WO2023063487A1 PCT/KR2021/017958 KR2021017958W WO2023063487A1 WO 2023063487 A1 WO2023063487 A1 WO 2023063487A1 KR 2021017958 W KR2021017958 W KR 2021017958W WO 2023063487 A1 WO2023063487 A1 WO 2023063487A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
load
control unit
frequency
integrated controller
Prior art date
Application number
PCT/KR2021/017958
Other languages
English (en)
French (fr)
Inventor
권동영
정욱
장권영
김태훈
황선경
김윤기
Original Assignee
주식회사 시너지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 시너지 filed Critical 주식회사 시너지
Publication of WO2023063487A1 publication Critical patent/WO2023063487A1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention relates to an integrated controller for FAST DR and a system including the same, and relates to an integrated controller for FAST DR capable of controlling power according to power demand and a system including the same.
  • the amount of power generation is controlled by operating a frequency following operation or an automatic power generation control operation, but as the proportion of renewable energy increases, there is inevitably a limit to control of the amount of power generation.
  • 4th industrial revolution technologies such as electric vehicles, smart internet, and artificial intelligence (AI)
  • demand for electricity is expected to increase exponentially.
  • the present invention has been made to solve the above problems, and an object of the present invention is to normalize power system frequency (frequency DR) through load blocking implemented by the domestic power exchange in response to renewable energy volatility (frequency DR), To provide an integrated controller for FAST DR that can normalize the power system by increasing or decreasing power consumption in response to power demand, and a system including the same.
  • frequency DR power system frequency
  • frequency DR renewable energy volatility
  • An integrated controller for FAST DR that works with a server for FAST DR management according to an embodiment of the present invention for achieving the above object receives FAST DR issue information from the server and power from a measuring means that works with the load. and a communication unit receiving frequency data. and a control unit for controlling the control unit based on the power and frequency data received from the communication unit in association with a control unit for adjusting power or frequency supplied to the load, wherein the control unit includes a type of the control unit According to this, the power supplied to the load is cut off or the power supplied to the load is adjusted to increase or decrease.
  • control unit if the control means is a power distribution control panel for supplying power to the load, controls a relay module matched for each load and transmits an on/off signal to the power distribution control panel. and a relay control unit configured to cut off power supplied to the load for a predetermined time by controlling a contact operation time of the relay module based on a frequency of power supplied to the load.
  • the control means is a control means capable of receiving an analog input signal
  • the controller controls an analog output module matched for each load so that a signal for adjusting the output voltage and current of the control means is generated.
  • an analog output control unit configured to transmit power to the control unit, wherein the analog output control unit controls an output voltage and current of the analog output module based on a frequency of power supplied to the load to control the output frequency of the control unit.
  • control means is an inverter of a solar power plant that supplies power to a load
  • control means operates with the power system for a certain period of time when the frequency of the power system collected from the measuring means falls within a preset range. separation can be controlled.
  • control unit controls the power generation after the inverter of the photovoltaic power plant is connected to an Energy Storage System (ESS) or an Uninterruptible (UPS), and the separation time between the control unit and the power system exceeds the predetermined time period.
  • ESS Energy Storage System
  • UPS Uninterruptible
  • the controller classifies it as either a short-term abnormality or a long-term abnormality, and if the number of short-term abnormalities exceeds a predetermined number of times, the short-term abnormality may be determined as a long-term abnormality.
  • the present invention can provide a system including an integrated controller for the FAST DR.
  • frequency DR frequency DR
  • load use blocking implemented by the domestic power exchange, as well as by increasing or decreasing power consumption in response to power demand
  • the power system can be normalized.
  • FIG. 1 is a block diagram for explaining the configuration of an integrated controller according to an embodiment of the present invention.
  • Figure 2 is a schematic diagram of a system including an integrated controller for FAST DR of the invention.
  • FIG. 1 is a block diagram for explaining the configuration of an integrated controller 10 according to an embodiment of the present invention.
  • the integrated controller 10 for FAST DR is linked with a server (S) built by a management company that enters into a contract with a load user and, if necessary, gives a power increase or decrease instruction to the load user or monitors the amount of reduction. It is provided to control the demand response of the demand response resource according to the current power frequency, and FAST DR issuance information can be received from the server (S).
  • S server
  • the server (S) built by the management company is connected to the control center (C), which is built by the power exchange or power company and requests reduction when load power reduction is required, so that FAST DR according to this embodiment
  • the integrated controller 10 may be able to communicate with the control center (C).
  • the integrated controller 10 communicates with the control center (C)
  • the integrated controller 10 and the control center (C) perform direct communication or the control center (C) through a server (S) built by a management company. You can also send and receive information.
  • the integrated controller 10 receives the size and frequency data of the power applied to the load 50 measured by the measuring means 70 installed or connected to the load 50, and measures the power supplied to the load 50.
  • a control signal may be transmitted to the control means 30 for controlling.
  • the integrated controller 10 may include a communication unit 11, an input unit 13, a control unit 15, a storage unit 17, and an output unit 19.
  • the communication unit 11 communicates with the server S built by the management business operator that signs a contract with the load user and issues power increase or decrease instructions to the load user when necessary or monitors the amount of reduction to transmit and receive various information, and transmits and receives various information, and the load 50 It is possible to receive the size and frequency data of the power applied to the load 50 from the measurement means 70 installed in the load 50 or connected to the load 50.
  • the communication unit 11 may receive an ID of the integrated controller 10 from the server S built by the management company and store it in the storage unit 17 .
  • the communication unit 11 may be one of general communication methods including Wi-Fi, Ethernet, Zigbee, and LoRa (Long Range).
  • the communication unit 11 may receive a reduction request signal from the control center C when the load power needs to be reduced according to the state of the load 50, such as the amount of power used and the frequency.
  • the communication unit 11 may receive magnitude and frequency data of the power applied to the load 50 measured by the measuring means 70 installed or connected to the load 50 and store them in the storage unit 17. .
  • the communication unit 11 when the communication unit 11 is provided as a low-power LoRa (LongRange) module used for IoT as a communication method, an ID for each LoRa module is set, and a load ID for each LoRa module is mapped to match any load 50 for each module It is possible to define whether it works in conjunction with .
  • LoRa Low-power LoRa
  • S server
  • the communication unit 11 communicates with the measurement means 70 using the Modbus communication protocol, and uses it for various types of EMS interlocking or interlocks with the control means 30 including an inverter to obtain power data, frequency , active power, reactive power, etc. may be measured, or the load 50 equipment may be controlled through the control means 30 or EMS (Energy Management System).
  • EMS Electronics Management System
  • the input unit 13 is provided to directly receive various commands from the administrator, and receives a selection for a random selection button among a plurality of selection buttons output through the output unit 19 according to the user interface (UI).
  • UI user interface
  • the input unit 13 may receive information such as power on/off, settings for the communication unit 11, settings for the control unit 15, and types of demand response from a manager.
  • control unit 15 is provided to directly control the load 50, and is interlocked with the existing control means 30 for controlling the power supplied to the plurality of loads 50 to output an on/off signal or an analog output. It may be provided to control the amount of power through a signal.
  • the control unit 15 is a control means 30 for controlling the power of the load 50 based on the size and frequency data of the power applied to the load 50 and the issue information from the control center C or server S It is possible to adjust the amount of power applied to the load 50 by transmitting a control signal to the load 50 .
  • the integrated controller 10 may be manufactured as a board, and a relay module, an analog output module, a modbus module, and the like may be included in the integrated controller 10.
  • a relay module an analog output module, a modbus module, and the like may be included in the integrated controller 10.
  • Each of these relay modules, analog output modules and Modbus modules can be assigned a unique ID.
  • control unit 15 may include a relay control unit 151 and an analog output control unit 153 according to the type of module to be controlled.
  • the relay control unit 151 can be defined as to which load 50 the relay module operates in conjunction with.
  • each relay module can be set to one of the A point method, B contact method, or self-holding circuit method, and controls the on/off signal in conjunction with the existing control means 30 connected to the load 50 side. It becomes possible to deliver to the means (30).
  • the control unit 30 may be a power distribution control panel connected to the load 50 .
  • the relay control unit 151 may control the contact operating time for each relay module for a preset time, and the preset contact operating time may be specified as one of 1 second to minutes and unlimited. This may be input from the server (S) built by the management company or set in advance by input through the input unit (13).
  • the relay control unit 151 may set a trigger operating frequency for each relay module to operate the relay module in a contact method set at the corresponding operating frequency. For example, assuming that the relay module having the number 1 ID is connected to the number 1 control means 30 connected to the number 1 load 50, the server (S) built by the management company or the manager input unit 13 ), the operating frequency at which relay module No. 1 should operate is set in advance by dividing it into on/off.
  • the relay control unit 151 switches An off signal may be sent to the control unit 30 .
  • the relay control unit 151 may send an on signal to the first control means 30.
  • the relay control unit 151 may control an operation trigger frequency for generating an on signal not to be input if the contact operation time is separately designated.
  • the trigger frequency of the off operation and the holding time of the off may be set within 1 minute to several minutes. Assuming that the holding time of the off is set to 1 minute, the on ( The trigger frequency of the on operation may not be set, and the on operation may be set to be executed after an off holding time.
  • the holding time of the off operation may be received from the server S or set in advance by a manager.
  • the relay control unit 151 may control the on/off operation of the relay module through a signal received from the server S without setting an operation trigger of the relay module.
  • the integrated controller 10 can reduce the power supplied to the load based on the power frequency data.
  • the analog output control unit 153 controls the analog output module when the integrated controller 10 is interlocked with the control means 30 capable of receiving an analog input signal, so that the control means is not simply on/off. It is provided to increase or decrease the output of (30).
  • the control unit 30 capable of receiving an analog input signal may be an inverter or a load output increase/decrease device.
  • each analog output module may be assigned a unique ID, and an output method may be designated for each analog output module.
  • the output method designated here may be designated as 0vDC to 10vDC or 4mA to 20mA.
  • analog output module matches the load ID of each analog output module provided on the board by the server S, like the relay module described above, it defines which load 50 each analog output module operates in conjunction with. It can be.
  • the analog output controller 153 determines the output frequency based on the command information data, such as the received target power, and transfers the output signal to the control unit 30 connected to the load 50 according to the determined output frequency, thereby controlling the control unit.
  • the output frequency of (30) can be controlled.
  • the reduction rate compared to the power frequency may be determined by the control center (C).
  • the analog output controller 153 may control the operation of the analog output module according to the trigger signal of the analog output module.
  • the analog output control unit 153 receives a control value according to a frequency signal from the server S, it controls the analog output module to increase or decrease the output of the control unit 30 in response thereto, and terminates the control from the server S.
  • control of the analog output module may be terminated to control the output frequency of the control unit 30 .
  • analog output controller 153 may control the analog output module based on the power system frequency rather than the signal of the server S.
  • the analog output control unit 153 may set the minimum frequency for operation of the analog output module or the maximum frequency for operation in advance, and increase or decrease the output of the control unit 30 according to the frequency measured from the measurement unit 70. there is.
  • analog output control unit 153 utilizes the law of similarity for shaft power that shaft power is proportional to the cube of the rotational speed change in order to accurately control the power consumption of load equipment according to the output frequency of the control means 30, according to the target power. output frequency can be obtained.
  • the output frequency of the control means 30 according to the target amount of power can be set to 0 Hz if it is negative and to 60 Hz if it exceeds 60 Hz. and the maximum frequency range may vary depending on the characteristics of the facility, so the manager may freely change the setting according to the characteristics of the facility.
  • control unit 15 may control a menu for setting each configuration to be displayed through the output unit 19 according to a user interface (UI).
  • UI user interface
  • control unit 15 may control the amount of power generation in association with the photovoltaic power plant.
  • EMS solar energy management system
  • control unit 15 uses a circuit breaker and a relay of the control unit 30, which is an inverter or EMS, when the power system frequency of the control unit 30, which is an inverter of a solar power plant, is in an abnormal range. do.
  • control unit 15 continuously checks the frequency of the power system collected from the measuring means 70, and when it is determined that the frequency falls within an abnormal range, it transmits a signal to the control means 30 so that the system is blocked for a certain period of time. controlled to be separated from
  • control unit 15 may reclose the control means 30 to connect to the power system when it is determined that the power system frequency has returned to the normal range (60Hz ⁇ 0.2Hz).
  • the one-side control unit 15 has exceeded the predetermined cut-off time, but still determines that the system frequency falls within the abnormal range, and if the solar power plant is connected to an ESS (Energy Storage System) or a UPS (Uninterruptible Power Equipment), the ESS or Charge the UPS with electricity.
  • ESS Electronicgy Storage System
  • UPS Uninterruptible Power Equipment
  • the circuit breaker of the inverter which is the control means 30, is reclosed to connect to the power system. .
  • control unit 15 can set the name and ID of the photovoltaic power plant set by the demand management business, and set the communication method with the control means 30, which is an inverter of the solar power plant to be linked, including serial and TCP/
  • the control means 30 may be directly controlled through IP communication, or the control means 30 may be controlled by requesting the server S.
  • control unit 15 may directly control the control unit 30 through serial and TCP/IP communication, similar to the control unit 30 as a communication method with the ESS or UPS.
  • the controller 15 may request the server S to receive ESS information and request control. In this case, it may be used only when a system for bidirectional communication such as an MQTT server is established.
  • control unit 15 may update the inverter or EMS model by requesting and receiving metadata about the communication map for each model of the inverter or EMS, which is the control unit 30, from the server S.
  • control unit 15 may set the blocking time of the solar power plant by controlling the inverter or EMS, which is the control means 30, according to the range of power system frequencies, and this blocking time is stored in the storage unit 17 in advance. There may be.
  • control unit 15 controls the inverter or EMS, which is the control means 30, when the power system frequency falls within an abnormal range in association with an ESS (Energy Storage System) or UPS (Uninterruptible Power Equipment). It will be described in more detail how to control the solar power plant in the.
  • ESS Electronicgy Storage System
  • UPS Uninterruptible Power Equipment
  • the control unit 15 may control the photovoltaic power plant by dividing the power system frequency into a short-term abnormality and a long-term abnormality.
  • the short term may be equal to or less than the previously set blocking time or may be set separately from the blocking time by the user.
  • control unit 15 continuously checks the power system frequency, and if the power system frequency falls within an abnormal range, it commands the control means 30, which is an inverter, to separate from the system during the cutoff time. Afterwards, if the power system frequency returns to the normal range within the cutoff time, it is determined that it is a short-term abnormal case, and it can be reclosed and connected to the power system.
  • the process of separating from the system may be repeated again because the power system frequency falls within the abnormal range.
  • control unit 15 may be configured to classify the power system frequency as a long-term abnormality rather than a short-term abnormality if the frequency corresponding to the short-term abnormality is repeated more than a certain number of times.
  • counting the number of short-term abnormalities may be counted based on the number of times of returning to the normal range within the blocking time after being confirmed to be in the abnormal range.
  • control unit 15 may classify the power system frequency as a long-term abnormality if the frequency of the power system frequently falls within the abnormal range even if the checked power system frequency returns to the normal range after the cutoff time has elapsed.
  • a predetermined number of times for classifying short-term abnormalities into long-term abnormalities may be set in advance, and if the counted number of short-term abnormalities exceeds the preset number, they may be classified as long-term abnormalities.
  • control unit 15 determines that the grid frequency is still in the abnormal range even though the predetermined cut-off time has exceeded as described above, so that the power generation amount of the solar power plant is charged to the ESS or UPS can
  • control unit 15 determines the long-term abnormality, charges the ESS or UPS, and rechecks the frequency again when the capacity of the ESS or UPS is completely filled. At this time, if the system frequency is normal, it is connected to the power system again.
  • the control unit (15 ) controls the charging power of the ESS or UPS to be used for other loads so that the ESS or UPS is discharged. Then, the control unit 15 may cut off the connection with the power system and charge the generation amount to the ESS or UPS again.
  • control unit 15 counts the number of short-term abnormal states, and after the counted number exceeds a preset number and is classified as a long-term abnormal state, the short-term abnormal state determined as a long-term abnormal state is returned to the short-term abnormal state according to certain conditions. It can be classified as abnormal.
  • the short-term abnormal state may mean a case where the time period when the grid frequency is in the normal state is longer than the time period when the grid frequency is in the abnormal state, so based on the average time in the normal state and the average time in the abnormal state Therefore, if the average time of the steady state is long, it can be controlled to return to the short-term abnormal state.
  • the average time has been described, but it is not limited thereto.
  • the maximum time for maintaining an abnormal state and the maximum time for maintaining a normal state are compared, and if the maximum time for maintaining a normal state is greater than the maximum time for maintaining an abnormal state, a long term It may be possible to control abnormalities to return to short-term abnormalities.
  • the storage unit 17 stores various data transmitted and received through the communication unit 11, ID for each module constituting the integrated controller 10, and ID of the control means 30 interworking with the integrated controller 10. , the ID of the load 50 and the ID of the measurement means 70 may be stored.
  • the output unit 19 is controlled by the control unit 15 and may output a plurality of selection buttons according to the user interface or output a screen composition based on the user interface in order to directly receive various commands from the manager.
  • information on the state of the control means 30, the load 50 and the measurement means 70 can be output to the output unit 19 through a user interface, and transmitted from the server S and the control center C.
  • the received information may be output based on the user interface.
  • the output unit 19 may include a display unit, a sound output unit, and an alarm unit, and may be provided as a touch screen to directly receive information from a manager or output generated information.
  • the integrated controller 10 of the present invention may further include a RealTimeClock (RTC) module capable of recognizing time by maintaining a real-time state, so that data transmission/reception and data measurement time may be grasped.
  • RTC RealTimeClock
  • FIG. 2 is a schematic diagram of a system including an integrated controller 10 for FAST DR of the present invention.
  • the system of the present invention may include a control center (C), a server (S), an integrated controller 10, a control means 30, a load 50 and a measuring means 70.
  • the control center (CS) is built by the power exchange or power company and can receive data on the load condition including the amount of power used from the server (S), and if it is necessary to reduce the load power, the server (S) Reduction requests can be sent. To this end, the control center (C) can communicate with the server (S) by various communication methods including MQTT and HTTP.
  • the server (S) is a server built by a demand management service provider, and the management service provider contracts with the load user and, if necessary, issues instructions to the load user to increase or decrease power or conducts various monitoring including monitoring the amount of reduction.
  • (S) can be built including a database.
  • the server S may define load ID mapping by matching the ID of the load 50 for each module, such as a relay module, a modbus communication module, and an analog output module constituting the integrated controller 10.
  • the server (S) may output information according to the user interface to a separate terminal device of the management service provider.
  • the server (S) may transmit data on the load state, including data received from the integrated controller 10, to the control center (C), and receive a load power reduction request from the control center (C) to the integrated controller. (10) can also be passed.
  • the control center (C) or the integrated controller 10 it is possible to communicate with the control center (C) or the integrated controller 10 and various communication methods including MQTT, Modbus RTU, Modbus TCP, TCP/IP, and the like.
  • the server (S) receives information such as a reduction ratio according to the range of output frequencies directly from the management company or received from a separate management company terminal device and transmits the information to the integrated controller 10 to the storage of the integrated controller 10. You can also have it saved.
  • control means 30 interworking with the integrated controller 10 is an inverter or EMS of a solar power plant
  • the inverter or EMS transmits a control signal of the control means 30 from the integrated controller 10 It can also control the amount of power generation output of a solar power plant.
  • the server (S) delivers information of the ESS or UPS to the integrated controller 10, and the integrated controller 10 Depending on the control signal received from the ESS or UPS can be controlled.
  • ESS Electronic Storage System
  • UPS Uninterruptible Power Equipment
  • the integrated controller 10 receives the size and frequency data of the power applied to the load 50 measured by the measuring means 70 installed or connected to the load 50, and issues FAST DR received from the server S.
  • a control signal may be transmitted to the control means 30 for controlling power supplied to the load 50 based on the information.
  • the integrated controller 10 transmits an on/off signal to the control means 30 to cut off the power supplied to the load 50 or transmits the output frequency to the control means 30 to output the control means 30.
  • the frequency By controlling the frequency, it is possible to adjust the power supplied to the load 50 and the increase or decrease of the frequency.
  • control means 30 is an inverter or EMS of a solar power plant
  • the integrated controller 10 uses the circuit breaker and relay of the control means 30 when the power system frequency falls within an abnormal range in conjunction with the solar power plant. It can be controlled to be separated from the power system for a predetermined time.
  • relay control unit 153 analog output control unit
  • control means 50 load

Abstract

본 발명의 FAST DR 관리를 위한 서버와 연동되는 FAST DR을 위한 통합 컨트롤러는, 상기 서버로부터 FAST DR 발령 정보를 수신하고, 부하와 연동되는 계측수단으로부터 전력 및 주파수 데이터를 수신하는 통신부; 및 상기 부하에 공급되는 전력 또는 주파수를 조절하는 제어수단과 연동되어 상기 통신부로부터 수신된 상기 전력 및 주파수 데이터에 기초하여 상기 제어수단을 제어하는 제어부를 포함하고, 상기 제어부는, 상기 제어수단의 종류에 따라 상기 부하에 공급되는 전력을 차단하거나 상기 부하에 공급되는 전력이 증감되도록 조절한다. [대표도] 도 1

Description

FAST DR을 위한 통합 컨트롤러 및 이를 포함하는 시스템
본 발명은 FAST DR을 위한 통합 컨트롤러 및 이를 포함하는 시스템에 관한 것으로, 전력 수요에 맞춰 전력을 제어할 수 있는 FAST DR을 위한 통합 컨트롤러 및 이를 포함하는 시스템에 관한 것이다.
세계는 기후 위기의 심각성을 공감하며 화석연료 기반의 발전 등에 대한 문제 의식이 커지면서, 상대적으로 환경 오염 문제로부터 자유로운 풍력, 태양광 및 조력 발전과 같은 신재생 에너지가 대안으로 제시되고 있다.
하지만, 신재생 에너지는 정래의 화석연료 기반의 발전 또는 원자력 발전에 비하여 전력 공급의 변동성이 클 수 밖에 없으며, 발전량이 안정적으로 유지되지 못하고 전력수급에 문제가 발생하게 되면 정상적인 전력망의 주파수 유지가 어렵게 된다.
이에 전력망의 주파수 변동에 따른 위험을 방지하기 위해 주파수 추종 운전 또는 자동발전 제어운전을 운용하여 발전량을 제어하지만, 신재생 에너지의 비중이 높아질수록 발전량 제어에 한계가 있을 수 밖에 없다. 특히나 전기차, 스마트 인터넷, AI 등의 4차 산업혁명기술 도입으로 인해 전력 수요의 폭발적인 증가가 예상되고 있는 요즘, 전력 공급의 증가뿐만 아니라 수요자 차원의 에너지 수요관리가 점점 중요해지고 있다.
이러한 에너지 수요관리로 수요 반응(DR, Demand Response)이 있으며, 기존의 수요 반응 자원 관리는 전력계통 피크와 발전비용절감 측면에서 운용되고 있는 바, 전력망의 주파수가 정상적인 주파수 범위를 벗어나게 되는 상황이 감지되었을 때, 전력 수요자에게 응동을 요청하는 기존의 수요 반응 자원 관리 방식으로는 비정상 주파수 범위에 따른 전력망의 조속한 안정화를 달성하는데 한계가 있었다.
[선행기술문헌]
[특허문헌]
한국공개특허공보 제2010-0047069호
본 발명은 상기와 같은 문제를 해결하기 위해 안출된 것으로, 본 발명의 목적은 신재생 에너지 변동성에 대응하여 국내 전력거래소에서 시행하고 있는 부하사용차단을 통한 전력계통 주파수 정상화(주파수 DR)는 물론, 전력 수요에 반응하여 전력사용량을 증감함으로써 전력계통을 정상화할 수 있는 FAST DR을 위한 통합 컨트롤러 및 이를 포함하는 시스템을 제공하는 것이다.
상기 목적을 달성하기 위한 본 발명의 일 실시예에 따른 FAST DR 관리를 위한 서버와 연동되는 FAST DR을 위한 통합 컨트롤러는, 상기 서버로부터 FAST DR 발령 정보를 수신하고, 부하와 연동되는 계측수단으로부터 전력 및 주파수 데이터를 수신하는 통신부; 및 상기 부하에 공급되는 전력 또는 주파수를 조절하는 제어수단과 연동되어 상기 통신부로부터 수신된 상기 전력 및 주파수 데이터에 기초하여 상기 제어수단을 제어하는 제어부를 포함하고, 상기 제어부는, 상기 제어수단의 종류에 따라 상기 부하에 공급되는 전력을 차단하거나 상기 부하에 공급되는 전력이 증감되도록 조절한다.
여기서 상기 제어부는, 상기 제어수단이 상기 부하에 전력을 공급하기 위한 배전용 제어패널이면, 상기 부하별로 매칭되는 릴레이 모듈을 제어하여 온/오프(on/off) 신호가 상기 배전용 제어패널로 전달되도록 하는 릴레이 제어부를 포함하고, 상기 릴레이 제어부는, 상기 부하에 공급되는 전력의 주파수에 기초하여 상기 릴레이 모듈의 접점 동작 시간을 제어하여 기설정된 시간동안 상기 부하에 공급되는 전력을 차단할 수 있다.
한편 상기 제어부는, 상기 제어수단이 아날로그 인풋(Analog Input) 신호를 수신할 수 있는 제어수단이면, 상기 부하별로 매칭되는 아날로그 아웃풋 모듈을 제어하여 상기 제어수단의 출력전압 및 전류를 조절하기 위한 신호가 상기 제어수단으로 전달되도록 하는 아날로그 아웃풋 제어부를 포함하고, 상기 아날로그 아웃풋 제어부는, 상기 부하에 공급되는 전력의 주파수에 기초하여, 상기 아날로그 아웃풋 모듈의 출력전압 및 전류를 제어하여 상기 제어수단의 출력 주파수를 증감시킬 수 있다.
그리고 상기 제어부는, 상기 제어수단이 부하에 전력을 공급하는 태양광 발전소의 인버터이면, 상기 계측수단으로부터 수집되는 전력계통의 주파수가 기설정된 범위에 해당하면 상기 제어수단이 일정시간동안 상기 전력계통과 분리되도록 제어할 수 있다.
또한, 상기 제어부는, 상기 태양광 발전소의 인버터가 ESS(Energy Sotrage Sysptem) 또는 UPS(Uninterruptible)와 연계되어 있고, 상기 제어수단과 상기 전력계통의 분리된 시간이 상기 일정시간을 초과한 이후 상기 전력계통과 연결되었으나 상기 전력계통의 주파수가 상기 기설정된 범위에 해당하면, 상기 ESS 또는 UPS가 충전되도록 제어할 수 있다.
그리고, 상기 제어부는, 상기 전력계통의 주파수가 기설정된 범위에 해당하면 단기 비정상 또는 장기 비정상 중 하나로 구분하되, 상기 단기 비정상의 횟수가 소정의 횟수를 초과하면 단기 비정상을 장기 비정상으로 판단할 수 있다.
나아가 본 발명은 상기 FAST DR을 위한 통합 컨트롤러를 포함하는 시스템을 제공할 수 있다.
상술한 본 발명의 일측면에 따르면, 신재생 에너지 변동성에 대응하여 국내 전력거래소에서 시행하고 있는 부하사용차단을 통한 전력계통 주파수 정상화(주파수 DR)는 물론, 전력 수요에 반응하여 전력사용량을 증감시켜 전력계통을 정상화할 수 있다.
도 1은 본 발명의 일 실시예에 따른 통합 컨트롤러의 구성을 설명하기 위한 블록도, 그리고,
도 2는 발명의 FAST DR을 위한 통합 컨트롤러를 포함하는 시스템에 대한 개략도이다.
후술하는 본 발명에 대한 상세한 설명은, 본 발명이 실시될 수 있는 특정 실시예를 예시로서 도시하는 첨부 도면을 참조한다. 이들 실시예는 당업자가 본 발명을 실시할 수 있기에 충분하도록 상세히 설명된다. 본 발명의 다양한 실시예는 서로 다르지만 상호 배타적일 필요는 없음이 이해되어야 한다. 예를 들어, 여기에 기재되어 있는 특정 형상, 구조 및 특성은 일 실시예와 관련하여 본 발명의 정신 및 범위를 벗어나지 않으면서 다른 실시예로 구현될 수 있다. 또한, 각각의 개시된 실시예 내의 개별 구성요소의 위치 또는 배치는 본 발명의 정신 및 범위를 벗어나지 않으면서 변경될 수 있음이 이해되어야 한다. 따라서, 후술하는 상세한 설명은 한정적인 의미로서 취하려는 것이 아니며, 본 발명의 범위는, 적절하게 설명된다면, 그 청구항들이 주장하는 것과 균등한 모든 범위와 더불어 첨부된 청구항에 의해서만 한정된다. 도면에서 유사한 참조부호는 여러 측면에 걸쳐서 동일하거나 유사한 기능을 지칭한다.
이하에서는 도면들을 참조하여 본 발명의 바람직한 실시예들을 보다 상세하게 설명하기로 한다.
도 1은 본 발명의 일 실시예에 따른 통합 컨트롤러(10)의 구성을 설명하기 위한 블록도이다.
본 실시예에 따른 FAST DR을 위한 통합 컨트롤러(10)는 부하 사용자와 계약을 맺고 필요 시 부하 사용자에게 전력 증감 지시를 내리거나 감축량 모니터링을 실시하는 관리사업자에 의해 구축되는 서버(S)와 연동되며, 현재 전력주파수에 따라 수요반응자원의 수요 응동을 제어하기 위해 마련되는 것으로, 서버(S)로부터 FAST DR 발령 정보를 수신할 수 있다.
그리고 관리사업자에 의해 구축되는 서버(S)는 전력거래소 또는 전력회사에 의해 구축되어 부하 전력의 감축이 필요한 경우 감축 요청을 실시하는 관제센터(C)와 연결됨으로써, 본 실시예에 따른 FAST DR을 위한 통합 컨트롤러(10)가 관제센터(C)와도 통신이 가능할 수 있다. 통합 컨트롤러(10)가 관제센터(C)와 통신하는 경우, 통합 컨트롤러(10)와 관제센터(C)가 직접 통신을 수행하거나 관리사업자에 의해 구축되는 서버(S)를 통해 관제센터(C)로 정보를 송수신할 수도 있다.
또한, 통합 컨트롤러(10)는 부하(50)에 설치 또는 연결된 계측수단(70)에 의해 측정된 부하(50)에 걸리는 전력의 크기 및 주파수 데이터를 수신하고, 부하(50)에 공급되는 전력을 제어하는 제어수단(30)으로 제어신호를 전송할 수 있다.
이를 위해 본 통합 컨트롤러(10)는 통신부(11), 입력부(13), 제어부(15), 저장부(17) 및 출력부(19)를 포함하여 마련될 수 있다.
통신부(11)는 부하 사용자와 계약을 맺고 필요시 부하사용자에게 전력 증감 지시를 내리거나 감축량 모니터링을 실시하는 관리사업자에 의해 구축되는 서버(S)와 통신하여 각종 정보를 송수신하고, 부하(50)에 설치되거나 부하(50)에 연결된 계측수단(70)로부터 부하(50)에 걸리는 전력의 크기 및 주파수 데이터를 수신받을 수 있다.
이를 위해 통신부(11)는 관리사업자에 의해 구축되는 서버(S)로부터 통합 컨트롤러(10)의 ID를 할당받아 저장부(17)에 저장되도록 할 수 있다. 그리고 통신부(11)는 와이파이(Wifi), 이더넷, 지그비(Zigbee) 및 LoRa(Long Range) 등 을 포함하는 일반적인 통신방법 중 하나의 통신방식일 수 있다.
그리고 통신부(11)는 사용 전력량 및 주파수와 같은 부하(50)의 상태에 따라 부하 전력의 감축이 필요한 경우 관제센터(C)로부터 감축 요청 신호를 수신할 수 있다.
또한 통신부(11)는 부하(50)에 설치 또는 연결된 계측수단(70)에 의해 측정된 부하(50)에 걸리는 전력의 크기 및 주파수 데이터를 수신하고 이를 저장부(17)에 저장되도록 할 수 있다.
그리고 통신부(11)가 통신 방식으로 IoT에 사용하는 저전력 LoRa(LongRange) 모듈로 마련되는 경우, LoRa 모듈별 ID를 설정하고, LoRa 모듈별 부하 ID를 매칭하여 맵핑되도록 하여 모듈별로 어떠한 부하(50)에 연동되어 동작하는지에 대해 정의할 수 있다. 이러한 설정 및 정의는 관리사업자에 의해 구축되는 서버(S)를 통해 수행될 수 있다.
또한 통신부(11)는 모드버스(Modbus) 통신프로토콜을 이용하여 계측수단(70)과 통신하고, 다양한 종류의 EMS 연동에 사용하거나 인버터를 포함하는 제어수단(30)과 연동함으로써, 전력량 데이터, 주파수, 유효전력, 무효전력 등의 데이터를 계측하거나 제어수단(30) 또는 EMS(Energy Management System)를 통해 부하(50)설비를 제어할 수도 있다.
한편 입력부(13)는 관리자로부터 각종 명령을 직접 입력받기 위해 마련되는 것으로, 사용자 인터페이스(UI)에 따라 출력부(19)를 통해 출력되는 복수개의 선택 버튼 중 임의의 선택 버튼에 대한 선택을 입력받을 수 있다.
이러한 입력부(13)가 관리자로부터 입력받는 것은 전원의 온오프, 통신부(11)에 대한 설정, 제어부(15)에 대한 설정, 수요반응의 종류 등의 정보를 입력받는 것일 수 있다.
한편, 제어부(15)는 부하(50)를 직접 제어하기 위해 마련되는 것으로 복수개의 부하(50)들에 공급되는 전력을 제어하는 기존의 제어수단(30)과 연동되어 온/오프 신호 또는 아날로그 출력 신호를 통해 전력량을 제어하기 위해 마련될 수 있다.
이러한 제어부(15)는 부하(50)에 걸리는 전력의 크기 및 주파수 데이터와 관제센터(C) 또는 서버(S)로부터의 발령정보를 기초로 부하(50)의 전력을 제어하는 제어수단(30)에 제어신호를 전송하여 부하(50)에 걸리는 전력의 크기를 조절할 수 있다.
본 실시예에 따른 통합 컨트롤러(10)는 보드로 제조될 수 있는데, 이러한 통합 컨트롤러(10) 내에는 릴레이 모듈, 아날로그 아웃풋 모듈, 모드버스 모듈 등을 포함할 수 있다. 이러한 릴레이 모듈, 아날로그 아웃풋 모듈 및 모드버스 모듈은 각각 고유의 ID를 할당받을 수 있다.
이를 위해 제어부(15)는 제어하는 모듈의 종류에 따라 릴레이 제어부(151) 및 아날로그 아웃풋 제어부(153)를 포함하여 마련될 수 있다.
릴레이 제어부(151)는 관리사업자에 의해 구축되는 서버(S)에 의해서 보드에 마련된 릴레이 모듈마다 부하(50)의 ID가 매칭되므로 릴레이 모듈이 어떠한 부하(50)에 연동되어 동작하는지에 대해 정의될 수 있다.
그리고 이러한 릴레이 모듈은 릴레이 모듈마다 A 점점 방식, B 접점 방식 또는 자기유지회로 방식 중 하나로 설정될 수 있으며, 부하(50)측에 연결된 기존의 제어수단(30)과 연동하여 온/오프 신호를 제어수단(30)으로 전달할 수 있게 된다. 여기서의 제어수단(30)은 부하(50)와 연결되는 배전용 제어패널일 수 있다.
이를 위해 릴레이 제어부(151)는 릴레이 모듈별 접점 동작 시간을 기설정된 시간동안 제어할 수 있으며, 기설정된 접점 동작 시간은 1초 내지 수분 및 무제한 중에 하나로 특정될수 있다. 이는 관리사업자에 의해 구축된 서버(S)로부터 입력받거나, 입력부(13)를 통한 입력에 의해 사전에 설정될 수 있다.
보다 구체적으로 릴레이 제어부(151)가 릴레이 모듈의 동작을 위해 릴레이 모듈별로 트리거 동작 주파수를 설정하여 해당 동작 주파수에 설정된 접점 방식으로 동작하도록 할 수 있다. 예를 들어 1번 ID를 갖는 릴레이 모듈이 1번 부하(50)와 연결되는 1번 제어수단(30)과 연결되어 있다고 가정하고, 관리사업자에 의해 구축된 서버(S) 또는 관리자가 입력부(13)를 통해 1번 릴레이 모듈이 동작해야하는 동작 주파수를 온/오프로 나누어 사전에 설정한다.
그리고 릴레이 제어부(151)는 1번 부하(50)와 연결된 계측수단(70)으로부터 1번 부하(50)에 할당된 주파수가 사전에 설정된 오프에 해당하는 트리거 주파수이면 릴레이 제어부(151)는 1번 제어수단(30)으로 오프신호를 보낼 수 있다.
만약 릴레이 제어부(151)는 1번 부하(50)와 연결된 계측수단(70)으로부터 1번 부하(50)에 할당된 주파수가 사전에 설정된 온(on)에 해당하는 트리거 주파수이면 릴레이 제어부(151)는 1번 제어수단(30)으로 온(on) 신호를 보낼 수 있다.
이때 릴레이 제어부(151)는 접점 동작시간이 별도로 지정되어 있는 경우라면 온(on) 신호를 생성하기 위한 동작 트리거 주파수를 입력할 수 없도록 제어할 수도 있다.
구체적으로 오프(off) 동작의 트리거 주파수와 오프(off)의 유지시간은 1분 내지 수분 내에서 설정될 수 있는데, 만약 오프(off)의 유지시간이 1분으로 설정되어 있다고 가정하면, 온(on) 동작의 트리거 주파수는 설정되지 않고, 오프(off) 유지시간 이후에 온(on) 동작이 실행되도록 설정될 수 있다. 오프(off) 동작의 유지시간은 서버(S)로부터 전달받거나 관리자에 의해 사전에 설정될 수도 있다.
그리고 릴레이 제어부(151)는 릴레이 모듈의 동작 트리거가 설정되지 않고, 서버(S)로부터 수신되는 신호를 통해 릴레이 모듈의 온/오프 동작을 제어할 수 있다.
이러한 릴레이 제어부(151)를 통해 본 실시예에 따른 통합 컨트롤러(10)는 전력 주파수 데이터를 기초로 부하에 공급되는 전력을 감축시킬 수 있게 된다.
한편 아날로그 아웃풋 제어부(153)는 통합 컨트롤러(10)가 아날로그 인풋(Analog Input) 신호를 받을 수 있는 제어수단(30)과 연동되면, 아날로그 아웃풋 모듈을 제어하여, 단순히 온/오프 동작이 아닌 제어수단(30)의 출력 증감하기 위해 마련된다. 아날로그 인풋 신호를 받을 수 있는 제어수단(30)이라 함은 인버터 또는 부하출력증감장치일 수 있다.
아날로그 아웃풋 모듈은 상술한 바와 같이 각각의 아날로그 아웃풋 모듈은 고유의 ID를 할당받을 수 있고, 각각의 아날로그 아웃풋 모듈별로 아웃풋의 출력 방식이 지정될 수 있다. 여기서 지정되는 출력방식은 0vDC 내지 10vDC 또는 4mA 내지 20mA로 지정될 수 있다.
그리고 이러한 아날로그 아웃풋 모듈은 상술한 릴레이 모듈과 마찬가지로 서버(S)에 의해서 보드에 마련된 아날로그 아웃풋 모듈마다 부하의 ID가 매칭되므로 각각의 아날로그 아웃풋 모듈이 어떠한 부하(50)에 연동되어 동작하는지에 대해 정의될 수 있다.
따라서 아날로그 아웃풋 제어부(153)는 전달받은 목표전력과 같은 발령정보 데이터를 기초하여 출력 주파수를 결정하고, 결정된 출력 주파수에 따라 부하(50)와 연결된 제어수단(30)으로 출력 신호를 전달함으로써 제어수단(30)의 출력 주파수를 제어할 수 있다. 그리고 전력 주파수 대비 감축률은 관제센터(C)에 의해 결정될 수 있다.
그리고 아날로그 아웃풋 제어부(153)는 아날로그 아웃풋 모듈의 트리거 신호에 따라 아날로그 아웃풋 모듈의 동작을 제어할 수 있다. 아날로그 아웃풋 제어부(153)는 서버(S)로부터 주파수신호에 따른 제어값을 수신하면 그에 대응하여 제어수단(30)의 출력을 증감시키도록 아날로그 아웃풋 모듈을 제어하고, 서버(S)로부터 제어종료를 요청하는 신호가 수신되면 아날로그 아웃풋 모듈의 제어를 종료하여 제어수단(30)의 출력 주파수를 제어할 수 있다.
이와 함께 아날로그 아웃풋 제어부(153)는 서버(S)의 신호가 아닌 전력계통 주파수에 기초하여 아날로그 아웃풋 모듈을 제어할 수도 있다.
아날로그 아웃풋 제어부(153)는 아날로그 아웃풋 모듈의 동작을 위한 최저 주파수 또는 동작을 위한 최대 주파수를 사전에 설정하고, 계측수단(70)으로부터 계측된 주파수에 따라 제어수단(30)의 출력을 증감시킬 수 있다.
그리고 아날로그 아웃풋 제어부(153)는 제어수단(30)의 출력 주파수에 따른 부하 설비의 전력 사용량을 정확하게 제어하기 위해서 축동력은 회전수 변화의 세제곱에 비례한다는 축동력에 대한 상사법칙을 활용하여 목표 전력에 따른 출력 주파수를 구할 수 있다.
축동력의 최대 주파수 입력 허용범위는 일반적으로 0~60Hz이므로, 목표전력량에 따른 제어수단(30)의 출력 주파수는 음수인 경우에는 0Hz로, 60Hz가 초과된 경우에는 60Hz로 설정될 수 있으며, 이러한 최소 및 최대 주파수 범위는 설비특성에 따라 달라질 수 있으므로, 이는 해당설비의 특성에 따라 관리자에 의해 얼마든지 설정변경가능할 것이다.
그리고 제어부(15)는 사용자 인터페이스(UI, User Interface)에 따라 출력부(19)를 통해 각 구성의 설정을 위한 메뉴가 디스플레이 되도록 제어할 수도 있다.
또한 제어부(15)는 제어수단(30)이 부하(50)에 전력을 공급하는 태양광 발전소의 인버터 또는 태양광 EMS(Energy management system)인 경우 태양광 발전소와 연계하여 발전량을 제어할 수 있다.
이를 위해 제어부(15)는 태양광 발전소의 인버터인 제어수단(30)의 전력계통 주파수가 비정상적인 범위인 경우, 인버터 또는 EMS인 제어수단(30)의 차단기와 릴레이를 이용하여 정해진 시간 동안 차단을 하게 된다.
이를 위해 제어부(15)는 계측수단(70)으로부터 수집되는 전력계통의 주파수를 지속적으로 확인하며, 주파수가 비정상적인 범위에 해당하는 것으로 판단되면 제어수단(30)에 신호를 전송하여 일정 차단시간동안 계통과 분리되도록 제어한다.
그리고 제어부(15)는 전력계통 주파수가 정상 범위(60Hz±0.2Hz)로 돌아온 것으로 판단되면 제어수단(30)을 재폐로하여 전력계통과 연결되도록 할 수 있다.
한변 제어부(15)는 이상의 일정 차단시간을 초과하였으나, 여전히 계통 주파수가 비정상적인 범위에 해당하는 것으로 판단되고, 태양광 발전소가 ESS(Energy Storage System) 또는 UPS(Uninterruptible Power Equipment)와 연계되어 있으면 ESS 또는 UPS에 발전량을 충전한다.
이 때 발전량의 합계가 ESS 및 UPS의 용량을 초과하지 않도록 해야하며, 만약 발전량의 합계가 ESS 및 UPS의 용량을 초과하면 제어수단(30)인 인버터의 차단기를 재폐로 하여 전력계통과 연결되도록 한다.
이를 위해 제어부(15)는 수요관리사업에 의해 설정된 태양광 발전소의 이름 및 ID를 설정하고, 연계되는 태양광 발전소의 인버터인 제어수단(30)과의 통신 방법을 설정할 수 있는데, 시리얼 및 TCP/IP 통신을 통해 제어수단(30)을 직접 제어하거나, 서버(S)에 요청하여 제어수단(30)을 제어할 수도 있다.
그리고 제어부(15)는 ESS 또는 UPS와의 통신 방법으로 제어수단(30)과 마찬가지로 시리얼 및 TCP/IP 통신을 통해 제어수단(30)을 직접 제어할 수 있다. 또는 제어부(15)는 서버(S)에 요청하여 ESS 정보를 수신하고 제어를 요청할 수도 있으며, 이 경우에는 MQTT 서버와 같은 양방향 통신을 위한 체계가 구축되어 있는 경우에만 사용할 수 있을 것이다.
또한 제어부(15)는 제어수단(30)인 인버터 또는 EMS의 모델별 통신맵에 대한 메타데이터를 서버(S)에 요청하여 수신하여 인버터 또는 EMS모델 업데이트를 수행할 수 있다.
그리고 제어부(15)는 전력계통 주파수의 범위에 따라 제어수단(30)인 인버터 또는 EMS를 제어하여 태양광 발전소의 차단 시간을 설정할 수 있으며, 이러한 차단시간은 사전에 저장부(17)에 저장되어 있을 수 있다.
이하에서는 제어부(15)가 다른 실시예에 따라 전력계통 주파수가 비정상적인 범위에 해당하는 경우 제어수단(30)인 인버터 또는 EMS를 제어하여 ESS(Energy Storage System) 또는 UPS(Uninterruptible Power Equipment)와 연계되어 있는 태양광 발전소를 제어하는 방법에 대해 보다 자세히 설명하기로 한다.
본 발명의 다른 실시예에 따른 제어부(15)는 전력계통 주파수가 단기 비정상인 경우와 장기 비정상인 경우로 구분하여 태양광 발전소를 제어할 수 있다. 여기서 단기는 상술한 사전에 설정된 차단시간 이하이거나 사용자에 의해 차단시간과는 별개로 설정될 수 있다.
상술한 바와 같이 제어부(15)는 전력계통 주파수를 지속적으로 확인하며, 전력계통 주파수가 비정상적인 범위에 해당하면 인버터인 제어수단(30)에 명령하여 차단시간동안 계통과 분리하게 된다. 이후 차단시간 이내에 전력계통 주파수가 정상 범위로 돌아오면 단기 비정상인 경우인 것으로 판단하고, 재폐로 하여 전력계통과 연결할 수 있다.
하지만 전력계통 주파수가 단기 비정상인 경우로 판단되어 재폐로하여 전력계통과 연결을 수행한 이후에 또 다시 전력계통 주파수가 비정상적인 범위에 해당하여 계통과 분리하는 과정이 반복될 수도 있다.
이에 제어부(15)는 전력계통 주파수가 단기 비정상적인 경우에 해당하는 횟수가 일정 횟수 이상 반복되면 단기 비정상이 아닌 장기 비정상인 경우로 구분하도록 설정될 수 있다. 여기서 단기 비정상의 횟수를 카운팅하는 것은 비정상범위인 것으로 확인된 후 차단시간 내에 정상범위로 되돌아온 횟수에 기초하여 카운팅할 수 있다.
따라서 제어부(15)는 차단시간 경과 후 확인한 전력계통의 주파수가 정상 범위로 돌아오더라도 전력계통 주파수가 비정상범위에 해당하는 경우가 잦으면 장기 비정상인 경우로 구분할 수 있다. 이를 위해 사전에 단기 비정상을 장기 비정상으로 구분하기 위한 소정의 횟수가 사전에 설정될 수 있으며, 카운팅된 단기 비정상의 횟수가 사전에 설정된 횟수를 초과하면 장기 비정상인 경우로 구분할 수 있다.
그리고 제어부(15)는 장기 비정상인 경우에는 상술한 바와 같이 일정 차단시간을 초과하였으나 여전히 계통 주파수가 비정상적인 범위에 해당 하는 것으로 판단하는 경우와 마찬가지로, 태양광 발전소의 발전량이 ESS 또는 UPS에 충전되도록 할 수 있다.
또한 제어부(15)는 장기 비정상으로 판단되어 ESS 또는 UPS를 충전하여 ESS 또는 UPS의 용량이 완전히 채워지면 다시 주파수를 재확인하게 되고, 이 때 계통 주파수가 정상이면 다시 전력계통과 연결되도록 한다.
만약 ESS 또는 UPS의 용량이 완전히 채워진 후 주파수를 재확인하였으나 여전히 계통 주파수가 비정상인 것으로 확인되면 전력계통과 연결 후 계통 주파수의 비정상 범위 상태를 확인하되 비정상 범위 상태가 일정시간 이상 지속되면, 제어부(15)는 ESS 또는 UPS의 충전 전원을 다른 부하에 사용하도록 제어하여 ESS 또는 UPS를 방전되도록 한다. 그러고나서 제어부(15)는 전력 계통과의 연결을 차단하고, 다시 ESS 또는 UPS에 발전량이 충전되도록 할 수 있다.
한편 제어부(15)는 단기 비정상 상태의 횟수를 카운팅하여 카운팅된 횟수가 사전에 설정된 횟수를 초과하여 장기 비정상 상태로 구분된 이후에, 일정조건에 따라 장기 비정상 상태로 판단된 단기 비정상 상태를 다시 단기 비정상 상태로 구분할 수 있다.
구체적으로 단기 비정상 상태는 계통 주파수가 정상 상태일 때의 시간 주기가 비정상 상태일 때의 시간주기보다 긴 경우를 의미할 수 있으므로, 정상 상태일 때의 평균시간과 비정상 상태일 때의 평균시간에 기초하여 정상 상태의 평균시간이 길면 단기 비정상 상태로 돌아가도록 제어할 수 있다.
이상에서는 평균시간으로 설명하였으나, 이제 한정되는 것은 아니며, 비정상 상태를 유지하는 최대시간과 정상 상태를 유지하는 최대시간을 비교하여 정상 상태를 유지하는 최대시간이 비정상 상태를 유지하는 최대시간보다 크면 장기 비정상을 단기 비정상으로 돌아가도록 제어할 수도 있을 것이다.
한편, 저장부(17)는 통신부(11)를 통해 송수신되는 각종 데이터가 저장되거나, 통합 컨트롤러(10)를 구성하는 각 모듈별 ID, 통합 컨트롤러(10)와 연동되는 제어수단(30)의 ID, 부하(50)의 ID 및 계측수단(70)의 ID를 저장할 수 있다.
출력부(19)는 제어부(15)에 의해 제어되며, 관리자로부터 각종 명령을 직접 입력받기 위해 사용자 인터페이스에 따라 복수개의 선택 버튼을 출력하거나, 사용자 인터페이스에 기초한 화면 구성을 출력할 수 있다.
또한 출력부(19)에는 사용자 인터페이스에 의해 제어수단(30), 부하(50) 및 계측수단(70)의 상태에 대한 정보를 출력할 수 있으며, 서버(S) 및 관제센터(C)로부터 전달받은 정보를 사용자 인터페이스에 기초하여 출력할 수도 있다.
이러한 출력부(19)는 디스플레이부, 음향 출력부 및 알람부 등을 포함할 수 있으며 터치스크린으로 구비되어 관리자로부터 정보를 직접 입력받거나 생성된 정보를 출력할 수도 있다.
또한 본 발명의 통합 컨트롤러(10)는 실시간 상태를 유지하여 시간을 인지할 수 있는 RTC(RealTimeClock) 모듈을 더 포함하도록 마련하여 데이터의 송수신, 데이터의 계측 시간 등을 파악할 수도 있다.
도 2는 본 발명의 FAST DR을 위한 통합 컨트롤러(10)를 포함하는 시스템에 대한 개략도이다.
본 발명의 시스템은 관제센터(C), 서버(S), 통합 컨트롤러(10), 제어수단(30), 부하(50) 및 계측수단(70)을 포함하여 구성될 수 있다.
관제센터(CS)는 전력거래소 또는 전력회사에 의해 구축되는 것으로 서버(S)로부터 사용 전력량을 포함하는 부하 상태에 대한 데이터를 전달받을 수 있고, 부하 전력의 감축이 필요한 경우에는 서버(S)로 감축 요청을 전송할 수 있다. 이를 위해 관제센터(C)는 서버(S)와 MQTT, HTTP를 포함하는 다양한 통신방식에 의해서 통신할 수 있다.
서버(S)는 수요관리사업자에 의해 구축되는 서버로써, 관리사업자는 부하 사용자와 계약을 맺고 필요시 부하 사용자에게 전력 증감 지시를 내리거나 감축량 모니터링을 포함하는 각종 모니터링을 실시하는 주체로 이러한 서버(S)는 데이터 베이스를 포함하여 구축할 수 있다.
서버(S)는 통합 컨트롤러(10)를 구성하는 릴레이 모듈, 모드버스 통신모듈, 아날로그 아웃풋 모듈 등 각각의 모듈별로 부하(50)의 ID를 매칭하여 부하 ID 맵핑이 되도록 정의할 수 있다.
그리고 서버(S)는 관리사업자의 별도의 단말장치로 사용자 인터페이스에 따라 정보들이 출력되도록 할 수도 있다.
그리고 서버(S)는 통합 컨트롤러(10)로부터 수신되는 데이터를 포함하여 부하 상태에 대한 데이터를 관제센터(C)로 전달할 수 있으며, 관제센터(C)로부터 부하 전력의 감축 요청을 수신하여 통합 컨트롤러(10)로 전달할 수도 있다. 이를 위해 관제센터(C) 또는 통합 컨트롤러(10)와 MQTT, Modbus RTU, Modbus TCP, TCP/IP 등을 포함하는 다양한 통신방식에 의해서 통신할 수 있다.
또한 서버(S)는 출력주파수의 범위에 따른 감축비율과 같은 정보를 관리사업자로부터 직접 입력받거나 별도의 관리사업자 단말장치로부터 전달받아 통합 컨트롤러(10)로 전송하여 통합 컨트롤러(10)의 저장부에 저장되도록 할 수도 있다.
그리고 서버(S)는 통합 컨트롤러(10)와 연동되는 제어수단(30)이 태양광 발전소의 인버터 또는 EMS인 경우, 인버터 또는 EMS는 통합 컨트롤러(10)로부터 제어수단(30)의 제어신호를 전달받아 태양광 발전소의 발전 출력량을 제어할 수도 있다.
또한 이상의 태양광 발전소가 ESS(Energy Storage System) 또는 UPS(Uninterruptible Power Equipment)와 연계되어 있는 경우, 서버(S)는 ESS 또는 UPS의 정보를 통합 컨트롤러(10)에 전달하고, 통합 컨트롤러(10)로부터 수신되는 제어신호에 따라 ESS 또는 UPS를 제어할 수도 있다.
한편 통합 컨트롤러(10)는 부하(50)에 설치 또는 연결된 계측수단(70)에 의해 측정된 부하(50)에 걸리는 전력의 크기 및 주파수 데이터를 수신하고, 서버(S)로부터 수신되는 FAST DR 발령 정보에 기초하여 부하(50)에 공급되는 전력을 제어하는 제어수단(30)으로 제어신호를 전송할 수 있다.
이를 통해 통합 컨트롤러(10)는 제어수단(30)으로 온오프 신호를 전송하여 부하(50)로 공급되는 전력을 차단하거나, 제어수단(30)으로 출력 주파수를 전달하여 제어수단(30)의 출력 주파수를 제어하여 부하(50)에 공급되는 전력 및 주파수의 증감을 조절할 수 있다.
또한 통합 컨트롤러(10)는 제어수단(30)이 태양광 발전소의 인버터 또는 EMS인 경우에는 태양광 발전소와 연계하여 전력계통 주파수가 비정상적인 범위에 해당하는 경우 제어수단(30)의 차단기와 릴레이를 이용하여 정해진 시간동안 전력계통과 분리되도록 제어할 수 있다.
이러한 통합 컨트롤러(10)의 구체적인 구성과 제어수단(30), 부하(50) 및 계측수단(70)은 도 1에서 이미 설명하였거나 충분히 유추가능하므로, 도 2에서는 자세한 설명은 생략하기로 한다.
이상에서는 본 발명의 다양한 실시예에 대하여 도시하고 설명하였지만, 본 발명은 상술한 특정의 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 다양한 변형실시가 가능한 것은 물론이고, 이러한 변형실시들은 본 발명의 기술적 사상이나 전망으로부터 개별적으로 이해되어져서는 안될 것이다.
[부호의 설명]
10 : 통합 컨트롤러 11 : 통신부
13 : 입력부 15 : 제어부
151 : 릴레이 제어부 153 : 아날로그 아웃풋 제어부
17 : 저장부 19 : 출력부
30 : 제어수단 50 : 부하
70 : 계측수단

Claims (7)

  1. FAST DR 관리를 위한 서버와 연동되는 FAST DR을 위한 통합 컨트롤러에 있어서,
    상기 서버로부터 FAST DR 발령 정보를 수신하고, 부하와 연동되는 계측수단으로부터 전력 및 주파수 데이터를 수신하는 통신부; 및
    상기 부하에 공급되는 전력 또는 주파수를 조절하는 제어수단과 연동되어 상기 통신부로부터 수신된 상기 전력 및 주파수 데이터에 기초하여 상기 제어수단을 제어하는 제어부를 포함하고,
    상기 제어부는,
    상기 제어수단의 종류에 따라 상기 부하에 공급되는 전력을 차단하거나 상기 부하에 공급되는 전력이 증감되도록 조절하는 것을 특징으로 하는 FAST DR을 위한 통합 컨트롤러.
  2. 제1항에 있어서,
    상기 제어부는,
    상기 제어수단이 상기 부하에 전력을 공급하기 위한 배전용 제어패널이면, 상기 부하별로 매칭되는 릴레이 모듈을 제어하여 온/오프(on/off) 신호가 상기 배전용 제어패널로 전달되도록 하는 릴레이 제어부를 포함하고,
    상기 릴레이 제어부는,
    상기 부하에 공급되는 전력의 주파수에 기초하여 상기 릴레이 모듈의 접점 동작 시간을 제어하여 기설정된 시간동안 상기 부하에 공급되는 전력을 차단하는 것을 특징으로 하는, FAST DR을 위한 통합 컨트롤러.
  3. 제1항에 있어서,
    상기 제어부는,
    상기 제어수단이 아날로그 인풋(Analog Input) 신호를 수신할 수 있는 제어수단이면, 상기 부하별로 매칭되는 아날로그 아웃풋 모듈을 제어하여 상기 제어수단의 출력전압 및 전류를 조절하기 위한 신호가 상기 제어수단으로 전달되도록 하는 아날로그 아웃풋 제어부를 포함하고,
    상기 아날로그 아웃풋 제어부는,
    상기 부하에 공급되는 전력의 주파수에 기초하여, 상기 아날로그 아웃풋 모듈의 출력전압 및 전류를 제어하여 상기 제어수단의 출력 주파수를 증감시키는 것을 특징으로 하는, FAST DR을 위한 통합 컨트롤러.
  4. 제1항에 있어서,
    상기 제어부는,
    상기 제어수단이 부하에 전력을 공급하는 태양광 발전소의 인버터이면, 상기 계측수단으로부터 수집되는 전력계통의 주파수가 기설정된 범위에 해당하면 상기 제어수단이 일정시간동안 상기 전력계통과 분리되도록 제어하는 것을 특징으로 하는 FAST DR을 위한 통합 컨트롤러.
  5. 제4항에 있어서,
    상기 제어부는,
    상기 태양광 발전소의 인버터가 ESS(Energy Sotrage Sysptem) 또는 UPS(Uninterruptible)와 연계되어 있고, 상기 제어수단과 상기 전력계통의 분리된 시간이 상기 일정시간을 초과한 이후 상기 전력계통과 연결되었으나 상기 전력계통의 주파수가 상기 기설정된 범위에 해당하면, 상기 ESS 또는 UPS가 충전되도록 제어하는 것을 특징으로 하는, FAST DR을 위한 통합 컨트롤러.
  6. 제5항에 있어서,
    상기 제어부는,
    상기 전력계통의 주파수가 기설정된 범위에 해당하면 단기 비정상 또는 장기 비정상 중 하나로 구분하되, 상기 단기 비정상의 횟수가 소정의 횟수를 초과하면 단기 비정상을 장기 비정상으로 판단하는 것을 특징으로 하는, FAST DR을 위한 통합 컨트롤러.
  7. 제1항 내지 제6항의 어느 하나의 항에 따른 FAST DR을 위한 통합 컨트롤러를 포함하는 시스템.
PCT/KR2021/017958 2021-10-15 2021-12-01 Fast dr을 위한 통합 컨트롤러 및 이를 포함하는 시스템 WO2023063487A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2021-0137707 2021-10-15
KR1020210137707A KR102575039B1 (ko) 2021-10-15 2021-10-15 Fast dr을 위한 통합 컨트롤러 및 이를 포함하는 시스템

Publications (1)

Publication Number Publication Date
WO2023063487A1 true WO2023063487A1 (ko) 2023-04-20

Family

ID=85988720

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2021/017958 WO2023063487A1 (ko) 2021-10-15 2021-12-01 Fast dr을 위한 통합 컨트롤러 및 이를 포함하는 시스템

Country Status (2)

Country Link
KR (1) KR102575039B1 (ko)
WO (1) WO2023063487A1 (ko)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190038093A (ko) * 2017-09-29 2019-04-08 한국전력공사 주파수 제어 시스템
US20200073427A1 (en) * 2017-03-23 2020-03-05 Hitachi, Ltd. Aggregation system, method for controlling same, and complex power conversion device
KR102120011B1 (ko) * 2019-07-17 2020-06-05 이재호 통합 수요반응자원 운영 시스템 및 방법
KR20210026373A (ko) * 2019-08-30 2021-03-10 주식회사 아이디알서비스 Fast dr을 위한 계측 및 제어 시스템
KR102246252B1 (ko) * 2020-01-06 2021-04-29 (주)호디 전력계통 보조서비스에 Fast DR이 적용된 전기자동차 충전기 및 전기차 충전 전력 제어 방법 및 장치

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4892417B2 (ja) * 2007-06-19 2012-03-07 株式会社日立製作所 電力系統需給制御システム、指令装置、及び電力系統需給制御方法
KR101022574B1 (ko) 2008-10-28 2011-03-16 한국전력공사 고객기준부하 기반의 상시 부하 저감 시스템
KR101489821B1 (ko) * 2013-05-31 2015-02-06 (주) 이이시스 태양광 발전 모니터링 시스템 및 그 모니터링 방법
KR102546644B1 (ko) * 2016-03-29 2023-06-21 엘에스일렉트릭(주) 하이브리드 전력 저장 장치
KR102207244B1 (ko) * 2017-11-29 2021-01-22 주식회사 제이케이코어 IoT 일체형 3kW 인버터 및 통합 관리 시스템

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200073427A1 (en) * 2017-03-23 2020-03-05 Hitachi, Ltd. Aggregation system, method for controlling same, and complex power conversion device
KR20190038093A (ko) * 2017-09-29 2019-04-08 한국전력공사 주파수 제어 시스템
KR102120011B1 (ko) * 2019-07-17 2020-06-05 이재호 통합 수요반응자원 운영 시스템 및 방법
KR20210026373A (ko) * 2019-08-30 2021-03-10 주식회사 아이디알서비스 Fast dr을 위한 계측 및 제어 시스템
KR102246252B1 (ko) * 2020-01-06 2021-04-29 (주)호디 전력계통 보조서비스에 Fast DR이 적용된 전기자동차 충전기 및 전기차 충전 전력 제어 방법 및 장치

Also Published As

Publication number Publication date
KR20230054110A (ko) 2023-04-24
KR102575039B1 (ko) 2023-09-06

Similar Documents

Publication Publication Date Title
CN202435131U (zh) 配电自动化终端
BR9600042A (pt) Primeiro computador para uso em conjunto com um segundo microcomputador para controle da operação de uma pluralidade de cargas elétricas nas instalações de um cliente controlador secundário para uso com um controlador mestre sistema para controlar a operação de um dispositivo de carga elétrica monitor para permitir a determinação remota do estado de corrente em um acionador de suprimento de circuito de ramificação elétrica em uma carga elétrica monitor para determinação de parâmetros de consumo de energia eletrica por uma carga eletrica em um circuito de ramificação processo de controle da restaração das cargas de um sistema de distribuição de energia elétrica processo para facilitar a manutenção preventiva em um sistema de distriuição de energia elétrica de um provedor de energia etéricaaparelho sistema para controler a operação de um dispositivo de carga elétrica metodo para fornecer informações sobre o uso de energia elétrica
CN110970914A (zh) 一种具有安全保护功能的储能系统
WO2012081749A1 (ko) 무선전력 공급 장치, 무선전력 수신이 가능한 전자 기기 및 무선전력 전송 제어 방법
CN101237157A (zh) 触摸式节能高频开关直流电源系统
CN101237156B (zh) 壁挂式高频开关直流电源系统的实现方法
WO2012060478A1 (ko) 전력제어장치 및 전력제어방법
CN110994803A (zh) 一种配电房电气信息采集处理系统
WO2019221361A1 (ko) 전력 관리 시스템
WO2011074798A2 (en) Method of controlling network system
WO2023063487A1 (ko) Fast dr을 위한 통합 컨트롤러 및 이를 포함하는 시스템
CN114285159A (zh) 一种台区能源控制系统
WO2020215583A1 (zh) 一种电池组监控系统及方法
WO2022196846A1 (ko) 에너지저장시스템 계층형 관리시스템
WO2021015362A1 (ko) 지능형 배전반 및 이를 이용한 전력 제어방법
CN220754425U (zh) 一种ups电源供电调度系统
CN210490554U (zh) 一种智能电力操作电源系统
CN1278468C (zh) 分布式直流电源装置
CN110601238A (zh) 储能系统智能微网调峰控制器
CN218415907U (zh) 一种多路采集的电缆型故障指示器
WO2023038297A1 (ko) 전력공급 차단시 배터리팩 운용방식의 배터리 교체 스테이션
CN218124398U (zh) 交流切换装置控制的分级监控系统
CN218158767U (zh) 一种用于抢修现场的可移动式设备
CN212115345U (zh) 一种用于有序用电管理的网络架构系统
CN215772636U (zh) 一种一二次深度融合智能跌落式熔断器

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21960752

Country of ref document: EP

Kind code of ref document: A1