WO2017145458A1 - 電力供給制御システム、電力供給制御方法および電力供給制御プログラム - Google Patents

電力供給制御システム、電力供給制御方法および電力供給制御プログラム Download PDF

Info

Publication number
WO2017145458A1
WO2017145458A1 PCT/JP2016/084109 JP2016084109W WO2017145458A1 WO 2017145458 A1 WO2017145458 A1 WO 2017145458A1 JP 2016084109 W JP2016084109 W JP 2016084109W WO 2017145458 A1 WO2017145458 A1 WO 2017145458A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
power supply
consumers
consumer
control system
Prior art date
Application number
PCT/JP2016/084109
Other languages
English (en)
French (fr)
Inventor
恭之 江田
一希 笠井
紘 今井
皓正 高塚
冨実二 相田
Original Assignee
オムロン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by オムロン株式会社 filed Critical オムロン株式会社
Publication of WO2017145458A1 publication Critical patent/WO2017145458A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom

Definitions

  • the present invention relates to a power supply control system, a power supply control method, and a power supply control program for controlling the supply of surplus power among a plurality of consumers in a situation where the power supply situation is tight, such as when a power failure occurs. .
  • a power generation apparatus for example, a solar power generation apparatus
  • a surplus power purchase system has been established, so that electric power generated by a solar power generation device, a wind power generation device, or the like can be sold to an electric power company.
  • the generated power may not be sold to the power company.
  • output suppression a predetermined amount of power that can be purchased by an electric power company is exceeded (hereinafter referred to as output suppression). For this reason, a consumer may use a storage battery that can temporarily store power that could not be sold.
  • Patent Document 1 discloses an electric power packet system that can supply and demand end-to-end between a consumer and a consumer by delivering power energy using a power packet attached to header information. .
  • the conventional power packet system has the following problems. That is, in the power packet system disclosed in the above publication, surplus power is generated among a plurality of consumers when the power supply from the system becomes tight, such as during a power failure. Even in this case, no consideration is given to the effective use of this surplus power.
  • An object of the present invention is to provide a power supply control system, a power supply control method, and a power supply control program capable of effectively utilizing surplus power among a plurality of consumers according to the supply status of power from the grid There is to do.
  • a power supply control system is a power supply control system in which surplus power is interchanged among a plurality of consumers who own a power supply device, and includes a power status acquisition unit, a power amount information acquisition unit, The power supply / demand prediction unit and the control unit are provided.
  • the power status acquisition unit acquires information on the power supply status to a plurality of consumers from the grid.
  • the power amount information acquisition unit acquires information related to the amount of power supplied by the power supply device for each of a plurality of consumers.
  • the power supply / demand prediction unit predicts the power supply / demand situation for each of the plurality of consumers based on the information acquired by the power amount information acquisition unit.
  • the control unit determines a supply source and a supply destination of surplus power among a plurality of consumers based on the information acquired in the power status acquisition unit and the power amount information acquisition unit and the prediction result in the power supply and demand prediction unit. To do.
  • the power supply status from the grid to each customer is detected, and if the power supply status is tight, surplus power is generated in the customer group including the customer who owns the power supply device. Electric power is supplied from the consumer (supplier) to the consumer (supplier) who needs power.
  • the power supply from the system is tight, for example, during a power outage when the power supply from the system is stopped, the power demand exceeds the power supply due to the operation of the air conditioner in the summer. Situation.
  • the consumer group including a plurality of consumers may include at least one consumer who owns the power supply apparatus, and may include a consumer who does not own the power supply apparatus.
  • a consumer group is a group containing two or more consumers, and each consumer is connected by the distribution line.
  • a power supply device owned by a consumer for example, a power generation device utilizing a renewable energy such as a solar power generation device, a wind power generation device, a geothermal power generation device, a generator, a binary power generation device, an electric vehicle, a power storage device Etc. are included.
  • the information acquired by the power status acquisition unit includes general information related to power supply from the system, such as the occurrence of a power failure, the balance of the demand amount with respect to the power supply amount from the system, and the prediction thereof.
  • the power supply and demand forecasting unit based on information on the power supply device owned by the consumer (for example, power generation amount, power storage amount, etc.) and information on the power consumption amount in the consumer, the total amount of power supplied by the power supply device and By comparing the total amount of power consumed by the load, the balance between power demand and supply at each consumer is predicted.
  • the control unit supplies power from consumers who generate surplus power to consumers who need power
  • a consumer that is a consumer supply destination that is a supply source is set.
  • the supply status of power from the grid is tight, power is supplied from the consumers with surplus power to the consumers who need the power. Can be controlled.
  • the power supply control system according to the second invention is the power supply control system according to the first invention, and the power status acquisition unit acquires information relating to a power failure in which power supply from the system is stopped.
  • the power supply status from the system is assumed to be when a power failure occurs when the power supply from the system is stopped.
  • surplus power is generated in the customer group when power supply from the system is stopped due to a power failure, the consumer who has generated surplus power is required for the consumer who needs the power. Can supply power.
  • surplus power generated in the consumer group including a plurality of consumers can be effectively utilized.
  • a power supply control system is the power supply control system according to the first or second aspect of the present invention, wherein the control unit obtains information indicating that the power status acquisition unit has stopped power supply from the system. Upon acquisition, a supply source and a supply destination of surplus power among a plurality of consumers are determined.
  • the control unit performs control so that surplus power is interchanged between consumers.
  • a power supply control system is the power supply control system according to any one of the first to third inventions, wherein the power status acquisition unit relates to a power supply status to a plurality of consumers. Information is acquired from each consumer.
  • the power supply status is acquired from each consumer.
  • a power outage occurs, it is estimated that a power outage has occurred even in a customer belonging to the same distribution network by acquiring information related to the power outage directly from a customer belonging to the distribution network where the power outage occurred. be able to.
  • a power supply control system is the power supply control system according to any one of the first to fourth aspects, wherein the plurality of consumers include the first consumer and the second consumer Includes with consumers.
  • the power supply control system further includes a matching unit that matches the power demand condition of the first consumer and the power supply condition of the second consumer based on the prediction result of the power supply and demand prediction unit. Yes.
  • the demand condition in the first consumer and the supply condition in the second consumer are collated, and the first power that requires surplus power in a predetermined time zone A combination of a consumer (supplier) and a second consumer (supplier) that generates surplus power during the time period is detected.
  • the combination of the 1st consumer and the 2nd consumer detected in a matching part may be one, and plural may be sufficient as it.
  • a power supply control system is the power supply control system according to the fifth aspect of the present invention, wherein the power demand conditions in the first consumer include the type of power supply device, the required amount of power, At least one of date / time, time zone, place, unit price of electric power, and consideration is included.
  • the power demand conditions of the first consumer are the type of power supply device that the first consumer desires to receive, the amount of required power, the desired reception date and time, the time zone, the location, the unit price of power, the consideration, etc. Information.
  • a power supply control system is the power supply control system according to the fifth or sixth aspect of the present invention, wherein the power supply conditions in the second consumer include the type of load and the power that can be supplied At least one of quantity, date / time, time zone, location, unit price of electric power, and consideration is included.
  • the power supply conditions of the second consumer are the type of load owned by the first consumer, the amount of power that can be supplied by the second consumer, the date and time of supply, the time zone, the location, and the power. Includes information such as unit price and consideration.
  • the amount of surplus power that can be supplied by the second consumer but also the type of load owned by the first consumer, the date and time when the surplus power can be supplied to the first consumer, the time zone, the first It is possible to perform matching with the optimal first consumer by using information on the location of the customer, the unit price of surplus power, and the consideration.
  • a power supply control system is the power supply control system according to any one of the fifth to seventh aspects of the present invention, further comprising a storage unit for storing demand conditions and supply conditions. Yes.
  • the demand condition of the first consumer and the supply condition of the second consumer are stored in a storage unit provided in the system.
  • a power supply control system is the power supply control system according to any one of the fifth to eighth aspects, wherein the demand condition is input by the first consumer.
  • the power supply and demand prediction unit predicts the power supply and demand using the power demand condition input by the first consumer.
  • the electric power supply and demand in the 1st consumer can be predicted using the demand conditions directly inputted from the 1st consumer using electronic terminals, such as PC (Personal Computer) and a smart phone.
  • a power supply control system is the power supply control system according to any one of the fifth to ninth aspects, wherein the supply condition is input by the second consumer.
  • the information regarding the power supply device is input by the second consumer as the surplus power supply condition.
  • the information related to the input power supply device includes information such as the type of the power supply device, the power generation capacity, the estimated power generation amount based on the weather forecast, the power storage amount of the power storage device, and the full charge capacity of the storage battery.
  • An electric power supply control system is the electric power supply control system according to any one of the first to fourth aspects of the invention, wherein the control unit has a plurality of consumers based on a predetermined priority order. The supply source and the supply destination of surplus power during the period are determined.
  • priority is given based on predetermined conditions to determine the supply destination.
  • Specific conditions may be set in advance so as to preferentially select consumers such as hospitals, relatives, and friends. Thereby, it is possible to preferentially select consumers such as hospitals and relatives, relatives, friends, acquaintances and the like and supply surplus power.
  • a power supply control system is the power supply control system according to the eleventh aspect of the present invention, further comprising a storage unit that stores information relating to a predetermined priority order.
  • the information regarding the predetermined priority used when determining the supply destination of surplus power is preserve
  • surplus power can be preferentially supplied to a public institution such as a hospital using information on the priority order stored in the storage unit in advance.
  • a power supply control system is the power supply control system according to any one of the first to twelfth aspects of the present invention, wherein the power supply and demand prediction unit uses the weather forecast information for a predetermined time.
  • the amount of power generated by the power generation device included in the power supply device in the belt is predicted.
  • the power supply and demand prediction unit predicts the amount of power generation in the power supply device (power generation device) using information related to the weather forecast.
  • a power supply control system is the power supply control system according to any one of the first to thirteenth aspects of the present invention, wherein the power supply / demand prediction unit is a current state of power storage devices included in the power supply unit. Is used to predict the amount of electricity stored in the electricity storage device in a predetermined time period.
  • the power storage amount of the current power storage device is used for the power supply / demand prediction in the power supply / demand prediction unit.
  • the power supply and demand for each consumer in a predetermined time period is predicted using the current power storage amount of the storage battery together with the estimated power generation amount and power consumption of the power supply device for each consumer in a predetermined time period. can do.
  • a power supply control system according to a fifteenth aspect of the present invention is the power supply control system according to any one of the first to fourteenth aspects of the present invention, wherein the power supply and demand forecasting unit is based on past life patterns of a plurality of consumers. Based on the data which recorded the corresponding power consumption, the power consumption in several consumers is estimated.
  • the data which recorded the power consumption according to the life pattern for every some consumer is used for the estimation of the power consumption in a power supply-and-demand prediction part.
  • a consumer has a lifestyle pattern that consumes more power at night than during the day, surplus power is generated during the daytime when the amount of power generated by the solar power generator is large and the amount of power consumed is low. It is understood that there is a high possibility that Therefore, it is possible to detect the time zone in which surplus power is likely to be generated for each consumer, and improve the estimation accuracy of the power consumption.
  • a power supply control method is a power supply control method in which surplus power is interchanged among a plurality of consumers who own a power supply device, the power status acquisition step, the power amount information acquisition step, A power supply / demand prediction step and a control step are provided.
  • the power status acquisition step acquires information related to the power supply status to a plurality of consumers from the grid.
  • the power amount information acquisition step acquires information related to the amount of power supplied by the power supply device for each of a plurality of consumers.
  • the power supply and demand prediction step predicts the power supply and demand situation for each of a plurality of consumers based on the information acquired in the power amount information acquisition step.
  • the control step determines a supply source and a supply destination of surplus power among a plurality of consumers based on the information acquired in the power status acquisition step and the power amount information acquisition step and the prediction result in the power supply and demand prediction step To do.
  • the power supply status from the grid to each customer is detected, and if the power supply status is tight, surplus power is generated in the customer group including the customer who owns the power supply device. Electric power is supplied from the consumer (supplier) to the consumer (supplier) who needs power.
  • the power supply from the system is tight, for example, during a power outage when the power supply from the system is stopped, the power demand exceeds the power supply due to the operation of the air conditioner in the summer. Situation.
  • the consumer group including a plurality of consumers may include at least one consumer who owns the power supply apparatus, and may include a consumer who does not own the power supply apparatus.
  • a consumer group is a group containing two or more consumers, and each consumer is connected by the distribution line.
  • a power supply device owned by a consumer for example, a power generation device utilizing a renewable energy such as a solar power generation device, a wind power generation device, a geothermal power generation device, a generator, a binary power generation device, an electric vehicle, a power storage device Etc. are included.
  • the information acquired in the power status acquisition step includes general information related to power supply from the system, such as the occurrence of a power failure, the balance of the demand amount with respect to the power supply amount from the system, and the prediction thereof.
  • the power supply and demand prediction step based on information on the power supply device owned by the consumer (for example, power generation amount, power storage amount, etc.) and information on the power consumption amount in the consumer, the total amount of power supplied by the power supply device and By comparing the total amount of power consumed by the load, the balance between power demand and supply at each consumer is predicted.
  • control step power is supplied from consumers who generate surplus power to consumers who need power based on the power supply status from the power supply system from the power company and the prediction result in the power supply and demand prediction step.
  • a consumer that is a consumer supply destination that is a supply source is set.
  • power is supplied from the consumers with surplus power to the consumers who need the power. Can be controlled.
  • a power supply control program is a power supply control program in which surplus power is interchanged among a plurality of consumers who own a power supply device, the power status acquisition step, the power amount information acquisition step, The computer is caused to execute a power supply control method including a power supply and demand prediction step and a control step.
  • the power status acquisition step acquires information related to the power supply status to a plurality of consumers from the grid.
  • the power amount information acquisition step acquires information related to the amount of power supplied by the power supply device for each of a plurality of consumers.
  • the power supply and demand prediction step predicts the power supply and demand situation for each of a plurality of consumers based on the information acquired in the power amount information acquisition step.
  • the control step determines a supply source and a supply destination of surplus power among a plurality of consumers based on the information acquired in the power status acquisition step and the power amount information acquisition step and the prediction result in the power supply and demand prediction step To do.
  • the power supply status from the grid to each customer is detected, and if the power supply status is tight, surplus power is generated in the customer group including the customer who owns the power supply device. Electric power is supplied from the consumer (supplier) to the consumer (supplier) who needs power.
  • the power supply from the system is tight, for example, during a power outage when the power supply from the system is stopped, the power demand exceeds the power supply due to the operation of the air conditioner in the summer. Situation.
  • the consumer group including a plurality of consumers may include at least one consumer who owns the power supply apparatus, and may include a consumer who does not own the power supply apparatus.
  • a consumer group is a group containing two or more consumers, and each consumer is connected by the distribution line.
  • a power supply device owned by a consumer for example, a power generation device utilizing a renewable energy such as a solar power generation device, a wind power generation device, a geothermal power generation device, a generator, a binary power generation device, an electric vehicle, a power storage device Etc. are included.
  • the information acquired in the power status acquisition step includes general information related to power supply from the system, such as the occurrence of a power failure, the balance of the demand amount with respect to the power supply amount from the system, and the prediction thereof.
  • the power supply and demand prediction step based on information on the power supply device owned by the consumer (for example, power generation amount, power storage amount, etc.) and information on the power consumption amount in the consumer, the total amount of power supplied by the power supply device and By comparing the total amount of power consumed by the load, the balance between power demand and supply at each consumer is predicted.
  • control step power is supplied from consumers who generate surplus power to consumers who need power based on the power supply status from the power supply system from the power company and the prediction result in the power supply and demand prediction step.
  • a consumer that is a consumer supply destination that is a supply source is set.
  • power is supplied from the consumers with surplus power to the consumers who need the power. Can be controlled.
  • the power supply control system According to the power supply control system according to the present invention, it is possible to effectively use surplus power among a plurality of consumers according to the supply status of power from the grid.
  • the block diagram which shows the connection relation of the electric power supply control system which concerns on one Embodiment of this invention, a consumer, and a system
  • the flowchart which shows the flow of the power supply control method performed by the power supply control system of FIG.
  • the flowchart which shows the flow of supply of the surplus electric power in the electric power supply control method performed by the electric power supply control system of FIG.
  • a consumer A (first consumer, second consumer) 20 appearing in the following description uses a power generation device (solar panel 21, wind power generation device 23, and power storage device 27) as a power supply device. I own it.
  • a power generation device solar panel 21, wind power generation device 23, and power storage device 27
  • the customer B (2nd customer, 1st customer) 30 owns the binary electric power generating apparatus 31 and the electric vehicle 32 as an electric power supply apparatus.
  • the consumers A and B shall interchange the side which requires electric power, and the side which supplies surplus electric power according to a time slot
  • a consumer is, for example, an individual, a corporation, an organization, or the like who has a contract with an electric power company and uses electric power supplied from the electric power company via the grid 50 (see FIG. 1). General households (detached houses, condominiums), companies (business establishments, factories, facilities, etc.), local governments, national institutions, etc. are included.
  • the consumer includes a consumer who can supply electric power by private power generation and a consumer who has realized ZEB (Zero Energy Building).
  • the customer A20 and the customer B30 are mentioned and demonstrated one by one for convenience of explanation.
  • the combination of the consumer A20 and the consumer B30 is not limited to one-to-one.
  • strain 40 (refer FIG. 1) means the electric power system which supplies the electric power supplied from an electric power company with respect to each consumer.
  • the loads 24 and 34 are, for example, power consumers such as air conditioners, lighting, refrigerators, power ranges, IH cooking heaters, and televisions when the consumer is a general household.
  • power consumers such as air conditioners, lighting, refrigerators, power ranges, IH cooking heaters, and televisions when the consumer is a general household.
  • Means when a consumer is a company (a factory or the like), it means power consumers such as various facilities and air conditioning equipment installed in the factory.
  • EMS (Energy Management System) 26 and 36 are installed in each consumer, and are provided to reduce power consumption in each consumer.
  • the EMSs 26 and 36 are connected to the power supply control system 10 via a network.
  • Embodiment 1 When the power supply control system 10 of the present embodiment detects a situation where power supply from the system 40 is tight, such as during a power failure, a plurality of demands including consumers who own power supply devices (power generation devices, power storage devices, etc.) It is provided to allow surplus power to be exchanged between houses. Then, as shown in FIG. 1, the power supply control system 10 switches the plurality of switching units 28, 29, 37, and 41 while changing the customer A (first consumer) 20 and the customer B (second consumer). Exchange of surplus power with the (customer) 30.
  • a situation where power supply from the system 40 is tight such as during a power failure
  • a plurality of demands including consumers who own power supply devices (power generation devices, power storage devices, etc.) It is provided to allow surplus power to be exchanged between houses. Then, as shown in FIG. 1, the power supply control system 10 switches the plurality of switching units 28, 29, 37, and 41 while changing the customer A (first consumer) 20 and the customer B (second consumer). Exchange of surplus power with the (customer)
  • the power supply control system 10 acquires information on the power supply status for each customer A20, B30 from the grid 40. And the electric power supply control system 10 detects the supply-and-demand situation of electric power in the consumer group containing a some consumer for every predetermined
  • the customer A 20 supplies the power supply control system 10 to the power supply control system 10 via an EMS (Energy Management System) 26, and the power supply status and power supply / demand of the customer A 20 for each predetermined time period. Send information about the situation.
  • the consumer A 20 includes a solar panel (power supply device) 21, a photovoltaic power conversion device (PCS) 22, a generated power sensor 22 a, and a wind power generation device (power supply device). 23, wind power generation power sensor 23a, load 24, load power sensor 24a, distribution board 25, EMS 26, power status acquisition unit 26a, power storage device 27, power storage power sensor 27a, switching unit 28, and switching unit 29 It has.
  • the solar panel (power supply device) 21 is a power generation device that generates electricity using the photovoltaic effect using the light energy of sunlight, and is installed on the roof or the like of the consumer A20. And the electric power generation amount in the solar panel 21 can be estimated based on the information regarding the sunshine time of a weather forecast.
  • a photovoltaic power generation converter (PCS (Power Conditioning System)) 22 is connected to a solar panel 21 and converts a direct current generated in the solar panel 21 into an alternating current.
  • the generated power sensor 22 a is connected to the solar power converter 22 and measures the amount of power generated by the solar panel 21.
  • the generated power sensor 22 a transmits the measurement result (power generation amount) to the EMS 26.
  • the wind power generation device (power supply device) 23 is a power generation device that generates electricity by rotating a windmill using natural wind force, and is installed in the premises of the customer A20. And the electric power generation amount in the wind power generator 23 can be estimated based on the information regarding the wind speed of a weather forecast.
  • the wind power generation power sensor 23 a is connected to the wind power generation apparatus 23 and measures the amount of power generated by the wind power generation apparatus 23. Then, the wind power generation power sensor 23 a transmits the measurement result (power generation amount) to the EMS 26.
  • the load 24 is a power consumer such as an air conditioner, an illumination, a television (TV), a refrigerator, or the like in a general home, equipment in a factory, an air conditioner, etc. The power generated by the solar panel 21 and the wind power generator 23 is consumed.
  • the load power sensor 24 a is connected to the load 24 and measures the amount of power consumed by the load 24. Then, the load power sensor 24 a transmits the measurement result (power consumption amount) to the EMS 26.
  • the distribution board 25 is connected to a power sensor for generated power 22a, a power sensor for wind power generation 23a, a power sensor for load 24a, and a power sensor for stored power 27a.
  • the distribution board 25 supplies the load 24 with the power generated by the solar panel 21 and the wind power generator 23 and the power supplied from the power storage device 27. Furthermore, the distribution board 25 supplies surplus power generated according to the time zone to the customer B or the system 40 via the switching units 28 and 29 and the like. Thereby, consumer A20 can sell surplus electric power with respect to consumer B or electric power company which belongs to the same consumer group.
  • the EMS (Energy Management System) 26 is an energy management system provided to reduce power consumption in the consumer A20. As shown in FIG. 1, each sensor 22a, 23a, 24a is used. , 27a. Further, the EMS 26 uses the detection results received from the sensors 22a, 23a, 24a, and 27a to efficiently generate the power generated in the solar panel 21 and the wind power generator 23 and the power supplied from the power storage device 27 to the load 24. Supply.
  • the EMS 26 transmits information (demand conditions, supply conditions) regarding the power supply / demand situation for each predetermined time period in the customer A20 to the power amount information acquisition unit 12 of the power supply control system 10. Specifically, the EMS 26 receives the detection results from the sensors 22a, 23a, 24a, and 27a for each predetermined time period, and the past power consumption according to the information related to the weather forecast and the lifestyle pattern of the consumer A20. Send data about
  • the power status acquisition unit 26a is provided in the EMS 26, and acquires information on the supply status of power supplied from the power company to the customer A20 via the grid 40. Specifically, the power status acquisition unit 26a monitors the status of power supplied from the distribution network O connected to the grid 40, and detects, for example, that a power outage or power supply has become tight. . Then, the power status acquisition unit 26a transmits the detection result to the power supply control system 10 (power status acquisition unit 11).
  • the power status acquisition unit 26a for each of the plurality of consumers, when an abnormality occurs in the power supply from the system 40 such as a power failure, the range including the consumer A20 is abnormal. You can see if it is occurring.
  • the power storage device 27 is provided to temporarily store surplus power that cannot be consumed by the load 24 among the power generated by the solar panel 21 and the wind power generation device 23. Thereby, even when the amount of power consumed by the load 24 is small during the daytime when power is generated by the solar panel 21 and the wind power generator 23, the surplus power is stored in the power storage device 27, thereby generating the generated power. The waste that throws away can be eliminated.
  • the stored power sensor 27 a is connected to the power storage device 27 and measures the amount of power stored in the power storage device 27. Then, the power sensor 27a for stored power transmits a measurement result (charged amount) to the EMS 26.
  • the switching units 28 and 29 are provided on a distribution line that connects between the consumer A20 and the distribution network O connected to the grid 40, and on a power distribution line between the consumers A20 and B30 that belong to the same consumer group. ing.
  • the switching unit 28 is a connection switching unit that switches the connection between the grid 40 and the distribution board 25 of the customer A20, and is controlled to be turned off when the customer A20 wants to cut off the power supply from the grid 40.
  • the switching unit 29 is switched so as to be turned on in a time zone in which power is excessively supplied in the consumer group. Thereby, the path
  • the consumer A20 switches the side that desires the supply of surplus power from the outside and the side that supplies the surplus power to the outside for each predetermined time period. For this reason, in the consumer A20, the power consumption amount by the load 24 is larger and smaller than the total amount of the power generation amount by the solar panel 21 and the wind power generation device 23 and the power storage amount of the power storage device 27. And exist.
  • the customer B30 transmits information on the power supply / demand situation of the customer B30 for each predetermined time zone to the power supply control system 10 via an EMS (Energy Management System) 36.
  • the consumer B 30 includes a binary power generation device (power supply device) 31, an electric vehicle (power supply device) 32, an electric vehicle power sensor 32 a, a load 34, a load power sensor 34 a, a minute
  • An electrical panel 35, an EMS 36, a power status acquisition unit 36a, and a switching unit 37 are provided.
  • the binary power generation device (power supply device) 31 is a power generation device mainly using a heat source such as water of about 100 ° C., and is installed in the site of the customer B30.
  • the binary power generation device 31 stores electricity by converting electricity generated by solar thermal power generation or solar power generation into heat by a heat pump. Therefore, the amount of heat stored in the binary power generator 31 varies depending on the weather. For this reason, the electric power generation amount by the binary power generation device 31 can be predicted based on the information regarding the sunshine hours of the weather forecast.
  • the generated power sensor 31 a is connected to the binary power generator 31 and measures the amount of power generated by the binary power generator 31. Then, the generated power sensor 31a transmits the measurement result (power generation amount) to the EMS 36.
  • the electric vehicle 32 is a kind of power supply device owned by the customer B30, and supplies the power amount of the battery to be mounted via the distribution board 35. The electric vehicle 32 is not a power supply device but a kind of load 34 when charging the on-board battery.
  • the electric vehicle power sensor 32 a is connected to the electric vehicle 32 and measures electric power supplied from a battery mounted on the electric vehicle 32.
  • the electric vehicle power sensor 32a transmits the measurement result (amount of supplied power) to the EMS 36.
  • the load 34 is a power consumer such as an air conditioner, lighting, television (TV), refrigerator, etc. in a general household, equipment in a factory, air conditioner, etc.
  • the electric power generated by the binary power generator 31 and the electric power supplied from the electric vehicle 32 are consumed.
  • the load power sensor 34 a is connected to the load 34 and measures the amount of power consumed by the load 34. Then, the load power sensor 34 a transmits a measurement result (power consumption amount) to the EMS 36.
  • the distribution board 35 is connected to a power sensor 31a for generated power, a power sensor 32a for an electric vehicle, and a power sensor 34a for a load.
  • the distribution board 35 supplies the power generated by the binary power generation device 31 and the power supplied from the electric vehicle 32 to the load 34.
  • the distribution board 35 supplies the surplus power generated according to the time zone to the customer A20 or the system 40 via the switching units 37, 29 and the like. Thereby, consumer B30 can sell surplus electric power with respect to consumer A20 or electric power company which belongs to the same consumer group.
  • the EMS (Energy Management System) 36 is an energy management system provided to reduce the power consumption in the customer B30. As shown in FIG. 1, each sensor 31a, 32a, 34a is used. Connected with. Further, the EMS 36 efficiently supplies the generated power in the binary power generation device 31 and the power supplied from the electric vehicle 32 to the load 34 using the detection results received from the sensors 31a, 32a, and 34a. Thereby, the consumption of the electric power supplied from the system
  • the EMS 36 receives detection results from the respective sensors 31a, 32a, 34a for each predetermined time zone, and also provides information on weather forecasts and data on past power consumption according to the lifestyle pattern of the customer B30.
  • the power status acquisition unit 36a is provided in the EMS 36, and acquires information related to the supply status of power supplied from the power company to the customer B30 via the grid 40.
  • the power status acquisition unit 36a monitors the status of the power supplied from the distribution network O connected to the grid 40, and detects, for example, that the power outage or the power supply has become tight. . Then, the power status acquisition unit 36a transmits the detection result to the power supply control system 10 (power status acquisition unit 11).
  • the switching unit 37 is provided on a distribution line for power supplied from the distribution network O connected to the grid 40.
  • the switching unit 37 is connection switching means for switching the connection between the system 40 and the distribution board 35 of the customer B30, and is turned off when the customer B30 wants to disconnect the power supply from the system 40. Be controlled.
  • the customer B30 switches the side that desires the supply of surplus power from the outside and the side that supplies the surplus power to the outside for each predetermined time period. For this reason, in the consumer B30, a time zone in which the power consumption amount by the load 34 is larger and a smaller time period than the total amount of the power generated by the binary power generation device 31 and the storage amount of the battery mounted on the electric vehicle 32. It is assumed that there is a belt.
  • the power supply control system 10 of the present embodiment is provided in order to exchange surplus power between consumers according to the supply status of power from the system 40 to the consumers A20 and B30.
  • the electric power supply control system 10 is provided with the electric power condition acquisition part 11, the electric energy information acquisition part 12, the electric power supply-and-demand prediction part 13, the matching part 14, the memory
  • the power status acquisition unit 11 acquires information related to the supply status of power supplied from the grid 40 in the same manner as the power status acquisition units 26a and 36a provided to the customer A20 and the customer B30, respectively.
  • the power status acquisition units 26a and 36a respectively provided in the customer A20 and the customer B30 are provided for detecting the power supply status for each customer A20 and the customer B30 from the system 40. It has been.
  • the power status acquisition unit 11 acquires information on the power supply status from the grid 40 in a plurality of consumers, and detects the ranges of the distribution networks O, M, etc. in which a power failure or the like has occurred.
  • the power amount information acquisition unit 12 acquires information on the power supply / demand status of each customer from the EMS 26 of the customer A 20 and the EMS 36 of the customer B 30 via the power status acquisition unit 11. To do. As shown in FIG. 1, the power supply and demand prediction unit 13 generates power for each predetermined time period within a consumer group including the consumer A20 and the consumer B30 based on the information acquired by the power amount information acquisition unit 12. Predict the supply and demand situation.
  • the power supply / demand prediction unit 13 can predict the power supply amount for each predetermined time period.
  • the demand information acquired by the power amount information acquisition unit 12 includes data on the power consumption amount that varies depending on the types of loads 24 and 34 owned by the consumers A20 and B30, and lifestyle patterns.
  • the power supply and demand prediction unit 13 can predict the power consumption for each predetermined time period.
  • the matching unit 14 uses the information acquired by the power amount information acquisition unit 12 and the prediction result of the power supply / demand prediction unit 13 to generate a surplus power at every predetermined time and a consumer who needs power supply. And combine. More specifically, the matching unit 14 collates the necessary power amount for each consumer with the surplus power amount generated during the time period, and the conditions such as the supply date and time, the power amount, the compensation for the supply, and the like match. Detect consumer combinations.
  • the combination of a plurality of consumers detected by the matching unit 14 is not limited to one set, and when there are a plurality of combinations that satisfy the condition, a combination of a plurality of consumers may be detected as a candidate. Then, when there are a plurality of combinations that satisfy the condition, the matching unit 14 narrows down the final combinations by adding conditions such as consideration for surplus power supply and loss during power transmission.
  • the storage unit 15 acquires the information acquired in the power amount information acquisition unit 12 and the prediction result in the power supply and demand prediction unit 13, acquires the matching result in the matching unit 14, and stores these information.
  • the control unit 16 detects the power supply status for each customer A20, B30 from the system 40 based on various information stored in the storage unit 15, and in the customer group including the customer A20 and the customer B30. A time zone in which power is excessively supplied is detected. And the control part 16 ensures the supply path which supplies electric power from the consumer of a supply source to the consumer of a supply destination in the time slot
  • step S11 the power status acquisition unit 11 acquires information regarding the power supply status from the grid 40 for each of the customer A20 and the customer B30.
  • the power status acquisition unit 11 acquires information on a power system (electric power company) that supplies power via the system 40, a distribution network, a customer, and a power supply status.
  • a power system electric power company
  • the electric power supplied with respect to consumers A20 and B30 via the distribution network O from T electric power is in a supply stop state.
  • the power supply status supplied from the same T power via the distribution network M is normal.
  • step S ⁇ b> 12 information regarding the power supply acquired by the power status acquisition unit 11 is stored in the storage unit 15.
  • step S13 whether or not the power supply from the grid 40 to each of the consumers A20 and B30 is stopped based on the information regarding the power supply acquired by the power status acquisition unit 11 (whether power supply ⁇ 0). Or not).
  • step S14 when the power supply from the grid 40 is stopped (for example, a power failure), the process proceeds to step S14.
  • the power supply from the system 40 is in a normal state, the control is terminated.
  • step S14 since the power supply from the grid 40 is stopped in step S13, the power amount information acquisition unit 12 acquires information on the power supply amount for each of the consumers A20 and B30.
  • the electric energy information acquisition unit 12 is owned by the consumers A20 and B30 and the consumers A20 and B30 belonging to the distribution network O in a state where the power supply from the system 40 is stopped.
  • Information such as the type of power supply device and a predicted value of the amount of power that can be supplied for each predetermined time period is acquired.
  • the customer A20 belonging to the power distribution network O information on the amount of power 5 kwh that can be supplied from the wind power generator 23 in the time zone from 12:00 to 13:00 on 2015/10/30 is acquired. Further, in the customer A20 belonging to the power distribution network O, the information about the amount of power 5 kwh that can be supplied from the power storage device 27 in the time period from 7:00 to 8:00 on 2015/10/30 is acquired.
  • the binary power generation apparatus 31 acquires information on the amount of power 5 kwh that can be supplied in the time zone from 7:00 to 8:00 on 2015/10/30.
  • information on the amount of power 5 kwh that can be supplied from the electric vehicle 32 in the time zone from 12:00 to 13:00 on 2015/10/30 is acquired.
  • step S15 the power supply and demand prediction unit 13 acquires information necessary for power demand prediction for each of the consumers A20 and B30, and predicts power demand for each predetermined time period. Specifically, as shown in FIG. 6, the power supply and demand prediction unit 13 uses the consumers A20 and B30 belonging to the distribution network O, the types of loads owned by the consumers A20 and B30, and the consumption due to the load for each predetermined time period. Obtain information such as the predicted value of electric energy.
  • step S ⁇ b> 16 the control unit 16 is configured to supply power from the consumer that generates surplus power to the consumer that lacks power, based on the power supply and demand prediction result for each of the consumers A ⁇ b> 20 and B ⁇ b> 30. Determine the power supply source and destination.
  • the control unit 16 based on the power supply prediction illustrated in FIG. 5 and the power demand prediction illustrated in FIG. 6, as illustrated in FIG. 7, the surplus power supply source, the supply destination, and the power supply
  • the type of device, the amount of power supplied, a predetermined time zone, etc. are determined.
  • the customer A20 owns the customer B20 as the supply destination from the customer A20 as the supply destination in the time zone from 7:00 to 8:00 on 2015/10/30.
  • From the power storage device 27, 5 kwh of surplus power is supplied.
  • the electric vehicle 32 owned by the customer B30 is supplied from the customer B30 as the supply source to the customer A20 as the supply destination. Surplus power of 5 kwh is supplied.
  • the supply source and supply A previous consumer can be determined for each predetermined time period.
  • step S ⁇ b> 17 information regarding the surplus power supply source, the supply destination, and the predetermined time period illustrated in FIG. 7 is stored in the storage unit 15. ⁇ Selection of consumers as suppliers and suppliers>
  • surplus power is accommodated in a consumer group including a plurality of consumers even when an abnormality occurs in the power supply from the grid 40 according to the flowchart shown in FIG. .
  • step S21 it is determined in the consumer A20 whether or not there is power consumption by the load 24 every predetermined time period.
  • the load 24 it progresses to step S22, and when it does not exist, it progresses to step S30.
  • step S22 the power consumption by the load 24 owned by the consumer A20 is compared with the power supply amount (power generation amount + power storage amount) by the power supply device to determine whether the power supply amount is greater. Determine. If the power supply amount is larger than the power consumption amount, the process proceeds to step S25. If the power supply amount is smaller than the power consumption amount, the process proceeds to step S23. Next, in step S23, since the power supply amount is smaller than the power consumption amount, it is determined that no surplus power is generated in the customer A20.
  • step S24 all the electric power secured in the consumer A20 is set to be supplied into the house (the consumer A20), and the process is terminated.
  • step S25 as a result of the determination in step S22 and step S30, it is determined that there is surplus power in the customer A20.
  • step S ⁇ b> 26 it is determined whether there is another customer that can supply surplus power generated in the customer A ⁇ b> 20. If the supply destination exists, the process proceeds to step S27. If the supply destination does not exist, the process proceeds to step S29.
  • step S27 since there is another consumer as a supply destination of surplus power, a consumer B30 as a supply destination is determined.
  • priorities are assigned based on predetermined conditions to determine supply destinations. Specific conditions may be set in advance so as to preferentially select consumers such as hospitals, relatives, and friends.
  • step S28 when surplus power is supplied to the customer B30, it is determined whether or not the power storage device 27 still has a power storage amount.
  • the process returns to step S26 again to enter a flow for searching for a supply destination.
  • surplus power is supplied to the consumer B30, if it is determined that there is no power storage amount, the process proceeds to step S29.
  • step S29 since it is determined in step S26 that there is no surplus power supply destination, the surplus power supply destination is set to the power storage device 27 owned by the home (customer A20), and the process is terminated.
  • step S30 since there is no power consumption by the load 24 in the consumer A20, it is determined whether or not there is an amount of power supplied by the power supply device owned by the consumer A20. If there is a power supply amount, the process proceeds to step S25. If there is no power supply amount, the process proceeds to step S31. Next, in step S31, since there is no nighttime power supply to the power supply device in the consumer A20, it is determined that no surplus power is generated in the consumer A20, and the process is terminated.
  • the above information may be acquired via electronic terminals 129 and 139. That is, at least part of the information regarding the power supply status and supply / demand information of each customer A120, B130 may be directly input by the customer A120, B130 via the electronic terminals 129, 139.
  • the electronic terminals 129, 139, PCs, tablet terminals, smartphones, mobile phones, etc. owned by the consumers A120, B130 can be used.
  • the electronic terminal does not need to be installed in each consumer, and may constitute a consumer group including a consumer in which the electronic terminal is installed and a consumer in which the electronic terminal is not installed. In this case, it is only necessary to acquire necessary information from the EMS for the customer in which the electronic terminal is not installed as in the above embodiment.
  • the present invention is not limited to this.
  • the power status acquisition unit 11 is provided only in the power supply control system 10 without providing the power status acquisition unit in the EMSs 226 and 236 of the customer A220 and the customer B230. May be. Even in this case, by obtaining the power supply status from the grid 40 from the EMSs 226 and 236 of the respective consumers A220 and B230, it is possible to obtain the same effect as in the above embodiment.
  • the power status acquisition unit 26 a may be provided only for the consumer A ⁇ b> 20 among the plurality of consumers. Or the structure by which the electric power condition acquisition part 36a was provided only in consumer B30 among several consumers may be sufficient.
  • a power supply control system 310 may be provided in which power status acquisition units 26 a and 36 a are provided on the side of a plurality of consumers (customer A20 and customer B30).
  • the power supply status from the grid 40 acquired by each customer may be received by the power amount information acquisition unit 12 and stored in the storage unit 15.
  • the control part 16 switches switching part 28,29,37,41 so that surplus electric power can be interchanged according to the supply condition of the electric power from the system
  • the power supply status from the system has been described by taking as an example the occurrence of a power failure when the power supply from the system is stopped.
  • the present invention is not limited to this.
  • the present invention May be implemented.
  • the present invention is not limited to this.
  • the present invention may be implemented by predicting the power supply status from the grid in a predetermined time zone in the future. .
  • the power supply control system of the present invention produces an effect that surplus power can be effectively utilized among a plurality of consumers in accordance with the power supply status from the grid.
  • the present invention can be widely applied in communities including consumer groups that own supply devices.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

電力供給制御システム(10)は、電力状況取得部(11)、電力量情報取得部(12)、電力需給予測部(13)、制御部(16)を備えている。電力状況取得部(11)は、系統(40)から需要家(A20,B30)に対する電力の供給状況情報を取得する。電力量情報取得部(12)は、需要家(A20,B30)ごとの電力供給装置による電力供給量情報を取得する。電力需給予測部(13)は、電力量情報取得部(12)で取得された情報に基づいて、需要家(A20,B30)ごとの電力の需給状況を予測する。制御部(16)は、電力状況取得部(11)、電力量情報取得部(12)において取得された情報と電力需給予測部(13)における予測結果とに基づいて、需要家(A20,B30)間における余剰電力の供給元と供給先を決定する。

Description

電力供給制御システム、電力供給制御方法および電力供給制御プログラム
 本発明は、例えば、停電発生時等のように電力供給状況が逼迫した状況において、複数の需要家間における余剰電力の供給を制御する電力供給制御システム、電力供給制御方法および電力供給制御プログラムに関する。
 近年、再生可能エネルギーを利用して発電する発電電力装置(例えば、太陽光発電装置)が活用されている。わが国においては、余剰電力買い取り制度が制定されているため、太陽光発電装置や風力発電電装置等で発電された電力を電力会社に売ることができる。
 一方、発電した電力を電力会社に売ることができない場合がある。例えば、電力会社が買い取り可能な所定の電力量を超えた場合(以下:出力抑制と示す。)等である。このため、需要家は、売却できなかった電力を一時貯めることが可能な蓄電池を用いることがある。
 しかしながら、蓄電池の残電池容量に対して、発電装置で発電される電力量が多い場合には、発電装置において発電された電力を捨てなければならない場合がある。
 例えば、特許文献1には、電力エネルギーをヘッダ情報に付した電力パケットにより配送することにより、需要家と需要家との間においてエンドツーエンドに供給と需給ができる電力パケットシステムについて開示されている。
特開2011-142771号公報
 しかしながら、上記従来の電力パケットシステムでは、以下に示すような問題点を有している。
 すなわち、上記公報に開示された電力パケットシステムでは、例えば、停電時等のように、系統からの電力供給が逼迫した状況になった際に、複数の需要家間において余剰電力が発生している場合でも、この余剰電力を有効に活用することについて何ら考慮されていない。
 本発明の課題は、系統からの電力の供給状況に応じて、複数の需要家間において余剰電力を有効に活用することが可能な電力供給制御システム、電力供給制御方法および電力供給制御プログラムを提供することにある。
(課題を解決するための手段)
 第1の発明に係る電力供給制御システムは、電力供給装置を所有する複数の需要家間において余剰電力を融通し合う電力供給制御システムであって、電力状況取得部と、電力量情報取得部と、電力需給予測部と、制御部と、を備えている。電力状況取得部は、系統から複数の需要家に対する電力の供給状況に関する情報を取得する。電力量情報取得部は、複数の需要家ごとの電力供給装置による電力供給量に関する情報を取得する。電力需給予測部は、電力量情報取得部において取得された情報に基づいて、複数の需要家ごとの電力の需給状況を予測する。制御部は、電力状況取得部および電力量情報取得部において取得された情報と電力需給予測部における予測結果とに基づいて、複数の需要家の間における余剰電力の供給元と供給先とを決定する。
 ここでは、系統から各需要家への電力の供給状況を検出し、電力の供給状況が逼迫した状況である場合には、電力供給装置を所有する需要家を含む需要家群において余剰電力が発生した需要家(供給元)から電力を必要とする需要家(供給先)に対して、電力供給を行う。
 ここで、系統からの電力の供給状況が逼迫した状況には、例えば、系統からの電力供給が停止される停電時、夏季に空調装置の稼働等によって電力供給量に対して電力需要量が上回った状況等が含まれる。
 また、複数の需要家を含む需要家群は、電力供給装置を所有している需要家を少なくとも1つ含んでいればよく、電力供給装置を所有していない需要家を含んでいてもよい。また、需要家群は、2つ以上の需要家を含むグループであって、配電線によって各需要家間が接続されている。
 なお、需要家が所有する電力供給装置としては、例えば、太陽光発電装置、風力発電装置、地熱発電装置等の再生可能エネルギーを活用した発電装置、発電機、バイナリー発電装置、電気自動車、蓄電装置等が含まれる。
 電力状況取得部において取得される情報には、停電の発生、系統からの電力の供給量に対する需要量のバランス、その予想等、系統からの電力供給に関する情報全般が含まれる。
 電力需給予測部では、需要家が所有する電力供給装置に関する情報(例えば、発電量、蓄電量等)および需要家における消費電力量に関する情報に基づいて、電力供給装置による供給電力量の総和量と負荷による消費電力量の総和量とを比較することで、各需要家における電力の需要と供給のバランスを予測する。
 制御部は、電力会社から電力が供給される系統からの電力供給状況、および電力需給予測部における予測結果に基づいて、余剰電力が発生する需要家から電力を必要とする需要家へ電力が供給されるように、供給元となる需要家供給先となる需要家とを設定する。
 これにより、複数の需要家を含む需要家群において、系統からの電力の供給状況が逼迫している場合には、余剰電力が生じた需要家から電力を必要とする需要家へ電力が供給されるように制御することができる。
 この結果、系統からの電力供給が逼迫する状況が発生した場合でも、需要家群内において、電力の供給側となる需要家から需要側となる需要家に対して、余剰電力を供給することで、余剰電力を有効に活用することができる。
 第2の発明に係る電力供給制御システムは、第1の発明に係る電力供給制御システムであって、電力状況取得部は、系統からの電力供給が停止した停電に関する情報を取得する。
 ここでは、系統からの電力供給状況として、系統からの電力供給が停止される停電発生時を想定している。
 これにより、停電によって系統からの電力供給が停止された際に、需要家群内において余剰電力が生じている場合には、電力を必要とする需要家に対して、余剰電力が発生した需要家から電力を供給することができる。この結果、複数の需要家を含む需要家群内において生じた余剰電力を有効に活用することができる。
 第3の発明に係る電力供給制御システムは、第1または第2の発明に係る電力供給制御システムであって、制御部は、電力状況取得部が系統からの電力供給が停止したとの情報を取得すると、複数の需要家の間における余剰電力の供給元と供給先とを決定する。
 ここでは、電力状況取得部が系統からの電力供給が停止したとの情報(停電情報)を取得した場合には、制御部が、需要家間において余剰電力の融通を行うように制御を行う。
 これにより、系統からの電力供給が停止する停電発生時においても、需要家間において生じた余剰電力を融通し合うことができる。
 第4の発明に係る電力供給制御システムは、第1から第3の発明のいずれか1つに係る電力供給制御システムであって、電力状況取得部は、複数の需要家に対する電力の供給状況に関する情報を、各需要家から取得する。
 ここでは、電力の供給状況は、各需要家からそれぞれ取得される。
 これにより、例えば、停電発生時には、停電が発生した配電網に属する需要家から直接、停電に関する情報を取得することで、同じ配電網に属する需要家においても停電が発生していることを推定することができる。
 この結果、例えば、停電が発生した地区の需要家における個々の電力需給状況を予測して、需要量が供給量を上回る需要家に対して、余剰電力が生じる需要家から電力を供給することができる。
 第5の発明に係る電力供給制御システムは、第1から第4の発明のいずれか1つに係る電力供給制御システムであって、複数の需要家には、第1の需要家と第2の需要家とが含まれている。電力供給制御システムは、電力需給予測部の予測結果に基づいて、第1の需要家における電力の需要条件と、第2の需要家における電力の供給条件とをマッチングするマッチング部を、さらに備えている。
 ここでは、電力需給予測部の予測結果に基づいて、第1の需要家における需要条件と第2の需要家における供給条件とを照合して、所定時間帯において余剰電力を必要とする第1の需要家(供給先)と、当該時間帯に余剰電力が発生する第2の需要家(供給元)との組合せを検出する。
 なお、マッチング部において検出される第1の需要家と第2の需要家の組み合わせは、1つであってもよいし、複数であってもよい。
 これにより、系統からの電力供給が逼迫した状況において、第2の需要家において余剰電力が発生する場合には、第1の需要家における需要条件と第2の需要家における供給可能条件を照合して、適切な組合せをマッチングすることができる。
 よって、系統からの電力供給が逼迫した状況下において、第2の需要家において発生した余剰電力を、複数の需要家間において有効に活用することができる。この結果、電力供給装置を所有する複数の需要家間において効率的に余剰電力を融通し合うことができる。
 第6の発明に係る電力供給制御システムは、第5の発明に係る電力供給制御システムであって、第1の需要家における電力の需要条件には、電力供給装置の種類、必要な電力量、日時、時間帯、場所、電力の単価、対価のうちの少なくとも1つが含まれる。
 ここでは、第1の需要家における電力の需要条件は、第1の需要家が受け取りを希望する電力供給装置の種類、必要電力量、受取希望日時、時間帯、場所、電力の単価、対価等の情報を含む。
 これにより、第1の需要家において必要な電力量だけでなく、第2の需要家から余剰電力を受け取る電力供給装置の種類(例えば、太陽光発電装置等)、希望日時、時間帯、第2の需要家の場所、余剰電力の単価、対価に関する情報を用いて、最適な第2の需要家とのマッチングを行うことができる。
 第7の発明に係る電力供給制御システムは、第5または第6の発明に係る電力供給制御システムであって、第2の需要家における電力の供給条件には、負荷の種類、供給可能な電力量、日時、時間帯、場所、電力の単価、対価のうちの少なくとも1つが含まれる。
 ここでは、第2の需要家における電力の供給条件は、第1の需要家が所有する負荷の種類、第2の需要家が供給可能な電力量、供給希望日時、時間帯、場所、電力の単価、対価等の情報を含む。
 これにより、第2の需要家において供給可能な余剰電力量だけでなく、第1の需要家が所有する負荷の種類、第1の需要家へ余剰電力を供給可能な日時、時間帯、第1の需要家の場所、余剰電力の単価、対価に関する情報を用いて、最適な第1の需要家とのマッチングを行うことができる。
 第8の発明に係る電力供給制御システムは、第5から第7の発明のいずれか1つに係る電力供給制御システムであって、需要条件と供給条件とを保存する記憶部を、さらに備えている。
 ここでは、第1の需要家の需要条件と第2の需要家の供給条件とを、システム内に設けられた記憶部に保存する。
 これにより、例えば、所定時間経過ごとに、記憶部に保存された各種情報を用いて、第1の需要家と第2の需要家とを組み合わせを検出して、電力融通のマッチングを行うことができる。
 第9の発明に係る電力供給制御システムは、第5から第8の発明のいずれか1つに係る電力供給制御システムであって、需要条件は、第1の需要家によって入力される。
 ここでは、第1の需要家によって入力された電力の需要条件を用いて、電力需給予測部が電力需給を予測する。
 これにより、例えば、PC(Personal Computer)やスマートフォン等の電子端末を用いて第1の需要家から直接入力された需要条件を用いて、第1の需要家における電力需給を予測することができる。
 第10の発明に係る電力供給制御システムは、第5から第9の発明のいずれか1つに係る電力供給制御システムであって、供給条件は、第2の需要家によって入力される。
 ここでは、余剰電力の供給条件として、電力供給装置に関する情報が、第2の需要家によって入力される。
 なお、入力される電力供給装置に関する情報としては、電力供給装置の種類、発電能力、天気予報に基づく推定発電量、蓄電装置の蓄電量、蓄電池の満充電容量等の情報が含まれる。
 これにより、例えば、PC(Personal Computer)やスマートフォン等の電子端末を用いて第2の需要家から直接入力された電力供給装置に関する情報を用いて、第2の需要家における電力需給を予測することができる。
 第11の発明に係る電力供給制御システムは、第1から第4の発明のいずれか1つに係る電力供給制御システムであって、制御部は、所定の優先順位に基づいて、複数の需要家の間における余剰電力の供給元と供給先とを決定する。
 ここでは、余剰電力の供給先として複数の需要家が存在する場合には、所定の条件に基づいて優先順位を付けて、供給先を決定する。
 具体的な条件としては、病院等の公共機関、親族、友人等の需要家を優先的に選択するように予め条件設定されていればよい。
 これにより、病院等の公共機関や親族、友人、知人等の需要家を優先的に選択して、余剰電力を供給することができる。
 第12の発明に係る電力供給制御システムは、第11の発明に係る電力供給制御システムであって、所定の優先順位に関する情報を保存する記憶部を、さらに備えている。
 ここでは、余剰電力の供給先を決定する際に用いられる所定の優先順位に関する情報を、システム内に設けられた記憶部に保存する。
 これにより、例えば、予め記憶部に保存された優先順位に関する情報を用いて、病院等の公共機関に優先的に余剰電力を供給することができる。
 第13の発明に係る電力供給制御システムは、第1から第12の発明のいずれか1つに係る電力供給制御システムであって、電力需給予測部は、天気予報の情報を用いて、所定時間帯における電力供給装置に含まれる発電装置による発電量を予測する。
 ここでは、電力需給予測部において、天気予報に関する情報を用いて電力供給装置(発電装置)における発電量を予測する。
 これにより、例えば、電力供給装置が太陽光発電装置の場合には、天気予報の日照時間の情報を用いて、太陽光発電装置による発電量を予測することができる。また、例えば、電力供給装置が風力発電装置の場合には、天気予報の風速の情報を用いて、風力発電装置による発電量を予測することができる。
 第14の発明に係る電力供給制御システムは、第1から第13の発明のいずれか1つに係る電力供給制御システムであって、電力需給予測部は、電力供給装置に含まれる蓄電装置の現在の蓄電量を用いて、所定時間帯における蓄電装置の蓄電量を予測する。
 ここでは、電力需給予測部における需給予測に、現在の蓄電装置の蓄電量を用いる。
 これにより、例えば、所定時間帯における需要家ごとの電力供給装置の発電量、消費電力量の推定値とともに、現在の蓄電池の蓄電量を用いて、所定時間帯における需要家ごとの電力需給を予測することができる。
 第15の発明に係る電力供給制御システムは、第1から第14の発明のいずれか1つに係る電力供給制御システムであって、電力需給予測部は、複数の需要家の過去の生活パターンに応じた消費電力量を記録したデータに基づいて、複数の需要家における消費電力量を推定する。
 ここでは、電力需給予測部における消費電力量の推定に、複数の需要家ごとの生活パターンに応じた消費電力量を記録したデータを用いる。
 これにより、例えば、ある需要家が日中よりも夜間の消費電力量が多い生活パターンの場合には、太陽光発電装置による発電量が多く、消費電力量が少ない日中の時間帯に余剰電力が生じる可能性が高いことが分かる。よって、需要家ごとに余剰電力が生じやすい時間帯を検出して、消費電力量の推定精度を向上させることができる。
 第16の発明に係る電力供給制御方法は、電力供給装置を所有する複数の需要家間において余剰電力を融通し合う電力供給制御方法であって、電力状況取得ステップと、電力量情報取得ステップと、電力需給予測ステップと、制御ステップと、を備えている。電力状況取得ステップは、系統から複数の需要家に対する電力の供給状況に関する情報を取得する。電力量情報取得ステップは、複数の需要家ごとの電力供給装置による電力供給量に関する情報を取得する。電力需給予測ステップは、電力量情報取得ステップにおいて取得された情報に基づいて、複数の需要家ごとの電力の需給状況を予測する。制御ステップは、電力状況取得ステップおよび電力量情報取得ステップにおいて取得された情報と電力需給予測ステップにおける予測結果とに基づいて、複数の需要家の間における余剰電力の供給元と供給先とを決定する。
 ここでは、系統から各需要家への電力の供給状況を検出し、電力の供給状況が逼迫した状況である場合には、電力供給装置を所有する需要家を含む需要家群において余剰電力が発生した需要家(供給元)から電力を必要とする需要家(供給先)に対して、電力供給を行う。
 ここで、系統からの電力の供給状況が逼迫した状況には、例えば、系統からの電力供給が停止される停電時、夏季に空調装置の稼働等によって電力供給量に対して電力需要量が上回った状況等が含まれる。
 また、複数の需要家を含む需要家群は、電力供給装置を所有している需要家を少なくとも1つ含んでいればよく、電力供給装置を所有していない需要家を含んでいてもよい。また、需要家群は、2つ以上の需要家を含むグループであって、配電線によって各需要家間が接続されている。
 なお、需要家が所有する電力供給装置としては、例えば、太陽光発電装置、風力発電装置、地熱発電装置等の再生可能エネルギーを活用した発電装置、発電機、バイナリー発電装置、電気自動車、蓄電装置等が含まれる。
 電力状況取得ステップにおいて取得される情報には、停電の発生、系統からの電力の供給量に対する需要量のバランス、その予想等、系統からの電力供給に関する情報全般が含まれる。
 電力需給予測ステップでは、需要家が所有する電力供給装置に関する情報(例えば、発電量、蓄電量等)および需要家における消費電力量に関する情報に基づいて、電力供給装置による供給電力量の総和量と負荷による消費電力量の総和量とを比較することで、各需要家における電力の需要と供給のバランスを予測する。
 制御ステップは、電力会社から電力が供給される系統からの電力供給状況、および電力需給予測ステップにおける予測結果に基づいて、余剰電力が発生する需要家から電力を必要とする需要家へ電力が供給されるように、供給元となる需要家供給先となる需要家とを設定する。
 これにより、複数の需要家を含む需要家群において、系統からの電力の供給状況が逼迫している場合には、余剰電力が生じた需要家から電力を必要とする需要家へ電力が供給されるように制御することができる。
 この結果、系統からの電力供給が逼迫する状況が発生した場合でも、需要家群内において、電力の供給側となる需要家から需要側となる需要家に対して、余剰電力を供給することで、余剰電力を有効に活用することができる。
 第17の発明に係る電力供給制御プログラムは、電力供給装置を所有する複数の需要家間において余剰電力を融通し合う電力供給制御プログラムであって、電力状況取得ステップと、電力量情報取得ステップと、電力需給予測ステップと、制御ステップと、を備えた電力供給制御方法をコンピュータに実行させる。電力状況取得ステップは、系統から複数の需要家に対する電力の供給状況に関する情報を取得する。電力量情報取得ステップは、複数の需要家ごとの電力供給装置による電力供給量に関する情報を取得する。電力需給予測ステップは、電力量情報取得ステップにおいて取得された情報に基づいて、複数の需要家ごとの電力の需給状況を予測する。制御ステップは、電力状況取得ステップおよび電力量情報取得ステップにおいて取得された情報と電力需給予測ステップにおける予測結果とに基づいて、複数の需要家の間における余剰電力の供給元と供給先とを決定する。
 ここでは、系統から各需要家への電力の供給状況を検出し、電力の供給状況が逼迫した状況である場合には、電力供給装置を所有する需要家を含む需要家群において余剰電力が発生した需要家(供給元)から電力を必要とする需要家(供給先)に対して、電力供給を行う。
 ここで、系統からの電力の供給状況が逼迫した状況には、例えば、系統からの電力供給が停止される停電時、夏季に空調装置の稼働等によって電力供給量に対して電力需要量が上回った状況等が含まれる。
 また、複数の需要家を含む需要家群は、電力供給装置を所有している需要家を少なくとも1つ含んでいればよく、電力供給装置を所有していない需要家を含んでいてもよい。また、需要家群は、2つ以上の需要家を含むグループであって、配電線によって各需要家間が接続されている。
 なお、需要家が所有する電力供給装置としては、例えば、太陽光発電装置、風力発電装置、地熱発電装置等の再生可能エネルギーを活用した発電装置、発電機、バイナリー発電装置、電気自動車、蓄電装置等が含まれる。
 電力状況取得ステップにおいて取得される情報には、停電の発生、系統からの電力の供給量に対する需要量のバランス、その予想等、系統からの電力供給に関する情報全般が含まれる。
 電力需給予測ステップでは、需要家が所有する電力供給装置に関する情報(例えば、発電量、蓄電量等)および需要家における消費電力量に関する情報に基づいて、電力供給装置による供給電力量の総和量と負荷による消費電力量の総和量とを比較することで、各需要家における電力の需要と供給のバランスを予測する。
 制御ステップは、電力会社から電力が供給される系統からの電力供給状況、および電力需給予測ステップにおける予測結果に基づいて、余剰電力が発生する需要家から電力を必要とする需要家へ電力が供給されるように、供給元となる需要家供給先となる需要家とを設定する。
 これにより、複数の需要家を含む需要家群において、系統からの電力の供給状況が逼迫している場合には、余剰電力が生じた需要家から電力を必要とする需要家へ電力が供給されるように制御することができる。
 この結果、系統からの電力供給が逼迫する状況が発生した場合でも、需要家群内において、電力の供給側となる需要家から需要側となる需要家に対して、余剰電力を供給することで、余剰電力を有効に活用することができる。
(発明の効果)
 本発明に係る電力供給制御システムによれば、系統からの電力の供給状況に応じて、複数の需要家間において余剰電力を有効に活用することができる。
本発明の一実施形態に係る電力供給制御システムと需要家と系統との接続関係を示すブロック図。 図1の電力供給制御システムによって実行される電力供給制御方法の流れを示すフローチャート。 図1の電力供給制御システムによって実行される電力供給制御方法における余剰電力の供給の流れを示すフローチャート。 図1に示す需要家A,Bを含む需要家群における現時点の系統からの電力供給状況を示す図。 図1に示す需要家A,Bが所有する電力供給装置によって所定時間帯に供給される電力量を示す図。 図1に示す需要家A,Bが所有する負荷によって所定時間帯に消費される電力量を示す図。 図1に示す需要家A,B間において所定時間帯に余剰電力を融通し合う際の電力供給装置、電力供給量、所定時間帯を示す図。 本発明の他の実施形態に係る電力供給制御システムと需要家と系統との接続関係を示すブロック図。 本発明のさらに他の実施形態に係る電力供給制御システムと需要家と系統との接続関係を示すブロック図。 本発明のさらに他の実施形態に係る電力供給制御システムと需要家と系統との接続関係を示すブロック図。 本発明のさらに他の実施形態に係る電力供給制御システムと需要家と系統との接続関係を示すブロック図。
 本発明の一実施形態に係る電力供給制御システムについて、図1~図7を用いて説明すれば以下の通りである。
 ここで、以下の説明において登場する需要家A(第1の需要家、第2の需要家)20は、電力供給装置として、発電装置(ソーラーパネル21、風力発電装置23および蓄電装置27)を所有している。
 また、需要家B(第2の需要家、第1の需要家)30は、電力供給装置として、バイナリー発電装置31と電気自動車32とを所有している。
 なお、本実施形態では、需要家A,Bは、電力を必要とする側と余剰電力を供給する側とが時間帯によって入れ替わるものとする。
 また、需要家とは、例えば、電力会社と契約を結んでおり、電力会社から系統50(図1参照)を介して供給される電力を使用する個人、法人、団体等であって、例えば、一般家庭(戸建て、マンション)、企業(事業所、工場、設備等)、地方自治体、国の機関等が含まれる。なお、需要家には、自家発電によって電力をまかなう需要家、ZEB(Zero Energy Building)を実現した需要家も含まれる。
 また、以下の実施形態では、説明の便宜上、需要家A20、需要家B30を1つずつ挙げて説明している。しかし、本発明では、需要家A20と需要家B30の組合せは、1対1に限定されるものではなく、例えば、1つの需要家A20に対して余剰電力を供給可能な複数の需要家B30が存在していてもよい。
 また、以下の実施形態において、系統40(図1参照)とは、電力会社から供給される電力を各需要家に対して供給する電力系統を意味している。
 さらに、以下の実施形態において、負荷24,34(図1参照)とは、例えば、需要家が一般家庭の場合には、エアコン、照明、冷蔵庫、電力レンジ、IHクッキングヒータ、テレビ等の電力消費体を意味している。また、例えば、需要家が企業(工場等)の場合には、工場内に設置された各種設備、空調設備等の電力消費体を意味している。
 さらに、以下の実施形態において、EMS(Energy Management System)26,36(図1参照)とは、各需要家にそれぞれ設置されており、各需要家における消費電力量を削減するために設けられたシステムを意味している。そして、EMS26,36は、ネットワークを介して電力供給制御システム10と接続されている。
 (実施形態1)
 本実施形態の電力供給制御システム10は、停電時等の系統40からの電力供給が逼迫した状況を検出すると、電力供給装置(発電装置、蓄電装置等)を所有する需要家を含む複数の需要家間において余剰電力を融通し合うために設けられている。そして、電力供給制御システム10は、図1に示すように、複数のスイッチング部28,29,37,41を切り替えながら、需要家A(第1の需要家)20および需要家B(第2の需要家)30との間において余剰電力の融通を行う。
 具体的には、電力供給制御システム10は、系統40から各需要家A20,B30に対する電力供給の状況に関する情報を取得する。そして、電力供給制御システム10は、所定の時間帯ごとに、複数の需要家を含む需要家群内において電力の需給状況を検出し、需給状況に基づいて、複数の需要家間において余剰電力を融通し合う。そして、電力供給制御システム10は、マッチングされた需要家間において、余剰電力が供給されるように、スイッチング部28,29,37を切り替える制御を行う。
 なお、図1に示す各構成をつなぐ実線は、データ等の情報の流れを示しており、一点鎖線は電気の流れを示している。
 また、本実施形態の電力供給制御システム10の構成については、後段において詳述する。
 (需要家A)
 需要家A20は、図1に示すように、EMS(Energy Management System)26を介して、電力供給制御システム10に対して、所定時間帯ごとの需要家A20における系統電力の供給状況および電力の需給状況に関する情報を送信する。そして、需要家A20は、図1に示すように、ソーラーパネル(電力供給装置)21、太陽光発電用電力変換装置(PCS)22、発電電力用電力センサ22a、風力発電装置(電力供給装置)23、風力発電用電力センサ23a、負荷24、負荷用電力センサ24a、分電盤25、EMS26、電力状況取得部26a、蓄電装置27、蓄電電力用電力センサ27a、スイッチング部28、およびスイッチング部29を備えている。
 ソーラーパネル(電力供給装置)21は、太陽光の光エネルギーを用いた光起電力効果を利用して電気を発生させる発電装置であって、需要家A20の屋根等に設置されている。そして、ソーラーパネル21における発電量は、天気予報の日照時間に関する情報に基づいて予測することができる。
 太陽光発電用電力変換装置(PCS(Power Conditioning System))22は、図1に示すように、ソーラーパネル21と接続されており、ソーラーパネル21において発生した直流電流を交流電流に変換する。
 発電電力用電力センサ22aは、図1に示すように、太陽光発電用電力変換装置22に接続されており、ソーラーパネル21において発電した電力量を測定する。そして、発電電力用電力センサ22aは、EMS26に対して測定結果(発電量)を送信する。
 風力発電装置(電力供給装置)23は、自然の風の力を利用して風車を回転させることで電気を発生させる発電装置であって、需要家A20の敷地内等に設置されている。そして、風力発電装置23における発電量は、天気予報の風速に関する情報に基づいて予測することができる。
 風力発電用電力センサ23aは、図1に示すように、風力発電装置23に接続されており、風力発電装置23によって発生した発電量を測定する。そして、風力発電用電力センサ23aは、EMS26に対して測定結果(発電量)を送信する。
 負荷24は、上述したように、一般家庭におけるエアコン、照明、テレビ(TV)、冷蔵庫等の家電製品、工場等における設備、空調装置等の電力消費体であって、系統40から供給される電力、ソーラーパネル21、風力発電装置23によって発生した電力を消費する。
 負荷用電力センサ24aは、図1に示すように、負荷24に接続されており、負荷24によって消費される電力量を測定する。そして、負荷用電力センサ24aは、EMS26に対して測定結果(消費電力量)を送信する。
 分電盤25は、図1に示すように、発電電力用電力センサ22a、風力発電用電力センサ23a、負荷用電力センサ24a、蓄電電力用電力センサ27aと接続されている。そして、分電盤25は、ソーラーパネル21および風力発電装置23において発電した電力、蓄電装置27から供給される電力を、負荷24に対して供給する。さらに、分電盤25は、時間帯によって発生した余剰電力を、スイッチング部28,29等を介して、需要家Bあるいは系統40へ供給する。これにより、需要家A20は、同じ需要家群に所属する需要家Bあるいは電力会社に対して余剰電力を売電することができる。
 EMS(Energy Management System)26は、上述したように、需要家A20における消費電力量を削減するために設けられたエネルギー管理システムであって、図1に示すように、各センサ22a,23a,24a,27aと接続されている。また、EMS26は、各センサ22a,23a,24a,27aから受信した検出結果を用いて、ソーラーパネル21および風力発電装置23における発電電力および蓄電装置27から供給される電力を効率よく負荷24に対して供給する。
 これにより、系統40から供給される電力の消費量を抑制して、需要家A20における電力コストを効果的に削減することができる。さらに、EMS26は、電力供給制御システム10の電力量情報取得部12に対して、需要家A20における所定時間帯ごとの電力の需給状況に関する情報(需要条件、供給条件)を送信する。
 具体的には、EMS26は、所定時間帯ごとの各センサ22a,23a,24a,27aからの検出結果を受信するとともに、天気予報に関する情報および需要家A20の生活パターンに応じた過去の消費電力量に関するデータ等を送信する。
 電力状況取得部26aは、EMS26内に設けられており、電力会社から系統40を介して需要家A20に供給される電力の供給状況に関する情報を取得する。具体的には、電力状況取得部26aは、系統40に接続された配電網Oから供給される電力の状況を監視して、例えば、停電や電力供給が逼迫した状況になったことを検出する。そして、電力状況取得部26aは、検出結果を電力供給制御システム10(電力状況取得部11)へと送信する。
 このように、複数の需要家のそれぞれに電力状況取得部26aを配置したことで、停電のように系統40からの電力供給に異常が発生した場合に、需要家A20を含むどの範囲まで異常が発生しているのかを把握することができる。
 蓄電装置27は、ソーラーパネル21および風力発電装置23において発電した電力のうち、負荷24によって消費しきれなかった余剰電力を一時的に蓄えるために設けられている。これにより、ソーラーパネル21および風力発電装置23によって発電する日中の時間帯において、負荷24による消費電力量が少ない場合でも、余った電力を蓄電装置27へ蓄えておくことで、発電した電力を捨ててしまう無駄を排除できる。
 蓄電電力用電力センサ27aは、図1に示すように、蓄電装置27に接続されており、蓄電装置27において蓄えられている電力量を測定する。そして、蓄電電力用電力センサ27aは、EMS26に対して測定結果(蓄電量)を送信する。
 スイッチング部28,29は、需要家A20と系統40に接続された配電網Oとの間をつなぐ配電線上、同じ需要家群に属する需要家A20,B30の間における電力の配電線上にそれぞれ設けられている。
 スイッチング部28は、系統40と需要家A20の分電盤25との接続を切り替える接続切替手段であって、系統40からの電力供給を需要家A20が切断したい場合にOFFになるように制御される。
 スイッチング部29は、需要家群内において電力供給過剰な時間帯には、ONになるように切り替えられる。これにより、余剰電力が発生した需要家から電力を必要とする他の需要家に対して電力が供給される経路を確保する。
 本実施形態では、需要家A20は、所定時間帯ごとに、外部から余剰電力の供給を希望する側、外部へ余剰電力を供給する側が入れ替わる。このため、需要家A20においては、ソーラーパネル21および風力発電装置23による発電電力量と蓄電装置27の蓄電量の総和量よりも、負荷24による消費電力量の方が大きい時間帯と小さい時間帯とが存在するものとする。
 (需要家B)
 需要家B30は、図1に示すように、EMS(Energy Management System)36を介して、電力供給制御システム10に対して、所定時間帯ごとの需要家B30における電力の需給状況に関する情報を送信する。そして、需要家B30は、図1に示すように、バイナリー発電装置(電力供給装置)31、電気自動車(電力供給装置)32、電気自動車用電力センサ32a、負荷34、負荷用電力センサ34a、分電盤35、EMS36、電力状況取得部36a、スイッチング部37を備えている。
 バイナリー発電装置(電力供給装置)31は、主に100℃程度の水等の熱源を用いた発電装置であって、需要家B30の敷地内に設置されている。バイナリー発電装置31は、太陽熱発電または太陽光発電によって発電した電気をヒートポンプによって熱に変換して蓄熱される。よって、バイナリー発電装置31における蓄熱量は、天気によって変動する。このため、バイナリー発電装置31による発電電力量は、天気予報の日照時間に関する情報に基づいて予測することができる。
 発電電力用電力センサ31aは、図1に示すように、バイナリー発電装置31に接続されており、バイナリー発電装置31において発電した電力量を測定する。そして、発電電力用電力センサ31aは、EMS36に対して測定結果(発電量)を送信する。
 電気自動車32は、需要家B30が所有する電力供給装置の一種であって、搭載するバッテリの電力量を、分電盤35を介して供給する。なお、電気自動車32は、搭載バッテリに充電する際には、電力供給装置ではなく、負荷34の一種となる。
 電気自動車用電力センサ32aは、図1に示すように、電気自動車32に接続されており、電気自動車32に搭載されたバッテリから供給される電力を測定する。そして、電気自動車用電力センサ32aは、EMS36に対して、測定結果(供給電力量)を送信する。
 負荷34は、上述したように、一般家庭におけるエアコン、照明、テレビ(TV)、冷蔵庫等の家電製品、工場等における設備、空調装置等の電力消費体であって、系統40から供給される電力、バイナリー発電装置31によって発生した電力、電気自動車32から供給された電力を消費する。
 負荷用電力センサ34aは、図1に示すように、負荷34に接続されており、負荷34によって消費される電力量を測定する。そして、負荷用電力センサ34aは、EMS36に対して測定結果(消費電力量)を送信する。
 分電盤35は、図1に示すように、発電電力用電力センサ31a、電気自動車用電力センサ32a、負荷用電力センサ34aと接続されている。そして、分電盤35は、バイナリー発電装置31において発電した電力および電気自動車32から供給される電力を、負荷34に対して供給する。さらに、分電盤35は、時間帯によって発生した余剰電力を、スイッチング部37,29等を介して、需要家A20あるいは系統40へと供給する。これにより、需要家B30は、同じ需要家群に所属する需要家A20あるいは電力会社に対して余剰電力を売電することができる。
 EMS(Energy Management System)36は、上述したように、需要家B30における消費電力量を削減するために設けられたエネルギー管理システムであって、図1に示すように、各センサ31a,32a,34aと接続されている。また、EMS36は、各センサ31a,32a,34aから受信した検出結果を用いて、バイナリー発電装置31における発電電力および電気自動車32から供給された電力を効率よく負荷34に対して供給する。これにより、系統40から供給される電力の消費量を抑制して、需要家B30における電力コストを効果的に削減することができる。さらに、EMS36は、電力供給制御システム10の電力量情報取得部12に対して、需要家B30における所定時間帯ごとの電力の需給状況に関する情報(供給条件、需要条件)を送信する。
 具体的には、EMS36は、所定時間帯ごとの各センサ31a,32a,34aからの検出結果を受信するとともに、天気予報に関する情報および需要家B30の生活パターンに応じた過去の消費電力量に関するデータ等を送信する。
 電力状況取得部36aは、EMS36内に設けられており、電力会社から系統40を介して需要家B30に供給される電力の供給状況に関する情報を取得する。具体的には、電力状況取得部36aは、系統40に接続された配電網Oから供給される電力の状況を監視して、例えば、停電や電力供給が逼迫した状況になったことを検出する。そして、電力状況取得部36aは、検出結果を電力供給制御システム10(電力状況取得部11)へと送信する。
 このように、複数の需要家のそれぞれに電力状況取得部36aを配置したことで、停電のように系統40からの電力供給に異常が発生した場合に、需要家B30を含むどの範囲まで異常が発生しているのかを把握することができる。
 スイッチング部37は、系統40に接続された配電網Oから供給される電力の配電線上に設けられている。そして、スイッチング部37は、系統40と需要家B30の分電盤35との接続を切り替える接続切替手段であって、系統40からの電力供給を需要家B30が切断したい場合にOFFになるように制御される。
 本実施形態では、需要家B30は、所定時間帯ごとに、外部から余剰電力の供給を希望する側と、外部へ余剰電力を供給する側とが入れ替わる。このため、需要家B30においては、バイナリー発電装置31による発電電力と電気自動車32に搭載されたバッテリの蓄電量との総和量よりも、負荷34による消費電力量の方が大きい時間帯と小さい時間帯とが存在するものとする。
 (電力供給制御システム10の構成)
 本実施形態の電力供給制御システム10は、系統40から各需要家A20,B30に対する電力の供給状況に応じて、需要家間における余剰電力を融通し合うために設けられている。そして、電力供給制御システム10は、図1に示すように、電力状況取得部11、電力量情報取得部12、電力需給予測部13、マッチング部14、記憶部15、および制御部16を備えている。
 電力状況取得部11は、需要家A20および需要家B30にそれぞれ設けられた電力状況取得部26a,36aと同様に、系統40から供給される電力の供給状況に関する情報を取得する。
 ここで、上述したように、需要家A20および需要家B30にそれぞれ設けられた電力状況取得部26a,36aは、系統40から各需要家A20、需要家B30に対する電力供給状況を検出するために設けられている。これに対して、電力状況取得部11は、複数の需要家における系統40からの電力供給状況に関する情報を取得して、停電等が発生した配電網O,M等の範囲を検出する。
 電力量情報取得部12は、図1に示すように、電力状況取得部11を介して、需要家A20のEMS26および需要家B30のEMS36から、それぞれの需要家における電力の需給状況に関する情報を取得する。
 電力需給予測部13は、図1に示すように、電力量情報取得部12において取得された情報に基づいて、需要家A20および需要家B30を含む需要家群内における所定時間帯ごとの電力の需給状況を予測する。
 ここで、電力量情報取得部12において取得される供給情報としては、ソーラーパネル21、風力発電装置23、バイナリー発電装置31の発電能力、天気予報に関する情報、蓄電装置27の現在の蓄電量、電気自動車32に搭載されたバッテリの電力量等が含まれる。これにより、電力需給予測部13では、所定時間帯ごとの電力供給量を予測することができる。
 一方、電力量情報取得部12において取得される需要情報としては、需要家A20,B30が所有する負荷24,34の種類、生活パターンに応じて変化する消費電力量のデータ等が含まれる。これにより、電力需給予測部13では、所定時間帯ごとの消費電力量を予測することができる。
 マッチング部14は、電力量情報取得部12において取得された情報と電力需給予測部13の予測結果とを用いて、所定時間ごとに余剰電力が発生する需要家と電力供給を必要とする需要家とを組み合わせる。より具体的には、マッチング部14では、各需要家における必要な電力量と、その時間帯に生じる余剰電力量とを照合して、供給日時、電力量、供給に対する対価等の条件が合致する需要家の組合せを検出する。
 なお、マッチング部14によって検出される複数の需要家の組み合わせは、1組に限らず、条件を満たす組み合わせが複数ある場合には、複数の需要家の組み合わせを候補として検出してもよい。
 そして、マッチング部14は、条件を満たす組み合わせが複数ある場合には、例えば、余剰電力供給の対価、送電時のロス等の条件を加えて、最終的な組み合わせを絞り込んでいく。
 記憶部15は、電力量情報取得部12において取得された情報、電力需給予測部13における予測結果を取得するとともに、マッチング部14におけるマッチングの結果を取得して、これらの情報を保存する。
 制御部16は、記憶部15に保存された各種情報に基づいて、系統40から各需要家A20,B30に対する電力供給状況を検出するとともに、需要家A20と需要家B30とを含む需要家群において電力が供給過剰となる時間帯を検出する。そして、制御部16は、その時間帯に供給元の需要家から供給先の需要家へと電力供給する供給経路を確保する。すなわち、制御部16は、停電のように系統40からの電力供給に異常が生じた場合には、需要家A20,B30との間において余剰電力の融通が可能となるように、スイッチング部28,29,37を制御する。
 <電力供給制御方法>
 本実施形態の電力供給制御システム10では、上述した構成により、図2および図3に示すフローチャートに従って、電力供給制御方法を実施する。
 すなわち、ステップS11では、電力状況取得部11において、需要家A20および需要家B30ごとの系統40からの電力供給状況に関する情報を取得する。
 具体的には、電力状況取得部11は、図4に示すように、系統40を介して電力を供給する電力系統(電力会社)、配電網、需要家、電力供給状況の情報を取得する。
 図4に示す例では、T電力から配電網Oを介して、需要家A20,B30に対して供給される電力が、供給停止状態にあることが分かる。また、同じT電力から配電網M(図1参照)を介して供給される電力供給状況は正常であることが分かる。
 次に、ステップS12では、電力状況取得部11において取得した電力供給に関する情報を、記憶部15に保存する。
 次に、ステップS13では、電力状況取得部11において取得した電力供給に関する情報に基づいて、系統40から各需要家A20,B30に対する電力供給が停止されているか否か(電力供給≒0であるか否か)を判定する。
 ここで、系統40からの電力供給が停止した状況(例えば、停電)である場合には、ステップS14へ進む。一方、系統40からの電力供給が通常時の状態である場合には、制御を終了する。
 次に、ステップS14では、ステップS13において系統40からの電力供給が停止した状況であるため、電力量情報取得部12において、需要家A20,B30ごとの電力供給量に関する情報を取得する。
 具体的には、電力量情報取得部12は、図5に示すように、系統40からの電力供給が停止した状態の配電網Oに属する需要家A20,B30、需要家A20,B30が所有する電力供給装置の種類、所定時間帯ごとに供給可能な電力量の予測値等の情報を取得する。
 図5に示す例では、配電網Oに属する需要家A20において、PV(ソーラーパネル21)から、2015/10/30の10:00~18:00の時間帯に供給可能な電力量100kwhという情報が取得される。また、配電網Oに属する需要家A20において、風力発電装置23から、2015/10/30の12:00~13:00の時間帯に供給可能な電力量5kwhという情報が取得される。さらに、配電網Oに属する需要家A20において、蓄電装置27から、2015/10/30の7:00~8:00の時間帯に供給可能な電力量5kwhという情報が取得される。
 同様に、配電網Oに属する需要家B30において、バイナリー発電装置31から、2015/10/30の7:00~8:00の時間帯に供給可能な電力量5kwhという情報が取得される。また、配電網Oに属する需要家B30において、電気自動車32から、2015/10/30の12:00~13:00の時間帯に供給可能な電力量5kwhという情報が取得される。
 次に、ステップS15では、電力需給予測部13において、需要家A20,B30ごとに、電力需要予測に必要な情報を取得して、所定時間帯ごとの電力需要を予測する。
 具体的には、電力需給予測部13は、図6に示すように、配電網Oに属する需要家A20,B30、需要家A20,B30が所有する負荷の種類、所定時間帯ごとの負荷による消費電力量の予測値等の情報を取得する。
 図6に示す例では、配電網Oに属する需要家A20において、エアコンによって、2015/10/30の10:00~18:00の時間帯に電力量100kwhを消費する見込みという情報が取得される。また、配電網Oに属する需要家A20において、照明によって、2015/10/30の12:00~13:00の時間帯に電力量10kwhを消費する見込みという情報が取得される。
 同様に、配電網Oに属する需要家B30において、TVによって、2015/10/30の7:00~8:00の時間帯に電力量10kwhを消費する見込みという情報が取得される。
 次に、ステップS16では、制御部16が、需要家A20,B30ごとの電力の需給予測結果に基づいて、余剰電力が生じる需要家から電力が不足する需要家に対して電力供給されるように、電力の供給元、供給先を決定する。
 具体的には、制御部16は、図5に示す電力の供給予測と図6に示す電力の需要予測とに基づいて、図7に示すように、余剰電力の供給元、供給先、電力供給装置の種類、供給される電力量、所定時間帯等を決定する。
 図7に示す例では、2015/10/30の7:00~8:00の時間帯に、供給元となる需要家A20から供給先となる需要家B30に対して、需要家A20が所有する蓄電装置27から、5kwhの余剰電力が供給される。
 一方、2015/10/30の12:00~13:00の時間帯には、供給元となる需要家B30から供給先となる需要家A20に対して、需要家B30が所有する電気自動車32から、5kwhの余剰電力が供給される。
 これにより、系統40からの電力供給が停止する等の異常が発生した場合でも、複数の需要家A20,B30を含む需要家群において余剰電力が発生すると予測される際に、その供給元、供給先の需要家を所定時間帯ごとに決定することができる。
 この結果、系統40からの電力の供給状況に応じて、複数の需要家間において余剰電力を有効に活用することができる。
 次に、ステップS17では、図7に示す余剰電力の供給元、供給先、所定時間帯に関する情報が、記憶部15に保存される。
 <供給元、供給先となる需要家の選択>
 本実施形態の電力供給制御システム10では、図2に示すフローチャートに従って、系統40からの電力供給に異常が生じた場合でも、複数の需要家を含む需要家群内において、余剰電力の融通を行う。
 具体的には、需要家A20を中心に考えると、停電等の系統40からの電力供給異常が検出されると、図3に示すフローチャートに従って、余剰電力の発生の有無、その供給先等を決定する。
 すなわち、ステップS21では、需要家A20において、所定時間帯ごとに負荷24による電力の消費があるか否かを判定する。ここで、負荷24が存在する場合には、ステップS22へ進み、存在しない場合には、ステップS30へ進む。
 次に、ステップS22では、需要家A20が所有する負荷24による消費電力量と電力供給装置による電力供給量(発電量+蓄電量)とを比較して、電力供給量の方が多いか否かを判定する。ここで、電力供給量が消費電力量よりも多い場合には、ステップS25へ進み、電力供給量が消費電力量よりも少ない場合には、ステップS23へ進む。
 次に、ステップS23では、電力供給量が消費電力量よりも少ないために、需要家A20において余剰電力の発生なしと判定する。
 次に、ステップS24では、需要家A20において確保される電力は、全て自家(需要家A20)内へ供給されるように設定され、処理を終了する。
 一方、ステップS25では、ステップS22およびステップS30における判定の結果、需要家A20において余剰電力ありと判定される。
 次に、ステップS26では、需要家A20において発生した余剰電力を供給可能な他の需要家が存在するか否かを判定する。ここで、供給先が存在する場合には、ステップS27へ進み、供給先が存在しない場合には、ステップS29へ進む。
 次に、ステップS27では、余剰電力の供給先となる他の需要家が存在しているため、供給先となる需要家B30を決定する。
 なお、余剰電力の供給先として複数の需要家が存在する場合には、所定の条件に基づいて優先順位を付けて、供給先を決定する。
 具体的な条件としては、病院等の公共機関、親族、友人等の需要家を優先的に選択するように予め条件設定されていればよい。
 次に、ステップS28では、需要家B30に対して余剰電力を供給した場合に、蓄電装置27にまだ蓄電量があるか否かを判定する。ここで、蓄電量があると判定された場合には、再びステップS26へ戻り、供給先を探すフローに入る。一方、需要家B30へ余剰電力を供給した場合に、蓄電量がないと判定された場合には、ステップS29へ進む。
 一方、ステップS29では、ステップS26において余剰電力の供給先がないと判定されたため、余剰電力の供給先を自家(需要家A20)が所有する蓄電装置27に設定して処理を終了する。
 一方、ステップS30では、需要家A20において負荷24による電力消費がない状況であるため、需要家A20が所有する電力供給装置による電力供給量があるか否かを判定する。ここで、電力供給量がある場合には、ステップS25へ進み、電力供給量がない場合には、ステップS31へ進む。
 次に、ステップS31では、需要家A20において、電力供給装置に夜電力供給がない状況であるため、需要家A20において余剰電力の発生はないと判定し、処理を終了する。
 [他の実施形態]
 以上、本発明の一実施形態について説明したが、本発明は上記実施形態に限定されるものではなく、発明の要旨を逸脱しない範囲で種々の変更が可能である。
 (A)
 上記実施形態では、本発明に係る電力供給制御方法として、図2および図3に示すフローチャートに従って、電力供給制御を実施する例を挙げて説明した。しかし、本発明はこれに限定されるものではない。
 例えば、図2および図3に示すフローチャートに従って実施される電力供給制御方法をコンピュータに実行させる電力供給制御プログラムとして、本発明を実現してもよい。
 また、この電力供給制御プログラムを格納した記録媒体として、本発明を実現してもよい。
 (B)
 上記実施形態では、電力状況取得部11および電力量情報取得部12が、EMS26,36から自動的に、各需要家A20,B30における電力の供給状況、需給情報に関する情報を取得する例を挙げて説明した。しかし、本発明はこれに限定されるものではない。
 例えば、図8に示すように、上記情報を、電子端末129,139を介して取得してもよい。
 すなわち、各需要家A120,B130における電力の供給状況、需給情報に関する情報のうちの少なくとも一部が、需要家A120,B130によって、電子端末129,139を介して直接入力されてもよい。
 ここで、電子端末129,139としては、需要家A120,B130が所有するPCやタブレット端末、スマートフォン、携帯電話等を用いることができる。
 なお、電子端末は、各需要家にそれぞれ設置されている必要はなく、電子端末が設置された需要家と設置されていない需要家とを含む需要家群を構成してもよい。
 この場合には、電子端末が設置されていない需要家については、上記実施形態と同様に、EMSから必要な情報を取得すればよい。
 (C)
 上記実施形態では、図1に示すように、複数の需要家(需要家A20および需要家B30)のそれぞれに電力状況取得部26a,36aが設けられた例を挙げて説明した。しかし、本発明はこれに限定されるものではない。
 例えば、図9に示すように、需要家A220および需要家B230のEMS226,236に電力状況取得部を設けることなく、電力供給制御システム10内にだけ、電力状況取得部11を設けた構成であってもよい。
 この場合でも、各需要家A220,B230のEMS226,236から系統40からの電力供給状況を取得することで、上記実施形態と同様の効果を得ることができる。
 (D)
 上記実施形態では、複数の需要家(需要家A20および需要家B30)のそれぞれに電力状況取得部26a,36aが設けられた例を挙げて説明した。しかし、本発明はこれに限定されるものではない。
 例えば、図10に示すように、複数の需要家のうち、需要家A20だけに電力状況取得部26aが設けられた構成であってもよい。
 あるいは、複数の需要家のうち、需要家B30だけに電力状況取得部36aが設けられた構成であってもよい。
 (E)
 上記実施形態では、図1に示すように、電力供給制御システム10、および複数の需要家(需要家A20および需要家B30)のそれぞれに電力状況取得部11,26a,36aが設けられた例を挙げて説明した。しかし、本発明はこれに限定されるものではない。
 例えば、図11に示すように、複数の需要家(需要家A20および需要家B30)の側のそれぞれに電力状況取得部26a,36aが設けられた電力供給制御システム310であってもよい。
 この場合には、各需要家(需要家A20および需要家B30)において取得した系統40からの電力供給状況を電力量情報取得部12において受信して、記憶部15に保存すればよい。これにより、制御部16は、上記実施形態と同様に、系統40から各需要家に対する電力の供給状況に応じて、余剰電力を融通し合うように、スイッチング部28,29,37,41を切替制御することができる。
 (F)
 上記実施形態では、電力供給制御システム10内に、各種情報を保存する記憶部15を設けた例を挙げて説明した。しかし、本発明はこれに限定されるものではない。
 例えば、電力供給制御システムの外部のサーバ、クラウドサービス等を、各種情報を保存する記憶部として利用してもよい。
 (G)
 上記実施形態では、系統からの電力の供給状況として、系統からの電力供給が停止される停電発生時を例として挙げて説明した。しかし、本発明はこれに限定されるものではない。
 例えば、停電時以外にも、夏季に空調装置の稼働率のアップ、電力会社が所有する発電所の一時的な操業停止等によって電力供給量に対して電力需要量が上回った状況において、本発明を実施してもよい。
 (H)
 上記実施形態では、現時点における電力の供給状況(例えば、停電発生等)に関する情報を取得する例を挙げて説明した。しかし、本発明はこれに限定されるものではない。
 例えば、将来的に、系統からの電力の供給状況が逼迫することが予測される場合には、将来の所定時間帯における系統からの電力供給状況を予測して、本発明を実施してもよい。
 本発明の電力供給制御システムは、系統からの電力の供給状況に応じて、複数の需要家間において余剰電力を有効に活用することができるという効果を奏することから、発電装置、蓄電池等の電力供給装置を所有する需要家群を含むコミュニティ等において広く適用可能である。
10   電力供給制御システム
11   電力状況取得部
12   電力量情報取得部
13   電力需給予測部
14   マッチング部
15   記憶部
16   制御部
20   需要家A(第1の需要家、第2の需要家)
21   ソーラーパネル(電力供給装置(発電装置))
22   太陽光発電用電力変換装置(PCS)
22a  発電電力用電力センサ
23   風力発電装置(電力供給装置(発電装置))
23a  風力発電用電力センサ
24   負荷
24a  負荷用電力センサ
25   分電盤
26   EMS
26a  電力状況取得部
27   蓄電装置
27a  蓄電電力用電力センサ
28   スイッチング部
29   スイッチング部
30   需要家B(第2の需要家、第1の需要家)
31   バイナリー発電装置(電力供給装置(発電装置))
31a  発電電力用電力センサ
32   電気自動車
32a  電気自動車用電力センサ
34   負荷
34a  負荷用電力センサ
35   分電盤
36   EMS
36a  電力状況取得部
37   スイッチング部
40   系統
41   スイッチング部
120  需要家A(第1の需要家、第2の需要家)
129  電子端末
130  需要家B(第2の需要家、第1の需要家)
139  電子端末
220  需要家A(第1の需要家、第2の需要家)
226  EMS
230  需要家B(第2の需要家、第1の需要家)
236  EMS
310  電力供給制御システム

Claims (17)

  1.  電力供給装置を所有する複数の需要家間において余剰電力を融通し合う電力供給制御システムであって、
     系統から前記複数の需要家に対する電力の供給状況に関する情報を取得する電力状況取得部と、
     前記複数の需要家ごとの前記電力供給装置による電力供給量に関する情報を取得する電力量情報取得部と、
     前記電力量情報取得部において取得された情報に基づいて、前記複数の需要家ごとの電力の需給状況を予測する電力需給予測部と、
     前記電力状況取得部および前記電力量情報取得部において取得された情報と前記電力需給予測部における予測結果とに基づいて、前記複数の需要家の間における余剰電力の供給元と供給先とを決定する制御部と、
    を備えている電力供給制御システム。
  2.  前記電力状況取得部は、前記系統からの電力供給が停止した停電に関する情報を取得する、
    請求項1に記載の電力供給制御システム。
  3.  前記制御部は、前記電力状況取得部が前記系統からの電力供給が停止したとの情報を取得すると、前記複数の需要家の間における余剰電力の供給元と供給先とを決定する、
    請求項1または2に記載の電力供給制御システム。
  4.  前記電力状況取得部は、前記複数の需要家に対する電力の供給状況に関する情報を、各需要家から取得する、
    請求項1から3のいずれか1項に記載の電力供給制御システム。
  5.  前記複数の需要家には、第1の需要家と第2の需要家とが含まれており、
     前記電力需給予測部の予測結果に基づいて、前記第1の需要家における電力の需要条件と、前記第2の需要家における電力の供給条件とをマッチングするマッチング部を、さらに備えている、
    請求項1から4のいずれか1項に記載の電力供給制御システム。
  6.  前記第1の需要家における電力の需要条件には、前記電力供給装置の種類、必要な電力量、日時、時間帯、場所、電力の単価、対価のうちの少なくとも1つが含まれる、
    請求項5に記載の電力供給制御システム。
  7.  前記第2の需要家における電力の供給条件には、負荷の種類、供給可能な電力量、日時、時間帯、場所、電力の単価、対価のうちの少なくとも1つが含まれる、
    請求項5または6に記載の電力供給制御システム。
  8.  前記需要条件と前記供給条件とを保存する記憶部を、さらに備えている、
    請求項5から7のいずれか1項に記載の電力供給制御システム。
  9.  前記需要条件は、前記第1の需要家によって入力される、
    請求項5から8のいずれか1項に記載の電力供給制御システム。
  10.  前記供給条件は、前記第2の需要家によって入力される、
    請求項5から9のいずれか1項に記載の電力供給制御システム。
  11.  前記制御部は、所定の優先順位に基づいて、前記複数の需要家の間における余剰電力の供給元と供給先とを決定する、
    請求項1から4のいずれか1項に記載の電力供給制御システム。
  12.  前記所定の優先順位に関する情報を保存する記憶部を、さらに備えている、
    請求項11に記載の電力供給制御システム。
  13.  前記電力需給予測部は、天気予報の情報を用いて、所定時間帯における前記電力供給装置に含まれる発電装置による発電量を予測する、
    請求項1から12のいずれか1項に記載の電力供給制御システム。
  14.  前記電力需給予測部は、前記電力供給装置に含まれる蓄電装置の現在の蓄電量を用いて、所定時間帯における前記蓄電装置の蓄電量を予測する、
    請求項1から13のいずれか1項に記載の電力供給制御システム。
  15.  前記電力需給予測部は、前記複数の需要家の過去の生活パターンに応じた消費電力量を記録したデータに基づいて、前記複数の需要家における消費電力量を推定する、
    請求項1から14のいずれか1項に記載の電力供給制御システム。
  16.  電力供給装置を所有する複数の需要家間において余剰電力を融通し合う電力供給制御方法であって、
     系統から前記複数の需要家に対する電力の供給状況に関する情報を取得する電力状況取得ステップと、
     前記複数の需要家ごとの前記電力供給装置による電力供給量に関する情報を取得する電力量情報取得ステップと、
     前記電力量情報取得ステップにおいて取得された情報に基づいて、前記複数の需要家ごとの電力の需給状況を予測する電力需給予測ステップと、
     前記電力状況取得ステップおよび前記電力量情報取得ステップにおいて取得された情報と前記電力需給予測ステップにおける予測結果とに基づいて、前記複数の需要家の間における余剰電力の供給元と供給先とを決定する制御ステップと、
    を備えている電力供給制御方法。
  17.  電力供給装置を所有する複数の需要家間において余剰電力を融通し合う電力供給制御プログラムであって、
     系統から前記複数の需要家に対する電力の供給状況に関する情報を取得する電力状況取得ステップと、
     前記複数の需要家ごとの前記電力供給装置による電力供給量に関する情報を取得する電力量情報取得ステップと、
     前記電力量情報取得ステップにおいて取得された情報に基づいて、前記複数の需要家ごとの電力の需給状況を予測する電力需給予測ステップと、
     前記電力状況取得ステップおよび前記電力量情報取得ステップにおいて取得された情報と前記電力需給予測ステップにおける予測結果とに基づいて、前記複数の需要家の間における余剰電力の供給元と供給先とを決定する制御ステップと、
    を備えている電力供給制御方法をコンピュータに実行させる電力供給制御プログラム。
PCT/JP2016/084109 2016-02-25 2016-11-17 電力供給制御システム、電力供給制御方法および電力供給制御プログラム WO2017145458A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016033947A JP6786815B2 (ja) 2016-02-25 2016-02-25 電力供給制御システム、電力供給制御方法および電力供給制御プログラム
JP2016-033947 2016-02-25

Publications (1)

Publication Number Publication Date
WO2017145458A1 true WO2017145458A1 (ja) 2017-08-31

Family

ID=59686179

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/084109 WO2017145458A1 (ja) 2016-02-25 2016-11-17 電力供給制御システム、電力供給制御方法および電力供給制御プログラム

Country Status (2)

Country Link
JP (1) JP6786815B2 (ja)
WO (1) WO2017145458A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023162656A1 (ja) * 2022-02-25 2023-08-31 京セラ株式会社 情報処理装置

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019146330A (ja) * 2018-02-19 2019-08-29 本田技研工業株式会社 電力供給システムおよび電力供給装置
KR101952419B1 (ko) * 2018-06-15 2019-02-26 (주)귀뚜라미 발전 기능을 가진 가스히트펌프시스템을 이용한 에너지 통합 제어 시스템 및 방법
JP2021149865A (ja) * 2020-03-23 2021-09-27 本田技研工業株式会社 電力供給制御装置、電力供給制御装置の制御方法、及びプログラム

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010220428A (ja) * 2009-03-18 2010-09-30 Toyota Motor Corp 電力融通システム
JP2011205871A (ja) * 2010-03-26 2011-10-13 Panasonic Electric Works Co Ltd 電力供給システム
WO2013038458A1 (ja) * 2011-09-16 2013-03-21 株式会社日立製作所 電力配分装置
JP2013186533A (ja) * 2012-03-06 2013-09-19 Yahoo Japan Corp 情報処理方法、システム及び方法
JP2014027780A (ja) * 2012-07-26 2014-02-06 Toyota Home Kk 電力供給システム
JP2015177574A (ja) * 2014-03-13 2015-10-05 株式会社Nttファシリティーズ 電力融通システム、及び電力融通方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010220428A (ja) * 2009-03-18 2010-09-30 Toyota Motor Corp 電力融通システム
JP2011205871A (ja) * 2010-03-26 2011-10-13 Panasonic Electric Works Co Ltd 電力供給システム
WO2013038458A1 (ja) * 2011-09-16 2013-03-21 株式会社日立製作所 電力配分装置
JP2013186533A (ja) * 2012-03-06 2013-09-19 Yahoo Japan Corp 情報処理方法、システム及び方法
JP2014027780A (ja) * 2012-07-26 2014-02-06 Toyota Home Kk 電力供給システム
JP2015177574A (ja) * 2014-03-13 2015-10-05 株式会社Nttファシリティーズ 電力融通システム、及び電力融通方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023162656A1 (ja) * 2022-02-25 2023-08-31 京セラ株式会社 情報処理装置

Also Published As

Publication number Publication date
JP2017153267A (ja) 2017-08-31
JP6786815B2 (ja) 2020-11-18

Similar Documents

Publication Publication Date Title
US11757304B2 (en) Versatile site energy router
WO2017145456A1 (ja) 電力取引マッチングシステム、電力取引マッチング方法および電力取引マッチングプログラム
JP6145670B2 (ja) 電力潮流制御システム、管理装置、プログラム
JP2024074822A (ja) 電力供給システムおよび電力供給方法
WO2017122243A1 (ja) 電力供給装置及び制御装置
WO2010103650A1 (ja) 交流の自律分散型の電力システム
JPWO2008117392A1 (ja) 電力システム
JP6732193B2 (ja) 管理方法、制御装置及び通信処理デバイス
JP5865225B2 (ja) 制御システム、制御装置、及び制御方法
WO2011042787A1 (ja) 電力分配システム
EP2903216B1 (en) Management system, management method, and device
WO2017145458A1 (ja) 電力供給制御システム、電力供給制御方法および電力供給制御プログラム
JP2015112014A (ja) 電力制御装置、電力制御システム及び電力制御方法
JP6189987B2 (ja) 管理システム、制御装置、及び制御方法
JP6903867B2 (ja) 電力供給経路制御システム、電力供給経路制御方法および電力供給経路制御プログラム
JP2013038838A (ja) 集合住宅電力システム
JP2015092822A (ja) パワーコンディショナー及び算出方法
JP7513529B2 (ja) 電力制御システムおよび電力制御方法
JP7495392B2 (ja) 電力制御システムおよび電力制御方法
WO2019211826A1 (en) System and method for managing a hierarchic power distribution grid
JP6672010B2 (ja) 電力連携制御システム、電力連携制御方法および電力連携制御プログラム
KR101496187B1 (ko) 가상 발전소 서비스 장치 및 방법
JP2013207935A (ja) エネルギー管理システム、エネルギー管理方法及び分散電源
JP2017153288A (ja) 蓄電制御装置、蓄電制御方法、および蓄電制御プログラム
JP6759623B2 (ja) 電力系統接続制御システム、電力系統接続制御方法および電力系統接続制御プログラム

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16891614

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 16891614

Country of ref document: EP

Kind code of ref document: A1