the cross-section of the steel pipe body; the plurality of support plates are evenly spaced along the circumference of the pile body.
作为优选的技术方案,所述多支混凝土支盘桩通过连续多支挤扩装置施工得到,所述连续多支挤扩装置包括底盘,所述底盘的上方对称设有连接盘,所述底盘和连接盘之间竖直固定有伸缩杆;所述连接盘与底盘之间安装有多条多支挤扩臂,所述多支挤扩臂包括至少两组相互铰接的挤扩单元,其中:靠近连接盘的挤扩单元的顶端与连接盘铰接,靠近底盘的挤扩单元的底端与底盘铰接;所述挤扩单元包括互相铰接的第一挤扩臂和第二挤扩臂;所述伸缩杆上滑动连接有限位支撑钢圈,所述限位支撑钢圈与挤扩单元铰接。As a preferred technical solution, the plurality of concrete support and disk piles are obtained by constructing a continuous multi-branch extrusion and expansion device. The continuous multi-branch extrusion and expansion device includes a chassis, and a connecting plate is symmetrically provided above the chassis. The chassis and A telescopic rod is vertically fixed between the connecting plates; a plurality of extruding and expanding arms are installed between the connecting plate and the chassis, and the multiple extruding and expanding arms include at least two groups of mutually hinged extruding and expanding units, wherein: The top end of the extrusion and expansion unit of the connecting plate is hinged with the connecting plate, and the bottom end of the extrusion and expansion unit close to the chassis is hinged with the chassis; the extrusion and expansion unit includes a first extrusion and expansion arm and a second extrusion and expansion arm that are hinged to each other; the telescopic expansion unit A limited support steel ring is slidably connected to the rod, and the limited support steel ring is hingedly connected to the extrusion and expansion unit.
进一步优选的,所述限位支撑钢圈包括用于与伸缩杆滑动配合的内圈以及用于与挤扩单元铰接的外圈;所述内圈与外圈通过限位杆固定连接;所述外圈的外侧固定有连接耳,所述连接耳沿水平方向开设有贯通连接耳的连接孔;所述挤扩单元通过穿设在连接孔内的销轴与外圈铰接。Further preferably, the limiting support steel ring includes an inner ring for slidingly fitting with the telescopic rod and an outer ring for hinged connection with the extrusion and expansion unit; the inner ring and the outer ring are fixedly connected through the limiting rod; A connecting lug is fixed on the outside of the outer ring, and a connecting hole is opened in the horizontal direction through the connecting lug. The extrusion and expansion unit is hingedly connected to the outer ring through a pin that is passed through the connecting hole.
更进一步优选的,所述第一挤扩臂和第二挤扩臂通过转动限位装置铰接;所述转动限位装置包括转轴以及与转轴转动连接的第一连接块和第二连接块,所述第一连接块和第二连接块分别用于与第一挤扩臂和第二挤扩臂连接;所述第一连接块的一侧中部具有U型卡位口,所述第一连接块位于U型卡位口的两侧对称固定有一对套筒,所述第一连接块通过套筒与转轴转动连接;所述第二连接块的一侧固定有限位卡块,所述限位卡块与第二连接块不在同一平面内,且限位卡块与第二连接块形成的钝角夹角朝向第一连接块;所述限位卡块的一侧面固定有用于与转轴转动连接的套筒,所述限位卡块的长度大于U型卡位口的深度。当第一连接块和第二连接块相对转动时,可以保证第一连接块和第二连接块之间的夹角始终小于180°,从而能够限制第一挤扩臂和第二挤扩臂之间的相对夹角,使挤扩单元始终具有向外侧挤扩的倾向。More preferably, the first extrusion and expansion arm and the second extrusion and expansion arm are hinged through a rotation limiting device; the rotation limiting device includes a rotating shaft and a first connecting block and a second connecting block that are rotationally connected to the rotating shaft, so The first connecting block and the second connecting block are used to connect with the first extruding and expanding arm and the second extruding and expanding arm respectively; the middle part of one side of the first connecting block has a U-shaped clamping opening, and the first connecting block A pair of sleeves are symmetrically fixed on both sides of the U-shaped clamping opening, and the first connecting block is rotationally connected to the rotating shaft through the sleeves; a limiting clamping block is fixed on one side of the second connecting block, and the limiting clamp The block and the second connecting block are not in the same plane, and the obtuse angle formed by the limiting block and the second connecting block faces the first connecting block; a sleeve for rotational connection with the rotating shaft is fixed on one side of the limiting block. cylinder, the length of the limiting block is greater than the depth of the U-shaped blocking opening. When the first connecting block and the second connecting block rotate relative to each other, it can be ensured that the angle between the first connecting block and the second connecting block is always less than 180°, thereby limiting the relationship between the first extruding and expanding arm and the second extruding and expanding arm. The relative angle between them makes the extrusion and expansion unit always have a tendency to expand outward.
本发明还提供了上述所述的钢管-混凝土支盘桩复合桩基结构的施工方法,包括以下步骤:The present invention also provides the above-mentioned construction method of the steel pipe-concrete support pile composite pile foundation structure, which includes the following steps:
(1)钻孔成孔至指定深度后,将开口式钢管吊装至孔内目标深度,实现对孔壁的支护,然后标记各个挤扩口的位置,便于后期连续多支挤扩装置的工作;与常规全截面密封钢管相比,间断式开口可以极大节省钢材,降低工程造价,且具有良好的孔壁支护功能;(1) After the hole is drilled to the specified depth, the open steel pipe is hoisted to the target depth in the hole to support the hole wall, and then the positions of each extrusion and expansion opening are marked to facilitate the subsequent work of multiple continuous extrusion and expansion devices. ;Compared with conventional full-section sealed steel pipes, intermittent openings can greatly save steel, reduce project costs, and have good hole wall support functions;
(2)通过连接盘将连续多支挤扩装置与外部液压装置连接,将连续多支挤扩装置吊装至开口式钢管内并使其多支挤扩臂分别对准开口式钢管的挤扩口;启动液压装置对连续多支挤扩装置施加向下的作用力时使其发生压缩,多支挤扩臂会向外延伸,对桩孔附近的地基土进行挤压,扩大孔径,当挤扩至目标孔径时,通过液压装置对连续多支挤扩装置进行拉伸,即可使连续多支挤扩装置复位,即完成此处位置的挤扩;当开口式钢管具有多层挤扩口时,改变连续多支挤扩装置的位置使其与对应的挤扩口对齐,重复步骤(2)即可完成相应位置的挤扩;直至全部挤扩完成,吊出连续多支挤扩装置;通过使用连续多支挤扩装置,在挤扩过程中可以在桩基轴线纵向长度范围内与横截面同时挤扩多个支口,可以减少常规工法的挤扩次数,避免由于挤扩支盘桩挤扩工艺的复杂性导致需要多次挤扩才可形成具有承载力较高的多支桩基结构的问题,显著提高了施工效率,降低工程造价。(2) Connect the continuous multiple extrusion and expansion devices to the external hydraulic device through the connecting plate, hoist the continuous multiple extrusion and expansion devices into the open steel pipe and align their multiple extrusion and expansion arms with the extrusion and expansion openings of the open steel pipe. ; When the hydraulic device is started to exert downward force on the continuous multi-branch extrusion and expansion device, it will be compressed. The multi-branch extrusion and expansion arms will extend outward to squeeze the foundation soil near the pile hole and expand the hole diameter. When the squeeze and expansion device is pressed, When the target aperture is reached, the continuous multi-branch extrusion and expansion device is stretched by the hydraulic device to reset the continuous multi-branch extrusion and expansion device, that is, the extrusion and expansion at this position is completed; when the open steel pipe has a multi-layer extrusion and expansion opening , change the position of the continuous multi-tube extrusion and expansion device to align it with the corresponding extrusion and expansion opening, repeat step (2) to complete the extrusion and expansion at the corresponding position; until all extrusion and expansion are completed, lift out the continuous multi-tube extrusion and expansion device; pass Using a continuous multi-branch extrusion and expansion device, during the extrusion and expansion process, multiple branches can be extruded and expanded simultaneously within the longitudinal length range of the pile foundation axis and the cross section, which can reduce the number of extrusion and expansion of conventional construction methods and avoid pile extrusion due to extrusion and expansion. The complexity of the expansion process leads to the problem that multiple expansions are needed to form a multi-branch pile foundation structure with high bearing capacity, which significantly improves the construction efficiency and reduces the project cost.
(3)清理孔内由于挤扩产生的积渣,然后向孔内吊装钢筋笼并进行注浆,注浆时水泥浆体可以沿着开口式钢管中的挤扩口流向被挤扩产生的空间内最终形成支盘,成型后得到钢管-多支混凝土支盘桩复合桩基。(3) Clean the slag accumulated in the hole due to squeeze and expansion, then hoist the steel cage into the hole and perform grouting. During grouting, the cement slurry can flow along the squeeze and expand opening in the open steel pipe to the space created by the squeeze and expansion. The support plate is finally formed inside, and after forming, a steel pipe-multiple concrete support plate pile composite pile foundation is obtained.
与现有技术相比,本发明的有益效果为:Compared with the prior art, the beneficial effects of the present invention are:
本发明提供的钢管-混凝土支盘桩复合桩基结构,包括多支混凝土支盘桩以及固定在多支混凝土支盘桩内部的开口式钢管,开口式钢管可以减小相邻桩基在施工时导致的挤土效应对孔壁以及相邻桩基的影响,减小缺乏支护的孔壁塌陷,提高桩基在软弱地基的适用性。其次,减小挤土效应对新形成水泥桩身的破坏,避免桩基的隐蔽性病害。避免了常规挤扩成孔后二次挤扩导致孔壁塌陷、挤土效应导致孔径发生变化影响成桩质量等一系列问题,而且显著提高桩基承载力,增高施工效率。此外,与常规全截面密封钢管桩相比,间断式开口可以极大节省钢材,降低工程造价。The steel pipe-concrete support-disc pile composite pile foundation structure provided by the invention includes a plurality of concrete support-disk piles and an open steel pipe fixed inside the multiple concrete support-disk piles. The open steel pipe can reduce the load of adjacent pile foundations during construction. The resulting soil squeezing effect affects the hole wall and adjacent pile foundations, reducing the collapse of hole walls lacking support and improving the applicability of pile foundations on weak foundations. Secondly, reduce the damage caused by the soil squeezing effect to the newly formed cement pile body and avoid hidden diseases of the pile foundation. It avoids a series of problems such as hole wall collapse caused by secondary expansion after conventional extrusion and expansion, and hole diameter changes due to soil squeezing effect, which affects pile quality. It also significantly improves the pile foundation bearing capacity and construction efficiency. In addition, compared with conventional full-section sealed steel pipe piles, interrupted openings can greatly save steel and reduce project costs.
本发明提供的钢管-混凝土支盘桩复合桩基,不仅能大幅提升复合桩基的共同承载性能以及内部刚性桩的成桩质量,更好的发挥支盘桩的效果,并可以显著提高支盘桩的适用范围,为软弱地基的处理提供新的技术方法,具有一定的经济、技术、工程效益。The steel pipe-concrete supporting and disc pile composite pile foundation provided by the present invention can not only greatly improve the joint bearing performance of the composite pile foundation and the pile quality of the internal rigid piles, but also better exert the effect of supporting and disc piles, and can significantly improve the support and disc pile foundation. The applicable scope of piles provides new technical methods for the treatment of weak foundations, and has certain economic, technical and engineering benefits.
附图说明Description of the drawings
图1为钢管-混凝土支盘桩复合桩基结构的示意图;Figure 1 is a schematic diagram of the steel pipe-concrete support pile composite pile foundation structure;
图2为开口式钢管的结构示意图;Figure 2 is a schematic structural diagram of an open steel pipe;
图3为开口式钢管与连续多支挤扩装置配合施工的示意图;Figure 3 is a schematic diagram of the construction of open steel pipes and continuous multi-branch extrusion and expansion devices;
图4为连续多支挤扩装置在未挤扩时的结构示意图;Figure 4 is a schematic structural diagram of the continuous multi-branch extrusion and expansion device when it is not extruded and expanded;
图5为连续多支挤扩装置的在挤扩状态时的结构示意图;Figure 5 is a schematic structural diagram of the continuous multi-branch extrusion and expansion device in the extrusion and expansion state;
图6为限位支撑钢圈的结构示意图;Figure 6 is a schematic structural diagram of the limit support steel ring;
图7为外圈的结构示意图;Figure 7 is a schematic structural diagram of the outer ring;
图8为转动限位装置的结构示意图;Figure 8 is a schematic structural diagram of the rotation limiting device;
图9为转动限位装置的分解图;Figure 9 is an exploded view of the rotation limiting device;
附图标记:1-多支混凝土支盘桩,11-桩身,12-多支支盘,2-开口式钢管,21-钢管本体,22-挤扩口,3-连续多支挤扩装置,31-底盘,32-连接盘,33-伸缩杆,34-挤扩单元,341-第一挤扩臂,342-第二挤扩臂,35-限位支撑钢圈,351-内圈,352-外圈,353-限位杆,354-连接耳,355-连接孔,356-销轴,361-转轴,362-第一连接块,363-第二连接块,364-U型卡位口,365-套筒,366-限位卡块。Reference signs: 1-Multiple concrete support disk piles, 11-Pile body, 12-Multiple support disks, 2-Open steel pipe, 21-Steel pipe body, 22-Extrusion expansion mouth, 3-Continuous multi-extrusion expansion device , 31-chassis, 32-connecting plate, 33-telescopic rod, 34-extrusion and expansion unit, 341-first extrusion and expansion arm, 342-second extrusion and expansion arm, 35-limiting support steel ring, 351-inner ring, 352-outer ring, 353-limiting rod, 354-connecting ear, 355-connecting hole, 356-pin, 361-rotating shaft, 362-first connecting block, 363-second connecting block, 364-U-shaped clamping position Mouth, 365-sleeve, 366-limiting block.
具体实施方式Detailed ways
下面结合实施例和附图对本实用新型作更进一步的说明,以使本领域的技术人员可以更好地理解本实用新型并能予以实施,但所举实施例不作为对本实用新型的限定。The present utility model will be further described below with reference to the embodiments and drawings, so that those skilled in the art can better understand the present utility model and implement it, but the examples are not intended to limit the present utility model.
需要说明的是,本实用新型中“固定”、“连接”、“安装”、“固定连接”等均表示相互连接的两部件之间是固定在一起,一般是通过焊接、螺钉等方式固定在一起。“滑动连接”、“铰接”等是指两部件连接在一起并能相对运动。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。It should be noted that "fixed", "connected", "installed", "fixed connection", etc. in this utility model all mean that two components connected to each other are fixed together, usually by welding, screws, etc. Together. "Sliding connection", "hinged", etc. mean that two parts are connected together and can move relative to each other. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
需要理解的是,术语“上”、“下”、“顶”、 “底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为本实用新型的限制。本实用新型中所述“第一”、“第二”不代表具体的数量及顺序,仅仅是用于名称的区分。It should be understood that the orientation or positional relationship indicated by the terms "upper", "lower", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional relationship shown in the drawings and are only In order to facilitate the description of the present invention and simplify the description, it is not intended to indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention. The "first" and "second" mentioned in the present invention do not represent the specific number and order, but are only used for the distinction of names.
参考图1,一种钢管-混凝土支盘桩复合桩基结构,包括多支混凝土支盘桩1以及固定在多支混凝土支盘桩内部的开口式钢管2;开口式钢管2包括钢管本体21,钢管本体的侧壁周侧开设有多个挤扩口22;参考图2,开口式钢管共具有两层挤扩口,每层中的挤扩口沿着钢管本体横截面对称间隔分布;多支混凝土支盘桩1包括桩身11以及分布在桩身周侧的若干个多支支盘12,多支支盘12从开口式钢管的挤扩口22延伸向外。具体应用中,根据多支混凝土支盘桩1设计要求,预先确定需要挤扩的位置,在钢管本体的侧壁进行定位、开口,挤扩口沿着钢管横截面对称分布,而数量、长度和宽度均可根据桩基的设计要求进行工厂化预制生产。Referring to Figure 1, a steel pipe-concrete support pile composite pile foundation structure includes a plurality of concrete support piles 1 and an open steel pipe 2 fixed inside the multiple concrete support piles; the open steel pipe 2 includes a steel pipe body 21, A plurality of extruded openings 22 are provided on the side wall of the steel pipe body; referring to Figure 2, the open steel pipe has two layers of extruded openings, and the extruded openings in each layer are distributed symmetrically along the cross section of the steel pipe body; multiple branches The concrete support plate pile 1 includes a pile body 11 and several multi-branch support plates 12 distributed around the pile body. The multi-branch support plates 12 extend outward from the extruded and expanded mouth 22 of the open steel pipe. In specific applications, according to the design requirements of multiple concrete support piles 1, the positions that need to be squeezed and expanded are determined in advance, and the side walls of the steel pipe body are positioned and opened. The squeezed and expanded openings are symmetrically distributed along the cross section of the steel pipe, and the number, length and The width can be factory-prefabricated according to the design requirements of the pile foundation.
多支混凝土支盘桩1通过连续多支挤扩装置3施工得到,参考图3至图5,连续多支挤扩装置3包括底盘31,底盘31的上方对称设有连接盘32,底盘31和连接盘32之间竖直固定有伸缩杆33;连接盘32与底盘31之间安装有多条多支挤扩臂,多条多支挤扩臂沿着底盘31和连接盘32的四周间隔均匀分布,以使挤扩得到的多个支口均匀分布在桩基的周侧。施工时,多支挤扩臂的位置对应开口式钢管中挤扩口22的开口方向,挤扩过程中,多支挤扩臂中的挤扩单元能够从挤扩口22伸出并对孔壁周围的土体进行挤压;多支挤扩臂包括至少两组相互铰接的挤扩单元34,其中:靠近连接盘的挤扩单元的顶端与连接盘铰接,靠近底盘的挤扩单元的底端与底盘铰接;挤扩单元34包括互相铰接的第一挤扩臂341和第二挤扩臂342;伸缩杆33上滑动连接有限位支撑钢圈35,限位支撑钢圈35与挤扩单元34铰接。图4中多支挤扩臂的数量为两组,每个多支挤扩臂具有三组挤扩单元,需要说明的是,多支挤扩臂的数量和挤扩单元的数量均可根据开口式钢管2中挤扩口的数量和尺寸进行相应调整,以使它们互相匹配,在挤扩过程中,只需一次调整连续多支挤扩装置的位置使其与开口式钢管2中的挤扩口对应,即可对某段区域进行挤扩,提高施工效率。参考图6和图7,限位支撑钢圈35包括用于与伸缩杆33滑动配合的内圈351以及用于与挤扩单元34铰接的外圈352;内圈351与外圈352通过限位杆353固定连接;外圈352的外侧固定有连接耳354,连接耳354沿水平方向开设有贯通连接耳的连接孔355;挤扩单元34通过穿设在连接孔内的销轴356与外圈352铰接。进一步优选的,限位杆353的数量为四个,四个限位杆彼此之间呈90°均匀分布在内圈351和外圈352之间。限位杆353作为内圈351和外圈352之间的连接结构,可以显著提高限位支撑钢圈的结构稳定性。The multiple concrete support piles 1 are constructed through the continuous multi-branch extrusion and expansion device 3. Referring to Figures 3 to 5, the continuous multi-branch extrusion and expansion device 3 includes a chassis 31. A connecting plate 32 is symmetrically provided above the chassis 31. The chassis 31 and A telescopic rod 33 is fixed vertically between the connecting plates 32; a plurality of extruding and expanding arms are installed between the connecting plate 32 and the chassis 31, and the multiple extruding and expanding arms are evenly spaced along the periphery of the chassis 31 and the connecting plate 32. Distribute it so that the multiple branches obtained by extrusion and expansion are evenly distributed around the pile foundation. During construction, the positions of the multiple extrusion and expansion arms correspond to the opening direction of the extrusion and expansion opening 22 in the open steel pipe. During the extrusion and expansion process, the expansion units in the multiple extrusion and expansion arms can extend from the extrusion expansion opening 22 and align with the hole wall. The surrounding soil is squeezed; the multiple squeezing and expansion arms include at least two groups of mutually hinged squeezing and expansion units 34, wherein: the top of the squeezing and expansion unit close to the connecting plate is hinged to the connecting plate, and the bottom end of the squeezing and expanding unit close to the chassis Hinged with the chassis; the extrusion and expansion unit 34 includes a first extrusion and expansion arm 341 and a second extrusion and expansion arm 342 that are hinged to each other; the telescopic rod 33 is slidably connected to a limited support steel ring 35, and the limit support steel ring 35 and the extrusion and expansion unit 34 Articulated. In Figure 4, the number of multi-branch extrusion and expansion arms is two groups, and each multi-branch expansion arm has three sets of extrusion and expansion units. It should be noted that the number of multi-branch extrusion and expansion arms and the number of extrusion and expansion units can be determined according to the opening. The number and size of the extrusion and expansion openings in the open steel pipe 2 are adjusted accordingly so that they match each other. During the extrusion and expansion process, it is only necessary to adjust the positions of the continuous multiple expansion devices at one time to make them match the extrusion expansion openings in the open steel pipe 2. Corresponding to the openings, a certain area can be squeezed and expanded to improve construction efficiency. Referring to Figures 6 and 7, the limit support steel ring 35 includes an inner ring 351 for slidingly fitting with the telescopic rod 33 and an outer ring 352 for hinged connection with the extrusion and expansion unit 34; the inner ring 351 and the outer ring 352 pass through the limit The rod 353 is fixedly connected; a connecting lug 354 is fixed on the outside of the outer ring 352, and the connecting lug 354 has a connecting hole 355 extending through the connecting lug in the horizontal direction; the extrusion and expansion unit 34 communicates with the outer ring through a pin 356 that is inserted in the connecting hole. 352 Articulated. Further preferably, the number of limiting rods 353 is four, and the four limiting rods are evenly distributed at 90° to each other between the inner ring 351 and the outer ring 352 . The limiting rod 353 serves as a connecting structure between the inner ring 351 and the outer ring 352, which can significantly improve the structural stability of the limiting support steel ring.
作为优选的实施方式,参考图8和图9,第一挤扩臂341和第二挤扩臂342通过转动限位装置铰接;转动限位装置包括转轴361以及与转轴转动连接的第一连接块362和第二连接块363,第一连接块362和第二连接块363分别用于与第一挤扩臂341和第二挤扩臂342连接;第一连接块362的一侧中部具有U型卡位口364,第一连接块位于U型卡位口的两侧对称固定有一对套筒365,第一连接块362通过套筒与转轴361转动连接;第二连接块363的一侧固定有限位卡块366,限位卡块366与第二连接块363不在同一平面内,且限位卡块366与第二连接块363形成的钝角夹角朝向第一连接块362;限位卡块366的一侧面固定有用于与转轴转动连接的套筒365,限位卡块366的长度大于U型卡位口64的深度。As a preferred embodiment, referring to Figures 8 and 9, the first extrusion and expansion arm 341 and the second extrusion and expansion arm 342 are hinged through a rotation limiting device; the rotation limiting device includes a rotating shaft 361 and a first connecting block that is rotationally connected to the rotating shaft. 362 and the second connecting block 363. The first connecting block 362 and the second connecting block 363 are used to connect with the first extruding and expanding arm 341 and the second extruding and expanding arm 342 respectively; the middle part of one side of the first connecting block 362 has a U shape. The first connecting block 364 is symmetrically fixed with a pair of sleeves 365 on both sides of the U-shaped clamping opening 364. The first connecting block 362 is rotationally connected to the rotating shaft 361 through the sleeves; one side of the second connecting block 363 is fixed with a limited number. The limiting blocking block 366 is not in the same plane as the second connecting block 363, and the obtuse angle formed by the limiting blocking block 366 and the second connecting block 363 faces the first connecting block 362; the limiting blocking block 366 A sleeve 365 for rotational connection with the rotating shaft is fixed on one side of the U-shaped stopper 366 . The length of the limiter block 366 is greater than the depth of the U-shaped stopper opening 64 .
本发明还提供了上述所述的钢管-混凝土支盘桩复合桩基结构的施工方法,包括以下步骤:The present invention also provides the above-mentioned construction method of the steel pipe-concrete support pile composite pile foundation structure, which includes the following steps:
(1)钻孔成孔至指定深度后,将开口式钢管吊装至孔内目标深度,实现对孔壁的支护,然后标记各个挤扩口的位置,便于后期连续多支挤扩装置的工作;开口式钢管的直径略小于成孔孔径,便于吊装;与常规全截面密封钢管相比,间断式开口可以极大节省钢材,降低工程造价,且具有良好的孔壁支护功能;具体应用中,可根据支盘桩桩基设计要求,预先确定需要挤扩的位置,在钢管侧壁进行定位、开口,挤扩口沿着钢管横截面对称分布,而数量、长度和宽度均可根据桩基的设计要求进行工厂化预制生产。(1) After the hole is drilled to the specified depth, the open steel pipe is hoisted to the target depth in the hole to support the hole wall, and then the positions of each extrusion and expansion opening are marked to facilitate the subsequent work of multiple continuous extrusion and expansion devices. ; The diameter of the open steel pipe is slightly smaller than the hole diameter, making it easy to hoist. Compared with conventional full-section sealed steel pipes, the intermittent opening can greatly save steel, reduce project costs, and has good hole wall support functions; in specific applications , according to the design requirements of the support plate pile foundation, the position that needs to be squeezed and expanded can be determined in advance, and the side wall of the steel pipe is positioned and opened. The squeezed and expanded openings are symmetrically distributed along the cross section of the steel pipe, and the number, length and width can be determined according to the pile foundation. The design requires factory prefabricated production.
(2)通过连接盘将连续多支挤扩装置与外部液压装置连接,将连续多支挤扩装置吊装至开口式钢管内并使其多支挤扩臂分别对准开口式钢管的挤扩口;启动液压装置对连续多支挤扩装置施加向下的作用力时使其发生压缩,多支挤扩臂会向外延伸,对桩孔附近的地基土进行挤压,扩大孔径,当挤扩至目标孔径时,通过液压装置对连续多支挤扩装置进行拉伸,即可使连续多支挤扩装置复位,即完成此处位置的挤扩;当开口式钢管具有多层挤扩口时,改变连续多支挤扩装置的位置使其与对应的挤扩口对齐,重复步骤(2)即可完成相应位置的挤扩;直至全部挤扩完成,吊出连续多支挤扩装置。(2) Connect the continuous multiple extrusion and expansion devices to the external hydraulic device through the connecting plate, hoist the continuous multiple extrusion and expansion devices into the open steel pipe and align their multiple extrusion and expansion arms with the extrusion and expansion openings of the open steel pipe. ; When the hydraulic device is started to exert downward force on the continuous multi-branch extrusion and expansion device, it will be compressed. The multi-branch extrusion and expansion arms will extend outward to squeeze the foundation soil near the pile hole and expand the hole diameter. When the squeeze and expansion device is pressed, When the target aperture is reached, the continuous multi-branch extrusion and expansion device is stretched by the hydraulic device to reset the continuous multi-branch extrusion and expansion device, that is, the extrusion and expansion at this position is completed; when the open steel pipe has a multi-layer extrusion and expansion opening , change the position of the continuous multi-tube extrusion and expansion device to align it with the corresponding extrusion and expansion opening, and repeat step (2) to complete the extrusion and expansion at the corresponding position; until all extrusion and expansion are completed, lift out the continuous multi-tube extrusion and expansion device.
(3)清理孔内由于挤扩产生的积渣,然后向孔内吊装钢筋笼并进行注浆,注浆时水泥浆体可以沿着开口式钢管中的挤扩口流向被挤扩产生的空间内最终形成支盘,提高软弱地基的承载力。(3) Clean the slag accumulated in the hole due to squeeze and expansion, then hoist the steel cage into the hole and perform grouting. During grouting, the cement slurry can flow along the squeeze and expand opening in the open steel pipe to the space created by the squeeze and expansion. A supporting plate is eventually formed inside to improve the bearing capacity of the weak foundation.
显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。Obviously, the described embodiments are some, but not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without making creative efforts fall within the scope of protection of the present invention.

Claims (6)

  1. 一种钢管-混凝土支盘桩复合桩基结构,其特征在于:包括多支混凝土支盘桩以及固定在多支混凝土支盘桩内部的开口式钢管;所述开口式钢管包括钢管本体,所述钢管本体的侧壁周侧开设有多个挤扩口;所述多支混凝土支盘桩包括桩身以及分布在桩身周侧的若干个多支支盘,所述多支支盘从开口式钢管的挤扩口延伸向外。A steel pipe-concrete support pile composite pile foundation structure, characterized by: including a plurality of concrete support piles and an open steel pipe fixed inside the plurality of concrete support piles; the open steel pipe includes a steel pipe body, and the A plurality of extruded and expanded openings are provided on the side wall of the steel pipe body; the plurality of concrete support-plate piles include a pile body and a plurality of multiple support plates distributed around the pile body, and the multiple support plates are formed from an open type The extrusion and expansion of the steel pipe extends outward.
  2. 根据权利要求1所述的钢管-混凝土支盘桩复合桩基结构,其特征在于:所述多个挤扩口沿着钢管本体横截面对称分布;所述多支支盘沿桩身周侧均匀间隔分布。The steel pipe-concrete support plate pile composite pile foundation structure according to claim 1, characterized in that: the plurality of extrusion and expansion openings are symmetrically distributed along the cross section of the steel pipe body; the plurality of support plates are evenly distributed along the circumference of the pile body. interval distribution.
  3. 根据权利要求1所述的钢管-混凝土支盘桩复合桩基结构,其特征在于:所述多支混凝土支盘桩通过连续多支挤扩装置施工得到,所述连续多支挤扩装置包括底盘,所述底盘的上方对称设有连接盘,所述底盘和连接盘之间竖直固定有伸缩杆;所述连接盘与底盘之间安装有多条多支挤扩臂,所述多支挤扩臂包括至少两组相互铰接的挤扩单元,其中:靠近连接盘的挤扩单元的顶端与连接盘铰接,靠近底盘的挤扩单元的底端与底盘铰接;所述挤扩单元包括互相铰接的第一挤扩臂和第二挤扩臂;所述伸缩杆上滑动连接有限位支撑钢圈,所述限位支撑钢圈与挤扩单元铰接。The steel pipe-concrete support and disk pile composite pile foundation structure according to claim 1, characterized in that: the plurality of concrete support and disk piles are constructed through the construction of a continuous multi-branch extrusion and expansion device, and the continuous multi-branch extrusion and expansion device includes a chassis , a connecting plate is symmetrically provided above the chassis, and a telescopic rod is vertically fixed between the chassis and the connecting plate; a plurality of extruding expansion arms are installed between the connecting plate and the chassis, and the multiple extruding arms are The expansion arm includes at least two groups of mutually hinged extrusion and expansion units, wherein: the top of the extrusion and expansion unit close to the connecting plate is hinged to the connecting plate, and the bottom end of the extrusion and expansion unit close to the chassis is hinged to the chassis; the extrusion and expansion units include mutually hinged The first extrusion and expansion arm and the second extrusion and expansion arm; the telescopic rod is slidingly connected with a limited support steel ring, and the limit support steel ring is hingedly connected with the extrusion and expansion unit.
  4. 根据权利要求3所述的钢管-混凝土支盘桩复合桩基结构,其特征在于:所述限位支撑钢圈包括用于与伸缩杆滑动配合的内圈以及用于与挤扩单元铰接的外圈;所述内圈与外圈通过限位杆固定连接;所述外圈的外侧固定有连接耳,所述连接耳沿水平方向开设有贯通连接耳的连接孔;所述挤扩单元通过穿设在连接孔内的销轴与外圈铰接。The steel pipe-concrete support pile composite pile foundation structure according to claim 3, characterized in that: the limiting support steel ring includes an inner ring for slidingly matching with the telescopic rod and an outer ring for hinged connection with the extrusion and expansion unit. ring; the inner ring and the outer ring are fixedly connected through a limiting rod; a connecting ear is fixed on the outside of the outer ring, and a connecting hole is opened in the horizontal direction through the connecting ear; the extrusion and expansion unit passes through The pin shaft located in the connecting hole is hinged with the outer ring.
  5. 根据权利要求3所述的钢管-混凝土支盘桩复合桩基结构,其特征在于:所述第一挤扩臂和第二挤扩臂通过转动限位装置铰接;所述转动限位装置包括转轴以及与转轴转动连接的第一连接块和第二连接块,所述第一连接块和第二连接块分别用于与第一挤扩臂和第二挤扩臂连接;所述第一连接块的一侧中部具有U型卡位口,所述第一连接块位于U型卡位口的两侧对称固定有一对套筒,所述第一连接块通过套筒与转轴转动连接;所述第二连接块的一侧固定有限位卡块,所述限位卡块与第二连接块不在同一平面内,且限位卡块与第二连接块形成的钝角夹角朝向第一连接块;所述限位卡块的一侧面固定有用于与转轴转动连接的套筒,所述限位卡块的长度大于U型卡位口的深度。The steel pipe-concrete support pile composite pile foundation structure according to claim 3, characterized in that: the first extrusion and expansion arm and the second extrusion and expansion arm are hinged through a rotation limiter; the rotation limiter includes a rotating shaft And a first connecting block and a second connecting block that are rotationally connected to the rotating shaft. The first connecting block and the second connecting block are used to connect with the first extruding and expanding arm and the second extruding and expanding arm respectively; the first connecting block There is a U-shaped clamping opening in the middle of one side, and a pair of sleeves are symmetrically fixed on both sides of the U-shaped clamping opening on the first connecting block. The first connecting block is rotationally connected to the rotating shaft through the sleeves; A limiting block is fixed on one side of the two connecting blocks, the limiting block and the second connecting block are not in the same plane, and the obtuse angle formed by the limiting block and the second connecting block faces the first connecting block; A sleeve for rotational connection with the rotating shaft is fixed on one side of the limiting block, and the length of the limiting block is greater than the depth of the U-shaped blocking opening.
  6. 如权利要求1至5任一项所述的钢管-混凝土支盘桩复合桩基结构的施工方法,其特征在于:包括以下步骤:The construction method of a steel pipe-concrete support pile composite pile foundation structure according to any one of claims 1 to 5, characterized in that it includes the following steps:
    (1)钻孔成孔至指定深度后,将开口式钢管吊装至孔内目标深度,实现对孔壁的支护,然后标记各个挤扩口的位置,便于后期连续多支挤扩装置的工作;(1) After the hole is drilled to the specified depth, the open steel pipe is hoisted to the target depth in the hole to support the hole wall, and then the positions of each extrusion and expansion opening are marked to facilitate the subsequent work of multiple continuous extrusion and expansion devices. ;
    (2)通过连接盘将连续多支挤扩装置与外部液压装置连接,将连续多支挤扩装置吊装至开口式钢管内并使其多支挤扩臂分别对准开口式钢管的挤扩口;启动液压装置对连续多支挤扩装置施加向下的作用力时使其发生压缩,多支挤扩臂会向外延伸,对桩孔附近的地基土进行挤压,扩大孔径,当挤扩至目标孔径时,通过液压装置对连续多支挤扩装置进行拉伸,即可使连续多支挤扩装置复位,即完成此处位置的挤扩;当开口式钢管具有多层挤扩口时,改变连续多支挤扩装置的位置使其与对应的挤扩口对齐,重复步骤(2)即可完成相应位置的挤扩;直至全部挤扩完成,吊出连续多支挤扩装置;(2) Connect the continuous multiple extrusion and expansion devices to the external hydraulic device through the connecting plate, hoist the continuous multiple extrusion and expansion devices into the open steel pipe and align their multiple extrusion and expansion arms with the extrusion and expansion openings of the open steel pipe. ; When the hydraulic device is started to exert downward force on the continuous multi-branch extrusion and expansion device, it will be compressed. The multi-branch extrusion and expansion arms will extend outward to squeeze the foundation soil near the pile hole and expand the hole diameter. When the squeeze and expansion device is pressed, When the target aperture is reached, the continuous multi-branch extrusion and expansion device is stretched by the hydraulic device to reset the continuous multi-branch extrusion and expansion device, that is, the extrusion and expansion at this position is completed; when the open steel pipe has a multi-layer extrusion and expansion opening , change the position of the continuous multi-tube extrusion and expansion device to align it with the corresponding extrusion and expansion opening, repeat step (2) to complete the extrusion and expansion at the corresponding position; until all extrusion and expansion are completed, lift out the continuous multi-tube extrusion and expansion device;
    (3)清理孔内由于挤扩产生的积渣,然后向孔内吊装钢筋笼并进行注浆,注浆时水泥浆体可以沿着开口式钢管中的挤扩口流向被挤扩产生的空间内最终形成支盘,成型后得到钢管-多支混凝土支盘桩复合桩基。(3) Clean the slag accumulated in the hole due to squeeze and expansion, then hoist the steel cage into the hole and perform grouting. During grouting, the cement slurry can flow along the squeeze and expand opening in the open steel pipe to the space created by the squeeze and expansion. The support plate is finally formed inside, and after forming, a steel pipe-multiple concrete support plate pile composite pile foundation is obtained.
PCT/CN2022/113800 2022-04-08 2022-08-22 Composite pile foundation structure for steel pipe-concrete branch piles, and construction method therefor WO2023193387A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202210366208.XA CN114941318A (en) 2022-04-08 2022-04-08 Steel pipe-concrete support pile composite pile foundation structure and construction method thereof
CN202210366208.X 2022-04-08

Publications (1)

Publication Number Publication Date
WO2023193387A1 true WO2023193387A1 (en) 2023-10-12

Family

ID=82907304

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/113800 WO2023193387A1 (en) 2022-04-08 2022-08-22 Composite pile foundation structure for steel pipe-concrete branch piles, and construction method therefor

Country Status (3)

Country Link
CN (1) CN114941318A (en)
LU (1) LU505665B1 (en)
WO (1) WO2023193387A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115492081B (en) * 2022-09-01 2023-08-15 广东博竣建设工程有限公司 Pile forming method for soil cement composite pile of soft soil foundation
CN115506343B (en) * 2022-11-07 2023-07-21 滁州职业技术学院 Prefabricated prestressed concrete filled steel tubular column and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002339352A (en) * 2001-05-21 2002-11-27 Michiaki Sugawara Steel pipe pile with enlarged base
CN202017199U (en) * 2011-04-12 2011-10-26 中国建筑第七工程局有限公司 Squeezing and expanding device for branch piles
CN202031082U (en) * 2011-04-12 2011-11-09 中国建筑第七工程局有限公司 Branch disk pile expanding tool
CN103452100A (en) * 2013-08-20 2013-12-18 河北建设勘察研究院有限公司 Construction method of post-grouting squeezing and expanding combination cast-in-place bored pile
CN106592585A (en) * 2016-12-16 2017-04-26 兰州理工大学 Extension body compaction pile capable of eliminating pile foundation negative friction and construction method
CN109930597A (en) * 2019-04-10 2019-06-25 同济大学浙江学院 A kind of squeezed formula steel-pipe pile
CN110130427A (en) * 2019-06-13 2019-08-16 国网江苏省电力有限公司连云港供电分公司 The reinforcement means and organizational pile foundation of precast hollow tubular pole

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3216048B2 (en) * 1998-08-27 2001-10-09 日本鋼管株式会社 Screw-in type steel pipe pile
CN105714774B (en) * 2014-12-04 2018-07-03 宫能和 Diameter changeable agitation machine and its bore forming method, drilling rod
CN105908708B (en) * 2015-03-30 2019-02-05 荣成市运达基础工程有限公司 Stir drilling rod, diameter changeable agitation machine and bore forming method
CN106087999B (en) * 2016-03-19 2019-05-24 王继忠 It is a kind of to stir the constructing device and its construction method for spraying expanding reinforcing pile

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002339352A (en) * 2001-05-21 2002-11-27 Michiaki Sugawara Steel pipe pile with enlarged base
CN202017199U (en) * 2011-04-12 2011-10-26 中国建筑第七工程局有限公司 Squeezing and expanding device for branch piles
CN202031082U (en) * 2011-04-12 2011-11-09 中国建筑第七工程局有限公司 Branch disk pile expanding tool
CN103452100A (en) * 2013-08-20 2013-12-18 河北建设勘察研究院有限公司 Construction method of post-grouting squeezing and expanding combination cast-in-place bored pile
CN106592585A (en) * 2016-12-16 2017-04-26 兰州理工大学 Extension body compaction pile capable of eliminating pile foundation negative friction and construction method
CN109930597A (en) * 2019-04-10 2019-06-25 同济大学浙江学院 A kind of squeezed formula steel-pipe pile
CN110130427A (en) * 2019-06-13 2019-08-16 国网江苏省电力有限公司连云港供电分公司 The reinforcement means and organizational pile foundation of precast hollow tubular pole

Also Published As

Publication number Publication date
LU505665A1 (en) 2023-12-05
CN114941318A (en) 2022-08-26
LU505665B1 (en) 2024-04-04

Similar Documents

Publication Publication Date Title
WO2023193387A1 (en) Composite pile foundation structure for steel pipe-concrete branch piles, and construction method therefor
CN108149844B (en) A kind of self-positioning assembly concrete-filled steel tube intercolumniation node and its construction method
CN101705697B (en) Diaphragm wall joint flexible water stop installing device and method
CN205134308U (en) Revolve and twist piling bar that creeps into
CN2861282Y (en) Automatic compandor
CN104234047A (en) Composite pile made by jointly embedding nodular pile and tubular pile into cement-soil mixed soil-nailed pile
CN203603267U (en) Connecting joint of steel reinforced concrete superposed beams and middle column
CN111501771A (en) Application method of multi-elliptical-ring combined support in deep large-sludge foundation pit engineering
CN206752454U (en) One kind perfusion embedded pile
CN1341795A (en) Variable supporting-plate club-footed embedded pile and its forming method
CN206346224U (en) A kind of modular splicing punching block suspension device
CN209923757U (en) H-shaped steel-D-shaped rubber combined pile structure
CN111173033A (en) Prefabricated pipe gallery structure and pipe jacking method construction method thereof
CN206752632U (en) Plastic reinforcing steel composite construction municipal drainage inspection shaft
CN216238650U (en) Prefabricated whole PC well room of assembled
CN214784092U (en) Foundation ditch relief well enclosed construction
CN211646378U (en) Sleeve for immersed tube construction precast pile
CN210151705U (en) Reinforcing pile for soft soil foundation
CN210459181U (en) New and old ground is wall T joint design node even
CN217810943U (en) Continuous multi-support squeezing and expanding device
CN113982126A (en) Novel corrugated pipe connection square steel pipe concrete splicing column
CN219731960U (en) Prefabricated club-footed pipe pile
CN109706923A (en) Tubular pile splicing device and method
CN211898551U (en) Prefabricated pipe gallery structure
CN204984271U (en) A ream bit for abrasion drill

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22936316

Country of ref document: EP

Kind code of ref document: A1