WO2023070370A1 - Metering precision checking apparatus and method for coal conveying electronic belt scale of circular stacker-reclaimer - Google Patents

Metering precision checking apparatus and method for coal conveying electronic belt scale of circular stacker-reclaimer Download PDF

Info

Publication number
WO2023070370A1
WO2023070370A1 PCT/CN2021/126720 CN2021126720W WO2023070370A1 WO 2023070370 A1 WO2023070370 A1 WO 2023070370A1 CN 2021126720 W CN2021126720 W CN 2021126720W WO 2023070370 A1 WO2023070370 A1 WO 2023070370A1
Authority
WO
WIPO (PCT)
Prior art keywords
coal
belt scale
reclaimer
electronic belt
circular
Prior art date
Application number
PCT/CN2021/126720
Other languages
French (fr)
Chinese (zh)
Inventor
朱传峰
Original Assignee
华能烟台八角热电有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华能烟台八角热电有限公司 filed Critical 华能烟台八角热电有限公司
Priority to PCT/CN2021/126720 priority Critical patent/WO2023070370A1/en
Publication of WO2023070370A1 publication Critical patent/WO2023070370A1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G11/00Apparatus for weighing a continuous stream of material during flow; Conveyor belt weighers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G23/00Auxiliary devices for weighing apparatus
    • G01G23/01Testing or calibrating of weighing apparatus

Definitions

  • the invention relates to the technical field of measurement accuracy verification of belt scales, in particular to a measurement accuracy verification device and method for a circular stacker-reclaimer coal conveying electronic belt scale.
  • the accuracy verification of the electronic belt scale is carried out in the coal loading system of the power plant composed of the circular stacker-reclaimer, and the conventional coal loading method is adopted, that is, the coal is dropped from the belt conveyor-round stacker-reclaimer cantilever-to Ground - the loader collects coal and pours it into the transport vehicle - the transport vehicle transports the coal to the truck scale for weighing and measurement - compares the measurement data of the truck scale with the data of the electronic belt scale - obtains the accuracy of the electronic belt scale - calibrates the belt scale.
  • the technical problem to be solved by the present invention is the problem that the circular stacker-reclaimer cannot be accurately collected due to the inability of the cantilever to drop the coal used for metering and verification.
  • a device for calibrating measurement accuracy of electronic belt scales for coal conveying in circular stackers and reclaimers comprising:
  • the coal transport assembly includes a belt scale, a drive wheel and a drive motor, the belt scale is arranged on the drive wheel, and the drive motor is connected to the drive wheel;
  • the coal collecting assembly includes a pillar arranged under the belt scale, a cantilever arranged on the pillar and a coal drop tube suspended under the cantilever, the coal drop tube is provided with a connecting piece, and a traction piece is set above the cantilever.
  • a hanging column is arranged on the cantilever, and a socket is provided through the hanging column.
  • the coal falling cylinder includes a top frame, a surrounding cloth and a bottom frame, and the top frame and bottom frame The frames are respectively set on the upper and lower ends of the surrounding cloth;
  • the connecting piece includes a plug-in post and a transition piece, the plug-in post is fixed at the top four corners of the top frame, and the transition piece is sleeved on the plug-in post.
  • the end of the plug-in column is provided with a cone, and the outer side of the transition piece is provided with a cone ;
  • the end of the plug-in column is provided with a lifting ring.
  • a plate groove is arranged on the outside of the hanging column, and a sealing plate is arranged in the plate groove. There are perforations on the cover plate;
  • Round holes and square grooves are sequentially arranged on the hanging post radially from outside to inside.
  • the hanging column is provided with a stopper, and the stopper includes a round rod and is arranged on a round bar.
  • the stopper includes a round rod and is arranged on a round bar.
  • the round rod is arranged in the round hole, the square rod is in the square groove, the round rod is covered with a spring, and the spring connects the end of the square rod and the bottom of the square groove;
  • the end of the square rod is provided with a slope.
  • the traction member includes a traction rope and a guide pipe
  • the traction rope is arranged on the guide pipe
  • the guide tube includes a vertical bar, a horizontal bar arranged horizontally and connected to the vertical bar, and a branch tube communicating with the horizontal bar.
  • the end of the traction rope is provided with a hook, and the end of the branch pipe communicates with the socket;
  • the traction rope runs through the vertical bar, the horizontal bar and the branch pipe, and the hook is arranged in the jack.
  • a transport vehicle is provided under the coal falling barrel, and a truck scale is provided at a certain distance from the transport vehicle .
  • the present invention also provides a method for calibrating the measurement accuracy of an electronic belt scale for coal conveyance of a circular stacker and reclaimer, wherein:
  • the coal passes through the belt scale, and the scale shows the crude weight A;
  • the coal is collected and dropped into the transport vehicle through the coal dropper, and the accurate mass B is measured at the truck scale;
  • the side of the support frame is also provided with a second fixing hole, the position of which is the same as that of the first Corresponding to the position of the fixing hole.
  • the beneficial effect of the present invention is that by using the conveniently disassembled coal drop tube to collect coal, errors caused by scattering are avoided, and meanwhile, the coal drop tube is convenient to be replaced in case of damage or the like.
  • Figure 1 is a schematic diagram of the overall structure of a circular stacker-reclaimer coal conveying electronic belt scale measurement accuracy verification device according to an embodiment of the present invention
  • Fig. 2 is a structural schematic diagram of the traction part in the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale measurement accuracy verification device according to an embodiment of the present invention
  • Fig. 3 is a schematic diagram of the placement structure of the connectors in the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale measurement accuracy verification device according to an embodiment of the present invention
  • Fig. 4 is a schematic cross-sectional structure diagram of the hanging column in the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale measurement accuracy verification device according to an embodiment of the present invention
  • Fig. 5 is a structural schematic diagram of the connecting parts in the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale according to an embodiment of the present invention.
  • one embodiment or “embodiment” referred to herein refers to a specific feature, structure or characteristic that may be included in at least one implementation of the present invention. "In one embodiment” appearing in different places in this specification does not all refer to the same embodiment, nor is it a separate or selective embodiment that is mutually exclusive with other embodiments.
  • this embodiment provides a device for calibrating measurement accuracy of a circular stacker-reclaimer coal conveying electronic belt scale, which includes a coal transport assembly 100 and a coal collection assembly 200, wherein the coal transport assembly 100 includes a belt scale 101, Drive wheel 102 and drive motor 103, belt scale 101 is arranged on the drive wheel 102, and drive motor 103 is connected with drive wheel 102;
  • Coal collection assembly 200 comprises the pillar 201 that is arranged on belt scale 101 below, is arranged on the cantilever 202 on the pillar And the coal drop tube 203 suspended below the cantilever 202, the coal drop tube 203 is provided with a connecting piece 300, and the top of the cantilever 202 is provided with a traction piece 400.
  • the coal transport assembly 100 is used for weighing and transporting coal, specifically weighing through the belt scale 101, and this device is used for inspection of the belt scale 101, specifically, the driving motor 103 is used to control the driving wheel 102 drives, and driving wheel is provided with two, and a driving wheel is connected with driving motor 103, and one is driven wheel, and two driving wheels 102 drive belt scale 101.
  • the coal collecting assembly 200 is used to collect the coal falling from the belt scale 101 to prevent it from splashing and scattering during the process of falling from a high place, which will eventually lead to weighing errors.
  • the connecting piece 300 is used to fix the coal drop tube 203 on the cantilever 202, and the traction piece 400 is used to lift the coal drop tube 203.
  • the top opening of the coal drop tube 203 corresponds to the bottom of the belt scale 101, and the coal flows from the belt. Falling on claiming 101 will all fall in the coal drop tube 203.
  • a hanging column 202a is provided on the cantilever 202, and an insertion hole 202b is provided through the hanging column 202a;
  • the cloth 203b and the bottom frame 203c, the top frame 203a and the bottom frame 203c are respectively arranged on the upper and lower ends of the surrounding cloth 203b;
  • the connector 300 includes a plug-in post 301 and a transition piece 302, and the plug-in post 301 is fixed at the top four corners of the top frame 203a,
  • the transition piece 302 is sheathed on the insertion post 301 .
  • the surrounding cloth 203b is a waterproof, sunscreen, thickened and wear-resistant PVC plastic-coated tarpaulin
  • the top frame 203a, bottom frame 203c and the connector 300 arranged on the top frame 203a are all made of hard PVC material, which has high hardness and high density. Small, lighter in size, easy to lift, the same material of the top frame 203a and the bottom frame 203c is for the convenience of production, the shape and size of the top frame 203a and the bottom frame 203c can be connected, and both can be used in common.
  • a counterweight is provided under the bottom frame 203c to keep the bottom frame 203 from moving randomly. Specifically, the bottom frame 203 is suspended above the transport vehicle 204, and coal falling will directly fall into the transport vehicle 204 for collection.
  • the end of the insertion post 301 is provided with a frustum 301a
  • the outer side of the transition piece 302 is provided with a conical surface 302a
  • the end of the insertion post 301 is provided with a lifting ring 301b
  • the overall transition piece 302 is in the shape of a truncated cone, and a through hole is formed on it along the axis.
  • the transition piece 302 is sleeved on the insertion column 301 and can be inserted Move on the connecting post 301;
  • the frustum 301a is a frustum structure with the same size as the transition piece 302. Further, referring to FIG. , the side of the frustum 301a and the conical surface 302a smoothly transition.
  • a plate groove 202c is arranged on the outside of the hanging column 202a, a sealing plate 202d is arranged in the plate groove 202c, and a perforation 202e is arranged on the sealing plate 202d; a round hole 202f and a square hole 202f are arranged on the hanging column 202a radially from outside to inside. Groove 202g.
  • the plate groove 202c is an arc-shaped groove arranged on the outside of the hanging post 202a, and the sealing plate 202d is fixed in the plate groove 202 by means of bolt connection; furthermore, the position of the perforation 202e corresponds to the position of the round hole 202f, specifically Yes, the perforation 202e and the round hole 202f are both circular holes coaxially arranged, and the square groove is a square hole whose cross-sectional size is larger than the cross-sectional size of the round hole 202f.
  • the hanging column 202a is provided with a stopper 202h, and the stopper 202h includes a round rod 202h-1, a square rod 202h-2 arranged at one end of the round rod 202h-1 and a baffle plate 202h-3 arranged at the other end of the round rod 202h-1
  • the round rod 202h-1 is set in the round hole 202f
  • the square rod 202h-2 is in the square groove 202g
  • the round rod 202h-1 is covered with a spring 202h-4
  • the spring 202h-4 is connected to the end of the square rod 202h-2 and the bottom of the square groove 202g
  • the end of the square rod 202h-2 is provided with a slope 202h-5.
  • the size of the round hole 202f matches the round rod 202h-1
  • the size of the square rod 202h-2 matches the size of the square groove 202g
  • the stopper 202h is used to limit the connecting piece 300 and fix the connecting piece 300 on the cantilever 202.
  • the structure of the square rod 202h-2 and the square groove 202g prevents the block 202h from rotating, and the square rod 202h-2 can only move along the axis of the round rod 202h-1.
  • the spring 202h-4 is in the square groove 202g, and squeezes the part of the square rod 202h-2, especially the part where the slope 202h-5 is located, into the socket 202b, and the slope 202h-5 faces directly downward.
  • the plug post 301 is inserted into the socket 202b, the side of the cone 301a contacts the inclined surface 202h-5, and during the upward movement, the square rod 202h-2 is pushed into the square groove 202g, so that the spring 202h- 4 is compressed, after the end of the square rod 202h-2 crosses the frustum 301a, it is ejected under the action of the spring 202h-4, and is stuck under the frustum 301a. Under the action of gravity, the frustum 301a bears on the frustum 301a 2 on.
  • the square bar 202h-2 retreats, the transition piece 302 crosses the square bar 202h-2, and then under the action of gravity, the insertion post 301 moves down,
  • the transition piece 302 is clamped by the square rod 202h-2 and moves up until it contacts the frustum 301a, the square rod 202h-2 moves up along the conical surface 302a and crosses the transition piece 302 until it contacts the side of the frustum 301a and passes over the frustum 301a.
  • the plug post 301 is disengaged from the hanging post 202a.
  • the traction member 400 includes a traction rope 401 and a guide tube 402, the traction rope 401 is arranged in the guide tube 402, the guide tube 402 includes a vertical bar 402a, a horizontal bar 402b arranged horizontally and connected to the vertical bar 402a, and a horizontal bar 402b connected to the vertical bar 402b The communicating branch pipe 402c.
  • the end of the traction rope 401 is provided with a hook 401a, and the end of the branch pipe 402c communicates with the socket 202b; the traction rope 401 runs through the vertical bar 402a, the horizontal bar 402b and the branch pipe 402c, and the hook 401a is arranged in the socket 202b.
  • the traction rope 401 and the guide tube 402 are used to raise the top frame 203a horizontally.
  • the vertical bar 402a is placed vertically, and there are two horizontal bars 402b, which are arranged symmetrically, and their ends are connected to the vertical bar.
  • 402a communicates with each other, and there are four branch pipes 402c, which are symmetrically arranged under the cross bar 402b in pairs.
  • the four-strand traction rope 401 is separated two by two at the interface between the vertical bar 402a and the cross bar 402b, and enters the cross bar 402b two by two, and separates at the junction of the cross bar 402b and the branch pipe 402c, and enters the branch pipe 402c one by one Among them, the end of each traction rope 401 is provided with a hook 401a, and the hook 401a is located in the insertion hole 202b.
  • the end of the vertical bar 402a is provided with a winding roller, which is driven by a motor, and the traction rope 401 is wound on the winding roller, and the length of the traction rope 401 left in the guide tube 402 is consistent, so that the traction rope 401 ends are at the same level.
  • the action of the rewinding roller can be driven by a remote control motor. Because it is at a high place, it is difficult to directly control it by a rope.
  • put down the hook 401a connect the hook 401a with the ring 301b, and then lift the hook 401a to the trigger condition
  • the device is also provided with a counterweight 500 , and the counterweight 500 is provided with a hook for maintaining the horizontal state of the traction rope 301 .
  • a transport vehicle 204 is arranged below the coal falling barrel 203, and a truck scale 205 is arranged at a certain distance from the transport vehicle 204.
  • this embodiment provides a method for verifying the measurement accuracy of an electronic belt scale for circular stacker-reclaimer coal conveyance. Coal passes through the belt scale 101, and the weighing shows a rough weight A;
  • the coal is collected and dropped into the transport vehicle 204 through the coal drop tube 203, and the accurate mass B is measured at the vehicle scale 205;
  • the coal falling tube 203 that is easy to replace collects the coal into the transport vehicle 204 to ensure that the coal weighed by the truck scale 205 is not far from the coal weighed by the belt scale 101, and the coal falling tube 203 is easy to carry. Replacement, to avoid scratches and damages to the surrounding cloth 203b and coal ash adhesion and other damages during the coal falling process, which will affect the inspection.
  • any process or method steps may be varied or re-sequenced according to alternative embodiments.
  • any "means-plus-function" clause is intended to cover the structures described herein as performing the recited function and not only structural equivalents but also equivalent structures.
  • Other substitutions, modifications, changes and omissions may be made in the design, operation and arrangement of the exemplary embodiments without departing from the scope of the invention. Accordingly, the invention is not limited to a particular embodiment, but extends to various modifications still falling within the scope of the appended claims.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

Disclosed are a metering precision checking apparatus and method for a coal conveying electronic belt scale of a circular stacker-reclaimer. The metering precision checking apparatus for the coal conveying electronic belt scale of the circular stacker-reclaimer comprises: a coal conveying assembly, comprising a belt scale, a driving wheel, and a driving motor, the belt scale being provided on the driving wheel, and the driving motor being connected to the driving wheel; and a coal collecting assembly, comprising a supporting column provided below the belt scale, a cantilever provided on the supporting column, and a coal falling cylinder suspended below the cantilever, a connecting member being provided on the coal falling cylinder, and a traction member being provided above the cantilever. Coal is collected by means of the coal falling cylinder convenient to be disassembled and assembled, so that errors caused by coal scattering are avoided, and the coal falling cylinder is convenient to be replaced under the conditions of damage and the like.

Description

一种圆形堆取料机输煤电子皮带秤计量精度校验装置及方法Device and method for calibrating measurement accuracy of electronic belt scale for circular stacker and reclaimer for coal conveyance 技术领域technical field
本发明涉及皮带秤计量精度校验技术领域,尤其是一种圆形堆取料机输煤电子皮带秤计量精度校验装置及方法。The invention relates to the technical field of measurement accuracy verification of belt scales, in particular to a measurement accuracy verification device and method for a circular stacker-reclaimer coal conveying electronic belt scale.
背景技术Background technique
目前在由圆形堆取料机构成的发电厂上煤系统里进行电子皮带秤的精度校验,采取的是常规上煤方法,即煤炭由皮带机-圆形堆取料机悬臂-下落至地面-装载机收集煤炭倒入运输车辆-运输车辆将煤运到汽车衡称重计量-将汽车衡计量数据与电子皮带秤数据比对-得出电子皮带秤精度-校准皮带秤。At present, the accuracy verification of the electronic belt scale is carried out in the coal loading system of the power plant composed of the circular stacker-reclaimer, and the conventional coal loading method is adopted, that is, the coal is dropped from the belt conveyor-round stacker-reclaimer cantilever-to Ground - the loader collects coal and pours it into the transport vehicle - the transport vehicle transports the coal to the truck scale for weighing and measurement - compares the measurement data of the truck scale with the data of the electronic belt scale - obtains the accuracy of the electronic belt scale - calibrates the belt scale.
缺点:因此种圆形堆取料机悬臂为固定式,不能上下升降,距离地面30米高。煤炭只能从距离地面30多米高的悬臂头部辊筒处下落,1)细的煤炭粉末会四处飞扬,造成质量上的损失;2)落到地面的煤块有一部分迸溅很远,与其他非计量检定用煤混在一起,难以区分,造成需要计量检定的煤炭难以完全收集起来。收集迸溅出去的那部分煤炭时往往过多或过少。最终导致实际收集起来的煤炭与通过堆取料机悬臂的煤炭在质量上数据差距大,无法对电子皮带秤进行真实比对和校正。Disadvantages: Therefore, the cantilever of this circular stacker-reclaimer is fixed and cannot be lifted up and down, and it is 30 meters above the ground. Coal can only fall from the cantilever head roller at a height of more than 30 meters from the ground. 1) Fine coal powder will fly around, causing quality loss; Coals used for non-measurement verification are mixed together, making it difficult to distinguish them, making it difficult to collect coal that requires measurement verification. Often too much or too little coal is collected when the part of the coal that splatters is collected. In the end, there is a large data gap between the actually collected coal and the coal passed through the cantilever of the stacker-reclaimer, and it is impossible to truly compare and correct the electronic belt scale.
发明内容Contents of the invention
本部分的目的在于概述本发明的实施例的一些方面以及简要介绍一些较佳实施例,在本部分以及本申请的说明书摘要和发明名称中可能会做些简化或省略以避免使本部分、说明书摘要和发明名称的目的模糊,而这种简化或省略不能用于限制本发明的范围。The purpose of this section is to summarize some aspects of the embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and in the abstract and title of the application to avoid making this section, the specification The abstract and titles are intended to be vague, and such simplifications or omissions should not be used to limit the scope of the invention.
鉴于上述和/或现有技术中所存在的问题,提出了本发明。In view of the problems mentioned above and/or in the prior art, the present invention is proposed.
因此,本发明所要解决的技术问题是圆形堆取料机因悬臂无法下落而导致用来计量检定的煤炭四处飞溅洒落无法准确收集的问题。Therefore, the technical problem to be solved by the present invention is the problem that the circular stacker-reclaimer cannot be accurately collected due to the inability of the cantilever to drop the coal used for metering and verification.
为解决上述技术问题,本发明提供如下技术方案:一种圆形堆取料机输煤电子皮带秤计量精度校验装置,包括,In order to solve the above-mentioned technical problems, the present invention provides the following technical solutions: a device for calibrating measurement accuracy of electronic belt scales for coal conveying in circular stackers and reclaimers, comprising:
运煤组件,包括皮带秤、驱动轮和驱动电机,所述皮带秤设置于所述驱动轮上,所述驱动电机与所述驱动轮连接;The coal transport assembly includes a belt scale, a drive wheel and a drive motor, the belt scale is arranged on the drive wheel, and the drive motor is connected to the drive wheel;
集煤组件,包括设置于皮带秤下方的支柱、设置于支柱上的悬臂和悬挂于悬臂下方的落煤筒,所述落煤筒上设置有连接件,所述悬臂上方设置有牵引件。The coal collecting assembly includes a pillar arranged under the belt scale, a cantilever arranged on the pillar and a coal drop tube suspended under the cantilever, the coal drop tube is provided with a connecting piece, and a traction piece is set above the cantilever.
作为本发明所述圆形堆取料机输煤电子皮带秤计量精度校验装置的一种优选方案,其中:所述悬臂上设置有挂柱,所述挂柱中贯穿设置有插孔。As a preferred solution of the measurement accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale of the present invention, a hanging column is arranged on the cantilever, and a socket is provided through the hanging column.
作为本发明所述圆形堆取料机输煤电子皮带秤计量精度校验装置的一种优选方案,其中:所述落煤筒包括顶框、围布和底框,所述顶框和底框分别设置于围布的上下端;As a preferred solution of the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale in the present invention, wherein: the coal falling cylinder includes a top frame, a surrounding cloth and a bottom frame, and the top frame and bottom frame The frames are respectively set on the upper and lower ends of the surrounding cloth;
所述连接件包括插接柱和过渡件,所述插接柱固定于所述顶框顶部四角处,所述过渡件套设于所述插接柱上。The connecting piece includes a plug-in post and a transition piece, the plug-in post is fixed at the top four corners of the top frame, and the transition piece is sleeved on the plug-in post.
作为本发明所述圆形堆取料机输煤电子皮带秤计量精度校验装置的一种优选方案,其中:所述插接柱端部设置有锥台,所述过渡件外侧设置有锥面;As a preferred solution of the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale of the present invention, wherein: the end of the plug-in column is provided with a cone, and the outer side of the transition piece is provided with a cone ;
所述插接柱端部设置有吊环。The end of the plug-in column is provided with a lifting ring.
作为本发明所述圆形堆取料机输煤电子皮带秤计量精度校验装置的一种优选方案,其中:所述挂柱外侧设置有板槽,所述板槽中设置有封板,所述封板上设置有穿孔;As a preferred solution of the measurement accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale in the present invention, a plate groove is arranged on the outside of the hanging column, and a sealing plate is arranged in the plate groove. There are perforations on the cover plate;
所述挂柱上沿径向由外向内依次设置有圆孔和方槽。Round holes and square grooves are sequentially arranged on the hanging post radially from outside to inside.
作为本发明所述圆形堆取料机输煤电子皮带秤计量精度校验装置的一种优选方案,其中:所述挂柱中设置有挡块,所述挡块包括圆杆、设置于圆杆一端的方杆和设置于圆杆另一端的挡板;As a preferred solution of the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale in the present invention, wherein: the hanging column is provided with a stopper, and the stopper includes a round rod and is arranged on a round bar. A square rod at one end of the rod and a baffle arranged at the other end of the round rod;
所述圆杆设置于所述圆孔中,所述方杆处于所述方槽中,所述圆杆上套设有弹簧,所述弹簧连接方杆端部和方槽底部;The round rod is arranged in the round hole, the square rod is in the square groove, the round rod is covered with a spring, and the spring connects the end of the square rod and the bottom of the square groove;
所述方杆端部设置有斜面。The end of the square rod is provided with a slope.
作为本发明所述圆形堆取料机输煤电子皮带秤计量精度校验装置的一种优选方案,其中:所述牵引件包括牵引绳和导向管,所述牵引绳设置于所述导向管中,所述导向管包括竖杆、水平设置并于竖杆连接的横杆和与横杆连通的分支管。As a preferred solution of the measurement accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale in the present invention, wherein: the traction member includes a traction rope and a guide pipe, and the traction rope is arranged on the guide pipe Among them, the guide tube includes a vertical bar, a horizontal bar arranged horizontally and connected to the vertical bar, and a branch tube communicating with the horizontal bar.
作为本发明所述圆形堆取料机输煤电子皮带秤计量精度校验装置的一种优选方案,其中:所述牵引绳端部设置有卡钩,分支管端部与插孔相通;As a preferred solution of the measurement accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale of the present invention, wherein: the end of the traction rope is provided with a hook, and the end of the branch pipe communicates with the socket;
所述牵引绳贯穿竖杆、横杆和分支管,卡钩设置于所述插孔中。The traction rope runs through the vertical bar, the horizontal bar and the branch pipe, and the hook is arranged in the jack.
作为本发明所述圆形堆取料机输煤电子皮带秤计量精度校验装置的一种优选方案,其中:所述落煤筒下方设置有运输车,距离运输车一定距离处设置有汽车衡。As a preferred solution of the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale in the present invention, a transport vehicle is provided under the coal falling barrel, and a truck scale is provided at a certain distance from the transport vehicle .
本发明还提供一种圆形堆取料机输煤电子皮带秤计量精度校验方法,其中:The present invention also provides a method for calibrating the measurement accuracy of an electronic belt scale for coal conveyance of a circular stacker and reclaimer, wherein:
煤炭从皮带称上经过,称重显示粗重量A;The coal passes through the belt scale, and the scale shows the crude weight A;
煤炭经落煤筒收集落入运输车中,至汽车衡处测得精准质量B;The coal is collected and dropped into the transport vehicle through the coal dropper, and the accurate mass B is measured at the truck scale;
计算皮带称精度为(B-A)/B*100%;Calculate the belt weighing accuracy as (B-A)/B*100%;
将精准质量B输入皮带称,校验皮带称;Input the precise mass B into the belt scale, and check the belt scale;
依上反复校验,直至皮带秤精度达到0.5%为止。Repeat the calibration according to the above until the accuracy of the belt scale reaches 0.5%.
作为本发明所述圆形堆取料机输煤电子皮带秤计量精度校验装置及方法的一种优选方案,其中:所述支撑架侧面还设有第二固定孔,位置与所述第一固定孔位置对应。As a preferred solution of the metering accuracy verification device and method of the circular stacker-reclaimer coal conveying electronic belt scale of the present invention, wherein: the side of the support frame is also provided with a second fixing hole, the position of which is the same as that of the first Corresponding to the position of the fixing hole.
本发明的有益效果:通过利用可方便拆装的落煤筒收集煤炭,避免散落导致误差,同时落煤筒方便在破损等情况下进行更换。The beneficial effect of the present invention is that by using the conveniently disassembled coal drop tube to collect coal, errors caused by scattering are avoided, and meanwhile, the coal drop tube is convenient to be replaced in case of damage or the like.
附图说明Description of drawings
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。其中:In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For Those of ordinary skill in the art can also obtain other drawings based on these drawings without any creative effort. in:
图1为本发明提供的一种实施例所述的圆形堆取料机输煤电子皮带秤计量精度校验装置的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of a circular stacker-reclaimer coal conveying electronic belt scale measurement accuracy verification device according to an embodiment of the present invention;
图2为本发明提供的一种实施例所述的圆形堆取料机输煤电子皮带秤计量精度校验装置中牵引件的结构示意图;Fig. 2 is a structural schematic diagram of the traction part in the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale measurement accuracy verification device according to an embodiment of the present invention;
图3为本发明提供的一种实施例所述的圆形堆取料机输煤电子皮带秤计量精度校验装置中连接件的放置结构示意图;Fig. 3 is a schematic diagram of the placement structure of the connectors in the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale measurement accuracy verification device according to an embodiment of the present invention;
图4为本发明提供的一种实施例所述的圆形堆取料机输煤电子皮带秤计量精度校验装置中挂柱的剖面结构示意图;Fig. 4 is a schematic cross-sectional structure diagram of the hanging column in the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale measurement accuracy verification device according to an embodiment of the present invention;
图5为本发明提供的一种实施例所述的圆形堆取料机输煤电子皮带秤计量精度校验装置中连接件的结构示意图。Fig. 5 is a structural schematic diagram of the connecting parts in the metering accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale according to an embodiment of the present invention.
具体实施方式Detailed ways
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合说明书附图对本发明的具体实施方式做详细的说明。In order to make the above objects, features and advantages of the present invention more obvious and comprehensible, specific implementations of the present invention will be described in detail below in conjunction with the accompanying drawings.
在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是本发明 还可以采用其他不同于在此描述的其它方式来实施,本领域技术人员可以在不违背本发明内涵的情况下做类似推广,因此本发明不受下面公开的具体实施例的限制。In the following description, a lot of specific details are set forth in order to fully understand the present invention, but the present invention can also be implemented in other ways different from those described here, and those skilled in the art can do it without departing from the meaning of the present invention. By analogy, the present invention is therefore not limited to the specific examples disclosed below.
其次,本发明结合示意图进行详细描述,在详述本发明实施例时,为便于说明,表示器件结构的剖面图会不依一般比例作局部放大,而且所述示意图只是示例,其在此不应限制本发明保护的范围。此外,在实际制作中应包含长度、宽度及深度的三维空间尺寸。Secondly, the present invention is described in detail in combination with schematic diagrams. When describing the embodiments of the present invention in detail, for the convenience of explanation, the cross-sectional view showing the device structure will not be partially enlarged according to the general scale, and the schematic diagram is only an example, and it should not be limited here. The protection scope of the present invention. In addition, the three-dimensional space dimensions of length, width and depth should be included in actual production.
再其次,此处所称的“一个实施例”或“实施例”是指可包含于本发明至少一个实现方式中的特定特征、结构或特性。在本说明书中不同地方出现的“在一个实施例中”并非均指同一个实施例,也不是单独的或选择性的与其他实施例互相排斥的实施例。Second, "one embodiment" or "embodiment" referred to herein refers to a specific feature, structure or characteristic that may be included in at least one implementation of the present invention. "In one embodiment" appearing in different places in this specification does not all refer to the same embodiment, nor is it a separate or selective embodiment that is mutually exclusive with other embodiments.
实施例1Example 1
参照图1,本实施例提供了一种圆形堆取料机输煤电子皮带秤计量精度校验装置,包括运煤组件100和集煤组件200,其中运煤组件100,包括皮带秤101、驱动轮102和驱动电机103,皮带秤101设置于驱动轮102上,驱动电机103与驱动轮102连接;集煤组件200,包括设置于皮带秤101下方的支柱201、设置于支柱上的悬臂202和悬挂于悬臂202下方的落煤筒203,落煤筒203上设置有连接件300,悬臂202上方设置有牵引件400。Referring to Fig. 1 , this embodiment provides a device for calibrating measurement accuracy of a circular stacker-reclaimer coal conveying electronic belt scale, which includes a coal transport assembly 100 and a coal collection assembly 200, wherein the coal transport assembly 100 includes a belt scale 101, Drive wheel 102 and drive motor 103, belt scale 101 is arranged on the drive wheel 102, and drive motor 103 is connected with drive wheel 102; Coal collection assembly 200, comprises the pillar 201 that is arranged on belt scale 101 below, is arranged on the cantilever 202 on the pillar And the coal drop tube 203 suspended below the cantilever 202, the coal drop tube 203 is provided with a connecting piece 300, and the top of the cantilever 202 is provided with a traction piece 400.
应说明的是,运煤组件100用于对煤炭称重并运输,具体为通过皮带称101进行称重,本装置用于对皮带称101的检验,具体的,驱动电机103用于对驱动轮102进行驱动,驱动轮设置有两个,一个主动轮与驱动电机103连接,一个为从动轮,两个驱动轮102对皮带称101进行驱动。It should be noted that the coal transport assembly 100 is used for weighing and transporting coal, specifically weighing through the belt scale 101, and this device is used for inspection of the belt scale 101, specifically, the driving motor 103 is used to control the driving wheel 102 drives, and driving wheel is provided with two, and a driving wheel is connected with driving motor 103, and one is driven wheel, and two driving wheels 102 drive belt scale 101.
集煤组件200用于对从皮带称101上落下的煤炭进行收集,防止其在哦传难过高处下落的过程中飞溅散落,最终导致称重误差。The coal collecting assembly 200 is used to collect the coal falling from the belt scale 101 to prevent it from splashing and scattering during the process of falling from a high place, which will eventually lead to weighing errors.
连接件300用于将落煤筒203固定在悬臂202上,牵引件400用于将落煤筒203提升,具体的,落煤筒203顶部敞口对应于皮带称101端部下方,煤炭从皮带称101上掉落将全部落入落煤筒203中。The connecting piece 300 is used to fix the coal drop tube 203 on the cantilever 202, and the traction piece 400 is used to lift the coal drop tube 203. Specifically, the top opening of the coal drop tube 203 corresponds to the bottom of the belt scale 101, and the coal flows from the belt. Falling on claiming 101 will all fall in the coal drop tube 203.
实施例2Example 2
参照图1~5,本实施例与上一实施例的不同之处在于,悬臂202上设置有挂柱202a,挂柱202a中贯穿设置有插孔202b;落煤筒203包括顶框203a、围 布203b和底框203c,顶框203a和底框203c分别设置于围布203b的上下端;连接件300包括插接柱301和过渡件302,插接柱301固定于顶框203a顶部四角处,过渡件302套设于插接柱301上。Referring to Figures 1 to 5, the difference between this embodiment and the previous embodiment is that a hanging column 202a is provided on the cantilever 202, and an insertion hole 202b is provided through the hanging column 202a; The cloth 203b and the bottom frame 203c, the top frame 203a and the bottom frame 203c are respectively arranged on the upper and lower ends of the surrounding cloth 203b; the connector 300 includes a plug-in post 301 and a transition piece 302, and the plug-in post 301 is fixed at the top four corners of the top frame 203a, The transition piece 302 is sheathed on the insertion post 301 .
应说明的是,围布203b为防水防晒加厚耐磨PVC涂塑篷布,顶框203a和底框203c以及设置于顶框203a上的连接件300均为硬质PVC材料,其硬度高密度小,尺寸较轻,易于提升,顶框203a和底框203c同样的材质是为了便于生产,顶框203a和底框203c的形状尺寸可相通,两者可通用。It should be noted that the surrounding cloth 203b is a waterproof, sunscreen, thickened and wear-resistant PVC plastic-coated tarpaulin, and the top frame 203a, bottom frame 203c and the connector 300 arranged on the top frame 203a are all made of hard PVC material, which has high hardness and high density. Small, lighter in size, easy to lift, the same material of the top frame 203a and the bottom frame 203c is for the convenience of production, the shape and size of the top frame 203a and the bottom frame 203c can be connected, and both can be used in common.
应说明的是,底框203c下设置有配重块,保持底框203不会乱移动,具体的,底框203悬挂设置于运输车204上方,煤炭落下将直接落入运输车204中收集。It should be noted that a counterweight is provided under the bottom frame 203c to keep the bottom frame 203 from moving randomly. Specifically, the bottom frame 203 is suspended above the transport vehicle 204, and coal falling will directly fall into the transport vehicle 204 for collection.
进一步的,插接柱301端部设置有锥台301a,过渡件302外侧设置有锥面302a;插接柱301端部设置有吊环301b;吊环301b用于与牵引件400连接,并由牵引件400提升吊环301b以及落煤筒203,应说明的是,过渡件302整体呈锥台形状,其上沿轴线贯穿设置有通孔,过渡件302套设于插接柱301上,且可在插接柱301上移动;锥台301a为与过渡件302尺寸相同的锥台结构,更进一步的,参照图5,锥台301a和过渡件302相向设置,也即锥台301a和过渡件302接触时,锥台301a侧面与锥面302a平滑过渡。Further, the end of the insertion post 301 is provided with a frustum 301a, and the outer side of the transition piece 302 is provided with a conical surface 302a; the end of the insertion post 301 is provided with a lifting ring 301b; 400 to lift the lifting ring 301b and the coal drop tube 203. It should be noted that the overall transition piece 302 is in the shape of a truncated cone, and a through hole is formed on it along the axis. The transition piece 302 is sleeved on the insertion column 301 and can be inserted Move on the connecting post 301; the frustum 301a is a frustum structure with the same size as the transition piece 302. Further, referring to FIG. , the side of the frustum 301a and the conical surface 302a smoothly transition.
进一步的,挂柱202a外侧设置有板槽202c,板槽202c中设置有封板202d,封板202d上设置有穿孔202e;挂柱202a上沿径向由外向内依次设置有圆孔202f和方槽202g。Further, a plate groove 202c is arranged on the outside of the hanging column 202a, a sealing plate 202d is arranged in the plate groove 202c, and a perforation 202e is arranged on the sealing plate 202d; a round hole 202f and a square hole 202f are arranged on the hanging column 202a radially from outside to inside. Groove 202g.
应说明的是,板槽202c为设置于挂柱202a外侧的弧形槽,封板202d通过螺栓连接的方式固定于板槽202中;更进一步的,穿孔202e位置与圆孔202f位置对应,具体的,穿孔202e和圆孔202f均为圆形孔两者同轴线设置,方槽为截面尺寸大于圆孔202f截面尺寸的方形孔。It should be noted that the plate groove 202c is an arc-shaped groove arranged on the outside of the hanging post 202a, and the sealing plate 202d is fixed in the plate groove 202 by means of bolt connection; furthermore, the position of the perforation 202e corresponds to the position of the round hole 202f, specifically Yes, the perforation 202e and the round hole 202f are both circular holes coaxially arranged, and the square groove is a square hole whose cross-sectional size is larger than the cross-sectional size of the round hole 202f.
挂柱202a中设置有挡块202h,挡块202h包括圆杆202h-1、设置于圆杆202h-1一端的方杆202h-2和设置于圆杆202h-1另一端的挡板202h-3;圆杆202h-1设置于圆孔202f中,方杆202h-2处于方槽202g中,圆杆202h-1上套设有弹簧202h-4,弹簧202h-4连接方杆202h-2端部和方槽202g底部;方杆202h-2端部设置有斜面202h-5。The hanging column 202a is provided with a stopper 202h, and the stopper 202h includes a round rod 202h-1, a square rod 202h-2 arranged at one end of the round rod 202h-1 and a baffle plate 202h-3 arranged at the other end of the round rod 202h-1 The round rod 202h-1 is set in the round hole 202f, the square rod 202h-2 is in the square groove 202g, the round rod 202h-1 is covered with a spring 202h-4, and the spring 202h-4 is connected to the end of the square rod 202h-2 and the bottom of the square groove 202g; the end of the square rod 202h-2 is provided with a slope 202h-5.
具体的,圆孔202f和圆杆202h-1尺寸配合,方杆202h-2和方槽202g尺寸 配合,挡块202h用于限制连接件300,将连接件300固定在悬臂202上,具体的,方杆202h-2和方槽202g的结构避免挡块202h转动,方杆202h-2仅可沿圆杆202h-1轴线方向移动。Specifically, the size of the round hole 202f matches the round rod 202h-1, the size of the square rod 202h-2 matches the size of the square groove 202g, and the stopper 202h is used to limit the connecting piece 300 and fix the connecting piece 300 on the cantilever 202. Specifically, The structure of the square rod 202h-2 and the square groove 202g prevents the block 202h from rotating, and the square rod 202h-2 can only move along the axis of the round rod 202h-1.
初始状态下,弹簧202h-4处于方槽202g中,并将方杆202h-2部分,尤其是斜面202h-5所在部位挤入插孔202b中,斜面202h-5朝向正下方。In the initial state, the spring 202h-4 is in the square groove 202g, and squeezes the part of the square rod 202h-2, especially the part where the slope 202h-5 is located, into the socket 202b, and the slope 202h-5 faces directly downward.
在连接过程中,插接柱301向插孔202b中插入,锥台301a侧面接触斜面202h-5,并在向上移动过程中,将方杆202h-2向方槽202g中推动,使弹簧202h-4被压缩,在方杆202h-2端部越过锥台301a后,在弹簧202h-4的作用下被弹出,卡于锥台301a下方,在重力作用下,锥台301a担于方杆202h-2上。During the connection process, the plug post 301 is inserted into the socket 202b, the side of the cone 301a contacts the inclined surface 202h-5, and during the upward movement, the square rod 202h-2 is pushed into the square groove 202g, so that the spring 202h- 4 is compressed, after the end of the square rod 202h-2 crosses the frustum 301a, it is ejected under the action of the spring 202h-4, and is stuck under the frustum 301a. Under the action of gravity, the frustum 301a bears on the frustum 301a 2 on.
若需要拆卸,进一步向上移动插接柱301,在过渡件302的推动下,方杆202h-2退让,过渡件302越过方杆202h-2,随后在重力作用下,插接柱301下移,过渡件302被方杆202h-2夹持上移,至与锥台301a接触后,方杆202h-2顺着锥面302a上移并越过过渡件302至与锥台301a侧面接触,越过锥台301a。If it needs to be disassembled, further move the insertion post 301 upwards, under the push of the transition piece 302, the square bar 202h-2 retreats, the transition piece 302 crosses the square bar 202h-2, and then under the action of gravity, the insertion post 301 moves down, The transition piece 302 is clamped by the square rod 202h-2 and moves up until it contacts the frustum 301a, the square rod 202h-2 moves up along the conical surface 302a and crosses the transition piece 302 until it contacts the side of the frustum 301a and passes over the frustum 301a.
至此插接柱301从挂柱202a中脱离。At this point, the plug post 301 is disengaged from the hanging post 202a.
进一步的,牵引件400包括牵引绳401和导向管402,牵引绳401设置于导向管402中,导向管402包括竖杆402a、水平设置并于竖杆402a连接的横杆402b和与横杆402b连通的分支管402c。Further, the traction member 400 includes a traction rope 401 and a guide tube 402, the traction rope 401 is arranged in the guide tube 402, the guide tube 402 includes a vertical bar 402a, a horizontal bar 402b arranged horizontally and connected to the vertical bar 402a, and a horizontal bar 402b connected to the vertical bar 402b The communicating branch pipe 402c.
牵引绳401端部设置有卡钩401a,分支管402c端部与插孔202b相通;牵引绳401贯穿竖杆402a、横杆402b和分支管402c,卡钩401a设置于插孔202b中。The end of the traction rope 401 is provided with a hook 401a, and the end of the branch pipe 402c communicates with the socket 202b; the traction rope 401 runs through the vertical bar 402a, the horizontal bar 402b and the branch pipe 402c, and the hook 401a is arranged in the socket 202b.
应说明的是,牵引绳401和导向管402用于使顶框203a水平上升,具体的,竖杆402a竖直放置,横杆402b设置有两个,其对称设置,其端部均与竖杆402a连通,分支管402c共设置有四个,两两对称设置于横杆402b下方,四个分支管402c端部分别一一与悬臂202上的四个挂柱202a一一对应,牵引绳401共有四股,四股牵引绳401在竖杆402a与横杆402b的接口处两两分开,并两两进入横杆402b中,并在横杆402b与分支管402c的连接处分开,一一进入分支管402c中,每根牵引绳401的端部均设置有卡钩401a,且卡钩401a处于插孔202b中。It should be noted that the traction rope 401 and the guide tube 402 are used to raise the top frame 203a horizontally. Specifically, the vertical bar 402a is placed vertically, and there are two horizontal bars 402b, which are arranged symmetrically, and their ends are connected to the vertical bar. 402a communicates with each other, and there are four branch pipes 402c, which are symmetrically arranged under the cross bar 402b in pairs. Four strands, the four-strand traction rope 401 is separated two by two at the interface between the vertical bar 402a and the cross bar 402b, and enters the cross bar 402b two by two, and separates at the junction of the cross bar 402b and the branch pipe 402c, and enters the branch pipe 402c one by one Among them, the end of each traction rope 401 is provided with a hook 401a, and the hook 401a is located in the insertion hole 202b.
应说明的是,竖杆402a端部设置有收卷辊,由电机驱动,牵引绳401收卷于收卷辊上,牵引绳401在导向管402中遗留的长度一致,以使牵引绳401端 部处于同一水平高度。It should be noted that the end of the vertical bar 402a is provided with a winding roller, which is driven by a motor, and the traction rope 401 is wound on the winding roller, and the length of the traction rope 401 left in the guide tube 402 is consistent, so that the traction rope 401 ends are at the same level.
收卷辊的动作可通过遥控控制电机驱动,因其处于高处,难以通过绳索直接控制,使用时将卡钩401a放下,将卡钩401a与吊环301b连接,随后提升卡钩401a,至触发条件成立时,稍微松弛一点牵引绳301,使锥台301a由挡块202h支撑,减轻牵引绳301的压力,防止牵引绳301断裂导致落煤筒203掉落引发事故。The action of the rewinding roller can be driven by a remote control motor. Because it is at a high place, it is difficult to directly control it by a rope. When using it, put down the hook 401a, connect the hook 401a with the ring 301b, and then lift the hook 401a to the trigger condition When set up, loosen the traction rope 301 a little, so that the cone 301a is supported by the block 202h, reduce the pressure of the traction rope 301, and prevent the fracture of the traction rope 301 from causing the coal drop tube 203 to fall and cause an accident.
本装置还设置有配重件500,配重件500上设置有挂钩,用以保持牵引绳301的水平状态。The device is also provided with a counterweight 500 , and the counterweight 500 is provided with a hook for maintaining the horizontal state of the traction rope 301 .
落煤筒203下方设置有运输车204,距离运输车204一定距离处设置有汽车衡205。A transport vehicle 204 is arranged below the coal falling barrel 203, and a truck scale 205 is arranged at a certain distance from the transport vehicle 204.
实施例2Example 2
参照图1,本实施例提供了一种圆形堆取料机输煤电子皮带秤计量精度校验方法,煤炭从皮带称101上经过,称重显示粗重量A;Referring to Fig. 1, this embodiment provides a method for verifying the measurement accuracy of an electronic belt scale for circular stacker-reclaimer coal conveyance. Coal passes through the belt scale 101, and the weighing shows a rough weight A;
煤炭经落煤筒203收集落入运输车204中,至汽车衡205处测得精准质量B;The coal is collected and dropped into the transport vehicle 204 through the coal drop tube 203, and the accurate mass B is measured at the vehicle scale 205;
计算皮带称101精度为B-A/B*100%;Calculate the belt weighing 101 accuracy as B-A/B*100%;
将精准质量B输入皮带称101,校验皮带称101;Input the precise mass B into the belt and weigh 101, and check the belt and weigh 101;
依上反复校验,直至皮带秤101精度达到0.5%为止。Repeat the verification according to the above until the accuracy of the belt scale 101 reaches 0.5%.
在本实施例中,便于更换的落煤筒203将煤炭收集至运输车204中,以保证汽车衡205最终称量的煤炭与皮带称101称量的煤炭差距不大,且落煤筒203易于更换,避免煤炭下落过程中对围布203b的划伤损坏以及煤灰附着等损坏,对检验造成的影响。In this embodiment, the coal falling tube 203 that is easy to replace collects the coal into the transport vehicle 204 to ensure that the coal weighed by the truck scale 205 is not far from the coal weighed by the belt scale 101, and the coal falling tube 203 is easy to carry. Replacement, to avoid scratches and damages to the surrounding cloth 203b and coal ash adhesion and other damages during the coal falling process, which will affect the inspection.
重要的是,应注意,在多个不同示例性实施方案中示出的本申请的构造和布置仅是例示性的。尽管在此公开内容中仅详细描述了几个实施方案,但参阅此公开内容的人员应容易理解,在实质上不偏离该申请中所描述的主题的新颖教导和优点的前提下,许多改型是可能的(例如,各种元件的尺寸、尺度、结构、形状和比例、以及参数值(例如,温度、压力等)、安装布置、材料的使用、颜色、定向的变化等)。例如,示出为整体成形的元件可以由多个部分或元件构成,元件的位置可被倒置或以其它方式改变,并且分立元件的性质或数目或位置可被更改或改变。因此,所有这样的改型旨在被包含在本发明的范围 内。可以根据替代的实施方案改变或重新排序任何过程或方法步骤的次序或顺序。在权利要求中,任何“装置加功能”的条款都旨在覆盖在本文中所描述的执行所述功能的结构,且不仅是结构等同而且还是等同结构。在不背离本发明的范围的前提下,可以在示例性实施方案的设计、运行状况和布置中做出其他替换、改型、改变和省略。因此,本发明不限制于特定的实施方案,而是扩展至仍落在所附的权利要求书的范围内的多种改型。It is important to note that the construction and arrangement of the application, shown in the various exemplary embodiments, are illustrative only. Although only a few embodiments have been described in detail in this disclosure, it should be readily apparent to those who review this disclosure that many modifications are possible without materially departing from the novel teachings and advantages of the subject matter described in this application. are possible (e.g., variations in dimensions, dimensions, structures, shapes and proportions of various elements, as well as parameter values (e.g., temperature, pressure, etc.), mounting arrangements, use of materials, colors, orientations, etc.). For example, elements shown as integrally formed may be constructed of multiple parts or elements, the position of elements may be inverted or otherwise varied, and the nature or number or positions of discrete elements may be altered or varied. Accordingly, all such modifications are intended to be included within the scope of this invention. The order or sequence of any process or method steps may be varied or re-sequenced according to alternative embodiments. In the claims, any "means-plus-function" clause is intended to cover the structures described herein as performing the recited function and not only structural equivalents but also equivalent structures. Other substitutions, modifications, changes and omissions may be made in the design, operation and arrangement of the exemplary embodiments without departing from the scope of the invention. Accordingly, the invention is not limited to a particular embodiment, but extends to various modifications still falling within the scope of the appended claims.
此外,为了提供示例性实施方案的简练描述,可以不描述实际实施方案的所有特征(即,与当前考虑的执行本发明的最佳模式不相关的那些特征,或于实现本发明不相关的那些特征)。Moreover, in order to provide a concise description of exemplary embodiments, not all features of an actual embodiment (i.e., those features not relevant to the best mode presently considered for carrying out the invention, or to practicing the invention feature).
应理解的是,在任何实际实施方式的开发过程中,如在任何工程或设计项目中,可做出大量的具体实施方式决定。这样的开发努力可能是复杂的且耗时的,但对于那些得益于此公开内容的普通技术人员来说,不需要过多实验,所述开发努力将是一个设计、制造和生产的常规工作。It should be appreciated that during the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort would be complex and time-consuming, but would be a routine matter of design, fabrication, and production without undue experimentation to those of ordinary skill having the benefit of this disclosure .
应说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的精神和范围,其均应涵盖在本发明的权利要求范围当中。It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention without limitation, although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be carried out Modifications or equivalent replacements without departing from the spirit and scope of the technical solution of the present invention shall be covered by the claims of the present invention.

Claims (10)

  1. 一种圆形堆取料机输煤电子皮带秤计量精度校验装置,其特征在于:包括,A measurement accuracy verification device for a circular stacker-reclaimer coal conveying electronic belt scale, characterized in that it includes,
    运煤组件(100),包括皮带秤(101)、驱动轮(102)和驱动电机(103),所述皮带秤(101)设置于所述驱动轮(102)上,所述驱动电机(103)与所述驱动轮(102)连接;The coal transport assembly (100) includes a belt scale (101), a drive wheel (102) and a drive motor (103), the belt scale (101) is arranged on the drive wheel (102), and the drive motor (103 ) is connected with the drive wheel (102);
    集煤组件(200),包括设置于皮带秤(101)下方的支柱(201)、设置于支柱上的悬臂(202)和悬挂于悬臂(202)下方的落煤筒(203),所述落煤筒(203)上设置有连接件(300),所述悬臂(202)上方设置有牵引件(400)。The coal collection assembly (200) includes a pillar (201) arranged below the belt scale (101), a cantilever (202) arranged on the pillar and a coal drop tube (203) suspended below the cantilever (202), the falling A connecting piece (300) is arranged on the coal drum (203), and a traction piece (400) is arranged above the cantilever (202).
  2. 根据权利要求1所述的圆形堆取料机输煤电子皮带秤计量精度校验装置,其特征在于:所述悬臂(202)上设置有挂柱(202a),所述挂柱(202)中贯穿设置有插孔(202b)。The device for calibrating measurement accuracy of electronic belt scales for circular stackers and reclaimers according to claim 1, characterized in that: the cantilever (202) is provided with a hanging column (202a), and the hanging column (202) A jack (202b) is provided through the center.
  3. 根据权利要求1或2所述的圆形堆取料机输煤电子皮带秤计量精度校验装置,其特征在于:所述落煤筒(203)包括顶框(203a)、围布(203b)和底框(203c),所述顶框(203a)和底框(203c)分别设置于围布(203b)的上下端;According to claim 1 or 2, the circular stacker-reclaimer coal conveying electronic belt scale metering accuracy verification device is characterized in that: the coal falling barrel (203) includes a top frame (203a), a surrounding cloth (203b) and a bottom frame (203c), the top frame (203a) and the bottom frame (203c) are respectively arranged on the upper and lower ends of the surrounding cloth (203b);
    所述连接件(300)包括插接柱(301)和过渡件(302),所述插接柱(301)固定于所述顶框(203a)顶部四角处,所述过渡件(302)套设于所述插接柱(301)上。The connector (300) includes a plug post (301) and a transition piece (302), the plug post (301) is fixed at the top four corners of the top frame (203a), and the transition piece (302) covers Set on the insertion post (301).
  4. 根据权利要求3所述的圆形堆取料机输煤电子皮带秤计量精度校验装置,其特征在于:所述插接柱(301)端部设置有锥台(301a),所述过渡件(302)外侧设置有锥面(302a);The device for calibrating measurement accuracy of electronic belt scales for circular stacker-reclaimer coal conveying according to claim 3, characterized in that: a conical frustum (301a) is provided at the end of the plug-in column (301), and the transition piece (302) is provided with a tapered surface (302a) on the outside;
    所述插接柱(301)端部设置有吊环(301b)。A suspension ring (301b) is provided at the end of the insertion column (301).
  5. 根据权利要求4所述的圆形堆取料机输煤电子皮带秤计量精度校验装置,其特征在于:所述挂柱(202a)外侧设置有板槽(202c),所述板槽(202c)中设置有封板(202d),所述封板(202d)上设置有穿孔(202e);According to claim 4, the circular stacker-reclaimer coal conveying electronic belt scale metering accuracy verification device is characterized in that: a plate groove (202c) is arranged on the outside of the hanging column (202a), and the plate groove (202c ) is provided with a sealing plate (202d), and the sealing plate (202d) is provided with a perforation (202e);
    所述挂柱(202a)上沿径向由外向内依次设置有圆孔(202f)和方槽(202g)。A circular hole (202f) and a square groove (202g) are sequentially arranged on the hanging post (202a) radially from outside to inside.
  6. 根据权利要求5所述的圆形堆取料机输煤电子皮带秤计量精度校验装置,其特征在于:所述挂柱(202a)中设置有挡块(202h),所述挡块(202h)包括圆杆(202h-1)、设置于圆杆(202h-1)一端的方杆(202h-2)和设置于圆杆(202h-1)另一端的挡板(202h-3);According to claim 5, the measurement accuracy verification device of circular stacker-reclaimer coal conveying electronic belt scale is characterized in that: the hanging column (202a) is provided with a stopper (202h), and the stopper (202h ) includes a round rod (202h-1), a square rod (202h-2) arranged at one end of the round rod (202h-1), and a baffle (202h-3) arranged at the other end of the round rod (202h-1);
    所述圆杆(202h-1)设置于所述圆孔(202f)中,所述方杆(202h-2)处于所述方槽(202g)中,所述圆杆(202h-1)上套设有弹簧(202h-4),所述弹簧(202h-4)连接方杆(202h-2)端部和方槽(202g)底部;The round rod (202h-1) is set in the round hole (202f), the square rod (202h-2) is in the square groove (202g), and the round rod (202h-1) is covered A spring (202h-4) is provided, and the spring (202h-4) connects the end of the square rod (202h-2) and the bottom of the square groove (202g);
    所述方杆(202h-2)端部设置有斜面(202h-5)。The end of the square rod (202h-2) is provided with a slope (202h-5).
  7. 根据权利要求4~6任一所述的圆形堆取料机输煤电子皮带秤计量精度校验装置,其特征在于:所述牵引件(400)包括牵引绳(401)和导向管(402),所述牵引绳(401)设置于所述导向管(402)中,所述导向管(402)包括竖杆(402a)、水平设置并于竖杆(402a)连接的横杆(402b)和与横杆(402b)连通的分支管(402c)。According to any one of claims 4 to 6, the measurement accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale is characterized in that: the traction member (400) includes a traction rope (401) and a guide pipe (402 ), the traction rope (401) is arranged in the guide tube (402), and the guide tube (402) includes a vertical bar (402a), a horizontal bar (402b) arranged horizontally and connected to the vertical bar (402a) And the branch pipe (402c) that communicates with cross bar (402b).
  8. 根据权利要求7所述的圆形堆取料机输煤电子皮带秤计量精度校验装置,其特征在于:所述牵引绳(401)端部设置有卡钩(401a),分支管(402c)端部与插孔(202b)相通;The measurement accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale according to claim 7, characterized in that: the end of the traction rope (401) is provided with a hook (401a), and a branch pipe (402c) The end communicates with the jack (202b);
    所述牵引绳(401)贯穿竖杆(402a)、横杆(402b)和分支管(402c),卡钩(401a)设置于所述插孔(202b)中。The traction rope (401) runs through the vertical bar (402a), the horizontal bar (402b) and the branch pipe (402c), and the hook (401a) is arranged in the insertion hole (202b).
  9. 根据权利要求8所述的圆形堆取料机输煤电子皮带秤计量精度校验装置,其特征在于:所述落煤筒(203)下方设置有运输车(204),距离运输车(204)一定距离处设置有汽车衡(205)。The measurement accuracy verification device of the circular stacker-reclaimer coal conveying electronic belt scale according to claim 8, characterized in that: a transport vehicle (204) is arranged under the coal falling barrel (203), and the distance from the transport vehicle (204 ) is provided with a truck scale (205) at a certain distance.
  10. 一种圆形堆取料机输煤电子皮带秤计量精度校验方法,其特征在于:A method for calibrating the measurement accuracy of a circular stacker-reclaimer coal conveying electronic belt scale, characterized in that:
    煤炭从皮带称(101)上经过,称重显示粗重量A;The coal passes through the belt scale (101), and the weighing shows a rough weight A;
    煤炭经落煤筒(203)收集落入运输车(204)中,至汽车衡(205)处测得精准质量B;The coal is collected and dropped into the transport vehicle (204) through the coal drop tube (203), and the accurate mass B is measured at the truck scale (205);
    计算皮带称(101)精度为(B-A)/B*100%;Calculate the accuracy of the belt scale (101) as (B-A)/B*100%;
    将精准质量B输入皮带称(101),校验皮带称(101);Input the precise mass B into the belt scale (101), and check the belt scale (101);
    依上反复校验,直至皮带秤(101)精度达到0.5%为止。Check repeatedly according to the above, until the belt scale (101) accuracy reaches 0.5%.
PCT/CN2021/126720 2021-10-27 2021-10-27 Metering precision checking apparatus and method for coal conveying electronic belt scale of circular stacker-reclaimer WO2023070370A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2021/126720 WO2023070370A1 (en) 2021-10-27 2021-10-27 Metering precision checking apparatus and method for coal conveying electronic belt scale of circular stacker-reclaimer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2021/126720 WO2023070370A1 (en) 2021-10-27 2021-10-27 Metering precision checking apparatus and method for coal conveying electronic belt scale of circular stacker-reclaimer

Publications (1)

Publication Number Publication Date
WO2023070370A1 true WO2023070370A1 (en) 2023-05-04

Family

ID=86160286

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/126720 WO2023070370A1 (en) 2021-10-27 2021-10-27 Metering precision checking apparatus and method for coal conveying electronic belt scale of circular stacker-reclaimer

Country Status (1)

Country Link
WO (1) WO2023070370A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070074560A1 (en) * 2005-09-30 2007-04-05 Ronald Dietrich Loadcell live idler platform scale
CN106226125A (en) * 2016-07-22 2016-12-14 华北电力大学 A kind of high accuracy as-fired coal sampling and weigh verification integral system and method
CN106768219A (en) * 2016-12-19 2017-05-31 国核电力规划设计研究院 A kind of as-fired coal Weighing system and its weighing technique, method of calibration
CN209485530U (en) * 2019-03-08 2019-10-11 大唐桂冠合山发电有限公司 Boiler enters coal metering belted electronic balance calibration equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070074560A1 (en) * 2005-09-30 2007-04-05 Ronald Dietrich Loadcell live idler platform scale
CN106226125A (en) * 2016-07-22 2016-12-14 华北电力大学 A kind of high accuracy as-fired coal sampling and weigh verification integral system and method
CN106768219A (en) * 2016-12-19 2017-05-31 国核电力规划设计研究院 A kind of as-fired coal Weighing system and its weighing technique, method of calibration
CN209485530U (en) * 2019-03-08 2019-10-11 大唐桂冠合山发电有限公司 Boiler enters coal metering belted electronic balance calibration equipment

Similar Documents

Publication Publication Date Title
JP5291805B2 (en) Mold tablet sorting and feeding device
CN103538989A (en) Method and device for monitoring tension equalization adjusting states and displacement adjusting states of steel wire ropes of multi-rope hoister
WO2023070370A1 (en) Metering precision checking apparatus and method for coal conveying electronic belt scale of circular stacker-reclaimer
CN109351660A (en) A kind of logistics sorting device convenient for arrangement
CN211120995U (en) Engineering is managed with stake hole aperture detection device
CN209577462U (en) A kind of rotation detection device for electronic device
CN110108206B (en) Scrap steel grading and database building system and method
CN205844331U (en) Full-automatic wood water cut test machine
CN110133207A (en) A kind of rare earth metal automatic sorting device and its method for separating
CN205217392U (en) Diode pin defect detecting device
CN209093934U (en) A kind of detection classified collection device of extension bar compressed steel pearl production line
CN208276495U (en) Battery cover handle automatic setup system
CN212451480U (en) Device for measuring shape of blast furnace burden surface
CN106111543A (en) Steel ball is first checking device before assembling
CN210513244U (en) Cotton fiber detects metering device
CN211121875U (en) Scribble storage bucket droppability detection device
CN207268597U (en) Connection ring height detection machine
CN110220811A (en) Automatic sampling and the device and method for testing blocky alloyed powder rate
CN212173657U (en) Baffle device with adjustable funnel opening
CN210944627U (en) Ton bag inspection device
CN201534360U (en) Silicon single crystal rod extraction inspection equipment assembly
JP6658420B2 (en) Sintering raw material sampling apparatus and method
CN206208237U (en) One kind shooting ring height quick detection equipment
CN219319900U (en) Auxiliary supporting frame for coal sample preparation
CN207095642U (en) A kind of flyash ash can material depth measurement apparatus

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21961742

Country of ref document: EP

Kind code of ref document: A1