WO2022249988A1 - 給電回路、鉄道車両情報制御システム及び給電方法 - Google Patents

給電回路、鉄道車両情報制御システム及び給電方法 Download PDF

Info

Publication number
WO2022249988A1
WO2022249988A1 PCT/JP2022/020968 JP2022020968W WO2022249988A1 WO 2022249988 A1 WO2022249988 A1 WO 2022249988A1 JP 2022020968 W JP2022020968 W JP 2022020968W WO 2022249988 A1 WO2022249988 A1 WO 2022249988A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
power supply
voltage
main line
line
Prior art date
Application number
PCT/JP2022/020968
Other languages
English (en)
French (fr)
Inventor
貴之 夏井
佳伸 森田
庸介 嶋
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to JP2023523446A priority Critical patent/JPWO2022249988A1/ja
Publication of WO2022249988A1 publication Critical patent/WO2022249988A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L15/00Methods, circuits, or devices for controlling the traction-motor speed of electrically-propelled vehicles
    • B60L15/42Adaptation of control equipment on vehicle for actuation from alternative parts of the vehicle or from alternative vehicles of the same vehicle train
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks

Definitions

  • the present invention relates to a power supply circuit using PoE (Power Over Ethernet: Ethernet, Ethernet is a registered trademark), a railway vehicle information control system, and a power supply method.
  • PoE Power Over Ethernet: Ethernet, Ethernet is a registered trademark
  • a railway vehicle information control system and a power supply method.
  • Ethernet (R) communications for railways noise resistance and countermeasures against signal attenuation due to long cables between vehicles are required. Therefore, unlike the general Ethernet (R), the signal amplitude is boosted to improve the signal-to-noise ratio, and the main line and sub-line are multiplexed transmission paths to ensure redundancy.
  • PoE that uses an Ethernet (R) LAN cable to supply power to network devices is being used in security cameras and the like.
  • R Ethernet
  • Patent Document 1 a configuration has been proposed in which an abnormality in the power line is detected by detecting the supply current value and power is switched to power from a normal power line.
  • PoE power supply There are two types of PoE power supply: the Type A method, which superimposes the power supply voltage on the signal line, and the Type B method, which uses an empty signal line to supply power.
  • the Type A method which superimposes the power supply voltage on the signal line
  • the Type B method which uses an empty signal line to supply power.
  • power is supplied by the Type A method of both duplex lines when normal, and when one line is abnormal, both the Type A method and Type B method of the normal line are used. , Even if only one line, the same power is supplied as when both lines are normal.
  • the present invention has been made in view of the above problems, and its object is to provide a simple and efficient power supply circuit in a communication network with a multiplexed configuration that is powered by PoE.
  • the present invention which solves the above problems, is a power supply circuit for a communication network that supplies PoE power through a multiplexed transmission path having a main line and a sub line, and is a voltage detector that monitors the voltage level supplied from the main line.
  • a power relay unit capable of receiving power from a main line or a sub line and distributing power to a communication network and being backed up; If the monitored voltage level is within the specified range, power is received only from the main line to the power supply relay unit, and if the voltage detection unit detects a voltage abnormality that deviates from the specified range, power can also be received from the sub line. is switched to compensate for the voltage abnormality, and if there is a voltage drop during switching, the backup compensates for the instantaneous voltage drop.
  • the present invention it is possible to provide a simple and efficient power supply circuit in a communication network with a multiplexed configuration that uses PoE power supply.
  • the loss due to excessive margin in the power receiving device is reduced. can be reduced.
  • FIG. 1 is a functional block diagram showing a schematic configuration of a railway vehicle information control system (hereinafter also referred to as “system of FIG. 1” or “this system”) according to Embodiment 1 of the present invention
  • FIG. 2 is a functional block diagram of a power supply circuit (hereinafter also referred to as “power supply circuit” or “main power supply circuit”) that supplies PoE power for a communication network in the system of FIG. 1
  • 3 is a flow chart showing a procedure for switching the power supply in the power supply circuit of FIG. 2
  • 3 is a graph showing changes in efficiency according to load fluctuations of a switching regulator applicable to the power supply circuit of FIG. 2
  • FIG. 3 is a functional block diagram of a power supply circuit (also referred to as “power supply circuit” or “main power supply circuit”) according to Example 2 of the present invention, corresponding to FIG. 2 ;
  • Example 1 will be described with reference to FIGS. 1 to 4.
  • FIG. A second embodiment will be described with reference to FIG.
  • the comparative example uses FIG. 4 to illustrate the case where the switching regulators of the two systems are used at a low load/low operation rate of 30% each in a steady state.
  • FIG. 1 is a functional block diagram showing a schematic configuration of a railway vehicle information control system (this system) according to Embodiment 1 of the present invention. As shown in FIG. 1, this system is an information control system based on a communication network for bi-directionally transmitting operation information between the driver's cab and the end of the running gear in a four-car train.
  • the vehicle information control device comprises general control devices 5 and 6, router devices 1, 2, 3 and 4, cab IF devices 7 and 10, and vehicle IF devices 8 and 9. Each device is connected to Ethernet ( R). Router devices 1 and 4, cab IF devices 7 and 10, and integrated control devices 5 and 6 are installed in cars 1 and 4 serving as cabs, and router devices 2 and 3 and cab IF devices are installed in cars 2 and 4. 7 and 10 are installed.
  • Each car is connected via a router device.
  • Each device is controlled by integrated control devices 5 and 6 in the driver's cab. Any device can be configured as a power supply device or a power reception device, and responds according to the installation situation in the vehicle.
  • FIG. 2 is a functional block diagram of a power supply circuit for PoE power supply for communication networks in the system of FIG.
  • the counter circuit 11 is connected to the power reception control circuit 12 via the main line 17 and the sub line 18 .
  • the counter circuit 11 and the power reception control circuit 12 perform data communication and power supply via the main line 17 and the sub line 18 , and power is supplied from the counter circuit 11 to the power reception control circuit 12 .
  • the main line 17 and sub-line 18 form a multiplexed transmission path configuration.
  • the opposing circuit is equipped with power supply equipment 13, 14 and transmission-side transformers 15, 16, enabling data transmission and power supply to both the main line and the sub line.
  • the power reception control circuit 12 receives and receives data and power from the main line 17 and the sub line 18 via the receiving transformers 19 and 20 . Based on the IEEE802.3af standard, the power reception control circuit 12 supports both the Type A system and the Type B system.
  • the main line 17 is connected to the receiving side transformer 19 in the power receiving control circuit 12 , and the primary side intermediate tap of the receiving side transformer 19 is connected to the power receiving device (power device, eg switching regulator) 21 . Also, the output voltage of the power receiving device 21 is input to the low voltage detection unit 23 to detect the low voltage.
  • the power receiving device power device, eg switching regulator
  • the sub line 18 is connected to the receiving side transformer 20 in the power receiving control circuit 12 , and the primary side intermediate tap of the receiving side transformer 20 is connected to the power receiving device 22 via the relay 28 .
  • the connection between the receiving transformer 20 and the power receiving device (Power Device, eg switching regulator) 22 can be cut off.
  • Outputs from the two power receiving devices (switching regulators) 21, 21 are supplied to a power source and a backup circuit (hereinafter referred to as a “power source with backup” or “power relay unit”) via a first diode 24 and a second diode 25, respectively. ) 26 .
  • This power supply with backup 26 is a circuit for preventing the power supply from being interrupted when switching to the sub line 18 .
  • the two power supplies as a redundant power supply configuration are commonly connected to the power supply destination by matching the cathodes of both through the first and second diodes 24 and 25 that are connected to each other.
  • the two power supply systems of the main line 17 and the sub line 18 are connected to the power supply relay unit 26 by the power supply of the other system due to the OR logic circuit configuration even when one system is down, and the operation is performed. Configurable.
  • a load that can be driven by one power supply circuit is assumed, if power is received from both the main line 17 and the sub line 18 of the multiplexed transmission path without intervening the relay 28 or with the relay 28 always ON, There is the following problem.
  • the switching regulators 21 and 22 have excess margin. Therefore, the switching regulators 21 and 22 cannot be operated with loads having high conversion efficiency, resulting in large losses. As a result, a large amount of heat is generated, making it difficult to extend the life of the device and reduce the size of the device.
  • the output of the low voltage detection unit 23 is connected to a sub line power receiving device ON/OFF circuit (hereinafter referred to as "power supply control unit") 27, and the power supply voltage level determination result supplied from the main line 17 is sent to the power supply control unit 27. notify.
  • the low voltage detection unit 23 notifies the power supply control unit 27 that the power supply voltage is normal.
  • the power supply control unit 27 receiving the signal opens the relay 28 to cut off the connection between the receiving side transformer 20 and the switching regulator 22 .
  • the low voltage detection unit 23 When the voltage level is equal to or less than the threshold, the low voltage detection unit 23 notifies the power supply control unit 27 that the power supply voltage is abnormal.
  • the power supply control unit 27 receiving the signal short-circuits the relay 28 to connect the receiving side transformer 20 and the switching regulator 22 .
  • FIG. 3 is a flow chart showing the procedure for switching the power supply in the power supply circuit of FIG. In the procedure shown in steps S1 to S6 in FIG. 3, when an abnormality occurs in the main line 17, power is supplied from the power supply relay unit 26 in addition to the sub line 18 as compensation for the voltage drop, and the power is restored when the abnormality disappears.
  • the relay of the sub line 18 is short-circuited (S3) when it falls below the threshold. Since the relay 28 is short-circuited, it is connected to the switching regulator 22 and the PoE power supply negotiation (preparation) of the sub line 18 is started (S4). Power is supplied by the backup circuit 26 until the power supply is switched to the power supply from the sub line 18 after the voltage becomes equal to or lower than the threshold. After that, the threshold determination (S5) of the voltage supplied from the main line 17 is performed, and if the voltage remains below the threshold, the power supply from the sub line 18 is continued. When the main line 17 is restored and the voltage becomes equal to or higher than the threshold value, the relay of the sub line 18 is opened to switch to power supply from the main line 17 .
  • FIG. 4 is a graph showing efficiency changes according to load fluctuations of the switching regulators 21 and 22 applicable to the power supply circuit of FIG. 2 or FIG. 5, which will be described later.
  • general switching regulators 21 and 22 have high efficiency exceeding 80% at 100% load and little heat loss, but at 10% load with excess margin, the efficiency falls below 40%, It has a load-to-efficiency property that becomes extremely low efficiency when the load is less than that.
  • This power supply circuit which corresponds to this property, has a power supply capacity close to the minimum necessary to maintain a high efficiency state of 80% to 100% load that operates the switching regulators 21 and 22 with high efficiency. did.
  • the main line 17 and the sub line 18 are redundantly configured so that one system is enough if there is no possibility of an abnormality, and the operation is guaranteed. Therefore, in order to avoid excessive margins when these two systems are fully capable of supplying power at the same time, for example, the connection may be switched to receive power from only one of the main line 17 and the sub line 18 .
  • each of the switching regulators 21 and 22 has a small power supply capacity limited to approximately one system. Of these two, only one can be operated at high load (60-80%)/high efficiency (76-79%) at all times, thus reducing heat generation due to wasteful losses.
  • the switching regulators 21 and 22 of the comparative example are also designed to have the same capacity under the preconditions of a peak load of 80% and a steady load of 60%, similar to this power supply circuit.
  • the power supply from the main line 17 and the sub line 18 is not switched so that only one system, which is a two-way alternative, is made to have a high load/high operating rate, and the power demand for only one system is switched by two switching.
  • the regulators 21 and 22 share the load, the load assigned to one is halved.
  • the switching regulators 21 and 22 of each of the two systems are operated at a low load/low operation rate of 30% each during normal operation.
  • the switching regulator 21 for the main line 17 and the switching regulator 22 for the sub line 18 each operate at a low efficiency of about 65%.
  • a loss of 35% x 2 lines occurs per line.
  • both the switching regulators 21 and 22 of the main line 17 and the sub line 18 do not operate at the same time. Only one can be used at 60% high load/75% high utilization at any given time. In this way, the power supply circuit can improve the efficiency to 75% and reduce the loss to about 25%. In other words, this power supply circuit is far superior to the comparative example with an efficiency of 30% and a loss of 70%.
  • FIG. 5 is a functional block diagram of a power supply circuit (also referred to as "this power supply circuit") according to Example 2 of the present invention, corresponding to FIG.
  • the second embodiment provides two determination thresholds for the main line voltage level determination (S2) in the first embodiment. Although only the voltage drop is detected in the first embodiment, by providing the overvoltage detection circuit 29 in the second embodiment, it becomes possible to detect not only the abnormality at the time of voltage drop but also the abnormality at the time of voltage rise. As a result, more reliable power supply switching becomes possible, and reliability can be improved.
  • This power supply circuit is a power supply circuit for a communication network that supplies PoE power via a multiplexed transmission path, and includes a voltage detection section 23 , a power relay section 26 , and a power supply control section 27 . Also, the multiplexed transmission path has a main line 17 and a sub line 18 .
  • the voltage detection unit 23 monitors the voltage level supplied from the main line 17.
  • the power relay unit 26 has a chargeable/dischargeable backup power supply, and the power supply can receive power from the main line 17 or the subline 18 and distribute the power to the communication network.
  • the power supply control unit 27 controls switching of the power receiving path, and has a sub-line power receiving device ON/OFF circuit.
  • the power supply control unit 27 distinguishes between normal and abnormal conditions, and controls power supply by reversible operation so as to ensure proper power reception during transitions between them. In normal times, that is, when the voltage level monitored by the voltage detection unit 23 is within the specified range, power is received from the main line 17 only to the power supply relay unit 26 . When an abnormality occurs, that is, when the voltage detection unit 23 detects a voltage abnormality that deviates from the specified range, the path is switched so that power can be received from the sub line 18 as well, thereby compensating for the voltage abnormality. Voltage anomalies include both overvoltage and undervoltage, but in reality, failures due to undervoltage are more frequent. It may be read as "voltage drop compensation".
  • the backup power supply compensates for the instantaneous voltage drop.
  • the function of the changeover switch is, for example, a single-throw double-pole type, a non-energization timing is provided in which neither of the two poles is energized in order to avoid short-circuiting between the two poles during the switching operation.
  • the instantaneous voltage drop at the non-energization timing is compensated by the backed up power supply.
  • the PoE-powered power supply circuit for conventional communication networks is a load that can operate even with the power supply capacity of only one side of the redundant system.
  • the switching regulators 21 and 22 cannot be operated under high load with high conversion efficiency, resulting in low load/low efficiency/large loss. . Therefore, a large amount of heat is generated, which makes it difficult to extend the life of the device and reduce its size.
  • this power supply circuit in the redundant system, the power receiving system is appropriately switched and used so that the power supply capacity can be limited to only one side of the system, so waste can be eliminated. Therefore, according to this power supply circuit, it is possible to realize simple and energy saving (high efficiency/low heat generation/low loss), and to configure an efficient PoE power supply multiplex communication network.
  • the power supply control unit 27 controls the main line It is preferable to return to receiving power from 17 only.
  • the main system which is always used, can be made robust for long-term durability, while the sub-system, which is used temporarily only in the event of an emergency, can be set to a short durability time, making it even simpler. can be thorough.
  • rationalization of design can be easily pursued.
  • the power supply relay unit 26 preferably relays power received from either the main line 17 or the sub line 18 at a voltage within a specified range by an OR logic circuit.
  • This OR logic circuit is configured by connecting the cathode of the first diode 24, the cathode of the second diode 25, and the cathodes of these terminals of the same polarity to each other so as to be concentrated in the power relay section 26.
  • the first diode 24 is inserted in the path from the main line 17 to the power supply relay section 26 .
  • a second diode 25 is inserted in the path from the sub line 18 to the power supply relay unit 26 .
  • the power relay unit 26 preferably has a capacitor for backup.
  • a large-capacity capacitor which has been readily available in recent years, should be applied.
  • the function of the changeover switch such as the relay 28 is, for example, a single-throw double-pole type, a non-energization timing is provided in which neither of the two poles is energized in order to avoid a short circuit between the two poles during the switching operation.
  • the instantaneous voltage drop at the non-energization timing is compensated by the backed up power supply.
  • a capacitor is suitable for backing up such an instantaneous voltage drop.
  • the power supply relay unit 26 of the power supply circuit does not need to have a large capacity such as a secondary battery for power failure compensation for backup, and a simple capacitor is sufficient.
  • the switching regulators 21 and 22 that supply power at a load of 60 ⁇ 10% are connected to the steady state load power of the power supply relay unit 26, and the switching regulators 21 and 22 are connected to the power supply relay unit. It is preferably set at 80 ⁇ 10% load for a peak load of 26.
  • the switching regulator (power receiving device) 22 is operated with a highly efficient load by switching to the power supply from the sub line 18 .
  • the power supply circuit can reduce losses in the power receiving devices (switching regulators) 21 and 22 .
  • a railway vehicle information control system (this system) according to an embodiment of the present invention preferably uses the power supply circuit according to any one of [1] to [6] above.
  • Ethernet (R) communication for railroads requires noise resistance and countermeasures against signal attenuation due to long cables between vehicles. Therefore, unlike general Ethernet (R), the signal amplitude is boosted to improve the signal-to-noise ratio, and the main line 17 and sub-line 18 are multiplexed transmission paths to ensure redundancy.
  • the power supply circuit using PoE supplies power to network equipment using Ethernet (R) LAN cables.
  • R Ethernet
  • the power supply circuit using PoE supplies power to network equipment using Ethernet (R) LAN cables.
  • the power supply method (this method) according to the embodiment of the present invention has the steps shown in the following steps S1 to S6.
  • step S1 the capacitor is charged in advance with the voltage required for the power supply.
  • step S ⁇ b>2 the voltage detection unit 23 detects that an abnormality has occurred by detecting a voltage drop in the main line 17 .
  • step S3 the power feeding path is switched so that power can also be received from the sub-line 18 as well.
  • step S4 the power relay unit 26 also receives power from the sub line 18 to compensate for the voltage drop.
  • the voltage drop is not compensated for that time, even if it is an instantaneous voltage drop. , damage to communication systems may be unavoidable.
  • step S1 since the voltage required for the power supply is precharged in the capacitor, the momentary voltage drop is compensated for by discharging the capacitor.
  • step S5 it is detected that the voltage drop in the main line 17 has been resolved.
  • step S6 the feed path from the sub line 18 is cut off. Then, the power relay unit 26 returns to the normal state of receiving power only from the main line 17 .
  • the power receiving system is appropriately switched so that the power supply capacity can be limited to the power supply capacity of only one side system in the redundant system, so waste can be eliminated. Therefore, according to this method, it is possible to realize simple and energy saving (high efficiency/low heat generation/low loss), and to configure an efficient PoE power supply multiplex communication network.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Direct Current Feeding And Distribution (AREA)

Abstract

主回線と副回線とを有する多重経路を介してPoE給電する通信ネットワーク用の給電回路であって、主回線から供給される電圧レベルを監視する電圧検出部と、主回線又は副回線から受電して通信ネットワークへ配電可能でありバックアップされた電源中継部と、受電経路の切替を制御する給電制御部と、を備え、給電制御部は、電圧検出部の監視された電圧レベルが規定範囲ならば、主回線のみから電源中継部へ受電させておき、電圧検出部が規定範囲から逸脱した電圧異常を検出したならば、副回線からも受電可能に経路を切替えて電圧異常補償し、切替えの途中に電圧低下があれば、バックアップによって瞬時電圧低下補償する。主回線の電圧レベルが規定範囲に復帰した場合、給電制御部は、主回線のみからの受電に戻す。これにより、PoE給電される多重化構成の通信ネットワークにおいて、簡素かつ効率良い給電回路を提供する。

Description

給電回路、鉄道車両情報制御システム及び給電方法
 本発明はPoE(Power Over Ethernet:Ethernet、イーサネットは登録商標)を用いた給電回路、鉄道車両情報制御システム及び給電方法に関する。
 鉄道車両情報制御システムは、各鉄道事業者の様々なニーズに応じる必要性から、より高機能・高信頼の車上ネットワークが求められている。それに伴い、伝送の高速化・大容量化のためイーサネット(R)を用いて車両内情報伝送を行うのが一般的となりつつある。
 鉄道用のイーサネット(R)通信では、耐ノイズ性、車両間をまたぐ長いケーブルによる信号減衰への対策が求められる。そのため一般的なイーサネット(R)と異なり、信号雑音比向上のため信号振幅を昇圧しており冗長性確保のために主回線、副回線の多重化伝送経路となっている。
 近年ではPoEと呼ばれるイーサネット(R)のLANケーブルを用いてネットワーク機器に電力を供給する技術が、防犯カメラなどで採用されつつある。この技術により電源を確保しづらい場所でもLANケーブルから電力を得ることができ、設置コストを削減することができる。
 PoEを用いた多重化伝送経路における電力供給方法については、供給電流値を検出することで電力線の異常を検出し、正常な電力線からの給電に切替える構成が提案されている(特許文献1)。
特開2009-253307号公報
 PoEによる給電は信号線に電源電圧を重畳するType A方式と空き信号線を利用して給電するType B方式が存在する。特許文献1に開示されている発明においては、正常時は二重系両回線のType A方式で給電を行い、片回線異常時は正常な回線のType A方式、Type B方式を両方用いることで、片回線のみでも両回線正常時と同等の電力を供給する。
 しかしこの構成を用いた場合、Type A、Type B両方の方式で給電できる回路とする必要があり、UTPケーブルの8線すべてを使用する1000BASE-Tへは対応不可能である。また給電構成切替えに必要な部品点数が多くコストや実装面積が増加するという課題がある。
 本発明は上記課題に鑑みてなされたものであり、その目的とするところは、PoE給電される多重化構成の通信ネットワークにおいて、簡素かつ効率良い給電回路を提供することにある。
 上記課題を解決する本発明は、主回線と副回線とを有する多重化伝送経路を介してPoE給電する通信ネットワーク用の給電回路であって、主回線から供給される電圧レベルを監視する電圧検出部と、主回線又は副回線から受電して通信ネットワークへ配電可能でありバックアップされた電源中継部と、受電経路の切替を制御する給電制御部と、を備え、給電制御部は、電圧検出部の監視された電圧レベルが規定範囲ならば、主回線のみから電源中継部へ受電させておき、電圧検出部が規定範囲から逸脱した電圧異常を検出したならば、副回線からも受電可能に経路を切替えて電圧異常補償し、切替えの途中に電圧低下があれば、バックアップによって瞬時電圧低下補償する。
 本発明によれば、PoE給電される多重化構成の通信ネットワークにおいて、簡素かつ効率良い給電回路を提供できる。つまり、主回線、副回線からの電源供給を二者択一に切替えて、余裕過剰な軽負荷稼働を避け、適正負荷で稼働することにより、受電装置(スイッチングレギュレータ)での余裕過剰による損失を低減することができる。
本発明の実施例1に係る鉄道車両情報制御システム(以下、「図1のシステム」又は「本システム」ともいう)の概略構成を示す機能ブロック図である。 図1のシステムにおいて、通信ネットワーク用にPoE給電する給電回路(以下、「給電回路」又は「本給電回路」ともいう)の機能ブロック図である。 図2の給電回路において、供給電源を切替える手順を示すフローチャートである。 図2の給電回路に適用可能なスイッチングレギュレータの負荷変動に応じた効率変化を示したグラフである。 図2に対応した、本発明の実施例2に係る給電回路(これも、「給電回路」又は「本給電回路」という)の機能ブロック図である。
 以下、図面を参照しつつ、本発明の実施形態について説明する。実施例1は、図1~図4を用いて説明する。実施例2は、図5を用いて説明する。また、比較例は、図4を用いて、定常時に2系統それぞれのスイッチングレギュレータを各30%の低負荷/低稼働率で使用した場合を例示する。
 図1は、本発明の実施例1に係る鉄道車両情報制御システム(本システム)の概略構成を示す機能ブロック図である。図1に示すように、本システムは、4両編成の鉄道車両において、運転台と走行装置の末端との間で双方向に運転情報を伝送する通信ネットワークに基づく情報制御システムである。
 車両情報制御装置は、統括制御装置5,6、ルータ装置1,2,3,4、運転台IF装置7,10、及び車両IF装置8,9から構成されており、それぞれの装置はイーサネット(R)で接続される。運転台となる1,4号車にはルータ装置1,4、運転台IF装置7,10、統括制御装置5,6が設置され、2,4号車にはルータ装置2,3、運転台IF装置7,10が設置される。
 各号車間はルータ装置を介して接続される。各装置は運転台にある統括制御装置5,6により制御される。どの装置も給電装置もしくは受電装置として構成可能であり、車両内の設置状況に応じて対応する。
 図2は、図1のシステムにおいて、通信ネットワーク用にPoE給電する給電回路の機能ブロック図である。図2に示すように、対向回路11から主回線17、副回線18を介して受電制御回路12へ接続される。対向回路11と受電制御回路12は主回線17、副回線18を介してデータ通信及び給電を行っており、電力は対向回路11から受電制御回路12へ給電されている。この主回線17、副回線18により多重化伝送経路構成としている。
 対向回路は給電装置(Power Supply Equipment)13,14と送信側トランス15,16が実装されており、主回線、副回線両方に対しデータ送信及び電力供給が可能となっている。受電制御回路12は主回線17、副回線18からのデータと電力を受信側トランス19,20を介して受信及び受電している。IEEE802.3afでの規定に基づき受電制御回路12はType A方式と、Type B方式と、それらの両方に対応している。
 主回線17は、受電制御回路12内で受信側トランス19と接続され、受信側トランス19の一次側中間タップが受電装置(Power Device、例えばスイッチングレギュレータ)21と接続される。また受電装置21の出力電圧を低電圧検出部23へ入力し低電圧を検出している。
 副回線18は、受電制御回路12内で受信側トランス20と接続され、受信側トランス20の一次側中間タップがリレー28を介して受電装置22と接続される。このリレー28を制御することで受信側トランス20と、受電装置(Power Device、例えばスイッチングレギュレータ)22と、の間で接続を切り離すことができる。
 二つの受電装置(スイッチングレギュレータ)21,21からの出力は、第1のダイオード24及び第2のダイオード25をそれぞれ介して電源及びバックアップ回路(以下、「バックアップ付電源」又は、「電源中継部」ともいう)26へ接続される。このバックアップ付電源26は、副回線18への切替え時に電源供給が遮断されないようにするための回路である。
 このように、冗長給電構成としての2系統の電源は、それぞれ接続された第1、第2のダイオード24,25を介し、両者のカソードどうしを突き合わせて給電先に共有接続される。換言すると、主回線17と副回線18との2系統の電源は、OR論理回路構成により、片系ダウン時であっても、もう片系の電源供給で電源中継部26へ接続されて、動作可能に構成できる。しかし、片方の給電回路でも駆動できる負荷を想定しても、リレー28を介在させず、又はそのリレー28を常時ONして多重化伝送経路の主回線17及び副回線18の両方から受電すると、つぎの不具合がある。
 すなわち、冗長給電構成において、片系の電源で動作可能な負荷であるにも関わらず、両系の電源で動作させている場合、スイッチングレギュレータ21,22にとって余裕過剰となる。そのため、スイッチングレギュレータ21,22を変換効率の高い負荷で動作させることができず、損失が大きい。そのため発熱も大きく、装置の長寿命化や小型化が困難となる。
 低電圧検出部23の出力を副回線受電装置ON/OFF回路(以下、「給電制御部」という)27へ接続し、主回線17から供給された電源電圧レベルの判定結果を給電制御部27に通達する。電圧レベルが閾値以上である場合、低電圧検出部23から給電制御部27へ電源電圧が正常であることを通達する。それを受けた給電制御部27はリレー28を開放状態とし受信側トランス20とスイッチングレギュレータ22間の接続を切り離す。
 電圧レベルが閾値以下である場合、低電圧検出部23から給電制御部27へ電源電圧が異常であることを通達する。それを受けた給電制御部27はリレー28を短絡状態とし受信側トランス20とスイッチングレギュレータ22間を接続する。
 図3は、図2の給電回路において、供給電源を切替える手順を示すフローチャートである。図3のステップS1~S6に示す手順で、主回線17に異常が生じた場合、その電圧低下補償として、副回線18のほか、電源中継部26から給電され、異常がなくなれば復帰する。
 電源起動後、主回線17から電力供給が開始され、バックアップ用コンデンサをチャージ(S1)する。この時副回線18に接続されているリレー28は開放状態となっている。チャージ完了後、負荷に対し給電が開始される。その際、供給されている電圧が閾値に対しどのレベルにあるか判定(S2)を行う。閾値以上であればそのまま監視を続ける。
 主回線17の断線や部品故障などにより閾値以下となった時、副回線18のリレーを短絡(S3)する。リレー28が短絡されたことでスイッチングレギュレータ22と接続され副回線18のPoE給電ネゴシエーション(準備)が開始(S4)される。電圧が閾値以下となってから副回線18からの給電に切り替わるまではバックアップ回路26により給電される。その後も主回線17で供給される電圧の閾値判定(S5)を行い、閾値以下のままであれば副回線18からの給電を続ける。主回線17が復帰し閾値以上の電圧となった場合、副回線18のリレーを開放し、主回線17からの給電に切替える。
 図4は、図2又は後述する図5の給電回路に適用可能なスイッチングレギュレータ21,22の負荷変動に応じた効率変化を示したグラフである。図4のグラフに示すように、一般的なスイッチングレギュレータ21,22は、100%負荷で80%を超す高効率で発熱損失も少ないが、余裕過剰な10%負荷時には、効率40%を下回り、それ以下の過小負荷時には極端に低効率となる負荷対効率の性質がある。
 低効率運転は電力が無駄なだけでなく、発熱も多くなり、設備寿命を低減させる。この性質に対応した本給電回路は、スイッチングレギュレータ21,22を高効率に運転する80%~100%負荷、すなわち高稼働率状態を維持するように、必要最小限に近い給電能力のものを用意した。
 そもそも、主回線17と副回線18とは、異常発生の可能性が無ければ1系統のみで足りるところを冗長構成により動作保証している。したがって、これら2系統分それぞれが同時にフル給電可能状態で余裕過剰とならないように、例えば、主回線17と副回線18の一方からのみ受電する接続に切替えて使用すれば良い。
 このようにして、スイッチングレギュレータ21,22は、それぞれが概ね1系統分に限定された小さな給電容量である。これら2つのうち、1つだけを常に高負荷(60~80%)/高効率状態(76~79%)で動作させることができ、その結果、無駄な損失による発熱を低減することができる。
 比較例のスイッチングレギュレータ21,22も、本給電回路と同様に、ピーク時負荷80%、定常時負荷を60%の前提条件で同一容量に設計する。比較例では、主回線17と副回線18からの電源供給を二者択一した1系統のみ高負荷/高稼働率にさせるようには切替えず、その1系統分しかない電力需要を2つのスイッチングレギュレータ21,22で分担して応じた場合、1つに割り当てられる負荷は半減する。
 したがって、比較例の場合、定常時は2系統それぞれのスイッチングレギュレータ21,22を各30%の低負荷/低稼働率での動作となる。このとき、主回線17用のスイッチングレギュレータ21と、副回線18用のスイッチングレギュレータ22とは、それぞれが65%程度の低効率での動作となる。結果として1系統あたり35%×2系統分の損失が発生する。
 これに対し、本給電回路によれば、主回線17又は副回線18それぞれのスイッチングレギュレータ21,22は両方が同時に稼働することは無い。常に、どちらか一方のみを60%の高負荷/75%の高稼働率で使用することができる。このように、本給電回路は、効率75%に向上し、損失は25%程度にまで低減できる。つまり、本給電回路は、上記比較例の効率30%で損失70%の成績よりもはるかに優位である。
 図5は図2に対応した、本発明の実施例2に係る給電回路(これも「本給電回路」という)の機能ブロック図である。実施例2は、実施例1における主回線電圧レベル判定(S2)の判定閾値を二つ設けるものである。実施例1では電圧低下のみを検出しているが、実施例2では過電圧検知回路29を設けることにより、電圧低下時の異常だけでなく、電圧上昇時の異常も検出できるようになる。これによってより確実な給電切替えが可能となり、信頼性の向上が図れる。
 本発明の実施形態に係る給電回路(本給電回路)は、つぎのように総括できる。
[1]本給電回路は、多重化伝送経路を介してPoE給電する通信ネットワーク用の給電回路であり、電圧検出部23と、電源中継部26と、給電制御部27と、を備える。また、多重化伝送経路は、主回線17と副回線18とを有する。
 電圧検出部23は、主回線17から供給される電圧レベルを監視する。電源中継部26は、充放電可能にバックアップされた電源を有し、その電源は主回線17又は副回線18から受電して通信ネットワークへ配電可能である。給電制御部27は、受電経路の切替を制御するものであり、副回線受電装置ON/OFF回路を有する。
 給電制御部27は、通常時と異常時を識別し、それらの遷移において、適切な受電を保証するように可逆動作により給電制御する。通常時、すなわち、電圧検出部23の監視された電圧レベルが規定範囲ならば、主回線17のみから電源中継部26へ受電させておく。異常時、すなわち、電圧検出部23が規定範囲から逸脱した電圧異常を検出したならば、副回線18からも受電可能に経路を切替えて電圧異常を補償する。なお、電圧異常は、過電圧と減電圧の両方を含むが、実際には、減電圧による故障の方が多いので、「電圧異常」を「電圧低下」と考えて、「電圧異常補償」を「電圧低下補償」と読み替えても構わない。
 切換えスイッチの機能上、切替えの途中に電圧低下があれば、バックアップされた電源によって瞬時電圧低下補償する。切換えスイッチの機能が、例えば単投双極形であれば、切替操作時に双極間の短絡を避けるため、双極の何れにも通電させない無通電タイミングが設けられる。その無通電タイミングの瞬時電圧低下をバックアップされた電源によって補償する。
 PoE給電される従来の通信ネットワーク用の給電回路は、冗長系統における片側系統のみの給電容量でも動作可能な負荷である。ところが、PoE給電用の電源まで両系統で冗長動作させている場合、スイッチングレギュレータ21,22を変換効率の高い高負荷で動作させることができず、低負荷/低効率/損失大となっていた。そのため発熱も大きく、装置の長寿命化や小型化が困難となる不具合があった。
 これに対し、本給電回路は、冗長系統において、片側系統のみの給電容量に限定できるように、受電系統を適宜切替えて生かしたので無駄が省ける。したがって、本給電回路によれば、簡素にして省エネルギー(高効率/低発熱/低損失)を実現可能であり、効率の良いPoE給電の多重通信ネットワークを構成できる。
[2]上記[1]において、電圧異常補償している状態において、主回線17の供給電圧レベルが規定範囲に復帰したことを電圧検出部23が検出した場合、給電制御部27は、主回線17のみからの受電に戻すことが好ましい。このような運用によれば、常時使用する主系統を長時間耐久仕様のため堅牢にする一方で、異常時のみ臨時使用する副系統は、耐久時間を短時間に設定できるので、より簡素化を徹底できる。このように、本給電回路によれば、設計合理化を追求し易くなる。
[3]上記[1]において、主回線17の系統で電圧監視する電圧検出部23が規定範囲から逸脱した電圧異常を検出したならば、副回線18からも受電可能に経路を切替える。すなわち、異常時には、副回線18に接続された受信側トランス20とスイッチングレギュレータ22との間に介挿されたリレー28を閉じて通電させることにより、副回線18からも受電可能にする。その結果、副回線18からスイッチングレギュレータ22を介して受電した電力を電源中継部26に付与して電圧異常補償する。復帰時には、リレー28を開いて副回線18からの受電を止め、主回線17からの受電を再開して復旧する。
[4]上記[1]において、電源中継部26は、OR論理回路により主回線17と副回線18の何れか一方から規定範囲の電圧で受電した電力を中継すると良い。このOR論理回路は、第1のダイオード24のカソードと、第2のダイオード25のカソードと、これら同極端子のカソードどうしを電源中継部26で集中するように共有接続して構成される。第1のダイオード24は、主回線17から電源中継部26まで経路に介挿される。第2のダイオード25は、副回線18から電源中継部26まで経路に介挿される。なお、このようなOR論理回路によれば、電圧の高い系統の電力のみを二者択一的に受電できる。
[5]上記[1]において、電源中継部26は、バックアップ用にコンデンサを備えることが好ましい。近年、容易に入手できる大容量のコンデンサを適用すれば良い。リレー28等の切換えスイッチの機能が、例えば単投双極形であれば、切替操作時に双極間の短絡を避けるため、双極の何れにも通電させない無通電タイミングが設けられる。その無通電タイミングの瞬時電圧低下をバックアップされた電源によって補償する。このような瞬時電圧低下のバックアップ用にはコンデンサが好適である。本給電回路の電源中継部26には、バックアップ用として、停電補償する二次電池のような大容量である必要もなく、簡素なコンデンサで足りる。
[6]上記[1]において、電源中継部26の定常時負荷電力に対し、負荷60±10%で電力供給するスイッチングレギュレータ21,22が接続され、そのスイッチングレギュレータ21,22は、電源中継部26のピーク負荷に対し、負荷80±10%に設定されることが好ましい。これにより、主回線17からの給電が異常となったときのみ、副回線18からの給電に切替えることでスイッチングレギュレータ(受電装置)22を効率の高い負荷で動作させる。その結果、本給電回路は、受電装置(スイッチングレギュレータ)21,22での損失を低減できる。
[7]本発明の実施形態に係る鉄道車両情報制御システム(本システム)は、上記[1]~[6]の何れかに記載の給電回路を用いることが好ましい。鉄道用のイーサネット(R)通信では、耐ノイズ性、車両間をまたぐ長いケーブルによる信号減衰への対策が求められる。そのため一般的なイーサネット(R)と異なり、信号雑音比向上のため信号振幅を昇圧しており冗長性確保のために主回線17、副回線18の多重化伝送経路となっている。
 また、PoEを用いた給電回路は、イーサネット(R)のLANケーブルを用いてネットワーク機器に電力を供給する。この技術により電源を確保しづらい場所でもLANケーブルから電力を得ることができ、設置コストを削減することができる。このように、鉄道車両情報制御システムにPoEを採用する実施形態であれば、主回線又は副回線から通信データのみでなく、電源供給することが可能となるため、車両内の空きスペースに装置を設置しやすくなる。また、本システムによれば、簡素にして省エネルギー(高効率/低発熱/低損失)を実現可能であり、効率の良いPoE給電の多重通信ネットワークを構成できる。
[8]本発明の実施形態に係る給電方法(本方法)は、つぎのステップS1~S6に示す手順を有することが好ましい。ステップS1では、電源に必要な電圧をコンデンサに予め充電しておく。つぎに、ステップS2では、異常が発生したことを、電圧検出部23が主回線17の電圧低下により検知する。これに応じたステップS3では、副回線18からも受電可能に給電経路を切替える。
 そうすると、ステップS4では、電源中継部26は、副回線18からも受電して電圧低下補償される。しかし、電圧低下した主回線17に、副回線18からの給電経路が開通するまでに時間を要する場合、その時間だけ電圧低下補償されていない可能性もあり、それが瞬間電圧低下であっても、通信システムへのダメージが避けられないこともある。これに対し、ステップS1で、電源に必要な電圧をコンデンサに予め充電されているので、それを放電させることにより瞬間電圧低下補償する。
 一方、ステップS5では、主回線17の電圧低下が解消したことを検知する。これに応じたステップS6では、副回線18からの給電経路を遮断する。そうすると、電源中継部26は、主回線17のみから受電する通常状態へと復帰する。
 本方法は、上記[1]同様に、冗長系統において、片側系統のみの給電容量に限定できるように、受電系統を適宜切替えて生かしたので無駄が省ける。したがって、本方法によれば、簡素にして省エネルギー(高効率/低発熱/低損失)を実現可能であり、効率の良いPoE給電の多重通信ネットワークを構成できる。
1…1号車ルータ装置、2…2号車ルータ装置、3…3号車ルータ装置、4…4号車ルータ装置、5…1号車統括制御装置、6…4号車統括制御装置、7…1号車運転台IF装置、8…2号車車両IF装置、9…3号車車両IF装置、10…4号車運転台IF装置、11…PoEの給電回路を持つ対向回路、12…PoEにより電力供給される受電制御回路、13…主回線の給電装置(Power Supply Equipment)、14…副回線の給電装置(Power Supply Equipment)、15…主回線の送信側トランス、16…副回線の送信側トランス、17…イーサネット(R)接続の主回線、18…イーサネット(R)接続の副回線、19…主回線の受信側トランス、20…副回線の受信側トランス、21…主回線の受電装置(Power Device、スイッチングレギュレータ)、22…副回線の受電装置(Power Device、スイッチングレギュレータ)、23…主回線低電圧検出部、24…主回線用(第1の)ダイオード、25…副回線用(第2の)ダイオード、26…電源中継部(電源回路及びバックアップ回路)、27…副回線受電装置ON/OFF回路(給電制御部)、28…副回線用リレー、29…主回線過電圧検出部、S1…源バックアップ、S2…主回線供給電圧レベル判定、S3…副回線リレー切替え、S4…副回線PoE給電ネゴシエーション(準備)、S5…主回線供給電圧レベル判定、S6…副回線リレー切替え

Claims (13)

  1.  主回線と副回線とを有する多重化伝送経路を介してPoE給電する通信ネットワーク用の給電回路であって、
     前記主回線から供給される電圧レベルを監視する電圧検出部と、
     前記主回線又は前記副回線から受電して通信ネットワークへ配電可能でありバックアップされた電源中継部と、
     受電経路の切替を制御する給電制御部と、
     を備え、
     前記給電制御部は、
     前記電圧検出部の監視された電圧レベルが規定範囲ならば、前記主回線のみから前記電源中継部へ受電させておき、
     前記電圧検出部が前記規定範囲から逸脱した電圧異常を検出したならば、前記副回線からも受電可能に経路を切替えて電圧異常補償し、
     前記切替えの途中に電圧低下があれば、前記バックアップによって瞬時電圧低下補償する、
     給電回路。
  2.  前記電圧異常補償している状態において、
     前記主回線の供給電圧レベルが前記規定範囲に復帰したことを前記電圧検出部が検出した場合、
     前記給電制御部は、前記主回線のみからの受電に戻す、
     請求項1に記載の給電回路。
  3.  前記副回線と前記電源中継部の間に介在して該電源中継部の出力を電圧異常補償するために前記副回線から受電する受電装置と、
     前記副回線に接続された受信側トランスと、前記電源中継部と、の間に介挿されて通電を開閉するリレーと、
     を備え、
     前記給電制御部が前記リレーを閉じることにより前記電圧異常補償する、
     請求項1に記載の給電回路。
  4.  前記主回線から前記電源中継部まで経路に介挿された第1のダイオードと、
     前記副回線から前記電源中継部まで経路に介挿された第2のダイオードと、
     前記第1のダイオード、前記第2のダイオードそれぞれの同極端子を前記電源中継部で集中させる接続形態に構成されたOR論理回路と、
     をさらに備え、
     前記電源中継部は、前記OR論理回路により前記主回線と前記副回線の何れか一方から前記規定範囲の電圧で受電した電力を中継する、
     請求項1に記載の給電回路。
  5.  前記電源中継部に付設されて電源バックアップするコンデンサと、
     前記電源バックアップに必要な電圧を前記コンデンサに充電させる前記主回線からの充電経路と、
     前記電圧検出部が前記主回線の電圧異常を検知したならば、前記副回線からも受電可能に給電経路を切替えるスイッチと、
     をさらに備え、
     前記電圧検出部が前記主回線の電圧異常の解消を検知したならば、前記スイッチは前記副回線からの給電経路を遮断する、
     請求項1に記載の給電回路。
  6.  前記電源中継部の定常時負荷に対し、負荷60±10%で電力供給するスイッチングレギュレータが接続され、
     前記電源中継部のピーク負荷に対し、前記スイッチングレギュレータは負荷80±10%で電力供給する、
     請求項1に記載の給電回路。
  7.  請求項1~6の何れか1項に記載の給電回路を用いた鉄道車両情報制御システム。
  8.  主回線と副回線とを有する多重化伝送経路を介してPoE給電する通信ネットワーク用の給電方法であって、
     前記主回線から供給される電圧レベルを監視し、
     バックアップされた電源中継部が、前記主回線又は前記副回線から受電して通信ネットワークへ配電可能にし、
     給電制御部が受電経路の切替を制御し、
     前記給電制御部は、
     前記監視された電圧レベルが規定範囲ならば、前記主回線のみから前記電源中継部へ受電させ、
     前記規定範囲から逸脱した電圧異常が検出されたならば、前記副回線からも受電可能に切替えて電圧異常補償し、
     前記切替えの途中に電圧低下があれば、前記バックアップによって瞬時電圧低下補償する、
     給電方法。
  9.  前記電圧異常補償している状態において、
     前記主回線の供給電圧レベルが前記規定範囲に復帰した場合、
     前記給電制御部は、前記主回線のみからの受電に戻す、
     請求項8に記載の給電方法。
  10.  前記副回線と前記電源中継部の間に介在する受電装置が、前記副回線から受電した電力を前記電源中継部に付与して電圧異常補償し、
     前記副回線に接続された受信側トランスと、前記電源中継部との間を、通電開閉可能にリレーが介挿され、
     前記給電制御部が前記リレーを閉じることにより前記電圧異常補償する、
     請求項8に記載の給電方法。
  11.  電源中継部は、
     前記主回線から第1のダイオードを経由した電力と、
     前記副回線から第2のダイオードを経由した電力と、
     何れか一方の電力が前記規定範囲の電圧であればOR論理により受電して中継する、
     請求項8に記載の給電方法。
  12.  前記電源中継部は、電源バックアップするコンデンサに充放電させることにより瞬間電圧低下補償するために、
     電源に必要な電圧を前記コンデンサに充電させるステップと、
     前記主回線の電圧低下を検知するステップと、
     前記副回線からも受電可能に給電経路を切替えるステップと、
     前記副回線からも受電して電圧低下補償するステップと、
     前記主回線の電圧低下の解消を検知するステップと、
     前記副回線からの給電経路を遮断するステップと、
     を有する、
     請求項8に記載の給電方法。
  13.  前記電源中継部の定常時負荷に対し、負荷60±10%で電力供給できるスイッチングレギュレータを用い、
     前記電源中継部のピーク負荷に対し、前記スイッチングレギュレータは負荷80±10%で電力供給する、
     請求項8に記載の給電方法。
     
PCT/JP2022/020968 2021-05-27 2022-05-20 給電回路、鉄道車両情報制御システム及び給電方法 WO2022249988A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023523446A JPWO2022249988A1 (ja) 2021-05-27 2022-05-20

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-089107 2021-05-27
JP2021089107 2021-05-27

Publications (1)

Publication Number Publication Date
WO2022249988A1 true WO2022249988A1 (ja) 2022-12-01

Family

ID=84229847

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/020968 WO2022249988A1 (ja) 2021-05-27 2022-05-20 給電回路、鉄道車両情報制御システム及び給電方法

Country Status (2)

Country Link
JP (1) JPWO2022249988A1 (ja)
WO (1) WO2022249988A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11184569A (ja) * 1997-12-25 1999-07-09 Fujitsu Denso Ltd 半導体メモリのデータバックアップ装置及びデータバックアップ方法
JP2014187810A (ja) * 2013-03-22 2014-10-02 Yamaha Corp ネットワークの給電制御装置
US20150019884A1 (en) * 2013-07-12 2015-01-15 Linear Technology Corporation Pd in poe system having redundant pse channel inputs
JP2019062484A (ja) * 2017-09-28 2019-04-18 サイレックス・テクノロジー株式会社 受電装置および制御方法
JP2019521898A (ja) * 2016-05-16 2019-08-08 ウィ−トロニックス, リミティッド ライアビリティ カンパニーWi−Tronix, Llc リアルタイムデータ取得・記録システム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11184569A (ja) * 1997-12-25 1999-07-09 Fujitsu Denso Ltd 半導体メモリのデータバックアップ装置及びデータバックアップ方法
JP2014187810A (ja) * 2013-03-22 2014-10-02 Yamaha Corp ネットワークの給電制御装置
US20150019884A1 (en) * 2013-07-12 2015-01-15 Linear Technology Corporation Pd in poe system having redundant pse channel inputs
JP2019521898A (ja) * 2016-05-16 2019-08-08 ウィ−トロニックス, リミティッド ライアビリティ カンパニーWi−Tronix, Llc リアルタイムデータ取得・記録システム
JP2019062484A (ja) * 2017-09-28 2019-04-18 サイレックス・テクノロジー株式会社 受電装置および制御方法

Also Published As

Publication number Publication date
JPWO2022249988A1 (ja) 2022-12-01

Similar Documents

Publication Publication Date Title
US5894413A (en) Redundant power supply switchover circuit
US7598625B2 (en) Network-based aircraft secondary electric power distribution system
WO2012043249A1 (ja) 放電システムおよび電動車両
US6031298A (en) 2N redundant power system and method using cross-coupled AC power transfer
CN101266468B (zh) 开关机自动控制系统及控制方法
US7701077B2 (en) Secondary power for critical loads for railroad
CN109808503B (zh) 一种高压系统控制方法、系统和列车
EP1591299B1 (en) Auxiliary power supply for vehicle
US20130069667A1 (en) Fault detection for parallel inverters system
US11708056B2 (en) Emergency braking control circuit based on coupler coupling detection
US20040189094A1 (en) Uninterruptible power supply apparatus
CN114466762A (zh) 用于车辆的控制装置
WO2022249988A1 (ja) 給電回路、鉄道車両情報制御システム及び給電方法
US20150130274A1 (en) Isolation contactor state control system
WO2020037827A1 (zh) 用于城轨车辆的并网供电控制系统及城轨车辆
EP3883085A1 (en) Dc contactor input into rat auto-deploy
US11383855B2 (en) DC bus voltage input into RAT auto-deploy
US20020117899A1 (en) Telecommunications power distribution systems, telecommunications power distribution circuits and methods of supplying power to at least one telecommunications device
EP1835711B1 (en) A long-distance powering system
US20220234463A1 (en) Charging apparatus and method of operating the same
US11981408B2 (en) Method and device for data transmission on board a watercraft
KR100892314B1 (ko) 빌딩관리시스템 및 운전방법
JP2001145201A (ja) 電気鉄道車両制御電源システム
CN112550330A (zh) 轨道交通空调控制装置及其控制方法、控制系统
CN113572254B (zh) 列车控制系统、列车控制管理系统及列车

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22811258

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2023523446

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 22811258

Country of ref document: EP

Kind code of ref document: A1