WO2023021554A1 - 移動先決定装置、物理サーバ、移動先決定システム、移動先決定方法、及びプログラム - Google Patents
移動先決定装置、物理サーバ、移動先決定システム、移動先決定方法、及びプログラム Download PDFInfo
- Publication number
- WO2023021554A1 WO2023021554A1 PCT/JP2021/029924 JP2021029924W WO2023021554A1 WO 2023021554 A1 WO2023021554 A1 WO 2023021554A1 JP 2021029924 W JP2021029924 W JP 2021029924W WO 2023021554 A1 WO2023021554 A1 WO 2023021554A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- resource
- destination determination
- virtual machine
- migration
- physical server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/455—Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
- G06F9/45533—Hypervisors; Virtual machine monitors
- G06F9/45558—Hypervisor-specific management and integration aspects
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/455—Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
- G06F9/45533—Hypervisors; Virtual machine monitors
- G06F9/45558—Hypervisor-specific management and integration aspects
- G06F2009/4557—Distribution of virtual machine instances; Migration and load balancing
Definitions
- the present invention relates to migration that moves a virtual machine from a physical server to another physical server.
- ICT Information and Communication Technology
- FIG. 1 a plurality of virtual machines housed in physical server A-1 in building A, which is the source of migration, are migrated to two physical servers B-1 and B-2 in building B, which is the destination of migration. Examples are given.
- the amount of resources required by the virtual machine accommodated at the migration source (power/virtual CPU/virtual memory size/virtual storage capacity/line bandwidth etc.) is superimposed on the amount of resources consumed by the virtual machines accommodated at the migration destination, it is necessary to confirm that the allowable upper limit value of the physical resources at the migration destination is not exceeded.
- the amount of resources required by a virtual machine fluctuates depending on service demand, it is also important to confirm that the allowable upper limit of the amount of resources is not exceeded until the power source of the migration source is restored.
- FIG. 2 shows an example of migration between multiple buildings in a blackout area and multiple buildings in destination areas 1 and 2 .
- Non-Patent Document 2 discloses a technique for migration between clouds having a heterogeneous environment, but the study focuses on the virtualization overhead of I/O devices, avoiding conflicts including other resources. is not mentioned.
- Non-Patent Document 3 points out that excessive overcommitting has an adverse effect on performance with respect to overcommitting that allocates the number of virtual machines exceeding the resource upper limit of the physical server, but it is limited to performance analysis related to virtual CPUs, and other resource contention is not mentioned.
- a migration destination determination device for determining a physical server to which the virtual machine is to be migrated in migration of the virtual machine, an extraction unit that extracts one or more variation patterns of resource usage from resource usage logs acquired from a plurality of physical servers; A physical server to which the virtual machine is to be migrated, based on the similarity between the resource usage variation pattern of the virtual machine in the migration source area and the resource usage variation pattern of the physical server in another area.
- a destination determination device is provided, comprising a destination determination unit that determines
- a technology that makes it possible to determine a migration destination in a migration that moves a virtual machine from one physical server to another physical server so that resource depletion does not occur in the physical server at the migration destination. be done.
- FIG. 4 is a diagram for explaining determining a migration destination in units of virtual machines
- FIG. FIG. 10 is a diagram showing an example of a case where there are multiple areas of migration destination candidates for a power outage area. It is a figure which shows the system configuration example in embodiment of this invention. It is a figure which shows the connection structural example of an ICT equipment monitoring apparatus. It is a figure which shows the connection structural example of an ICT equipment monitoring apparatus. 3 is a functional configuration diagram of a physical server;
- FIG. FIG. 10 is a diagram showing an example of a resource amount log;
- FIG. FIG. 10 is a flowchart for explaining an operation example of the ICT resource migration destination determination device; FIG. It is a figure for demonstrating a neighborhood area.
- the control device 30 receives information (address, etc.) of the virtual machine migration destination, which is the processing result, from the ICT equipment monitoring device 20, and based on the information, determines the corresponding physical server (for example, the migration source physical server and the migration destination physical server). By issuing an instruction to each of the destination physical servers, the virtual machine is migrated from the migration source physical server to the migration destination physical server.
- the ICT resource migration destination determination device 100 may include the functions of the control device 30 .
- the ICT resource migration destination determination device 100 has a preprocessing unit 110, an extraction unit 120, a priority calculation unit 130, and a migration destination determination unit 140.
- the functions of the preprocessing unit 110 may be included in the extraction unit 120 .
- the function of the priority calculation unit 130 may be included in the destination determination unit 140 .
- the function outline of each part is as follows.
- the preprocessing unit 110 reads the resource amount log from the ICT device monitoring device 20, and narrows down and processes the data to be analyzed.
- the extraction unit 120 analyzes the processed data as input, extracts an arbitrary number of representative fluctuation patterns specified in advance from the input data, and for each pattern, the items of each axis of the input data are A “degree of association” is calculated to indicate the degree of association.
- the priority calculation unit 130 calculates weights for determining the order of evaluation of virtual machine migration destinations based on the priority of each resource separately specified by the person conducting the analysis.
- the destination determination unit 140 uses the weights in the priority calculation unit 130 in the previous stage to determine the order of evaluating the destinations of the virtual machines, evaluates the destinations of the virtual machines in the blackout area according to the evaluation order, and determines the destinations of the virtual machines. is determined and output.
- a virtual machine on a physical server in a building located in a blackout area is moved, but this is an example and the reason for movement is arbitrary.
- a virtual machine may be moved to a physical server in another building in advance for building construction.
- the unit of "area” in this embodiment is arbitrary.
- the "area” may be a unit such as a municipality, a grid unit of a predetermined size, or one building may be one area.
- FIG. 4 shows a more detailed connection configuration example regarding the ICT equipment monitoring device and the physical server.
- building A is equipped with an ICT equipment monitoring device 21, and a monitoring base is equipped with an ICT equipment monitoring device 22.
- FIG. 4 shows a more detailed connection configuration example regarding the ICT equipment monitoring device and the physical server.
- building A is equipped with an ICT equipment monitoring device 21, and a monitoring base is equipped with an ICT equipment monitoring device 22.
- FIG. 4 shows a more detailed connection configuration example regarding the ICT equipment monitoring device and the physical server.
- building A is equipped with an ICT equipment monitoring device 21
- a monitoring base is equipped with an ICT equipment monitoring device 22.
- the ICT device monitoring devices 21 and 22 collect and accumulate device logs of physical servers as observation information.
- a device such as a sensor capable of transmitting observation information may be added to observe the state of the physical server. It is assumed that device logs of ICT devices including these physical servers are periodically transmitted to the ICT device monitoring devices 21 and 22. It may be acquired from the server.
- the ICT equipment monitoring device may be installed in each building, installed in an external monitoring base, or configured in multiple stages.
- the example of FIG. 4 is an example in which ICT equipment monitoring devices are configured in multiple stages at building A and monitoring bases.
- the ICT device monitoring device 20 may monitor multiple areas.
- the device log of the ICT device is recorded in the main memory or the secondary storage device (collectively referred to as storage means) of the ICT device monitoring device 20, it is not limited to this.
- the ICT device on which the virtual machine operates is a physical server.
- An ICT device including a physical server may be called an information communication device.
- the ICT device monitoring device 20 collects resources indicating individual usage amounts in the formats shown in FIGS. An amount log, a resource amount log indicating the total usage amount, and a resource amount log indicating the remaining amount are recorded in the storage means.
- the virtual machine ID is the ID of the virtual machine from which the log was obtained, and may be arbitrarily assigned by the telecommunications carrier or automatically assigned by the virtualization system.
- resource items include power, virtual CPU, virtual memory size, virtual storage capacity, and line bandwidth.
- the resource value is a value associated with each resource item, and resources for each virtual machine, such as power usage of the virtual machine in the case of power, logical CPU allocation to the virtual machine in the case of virtual CPU, etc. Represents consumption.
- the resource amount log of the total usage amount shown in FIG. 7(b) is a log of the total resource usage amount in the physical server indicated by the resource location ID described later.
- the value of the log may be directly collected from each server, or may be calculated from logs having common area IDs, building IDs, and server IDs in resource amount logs of individual usage amounts.
- the preprocessing unit 110 reads out the resource amount log recorded in the ICT device monitoring apparatus 20, and narrows down and processes the data necessary for analysis by the processing described later.
- One three-dimensional array X is obtained as an output result of the preprocessing unit 110 . Detailed procedures are as follows.
- the preprocessing unit 110 acquires a set of resource amount logs (three types of resource amount logs) for a predetermined period T from the ICT device monitoring device 20 by referring to the time stamps.
- the start time t1 and the end time t2 of the period T are numerical values arbitrarily determined by the person who conducts the analysis, but it is preferable to target logs for several days in order to see resource fluctuation trends. Further, it is assumed that each resource value of the resource amount log is discretized with a time granularity of, for example, 1 minute or 5 minutes, based on the aggregation specifications of the ICT equipment monitoring apparatus 20 .
- the preprocessing unit 110 identifies a neighboring area at a distance d from the blackout area based on the neighboring area list predefined by the person conducting the analysis as follows.
- any one of these statistic values may be used, or a plurality of them may be used in the form of the interval average value of the resource item, the interval maximum value of the resource item, and the interval median value of the resource item. This is to adjust how much the physical resource upper limit amount is allowed to be exceeded during migration, taking into account that the effect of exceeding the upper limit physical resource amount differs depending on the resource item. For example, if the resource item to be handled is power, the power supply to the physical server will be cut off by the breaker if the physical resource upper limit is exceeded, so the maximum value must be used as the statistic. On the other hand, if the resource item to be handled is virtual CPU or line bandwidth, even if the upper limit of physical resource is temporarily exceeded, the effect is limited to waiting time for processing or transfer, so the average value is the statistical amount. or the median value may be used.
- FIG. 10 shows an example of a three-dimensional array X.
- the time interval, resource item name, and resource position ID are the items on each axis.
- the number of items L on the time interval axis is a number that depends on the period T and aggregation granularity of the input observation information.
- the number of items M on the resource item axis depends on the resource items collected by the ICT equipment monitoring device 20 .
- the number of items N of resource location IDs is a number that depends on physical servers/virtual machines existing in the vicinity area of distance d selected by the preprocessing unit 110 .
- the obtained two-dimensional array has as elements the degree of relevance between the items on each axis of the three-dimensional array X and the specified K representative ICT resource load fluctuation patterns by the pattern extraction method described later.
- A a two-dimensional array whose axes are timestamps (or time intervals) and representative ICT resource load fluctuation patterns
- A resource item names and representative ICT resource load fluctuation patterns
- B a two-dimensional array whose axes are resource location IDs and representative ICT resource load fluctuation patterns
- C a two-dimensional array whose axes are resource location IDs and representative ICT resource load fluctuation patterns
- Fig. 11 shows an example of the two-dimensional arrays A, B, and C, which are the output results of the pattern extraction method. As shown in FIG. 11, K time-series variations can be obtained from the two-dimensional array A.
- FIG. 11 shows an example of the two-dimensional arrays A, B, and C, which are the output results of the pattern extraction method. As shown in FIG. 11, K time-series variations can be obtained from the two-dimensional array A.
- resource item name that is the basis for extracting each representative ICT resource load fluctuation pattern.
- resource items that are highly relevant to a certain variation pattern are considered to be the grounds for extracting that variation pattern.
- the three-dimensional array H is data for calculating a three-dimensional array from three two-dimensional arrays.
- any method such as NTF (Non-negative Tensor Factorization), CP decomposition, Tucker decomposition, etc. can be used to extract the relationship between each axis and each pattern with a three-dimensional array as input.
- NTF Non-negative Tensor Factorization
- CP decomposition CP decomposition
- Tucker decomposition etc.
- the priority calculation unit 130 is used to determine the order (order of the virtual machines) for evaluating the destinations of the virtual machines in the blackout area according to the priority for each resource item separately specified by the person conducting the analysis. , the weight of the variation pattern is calculated.
- the order of priority for example, information indicating the order of priority for each resource item is transmitted in advance from the terminal of the person conducting the analysis to the ICT resource migration destination determination device 100, and the ICT resource migration destination determination device 100 determines the priority order. The information to be displayed is held in a memory or the like.
- the ICT resource migration destination determination device 100 performs calculation using the information indicating the priority order.
- the order of priority can be arbitrarily specified by the person conducting the analysis, but for example, memory/storage, which must be exclusively reserved for resources, should be given the highest priority, and although excess physical resources are not allowed, resources may be used in a certain amount of time.
- memory/storage which must be exclusively reserved for resources, should be given the highest priority, and although excess physical resources are not allowed, resources may be used in a certain amount of time.
- the person who conducts the analysis sets a coefficient wm corresponding to the degree of priority in the order of priority as information indicating the order of priority.
- the factor assigns higher values to higher priority resource items (w 1 ⁇ w 2 ⁇ . . . ⁇ w m ⁇ 0).
- the priority calculation unit 130 calculates the weight for the variation pattern k. Specifically, when the variation pattern k in the two-dimensional array B and the value of the relevance of the resource item m are b k,m , ⁇ m ⁇ 1,...,M ⁇ w m b k,m is the weight of the variation pattern k. This value represents the degree of association between the variation pattern k and the resource item with high priority.
- the destination determination unit 140 determines the destination of each virtual machine in the blackout area based on the weight for each variation pattern calculated by the priority calculation unit 130 and the two-dimensional array C. Destination determination unit 140 transmits the determined destination to control device 30 .
- the destination determination unit 140 divides the two-dimensional array C into three partial arrays based on the resource location ID information. That is, a partial array associated with the resource position ID set of the virtual machine in the blackout area, and a partial array associated with the resource position ID set of the physical server in the neighboring area, each relating to the total resource usage amount and the remaining resource amount of the corresponding physical server. are three subarrays of .
- FIG. 12 shows a simple example of three partial arrays.
- the variation pattern axis of the two-dimensional array C is rearranged in descending order of weight ( ⁇ m ⁇ 1, . . . , M ⁇ w m b k, m ), and the resource position ID axis is They are sorted in descending order of relevance to each variation pattern.
- the resource position ID axis is arranged in descending order of the degree of relevance in the first (maximum weight) variation pattern, and for the resource position ID axis with the same degree of relevance, the relevance in the variation pattern with the next largest weight is Sort in descending order. In this way, the resource position ID axis is sorted in descending order of relevance to each variation pattern.
- resource location IDs are area IDs, building IDs, server IDs, virtual machine IDs, and values of 0 and -1.
- a power outage has occurred in area A, and nearby areas B and C are used as candidates for evaluating the destination of the virtual machine.
- the values of the two-dimensional array are converted to 0 and 1 using a separately defined threshold (the values after conversion are shown at the bottom of FIG. 11).
- This threshold value may be arbitrarily set by the person who conducts the analysis, or may be set to the average value or the median value of the two-dimensional array C values. In the following, processing is performed using the three partial arrays after this conversion.
- the migration destination determination unit 140 determines a migration destination physical server for the virtual machine nu in the blackout area by the following procedure.
- the above formula 1 means that the physical server nr is selected such that the similarity of the variation pattern of resource usage between the virtual machine n u and the physical server n r is low.
- the physical server nr is determined as the migration destination server n * u of the virtual machine nu .
- ⁇ m is the excess allowable amount set for the resource item , and may be specified separately by the person who conducts the analysis .
- R m max /w m That is, the higher the priority, the smaller the excess allowable amount, so that a physical server with a larger remaining amount can be selected for the resource item.
- R m max represents the upper limit value for resource item m.
- max k (ck , n_t + c k, n_u ) ⁇ 1 Equation 3 Note that max k (c k,n_t +c k,n_u ) represents the maximum “c k,n_t +c k,n_u ” among “c k ,n_t +c k,n_u ” for k 1 to K . This is the same for formulas using max below.
- the physical server n t is determined as the migration destination server n * u of the virtual machine n u .
- the undetermined migration destination virtual machine list is stored in a storage unit such as a memory of the ICT resource migration destination determination device 100 .
- the above evaluation should be performed by rounding by building or by server.
- the ICT resource migration destination determination device 100, the ICT device monitoring device 20, the physical server 10 (ICT device, information communication device), and the control device 30 can all be implemented by causing a computer to execute a program, for example.
- the computer may be a physical computer or a virtual machine.
- the ICT resource migration destination determination device 100, the ICT equipment monitoring device 20, the physical server 10, and the control device 30 are collectively referred to as "devices".
- the device can be realized by executing a program corresponding to the processing performed by the device using hardware resources such as a CPU and memory built into the computer.
- the above program can be recorded in a computer-readable recording medium (portable memory, etc.), saved, or distributed. It is also possible to provide the above program through a network such as the Internet or e-mail.
- FIG. 13 is a diagram showing a hardware configuration example of the computer.
- the computer of FIG. 13 has a drive device 1000, an auxiliary storage device 1002, a memory device 1003, a CPU 1004, an interface device 1005, a display device 1006, an input device 1007, an output device 1008, etc., which are interconnected by a bus BS.
- a program that implements the processing in the computer is provided by a recording medium 1001 such as a CD-ROM or memory card, for example.
- a recording medium 1001 such as a CD-ROM or memory card
- the program is installed from the recording medium 1001 to the auxiliary storage device 1002 via the drive device 1000 .
- the program does not necessarily need to be installed from the recording medium 1001, and may be downloaded from another computer via the network.
- the auxiliary storage device 1002 stores installed programs, as well as necessary files and data.
- the memory device 1003 reads and stores the program from the auxiliary storage device 1002 when a program activation instruction is received.
- the CPU 1004 implements functions related to the device according to programs stored in the memory device 1003 .
- the interface device 1005 is used as an interface for connecting to a network or the like.
- a display device 1006 displays a GUI (Graphical User Interface) or the like by a program.
- An input device 1007 is composed of a keyboard, a mouse, buttons, a touch panel, or the like, and is used to input various operational instructions.
- the output device 1008 outputs the calculation result.
- This specification discloses at least a destination determination device, a physical server, a destination determination system, a destination determination method, and a program according to the following items.
- a migration destination determination device for determining a physical server to which the virtual machine is to be migrated in migration of the virtual machine, an extraction unit that extracts one or more variation patterns of resource usage from resource usage logs acquired from a plurality of physical servers;
- a destination determination device that determines a destination.
- the extraction unit generates, from the resource amount log, a three-dimensional array whose elements are resource values having a time interval axis, a resource position axis, and a resource item axis, and extracts each axis from the three-dimensional array. Calculate the degree of relevance indicating how much the item and each variation pattern are related, 2.
- the destination determination device according to claim 1, wherein the destination determination unit determines the similarity using the degree of association.
- the migration destination determination unit determines the similarity of the variation pattern between the virtual machine and the physical server based on the degree of association between the virtual machine and each variation pattern and the degree of association between the physical server and each variation pattern 3.
- the migration destination determination device determines a migration destination candidate when the physical server is determined to be low.
- the migration destination determination unit selects one or more physical servers that are migration destination candidates based on the resource remaining amount in the one or more physical servers that are migration destination candidates and the resource usage amount of the virtual machine. 4.
- the migration destination determination device determines a physical server of a migration destination. (Section 5) the destination determination device according to any one of items 1 to 4; an ICT device monitoring device that collects the resource amount logs from the plurality of physical servers; Destination determination system.
- a physical server comprising: a migration execution unit that receives information about a virtual machine migration destination determined by the migration destination determination device and migrates the virtual machine to the migration destination.
- a migration destination determination method executed by a migration destination determination device for determining a physical server to which the virtual machine is to be migrated in migration of the virtual machine comprising: an extraction step of extracting one or more variation patterns of resource usage from resource usage logs obtained from a plurality of physical servers; A physical server to which the virtual machine is to be migrated, based on the similarity between the resource usage variation pattern of the virtual machine in the migration source area and the resource usage variation pattern of the physical server in another area.
- a destination determination method comprising a destination determination step of determining (Section 8) A program for causing a computer to function as the destination determination device according to any one of items 1 to 4.
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Debugging And Monitoring (AREA)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023542043A JP7713141B2 (ja) | 2021-08-16 | 2021-08-16 | 移動先決定装置、移動先決定システム、移動先決定方法、及びプログラム |
| PCT/JP2021/029924 WO2023021554A1 (ja) | 2021-08-16 | 2021-08-16 | 移動先決定装置、物理サーバ、移動先決定システム、移動先決定方法、及びプログラム |
| US18/291,727 US20250094193A1 (en) | 2021-08-16 | 2021-08-16 | Migration destination determination apparatus, physical server, migration destination determination system, migration destination determination method and program |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2021/029924 WO2023021554A1 (ja) | 2021-08-16 | 2021-08-16 | 移動先決定装置、物理サーバ、移動先決定システム、移動先決定方法、及びプログラム |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2023021554A1 true WO2023021554A1 (ja) | 2023-02-23 |
Family
ID=85240199
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2021/029924 Ceased WO2023021554A1 (ja) | 2021-08-16 | 2021-08-16 | 移動先決定装置、物理サーバ、移動先決定システム、移動先決定方法、及びプログラム |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US20250094193A1 (cg-RX-API-DMAC7.html) |
| JP (1) | JP7713141B2 (cg-RX-API-DMAC7.html) |
| WO (1) | WO2023021554A1 (cg-RX-API-DMAC7.html) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12632345B2 (en) * | 2022-12-20 | 2026-05-19 | Dell Products L.P. | Prioritization in cloud migration for deduplication systems |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010117760A (ja) * | 2008-11-11 | 2010-05-27 | Hitachi Ltd | 仮想マシン移動管理サーバおよび仮想マシン移動方法 |
| JP2013175177A (ja) * | 2012-02-26 | 2013-09-05 | Palo Alto Research Center Inc | データセンタにおけるQoS認識バランシング |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010277208A (ja) * | 2009-05-27 | 2010-12-09 | Hitachi Ltd | 仮想化システム制御方法および仮想化システム制御プログラム |
| JP5614226B2 (ja) * | 2010-10-15 | 2014-10-29 | 富士通株式会社 | 仮想マシン制御装置、仮想マシン制御プログラムおよび仮想マシン制御方法 |
| JP6424632B2 (ja) * | 2015-01-08 | 2018-11-21 | 富士通株式会社 | 負荷算出方法、負荷算出プログラム及び負荷算出装置 |
| JP6439475B2 (ja) * | 2015-02-09 | 2018-12-19 | 富士通株式会社 | 情報処理装置、情報処理システム及び制御プログラム |
| JP6911670B2 (ja) * | 2017-09-22 | 2021-07-28 | 富士通株式会社 | 情報提供プログラム、情報提供装置および情報提供方法 |
| US11838266B2 (en) * | 2019-06-06 | 2023-12-05 | Nippon Telegraph And Telephone Corporation | IP address assignment apparatus, IP address assignment method and program |
| CN112887355B (zh) * | 2019-11-29 | 2022-09-27 | 北京百度网讯科技有限公司 | 异常服务器的业务处理方法及装置 |
| US11360825B2 (en) * | 2019-12-17 | 2022-06-14 | Citrix Systems, Inc. | Systems and methods for service resource allocation and deployment |
| JP7360036B2 (ja) * | 2019-12-24 | 2023-10-12 | 富士通株式会社 | 情報処理装置、情報処理システム、情報処理方法およびプログラム |
| US12008416B2 (en) * | 2021-06-29 | 2024-06-11 | Capital One Services, Llc | Systems and methods for choosing an appropriate scaling technique for allocating computational resources to distributed applications |
-
2021
- 2021-08-16 WO PCT/JP2021/029924 patent/WO2023021554A1/ja not_active Ceased
- 2021-08-16 JP JP2023542043A patent/JP7713141B2/ja active Active
- 2021-08-16 US US18/291,727 patent/US20250094193A1/en active Pending
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010117760A (ja) * | 2008-11-11 | 2010-05-27 | Hitachi Ltd | 仮想マシン移動管理サーバおよび仮想マシン移動方法 |
| JP2013175177A (ja) * | 2012-02-26 | 2013-09-05 | Palo Alto Research Center Inc | データセンタにおけるQoS認識バランシング |
Also Published As
| Publication number | Publication date |
|---|---|
| JPWO2023021554A1 (cg-RX-API-DMAC7.html) | 2023-02-23 |
| JP7713141B2 (ja) | 2025-07-25 |
| US20250094193A1 (en) | 2025-03-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115525438A (zh) | 在分布式系统中资源及任务的分配方法、装置及系统 | |
| He et al. | Parallel implementation of classification algorithms based on MapReduce | |
| JP2022033685A (ja) | 堅牢性を確定するための方法、装置、電子機器、コンピュータ可読記憶媒体、及びコンピュータプログラム | |
| Dagade et al. | Big data weather analytics using hadoop | |
| JP6878369B2 (ja) | ボリューム配置管理装置、ボリューム配置管理方法、及びボリューム配置管理プログラム | |
| JP4839585B2 (ja) | 資源情報収集配信方法およびシステム | |
| JP2025007543A (ja) | 異常検出装置、異常検出システム及び異常検出方法 | |
| Liu et al. | On construction of an energy monitoring service using big data technology for smart campus | |
| CN110895491B (zh) | 辅助资源分配优化的系统和方法 | |
| Wang et al. | PV hosting capacity estimation: Experiences with scalable framework | |
| WO2023154051A1 (en) | Determining root causes of anomalies in services | |
| JP7713141B2 (ja) | 移動先決定装置、移動先決定システム、移動先決定方法、及びプログラム | |
| Pandey et al. | OnTimeURB: Multi-cloud resource brokering for bioinformatics workflows | |
| Liu et al. | A mathematical programming-and simulation-based framework to evaluate cyberinfrastructure design choices | |
| JP6546704B2 (ja) | データ処理方法、分散型データ処理システム及び記憶媒体 | |
| CN119311375B (zh) | 多源异构数据处理方法、装置及系统 | |
| US11392424B2 (en) | Method and device for aiding decision-making for the allocation of computing means on a high performance computing infrastructure | |
| JP2009053862A (ja) | 情報処理システム、データ形式変換方法、およびプログラム | |
| Bumgardner et al. | An edge-focused model for distributed streaming data applications | |
| KR102831750B1 (ko) | 정비 작업절차 구성 방법 | |
| KR20110051886A (ko) | 그리드 컴퓨팅을 이용한 과학기술지식발견 프레임워크 | |
| KR100779116B1 (ko) | 시스템 사용에 따른 종량요금 보상 시스템 및 보상 방법 | |
| Liu | Design and implementation of performance monitor and evaluation middleware in virtual clouds | |
| JP2015106329A (ja) | 運用作業の履歴を検索する情報処理装置、情報処理システム、運用作業履歴検索方法及びそのためのプログラム | |
| Eskandari | Task Scheduling in Data Stream Processing Systems |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21954129 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 18291727 Country of ref document: US Ref document number: 2023542043 Country of ref document: JP |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 21954129 Country of ref document: EP Kind code of ref document: A1 |
|
| WWP | Wipo information: published in national office |
Ref document number: 18291727 Country of ref document: US |