WO2022261794A1 - Manual butt-joint steel skeleton - Google Patents
Manual butt-joint steel skeleton Download PDFInfo
- Publication number
- WO2022261794A1 WO2022261794A1 PCT/CN2021/000119 CN2021000119W WO2022261794A1 WO 2022261794 A1 WO2022261794 A1 WO 2022261794A1 CN 2021000119 W CN2021000119 W CN 2021000119W WO 2022261794 A1 WO2022261794 A1 WO 2022261794A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- steel
- joint
- double
- hook
- pipe
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 227
- 239000010959 steel Substances 0.000 title claims abstract description 227
- 210000001503 joint Anatomy 0.000 claims abstract description 72
- 238000005516 engineering process Methods 0.000 claims description 63
- 238000009434 installation Methods 0.000 claims description 16
- 238000003032 molecular docking Methods 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 13
- 238000003466 welding Methods 0.000 claims description 12
- 238000004519 manufacturing process Methods 0.000 claims description 11
- 238000013461 design Methods 0.000 claims description 8
- 238000012545 processing Methods 0.000 claims description 8
- 238000007789 sealing Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 34
- 239000000463 material Substances 0.000 abstract description 11
- 238000010586 diagram Methods 0.000 description 9
- 239000011150 reinforced concrete Substances 0.000 description 7
- 244000000626 Daucus carota Species 0.000 description 6
- 235000005770 birds nest Nutrition 0.000 description 6
- 238000005034 decoration Methods 0.000 description 6
- 235000005765 wild carrot Nutrition 0.000 description 6
- 230000008859 change Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 230000007306 turnover Effects 0.000 description 4
- 238000009435 building construction Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000005484 gravity Effects 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 238000000859 sublimation Methods 0.000 description 3
- 230000008022 sublimation Effects 0.000 description 3
- 239000011449 brick Substances 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000005406 washing Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241000255925 Diptera Species 0.000 description 1
- 229910000677 High-carbon steel Inorganic materials 0.000 description 1
- 241000282412 Homo Species 0.000 description 1
- 241000282414 Homo sapiens Species 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 244000309466 calf Species 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/19—Three-dimensional framework structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/58—Connections for building structures in general of bar-shaped building elements
Definitions
- the manual butt joint steel frame technology involves the steel frame, which refers to the steel structure components such as steel pipes and connecting blocks of the steel frame. Perfect combination, use manual docking of "three-piece butt joint” and “double hook butt joint” to connect all components, and complete the steel framework and All kinds of tower cranes, gantry cranes, mobile cranes, and various bridge steel columns, beam frames and other steel skeletons, hence the name.
- the "Three-piece Manual Butt-joint Steel Skeleton” technology is an upgraded version of "Three-piece Butt-joint Scaffolding". I reported it to the National Patent Office on January 11, 2019.
- the technology of "Constructing the Skeleton” is not simple or repeating the technology of "Three-piece Butt-joint Scaffolding", but the development and sublimation of its technology. Compared with the technology of "Three-piece Butt-joint Scaffolding", it will be better than its technology: Including the female joints at both ends of the steel pipe, each force point of the well-shaped, single pipe, and spherical connection block corresponds to the female joint of the steel pipe head as a male joint.
- the inner wall of the casing and the outer wall of the male joint and the steel pipe wall are called " Three-piece set", connect all the components by manual docking, and complete the steel structure skeleton of the stadium, building hall, house building, tower crane, gantry crane, row crane, various bridge steel columns, beam frames, etc. Skeleton, she is not simple or repeating the "three-piece butt-joint scaffolding" technology, it is the development and sublimation of its technology.
- each force point has been reinforced technically, that is: the male joint and the female joint on the docking point, the original technology has only one ring of bearing balls, and now it is designed to be three or more rings of bearing balls; the second is, The original connecting blocks are well-shaped and cross-shaped connecting blocks, which are now added as well-shaped, single-tube, and sphere connecting blocks. At the same time, the number, direction and angle of the force points of the well-shaped, single-tube, and sphere connecting blocks should be firmly welded according to the needs of the skeleton; The third is to use the female joints at both ends of the steel pipe and the connecting blocks such as wells, single pipes, and spheres, and the two sealing surfaces of the male joints as vertebral bodies.
- the technology of "Double-hook Manual Butt-joint Steel Framework” is an upgraded version of "Double-Hook Butt-joint Scaffold". I reported it to the National Patent Office on March 11, 2019.
- the patent number is 201920311629.6.
- the technology of double-hook manual butt joint steel framework includes both ends of steel pipes.
- the joints of the well-shaped, single-pipe, and spherical connecting blocks correspond to double-hook joints, which have the same form and size.
- Two relatively semi-circular double hooks and semi-circular square rods are stitched together to form a round rod after being closed, and the casing is completely locked.
- the number, direction, and angle of the force point of the single tube and sphere connection block should be welded firmly according to the needs of the skeleton; third, because the double-hook manual butt joint steel frame is installed from bottom to top, and when disassembled from top to bottom, Layer-by-layer installation and layer-by-layer dismantling, this technology adds a single-insert double-hook joint and a double-hook rotary joint in one side of the steel pipe. Add or reduce rooms and walls at will, especially the addition of a double-hook rotary joint in the steel pipe, which can also be welded on the corresponding joint.
- the strength of the steel pipe is not reduced, and the production and processing There is no need to pay attention to the direction of the welding double hooks, and it can be installed manually, which is convenient and reliable;
- the construction and installation of the manual docking steel frame is not affected by any environment and conditions, whether it is a mountain or a plain, whether it is a city, Or in the countryside, whether it is the ground or the water, and the construction floor and area can be arbitrary, high or low, large or small.
- the two technologies "Three-piece Manual Butt Steel Frame” and "Double-Hook Manual Butt Steel Frame” are major inventions in the history of architecture. Just like humans invented the piano and violin, they can be played alone or in ensembles. Moreover, the ensemble will make people enjoy greater music enjoyment, and when these two technologies are combined, it will be like a symphony of percussion, wind and string ensembles, which will be played throughout China and around the world in the construction industry .
- the manual butt steel frame technology is a perfect combination of the "three-piece manual butt steel frame” and “double-hook manual butt steel frame” technologies. This technology is applied to the "fourth generation housing" as a
- the skeleton of the building first, the entire construction project must be redesigned and must be approved by the architectural design institute; second, the production and construction party does not need any mechanical equipment, and can be installed manually, and the hoisting equipment and the skeleton of the three-dimensional construction on the construction site As a whole, the hoisting equipment is installed while the steel structure housing frame is raised. After the frame is installed, the house is completed as a whole.
- the materials are completely abandoned reinforced concrete, and the building materials are also widely used, such as furniture, wardrobes, etc., to decorate the walls and so on; this kind of architectural form will completely change the concept of building construction, completely change the construction plan, and completely change the materials used in building construction. , Completely change the building construction process, thereby completely subverting the entire construction industry.
- the application of this technology will completely bid farewell to the "elevator room era" of reinforced concrete.
- the manual docking steel frame technology can also be applied to the steel frame of large, medium and small stadiums and halls, various tower cranes, gantry cranes, mobile cranes, and various bridge steel columns and beams , the entire construction process is the same as that of housing construction: first, the entire construction project must be redesigned and must be approved by the architectural design institute; The hoisting equipment is integrated with the skeleton, and the hoisting equipment is installed while the steel skeleton is raised. After the skeleton is installed, the overall installation is completed.
- the internal decoration fulfills its function and so on.
- the manual butt joint steel frame technology mainly consists of steel pipes and well-shaped, single-pipe, and sphere connection blocks.
- Corresponding to the female joint of the steel pipe head is a male joint; the steel pipe in the "double-hook butt joint" is composed of a well-shaped, single-pipe, and sphere connection block.
- Each force point corresponds to the double-hook joint of the steel pipe head, which is also a double-hook joint.
- these connecting blocks are connected with steel pipes to form various steel structure skeletons; taking the tower crane as an example, the main body of the tower suspension column is composed of steel pipes and well-shaped connecting blocks.
- the tower crane beam is composed of steel pipes and sphere connecting blocks, each of which constitutes the cube and triangle steel structure skeleton required by the tower crane; the main body of the tower crane column and the tower crane beam, which use the triangular firmness characteristics to divide each shape into triangles Structural forms are connected; these connected force points are the male or double hook joints of various connection blocks.
- the spherical connection block is welded at regular distribution angles according to the requirements of the steel frame. After the joint sphere connection block is docked with the steel pipe joint, each shape is divided into triangles and connected in the form of a triangular structure.
- the overall cubic plate becomes a three-dimensional mechanical steel structure skeleton with incomparable strength.
- Butt jointer "single hook butt joint” and “double hook butt joint” technology, connect all the components, and complete the large, medium and small various stadiums, halls, building steel skeletons and various Tower cranes, gantry cranes, row cranes, and various types of bridge steel columns, beam frames and other steel skeletons; in today's construction industry, the frame of a building with more than 100 floors, considering the structure of reinforced concrete, its weight cannot be the same as that of the ground floor and The foundation is generally supported by a steel frame; and the reason why these technologies I introduced can replace the on-site welding form has their theoretical roots: the "three-piece set”, “double hook” and “single hook” I introduced are It means that these force-bearing contact surfaces exceed the cross-sectional area of the steel pipe wall, that is to say, the cross-sectional area of the steel pipe wall is smaller than the cross-sectional area of the same round rod, and it is also less than 1/4 of the same round rod cross-sectional area.
- "Double hook” and “single hook” are made of the same garden rod, and the cross-sectional area of each part is 1/3. Therefore, it is far larger than the cross-sectional area of the steel pipe wall. This is the first; “Piece set”, “single hook” and “double hook” are all made of high carbon steel, which is unmatched by all steel pipe materials; thirdly, the steel pipe sheath is cleverly used, which not only protects the connection point but also facilitates loading and unloading , so that all the added force can only be done along the sheath of the steel pipe.
- Figure 1 is the main picture of the three-piece manual butt joint steel structure skeleton, the fourth generation housing - the conceptual conception diagram of the modular house;
- Figure 2 is the main picture of the three-piece manual butt joint steel frame skeleton, a large-scale stadium - the conceptual conception of the Bird's Nest;
- Fig. 3 is the conceptual conception diagram of the tower crane of the three-piece manual butt joint steel framework main drawing
- Fig. 4 is the conceptual conception diagram of the semi-enclosed air-to-sky steel bridge of the main picture of the three-piece manual butt joint steel structure skeleton;
- Fig. 5 is a diagram of steel pipes, female joints, spherical connection blocks and male joints of a three-piece manual butt steel frame;
- Fig. 6 is a well-shaped and single-pipe connection block and a male joint diagram of a three-piece manual butt steel frame
- Fig. 7 is a diagram of a single-plug male joint and a female joint of a three-piece manual butt steel framework.
- Fig. 8 is a diagram of a steel pipe double-hook joint, a sphere connection block and a double-hook joint of a double-hook type manual butt steel frame;
- Fig. 9 is a double-hook type manual butt steel skeleton well-shaped and single-pipe connection block and a double-hook joint diagram
- Fig. 10 is a diagram of a single-insertion double-hook joint of a double-hook type manual butt steel frame and a side-rotating double-hook joint in a steel pipe.
- the "three-piece manual butt joint steel frame” technology in the manual butt joint steel frame technology mainly consists of steel pipe 1, well-shaped connection block 2, single pipe connection block 3, and sphere connection block 4. Both ends of the steel pipe are female joints 5 ; Each force point of the well-shaped, single-pipe, and sphere connection block corresponds to the female joint of the steel pipe head as a male joint 6; the female joint of the steel pipe has three or more circles, and each circle has more than two bearing balls 7, Embedded in the steel pipe wall, there is a sleeve 8 on the outside of the female joint, a ring at each end to lock the sleeve, and a spring 9 on the inside to squeeze the sleeve to the other side; the inner wall of the sleeve and the outer wall of the male joint It is called a "three-piece set" with the steel pipe wall.
- the inner screw 26 and the corresponding outer screw of the male joint are also designed to fix the casing with gongs 27 at both ends of the steel pipe.
- the ball connecting block and the steel pipe are the core of the steel structure skeleton, so , the welding changes of multiple male joints on the sphere connection block, there are 45°, 60°, 90° arrangements on the whole or half surface, which are designed according to the needs of the skeleton, and also determine the shape of the steel skeleton of the steel skeleton structure;
- the female joints at both ends and the connection blocks such as well-shaped, single-pipe, and sphere, and the two sealing surfaces of the male joints are cones, so that the steel pipe and the connection block are more tightly connected.
- the direction can be adjusted at will during installation, so as not to be sealed
- the surface is stuck;
- the specifications of the steel pipe, the shape of the well, the single pipe, the sphere and other connecting blocks are the shapes summarized in the actual application.
- the single pipe connecting block is used in the half-meter layer between the layers, it will be less than half a meter
- Both ends of the short steel pipe are welded to the short pipe with spherical connecting blocks; well-shaped, single-pipe, sphere and other connecting blocks are installed.
- the steel structure skeleton is more firm; this technology also designs a single-plug male connector 12, and two gong wires 13 are installed at the bottom of it for fixing.
- this single-plug male connector especially During decoration, rooms or walls can be added according to the wishes of the homeowner, and the addition or reduction of rooms and walls at any time will be done by the homeowner at will.
- the "double-hook manual butt joint steel frame” technology in the manual butt joint steel frame technology mainly consists of steel pipe 14, well-shaped connection block 15, single-pipe connection block 16, and sphere connection block 17. Both ends of the steel pipe are double-hook joints 18; Each force point of the single pipe and sphere connection block corresponds to the double hook joint of the steel pipe head; two double hooks and a sleeve, known as "double hook butt joint", the structural form and size standard of the two double hooks are exactly the same Consistent, the top is two relatively semicircular double hooks, and the middle is a semicircular square rod connected with a round rod. After these two double hooks are closed, they are completely sewed into a round rod.
- the diameter of the outer circle of the rod is the same, and the casing is completely locked in the shape of the round rod.
- the two methods can be used singly or at the same time;
- the welding changes of multiple double hook joints on the connecting block can be arranged at 45°, 60°, or 90° on a full or half surface.
- the steel frame After welding into the well-shaped connecting blocks, the steel frame is stronger;
- This technology has also designed a kind of single-plug double-hook joint 23, and two gong wires 24 are installed at its bottom, for fixing, after having had this single-plug double-hook joint, especially when decorating, can increase the room or Wall, and increase or decrease room, wall at any time, will be done at will by the homeowner;
- the double hook joint side of steel pipe has the double hook joint 25 of rotation, also can be welded on the corresponding joint, after having had the double hook joint of rotation, and The strength of the steel pipe is not reduced.
- This design is the result of practice and can reduce the difficulty in production and processing. It is not necessary to consider the direction of the welding double hooks. It can be installed manually during installation, which is convenient and reliable.
- the "three-piece manual butt steel frame” and “double-hook manual butt steel frame” technologies and the “three-piece butt” and “double-hook butt” technologies in the manual butt joint steel frame technology have their own advantages and disadvantages.
- the manual butt joint of the steel frame must first ensure that the error after the connection is controlled at the millimeter level, so the requirements for processing and producing various parts must also be controlled at the millimeter level, so the production and processing of the joint butt joint parts is of high precision, and the "double hook butt joint The requirements for the parts of the "three-piece butt joint" are higher than those of the "three-piece butt joint".
- the latter generally use lathes and drilling machines to complete the processing, while the former must also use a washing machine, and the production cost is higher than the latter; second, when installing the steel frame
- the "three-piece butt joint” can only be installed from bottom to top and from the inside to the outside, while the “double hook butt” can be installed from the bottom to the top and from the inside to the outside, and can also be installed from the top to the bottom and from the outside to the outside.
- the steel frame, and the steel frame connected by the "double hook butt joint device” can remove any steel pipe from the middle without using cutting equipment;
- the construction and installation of the manual butt joint steel frame frame is not subject to any environment and conditions The impact, whether it is a mountain or a plain, whether it is a city or a countryside, whether it is the ground or water, and the construction floor and area can be as high or low, large or small as you like.
- the "three-piece butt jointer” and “double hook butt jointer” in the manual jointing steel frame technology will improve the overall technology of the steel frame after the combination of the two technologies, just like the computer's Hardware and software are the same, the former is a "hard” connection, while the latter is a “soft” connection; first, after the combination of the two technologies, the production cost will be reduced during processing; second, in the manual butt installation combination, the steel
- the horizontal and vertical steel pipes, connecting blocks and other steel structural parts of the framework use the "three-piece butt joint” technology, which is not only fast to install, but also firm and reliable. It is not suitable for anyone to dismantle it casually.
- Traditional building products are, for example, housing.
- the building products of the steel skeleton structure all the upper and lower layers into a main body, and the force at one point is decomposed by the whole main body.
- the gravity of this kind of building product can be said to be negligible to its own weight in the study of mechanics; the third is , in view of the above point, as long as the steel frame of this kind of building hits a little, it will be resolved by the whole main body, so it can withstand any level of earthquake, typhoon, and any natural disaster, such as installing bulletproof glass and steel plate walls around the building walls , and can also withstand the impact of man-made wars; fourth, the assembly and dismantling of the steel frame of this building are very simple and easy, this kind of assembly does not require mechanical equipment, as long as the personnel are manual, as long as the manpower is properly arranged, ten floors can be installed a day Up to dozens of floors, a high-rise building is often erected overnight, and it is easier to dismantle it, and often the high-rise building here no longer exists overnight. Unlike traditional building products, countless reinforced concrete is required for construction. There is no way for these waste reinforced concrete to disappear during removal.
- the "fourth-generation housing" installed by manually connecting the steel frame technology also includes various large, medium and small stadiums and halls: First, the traditional concept has been changed from the design, and the overall use of the structure has been changed.
- the network decomposition of steel pipes such as taking a cube as an example, connect the reinforced concrete cube with twelve steel pipes and sphere connecting blocks, and then add six steel pipes to the opposite corners of the six faces and one steel pipe to connect the sphere to the diagonally diagonally in the middle Connecting each other, and then connecting such steel pipe cubes one by one, the triangle will firmly stabilize the entire main body.
- the weight of this main body is incomparable with the weight of reinforced concrete, and the weight of the upper body on the lower body is also incomparable;
- the "fourth-generation housing" installed by manually docking the steel frame technology does not have the process of driving piles and burying beams during construction.
- the ground is covered with two or three floors that are connected in units of meters and divided into triangular cubes.
- the floor space between each floor of the house and the vertical walls every 20 meters to 60 meters are also connected with this kind of structure.
- the ground is covered with triangular cubes.
- the hoisting equipment for the three-dimensional construction on the construction site is integrated with the skeleton of the house.
- the hoisting equipment is installed while the steel structure housing skeleton is raised. After the skeleton is installed, the main body of the hanger becomes the elevator shaft. If it is completed, the preliminary construction is completed; the second step is the decoration and decoration of the house.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
A manual butt-joint steel skeleton, comprising a three-piece set-type manual butt-joint steel skeleton and a two-hook-type manual butt-joint steel skeleton. A male joint (6) and a female joint (5) of a "three-piece butt joint set" are horizontally and vertically connected, and two-hook joints of "two-hook butt joints" are closed to form a round rod and are then tightly sleeved with a sleeve (19), such that a steel pipe (14) is fixedly connected to a #-shaped connection block (15), a single-pipe connection block (16) and a spherical connection block (17). The manual butt-joint steel skeleton can be used as the steel skeleton for stadiums, halls, and buildings, and as the steel skeleton for steel columns of bridge frameworks such as tower cranes, gantry cranes and bridge cranes. The steel skeleton can shorten the construction period, and can save on materials, construction apparatuses and labor, and is excellent in quality, accuracy, firmness and service life.
Description
手动对接钢构骨架技术涉及钢构骨架,系指钢构骨架的钢管、连接块等钢构部件,运用“三件套式手动对接钢构骨架”和“双钩式手动对接钢构骨架”技术的完美组合,用手动对接“三件套对接器”和“双钩对接器”,将所有构件连接,而完成大、中、小型的各类体育场馆、楼堂馆所、房屋建筑的钢构骨架和各类塔吊、龙门吊、行吊,以及各类桥架钢构柱、梁架等等钢构骨架,因此而得名。The manual butt joint steel frame technology involves the steel frame, which refers to the steel structure components such as steel pipes and connecting blocks of the steel frame. Perfect combination, use manual docking of "three-piece butt joint" and "double hook butt joint" to connect all components, and complete the steel framework and All kinds of tower cranes, gantry cranes, mobile cranes, and various bridge steel columns, beam frames and other steel skeletons, hence the name.
我赞同清华大学建筑研究院认知的,我们的住房走到今天,已经历了“茅草房”、“砖瓦房”、“电梯房”三个时代;我个人的亲身经历,从我出生的头十年一直随父母住“茅草房”,又二十年住“砖瓦房”,近四十年返复搬迁、住高楼,就叫“电梯房”吧;而他们所认知的“第四代住房时代”已经到来,我不敢苟同,因为我国的住房现状和形势非常严峻,不管是经济层面,还是政治层面,亦或者社会层面遭受到的打压非常严重,住房建设不断萎缩,而且还在不断恶化,要想用新的住房理念改变现行的住房现状和形势,很难、非常难;不过该研究院的“第四代住房”理念却给了我一个重大启示,如果有了新型建筑技术支撑,再加上国家的大力支持,这种新构想也一定是能够实现的。I agree with Tsinghua University’s Architectural Research Institute’s recognition that our housing has gone through three eras: “thatched house”, “brick house” and “elevator house”; my personal experience, from the time I was born They lived with their parents in a "thatched house" for the first ten years, and lived in a "brick and tile house" for the next 20 years. In the past 40 years, they moved back and lived in a high-rise building, which is called an "elevator room". The era of "four generations of housing" has arrived, and I do not agree with it, because the current situation and situation of housing in our country is very severe. Whether it is economic, political, or social, the suppression is very serious, and housing construction continues to shrink. It is very difficult and very difficult to change the current housing situation and situation with new housing concepts; however, the "fourth generation housing" concept of the institute has given me a great inspiration. If there is a new type of building With the support of technology and the strong support of the state, this new idea must be realized.
我所设计的《三件套对接器》ZL200820192513.7、《双钩对接器》ZL200820192512.2,以及《三件套对接式模板》、《三件套对接式脚手架》和《双钩对接式脚手架》的专利号为ZL200920227956.X、ZL200920227957.4和ZL200920227958.9,是我这么多年来在建筑行业的总结;介绍的是在建 筑施工中必须使用的周转材料的革新,在我向专业企业推荐这些技术时,遭到很多企业的反对,原因很简单,“按照这种技术生产的建筑周转材料将加大周转材料费用成本,而这种高精致的周转材料运用是——高射炮打蚊子——大才小用”;我找过很多塔吊生产厂家,也到过曾经参加北京鸟巢钢构施工单位,到过杭州几个大型钢构企业,同好多技术人员和企业老总推荐和介绍这些脚手架的延伸运用技术,他们都认为“这可是一场钢结构行业和塔吊行业的行业革命呀!”而这样的技术命名“脚手架”就叫做——大头带着小官帽——名不付实,用这样专利名称是很难在本行业推广的,必须重新包装。The "Three-piece Butt Butt" ZL200820192513.7, "Double Hook Butt" ZL200820192512.2, and the "Three-piece Butt Butt Formwork", "Three-piece Butt Butt Scaffold" and "Double Hook Butt Butt Scaffold" that I designed The patent numbers are ZL200920227956.X, ZL200920227957.4 and ZL200920227958.9, which are my summary in the construction industry for so many years; what I introduced is the innovation of turnover materials that must be used in construction. When I recommend these technologies to professional enterprises , was opposed by many enterprises, the reason is very simple, "The construction turnover materials produced according to this technology will increase the cost of turnover materials, and the use of this kind of high-precision turnover materials is - anti-aircraft guns to shoot mosquitoes - big talents are small "Use"; I have found many tower crane manufacturers, and I have also been to the steel structure construction unit that participated in the Beijing Bird's Nest, and several large steel structure enterprises in Hangzhou. They all think that "this is an industry revolution in the steel structure industry and the tower crane industry!" And the name "scaffolding" of such a technology is called - a big head with a small official hat - not worthy of the name, using such a patent name is Difficult to promote in the industry, must be repackaged.
《三件套式手动对接钢构骨架》技术是《三件套对接式脚手架》的升级版,我于2019年01月11日报国家专利局,专利号为201920050697.1,《三件套式手动对接钢构骨架》的技术并不是简单或重复《三件套对接式脚手架》技术,是在其技术上的发展和升华,与《三件套对接式脚手架》技术相比,将更优于其技术:包括钢管两头为母型接头,井形、单管、球体连接块的每个作力点与钢管头的母型接头相对应为公型接头,套管的内壁和公型接头的外壁与钢管壁号称“三件套”,用手动对接将所有构件连接,而完成体育场馆、楼堂馆所、房屋建筑的钢构骨架和塔吊、龙门吊、行吊,各类桥架钢构柱、梁架等等钢构骨架,她并不是简单或重复《三件套对接式脚手架》技术,是在其技术上的发展和升华,与《三件套对接式脚手架》技术相比,将更优于其技术:一是,在其技术上对每个作力点上进行了加固,即:对接点上公型接头与母型接点,原技术只有一圈轴承滚珠,现设计为三圈、或以上轴承滚珠;二是,原连接块为井形和十字连接块,现增加为井形、单管、球体连接块,同时,井形、单管、球体连接块的作力点要根据骨架的需要来牢固焊接其数量和方向、角度;三是,以钢管两头的母型接点与以井形、单管、球体等连接块以公型接头两密封面为椎体,修改后那怕椎度只有一、两度的密封面,而使钢管与连接块更加紧 密,同时,在安装时可随意调整方向,不至于被密封面卡死;四是,由于三件套式手动对接钢构骨架安装是从下到上,而拆卸时又必须从上往下,层层安装、层层拆卸。The "Three-piece Manual Butt-joint Steel Skeleton" technology is an upgraded version of "Three-piece Butt-joint Scaffolding". I reported it to the National Patent Office on January 11, 2019. The technology of "Constructing the Skeleton" is not simple or repeating the technology of "Three-piece Butt-joint Scaffolding", but the development and sublimation of its technology. Compared with the technology of "Three-piece Butt-joint Scaffolding", it will be better than its technology: Including the female joints at both ends of the steel pipe, each force point of the well-shaped, single pipe, and spherical connection block corresponds to the female joint of the steel pipe head as a male joint. The inner wall of the casing and the outer wall of the male joint and the steel pipe wall are called " Three-piece set", connect all the components by manual docking, and complete the steel structure skeleton of the stadium, building hall, house building, tower crane, gantry crane, row crane, various bridge steel columns, beam frames, etc. Skeleton, she is not simple or repeating the "three-piece butt-joint scaffolding" technology, it is the development and sublimation of its technology. , each force point has been reinforced technically, that is: the male joint and the female joint on the docking point, the original technology has only one ring of bearing balls, and now it is designed to be three or more rings of bearing balls; the second is, The original connecting blocks are well-shaped and cross-shaped connecting blocks, which are now added as well-shaped, single-tube, and sphere connecting blocks. At the same time, the number, direction and angle of the force points of the well-shaped, single-tube, and sphere connecting blocks should be firmly welded according to the needs of the skeleton; The third is to use the female joints at both ends of the steel pipe and the connecting blocks such as wells, single pipes, and spheres, and the two sealing surfaces of the male joints as vertebral bodies. It is more closely connected with the connecting block. At the same time, the direction can be adjusted at will during installation, so as not to be stuck by the sealing surface; Fourth, since the three-piece manual butt steel frame is installed from bottom to top, it must be disassembled from the bottom to the top. Up and down, layer by layer installation, layer by layer removal.
《双钩式手动对接钢构骨架》技术是《双钩对接式脚手架》的升级版,我于2019年03月11日报国家专利局,专利号为201920311629.6,双钩式手动对接钢构骨架的技术包括钢管两头和井形、单管、球体连接块接点与其相对应为双钩接头,其形式和尺寸一致,两个相对半圆形的双钩和半圆形方杆,合拢后合缝成圆棒,套管完全套牢,她并不是简单或重复《双钩对接式脚手架》技术,是在其技术上的发展和升华,与《双钩对接式脚手架》技术相比,将更优于其技术:一是,在其技术上对每个作力点上进行了加固,即:对接点上双钩接头与双钩接点,两个双钩的结构形式和尺寸标准完全相同一致,这两个双钩合拢后,完全合缝成圆棒形,套管的内圆与圆棒外圆的直径相同,套管完全套牢圆棒形双钩;二是,原连接块为井形和十字连接块,现增加为井形、单管、球体连接块,同时,井形、单管、球体连接块的作力点要根据骨架的需要来牢固焊接其数量和方向、角度;三是,由于双钩手动对接钢构骨架安装是从下到上,而拆卸时从上往下,层层安装、层层拆卸,本技术增加了单挿双钩接头和钢管中一边双钩旋转接头,有了增加了这些双钩接头后,装修时,可随房主意愿增加房间或墙壁,而且在任何时候增加或减少房间、墙壁,随意为之,特别是增加了在钢管中一边双钩旋转接头,也可焊接在对应的接头上,有了旋转的双钩接头后,并没有降低钢管强度,而且在生产加工中不必着意考虑焊接双钩方向,又可手动安装方便、可靠;四是,手动对接钢构骨架的施工建设安装不受任何环境和条件的影响,不管是高山、亦或是平原,不管是城市、亦或是农村,不管是地面、亦或是水面,而且施工楼层和面积随心所欲,可高可低、可大可小。《三件套式手动对接钢构骨架》和《双钩式手动对接钢构骨架》这两项技术都是建筑史上的重大发明,如同人类发明了钢琴和小提琴一样, 它们可以独奏、也可合奏,而且合奏起来更使人们获得更大的音乐享受,而这两项技术组合在一起后,如同打击乐和管、弦乐合奏的交响乐,在建筑行业上将会奏响全中国、响彻全世界。The technology of "Double-hook Manual Butt-joint Steel Framework" is an upgraded version of "Double-Hook Butt-joint Scaffold". I reported it to the National Patent Office on March 11, 2019. The patent number is 201920311629.6. The technology of double-hook manual butt joint steel framework includes both ends of steel pipes. The joints of the well-shaped, single-pipe, and spherical connecting blocks correspond to double-hook joints, which have the same form and size. Two relatively semi-circular double hooks and semi-circular square rods are stitched together to form a round rod after being closed, and the casing is completely locked. , she is not simple or repeating the "Double-hook Butt-joint Scaffold" technology, but the development and sublimation of its technology. Reinforcement is carried out on each force point, that is: the double-hook joint on the docking point and the double-hook joint, the structural form and size standard of the two double hooks are exactly the same. The diameter of the inner circle of the pipe is the same as that of the outer circle of the round rod, and the casing is completely locked into the round rod-shaped double hooks; the second is that the original connecting block is a well-shaped and cross-shaped connecting block, which is now added to a well-shaped, single-pipe, and spherical connecting block. At the same time, the well-shaped 1. The number, direction, and angle of the force point of the single tube and sphere connection block should be welded firmly according to the needs of the skeleton; third, because the double-hook manual butt joint steel frame is installed from bottom to top, and when disassembled from top to bottom, Layer-by-layer installation and layer-by-layer dismantling, this technology adds a single-insert double-hook joint and a double-hook rotary joint in one side of the steel pipe. Add or reduce rooms and walls at will, especially the addition of a double-hook rotary joint in the steel pipe, which can also be welded on the corresponding joint. With the rotating double-hook joint, the strength of the steel pipe is not reduced, and the production and processing There is no need to pay attention to the direction of the welding double hooks, and it can be installed manually, which is convenient and reliable; Fourth, the construction and installation of the manual docking steel frame is not affected by any environment and conditions, whether it is a mountain or a plain, whether it is a city, Or in the countryside, whether it is the ground or the water, and the construction floor and area can be arbitrary, high or low, large or small. The two technologies "Three-piece Manual Butt Steel Frame" and "Double-Hook Manual Butt Steel Frame" are major inventions in the history of architecture. Just like humans invented the piano and violin, they can be played alone or in ensembles. Moreover, the ensemble will make people enjoy greater music enjoyment, and when these two technologies are combined, it will be like a symphony of percussion, wind and string ensembles, which will be played throughout China and around the world in the construction industry .
发明内容Contents of the invention
手动对接钢构骨架技术是将“三件套式手动对接钢构骨架”和“双钩式手动对接钢构骨架”技术的完美组合,该技术运用在“第四代住房”上,作为这代住房的骨架:一是,整个建筑项目必须重新设计,必须得到建筑设计院的认可;二是,生产施工方不用任何机械设备,用手动安装就行,而这些建筑现场的立体施工的吊装设备与房屋骨架联为一体,边安吊装设备、边上升钢构住房骨架,骨架安装完毕,则房屋整体完成;三是,直接在房屋骨架上进行房屋总体装饰和分部装饰完成住房功能;四是,该住房用材彻底屏弃钢筋混凝土,而且也广泛了建房用材,将家具、衣柜等,一同装饰墙中等等;这样的建筑形式,将彻底改变建筑施工观念,彻底改变建筑施工方案,彻底改变建筑施工用料,彻底改变建筑施工工艺,从而彻底颠覆整个建筑行业,这种技术的运用将彻底告别钢筋混凝土的“电梯房时代”。The manual butt steel frame technology is a perfect combination of the "three-piece manual butt steel frame" and "double-hook manual butt steel frame" technologies. This technology is applied to the "fourth generation housing" as a The skeleton of the building: first, the entire construction project must be redesigned and must be approved by the architectural design institute; second, the production and construction party does not need any mechanical equipment, and can be installed manually, and the hoisting equipment and the skeleton of the three-dimensional construction on the construction site As a whole, the hoisting equipment is installed while the steel structure housing frame is raised. After the frame is installed, the house is completed as a whole. The materials are completely abandoned reinforced concrete, and the building materials are also widely used, such as furniture, wardrobes, etc., to decorate the walls and so on; this kind of architectural form will completely change the concept of building construction, completely change the construction plan, and completely change the materials used in building construction. , Completely change the building construction process, thereby completely subverting the entire construction industry. The application of this technology will completely bid farewell to the "elevator room era" of reinforced concrete.
手动对接钢构骨架技术还可以运用在大、中、小型各类的体育场馆、楼堂馆所的钢构骨架和各类塔吊、龙门吊、行吊,以及各类桥架钢构柱、梁架上,整个施工过程与住房施工一样:一是,整个施工项目必须重新设计,必须得到建筑设计院的认可;二是,生产施工方不用任何机械设备,用手动安装就行,而这些建筑现场的立体施工的吊装设备与骨架联为一体,边安吊装设备、边上升钢构骨架,骨架安装完毕,则整体安装完成;三是,接着对内部设施,如体育场馆、楼堂馆所进行总体装饰和分部装饰完成其功能等等。The manual docking steel frame technology can also be applied to the steel frame of large, medium and small stadiums and halls, various tower cranes, gantry cranes, mobile cranes, and various bridge steel columns and beams , the entire construction process is the same as that of housing construction: first, the entire construction project must be redesigned and must be approved by the architectural design institute; The hoisting equipment is integrated with the skeleton, and the hoisting equipment is installed while the steel skeleton is raised. After the skeleton is installed, the overall installation is completed. The internal decoration fulfills its function and so on.
手动对接钢构骨架技术主要有钢管和井形、单管、球体连接块组成,在“三件套对接器”中的钢管两头为母型接头,井形、单管、球体连接块的每个作力点与钢管头的母型接头相对应的为公型接头;在“双钩对接器”中的钢管和井形、单管、球体连接块组成,钢管两头为双钩接头,井形、单管、球体连接块的每个作力点与钢管头的双钩接头相对应的也为双钩接头,根据需要这些连接块与钢管对接后组成各类不同的钢构骨架;以塔吊为例,塔吊柱主体由钢管和井形连接块组成,塔吊横梁则是由钢管和球体连接块组成,各构成塔吊需要的立方体和三角体钢构骨架;塔吊柱主体和塔吊横梁,这种用三角形牢固性特点,将各形体分割成一个个三角形结构形式连接组成;这些相连的作力点就是各种连接块的公型或双钩接头,比如在球体连接块是根据钢构骨架的要求,在有规律的分布角度上焊接接头,由分布角度上焊接接头球体连接块与钢管接头对接后,由各形体分割成一个个三角体结构形式连接而成的在整体立方板块成为立体力学钢构骨架而强度威力无比。The manual butt joint steel frame technology mainly consists of steel pipes and well-shaped, single-pipe, and sphere connection blocks. Corresponding to the female joint of the steel pipe head is a male joint; the steel pipe in the "double-hook butt joint" is composed of a well-shaped, single-pipe, and sphere connection block. Each force point corresponds to the double-hook joint of the steel pipe head, which is also a double-hook joint. According to the needs, these connecting blocks are connected with steel pipes to form various steel structure skeletons; taking the tower crane as an example, the main body of the tower suspension column is composed of steel pipes and well-shaped connecting blocks. Composition, the tower crane beam is composed of steel pipes and sphere connecting blocks, each of which constitutes the cube and triangle steel structure skeleton required by the tower crane; the main body of the tower crane column and the tower crane beam, which use the triangular firmness characteristics to divide each shape into triangles Structural forms are connected; these connected force points are the male or double hook joints of various connection blocks. For example, the spherical connection block is welded at regular distribution angles according to the requirements of the steel frame. After the joint sphere connection block is docked with the steel pipe joint, each shape is divided into triangles and connected in the form of a triangular structure. The overall cubic plate becomes a three-dimensional mechanical steel structure skeleton with incomparable strength.
手动对接钢构骨架技术的各种零部件都是专业厂家在车间中完成,利用数控机床、洗床和专用模块,自动焊接机和机械手在生产流水线上完成,保证了管、块的精密制造,以保障钢构骨架牢固可靠,一点都不弱现场焊接力学强度;同时,在车间加工时能用多种工艺保证各管块的外部防锈措施,使手动对接后,安装成形一步到位,既减轻了工人的劳动强度,又加快工程进度;每个管、块部件都有各自用英文字母和阿拉伯数字组成的钢印条幅,包括规格、材质、壁厚、有无缝、承受力吨位、监制单位、生产厂家、批次和出厂日期等钢构骨架主要内容的国家和国际标准,使工人一拿到管块部件就能对接上手到位。The various parts of the manual butt joint steel frame technology are completed by professional manufacturers in the workshop. Using CNC machine tools, washing beds and special modules, automatic welding machines and manipulators are completed on the production line to ensure the precise manufacture of pipes and blocks. In order to ensure that the steel frame is solid and reliable, and the mechanical strength of the on-site welding is not weak at all; at the same time, various processes can be used to ensure the external rust prevention measures of each pipe block during processing in the workshop, so that after manual docking, the installation and forming can be completed in one step, which not only reduces It reduces the labor intensity of workers and speeds up the progress of the project; each pipe and block has its own stamped banner composed of English letters and Arabic numerals, including specifications, materials, wall thickness, seamlessness, bearing tonnage, supervisory unit, The national and international standards for the main contents of the steel frame, such as the manufacturer, batch, and date of manufacture, enable workers to connect the pipe block components in place as soon as they get them.
手动对接钢构骨架技术和《三件套式手动对接钢构骨架》、《单钩式手动对接钢构骨架》《双钩式手动对接钢构骨架》《二式手动对接钢构骨架》、的技术分别于2019年01月11日、03月11日、03月25日、04月 04日报国家专利局的实用新型专利,专利号为2019203111629.6和201920050697.1、201920457410.7、201920457388.6、201920311629.6,都是运用《三件套对接器》、《单钩对接器》和《双钩对接器》技术,将所有构件连接,而完成大、中、小型的各类体育场馆、楼堂馆所、房屋建筑的钢构骨架和各类塔吊、龙门吊、行吊,以及各类桥架钢构柱、梁架等等钢构骨架;当今建筑业,凡属百层以上房屋的框架,考虑到钢筋砼的结构,其重量不能为底层和基础所承受,一般都为钢构骨架;而我所介绍的这些技术之所以能够取代现场焊接形式是有她们理论根源的:我所介绍“三件套”、“双钩”和“单钩”是指这些受力接触面都超过了钢管管壁的截面积,就是说,钢管管壁的截面积都小于同等园棒的截面积,也小于同等园棒截面积的1/4,而这些技术的“双钩”和“单钩”是用同等园棒制作而成,每部分受力截面积是1/3,因此,远远大于钢管管壁的截面积,这是其一;其二,“三件套”、“单钩”和“双钩”的原材料都为高碳钢,这是所有钢管材料无法比拟的;其三,巧妙地运用了钢管护套,它既保护了连接点又方便了装卸,使所有加力只能顺钢管护套而为之,因此,这些手动对接的钢构骨架,理论上是优于现场焊接的力学强度的,从而保障了建筑房屋的功能;手动对接钢构骨架技术以及《三件套式手动对接钢构骨架》和《单钩式手动对接钢构骨架》、《双钩式手动对接钢构骨架》、《二式手动对接钢构骨架》一样,这些技术构思胆大、工艺奇特、设计独到、生产精密、施工简洁、装御方便,都是建筑史上的难得佳作。Manual docking steel frame technology and "three-piece manual butt steel frame", "single-hook manual butt steel frame", "double-hook manual butt steel frame", "two-type manual butt steel frame", technology The utility model patents of the National Patent Office were reported on January 11, March 11, March 25, and April 4, 2019 respectively. The patent numbers are 2019203111629.6 and 201920050697.1, 201920457410.7, 201920457388.6, and 201920311629.6. Butt jointer", "single hook butt joint" and "double hook butt joint" technology, connect all the components, and complete the large, medium and small various stadiums, halls, building steel skeletons and various Tower cranes, gantry cranes, row cranes, and various types of bridge steel columns, beam frames and other steel skeletons; in today's construction industry, the frame of a building with more than 100 floors, considering the structure of reinforced concrete, its weight cannot be the same as that of the ground floor and The foundation is generally supported by a steel frame; and the reason why these technologies I introduced can replace the on-site welding form has their theoretical roots: the "three-piece set", "double hook" and "single hook" I introduced are It means that these force-bearing contact surfaces exceed the cross-sectional area of the steel pipe wall, that is to say, the cross-sectional area of the steel pipe wall is smaller than the cross-sectional area of the same round rod, and it is also less than 1/4 of the same round rod cross-sectional area. "Double hook" and "single hook" are made of the same garden rod, and the cross-sectional area of each part is 1/3. Therefore, it is far larger than the cross-sectional area of the steel pipe wall. This is the first; "Piece set", "single hook" and "double hook" are all made of high carbon steel, which is unmatched by all steel pipe materials; thirdly, the steel pipe sheath is cleverly used, which not only protects the connection point but also facilitates loading and unloading , so that all the added force can only be done along the sheath of the steel pipe. Therefore, these manually-joined steel frameworks are theoretically better than the mechanical strength of on-site welding, thus ensuring the function of building houses; manual butt steel frameworks The technology is the same as "Three-piece Manual Butt Steel Frame" and "Single-Hook Manual Butt Steel Frame", "Double-Hook Manual Butt Steel Frame" and "Two-Type Manual Butt Steel Frame". Large, unique craftsmanship, unique design, precise production, simple construction, and convenient decoration are all rare masterpieces in the history of architecture.
手动对接钢构骨架技术的运用将会做到“四省”,即:施工工期省、施工用料省、施工设备省、用工人员省;同时,做到“四优”,即:施工质量优、项目精度优、骨架牢固优、使用寿命优;以北京鸟巢为例:鸟巢2003年12月24日开工建设,2008年3月完工,当年总造价22.67亿元,按现比价可能突破百亿元;如果用手动对接钢构骨架技术建设北京的鸟巢工程,就会节省在现场施工大量的焊结工程,节省大量的人力、财力、物力, 还节省工程时间,从估算人力、财务、机械设备等各种费用都只占百分之十,还节省工程时间,可能只需一年就能建成;同时,奥运会结束后也无需为维护鸟巢犯愁;拆卸迅速,如果武汉举办大型国际运动会事,鸟巢又可以在武汉安家。The application of manual docking steel frame technology will achieve "four provinces", namely: construction period saving, construction material saving, construction equipment saving, labor saving; at the same time, achieve "four excellent", namely: excellent construction quality , the project has excellent precision, solid skeleton and excellent service life; take the Beijing Bird's Nest as an example: the construction of the Bird's Nest started on December 24, 2003 and was completed in March 2008. ; If the Bird's Nest project in Beijing is built with manual butt joint steel frame technology, it will save a lot of welding projects on site, save a lot of manpower, financial resources, and material resources, and also save engineering time. All kinds of costs only account for 10%, and it saves engineering time. It may only take one year to build; at the same time, there is no need to worry about maintaining the Bird’s Nest after the Olympics; You can settle down in Wuhan.
图1是三件套式手动对接钢构骨架主图第四代住房——模块房概念构想图;Figure 1 is the main picture of the three-piece manual butt joint steel structure skeleton, the fourth generation housing - the conceptual conception diagram of the modular house;
图2是三件套式手动对接钢构骨架主图大型体育场——鸟巢概念构想图;Figure 2 is the main picture of the three-piece manual butt joint steel frame skeleton, a large-scale stadium - the conceptual conception of the Bird's Nest;
图3是三件套式手动对接钢构骨架主图塔吊概念构想图;Fig. 3 is the conceptual conception diagram of the tower crane of the three-piece manual butt joint steel framework main drawing;
图4是三件套式手动对接钢构骨架主图半封闭式空天钢架桥概念构想图;Fig. 4 is the conceptual conception diagram of the semi-enclosed air-to-sky steel bridge of the main picture of the three-piece manual butt joint steel structure skeleton;
图5是三件套式手动对接钢构骨架的钢管及母型接头和球体连接块及公型接头图;Fig. 5 is a diagram of steel pipes, female joints, spherical connection blocks and male joints of a three-piece manual butt steel frame;
图6是三件套式手动对接钢构骨架的井形和单管连接块及公型接头图;Fig. 6 is a well-shaped and single-pipe connection block and a male joint diagram of a three-piece manual butt steel frame;
图7是三件套式手动对接钢构骨架的单挿公型接头与母型接头图。Fig. 7 is a diagram of a single-plug male joint and a female joint of a three-piece manual butt steel framework.
图8是双钩式手动对接钢构骨架的钢管双钩接头和球体连接块及双钩接头图;Fig. 8 is a diagram of a steel pipe double-hook joint, a sphere connection block and a double-hook joint of a double-hook type manual butt steel frame;
图9是双钩式手动对接钢构骨架井形和单管连接块及双钩接头图;Fig. 9 is a double-hook type manual butt steel skeleton well-shaped and single-pipe connection block and a double-hook joint diagram;
图10是双钩式手动对接钢构骨架的单挿双钩接头和钢管中一边旋转双钩接头图。Fig. 10 is a diagram of a single-insertion double-hook joint of a double-hook type manual butt steel frame and a side-rotating double-hook joint in a steel pipe.
手动对接钢构骨架技术中的《三件套式手动对接钢构骨架》技术,主要有钢管1和井形连接块2、单管连接块3、球体连接块4组成,钢管两头为母型接头5;井形、单管、球体连接块的每个作力点与钢管头的母型接头相对应的为公型接头6;钢管的母型接头由有三圈或以上,每圈两个以上轴承滚珠7,镶嵌在钢管壁中,母型接头外有一套管8,两端各有一圈环为锁住套管,内边有一弹簧9挤压套管到另一边;套管的内壁和公型接头的外壁与钢管壁号称“三件套”,钢管壁内镶嵌三圈滚珠,对应着套管内壁10和公型接头外壁11的三圈凹槽,当用手挤压弹簧时,钢管壁内的滚珠滚入套管内壁的凹槽里将打开公型接头与母型接头,当手松开弹簧,钢管壁的滚珠滚入公型接头外壁的凹槽里,将锁定了公型接头与母型接头,这是一种方式,还有一种方式,套管内壁10没有凹槽,前者为方便装卸多用于塔吊钢架,后者用于房屋钢构骨架等永久性建筑中,这种固定套管头有内絲扣26与对应公型接头外絲扣,还在钢管两头设计用锣丝27固定套管,这两种方法可单一或同时使用;球体连接块和钢管是本钢构骨架的核心,因此,在球体连接块上的多个公型接头焊接变化,有全面或者半面的45°、60°、90°排布,因骨架之需而设,也决定钢构骨架结构钢构骨架形状;钢管两头的母型接点与以井形、单管、球体等连接块以公型接头两密封面为椎体,而使钢管与连接块更加紧密,同时,在安装时可随意调整方向,不至于被密封面卡死;钢管的规格,井形、单管、球体等连接块都是结合实际运用中总结出来的形状,比如,单管连接块用在层与层之间半米层时,将不足半米的短钢管两头以球体连接块焊死在短管上;井形、单管、球体等连接块安装,井形连接块多用于钢构骨架的柱子、塔吊主体和电梯内井等部位,焊成井形连接块后使钢构骨架更加牢固;本技术还设计了一种单挿公型接头12,在其底部安装了两个锣丝13,为固定用,有了这个单挿公型接头后,特别是装修时,可随房主意愿增加房间或墙壁,而且在任何时候增加或减少房间、墙壁,将由房主随意为之。The "three-piece manual butt joint steel frame" technology in the manual butt joint steel frame technology mainly consists of steel pipe 1, well-shaped connection block 2, single pipe connection block 3, and sphere connection block 4. Both ends of the steel pipe are female joints 5 ; Each force point of the well-shaped, single-pipe, and sphere connection block corresponds to the female joint of the steel pipe head as a male joint 6; the female joint of the steel pipe has three or more circles, and each circle has more than two bearing balls 7, Embedded in the steel pipe wall, there is a sleeve 8 on the outside of the female joint, a ring at each end to lock the sleeve, and a spring 9 on the inside to squeeze the sleeve to the other side; the inner wall of the sleeve and the outer wall of the male joint It is called a "three-piece set" with the steel pipe wall. Three circles of balls are inlaid in the steel pipe wall, corresponding to the three circles of grooves on the inner wall 10 of the casing and the outer wall 11 of the male joint. When the spring is squeezed by hand, the balls in the steel pipe wall roll Inserting into the groove on the inner wall of the sleeve will open the male and female connectors. When the spring is released, the ball on the steel tube wall will roll into the groove on the outer wall of the male connector, locking the male and female connectors. This is one way, and there is another way. There is no groove on the inner wall 10 of the sleeve. The former is mostly used for tower crane steel frames for the convenience of loading and unloading. The inner screw 26 and the corresponding outer screw of the male joint are also designed to fix the casing with gongs 27 at both ends of the steel pipe. These two methods can be used singly or at the same time; the ball connecting block and the steel pipe are the core of the steel structure skeleton, so , the welding changes of multiple male joints on the sphere connection block, there are 45°, 60°, 90° arrangements on the whole or half surface, which are designed according to the needs of the skeleton, and also determine the shape of the steel skeleton of the steel skeleton structure; The female joints at both ends and the connection blocks such as well-shaped, single-pipe, and sphere, and the two sealing surfaces of the male joints are cones, so that the steel pipe and the connection block are more tightly connected. At the same time, the direction can be adjusted at will during installation, so as not to be sealed The surface is stuck; the specifications of the steel pipe, the shape of the well, the single pipe, the sphere and other connecting blocks are the shapes summarized in the actual application. For example, when the single pipe connecting block is used in the half-meter layer between the layers, it will be less than half a meter Both ends of the short steel pipe are welded to the short pipe with spherical connecting blocks; well-shaped, single-pipe, sphere and other connecting blocks are installed. After the block, the steel structure skeleton is more firm; this technology also designs a single-plug male connector 12, and two gong wires 13 are installed at the bottom of it for fixing. With this single-plug male connector, especially During decoration, rooms or walls can be added according to the wishes of the homeowner, and the addition or reduction of rooms and walls at any time will be done by the homeowner at will.
手动对接钢构骨架技术中的《双钩式手动对接钢构骨架》技术,主要有钢管14和井形连接块15、单管连接块16、球体连接块17组成,钢管两头为双钩接头18;井形、单管、球体连接块的每个作力点与钢管头的双钩接头相对应的为双钩接头;两个双钩和一个套管,号称“双钩对接器”,两个双钩的结构形式和尺寸标准完全相同一致,顶端是两个相对半圆形的双钩,中间是一个半圆形方杆与圆棒连在一起,这两个双钩合拢后,完全合缝成圆棒,套管19的内圆与圆棒外圆的直径相同,套管完全套牢圆棒形状,在每个井形、单管、球体连接块的每个作力点的双钩底部都有丝扣20,对应套管端内丝扣21,为固定套管用,还有在钢管两头设计锣丝钉22,为固定套管的另一个形式,两种方式可单一或同时使用;球体连接块和钢管是本钢构骨架的核心,因此,在球体连接块上的多个双钩接头焊接变化,有全面或者半面的45°、60°、90°排布,因骨架之需而设,也决定钢构骨架结构钢构骨架形状;钢管的规格,井形、单管、球体等连接块都是结合实际运用中总结出来的形状,比如,单管连接块用在层与层之间半米层时,将不足半米的短钢管两头以球体连接块焊死在短管上;井形、单管、球体等连接块安装,井形连接块多用于钢构骨架的柱子、塔吊主体和电梯内井等部位,焊成井形连接块后使钢构骨架更加牢固;本技术还设计了一种单挿双钩接头23,在其底部安装了两个锣丝24,为固定用,有了这个单挿双钩接头后,特别是装修时,可随房主意愿增加房间或墙壁,而且在任何时候增加或减少房间、墙壁,将由房主随意为之;钢管的双钩接头一边有旋转的双钩接头25,也可焊接在对应的接头上,有了旋转的双钩接头后,并没有降低钢管强度,这种设计是由实践总结的结果,能降低在生产加工中的难度,不必着意考虑焊接双钩方向,在安装时又可手动安装方便、可靠。The "double-hook manual butt joint steel frame" technology in the manual butt joint steel frame technology mainly consists of steel pipe 14, well-shaped connection block 15, single-pipe connection block 16, and sphere connection block 17. Both ends of the steel pipe are double-hook joints 18; Each force point of the single pipe and sphere connection block corresponds to the double hook joint of the steel pipe head; two double hooks and a sleeve, known as "double hook butt joint", the structural form and size standard of the two double hooks are exactly the same Consistent, the top is two relatively semicircular double hooks, and the middle is a semicircular square rod connected with a round rod. After these two double hooks are closed, they are completely sewed into a round rod. The diameter of the outer circle of the rod is the same, and the casing is completely locked in the shape of the round rod. There are threaded buttons 20 at the bottom of the double hooks at each force point of each well-shaped, single-tube, and sphere connection block, corresponding to the inner threaded button 21 of the casing end, for For fixing the casing, there is also a gong screw 22 designed at both ends of the steel pipe, which is another form of fixing the casing. The two methods can be used singly or at the same time; The welding changes of multiple double hook joints on the connecting block can be arranged at 45°, 60°, or 90° on a full or half surface. It is designed according to the needs of the skeleton and also determines the shape of the steel skeleton of the steel skeleton structure; the specification of the steel pipe, the shape of the well , single tube, sphere and other connecting blocks are all shapes summarized in practical applications. Dead on the short pipe; well-shaped, single-pipe, sphere and other connecting blocks are installed. The well-shaped connecting blocks are mostly used for the columns of the steel frame, the main body of the tower crane, and the inner shaft of the elevator. After welding into the well-shaped connecting blocks, the steel frame is stronger; This technology has also designed a kind of single-plug double-hook joint 23, and two gong wires 24 are installed at its bottom, for fixing, after having had this single-plug double-hook joint, especially when decorating, can increase the room or Wall, and increase or decrease room, wall at any time, will be done at will by the homeowner; The double hook joint side of steel pipe has the double hook joint 25 of rotation, also can be welded on the corresponding joint, after having had the double hook joint of rotation, and The strength of the steel pipe is not reduced. This design is the result of practice and can reduce the difficulty in production and processing. It is not necessary to consider the direction of the welding double hooks. It can be installed manually during installation, which is convenient and reliable.
手动对接钢构骨架技术中的《三件套式手动对接钢构骨架》和《双钩式手动对接钢构骨架》技术及“三件套对接器”和“双钩对接器”这两项技术各有千秋,手动对接钢构骨架首先必须保障在连接后的误差控制在 毫米级别,所以在加工生产各种零部件的要求也必须控制在丝米级别,因此生产加工接头对接部件精密度高,而“双钩对接器”比“三件套对接器”的零部件要求更高,后者一般动用车床和钻床完成加工,而前者还必须动用洗床,生产成本比后者高;其二,在安装钢构骨架这两项技术时,“三件套对接器”只能从下向上和从内向外安装,而“双钩对接器”既能从下向上和从内向外安装,又能从上向下和从外向内安装,因此,在房屋建筑钢构骨架的安装中,《三件套式手动对接钢构骨架》一般认为用在大、中型钢构骨架的安装中,而《双钩式手动对接钢构骨架》则用在小型的钢构骨架这个技术特别实应小型钢构骨架的安装中;其三,运用“三件套对接器”连接后的钢构骨架如果不动用切割设备是不能从中间拆除任何一根钢管,而“双钩对接器”连接后的钢构骨架不需动用切割设备是能从中间拆除任何一根钢管的;其四,手动对接钢构骨架的施工建设安装不受任何环境和条件的影响,不管是高山、亦或是平原,不管是城市、亦或是农村,不管是地面、亦或是水面,而且施工楼层和面积随心所欲,可高可低、可大可小。The "three-piece manual butt steel frame" and "double-hook manual butt steel frame" technologies and the "three-piece butt" and "double-hook butt" technologies in the manual butt joint steel frame technology have their own advantages and disadvantages. The manual butt joint of the steel frame must first ensure that the error after the connection is controlled at the millimeter level, so the requirements for processing and producing various parts must also be controlled at the millimeter level, so the production and processing of the joint butt joint parts is of high precision, and the "double hook butt joint The requirements for the parts of the "three-piece butt joint" are higher than those of the "three-piece butt joint". The latter generally use lathes and drilling machines to complete the processing, while the former must also use a washing machine, and the production cost is higher than the latter; second, when installing the steel frame When using these two technologies, the "three-piece butt joint" can only be installed from bottom to top and from the inside to the outside, while the "double hook butt" can be installed from the bottom to the top and from the inside to the outside, and can also be installed from the top to the bottom and from the outside to the outside. Therefore, in the installation of building steel frame, "three-piece manual butt steel frame" is generally considered to be used in the installation of large and medium-sized steel frames, while "double hook manual butt steel frame" This technology is especially suitable for the installation of small steel frames; thirdly, the steel frames connected by the "three-piece butt joint" cannot be removed from the middle without cutting equipment. steel frame, and the steel frame connected by the "double hook butt joint device" can remove any steel pipe from the middle without using cutting equipment; Fourth, the construction and installation of the manual butt joint steel frame frame is not subject to any environment and conditions The impact, whether it is a mountain or a plain, whether it is a city or a countryside, whether it is the ground or water, and the construction floor and area can be as high or low, large or small as you like.
手动对接钢构骨架技术中的“三件套对接器”和“双钩对接器”这两项技术经过组合后,将对钢构骨架的总的技术得到质提升,两项技术就如同电脑中的硬、软件一样,前者是“硬性”连接,而后者则是“软性”连接;首先,两种技术组合后,在加工中会降底生产成本;其二,在手动对接安装组合中,钢构骨架的水平和垂直的钢管、连接块等钢构部件运用“三件套对接器”技术,不仅安装迅速,而且牢固可靠,任何人不宜随便拆除,同时将所有斜拉杆运用“双钩对接器”技术后,所有水平和垂直的钢管、连接块等钢构部件安装完成后,再安装斜拉杆又简化了安装难度,使钢构骨架更加牢固可靠,比如用在大型体育场馆钢构骨架中可能用3至5米甚至更长、有腿肚粗的钢管垂直运用时,可能只用手指粗、以半米长的管棒用“双钩对接器”技术,斜拉角就能达到应有的拉力受力强度而节 省用料;其三,大型钢构骨架也离不开“双钩对接器”技术,在安装体育场馆、楼堂馆所、房屋建筑的钢构骨架中都要先安装塔吊井架、电梯内井和立柱方架,后安装的钢构骨架用双钩接头就更为方便,因此,钢管接头分别为双钩和三件套了,同时,在大型球体、摩天轮体等异形钢构骨架的外架也必须由“双钩对接器”技术,也要用弧形钢管而两个接头或都为双钩、或分别为双钩和三件套;其四,所有承重钢构骨架安装完成后进入装饰阶段时,“双钩对接器”更优越于“三件套对接器”技术,“三件套对接器”只能从下向上和从内向外安装,而“双钩对接器”既能从下向上和从内向外安装,又能从上向下和从外向内安装。The "three-piece butt jointer" and "double hook butt jointer" in the manual jointing steel frame technology will improve the overall technology of the steel frame after the combination of the two technologies, just like the computer's Hardware and software are the same, the former is a "hard" connection, while the latter is a "soft" connection; first, after the combination of the two technologies, the production cost will be reduced during processing; second, in the manual butt installation combination, the steel The horizontal and vertical steel pipes, connecting blocks and other steel structural parts of the framework use the "three-piece butt joint" technology, which is not only fast to install, but also firm and reliable. It is not suitable for anyone to dismantle it casually. After the technology is completed, all horizontal and vertical steel pipes, connecting blocks and other steel components are installed, and the installation of diagonal stays simplifies the difficulty of installation, making the steel frame more solid and reliable. For example, it may be used in the steel frame of large stadiums. When a steel pipe with a thickness of 3 to 5 meters or longer and a thick calf is used vertically, it is possible to use the "double-hook butt joint" technology with a half-meter-long pipe stick with thick fingers, and the oblique angle can achieve the desired tensile force. Third, the large-scale steel frame is also inseparable from the "double-hook docking device" technology. When installing the steel frame of stadiums, buildings, and buildings, tower cranes and elevators must be installed first. It is more convenient to use double-hook joints for the steel frame of the inner well and the column frame, so the steel pipe joints are double-hook and three-piece sets respectively. The frame must also use the "double-hook butt joint" technology, and arc-shaped steel pipes must also be used, and the two joints are either double hooks, or double hooks and three-piece sets respectively; , "Double-hook butt" is superior to "three-piece butt" technology, "three-piece butt" can only be installed from bottom to top and from inside to outside, while "double-hook butt" can be installed from bottom to top and from inside to outside It can be installed outside, and can be installed from top to bottom and from outside to inside.
手动对接钢构骨架技术的钢管、连接块等钢构部件,用手动对接“三件套对接器”和“双钩对接器”,将所有构件连接,而完成大、中、小型的各类体育场馆、楼堂馆所、房屋建筑的钢构骨架和各类塔吊、龙门吊、行吊,以及各类桥架钢构柱、梁架等等钢构骨架:一是,彻底打破了传统的建筑观念、建筑工艺、施工程序和工程用材;二是,已经不能按传统观念来看待这些建筑产品,传统建筑产品为,比如住房,下层住房要承受上层建筑包括该层所有人和物的重力,而由手动对接钢构骨架的建筑产品将上上下下所有层面结构成一个主体,一点的受力被整个主体分解,这种建筑产品受到的重力,在力学研究中可以说对自身的重量可以忽略不计;三是,鉴于上点,这种建筑的钢构骨架只要冲击一点,都会被整个主体所化解,因此能够承受任何级别的地震、台风,任何自然灾害,比如在建筑墙体外围加装防弹玻璃和钢板墙,也可以抵卸人为的战争冲击;四是,装配和撤卸这种建筑的钢构骨架都非常简单和容易,这种装配无需机械设备,只要人员手动,只要人力安排得当,一天安装十层到几十层,往往一夜之间竖起了座高楼大厦,撤卸更比较简单,又往往一夜之间此地的高楼大厦不复存在,不象传统的建筑产品,建筑时需要无数钢筋混凝土,而撤卸时这些废钢筋混凝土没有办法消失。Manually butt the steel structure components such as steel pipes and connecting blocks of the steel frame technology, use the manual butt "three-piece butt joint" and "double hook butt joint" to connect all the components, and complete various large, medium and small stadiums The steel skeletons of buildings, halls, buildings, various tower cranes, gantry cranes, row cranes, and various bridge steel columns, beam frames, etc. steel skeletons: First, it completely breaks the traditional architectural concepts, technology, construction procedures and engineering materials; secondly, these building products can no longer be viewed according to the traditional concept. Traditional building products are, for example, housing. The building products of the steel skeleton structure all the upper and lower layers into a main body, and the force at one point is decomposed by the whole main body. The gravity of this kind of building product can be said to be negligible to its own weight in the study of mechanics; the third is , in view of the above point, as long as the steel frame of this kind of building hits a little, it will be resolved by the whole main body, so it can withstand any level of earthquake, typhoon, and any natural disaster, such as installing bulletproof glass and steel plate walls around the building walls , and can also withstand the impact of man-made wars; fourth, the assembly and dismantling of the steel frame of this building are very simple and easy, this kind of assembly does not require mechanical equipment, as long as the personnel are manual, as long as the manpower is properly arranged, ten floors can be installed a day Up to dozens of floors, a high-rise building is often erected overnight, and it is easier to dismantle it, and often the high-rise building here no longer exists overnight. Unlike traditional building products, countless reinforced concrete is required for construction. There is no way for these waste reinforced concrete to disappear during removal.
手动对接钢构骨架技术安装出来的“第四代住房”,也包括各类大、中、小型体育场馆和楼堂馆所:首先,从设计时就改变了传统观念,它将结构的整体用钢管的网状分解,比如以立方体为例,把钢筋砼立方体由十二根钢管与球体连接块相连,再在将六个面的对角加六根和中间斜对角加根钢管与球体连接块相连,再将这样一个个的钢管立方体相连,就将三角形的牢固稳定了整个主体,这个主体的重量与钢筋砼的重量是没得比,而上体对下体的重压也是没得比;其二,从施工方面来说,由于本体的重量可以忽略不计,所以也没有打地桩,埋地粱这道工序了;其三,原来的房屋是由上对下的重力传递——当然也有下对上的传递,由于重力的传递远远大于下对上的传递,就无法体会——而这种新型技术运用后,自重体重大大降低后,这种下对上的力的传递就显现出来,用另一种语言表述,就是说当有巨大的力在这个主体某一点施为时,这个力就被分解到每个着力点了。The "fourth-generation housing" installed by manually connecting the steel frame technology also includes various large, medium and small stadiums and halls: First, the traditional concept has been changed from the design, and the overall use of the structure has been changed. The network decomposition of steel pipes, such as taking a cube as an example, connect the reinforced concrete cube with twelve steel pipes and sphere connecting blocks, and then add six steel pipes to the opposite corners of the six faces and one steel pipe to connect the sphere to the diagonally diagonally in the middle Connecting each other, and then connecting such steel pipe cubes one by one, the triangle will firmly stabilize the entire main body. The weight of this main body is incomparable with the weight of reinforced concrete, and the weight of the upper body on the lower body is also incomparable; Second, in terms of construction, since the weight of the main body is negligible, there is no process of driving piles and burying beams; third, the original house is transmitted by gravity from top to bottom—of course there are also bottom The transmission to the top, because the transmission of gravity is much greater than the transmission from the bottom to the top, it is impossible to understand - and after the application of this new technology, after the self-weight is greatly reduced, the transmission of the force from the bottom to the top will appear. Expressed in another language, it means that when there is a huge force acting on a certain point of the subject, this force is decomposed into each point of force.
手动对接钢构骨架技术安装出来的“第四代住房”,在施工由于没有打地桩,埋地粱这道工序,“万丈高楼平地起”,所以钢构骨架在地面时,平衡地平,在地面上铺满两、三层以米为单位连接的一个个分成三角体立方体的基础上连接,住房的每层间楼隔和每隔二十米到六十米的竖墙也都用这种地面满铺三角体立方体形式,这些建筑现场的立体施工的吊装设备与房屋骨架联为一体,边安吊装设备、边上升钢构住房骨架,骨架安装完毕,而吊架主体成为电梯竖井,房屋整体完成,则前期施工完成;第二步则是房屋的装修装饰,这个步骤在现在是购房者负责,如果是这样的话,购房者购得的是这个“第四代住房”钢构骨架的是个空间,那么,按购房价格,只是“电梯房”的几十分之一,也就是说,买“电梯房”一个平方,而买“第四代住房”钢构骨架这个空间将可买几十个平方;房屋的装修装饰,所有的地板、墙壁、楼梯和家具都可以作为“模块”安装,比如地板和墙壁内层用泡沫填充,既可以隔音又可以保暖,同时,由于内 部空间巨大,个人也买得起,将公路和停车点设置在每层每家的门口成为可能,因此,我将“第四代住房”命名为“模块房”。The "fourth-generation housing" installed by manually docking the steel frame technology does not have the process of driving piles and burying beams during construction. The ground is covered with two or three floors that are connected in units of meters and divided into triangular cubes. The floor space between each floor of the house and the vertical walls every 20 meters to 60 meters are also connected with this kind of structure. The ground is covered with triangular cubes. The hoisting equipment for the three-dimensional construction on the construction site is integrated with the skeleton of the house. The hoisting equipment is installed while the steel structure housing skeleton is raised. After the skeleton is installed, the main body of the hanger becomes the elevator shaft. If it is completed, the preliminary construction is completed; the second step is the decoration and decoration of the house. This step is now the responsibility of the home buyer. If this is the case, what the home buyer buys is a space in the steel frame of the "fourth generation housing" , then, according to the purchase price, it is only a few tenths of the "elevator room". Square; house decoration, all the floors, walls, stairs and furniture can be installed as "modules", such as the floor and the inner layer of the walls are filled with foam, which can not only soundproof but also keep warm. At the same time, due to the huge internal space, individuals can also Affordable, it is possible to set roads and parking spots at the door of every house on every floor, so I named the "fourth generation housing" "modular house".
人类是群居生物,当今社会将人口越增加,社会越发展,城市人口越大,体现这个国家越现代化;地球赖以生存的地面,由于人口的不断增长,只得向空中发展,因此,一座座高楼大厦比肩,一个更比一个高;“第四代住房”的“模块房”将会超越所有的“电梯房”,比如,将“模块房”做成“金字塔”形状,那么,“模块房”不只会是一百多层,而是几百层,甚至上千层,而且,也不必去考虑它会倾倒,一座房屋建成为一座城市。Human beings live in groups. In today's society, the more the population increases, the more the society develops, and the larger the urban population, the more modern the country is. The buildings are shoulder to shoulder, one taller than the other; the "modular house" of the "fourth generation housing" will surpass all "elevator rooms", for example, if the "modular house" is made into a "pyramid" shape, then the "modular house" Not just one hundred floors, but hundreds, even thousands of floors, and there is no need to consider that it will collapse, a house is built into a city.
Claims (10)
- 手动对接钢构骨架运用“三件套式手动对接钢构骨架”和“双钩式手动对接钢构骨架”的两项技术,其特征在于:用手动对接“三件套对接器”和“双钩对接器”,将钢管和井形连接块、单管连接块、球体连接块所有构件连接,而完成大、中、小型的各类体育场馆、楼堂馆所、房屋建筑的钢构骨架和各类塔吊、龙门吊、行吊,以及各类桥架钢构柱、梁架等等钢构骨架。Manual docking of steel frame uses two technologies of "three-piece manual docking steel frame" and "double-hook manual docking steel frame", which is characterized in that: manual docking "three-piece butt joint" and "double hook docking Connect the steel pipe with the well-shaped connection block, single-pipe connection block, and sphere connection block, and complete the steel skeleton of various large, medium and small stadiums, buildings, houses, and various tower cranes. , gantry cranes, row cranes, and all kinds of bridge steel columns, beam frames and other steel skeletons.
- 根据权利要求1所述的手动对接钢构骨架,其特征在于:“三件套式手动对接钢构骨架”的主要有钢管和井形连接块、单管连接块、球体连接块组成,钢管两头为母型接头,井形、单管、球体连接块的每个作力点与钢管头的母型接头相对应的为公型接头,套管的内壁和公型接头的外壁与钢管壁号称“三件套”,钢管壁内每圈镶嵌两个以上滚珠,对应着套管内壁和公型接头外壁的凹槽,都为三圈或以上,钢管壁的滚珠滾入公型接头外壁的凹槽里,将锁定了公型接头与母型接头,钢管壁内的滚珠滾入套管内壁的凹槽里将打开公型接头与母型接头,这是一种方式,还有一种方式,套管内壁没有凹槽,这种方式固定套管头,必须还有内絲扣与对应公型接头外絲扣和在钢管两头设计用锣丝固定套管的两种方法,这两种方法可单一或同时使用。The manual butt joint steel frame according to claim 1, characterized in that: the "three-piece manual butt steel frame" mainly consists of steel pipes, well-shaped connection blocks, single pipe connection blocks, and sphere connection blocks, and the two ends of the steel pipes are The female joint, each force point of the well-shaped, single-pipe, and spherical connection block corresponds to the female joint of the steel pipe head as a male joint. The inner wall of the casing and the outer wall of the male joint and the steel pipe wall are called "three-piece sets ", each ring of the steel pipe wall is inlaid with more than two balls, corresponding to the grooves on the inner wall of the casing and the outer wall of the male joint, there are three or more rings, and the balls on the steel pipe wall roll into the grooves on the outer wall of the male joint. Lock the male joint and the female joint, the ball in the steel pipe wall will roll into the groove on the inner wall of the sleeve to open the male joint and the female joint. This is one way, and there is another way. Groove, in this way to fix the casing head, there must be two methods of fixing the casing with inner thread and corresponding male connector outer thread and designing the two ends of the steel pipe with gongs, these two methods can be used singly or at the same time.
- 根据权利要求1所述的手动对接钢构骨架,其特征在于:“双钩式手动对接钢构骨架”主要有钢管和井形连接块、单管连接块、球体连接块组成,钢管两头为双钩接头,井形、单管、球体连接块的每个作力点与钢管头的双钩接头相对应的也为双钩 接头,这两个双钩和一个套管,号称“双钩对接器”的两个双钩结构形式和尺寸标准完全相同一致,顶端是两个相对半圆形的双钩,中间是一个半圆形方杆与圆棒连在一起,这两个双钩合拢后,完全合缝成圆棒,套管的内圆与圆棒外圆的直径相同,套管完全套牢圆棒形状。The manual butt joint steel frame according to claim 1, characterized in that: the "double-hook manual butt steel frame" mainly consists of steel pipes, well-shaped connection blocks, single pipe connection blocks, and sphere connection blocks, and the two ends of the steel pipes are double-hook joints. Each force point of the well-shaped, single-pipe, and sphere connection block corresponds to the double-hook joint of the steel pipe head, which is also a double-hook joint. The standards are exactly the same, the top is two opposite semicircular double hooks, and the middle is a semicircular square rod connected with the round rod. After the two double hooks are closed, they are completely sewn into a round rod. The inner circle of the casing The same diameter as the outer circle of the rod, the sleeve fully grips the shape of the rod.
- 根据权利要求1或2所述的手动对接钢构骨架,其特征在于:“三件套式手动对接钢构骨架”钢管两头的母型接点与以井形、单管、球体等连接块以公型接头两密封面为椎体,而使钢管与连接块更加紧密,同时,在安装时可随意调整方向,不至于被密封面卡死。According to claim 1 or 2, the manual butt joint steel structure framework is characterized in that: the female joints at both ends of the steel pipes of the "three-piece manual joint joint steel structure framework" are connected with the male joints of well-shaped, single-pipe, sphere and other connecting blocks. The two sealing surfaces of the joint are vertebral bodies, so that the steel pipe and the connecting block are more tightly connected. At the same time, the direction can be adjusted at will during installation, so as not to be stuck by the sealing surfaces.
- 根据权利要求1或3所述的手动对接钢构骨架,其特征在于:“双钩式手动对接钢构骨架”钢管两头的双钩接点与以井形、单管、球体等连接块以双钩接头这两个双钩合拢后,完全合缝成圆棒形,套管的内圆与圆棒外圆的直径相同,套管完全套牢圆棒形状,在每个井形、单管、球体连接块的每个作力点的双钩底部都有丝扣,对应套管端内丝扣,为固定套管用,还有在钢管两头设计锣丝钉,为固定套管的另一个形式,两种方式可单一或同时使用。According to claim 1 or 3, the manual butt joint steel frame is characterized in that: the double-hook joints at both ends of the "double-hook manual butt steel frame" steel pipe are connected with well-shaped, single-pipe, sphere and other connecting blocks with double-hook joints. After the double hooks are closed, they are completely seamed into a round rod shape. The diameter of the inner circle of the sleeve is the same as the diameter of the outer circle of the round rod. There are threaded buckles at the bottom of the double hooks, corresponding to the inner threaded buckles at the end of the casing, for fixing the casing, and there are gong screw nails at both ends of the steel pipe, which is another form of fixing the casing. The two methods can be used singly or at the same time.
- 根据权利要求1或2或3或4或5所述的手动对接钢构骨架,其特征在于:手动对接钢构骨架的球体连接块和钢管是本钢构骨架的核心,因此,在球体连接块上的多个接头焊接变化,有 全面或者半面的45°、60°、90°排布,因骨架之需而设,也决定钢构骨架结构钢构骨架形状。According to claim 1 or 2 or 3 or 4 or 5 described manual butt joint steel framework, it is characterized in that: the spherical connection block and the steel pipe of manual butt joint steel framework are the core of this steel framework, therefore, in the spherical connection block The welding changes of multiple joints on the steel structure can be arranged in 45°, 60°, and 90° on a full or half surface, which are set according to the needs of the skeleton and also determine the shape of the steel skeleton.
- 根据权利要求1或2或3或4或5所述的手动对接钢构骨架,其特征在于:手动对接钢构骨架钢构骨架的钢管的规格,井形、单管、球体等连接块都是结合实际运用中总结出来的形状,比如,单管连接块用在层与层之间半米层时,将不足半米的短钢管两头以球体连接块焊死在短管上。According to claim 1 or 2 or 3 or 4 or 5, the manual butt joint steel frame is characterized in that: the specifications of the steel pipes for the manual butt joint steel frame steel frame, the connection blocks such as well shape, single pipe, and sphere are combined The shape summarized in practical application, for example, when the single pipe connection block is used in the half-meter layer between the layers, the two ends of the short steel pipe less than half a meter are welded to the short pipe with spherical connection blocks.
- 根据权利要求1或2或3或4或5所述的手动对接钢构骨架,其特征在于:手动对接钢构骨架的井形、单管、球体等连接块安装,井形连接块多用于钢构骨架的柱子、塔吊主体和电梯内井等部位,焊成井形连接块后使钢构骨架更加牢固。According to claim 1 or 2 or 3 or 4 or 5, the manual butt joint steel structure skeleton is characterized in that: the well-shaped, single pipe, sphere and other connecting blocks for the manual butt joint steel structure skeleton are installed, and the well-shaped connection blocks are mostly used for the steel structure skeleton The pillars of the tower crane, the main body of the tower crane and the inner shaft of the elevator are welded into well-shaped connection blocks to make the steel structure stronger.
- 根据权利要求1或2或3或4或5所述的手动对接钢构骨架,其特征在于:手动对接钢构骨架的技术还设计了一种单揷公型接头或单揷双钩接头,在其底部安装了为固定用的锣丝,有了这个单揷接头后,特别是装修时,可随房主意愿增加房间或墙壁,而且在任何时候增加或减少房间、墙壁,将由房主随意为之。According to claim 1 or 2 or 3 or 4 or 5, the manual butt steel skeleton is characterized in that: the technique of manual butt steel skeleton also designs a single-clamp male joint or a single-clamp double-hook joint, in which The gong wire for fixing is installed at the bottom. With this single joint, especially when decorating, you can add rooms or walls according to the wishes of the homeowner, and the addition or subtraction of rooms and walls at any time will be done by the homeowner at will. .
- 根据权利要求1或2或3或4或5所述的手动对接钢构骨架,其特征在于:手动对接钢构骨架的技术还设计了钢管的双钩接头一边有旋转的双钩接头,也可焊接在对应的连接块接头上,有了旋转的双钩接头后,并没有降低钢管强度,这种设计是由实践总结的结果,能降低在生产加工中的难度,不必着意考虑焊接双钩方向,在安装时又可手动安装方便、可靠。According to claim 1 or 2 or 3 or 4 or 5, the manual butt steel skeleton is characterized in that: the technology of manual butt steel skeleton has also designed the double hook joint of the steel pipe with a rotating double hook joint on one side, which can also be welded on On the corresponding connection block joint, the strength of the steel pipe is not reduced after the rotating double-hook joint is installed. This design is the result of practical summary, which can reduce the difficulty in production and processing. It is not necessary to consider the direction of the welding double hook. When installing It can also be installed manually, which is convenient and reliable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2021/000119 WO2022261794A1 (en) | 2021-06-15 | 2021-06-15 | Manual butt-joint steel skeleton |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2021/000119 WO2022261794A1 (en) | 2021-06-15 | 2021-06-15 | Manual butt-joint steel skeleton |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022261794A1 true WO2022261794A1 (en) | 2022-12-22 |
Family
ID=84526786
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2021/000119 WO2022261794A1 (en) | 2021-06-15 | 2021-06-15 | Manual butt-joint steel skeleton |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2022261794A1 (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2750153Y (en) * | 2004-11-23 | 2006-01-04 | 重庆军通汽车有限责任公司 | Double row steel ball type express connector |
CN201372986Y (en) * | 2008-11-18 | 2009-12-30 | 马克双 | Double hook butting connector |
CN201372987Y (en) * | 2008-11-18 | 2009-12-30 | 马克双 | Three-piece suit butting connector |
CN201474282U (en) * | 2009-09-09 | 2010-05-19 | 马克双 | Three-piece butt-joint scaffold |
CN201495760U (en) * | 2009-09-09 | 2010-06-02 | 马克双 | Double-hook butting scaffold |
JP2017053399A (en) * | 2015-09-08 | 2017-03-16 | Ntn株式会社 | Manufacturing method of constant velocity universal joint |
CN113494130A (en) * | 2020-04-08 | 2021-10-12 | 马克双 | Manual butt joint steel structure framework |
CN113494131A (en) * | 2020-04-08 | 2021-10-12 | 马克双 | Two-type manual butt joint steel framework |
-
2021
- 2021-06-15 WO PCT/CN2021/000119 patent/WO2022261794A1/en active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2750153Y (en) * | 2004-11-23 | 2006-01-04 | 重庆军通汽车有限责任公司 | Double row steel ball type express connector |
CN201372986Y (en) * | 2008-11-18 | 2009-12-30 | 马克双 | Double hook butting connector |
CN201372987Y (en) * | 2008-11-18 | 2009-12-30 | 马克双 | Three-piece suit butting connector |
CN201474282U (en) * | 2009-09-09 | 2010-05-19 | 马克双 | Three-piece butt-joint scaffold |
CN201495760U (en) * | 2009-09-09 | 2010-06-02 | 马克双 | Double-hook butting scaffold |
JP2017053399A (en) * | 2015-09-08 | 2017-03-16 | Ntn株式会社 | Manufacturing method of constant velocity universal joint |
CN113494130A (en) * | 2020-04-08 | 2021-10-12 | 马克双 | Manual butt joint steel structure framework |
CN113494131A (en) * | 2020-04-08 | 2021-10-12 | 马克双 | Two-type manual butt joint steel framework |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113494131A (en) | Two-type manual butt joint steel framework | |
CN113494130A (en) | Manual butt joint steel structure framework | |
Rizzuto et al. | Connection systems in reciprocal frames and mutually supported elements space structure networks | |
Gong et al. | A Review of Key Technologies Development of Super High‐Rise Building Construction in China | |
WO2022261794A1 (en) | Manual butt-joint steel skeleton | |
WO2022261796A1 (en) | Dual-type manual coupling steel frame | |
GB2528090A (en) | Building system | |
WO2022261797A1 (en) | Single-hook type manual butt joint steel structure frame | |
WO2022261795A1 (en) | Double-hook-type manually butt-jointed steel structure framework | |
WO2022261798A1 (en) | Three-piece set-type manual butt-joint steel skeleton | |
CN113073735A (en) | Three-piece set type manual butt joint steel framework | |
CN113494129A (en) | Single-hook type manual butt joint steel framework | |
CN202202413U (en) | Rectangular steel tube concrete special-shaped column and steel beam frame corner node | |
CN113073734A (en) | Double-hook type manual butt-joint steel framework | |
Mason | The use of earthenware tubes in Roman vault construction: an example from Chester | |
Mallikarjun et al. | Analysis and Design of a Multi Storied Residential Building of (Ung-2+ G+ 10) By Using Most Economical Column Method | |
Parke et al. | Space structures 4 | |
CN112627587A (en) | Large-span building wavy line roof steel truss mounting structure | |
Buzalo et al. | Energy efficient building structures based on gridshell | |
CN201339333Y (en) | Tower-type suspension house building | |
Karimi | Study and comparison arch at framework modern materials case study: Iran | |
Gong | Shanghai tower | |
Erkoç et al. | Design of Inclined-Form Buildings: Architectural and Structural Considerations | |
CN221920415U (en) | Assembly type building reinforcing assembly | |
Xiong et al. | Mechanical Performance of High-Rise Twisted Diagrid Tube Structure System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21945392 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 21945392 Country of ref document: EP Kind code of ref document: A1 |