WO2023162656A1 - 情報処理装置 - Google Patents

情報処理装置 Download PDF

Info

Publication number
WO2023162656A1
WO2023162656A1 PCT/JP2023/003866 JP2023003866W WO2023162656A1 WO 2023162656 A1 WO2023162656 A1 WO 2023162656A1 JP 2023003866 W JP2023003866 W JP 2023003866W WO 2023162656 A1 WO2023162656 A1 WO 2023162656A1
Authority
WO
WIPO (PCT)
Prior art keywords
power generation
power
transaction
token
generation facility
Prior art date
Application number
PCT/JP2023/003866
Other languages
English (en)
French (fr)
Inventor
吉雅 草野
和秀 戸田
哲平 青木
道隆 渡慶次
真 本間
洋一 坂本
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Publication of WO2023162656A1 publication Critical patent/WO2023162656A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Definitions

  • the present disclosure relates to an information processing device.
  • Self-consignment in which a business operator generates power using its own power generation equipment and transmits it to the business operator's equipment in another location via a power transmission and distribution network (see Patent Document 1).
  • An information processing device includes: a token issuer causing a first token issued in a predetermined database to represent an ownership interest in the power plant; A sale to effectuate a transaction of power generated by the power generation facility based on information related to the power generation facility, information related to an ownership interest in the power generation facility, and information related to a price according to the ownership interest. a processing unit; a token transfer unit that transfers the first token to a purchaser in the transaction in accordance with the ownership share when the transaction by the sales processing unit is successful; Prepare.
  • the information processing device includes: a token issuer causing a first token issued in a predetermined database to represent an ownership interest in the power plant; a power generation prediction acquisition unit that predicts integrated power generated by the power generation equipment in a predetermined time period; Sales of power generated by the power generation facility based on the information related to the power generation facility, the information related to the power predicted by the power generation prediction unit, and the information related to the price according to the equity. a processing unit; a token transfer unit that transfers the first token to a purchaser in the transaction according to the electric power predicted by the power generation prediction unit when the transaction by the sales processing unit is successful; Prepare.
  • the information processing device includes: a token issuer causing a first token issued in a predetermined database to represent an ownership interest in the power plant; Power generated by the power generation facility based on information related to the power generation facility, information related to carbon dioxide emissions per unit power generated by the power generation facility, and information related to the price according to the equity a sales processing unit for executing electricity transactions; a token transfer unit that transfers the first token to a purchaser in the transaction according to the electric power predicted by the power generation prediction unit when the transaction by the sales processing unit is successful; Prepare.
  • a non-temporary tangible medium recording a program is to the computer, a token issuance process causing a first token to be issued in a predetermined database representing an ownership interest in the power generation facility; A sale to effectuate a transaction of power generated by the power generation facility based on information related to the power generation facility, information related to an ownership interest in the power generation facility, and information related to a price according to the ownership interest. processing; a transfer process of transferring the first token to a purchaser in the transaction in accordance with the share of the ownership when the transaction by the sales processing unit is established; It is a medium that records a program for executing
  • FIG. 3 is a diagram illustrating an example hardware configuration of a management server 2;
  • FIG. 3 is a diagram showing a software configuration example of a management server 2;
  • FIG. It is a figure which shows the flow of a power transmission process in the electric power procurement system of this embodiment.
  • FIG. 2 is a diagram showing the flow of distribution of ownership of power generation equipment in the power procurement system of the present embodiment; It is a figure which shows the example of the transaction screen in the electric power procurement system of this embodiment. It is a figure which shows the example of the transaction screen in the electric power procurement system of this embodiment. It is a figure which shows the example of the transaction screen in the electric power procurement system of this embodiment. It is a figure which shows the example of the transaction screen in the electric power procurement system of this embodiment. It is a figure which shows the example of the transaction screen in the electric power procurement system of this embodiment. It is a figure which shows the example of the transaction screen in the electric power procurement system of this embodiment. It is a figure which shows the example of the transaction screen in the electric power procurement system of this embodiment. It is a figure which shows the example of the transaction screen in the electric power procurement system of this embodiment. It is a figure which shows the example of the transaction screen in the electric power procurement system of this embodiment. It is a figure which shows the example of the transaction screen in the electric power procurement system
  • An object of the present disclosure is to provide a technique for facilitating desired power procurement in order to solve the above problems. According to embodiments of the present disclosure, desired power procurement can be facilitated. An embodiment of the power procurement system of the present disclosure will be described below.
  • the power generation facilities are made into small lots using security tokens (Security Tokens) so that they can be owned separately.
  • security tokens Security Tokens
  • the power procurement system of the present embodiment can reduce the initial investment in owning power generation equipment.
  • the power generation facility may be assumed to be, for example, a solar panel.
  • the power generation equipment is not limited to the solar panel, and may be a thermal power generation equipment, a storage battery, or the like.
  • security tokens are also referred to as “ST”.
  • the power procurement system of this embodiment realizes a marketplace that enables high-frequency trading in which ST is held only when it is used.
  • In-house power generation equipment is generally owned by a single business operator or individual.
  • This embodiment adopts a model in which a plurality of consumers (consumers) can jointly own one power generation facility.
  • the power generation facility is divided not physically but virtually, and the divided divisions are represented by block chain ST, for example, and the ownership of each divided unit is determined by the power generation facility. Users can hold As a result, it is possible to partially own expensive power generation facilities for a small amount, and because it is virtually divided, even power generation facilities other than solar power generation, which have physical restrictions on division, can be owned by division.
  • the amount of power generated by the power generation equipment is measured, and the amount of power (kWh) is supplied in the form of self-consignment according to the ratio of holdings for each fixed time period (every 30 minutes, etc.) I am trying to
  • the power procurement system of this embodiment it is possible to electronically record the percentage of ownership of power generation equipment. As a result, the power procurement system of this embodiment can improve the ease of trading. Therefore, the power procurement system of the present embodiment can be expected to increase the liquidity of assets by preparing a platform for trading ownership and offtake rights of electric energy (kWh) linked thereto. In addition, the power procurement system of the present embodiment makes it possible to improve the operation rate of facilities by installing existing facilities on the platform.
  • the offtake right may be represented by, for example, a utility token.
  • utility tokens refer to tokens that represent secondary assets or values generated from a certain asset or value.
  • a utility token may be a token representing value created from a security token.
  • the utility token may be, for example, a type of token that does not have a monetary value in itself and that becomes a token only when it is exchanged for another specific asset.
  • the utility token can be used to indicate the relationship between the offtake right corresponding to the generated power amount and the power amount used at the time of transaction.
  • utility tokens are also referred to as "UT”.
  • at least one of ST (Security Token) and UT (Utility Token) may be simply referred to as "token”.
  • a smart contract may be constructed to move UTs according to the amount owned by STs.
  • a smart contract is a computer protocol intended for automating contracts or facilitating verification, enforcement, execution and negotiation of contracts.
  • a smart contract may be implemented in an application running on a blockchain.
  • Smart contracts are characterized by the ability to process credit-secured transactions without a third party.
  • the power procurement system of this embodiment not only realizes direct financing (Security Token Offering: STO), but also protects the rights of its investors (for example, solar panel owners) (appropriate distribution of power generation) and secure liquidity (ease of asset transfer).
  • parties who have jointly invested in power generation facilities can own ST equivalent to their respective investments.
  • the entire power generation facility such as a solar panel corresponds to 40ST.
  • person A who has invested 50% of the power generation equipment may own 20ST according to the investment.
  • the person B who invested 12.5% of the power generation facility may own 5ST according to the investment.
  • the person C who has invested 37.5% of the power generation facility may hold 15 ST according to the investment.
  • a security token ST
  • a token unit such as 20ST, 5ST, and 15ST described above.
  • UTs may be distributed according to ST's stake.
  • utility tokens such as 40UTs, 10UTs, and 30UTs described above may be referred to as units of tokens.
  • ST which is a blockchain security token
  • UT which is a token that represents the amount of power (to be acquired)
  • a scheme can be realized that combines ownership (ST) with power (kWh) offtake rights (UT). Therefore, there is no limit to the power generation equipment that can be jointly owned, and it can be applied to thermal power, water power, wind power, geothermal power, biomass power, nuclear power, all other power generation methods, and storage batteries.
  • power generation equipment that is used only in a specific season or time period in a factory can be temporarily sold during the unused time. . Therefore, even if there is a time period during which the power load is not in operation, it is possible to enjoy profits while operating the power generation equipment all the time. This is expected to improve the operating rate of the facility, and as an accompanying effect, for example, it will reduce the operation cost of power generation in the whole country like Japan and / or improve the economic efficiency of having power generation facilities (short-term such as peak cut) Consumers who need to procure electricity can use it regardless of the size of their demand, so there is a possibility that they will be sold at a higher price than when they are sold to ordinary electric power companies).
  • FIG. 1 is a diagram illustrating an overview of power procurement in one embodiment.
  • a consumer 10 (company A) has a demand facility 11, and when procuring electric power to be used by the demand facility 11, procure a section 131 obtained by virtually dividing the power generation facility 13 from the marketplace 12. .
  • the section 131 may be the virtual holding section by the STO described above.
  • the electric power generated by the power generation equipment 13 is divided according to the share (ST) of the power generation equipment 13 and supplied from the power generation equipment 13 to the demand equipment 11 by self-consignment.
  • ST share
  • Self-consignment means that a person who installs a private power generation facility transmits electricity generated using the private power generation facility to a person who installs the private power generation facility through a power transmission and distribution network maintained and operated by a general power transmission and distribution business operator. A service provided by a general power transmission and distribution business operator when transmitting power to a factory, etc. located in another location. In this way, power supply by self-consignment can be performed. Due to the existence of the marketplace 12, the liquidity of (a division of) the power generation facility 13 is ensured. Therefore, the consumer 10 can acquire a necessary proportion of equity when necessary and carry out self-consignment from the in-house power generation facility 13 . That is, in this embodiment, it is possible to own the power generation equipment 13 only when it is used, and to procure electric power only when it is used.
  • FIG. 2 is a diagram explaining the conventional joint ownership of solar panels.
  • the unit owners owned the power generation facility 13 (solar panel) in physically divided units (eg, 1/3, etc.).
  • a smart meter 14 is installed for each physical division 131 for one power generation facility 13 to manage the power generation amount of each division 131 .
  • FIG. 3 is a diagram explaining the form of joint ownership of the power generation equipment 13 according to this embodiment. That is, FIG. 3 is a diagram illustrating an example of STO using a solar panel.
  • the power generation equipment 13 itself may be, for example, a solar panel similar to that used in conventional community solar.
  • only one smart meter 14 is installed in the power generation facility 13 . This single smart meter 14 measures the amount of power generated by the entire power generation facility 13 .
  • 100 tokens have been issued by ST for power generation equipment 13 .
  • the power generation facility 13 is shared by four companies A, B, C, and D, and that the shares are 60%, 10%, 20%, and 10%, respectively.
  • Company A has 60 tokens
  • Company B has 10 tokens
  • Company C has 20 tokens
  • Company D has 10 tokens
  • the ownership ratio can be proved (ST).
  • the amount of electric power generated by the power generation equipment 13 is also divided (UT) and considered to be self-consigned to each company.
  • UT the offtake right
  • Company A sells 30 tokens
  • Company B purchases an additional 30 tokens
  • Company C sells 10 tokens
  • Company E purchases 10 tokens in different time periods.
  • the amount of power generated by the power generation facility 13 is virtually divided (UT) and self-consigned to each company according to the ownership ratio of this token.
  • the amount of electric power can be measured and distributed for each time period of a predetermined length of time (for example, 30 minutes).
  • the length of the time period can also be set as an arbitrary length that varies depending on the market.
  • FIG. 4 is a diagram explaining the distribution of the generated power amount.
  • a curve 141 indicates the temporal transition of the amount of power generated by the power generation equipment 13 .
  • the power generation equipment 13 generated 30 kWh of electricity at 12:00 (a 30-minute period from 12:00), and Company A possessed 60 tokens out of 100 tokens and Company B possessed 10 tokens out of 100 tokens.
  • the power generation equipment 13 generated 20 kWh of power at 18:00, and Company A held 30 tokens and Company B held 40 tokens during that time period.
  • FIG. 5 is a diagram showing an overview of transactions in the power procurement system of this embodiment.
  • the marketplace 12 transaction platform (transaction PF)
  • information on the power generation facility 13 is registered by the facility provider 15 (which can also be the owner of the facility), and tokens are issued (asset registration).
  • the consumer 10 who is the seller of the token, registers the conditions for the sale.
  • the demander 10, who is the purchaser of the token has conditions such as the power generation type (solar or wind power, etc.) of the power generation equipment 13 that he/she wants to purchase, the amount of power, the price, the time zone, and/or the area (the superiority of the conditions, etc.). can be set.).
  • the power generation type solar or wind power, etc.
  • the marketplace 12 matches 121 the divisions 131 of the power plant 13 . Matching is performed in each slot every 30 minutes after the current time (the current unit time for power measurement, and if the unit time changes, it will be based on the new specified unit time) (reservation for buying and selling). Then, when the actual date arrives at the time of the slot, the ownership or ST (and the right of offtake or UT) of the section 131 of the power plant 13 is transferred from the seller to the purchaser. Accompanying this transfer, the amount of tokens corresponding to the ownership ratio of the division 131 is transferred to the wallet of the consumer 10 of the purchaser. This will prove the transfer of ownership (and offtake rights).
  • the marketplace 12 can automatically calculate the offtake amount (UT) of electric power (kWh) according to the generated electric power amount (predicted value and/or actual value) and token holding ratio (ST). Along with this, the marketplace 12 can record the amount of power generation (predicted and actual power generation) and create reports for the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) and/or token holders (report creation). .
  • UT offtake amount
  • ST token holding ratio
  • the marketplace 12 can record the amount of power generation (predicted and actual power generation) and create reports for the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) and/or token holders (report creation).
  • Information from the marketplace 12 can be obtained by an API (Application Programming Interface).
  • the OCCTO system cross-regional organization system 16
  • reports such as planned values via an API.
  • This data linkage allows automation of linkages, such as the creation of notification data and/or report data, as mandated by self-consignment regulations.
  • the retailer 17 can buy and sell tokens on the marketplace 12 in the same manner as the consumer 10 .
  • the retailer 17 can provide power procurement using tokens as a menu for customers, and can also be used as a power procurement means for the retailer itself. Token-based self-consignment power procurement may also be provided in this manner.
  • the API it is possible to cooperate with the system used by the retailer 17 .
  • the power supply and demand service provider 18 can also trade tokens on the marketplace 12 in the same manner as the consumer 10 .
  • the power supply and demand service provider 18 can utilize token trading as part of a customer's power service menu such as peak cut.
  • the API described above can also be linked with the system used by the power supply and demand service provider 18 .
  • FIG. 6 is a diagram showing an example of the overall configuration of the power procurement system.
  • the power procurement system of this embodiment includes a management server 2 .
  • the management server 2 is communicably connected to the user terminal 1 via the communication network 3 .
  • the communication network 3 is, for example, the Internet, and may be constructed by a public telephone line network, a mobile phone line network, a wireless communication path, Ethernet (registered trademark), or the like.
  • the management server 2 is also connected to a blockchain network (hereinafter referred to as a blockchain 4).
  • Blockchain 4 is composed of a plurality of computers (nodes) and manages a distributed ledger.
  • the user terminal 1 is a computer operated by the consumer 10, and can be, for example, a smart phone, a tablet computer, or a personal computer.
  • the wide area organization system 16 may also be included in the user terminal 1 .
  • the system of the retailer 17 and/or the retailer service provider 18 may also be included in the user terminal 1 .
  • a consumer 10 OCCTO, a retailer 17, or a power supply and demand service provider 18
  • FIG. 1 A consumer 10 (OCCTO, a retailer 17, or a power supply and demand service provider 18) can access the management server 2 from the user terminal 1.
  • the management server 2 is a computer that implements the marketplace 12.
  • the management server 2 may be a general-purpose computer such as a workstation or personal computer, or may be logically implemented by cloud computing.
  • Blockchain 4 may be based on database technology that records information.
  • the block chain 4 may manage data in units called blocks and store data by linking them like a chain, like a general block chain.
  • Data called a hash value representing the contents of the previous block is written in each block of the blockchain. If the data is tampered with, the resulting hash value will also be different. This requires changing the hash value of all subsequent blocks.
  • Blockchain distributes and manages the same data in multiple places. For this reason, blockchains are also called distributed ledgers.
  • Blockchain can be used for general purposes, and currently, in addition to smart contracts that automate contracts and transactions, many other applications have been devised.
  • the blockchain 4 may be based on the same technology as the general blockchain described above. However, in one embodiment, the blockchain 4 may be based on database technology instead of a typical blockchain-like technology.
  • FIG. 7 is a diagram showing a hardware configuration example of the management server 2. As shown in FIG. The illustrated configuration is an example, and a part of the illustrated configuration may be omitted, or a configuration other than the illustrated configuration may be provided.
  • the management server 2 includes a CPU 201 , a memory 202 , a storage device 203 , a communication interface 204 , an input device 205 and an output device 206 .
  • the storage device 203 stores various data and/or programs. Storage device 203 may be, for example, a hard disk drive, solid state drive, or flash memory.
  • a communication interface 204 is an interface for connecting to the communication network 3 .
  • the communication interface 204 includes, for example, an adapter for connecting to Ethernet (registered trademark), a modem for connecting to a public telephone network, a wireless communication device for wireless communication, and a USB (Universal Serial Bus) for serial communication. ) connector or RS232C connector.
  • the input device 205 is a device used when inputting data.
  • the input device 205 may be, for example, a keyboard, mouse, touch panel, buttons, microphone, or the like.
  • the input device 205 accepts input of commands for each functional unit provided in the management server 2, which will be described later.
  • the output device 206 is a device used when outputting data. Output device 206 may be, for example, a display, printer, or speaker.
  • Each functional unit included in the management server 2, which will be described later, may be realized by the CPU 201 reading a program stored in the storage device 203 into the memory 202 and executing the program.
  • the CPU 201 may be configured to interpret commands input to the input device 205, which are directed to functional units of the management server 2, which will be described later.
  • the CPU 201 may control the output device 206 so as to create information to be displayed on the output device 206 and issue a command to the output device 206 to display the information.
  • each storage unit included in the management server 2 may be realized as part of the storage area provided by the memory 202 and the storage device 203 .
  • the input device 205 and the output device 206 may be singular or plural. Also, the input device 205 and the output device 206 may be an integrated device such as a touch panel. Furthermore, although the management server 2 has been described as an example including the input device 205 and the output device 206, it is not limited to this. For example, the management server 2 may not include the input device 205 and the output device 206. . In addition, the management server 2 may include the input device 205 and the output device 206, and the input device 205 and the output device 206 may exist outside. When the input device 205 and the output device 206 are outside the management server 2, the management server 2 may exchange various commands and information with the external input device 205 and the output device 206 via the communication interface 204. .
  • the external input device 205 may receive a command for each functional unit included in the management server 2, which will be described later.
  • the management server 2 may receive this command via the communication interface 204.
  • FIG. The instructions received in this manner may be interpreted by the CPU 201 .
  • the CPU 201 may create information to be output to the external output device 206 and transmit a command to the external output device 206 to output the information to the external output device 206 via the communication interface 204 .
  • FIG. 8 is a diagram showing a software configuration example of the management server 2.
  • the management server 2 includes an asset registration unit 211 , a token issuing unit 212 , a demand input unit 213 , a sales input unit 214 and a matching processing unit 215 .
  • the management server 2 also includes a sales processing unit 216 , a token transfer unit 217 , a power generation forecast acquisition unit 218 , a power generation performance acquisition unit 219 , a report creation unit 220 , an API processing unit 221 , and an asset information storage unit 231 .
  • the asset information storage unit 231 stores information about each power generation facility 13 (hereinafter referred to as asset information).
  • Asset information can include, for example, the type, output, and/or installation location of the power generation facility 13 .
  • the asset registration unit 211 registers asset information in the asset information storage unit 231.
  • the asset registration unit 211 can receive asset information from the user terminal 1 of the facility provider 15 and write the received asset information into the asset information storage unit 231 .
  • the asset registration unit 211 can also register information (hereinafter referred to as owner information) on the owner of the power generation facility 13 (initially the facility provider 15).
  • the owner information may be managed in the blockchain 4 ledger.
  • the asset registration unit 211 can issue a transaction for registering owner information to the blockchain 4 .
  • the token issuing unit 212 causes the blockchain 4 to issue tokens (ST and UT) that represent the ownership and offtake rights of the power generation facility 13 backed by the power generation facility 13 . Since token issuance can use the technique adopted by general STO, more detailed explanation is omitted.
  • the token issuer 212 can issue any number of tokens. In the examples of FIGS. 3 and 4, 100 tokens are issued for one power generation facility 13 . However, the token issuer 212 may issue any number of tokens, such as 10 tokens or 2000 tokens. The issued token is put into the wallet of the owner of the power generation equipment 13 (equipment provider 15).
  • the demand input unit 213 receives from the consumer 10 an input of the demand for electric power to be procured from the power generation equipment 13 .
  • the demand input unit 213 can receive, for example, information in which a demand is set in a purchase request for acquiring the category 133 of the power generation equipment 13 from the user terminal 1 of the consumer 10 .
  • the demand input unit 213 may receive designation of conditions for the power generation equipment together with the demand.
  • the purchase request may specify the power generation type of the power generation facility 13 (solar power generation, wind power generation, or the like), the amount of demand (the amount of power to be procured), and/or the time period.
  • the purchase request may include information specifying an individual power generation facility 13, information specifying a specific power station, and/or designation of an area where the power generation facility 13 is located. Further, in the purchase request, information on the predicted power generation value of the power generation equipment 13 and/or information on the destination of self-consignment may be specified. Also, in the purchase request, an amount of money desired to be purchased may be set as a limit price. Moreover, in the purchase request, a plurality of conditions may be set and the priority of the conditions may be set.
  • the sales amount input unit 214 receives designation of tokens to be sold from a seller (facility provider 15 or consumer 10) who wants to sell the tokens.
  • the sales amount input unit 214 can receive a sales request from the user terminal 1 of the seller, for example.
  • a token to be sold and its selling price can be set in the sale request.
  • a minimum selling price can be set.
  • a range from the lowest price to the highest price can also be specified for the selling price.
  • the matching processing unit 215 can match the sale request and the purchase request.
  • the matching processing unit 215 can search for asset information that matches the conditions specified in the purchase request.
  • the matching processing unit 215 can identify a token sale request backed by the power generation facility 13 indicated by the matched property information.
  • the matching processing unit 215 can allocate the identified token related to the sale request to the purchaser.
  • the matching processing unit 215 can, for example, allocate sales requests in the order in which the purchase requests are received, according to the conditions of the received purchase requests.
  • the matching processing unit 215 can collectively allocate purchase requests and sale requests received during a certain period of time.
  • the matching processing unit 215 can perform, for example, matching processing similar to sales processing in the stock market.
  • the sales processing unit 216 performs processing related to sales of tokens to the consumer 10 .
  • the sale processing unit 216 can receive payment from the purchaser of the tokens and perform processing for paying to the seller.
  • the sales processing unit 216 may subtract the commission from the amount paid by the purchaser and make payment to the seller.
  • the token transfer unit 217 performs transfer processing to transfer the amount of tokens corresponding to the stake in the power generation facility 13 to be sold to the wallet of the consumer. Token transfer may be automatically performed by a program on the blockchain when the actual date and time reaches the date and time of each slot (eg, every 30 minutes).
  • the token transfer unit 217 can issue transactions to the blockchain 4 to transfer the sold tokens from the seller's wallet to the buyer's wallet. As a result, the token transfer unit 217 can transfer the amount of tokens corresponding to the amount demanded by the consumer 10 to the wallet of the consumer.
  • the power generation prediction acquisition unit 218 acquires the predicted value of the amount of power generated by the power generation equipment 13 .
  • the power generation prediction acquisition unit 218 may predict the amount of power generation by itself, or may acquire a prediction value from an external computer that has predicted the amount of power generation.
  • the power generation prediction acquisition unit 218 can, for example, predict the amount of solar radiation for the power generation equipment 13 related to photovoltaic power generation.
  • the power generation prediction acquisition unit 218 calculates the predicted value of the power generation amount of the power generation equipment 13 from data indicating past results of various conditions such as weather, solar radiation, temperature, and/or humidity, for example. good too.
  • the power generation prediction acquisition unit 218 may calculate the predicted value of the amount of power generated by the power generation equipment 13 in consideration of future output suppression and/or weather forecast.
  • output suppression means that a power company or the like restricts the supply of power from a power generation facility such as a photovoltaic power generation system to the power system.
  • the output suppression may be the output suppression until noon one day before, or the plan may be changed on the day.
  • the power generation prediction acquisition unit 218 may change the amount of power generated by the power generation equipment 13 depending on whether the power source is the target of output control.
  • the power generation prediction acquisition unit 218 may change the amount of power generated by the power generation equipment 13 depending on whether the area is likely to be subject to output suppression.
  • the power generation prediction acquisition unit 218 may receive the predicted value of the power generation amount from the user terminal 1 of the owner of the power generation facility 13 or the facility provider 15 .
  • the power generation record acquisition unit 219 can acquire the actual value of the amount of power generated by the power generation facility 13 from the smart meter 14 provided in the power generation facility 13 .
  • the report creation unit 220 can output a report on the power generation plan.
  • the report creation unit 220 calculates the predicted value of the amount of power generated by the power generation equipment 13 as the total token amount of the amount of tokens held in the wallet of the consumer 10 and the amount of tokens scheduled to be matched in the future slot (hereinafter referred to as the amount of tokens held). Planned amount of tokens). Then, the report creation unit 220 can include the predicted value of the power generation amount divided in this way in the power generation plan for each consumer 10 . In addition, the report creation unit 220 can output a report regarding the power generation performance. The report creation unit 220 apportions the actual value obtained from the smart meter 14 according to the amount of tokens to be held by the consumer 10 . Then, the report creation unit 220 can include the proportionally generated power amount (divided power generation performance value) in the power generation performance. The report creation unit 220 may include the predicted value predicted in the power generation plan in the power generation record.
  • the report creation unit 220 provides a GUI (viewing screen ) can be provided.
  • the viewing screen can include the predicted value of the generated power amount, the ownership ratio of the power generation equipment 13, and/or basic information of the power generation equipment 13, and the like.
  • the report creation unit 220 can create a plan for the Organization for Cross-regional Coordination of Transmission Operators (OCCTO).
  • OCCTO Organization for Cross-regional Coordination of Transmission Operators
  • the report generator 220 can also automatically submit the plan to the cross-regional organization system 16 .
  • the report creation unit 220 You can create a form that describes the information required for
  • the API processing unit 221 can provide APIs to external devices of the management server 2 .
  • the API can be, for example, REST (REpresentational State Transfer).
  • the API processing unit 221 can extract necessary information from the information managed by the management server 2 and the blockchain 4 and provide an API in response to a request from an external device.
  • the management server 2 can perform data cooperation with the cross-regional organization system 16 .
  • the API processing unit 221 additionally creates a form for documents to be submitted to retailers and/or general power transmission and distribution companies based on the data managed by the management server 2 and the block chain 4. Able to collaborate. Also, via the API, retailers and/or companies that provide services for consumers can provide a mechanism that allows them to link and trade terms of sale via their own systems.
  • FIG. 9 is a diagram showing the flow of power transmission processing in the power procurement system of this embodiment.
  • the management server 2 receives the property information of the power generation equipment 13 and records (registers) the property information in the property information storage unit 231 (S301).
  • Asset information may include the type, output, and/or installation location of the power generation equipment 13 .
  • the asset information of the power generation equipment may be registered, for example, by the equipment owner. Also, when the property information of power generation equipment is registered, measures may be taken to make registration by spoofing difficult. For example, the retailer may temporarily purchase the tokens corresponding to the asset information of the power generation equipment 13 .
  • the management server 2 issues (STO) a token backed by the power generation equipment 13 (S302).
  • the management server 2 may issue any number of tokens.
  • an index such as the upper limit of tokens to be issued or a standard will make trading easier. Therefore, for example, 100 tokens may be granted for each power generation facility 13, and the amount granted in this manner may represent the ownership ratio of the facility. In this case, the amount of power corresponding to the token may be calculated separately and displayed.
  • the number of tokens per amount of electric power generated by the power generation equipment 13 may be issued. In particular, when it is desired to trade the amount of electric power across a plurality of power generation facilities, the number of tokens may be issued for each amount of electric power generated.
  • the number of tokens to be issued to the power generation facility may be determined by multiplying the number of tokens to be given per predetermined unit output (kWh) by the maximum output kWh, which is the capacity of the power generation facility. For example, if it is specified to issue 1 ST per 1 kWh and the maximum output of the power generation facility is 150 kWh, it may be decided to issue 150 tokens. In this case, it is also assumed that the issued token will deviate from the percentage of ownership of the power generation facility 13 . A separate allowance may be granted for this difference in ownership. In the above case, the maximum power may be the rated power, which is the maximum value of power used under certain conditions.
  • the ownership of the power generation facility 13 may be determined after the amount of power for which the transaction has been completed is determined.
  • the amount of power generated by the power generation equipment 13 may vary depending on past performance such as the period or time of power generation.
  • the amount of tokens may also change according to changes in the amount of power generated by the power generation equipment 13 .
  • token trading may be possible by converting the amount of electric power that can be obtained in the future into a present value. For example, it may be converted so that the farther into the future the power amount that can be obtained is, the more discounted the charge will be.
  • the management server 2 can solicit applicants for divisional owners of the power generation facility 13 .
  • the power consumer 10 has a sectional ownership right (represented by ST) of the power generation facility 13 and an offtake right (represented by UT) of the amount of power (kWh) generated from the power generation facility 13. is used).
  • the management server 2 can record (register) the owner information of the token holder (initially the equipment provider 15) in the ledger of the blockchain 4 (S303).
  • the management server 2 acquires the amount of power generated by the power generation equipment 13 from a measuring device such as a smart meter 14, and measures the amount of power at a fixed reference time such as a 30-minute value (the measurement time can be set arbitrarily). can be aggregated (S304).
  • the management server 2 allocates the amount of generated power to the grouped owners according to the amount of tokens held (including tokens scheduled to be moved in future slots that have already been matched) (S305), and can supply power in the form of self-consignment ( S306).
  • the power supply by self-consignment performed in S306 may be performed after creating a self-consignment plan and reporting it to, for example, OCCTO.
  • the management server 2 may automatically calculate a planned value for self-consignment after matching by the matching processing unit 215 is completed, and may automatically transmit the calculated value to the OCCTO or the like. Further, in S306, the management server 2 may enable supply of only the power generation amount that matches the planned value for self-consignment.
  • the demand input unit 213 can receive, from the user terminal 1 of the consumer 10 , information in which the demand is set in the purchase request for acquiring the category 133 of the power generation equipment 13 .
  • the purchase request may include information designating the time period, or may include the predicted amount of power to be generated in that time period.
  • the management server 2 provides a trading platform that enables trading of tokens held by users.
  • the management server 2 provides a trading platform that enables trading from the day before the power generation (day-ahead market) as long as the power generator allows.
  • FIG. 10 is a diagram showing the distribution flow of ownership of power generation equipment in the power procurement system of this embodiment.
  • the management server 2 calculates the offtake amount (which may be represented by UT) of the power generation amount (kWh) of the consumer 10 according to the holding ratio of ST (including the matched move scheduled token in the future slot). (S321).
  • the management server 2 receives a purchase request with set conditions from the purchaser (S322).
  • the purchase request can include the type of power generation (solar, wind, etc.), amount of power, price, time zone, and/or area, and superiority or inferiority of conditions.
  • the conditions can be similar to the conditions of a stock trading platform (such as a limit price, a stop price, or a conditional trade when the price reaches a certain level).
  • the management server 2 accepts the sale request (S323).
  • the management server 2 matches the token specified by the sale request with the purchase request based on the conditions set in the purchase request (S324).
  • the matching process performed in step S324 is also referred to as "matching process”.
  • the matching process it is possible to perform detailed matching of purchasers and sellers by matching the condition settings to the actual state of electricity transactions. For example, without setting a selling price (or by giving a range to the price or taking the chance), the power generation equipment 13 corresponding to the specified conditions (such as solar power) is sold or sold until a certain amount of power (kWh) is reached. can continue to run. Also, an area is specified in the purchase request, and purchases are continued from one or a plurality of power generation facilities 13 installed in the specified area until a certain amount of electric power (kWh) or the total purchase price reaches a certain amount. You can also make It is also possible to specify only the purchase price and continue to purchase or sell without specifying the amount of power (kWh). Also, it is possible to specify only the time zone in the purchase request, and to sell or continue to sell within the specified time zone until reaching a certain power amount (kWh). Furthermore, the conditions may not be set, or the conditions may be prioritized.
  • a transaction screen displaying predetermined transaction information may be displayed.
  • the transaction screen may be displayed on the output device 206 or the like.
  • the matching process it may be displayed whether or not the power generation facility is the target of output suppression.
  • a predicted value of the amount of power generated by the power generation equipment may be displayed.
  • an indicator of the reliability of prediction of the amount of power generation by the power generation equipment may be displayed.
  • whether or not the minimum output capacity of the power generation equipment 13 is guaranteed within the trading target period and/or the specific value (kWh) of the minimum output capacity may be displayed. Further, in the matching process, specific contents of compensation may be displayed when the value of the guaranteed minimum power capacity is actually exceeded.
  • countermeasures may be taken according to the discrepancy. Further, when such a deviation occurs, feedback may be provided on such a deviation to improve the prediction accuracy or lower the reliability index.
  • the management server 2 After the matching process, if the sale fails (S325: NO), the management server 2 does not transfer the token from the seller (thus, does not transfer ownership and offtake rights). In this case, the power from the power generation equipment 13 may be sold to the wholesale power exchange (S326). Also, in this case, the products may be sold to retailers through negotiated transactions instead of the wholesale market.
  • the matching processing in this embodiment will be further described below.
  • the matching processing in this embodiment may be processing executed in step S324 shown in FIG. 10, for example.
  • the matching processing unit 215 of the management server 2 may perform matching processing similar to sales processing in a normal stock market.
  • the matching processing unit 215 may perform the matching from the viewpoint of (current) electric energy and/or ownership ratio (token), price, and the like.
  • the matching processing unit 215 may perform matching from the following viewpoints, for example.
  • (2) Amount and Price of Power Generated by Power Generation Equipment 13 In other words, the amount of power generated by the power generation equipment 13 and its price may be displayed and traded.
  • the viewpoint shown in (2) above is, for example, (a) the predicted value of the power generated by the power generation equipment 13, (b) the accuracy of prediction (past accuracy rate, etc.), and (c) the charge per unit electric energy. , may be obtained based on the product of In particular, the above (b) prediction accuracy (past correct answer rate, etc.) is not fixed information at the present time, so it may be displayed as a future prediction value for trading.
  • the predicted value of the power generated by the power generation equipment 13 and the accuracy of the prediction may be determined based on various factors.
  • the management server 2 may evaluate the value of the power generation facility 13 as a power generation facility, and the transaction may be conducted based on the value.
  • the management server 2 may display various evaluations on the output device 206 at the time of transaction.
  • the value of the power generation facility 13 as a power generation facility may also be evaluated from various viewpoints. For example, the value of the power generation facility 13 as a power generation facility may be evaluated in terms of how long and/or how much output is expected.
  • the value of the power generation facility 13 as a power generation facility may be evaluated from a viewpoint other than the power (kWh) to be generated. Specifically, the value of the power generation facility 13 as a power generation facility may be evaluated, for example, based on the amount of CO 2 emitted until the power generation facility is completed. Further, the value of the power generation equipment 13 as power generation equipment may be evaluated, for example, based on the amount of CO 2 emissions per 1 kW of power generated by the power generation equipment 13 . Furthermore, the value of the power generation equipment 13 as power generation equipment may be evaluated based on, for example, the amount of CO 2 emitted until the power generation equipment is scrapped. In addition, the value of the power generation facility 13 as a power generation facility may be displayed on the output device 206 or the like together with a comparison target, or may be displayed after being ranked, as a criterion for matching. .
  • the value of the power generation facility 13 as a power generation facility may be evaluated from the perspective of various risks.
  • the value of the power generation facility 13 as a power generation facility may be evaluated based on trends in the frequency and/or degree of natural disasters in the area where the power generation facility is installed.
  • the value of the power generation facility 13 as a power generation facility may be evaluated based on the security and/or political stability of the area where the power generation facility is installed.
  • the value of the power generation facility 13 as a power generation facility may be evaluated based on the degree of consumption in the area where power is generated, that is, the degree of local production for local consumption. Electricity that is closer to where it is generated and consumed can reduce the load on power lines and other infrastructure. Also, electric power generated near the place of consumption can provide a sense of security to those who consume the electric power.
  • the value of the power generation facility 13 as a power generation facility may be evaluated from the perspective of the past output report of the power generation facility, the lifetime of the power generation facility, and/or the deterioration prediction of the power generation facility.
  • the value of the power generation equipment 13 as a power generation equipment may be evaluated from the degree of environmental load, for example, no embankment is used at the installation location of the power generation equipment.
  • the value of the power generation facility 13 as a power generation facility may be evaluated as the degree of legality of the power generation facility 13 from the viewpoint of the cleanliness of renewable energy.
  • the value of the power generation facility 13 as a power generation facility may be evaluated from the viewpoint of items listed in SDGs (Sustainable Development Goals) as an example, such as the viewpoint of reduction of environmental load.
  • SDGs Stustainable Development Goals
  • any of the above evaluations may also include evaluations represented by numerical values specified based on predetermined criteria. For example, as a five-level standard with one level each, the standard may be such that the higher the number, the higher the evaluation. Specifically, stepwise criteria are defined such as 1 (bad), 2 (slightly bad), 3 (normal), 4 (slightly good), 5 (good), and each power generation facility 13 A numerical value may be included in the evaluation.
  • step S306 of FIG. 9 the self-consignment performed in step S306 of FIG. 9 will be further described.
  • the conditions necessary for self-consignment may be reflected.
  • transactions bidding
  • maximum received power the amount of demand handled by itself
  • the power procurement system of the present embodiment may automatically acquire the contracted capacity (maximum received power) of the self-consignment destination.
  • the transaction platform 12 provided in the power procurement system of the present embodiment may acquire information related to the contract power capacity of the consumer from an external server such as a power company (retail power company).
  • the external server of OCCTO manages the information related to the contract power capacity of the consumer
  • the information may be obtained from the external server of OCCTO.
  • Such information related to the contracted power capacity of the consumer may be acquired, for example, before participation in a bid in a transaction or before a successful bid.
  • information related to the contracted power capacity of the consumer may be made obtainable by using the consumer's identification information and/or authentication information.
  • such information related to the contract power capacity of the consumer may be made obtainable by using an API.
  • trading platform 12 may obtain data regarding power consumption by time period for the past 30 minutes.
  • Trading platform 12 may also obtain data such as the previous day's data, or the average, lowest, or highest value for a given time or period (such as a weekday, week, month, or year).
  • consumer who participate in transactions are required to submit (transmit) information indicating the contracted capacity (maximum received power) contracted with the electric power company to the management side such as an external server in advance along with a predetermined certificate.
  • the contracted capacity indicates the maximum received power at the customer's facility that self-consigns the power after the successful bid.
  • the trading platform 12 may automatically acquire information indicating the submitted (transmitted) contract capacity from an external server or the like.
  • the consumer's identification information and authentication information may be used. At least one of such identification information and authentication information may be issued to the consumer from an external server, for example.
  • a consumer can participate in a transaction by entering at least this identification information and authentication information into the trading platform 12 at the time of the transaction.
  • the trading platform 12 can obtain from the external server information indicating the contracted capacity of the consumer who is about to participate in the trading. As a result, the trading platform 12 can limit bids for the amount of power that exceeds the maximum received power at the customer's facility of the self-consignment destination.
  • the management server 2 may store the identification information and the authentication information in the storage device 203 or the like in association with the submitted (transmitted) information indicating the contract capacity.
  • the trading platform 12 When conducting transactions on the trading platform 12, for example, screens such as those shown in FIGS. Specifically, the CPU 201 creates information about the screen, and the management server 2 issues a command to the output device 206 or the like to display the screen based on the information about this screen. 11 to 14, the selection screen is shown on the left side, and the confirmation screen is shown on the right side.
  • the trading platform 12 may have a search function that can search according to input of various conditions when the ST, UT, and/or power generation equipment 13 to be purchased is selected. In addition, the trading platform 12 may display STs, UTs, and/or power generation facilities 13 found by the search on the selection screen.
  • the input device 205 receives the input of various conditions and the input of information and instructions regarding transactions.
  • FIG. 11 shows a screen that can be displayed on the output device 206 when the transaction amount is fixed and ST is transacted.
  • the consumer can check the availability of the power generation equipment 13, that is, the slots in which ST can be purchased, on the selection screen shown on the left side of FIG.
  • filled slots may indicate that there are no vacancies, and non-filled slots may indicate that there are vacancies.
  • the confirmation screen shown on the right side of FIG. 11 may be displayed.
  • the consumer can confirm the information related to the transaction before finalizing the transaction.
  • the confirmation screen shown on the right side of FIG. 11 when an input to the confirmation button by the consumer is detected, the transaction as shown on the confirmation screen on the right side of FIG. 11 can be confirmed.
  • the acquired tokens and the capacity (kW) corresponding to the acquired tokens may be displayed in cases where the amount of acquired power generation capacity (kW) may be misleading to consumers. good too.
  • the consumer may be requested to enter the consumer ID and the authentication information and be requested to log in before the consumer performs selection input.
  • the transaction platform 12 may store the consumer ID and the consignment destination ID (including information on the consignment destination) in association with each other.
  • FIG. 12 shows a screen that can be displayed on the output device 206 when the transaction amount is fixed and UT is traded.
  • the consumer can check the predicted power generation value of the power generation equipment 13, that is, the slot where the UT can be purchased on the selection screen shown on the left side of FIG.
  • the unit of time for power trading is not particularly limited, but can be, for example, 30 minutes.
  • filled slots may indicate that there are no vacancies, and non-filled slots may indicate that there are vacancies.
  • slots that cannot be selected may be included as non-transactionable slots.
  • the confirmation screen shown on the right side of FIG. 12 may be displayed.
  • the consumer can confirm the information related to the transaction before finalizing the transaction.
  • the confirmation screen shown on the right side of FIG. 12 when an input to the confirm button by the consumer is detected, the transaction as shown on the confirmation screen on the right side of FIG. 12 can be confirmed.
  • the consumer may be requested to enter the consumer ID and authentication information and log in before the consumer performs selection input.
  • the transaction platform 12 may store the consumer ID and the consignment destination ID (including information on the consignment destination) in association with each other.
  • the contract capacity maximum received power
  • the trading platform 12 may restrict or prohibit bidding if the contracted capacity is exceeded, display only those that can be bid, or display those that can be bid and those that cannot be bid, respectively, as restrictions on trading. or select only possible ones.
  • the trading platform 12 may restrict the transaction by permitting bidding but not making a successful bid. Further, the trading platform 12 may limit the transaction by displaying a warning screen and/or warning display before confirming the bid if a bid is made when the capacity is exceeded. .
  • the trading platform 12 may let the demander who has made the highest bid so far win the bid after a predetermined bidding time has elapsed after bidding. Moreover, the trading platform 12 may display a screen showing the contents of the successful bid.
  • FIG. 13 shows a screen that can be displayed on the output device 206 when the transaction amount is fixed and UT is traded for a long period of time.
  • the consumer can confirm the predicted power generation value of the power generation facility 13, that is, the facility where the UT can be purchased on the selection screen shown on the left side of FIG.
  • the consumer can select at least one of the power generation facility with the facility name AAA and the power generation facility with the facility name BBB, for example.
  • the selection screen on the left side of FIG. 13 for example, when a power generation facility with the facility name AAA is selected, the display items are surrounded by a thick border or the color of the display items is changed to indicate the selection.
  • the confirmation screen shown on the right side of FIG. 13 may be displayed.
  • the consumer can confirm the information related to the transaction before finalizing the transaction.
  • the confirmation screen shown on the right side of FIG. 13 when an input to the confirm button by the consumer is detected, the transaction as shown in the confirmation screen on the right side of FIG. 13 can be confirmed.
  • FIG. 14 shows a screen that can be displayed on the output device 206 when the transaction amount is determined by bidding and the UT is traded for a long period of time.
  • the consumer can confirm the predicted power generation value of the power generation facility 13, that is, the facility where the UT can be purchased on the selection screen shown on the left side of FIG.
  • the consumer can select at least one of the power generation facility with the facility name AAA and the power generation facility with the facility name BBB, for example.
  • the transaction amount is determined by bidding.
  • the amount is not displayed for the power generation facility with the facility name AAA shown in the selection screen on the left side of FIG.
  • the display items are surrounded by a thick border or the color of the display items is changed to indicate the selection. It may be displayed so as to be distinguishable from others, such as
  • the confirmation screen shown on the right side of FIG. 14 may be displayed.
  • the consumer can confirm the information related to the transaction before finalizing the transaction, and can enter the bid amount for the selected power generation facility.
  • the transaction (bid) with the contents shown on the confirmation screen on the right side of FIG. 14 is executed. can be determined.
  • the screen may transition to the post-bid screen shown on the left side of FIG. 15, for example.
  • the output device 206 may display various information about the bid transaction along with the confirmed bid amount. Further, as shown in the post-bid screen on the left side of FIG. 15, information may be displayed to the effect that the user who has made a bid in FIG. 14 is the current highest bidder.
  • the bid on the left side of FIG. 15 may not be awarded.
  • a higher bid may be made by returning to the confirmation screen shown on the right side of FIG. 14, for example.
  • a successful bid screen as shown on the right side of FIG. 15 may be displayed.
  • information to the effect that a successful bid has been made at the successful bid amount may be displayed at the end of the transaction period.
  • the successful bid button is detected on the successful bid screen shown on the right side of FIG. 15, the successful bid for the bid shown on the right successful bid screen of FIG. 15 may be confirmed.
  • the selection screen shown on the left side of FIG. 11 slots with vacancies and slots with no vacancies are shown as scenes for transactions.
  • the input screen for the equipment owner for example, like the selection screen shown in FIG. As shown in FIG. 16, for example, when one of the slots shown as not being traded is selected, the display mode such as the color of the slot is changed to indicate that the slot has been selected. good too. After that, based on the input to the confirmation button as shown in FIG. 16, the display mode may be changed, for example, by changing the color so that the slot indicates the transaction object.
  • the facility owner may request login by requesting input of the facility owner's ID and authentication information.
  • the property information storage unit 231 shown in FIG. 8 may associate and store the equipment owner ID and information such as the facility name AAA and/or the power generation capacity.
  • the display mode such as the color of the slot is changed to indicate that the slot has been selected. good too.
  • the display mode may be changed, for example, by changing the color so that the slot indicates the transaction object.
  • the facility owner may request login by requesting input of the facility owner's ID and authentication information.
  • the property information storage unit 231 shown in FIG. 8 may associate and store the equipment owner ID and information such as the facility name AAA and/or the power generation capacity.
  • the registration and issuance of the facility owner's ID may be performed, for example, as follows.
  • the demanders who participate in the transaction submit (transmit) information indicating the contracted capacity (maximum received power) contracted with the electric power company to the management side such as an external server in advance along with a predetermined certificate.
  • the management side such as an external server in advance along with a predetermined certificate.
  • an owner of a power generation facility participating in a transaction may submit (transmit) in advance information on the facility to be traded together with a predetermined certificate to an operating side such as an external server.
  • the prescribed certificate is, for example, a certified copy of the register when the facility owner is a corporation, an ordering contract for the facility, a receipt certifying the purchase of the facility, and/or a certification of the facility by a third party It can also be used as a book.
  • the information submitted in this manner may be stored in the property information storage unit 231 in association with the equipment owner's identification information or authentication information described below. At least one of the equipment owner identification information and authentication information may be issued to the equipment owner from, for example, an external server.
  • a facility owner may participate in a transaction by entering at least this identification and authentication information into trading platform 12 at the time of the transaction.
  • the trading platform 12 acquires information on the equipment of the equipment owner who is about to participate in the transaction from the asset information storage unit 231, and displays it when trading. It can be displayed on the screen you get.
  • Time periods 1 to 18 as shown in FIGS. 12 and 17 may be set at any time.
  • the unit of one time period may be set to 30 minutes, and one day may be displayed as 1 to 48 time periods.
  • smart contracts may be used to switch electricity retailers. Since the necessary data can be obtained by using the API, switching of electricity retailers may be performed on the trading system side.
  • the power procurement system of this embodiment may automatically create self-consignment plan information based on transaction information after the matching process described above is completed.
  • the power procurement system of the present embodiment transmits the information of the self-consignment plan created in this way together with the information of the consumer who has made the transaction to, for example, OCCTO after the matching process described above is completed. good.
  • the plan information to be transmitted to OCCTO etc. is, for example, information on the sender of the plan, information on the destination of the plan, power amount of the plan, time zone of the plan, and / or predicted power generation value of the power generation facility. May contain information. In this way, a self-consignment plan can be created and reported to relevant parties before self-consignment can be carried out.
  • the power procurement system of the present embodiment automatically concludes a contract necessary for self-consignment with a power retailer that has a contract to supply power to the customer's facility by means of a smart contract or the like.
  • the management server 2 when a transaction by the sales processing unit 216 is established, the management server 2 creates a plan for self-consignment by the day before the day on which self-consignment is executed, and submits the plan. For example, it may be submitted to a predetermined agency such as OCCTO.
  • the power procurement system may automatically conclude a contract for self-consignment related to matching processing with the power retailer using a smart contract or the like.
  • the power procurement system may automatically conclude a self-consignment contract for matching processing with each power retailer using a smart contract or the like.
  • the power procurement system of the present embodiment may conclude a self-consignment contract together with the matching process described above.
  • the power procurement system of this embodiment includes a power retailer who has a contract to handle the power generated by the power generation facility, and a power retailer who has a contract to supply power to the facility of the consumer. Strategies may be taken to complete the matching only if and are the same.
  • a person who has a contract with an electricity retailer is a person who has a contract to provide or supply electricity at the equipment or facilities owned by the contractor.
  • the power procurement system may conduct transactions only between multiple consumers who have contracts with the same power retailer and the owner of the power generation facility. Participation in transactions may be prohibited for consumers who have contracted with an electricity retailer different from the electricity retailer with whom the owner has contracted for power generation equipment of the electricity procurement system.
  • FIG. 18 is a diagram showing an example of token purchase in the power procurement system of this embodiment.
  • the owner of the power generation facility is an electric power retailer will be described.
  • the retailer by participating in the transaction as the facility owner of the power generation facility, the retailer itself can increase the credibility of those who participate in the transaction. That is, in a transaction using the transaction PF, the consumer acquires the right to receive the power related to these tokens by bidding on the security token or utility token of the power generation facility.
  • the retailer is already supplying electricity, it has a track record of supplying electricity, so it is possible to reduce the anxiety of consumers that they will not be able to receive the electricity related to the tokens that have won a successful bid.
  • a retailer that has power generation equipment in advance may participate in the transaction.
  • a retailer collects funds from a consumer group consisting of a plurality of consumers, purchases power generation equipment such as solar panels, and installs it on a predetermined land. state. Such transactions may be conducted in a manner similar to the embodiments described above.
  • a consumer who has made a successful bid will receive power from the retailer who owns the facility according to the token that has been awarded.
  • the power procurement system when funds are collected from the demander group and the power generation equipment such as the solar panel 13 is purchased, the power procurement system does not perform the transaction as in the above-described embodiment, and the power procurement system Tokens may be issued or given to this consumer group.
  • the retailer 19 may contribute funds in addition to the consumer.
  • the consumer group is supplied with electricity corresponding to this token from the retailer 19 who is the owner of the facility.
  • the power procurement system may issue or grant tokens to consumers who are respective consumers in the consumer group so that they can receive the corresponding power supply.
  • the tokens may be distributed equally among the consumers, or may be allocated according to the funds provided.
  • retailer 19 may be, for example, a solar panel owner. Retailers 19 may purchase solar panels directly using funds collected from consumer groups. Also, as shown in FIG. 18, the retailer 19 may virtual compartmentalize the solar panels while continuing to sell ownership of them.
  • the power procurement system issues 100 tokens as security tokens to the power generation facility associated with the investment of the consumer group, the power procurement system will give 2% of the total investment to the invested consumer. You may give 2 tokens. For example, if the power generation facility has a maximum output of 100 kWh per day, a consumer given 2 tokens will be supplied with 2 kW of power per day by the retailer 19 who owns the facility. Here, as long as the consumer owns these two tokens, the consumer may be semi-permanently supplied with 2 kw of electricity per day from the retailer 19 who is the owner of the facility. However, this 2 kw per day is an actual value or a theoretical value. Therefore, in reality, the power supplied may decrease due to deterioration or failure of power generation equipment.
  • Tokens may be purchased from consumers.
  • the retailer 19 may be supplied with power. For example, as shown in FIG. 18, assume that a consumer who is a household X that does not provide funds purchases 2 tokens corresponding to 2% of the total funds from the retailer 19 who provided part of the funds. . In this case, based on the same idea as described above, the consumer may purchase semi-permanent tokens equivalent to 2 kW per day from the retailer 19 .
  • the consumer group will receive the amount corresponding to the tokens purchased from the retailer 19. of power can be supplied.
  • the power procurement system may manage to give tokens to the consumer groups.
  • the consumer group and the retailer 19 conclude a supply contract for a predetermined amount of electricity corresponding to a predetermined token, and the consumer group may hold tokens in a pseudo manner.
  • FIG. 19 is a diagram showing an example of money billing in the power procurement system of this embodiment. Also in FIG. 19, for example, the case where the owner of the power generation facility is an electric power retailer will be described.
  • the retailer itself can increase the reliability of those who participate in the transaction, as in the case shown in FIG.
  • the retailer 19 is the facility owner of a power generation facility that generates 10,000 kWh of electric power every month.
  • the retailer 19 may be allowed to participate in the transaction PF as the facility owner by registering the asset information of the power generation facility in the power procurement system according to one embodiment.
  • the power procurement system may issue, for example, 100 tokens as security tokens. If a consumer who is household X wins two tokens from the transaction PF of the power procurement system, this consumer will sell 200 kWh of electricity per month, which is equivalent to 2% of the monthly 10,000 kWh of electricity, to retailers. You will get the right to be supplied by the operator 19 .
  • the monthly power usage charge for household X is, for example, 450 kWh. In this case, by offsetting the right to supply 200 kWh of power acquired through the transaction, for example, 250 kWh of power obtained by subtracting 200 kWh from 450 kWh may be used.
  • the retailer 19 may charge the household X shown in FIG. In this way, subtracting the generated power amount corresponding to the token acquired by the transaction from the purchased power amount to be purchased from the retailer 19 as the amount of power to be billed is referred to as "net meter called "ring".
  • FIG. 20 is a flow chart explaining the operation of power supply by net metering of the power procurement system according to one embodiment.
  • step S301 to step S305 may be performed in the same manner as the operation shown in FIG.
  • the management server 2 may supply power by net metering as described above (S401). .
  • tokens issued by the blockchain 4 are used to manage ownership of the power generation facility 13 and whereabouts of offtake rights.
  • location management does not necessarily have to use blockchain technology.
  • ownership and offtake rights may be managed in a predetermined database, and the database manager (manager of the management server 2) may guarantee the authenticity of the content. That is, in one embodiment, tokens may be issued (recorded) in a predetermined database.
  • the owner information about the owner of the power generation equipment 13 is managed in the blockchain 4 ledger.
  • the management server 2 may be provided with an owner information storage unit that stores owner information.
  • the power procurement system of one embodiment may collect a commission at the time of transaction or collect a commission at the time of self-consignment.
  • the prediction of the amount of power to be generated may be different for each time period. Furthermore, in the power procurement system of one embodiment, if the prediction of the amount of power to be generated is incorrect, for example, a penalty may be imposed according to the degree of the error. Further, in the power procurement system of one embodiment, instead of indicating the original predicted value of the power to be generated, for example, a predetermined ratio may be indicated for safety before conducting transactions. For example, when the predicted value of the power to be generated is originally 1000 kWh, the transaction may be made by indicating 900 kWh.
  • the power generation facility 13 may be not only a solar panel (solar battery) that generates solar power, but also a storage battery (including an electric vehicle (EV)), for example. Further, in the power procurement system of one embodiment, if the power generation facility 13 includes a storage battery, the storage battery may function as a power buffer.
  • the surplus may be purchased by the power transmission and distribution company. Further, in the power procurement system of one embodiment, if there is a shortage of power generated by the power generation equipment 13, the power purchaser (power generation side) may pay a penalty.
  • a mechanism may be constructed in which the amount of power that is expected to be obtained in the future according to the investment recovery period is reflected in the current value and discounted.
  • the present disclosure also includes the following configuration.
  • a token issuing unit that causes a blockchain to issue a token representing ownership and offtake rights of the power generation facility backed by the power generation facility; a demand amount input unit that receives from a demander a demand amount of electric power to be procured from the power generation facility; a sales processing unit that performs processing related to sales of the token to the consumer; a token transfer unit that transfers an amount of the tokens corresponding to the demand amount to the consumer's wallet;
  • An information processing device comprising: [Item 2] The information processing device according to item 1, a power generation prediction acquisition unit that acquires a predicted value of the amount of power generated by the power generation equipment; a power generation plan output unit that divides and outputs the predicted value of the power generation amount according to the amount of tokens scheduled to be held by the consumer for each of the consumers;
  • An information processing apparatus further comprising: [Item 3] The information processing device according to item 1 or 2, A power generation performance acquisition unit that acquires a performance value

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

情報処理装置は、発電設備の所有権の持分を表す第1のトークンを所定のデータベースにおいて発行させるトークン発行部と、発電設備に関連する情報、発電設備の所有権の持分に関連する情報、及び持分に応じた価格に関連する情報に基づいて、発電設備によって発電される電力の取引を実行させる販売処理部と、販売処理部による取引が成立した場合に、第1のトークンを、所有権の持分に応じて取引における購入者に移転させるトークン移転部と、を備える。

Description

情報処理装置 関連出願の相互参照
 本出願は、2022年2月25日に日本国に特許出願された特願2022-28705の優先権を主張するものであり、この先の出願の開示全体を、ここに参照のために取り込む。
 本開示は、情報処理装置に関する。
 事業者が自身の所有する発電設備を用いて発電した電力を、送配電ネットワークを介して他の場所にある当該事業者の設備に送電する自己託送が知られている(特許文献1参照)。
特開2017-163780号公報
 一実施形態に係る情報処理装置は、
 発電設備の所有権の持分を表す第1のトークンを所定のデータベースにおいて発行させるトークン発行部と、
 前記発電設備に関連する情報、前記発電設備の所有権の持分に関連する情報、及び前記持分に応じた価格に関連する情報に基づいて、前記発電設備によって発電される電力の取引を実行させる販売処理部と、
 前記販売処理部による前記取引が成立した場合に、前記第1のトークンを、前記所有権の持分に応じて前記取引における購入者に移転させるトークン移転部と、
 を備える。
 また、一実施形態に係る情報処理装置は、
 発電設備の所有権の持分を表す第1のトークンを所定のデータベースにおいて発行させるトークン発行部と、
 前記前記発電設備が所定の時間帯において発電する積算の電力を予測する発電予測取得部と、
 前記発電設備に関連する情報、発電予測部によって予測される電力に関連する情報、及び前記持分に応じた価格に関連する情報に基づいて、前記発電設備によって発電される電力の取引を実行させる販売処理部と、
 前記販売処理部による前記取引が成立した場合に、前記第1のトークンを、前記発電予測部によって予測される電力に応じて前記取引における購入者に移転させるトークン移転部と、
 を備える。
 また、一実施形態に係る情報処理装置は、
 発電設備の所有権の持分を表す第1のトークンを所定のデータベースにおいて発行させるトークン発行部と、
 前記発電設備に関連する情報、前記発電設備によって発電される単位電力あたりの二酸化炭素排出量に関連する情報、及び前記持分に応じた価格に関連する情報に基づいて、前記発電設備によって発電される電力の取引を実行させる販売処理部と、
 前記販売処理部による前記取引が成立した場合に、前記第1のトークンを、発電予測部によって予測される電力に応じて前記取引における購入者に移転させるトークン移転部と、
 を備える。
 また、一実施形態に係るプログラムを記録した一時的でない有形の媒体は、
 コンピュータに、
 発電設備の所有権の持分を表す第1のトークンを所定のデータベースにおいて発行させるトークン発行処理と、
 前記発電設備に関連する情報、前記発電設備の所有権の持分に関連する情報、及び前記持分に応じた価格に関連する情報に基づいて、前記発電設備によって発電される電力の取引を実行させる販売処理と、
 前記販売処理部による前記取引が成立した場合に、前記第1のトークンを、前記所有権の持分に応じて前記取引における購入者に移転させる移転処理と、
 を実行させるためのプログラムを記録した媒体である。
 その他本願が開示する課題、及び、その解決方法については、本開示の実施形態の欄及び図面により明らかにされる。
電力調達の概要を説明する図である。 従来の太陽光パネルの共同所有形態を説明する図である。 発電設備13の共同所有形態を説明する図である。 発電電力量の分配について説明する図である。 電力調達システムにおける取引の概要を示す図である。 電力調達システムの全体構成例を示す図である。 管理サーバ2のハードウェア構成例を示す図である。 管理サーバ2のソフトウェア構成例を示す図である。 本実施形態の電力調達システムにおける送電処理の流れを示す図である。 本実施形態の電力調達システムにおける発電設備の持分の流通の流れを示す図である。 本実施形態の電力調達システムにおける取引画面の例を示す図である。 本実施形態の電力調達システムにおける取引画面の例を示す図である。 本実施形態の電力調達システムにおける取引画面の例を示す図である。 本実施形態の電力調達システムにおける取引画面の例を示す図である。 本実施形態の電力調達システムにおける取引画面の例を示す図である。 本実施形態の電力調達システムにおける取引画面の例を示す図である。 本実施形態の電力調達システムにおける取引画面の例を示す図である。 本実施形態の電力調達システムにおけるトークン購入の例を示す図である。 本実施形態の電力調達システムにおける請求の例を示す図である。 本実施形態の電力調達システムにおける送電処理の流れを示す図である。
 発電設備の所有には、通常は多額の初期投資を必要し、所有のハードルが高い。本開示の目的は、上記課題を解決するために、希望の電力調達を容易にする技術を提供することにある。本開示の実施形態によれば、希望の電力調達を容易にすることができる。以下、本開示の電力調達システムの実施形態について説明する。
 本実施形態の電力調達システムでは、発電設備を証券トークン(セキュリティトークン:Security Token)により小口化して区分所有可能にする。これにより、本実施形態の電力調達システムは、発電設備保有の初期投資を抑制し得る。本実施形態の電力調達システムにおいて、発電設備とは、例えば太陽光パネルを想定してよい。しかしながら、本実施形態の電力調達システムにおいて、発電設備は、太陽光パネルに限らず、火力発電設備であってもよいし、蓄電池等であってもよい。本開示において、証券トークン(セキュリティトークン)を、「ST」とも記す。また、本実施形態の電力調達システムは、利用時のみSTを保有する高頻度売買を可能とするマーケットプレイスを実現する。これにより、例えば、発電設備の遊休状態を解消するとともに、発電設備のセカンダリー市場での値付けを行い、流動性を確保することで、発電設備の価値向上も実現することができる。電力の需要者は、発電設備を区分所有することにより、自己託送制度を利用して電力需要設備に区分所有している発電設備からの送電を行うことができる。
 自家発電設備は、通常ある事業者又は個人などが単体で保有するのが一般的である。本実施形態では、1つの発電設備を複数の需要家(需要者)が共同保有し得るモデルを採用する。
 従来型の大型発電設備(太陽光に限らず火力及び風力なども)は初期投資に費用が掛かり、一事業者での保有は負担が大きい。また、発電設備によっては日中のピークカットに利用するのみで、稼働していない時間も多く、稼働率を上げたいというニーズがある。あるいは、短時間の出力調整が難しい発電設備の場合、需要設備が稼働していないタイミングでは発電電力量が過剰となり、経済性の成り立たない価格であっても他社に売電するしか選択肢が無いなどの課題を持つ。経済性を向上させるにも、例えば設備の区分所有権を売却し、購入者が自己託送制度を利用可能とすることでより流動性を高める仕組みは存在しない。また、共同保有を実際に行うとしても、所有区分を物理的に切り分け、各区分にメータを設置し発電電力量を計測できる太陽光発電設備ぐらいしか適用可能な発電設備は存在せず、実施したとしてもメータの複数設置などで経済性が悪化することが予想される。また、仮に大型の太陽光発電設備を物理的に分割して保有した場合、場所によって日射量の違い、パネルの劣化の違いがあるため、同一面積のパネルを保有していたとしても計測地点によって発電電力量が違い、不公平が生じていた。また、このように物理的に切り分ける方式は、それ以外の発電設備(火力、水力、風力、地熱、バイオマス、原子力、その他発電方法及び蓄電池)に広げることが困難であった。そもそも、太陽光パネルの場合は保有にかかる形態がパネル単位と物理的に切り分けできるものの、他の発電設備はこのような物理的な切り分けが困難であった。
 そこで、本実施形態の電力調達システムでは、発電設備を物理的にではなく仮想的に分割し、その分割した区分を例えばブロックチェーンのSTにより表章し、分割した単位での所有権を発電設備の利用者が保有できるようにした。これにより、高額な発電設備を少額で一部保有することが可能となり、また仮想的に分割するため、分割に物理的な制約がある太陽光発電以外の発電設備でも分割での保有を可能としている。
 また、本実施形態の電力調達システムでは、発電設備の発電電力量を計測し、一定の時間帯(30分毎など)毎に保有した割合に応じ電力量(kWh)を自己託送の形で供給するようにしている。
 また、本実施形態の電力調達システムでは、発電設備を保有している割合を電子的に記録することができる。これにより、本実施形態の電力調達システムは、売買容易性を高めることができる。したがって、本実施形態の電力調達システムは、所有権及びそれに紐づく電力量(kWh)のオフテイク権を売買できるプラットフォームを用意することにより、資産の流動性を高めることが期待できる。また、本実施形態の電力調達システムは、既存の設備も当該プラットフォームに載せることにより、設備の稼働率を向上させることを可能にする。
 本実施形態の電力調達システムでは、上述のオフテイク権は、例えばユーティリティトークン(Utility Token)により表章されるものとしてよい。ここで、ユーティリティトークンとは、ある資産又は価値から生まれる二次的な資産又は価値を表すトークンをいう。例えば、ユーティリティトークンとは、セキュリティトークンから生み出される価値を表すトークンしてもよい。また、ユーティリティトークンとは、例えば、トークンそれ自体は金銭的価値をもたず、具体的な他のアセットと交換することにより初めて資産性が生まれる種類のトークンとしてもよい。本実施形態の電力調達システムにおいては、ユーティリティトークンを用いることにより、発電電力量に対応するオフテイク権と、取引時に用いる電力量との関係を示すことができる。本開示において、ユーティリティトークンを、「UT」とも記す。また、本開示において、ST(セキュリティトークン)及びUT(ユーティリティトークン)の少なくとも一方を、単に「トークン」と記すことがある。
 太陽光発電の資産を共有保有したり、また当該資産を用いて電力の自己託送を行ったりする際には、発電量を資産の持分に応じて適正に分配することが必要と想定される。ここで、持分を証明する手段、及び、保有者に紐づく発電量を記録する手段として、非改ざん性が高いとされるブロックチェーンのシステムを利用することが有効と考えられる。例えば、本実施形態の電力調達システムにおいて、STの保有分に応じてUTを移動させるスマートコントラクトを構築してよい。ここで、スマートコントラクトとは、契約の自動化、又は契約のスムーズな検証、執行、実行、交渉を意図したコンピュータプロトコルをいう。例えば、スマートコントラクトとは、ブロックチェーンにおいて動作するアプリケーションに実装されるものとしてもよい。スマートコントラクトには、第三者を介さずに信用が担保されたトランザクションを処理できるという特徴がある。本実施形態の電力調達システムにより、直接金融を活用したファイナンス(Security Token Offering:STO)の実現のみならず、その出資者(例えば太陽光パネル保有者)の権利保護(発電量の適切な分配)及び流動性確保(資産の譲渡容易性)の両立が可能になる。
 例えば、太陽光パネルなどの発電設備に共同出資した者は、それぞれが出資した分に相当するSTを保有することができる。例えば、太陽光パネルなどの発電設備の全体が40STに相当するものとする。この場合、当該発電設備のうち50%に出資した者Aは、当該出資分に応じて、20STを保有するものとしてよい。また、例えば、当該発電設備のうち12.5%に出資した者Bは、当該出資分に応じて、5STを保有するものとしてよい。さらに、例えば、当該発電設備のうち37.5%に出資した者Cは、当該出資分に応じて、15STを保有するものとしてよい。以下、上述した20ST、5ST、15STなどのように、セキュリティトークン(ST)をトークンの単位として記すことがある。
 一方、前述の発電設備は、例えば、所定の一日における30分の間に、80kWhの発電を行う予定であるとする。この場合、上述の者Aは、80kWhの50%を受ける権利として、例えば40UTを保有するものとしてよい。また、例えば、上述の者Bは、80kWhの12.5%を受ける権利として、例えば10UTを保有するものとしてよい。また、例えば、上述の者Cは、80kWhの37.5%を受ける権利として、例えば30UTを保有するものとしてよい。このように、STの持分に応じて、UTが配分されるようにしてよい。以下、上述した40UT、10UT、30UTなどのように、ユーティリティトークン(UT)をトークンの単位として記すことがある。
 ブロックチェーンの証券トークンであるSTを採用することにより、ウォレット間におけるSTの授受により取引が完了する。このため、資産の売却が容易になることにより、セカンダリマーケットの創出が期待される。また、(獲得予定の)電力量を表章するトークンであるUTを採用することにより、発電量の適切な分配及び出力抑制などに対応することができるのみならず、託送料金の整合性を確認することもできる。
 このようにして、本実施形態の電力調達システムによれば、トークンの分割により、少額からの初期投資で発電設備を所有することができる。
 また、本実施形態の電力調達システムによれば、高頻度のトークン売買プラットフォームを実現するために、発電設備を利用しない時間帯のみ売却するような運用を行うことができる。これにより、硬直的な傾向にあった発電設備の保有形態に売却、あるいは一時的な売却という選択が追加されることで資産の投資活発化が期待される。よって、資産の流動性を確保及び資産価値を向上させることができる。
 また、本実施形態の電力調達システムによれば、実際の発電設備を物理的に分けるのではなく(太陽光パネル以外はそもそも物理的に分けることが困難である。)、トークンによる仮想的に区分した所有権(ST)と、電力(kWh)のオフテイク権(UT)とを組み合わせる仕組みを実現することができる。したがって、共同で保有できる発電設備に制限がなく、火力、水力、風力、地熱、バイオマス、原子力、その他発電方法すべて及び蓄電池に適用が可能である。
 また、本実施形態の電力調達システムによれば、例えば、工場などで特定の季節、時間帯しか利用されていない発電設備などについても、利用していない時間について一時的な売却を行うこともできる。したがって、電力負荷が非稼働な時間帯が存在しても、発電設備を常時稼働させながら収益を享受することができる。これにより設備の稼働率向上が見込まれ、付随効果として、例えば日本国のような国家全体における発電にかかるオペレーションコスト低減、及び/又は発電設備を持つ経済性が向上する(ピークカットなど短期的な電力調達を必要とする需要家も、需要の大小を問わず利用できるため、通常の電力会社への売電よりも高値で売れる可能性がある)。
 また、発電設備を仮想的に分割保有することで、各パネルの劣化及び/又は日射量の違いによる発電電力量の違いによる所有者間の不公平さが発生しなくなる。これにより、例えば従来のコミュニティソーラーのように、太陽光パネル間での発電電力量のブレ(差)による不公平をなくすことができる。
<電力調達の概要>
 図1は、一実施形態における電力調達の概要を説明する図である。需要者10(企業A)は、需要設備11を有しており、需要設備11で利用するための電力を調達するにあたり、マーケットプレイス12から発電設備13を仮想的に分割した区分131を調達する。ここで、区分131は、上述したSTOによる仮想保有区分としてよい。発電設備13により発電された電力は、発電設備13の持分(ST)に応じて分割されて、自己託送により発電設備13から需要設備11に供給される。実際には送電事業者により送電されるところ、仮想的に発電設備13からの発電電力量の一部が需要設備11に送電されたと看做されることになる。自己託送とは、自家用発電設備を設置する者が、当該自家用発電設備を用いて発電した電気を一般送配電事業者が維持し運用する送配電ネットワークを介して、当該自家用発電設備を設置する者の別の場所にある工場等に送電する際に、当該一般送配電事業者が提供するサービスのことをいう。このようにして、自己託送による電力供給を行うことができる。マーケットプレイス12の存在により、発電設備13(の区分)の流動性が確保されている。このため、需要者10は、必要なときに必要な割合の持分を取得して、自家発電設備13からの自己託送を行うことが可能となる。すなわち、本実施形態においては、利用時のみ発電設備13を保有するとともに、利用時のみ電力量を調達することができる。
 図2は、参考までに、従来の太陽光パネルの共同所有形態を説明する図である。従来、太陽光パネルを共同所有しようとする場合、区分所有者は、発電設備13(太陽光パネル)を物理的に分割した単位(例えば1/3など)で所有するというのが実態であった。この場合、例えば1つの発電設備13に対し、物理的な区分131ごとにスマートメータ14をそれぞれ設置して、それぞれの区分131の発電電力量を管理するようにしていた。
 図3は、本実施形態に係る発電設備13の共同所有形態を説明する図である。すなわち、図3は、太陽光パネルを利用してSTOを行う場合の例を説明する図である。本実施形態において、発電設備13そのものは、例えば、従来のコミュニティソーラーに用いられるのと同様の太陽光パネルなどとしてもよい。図3の例では、発電設備13には1つのスマートメータ14のみが設置される。この1つのスマートメータ14によって、発電設備13の全体による発電電力量が計測される。ここで、発電設備13についてSTにより100トークンが発行されたものとする。発電設備13は、A社、B社、C社、及びD社の4社により共有されており、持分がそれぞれ60%、10%、20%、10%であるものとする。この場合、A社は60トークン、B社は10トークン、C社は20トークン、D社は10トークンを保有し、持分割合を証することができる(ST)。この割合に応じて、発電設備13が発電した電力量(スマートメータ14により計測される。)も分割されて(UT)、各社に自己託送されたものと看做される。このように、本実施形態において、STの割合に応じて設備を保有することができ、当該設備から発生する電力量(kWh)のオフテイク権(UT)を保有することができる。ここで、別の時間帯においては、A社は30トークンを売却し、B社は30トークンを追加購入し、C社は10トークンを売却し、E社が10トークンを購入したとする。この場合にも、このトークンの保有割合に応じて、発電設備13の発電電力量は仮想的に分割されて(UT)各社に自己託送されたものと看做すことができる。このように、測定される単位時間(時間帯)において電力量の売買を可能とすることで、市場において流動性を創出することができる。なお、電力量は、所定時間(例えば、30分とすることができる。)の長さの時間帯ごとに計測されて配分されるようにすることができる。なお、時間帯の長さは、市場により異なる任意の長さとして設定することもできる。
 図4は、発電電力量の分配について説明する図である。図4の例では、発電設備13からの発電電力量の時間的な推移が曲線141により示されている。12:00(から30分の時間帯)には発電設備13が30kWhの発電を行い、A社が100トークン中の60トークン、B社が100トークン中の10トークンを保有していたとする。この場合、A社が調達した電力量は30kWh×60/100=18kWhとなり、B社が調達した電力量は30kW×10/100=3kWhとなる。同様に、18:00に発電設備13が20kWhの発電を行い、その時間帯においてA社が30トークン、B社が40トークン保有していたとする。この場合、A社の調達した電力量は20kWh×30/100=6kWh、B社の調達した電力量は20kWh×40/100=8kWhになる。
 図5は、本実施形態の電力調達システムにおける取引の概要を示す図である。マーケットプレイス12(取引プラットフォーム(取引PF))では、設備提供者15(設備の保有者にもなり得る)により発電設備13の情報が登録されるとともに、トークンが発行される(資産登録)。そして、トークンの売却者となる需要者10が、売却したい条件を登録する。さらに、トークンの購入者となる需要者10が、購入したい発電設備13の発電タイプ(太陽光又は風力など)、電力量、価格、時間帯、及び/又は地域などの条件(条件の優劣なども設定可能である。)を設定する。このようにして、マーケットプレイス12において、発電設備13の区分131のマッチング121が行われる。マッチングは、現在以降の30分毎(現在の電力計測の単位時間であり、単位時間が変わった場合は新たな規定単位時間に基づくものとする)の各スロットにおいて行われる(売買の予約)。そして、実際の日付が当該スロットの時間になった際に、発電設備13の区分131の所有権すなわちST(及びオフテイク権すなわちUT)が、売却者から購入者に移転される。この移転に伴って、区分131の持分割合に応じた量のトークンが、購入者の需要者10のウォレットに移転する。これにより、所有権(及びオフテイク権)の移転が証明されることになる。
 また、マーケットプレイス12は、発電電力量(予測値及び/又は実績値)並びにトークンの保有割合(ST)に応じた電力(kWh)のオフテイク量(UT)を自動計算することができる。これとともに、マーケットプレイス12は、発電電力量を記録し(発電予測及び実績)、電力広域的運営推進機関(OCCTO)、及び/又はトークンの保有者に対するレポートを作成することができる(レポート作成)。
 マーケットプレイス12からの情報は、API(Application Programming Interface)により取得可能である。例えば、OCCTOのシステム(広域機関システム16)は、APIを介して計画値などのレポートを取得可能である。このデータ連携により、自己託送の規制により義務付けられている通知データ及び/又は報告データの作成などの連携を自動化することができる。また、小売事業者17も、需要者10と同様に、マーケットプレイス12においてトークンの売買を行うことができる。これにより、小売事業者17は、顧客向けのメニューとして、トークンを活用した電力調達を提供し、小売事業者自身の電力調達手段としても活用することができる。また、このようにして、トークンを活用した自己託送による電力調達を提供してもよい。APIを用いることにより、小売事業者17の利用しているシステムとも連携することができる。また、電力需給のサービス提供会社18も、需要者10と同様に、マーケットプレイス12においてトークンの売買を行うことができる。これにより、電力需給のサービス提供会社18は、例えば、ピークカットなど顧客の電力サービスメニューの一環として、トークン売買を活用することができる。上述したAPIは、電力需給のサービス提供会社18が利用しているシステムとも連携が可能である。
<システムの概要>
 図6は、電力調達システムの全体構成例を示す図である。本実施形態の電力調達システムは、管理サーバ2を含んで構成される。管理サーバ2は、通信ネットワーク3を介してユーザ端末1と通信可能に接続される。通信ネットワーク3は、例えばインターネットであり、公衆電話回線網、携帯電話回線網、無線通信路、又はイーサネット(登録商標)などにより構築されてよい。管理サーバ2はまた、ブロックチェーンネットワーク(以下、ブロックチェーン4という。)に接続されている。ブロックチェーン4は、複数のコンピュータ(ノード)により構成され、分散台帳を管理する。
 ユーザ端末1は、需要者10が操作するコンピュータであり、例えば、スマートフォン、タブレットコンピュータ、又はパーソナルコンピュータなどとすることができる。ここで、広域機関システム16も、ユーザ端末1に含まれるものとしてもよい。また、小売事業者17、及び/又は小売事業者サービス提供会社18のシステムも、ユーザ端末1に含まれるものとしてもよい。需要者10(OCCTO、小売事業者17、又は電力需給のサービス提供会社18)は、ユーザ端末1により管理サーバ2にアクセスすることができる。
 管理サーバ2は、マーケットプレイス12を実現するコンピュータである。管理サーバ2は、例えばワークステーション又はパーソナルコンピュータのような汎用コンピュータとしてもよいし、あるいはクラウド・コンピューティングによって論理的に実現されてもよい。
 ブロックチェーン4は、情報を記録するデータベース技術に基づくものとしてよい。本実施形態において、ブロックチェーン4は、一般的なブロックチェーンと同様に、ブロックと呼ばれる単位でデータを管理し、それを鎖(チェーン)のように連結してデータを保管するものとしてよい。ブロックチェーンの各々のブロックには、直前のブロックの内容を表すハッシュ値と呼ばれるデータが書き込まれる。仮にデータを改ざんした場合、それによって導き出されるハッシュ値も異なるようになる。このため、それ以降のすべてのブロックのハッシュ値を変更する必要がある。しかしながら、それは極めて困難であるため、ブロックチェーンによって管理されるデータの改ざんは難しいとされている。ブロックチェーンは、同じデータを複数の場所に分散して管理する。このため、ブロックチェーンは、分散型台帳とも呼ばれる。ブロックチェーンは汎用的に利用可能であり、現在では契約及び取引などを自動化するスマートコントラクトなどの他、いくつもの応用などが考案されている。
 本実施形態の電力調達システムにおいて、ブロックチェーン4は、上述した一般的なブロックチェーンと同様の技術に基づくものとしてよい。しかしながら、一実施形態において、ブロックチェーン4は、一般的なブロックチェーンのような技術に代えて、データベース技術に基づくものを採用してもよい。
<管理サーバ2>
 図7は、管理サーバ2のハードウェア構成例を示す図である。なお、図示された構成は一例であり、図示された構成の一部を省略してもよいし、図示された構成以外の構成を有していてもよい。管理サーバ2は、CPU201、メモリ202、記憶装置203、通信インタフェース204、入力装置205、及び出力装置206を備える。記憶装置203は、各種のデータ及び/又はプログラムを記憶する。記憶装置203は、例えば、ハードディスクドライブ、ソリッドステートドライブ、又はフラッシュメモリなどとしてよい。通信インタフェース204は、通信ネットワーク3に接続するためのインタフェースである。通信インタフェース204は、例えば、イーサネット(登録商標)に接続するためのアダプタ、公衆電話回線網に接続するためのモデム、無線通信を行うための無線通信機、シリアル通信のためのUSB(Universal Serial Bus)コネクタ又はRS232Cコネクタなどとしてよい。入力装置205は、データを入力する際に用いられる装置である。入力装置205は、例えば、キーボード、マウス、タッチパネル、ボタン、又はマイクロフォンなどとしてよい。
 入力装置205は、後述する管理サーバ2が備える各機能部に対する指令の入力を受け付ける。出力装置206は、データを出力する際に用いられる装置である。出力装置206は、例えば、ディスプレイ、プリンタ、又はスピーカなどとしてよい。後述する管理サーバ2が備える各機能部は、CPU201が記憶装置203に記憶されているプログラムをメモリ202に読み出して実行することにより実現されてよい。CPU201は、入力装置205に入力された指令であって、後述する管理サーバ2が備える各機能部に対する指令を解釈するようにしてもよい。CPU201は、出力装置206に表示させる情報を作成し、出力装置206に表示させる指令を出力装置206に出すように、出力装置206を制御するようにしてもよい。また、管理サーバ2が備える各記憶部は、メモリ202及び記憶装置203が提供する記憶領域の一部として実現されてよい。
 入力装置205及び出力装置206は、それぞれ単数であってもよいし、複数であってもよい。また、入力装置205及び出力装置206は、例えばタッチパネルのように一体の装置になっていてもよい。さらに、管理サーバ2は、入力装置205及び出力装置206を含む例として説明したが、これに限られるものではなく、例えば、管理サーバ2は、入力装置205及び出力装置206を含まなくてもよい。また、管理サーバ2は、入力装置205及び出力装置206を含みつつ、外部にも入力装置205及び出力装置206が存在してもよい。入力装置205及び出力装置206が管理サーバ2の外部にある場合、管理サーバ2は、通信インタフェース204を介して、外部の入力装置205及び出力装置206と各種の指令や情報のやり取りを行ってよい。具体的には、後述する管理サーバ2が備える各機能部に対する指令を、外部の入力装置205が受け付けてよい。この場合、管理サーバ2は、この指令を、通信インタフェース204を介して受け取るようにしてもよい。このようにして受け取った指令を、CPU201が解釈するようにしてもよい。また、CPU201は、外部の出力装置206に出力させる情報を作成し、外部の出力装置206に出力させる指令を、通信インタフェース204を介して外部の出力装置206に送信するようにしてもよい。
 図8は、管理サーバ2のソフトウェア構成例を示す図である。管理サーバ2は、資産登録部211、トークン発行部212、需要量入力部213、売却量入力部214、マッチング処理部215を備える。また、管理サーバ2は、販売処理部216、トークン移転部217、発電予測取得部218、発電実績取得部219、レポート作成部220、API処理部221、及び資産情報記憶部231を備える。
 資産情報記憶部231は、発電設備13のそれぞれについて、発電設備13に関する情報(以下、資産情報という。)を記憶する。資産情報には、例えば、発電設備13の種類、出力、及び/又は設置場所などを含めることができる。
 資産登録部211は、資産情報を資産情報記憶部231に登録する。資産登録部211は、設備提供者15のユーザ端末1から資産情報を受信し、受信した資産情報を資産情報記憶部231に書き込むことができる。また、資産登録部211は、発電設備13の所有者(当初は設備提供者15)に関する情報(以下、所有者情報)を登録することもできる。本実施形態では、所有者情報は、ブロックチェーン4の台帳に管理するものとしてよい。資産登録部211は、所有者情報を登録するためのトランザクションを、ブロックチェーン4に発行することができる。
 トークン発行部212は、発電設備13を裏付けとした、発電設備13の所有権及びオフテイク権を表すトークン(ST及びUT)を、ブロックチェーン4において発行させる。トークンの発行は、一般的なSTOに採用されている技術を用いることができるため、より詳細な説明は省略する。トークン発行部212は、任意の数のトークンを発行することができる。図3及び図4の例では、1つの発電設備13について100トークン発行するものとした。しかしながら、トークン発行部212は、10トークン又は2000トークンなど、任意の数のトークンを発行してもよい。発行されたトークンは、発電設備13の所有者(設備提供者15)のウォレットに入れられる。
 需要量入力部213は、発電設備13から調達したい電力の需要量の入力を、需要者10から受け付ける。需要量入力部213は、例えば、発電設備13の区分133を取得するための購入リクエストに需要量を設定した情報を、需要者10のユーザ端末1から受信することができる。需要量入力部213は、需要量とともに発電設備についての条件の指定を受け付けるようにしてもよい。購入リクエストには、発電設備13の発電タイプ(太陽光発電若しくは風力発電など)、需要量(調達したい電力量)、及び/又は時間帯などが指定され得る。購入リクエストには、個別の発電設備13を特定する情報、特定の発電所を特定する情報、及び/又は、発電設備13が配置されている地域などの指定を設定するようにしてもよい。さらに、購入リクエストには、発電設備13の発電予測値の情報、及び/又は、自己託送する先の情報などの指定を設定するようにしてもよい。また、購入リクエストには、購入したい金額を指し値として設定するようにしてもよい。また、購入リクエストにおいて、複数の条件を設定して、条件の優先度を設定するようにしてもよい。
 売却量入力部214は、トークンを売却したい売却者(設備提供者15又は需要者10)から、売却したいトークンの指定を受け付ける。売却量入力部214は、例えば、売却者のユーザ端末1から売却リクエストを受信することができる。売却リクエストには、売却対象となるトークンと、その売却価格とを設定することができる。売却価格は、最低価格を設定することができる。売却価格には、最低価格から最高価格までの範囲を指定することもできる。
 マッチング処理部215は、売却リクエストと、購入リクエストとをマッチングさせることができる。マッチング処理部215は、購入リクエストに指定された条件にマッチする資産情報を検索することができる。また、マッチング処理部215は、マッチした資産情報が示す発電設備13を裏付けとしたトークンの売却リクエストを特定することができる。さらに、マッチング処理部215は、特定した売却リクエストに係るトークンを、当該購入者に割り当てることができる。マッチング処理部215は、例えば、購入リクエストを受信した順に、受信した購入リクエストの条件に応じて、売却リクエストを割り当てることができる。また、マッチング処理部215は、一定期間に受信した購入リクエストと売却リクエストとをまとめて割当てを行うようにすることもできる。マッチング処理部215は、例えば、株式市場における販売処理と同様のマッチング処理を行うようにすることができる。
 販売処理部216は、トークンの需要者10への販売に係る処理を行う。販売処理部216は、トークンの購入者からの支払を受け付けて、売却者に支払う処理を行うことができる。販売処理部216は、購入者が支払った金額から手数料を減じて、売却者に対して支払を行うようにしてもよい。
 トークン移転部217は、販売される発電設備13の持分に応じた量のトークンを、需要者のウォレットに移転する移転処理を行う。トークンの移転は、実際の日時が各スロット(例えば30分毎)の日時に到達した際に、ブロックチェーン上のプログラムによって自動で実施されてよい。トークン移転部217は、販売されたトークンを売却者のウォレットから購入者のウォレットに移転させるためのトランザクションを、ブロックチェーン4に発行することができる。これにより、トークン移転部217は、需要者10の需要量に応じた量のトークンを、需要者のウォレットに移転させることができる。
 発電予測取得部218は、発電設備13による発電電力量の予測値を取得する。発電予測取得部218は、自ら発電電力量の予測を行ってもよいし、発電電力量の予測を行った外部のコンピュータから予測値を取得するようにしてもよい。発電予測取得部218は、例えば、太陽光発電に係る発電設備13について、日射量の予測を行うことができる。また、発電予測取得部218は、例えば、天候、日射量、温度、及び/又は湿度などの過去の各種条件の実績を示すデータなどから、発電設備13による発電電力量の予測値を算出してもよい。さらに、発電予測取得部218は、今後の出力抑制及び/又は天気予報を考慮して、発電設備13による発電電力量の予測値を算出してもよい。ここで、出力抑制とは、電力会社等が太陽光発電等の発電設備からの電力系統への供給を制限することをいう。例えば、出力抑制とは、1日前の正午までの出力抑制としてもよいし、当日に計画変更が可能としてもよい。また、発電予測取得部218は、発電設備13による発電電力量を、出力制御の対象となる電源であるか否かに応じて変更してもよい。また、発電予測取得部218は、発電設備13による発電電力量を、出力抑制の対象になり易い地域か否かに応じて変更してもよい。発電予測取得部218は、発電設備13の所有者又は設備提供者15のユーザ端末1から、発電電力量の予測値を受信するようにしてもよい。
 発電実績取得部219は、発電設備13に設けられているスマートメータ14から、発電設備13により発電された発電電力量の実績値を取得することができる。
 レポート作成部220は、発電計画に関するレポートを出力することができる。レポート作成部220は、発電設備13の発電電力量の予測値を、需要者10のウォレットに保有されているトークンの量と将来スロットにおけるマッチング済みの移動予定トークン量の合計トークン量(以下、保有予定トークン量)に応じて分割する。そして、レポート作成部220は、このようにして分割した発電電力量の予測値を、需要者10毎に発電計画に含めることができる。また、レポート作成部220は、発電実績に関するレポートを出力することができる。レポート作成部220は、スマートメータ14から取得した実績値を、需要者10の保有予定トークン量に応じて案分する。そして、レポート作成部220は、案分した発電電力量(分割発電実績値)を、発電実績に含めることができる。レポート作成部220は、発電実績に、発電計画において予測した予測値を含めるようにしてもよい。
 レポート作成部220は、発電設備13の設備提供者15、購入者、及び/又は売却者に向けて、自身の保有する発電設備13に関する情報(資産情報)を閲覧することのできるGUI(閲覧画面)を提供することができる。閲覧画面には、発電電力量の予測値、発電設備13の保有割合、及び/又は発電設備13の基本情報などを含めることができる。
 レポート作成部220は、電力広域的運営推進機関(OCCTO)向けの計画書を作成することができる。レポート作成部220はまた、広域機関システム16に対して計画書を自動提出することができる。レポート作成部220は、資産情報、発電電力量の予測値、及び/又はスマートメータ14から取得した発電電力量の実績値などに基づいて、発電設備13の保有者又は運営者が系統連携する際に求められる情報を記載した帳票を作成することができる。
 API処理部221は、管理サーバ2の外部装置に対してAPIを提供することができる。APIは、例えば、REST(REpresentational State Transfer)などとすることができる。API処理部221は、外部装置からのリクエストに応じて、管理サーバ2及びブロックチェーン4で管理されている情報から必要な情報を抽出して、APIを提供することができる。APIを用いることにより、管理サーバ2は、広域機関システム16とデータ連携を行うことができる。API処理部221は、小売事業者及び/又は一般送配電事業者向けに提出すべき書類について、管理サーバ2及びブロックチェーン4で管理されているデータをもとに、追加で帳票を作成若しくはシステム連携を行うことができる。また、APIを介して、小売事業者及び/又は需要家向けサービスを提供する会社が、自身のシステムを介して売買条件を連携及び取引できる仕組みを提供することができる。
<動作>
 図9は、本実施形態の電力調達システムにおける送電処理の流れを示す図である。
 管理サーバ2は、発電設備13の資産情報を受け付けて、当該資産情報を資産情報記憶部231に記録(登録)する(S301)。資産情報には、発電設備13の種類、出力、及び/又は設置場所などが含まれ得る。ステップS301において、発電設備の資産情報は、例えば設備所有者によって登録されてよい。また、発電設備の資産情報が登録される際に、なりすましによる登録を困難にする策を設けてもよい。例えば、発電設備13の資産情報に応じたトークンを、小売り事業者がいったん買い取るようにしてもよい。
 次に、管理サーバ2は、発電設備13を裏付けとしたトークンを発行(STO)する(S302)。ステップS302において、管理サーバ2は、任意の数のトークンを発行してよい。しかしながら、発行されるトークンの上限又は基準などの指標が設定されることにより、取引がし易くなることも想定される。そこで、例えば、1つの発電設備13あたり100トークンを付与するようにして、このように付与される量が、その設備の保有割合を表すものとしてもよい。この場合、トークンに対応する電力量は別途計算されることにより表示されるようにしてもよい。また、発電設備13が発電する電力量あたりのトークン数が発行されるようにしてもよい。特に、複数の発電施設をまたぐ電力量で取引したい場合は、発電する電力量あたりのトークン数が発行されるようにしてもよい。例えば、予め定められた単位出力(kWh)あたりに付与するトークン数に発電設備の能力である最大出力kWhを掛け合わせた値を、発電設備に発行するトークン数として決めてもよい。例えば、1kWhあたり1STを発行すると定められている場合であって、発電設備の最大出力が150kWhである場合には、150トークンを発行すると決めてもよい。この場合、発行されるトークンが、発電設備13の持分の割合とずれることも想定される。この持分のずれに対しては、別途手当を付与してもよい。前述の場合において、最大出力は、一定の条件下で使用した出力の最大値である定格出力であってもよい。
 発電設備13の持分は、取引完了した電力量が決定された後に定まるようにしてもよい。発電設備13が発電する電力量は、発電の期間又は時間のような過去の実績によって変化するようにしてもよい。この場合、発電設備13が発電する電力量の変化に応じて、トークンの量も変化するようにしてもよい。また、将来取得可能な電力量を現在の価値に換算して、トークンの取引を可能にしてもよい。例えば、取得可能な電力量が現在から先の将来になるほど、割り引かれた料金になるように換算してもよい。
 トークンの発行後、管理サーバ2は、発電設備13の区分所有者の希望者を募ることができる。電力の需要者10は、トークンを保有することで、発電設備13の区分所有権(STにより表章される)とその発電設備13から発生する電力量(kWh)のオフテイク権(UTにより表章される)とを持つことになる。
 管理サーバ2は、トークンの保有者(最初は設備提供者15)の所有者情報を、ブロックチェーン4の台帳に記録(登録)することができる(S303)。管理サーバ2は、発電設備13が発電した電力量を、スマートメータ14などの計測機器から取得して、30分値など一定の基準の時間(測定時間は任意に設定することができる。)での発電電力量(kWh)を集計することができる(S304)。管理サーバ2は、トークンの保有量(将来スロットにおけるマッチング済みの移動予定トークンを含む)に応じて区分所有者に発電電力量を割り当て(S305)、自己託送の形で電力供給させることができる(S306)。
 S306において行う自己託送による電力供給は、自己託送の計画を作成した後に例えばOCCTOなどに報告した後で行うようにしてもよい。例えば、管理サーバ2は、マッチング処理部215によるマッチングが完了した後に、自己託送の計画値を自動計算してOCCTOなどに自動送信してもよい。また、S306において、管理サーバ2は、自己託送の計画値に適合する発電量のみを供給可能にしてもよい。
 発電設備13から調達したい電力の需要量は、電力が要求される時間帯によって、必要となる発電設備13の発電容量は異なることも想定される。需要量入力部213は、発電設備13の区分133を取得するための購入リクエストに需要量を設定した情報を、需要者10のユーザ端末1から受信することができる。このため、その購入リクエストに時間帯を指定する情報も含めてもよいし、その時間帯において発電する電力の予測量を含めてもよい。
 管理サーバ2は、ユーザが保有しているトークンを売買可能にする取引プラットフォームを提供する。また、管理サーバ2は、発電の前日(前日市場)以前から発電者が許す限りの前期間での売買を可能とする取引プラットフォームを提供する。
 図10は、本実施形態の電力調達システムにおける発電設備の持分の流通の流れを示す図である。
 管理サーバ2は、ST(将来スロットにおけるマッチング済みの移動予定トークンを含む)の保有割合に応じて、需要者10の発電電力量(kWh)のオフテイク量(UTにより表章されてよい)を算出する(S321)。管理サーバ2は、条件を設定した購入リクエストを、購入者から受け付ける(S322)。上述したように、購入リクエストには、発電タイプ(太陽光又は風力など)、電力量、価格、時間帯、及び/又は地域、並びに条件の優劣などを設定することができる。条件にはこれ以外にも、株式の取引プラットフォームの条件に類似した内容(指値、逆指値、又は一定価格になった場合の条件付き売買など)を設定することができる。
 管理サーバ2は、売却リクエストを受け付ける(S323)。次に、管理サーバ2は、購入リクエストに設定された条件に基づいて、売却リクエストにより指定されているトークンを購入リクエストにマッチングさせる(S324)。ステップS324において行われるマッチングの処理を、「マッチング処理」とも記す。
 マッチング処理では、購入者及び売却者に関し、条件設定を電力の取引実態に合わせる形できめ細かくマッチングを行うことができる。例えば、販売価格を定めずに(若しくは価格にレンジを持たせるか成り行きにして)、指定した条件(太陽光など)に該当する発電設備13から一定の電力量(kWh)に達するまで販売又は売却を実行し続けることができる。また、購入リクエストに地域を指定し、指定された地域に設置されている1つ又は複数の発電設備13から、一定の電力量(kWh)又は購入価格の合計値が一定額に達するまで買い続けるようにすることもできる。また、購入価格のみを指定して、電力量(kWh)の指定をせずに購入又は販売し続けるようにすることもできる。また、購入リクエストに時間帯のみを指定して、指定された時間帯内であれば一定の電力量(kWh)に達するまで販売又は売却し続けるようにすることができる。さらに、条件を設定しなくてもよく、また、条件に優先度をつけるようにしてもよい。
 ステップS324において行われるマッチング処理において、所定の取引情報を表示する取引画面を表示するようにしてもよい。この場合、取引画面は、出力装置206などに表示されるようにしてよい。例えば、マッチング処理において、発電設備が出力抑制の対象となる設備か否かを表示してもよい。また、マッチング処理が行われる際に、発電設備による発電量が表示される代わりに、発電設備による発電量の予測値が表示されるようにしてもよい。さらに、マッチング処理において、例えば発電設備による発電量の予測の信頼度の指標などを表示してもよい。さらに、マッチング処理において、発電設備13における取引対象期間内の最低出力容量の保証の有無、及び/又は、具体的な最低出力容量の値(kWh)を表示してもよい。また、マッチング処理において、保証された最低電力容量の値を実際に下回ってしまった場合の具体的な補償内容を表示してもよい。
 また、マッチング処理時の発電設備による発電量の予測値と実績値とがずれる場合、当該ずれに応じた対応策を講じてもよい。また、このようなずれが生じた場合に、そのようなずれについてフィードバックを行うことにより、予測精度を向上させたり、信頼度の指標を下げたりしてもよい。
 マッチング処理の後、売買に失敗した場合(S325:NO)、管理サーバ2は、売却者からのトークンは移転させない(したがって、所有権及びオフテイク権は移転させない)。この場合、当該発電設備13からの電力は、卸電力取引所に販売するようにしてよい(S326)。また、この場合、卸売市場ではなく、相対取引で小売事業者に販売するようにしてもよい。
 以下、本実施形態におけるマッチング処理について、さらに説明する。ここで、本実施形態におけるマッチング処理とは、例えば図10に示すステップS324において実行される処理としてよい。
 上述のように、管理サーバ2のマッチング処理部215は、通常の株式市場における販売処理と同様のマッチング処理を行うようにしてよい。マッチング処理部215は、売却リクエストと、購入リクエストとをマッチングさせる際に、例えば、(現状の)電力量及び/又は持分の割合(トークン)、並びに価格などの観点からマッチングを行ってよい。具体的には、マッチング処理部215は、例えば以下のような観点からマッチングを行ってよい。
 (1)発電設備13の持分の割合(トークン)及び価格
 すなわち、発電設備13の持分の割合(トークン)と、その価格とをそれぞれ表示して取引を行ってよい。
 (2)発電設備13による発電の電力量及び価格
 すなわち、発電設備13によって発電される電力の電力量と、その価格とをそれぞれ表示して取引を行ってよい。
 上記(2)に示す観点は、例えば、(a)発電設備13による発電電力の予測値と、(b)予測の精度(過去の正解率など)と、(c)単位電力量あたりの料金と、の積に基づいて求めてもよい。特に、上記(b)予測の精度(過去の正解率など)については、現在の時点で確定した情報ではないため、将来の予測値として表示しながら取引を行うものとしてもよい。
 また、上記(a)発電設備13による発電電力の予測値、及び上記予測の精度(過去の正解率など)について、種々の要因から定められるものとしてもよい。例えば、発電設備13の発電設備としての価値を管理サーバ2が評価することにより、当該価値に基づいて取引が行われるようにしてもよい。また、管理サーバ2は、各種の評価を、取引の際に出力装置206に表示してもよい。発電設備13の発電設備としての価値も、種々の観点から評価してよい。例えば、発電設備13の発電設備としての価値は、どの程度の期間、及び/又は、どの程度の出力が予測されるかという観点から評価されてもよい。
 また、例えば、発電設備13の発電設備としての価値は、発電する電力(kWh)以外の観点から評価されてもよい。具体的には、発電設備13の発電設備としての価値は、例えば、発電設備が完成するまでのCOの排出量に基づいて評価されてもよい。また、発電設備13の発電設備としての価値は、例えば、発電設備13が発電する電力1kWあたりのCOの排出量に基づいて評価されてもよい。さらに、発電設備13の発電設備としての価値は、例えば、発電設備が廃棄されるまでのCOの排出量に基づいて評価されてもよい。また、発電設備13の発電設備としての価値は、マッチングの際の判断基準などとして、例えば比較対象とともに出力装置206等に表示されるようにしたり、ランク分けされて表示されるようにしてもよい。
 さらに、発電設備13の発電設備としての価値は、種々のリスクの観点から評価されてもよい。例えば、発電設備13の発電設備としての価値は、発電設備が設置される地域の自然災害の頻度及び/又は度合いの傾向などから評価されてもよい。また、発電設備13の発電設備としての価値は、発電設備が設置される地域の治安及び/又は政治的安定度などから評価されてもよい。
 また、発電設備13の発電設備としての価値は、電力を発電した地域において消費する度合い、いわゆる地産地消の度合いに基づいて評価されてもよい。電力は、発電した場所と消費する場所が近い方が、電線などのインフラに対する負荷を低減させ得る。また、消費地から近い場所で発電される電力は、電力を消費する側の者に安心感を提供し得る。
 さらに、発電設備13の発電設備としての価値は、発電設備の過去の出力レポート、発電設備の寿命、及び/又は発電設備の劣化予測などの観点から評価されてもよい。また、発電設備13の発電設備としての価値は、例えば発電設備の設置場所に盛り土が使用されていないなど、環境への負荷の度合いから評価されてもよい。また、発電設備13の発電設備としての価値は、再生可能エネルギーのクリーン度の観点から、発電設備13の適法性などの度合いとして評価されてもよい。さらに、発電設備13の発電設備としての価値は、例えば環境負荷の低減の観点など、一例としてSDGs(Sustainable Development Goals)に掲げられた項目のような観点から評価されてもよい。なお、上記のいずれの評価も、予め定められた基準をもとに特定された数値で表される評価を含んでもよい。例えば、1つずつの段階による5段階の基準として、数字が増えるごとに高い評価を示すことを基準としてもよい。具体的には、1(悪い)、2(やや悪い)、3(普通)、4(やや良い)、5(良い)などのようにして段階的な基準を定義し、それぞれの発電設備13の価値を示す数値が評価に含まれてもよい。
 次に、図9のステップS306において行われる自己託送について、さらに説明する。
 本実施形態の電力調達システムにおいて、自己託送に必要な条件が反映されるようにしてもよい。例えば、本実施形態の電力調達システムにおいて、自己の扱う需要量(最大の受電電力)を超えて取引(入札)できないようにしてもよい。このようにすれば、消費可能な量を超えるような自己託送は回避されるため、例えばペナルティが課されるような事態を防ぐことができる。このような策を実現するために、本実施形態の電力調達システムは、自己託送する先の契約容量(最大の受電電力)を自動的に取得してもよい。
 本実施形態の電力調達システムにおいて取引が行われる際に、自己の扱う需要量を超える電力は落札できないようにしてもよい。例えば、本実施形態の電力調達システムにおいて提供される取引プラットフォーム12は、需要者の契約電力容量に関連する情報を、電力事業者(小売電気事業者)などの外部サーバから取得してよい。また、OCCTOの外部サーバが需要者の契約電力容量に関連する情報を管理する場合は、OCCTOの外部サーバから当該情報を取得するようにしてもよい。このような需要者の契約電力容量に関連する情報は、例えば取引における入札の参加前まで、又は、落札の前までに取得されるようにしてもよい。また、このような需要者の契約電力容量に関連する情報は、需要者の識別情報及び/又は認証情報を用いることにより取得可能にしてもよい。さらに、このような需要者の契約電力容量に関連する情報は、APIを用いることにより取得可能にしてもよい。
 さらに、本実施形態の電力調達システムにおいて取引が行われる際に、需要者の契約電力容量に関連する情報の他にも各種データを取得してもよい。例えば、取引プラットフォーム12は、過去の30分の時間帯ごとの消費電力に関するデータを取得してもよい。また、取引プラットフォーム12は、前日のデータ、又は、所定の時間若しくは期間(平日、週、月、又は年など)の平均値、最低値、又は最高値などのデータを取得してもよい。
 また、取引に参加する需要者は、予め外部サーバなどの運営側に、電力事業者と契約している契約容量(最大受電電力)を示す情報を、所定の証明書と共に提出(送信)するようにしてもよい。ここで、契約容量とは、落札後に電力を自己託送する需要家施設における最大受電電力を示すものである。また、取引プラットフォーム12は、提出(送信)された契約容量を示す情報を、外部サーバなどから自動で取得してよい。この時、需要者の識別情報及び認証情報が用いられるようにしてもよい。このような識別情報及び認証情報の少なくとも一方は、例えば外部サーバから需要者に発行されるようにしてもよい。需要者は、少なくともこの識別情報及び認証情報を、取引時に取引プラットフォーム12に入力することで、取引に参加することができる。取引プラットフォーム12は、この識別情報及び認証情報を用いることにより、取引に参加しようとしている需要者の契約容量を示す情報を、外部サーバから取得することができる。これにより、取引プラットフォーム12は、需要者が自己託送先の需要家施設における最大受電電力を超えた電力量に対応するような落札を制限することができる。取引プラットフォーム12において、管理サーバ2は、この識別情報及び認証情報を、提出(送信)された契約容量を示す情報などと関連付けて、記憶装置203などに記憶してよい。
 次に、上述したような取引の際に表示可能な画面の例について、さらに説明する。
 取引プラットフォーム12において取引を行う際に、例えば図11乃至図14に示すような画面を需要者、施設所有者、又は管理サーバ2の運営者等の出力装置206などに表示してもよい。具体的には、CPU201が画面に関する情報を作成し、管理サーバ2が出力装置206等に向けてこの画面に関する情報に基づいた画面を表示する指令を出すことで実現される。図11乃至図14において、左側に選択画面を示し、右側に確認画面を示す。ここで、取引プラットフォーム12は、購入したいST、UT、及び/又は発電設備13が選択される際に、各種条件の入力に応じて検索を行うことができる検索機能を有してもよい。また、取引プラットフォーム12は、検索によって該当したST、UT、及び/又は発電設備13を、選択画面に示すようにしてもよい。各種条件の入力や、取引に関する情報や指示の入力は入力装置205が受け付ける。
 図11は、取引の金額が決まっていて、STを取引する場合に出力装置206に表示し得る画面を示す。このような画面を表示することにより、需要者は、図11の左側に示す選択画面において、発電設備13の空き状況、すなわちSTを購入可能なスロットを確認することができる。図11の左側に示す選択画面において、塗りつぶされたスロットは空きがないことを示し、塗りつぶされていないスロットは空きがあることを示すものとしてよい。図11の左側に示す選択画面において、需要者によって空いているスロットが選択されると、図11の右側に示す確認画面に遷移してよい。図11の右側に示す確認画面において、需要者は、取引に関連する情報を、取引の確定前に確認することができる。図11の右側に示す確認画面において、需要者による確定ボタンに対する入力が検出されると、図11の右側の確認画面に示すような内容の取引を確定することができる。
 図11に示す画面において、トークンのみを示すと、発電容量(kW)の取得量について需要者に誤解を与え得るような場合、取得トークン及び当該取得トークンに応じた容量(kW)を表示してもよい。また、図11の左側に示す選択画面において、需要者による選択入力が行われる前に、当該需要者に需要者ID及び認証情報の入力を求めてログインを要求するようにしてもよい。この場合、取引プラットフォーム12において、需要者IDと託送先ID(託送先の情報を含む)が関連付けて記憶されるようにしてもよい。
 図12は、取引の金額が決まっていて、UTを取引する場合に出力装置206に表示し得る画面を示す。このような画面を表示することにより、需要者は、図12の左側に示す選択画面において、発電設備13の発電予測値、すなわちUTを購入可能なスロットを確認することができる。図12の左側の選択画面に示すように、電力取引の時間の単位は、特に限定されないが、例えば30分間とすることができる。図12の左側に示す選択画面において、塗りつぶされたスロットは空きがないことを示し、塗りつぶされていないスロットは空きがあることを示すものとしてよい。また、図12の左側に示す選択画面において、取引対象外のスロットとして、選択できないスロットを含ませてもよい。図12の左側に示す選択画面において、需要者によって空いているスロットが選択されると、図12の右側に示す確認画面に遷移してよい。図12の右側に示す確認画面において、需要者は、取引に関連する情報を、取引の確定前に確認することができる。図12の右側に示す確認画面において、需要者による確定ボタンに対する入力が検出されると、図12の右側の確認画面に示すような内容の取引を確定することができる。
 図12の左側に示す選択画面において、需要者による選択入力が行われる前に、当該需要者に需要者ID及び認証情報の入力を求めてログインを要求するようにしてもよい。この場合、取引プラットフォーム12において、需要者IDと託送先ID(託送先の情報を含む)が関連付けて記憶されるようにしてもよい。また、取引プラットフォーム12において、需要者ID及び認証情報を用いることにより、例えば電力事業者(小売電気事業者)又はOCCTOの外部サーバから契約容量(最大受電電力)を取得しておき、その契約容量を超えるような取引を制限してもよい。例えば、取引プラットフォーム12は、取引の制限として、その契約容量を超えた場合に入札を禁止又は拒否する、入札可能なものだけを表示する、入札が可能なものと不可のものをそれぞれ区別して表示する、又は可能なものだけ選択可能する、などとしてよい。また、取引プラットフォーム12は、取引の制限として、入札は許可しても、落札できないようにしてもよい。さらに、取引プラットフォーム12は、取引の制限として、その容量を超えた場合に入札が行われた場合には、入札を確定する前に、警告画面及び/又は警告表示などを行うようにしてもよい。
 取引プラットフォーム12は、入札後に予め定められた入札可能な時間が経過した後、それまでに最高額を入札した需要者に落札させてよい。また、取引プラットフォーム12は、落札した内容を示す画面を表示してもよい。
 図13は、取引の金額が決まっていて、UTを長期で取引する場合に出力装置206に表示し得る画面を示す。このような画面を表示することにより、需要者は、図13の左側に示す選択画面において、発電設備13の発電予測値、すなわちUTを購入可能な施設を確認することができる。図13の左側の選択画面に示すように、需要者は、例えば施設名AAAの発電設備、及び例えば施設名BBBの発電設備のうち、少なくとも一方を選択することができる。図13の左側の選択画面に示すように、例えば施設名AAAの発電設備が選択されている場合、当該選択を示すために、表示項目が太い枠線で囲まれる又は表示項目の色が変更されるなど、他と区別可能に表示されるようにしてもよい。図13の左側に示す選択画面において、需要者によって項目が選択されると、図13の右側に示す確認画面に遷移してよい。図13の右側に示す確認画面において、需要者は、取引に関連する情報を、取引の確定前に確認することができる。図13の右側に示す確認画面において、需要者による確定ボタンに対する入力が検出されると、図13の右側の確認画面に示すような内容の取引を確定することができる。
 図14は、取引の金額が入札により決定されて、UTを長期で取引する場合に出力装置206に表示し得る画面を示す。このような画面を表示することにより、需要者は、図14の左側に示す選択画面において、発電設備13の発電予測値、すなわちUTを購入可能な施設を確認することができる。図14の左側の選択画面に示すように、需要者は、例えば施設名AAAの発電設備、及び例えば施設名BBBの発電設備のうち、少なくとも一方を選択することができる。また、図14の左側の選択画面に示す施設名AAAの発電設備においては、入札により取引金額が決定される。すなわち、この時点ではまだ取引金額が決定されていないため、図14の左側の選択画面に示す施設名AAAの発電設備において、金額が表示されていない。図14の左側の選択画面に示すように、例えば施設名AAAの発電設備が選択されている場合、当該選択を示すために、表示項目が太い枠線で囲まれる又は表示項目の色が変更されるなど、他と区別可能に表示されるようにしてもよい。図14の左側に示す選択画面において、需要者によって項目が選択されると、図14の右側に示す確認画面に遷移してよい。図14の右側に示す確認画面において、需要者は、取引に関連する情報を取引の確定前に確認することができるとともに、選択された発電設備の入札金額を入力することができる。図14の右側に示す確認画面において、需要者によって入札金額が入力された上で、入札ボタンに対する入力が検出されると、図14の右側の確認画面に示すような内容の取引(入札)を確定することができる。
 図14の右側に示す確認画面において入札ボタンに対する入力が検出されると、例えば図15の左側に示す入札後画面に遷移してもよい。図15の左側の入札後画面においては、確定された入札金額とともに、入札された取引に関する各種情報が出力装置206に表示されてもよい。また、図15の左側の入札後画面に示すように、図14において入札したユーザが現在の最高額の入札者である旨の情報などが表示されてもよい。
 図15の左側の入札後画面が表示された状況において、例えば他の入札者によってさらに高額の入札が行われた場合、図15の左側に示す入札に対する落札は行われないようにしてもよい。この場合、落札は完了しないため、例えば図14の右側に示す確認画面に戻ることにより、さらに高額の入札を行うことができるようにしてもよい。
 一方、図15の左側の入札後画面が表示されて、取引期間が終了したら、例えば図15の右側に示すような落札画面を表示してもよい。図15の右側に示す落札画面においては、取引期間の終了に伴って、当該落札金額によって落札した旨の情報が表示されてよい。また、図15の右側に示す落札画面において、落札ボタンに対する入力が検出されると、図15の右側の落札画面に示すような内容の入札に対する落札が確定されるようにしてもよい。
 図11の左側に示す選択画面においては、取引を行う場面として、空きがあるスロット及び空きがないスロットを示した。一方、設備所有者の入力画面として、例えば図16に示す選択画面のように、取引対象のスロット、取引対象外のスロット、及び落札済みのスロットを表示してもよい。図16に示すように、例えば、取引対象外として示されるスロットのいずれかが選択されると、当該スロットの色彩などの表示態様を変化させて、当該スロットが選択されたことを示すようにしてもよい。その後、図16に示すような確定ボタンに対する入力に基づいて、前記スロットが取引対象を示すように、例えば色彩を変更するなど表示態様を変化させてよい。このような動作の前提として、設備所有者は、当該設備所有者のID及び認証情報の入力を求めてログインを要求するようにしてもよい。この場合、例えば、図8に示した資産情報記憶部231は、設備所有者IDと、施設名AAA及び/又は発電容量などの情報帆を関連付けて記憶してもよい。
 また、図12の左側に示す選択画面においては、取引を行う場面として、空きがあるスロット、空きがないスロット、及び取引対象外のスロットを示した。一方、設備所有者の入力画面として、例えば図17に示す選択画面のように、取引対象のスロット、取引対象外のスロット、及び落札済みのスロットを表示してもよい。図17に示すように、例えば、取引対象外として示されるスロットのいずれかが選択されると、当該スロットの色彩などの表示態様を変化させて、当該スロットが選択されたことを示すようにしてもよい。その後、図17に示すような確定ボタンに対する入力に基づいて、前記スロットが取引対象を示すように、例えば色彩を変更するなど表示態様を変化させてよい。このような動作の前提として、設備所有者は、当該設備所有者のID及び認証情報の入力を求めてログインを要求するようにしてもよい。この場合、例えば、図8に示した資産情報記憶部231は、設備所有者IDと、施設名AAA及び/又は発電容量などの情報帆を関連付けて記憶してもよい。
 設備所有者のIDの登録及び発行は、例えば以下のようにして実行してよい。上述のように、取引に参加する需要者は、予め外部サーバなどの運営側に、電力事業者と契約している契約容量(最大受電電力)を示す情報を、所定の証明書と共に提出(送信)するようにしてよい。同様に、取引に参加する発電設備の所有者は、予め外部サーバなどの運営側に、取引の対象となる設備に関する情報を、所定の証明書と共に提出(送信)するようにしてもよい。ここで、所定の証明書は、例えば、設備所有者が法人である場合の登記簿謄本、設備の発注契約書、設備の購入を証明する領収証、及び/又は、第三者機関による設備の証明書などとしてもよい。
 このようにして提出された情報は、以下説明する設備所有者の識別情報又は認証情報と関連付けて、資産情報記憶部231に記憶されてよい。設備所有者の識別情報及び認証情報の少なくとも一方は、例えば外部サーバから設備所有者に発行されるようにしてもよい。設備所有者は、少なくともこの識別情報及び認証情報を、取引時に取引プラットフォーム12に入力することで、取引に参加することができる。取引プラットフォーム12は、この入力された識別情報及び認証情報を用いることにより、取引に参加しようとしている設備所有者の設備に関する情報を、資産情報記憶部231から取得し、取引する場合等に表示し得る画面に表示させることができる。
 
 図12及び図17に示すような時間帯1~18は、任意の時間を設定してよい。例えば、1つの時間帯の単位を30分として、1日を1~48の時間帯として表示してもよい。
 また、例えば取引プラットフォームにおいて、スマートコントラクトによって電力小売業者のスイッチングを行ってもよい。APIを用いることで必要なデータを取得することができるため、取引システム側で電力小売業者のスイッチングを行ってもよい。
 本実施形態の電力調達システムは、上述したマッチング処理が完了した後、取引に関する情報に基づいて、自己託送の計画の情報を自動的に作成してもよい。本実施形態の電力調達システムは、このようにして作成された自己託送の計画の情報を、取引を行った需要者の情報と共に、上述したマッチング処理が完了した後に、例えばOCCTOなどに送信してよい。OCCTOなどに送信する計画の情報は、例えば、計画の送付元の情報、計画の送付先の情報、計画の電力量、計画の時間帯、及び/又は、発電設備の発電予測値など、各種の情報を含んでよい。このようにすれば、自己託送の計画を作成し、関係各所に報告してから、自己託送を行うことができる。
 さらに、本実施形態の電力調達システムは、需要者の施設へ電力を供給する契約をしている電力小売事業者と、自己託送に必要な契約を、スマートコントラクト等によって自動的に締結するようにしてもよい。また、本実施形態の電力調達システムにおいて、管理サーバ2は、販売処理部216による取引が成立した場合、自己託送が実行される日の前日までに、自己託送の計画を作成し、その計画を例えばOCCTOのような所定の機関に提出してもよい。
 次に、本実施形態に係る電力調達システムにおける自己託送契約の例について、以下の2つの場合について、さらに説明する。
(1)電力小売事業者が同じ場合
 電力小売事業者が同じ場合とは、発電設備から発電される電力を取り扱う契約をしている電力小売事業者と、需要者の施設への電力を供給する契約をしている電力小売事業者とが同じ場合としてよい。このような場合、本実施形態に係る電力調達システムは、電力小売事業者と、マッチング処理に係る自己託送の契約を、スマートコントラクト等によって自動的に締結してよい。
(2)電力小売事業者が異なる場合
 電力小売事業者が同じ場合とは、発電設備から発電される電力を取り扱う契約をしている電力小売事業者と、需要者の施設への電力を供給する契約をしている電力小売事業者とが異なる場合としてよい。このような場合、本実施形態に係る電力調達システムは、それぞれの電力小売事業者とマッチング処理に係る自己託送の契約をスマートコントラクト等によって自動的に締結してよい。
 これらの場合、本実施形態の電力調達システムは、上述のマッチング処理とともに、自己託送の契約を締結するようにしてもよい。また、本実施形態の電力調達システムは、発電設備から発電される電力を取り扱う契約をしている電力小売事業者と、需要者の施設への電力を供給する契約をしている電力小売事業者とが同じ場合にのみマッチングを完了するような策を講じてもよい。
 この場合の電力小売事業者と契約している者とは、契約者が所有している設備や施設での電力の提供又は供給をする契約をしている者である。例えば、電力調達システムは、同一の電力小売事業者と契約している複数の需要者と発電設備の所有者との間でのみ取引を行うようにしてもよい。電力調達システム発電設備を所有者が契約している電力小売事業者と異なる電力小売り事業者と契約している需要者が取引への参加を禁止するようにしてもよい。
 次に、本実施形態の電力調達システムにおいてトークンを購入する態様について、さらに具体的に説明する。
 図18は、本実施形態の電力調達システムにおけるトークン購入の例を示す図である。図18においては、例えば、発電設備の所有者が電力小売事業者である場合として説明する。
 上述した実施形態においては、発電設備の所有者が、取引PFに発電設備の情報を登録することにより施設所有者として取引に参加する例について説明した。一実施形態に係る電力調達システムにおいては、小売事業者が太陽光パネル等の発電設備の施設所有者として取引に参加してもよい。このような場合、前述以外の構成は、上述した実施形態と同様としてよい。
 例えば、小売事業者自身が、発電設備の施設所有者として取引に参加することにより、取引に参加する者に対しての信頼性を高めることができる。すなわち、取引PFを用いた取引において、需要者は、発電設備のセキュリティトークン又はユーティリティトークンを落札することにより、これらのトークンに係る電力を受け取る権利を取得することになる。しかしながら、既に電力を供給している小売事業者であれば、電力の供給に関しての実績があるため、落札したトークンに係る電力を受け取れないのではないかという需要者の不安を減らすことができる。
 一実施形態においては、例えば、予め発電設備を備えている小売事業者が取引に参加してもよい。また、一実施形態においては、例えば、小売事業者が複数の需要者からなる需要者グループから資金を集め、太陽光パネル等の発電設備を購入して所定の土地に設置することにより発電可能な状態にしてもよい。このような取引は、上述した実施形態と同様に行われるものとしてよい。落札した需要者は、施設所有者である小売事業者から落札したトークンに応じて、電力の提供を受けることになる。
 一方、図18に示すように、需要者グループから資金を集め、太陽光パネル13等の発電設備を購入した場合、上述した実施形態のような取引を行わずに、電力調達システムが所定量のトークンをこの需要家グループに発行又は付与するようにしてもよい。この場合、需要家に加えて、小売事業者19も資金を出資するようにしてもよい。これにより、需要家グループは、このトークンに対応した分の電力を、施設所有者である小売事業者19から供給されることになる。
 また、一実施形態に係る電力調達システムは、需要家グループ内におけるそれぞれの需要家である需要者に、それぞれ対応する電力の供給を受けられるように、トークンを発行又は付与するようにしてもよい。その場合のトークンは、需要家それぞれで均等になるようにしてもよいし、提供した資金に応じて割り振るようにしてもよい。
 図18において、小売事業者19は、例えば太陽光パネルの保有者としてよい。小売事業者19は、需要家グループから収集した資金を用いて、太陽光パネルを直接購入してもよい。また、図18に示すように、小売事業者19は、太陽光パネルを仮想区分化するとともに、その所有権は引き続き小売りしてもよい。
 例えば、需要家グループの出資に対応付けられた発電設備に対して、電力調達システムがセキュリティトークンとして100トークンを発行した場合、電力調達システムは、全出資額の2%を、出資した需要家に2トークンを与えてよい。例えば発電設備の1日当たりの最大出力が100kWhである場合、2トークンを与えられた需要家は、1日当たり2kwの電力を、施設所有者である小売事業者19から供給されることになる。ここで、この需要家は、この2トークンを保有している限り、半永久的に、1日当たり2kwの電力を、施設所有者である小売事業者19から供給されることとしてよい。ただし、この1日当たり2kwは、実績値又は理論値である。このため、供給される電力は、現実的には、発電設備の劣化や故障に伴い、低下することがある。
 また、図18において、太陽光パネルの購入のための資金を出していない需要家グループであっても、小売事業者19、資金を提供した需要家グループ、又は資金を提供した需要家グループに属する需要家からトークンを購入可能にしてもよい。このようにしてトークンが購入された場合、小売事業者19から電力の供給を受けられるようにしてもよい。例えば、図18に示すように、資金を提供していない家庭Xである需要家が、資金の一部を提供した小売事業者19から資金の全体の2%分にあたる2トークンを購入したとする。この場合、上述と同様の思想に基づいて、この需要家は小売事業者19から1日あたり2kW相当の半永久的なトークンを購入したものとしてよい。
 また、資金を提供していない需要家グループが、資金の一部を提供した小売事業者19からトークンを購入した場合、需要家グループに対して、小売事業者19から購入したトークンに対応した分の電力が供給可能となる。この場合、電力調達システムは、需要家グループに対してトークンを与えるように管理してもよい。また、電力調達システムが介在せずに需要家グループと小売事業者19とが所定のトークンに対応した所定量の電力の供給契約を結ぶことにより、小売事業者19を経由して、需要家グループが、疑似的にトークンを保有するようにしてもよい。
 このように、電力小売事業者が直接取引対象者になることにより、取引対象の発電設備が実在すること、及び/又は、取引時に表示される設備に関する情報に対する信頼性を高めることができる。
 図19は、本実施形態の電力調達システムにおける金銭の請求の例を示す図である。図19においても、例えば、発電設備の所有者が電力小売事業者である場合として説明する。
 上述した実施形態においては、発電設備の所有者が、取引PFに発電設備の情報を登録することにより施設所有者として取引に参加する例を説明した。一実施形態に係る電力調達システムにおいては、小売事業者が太陽光パネル等の発電設備の施設所有者として取引に参加してもよい。このような場合、前述以外の構成は、上述した実施形態と同様としてよい。
 例えば、小売事業者自身が、発電設備の施設所有者として取引に参加することにより、図18に示した場合と同様に、取引に参加する者に対しての信頼性を高めることができる。
 一実施形態において、図19に示すように、小売事業者19が毎月10,000kWhの電力を発電する発電設備の施設所有者である場合の例について説明する。この場合、小売事業者19は、一実施形態に係る電力調達システムに、この発電設備の資産情報として、資産登録を行うことにより、施設所有者として取引PFに参加可能となるようにしてよい。
 この場合、一実施形態に係る電力調達システムは、セキュリティトークンとして、例えば100トークンを発行するようにしてよい。家庭Xである需要者が電力調達システムの取引PFから2トークンを落札した場合、この需要者は、毎月10,000kWhの電力の2%に相当する、1か月あたり200kWhの電力量を、小売事業者19から供給される権利を得ることになる。ここで、取引に参加した需要者が小売事業者19と電力供給の契約を結んでいる場合に、家庭Xでの1か月あがりの電力利用料が例えば450kWhであるとする。この場合、取引によって獲得された200kWh分の電力を供給される権利と相殺することにより、例えば、450kWhから200kWhを差し引いた250kWh分の電力が利用されたこととしてもよい。
 この場合、図19に示す家庭Xに対して、250kWh分の電力の利用料金が、小売事業者19から請求されるようにしてよい。このように、請求する電力量として、小売事業者19から購入することになる買電の電力量から、取引によって獲得したトークンに対応した発電電力量が差し引かれるようにすることを、「ネットメータリング」という。
 このように、需要者(家庭X)が取引を完了し、1か月で10,000kWhの発電設備の2%のトークンを取得した場合、取引した小売業者によって、毎月請求される電力量から2%(200kWh)分の電力量が差し引かれるようにしてもよい。
 図20は、一実施形態に係る電力調達システムのネットメータリングによる電力供給の動作を説明するフローチャートである。
 図20に示す動作において、ステップS301~ステップS305の動作は、図9に示した動作と同様に行ってよい。
 図20に示すように、ステップS305においてトークンの保有者に応じて区分保有者に発電量が割り当てられたら、管理サーバ2は、上述のようなネットメータリングによって電力を供給してよい(S401)。
 以上、本実施形態について説明したが、上記実施形態は本開示の理解を容易にするためのものであり、本開示を限定して解釈するためのものではない。本開示は、その趣旨を逸脱することなく、変更、改良され得ると共に、本開示にはその等価物も含まれる。
 例えば、本実施形態では、ブロックチェーン4が発行するトークンを利用して発電設備13の所有権及びオフテイク権の所在を管理するものとした。しかしながら、一実施形態において、上述のような所在の管理は、必ずしもブロックチェーンの技術を用いてしなくてもよい。例えば、所定のデータベースに所有権及びオフテイク権を管理するようにし、データベースの管理者(管理サーバ2の運営者)が内容の真性を保証するようにしてもよい。すなわち、一実施形態において、所定のデータベースにトークンを発行(記録)するようにしてもよい。
 また、本実施形態では、発電設備13の所有者に関する所有者情報は、ブロックチェーン4の台帳に管理するものとした。しかしながら、管理サーバ2が、所有者情報を記憶する所有者情報記憶部を備えるようにしてもよい。
 また、一実施形態の電力調達システムは、取引の際の手数料を徴収したり、自己託送時の手数料を徴収したりしてもよい。
 また、一実施形態の電力調達システムにおいて、発電する電力量の予測は、時間帯ごとに異なるようにしてもよい。さらに、一実施形態の電力調達システムにおいて、発電する電力量の予測が外れた場合には、例えば外れた程度に応じてペナルティが課されるなどの策を講じてもよい。また、一実施形態の電力調達システムにおいて、発電する電力の予測値として、本来の予測値を示す代わりに、例えば安全のため所定の割合を示した上で取引を行うようにしてもよい。例えば、発電する電力の予測値が本来は1000kWhである場合に、あえて900kWhなどと示すことにより、取引を行うようにしてもよい。
 一実施形態の電力調達システムにおいて、発電設備13は、太陽光発電をする太陽光パネル(太陽電池)のみならず、例えば蓄電池(電気自動車(Electric Vehicle:EV)を含む)としてもよい。また、一実施形態の電力調達システムにおいて、発電設備13が蓄電池を含む場合、当該蓄電池を電力のバッファとして機能するようにしてもよい。
 また、一実施形態の電力調達システムにおいて、発電設備13が発電した電力に余剰が生じた場合、当該余剰分は送配電業者側が買電するようにしてもよい。また、一実施形態の電力調達システムにおいて、発電設備13が発電した電力に不足が生じた場合、買電した側(発電側)がペナルティを支払うようにしてもよい。
 さらに、一実施形態の電力調達システムにおいて、投資の回収期間に応じて将来得られる予定の電力量等を、現在の価値に反映させて割引く仕組みを構築してもよい。
<開示事項>
 なお、本開示には、以下のような構成も含まれる。
[項目1]
 発電設備を裏付けとした、前記発電設備の所有権及びオフテイク権を表すトークンをブロックチェーンにおいて発行させるトークン発行部と、
 前記発電設備から調達したい電力の需要量を需要者から受け付ける需要量入力部と、
 前記トークンの前記需要者への販売に係る処理を行う販売処理部と、
 前記需要量に応じた量の前記トークンを前記需要者のウォレットに移転させるトークン移転部と、
 を備えることを特徴とする情報処理装置。
[項目2]
 項目1に記載の情報処理装置であって、
 前記発電設備による発電電力量の予測値を取得する発電予測取得部と、
 前記需要者ごとに、前記需要者の保有予定トークン量に応じて前記発電電力量の予測値を分割して出力する発電計画出力部と、
 をさらに備えることを特徴とする情報処理装置。
[項目3]
 項目1又は2に記載の情報処理装置であって、
 前記発電設備に設けられているスマートメータから前記発電設備により発電された発電電力量の実績値を取得する発電実績取得部と、
 前記実績値を保有予定トークン量に応じて分割した分割発電実績値及び前記予測値を出力する発電実績出力部と、
 をさらに備えることを特徴とする情報処理装置。
[項目4]
 項目1乃至3のいずれか1項に記載の情報処理装置であって、
 前記需要量入力部は、前記需要量とともに前記発電設備についての条件の指定を受け付け、
 前記情報処理装置は、
 複数の前記発電設備のそれぞれについて、前記発電設備に関する資産情報を記憶する資産情報記憶部と、
 前記条件にマッチする前記資産情報を検索するマッチング処理部と、
 をさらに備え、
 前記トークン移転部は、マッチした前記資産情報に対応する前記発電設備のウォレットから、前記需要者のウォレットから前記需要量に応じた量の前記トークンを移転させること、
 を特徴とする情報処理装置。
 1 ユーザ端末
 2 管理サーバ
 3 通信ネットワーク
 4 ブロックチェーン
 10 需要者
 11 需要設備
 12 マーケットプレイス
 13 発電設備
 14 スマートメータ
 15 設備提供者
 16 広域機関システム
 17 小売事業者
 18 サービス提供会社
 131 区分
 211 資産登録部
 212 トークン発行部
 213 需要量入力部
 214 売却量入力部
 215 マッチング処理部
 216 販売処理部
 217 トークン移転部
 218 発電予測取得部
 219 発電実績取得部
 220 レポート作成部
 221 API処理部
 231 資産情報記憶部
 
 

Claims (11)

  1.  発電設備の所有権の持分を表す第1のトークンを所定のデータベースにおいて発行させるトークン発行部と、
     前記発電設備に関連する情報、前記発電設備の所有権の持分に関連する情報、及び前記持分に応じた価格に関連する情報に基づいて、前記発電設備によって発電される電力の取引を実行させる販売処理部と、
     前記販売処理部による前記取引が成立した場合に、前記第1のトークンを、前記所有権の持分に応じて前記取引における購入者に移転させるトークン移転部と、
     を備える、情報処理装置。
  2.  発電設備の所有権の持分を表す第1のトークンを所定のデータベースにおいて発行させるトークン発行部と、
     前記前記発電設備が所定の時間帯において発電する積算の電力を予測する発電予測取得部と、
     前記発電設備に関連する情報、発電予測部によって予測される電力に関連する情報、及び前記持分に応じた価格に関連する情報に基づいて、前記発電設備によって発電される電力の取引を実行させる販売処理部と、
     前記販売処理部による前記取引が成立した場合に、前記第1のトークンを、前記発電予測部によって予測される電力に応じて前記取引における購入者に移転させるトークン移転部と、
     を備える、情報処理装置。
  3.  発電設備の所有権の持分を表す第1のトークンを所定のデータベースにおいて発行させるトークン発行部と、
     前記発電設備に関連する情報、前記発電設備によって発電される単位電力あたりの二酸化炭素排出量に関連する情報、及び前記持分に応じた価格に関連する情報に基づいて、前記発電設備によって発電される電力の取引を実行させる販売処理部と、
     前記販売処理部による前記取引が成立した場合に、前記第1のトークンを、発電予測部によって予測される電力に応じて前記取引における購入者に移転させるトークン移転部と、
     を備える、情報処理装置。
  4.  前記販売処理部は、過去の実績に基づく予測精度に関する情報を用いることにより、前記発電設備によって発電される電力の取引を実行させる、請求項1から3のいずれかに記載の情報処理装置。
  5.  前記販売処理部による前記取引が成立した場合に、前記第1のトークンに応じた発電電力を、前記時間帯において、予め定められた需要設備に自己託送する、請求項2に記載の情報処理装置。
  6.  前記販売処理部による前記取引が成立した場合に、前記販売処理部は、自己託送を行う設備として予め定められた需要設備の契約容量を超えた電力の入札を禁止又は拒否する、請求項1から5のいずれかに記載の情報処理装置。
  7.  前記販売処理部は、前記発電設備から発電される電力を取り扱う契約をしている電力小売事業者と、前記電力の需要者の施設に電力を供給する契約をしている電力小売事業者とが同じ場合にのみ取引を成立させる、請求項1から6のいずれかに記載の情報処理装置。
  8.  自己託送を行う設備として予め定められた需要設備の契約容量に関連する情報を外部から取得する通信インタフェースを備える、請求項1から7のいずれかに記載の情報処理装置。
  9.  前記販売処理部による前記取引が成立した場合に、自己託送が実行される日の前日までに前記自己託送の計画を作成し、当該計画を所定の機関に提出する、請求項1から8のいずれかに記載の情報処理装置。
  10.  前記販売処理部による前記取引が成立した場合に、前記自己託送する事業者と前記需要設備の所有者との間において前記自己託送に必要な契約を電子契約で実施する、請求項1から9のいずれかに記載の情報処理装置。
  11.  コンピュータに、
     発電設備の所有権の持分を表す第1のトークンを所定のデータベースにおいて発行させるトークン発行処理と、
     前記発電設備に関連する情報、前記発電設備の所有権の持分に関連する情報、及び前記持分に応じた価格に関連する情報に基づいて、前記発電設備によって発電される電力の取引を実行させる販売処理と、
     前記販売処理部による前記取引が成立した場合に、前記第1のトークンを、前記所有権の持分に応じて前記取引における購入者に移転させる移転処理と、
     を実行させるためのプログラムを記録した、一時的でない有形の媒体。
     
PCT/JP2023/003866 2022-02-25 2023-02-06 情報処理装置 WO2023162656A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-028705 2022-02-25
JP2022028705A JP2023124732A (ja) 2022-02-25 2022-02-25 情報処理装置

Publications (1)

Publication Number Publication Date
WO2023162656A1 true WO2023162656A1 (ja) 2023-08-31

Family

ID=87765650

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/003866 WO2023162656A1 (ja) 2022-02-25 2023-02-06 情報処理装置

Country Status (2)

Country Link
JP (1) JP2023124732A (ja)
WO (1) WO2023162656A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017145458A1 (ja) * 2016-02-25 2017-08-31 オムロン株式会社 電力供給制御システム、電力供給制御方法および電力供給制御プログラム
JP2020201775A (ja) * 2019-06-11 2020-12-17 株式会社チェンジ・ザ・ワールド 取引価格処理装置、取引価格処理プログラム、取引価格処理方法、及び取引システム
US20210294404A1 (en) * 2020-03-20 2021-09-23 Robert Bosch Gmbh Computer-implemented method for controlling a utilization of power plant capacity of a power plant

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017145458A1 (ja) * 2016-02-25 2017-08-31 オムロン株式会社 電力供給制御システム、電力供給制御方法および電力供給制御プログラム
JP2020201775A (ja) * 2019-06-11 2020-12-17 株式会社チェンジ・ザ・ワールド 取引価格処理装置、取引価格処理プログラム、取引価格処理方法、及び取引システム
US20210294404A1 (en) * 2020-03-20 2021-09-23 Robert Bosch Gmbh Computer-implemented method for controlling a utilization of power plant capacity of a power plant

Also Published As

Publication number Publication date
JP2023124732A (ja) 2023-09-06

Similar Documents

Publication Publication Date Title
US11501389B2 (en) Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform
Mengelkamp et al. A blockchain-based smart grid: towards sustainable local energy markets
Esmat et al. A novel decentralized platform for peer-to-peer energy trading market with blockchain technology
KR101976401B1 (ko) 블록체인 기반 전력 거래 운영 시스템, 이의 방법, 그리고 이 방법을 저장한 컴퓨터 판독 가능 저장 매체
Oprea et al. Two novel blockchain-based market settlement mechanisms embedded into smart contracts for securely trading renewable energy
US9134353B2 (en) Comfort-driven optimization of electric grid utilization
JP6954782B2 (ja) 環境付加価値の証券化システム
Ma et al. Evolution toward standardized market design
US20100218108A1 (en) System and method for trading complex energy securities
US20100332373A1 (en) System and method for participation in energy-related markets
US20050027636A1 (en) Method and apparatus for trading energy commitments
Faizan et al. Decentralized bottom-up energy trading using Ethereum as a platform
Gunarathna et al. Reviewing global peer-to-peer distributed renewable energy trading projects
Liu et al. Framework for the design and analysis of congestion revenue rights
Hogan A competitive electricity market model
JP6895588B2 (ja) リソース融通支援システム、リソース融通支援方法、および、リソース融通支援装置
Peterson et al. The future of the electric grid and its regulation: Some considerations
Pipattanasomporn et al. Blockchain-based Solar Electricity Exchange: Conceptual architecture and laboratory setup
Lin Analysis of blockchain-based smart contracts for peer-to-peer solar electricity transactive markets
Lowder et al. The evolving US distribution system: Technologies, architectures, and regulations for realizing a Transactive energy marketplace
WO2023162656A1 (ja) 情報処理装置
Ilieva et al. The innovative role of local system operator as a facilitator of grid and community services in the local electricity market
KR102218800B1 (ko) 광고 트래픽 거래 서비스 제공 방법 및 그 장치
TCR White Paper on Developing Competitive Electricity Markets and Pricing Structures
Cazalet Transactional energy market information exchange (TeMIX)

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23759660

Country of ref document: EP

Kind code of ref document: A1