WO2022252472A1 - Method for shortening replacement time of rh vacuum chamber and rh vacuum chamber replacement apparatus - Google Patents

Method for shortening replacement time of rh vacuum chamber and rh vacuum chamber replacement apparatus Download PDF

Info

Publication number
WO2022252472A1
WO2022252472A1 PCT/CN2021/124914 CN2021124914W WO2022252472A1 WO 2022252472 A1 WO2022252472 A1 WO 2022252472A1 CN 2021124914 W CN2021124914 W CN 2021124914W WO 2022252472 A1 WO2022252472 A1 WO 2022252472A1
Authority
WO
WIPO (PCT)
Prior art keywords
vacuum chamber
station
vacuum
standby
transport vehicle
Prior art date
Application number
PCT/CN2021/124914
Other languages
French (fr)
Chinese (zh)
Inventor
许海虹
欧洪林
Original Assignee
中冶南方工程技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中冶南方工程技术有限公司 filed Critical 中冶南方工程技术有限公司
Publication of WO2022252472A1 publication Critical patent/WO2022252472A1/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/10Handling in a vacuum

Definitions

  • the invention belongs to the field of steelmaking vacuum refining in the metallurgical industry, and in particular relates to a method for shortening the replacement time of an RH vacuum chamber.
  • RH vacuum cycle degassing
  • the double processing station RH uses two processing stations alternately, it can save auxiliary operation time such as sitting bag, hanging bag, ladle car driving, wire feeding, soft mixing, etc. accounted for the vast majority.
  • the single processing station RH has the advantages of energy saving, low investment cost, small footprint, and high equipment operation rate.
  • the auxiliary operation time can also be effectively shortened.
  • the single-handling station RH is back to life.
  • the existing single-processing station RH is generally equipped with one processing station and two standby stations, equipped with two vacuum chambers, which fall on two vacuum chamber transport vehicles respectively, and the processing station or standby station 11 in Fig. 1 is ladle car, 12 is steel ladle, 13 is steel platform, 14 is vacuum system, 15 is 2# vacuum chamber, 16 is 2# vacuum chamber transport vehicle, 17 is 1# vacuum chamber, 18 It is a 1# vacuum chamber transport vehicle.
  • the 2# vacuum chamber transport vehicle is transported to the 2# standby station, and then the The workshop is hoisted to the maintenance area and replaced with a new vacuum chamber; at the same time, the 1# vacuum chamber in the hot standby state at the 1# standby station is transported to the processing station by the 1# vacuum chamber transport vehicle, and can continue Carry out vacuum refining treatment.
  • the RH vacuum refining furnace cannot be used for production, so the shorter the vacuum chamber replacement time, the better.
  • the present invention aims to provide a method for shortening the replacement time of the RH vacuum chamber.
  • the two vacuum chambers are respectively defined as the first vacuum chamber and the second vacuum chamber.
  • the positions of the first and second vacuum chambers on the vacuum chamber transport vehicle Determined by the positions of the 1# standby station, processing station and 2# standby station of the single-station RH vacuum refining furnace, when the first vacuum chamber is at the processing station, the second vacuum chamber is at the 2# standby station , when the second vacuum chamber is at the processing station, the first vacuum chamber is at the 1# standby station; when replacing, the vacuum chamber to be replaced is transported to the corresponding standby process by the operation of the vacuum chamber transport vehicle, and the standby The vacuum chamber is transported to the processing station.
  • the invention also provides a RH vacuum chamber replacement device.
  • a RH vacuum chamber replacement device which is applied to a single-station RH vacuum refining furnace, and the single-station RH vacuum refining furnace has a 1# standby station, a processing station and a 2# standby station, including a double vacuum chamber transport vehicle 1.
  • the first vacuum chamber and the second vacuum chamber installed on the double-vacuum chamber transport vehicle, the positions of the first vacuum chamber 2 and the second vacuum chamber on the double-vacuum chamber transport vehicle are controlled by 1# of the single-station RH vacuum refining furnace
  • the positions of the standby station, processing station and 2# standby station are determined.
  • the first vacuum chamber is at the processing station
  • the second vacuum chamber is at the 2# standby station.
  • the first vacuum chamber is located at the 1# standby station.
  • the double vacuum chamber transport vehicle has a gas valve station, a cooling water valve station, connecting pipelines and an inspection platform.
  • the double-vacuum-chamber transport vehicle has a drag chain, and various energy media can be sent to the double-vacuum-chamber transport vehicle by means of the drag chain.
  • the double vacuum chamber transport vehicle has one set of drives or two sets of drives.
  • the double vacuum chamber transport vehicle has 3 sets of wheels, which are respectively arranged at both ends of the double vacuum chamber transport vehicle and in the middle of the double vacuum chamber.
  • a method for shortening the replacement time of the RH vacuum chamber has the following advantages: the present invention combines the original two vacuum chamber transport vehicles of the single processing station RH into a longer double
  • the vacuum chamber transport vehicle can simultaneously complete one of the two vacuum chambers running from the processing station to the standby station and the other of the two vacuum chambers from the standby station to the processing station, reducing the non-stop operation of the RH vacuum refining furnace.
  • the production time is short, and it has the advantages of light equipment weight, short overall length and large working area.
  • Fig. 1 shows a schematic diagram of a single-station RH vacuum refining furnace in the prior art.
  • Fig. 2 shows a schematic diagram of a single-station RH vacuum refining furnace in the present invention.
  • this RH vacuum chamber replacement device comprises a pair of vacuum chamber transport vehicles 27, installed in the double vacuum chamber The first vacuum chamber 26 and the second vacuum chamber 25 on the chamber transport cart 27.
  • the single-station RH vacuum refining furnace as shown in Figure 2 includes a ladle car 21, a ladle 22 positioned on the ladle car 21, a steel platform 23 and a vacuum system 24, and only the main components of the RH vacuum refining furnace are shown in the figure. It is a prior art, so the specific structure will not be repeated here.
  • the RH vacuum refining furnace has 1# standby station, processing station and 2# standby station, wherein the processing station is located between 1# standby station and 2# standby station.
  • the positions of the first vacuum chamber 26 and the second vacuum chamber 25 on the double vacuum chamber transporter 27 are determined by the positions of the 1# standby station, the processing station and the 2# standby station of the single-station RH vacuum refining furnace, When the first vacuum chamber 26 is at the processing station, the second vacuum chamber 25 is at the 2# standby station, and when the second vacuum chamber 25 is at the processing station, the first vacuum chamber 26 is at the 1# standby station.
  • this RH vacuum chamber replacement device can be in the first vacuum chamber 26 or the second vacuum chamber 25 when one of them is moved to 1# standby station or 2# standby station by processing station, first vacuum chamber 26 or another action of the second vacuum chamber 25 from the 2# standby station or the 1# standby station to the processing station, which reduces the operation time of the RH vacuum refining furnace to replace the vacuum chamber, thereby reducing the RH vacuum refining Furnace non-production time.
  • the double-vacuum-chamber transport vehicle 27 has a drag chain, and various energy media can be sent to the vehicle by the drag-chain, so as to facilitate the transportation of various energy media to the dual-vacuum chamber transport vehicle 27 .
  • the double vacuum chamber transport vehicle 27 has one set of drives or two sets of drives, and the two sets of drives can play the role of one for use and one for standby.
  • the double vacuum chamber transport vehicle 27 has more space than the existing independent two vacuum chamber transport vehicles, and these spaces can be used to install various required gas valve stations, cooling water valve stations, connection Pipeline and maintenance platform, which can facilitate the replacement of the vacuum chamber, thereby reducing the non-production time of the RH vacuum refining furnace.
  • the double-vacuum-chamber transport vehicle 27 has 3 sets of wheels, which are respectively arranged at both ends of the transport vehicle and in the middle of the double-vacuum chambers, so as to evenly bear the load of the double-vacuum chambers.
  • the present invention also provides a method for shortening the replacement time of the RH vacuum chamber, which installs two vacuum chambers, one for use and one for standby, on the same vacuum chamber transport vehicle at the same time.
  • the two vacuum chambers are respectively defined as the first vacuum chamber and the second vacuum chamber.
  • the positions of the first and second vacuum chambers on the vacuum chamber transport vehicle are determined by the 1# standby station and the processing station of the single-station RH vacuum refining furnace.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Solid-Phase Diffusion Into Metallic Material Surfaces (AREA)

Abstract

A method for shortening the replacement time of an RH vacuum chamber and an RH vacuum chamber replacement apparatus. In the present invention, original two vacuum chamber transport vehicles of a single processing station RH are combined into a longer dual-vacuum-chamber transport vehicle (27), and thus actions of one of two vacuum chambers (25, 26) running from the processing station to a standby station and the other of the two vacuum chambers (25, 26) running from the standby station to the processing station can be completed simultaneously, thereby reducing the non-production time of an RH vacuum refining furnace, and the present invention has the advantages of light weight, short overall length, and large working area.

Description

一种缩短RH真空室更换时间的方法及RH真空室更换装置A method for shortening the replacement time of RH vacuum chamber and an RH vacuum chamber replacement device 技术领域technical field
本发明属于冶金行业炼钢真空精炼领域,具体涉及一种缩短RH真空室更换时间的方法。The invention belongs to the field of steelmaking vacuum refining in the metallurgical industry, and in particular relates to a method for shortening the replacement time of an RH vacuum chamber.
背景技术Background technique
随着经济的发展,用户对钢材品种的需求不断扩大,对钢材质量的要求也日益提高。从工艺本身和经验来看,RH(真空循环脱气)系真空处理技术已成为一种扩大产品范围,提高产品质量行之有效的手段之一。With the development of the economy, the user's demand for steel products continues to expand, and the requirements for steel quality are also increasing. From the perspective of the process itself and experience, RH (vacuum cycle degassing) series vacuum treatment technology has become one of the effective means to expand the product range and improve product quality.
目前钢厂现有RH真空精炼炉存在单处理工位和双处理工位两大类型式。一般来讲由于双处理工位RH是两个处理工位交替使用,可以节省坐包、吊包、钢包车开行、喂丝、软搅拌等辅助作业时间,因此具有较短的处理周期,在数量上占绝大多数。但是单处理工位RH具有节能、投资费用省、占地面积小、设备作业率高的优势,在出现V型双钢包车式、钢包旋转式等新型式后,辅助作业时间也能有效缩短,单处理工位RH又焕发了生机。At present, there are two types of RH vacuum refining furnaces in steel mills: single processing station and double processing station. Generally speaking, since the double processing station RH uses two processing stations alternately, it can save auxiliary operation time such as sitting bag, hanging bag, ladle car driving, wire feeding, soft mixing, etc. accounted for the vast majority. However, the single processing station RH has the advantages of energy saving, low investment cost, small footprint, and high equipment operation rate. After the emergence of new models such as V-shaped double ladle car type and ladle rotary type, the auxiliary operation time can also be effectively shortened. The single-handling station RH is back to life.
如图1所示,现有单处理工位RH一般设置一个处理工位和两个待机工位,配置两个真空室,分别落在两台真空室运输车上,在处理工位或待机工位工作,图1中的11为钢包车、12为钢包、13为钢平台、14为真空系统、15为2#真空室、16为2#真空室运输车、17为1#真空室、18为1#真空室运输车。其中以2#真空室在处理工位连续进行多炉次的真空精炼处理为例,直到2#真空室耐火材料蚀损不能使用,2#真空室运输车运送至2#待机工位,再由车间行车吊运至维修区,并换上新的真空室;以此同时,在1#待机工位处于热备用状态的1#真空室由1#真空室运输车运送至处理工位,可继续进行真空精炼处理。在更换处理 工位的真空室期间,RH真空精炼炉不能进行生产,因此真空室更换时间越短越好。As shown in Figure 1, the existing single-processing station RH is generally equipped with one processing station and two standby stations, equipped with two vacuum chambers, which fall on two vacuum chamber transport vehicles respectively, and the processing station or standby station 11 in Fig. 1 is ladle car, 12 is steel ladle, 13 is steel platform, 14 is vacuum system, 15 is 2# vacuum chamber, 16 is 2# vacuum chamber transport vehicle, 17 is 1# vacuum chamber, 18 It is a 1# vacuum chamber transport vehicle. Taking the 2# vacuum chamber as an example to carry out continuous vacuum refining treatment for multiple furnaces at the processing station, until the refractory material of the 2# vacuum chamber is corroded and cannot be used, the 2# vacuum chamber transport vehicle is transported to the 2# standby station, and then the The workshop is hoisted to the maintenance area and replaced with a new vacuum chamber; at the same time, the 1# vacuum chamber in the hot standby state at the 1# standby station is transported to the processing station by the 1# vacuum chamber transport vehicle, and can continue Carry out vacuum refining treatment. During the replacement of the vacuum chamber of the processing station, the RH vacuum refining furnace cannot be used for production, so the shorter the vacuum chamber replacement time, the better.
发明内容Contents of the invention
本发明旨在提供一种缩短RH真空室更换时间的方法。The present invention aims to provide a method for shortening the replacement time of the RH vacuum chamber.
具体方案如下:The specific plan is as follows:
一种缩短RH真空室更换时间的方法,其应用单工位RH真空精炼炉上,且单工位RH真空精炼炉具有1#待机工位、处理工位和2#待机工位,其将一用一备两个真空室同时安装在同一辆真空室运输车上,两个真空室分别定义为第一真空室和第二真空室,第一、第二真空室在真空室运输车上的位置由单工位RH真空精炼炉的1#待机工位、处理工位和2#待机工位的位置来确定,当第一真空室位于处理工位时,第二真空室位于2#待机工位,当第二真空室位于处理工位时,第一真空室位于1#待机工位;更换时,通过真空室运输车的运行将待更换的真空室运送至对应的待机工艺,并同时将备用的真空室运送至处理工位。A method for shortening the replacement time of the RH vacuum chamber, which is applied to a single-station RH vacuum refining furnace, and the single-station RH vacuum refining furnace has a 1# standby station, a processing station and a 2# standby station, which will One and two vacuum chambers are installed on the same vacuum chamber transport vehicle at the same time. The two vacuum chambers are respectively defined as the first vacuum chamber and the second vacuum chamber. The positions of the first and second vacuum chambers on the vacuum chamber transport vehicle Determined by the positions of the 1# standby station, processing station and 2# standby station of the single-station RH vacuum refining furnace, when the first vacuum chamber is at the processing station, the second vacuum chamber is at the 2# standby station , when the second vacuum chamber is at the processing station, the first vacuum chamber is at the 1# standby station; when replacing, the vacuum chamber to be replaced is transported to the corresponding standby process by the operation of the vacuum chamber transport vehicle, and the standby The vacuum chamber is transported to the processing station.
本发明还提供了一种RH真空室更换装置。The invention also provides a RH vacuum chamber replacement device.
具体方案如下:The specific plan is as follows:
一种RH真空室更换装置,其应用单工位RH真空精炼炉上,且单工位RH真空精炼炉具有1#待机工位、处理工位和2#待机工位,包括一双真空室运输车、安装在双真空室运输车上的第一真空室和第二真空室,第一真空室2和第二真空室在双真空室运输车上的位置由单工位RH真空精炼炉的1#待机工位、处理工位和2#待机工位的位置来确定,当第一真空室位于处理工位时,第二真空室位于2#待机工位,当第二真空室位于处理工位时,第一真空室位于1#待机工位。A RH vacuum chamber replacement device, which is applied to a single-station RH vacuum refining furnace, and the single-station RH vacuum refining furnace has a 1# standby station, a processing station and a 2# standby station, including a double vacuum chamber transport vehicle 1. The first vacuum chamber and the second vacuum chamber installed on the double-vacuum chamber transport vehicle, the positions of the first vacuum chamber 2 and the second vacuum chamber on the double-vacuum chamber transport vehicle are controlled by 1# of the single-station RH vacuum refining furnace The positions of the standby station, processing station and 2# standby station are determined. When the first vacuum chamber is at the processing station, the second vacuum chamber is at the 2# standby station. When the second vacuum chamber is at the processing station , the first vacuum chamber is located at the 1# standby station.
进一步的,所述双真空室运输车具有气体阀站、冷却水阀站、连接管线和检修平台。Further, the double vacuum chamber transport vehicle has a gas valve station, a cooling water valve station, connecting pipelines and an inspection platform.
进一步的,所述双真空室运输车上具有一个拖链,各种能源介质均可借由所述拖链送到双真空室运输车上。Further, the double-vacuum-chamber transport vehicle has a drag chain, and various energy media can be sent to the double-vacuum-chamber transport vehicle by means of the drag chain.
进一步的,所述双真空室运输车具有一组驱动或者具有两组驱动。Further, the double vacuum chamber transport vehicle has one set of drives or two sets of drives.
进一步的,所述双真空室运输车具有3组车轮,分别布置在双真空室运输车的两端及双真空室的中间。Further, the double vacuum chamber transport vehicle has 3 sets of wheels, which are respectively arranged at both ends of the double vacuum chamber transport vehicle and in the middle of the double vacuum chamber.
本发明提供的一种缩短RH真空室更换时间的方法与现有技术相比较具有以下优点:本发明的将单处理工位RH原有的两台真空室运输车合并为一台较长的双真空室运输车,可同时完成两真空室的其一从处理工位运行至待机工位和两真空室的另一由待机工位运行至处理工位的动作,减少了RH真空精炼炉的非生产时间,并具有设备重量轻、总长度短、作业面积大的优点。Compared with the prior art, a method for shortening the replacement time of the RH vacuum chamber provided by the present invention has the following advantages: the present invention combines the original two vacuum chamber transport vehicles of the single processing station RH into a longer double The vacuum chamber transport vehicle can simultaneously complete one of the two vacuum chambers running from the processing station to the standby station and the other of the two vacuum chambers from the standby station to the processing station, reducing the non-stop operation of the RH vacuum refining furnace. The production time is short, and it has the advantages of light equipment weight, short overall length and large working area.
附图说明Description of drawings
图1示出了现有技术中单工位RH真空精炼炉的示意图。Fig. 1 shows a schematic diagram of a single-station RH vacuum refining furnace in the prior art.
图2示出了本发明中单工位RH真空精炼炉的示意图。Fig. 2 shows a schematic diagram of a single-station RH vacuum refining furnace in the present invention.
具体实施方式Detailed ways
为进一步说明各实施例,本发明提供有附图。这些附图为本发明揭露内容的一部分,其主要用以说明实施例,并可配合说明书的相关描述来解释实施例的运作原理。配合参考这些内容,本领域普通技术人员应能理解其他可能的实施方式以及本发明的优点。图中的组件并未按比例绘制,而类似的组件符号通常用来表示类似的组件。To further illustrate the various embodiments, the present invention is provided with accompanying drawings. These drawings are a part of the disclosure of the present invention, which are mainly used to illustrate the embodiments, and can be combined with related descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, those skilled in the art should understand other possible implementations and advantages of the present invention. Components in the figures are not drawn to scale, and similar component symbols are generally used to denote similar components.
现结合附图和具体实施方式对本发明进一步说明。The present invention will be further described in conjunction with the accompanying drawings and specific embodiments.
针对现有单工位RH真空精炼炉的不足,本发明提供了一种RH真空室更换装置,如图2所示的,该RH真空室更换装置包括一双真空室运输车27、安装在双真空室运输车27上的第一真空室26和第二真空室25。Aiming at the deficiency of existing single station RH vacuum refining furnace, the present invention provides a kind of RH vacuum chamber replacement device, as shown in Figure 2, this RH vacuum chamber replacement device comprises a pair of vacuum chamber transport vehicles 27, installed in the double vacuum chamber The first vacuum chamber 26 and the second vacuum chamber 25 on the chamber transport cart 27.
如图2中所示的单工位RH真空精炼炉包括有钢包车21、位于钢包车21上的钢包22、钢平台23和真空系统24,图中仅示出RH真空精炼炉主要的部件,其为现有技术因此具体的结构在此不进行赘述。该RH真空精炼炉具有1#待机工位、处理工位和2#待机工位,其中处理工位位于1#待机工位、2#待机工位中间。第一真空室26和第二真空室25在双真空室运输车27上的位置由单工位RH真空精炼炉的1#待机工位、处理工位和2#待机工位的位置来确定,当第一真空室26位于处理工位时,第二真空室25位于2#待机工位,当第二真空室25位于处理工位时,第一真空室26位于1#待机工位。The single-station RH vacuum refining furnace as shown in Figure 2 includes a ladle car 21, a ladle 22 positioned on the ladle car 21, a steel platform 23 and a vacuum system 24, and only the main components of the RH vacuum refining furnace are shown in the figure. It is a prior art, so the specific structure will not be repeated here. The RH vacuum refining furnace has 1# standby station, processing station and 2# standby station, wherein the processing station is located between 1# standby station and 2# standby station. The positions of the first vacuum chamber 26 and the second vacuum chamber 25 on the double vacuum chamber transporter 27 are determined by the positions of the 1# standby station, the processing station and the 2# standby station of the single-station RH vacuum refining furnace, When the first vacuum chamber 26 is at the processing station, the second vacuum chamber 25 is at the 2# standby station, and when the second vacuum chamber 25 is at the processing station, the first vacuum chamber 26 is at the 1# standby station.
因此,该RH真空室更换装置可在将第一真空室26或第二真空室25中的其一由处理工位运行至1#待机工位或2#待机工位的同时将第一真空室26或第二真空室25的另一由2#待机工位或1#待机工位运行至处理工位的动作,减少了RH真空精炼炉更换真空室的操作时间,进而减小了RH真空精炼炉的非生产时间。Therefore, this RH vacuum chamber replacement device can be in the first vacuum chamber 26 or the second vacuum chamber 25 when one of them is moved to 1# standby station or 2# standby station by processing station, first vacuum chamber 26 or another action of the second vacuum chamber 25 from the 2# standby station or the 1# standby station to the processing station, which reduces the operation time of the RH vacuum refining furnace to replace the vacuum chamber, thereby reducing the RH vacuum refining Furnace non-production time.
在本实施例中,双真空室运输车27上具有一个拖链,各种能源介质均可由拖链送到车上,以方便将各种能源介质搬运至双真空室运输车27上。In this embodiment, the double-vacuum-chamber transport vehicle 27 has a drag chain, and various energy media can be sent to the vehicle by the drag-chain, so as to facilitate the transportation of various energy media to the dual-vacuum chamber transport vehicle 27 .
在本实施例中,双真空室运输车27具有一组驱动或者具有两组驱动,两组驱动可以起到一用一备的作用。In this embodiment, the double vacuum chamber transport vehicle 27 has one set of drives or two sets of drives, and the two sets of drives can play the role of one for use and one for standby.
在本实施例中,双真空室运输车27相对现有独立的两个真空室运输车具有更大的空间,这些空间可以用于安装各种所需的气体阀站、冷却水阀站、连接管线和检修平台,这样能够更便于真空室的更换,进而减小了RH真空精炼炉的非生产时间。In this embodiment, the double vacuum chamber transport vehicle 27 has more space than the existing independent two vacuum chamber transport vehicles, and these spaces can be used to install various required gas valve stations, cooling water valve stations, connection Pipeline and maintenance platform, which can facilitate the replacement of the vacuum chamber, thereby reducing the non-production time of the RH vacuum refining furnace.
在本实施例中,双真空室运输车27具有3组车轮,分别布置在运输车两端及双真空室的中间,能起到均匀承担双真空室负荷的目的。In this embodiment, the double-vacuum-chamber transport vehicle 27 has 3 sets of wheels, which are respectively arranged at both ends of the transport vehicle and in the middle of the double-vacuum chambers, so as to evenly bear the load of the double-vacuum chambers.
针对现有单工位RH真空精炼炉的不足,本发明还提供了一种缩短RH真空 室更换时间的方法,其将一用一备两个真空室同时安装在同一辆真空室运输车上,两个真空室分别定义为第一真空室和第二真空室,第一、第二真空室在真空室运输车上的位置由单工位RH真空精炼炉的1#待机工位、处理工位和2#待机工位的位置来确定,当第一真空室位于处理工位时,第二真空室位于2#待机工位,当第二真空室位于处理工位时,第一真空室位于1#待机工位;更换时,通过真空室运输车的运行将待更换的真空室运送至对应的待机工艺,同时将备用的真空室运送至处理工位,实现减少了RH真空精炼炉更换真空室操作时间的目的,进而减小了RH真空精炼炉的非生产时间。Aiming at the shortcomings of the existing single-station RH vacuum refining furnace, the present invention also provides a method for shortening the replacement time of the RH vacuum chamber, which installs two vacuum chambers, one for use and one for standby, on the same vacuum chamber transport vehicle at the same time. The two vacuum chambers are respectively defined as the first vacuum chamber and the second vacuum chamber. The positions of the first and second vacuum chambers on the vacuum chamber transport vehicle are determined by the 1# standby station and the processing station of the single-station RH vacuum refining furnace. and 2# standby position to determine, when the first vacuum chamber is at the processing station, the second vacuum chamber is at the 2# standby station, and when the second vacuum chamber is at the processing station, the first vacuum chamber is at 1 #Standby station; when replacing, the vacuum chamber to be replaced is transported to the corresponding standby process through the operation of the vacuum chamber transport vehicle, and the spare vacuum chamber is transported to the processing station at the same time, which reduces the replacement of vacuum chambers in the RH vacuum refining furnace The purpose of operating time, thereby reducing the non-production time of the RH vacuum refining furnace.
尽管结合优选实施方案具体展示和介绍了本发明,但所属领域的技术人员应该明白,在不脱离所附权利要求书所限定的本发明的精神和范围内,在形式上和细节上可以对本发明做出各种变化,均为本发明的保护范围。Although the present invention has been particularly shown and described in conjunction with preferred embodiments, it will be understood by those skilled in the art that changes in form and details may be made to the present invention without departing from the spirit and scope of the invention as defined by the appended claims. Making various changes is within the protection scope of the present invention.

Claims (6)

  1. 一种缩短RH真空室更换时间的方法,其应用单工位RH真空精炼炉上,且单工位RH真空精炼炉具有1#待机工位、处理工位和2#待机工位,其特征在于:其将一用一备两个真空室同时安装在同一辆真空室运输车上,两个真空室分别定义为第一真空室和第二真空室,第一、第二真空室在真空室运输车上的位置由单工位RH真空精炼炉的1#待机工位、处理工位和2#待机工位的位置来确定,当第一真空室位于处理工位时,第二真空室位于2#待机工位,当第二真空室位于处理工位时,第一真空室位于1#待机工位;更换时,通过真空室运输车的运行将待更换的真空室运送至对应的待机工艺,并同时将备用的真空室运送至处理工位。A method for shortening the replacement time of the RH vacuum chamber, which is applied to a single-station RH vacuum refining furnace, and the single-station RH vacuum refining furnace has a 1# standby station, a processing station and a 2# standby station, and is characterized in that : It installs two vacuum chambers, one for use and one for preparation, on the same vacuum chamber transport vehicle at the same time, and the two vacuum chambers are respectively defined as the first vacuum chamber and the second vacuum chamber, and the first and second vacuum chambers are transported in the vacuum chamber The position on the car is determined by the positions of the 1# standby station, the processing station and the 2# standby station of the single-station RH vacuum refining furnace. When the first vacuum chamber is at the processing station, the second vacuum chamber is at the 2# #Standby station, when the second vacuum chamber is at the processing station, the first vacuum chamber is at the 1# standby station; when replacing, the vacuum chamber to be replaced is transported to the corresponding standby process by the operation of the vacuum chamber transport vehicle, At the same time, the spare vacuum chamber is transported to the processing station.
  2. 一种RH真空室更换装置,其应用单工位RH真空精炼炉上,且单工位RH真空精炼炉具有1#待机工位、处理工位和2#待机工位,其特征在于:包括一双真空室运输车、安装在双真空室运输车上的第一真空室和第二真空室,第一真空室2和第二真空室在双真空室运输车上的位置由单工位RH真空精炼炉的1#待机工位、处理工位和2#待机工位的位置来确定,当第一真空室位于处理工位时,第二真空室位于2#待机工位,当第二真空室位于处理工位时,第一真空室位于1#待机工位。A RH vacuum chamber replacement device, which is applied to a single-station RH vacuum refining furnace, and the single-station RH vacuum refining furnace has a 1# standby station, a processing station and a 2# standby station, and is characterized in that it includes a pair of Vacuum chamber transport vehicle, the first vacuum chamber and the second vacuum chamber installed on the double vacuum chamber transport vehicle, the positions of the first vacuum chamber 2 and the second vacuum chamber on the double vacuum chamber transport vehicle are controlled by single-station RH vacuum refining The positions of the 1# standby station, the processing station and the 2# standby station of the furnace are determined. When the first vacuum chamber is at the processing station, the second vacuum chamber is at the 2# standby station. When the second vacuum chamber is at the When processing the station, the first vacuum chamber is located at the 1# standby station.
  3. 根据权利要求2所述的RH真空室更换装置,其特征在于:所述双真空室运输车具有气体阀站、冷却水阀站、连接管线和检修平台。The RH vacuum chamber replacement device according to claim 2, characterized in that: the double vacuum chamber transport vehicle has a gas valve station, a cooling water valve station, connecting pipelines and an inspection platform.
  4. 根据权利要求2所述的RH真空室更换装置,其特征在于:所述双真空室运输车上具有一个拖链,各种能源介质均可借由所述拖链送到双真空室运输车上。The RH vacuum chamber replacement device according to claim 2, characterized in that: the double-vacuum chamber transport vehicle has a towline, and various energy media can be sent to the double-vacuum chamber transport vehicle by means of the tow chain .
  5. 根据权利要求2所述的RH真空室更换装置,其特征在于:所述双真空室运输车具有一组驱动或者具有两组驱动。The RH vacuum chamber replacement device according to claim 2, wherein the double vacuum chamber transport vehicle has one set of drives or two sets of drives.
  6. 根据权利要求2所述的RH真空室更换装置,其特征在于:所述双真空室运输车具有3组车轮,分别布置在双真空室运输车的两端及双真空室的中间。The RH vacuum chamber replacement device according to claim 2, characterized in that: the double vacuum chamber transport vehicle has 3 sets of wheels, which are respectively arranged at both ends of the double vacuum chamber transport vehicle and in the middle of the double vacuum chambers.
PCT/CN2021/124914 2021-06-02 2021-10-20 Method for shortening replacement time of rh vacuum chamber and rh vacuum chamber replacement apparatus WO2022252472A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202110613743.6 2021-06-02
CN202110613743.6A CN113373280A (en) 2021-06-02 2021-06-02 Method for shortening single-station RH vacuum chamber replacement time and RH vacuum chamber replacement device

Publications (1)

Publication Number Publication Date
WO2022252472A1 true WO2022252472A1 (en) 2022-12-08

Family

ID=77575426

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/124914 WO2022252472A1 (en) 2021-06-02 2021-10-20 Method for shortening replacement time of rh vacuum chamber and rh vacuum chamber replacement apparatus

Country Status (2)

Country Link
CN (1) CN113373280A (en)
WO (1) WO2022252472A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113373280A (en) * 2021-06-02 2021-09-10 中冶南方工程技术有限公司 Method for shortening single-station RH vacuum chamber replacement time and RH vacuum chamber replacement device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005082826A (en) * 2003-09-05 2005-03-31 Sumitomo Metal Ind Ltd Method and apparatus for raising molten steel temperature
CN101892359A (en) * 2010-07-21 2010-11-24 中国重型机械研究院有限公司 Arrangement technology of multifunctional gun in refining outside RH furnace
CN202865257U (en) * 2012-09-10 2013-04-10 洛阳卓一重工设备制造有限公司 Double-station mechanical vacuumizing RH liquid steel refining device
JP2015193924A (en) * 2014-03-19 2015-11-05 Jfeスチール株式会社 Method for recycling dust generated in rh vacuum degassing apparatus
CN106544474A (en) * 2015-09-17 2017-03-29 鞍钢股份有限公司 Operation method for quickly changing medium-high carbon steel vacuum chamber
CN113373280A (en) * 2021-06-02 2021-09-10 中冶南方工程技术有限公司 Method for shortening single-station RH vacuum chamber replacement time and RH vacuum chamber replacement device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4353054B2 (en) * 2004-10-05 2009-10-28 住友金属工業株式会社 Method for decarburizing molten steel in RH vacuum degassing equipment
CN101451178A (en) * 2008-12-31 2009-06-10 河北省首钢迁安钢铁有限责任公司 Quick-speed replacement method of vacuum chamber for single station RH fining furnace
CN107127331A (en) * 2016-02-29 2017-09-05 宝钢工程技术集团有限公司 Ladle trolley alternating device and its application method
CN110257592A (en) * 2019-05-31 2019-09-20 北京首钢国际工程技术有限公司 A kind of single station RH method for arranging technological process of two ladle car rail junctions

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005082826A (en) * 2003-09-05 2005-03-31 Sumitomo Metal Ind Ltd Method and apparatus for raising molten steel temperature
CN101892359A (en) * 2010-07-21 2010-11-24 中国重型机械研究院有限公司 Arrangement technology of multifunctional gun in refining outside RH furnace
CN202865257U (en) * 2012-09-10 2013-04-10 洛阳卓一重工设备制造有限公司 Double-station mechanical vacuumizing RH liquid steel refining device
JP2015193924A (en) * 2014-03-19 2015-11-05 Jfeスチール株式会社 Method for recycling dust generated in rh vacuum degassing apparatus
CN106544474A (en) * 2015-09-17 2017-03-29 鞍钢股份有限公司 Operation method for quickly changing medium-high carbon steel vacuum chamber
CN113373280A (en) * 2021-06-02 2021-09-10 中冶南方工程技术有限公司 Method for shortening single-station RH vacuum chamber replacement time and RH vacuum chamber replacement device

Also Published As

Publication number Publication date
CN113373280A (en) 2021-09-10

Similar Documents

Publication Publication Date Title
WO2022252472A1 (en) Method for shortening replacement time of rh vacuum chamber and rh vacuum chamber replacement apparatus
CN103100826B (en) A kind of manufacture method of anti-corrosion type hydraulic rod and equipment
CN107475483B (en) Mobile online heating system for scrap steel
CN112792126B (en) Hot rolling method of bearing steel with large compression ratio
CN103471305B (en) A kind of casting, forging high efficiency cooling bootstrap system
CN103966414B (en) Steel ball compound waste heat tempering process
CN209763591U (en) On-line air cooling device for steel pipe production line
CN105775754A (en) Injection tank pressure relief device for positive pressure pneumatic conveying
CN104743778A (en) Vacuum dehydroxylation furnace for semiconductor quartz glass products
CN214235604U (en) Roller bed equipment and system for conveying hot steel pipes
CN101691001A (en) Method for solving problem of rough surface of ship plate
CN208019135U (en) Side guide plate system of coiling machine
CN205652842U (en) Malleation air conveying's jetting jar pressure relief device
CN112831632A (en) Online normalizing method for SAE1050M round steel
CN210789218U (en) Flexible connecting device in middle of one-pot bottom molten iron transportation process
CN206936362U (en) A kind of molten iron ladle pouring system based on the remaining steel line of return
CN108296595A (en) The treatment process of slabs made of steel defect
CN203470889U (en) Special durable steel ladle
CN211005485U (en) Heat treatment tool
CN110181234A (en) A kind of metal tube manufacturing process system
CN211645334U (en) High-pressure nitrogen sealing device, circulating fan and annealing furnace
CN218014880U (en) Feeding connection arrangement structure between casting and rolling line and medium plate workshop
CN207525302U (en) A kind of ferrochrome smelting waste residue reclaimer
CN208961102U (en) A kind of oil path in oil cylinder device for energy saving blast furnace billet shears
CN220479751U (en) Steel billet descaling device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21943824

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2023135582

Country of ref document: RU

122 Ep: pct application non-entry in european phase

Ref document number: 21943824

Country of ref document: EP

Kind code of ref document: A1