WO2022261795A1 - Double-hook-type manually butt-jointed steel structure framework - Google Patents

Double-hook-type manually butt-jointed steel structure framework Download PDF

Info

Publication number
WO2022261795A1
WO2022261795A1 PCT/CN2021/000120 CN2021000120W WO2022261795A1 WO 2022261795 A1 WO2022261795 A1 WO 2022261795A1 CN 2021000120 W CN2021000120 W CN 2021000120W WO 2022261795 A1 WO2022261795 A1 WO 2022261795A1
Authority
WO
WIPO (PCT)
Prior art keywords
double
hook
steel
joint
pipe
Prior art date
Application number
PCT/CN2021/000120
Other languages
French (fr)
Chinese (zh)
Inventor
马克双
Original Assignee
马克双
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 马克双 filed Critical 马克双
Priority to PCT/CN2021/000120 priority Critical patent/WO2022261795A1/en
Publication of WO2022261795A1 publication Critical patent/WO2022261795A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures

Definitions

  • the double-hook manual butt steel frame technology involves the steel frame, which refers to the steel structure components such as steel pipes and connecting blocks of the steel frame.
  • the "double-hook butt joint” is used to connect all the components manually to complete large, medium and small. It is named for the steel skeletons of various sports venues, buildings, buildings, tower cranes, gantry cranes, row cranes, and various bridge steel columns and beams.
  • the double-hook manual butt steel skeleton technology includes both ends of the steel pipe and the well-shaped, single-pipe, and spherical connection block joints.
  • the corresponding double-hook joints have the same form and size. After seaming into a round rod, the casing is completely locked. It is not a simple or repeated "double-hook butt-joint scaffold” technology, but a development and sublimation of its technology. Compared with the "double-hook butt-joint scaffold” technology, it will be better. Because of its technology: First, each force point is reinforced in its technology, that is: the double hook joint and the double hook joint on the docking point, the structure form and size standard of the two double hooks are exactly the same, and the two double hooks are closed.
  • the inner circle of the casing is the same as the diameter of the outer circle of the round rod, and the casing is completely locked in the round rod-shaped double hooks;
  • the original connecting block is a well-shaped and cross-shaped connecting block, which is now increased to a well-shaped , single tube, sphere connection block, at the same time, the number, direction, and angle of the force point of the well shape, single tube, and sphere connection block should be firmly welded according to the needs of the skeleton;
  • This technology adds a single-insert double-hook joint and a double-hook rotary joint in one side of the steel pipe.
  • the owner wishes to increase rooms or walls, and increase or decrease rooms and walls at any time, do it at will, especially the addition of a double-hook swivel joint in the steel pipe, which can also be welded on the corresponding joint.
  • a rotating double-hook joint does not reduce the strength of the steel pipe, and it is not necessary to consider the direction of the welding double hook during production and processing, and it can be installed manually, which is convenient and reliable.
  • Whether it is a mountain or a plain whether it is a city or a country, whether it is the ground or the water, and the construction floor and area can be high or low, large or small.
  • the double-hook manual butt steel skeleton technology is used in the "fourth generation housing" as the skeleton of this generation of housing: first, the entire construction project must be redesigned and must be approved by the architectural design institute; second, the production and construction parties do not need to Any mechanical equipment can be installed manually, and the hoisting equipment of the three-dimensional construction on the construction site is integrated with the house skeleton, and the hoisting equipment is installed while the steel structure housing skeleton is raised.
  • the house After the skeleton is installed, the house is completed as a whole; third, Carry out the overall house decoration and partial decoration directly on the house skeleton to complete the housing function; Fourth, the housing materials completely abandon reinforced concrete, and also widely use the building materials, such as furniture, wardrobes, etc., to decorate the walls and so on.
  • the housing materials completely abandon reinforced concrete, and also widely use the building materials, such as furniture, wardrobes, etc., to decorate the walls and so on.
  • Such a building form will completely change the concept of building construction, completely change the building construction plan, completely change the building construction materials, completely change the building construction technology, and thus completely subvert the entire construction industry.
  • the application of this technology will completely bid farewell to the "reinforced concrete" Elevator Room Era".
  • the double-hook manual butt steel skeleton technology can also be applied to the steel skeletons of large, medium and small stadiums and halls, various tower cranes, gantry cranes, row cranes, and various bridge steel columns and beams.
  • the entire construction process is the same as that of housing construction: first, the entire construction project must be redesigned and must be approved by the architectural design institute; The hoisting equipment of the three-dimensional construction is integrated with the skeleton, and the hoisting equipment is installed while the steel skeleton is raised. After the skeleton is installed, the overall installation is completed; the third is to carry out overall decoration of the internal facilities, such as stadiums and halls And segment decoration fulfills its function and so on.
  • the double-hook manual butt steel frame technology mainly consists of steel pipes and well-shaped, single-pipe, and sphere connection blocks.
  • the two ends of the steel pipes are double-hook joints; It is also a double-hook joint.
  • these connecting blocks are connected with steel pipes to form various steel frameworks.
  • the main body of the tower crane column is composed of steel pipes and well-shaped connecting blocks;
  • the beam of the tower crane is composed of steel pipes and spherical connecting blocks, each of which constitutes the cubic and triangular steel framework required by the tower crane.
  • the main body of the tower hanging column and the beam of the tower crane which use the triangular firmness characteristics, divide each shape into a triangular structure and connect them; these connected force points are the double hook joints of various connecting blocks.
  • the double-hook joints are welded at regular distribution angles. After the sphere connection blocks of the double-hook joints are welded on the distribution angles and the steel pipe double-hook joints are docked, each shape is divided into triangles and connected in the form of a whole.
  • the cubic plate becomes a three-dimensional mechanical steel framework with incomparable strength and power.
  • each pipe and block component has its own stamped banner composed of English letters and Arabic numerals, including specifications, materials, wall thickness, seamlessness, bearing tonnage, supervision
  • the national and international standards for the main contents of the steel frame such as unit, manufacturer, batch and date of manufacture, enable workers to connect the pipe block components in place as soon as they get them.
  • Double-hook manual butt steel skeleton technology and "three-piece manual butt steel skeleton”, “single-hook manual butt steel skeleton”, “two-type manual butt steel skeleton”, “manual butt steel skeleton” technology The utility model patents of the National Patent Office were reported on January 11, March 11, March 25, and April 4, 2019 respectively.
  • the patent numbers are 2019203111629.6 and 201920050697.1, 201920457410.7, 201920457388.6, and 201920311629.6.
  • Butt jointer "single hook butt joint” and “double hook butt joint” technology, connect all the components, and complete the large, medium and small various stadiums, halls, building steel skeletons and various Tower cranes, gantry cranes, row cranes, and various types of bridge steel columns, beam frames and other steel skeletons; in today's construction industry, the frame of a building with more than 100 floors, considering the structure of reinforced concrete, its weight cannot be the same as that of the ground floor and The foundation is generally supported by a steel frame; and the reason why these technologies I introduced can replace the on-site welding form has their theoretical roots: the "three-piece set”, “double hook” and “single hook” I introduced are It means that these force-bearing contact surfaces exceed the cross-sectional area of the steel pipe wall, that is to say, the cross-sectional area of the steel pipe wall is smaller than the cross-sectional area of the same round rod, and it is also less than 1/4 of the same round rod cross-sectional area.
  • "Double hook” and “single hook” are made of the same garden rod, and the cross-sectional area of each part is 1/3. Therefore, it is far larger than the cross-sectional area of the steel pipe wall. This is the first; “Piece set”, “single hook” and “double hook” are all made of high carbon steel, which is unmatched by all steel pipe materials; thirdly, the steel pipe sheath is cleverly used, which not only protects the connection point but also facilitates loading and unloading , so that all the added force can only be done along the sheath of the steel pipe.
  • double-hook manual butt joint steel frame technology will achieve "four provinces", namely: construction period saving, construction material saving, construction equipment saving, and labor saving; at the same time, it will achieve "four excellent”, namely: construction Excellent quality, excellent project accuracy, solid skeleton, and excellent service life; take the Beijing Bird's Nest as an example: the Bird's Nest started construction on December 24, 2003 and was completed in March 2008.
  • double-hook type manual butt joint steel frame technology is used to construct Beijing's Bird's Nest project, it will save a lot of welding projects on site, save a lot of manpower, financial resources, and material resources, and also save engineering time. From estimating manpower and financial Various costs such as equipment, machinery and equipment only account for 10%, and it also saves engineering time, and it may only take one year to complete.
  • Figure 1 is the steel skeleton diagram of the fourth-generation housing with double-hook manual docking steel skeleton—the conceptual conception module house;
  • Figure 2 is a large-scale stadium with a double-hook manual docking steel structure skeleton—a conceptual conception of the steel structure skeleton of the Bird's Nest;
  • Figure 3 is a tower crane diagram of the conceptual conception of the double-hook type manual docking steel frame
  • Figure 4 is a semi-enclosed conceptual conception of a double-hook type manual butt joint steel frame semi-enclosed steel bridge diagram
  • Fig. 5 is a steel pipe double-hook joint, a sphere connection block and a double-hook joint diagram of a double-hook type manual butt steel frame;
  • Fig. 6 is a double-hook type manual butt steel skeleton well-shaped and single-pipe connection block and a double-hook joint diagram
  • Fig. 7 is a diagram of a single-insertion double-hook joint of a double-hook type manual butt steel frame and a side-rotating double-hook joint in a steel pipe.
  • the double-hook manual butt joint steel frame technology mainly consists of steel pipe 1, well-shaped connecting block 2, single-pipe connecting block 3, and sphere connecting block 4. Both ends of the steel pipe are double-hook joints 5; Corresponding to the double-hook joint of the steel pipe head is the double-hook joint; two double-hooks and a sleeve, known as "double-hook butt joint", the structural form and size standard of the two double-hooks are exactly the same, and the top is two relatively semicircular Double hooks, in the middle is a semi-circular square rod connected with a round rod. After the two double hooks are closed, they are completely sewn into a round rod.
  • the inner circle of the sleeve 6 is the same diameter as the outer circle of the round rod, and the sleeve is completely locked.
  • a threaded button 7 at the bottom of the double hook of each force point of each well-shaped, single-tube, and sphere connection block, corresponding to the inner threaded button 8 at the casing end, for fixing the casing, and there are gongs at both ends of the steel pipe
  • the screw 9 is another form of the fixed casing, and the two methods can be used singly or simultaneously; the spheroid connection block and the steel pipe are the core of the steel structure skeleton, therefore, the welding changes of a plurality of double hook joints on the spheroid connection block, There are 45°, 60°, and 90° layouts on the whole or half surface, which are designed according to the needs of the skeleton, and also determine the shape of the steel skeleton structure; the specifications of the steel pipes, the connection blocks such as well shapes, single pipes, and spheres are
  • Two gong wires 11 are installed at the bottom for fixing.
  • This single-plug double-hook joint especially during decoration, rooms or walls can be added according to the wishes of the homeowner, and rooms can be increased or decreased at any time.
  • the wall will be made by the homeowner at will;
  • the double-hook joint of the steel pipe has a rotating double-hook joint 25 on one side, which can also be welded on the corresponding joint. After the rotating double-hook joint, the strength of the steel pipe has not been reduced.
  • the summarized results can reduce the difficulty in production and processing, do not need to consider the direction of welding double hooks, and can be installed manually during installation, which is convenient and reliable.
  • Double-hook manual docking of steel structure components such as steel pipes and connecting blocks with steel frame technology
  • use manual docking "double-hook docking device” to connect all components, and complete various large, medium and small stadiums, buildings, halls, etc.
  • Traditional building products are, for example, housing. Building products combine all the upper and lower layers into a main body, and the force at one point is decomposed by the whole main body.
  • the gravity of this kind of building product can be said to be negligible to its own weight in the study of mechanics; thirdly, in view of the above Point, as long as the steel frame of this kind of building has a little impact, it will be resolved by the whole main body. For example, adding bulletproof glass and steel plate wall to the periphery of the building wall can also withstand the impact of man-made war; Fourth, assembly and dismantling
  • the steel frame of this kind of building is very simple and easy. This kind of assembly does not require mechanical equipment. As long as the personnel are manually arranged, as long as the manpower is properly arranged, ten to dozens of floors are installed a day, and a high-rise building is often erected overnight. Unloading is relatively simple, and the high-rise buildings here often disappear overnight. Unlike traditional building products, countless reinforced concrete is required for construction, and these waste reinforced concrete cannot disappear during dismantling.
  • the "fourth-generation housing" installed by the double-hook manual butt joint steel frame technology also includes various large, medium and small stadiums and halls:
  • the connecting blocks are connected, and then such steel pipe cubes are connected one by one, so that the triangle is firmly stabilized and the whole main body is incomparable.
  • the "fourth-generation housing" installed by the double-hook manual docking steel frame technology has no process of driving piles and burying beams in the construction.
  • the ground is covered with two or three floors connected by meters, each divided into triangular cubes, and the floor space between each floor of the house and the vertical walls every 20 to 60 meters are also used.
  • the ground is covered with triangular cubes, and the three-dimensional construction hoisting equipment on the construction site is integrated with the housing skeleton.
  • the hoisting equipment is installed while the steel structure housing skeleton is raised. After the skeleton is installed, the main body of the hanger becomes the elevator shaft.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A double-hook-type manually butt-jointed steel structure framework, which is mainly composed of steel tubes (1), well-shaped connecting blocks (2), single-tube connecting blocks (3) and sphere connecting blocks (4). The double-hook-type manually butt-jointed steel structure framework is characterized in that: there are double-hook joints (5) at two ends of the steel tube (1); each force application point of the well-shaped connecting block, the single-tube connecting block and the sphere connecting block is also a double-hook joint (5) corresponding to the double-hook joints (5) of the steel tube at the two ends; and two double-hook joints (5) and one sleeve (6) are referred to as a "double-hook butt-joint device", wherein the two pairs of double hooks are completely identical and consistent in terms of form and dimension standards, and same each have a pair of opposite semi-circular double hooks at the top end, and have, in the middle, a semi-circular square rod connected to a round bar; after being combined, the two pairs of double hooks fit completely flush with each other to constitute a round bar; and the diameter of an inner circle of the sleeve (6) is the same as that of an outer circle of the round bar, and the sleeve (6) completely matches the round bar in terms of shape and is tightly sleeved thereon.

Description

双钩式手动对接钢构骨架Double-hook manual docking steel frame 技术领域technical field
双钩式手动对接钢构骨架技术涉及钢构骨架,系指钢构骨架的钢管、连接块等钢构部件,用手动对接“双钩对接器”,将所有构件连接,而完成大、中、小型的各类体育场馆、楼堂馆所、房屋建筑的钢构骨架和各类塔吊、龙门吊、行吊,以及各类桥架钢构柱、梁架等等钢构骨架,因此而得名。The double-hook manual butt steel frame technology involves the steel frame, which refers to the steel structure components such as steel pipes and connecting blocks of the steel frame. The "double-hook butt joint" is used to connect all the components manually to complete large, medium and small. It is named for the steel skeletons of various sports venues, buildings, buildings, tower cranes, gantry cranes, row cranes, and various bridge steel columns and beams.
背景技术Background technique
我赞同清华大学建筑研究院认知的,我们的住房走到今天,已经历了“茅草房”、“砖瓦房”、“电梯房”三个时代;不过该研究院的“第四代住房”理念却给了我一个重大启示,如果有了新型建筑技术支撑,再加上国家的大力支持,这种新构想也一定是能够实现的。I agree with what Tsinghua University Institute of Architecture recognizes. Our housing has gone through three eras: "thatched house", "brick house" and "elevator house"; but the institute's "fourth generation housing" "The concept gave me a great inspiration. If there is a new type of construction technology support, coupled with the country's strong support, this new concept will definitely be realized.
我所设计的《三件套对接器》ZL200820192513.7、《双钩对接器》ZL200820192512.2,以及《三件套对接式模板》、《三件套对接式脚手架》和《双钩对接式脚手架》的专利号为ZL200920227956.X、ZL200920227957.4和ZL200920227958.9,并获得国家专利,是我这么多年来在建筑行业的总结;介绍的是在建筑施工中必须使用的周转材料的革新,在我向专业企业推荐这些技术时,遭到很多企业的反对,原因很简单,“按照这种技术生产的建筑周转材料将加大周转材料费用成本,而这种高精致的周转材料运用是——高射炮打蚊子——大才小用”;我找过很多塔吊生产厂家,也到过曾经参加北京鸟巢钢构施工单位,到过杭州几个大型钢构企业,同好多 技术人员和企业老总推荐和介绍这些脚手架的延伸运用技术,他们都认为“这可是一场钢结构行业和塔吊行业的行业革命呀!”而这样的技术命名“脚手架”就叫做——大头带着小官帽——名不付实,用这样专利名称是很难在本行业推广的,必须重新包装。The "Three-piece Butt Butt" ZL200820192513.7, "Double Hook Butt" ZL200820192512.2, and the "Three-piece Butt Butt Formwork", "Three-piece Butt Butt Scaffold" and "Double Hook Butt Butt Scaffold" that I designed The patent numbers are ZL200920227956.X, ZL200920227957.4 and ZL200920227958.9, and they have obtained national patents. This is my summary in the construction industry for so many years; it introduces the innovation of turnover materials that must be used in construction. When companies recommend these technologies, they are opposed by many companies. The reason is very simple, "The construction turnover materials produced according to this technology will increase the cost of turnover materials, and the use of this kind of high-precision turnover materials is - anti-aircraft guns to fight mosquitoes. ——Great talent, small use"; I have found many tower crane manufacturers, and I have also been to the steel structure construction unit that participated in the Beijing Bird's Nest, and to several large steel structure enterprises in Hangzhou. I recommended and introduced these scaffolds with many technicians and company bosses They all think that "this is an industry revolution in the steel structure industry and the tower crane industry!" And the name "scaffolding" of such a technology is called - a big head with a small official hat - not worthy of the name, It is difficult to promote in this industry with such a patent name, and it must be repackaged.
双钩式手动对接钢构骨架技术包括钢管两头和井形、单管、球体连接块接点与其相对应为双钩接头,其形式和尺寸一致,两个相对半圆形的双钩和半圆形方杆,合拢后合缝成圆棒,套管完全套牢,她并不是简单或重复《双钩对接式脚手架》技术,是在其技术上的发展和升华,与《双钩对接式脚手架》技术相比,将更优于其技术:一是,在其技术上对每个作力点上进行了加固,即:对接点上双钩接头与双钩接点,两个双钩的结构形式和尺寸标准完全相同一致,这两个双钩合拢后,完全合缝成圆棒形,套管的内圆与圆棒外圆的直径相同,套管完全套牢圆棒形双钩;二是,原连接块为井形和十字连接块,现增加为井形、单管、球体连接块,同时,井形、单管、球体连接块的作力点要根据骨架的需要来牢固焊接其数量和方向、角度;三是,由于双钩手动对接钢构骨架安装是从下到上,而拆卸时从上往下,层层安装、层层拆卸,本技术增加了单挿双钩接头和钢管中一边双钩旋转接头,有了增加了这些双钩接头后,装修时,可随房主意愿增加房间或墙壁,而且在任何时候增加或减少房间、墙壁,随意为之,特别是增加了在钢管中一边双钩旋转接头,也可焊接在对应的接头上,有了旋转的双钩接头后,并没有降低钢管强度,而且在生产加工中不必着意考虑焊接双钩方向,又可手动安装方便、可靠;四是,双钩式手动对接钢构骨架的施工建设安装不受任何环境和条件的影响,不管是高山、亦或是平原,不管是城市、亦或是农村,不管是地面、亦或是水面,而且施工楼层和面积随心所欲,可高可低、可大可小。The double-hook manual butt steel skeleton technology includes both ends of the steel pipe and the well-shaped, single-pipe, and spherical connection block joints. The corresponding double-hook joints have the same form and size. After seaming into a round rod, the casing is completely locked. It is not a simple or repeated "double-hook butt-joint scaffold" technology, but a development and sublimation of its technology. Compared with the "double-hook butt-joint scaffold" technology, it will be better. Because of its technology: First, each force point is reinforced in its technology, that is: the double hook joint and the double hook joint on the docking point, the structure form and size standard of the two double hooks are exactly the same, and the two double hooks are closed. Finally, it is completely seamed into a round rod shape, the inner circle of the casing is the same as the diameter of the outer circle of the round rod, and the casing is completely locked in the round rod-shaped double hooks; the second is that the original connecting block is a well-shaped and cross-shaped connecting block, which is now increased to a well-shaped , single tube, sphere connection block, at the same time, the number, direction, and angle of the force point of the well shape, single tube, and sphere connection block should be firmly welded according to the needs of the skeleton; When disassembling, it is installed and disassembled layer by layer from top to bottom. This technology adds a single-insert double-hook joint and a double-hook rotary joint in one side of the steel pipe. The owner wishes to increase rooms or walls, and increase or decrease rooms and walls at any time, do it at will, especially the addition of a double-hook swivel joint in the steel pipe, which can also be welded on the corresponding joint. After having a rotating double-hook joint , does not reduce the strength of the steel pipe, and it is not necessary to consider the direction of the welding double hook during production and processing, and it can be installed manually, which is convenient and reliable. Whether it is a mountain or a plain, whether it is a city or a country, whether it is the ground or the water, and the construction floor and area can be high or low, large or small.
发明内容Contents of the invention
双钩式手动对接钢构骨架技术运用在“第四代住房”上,作为这代住房的骨架:一是,整个建筑项目必须重新设计,必须得到建筑设计院的认可;二是,生产施工方不用任何机械设备,用手动安装就行,而这些建筑现场的立体施工的吊装设备与房屋骨架联为一体,边安吊装设备、边上升钢构住房骨架,骨架安装完毕,则房屋整体完成;三是,直接在房屋骨架上进行房屋总体装饰和分部装饰完成住房功能;四是,该住房用材彻底屏弃钢筋混凝土,而且也广泛了建房用材,将家具、衣柜等,一同装饰墙中等等。这样的建筑形式,将彻底改变建筑施工观念,彻底改变建筑施工方案,彻底改变建筑施工用料,彻底改变建筑施工工艺,从而彻底颠覆整个建筑行业,这种技术的运用将彻底告别钢筋混凝土的“电梯房时代”。The double-hook manual butt steel skeleton technology is used in the "fourth generation housing" as the skeleton of this generation of housing: first, the entire construction project must be redesigned and must be approved by the architectural design institute; second, the production and construction parties do not need to Any mechanical equipment can be installed manually, and the hoisting equipment of the three-dimensional construction on the construction site is integrated with the house skeleton, and the hoisting equipment is installed while the steel structure housing skeleton is raised. After the skeleton is installed, the house is completed as a whole; third, Carry out the overall house decoration and partial decoration directly on the house skeleton to complete the housing function; Fourth, the housing materials completely abandon reinforced concrete, and also widely use the building materials, such as furniture, wardrobes, etc., to decorate the walls and so on. Such a building form will completely change the concept of building construction, completely change the building construction plan, completely change the building construction materials, completely change the building construction technology, and thus completely subvert the entire construction industry. The application of this technology will completely bid farewell to the "reinforced concrete" Elevator Room Era".
双钩式手动对接钢构骨架技术还可以运用在大、中、小型各类的体育场馆、楼堂馆所的钢构骨架和各类塔吊、龙门吊、行吊,以及各类桥架钢构柱、梁架上,整个施工过程与住房施工一样:一是,整个施工项目必须重新设计,必须得到建筑设计院的认可;二是,生产施工方不用任何机械设备,用手动安装就行,而这些建筑现场的立体施工的吊装设备与骨架联为一体,边安吊装设备、边上升钢构骨架,骨架安装完毕,则整体安装完成;三是,接着对内部设施,如体育场馆、楼堂馆所进行总体装饰和分部装饰完成其功能等等。The double-hook manual butt steel skeleton technology can also be applied to the steel skeletons of large, medium and small stadiums and halls, various tower cranes, gantry cranes, row cranes, and various bridge steel columns and beams. On the shelf, the entire construction process is the same as that of housing construction: first, the entire construction project must be redesigned and must be approved by the architectural design institute; The hoisting equipment of the three-dimensional construction is integrated with the skeleton, and the hoisting equipment is installed while the steel skeleton is raised. After the skeleton is installed, the overall installation is completed; the third is to carry out overall decoration of the internal facilities, such as stadiums and halls And segment decoration fulfills its function and so on.
双钩式手动对接钢构骨架技术主要有钢管和井形、单管、球体连接块组成,钢管两头为双钩接头;井形、单管、球体连接块的每个作力点与钢管头的双钩接头相对应的也为双钩接头,根据需要这些连接块与钢管对接后组成各类不同的钢构骨架。以塔吊为例,塔吊柱主体由钢管和井形连接块组成;塔吊横梁则是由钢管和球体连接块组成,各构成塔吊需要的立 方体和三角体钢构骨架。塔吊柱主体和塔吊横梁,这种用三角形牢固性特点,将各形体分割成一个个三角形结构形式连接组成;这些相连的作力点就是各种连接块的双钩接头,比如在球体连接块是根据钢构骨架的要求,在有规律的分布角度上焊接双钩接头,由分布角度上焊接双钩接头球体连接块与钢管双钩接头对接后,由各形体分割成一个个三角体结构形式连接而成的在整体立方板块成为立体力学钢构骨架而强度威力无比。The double-hook manual butt steel frame technology mainly consists of steel pipes and well-shaped, single-pipe, and sphere connection blocks. The two ends of the steel pipes are double-hook joints; It is also a double-hook joint. According to the needs, these connecting blocks are connected with steel pipes to form various steel frameworks. Taking the tower crane as an example, the main body of the tower crane column is composed of steel pipes and well-shaped connecting blocks; the beam of the tower crane is composed of steel pipes and spherical connecting blocks, each of which constitutes the cubic and triangular steel framework required by the tower crane. The main body of the tower hanging column and the beam of the tower crane, which use the triangular firmness characteristics, divide each shape into a triangular structure and connect them; these connected force points are the double hook joints of various connecting blocks. According to the requirements of the structural skeleton, the double-hook joints are welded at regular distribution angles. After the sphere connection blocks of the double-hook joints are welded on the distribution angles and the steel pipe double-hook joints are docked, each shape is divided into triangles and connected in the form of a whole. The cubic plate becomes a three-dimensional mechanical steel framework with incomparable strength and power.
双钩式手动对接钢构骨架技术的各种零部件都是专业厂家在车间中完成,利用数控机床、洗床和专用模块,自动焊接机和机械手在生产流水线上完成,保证了管、块的精密制造,以保障钢构骨架牢固可靠,一点都不弱现场焊接力学强度;同时,在车间加工时能用多种工艺保证各管块的外部防锈措施,使手动对接后,安装成形一步到位,既减轻了工人的劳动强度,又加快工程进度;每个管、块部件都有各自用英文字母和阿拉伯数字组成的钢印条幅,包括规格、材质、壁厚、有无缝、承受力吨位、监制单位、生产厂家、批次和出厂日期等钢构骨架主要内容的国家和国际标准,使工人一拿到管块部件就能对接上手到位。The various parts of the double-hook manual butt joint steel frame technology are completed by professional manufacturers in the workshop. Using CNC machine tools, washing beds and special modules, automatic welding machines and manipulators are completed on the production line to ensure the precision of pipes and blocks. Manufactured to ensure that the steel frame is firm and reliable, and the mechanical strength of on-site welding is not weak at all; at the same time, various processes can be used to ensure the external rust prevention measures of each pipe block during processing in the workshop, so that after manual docking, the installation and forming can be completed in one step. It not only reduces the labor intensity of workers, but also speeds up the progress of the project; each pipe and block component has its own stamped banner composed of English letters and Arabic numerals, including specifications, materials, wall thickness, seamlessness, bearing tonnage, supervision The national and international standards for the main contents of the steel frame, such as unit, manufacturer, batch and date of manufacture, enable workers to connect the pipe block components in place as soon as they get them.
双钩式手动对接钢构骨架技术和《三件套式手动对接钢构骨架》、《单钩式手动对接钢构骨架》《二式手动对接钢构骨架》、《手动对接钢构骨架》的技术分别于2019年01月11日、03月11日、03月25日、04月04日报国家专利局的实用新型专利,专利号为2019203111629.6和201920050697.1、201920457410.7、201920457388.6、201920311629.6,都是运用《三件套对接器》、《单钩对接器》和《双钩对接器》技术,将所有构件连接,而完成大、中、小型的各类体育场馆、楼堂馆所、房屋建筑的钢构骨架和各类塔吊、龙门吊、行吊,以及各类桥架钢构柱、梁架等等钢构骨架;当今建筑业,凡属百层以上房屋的框架,考虑到钢筋砼的结构, 其重量不能为底层和基础所承受,一般都为钢构骨架;而我所介绍的这些技术之所以能够取代现场焊接形式是有她们理论根源的:我所介绍“三件套”、“双钩”和“单钩”是指这些受力接触面都超过了钢管管壁的截面积,就是说,钢管管壁的截面积都小于同等园棒的截面积,也小于同等园棒截面积的1/4,而这些技术的“双钩”和“单钩”是用同等园棒制作而成,每部分受力截面积是1/3,因此,远远大于钢管管壁的截面积,这是其一;其二,“三件套”、“单钩”和“双钩”的原材料都为高碳钢,这是所有钢管材料无法比拟的;其三,巧妙地运用了钢管护套,它既保护了连接点又方便了装卸,使所有加力只能顺钢管护套而为之,因此,这些手动对接的钢构骨架,理论上是优于现场焊接的力学强度的,从而保障了建筑房屋的功能;三件套式手动对接钢构骨架技术以及《单钩式手动对接钢构骨架》和《双钩式手动对接钢构骨架》、《手动对接钢构骨架》、《二式手动对接钢构骨架》一样,这些技术构思胆大、工艺奇特、设计独到、生产精密、施工简洁、装御方便,都是建筑史上的难得佳作。Double-hook manual butt steel skeleton technology and "three-piece manual butt steel skeleton", "single-hook manual butt steel skeleton", "two-type manual butt steel skeleton", "manual butt steel skeleton" technology The utility model patents of the National Patent Office were reported on January 11, March 11, March 25, and April 4, 2019 respectively. The patent numbers are 2019203111629.6 and 201920050697.1, 201920457410.7, 201920457388.6, and 201920311629.6. Butt jointer", "single hook butt joint" and "double hook butt joint" technology, connect all the components, and complete the large, medium and small various stadiums, halls, building steel skeletons and various Tower cranes, gantry cranes, row cranes, and various types of bridge steel columns, beam frames and other steel skeletons; in today's construction industry, the frame of a building with more than 100 floors, considering the structure of reinforced concrete, its weight cannot be the same as that of the ground floor and The foundation is generally supported by a steel frame; and the reason why these technologies I introduced can replace the on-site welding form has their theoretical roots: the "three-piece set", "double hook" and "single hook" I introduced are It means that these force-bearing contact surfaces exceed the cross-sectional area of the steel pipe wall, that is to say, the cross-sectional area of the steel pipe wall is smaller than the cross-sectional area of the same round rod, and it is also less than 1/4 of the same round rod cross-sectional area. "Double hook" and "single hook" are made of the same garden rod, and the cross-sectional area of each part is 1/3. Therefore, it is far larger than the cross-sectional area of the steel pipe wall. This is the first; "Piece set", "single hook" and "double hook" are all made of high carbon steel, which is unmatched by all steel pipe materials; thirdly, the steel pipe sheath is cleverly used, which not only protects the connection point but also facilitates loading and unloading , so that all the added force can only be done along the sheath of the steel pipe. Therefore, these manually-joined steel skeletons are theoretically superior to the mechanical strength of on-site welding, thus ensuring the function of building houses; three-piece manual Butt steel frame technology is the same as "Single-hook Manual Butt Steel Frame" and "Double-Hook Manual Butt Steel Frame", "Manual Butt Steel Frame" and "Two-type Manual Butt Steel Frame". Large, unique craftsmanship, unique design, precise production, simple construction, and convenient decoration are all rare masterpieces in the history of architecture.
双钩式手动对接钢构骨架技术的运用将会做到“四省”,即:施工工期省、施工用料省、施工设备省、用工人员省;同时,做到“四优”,即:施工质量优、项目精度优、骨架牢固优、使用寿命优;以北京鸟巢为例:鸟巢2003年12月24日开工建设,2008年3月完工,当年总造价22.67亿元,按现比价可能突破百亿元;如果用双钩式手动对接钢构骨架技术建设北京的鸟巢工程,就会节省在现场施工大量的焊结工程,节省大量的人力、财力、物力,还节省工程时间,从估算人力、财务、机械设备等各种费用都只占百分之十,还节省工程时间,可能只需一年就能建成。The application of double-hook manual butt joint steel frame technology will achieve "four provinces", namely: construction period saving, construction material saving, construction equipment saving, and labor saving; at the same time, it will achieve "four excellent", namely: construction Excellent quality, excellent project accuracy, solid skeleton, and excellent service life; take the Beijing Bird's Nest as an example: the Bird's Nest started construction on December 24, 2003 and was completed in March 2008. If the double-hook type manual butt joint steel frame technology is used to construct Beijing's Bird's Nest project, it will save a lot of welding projects on site, save a lot of manpower, financial resources, and material resources, and also save engineering time. From estimating manpower and financial Various costs such as equipment, machinery and equipment only account for 10%, and it also saves engineering time, and it may only take one year to complete.
附图说明Description of drawings
图1是双钩式手动对接钢构骨架第四代住房——概念构想模块房钢构骨架图;Figure 1 is the steel skeleton diagram of the fourth-generation housing with double-hook manual docking steel skeleton—the conceptual conception module house;
图2是双钩式手动对接钢构骨架大型体育场——概念构想鸟巢钢构骨架图;Figure 2 is a large-scale stadium with a double-hook manual docking steel structure skeleton—a conceptual conception of the steel structure skeleton of the Bird's Nest;
图3是双钩式手动对接钢构骨架概念构想塔吊图;Figure 3 is a tower crane diagram of the conceptual conception of the double-hook type manual docking steel frame;
图4是双钩式手动对接钢构骨架半封闭式概念构想空天钢架桥图;Figure 4 is a semi-enclosed conceptual conception of a double-hook type manual butt joint steel frame semi-enclosed steel bridge diagram;
图5是双钩式手动对接钢构骨架的钢管双钩接头和球体连接块及双钩接头图;Fig. 5 is a steel pipe double-hook joint, a sphere connection block and a double-hook joint diagram of a double-hook type manual butt steel frame;
图6是双钩式手动对接钢构骨架井形和单管连接块及双钩接头图;Fig. 6 is a double-hook type manual butt steel skeleton well-shaped and single-pipe connection block and a double-hook joint diagram;
图7是双钩式手动对接钢构骨架的单挿双钩接头和钢管中一边旋转双钩接头图。Fig. 7 is a diagram of a single-insertion double-hook joint of a double-hook type manual butt steel frame and a side-rotating double-hook joint in a steel pipe.
具体实施方式detailed description
双钩式手动对接钢构骨架技术主要有钢管1和井形连接块2、单管连接块3、球体连接块4组成,钢管两头为双钩接头5;井形、单管、球体连接块的每个作力点与钢管头的双钩接头相对应的为双钩接头;两个双钩和一个套管,号称“双钩对接器”,两个双钩的结构形式和尺寸标准完全相同一致,顶端是两个相对半圆形的双钩,中间是一个半圆形方杆与圆棒连在一起,这两个双钩合拢后,完全合缝成圆棒,套管6的内圆与圆棒外圆的直径相同,套管完全套牢圆棒形状,在每个井形、单管、球体连接块的每个作力点的双钩底部都有丝扣7,对应套管端内丝扣8,为固定套管用,还有在钢管两头设计锣丝钉9,为固定套管的另一个形式,两种方式可单一或同时使用;球体连接块和钢管是本钢构骨架的核心,因此,在球体连接块上的多 个双钩接头焊接变化,有全面或者半面的45°、60°、90°排布,因骨架之需而设,也决定钢构骨架结构钢构骨架形状;钢管的规格,井形、单管、球体等连接块都是结合实际运用中总结出来的形状,比如,单管连接块用在层与层之间半米层时,将不足半米的短钢管两头以球体连接块焊死在短管上;井形、单管、球体等连接块安装,井形连接块多用于钢构骨架的柱子、塔吊主体和电梯内井等部位,焊成井形连接块后使钢构骨架更加牢固;本技术还设计了一种单挿双钩接头10,在其底部安装了两个锣丝11,为固定用,有了这个单挿双钩接头后,特别是装修时,可随房主意愿增加房间或墙壁,而且在任何时候增加或减少房间、墙壁,将由房主随意为之;钢管的双钩接头一边有旋转的双钩接头25,也可焊接在对应的接头上,有了旋转的双钩接头后,并没有降低钢管强度,这种设计是由实践总结的结果,能降低在生产加工中的难度,不必着意考虑焊接双钩方向,在安装时又可手动安装方便、可靠。The double-hook manual butt joint steel frame technology mainly consists of steel pipe 1, well-shaped connecting block 2, single-pipe connecting block 3, and sphere connecting block 4. Both ends of the steel pipe are double-hook joints 5; Corresponding to the double-hook joint of the steel pipe head is the double-hook joint; two double-hooks and a sleeve, known as "double-hook butt joint", the structural form and size standard of the two double-hooks are exactly the same, and the top is two relatively semicircular Double hooks, in the middle is a semi-circular square rod connected with a round rod. After the two double hooks are closed, they are completely sewn into a round rod. The inner circle of the sleeve 6 is the same diameter as the outer circle of the round rod, and the sleeve is completely locked. In the shape of a round rod, there is a threaded button 7 at the bottom of the double hook of each force point of each well-shaped, single-tube, and sphere connection block, corresponding to the inner threaded button 8 at the casing end, for fixing the casing, and there are gongs at both ends of the steel pipe The screw 9 is another form of the fixed casing, and the two methods can be used singly or simultaneously; the spheroid connection block and the steel pipe are the core of the steel structure skeleton, therefore, the welding changes of a plurality of double hook joints on the spheroid connection block, There are 45°, 60°, and 90° layouts on the whole or half surface, which are designed according to the needs of the skeleton, and also determine the shape of the steel skeleton structure; the specifications of the steel pipes, the connection blocks such as well shapes, single pipes, and spheres are all combined The shape summarized in practical application, for example, when the single pipe connection block is used in the half-meter layer between the layers, the two ends of the short steel pipe less than half a meter are welded to the short pipe with spherical connection blocks; the well shape, single pipe, Installation of connection blocks such as spheres, and well-shaped connection blocks are mostly used in the columns of the steel frame, the main body of the tower crane, and the inner shaft of the elevator. 10. Two gong wires 11 are installed at the bottom for fixing. With this single-plug double-hook joint, especially during decoration, rooms or walls can be added according to the wishes of the homeowner, and rooms can be increased or decreased at any time. The wall will be made by the homeowner at will; the double-hook joint of the steel pipe has a rotating double-hook joint 25 on one side, which can also be welded on the corresponding joint. After the rotating double-hook joint, the strength of the steel pipe has not been reduced. The summarized results can reduce the difficulty in production and processing, do not need to consider the direction of welding double hooks, and can be installed manually during installation, which is convenient and reliable.
双钩式手动对接钢构骨架技术的钢管、连接块等钢构部件,用手动对接“双钩对接器”,将所有构件连接,而完成大、中、小型的各类体育场馆、楼堂馆所、房屋建筑的钢构骨架和各类塔吊、龙门吊、行吊,以及各类桥架钢构柱、梁架等等钢构骨架:一是,彻底打破了传统的建筑观念、建筑工艺、施工程序和工程用材;二是,已经不能按传统观念来看待这些建筑产品,传统建筑产品为,比如住房,下层住房要承受上层建筑包括该层所有人和物的重力,而由双钩式手动对接钢构骨架的建筑产品将上上下下所有的层面结构成一个主体,一点的受力被整个主体分解,这种建筑产品受到的重力,在力学研究中可以说对自身的重量可以忽略不计;三是,鉴于上点,这种建筑的钢构骨架只要冲击一点,都会被整个主体所化解,比如在建筑墙体外围加装防弹玻璃和钢板墙,也可以抵卸人为的战争冲击; 四是,装配和撤卸这种建筑的钢构骨架都非常简单和容易,这种装配无需机械设备,只要人员手动,只要人力安排得当,一天安装十层到几十层,往往一夜之间竖起了座高楼大厦,撤卸更比较简单,又往往一夜之间此地的高楼大厦不复存在,不象传统的建筑产品,建筑时需要无数钢筋混凝土,而撤卸时这些废钢筋混凝土没有办法消失。Double-hook manual docking of steel structure components such as steel pipes and connecting blocks with steel frame technology, use manual docking "double-hook docking device" to connect all components, and complete various large, medium and small stadiums, buildings, halls, etc. The steel frame of the building and various types of tower cranes, gantry cranes, mobile cranes, and steel frames of various types of bridge steel columns, beam frames, etc.: First, it completely breaks the traditional architectural concept, construction technology, construction procedures and engineering materials; secondly, it is no longer possible to look at these building products according to traditional concepts. Traditional building products are, for example, housing. Building products combine all the upper and lower layers into a main body, and the force at one point is decomposed by the whole main body. The gravity of this kind of building product can be said to be negligible to its own weight in the study of mechanics; thirdly, in view of the above Point, as long as the steel frame of this kind of building has a little impact, it will be resolved by the whole main body. For example, adding bulletproof glass and steel plate wall to the periphery of the building wall can also withstand the impact of man-made war; Fourth, assembly and dismantling The steel frame of this kind of building is very simple and easy. This kind of assembly does not require mechanical equipment. As long as the personnel are manually arranged, as long as the manpower is properly arranged, ten to dozens of floors are installed a day, and a high-rise building is often erected overnight. Unloading is relatively simple, and the high-rise buildings here often disappear overnight. Unlike traditional building products, countless reinforced concrete is required for construction, and these waste reinforced concrete cannot disappear during dismantling.
双钩式手动对接钢构骨架技术安装出来的“第四代住房”,也包括各类大、中、小型体育场馆和楼堂馆所:首先,从设计时就改变了传统观念,它将结构的整体用钢管的网状分解,比如以立方体为例,把钢筋砼立方体由十二根钢管与球体连接块相连,再在将六个面的对角加六根和中间斜对角加根钢管与球体连接块相连,再将这样一个个的钢管立方体相连,就将三角形的牢固稳定了整个主体,这个主体的重量与钢筋砼的重量是没得比,而上体对下体的重压也是没得比;其二,从施工方面来说,由于本体的重量可以忽略不计,所以也没有打地桩,埋地粱这道工序了;其三,原来的房屋是由上对下的重力传递——当然也有下对上的传递,由于重力的传递远远大于下对上的传递,就无法体会——而这种新型技术运用后,自重体重大大降低后,这种下对上的力的传递就显现出来,用另一种语言表述,就是说当有巨大的力在这个主体某一点施为时,这个力就被分解到每个着力点了。The "fourth-generation housing" installed by the double-hook manual butt joint steel frame technology also includes various large, medium and small stadiums and halls: First, the traditional concept has been changed from the design, and the structural The network decomposition of steel pipes is used as a whole. For example, taking a cube as an example, connect the reinforced concrete cube with twelve steel pipes and sphere connecting blocks, and then add six steel pipes to the diagonal corners of the six faces and one steel pipe to the sphere diagonally in the middle. The connecting blocks are connected, and then such steel pipe cubes are connected one by one, so that the triangle is firmly stabilized and the whole main body is incomparable. Second, in terms of construction, since the weight of the main body can be ignored, there is no process of driving piles and burying beams in the ground; third, the original house is transmitted by gravity from top to bottom—of course There is also the transmission from the bottom to the top, because the transmission of gravity is much greater than the transmission from the bottom to the top, so it is impossible to understand - and after the application of this new technology, after the self-weight is greatly reduced, this kind of force transmission from the bottom to the top will appear To express it in another language, that is to say, when there is a huge force acting on a certain point of the subject, this force is decomposed into each point of force.
双钩式手动对接钢构骨架技术安装出来的“第四代住房”,在施工由于没有打地桩,埋地粱这道工序,“万丈高楼平地起”,所以钢构骨架在地面时,平衡地平,在地面上铺满两、三层以米为单位连接的一个个分成三角体立方体的基础上连接,住房的每层间楼隔和每隔二十米到六十米的竖墙也都用这种地面满铺三角体立方体形式,这些建筑现场的立体施工的吊装设备与房屋骨架联为一体,边安吊装设备、边上升钢构住房骨架, 骨架安装完毕,而吊架主体成为电梯竖井,房屋整体完成,则前期施工完成;第二步则是房屋的装修装饰,这个步骤在现在是购房者负责,如果是这样的话,购房者购得的是这个“第四代住房”钢构骨架的是个空间,那么,按购房价格,只是“电梯房”的几十分之一,也就是说,买“电梯房”一个平方,而买“第四代住房”钢构骨架这个空间将可买几十个平方;房屋的装修装饰,所有的地板、墙壁、楼梯和家具都可以作为“模块”安装,比如地板和墙壁内层用泡沫填充,既可以隔音又可以保暖,同时,由于内部空间巨大,个人也买得起,将公路和停车点设置在每层每家的门口成为可能,因此,我将“第四代住房”命名为“模块房”。The "fourth-generation housing" installed by the double-hook manual docking steel frame technology has no process of driving piles and burying beams in the construction. , the ground is covered with two or three floors connected by meters, each divided into triangular cubes, and the floor space between each floor of the house and the vertical walls every 20 to 60 meters are also used. The ground is covered with triangular cubes, and the three-dimensional construction hoisting equipment on the construction site is integrated with the housing skeleton. The hoisting equipment is installed while the steel structure housing skeleton is raised. After the skeleton is installed, the main body of the hanger becomes the elevator shaft. When the house is completed as a whole, the preliminary construction is completed; the second step is the decoration and decoration of the house. This step is now the responsibility of the buyer. If this is the case, what the buyer buys is the "fourth generation housing" It is a space, so, according to the purchase price, it is only a few tenths of the "elevator room". Ten square meters; for the decoration of the house, all the floors, walls, stairs and furniture can be installed as "modules". Individuals can also afford it, and it is possible to set roads and parking spots at the door of each floor and each house. Therefore, I named the "fourth generation housing" "modular housing".
人类是群居生物,当今社会将人口越增加,社会越发展,城市人口越大,体现这个国家越现代化;地球赖以生存的地面,由于人口的不断增长,只得向空中发展,因此,一座座高楼大厦比肩,一个更比一个高;“第四代住房”的“模块房”将会超越所有的“电梯房”,比如,将“模块房”做成“金字塔”形状,那么,“模块房”不只会是一百多层,而是几百层,甚至上千层,而且,也不必去考虑它会倾倒。Human beings live in groups. In today's society, the more the population increases, the more the society develops, and the larger the urban population, the more modern the country is. The buildings are shoulder to shoulder, one taller than the other; the "modular house" of the "fourth generation housing" will surpass all "elevator rooms", for example, if the "modular house" is made into a "pyramid" shape, then the "modular house" Not just one hundred layers, but hundreds, even thousands of layers, and there is no need to think about it falling over.

Claims (6)

  1. 双钩式手动对接钢构骨架主要有钢管和井形连接块、单管连接块、球体连接块组成,其特征在于:钢管两头为双钩接头,井形、单管、球体连接块的每个作力点与钢管头的双钩接头相对应的也为双钩接头,这两个双钩和一个套管,号称“双钩对接器”的两个双钩结构形式和尺寸标准完全相同一致,顶端是两个相对半圆形的双钩,中间是一个半圆形方杆与圆棒连在一起,这两个双钩合拢后,完全合缝成圆棒,套管的内圆与圆棒外圆的直径相同,套管完全套牢圆棒形状。The double-hook manual butt joint steel frame is mainly composed of steel pipes and well-shaped connecting blocks, single-pipe connecting blocks, and sphere connecting blocks. The corresponding double-hook joint of the head is also a double-hook joint. These two double-hooks and a sleeve, the two double-hook structure forms and size standards of the so-called "double-hook butt joint" are exactly the same, and the top is two relatively semi-circular double hooks. , in the middle is a semi-circular square rod connected with a round rod. After the two double hooks are closed, they are completely sewn into a round rod. The inner circle of the sleeve is the same diameter as the outer circle of the round rod, and the sleeve is completely locked on the round rod. shape.
  2. 根据权利要求1所述的双钩式手动对接钢构骨架,其特征在于:球体连接块和钢管是本钢构骨架的核心,因此,在球体连接块上的多个双钩接头焊接变化,有全面或者半面的45°、60°、90°排布,因骨架之需而设,也决定钢构骨架结构钢构骨架形状。The double-hook type manual butt steel frame according to claim 1 is characterized in that: the spherical connecting block and the steel pipe are the core of the steel frame, therefore, the welding changes of multiple double-hook joints on the spherical connecting block can be comprehensive or The 45°, 60°, and 90° arrangement of the half surface is set according to the needs of the skeleton, and also determines the shape of the steel skeleton of the steel skeleton structure.
  3. 根据权利要求1所述的双钩式手动对接钢构骨架,其特征在于:钢管两头的双钩接点与以井形、单管、球体等连接块以双钩接头这两个双钩合拢后,完全合缝成圆棒形,套管的内圆与圆棒外圆的直径相同,套管完全套牢圆棒形状,在每个井形、单管、球体连接块的每个作力点的双钩底部都有丝扣,对应套管端内丝扣,为固定套管用,还有在钢管两头设计锣丝钉,为固定套管的另一个形式,两种方式可单一或同时使用。According to claim 1, the double-hook type manual butt joint steel frame is characterized in that: after the double-hook joints at both ends of the steel pipe are connected with the well-shaped, single-pipe, sphere and other connecting blocks with double-hook joints, the two double-hooks are completely seamed into a circle Rod shape, the diameter of the inner circle of the casing is the same as the diameter of the outer circle of the round rod, the casing is completely locked into the shape of the round rod, and there are threads at the bottom of the double hooks at each force point of each well-shaped, single-tube, and sphere connection block, corresponding to The inner screw at the end of the casing is used to fix the casing, and the two ends of the steel pipe are designed with gongs and screws, which is another form of fixing the casing. The two methods can be used singly or at the same time.
  4. 根据权利要求1所述的双钩式手动对接钢构骨架,其特征在于:钢构骨架钢管的规格,井形、单管、球体等连接块都是结合实际运用中总结出来的形状,比如,单管连接块用在层与层之间半米层时,将不足半米的短钢管两头以球体连接块焊死在短管上。According to claim 1, the double-hook type manual butt-joint steel frame is characterized in that: the specifications of the steel frame steel pipes, the connection blocks such as well shape, single pipe, and sphere are all shapes summarized in actual use, such as single pipe When the connection block is used in the half-meter layer between the layers, the two ends of the short steel pipe less than half a meter are welded to the short pipe with the spherical connection block.
  5. 根据权利要求1所述的双钩式手动对接钢构骨架,其特征在于:井形、单管、球体等连接块安装,井形连接块多用于钢构骨架的柱子、塔吊主体和电梯内井等部位,焊成井形连接块后使钢构骨架更加牢固。According to claim 1, the double-hook type manual docking steel frame is characterized in that: well-shaped, single-pipe, sphere and other connecting blocks are installed, and the well-shaped connecting blocks are mostly used for the columns of the steel frame, the main body of the tower crane, and the inner shaft of the elevator. After being welded into a well-shaped connection block, the steel frame is more solid.
  6. 根据权利要求1、2、3、4、5所述的双钩式手动对接钢构骨架其特征在于:本技术还设计了一种单揷双钩接头,在其底部安装了为固定用的锣丝,有了这个单揷双钩接头后,特别是装修时,可随房主意愿增加房间或墙壁,而且在任何时候增加或减少房间、墙壁,将由房主随意为之,钢管的双钩接头一边有旋转的双钩接头,也可焊接在对应的接头上,有了旋转的双钩接头后,并没有降低钢管强度,这种设计是由实践总结的结果,能降低在生产加工中的难度,不必着意考虑焊接双钩方向,在安装时又可手动安装方便、可靠。According to claims 1, 2, 3, 4, and 5, the double-hook manual butt joint steel frame is characterized in that: this technology also designs a single-hook double-hook joint, and a gong wire for fixing is installed at the bottom of the joint. With this single-hook double-hook joint, especially during decoration, rooms or walls can be added according to the wishes of the homeowner, and the addition or reduction of rooms and walls at any time will be done by the homeowner at will. The double-hook joint of the steel pipe has a rotating The double-hook joint can also be welded on the corresponding joint. With the rotating double-hook joint, the strength of the steel pipe is not reduced. This design is the result of practical summary, which can reduce the difficulty in production and processing, and there is no need to consider welding the double-hook direction, and can be installed manually during installation, which is convenient and reliable.
PCT/CN2021/000120 2021-06-15 2021-06-15 Double-hook-type manually butt-jointed steel structure framework WO2022261795A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2021/000120 WO2022261795A1 (en) 2021-06-15 2021-06-15 Double-hook-type manually butt-jointed steel structure framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2021/000120 WO2022261795A1 (en) 2021-06-15 2021-06-15 Double-hook-type manually butt-jointed steel structure framework

Publications (1)

Publication Number Publication Date
WO2022261795A1 true WO2022261795A1 (en) 2022-12-22

Family

ID=84526788

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/000120 WO2022261795A1 (en) 2021-06-15 2021-06-15 Double-hook-type manually butt-jointed steel structure framework

Country Status (1)

Country Link
WO (1) WO2022261795A1 (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0292254A2 (en) * 1987-05-19 1988-11-23 Astro Aerospace Corporation Erectable structure truss attachment joint
EP0292415A1 (en) * 1987-05-18 1988-11-23 Jean René David Device for connecting tubes forming a scaffold for plates
US6887009B1 (en) * 2002-10-01 2005-05-03 Conservatek Industries, Inc. Cylindrical joint and reticulated frame structure
CN101479485A (en) * 2006-07-27 2009-07-08 矢崎化工株式会社 Pipe joint
CN201372986Y (en) * 2008-11-18 2009-12-30 马克双 Double hook butting connector
CN201495760U (en) * 2009-09-09 2010-06-02 马克双 Double-hook butting scaffold
CN213329404U (en) * 2020-06-30 2021-06-01 浙江精工钢结构集团有限公司 Reinforcing structure for outer-wrapped taper pipe of welding ball joint
CN113073734A (en) * 2020-01-05 2021-07-06 马克双 Double-hook type manual butt-joint steel framework
CN113494130A (en) * 2020-04-08 2021-10-12 马克双 Manual butt joint steel structure framework

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0292415A1 (en) * 1987-05-18 1988-11-23 Jean René David Device for connecting tubes forming a scaffold for plates
EP0292254A2 (en) * 1987-05-19 1988-11-23 Astro Aerospace Corporation Erectable structure truss attachment joint
US6887009B1 (en) * 2002-10-01 2005-05-03 Conservatek Industries, Inc. Cylindrical joint and reticulated frame structure
CN101479485A (en) * 2006-07-27 2009-07-08 矢崎化工株式会社 Pipe joint
CN201372986Y (en) * 2008-11-18 2009-12-30 马克双 Double hook butting connector
CN201495760U (en) * 2009-09-09 2010-06-02 马克双 Double-hook butting scaffold
CN113073734A (en) * 2020-01-05 2021-07-06 马克双 Double-hook type manual butt-joint steel framework
CN113494130A (en) * 2020-04-08 2021-10-12 马克双 Manual butt joint steel structure framework
CN213329404U (en) * 2020-06-30 2021-06-01 浙江精工钢结构集团有限公司 Reinforcing structure for outer-wrapped taper pipe of welding ball joint

Similar Documents

Publication Publication Date Title
Ferdous et al. New advancements, challenges and opportunities of multi-storey modular buildings–A state-of-the-art review
CN113494130A (en) Manual butt joint steel structure framework
CN113494131A (en) Two-type manual butt joint steel framework
Kuzman et al. A new era for multi-storey timber buildings in Europe
US20120131875A1 (en) Novel low-rise prefabricated steel structure house system
JP3168555B2 (en) Dome construction method
CN103243806B (en) Grid structure based on spherical polyhedron
CN107152084B (en) A kind of lifting self-forming GFRP latticed shell structure and its construction method
WO2022261795A1 (en) Double-hook-type manually butt-jointed steel structure framework
Gong et al. A Review of Key Technologies Development of Super High‐Rise Building Construction in China
Na et al. Additive manufacturing (3D Printing)-applied construction: Smart node system for an irregular building façade
CN205591351U (en) Use spherical building of membrane steel construction as main part
WO2022261797A1 (en) Single-hook type manual butt joint steel structure frame
WO2022261796A1 (en) Dual-type manual coupling steel frame
WO2022261794A1 (en) Manual butt-joint steel skeleton
WO2022261798A1 (en) Three-piece set-type manual butt-joint steel skeleton
CN113073735A (en) Three-piece set type manual butt joint steel framework
CN113073734A (en) Double-hook type manual butt-joint steel framework
CN114837483B (en) High-low span portal steel frame building structure and construction process thereof
CN112627587A (en) Large-span building wavy line roof steel truss mounting structure
Buzalo et al. Energy efficient building structures based on gridshell
CN215760665U (en) Large-span building wavy line roof steel truss mounting structure
CN210622082U (en) Steel construction keel frame for house furred ceiling
CN105604184A (en) Spherical-surface single-storey-building reticulated shell
CN201339333Y (en) Tower-type suspension house building

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21945393

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21945393

Country of ref document: EP

Kind code of ref document: A1