WO2023018300A1 - 향상된 견고성을 갖는 가벽 - Google Patents

향상된 견고성을 갖는 가벽 Download PDF

Info

Publication number
WO2023018300A1
WO2023018300A1 PCT/KR2022/012124 KR2022012124W WO2023018300A1 WO 2023018300 A1 WO2023018300 A1 WO 2023018300A1 KR 2022012124 W KR2022012124 W KR 2022012124W WO 2023018300 A1 WO2023018300 A1 WO 2023018300A1
Authority
WO
WIPO (PCT)
Prior art keywords
temporary wall
spring
temporary
wall
wall body
Prior art date
Application number
PCT/KR2022/012124
Other languages
English (en)
French (fr)
Inventor
박재성
Original Assignee
박재성
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박재성 filed Critical 박재성
Publication of WO2023018300A1 publication Critical patent/WO2023018300A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/7401Removable non-load-bearing partitions; Partitions with a free upper edge assembled using panels without a frame or supporting posts, with or without upper or lower edge locating rails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • E04B2/821Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition
    • E04B2/822Elastic connections, e.g. inflated joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • E04B2/821Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition
    • E04B2/824Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition restrained elastically at one surface and inelastically at the opposing surface

Definitions

  • the present invention relates to a temporary wall that can be easily installed through a spring, and more particularly to a structure of a temporary wall having improved robustness.
  • a temporary wall is used to separate various spaces, such as between a living room and a front door or between a living room and a kitchen.
  • the temporary wall may be composed of various materials such as wooden boards and air blocks. In addition, it may be composed of a wooden board integrally, or may be composed of a temporary wall design in which holes of various shapes are formed.
  • Korean registered patent ('10-0701427') discloses a height-adjustable movable lightweight partition wall.
  • the present invention is intended to provide a structure of a temporary wall that does not cause damage to the adhesive surface of the temporary wall when the temporary wall is removed.
  • the present invention is intended to provide a temporary wall that is strong enough to withstand the weight of the TV.
  • a temporary wall 1 may be provided that is intended to be installed between two external walls facing each other.
  • the temporary wall includes a temporary wall body 10 having one end and the other end; a spring 30 having one end and the other end; a bolt assembly having one end and the other end; and a nut 50 screwed to the bolt assembly.
  • an insertion hole 11 is formed at one end of the temporary wall body 10, the spring 30 is inserted into the insertion hole 11, and the bolt assembly is attached to the spring 30.
  • the spring 30 has a first length in a compressed state, and the spring 30 is longer than the first length.
  • the nut 50 may be disposed in a position in close contact with the one end of the temporary wall body 10 .
  • the one end of the bolt assembly may be inserted into the insertion hole 11 .
  • the other end of the spring 30 may be in contact with the bottom of the insertion hole 11 .
  • the bolt assembly may be disposed farther from the temporary wall body than the spring 30 .
  • the one end of the bolt assembly may be coupled to one point of the spring.
  • the one end of the bolt assembly may be coupled to the one end of the spring.
  • the bolt assembly includes a bolt 40 and a closing nut 60, the one end of the bolt assembly is one end of the bolt 40, and the closing nut 60 is the bolt 40 ), and the other end of the bolt assembly may be the closing nut 60.
  • the spring 30 has a first length in a compressed state, and the spring 30 is compressed more than the first length.
  • the nut 50 may be disposed in a position in close contact with the one end of the temporary wall body 10.
  • the temporary wall in a state where the temporary wall 1 is installed between the two outer walls, the temporary wall can be fixed between the two outer walls by the force provided by the spring 30 in a compressed state.
  • the entire length of the temporary wall 1 is It may be adapted to maintain a length equal to the length between the two outer walls.
  • the temporary wall may further include a support plate 20 in which a through hole 21 is formed.
  • the support plate 20 is coupled to the one end of the temporary wall body 10, and the through hole 21 in a state in which the support plate 20 is coupled to the one end of the temporary wall body 10 and the insertion hole 11 are aligned with each other, and the spring 30 may pass through the through hole 21 and be inserted into the insertion hole 11 .
  • the spring 30 has a first length in a compressed state, and the spring 30 is longer than the first length.
  • the nut 50 may be arranged in a position in close contact with the support plate 20 .
  • the temporary wall main body 10 is composed of a unit temporary wall main body 100 and plate materials 91, 92, and 93, and the one end of the temporary wall main body 10 is one end of the unit temporary wall main body 100 And, the other end of the temporary wall body 10 is the other end of the plate member, and the other end of the unit temporary wall body 100 may be coupled to one end of the plate member.
  • a unit wall may be provided which is adapted to be installed between two opposite external walls.
  • the unit temporary wall has a unit temporary wall body 100 having one end and the other end; a spring 30 having one end and the other end; a bolt assembly having one end and the other end; and a nut 50 screwed to the bolt assembly.
  • an insertion hole 11 is formed at one end of the unit wall body 100, the spring 30 is inserted into the insertion hole 11, and the bolt assembly is connected to the spring 30.
  • a predetermined temporary wall formed by combining one end of a predetermined plate material (91, 92, 93) provided separately from the unit temporary wall to the other end of the unit temporary wall body 100 is between the two outer walls
  • the other end of the plate is in contact with one of the two outer walls
  • the other end of the bolt assembly is in contact with the other of the two outer walls
  • the spring 30 has a first length in a compressed state, and in order to prevent the spring 30 from being compressed more than the first length, the nut 50 is provided on the unit of the wall body 100. It may be arranged in a position in close contact with the one end.
  • the one end of the bolt assembly may be inserted into the insertion hole 11 .
  • the other end of the spring 30 may be in contact with the bottom of the insertion hole 11 .
  • the bolt assembly may be disposed farther from the unit than the spring 30 from the wall body.
  • the one end of the bolt assembly may be coupled to one point of the spring.
  • the one end of the bolt assembly may be coupled to the one end of the spring.
  • the bolt assembly includes a bolt 40 and a closing nut 60, the one end of the bolt assembly is one end of the bolt 40, and the closing nut 60 is the bolt 40 is coupled to the other end of the bolt assembly, and the other end of the bolt assembly may be the closing nut 60.
  • the other end of the plate material is in contact with any one of the two outer walls, and the closing nut 60 is made to contact the other of the two outer walls, the spring 30 having a first length in a compressed state, so as to prevent the spring 30 from being compressed more than the first length;
  • the nut 50 may be arranged so that the unit is in close contact with the one end of the wall body 100.
  • the temporary wall in a state where the temporary wall 1 is installed between the two outer walls, the temporary wall can be fixed between the two outer walls by the force provided by the spring 30 in a compressed state.
  • the nut 50 is in close contact with the one end of the unit temporary wall body 100, so that the total length of the temporary wall 1 is It may be adapted to maintain a length equal to the length between the two outer walls.
  • the unit wall may further include a support plate 20 in which a through hole 21 is formed.
  • the support plate 20 is coupled to the one end of the unit wall body 100, the through hole ( 21) and the insertion hole 11 are aligned with each other, and the spring 30 may pass through the through hole 21 and be inserted into the insertion hole 11.
  • the spring 30 is configured to have a first length in a compressed state, and to prevent the spring 30 from being compressed more than the first length.
  • the nut 50 may be disposed in a position in close contact with the support plate 20 .
  • the temporary wall includes the temporary wall main body 10; and an upper frame 310.
  • the upper plane of the upper frame is installed in contact with the ceiling surface 81, and the lower part of the upper frame is fitted with one end of the upper and lower ends of the temporary wall body
  • a first groove ( 311) is formed, the ceiling surface is a bottom surface of the ceiling part, and the upper frame is formed extending upward from a portion of the upper frame to be inserted into a space above the ceiling surface. ), and the wing portion may be inserted into the ceiling portion so that the upper frame is fixed to the ceiling surface.
  • the wing portion includes a plurality of wings, and the plurality of wings extending from a portion of the upper frame may be spaced apart from each other at a predetermined interval d1 and inserted into the ceiling portion.
  • one side surface of the upper frame is in contact with the wall surface 83, and the wings extend in a direction from one side surface of the upper frame toward the ceiling surface to be inserted into the ceiling portion, and the ceiling surface
  • the upper plane of the upper frame and the one side of the upper frame are fitted to the ceiling surface and the wall surface, respectively, so that the wing portion is inserted into the ceiling portion by being inserted into the gap formed between one side surface 811 of the ceiling material forming the ceiling and the wall surface. can be installed on contact.
  • a spring insertion hole is formed at the other end of the upper end and the lower end of the temporary wall body, and the temporary wall is inserted into the spring insertion hole, the spring 30; A portion of which is fixedly coupled to one end of the spring, the bolt 40; And it may include a closing nut 60 coupled to the other end of the computerized bolt.
  • the temporary wall may further include a lower frame 320 installed on the bottom surface 82 and having a second groove 321 formed therein so that the finishing nut may be inserted.
  • a spring insertion hole is formed at any one end of the temporary wall body, and the temporary wall is inserted into the spring insertion hole, the spring 30; A portion of which is fixedly coupled to one end of the spring, the bolt 40; and a closing nut 60 coupled to the other end of the computerized bolt, and the closing nut may be inserted into the first groove of the upper frame.
  • a nut that is to be fitted into the computerized bolt And a support plate disposed at a lower portion of the temporary wall body, wherein a portion of the support plate corresponding to the spring insertion hole is formed with a through hole through which the power bolt can pass, and a combination of the spring and the power bolt is to be partially inserted into the spring insertion hole of the temporary wall body, and the other end of the power bolt passes through the through hole of the support plate so that the support plate is disposed under the temporary wall body, and the other end of the power bolt
  • the finishing nut may be fitted to the other end of the bolt.
  • the diameter of the spring is smaller than the diameter of the spring insertion hole and larger than the diameter of the through hole
  • the diameter of the through hole may be larger than the diameter of the threaded bolt
  • a portion of the upper frame may be an upper plane of the upper frame or one side of the upper frame.
  • a temporary wall according to another aspect of the present invention includes a temporary wall main body 10; and an upper frame 310, wherein a first groove 311 into which one of the upper and lower ends of the temporary wall body is fitted is formed at the lower part of the upper frame, and the upper The upper plane 314 of the frame is in contact with the ceiling surface 81, and one side surface 315 of the upper frame is in contact with the wall surface 83, and the upper frame is in contact with the upper plane of the upper frame.
  • the first edge line A third corner line 316c formed by connecting one end point 314p of and one end point 315p of the second corner line, and the other end point of the first corner line and the other end point of the second corner line It includes a diagonal surface 316 formed including a fourth edge line formed by being connected, and when the upper plane and the one side surface of the upper frame are installed in contact with the ceiling surface and the wall surface, respectively, the It may be characterized in that an inner space composed of a ceiling surface, the wall surface, and the diagonal surface of the upper frame is formed.
  • the ceiling surface is a bottom surface of the ceiling part
  • the upper frame includes a wing part 313 extending in a direction from a portion of the upper frame toward the ceiling surface to be inserted into the ceiling part, and the wing part The upper frame may be inserted into the ceiling and fixed to the ceiling surface.
  • a spring insertion hole is formed at the other end of the upper end and the lower end of the temporary wall body, and the temporary wall is inserted into the spring insertion hole, the spring 30; A portion of which is fixedly coupled to one end of the spring, the bolt 40; And it may include a closing nut 60 coupled to the other end of the computerized bolt.
  • a spring insertion hole is formed at any one end of the temporary wall body, and the temporary wall is inserted into the spring insertion hole, the spring 30; A portion of which is fixedly coupled to one end of the spring, the bolt 40; and a closing nut 60 coupled to the other end of the computerized bolt, and the closing nut may be inserted into the first groove of the upper frame.
  • the temporary wall has a first insertion hole formed at one end of the upper end and the lower end, and a screw insertion hole 14 is formed at the other end of the upper end and the lower end. It is, the wall body; a closing nut coupled to the first insertion hole and protruding from one end; A first screw 500 screwed into the screw insertion hole; an upper frame 310 installed on the ceiling surface 81 and having a first groove 311 formed thereunder; It is installed on the bottom surface and may include a lower frame 320 having a second groove 321 formed thereon. At this time, the head 510 of the first screw is fitted into one of the first groove and the second groove, and the closing nut is the other of the first groove and the second groove.
  • the central axis of the finishing nut and the central axis of the first screw are coaxial with each other, and the central axis of the finishing nut and the first screw are fitted into the groove in a state where the first screw is inserted into the groove. While the temporary wall body is rotated using the central axis of the screw as a rotation axis, the upper frame and the lower frame may be such that the frame formed with one of the grooves and the temporary wall body do not engage with each other.
  • the first insertion hole is a spring insertion hole, the wall is inserted into the spring insertion hole, the spring; and a sheathing bolt, a portion of which is fixedly coupled to one end of the spring, and the closing nut may be coupled to the other end of the sheathing bolt.
  • the head 510 of the first screw is fitted into the first groove
  • the closing nut is fitted into the second groove
  • the first screw is fitted into the first groove.
  • the bottom surface 317 of the upper frame and the upper end of the temporary wall body may be spaced apart by a predetermined distance d2 greater than 0 (zero).
  • the ceiling surface is a bottom surface of the ceiling part
  • the upper frame includes a wing part 313 extending in a direction from a portion of the upper frame toward the ceiling surface to be inserted into the ceiling part, and the wing part The upper frame may be inserted into the ceiling and fixed to the ceiling surface.
  • FIG. 1 shows a temporary wall according to an embodiment of the present invention.
  • FIG. 2 is a view for explaining the structure of a temporary wall body according to an embodiment of the present invention.
  • FIG 3 is a view for explaining a combination of a spring and a sheathing bolt according to an embodiment of the present invention.
  • FIG. 4 is a view for explaining a support plate according to an embodiment of the present invention.
  • FIG. 5 is a view for explaining a closing nut according to an embodiment of the present invention.
  • FIG. 6 is a view for explaining the configuration and coupling sequence of the temporary wall according to an embodiment of the present invention.
  • FIG. 7 is a view for explaining a method of installing a temporary wall according to an embodiment of the present invention.
  • FIG. 8 is a view for explaining a temporary wall installation method according to another embodiment of the present invention.
  • FIG. 9 is a view for explaining a temporary wall installation method according to another embodiment of the present invention.
  • FIG. 10 shows a skirting board according to an embodiment of the present invention.
  • FIG. 11 is a view for explaining a combination of a skirting board and a temporary wall according to an embodiment of the present invention.
  • FIG. 12a and 12b are 3-dimensional views of installation corresponding positions of the skirting board and the temporary wall of FIG. 11 according to an embodiment of the present invention.
  • FIG. 13 is a three-dimensional view of corresponding installation positions of a skirting board and a temporary wall according to another embodiment of the present invention.
  • FIG. 14a and 14b are views for explaining a temporary wall installation method when a rail is formed on a floor surface according to an embodiment of the present invention.
  • 15 is a view for explaining the shape of a temporary wall according to another embodiment of the present invention.
  • FIG. 16 shows a modified embodiment of the temporary wall of FIG. 15 .
  • FIG. 17 shows a modified embodiment of the temporary wall of FIG. 15 .
  • FIG. 18 shows a form in which a temporary wall is installed according to an embodiment of the present invention.
  • Figure 19a shows the shape of the upper frame according to the first embodiment of the present invention
  • Figure 19b shows the shape of the upper frame according to the second embodiment of the present invention
  • Figure 19c shows the upper frame according to the third embodiment It shows the shape of the frame.
  • Figure 20 shows only the upper end of the form in which the temporary wall is installed according to an embodiment different from that of Figure 18.
  • 21 shows the shapes of the ceiling molding and the upper frame according to another embodiment of the present invention.
  • FIG. 22 is a cross-section of the inside of a space in which a temporary wall having the shape of an upper frame as shown in FIG. 21 (c) according to another embodiment of the present invention is installed.
  • FIG. 23 is a cross-sectional view of a skylight-side space in which an upper frame is installed on the ceiling surface according to another embodiment of the present invention.
  • FIG. 24A is a perspective view of a ceiling-side space in which an upper frame is installed on the ceiling surface according to another embodiment of the present invention
  • FIG. 24B is a perspective view of a ceiling-side space in which an upper frame is installed on the ceiling surface according to another embodiment of the present invention.
  • FIG. 25A is a view for explaining the structure of a rotatable temporary wall according to another embodiment of the present invention
  • FIG. 25B is an enlarged view of the upper end of FIG. 25A.
  • FIG. 1 shows a temporary wall 1 according to an embodiment of the present invention.
  • the gable wall 1 may include a gable wall body 10, a support plate 20, a bolt 40, a nut 50, and a closing nut 60.
  • the temporary wall 1 may further include a spring (see FIG. 4).
  • the power bolt 40 may be simply referred to as a bolt 40.
  • FIG. 2 is a view for explaining the structure of a temporary wall body 10 according to an embodiment of the present invention.
  • FIG. 2 may have a form in which the removable wall body 10 shown in FIG. 1 is turned upside down.
  • the temporary wall body 10 may be made of, for example, a wooden board.
  • a spring insertion hole 11 may be formed in the lower portion of the movable wall body 10 along the extension direction of the spring.
  • the spring insertion hole 11 may simply be referred to as an insertion hole 11 .
  • a first screw hole 12 and a second screw hole 13 for fixing the supporting plate 20 to the temporary wall body 10 may be formed in the lower portion of the temporary wall body 10 .
  • FIG 3 is a view for explaining a combination of a spring and a sheathing bolt according to an embodiment of the present invention.
  • the combination of the spring and the power bolt may simply be referred to as a spring-bolt assembly (30+40).
  • One end of the spring 30 and one end of the bolt 40 may be fixedly coupled.
  • the combination of the spring 30 and the bolt 40 fixedly coupled in this way can be connected to the temporary wall body 10 by inserting the other end of the spring 30 into the spring insertion hole 11 of the temporary wall body 10.
  • the length L1 of the spring 30 in an uncompressed state may be longer than the length L2 of the wire bolt 40.
  • the upper end of the sheathing bolt 40 may have a shape in which a pillar smaller than the diameter of the sheathing bolt body is formed.
  • One end of the spring 30 may be fixedly coupled to the small pillar formed at the upper end of the bolt 40.
  • the diameter of the bolt 40 may be substantially the same as the diameter of the spring 30.
  • the upper end of the sheathing bolt 40 may have the same shape as the sheathing bolt body.
  • One end of the spring 30 may be fixedly coupled to the upper end of the computational bolt 40 in a way to be fitted. At this time, the diameter of the bolt 40 may be smaller than the diameter of the spring 30.
  • FIG. 4 is a view for explaining the support plate 20 according to an embodiment of the present invention.
  • the support plate 20 may have a through hole 21 through which a combination of the spring 30 and the bolt 40 passes. At this time, the through hole 21 may be formed in the support plate 20 at a position corresponding to the spring insertion hole 11 of the temporary wall body 10 .
  • the through hole 21 may also be referred to as a through hole 21 .
  • an eleventh screw hole 22 and a twelfth screw hole 23 for fixing the support plate 20 to the lower portion of the temporary wall body 10 may be formed in the support plate 20 .
  • the 11th screw hole 22 and the 12th screw hole 23 are formed on the support plate 20 at positions corresponding to the first screw hole 12 and the second screw hole 13 of the temporary wall body 10 It can be.
  • the temporary wall body 10 and the support plate 20 pass the first screw (not shown) and the second screw (not shown) through the 11th screw hole 22 and the 12th screw hole 23, respectively, and then the first screw It can be coupled by fixing to the hole 12 and the second screw hole 13.
  • FIG 5 is a view for explaining a closing nut 60 according to an embodiment of the present invention.
  • Figure 5 (a) shows a plan view of the finish nut 60
  • Figure 5 (b) shows a bottom view of the finish nut 60
  • Figure 5 (c) is a finish nut 60 It shows a perspective view.
  • the top of the closing nut 60 has a 61st coupling in the form corresponding to the thread of the bolt 40 so that the other end of the bolt 40 (that is, the part that is not coupled to the spring 30) can be fixedly coupled.
  • a hole 61 may be formed.
  • a combination of the closing nut 60 and the sheathing bolt 40 may be referred to as a bolt assembly 40+60.
  • FIG. 6 is a view for explaining the configuration and coupling sequence of the temporary wall according to an embodiment of the present invention.
  • step S10 the other end of the spring 30 of the combination of the spring 30 and the bolt 40 may be inserted into the spring insertion hole 11 of the main wall body 10.
  • step S11 the support plate 20 is placed under the temporary wall body 10 by passing the other end of the computer bolt 40 through the through hole 21 of the support plate 20, and then the first screw 71 ) And the second screw 72 can be used to fixedly couple the temporary wall body 10 and the support plate 20.
  • a nut 50 may be fitted to the other end of the shear bolt 40.
  • step S13 the closing nut 60 may be inserted into the other end of the bolt 40 to close.
  • a diameter of the spring may be smaller than a diameter of the spring insertion hole and larger than a diameter of the through hole.
  • the diameter of the through hole 21 may be larger than the diameter of the sheathing bolt (40).
  • FIG. 7 is a view for explaining a method of installing a temporary wall according to an embodiment of the present invention.
  • Figure 7 (a) is a front view of the temporary wall installation space (8) and the temporary wall (1) before the temporary wall (1) installation.
  • the height (h2) of the temporary wall (1) in which each configuration is combined can be greater than the distance between the ceiling surface (81) and the floor surface (82) of the temporary wall installation space (8), that is, the height (h1) of the ceiling there is.
  • the temporary wall installer may place the temporary wall 1 in the temporary wall installation space 8 as shown in FIG. 7(b) by pressing the temporary wall main body 10 to compress the spring 30.
  • the temporary wall installer may increase the supporting force of the temporary wall 10 by turning the nut 50 until it comes into contact with the support plate 20 .
  • 7 (c) shows a state in which the nut 50 is turned until it comes into contact with the support plate 20, and shows a state in which the temporary wall is completely installed.
  • the temporary wall 1 Since the overall height of the temporary wall 1 can be adjusted according to the degree of compression of the spring 30, even if the ceiling height h1 of the temporary wall installation space 8 changes, the temporary wall 1 can be installed in the temporary wall installation space 8 ) has the effect of being able to be installed.
  • the dimensions shown in FIG. 7 may be variously changed.
  • h1 may be 260 cm.
  • the width, height, and thickness of the temporary wall body 10 may be 20 cm, 240 cm, and 3 cm, respectively.
  • the length of the spring 30 in an equilibrium state may be 30 cm, and the length in a maximum compression state may be 10 cm.
  • the length of the computerized bolt 40 may be 30cm.
  • the diameter of the shear bolt 40 is 2cm, the diameter of the spring 30 may also be about 2cm.
  • the second embodiment is the same as the first embodiment, but differs in two points.
  • the height of the temporary wall body 10 may be 50 cm.
  • the height of the temporary wall body 10 may be smaller than 50 cm within a range in which the assembly of the bolt 40 and the spring 30 can be properly installed in the first groove 311.
  • an additional not-shown plate (or pole or rod) may be coupled to the upper end of the temporary wall body 10 .
  • the total height of the temporary wall assembly obtained by combining the temporary wall body 10 and the plate is 240 cm, the temporary wall assembly combining the temporary wall 1 and the plate can be installed in the temporary wall installation space 8.
  • a temporary wall assembly that can be installed regardless of the height of the temporary wall installation space 8. That is, it is standardized and produced by limiting the total height of the temporary wall (1) to about 1 to 3 types. For example, the total height of the temporary wall 1 may be determined within about 10 cm to 40 cm. In addition, it is possible to produce several types of plates to have various values for the height of the plate. Now, according to the height of the temporary wall installation space 8, it is possible to select a combination of the height of the temporary wall 1 and the height of the plate. According to the selected combination, a temporary wall assembly combining the temporary wall 1 and the plate can be completed. And the completed temporary wall assembly can be installed in the temporary wall installation space (8).
  • FIG. 8 is a view for explaining a temporary wall installation method according to another embodiment of the present invention.
  • the height h3 of the mini temporary wall 100 in the embodiment of FIG. 8 may be smaller than the height h2 of the temporary wall 1 of FIG. 7 .
  • planks 91 and 92 such as wooden boards, may be coupled to both sides of the mini temporary wall 100.
  • the mini temporary wall 100 may be referred to as a unit temporary wall body 100.
  • Figure 8 (a) shows before the plate materials 91 and 92 are coupled to the mini temporary wall 100
  • Figure 8 (b) shows the plate materials 91 and 92 coupled to the mini temporary wall 100
  • Figure 8 (c) shows a temporary wall in which the plates 91 and 92 are coupled to the mini temporary wall 100 is installed in the temporary wall installation space 8.
  • the plate may also be referred to as a panel.
  • An area of one surface of the panel 91 may be larger than an area of one surface of the mini temporary wall (temporary wall body) that comes into contact with one surface of the panel.
  • the upper surface of the panel coupled to the mini-wall may be in contact with the ceiling surface 81 or the floor surface 82.
  • the finishing nut of the mini temporary wall may be in contact with the bottom surface 82 or the ceiling surface 81.
  • an assembly in which the panel 91 , the panel 92 , and the unit temporary wall body (mini temporary wall) 100 are coupled to each other can be regarded as the temporary wall body 10 .
  • FIG. 9 is a view for explaining a temporary wall installation method according to another embodiment of the present invention.
  • Figure 9 shows a state viewed from the side of the wall (1).
  • the height h3 of the mini temporary wall 100 in the embodiment of FIG. 9 may be smaller than the height h2 of the temporary wall 1 of FIG. 7 .
  • an insertion groove 931 into which the mini temporary wall 100 can be inserted may be formed inside one plate member 93.
  • the plate member 91, 92, or 93 may be referred to as an extended member.
  • the mini temporary wall 100 may be inserted into the insertion groove 931 of the plate material 93.
  • Figure 9 (a) shows before the plate material 93 is coupled to the mini temporary wall 100
  • Figure 9 (b) shows after the plate material 93 is coupled to the mini temporary wall 100
  • Figure 9(c) shows a temporary wall in which the plate material 93 is coupled to the mini temporary wall 100 is installed in the temporary wall installation space 8.
  • an assembly in which the panel 93 and the unit temporary wall body (mini temporary wall) 100 are coupled to each other can be regarded as the temporary wall body 10 .
  • FIG. 10 shows a skirting board 210 according to an embodiment of the present invention.
  • FIG. 10 (a) shows a rear view of the skirting board 210
  • FIG. 10 (b) shows a front view of the skirting board 210.
  • One or more ring holes 211 to 214 may be formed on the rear surface of the skirting board 210 .
  • FIG. 11 is a view for explaining a combination of a skirting board and a temporary wall according to an embodiment of the present invention.
  • Figure 11 (a) shows a state before the skirting board is installed on the temporary wall according to one embodiment of the present invention
  • Figure 11 (b) shows the skirting board installed on the temporary wall according to an embodiment of the present invention is shown.
  • One or more hook parts 111 and 112 may be formed at the lower end of the temporary wall main body 10 to install the skirting board 210 .
  • the shape of the ring portion may be used in various forms such as rings and screws.
  • the base plate 210 can be easily coupled to the temporary wall body 10 by hooking the hook holes 211 and 212 formed in the base plate 210 to the hook parts 111 and 112 of the base wall body 10.
  • FIG. 12a and 12b are 3-dimensional views of installation corresponding positions of the skirting board and the temporary wall of FIG. 11 according to an embodiment of the present invention.
  • two hook parts 111 and 112 may be formed at the lower end of the temporary wall body 10 .
  • the length obtained by subtracting the height of the temporary wall main body 10 from the total height of the temporary wall 1 may be different from each other.
  • the length is L11
  • the length is L12
  • the two rings 111 and 112 may be hooked into the two ring holes 211 and 212 formed at the top of the skirting 210, respectively, and FIG. 12b shows the two rings
  • the parts 111 and 112 may be hooked on the two hook holes 213 and 214 formed at lower positions than the two hook holes 211 and 212 formed on the top of the skirting board 210, respectively.
  • various embodiments of adjusting the height of the skirting board may be applied.
  • FIG. 13 is a three-dimensional view of corresponding installation positions of a skirting board and a temporary wall according to another embodiment of the present invention.
  • the skirting board 220 may have two holes 221 and 222 formed therein. In each of the holes 221 and 222, partitions for each height to which the hook parts 121 and 122 formed at the lower end of the temporary wall body 10 can be hung may be formed.
  • the user may connect the base 220 and the temporary wall 1 by hanging the hooks 121 and 122 to a compartment having a desired height among the plurality of compartments of the holes 221 and 222 .
  • the ring parts 121 and 122 of the temporary wall body 10 may be formed integrally instead of a plurality, and only one hole may be formed in the base 220 to correspond thereto.
  • the skirting board may have a shape surrounding the sheathing bolt 40 , the nut 50 , and the closing nut 60 . Accordingly, it is possible to increase aesthetics by making the computerized bolt 40, the nut 50, and the finishing nut 60 invisible to the user's eyes in any direction.
  • FIG. 14a and 14b are views for explaining a temporary wall installation method when a rail is formed on a floor surface according to an embodiment of the present invention.
  • a rail 300 may be arranged and fixed on the bottom surface. At this time, rail grooves 311 and 312 in which the finishing nut 60 of the temporary wall 1 can move may be formed in the rail 300 .
  • the cross section of the rail 300 may be the same as that of FIG. 14A or 14B.
  • Other types of rails are available.
  • the length of the rail 300 is sufficiently long, so that the plurality of temporary walls 1 can be placed at a desired position, so that each user can create a temporary wall with a different design.
  • a rail 300 having a length corresponding to one temporary wall 1 may be used.
  • the rail 300 has been described as being formed on the floor surface in this embodiment, the rail 300 may be formed on the ceiling surface, and in this case, the temporary wall 1 may be installed in an inverted form unlike FIG. 14A I can understand.
  • 15 is a view for explaining the shape of a temporary wall according to another embodiment of the present invention.
  • the temporary wall 1 may include a first temporary wall 410 and a second temporary wall 420 .
  • a wooden board 94 may be positioned on top of the mini temporary wall 100, and the housing 95 is placed on the mini temporary wall 100 and the wooden board 94 ) may be wrapped around the lower end of the
  • FIG. 16 shows a modified embodiment of the temporary wall of FIG. 15 .
  • the length and width of the wooden board 94 can be manufactured in various ways.
  • the width of the housing 95 may be the same as the width of the wooden board 94, or may be wider than the width of the mini temporary wall 100 and narrower than the width of the wooden board 94.
  • FIG. 17 shows a modified embodiment of the temporary wall of FIG. 15 .
  • one wooden board 94 is fixedly coupled to each mini temporary wall 100 to form a plurality of temporary walls.
  • a plurality of mini temporary walls 100 may be fixedly coupled to one wooden board 94.
  • the width of the housing 95 may be wide enough to cover the plurality of mini temporary walls 100 .
  • three mini temporary walls 100 are fixedly coupled to one wooden board 94, and the housing 95 covers the lower end of the three mini temporary walls and one wooden board 94 to complete the temporary wall 430 can make it
  • the temporary wall 1 is generally installed to divide spaces or for interior purposes.
  • a hole is drilled in a concrete wall to be used.
  • the wall (and wallpaper) is damaged.
  • the temporary wall 1 of the present invention can be used to install a wall-mounted TV without damaging the wall.
  • FIG. 18 shows a form in which a temporary wall is installed according to an embodiment of the present invention.
  • FIG. 18 shows a TV 600 installed at one point of the false wall (1) (it is a convenient place to see when sitting, so it may vary depending on the situation). Since the TV 600 has a weight, when installing the TV 600 on the temporary wall 1, the temporary wall 1 must be firmly installed.
  • the temporary wall 1 may include the temporary wall main body 10, the spring 30, the bolt 40, and the closing nut 60 shown in FIG. And the temporary wall 1 may further include a pair of frames 300 for being fixed to the ceiling surface 81 and the floor surface 82 .
  • a spring insertion hole may be formed at one end of the upper end and the lower end of the temporary wall body 10 .
  • the spring 30 may be inserted into the spring insertion hole.
  • a portion of the computational bolt 40 may be fixedly coupled to one end of the spring 30.
  • the closing nut 60 may be coupled to the other end of the shear bolt 40.
  • the configuration of the spring 30, the bolt 40, and the closing nut 60 is a lifting member for fixing the temporary wall body 10 to the upper frame 300 to be described below.
  • a configuration of a simple bolt other than the configuration of the spring 30, the bolt 40, and the closing nut 60 may be used.
  • the frame 300 may include an upper frame 310 and a lower frame 320 .
  • the frame may be referred to as a rail.
  • the upper frame 310 and the lower frame 320 are presented together in this embodiment, it can be understood that the temporary wall 1 composed of only the upper frame 310 may be provided in another embodiment.
  • the upper frame 310 may be installed in contact with the ceiling surface 81 .
  • the upper frame 310 has a first groove 311 so that either one of the upper end and the lower end of the temporary wall body 10 is inserted into the other end where the spring insertion hole is not formed and the closing nut 60 is inserted 19a) may be formed.
  • the lower end of the temporary wall body 10 may mean the side where the spring insertion hole 11 is formed, and the upper portion of the temporary wall body 10 may mean the side where the spring insertion hole 11 is not formed.
  • the lower frame 320 may be installed on the bottom surface 82 .
  • a second groove 321 may be formed in the lower frame 320 so that the other end of the upper end and the lower end of the temporary wall body 10 and the other end of the closing nut 60 are inserted.
  • the upper frame 310 and the lower frame 320 may have the same shape as the rail 300 of FIG. 14B. Accordingly, the first groove 311 and the second groove 321 may be formed like the rail groove 312 of FIG. 14B.
  • the ceiling surface 81 may be a bottom surface of the ceiling material 80 forming the ceiling space (ie, ceiling) 90 .
  • the ceiling space 90 may be, for example, a space in which electric wires or an indoor unit of a system air conditioner are disposed.
  • the ceiling member 80 may be spaced apart from the concrete ceiling 84 by, for example, installation parts 91 and 92 and fixed to form a floor height of a predetermined height.
  • the ceiling material 80 may be, for example, a gypsum board.
  • the ceiling surface 81 may be a bottom surface of a concrete slab (concrete ceiling).
  • a concrete slab concrete ceiling
  • the concrete slab 84 or the space 80 between the concrete slab 84 and the ceiling member 80 it may be referred to as a ceiling part.
  • a gap may be formed between the wall surface 83 and one side surface 811 of the ceiling material 80 . Molding may be constructed to close the gap, but in this embodiment, molding is not applied.
  • the upper frame 310 may have a shape as shown in FIG. 19a or 19b in order to firmly install the temporary wall when molding is not applied.
  • Figure 19a shows the shape of the upper frame according to the first embodiment of the present invention
  • Figure 19b shows the shape of the upper frame according to the second embodiment of the present invention
  • Figure 19c shows the upper frame according to the third embodiment It shows the shape of the frame.
  • the upper frame 310 extends from one side surface 315 of the upper frame 310 in the direction Z of the ceiling surface 81 to be inserted into the plenum space 90. It may include a wing portion 313 that is. The wing part 313 may be specifically inserted into the ceiling space 90 through a gap formed between the wall surface 83 and one side surface 811 of the ceiling material 80 .
  • the wing portion 313 may have an integral shape, for example, as shown in FIG. 19A.
  • the upper frame 310 may have a shape such as a bench (chair) using the wings 313 as a backrest.
  • the upper frame 310 has a rectangular parallelepiped extending in a direction parallel to the horizontal length direction (X) of the temporary wall body 10 as a body 310_1, and one side surface 315 of the body 310_1 has the horizontal It may have a shape in which a rectangular parallelepiped thin panel extending in a direction parallel to the longitudinal direction (X) and toward the ceiling surface 81 is used as a wing part.
  • the wing unit 313 may include a plurality of wings 313_1, 313_2, .... Wings (313_1, 313_2, ...) may be formed spaced apart from each other at a predetermined interval (d1).
  • Each of the wings 313_1, 313_2, ... may have a smaller area than the wing portion 313 of FIG. 19A.
  • the wing part (or a plurality of wings) may be manufactured integrally with the upper frame 310, or the wing part 313 may be separately fixedly coupled to the rail 300 of FIG. 14A or 14B.
  • the plurality of wings may have a rectangular shape as shown in FIG. 19b or may have an equilateral triangle shape as shown in FIG. 19c, but the shape of each wing is not limited thereto.
  • Figure 20 shows only the upper end of the form in which the temporary wall is installed according to an embodiment different from that of Figure 18.
  • the wing portion 313 may be formed or fixedly coupled to the left side of the upper frame 310, but may also be formed or fixedly coupled to the right side of the upper frame 310.
  • the wing portion 313 may be formed by being fixedly coupled to the upper plane of the upper frame 310 .
  • the wing portion 313 may be formed by being fixedly coupled to both side surfaces of the upper frame 310 .
  • 21 shows the shapes of the ceiling molding and the upper frame according to another embodiment of the present invention.
  • a gap may be formed between the wall surface 83 and one side surface 811 of the ceiling material 80 . Molding may be installed to close the gap.
  • Figure 21 (a) is a cross-sectional view of the interior space in which flat molding is constructed
  • Figure 21 (b) is a cross-sectional view of the interior space in which crown molding (seagull molding) is constructed
  • Figure 21 (c ) shows a cross-sectional view of the interior space when the upper frame is installed on the ceiling surface where flat molding is installed.
  • the type of molding 410 may be various, such as flat molding 411 and crown molding 412. Therefore, it is necessary to have a form of temporary wall that can be installed no matter what molding is constructed.
  • the upper frame 310 may be manufactured in a shape such that a space is formed between the upper frame 310 and the molding 411 .
  • FIG. 22 is a cross-section of the inside of a space in which a temporary wall having the shape of an upper frame as shown in FIG. 21 (c) according to another embodiment of the present invention is installed.
  • FIG. 23 is a cross-section of a ceiling-side space in which an upper frame is installed on the ceiling surface according to another embodiment of the present invention.
  • FIG. 24A is a perspective view of a ceiling-side space in which an upper frame is installed on the ceiling surface according to another embodiment of the present invention
  • FIG. 24B is a perspective view of a ceiling-side space in which an upper frame is installed on the ceiling surface according to another embodiment of the present invention.
  • FIG. 18 The combined shape of the temporary wall body 10, the computerized bolt 40, and the closing nut 60 of FIG. 22 is shown in FIG. 18.
  • the finishing nut 60 is inserted into the first groove 311 formed in the upper frame 310, and the upper end of the temporary wall body 10 is formed in the second groove formed in the lower frame 320. (321).
  • the closing nut 60 is inserted into the second groove 321 formed in the lower frame 320, and the upper end of the temporary wall body 10 is inserted into the first groove 311 formed in the upper frame 310. can be plugged in
  • the upper plane 314 of the upper frame 310 is in contact with the ceiling surface 81, and one side surface 315 of the upper frame 320 is in contact with the wall surface 83.
  • the upper frame 310 may include a diagonal surface 316 connecting an upper plane 314 and one side surface 315 to each other.
  • the diagonal surface 316 includes first edge lines 314a and 316a on the wall side among edge lines of the upper plane 314 of the upper frame 310 and one side surface 315 of the upper frame 310.
  • first edge lines 314a and 316a On the corner lines of the ceiling surface side second corner lines 315a and 316b, one end point 314p of the first corner lines 314a and 316a and one end point 315p of the second corner lines 315a and 316b
  • a third edge line 316c formed by connecting the third edge line 316c, and a fourth edge formed by connecting the other end point (not shown) of the first edge line 314a and the other end point (not shown) of the second edge line 315a. It may be a surface formed by edge lines (not shown).
  • FIG. 24A when the upper frame 310 is installed in contact with the ceiling surface 81 and the wall surface 83, the diagonal surfaces of the ceiling surface 81, the wall surface 83, and the upper frame 310 ( An inner space 400 made of 316 may be formed. Although molding applied to the ceiling surface 81 is omitted in FIG. 24A, it can be confirmed that the inner space 400 is formed even when the molding 411 is applied as shown in FIG. 21(c).
  • the upper frame 310 shown in FIG. 24B is obtained by adding wing parts 313 to the upper frame 310 of FIG. 24A. As wing parts 313 are further added to the shape of the upper frame 310 of FIG. 24A , the upper frame 310 can be more firmly fixed to the ceiling surface 81 .
  • the shape and arrangement of the wings 313 may be the same as those described in FIGS. 18 to 20 .
  • the wing part 313 may include a plurality of wings.
  • FIG. 25A is a view for explaining the structure of a rotatable temporary wall according to another embodiment of the present invention
  • FIG. 25B is an enlarged view of the upper end of FIG. 25A.
  • the shape of the upper frame 310 installed on the ceiling surface 81 and the shape of the lower frame 320 installed on the floor surface 82 may be the same as the shape of the rail of FIG. 14A. In another embodiment, the shape of the upper frame 310 and the lower frame 320 may be the same as that of the rail of FIG. 14B.
  • a spring insertion hole 11 is formed at one end of the upper and lower ends of the temporary wall body 10, and a screw insertion hole 14 is formed at the other end of the upper and lower ends.
  • a spring insertion hole 11 may be formed at the lower end of the temporary wall body 10.
  • the removable wall main body 10 may have a screw insertion hole 14 formed at its upper end, unlike the above-described embodiments.
  • a first screw 500 may be screwed into the screw insertion hole 14 .
  • the first screw 500 may be referred to as 'dabo'.
  • the head 510 of the first screw 500 may be fitted into any one of the first groove 311 of the upper frame 310 and the second groove 321 of the lower frame 320, for example.
  • the closing nut 60 may be inserted into the other one of the first groove 311 and the second groove 321 .
  • the one groove may be the first groove 311 of the upper frame 310
  • the other groove may be the second groove of the lower frame 320 ( 321).
  • any one of the grooves eg, the first groove 311
  • the temporary wall body 10 is rotated, any one of the upper frame 310 and the lower frame 320
  • the frame 310 in which one groove (eg, the first groove 311) is formed and the movable wall body 10 may be prevented from being caught with each other.
  • the lower surface 317 of the upper frame 310 and the temporary wall body 10 are rotated while the temporary wall body 10 is rotated.
  • the upper end portions 15 may be spaced apart by a predetermined distance d2 greater than 0 (zero).
  • the head 510 of the first screw 500 may have, for example, a circular shape for rotation of the temporary wall body 10 .
  • wing parts 313 are further added to the upper frame 310 of FIGS. 25A and 25B so that the upper frame 310 can be more firmly fixed to the ceiling surface 81 .
  • the shape and arrangement of the wings 313 may be the same as those described in FIGS. 18 to 20 .
  • the wing part 313 may include a plurality of wings.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)
  • Connection Of Plates (AREA)

Abstract

가벽본체, 및 상측 프레임을 포함하며, 상기 상측 프레임의 상측평면은 천장면에 접촉하여 설치되도록 되어 있고, 상기 상측 프레임의 하부에는 상기 가벽본체의 상측단부 및 하측단부 중 어느 하나의 단부가 끼워지도록 되어 있는 제1홈이 형성되어 있으며, 상기 천장면은 천장부의 저면이며, 상기 상측 프레임은 상기 상측 프레임의 일 부분으로부터 위쪽 방향으로 연장되어 형성되어 상기 천장면의 위쪽 공간으로 삽입되도록 되어 있는 날개부를 포함하며, 상기 날개부가 상기 천장부로 삽입되어 상기 상측 프레임이 상기 천장면에 고정되도록 되어 있는, 가벽을 공개한다.

Description

향상된 견고성을 갖는 가벽
본 발명은 스프링을 통해 손쉽게 설치할 수 있는 가벽에 관한 것으로서, 특히 향상된 견고성을 갖는 가벽의 구조에 관한 것이다.
인테리어 등의 목적으로 공간 분리를 위해 가벽을 이용하는 경우가 많다. 가벽은 임시벽체로서 예컨대, 거실과 현관 사이 또는 거실과 주방 사이 등 다양한 공간 분리를 위해 사용된다.
가벽은 나무 판재, 에어블록 등 다양한 재질로 구성될 수 있다. 또한, 나무 판재의 일체형으로 구성될 수도 있고, 다양한 형상의 홀이 형성되어 있는 디자인의 가벽으로 구성될 수도 있다.
대한민국 등록특허('10-0701427')에는 높이조절형 가동경량 칸막이 벽체가 공개되어 있다.
높이조절형 칸막이 또는 가벽에 대한 다양한 구성 및 형상들이 공개되어 있지만, 사용자가 직접 설치하는 경우 다소 복잡하다는 문제가 있다. 또한, 가벽을 설치한 후 제거했을 때 가벽의 접착면(천장, 바닥)에 손상이 발생한다는 문제가 있다.
본 발명에서는, 간단하고 신속하게 설치할 수 있는 가벽을 제공하고자 한다.
또한, 본 발명에서는 가벽의 제거시 가벽의 접착면에 손상이 발생하지 않는 가벽의 구성을 제공하고자 한다.
또한, 본 발명에서는, 티비의 무게를 견딜 수 있을 만큼 견고한 가벽을 제공하고자 한다.
또한, 본 발명에서는, 회전이 가능하여 인테리어를 손쉽게 변경할 수 있는 가벽을 제공하고자 한다.
본 발명의 일 관점에 따라, 서로 대향하는 두 개의 외부 벽들 사이에 설치되도록 되어 있는 가벽(1)이 제공될 수 있다. 상기 가벽은, 일측 단부 및 타측 단부를 갖는 가벽본체(10); 일단부 및 타단부를 갖는 스프링(30); 일단부 및 타단부를 갖는 볼트 어셈블리; 및 상기 볼트 어셈블리에 나사결합된 너트(50);를 포함한다. 이때, 상기 가벽본체(10)의 상기 일측 단부에는 삽입홀(11)이 형성되어 있고, 상기 스프링(30)은 상기 삽입홀(11)에 삽입되어 있고, 상기 볼트 어셈블리는 상기 스프링(30)에 결합되어 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 가벽본체(10)의 상기 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고, 상기 볼트 어셈블리의 상기 타단부는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고, 상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고, 상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 가벽본체(10)의 상기 일측 단부에 밀착된 위치에 배치되도록 되어 있을 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 볼트 어셈블리의 상기 일단부는 상기 삽입홀(11)에 삽입되어 있을 수 있다.
이때, 상기 스프링(30)의 상기 타단부는 상기 삽입홀(11)의 바닥에 접촉되어 있을 수 있다.
이때, 상기 볼트 어셈블리는 상기 스프링(30)보다 상기 가벽본체로부터 더 멀리 배치되어 있을 수 있다.
이때, 상기 볼트 어셈블리의 상기 일단부는 상기 스프링의 일 지점에 결합되어 있을 수 있다.
이때, 상기 볼트 어셈블리의 상기 일단부는 상기 스프링의 상기 일단부에 결합되어 있을 수 있다.
이때, 상기 볼트 어셈블리는, 볼트(40) 및 마감너트(60)를 포함하고, 상기 볼트 어셈블리의 상기 일단부는 상기 볼트(40)의 일단부이고, 상기 마감너트는(60)는 상기 볼트(40)의 타단부에 결합되어 있으며, 상기 볼트 어셈블리의 상기 타단부는 상기 마감너트(60)일 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 가벽본체(10)의 상기 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고, 상기 마감너트(60)는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고, 상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고, 상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 가벽본체(10)의 상기 일측 단부에 밀착된 위치에 배치되도록 되어 있을 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 압축된 상태의 스프링(30)이 제공하는 힘에 의해 상기 가벽이 상기 두 개의 외부 벽들 사이에 고정될 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 너트(50)가 상기 가벽본체(10)의 상기 일측 단부에 밀착됨으로 인하여, 상기 가벽(1)의 전체 길이가 상기 상기 두 개의 외부 벽들 사이의 길이와 동일한 길이를 유지하도록 되어 있을 수 있다.
이때, 상기 가벽은 관통홀(21)이 형성되어 있는 지지판(20);을 더 포함할 수 있다. 이때, 상기 지지판(20)은 상기 가벽본체(10)의 상기 일측 단부에 결합되어 있고, 상기 지지판(20)이 상기 가벽본체(10)의 상기 일측 단부에 결합된 상태에서 상기 관통홀(21)과 상기 삽입홀(11)은 서로 정렬되어 있으며, 상기 스프링(30)은 상기 관통홀(21)을 관통하여 상기 삽입홀(11)에 삽입되어 있을 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 가벽본체(10)의 상기 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고, 상기 볼트 어셈블리의 상기 타단부는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고, 상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고, 상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 지지판(20)에 밀착된 위치에 배치되도록 되어 있을 수 있다.
이때, 상기 가벽본체(10)은, 유닛가벽본체(100) 및 판재(91, 92, 93)로 구성되며, 상기 가벽본체(10)의 상기 일측 단부는 상기 유닛가벽본체(100)의 일측 단부이고, 상기 가벽본체(10)의 상기 타측 단부는 상기 판재의 타측 단부이며, 상기 유닛가벽본체(100)의 타측 단부는 상기 판재의 일측 단부에 결합되어 있을 수 있다.
본 발명의 다른 관점에 따라, 서로 대향하는 두 개의 외부 벽들 사이에 설치되도록 되어 있는 유닛가벽이 제공될 수 있다. 상기 유닛가벽은, 일측 단부 및 타측 단부를 갖는 유닛가벽본체(100); 일단부 및 타단부를 갖는 스프링(30); 일단부 및 타단부를 갖는 볼트 어셈블리; 및 상기 볼트 어셈블리에 나사결합된 너트(50);를 포함한다. 이때, 상기 유닛가벽본체(100)의 상기 일측 단부에는 삽입홀(11)이 형성되어 있고, 상기 스프링(30)은 상기 삽입홀(11)에 삽입되어 있고, 상기 볼트 어셈블리는 상기 스프링(30)에 결합되어 있다.
이때, 상기 유닛가벽본체(100)의 상기 타측 단부에 상기 유닛가벽과 별도로 제공되는 소정의 판재(91, 92, 93)의 일측 단부를 결합하여 형성한 소정의 가벽이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 판재의 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고, 상기 볼트 어셈블리의 상기 타단부는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고, 상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고, 상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 유닛가벽본체(100)의 상기 일측 단부에 밀착된 위치에 배치되도록 되어 있을 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 볼트 어셈블리의 상기 일단부는 상기 삽입홀(11)에 삽입되어 있을 수 있다.
이때, 상기 스프링(30)의 상기 타단부는 상기 삽입홀(11)의 바닥에 접촉되어 있을 수 있다.
이때, 상기 볼트 어셈블리는 상기 스프링(30)보다 상기 유닛가벽본체로부터 더 멀리 배치되어 있을 수 있다.
이때, 상기 볼트 어셈블리의 상기 일단부는 상기 스프링의 일 지점에 결합되어 있을 수 있다.
이때, 상기 볼트 어셈블리의 상기 일단부는 상기 스프링의 상기 일단부에 결합되어 있을 수 있다.
이때, 상기 볼트 어셈블리는, 볼트(40) 및 마감너트(60)를 포함하고, 상기 볼트 어셈블리의 상기 일단부는 상기 볼트(40)의 일단부이고, 상기 마감너트(60)는 상기 볼트(40)의 타단부에 결합되어 있으며, 상기 볼트 어셈블리의 상기 타단부는 상기 마감너트(60)일 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 판재의 상기 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고, 상기 마감너트(60)는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고, 상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고, 상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 유닛가벽본체(100)의 상기 일측 단부에 밀착된 위치에 배치되도록 되어 있을 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 압축된 상태의 스프링(30)이 제공하는 힘에 의해 상기 가벽이 상기 두 개의 외부 벽들 사이에 고정될 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 너트(50)가 상기 유닛가벽본체(100)의 상기 일측 단부에 밀착됨으로 인하여, 상기 가벽(1)의 전체 길이가 상기 상기 두 개의 외부 벽들 사이의 길이와 동일한 길이를 유지하도록 되어 있을 수 있다.
이때, 상기 유닛가벽은, 관통홀(21)이 형성되어 있는 지지판(20);을 더 포함할 수 있다. 이때, 상기 지지판(20)은 상기 유닛가벽본체(100)의 상기 일측 단부에 결합되어 있고, 상기 지지판(20)이 상기 유닛가벽본체(100)의 상기 일측 단부에 결합된 상태에서 상기 관통홀(21)과 상기 삽입홀(11)은 서로 정렬되어 있으며, 상기 스프링(30)은 상기 관통홀(21)을 관통하여 상기 삽입홀(11)에 삽입되어 있을 수 있다.
이때, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 판재의 상기 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고, 상기 볼트 어셈블리의 상기 타단부는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고, 상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고, 상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 지지판(20)에 밀착된 위치에 배치되도록 되어 있을 수 있다.
본 발명의 다른 관점에 따른 가벽은 상기 가벽본체(10); 및 상측 프레임(310);을 포함할 수 있다. 상기 상측 프레임의 상측평면은 천장면(81)에 접촉하여 설치되도록 되어 있고, 상기 상측 프레임의 하부에는, 상기 가벽본체의 상측단부 및 하측단부 중 어느 하나의 단부가 끼워지도록 되어 있는 제1홈(311)이 형성되어 있으며, 상기 천장면은 천장부의 저면이며, 상기 상측 프레임은, 상기 상측 프레임의 일 부분으로부터 위쪽 방향으로 연장되어 형성되어 상기 천장면의 위쪽 공간으로 삽입되도록 되어 있는 날개부(313)를 포함하며, 상기 날개부가 상기 천장부로 삽입되어 상기 상측 프레임이 상기 천장면에 고정되도록 되어 있을 수 있다.
이때, 상기 날개부는 복수 개의 날개들을 포함하며, 상기 상측 프레임의 일 부분에서 연장되어 형성되는 상기 복수 개의 날개들은 서로 일정 간격(d1)으로 이격되어 상기 천장부로 삽입될 수 있다.
이때, 상기 상측 프레임의 일측면은 벽면(83)에 맞닿도록 되어 있으며, 상기 날개부는 상기 상측 프레임의 일측면에서 상기 천장면을 향하는 방향으로 연장되어 상기 천장부로 삽입되도록 되어 있으며, 그리고 상기 천장면을 형성하는 천장재의 일측면(811)과 상기 벽면 사이에 형성된 틈으로 상기 날개부가 끼워져 상기 천장부에 삽입되도록 상기 상측 프레임의 상측평면과 상기 상측프레임의 일측면이 각각 상기 천장면 및 상기 벽면에 맞닿아 설치될 수 있다.
이때, 상기 가벽본체의 상기 상측단부, 및 상기 하측단부 중 다른 하나의 단부에는 스프링 삽입홀이 형성되어 있으며, 상기 가벽은 상기 스프링 삽입홀에 삽입된, 스프링(30); 일부가 상기 스프링의 일단부에 고정결합되어 있는, 전산볼트(40); 및 상기 전산볼트의 타단부에 결합되어 있는, 마감너트(60)를 포함할 수 있다.
이때, 상기 가벽은, 바닥면(82)에 설치되며 상기 마감너트가 끼워지도록 제2홈(321)이 형성된, 하측 프레임(320)을 더 포함할 수 있다.
또는, 상기 가벽본체의 상기 어느 하나의 단부에는 스프링 삽입홀이 형성되어 있으며, 상기 가벽은 상기 스프링 삽입홀에 삽입된, 스프링(30); 일부가 상기 스프링의 일단부에 고정결합되어 있는, 전산볼트(40); 및 상기 전산볼트의 타단부에 결합되어 있는, 마감너트(60)를 포함하며, 상기 마감너트가 상기 상측 프레임의 상기 제1홈에 끼워질 수 있다.
이때, 상기 전산볼트에 끼워지도록 되어 있는, 너트; 및 상기 가벽본체의 하부에 배치되는 지지판을 더 포함하며, 상기 스프링 삽입홀에 대응하는 상기 지지판의 일부분에는 상기 전산볼트가 통과할 수 있는 통과홀이 형성되어 있으며, 상기 스프링과 상기 전산볼트의 결합체는 상기 가벽본체의 스프링 삽입홀에 일부가 삽입되도록 되어 있으며, 상기 전산볼트의 타단부가 상기 지지판의 통과홀에 통과됨으로써 상기 지지판이 상기 가벽본체의 하부에 배치되도록 되어 있으며, 상기 전산볼트의 타단부에 상기 너트가 끼워진 후 상기 마감너트가 상기 전산볼트의 타단부에 끼워지도록 되어 있을 수 있다.
이때, 상기 스프링의 직경은 상기 스프링 삽입홀의 직경보다 작고 상기 통과홀의 직경보다 크며, 상기 통과홀의 직경은 상기 전산볼트의 직경보다 클 수 있다.
이때, 상기 상측 프레임의 일 부분은 상기 상측 프레임의 상측평면 또는 상기 상측 프레임의 일측면일 수 있다.
본 발명의 다른 관점에 따른 가벽은, 가벽본체(10); 및 상측 프레임(310);을 포함하며, 상기 상측 프레임의 하부에는, 상기 가벽본체의 상측단부 및 하측단부 중 어느 하나의 단부가 끼워지도록 되어 있는 제1홈(311)이 형성되어 있고, 상기 상측 프레임의 상측평면(314)은 천장면(81)에 맞닿도록 되어 있고, 상기 상측 프레임의 일측면(315)은 벽면(83)에 맞닿도록 되어 있으며, 상기 상측 프레임은, 상기 상측 프레임의 상측평면의 모서리 라인들 중 상기 벽면 쪽의 제1모서리 라인(314a, 316a), 상기 상측 프레임의 일측면의 모서리 라인들 중 상기 천장면 쪽의 제2모서리 라인(315a, 316b), 상기 제1모서리 라인의 일끝지점(314p)과 상기 제2모서리 라인의 일끝지점(315p)이 연결되어 형성하는 제3모서리 라인(316c), 및 상기 제1모서리 라인의 타끝지점과 상기 제2모서리 라인의 타끝지점이 연결되어 형성하는 제4모서리 라인을 포함하여 형성되는 대각면(316)을 포함하며, 그리고 상기 상측프레임의 상기 상측평면과 상기 일측면이 각각 상기 천장면, 및 상기 벽면에 맞닿아 설치되면, 상기 천장면, 상기 벽면, 및 상기 상측 프레임의 대각면으로 이루어지는 내부공간이 형성되는 것을 특징으로 할 수 있다.
이때, 상기 천장면은 천장부의 저면이며, 상기 상측 프레임은 상기 상측 프레임의 일 부분에서 상기 천장면을 향하는 방향으로 연장되어 상기 천장부로 삽입되도록 되어 있는 날개부(313)를 포함하며, 상기 날개부가 상기 천장부로 삽입되어 상기 상측 프레임이 상기 천장면에 고정되도록 되어 있을 수 있다.
이때, 상기 가벽본체의 상기 상측단부, 및 상기 하측단부 중 다른 하나의 단부에는 스프링 삽입홀이 형성되어 있으며, 상기 가벽은 상기 스프링 삽입홀에 삽입된, 스프링(30); 일부가 상기 스프링의 일단부에 고정결합되어 있는, 전산볼트(40); 및 상기 전산볼트의 타단부에 결합되어 있는, 마감너트(60)를 포함할 수 있다.
또는, 상기 가벽본체의 상기 어느 하나의 단부에는 스프링 삽입홀이 형성되어 있으며, 상기 가벽은 상기 스프링 삽입홀에 삽입된, 스프링(30); 일부가 상기 스프링의 일단부에 고정결합되어 있는, 전산볼트(40); 및 상기 전산볼트의 타단부에 결합되어 있는, 마감너트(60)를 포함하며, 상기 마감너트가 상기 상측 프레임의 상기 제1홈에 끼워질 수 있다.
본 발명의 또 다른 관점에 따른 가벽은 상측단부 및 하측단부 중 어느 하나의 단부에는 제1삽입홀이 형성되어 있고 상기 상측단부 및 상기 하측단부 중 다른 하나의 단부에는 나사 삽입홀(14)이 형성되어 있는, 가벽본체; 상기 제1삽입홀에 결합되어 있으며 상기 어느 하나의 단부로부터 돌출되어 있는 마감너트; 상기 나사 삽입홀에 나사 결합되어 있는, 제1나사(500); 천장면(81)에 설치되도록 되어 있으며 그 하부에 제1홈(311)이 형성되어 있는 상측 프레임(310); 바닥면에 설치되도록 되어 있으며 그 상부에 제2홈(321)이 형성되어 있는 하측 프레임(320)을 포함할 수 있다. 이때, 상기 제1나사의 머리부(510)는 상기 제1홈 및 상기 제2홈 중 어느 하나의 홈에 끼워지도록 되어 있고, 상기 마감너트는 상기 제1홈 및 상기 제2홈 중 다른 하나의 홈에 끼워지도록 되어 있고, 상기 마감너트의 중심축과 상기 제1나사의 중심축은 서로 동축이며, 상기 제1나사가 상기 어느 하나의 홈에 끼워진 상태에서, 상기 마감너트의 중심축과 상기 제1나사의 중심축을 회전축으로 하여 상기 가벽본체를 회전시키는 동안 상기 상측 프레임과 상기 하측 프레임 중 상기 어느 하나의 홈이 형성된 프레임과 상기 가벽본체가 서로 걸리지 않도록 되어 있을 수 있다.
이때, 상기 제1삽입홀은 스프링 삽입홀이며, 상기 가벽은 상기 스프링 삽입홀에 삽입되어 있는, 스프링; 및 일부가 상기 스프링의 일단부에 고정결합되어 있는 전산볼트를 더 포함하며, 상기 마감너트는 상기 전산볼트의 타단부에 결합되어 있을 수 있다.
이때, 상기 제1나사의 머리부(510)는 상기 제1홈에 끼워지도록 되어 있고, 상기 마감너트는 상기 제2홈에 끼워지도록 되어 있고, 상기 제1나사가 상기 제1홈에 끼워진 상태에서, 상기 가벽본체를 회전시키는 동안 상기 상측 프레임의 저면(317)과 상기 가벽본체의 상기 상측단부 사이가 0(영)보다 큰 소정의 간격(d2)만큼 이격되도록 되어 있을 수 있다.
이때, 상기 천장면은 천장부의 저면이며, 상기 상측 프레임은 상기 상측 프레임의 일 부분에서 상기 천장면을 향하는 방향으로 연장되어 상기 천장부로 삽입되도록 되어 있는 날개부(313)를 포함하며, 상기 날개부가 상기 천장부로 삽입되어 상기 상측 프레임이 상기 천장면에 고정되도록 되어 있을 수 있다.
본 발명에 따르면, 간단하고 신속하게 설치할 수 있는 가벽을 제공할 수 있다.
또한, 본 발명에 따르면, 가벽의 제거시 가벽의 접착면에 손상이 발생하지 않는 가벽의 구성을 제공할 수 있다.
또한, 본 발명에 따르면, 티비의 무게를 견딜 수 있을 만큼 견고한 가벽을 제공할 수 있다.
또한, 본 발명에 따르면, 회전이 가능하여 인테리어를 손쉽게 변경할 수 있는 가벽을 제공할 수 있다.
도 1은 본 발명의 일 실시예에 따른 가벽을 나타낸 것이다.
도 2는 본 발명의 일 실시예에 따른 가벽본체의 구조를 설명하기 위한 도면이다.
도 3은 본 발명의 일 실시예에 따른 스프링과 전산볼트의 결합체를 설명하기 위한 도면이다.
도 4는 본 발명의 일 실시예에 따른 지지판을 설명하기 위한 도면이다.
도 5는 본 발명의 일 실시예에 따른 마감너트를 설명하기 위한 도면이다.
도 6은 본 발명의 일 실시예에 따른 가벽의 구성결합순서를 설명하기 위한 도면이다.
도 7은 본 발명의 일 실시예에 따라 가벽을 설치하는 방법을 설명하기 위한 도면이다.
도 8은 본 발명의 다른 실시예에 따른 가벽설치방법을 설명하기 위한 도면이다.
도 9는 본 발명의 또 다른 실시예에 따른 가벽설치방법을 설명하기 위한 도면이다.
도 10은 본 발명의 일 실시예에 따른 걸레받이를 나타낸 것이다.
도 11은 본 발명의 일 실시예에 따라 걸레받이와 가벽의 결합을 설명하기 위한 도면이다.
도 12a 및 도 12b는 본 발명의 일 실시예에 따라 도 11의 걸레받이와 가벽의 설치 대응 위치를 3차원으로 도시한 것이다.
도 13은 본 발명의 다른 실시예에 따른 걸레받이와 가벽의 설치 대응 위치를 3차원으로 도시한 것이다.
도 14a 및 도 14b는 본 발명의 일 실시예에 따라 바닥면에 레일이 형성된 경우의 가벽 설치방법을 설명하기 위한 도면이다.
도 15는 본 발명의 다른 실시예에 따른 가벽의 형상을 설명하기 위한 도면이다.
도 16은 도 15의 가벽의 변형된 실시예를 나타낸 것이다.
도 17은 도 15의 가벽의 변형된 실시예를 나타낸 것이다.
도 18은 본 발명의 일 실시예에 따른 가벽이 설치된 형태를 나타낸 것이다.
도 19a는 본 발명의 제1실시예에 따른 상측 프레임의 형상을 나타낸 것이고, 도 19b는 본 발명의 제2실시예에 따른 상측 프레임의 형상을 나타낸 것이며, 도 19c는 제3실시예에 따른 상측 프레임의 형상을 나타낸 것이다.
도 20은 도 18과는 다른 실시예에 따른 가벽이 설치된 형태의 상단부만을 나타낸 것이다.
도 21은 본 발명의 다른 실시예에 따른 천장몰딩 및 상측 프레임의 형상을 나타낸 것이다.
도 22는 본 발명의 다른 실시예에 따라 도 21의 (c)와 같은 상측 프레임의 형상을 갖는 가벽이 설치된 공간 내부의 단면을 나타낸 것이다.
도 23은 본 발명의 다른 실시예에 따라 천장면에 상측 프레임이 설치된 천창측 공간의 단면을 나타낸 것이다.
도 24a는 본 발명의 다른 실시예에 따라 천장면에 상측 프레임이 설치된 천장측 공간의 사시도이며, 도 24b는 본 발명의 또 다른 실시예에 따라 천장면에 상측 프레임이 설치된 천장측 공간의 사시도이다.
도 25a는 본 발명의 다른 실시예에 따라 회전 가능한 가벽의 구조를 설명하기 위한 도면이고, 도 25b는 도 25a의 상단부를 확대한 도면이다.
이하, 본 발명의 실시예를 첨부한 도면을 참고하여 설명한다. 그러나 본 발명은 본 명세서에서 설명하는 실시예에 한정되지 않으며 여러 가지 다른 형태로 구현될 수 있다. 본 명세서에서 사용되는 용어는 실시예의 이해를 돕기 위한 것이며, 본 발명의 범위를 한정하고자 의도된 것이 아니다. 또한, 이하에서 사용되는 단수 형태들은 문구들이 이와 명백히 반대의 의미를 나타내지 않는 한 복수 형태들도 포함한다.
도 1은 본 발명의 일 실시예에 따른 가벽(1)을 나타낸 것이다.
가벽(1)은 가벽본체(10), 지지판(20), 전산볼트(40), 너트(50), 및 마감너트(60)를 포함할 수 있다.
이때, 가벽(1)은 스프링(도 4 참조)을 더 포함할 수 있다.
본 명세서에서 상기 전산볼트(40)는 간단히 볼트(40)라고 지칭될 수 있다.
이하, 도 2 내지 도 5를 함께 참조하여 각 구성을 설명한다.
도 2는 본 발명의 일 실시예에 따른 가벽본체(10)의 구조를 설명하기 위한 도면이다.
도 2는 도 1에서 도시한 가벽본체(10)를 뒤집어 놓은 형태일 수 있다.
가벽본체(10)는 예컨대, 나무 판재로 구성될 수 있다.
가벽본체(10)의 하부에는 스프링 삽입홀(11)이 스프링의 연장방향을 따라 형성되어 있을 수 있다.
본 명세서에서 상기 스프링 삽입홀(11)은 간단히 삽입홀(11)이라고 지칭될 수도 있다.
또한, 가벽본체(10)의 하부에는 지지판(20)을 가벽본체(10)에 고정시키기 위한 제1나사홀(12) 및 제2나사홀(13)이 형성되어 있을 수 있다.
도 3은 본 발명의 일 실시예에 따른 스프링과 전산볼트의 결합체를 설명하기 위한 도면이다.
본 명세서에서 상기 스프링과 전산볼트의 결합체는 간단히 스프링-볼트 어셈블리(30+40)라고 지칭될 수도 있다.
스프링(30)의 일단부와 전산볼트(40)의 일단부는 고정결합되어 있을 수 있다.
이렇게 고정결합된 스프링(30)과 전산볼트(40)의 결합체는 스프링(30)의 타단부가 가벽본체(10)의 스프링 삽입홀(11)로 삽입됨으로써 가벽본체(10)에 연결될 수 있다.
이때, 스프링(30)의 압축되지 않은 상태의 길이(L1)는 전선볼트(40)의 길이(L2)보다 길 수 있다.
도 3의 (a)의 실시예에서는 전산볼트(40)의 상단부가 전산볼트 본체의 지름보다 작은 기둥이 형성된 모습을 갖고 있을 수 있다. 전산볼트(40)의 상단부에 형성된 상기 작은 기둥에 스프링(30)의 일단부가 끼워져 고정결합될 수 있다. 이때, 전산볼트(40)의 지름은 스프링(30)의 지름과 거의 동일할 수 있다.
도 3의 (b)의 실시예에서는 도 3의 (a)와 달리 전산볼트(40)의 상단부가 전산볼트 본체의 형상과 동일할 수 있다. 전산볼트(40)의 상단부에는 스프링(30)의 일단부가 끼워지는 방식으로 고정결합될 수 있다. 이때, 전산볼트(40)의 지름은 스프링(30)의 지름보다 작을 수 있다.
도 4는 본 발명의 일 실시예에 따른 지지판(20)을 설명하기 위한 도면이다.
지지판(20)에는 스프링(30)과 전산볼트(40)의 결합체가 통과하기 위한 통과홀(21)이 형성되어 있을 수 있다. 이때, 통과홀(21)은 가벽본체(10)의 스프링 삽입홀(11)에 대응되는 위치의 지지판(20)에 형성될 수 있다.
본 명세서에서 상기 통과홀(21)은 관통홀(21)이라고 지칭될 수도 있다.
또한, 지지판(20)에는 지지판(20)을 가벽본체(10)의 하부에 고정시키기 위한 제11나사홀(22) 및 제12나사홀(23)이 형성되어 있을 수 있다. 이때, 제11나사홀(22) 및 제12나사홀(23)은 가벽본체(10)의 제1나사홀(12) 및 제2나사홀(13)에 대응되는 위치의 지지판(20)에 형성될 수 있다.
가벽본체(10)와 지지판(20)은 제1나사(미도시) 및 제2나사(미도시)를 제11나사홀(22) 및 제12나사홀(23)에 각각 통과시킨 후 제1나사홀(12) 및 제2나사홀(13)에 고정결합함으로써 결합될 수 있다.
도 5는 본 발명의 일 실시예에 따른 마감너트(60)를 설명하기 위한 도면이다.
도 5의 (a)는 마감너트(60)의 평면도를 나타낸 것이고, 도 5의 (b)는 마감너트(60)의 저면도를 나타낸 것이며, 도 5의 (c)는 마감너트(60)의 사시도를 나타낸 것이다.
마감너트(60)의 상부에는 전산볼트(40)의 타단부(즉, 스프링(30)과 결합되지 않는 부분)가 고정결합될 수 있도록 전산볼트(40)의 나사산에 대응하는 형태의 제61결합홀(61)이 형성되어 있을 수 있다.
본 명세서에서 상기 마감너트(60)와 상기 전산볼트(40)의 결합체를 볼트 어셈블리(40+60)라고 지칭할 수 있다.
도 6은 본 발명의 일 실시예에 따른 가벽의 구성결합순서를 설명하기 위한 도면이다.
단계(S10)에서, 스프링(30)과 전산볼트(40)의 결합체 중 스프링(30)의 타단부를 가벽본체(10)의 스프링 삽입홀(11)에 삽입할 수 있다.
단계(S11)에서, 지지판(20)의 통과홀(21)에 전산볼프(40)의 타단부를 통과시킴으로써 가벽본체(10)의 하부에 지지판(20)을 배치한 후, 제1나사(71) 및 제2나사(72)를 이용하여 가벽본체(10)와 지지판(20)을 고정결합시킬 수 있다.
단계(S12)에서, 전산볼트(40)의 타단부에 너트(50)를 끼울 수 있다.
단계(S13)에서, 마감너트(60)를 전산볼트(40)의 타단부에 끼워 마감할 수 있다.
이때, 상기 스프링의 직경은 상기 스프링 삽입홀의 직경보다 작고, 상기 통과홀의 직경보다 클 수 있다. 그리고 통과홀(21)의 직경은 전산볼트(40)의 직경보다 클 수 있다.
따라서 지지판(20)이 가벽본체(10)에 고정됨으로써 스프링(30)과 전산볼트(40)의 결합체가 가벽본체(10)와 일체형이 될 수 있음을 알 수 있다.
도 7은 본 발명의 일 실시예에 따라 가벽을 설치하는 방법을 설명하기 위한 도면이다.
도 7의 (a)는 가벽(1) 설치전 가벽설치공간(8)과 가벽(1)을 정면으로 바라본 것이다.
각 구성이 모두 결합된 형태의 가벽(1)의 높이(h2)는 가벽설치공간(8)의 천장면(81)과 바닥면(82) 사이의 간격 즉, 천장의 높이(h1)보다 클 수 있다.
가벽 설치자는 가벽본체(10)를 눌러 스프링(30)을 압축시킴으로써 도 7의 (b)와 같이 가벽(1)을 가벽설치공간(8)에 배치할 수 있다.
이후, 가벽 설치자는 너트(50)를 지지판(20)에 맞닿을 때까지 돌려 가벽(10)의 지지력을 상승시킬 수 있다. 도 7의 (c)는 너트(50)가 지지판(20)에 맞닿을 때까지 돌아간 상태의 모습을 나타낸 것으로서, 가벽이 완전히 설치된 모습을 나타낸 것이다.
스프링(30)이 압축된 정도에 따라 가벽(1)의 전체 높이가 조절될 수 있으므로, 가벽설치공간(8)의 천장높이(h1)가 달라지더라도 가벽(1)을 상기 가벽설치공간(8)에 설치할 수 있다는 효과가 있다.
도 7에 나타낸 디멘젼은 다양하게 변경될 수 있다.
예컨대, 제1구현예에서, h1은 260cm일 수 있다. 이때 가벽본체(10)의 폭, 높이, 및 두께는 각각 20cm, 240cm, 및 3cm일 수 있다. 이때 스프링(30)의 평형 상태에서의 길이는 30cm이고 최대 압축 상태에서의 길이는 10cm일 수 있다. 이때, 전산볼트(40)의 길이는 30cm일 수 있다. 그리고 전산볼트(40)의 지름은 2cm이고, 스프링(30)의 지름도 약 2cm일 수 있다. 이는 예시일 뿐이며, 상술한 요소들의 구체적인 치수는 구체적인 환경에 따라 가변할 수 있다.
또 다른 예로서, 이하, 제2구현예를 제시한다. 상기 제2구현예는 상기 제1구현예와 동일하며, 다만 두 가지 점에서 차이점이 있다. 첫째, 가벽본체(10)의 높이가 50cm일 수 있다. 또는 가벽본체(10)의 높이는 전산볼트(40)와 스프링(30)의 어셈블리가 제1홈(311)에 적절히 설치될 수 있는 범위 내에서 50cm보다 작을 수도 있다. 둘째, 가벽본체(10)의 높이가 h1보다 너무 작기 때문에 가벽본체(10)만으로는 가벽(1)을 가벽설치공간(8)에 설치할 수 없다. 따라서 가벽본체(10)의 상단부에 추가적인 도시되지 않은 플레이트(plate)( 또는 폴(pole) 또는 로드(rod))를 결합할 수 있다. 예컨대 상기 가벽본체(10)와 상기 플레이트를 결합하여 얻은 가벽 어셈블리의 전체 높이가 240cm 라면, 상기 가벽(1)과 상기 플레이트를 결합한 가벽 어셈블리를 가벽 설치공간(8)에 설치할 수 있다.
이렇게 하면, 가벽 설치공간(8)의 높이에 관계없이 설치 가능한 가벽 어셈블리를 용이하게 생산할 수 있다. 즉, 가벽(1)의 전체 높이를 1가지~3가지 정도로 제한하여 규격화하여 생산한다. 예컨대 가벽(1)의 전체 높이는 약 10cm ~ 40cm 내에서 결정될 수 있다. 그리고 상기 플레이트의 높이를 다양한 값을 갖도록 여러 종류를 생산할 수 있다. 이제, 가벽 설치공간(8)의 높이에 따라, 가벽(1)의 높이와 플레이트의 높이의 조합을 선택할 수 있다. 상기 선택된 조합에 따라 가벽(1)과 플레이트를 결합한 가벽 어셈블리를 완성할 수 있다. 그리고 상기 완성된 가벽 어셈블리를 가벽 설치공간(8)에 설치할 수 있다.
도 8은 본 발명의 다른 실시예에 따른 가벽설치방법을 설명하기 위한 도면이다.
도 8은 가벽(1)을 측면으로 바라본 상태를 나타낸 것이다.
도 8의 실시예에서의 미니가벽(100)의 높이(h3)는 도 7의 가벽(1)의 높이(h2)보다 작을 수 있다.
가벽(1)의 완성을 위해, 미니가벽(100)의 양측면에 나무 판재와 같은 판재(91, 92)가 결합될 수 있다.
본 명세서에서 상기 미니가벽(100)은 유닛가벽본체(100)이라고 지칭할 수도 있다.
도 8의 (a)는 미니가벽(100)에 판재(91, 92)가 결합되기 전을 나타낸 것이고, 도 8의 (b)는 미니가벽(100)에 판재(91, 92)가 결합된 후를 나타낸 것이며, 도 8의 (c)는 미니가벽(100)에 판재(91, 92)가 결합된 가벽이 가벽설치공간(8)에 설치된 모습을 나타낸 것이다.
미니가벽(100)에 다양한 크기 및 모양의 판재가 결합됨으로써, 가벽설치공간(8)의 천장높이(h1)에 맞는 가벽을 설치할 수 있다는 장점이 있다.
상기 판재는 패널로 지칭될 수도 있다.
패널(91)의 일면의 면적은 상기 패널의 일면과 맞닿는 상기 미니가벽(가벽본체)의 일면의 면적보다 클 수 있다. 상기 미니가벽에 결합된 패널의 상면은 천장면(81) 또는 바닥면(82)에 맞닿도록 되어 있을 수 있다. 이때, 상기 미니가벽의 마감너트는 바닥면(82) 또는 천장면(81)에 맞닿도록 되어 있을 수 있다.
도 8에서, 상기 패널(91), 상기 패널(92), 및 상기 유닛가벽본체(미니가벽)(100)이 서로 결합된 어셈블리를 상기 가벽본체(10)인 것으로 간주할 수 있다.
도 9는 본 발명의 또 다른 실시예에 따른 가벽설치방법을 설명하기 위한 도면이다.
도 9는 가벽(1)을 측면으로 바라본 상태를 나타낸 것이다.
도 9의 실시예에서의 미니가벽(100)의 높이(h3)는 도 7의 가벽(1)의 높이(h2)보다 작을 수 있다.
도 8과 달리 도 9에서는 하나의 판재(93) 내부에 미니가벽(100)이 삽입될 수 있는 삽입홈(931)이 형성되어 있을 수 있다.
본 명세서에서 상기 판재(91, 92, 또는 93)를 연장멤버라고 지칭할 수도 있다.
가벽(1)의 완성을 위해, 미니가벽(100)을 판재(93)의 삽입홈(931)에 삽입할 수 있다.
도 9의 (a)는 미니가벽(100)에 판재(93)가 결합되기 전을 나타낸 것이고, 도 9의 (b)는 미니가벽(100)에 판재(93)가 결합된 후를 나타낸 것이며, 도 9의 (c)는 미니가벽(100)에 판재(93)가 결합된 가벽이 가벽설치공간(8)에 설치된 모습을 나타낸 것이다.
도 9에서, 상기 패널(93) 및 상기 유닛가벽본체(미니가벽)(100)이 서로 결합된 어셈블리를 상기 가벽본체(10)인 것으로 간주할 수 있다.
도 10은 본 발명의 일 실시예에 따른 걸레받이(210)를 나타낸 것이다.
도 10의 (a)는 걸레받이(210)의 배면도를 나타낸 것이고, 도 10의 (b)는 걸레받이(210)의 전면도를 나타낸 것이다.
걸레받이(210)의 배면에는 한 개 이상의 고리홀(211~214)이 형성되어 있을 수 있다.
도 11은 본 발명의 일 실시예에 따라 걸레받이와 가벽의 결합을 설명하기 위한 도면이다.
도 11의 (a)는 본 발명의 일 실시예에 따라 걸레받이가 가벽에 설치되기 전의 모습을 나타낸 것이고, 도 11의 (b)는 본 발명의 일 실시예에 따라 걸레받이가 가벽에 설치된 모습을 나타낸 것이다.
이하, 도 10 및 도 11을 함께 참조하여 설명한다.
걸레받이(210)의 설치를 위해서 가벽본체(10)의 하단부에는 한 개 이상의 고리부(111, 112)가 형성되어 있을 수 있다. 고리부의 형태는 고리, 나사 등 다양한 형태로 이용될 수 있다.
예컨대, 걸레받이(210)에 형성된 고리홀(211, 212)을 가벽본체(10)의 고리부(111, 112)에 걸어 간편하게 걸레받이(210)를 가벽본체(10)에 결합시킬 수 있다.
걸레받이를 통해 가벽(1)의 하단부가 가려짐으로써 미관을 좋게 할 수 있다.
도 12a 및 도 12b는 본 발명의 일 실시예에 따라 도 11의 걸레받이와 가벽의 설치 대응 위치를 3차원으로 도시한 것이다.
예컨대, 가벽본체(10)의 하단부에 두 개의 고리부(111, 112)가 형성되어 있을 수 있다. 그리고 도 12a의 경우와 도 12b의 경우 가벽(1)의 전체 높이에서 가벽본체(10)의 높이를 뺀 길이는 서로 다를 수 있다. 예컨대, 도 12a의 경우 상기 길이는 L11이고 도 12b의 경우 상기 길이는 L12이며, L11>L12 일 수 있다.
높이에 따라, 도 12a는 두 개의 고리부(111, 112)가 걸레받이(210)의 상단에 형성된 두 개의 고리홀(211, 212)에 각각 걸리도록 되어 있을 수 있으며, 도 12b는 두 개의 고리부(111, 112)가 걸레받이(210)의 상단에 형성된 두 개의 고리홀(211, 212)보다는 낮은 위치에 형성된 두 개의 고리홀(213, 214)에 각각 걸리도록 되어 있을 수 있다.
도 12a 및 도 12b의 실시예 외에도 걸레받이의 높이조절에 대한 다양한 실시예들이 적용될 수 있다.
도 13은 본 발명의 다른 실시예에 따른 걸레받이와 가벽의 설치 대응 위치를 3차원으로 도시한 것이다.
걸레받이(220)는 도 10의 걸레받이(110)와 달리 두 개의 홀(221, 222)이 형성되어 있을 수 있다. 각 홀(221, 222)에는 가벽본체(10)의 하단부에 형성된 고리부(121, 122)가 걸릴 수 있는 높이별 칸막이가 형성되어 있을 수 있다.
사용자는 홀(221, 222)의 복수 개의 칸들 중 원하는 높이의 칸에 고리부(121, 122)를 걸어 걸레받이(220)와 가벽(1)을 결합시킬 수 있다.
이때, 가벽본체(10)의 고리부(121, 122)는 복수 개가 아니라 일체형으로 형성될 수도 있고, 이에 대응되도록 걸레받이(220)에는 한 개의 홀만 형성될 수도 있다.
도 10 내지 도 13의 실시예와 달리, 걸레받이는 전산볼트(40), 너트(50), 및 마감너트(60)를 감싸는 형상을 가질 수도 있다. 이에 따라 어느 방향에서든 전산볼트(40), 너트(50), 및 마감너트(60)가 사용자의 눈에 보이지 않도록 하여 심미성을 높일 수 있다.
도 14a 및 도 14b는 본 발명의 일 실시예에 따라 바닥면에 레일이 형성된 경우의 가벽 설치방법을 설명하기 위한 도면이다.
가벽(1)의 자유로운 이동 및 고정을 위하여 바닥면에는 레일(300)을 배치하여 고정할 수 있다. 이때, 레일(300)에는 가벽(1)의 마감너트(60)가 이동 가능한 레일홈(311, 312)이 형성되어 있을 수 있다.
레일(300)을 A-A 방향으로 잘랐을 경우 레일(300)의 단면은 도 14a와 같을 수도 있고 도 14b와 같을 수도 있다. 이외의 다양한 형태의 레일이 이용가능하다.
레일(300)의 길이는 충분히 길어 복수 개의 가벽(1)들을 원하는 위치에 배치시킴으로써 사용자마다 서로 다른 디자인으로 가벽을 만들 수 있다. 또는 하나의 가벽(1)에 대응하는 길이의 레일(300)을 이용할 수도 있다.
본 실시예에서 레일(300)이 바닥면에 형성된 것으로 설명하였지만, 레일(300)은 천장면에 형성될 수도 있으며, 이러한 경우 가벽(1)은 도 14a와 달리 뒤집어진 형태로 설치될 수도 있음을 이해할 수 있다.
도 15는 본 발명의 다른 실시예에 따른 가벽의 형상을 설명하기 위한 도면이다.
가벽(1)은 제1가벽(410) 및 제2가벽(420)을 포함할 수 있다.
도 8과 유사하게, 가벽(1)의 완성을 위해, 미니가벽(100) 상단에 나무 판재(94)가 위치될 수 있으며, 하우징(95)이 미니가벽(100)과 나무 판재(94)의 하단부를 감싸도록 되어 있을 수 있다.
도 16은 도 15의 가벽의 변형된 실시예를 나타낸 것이다.
나무 판재(94)의 길이 및 너비는 다양하게 제작될 수 있다. 또한, 하우징(95)의 너비는 나무 판재(94)의 너비와 동일할 수도 있고, 미니가벽(100)의 너비보다는 넓고 나무 판재(94)의 너비보다는 좁을 수도 있다.
도 17은 도 15의 가벽의 변형된 실시예를 나타낸 것이다.
도 15에서는 미니가벽(100) 하나당 하나의 나무 판재(94)가 고정결합되어 복수 개의 가벽을 형성하였다. 그러나 도 17과 같이 복수 개의 미니 가벽(100)들을 하나의 나무 판재(94)에 고정결합시킬 수도 있다. 이러한 경우, 하우징(95)의 너비는 상기 복수 개의 미니 가벽(100)들을 감쌀만큼 넓을 수 있다.
예컨대, 3개의 미니 가벽(100)들을 하나의 나무 판재(94)에 고정결합시키고, 하우징(95)으로 3개의 미니 가벽들과 하나의 나무 판재(94)의 하단부를 감싸 가벽(430)을 완성시킬 수 있다.
가벽(1)은 일반적으로 공간을 구분하기 위해서, 또는 인테리어를 위해서 설치된다. 벽걸이 티비(TV)의 경우 콘크리트 벽에 구멍을 뚫어 이용하게 되는데 이러한 경우 벽( 및 벽지)를 훼손하게 된다는 문제가 있다. 또한, 예컨대 전세 또는 월세와 같은 방식으로 주택/아파트 등을 이용하는 경우에는 벽걸이 티비를 이용하기 쉽지 않을 수 있다.
벽걸이 티비를 벽의 훼손 없이 설치하기 위해 본 발명의 가벽(1)을 이용할 수 있다.
도 18은 본 발명의 일 실시예에 따른 가벽이 설치된 형태를 나타낸 것이다.
도 18은 가벽(1)의 일 지점(앉았을 때 보기 편한 지점이므로 상황에 따라 다를 수 있음)에 티비(600)가 설치된 모습을 나타냈다. 티비(600)의 무게가 있기 때문에, 가벽(1)에 티비(600)를 설치하는 경우 가벽(1)이 견고하게 설치되어야 한다.
이하에서는 가벽(1)을 천장면(81)과 바닥면(82)에 견고하게 설치하기 위한 구조에 대해 설명한다.
가벽(1)은 도 6에 나타낸 가벽본체(10), 스프링(30), 전산볼트(40), 및 마감너트(60)를 포함할 수 있다. 그리고 가벽(1)은 천장면(81)과 바닥면(82)에 고정되기 위한 한 쌍의 프레임(300)을 더 포함할 수 있다.
가벽본체(10)에는 상측단부 및 하측단부 중 어느 하나의 단부에 스프링 삽입홀이 형성되어 있을 수 있다.
스프링(30)은 상기 스프링 삽입홀에 삽입되어 있을 수 있다.
전산볼트(40)는 일부가 스프링(30)의 일단부에 고정결합되어 있을 수 있다.
마감너트(60)는 전산볼트(40)의 타단부에 결합되어 있을 수 있다.
스프링(30), 전산볼트(40), 및 마감너트(60)의 구성은 가벽본체(10)를 이하에서 설명하는 상측 프레임(300)에 고정하기 위한 리프팅 부재이다. 다른 실시예에서는 스프링(30), 전산볼트(40), 및 마감너트(60)의 구성이 아닌 단순 볼트의 구성이 사용될 수도 있다.
프레임(300)은 상측 프레임(310) 및 하측 프레임(320)을 포함할 수 있다. 이때, 다른 실시예에서 프레임은 레일로 지칭될 수 있다. 이때, 본 실시예에서 상측 프레임(310)과 하측 프레임(320)을 함께 제시하였지만, 다른 실시예에서 상측 프레임(310)만으로 구성되는 가벽(1)이 제공될 수도 있음을 이해할 수 있다.
상측 프레임(310)은 천장면(81)에 접촉하여 설치될 수 있다. 상측 프레임(310)에는 가벽본체(10)의 상측단부 및 하측단부 중 스프링 삽입홀이 형성되어 있지 않은 다른 하나의 단부 및 마감너트(60) 중 어느 하나가 끼워지도록 제1홈(311)(도 19a 참조)이 형성되어 있을 수 있다.
이때, 가벽본체(10)의 하측단부는 스프링 삽입홀(11)이 형성된 측을 의미이며, 가벽본체(10)의 상부는 스프링 삽입홀(11)이 형성되지 않은 측을 의미할 수 있다.
하측 프레임(320)은 바닥면(82)에 설치될 수 있다. 하측 프레임(320)에는 가벽본체(10)의 상기 상측단부 및 상기 하측단부 중 다른 하나의 단부 및 마감너트(60) 중 다른 하나가 끼워지도록 제2홈(321)이 형성되어 있을 수 있다.
이때, 상측 프레임(310) 및 하측 프레임(320)은 도 14b의 레일(300)과 같은 형상을 가질 수도 있다. 이에 따라 제1홈(311) 및 제2홈(321)은 도 14b의 레일홈(312)과 같이 형성될 수 있다.
천장면(81)은 천장속 공간(즉, 실링)(90)을 형성하는 천장재(80)의 저면일 수 있다. 천장속 공간(90)은 예컨대 전선이나 시스템 에어컨의 실내기 등이 배치되는 공간일 수 있다. 천장재(80)는 예컨대, 설치부품들(91, 92)에 의해 콘크리트 천장(84)으로부터 이격되어 소정의 높이의 층고를 형성하도록 고정될 수 있다. 천장재(80)는 예컨대 석고보드일 수 있다.
또는 천장면(81)은 콘크리트 슬라브(콘크리트 천장)의 저면일 수 있다. 본 명세서에서는 콘크리트 슬라브(84) 또는 콘크리트 슬라브(84)와 천장재(80) 사이의 공간(80)을 포함하여, 천장부라고 지칭할 수 있다.
이때, 벽면(83)과 천장재(80)의 일측면(811) 사이에는 틈이 형성될 수 있다. 이러한 틈을 막기 위하여 몰딩이 시공되어 있을 수도 있는데 본 실시예에서는 몰딩이 시공되어 있지 않은 경우에 대한 것이다.
몰딩이 시공되어 있지 않은 경우에 가벽을 견고히 설치하기 위해서 상측 프레임(310)은 도 19a 또는 도 19b와 같은 형상을 가질 수 있다.
도 19a는 본 발명의 제1실시예에 따른 상측 프레임의 형상을 나타낸 것이고, 도 19b는 본 발명의 제2실시예에 따른 상측 프레임의 형상을 나타낸 것이며, 도 19c는 제3실시예에 따른 상측 프레임의 형상을 나타낸 것이다.
이하, 도 18 내지 도 19b를 함께 참조하여 설명한다.
제1실시예 및 제2실시예에 따른 상측 프레임(310)은 상측 프레임(310)의 일측면(315)에서 천장면(81) 방향(Z)으로 연장되어 천장속 공간(90)으로 삽입되도록 되어 있는 날개부(313)를 포함할 수 있다. 상기 날개부(313)는 구체적으로 벽면(83)과 천장재(80)의 일측면(811) 사이에 형성된 틈을 통해 천장속 공간(90)에 삽입될 수 있다.
날개부(313)는 예컨대, 도 19a와 같이 일체형의 형상을 가질 수 있다.
도 19a를 참조하여 상측 프레임(310)의 구체적인 형상을 설명하면, 상측 프레임(310)은 날개부(313)를 등받이로 하는 벤치(의자)와 같은 형상을 가질 수 있다. 구체적으로 상측 프레임(310)은 가벽본체(10)의 가로길이 방향(X)과 평행한 방향으로 연장된 직육면체를 본체(310_1)로 하며, 상기 본체(310_1)의 일측면(315)에는 상기 가로길이 방향(X)과 평행한 방향으로 그리고 천장면(81)을 향해 연장되는 직육면체의 얇은 판넬을 날개부로 하는 형상을 가질 수 있다.
또는 도 19b와 같이 날개부(313)는 복수 개의 날개들(313_1, 313_2, ...)을 포함할 수 있다. 날개들(313_1, 313_2, ...)은 서로 일정 간격(d1)으로 이격되어 형성될 수 있다. 날개들(313_1, 313_2, ...) 각각은 도 19a의 날개부(313)의 면적보다 작을 수 있다.
상기 날개부(또는 복수 개의 날개들)는 상측 프레임(310)과 일체형으로 제작될 수도 있고, 도 14a 또는 도 14b의 레일(300)에 날개부(313)가 별도로 고정결합되어 제작될 수도 있다.
이때, 상기 복수 개의 날개들은 도 19b와 같이 직사각형의 형상을 가질 수도 있고, 도 19c와 같이 정삼각형의 형상을 가질 수도 있으며, 각 날개의 형상은 이에 제한되지 않는다.
도 20은 도 18과는 다른 실시예에 따른 가벽이 설치된 형태의 상단부만을 나타낸 것이다.
도 18과 같이 날개부(313)는 상측 프레임(310)의 좌측면에 형성되거나 고정결합될 수도 있지만, 상측 프레임(310)의 우측면에 형성되거나 고정결합될 수도 있다.
또는 도 20과 같이 날개부(313)는 상측 프레임(310)의 상측평면에 고정결합되어 형성될 수 있다. 또는 날개부(313)는 상측 프레임(310)의 양측면에 고정결합되어 형성될 수 있다.
또는, 도 18에서는 가벽이 벽면에 설치되는 경우에 대해 서술하였지만, 도 20과 같이, 가벽은 공간의 임의의 지점에 설치될 수도 있으며, 다양한 형태의 날개부를 이용하여 천장면(81)에 고정될 수 있다.
도 18 내지 도 20과 같은 날개부를 통해 천장면(81)의 타공을 최소화하고 가벽의 밀림, 및 넘어짐을 방지할 수 있다는 효과가 있다.
도 21은 본 발명의 다른 실시예에 따른 천장몰딩 및 상측 프레임의 형상을 나타낸 것이다.
이하, 도 18 및 도 21을 함께 참조하여 설명한다.
도 18에서 상술한 바와 같이 벽면(83)과 천장재(80)의 일측면(811) 사이에는 틈이 형성될 수 있다. 이러한 틈을 막기 위하여 몰딩이 시공되어 있을 수도 있다.
도 21의 (a)는 평몰딩이 시공된 내부 공간의 단면도를 나타낸 것이며, 도 21의 (b)는 크라운몰딩(갈매기 몰딩)이 시공된 내부 공간의 단면도를 나타낸 것이며, 그리고 도 21의 (c)는 평몰딩이 시공된 천장면에 상측 프레임을 설치한 경우의 내부 공간의 단면도를 나타낸 것이다.
도 21의 (a) 및 도 21의 (b)와 같이 몰딩(410)의 종류는 평몰딩(411), 및 크라운몰딩(412) 등 다양할 수 있다. 따라서 어떠한 몰딩이 시공되어 있더라도 설치할 수 있는 가벽의 형태가 필요하다. 예컨대, 도 21의 (c)와 같이 상측 프레임(310)은 상측 프레임(310)과 몰딩(411) 사이에 공간이 형성되도록 하는 형상으로 제조될 수 있다.
도 22는 본 발명의 다른 실시예에 따라 도 21의 (c)와 같은 상측 프레임의 형상을 갖는 가벽이 설치된 공간 내부의 단면을 나타낸 것이다.
도 23은 본 발명의 다른 실시예에 따라 천장면에 상측 프레임이 설치된 천장측 공간의 단면을 나타낸 것이다.
도 24a는 본 발명의 다른 실시예에 따라 천장면에 상측 프레임이 설치된 천장측 공간의 사시도이며, 도 24b는 본 발명의 또 다른 실시예에 따라 천장면에 상측 프레임이 설치된 천장측 공간의 사시도이다.
이하 도 22 내지 도 24a를 함께 참조하여 설명한다.
도 22의 가벽본체(10), 전산볼트(40), 및 마감너트(60)가 결합된 형상은 도 18과 같다. 이때, 도 22 및 도 23과 같이 마감너트(60)는 상측 프레임(310)에 형성된 제1홈(311)에 끼워지고 가벽본체(10)의 상측단부는 하측 프레임(320)에 형성된 제2홈(321)에 끼워질 수 있다. 그러나 다른 실시예에서는 마감너트(60)가 하측 프레임(320)에 형성된 제2홈(321)에 끼워지고 가벽본체(10)의 상측단부는 상측 프레임(310)에 형성된 제1홈(311)에 끼워질 수 있다.
도 23을 참조하면, 상측 프레임(310)의 상측평면(314)은 천장면(81)과 맞닿도록 되어 있고, 상측 프레임(320)의 일측면(315)은 벽면(83)에 맞닿도록 되어 있을 수 있다.
도 23 및 도 24a를 참조하면, 상측 프레임(310)은 상측평면(314)와 일측면(315) 사이를 연결하는 대각면(316)을 포함할 수 있다.
도 24a를 참조하면, 대각면(316)은 상측 프레임(310)의 상측평면(314)의 모서리 라인들 중 벽면측 제1모서리 라인(314a, 316a), 상측 프레임(310)의 일측면(315)의 모서리 라인들 중 천장면측 제2모서리 라인(315a, 316b), 제1모서리 라인(314a, 316a)의 일끝지점(314p)과 제2모서리 라인(315a, 316b)의 일끝지점(315p)이 연결되어 형성하는 제3모서리 라인(316c), 및 제1모서리 라인(314a)의 타끝지점(미도시)과 제2모서리 라인(315a)의 타끝지점(미도시)이 연결되어 형성하는 제4모서리 라인(미도시)으로 형성되는 면일 수 있다.
도 24a를 참조하면, 상측 프레임(310)이 천장면(81), 및 벽면(83)에 맞닿아 설치되면, 천장면(81), 벽면(83), 및 상측 프레임(310)의 대각면(316)으로 이루어지는 내부공간(400)이 형성될 수 있다. 도 24a에서는 천장면(81)에 시공되는 몰딩을 생략하였지만, 도 21의 (c)와 같이 몰딩(411)이 시공된 경우에도 내부공간(400)이 형성되어 있음을 확인할 수 있다.
도 24b에 도시한 상측 프레임(310)은 도 24a의 상측 프레임(310)에 날개부(313)가 더 추가된 것이다. 도 24a의 상측 프레임(310)의 형상에 날개부(313)가 더 추가됨으로써 상측 프레임(310)은 천장면(81)에 더 견고하게 고정설치될 수 있다.
이때, 날개부(313)의 형상 및 배치구조는 도 18 내지 도 20에서 설명한 바와 동일할 수 있다. 이때, 날개부(313)는 복수 개의 날개들을 포함할 수 있다.
도 25a는 본 발명의 다른 실시예에 따라 회전 가능한 가벽의 구조를 설명하기 위한 도면이고, 도 25b는 도 25a의 상단부를 확대한 도면이다.
천장면(81)에 설치되는 상측 프레임(310)의 형상과 바닥면(82)에 설치되는 하측 프레임(320)의 형상은 도 14a의 레일의 형상과 같을 수 있다. 다른 실시예에서 상측 프레임(310)과 하측 프레임(320)의 형상은 도 14b의 레일의 형상과 같을 수도 있다.
가벽본체(10)의 상측단부 및 하측단부 중 어느 하나의 단부에는 스프링 삽입홀(11)이 형성되어 있고, 상기 상측단부 및 하측단부 중 다른 하나의 단부에는 나사 삽입홀(14)이 형성되어 있을 수 있다.
예컨대, 도 25a를 참조하면, 가벽본체(10)의 하측단부에는 스프링 삽입홀(11)이 형성되어 있을 수 있다. 그리고 도 25b를 참조하면, 가벽본체(10)는 상술한 실시예들과 달리 그 상측단부에 나사 삽입홀(14)이 형성되어 있을 수 있다. 나사 삽입홀(14)에는 제1나사(500)가 나사 결합되어 있을 수 있다. 이때, 제1나사(500)는 '다보'로 지칭될 수 있다.
제1나사(500)의 머리부(510)는 예컨대, 상측 프레임(310)의 제1홈(311) 및 하측 프레임(320)의 제2홈(321) 중 어느 하나의 홈에 끼워지도록 되어 있을 수 있다. 그리고 마감너트(60)는 제1홈(311) 및 제2홈(321) 중 다른 하나의 홈에 끼워지도록 되어 있을 수 있다. 예컨대, 도 25a 및 도 25b를 함께 참조하면, 상기 어느 하나의 홈은 상측 프레임(310)의 제1홈(311)일 수 있으며, 상기 다른 하나의 홈은 하측 프레임(320)의 제2홈(321)일 수 있다.
제1나사(500)가 상기 어느 하나의 홈(예컨대, 제1홈(311))에 끼워진 상태에서, 가벽본체(10)를 회전시키는 동안 상측 프레임(310)과 하측 프레임(320) 중 상기 어느 하나의 홈(예컨대, 제1홈(311)))이 형성된 프레임(310)과 가벽본체(10)가 서로 걸리지 않도록 되어 있을 수 있다.
도 25b를 참조하면, 제1나사(500)가 제1홈(311)에 끼워진 상태에서, 가벽본체(10)를 회전시키는 동안 상측 프레임(310)의 저면(317)과 가벽본체(10)의 상측단부(15) 사이가 0(영)보다 큰 소정의 간격(d2)만큼 이격되도록 되어 있을 수 있다.
이때, 제1나사(500)의 머리부(510)는 가벽본체(10)의 회전을 위하여 예컨대, 원형의 형상을 가질 수 있다.
도 25a 및 도 25b의 상측 프레임(310)에도 도 18 내지 도 20과 마찬가지로 날개부(313)가 더 추가됨으로써 상측 프레임(310)이 천장면(81)에 더 견고하게 고정설치될 수 있다.
이때, 날개부(313)의 형상 및 배치구조는 도 18 내지 도 20에서 설명한 바와 동일할 수 있다. 이때, 날개부(313)는 복수 개의 날개들을 포함할 수 있다.
상술한 본 발명의 실시예들을 이용하여, 본 발명의 기술 분야에 속하는 자들은 본 발명의 본질적인 특성에서 벗어나지 않는 범위 내에 다양한 변경 및 수정을 용이하게 실시할 수 있을 것이다. 특허청구범위의 각 청구항의 내용은 본 명세서를 통해 이해할 수 있는 범위 내에서 인용관계가 없는 다른 청구항에 결합될 수 있다.

Claims (15)

  1. 서로 대향하는 두 개의 외부 벽들 사이에 설치되도록 되어 있는 가벽(1)으로서,
    일측 단부 및 타측 단부를 갖는 가벽본체(10);
    일단부 및 타단부를 갖는 스프링(30);
    일단부 및 타단부를 갖는 볼트 어셈블리; 및
    상기 볼트 어셈블리에 나사결합된 너트(50);
    를 포함하며,
    상기 가벽본체(10)의 상기 일측 단부에는 삽입홀(11)이 형성되어 있고,
    상기 스프링(30)은 상기 삽입홀(11)에 삽입되어 있고,
    상기 볼트 어셈블리는 상기 스프링(30)에 결합되어 있는,
    가벽.
  2. 제1항에 있어서,
    상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서,
    상기 가벽본체(10)의 상기 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고,
    상기 볼트 어셈블리의 상기 타단부는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고,
    상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고,
    상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 가벽본체(10)의 상기 일측 단부에 밀착된 위치에 배치되도록 되어 있는,
    가벽.
  3. 제2항에 있어서,
    상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서,
    상기 볼트 어셈블리의 상기 일단부는 상기 삽입홀(11)에 삽입되어 있는,
    가벽.
  4. 제1항에 있어서, 상기 스프링(30)의 상기 타단부는 상기 삽입홀(11)의 바닥에 접촉되어 있는, 가벽.
  5. 제1항에 있어서, 상기 볼트 어셈블리의 상기 일단부는 상기 스프링의 일 지점에 결합되어 있는, 가벽.
  6. 제5항에 있어서, 상기 볼트 어셈블리의 상기 일단부는 상기 스프링의 상기 일단부에 결합되어 있는, 가벽.
  7. 제1항에 있어서,
    상기 볼트 어셈블리는, 볼트(40) 및 마감너트(60)를 포함하고,
    상기 볼트 어셈블리의 상기 일단부는 상기 볼트(40)의 일단부이고,
    상기 마감너트(60)는 상기 볼트(40)의 타단부에 결합되어 있으며,
    상기 볼트 어셈블리의 상기 타단부는 상기 마감너트(60)인,
    가벽.
  8. 제2항에 있어서,
    상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서,
    상기 가벽본체(10)의 상기 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고,
    상기 마감너트(60)는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고,
    상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고,
    상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 가벽본체(10)의 상기 일측 단부에 밀착된 위치에 배치되도록 되어 있는,
    가벽.
  9. 제2항 또는 제8항에 있어서, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 압축된 상태의 스프링(30)이 제공하는 힘에 의해 상기 가벽이 상기 두 개의 외부 벽들 사이에 고정되는 것을 특징으로 하는, 가벽.
  10. 제2항 또는 제8항에 있어서, 상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서, 상기 너트(50)가 상기 가벽본체(10)의 상기 일측 단부에 밀착됨으로 인하여, 상기 가벽(1)의 전체 길이가 상기 상기 두 개의 외부 벽들 사이의 길이와 동일한 길이를 유지하도록 되어 있는, 가벽.
  11. 제1항에 있어서,
    관통홀(21)이 형성되어 있는 지지판(20);을 더 포함하며,
    상기 지지판(20)은 상기 가벽본체(10)의 상기 일측 단부에 결합되어 있고,
    상기 지지판(20)이 상기 가벽본체(10)의 상기 일측 단부에 결합된 상태에서 상기 관통홀(21)과 상기 삽입홀(11)은 서로 정렬되어 있으며,
    상기 스프링(30)은 상기 관통홀(21)을 관통하여 상기 삽입홀(11)에 삽입되어 있는,
    가벽.
  12. 제11항에 있어서,
    상기 가벽(1)이 상기 두 개의 외부 벽들 사이에 설치된 상태에서,
    상기 가벽본체(10)의 상기 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고,
    상기 볼트 어셈블리의 상기 타단부는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고,
    상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고,
    상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 지지판(20)에 밀착된 위치에 배치되도록 되어 있는,
    가벽.
  13. 제1항에 있어서,
    상기 가벽본체(10)는, 유닛가벽본체(100) 및 판재(91, 92, 93)로 구성되며,
    상기 가벽본체(10)의 상기 일측 단부는 상기 유닛가벽본체(100)의 일측 단부이고,
    상기 가벽본체(10)의 상기 타측 단부는 상기 판재의 타측 단부이며,
    상기 유닛가벽본체(100)의 타측 단부는 상기 판재의 일측 단부에 결합되어 있는,
    가벽.
  14. 서로 대향하는 두 개의 외부 벽들 사이에 설치되도록 되어 있는 유닛가벽으로서,
    일측 단부 및 타측 단부를 갖는 유닛가벽본체(100);
    일단부 및 타단부를 갖는 스프링(30);
    일단부 및 타단부를 갖는 볼트 어셈블리; 및
    상기 볼트 어셈블리에 나사결합된 너트(50);
    를 포함하며,
    상기 유닛가벽본체(100)의 상기 일측 단부에는 삽입홀(11)이 형성되어 있고,
    상기 스프링(30)은 상기 삽입홀(11)에 삽입되어 있고,
    상기 볼트 어셈블리는 상기 스프링(30)에 결합되어 있는,
    유닛가벽.
  15. 제14항에 있어서,
    상기 유닛가벽본체(100)의 상기 타측 단부에 상기 유닛가벽과 별도로 제공되는 소정의 판재(91, 92, 93)의 일측 단부를 결합하여 형성한 소정의 가벽이 상기 두 개의 외부 벽들 사이에 설치된 상태에서,
    상기 판재의 타측 단부는 상기 두 개의 외부 벽들 중 어느 하나의 벽에 접촉하도록 되어 있고,
    상기 볼트 어셈블리의 상기 타단부는 상기 두 개의 외부 벽들 중 다른 하나의 벽에 접촉하도록 되어 있고,
    상기 스프링(30)은 압축된 상태의 제1길이를 갖도록 되어 있고,
    상기 스프링(30)이 상기 제1길이보다 더 압축되지 않도록 하기 위해, 상기 너트(50)는 상기 유닛가벽본체(100)의 상기 일측 단부에 밀착된 위치에 배치되도록 되어 있는,
    유닛가벽.
PCT/KR2022/012124 2021-08-13 2022-08-12 향상된 견고성을 갖는 가벽 WO2023018300A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20210107336 2021-08-13
KR10-2021-0107336 2021-08-13

Publications (1)

Publication Number Publication Date
WO2023018300A1 true WO2023018300A1 (ko) 2023-02-16

Family

ID=85200184

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2022/012124 WO2023018300A1 (ko) 2021-08-13 2022-08-12 향상된 견고성을 갖는 가벽

Country Status (2)

Country Link
KR (1) KR20230025360A (ko)
WO (1) WO2023018300A1 (ko)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4277920A (en) * 1976-09-28 1981-07-14 Panelfold Doors, Inc. Portable and operable wall systems
US5042555A (en) * 1990-10-01 1991-08-27 Modernfold, Inc. Floor-supported movable wall panel with height adjustment system
JPH0620631U (ja) * 1992-03-28 1994-03-18 コマニー株式会社 間仕切りの仮止め機能付きアジャスター装置
JP2001152586A (ja) * 1999-11-24 2001-06-05 Matsushita Electric Works Ltd 壁パネル固定具
KR20200034881A (ko) * 2018-09-21 2020-04-01 대한민국(육군참모총장) 칸막이벽 간편 설치 부속

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4277920A (en) * 1976-09-28 1981-07-14 Panelfold Doors, Inc. Portable and operable wall systems
US5042555A (en) * 1990-10-01 1991-08-27 Modernfold, Inc. Floor-supported movable wall panel with height adjustment system
JPH0620631U (ja) * 1992-03-28 1994-03-18 コマニー株式会社 間仕切りの仮止め機能付きアジャスター装置
JP2001152586A (ja) * 1999-11-24 2001-06-05 Matsushita Electric Works Ltd 壁パネル固定具
KR20200034881A (ko) * 2018-09-21 2020-04-01 대한민국(육군참모총장) 칸막이벽 간편 설치 부속

Also Published As

Publication number Publication date
KR20230025360A (ko) 2023-02-21

Similar Documents

Publication Publication Date Title
WO2017204453A1 (ko) 인테리어용 조립식 벽체 및 그 시공 방법
WO2019151653A1 (en) Display device
WO2017188629A1 (en) Headrest folding device
WO2017082601A1 (ko) 힌지축 구동형 디스플레이 위치 조절장치
WO2017082571A1 (ko) 체인을 이용한 디스플레이 위치 조절장치
WO2015137774A1 (en) Latch system for door
WO2016140490A1 (en) Laundry treatment apparatus
WO2020153752A1 (ko) 온실하우스용 천장 개폐장치
WO2019009533A1 (ko) 프로파일 조립체
WO2021206223A1 (en) Rotation module and display apparatus including the same
WO2019209069A1 (ko) 광각 영상 제공 방법
WO2017082602A1 (ko) 섹터기어를 이용한 디스플레이 위치 조절장치
WO2017082598A1 (ko) 랙과 피니언을 이용한 디스플레이 위치 조절장치
WO2023018300A1 (ko) 향상된 견고성을 갖는 가벽
WO2020256449A1 (ko) 높이조절부를 구비한 벽체 시스템
WO2020189921A1 (ko) 옷걸이
WO2015088122A1 (ko) 설치가 용이한 반자동식 체결 구조체
WO2019177331A1 (ko) 부호화 방법 및 그 장치, 복호화 방법 및 그 장치
WO2017099301A1 (en) Speaker assembly and display device including speaker assembly
WO2015156559A1 (ko) 전자기기용 거치장치
WO2023177115A1 (ko) 단열성능 향상 및 외벽마감재 시공을 위한 조적앵글시스템
EP3949444A1 (en) Display apparatus
WO2016208973A1 (ko) 조립식 구조를 갖는 프레임
WO2016104878A1 (ko) 탄탈륨의 미세조직 및 집합조직 제어방법
WO2021157922A1 (en) Refrigerator

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22856293

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE