WO2023080507A1 - Bim 기반 철도 인프라 사업 설계 성과품 납품관리 시스템 - Google Patents

Bim 기반 철도 인프라 사업 설계 성과품 납품관리 시스템 Download PDF

Info

Publication number
WO2023080507A1
WO2023080507A1 PCT/KR2022/016175 KR2022016175W WO2023080507A1 WO 2023080507 A1 WO2023080507 A1 WO 2023080507A1 KR 2022016175 W KR2022016175 W KR 2022016175W WO 2023080507 A1 WO2023080507 A1 WO 2023080507A1
Authority
WO
WIPO (PCT)
Prior art keywords
bim
project
information
railway infrastructure
design
Prior art date
Application number
PCT/KR2022/016175
Other languages
English (en)
French (fr)
Inventor
신민호
김진만
이근일
Original Assignee
우송대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 우송대학교 산학협력단 filed Critical 우송대학교 산학협력단
Publication of WO2023080507A1 publication Critical patent/WO2023080507A1/ko

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • the present invention relates to a BIM-based railway infrastructure business design product delivery management system, and more specifically, a BIM-based railway infrastructure project capable of maintaining the compatibility of BIM results in other fields and maintaining the compatibility of BIM results between the owner of the railway project and the design company. It is about the delivery management system for design outcomes.
  • BIM Building Information Modeling
  • the BIM method is a 3D-based design and modeling method that converts buildings into data to create numerical data and allows you to see 3D display effects. It is not a simple line or plane work, but data of the length connecting the start and end points of the line is generated, and the area is data based on the closed plane. And combining length and area data gives volumetric data.
  • the BIM method includes information on the shape information, attribute information, relationship, and topology of an object, so it is excellent in analysis, service linkage, and usability.
  • BIM expresses each property of building objects such as walls, slabs, windows, doors, roofs, and stairs, recognizes the relationship between them, and can immediately reflect the changing elements of a building to the building design. Therefore, by using BIM, regardless of whether the building to be designed is structured or irregular, it is possible to integrate and utilize information at all stages through compatibility and sharing of data generated during building construction by project and process. .
  • the technical problem to be achieved by the present invention is to provide an interface for compatibility with BIM in other fields such as roads and rivers, and also to maintain the compatibility of BIM achievements between the owner of the railway project and the design company. It is to present a delivery management system for the design outcome of the basic railway infrastructure project.
  • the BIM-based railway infrastructure business design product delivery management system based on the manager's command accessible to the BIM-based railway infrastructure business, project basic information and A project management module that creates a project to be managed in the system and a package for each construction section using basic package information for each construction section; Based on the order of the designer who can access the BIM-based railway infrastructure project, the basic information of the large-capacity product files written in the index file template and the large-capacity product files are uploaded from the designer management device and stored in an integrated DB BIM product delivery management module; And a common interface module for receiving large-capacity product files and design status information uploaded from the design company management device and converting them into an IFC standard file format, wherein the BIM product delivery management module is an IFC standard file by the common interface module.
  • the large-capacity product files and design status information converted into forms are stored in the integrated DB.
  • Other field interface module for receiving BIM achievements of other fields prepared in the railroad infrastructure business and other fields of business in the form of an IFC standard file, classifying according to the classification and attribute of the other field BIM achievements, and storing them in the other field DB; further includes .
  • the common interface module transmits project and package information generated by the project management module to the design company electronic device.
  • FIG. 1 is a diagram showing a railway infrastructure BIM-based integrated management system for compatibility with BIM achievements according to an embodiment of the present invention
  • FIG. 2 is a diagram showing an interface concept for compatibility of BIM achievements between other fields and other details according to an embodiment of the present invention
  • FIG. 3 is a diagram showing an architecture for maintaining BIM compatibility between other details
  • FIG. 5 is a diagram showing an architecture for receiving BIM achievements in other fields.
  • FIG. 6 is an exemplary diagram in which BIM achievements in other fields in [Table 7] are changed to the BIM IFC standard format.
  • BIM construction information management module 150 BIM model change history management module
  • the element may be implemented in any form of software, hardware, or both software and hardware.
  • terms such as 'unit', 'module', 'server', 'system', 'platform', 'device' or 'terminal' refer to hardware and software driven by the hardware or for driving the hardware. It may be intended to refer to functional and structural combinations of
  • the hardware may be a data processing device including a CPU or other processor.
  • software driven by hardware may refer to a running process, an object, an executable file, a thread of execution, a program, and the like.
  • the terms may mean a predetermined code and a logical unit of hardware resources for executing the predetermined code, and do not necessarily mean physically connected codes or one type of hardware in the present invention. can be easily deduced to the average expert in the art.
  • each configuration of the BIM-based railway infrastructure integrated management system 100 and the R-IFC viewer module 300 indicates that they may be functionally and/or logically separated, and each configuration must be a separate physical device. It may not mean that it is separate or written in separate code.
  • DB may mean a functional and structural combination of software and hardware for storing information corresponding to each DB, and may further include a DBMS (Database Management System).
  • DBMS Database Management System
  • the BIM-based railway infrastructure integrated management system 100 may be installed in a predetermined data processing device to implement the technical spirit of the present invention.
  • the BIM-based railway infrastructure integrated management system 100, the designer management device 10, and the construction company management device 20 are, for example, desktop PCs, servers, laptop PCs, netbook computers, etc. It may be one of all electronic devices capable of installing and executing a program.
  • FIG. 1 is a diagram illustrating a railway infrastructure BIM-based integrated management system for compatibility with BIM achievements according to an embodiment of the present invention.
  • the railway infrastructure BIM-based integrated management system 100 for compatibility with BIM achievements can operate in a WEB / WAS (Web Application Server) server, BIM-based railway infrastructure business information management services are provided to maximize efficiency in each sector, while sharing information by field from design, construction, and completion through a common interface with a number of details based on BIM.
  • WEB / WAS Web Application Server
  • the railroad infrastructure BIM-based integrated management system for compatibility with BIM achievements provides an interface for compatibility with BIM achievements with other fields, such as BIM used in other fields than railroads, such as roads and rivers.
  • the results can be received and used in railway infrastructure projects.
  • a number of details include the designer and builder of the railway infrastructure business, and the railway infrastructure BIM-based integrated management system 100 corresponds to the ordering party.
  • the railway infrastructure BIM-based integrated management system 100 corresponding to the ordering party may be an electronic device used by a manager who plans a BIM-based railway infrastructure business or registers and places an order for a project.
  • the designer management device 10 is an electronic device of a designer who delivers BIM results of a railway infrastructure project and proceeds with design.
  • the constructor management device 20 is an electronic device of the constructor that proceeds with construction based on the BIM results of the railroad infrastructure project.
  • the other field BIM achievement management device 30 is an electronic device that stores and manages BIM achievements applied to fields other than railroads, such as roads and rivers.
  • the rail infrastructure BIM-based integrated management system 100 for BIM product compatibility includes a system management module 110, a project management module 120, and a BIM product delivery management module 130. ), BIM construction information management module (140), BIM model change history management module (150), integrated DB (160), other field DB (170), common interface module (180) and other field interface module (190) do.
  • the system management module 110 registers the information of contracted companies and users for BIM-based railway infrastructure business, and the user type authority to be granted to the registered user and the system menu list access authority provided by the system 100 Permissions can be set.
  • the system management module 110 manages the standard classification code, system code, user authority, system authority, menu registration and access authority for the operation of the BIM-based railway infrastructure information management system, and the user approved by the system manager. Only the system can be used, and the system menu provided according to the menu access authority is controlled. Standard classification codes are classified into PWBS (Project Work Breakdown Structure), CWBS (Contract WBS), PBS, design drawings, user codes, etc., and all project codes registered in the BIM-based railway infrastructure project management system (100) are all the same. can be used
  • the project management module 120 creates a package for each project and construction section to be managed in the system 100 using basic project information and package basic information for each construction section stored in the integrated DB 160, and the generated project and construction section Access rights for individual packages can be set for each user and group. To this end, the project management module 120 may perform project management and package management.
  • Project management is to manage the ordered project by linking project information that has been ordered in EPMS (Enterprise Project Management System) of the Korea Rail Network Authority with the BIM-based railroad infrastructure project information management system (100) applied as a BIM-based railroad infrastructure project design product delivery management system. It manages the user authority system for project access and use.
  • EPMS Enterprise Project Management System
  • BIM-based railroad infrastructure project information management system 100
  • It manages the user authority system for project access and use.
  • Package management manages contract package information by linking the contracted information in CPMS (Construction Project Management System) of the Korea Rail Network Authority with the system 100, provides basic information on construction, service, and facilities, and provides detailed construction system It is possible to use VIEWER through linkage with .
  • CPMS Construction Project Management System
  • VIEWER Through linkage with .
  • the BIM product delivery management module 130 provides an index file template form for uploading a product, and inputs basic information of the product file.
  • the BIM product delivery management module 130 transfers basic information of large-capacity product files written in the index file template and large-capacity product files from the designer management device 10 based on the designer's command among user types who can access the BIM-based railway infrastructure project. It is automatically uploaded and stored in the system DB (200).
  • the BIM product delivery management module 130 automatically reviews the delivery quality of large-capacity product files (eg, multiple BIM files, multiple IFC files, etc.) when processing product upload.
  • the BIM product delivery management module 130 manages information errors written in the index file and checks and reviews the interference of the product file registered in the integrated DB 160 to determine the BIM model configuration, construction cost, constructability, and energy efficiency.
  • interference with design documents occurs, issues can be resolved through sharing information on interference with designers and contractors through the issue registration function, and supplemented design documents are managed.
  • the BIM construction information management module 140 uploads the construction status information of the railway infrastructure project from the constructor management device 20 and stores it in the integrated DB 160 based on the command of the constructor that can access the BIM-based railway infrastructure business.
  • the BIM model change history management module 150 manages versions of the product files stored and registered in the integrated DB 160 through BIM product file upload, and checks the changed document information. That is, the BIM model change history management module 150 manages history information by classifying documents (product files) into registration, content change, content deletion, and download forms, and provides a reading service so that each version of the registered document can be viewed. to provide.
  • the integrated DB 160 is for the present invention, such as order completed business information registered in EPMS of the Korea Rail Network Authority, contract completed information registered in CPMS, standard classification code information (PWBS, CWBS, PBS, blueprint, user code, etc.) BIM-based railway infrastructure project information can be stored.
  • the integrated DB 160 stores basic information of large-capacity product files uploaded from the designer management device 10, large-capacity product files, and design status information, and stores construction status information uploaded from the constructor management device 20. can
  • the railway infrastructure BIM-based integrated management system 100 provides a BIM-based railway infrastructure business information management service by using the BIM-based railway infrastructure business information stored in the integrated DB 200.
  • the other field DB 170 stores other field BIM achievement information provided from the other field BIM achievement management device 30 .
  • the common interface module 180 provides an interface for transmitting and receiving data between other units.
  • the common interface module 180 may receive large-capacity product files and design status information uploaded from the designer management device 10 and convert them into Industry Foundation Classes (IFC) standard file formats.
  • IFC Industry Foundation Classes
  • the BIM product delivery management module 130 can process large-capacity product files and design status information converted by the common interface module 180 to be stored in the integrated DB 160 of the system 100 corresponding to the ordering party.
  • the common interface module 180 enables two-way communication between other parts, that is, transmission and reception, so that compatibility with the system 100, which is the ordering party, can be maintained. For example, even when transmitting a document stored in the system 100 (eg, project information or package information that is construction section information) to the design company management device 10, the common interface module 180 converts the IFC format. If the document does not need to be converted, the document can be transmitted to the designer management device 10 without a conversion process.
  • a document stored in the system 100 eg, project information or package information that is construction section information
  • the other field interface module 190 receives the BIM achievements of other fields prepared in the railroad infrastructure business and other fields of business in the form of an IFC standard file from the other field BIM achievement management device 30, and according to the classification and properties of the BIM achievements of other fields After classification, it can be stored in the DB 170 for other fields.
  • common interface module 180 and the other field interface module 190 are shown separately in FIG. 1 , the common interface module 180 and the other field interface module 190 may be integrated and operated as one module.
  • FIG. 2 is a diagram illustrating an interface concept for compatibility of BIM achievements between other fields and other details according to an embodiment of the present invention.
  • the other field interface module 190 receives BIM achievements of other fields such as roads and rivers and operates so that they can be utilized in a unidirectional manner, and the common interface module 180 performs two-way communication of BIM achievements between other details. It operates so that it can be transmitted and received through, so that compatibility with the rail infrastructure BIM-based integrated management system 100, which is the owner, can be maintained.
  • FIG. 3 is a diagram illustrating an architecture for maintaining BIM compatibility between other details.
  • BIM achievements between the owner 100, which is a first detail, the designer 10, which is a second detail, and the construction company 20, which is a third detail, can be transmitted and received in a compatible manner by a common interface module 180 capable of bidirectional communication. .
  • interfaces with serial numbers 1 to 3 transmit information from the ordering party 100 to the designer 10 and construction company 20, and interfaces with serial numbers 4 to 5. transmits information from the design company 10 to the client 100, and the serial number 6 interface transmits information from the construction company 20 to the client 100.
  • [Table 1] is a specification of interface 1. project information shown in FIG.
  • Table 2 is a specification of interface 2. package information shown in FIG.
  • package information Information details Package name, business identification number, business unit number, package manager, start date, end date, contract classification, contract unit number, classification code 1, classification code 2, classification code 3, classification code 4, classification code 5, designer, contractor, Number of tunnels, number of bridges, construction location, etc. explanation 2, 3 Structural design to provide detailed package information
  • [Table 3] is a specification of interface 3. issue information shown in FIG.
  • Issue information Information details Project name Issue information Information details Project name, deliverable title, deliverable number, document number, deliverable type, number of issues, number of unresolved cases, number of pending cases, number of completed cases explanation 2, 3Structure design to provide detailed issue information
  • Table 4 is a specification of interface 4. product delivery information shown in FIG.
  • [Table 5] is a specification of interface 5. design status information shown in FIG.
  • [Table 6] is a specification of interface 6. construction status information shown in FIG.
  • Construction status Information details Project information name Construction status Information details Project information, package information, facility classification code, progress rate, registration date, registrant explanation 3. By entering the progress rate of the construction site in detail, the owner can monitor the progress.
  • the other field interface module 190 receives BIM results from other fields in the form of an ISO-16739 standard IFC standard file, and receives Information (for example, field) for each received file may be recorded in a file (or file name), classified according to the classification and property of the BIM achievement corresponding to the received file, and stored in the other field DB 170. there is.
  • [Table 7] is a specification of BIM achievements in other fields, and [Table 8] shows the description of the detailed information items of [Table 7].
  • Receive BIM standard information from other fields middle category Receive BIM information Information details Agency number, BIM classification code, location information, work type classification, work type information, document information explanation Designing Expressions to Receive Other Discipline BIM Information
  • BIM achievements in other fields include information described in detailed information items such as agency numbers and BIM classification codes related to other fields (eg, roads).
  • Figure 6 is an example view of changing BIM achievements in other fields in [Table 7] to the BIM IFC standard format.
  • IFCReceiveInfo is one of a number of statements that correspond to classifications and attributes of BIM artifacts.
  • the other field interface module 190 interprets a plurality of phrases such as IFCReceiveInfo, classifies them according to classification and property, and then stores them in the other field DB 170.
  • the BIM-based railway infrastructure business design product delivery management system is tangibly implemented as a program of instructions for implementing it, so that a person skilled in the art can be provided by being included in a computer-readable recording medium. Easy to understand.
  • the BIM-based railway infrastructure project design product delivery management system may include a computer-readable recording medium on which programs that can be executed through various computer means are recorded.
  • the computer-readable recording medium includes magnetic media such as hard disks, optical media such as CD-ROM and DVD, and ROM, RAM, flash memory, and USB memory.
  • a hardware device eg, processor, central processing unit, graphics card, RAM, ROM, etc. configured to store program instructions and execute the stored program is included.
  • the present invention provides a program stored in a computer readable recording medium running on a computer that controls the BIM-based railway infrastructure business design product delivery management system in order to implement a BIM-based railway infrastructure business design product delivery management system.

Abstract

BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템이 제공된다. 프로젝트 관리 모듈은 BIM 기반 철도 인프라 사업에 접근 가능한 관리자의 명령에 기초하여, 프로젝트 기본 정보와 공사구간 별 패키지 기본 정보를 이용하여 시스템에서 관리할 프로젝트와 공사구간 별 패키지를 생성하고, BIM 성과품 납품 관리 모듈은 BIM 기반 철도 인프라 사업에 접근 가능한 설계사의 명령에 기초하여, 인덱스 파일 템플릿에 작성된 대용량 성과품 파일들의 기본 정보와 대용량 성과품 파일들을 설계사 관리 장치로부터 업로드하여 통합 DB에 저장하고, 공통 인터페이스 모듈은 설계사 관리 장치로부터 업로딩되는 대용량 성과품 파일들과 설계현황정보를 수신하여 IFC 표준 파일 형태로 변환하며, BIM 성과품 납품 관리 모듈은 공통 인터페이스 모듈에 의해 IFC 표준 파일 형태로 변환된 대용량 성과품 파일들과 설계현황정보를 통합 DB에 저장한다.

Description

BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템
본 발명은 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템에 관한 것으로서, 보다 상세하게는, 타분야 BIM 성과물의 호환성 유지와, 철도 사업의 발주처와 설계사 간의 BIM 성과물의 호환성 유지가 가능한 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템에 관한 것이다.
건물 정보 모델링(BIM: Building Information Modeling)이란, 다차원 가상공간에 기획, 설계, 엔지니어링(구조, 설비, 전기 등), 시공 더 나아가 유지관리 및 폐기까지 가상으로 시설물을 모델링하는 과정을 말한다.
BIM 방식은 건물을 데이터화하여 수치데이터를 만들며, 3D 디스플레이 효과를 볼 수 있는 3D 기반의 설계 및 모델링 방식이다. 단순한 선, 면 작업이 아닌 선의 시작과 끝점을 잇는 길이의 데이터가 발생되고, 면은 닫힌 면의 기준으로 면적이 데이터화된다. 그리고 길이와 면적의 데이터를 결합하면 체적 데이터를 얻을 수 있다.
또한, BIM 방식은 객체의 형상정보, 속성정보, 관계(Relationship) 및 위상구조(Topology)에 대한 정보를 포함하고 있어 분석, 서비스 연계 및 사용성이 우수하다. 즉, BIM은 빌딩 객체들인 벽, 슬라브, 창, 문, 지붕, 계단 등이 각각의 속성을 표현하여 서로의 관계를 인지하고 건물의 변경요소들을 즉시 건물설계에 반영할 수 있다. 따라서, BIM을 이용함으로써, 설계할 건물이 정형이든 비정형이든 상관없이, 건물을 지을 때 발생되는 데이터에 대하여 프로젝트 별, 프로세스 별로 호환, 공유를 통해 모든 단계의 정보를 통합 관리 및 활용하는 것이 가능하다.
최근 이러한 BIM 기술은 빌딩뿐만 아니라 도로, 하천, 철도 등 다양한 분야의 사업에 접목시키기 위한 시도가 증가하고 있다. 그러나, BIM 기술을 철도 사업에 접목 및 관리하는 수준은 아직 개발 단계에 있어, 발주부터 설계 및 시공까지 사업이 진행되는 동안 BIM이 적용된 상황을 확인하고, 오류, 문제 등을 서로 공유하고 해결하는데 많은 어려움이 발생하고 있다.
또한, 타분야의 BIM과 철도 사업의 BIM의 정보를 교환하고 호환성을 유지하며, 상호 간 BIM 설계 파일을 활용하기 위한 인터페이스에 대한 개발 역시 필요한 상황이다.
전술한 문제점을 해결하기 위하여 본 발명이 이루고자 하는 기술적 과제는, 도로, 하천과 같은 타분야 BIM과 호환을 위한 인터페이스를 제공하고, 또한, 철도 사업의 발주처와 설계사 간의 BIM 성과물의 호환성 유지가 가능한 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템을 제시하는 데 있다.
본 발명의 해결과제는 이상에서 언급된 것들에 한정되지 않으며, 언급되지 아니한 다른 해결과제들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.
전술한 기술적 과제를 해결하기 위한 수단으로서, 본 발명의 실시 예에 따르면, BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템은, BIM 기반 철도 인프라 사업에 접근 가능한 관리자의 명령에 기초하여, 프로젝트 기본 정보와 공사구간 별 패키지 기본 정보를 이용하여 시스템에서 관리할 프로젝트와 공사구간 별 패키지를 생성하는 프로젝트 관리 모듈; BIM 기반 철도 인프라 사업에 접근 가능한 설계사의 명령에 기초하여, 인덱스 파일 템플릿에 작성된 대용량 성과품 파일들의 기본 정보와 상기 대용량 성과품 파일들을 설계사 관리 장치로부터 업로드하여 통합 DB에 저장하는 BIM 성과품 납품 관리 모듈; 및 상기 설계사 관리 장치로부터 업로딩되는 대용량 성과품 파일들과 설계현황정보를 수신하여 IFC 표준 파일 형태로 변환하는 공통 인터페이스 모듈;을 포함하고, 상기 BIM 성과품 납품 관리 모듈은 상기 공통 인터페이스 모듈에 의해 IFC 표준 파일 형태로 변환된 대용량 성과품 파일들과 설계현황정보를 상기 통합 DB에 저장한다.
철도 인프라 사업과 다른 분야의 사업에서 작성된 타분야 BIM 성과물을 IFC 표준 파일 형태로 수신하여 상기 타분야 BIM 성과물의 분류 및 속성에 따라 분류하여 타분야 DB에 저장하는 타분야 인터페이스 모듈;을 더 포함한다.
상기 공통 인터페이스 모듈은, 상기 프로젝트 관리 모듈에서 생성되는 프로젝트와 패키지의 정보를 상기 설계사 전자장치로 전송한다.
본 발명에 따르면, 도로, 하천과 같은 타분야 BIM과 호환을 위한 인터페이스를 제공함으로써 타분야 BIM 설계 파일을 활용하여 BIM 기반 철도 사업을 설계 및 시공할 수 있다.
또한, BIM 기반 철도 사업을 위한 발주처와 설계사 간의 BIM 성과물을 양방향으로 송수신하는 인터페이스를 제공함으로써 각 세부 간 정보 공유 및 활용이 가능하여 작업효율 및 완성도를 높일 수 있다.
본 발명의 효과는 이상에서 언급된 것들에 한정되지 않으며, 언급되지 아니한 다른 효과들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.
도 1은 본 발명의 실시 예에 따른 BIM 성과물 호환을 위한 철도 인프라 BIM 기반 통합 관리 시스템을 도시한 도면,
도 2는 본 발명의 실시 예에 따른 타분야 및 타세부간 BIM 성과물의 호환을 위한 인터페이스 개념을 도시한 도면,
도 3은 타세부 간 BIM 호환성 유지를 위한 아키텍쳐를 도시한 도면,
도 4는 타세부 간 인터페이스 항목을 정의한 도면,
도 5는 타분야 BIM 성과물을 수신하기 위한 아키텍쳐를 도시한 도면, 그리고,
도 6은 [표 7]의 타분야 BIM 성과물을 BIM IFC 표준 포맷으로 변경한 예시도이다.
<부호의 설명>
100: 철도 인프라 BIM 기반 통합 관리 시스템 110: 시스템 관리 모듈
120: 프로젝트 관리 모듈 130: BIM 성과품 납품 관리 모듈
140: BIM 시공 정보 관리 모듈 150: BIM 모델 변경 이력 관리 모듈
160: 통합 DB 170: 타분야 DB
180: 공통 인터페이스 모듈 190: 타분야 인터페이스 모듈
본 발명의 실시를 위한 구체적인 내용을 설명하기에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사항에 부합하는 의미와 개념으로 해석되어야 할 것이다.
어떤 엘리먼트, 구성요소, 장치, 또는 시스템이 프로그램 또는 소프트웨어로 이루어진 구성요소를 포함한다고 언급되는 경우, 명시적인 언급이 없더라도, 그 엘리먼트, 구성요소, 장치, 또는 시스템은 그 프로그램 또는 소프트웨어가 실행 또는 동작하는데 필요한 하드웨어(예를 들면, 메모리, CPU 등)나 다른 프로그램 또는 소프트웨어(예를 들면 운영체제나 하드웨어를 구동하는데 필요한 드라이버 등)를 포함하는 것으로 이해되어야 할 것이다.
또한, 어떤 엘리먼트(또는 구성요소)가 구현됨에 있어서 특별한 언급이 없다면, 그 엘리먼트(또는 구성요소)는 소프트웨어, 하드웨어, 또는 소프트웨어 및 하드웨어 어떤 형태로도 구현될 수 있는 것으로 이해되어야 할 것이다.
또한, 본 명세서에서 '부', '모듈', '서버', '시스템', '플랫폼', '장치' 또는 '단말' 등의 용어는 하드웨어 및 해당 하드웨어에 의해 구동되거나 하드웨어를 구동하기 위한 소프트웨어의 기능적, 구조적 결합을 지칭하는 것으로 의도될 수도 있다. 예를 들어, 하드웨어는 CPU 또는 다른 프로세서(processor)를 포함하는 데이터 처리 기기일 수 있다. 또한, 하드웨어에 의해 구동되는 소프트웨어는 실행중인 프로세스, 객체(object), 실행파일(executable), 실행 스레드(thread of execution), 프로그램(program) 등을 지칭할 수 있다.
또한, 상기 용어들은 소정의 코드와 상기 소정의 코드가 수행되기 위한 하드웨어 리소스의 논리적인 단위를 의미할 수 있으며, 반드시 물리적으로 연결된 코드를 의미하거나, 한 종류의 하드웨어를 의미하는 것이 아님은 본 발명의 기술분야의 평균적 전문가에게는 용이하게 추론될 수 있다.
또한, BIM 기반 철도 인프라 통합 관리 시스템(100)과 R-IFC 뷰어 모듈(300)의 각각의 구성은 기능 및/또는 논리적으로 분리될 수도 있음을 나타내는 것이며, 반드시 각각의 구성이 별도의 물리적 장치로 구분되거나 별도의 코드로 작성됨을 의미하는 것은 아닐 수 있다.
또한, 본 명세서에서 DB라 함은, 각각의 DB에 대응되는 정보를 저장하는 소프트웨어 및 하드웨어의 기능적 구조적 결합을 의미할 수 있으며, DBMS(Database Management System)를 더 포함할 수도 있다.
이하, 본 발명에서 실시하고자 하는 구체적인 기술내용에 대해 첨부도면을 참조하여 상세하게 설명하기로 한다.
상기 BIM 기반 철도 인프라 통합 관리 시스템(100)은 소정의 데이터 프로세싱 장치에 설치되어 본 발명의 기술적 사상을 구현할 수도 있다.
또한, 본 발명의 실시 예에 따른 상기 BIM 기반 철도 인프라 통합 관리 시스템(100), 설계사 관리 장치(10) 및 시공사 관리 장치(20)는 예를 들면, 데스크탑 PC, 서버, 랩탑 PC, 넷북 컴퓨터 등 프로그램의 설치 및 실행이 가능한 모든 전자기기들 중 하나일 수 있다.
도 1은 본 발명의 실시 예에 따른 BIM 성과물 호환을 위한 철도 인프라 BIM 기반 통합 관리 시스템을 도시한 도면이다.
도 1에 도시된 본 발명의 실시 예에 따른 BIM 성과물 호환을 위한 철도 인프라 BIM 기반 통합 관리 시스템(100)은 WEB/WAS(Web Application Server) 서버에서 동작할 수 있으며, 철도 시설물의 계획, 발주, 설계 시공, 준공에 따른 분야별 정보를 BIM 기반으로 다수의 세부들과 공통 인터페이스를 통해 공유하고, 각 분야별 효율성의 극대화를 위한 BIM 기반 철도 인프라 사업 정보 관리 서비스를 제공한다.
또한, 본 발명의 실시 예에 따른 BIM 성과물 호환을 위한 철도 인프라 BIM 기반 통합 관리 시스템은 타분야와의 BIM 성과물을 호환하기 위한 인터페이스를 제공하여 도로, 하천 등과 같이 철도와는 다른 분야에서 사용된 BIM 성과물을 수신하여 철도 인프라 사업 시 활용할 수 있다.
다수의 세부들은 철도 인프라 사업의 설계사 및 시공사를 포함하며, 철도 인프라 BIM 기반 통합 관리 시스템(100)은 발주처에 해당한다.
따라서, 발주처에 해당하는 철도 인프라 BIM 기반 통합 관리 시스템(100)은 BIM 기반 철도 인프라 사업을 계획하거나 프로젝트를 등록 및 발주하는 관리자가 사용하는 전자장치일 수 있다.
설계사 관리 장치(10)는 철도 인프라 사업의 BIM 성과품을 납품하고, 설계를 진행하는 설계사의 전자장치이다.
시공사 관리 장치(20)는 철도 인프라 사업의 BIM 성과품을 토대로 시공을 진행하는 시공사의 전자장치이다.
타분야 BIM 성과물 관리 장치(30)는 도로, 하천과 같이 철도와는 다른 분야에 적용된 BIM 성과물을 저장, 관리하는 전자장치이다.
도 1을 참조하면, 본 발명의 실시 예에 따른 BIM 성과물 호환을 위한 철도 인프라 BIM 기반 통합 관리 시스템(100)은 시스템 관리 모듈(110), 프로젝트 관리 모듈(120), BIM 성과품 납품 관리 모듈(130), BIM 시공 정보 관리 모듈(140), BIM 모델 변경 이력 관리 모듈(150), 통합 DB(160), 타분야 DB(170), 공통 인터페이스 모듈(180) 및 타분야 인터페이스 모듈(190)을 포함한다.
시스템 관리 모듈(110)은 BIM 기반 철도 인프라 사업을 위해 계약 완료된 기업과 사용자의 정보를 등록하고, 등록된 사용자에게 부여할 사용자 유형 권한과 시스템(100)에서 제공하는 시스템 메뉴 목록의 접근 권한인 시스템 권한을 설정할 수 있다.
자세히 설명하면, 시스템 관리 모듈(110)은 BIM 기반 철도 인프라 정보관리시스템 운영을 위한 표준분류 코드, 시스템 코드, 사용자 권한, 시스템 권한, 메뉴등록 및 접근권한을 관리하고, 시스템 관리자로부터 승인이 된 사용자만 시스템을 이용할 수 있으며, 메뉴접근 권한에 따라 제공되는 시스템 메뉴가 제어된다. 표준 분류코드는 PWBS(Project Work Breakdown Structure), CWBS(Contract WBS), PBS, 설계도면, 사용자 코드 등으로 분류되며, BIM 기반 철도 인프라 사업 관리 시스템(100)에 등록된 모든 프로젝트 코드는 모두 동일하게 사용될 수 있다.
프로젝트 관리 모듈(120)은 통합 DB(160)에 저장된 프로젝트 기본 정보와 공사구간 별 패키지 기본 정보를 이용하여 시스템(100)에서 관리할 프로젝트와 공사구간 별 패키지를 생성하고, 생성된 프로젝트와 공사구간 별 패키지에 대한 접근 권한을 사용자 및 그룹 별로 설정할 수 있다. 이를 위하여, 프로젝트 관리 모듈(120)은 프로젝트 관리와 패키지 관리를 수행할 수 있다.
프로젝트 관리는, 철도시설공단의 EPMS(Enterprise Project Management System)에서 발주 완료된 사업 정보를 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템으로 적용된 BIM 기반 철도 인프라 사업 정보 관리 시스템(100)과 연계하여 발주 프로젝트를 관리하며, 프로젝트 접근 및 사용을 위한 사용자 권한 체계를 관리한다.
패키지 관리는, 철도시설공단의 CPMS(Construction Project Management System)에서 계약 완료된 정보를 시스템(100)과 연계하여 계약패키지 정보를 관리하며, 공사, 용역, 시설물에 대한 기본정보를 제공하며, 세부 시공 시스템과 연계를 통한 VIEWER 활용이 가능하다.
BIM 성과품 납품 관리 모듈(130)은 성과품 업로드를 하기 위한 인덱스 파일 템플릿 양식을 제공하며, 성과품 파일의 기본 정보를 입력한다. BIM 성과품 납품 관리 모듈(130)은 BIM 기반 철도 인프라 사업에 접근 가능한 사용자 유형 중 설계사의 명령에 기초하여, 인덱스 파일 템플릿에 작성된 대용량 성과품 파일들의 기본 정보와 대용량 성과품 파일들을 설계사 관리 장치(10)로부터 자동 업로드하여 시스템 DB(200)에 저장한다. BIM 성과품 납품 관리 모듈(130)은 성과품 업로드 처리 시 대용량 성과품 파일들(예를 들어 다수의BIM 파일, 다수의 IFC 파일 등)의 납품 품질을 자동 검토한다.
또한, BIM 성과품 납품 관리 모듈(130)은 인덱스 파일에 작성된 정보 오류를 관리하고, 통합 DB(160)에 등록된 성과품 파일의 간섭 체크 및 검토를 통해 BIM 모델 구성, 공사비용, 시공성, 에너지 효율성에 대한 파악이 가능하고, 설계문서에 대한 간섭 발생 시 이슈 등록 기능을 통해 설계사, 시공사에게 간섭 발생에 대한 정보 공유를 통해 이슈를 해결하고, 보완된 설계문서를 관리한다.
BIM 시공 정보 관리 모듈(140)은 BIM 기반 철도 인프라 사업에 접근 가능한 시공사의 명령에 기초하여, 철도 인프라 사업의 시공현황정보를 시공사 관리 장치(20)로부터 업로드하여 통합 DB(160)에 저장한다.
BIM 모델 변경 이력 관리 모듈(150)은 BIM 성과품 파일 업로드를 통해 통합 DB(160)에 저장 및 등록된 성과품 파일들에 대한 버전 관리를 하며, 변경된 문서 정보를 확인한다. 즉, BIM 모델 변경 이력 관리 모듈(150)은 등록, 내용 변경, 내용 삭제, 다운로드 형태로 문서(성과품 파일)를 구분하여 이력 정보를 관리하고, 등록된 문서의 버전 별로 열람이 가능하도록 열람 서비스를 제공한다.
통합 DB(160)는 철도시설공단의 EPMS에 등록된 발주 완료된 사업 정보, CPMS에 등록된 계약 완료된 정보, 표준 분류 코드 정보(PWBS, CWBS, PBS, 설계도면, 사용자 코드 등) 등 본 발명을 위한 BIM 기반의 철도 인프라 사업 정보를 저장할 수 있다. 또한, 통합 DB(160)는 설계사 관리 장치(10)로부터 업로딩된 대용량 성과품 파일들의 기본 정보와 대용량 성과품 파일들, 설계현황정보를 저장하고, 시공사 관리 장치(20)로부터 업로딩된 시공현황정보를 저장할 수 있다.
철도 인프라 BIM 기반 통합 관리 시스템(100)은 통합 DB(200)에 저장된 BIM 기반의 철도 인프라 사업 정보를 이용하여 BIM 기반 철도 인프라 사업 정보 관리 서비스를 제공한다.
타분야 DB(170)는 타분야 BIM 성과물 관리 장치(30)로부터 제공되는 타분야 BIM 성과물 정보를 저장한다.
공통 인터페이스 모듈(180)은 타세부들 간 데이터 송수신을 위한 인터페이스를 제공한다. 공통 인터페이스 모듈(180)은 설계사 관리 장치(10)로부터 업로딩되는 대용량 성과품 파일들과 설계현황정보를 수신하여 IFC(Industry Foundation Classes) 표준 파일 형태로 변환할 수 있다.
BIM 성과품 납품 관리 모듈(130)은 공통 인터페이스 모듈(180)에 의해 변환된 대용량 성과품 파일들과 설계현황정보가 발주처에 해당하는 시스템(100)의 통합 DB(160)에 저장되도록 처리할 수 있다.
또한, 공통 인터페이스 모듈(180)은 타세부들 간 양방향 통신, 즉, 송수신이 가능하도록 하여, 발주처인 시스템(100)과의 호환성을 유지할 수 있도록 한다. 예를 들어, 시스템(100)에 저장된 문서(예를 들어, 프로젝트 정보 또는 공사구간 정보인 패키지 정보)를 설계사 관리 장치(10)로 전송하는 경우에도, 공통 인터페이스 모듈(180)은 IFC 포맷으로 변환할 필요가 없는 문서인 경우, 변환 과정없이 설계사 관리 장치(10)로 문서를 전송할 수 있다.
타분야 인터페이스 모듈(190)은 철도 인프라 사업과 다른 분야의 사업에서 작성된 타분야 BIM 성과물을 타분야 BIM 성과물 관리 장치(30)로부터 IFC 표준 파일 형태로 수신하여 타분야 BIM 성과물의 분류 및 속성에 따라 분류한 후 타분야 DB(170)에 저장할 수 있다.
도 1에서는 공통 인터페이스 모듈(180)과 타분야 인터페이스 모듈(190)이 분리되어 도시되어 있으나, 공통 인터페이스 모듈(180)과 타분야 인터페이스 모듈(190)은 하나의 모듈로 통합되어 동작할 수도 있다.
도 2는 본 발명의 실시 예에 따른 타분야 및 타세부간 BIM 성과물의 호환을 위한 인터페이스 개념을 도시한 도면이다.
도 2를 참조하면, 타분야 인터페이스 모듈(190)은 도로, 하천 등의 타분야 BIM 성과물을 수신하여 단방향으로 활용가능하도록 동작하며, 공통 인터페이스 모듈(180)은 타세부 간 BIM 성과물을 양방향 통신을 통해 송수신가능하도록 동작하여, 발주처인 철도인프라 BIM 기반 통합 관리 시스템(100)과의 호환성을 유지할 수 있도록 한다.
도 3은 타세부 간 BIM 호환성 유지를 위한 아키텍쳐를 도시한 도면이다.
도 3을 참조하면, 1세부인 발주처(100), 2세부인 설계사(10) 및 3세부인 시공사(20) 간 BIM 성과물은 양방향 통신이 가능한 공통 인터페이스 모듈(180)에 의해 호환성있게 송수신 가능하다.
발주처(100), 설계사(10) 및 시공사(20) 간 동일한 시설물 분류체계를 활용하나, 발주처(100), 설계사(10) 및 시공사(20) 간의 정보 교환을 위해 도 4와 같이 인터페이스 항목이 도출되어 정의될 수 있다.
도 4를 참조하면, 인터페이스 항목은 6개이며, 이 중 일련번호 1~3의 인터페이스는 발주처(100)에서 설계사(10) 및 시공사(20)로 정보를 전송하고, 일련번호 4~5의 인터페이스는 설계사(10)에서 발주처(100)로 정보를 전송하며, 일련번호 6의 인터페이스는 시공사(20)에서 발주처(100)로 정보를 전송한다.
[표 1]은 도 4에 도시된 인터페이스 1. 프로젝트 정보에 대한 명세이다.
정보명 프로젝트 정보
정보세부항목 프로젝트명, 프로젝트관리자, 프로젝트 기간, 입찰공고번호, 사업단위번호, 발주기관, 발주일, 발주구분, 발주업종, 프로젝트 시작위치, 프로젝트 종료위치, 공사구역, 공사규모 등
설명 2, 3세부 프로젝트 정보를 제공하기 위한 구조 설계
[표 2]는 도 4에 도시된 인터페이스 2. 패키지 정보에 대한 명세이다.
정보명 패키지 정보
정보세부항목 패키지 명칭, 사업식별번호, 사업단위번호, 패키지관리자, 착수일, 종료일, 계약분류, 계약단위번호, 분류코드1, 분류코드2, 분류코드3, 분류코드4, 분류코드 5, 설계사, 시공사, 터널갯수, 교량갯수, 공사위치 등
설명 2, 3세부 패키지 정보를 제공하기 위한 구조 설계
[표 3]은 도 4에 도시된 인터페이스 3. 이슈 정보에 대한 명세이다.
정보명 이슈 정보
정보세부항목 프로젝트 명칭, 성과품 제목, 성과품 번호, 문서번호, 성과품 종류, 이슈 건수, 미처리 건수, 처리중 건수, 완료건수
설명 2, 3세부 이슈정보를 제공하기 위한 구조 설계
[표 4]는 도 4에 도시된 인터페이스 4. 성과품 납품 정보에 대한 명세이다.
정보명 성과품 납품
정보세부항목 성과품 명칭, 업로드 처리, 성과품 종류, 건설분야코드, 업로드 파일
설명 2세부에서 성과품 납품을 위해 함수 호출
[표 5]는 도 4에 도시된 인터페이스 5. 설계현황정보에 대한 명세이다.
정보명 설계 현황
정보세부항목 프로젝트 정보, 패키지정보, 시설분류코드, 파일명, 등록일자, 등록자
설명 2세부의 설계현황 정보를 제공하여 발주처에서 진척 상황을 모니터링 할 수 있다.
[표 6]은 도 4에 도시된 인터페이스 6. 시공현황정보에 대한 명세이다.
정보명 시공 현황
정보세부항목 프로젝트 정보, 패키지정보, 시설분류코드, 진척률, 등록일자, 등록자
설명 3세부의 시공현장의 진척률을 입력하여 발주처에서 진척 상황을 모니터링 할 수 있다.
도 5는 타분야 BIM 성과물을 수신하기 위한 아키텍쳐를 도시한 도면이다.도 5를 참조하면, 타분야 인터페이스 모듈(190)은 타분야 BIM 성과물을 ISO-16739 규격 IFC 표준 파일 형태로 수신하여, 수신된 각 파일에 대한 정보(예를 들어, 분야)를 파일(또는 파일명)에 기록하고, 수신된 파일에 해당하는 BIM 성과물의 분류 및 속성에 따라서 분류하여 타분야 DB(170)에 저장되도록 할 수 있다.
[표 7]은 타분야 BIM 성과물에 대한 명세이고, [표 8]은 [표 7]의 정보세부항목에 대한 설명을 보여준다.
정보명 타분야 BIM 표준 정보 수신
중분류 BIM 정보 수신
정보세부항목 기관번호, BIM 분류코드, 위치정보, 공종분류, 공종정보, 문서정보
설명 타분야 BIM 정보를 수신하기 위한 표현식 설계
[표 7]을 참조하면, 타분야 BIM 성과물은 타분야(예를 들어, 도로)와 관련된 기관번호, BIM 분류코드 등 정보세부항목에 기재된 정보를 포함한다.
명칭 ASN.1
데이터 명
설명 데이터유형 크기
(bytes)
기관번호 isttNo BIM 성과품을 발신하는 기관번호 String 2
BIM 분류코드 wbsCdNo BIM 성과품 관리를 위한 WBS 번호 String 10
위치정보 locationInfo 공구번호, 위치정보, 구조물 번호 등 String 5
공종분류 corKindCd 공사의 종류를 구분하기 위한 코드 String 10
공종정보 corClassCd 공종분류에 대한 상세 정보 코드 String 10
문서정보 docInfo 문서 정보에 대한 파일 정보 String 100
도 6은 [표 7]의 타분야 BIM 성과물을 BIM IFC 표준 포맷으로 변경한 예시도이다.도 6을 참조하면, 타분야의 설계사에서 설계된 파일은 인터페이스를 위한 IFC 표준포맷으로 변경하여 생성된 코딩으로서, 예를 들어, IFCReceiveInfo는 BIM 성과물의 분류 및 속성에 해당하는 다수의 구문들 중 하나이다. 타분야 인터페이스 모듈(190)은 IFCReceiveInfo와 같은 다수의 구문들을 해석하여 분류 및 속성에 따라 분류한 후 타분야 DB(170)에 저장되도록 할 수 있다.
한편 본 발명에 따른 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템은 이를 구현하기 위한 명령어들의 프로그램이 유형적으로 구현됨으로써, 컴퓨터를 통해 판독될 수 있는 기록매체에 포함되어 제공될 수도 있음은 통상의 기술자가 쉽게 이해할 수 있다.
즉, 본 발명에 따른 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템은 다양한 컴퓨터 수단을 통하여 수행될 수 있는 프로그램이 기록된 컴퓨터 판독 가능한 기록매체를 포함할수 있다. 상기 컴퓨터 판독 가능한 기록매체에는 하드 디스크와 같은 자기 매체(magnetic media), CD-ROM, DVD와 같은 광기록 매체(optical media) 및 롬(ROM), 램(RAM), 플래시 메모리, USB 메모리 등과 같은 프로그램 명령을 저장하고, 저장된 프로그램을 실행하도록 구성된 하드웨어 장치(예를 들어, 프로세서, 중앙처리장치, 그래픽 카드, RAM, ROM 등)가 포함된다.
따라서, 본 발명은 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템을 구현하기 위하여 상기 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템을 제어하는 컴퓨터 상에서 수행되는 컴퓨터 판독 가능한 기록매체에 저장된 프로그램을 함께 제공한다.
한편, 이상으로 본 발명의 기술적 사상을 예시하기 위한 바람직한 실시 예와 관련하여 설명하고 도시하였지만, 본 발명은 이와 같이 도시되고 설명된 그대로의 구성 및 작용에만 국한되는 것이 아니며, 기술적 사상의 범주를 일탈함이 없이 본 발명에 대해 다수의 변경 및 수정 가능함을 당업자들은 잘 이해할 수 있을 것이다. 따라서, 그러한 모든 적절한 변경 및 수정과 균등물들도 본 발명의 범위에 속하는 것으로 간주하여야 할 것이다. 따라서, 본 발명의 진정한 기술적 보호 범위는 첨부된 등록청구범위의 기술적 사상에 의해 정해져야 할 것이다.

Claims (3)

  1. BIM 기반 철도 인프라 사업에 접근 가능한 관리자의 명령에 기초하여, 프로젝트 기본 정보와 공사구간 별 패키지 기본 정보를 이용하여 시스템에서 관리할 프로젝트와 공사구간 별 패키지를 생성하는 프로젝트 관리 모듈;
    BIM 기반 철도 인프라 사업에 접근 가능한 설계사의 명령에 기초하여, 인덱스 파일 템플릿에 작성된 대용량 성과품 파일들의 기본 정보와 상기 대용량 성과품 파일들을 설계사 관리 장치로부터 업로드하여 통합 DB에 저장하는 BIM 성과품 납품 관리 모듈; 및
    상기 설계사 관리 장치로부터 업로딩되는 대용량 성과품 파일들과 설계현황정보를 수신하여 IFC 표준 파일 형태로 변환하는 공통 인터페이스 모듈;을 포함하고,
    상기 BIM 성과품 납품 관리 모듈은 상기 공통 인터페이스 모듈에 의해 IFC 표준 파일 형태로 변환된 대용량 성과품 파일들과 설계현황정보를 상기 통합 DB에 저장하는 것을 특징으로 하는 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템.
  2. 제1항에 있어서,
    철도 인프라 사업과 다른 분야의 사업에서 작성된 타분야 BIM 성과물을 IFC 표준 파일 형태로 수신하여 상기 타분야 BIM 성과물의 분류 및 속성에 따라 분류하여 타분야 DB에 저장하는 타분야 인터페이스 모듈;
    을 더 포함하는 것을 특징으로 하는 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템.
  3. 제1항에 있어서,
    상기 공통 인터페이스 모듈은,
    상기 프로젝트 관리 모듈에서 생성되는 프로젝트와 패키지의 정보를 상기 설계사 전자장치로 전송하는 것을 특징으로 하는 BIM 기반 철도 인프라 사업 설계 성과품 납품관리 시스템.
PCT/KR2022/016175 2021-11-03 2022-10-21 Bim 기반 철도 인프라 사업 설계 성과품 납품관리 시스템 WO2023080507A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2021-0149763 2021-11-03
KR1020210149763A KR20230064681A (ko) 2021-11-03 2021-11-03 Bim 기반 철도 인프라 사업 설계 성과품 납품관리 시스템

Publications (1)

Publication Number Publication Date
WO2023080507A1 true WO2023080507A1 (ko) 2023-05-11

Family

ID=86241404

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2022/016175 WO2023080507A1 (ko) 2021-11-03 2022-10-21 Bim 기반 철도 인프라 사업 설계 성과품 납품관리 시스템

Country Status (2)

Country Link
KR (1) KR20230064681A (ko)
WO (1) WO2023080507A1 (ko)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117172722A (zh) * 2023-11-02 2023-12-05 成都飞机工业(集团)有限责任公司 一种基于基础与高级两阶段的保障装备交付管理系统
CN117633978A (zh) * 2023-11-30 2024-03-01 广东南海产业集团有限公司 一种基于大数据的建筑能耗管理系统及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101056257B1 (ko) * 2010-11-30 2011-08-11 주식회사 디디알소프트 Bim기반 스마트 bom의 형상관리에 의한 전수명주기를 고려한 철도 건설 사업 관리 시스템 및 방법
KR101900803B1 (ko) * 2017-12-18 2018-09-20 한국건설기술연구원 Bim모델의 인프라 ifc포맷 변환 시스템 및 방법
KR20200071863A (ko) * 2018-12-05 2020-06-22 한국건설기술연구원 국제표준 ifc 기반 라이브러리 작성 및 공유 방법 및 시스템
JP2021021983A (ja) * 2019-07-24 2021-02-18 株式会社奥村組 建設物の施工管理装置
KR102255754B1 (ko) * 2020-10-20 2021-05-26 우송대학교 산학협력단 Bim 기반 철도 인프라 사업 정보 관리 시스템 및 그의 방법

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101752913B1 (ko) 2016-11-29 2017-07-03 주식회사 코바엔지니어링 Bim을 이용한 건물 시공 운영관리 시스템 및 방법

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101056257B1 (ko) * 2010-11-30 2011-08-11 주식회사 디디알소프트 Bim기반 스마트 bom의 형상관리에 의한 전수명주기를 고려한 철도 건설 사업 관리 시스템 및 방법
KR101900803B1 (ko) * 2017-12-18 2018-09-20 한국건설기술연구원 Bim모델의 인프라 ifc포맷 변환 시스템 및 방법
KR20200071863A (ko) * 2018-12-05 2020-06-22 한국건설기술연구원 국제표준 ifc 기반 라이브러리 작성 및 공유 방법 및 시스템
JP2021021983A (ja) * 2019-07-24 2021-02-18 株式会社奥村組 建設物の施工管理装置
KR102255754B1 (ko) * 2020-10-20 2021-05-26 우송대학교 산학협력단 Bim 기반 철도 인프라 사업 정보 관리 시스템 및 그의 방법

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117172722A (zh) * 2023-11-02 2023-12-05 成都飞机工业(集团)有限责任公司 一种基于基础与高级两阶段的保障装备交付管理系统
CN117633978A (zh) * 2023-11-30 2024-03-01 广东南海产业集团有限公司 一种基于大数据的建筑能耗管理系统及方法

Also Published As

Publication number Publication date
KR20230064681A (ko) 2023-05-11

Similar Documents

Publication Publication Date Title
WO2023080507A1 (ko) Bim 기반 철도 인프라 사업 설계 성과품 납품관리 시스템
CN106296378B (zh) 基于xbrl的智能财务云平台系统、构建方法及业务实现方法
CN106815681B (zh) 基于二维码的变电站二次设备闭环管理平台及其管理系统
WO2023080508A1 (ko) Bim 기반 철도 인프라 사업 시공 정보 관리 시스템
CN102902544B (zh) 一种电话支付终端软件平台的实现方法
RU2359319C2 (ru) Способ интеграции информационных ресурсов неоднородной вычислительной сети
WO2021248656A1 (zh) 基于区块链的电子罚单处理方法、装置、设备及存储介质
CN110990620A (zh) 一种基于智能技术应用的变电站图档资料智能管理方法
WO2018004020A1 (ko) 마크업 언어 기반 문서에 대한 동시 편집 정합성 검증 장치 및 방법
CN106599216A (zh) 一种用于计算机辅助训练课件发布系统
JPWO2002071269A1 (ja) インターネットによる特許または実用新案の情報検索管理システム
CN111813745A (zh) 用于土建施工技术及标准查询的系统、装置及方法
Grønbæk et al. CSCW challenges in large-scale technical projects—a case study
WO2020141690A1 (ko) 스마트 컨트랙트 기반 논문 심사 시스템
WO2018212456A1 (ko) 데이터 분산형 통합 관리시스템
Zheng et al. Discussion of University Chemistry Laboratory Management Using DOSA Platform and Safety Education Based on Blockchain
CN1932760B (zh) 用于运行应用程序的系统和方法
CN111865929B (zh) 光纤与设备资源及链路管理方法及系统
CN207489085U (zh) 交通运输业远程安全管理咨询系统
CN113377857A (zh) 数据分发方法、装置、电子设备及可读存储介质
KR102635057B1 (ko) 프로젝트 관리 정보 디바이스 및 시스템과 이들을 활용하여 프로젝트 관리 정보를 관리하는 방법
US20140019370A1 (en) Transforming project management representations into business process representations
TR2023015688T2 (tr) Bim tabanli demi̇ryolu alt yapi i̇şi̇ i̇nşaat bi̇lgi̇ yöneti̇m si̇stemi̇
Borghoff et al. Long-term lifecycle-related management of digital building documents: towards a holistic and standard-based concept for a technical and organizational solution in building authorities
WO2024101843A1 (ko) 데이터 거버넌스 시스템 및 데이터 거버넌스 시스템의 데이터 관리 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22890242

Country of ref document: EP

Kind code of ref document: A1