WO2022185794A1 - 情報処理装置、情報処理方法およびプログラム - Google Patents
情報処理装置、情報処理方法およびプログラム Download PDFInfo
- Publication number
- WO2022185794A1 WO2022185794A1 PCT/JP2022/002819 JP2022002819W WO2022185794A1 WO 2022185794 A1 WO2022185794 A1 WO 2022185794A1 JP 2022002819 W JP2022002819 W JP 2022002819W WO 2022185794 A1 WO2022185794 A1 WO 2022185794A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- communication
- information
- schedule
- unit
- communication unit
- Prior art date
Links
- 230000010365 information processing Effects 0.000 title claims abstract description 49
- 238000003672 processing method Methods 0.000 title claims description 11
- 238000004891 communication Methods 0.000 claims abstract description 429
- 238000000034 method Methods 0.000 claims description 60
- 230000009471 action Effects 0.000 claims description 6
- 230000008569 process Effects 0.000 description 12
- 238000010586 diagram Methods 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 230000003287 optical effect Effects 0.000 description 4
- 239000004065 semiconductor Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000010267 cellular communication Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 230000001151 other effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/54—Allocation or scheduling criteria for wireless resources based on quality criteria
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04M—TELEPHONIC COMMUNICATION
- H04M1/00—Substation equipment, e.g. for use by subscribers
- H04M1/72—Mobile telephones; Cordless telephones, i.e. devices for establishing wireless links to base stations without route selection
- H04M1/724—User interfaces specially adapted for cordless or mobile telephones
- H04M1/72448—User interfaces specially adapted for cordless or mobile telephones with means for adapting the functionality of the device according to specific conditions
- H04M1/72451—User interfaces specially adapted for cordless or mobile telephones with means for adapting the functionality of the device according to specific conditions according to schedules, e.g. using calendar applications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W48/00—Access restriction; Network selection; Access point selection
- H04W48/18—Selecting a network or a communication service
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0225—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal
- H04W52/0235—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal where the received signal is a power saving command
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0225—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal
- H04W52/0248—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal dependent on the time of the day, e.g. according to expected transmission activity
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0261—Power saving arrangements in terminal devices managing power supply demand, e.g. depending on battery level
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/02—Terminal devices
- H04W88/06—Terminal devices adapted for operation in multiple networks or having at least two operational modes, e.g. multi-mode terminals
Definitions
- the present invention relates to an information processing device, an information processing method, and a program.
- a communication unit with a large communication capacity consumes a large amount of power, and in the case of remote work, the environment may not always receive power supply, so it provides an optimal communication environment while suppressing power consumption.
- Patent Document 1 power consumption ( It is disclosed to select which of the communication units with different communication capacities to use. However, it cannot be said that an appropriate communication unit can be selected based only on the information on the operation time, and it cannot be said that power consumption can be suppressed appropriately.
- the present disclosure proposes an information processing device, an information processing method, and a program capable of providing an optimal communication environment while suppressing power consumption.
- an information processing device has a processing unit that selects one communication unit from a plurality of communication units with different communication methods based on schedule information and time information. Further, according to the present disclosure, there are provided an information processing method in which the information processing of the information processing device is executed by a computer, and a program for causing the computer to implement the information processing of the information processing device.
- FIG. 1 illustrates an example of a network environment
- FIG. It is a figure which shows an example of a structure of a communication unit.
- 4 is a flow chart showing an example of an information processing method performed by a communication unit;
- FIG. 10 is a diagram showing a specific example of switching control of communication units in line with an actual schedule;
- 3 is a block diagram showing a hardware configuration example of a communication unit;
- FIG. 1 is a diagram illustrating an example of a network environment used in the present disclosure.
- 5G-NR the next-generation wireless communication system.
- 5G-NR has high speed and large capacity (eMBB; Enhanced Mobile Broadband), multiple connections (mMTC; massive Machine Type Communication), low delay and high reliability (URLLC; Ultra-Reliable and Low Latency Communication). Scope of standardization.
- eMBB Enhanced Mobile Broadband
- mMTC massive Machine Type Communication
- URLLC Ultra-Reliable and Low Latency Communication
- 5G-NR In particular, it is necessary to expand the frequency band used for wireless communication in order to realize higher communication speeds in eMBB. Therefore, in 5G-NR, the use of high frequency bands typified by the millimeter wave band, for example, is under consideration. Specifically, 5G-NR has added a frequency band definition that can be assigned to 24 GHz or higher. When a high frequency band is used, it is possible to carry out faster communications than with the frequency bands that have been used previously.
- the radio wave characteristics will change. For example, when performing communication using a high frequency band, transmission power is higher than that of frequency bands used in wireless communication systems prior to 4G, so power consumption increases when transmitting radio signals. Further, for example, when performing communication using a high frequency band, it is assumed that the modem processing load of the terminal device increases, resulting in an increase in power consumption compared to other frequency bands.
- the communication unit CU has a function of determining the frequency band (communication method) to be used for communication based on the state of its own device. According to this configuration, communication suitable for the state of the device can be performed, and power consumption can be suppressed according to the state.
- FIG. 1 shows a communication system CS including a communication unit CU, multiple base stations BS and a network NW.
- the multiple base stations BS include, for example, a 5GNR base station BS1 and an LTE base station BS2.
- An example in which a communication scheme is selected between 4G/LTE and 5G will be described below.
- the NSA Non Stand Alone
- the NSA system is a system that uses LTE (Long Term Evolution) lines when implementing 5G-NR communication.
- the NSA system is a system in which control signals are transmitted and received on an LTE line, and data signals are transmitted and received on a 5G-NR line.
- the technology according to the present disclosure can also be applied to the SA (Stand Alone) method of the 5G-NR communication system.
- the SA system is a system in which both transmission and reception of control signals and data signals are performed on the 5G-NR line.
- the 5G-NR communication system communication is only an example, and the technology may be applicable to other communication systems.
- the 5GNR base station BS1 is a base station that provides 5G-NR wireless communication.
- the 5GNR base station BS1 is connected to a core network (Core Network) CN.
- the core network CN is connected to a data network DN via a gateway device (not shown).
- the cell of 5GNR base station BS1 may have a smaller range than the cell of LTE base station BS2.
- the communication unit CU connects to the 5GNR base station BS1 or LTE base station BS2 to enjoy wireless communication services.
- the communication unit CU may for example be a smart phone.
- the communication unit CU transmits/receives control signals to/from the LTE base station BS2, and transmits/receives data signals to/from the 5GNR base station BS1.
- the communication unit CU determines the frequency band to be used for communication from a plurality of independent frequency bands (communication method) based on information related to its own device.
- the information related to the device itself means, for example, information related to the processing that the device is scheduled to perform.
- the communication unit CU selects, for each schedule item, an appropriate communication method according to the communication performance required in implementing the schedule item.
- the LTE base station BS2 is a base station that provides LTE wireless communication.
- the LTE base station BS2, like the 5GNR base station BS1, is connected to the core network CN.
- FIG. 2 is a diagram showing an example of the configuration of the communication unit CU.
- the communication unit CU is an information processing device that processes various types of information.
- the communication unit CU can perform processing for each schedule item based on the schedule information 51 .
- the communication unit CU has, for example, a plurality of communication units 10, an antenna unit AT, a processing unit 20, a time management unit 30, a power supply unit 40 and a storage unit 50.
- the multiple communication units 10 employ different communication methods.
- the multiple communication units 10 include, for example, a first communication unit 11 and a second communication unit 12 .
- the first communication unit 11 adopts a communication method such as 5G, which has a large communication capacity (communication speed) and power consumption.
- the second communication unit 12 employs a communication scheme such as 4G/LTE, which has a smaller communication capacity and power consumption than the first communication unit 11 .
- Communication performance and power consumption are in a trade-off relationship.
- the communication unit 10 transmits and receives image and audio information to and from an external device via the antenna unit AT.
- the processing unit 20 provides various functions of the communication unit CU.
- the processing unit 20 has, for example, a determination unit 21, a communication control unit 22, a registration unit 23, and a notification unit 24.
- the determination unit 21 Based on the schedule-related information 53 acquired from the storage unit 50, the time information acquired from the time management unit 30, and the external power supply information acquired from the power supply unit 40, the determination unit 21 performs communication using any communication method. determine whether to The communication control unit 22 performs communication by controlling the communication unit 10 corresponding to the communication method determined by the determination unit 21 .
- the schedule-related information 53 includes various information related to schedules.
- schedule-related information 53 includes schedule information 51 and schedule communication information 52 .
- the schedule information 51 includes information on the user's schedule registered in the communication unit CU.
- the schedule information 51 may be information recorded in the communication unit CU, or may be information acquired from an external server using a schedule management application or the like.
- the schedule information 51 may include at least information about the schedule for the current day.
- the determination unit 21 selects one communication unit 10 from a plurality of communication units 10 with different communication methods based on the schedule information 51 and time information. Thereby, the communication unit 10 having appropriate communication performance matching the schedule is selected. Therefore, power consumption can be suppressed while ensuring sufficient communication quality.
- the schedule communication information 52 is information indicating the correspondence between schedule items and required communication performance.
- the required communication performance includes, for example, performance related to communication capacity and permissible amount of delay.
- a plurality of schedule items are registered in the schedule communication information 52 .
- Required communication performance is registered in the schedule communication information 52 for each schedule item.
- the determination unit 21 selects the communication unit 10 based on the schedule communication information 52 in which the required communication performance for each schedule item is registered. According to this configuration, an appropriate communication unit can be selected for each schedule item.
- the permissible amount of delay in two-way conferences such as video conferences is about 500 ms.
- the required delay amount required for one-way video viewing, listening to lectures on the Web, etc. is larger than the allowable delay amount required for two-way conferences. Therefore, in the case of a schedule that does not require a high amount of delay, power consumption can be suppressed by using the communication unit 10 that has low communication performance but low power consumption.
- the required communication performance may be set in advance by the user, or may be estimated based on the communication information acquired during the implementation period of the past schedule item and the user's action history. For example, the communication capacity registered as the required communication performance can be estimated from the past average communication capacity, the relationship with the application used, and the like. Alternatively, the user's past setting information and current communication information (communication capacity) may be learned, and the required communication performance may be updated as needed based on the learning results.
- the schedule communication information 52 can include information indicating the use start timing of the communication unit for each schedule item. For example, when the schedule includes parties such as meetings, a delay in communication immediately after switching the communication unit 10 may not be allowed. In that case, it is preferable to switch the communication unit 10 a predetermined time before the start time of the schedule. In the case of work that does not require a partner, a delay in communication immediately after switching may be allowed. In this case, the switching of the communication unit 10 may be performed at the timing when the start time of the schedule comes. If switching control is performed exactly at the scheduled time, there is a possibility that a delay will occur due to the switching of the communication unit 10 . In that case, sufficient communication quality is ensured by switching the communication unit 10 in advance.
- the time management unit 30 manages time information of the current communication unit CU.
- the time management unit 30 may periodically communicate with an external server to perform time synchronization.
- the power supply unit 40 manages the battery of the communication unit CU.
- the power supply unit 40 notifies the processing unit 20 of the remaining power supply capacity.
- the power supply unit 40 notifies the processing unit 20 of external power supply information regarding connection with the external power supply.
- the external power source information is used to estimate the endurance of the battery.
- the determination unit 21 determines whether the communication unit 10 can be switched based on the external power supply information.
- the external power supply information includes information (connection information) about the connection state between the communication unit CU and the external power supply and information indicating the possibility of connection with the external power supply (connection environment information).
- the connection information is information indicating whether or not the communication unit CU is currently connected to the external power supply.
- the connection environment information is information indicating whether or not the communication unit CU is currently in an environment in which it can be connected to an external power source.
- the determination unit 21 determines that the communication unit CU is currently connected to the external power source based on the connection information, it determines that switching of the communication unit 10 is unnecessary. Even if it is determined that the communication unit CU is currently connected to the external power supply and the remaining battery capacity is equal to or greater than the predetermined value, the determination unit 21 does not need to switch the communication unit 10. Determine that there is. Further, the determination unit 21 detects position information regarding the current location of the communication unit CU based on sensor information detected by a GPS sensor or the like. Based on the position information of the communication unit CU, the determination unit 21 determines whether or not it is in an environment (such as an office) that can be connected to an external power source.
- an environment such as an office
- the determination unit 21 monitors the implementation status of the schedule items included in the schedule information 51. When the determination unit 21 detects information indicating that the implementation of the schedule item has ended, the determination unit 21 selects the communication unit 10 based on the schedule following the completed schedule item. For example, the determination unit 21 can switch the communication unit 10 based on information indicating that the schedule has ended regardless of the current time (such as information indicating an operation of a conference exit button or an operation of closing an application). As a result, for example, if the conference ends earlier than planned, power consumption can be suppressed by switching the communication unit 10 to a communication unit with low communication performance. In addition, if the conference takes longer than planned, the communication quality can be sufficiently ensured by not switching the communication unit 10 .
- the registration unit 23 obtains the required communication performance of an unregistered schedule item that is not registered in the schedule communication information 52 from communication information (communication capacity) acquired during the implementation period of the unregistered schedule item or the user's action history (manually performed by the user). (e.g., the communication method was switched in the The registration unit 23 registers the determined required communication performance in the schedule communication information 52 in association with the unregistered schedule item.
- the registration unit 23 updates the required communication performance registered in the schedule communication information 52 based on the learning result of past communication information (communication capacity). For example, it is assumed that a schedule set with a specific schedule item name is a work that remotely operates an external device, and the registered required communication performance is communication performance compatible with 4G/LTE. If the registration unit 23 determines that the schedule corresponding to this schedule item name requires a communication capacity equal to or greater than a predetermined capacity from the communication result of the schedule set with the same schedule item name in the past, the registration unit 23 registers this schedule item name. Correct the required communication performance of the schedule item corresponding to the communication performance corresponding to 5G.
- the notification unit 24 When switching the communication unit 10 in use to another communication unit 10 based on the selection result, the notification unit 24 notifies the user about whether or not switching is possible before switching the communication unit 10 . For example, when another schedule is scheduled before a schedule requiring switching of the communication unit 10, or when it is detected that communication work is being performed on the communication unit 10 before switching , the notification unit 24 notifies the user before switching the communication unit 10 . As a result, it is possible to prompt the user to switch the communication unit 10 at a suitable timing without disturbing the user's work.
- the storage unit 50 stores, for example, schedule information 51, schedule communication information 52, and a program 59 executed by the processing unit 20.
- the program 59 is a program that causes a computer to execute information processing according to the present disclosure.
- the processing unit 20 performs various processes according to programs 59 stored in the storage unit 50 .
- the storage unit 50 may be used as a working area that temporarily stores the processing results of the processing unit 20 .
- Storage unit 50 includes, for example, any non-transitory storage medium such as a semiconductor storage medium and a magnetic storage medium.
- the storage unit 50 includes, for example, an optical disc, a magneto-optical disc, or a flash memory.
- the program 59 is stored, for example, in a non-transitory computer-readable storage medium.
- the processing unit 20 is, for example, a computer configured with a processor and memory.
- the memory of the processing unit 20 includes RAM (Random Access Memory) and ROM (Read Only Memory).
- the processing unit 20 functions as a determination unit 21 , a communication control unit 22 , a registration unit 23 and a notification unit 24 by executing the program 59 .
- FIG. 3 is a flow chart showing an example of an information processing method performed by the communication unit CU.
- a communication method with low communication performance (second communication unit 12) is adopted as a default communication method.
- step S101 the determination unit 21 acquires from the storage unit 50 the schedule information 51 indicating at least the user's schedule for the current day.
- step S ⁇ b>102 the determination unit 21 determines the current communication method to be set from the current time information and the acquired schedule information 51 .
- the timing for switching the communication method may be the timing at which a schedule requiring high communication performance is scheduled, or a predetermined time (for example, 2 or 3 minutes) before the scheduled time for this schedule.
- step S103 the determination unit 21 determines whether to change the communication method based on the determination result of S102. If it is determined in step S103 that the communication method is to be changed (step S103: Yes), the process proceeds to step S104. If it is determined in step S103 that the communication method should not be changed (step S103: No), the process returns to step S102 and the above processing is repeated until it is determined that the communication method should be changed.
- step S104 the determination unit 21 changes the communication method to a method with high communication performance (large power consumption).
- the communication control unit 22 performs communication by controlling the communication unit 10 (first communication unit 11) corresponding to the changed communication method.
- step S105 the determination unit 21 determines whether or not there is information regarding the end of the schedule. If it is determined in step S105 that there is information regarding the end of the schedule (step S105: Yes), the process proceeds to step S107. If it is determined in step S105 that there is no information regarding the end of the schedule (step S105: No), the process proceeds to step S106.
- step S106 the determination unit 21 determines whether or not it is time to end the schedule. If it is determined in step S106 that the schedule ends (step S106: Yes), the process proceeds to step S107. If it is determined in step S106 that the time to end the schedule has not come (step S106: No), the process returns to step S105, and the above processing is repeated until it is determined that the time to end the schedule has arrived. be
- the notification unit 24 may notify the user in advance of the change, and after receiving the response, the process may proceed to step S107. If the conference is long, etc., suddenly changing the communication method may interfere with the conference. In that case, by notifying the user about whether or not the switching of the communication method is possible, the user can recognize that the communication method switching time has come and can judge whether or not the switching of the communication method is possible. can be done.
- step S107 the determination unit 21 changes the communication method to a method with low communication performance (low power consumption).
- the communication control unit 22 performs communication by controlling the communication unit 10 (second communication unit 12) corresponding to the changed communication method.
- step S108 the determination unit 21 determines whether another schedule is set after the current time. If it is determined in step S108 that another schedule is scheduled after the current time (step S108: Yes), the process returns to step S102 and the above-described processes are repeated. If it is determined in step S108 that no other schedule is scheduled after the current time (step S108: No), the determination unit 21 terminates the process.
- FIG. 4 is a diagram showing a specific example of switching control of the communication unit 10 in line with the actual schedule.
- FIG. 4 shows a schedule for Monday and Tuesday as an example of the schedule.
- a communication method with low communication performance (second communication unit 12) is adopted as a default communication method.
- a Web conference (a schedule that requires a larger communication capacity than a predetermined amount) is scheduled at 9:30 outside the office (power connection is not possible). Therefore, the determination unit 21 switches from the second communication unit 12 to the first communication unit 11 with high communication performance (large power consumption).
- the determination unit 21 acquires conference end information indicating the end of the conference (information indicating the operation of the end button, etc.). The determination unit 21 switches from the first communication unit 11 to the second communication unit 12 based on the conference end information. A web-based lecture is scheduled to start at 11:00, but the only communication from users is chatting in a question box, and high delay accuracy is not required. Therefore, the determination unit 21 maintains the current communication method (second communication unit 12).
- Second Communication Unit 12 ⁇ First Communication Unit 11> Task A is scheduled that requires communication with an external device.
- the determination unit 21 maintains the current communication method (the second communication unit 12) because the work has not been registered in the past.
- remote work requires a larger communication capacity than a predetermined amount, and the user manually switches from the second communication unit 12 to the first communication unit 11 .
- the registration unit 23 registers the required communication performance of the work A in the schedule communication information 52 based on the communication capacity required for the work A or the user's action history (result of manual switching of the communication unit 10 by the user).
- the registration unit 23 stores the updated schedule communication information 52 in the storage unit 50 . Thereafter, for work A, the determination unit 21 automatically selects the first communication unit 11 .
- Second Communication Unit 12> A normal meeting (not a schedule that requires a larger communication capacity than specified) is scheduled. Therefore, the determination unit 21 maintains the current communication method (second communication unit 12).
- Second Communication Unit 12 First Communication Unit 11> A web conference (a schedule that requires a larger communication capacity than a predetermined amount) is scheduled. Therefore, the determination unit 21 switches from the second communication unit 12 to the first communication unit 11 .
- the determination unit 21 acquires information indicating the end of the conference. However, since the determination unit 21 determines that the position of the device specified from the position information is a place where the power can be connected, the current communication method (first communication unit 11) is maintained.
- the registration unit 23 determines the required communication performance of the work B from the communication capacity required for the work B, and registers it in the schedule communication information 52 .
- the registration unit 23 stores the updated schedule communication information 52 in the storage unit 50 . For example, if the communication capacity of work B is small and can be handled by the second communication unit 12, the registration unit 23 registers the required communication performance of work B as the communication performance corresponding to the second communication unit 12. .
- a Web conference (a schedule that requires a communication capacity larger than a predetermined amount) is scheduled at 10:30 at an outside location (connection to a power source is not possible). Therefore, the determination unit 21 switches from the second communication unit 12 to the first communication unit 11 .
- the determination unit 21 acquires conference end information indicating the end of the conference.
- the determination unit 21 switches from the first communication unit 11 to the second communication unit 12 based on the conference end information.
- Task C is scheduled.
- the communication capacity of work C is a communication capacity that can be handled even by the second communication unit 12 .
- the user has not performed a manual switching operation of the communication unit 10 either.
- the registration unit 23 registers the required communication performance of the work C in the schedule communication information 52 based on the communication capacity required for the work C or the result of manual switching of the communication unit 10 by the user.
- the registration unit 23 stores the updated schedule communication information 52 in the storage unit 50 . Thereafter, for work C, the determination unit 21 automatically selects the second communication unit 12 .
- the determination unit 21 switches from the second communication unit 12 to the first communication unit 11 .
- the determination unit 21 notifies the user via the notification unit 24 that the first communication unit 11 is switched to the second communication unit 12 .
- the determination unit 21 switches from the first communication unit 11 to the second communication unit 12 upon receiving the user's consent to the notification.
- Second Communication Unit 12 First Communication Unit 11> A web conference (a schedule that requires a larger communication capacity than a predetermined amount) is scheduled. Therefore, the determination unit 21 switches from the second communication unit 12 to the first communication unit 11 .
- the determination unit 21 When switching the communication unit 10 at the end of each task, the determination unit 21 once sends a notification to the user via the notification unit 24, receives consent to the switch, and executes switching of the communication method. You may Work is scheduled, but it doesn't always end on schedule and sometimes takes longer than expected. If the notification as described above is performed, it is possible to prevent the communication unit 10 from being switched without permission and hindering work.
- FIG. 5 is a block diagram showing a hardware configuration example of the communication unit CU.
- the communication unit CU includes, for example, a processor 871, a ROM 872, a RAM 873, a host bus 874, a bridge 875, an external bus 876, an interface 877, an input device 878, an output device 879, a storage 880, a drive 881 , a connection port 882 and a communication device 883 .
- a processor 871 for example, a processor 871, a ROM 872, a RAM 873, a host bus 874, a bridge 875, an external bus 876, an interface 877, an input device 878, an output device 879, a storage 880, a drive 881 , a connection port 882 and a communication device 883 .
- a processor 871 for example, a processor 871, a ROM 872, a RAM 873, a host bus 874, a bridge 875, an external bus 876, an interface 877, an input device 878, an output device 879, a storage
- the processor 871 functions as, for example, an arithmetic processing device or a control device, and controls the overall operation of each component or a part thereof based on various programs recorded in the ROM 872, RAM 873, storage 880, or removable recording medium 901. .
- the ROM 872 is means for storing programs to be read into the processor 871 and data used for calculations.
- the RAM 873 temporarily or permanently stores, for example, programs to be read into the processor 871 and various parameters that change appropriately when the programs are executed.
- the processor 871, ROM 872, and RAM 873 are interconnected via, for example, a host bus 874 capable of high-speed data transmission.
- the host bus 874 is connected, for example, via a bridge 875 to an external bus 876 with a relatively low data transmission speed.
- External bus 876 is also connected to various components via interface 877 .
- the input device 878 for example, a mouse, keyboard, touch panel, button, switch, lever, etc. are used. Furthermore, as the input device 878, a remote controller (hereinafter referred to as a remote controller) capable of transmitting control signals using infrared rays or other radio waves may be used.
- the input device 878 also includes a voice input device such as a microphone.
- the output device 879 is, for example, a display device such as a CRT (Cathode Ray Tube), an LCD, or an organic EL, an audio output device such as a speaker or headphone, a printer, a mobile phone, a facsimile, or the like, and transmits the acquired information to the user. It is a device capable of visually or audibly notifying Output devices 879 according to the present disclosure also include various vibration devices capable of outputting tactile stimuli.
- the storage 880 is a device for storing various data.
- a magnetic storage device such as a hard disk drive (HDD), a semiconductor storage device, an optical storage device, a magneto-optical storage device, or the like is used.
- the drive 881 is a device that reads information recorded on a removable recording medium 901 such as a magnetic disk, an optical disk, a magneto-optical disk, or a semiconductor memory, or writes information to the removable recording medium 901, for example.
- a removable recording medium 901 such as a magnetic disk, an optical disk, a magneto-optical disk, or a semiconductor memory
- the removable recording medium 901 is, for example, DVD media, Blu-ray (registered trademark) media, HD DVD media, various semiconductor storage media, and the like.
- the removable recording medium 901 may be, for example, an IC card equipped with a contactless IC chip, an electronic device, or the like.
- connection port 882 is a port for connecting an external connection device 902 such as a USB (Universal Serial Bus) port, an IEEE1394 port, a SCSI (Small Computer System Interface), an RS-232C port, or an optical audio terminal.
- an external connection device 902 such as a USB (Universal Serial Bus) port, an IEEE1394 port, a SCSI (Small Computer System Interface), an RS-232C port, or an optical audio terminal.
- the externally connected device 902 is, for example, a printer, portable music player, digital camera, digital video camera, or IC recorder.
- the communication device 883 is a communication device for connecting to a network. subscriber line) or a modem for various communications.
- the communication device 883 has a communication interface that supports wireless communication methods such as 5G-NR, LTE, and LTE-Advanced.
- communication unit 883 may include a baseband processor that performs signal processing such as encoding, decoding, modulation and demodulation.
- Communication device 883 may also include RF circuitry.
- the communication device 883 may also include an antenna that radiates radio waves into space and converts the radio waves in space into signals.
- the communication unit CU has a processing section 20 . Based on the schedule information 51 and the time information, the processing unit 20 selects one communication unit 10 from a plurality of communication units 10 with different communication methods. In the information processing method of this embodiment, the processing of the communication unit CU described above is executed by a computer. The program 59 of this embodiment causes the computer to implement the processing of the communication unit CU described above.
- the processing unit 20 selects the communication unit 10 based on the schedule communication information 52 in which the required communication performance for each schedule item is registered.
- an appropriate communication unit 10 is selected for each schedule item.
- the processing unit 20 determines the required communication performance of an unregistered schedule item that is not registered in the schedule communication information 52 based on the communication information acquired during the implementation period of the unregistered schedule item or the user's action history. The processing unit 20 registers the determined required communication performance in the schedule communication information 52 in association with the unregistered schedule item.
- the required communication performance of the unregistered schedule item is appropriately set according to the actual communication situation during the implementation period of the unregistered schedule item.
- the required communication performance includes performance related to communication capacity or allowable amount of delay.
- an appropriate communication unit 10 is selected based on the communication capacity and the allowable amount of delay.
- the schedule communication information 52 includes information indicating the start timing of using the communication unit 10 for each schedule item.
- the processing unit 20 determines whether or not the communication unit 10 can be switched based on the information regarding the connection state with the external power source or the information indicating the possibility of connection with the external power source.
- the endurance of the battery is estimated based on the state of connection with the external power source or the possibility of connection with the external power source. By comparing the power consumption of each communication unit 10 with the endurance of the battery, an appropriate communication unit 10 corresponding to the endurance of the battery is selected.
- the processing unit 20 determines that switching of the communication unit 10 is unnecessary in a situation where the battery has a high endurance. For example, if the processing unit 20 determines that it is currently connected to the external power source based on the information about the connection state, or if it is currently connected to the external power source and If it is determined that the capacity is equal to or greater than the predetermined value, it is determined that switching of the communication unit 10 is unnecessary.
- the processing unit 20 When the communication unit 10 in use is switched to another communication unit 10 based on the selection result, the processing unit 20 notifies the user about whether or not switching is possible before switching the communication unit 10 .
- the switching of the communication unit 10 can be prevented from interfering with the work performed before switching.
- the processing unit 20 monitors the implementation status of the schedule items included in the schedule information 51. When the processing unit 20 detects information indicating that the execution of the schedule item has ended, the processing unit 20 selects the communication unit 10 based on the schedule following the completed schedule item.
- 5G and 4G/LTE are exemplified as a combination of communication schemes with different communication performances.
- the communication method has been switched between 5G and 4G/LTE, the combination of communication methods is not limited to this.
- the communication method may be switched between Wi-Fi (registered trademark) (Wireless Fidelity) and 3G.
- An information processing apparatus having a processing unit that selects one communication unit from a plurality of communication units using different communication methods based on schedule information and time information.
- the processing unit selects the communication unit based on schedule communication information in which required communication performance for each schedule item is registered.
- the processing unit determines a required communication performance of an unregistered schedule item that is not registered in the schedule communication information based on communication information acquired during an implementation period of the unregistered schedule item, and determines the determined required communication. registering performance in the schedule communication information in association with the unregistered schedule item; The information processing apparatus according to (2) above.
- the processing unit determines a required communication performance of an unregistered schedule item that is not registered in the schedule communication information based on a user's action history acquired during an implementation period of the unregistered schedule item, and registering the required communication performance in the schedule communication information in association with the unregistered schedule item;
- the required communication performance includes performance related to communication capacity, The information processing apparatus according to any one of (2) to (4) above.
- the required communication performance includes performance regarding an allowable amount of delay, The information processing apparatus according to any one of (2) to (4) above.
- the schedule communication information includes information indicating the start timing of use of the communication unit for each of the schedule items.
- the processing unit determines whether switching of the communication unit is possible based on information regarding a connection state with an external power supply.
- the information processing apparatus according to any one of (1) to (7) above. (9) If it is determined that the processing unit is currently connected to an external power supply based on the information about the connection state, the processing unit determines that switching of the communication unit is unnecessary. The information processing apparatus according to (8) above. (10) If it is determined that the processing unit is currently connected to an external power source and the remaining battery capacity is equal to or greater than a predetermined value based on the information regarding the connection state, the processing unit performs the communication. determine that switching of parts is unnecessary, The information processing apparatus according to (8) above.
- the processing unit determines whether or not the communication unit can be switched based on information indicating the possibility of connection with an external power source.
- the information processing apparatus according to any one of (1) to (7) above.
- the processing unit When switching the communication unit in use to another communication unit based on the selection result, the processing unit notifies the user about whether or not switching is possible before switching the communication unit.
- the processing unit monitors the implementation status of the schedule item included in the schedule information, and when detecting information indicating that the implementation of the schedule item has ended, performs the select the communication part, The information processing apparatus according to any one of (1) to (12) above.
- An information processing method executed by a computer comprising selecting one communication unit from a plurality of communication units with different communication methods based on schedule information and time information.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Quality & Reliability (AREA)
- Computer Security & Cryptography (AREA)
- Human Computer Interaction (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
情報処理装置(CU)は、処理部(20)を有する。処理部(20)は、スケジュール情報(51)と時刻情報とに基づいて、通信方式の異なる複数の通信部(10)から1つの通信部(10)を選択する。
Description
本発明は、情報処理装置、情報処理方法およびプログラムに関する。
近年、無線通信システムを利用して送受信可能な通信容量は増加しており、最近では第5世代移動通信システム(5G)の実用化が開始されている。このような背景に加え、最近ではビジネスにおいてリモートワークといった場所にとらわれない働き方が広がってきており、TV会議やリモートコントロールを用途として無線通信を介した通信容量は増加していく傾向である。
一般的に、通信可能容量が大きい通信部は消費電力も大きく、リモートワークの場合は常に電力供給を受けられる環境ではない場合もあることから、電力の消費を抑制しながら最適な通信環境を提供するシステムが必要となっている。
特許文献1には、自機の動作時間に関する情報と、同操作をある通信部で通信した場合の(予測)電池残量が所定の閾値に達するか否かの判定結果に応じて消費電力(通信容量)の異なるいずれの通信部を利用するかを選択することが開示されている。しかし、動作時間の情報だけでは適切な通信部の選択ができているとはいえず、適切に消費電力が抑制できているとはいえない。
そこで、本開示では、電力の消費を抑制しながら最適な通信環境を提供することが可能な情報処理装置、情報処理方法およびプログラムを提案する。
本開示によれば、スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択する処理部を有する、情報処理装置が提供される。また、本開示によれば、前記情報処理装置の情報処理がコンピュータにより実行される情報処理方法、ならびに、前記情報処理装置の情報処理をコンピュータに実現させるプログラムが提供される。
以下に、本開示の実施形態について図面に基づいて詳細に説明する。以下の各実施形態において、同一の部位には同一の符号を付することにより重複する説明を省略する。
なお、説明は以下の順序で行われる。
[1.通信ネットワーク]
[2.通信ユニットの構成]
[3.情報処理方法]
[4.ハードウェア構成例]
[5.効果]
[6.変形例]
[1.通信ネットワーク]
[2.通信ユニットの構成]
[3.情報処理方法]
[4.ハードウェア構成例]
[5.効果]
[6.変形例]
[1.通信ネットワーク]
図1は、本開示で利用されるネットワーク環境の一例を示す図である。
図1は、本開示で利用されるネットワーク環境の一例を示す図である。
近年、3GPP(Third Generation Partnership Project)において、次世代無線通信システムである5G-NRの仕様が検討されている。具体的には、5G-NRは、高速大容量(eMBB;Enhanced Mobile Broadband)、多数接続(mMTC;massive Machine Type Communication)、低遅延・高信頼性(URLLC;Ultra-Reliable and Low Latency Communications)が標準化の範囲(スコープ)として挙げられる。
特に、eMBBにおける通信高速化の実現のため、無線通信に使用する周波数帯の拡張が必要となる。そこで、5G-NRでは、例えばミリ波帯に代表される高周波数帯の使用が検討されている。具体的には、5G-NRでは、24GHz以上に割り当てが可能となる周波数帯定義が追加された。高周波数帯域が用いられる場合、以前まで使用されてきた周波数帯域の場合と比較して、より高速な通信の実行が可能となる。
ところで、通信に使用される周波数帯域が異なると、電波特性は変化する。例えば、高周波数帯域を用いた通信を行う場合、4G以前の無線通信システムにおいて使用された周波数帯域と比較して送信電力が高いため、電波信号を送信する際の消費電力は増大する。また、例えば、高周波数帯域を用いた通信を行う場合、端末装置のモデム処理負荷が増大し、他の周波数帯域と比較して、結果消費電力が増大すると想定される。
一方で、端末装置が実行するセルラ通信のデータ量によっては、高周波数帯域を使用した場合の通信速度程度の速さは、必ずしも必要とされない場合がある。例えば、文字メッセージの送受信では通信されるデータ量が少ないため、高周波数帯域を使用した高速な通信速度でなくても問題が無いと想定される。
上記のような点に鑑みると、端末装置の状態や通信の目的に応じた周波数帯域の決定による、電力消費の軽減が望まれる。
そこで、本開示の一実施形態に係る通信ユニットCUは、自機の状態に基づいて、通信に使用する周波数帯域(通信方式)を決定する機能を有する。この構成によれば、自機の状態に適した通信を行うことができ、状態に応じて電力消費を抑えることができる。
図1には、通信ユニットCU、複数の基地局BSおよびネットワークNWを含む通信システムCSが示されている。複数の基地局BSには、例えば、5GNR基地局BS1およびLTE基地局BS2が含まれる。以下、4G/LTEと5Gとの間で通信方式の選択が行われる例を説明する。5G-NR通信システムでは、例えば、NSA(Non StandAlone)方式が採用される。NSA方式とは、5G-NR通信の実現に際し、LTE(Long Term Evolution)回線を利用する方式である。具体的には、NSA方式は、制御信号の送受信をLTE回線で行い、データ信号の送受信を5G-NR回線で行う方式である。
一方で、5G-NR通信システムのSA(StandAlone)方式においても本開示に係る技術を適用可能である。SA方式とは、制御信号およびデータ信号の双方の送受信を5G-NR回線で行う方式である。勿論、5G-NR通信システム通信はあくまで一例であり、本技術は他の通信システムに対しても適用可能であり得る。
5GNR基地局BS1は、5G-NR無線通信を提供する基地局である。5GNR基地局BS1は、コアネットワーク(Core Network)CNに接続される。ここで、コアネットワークCNは、ゲートウェイ装置(図示せず)を介してデータネットワーク(Data Network)DNに接続される。また、5GNR基地局BS1のセルは、LTE基地局BS2のセルよりも小さい範囲であり得る。
通信ユニットCUは、5GNR基地局BS1またはLTE基地局BS2に接続して、無線通信サービスを享受する。通信ユニットCUは、例えばスマートフォンであり得る。なお、通信ユニットCUは、LTE基地局BS2と制御信号を送受信し、5GNR基地局BS1とデータ信号を送受信する。
通信ユニットCUは、自機に係る情報に基づいて、複数の独立した周波数帯域(通信方式)から、通信に使用される周波数帯域を決定する。ここで、自機に係る情報とは、例えば、自機が実施を予定している処理に関する情報をいう。通信ユニットCUは、スケジュール項目ごとに、スケジュール項目の実施において要求される通信性能に応じた適切な通信方式を選択する。
LTE基地局BS2は、LTE無線通信を提供する基地局である。LTE基地局BS2は、5GNR基地局BS1と同様に、コアネットワークCNに接続される。
[2.通信ユニットの構成]
図2は、通信ユニットCUの構成の一例を示す図である。
図2は、通信ユニットCUの構成の一例を示す図である。
通信ユニットCUは、各種情報を処理する情報処理装置である。通信ユニットCUは、スケジュール情報51に基づいてスケジュール項目ごとに処理を実施可能である。通信ユニットCUは、例えば、複数の通信部10、アンテナ部AT、処理部20、時刻管理部30、電源部40および記憶部50を有する。
複数の通信部10は、それぞれ異なる通信方式を採用する。複数の通信部10には、例えば、第1通信部11と第2通信部12とが含まれる。第1通信部11は、通信容量(通信速度)および消費電力が大きい5Gなどの通信方式を採用する。第2通信部12は、通信容量および消費電力が第1通信部11より小さい4G/LTEなどの通信方式を採用する。一般に、通信容量が大きくなると、通信性能は高まるが、消費電力も大きくなる。通信性能と消費電力はトレードオフの関係にある。通信部10は、アンテナ部ATを介して外部装置と画像や音声情報などの送受信を行う。
処理部20は、通信ユニットCUの様々な機能を提供する。処理部20は、例えば、判定部21、通信制御部22、登録部23および通知部24を有する。
判定部21は、記憶部50から取得したスケジュール関連情報53、時刻管理部30から取得した時刻情報、および、電源部40から取得した外部電源情報などに基づいて、いずれの通信方式で通信を行うべきかを判定する。通信制御部22は、判定部21で判定された通信方式に対応する通信部10を制御して通信を行う。
スケジュール関連情報53は、スケジュールに関する様々な情報を含む。例えば、スケジュール関連情報53には、スケジュール情報51とスケジュール通信情報52とが含まれる。
スケジュール情報51は、通信ユニットCUに登録されたユーザのスケジュールに関する情報を含む。スケジュール情報51は、通信ユニットCUに記録されている情報でもよいし、スケジュール管理アプリなどを用いて外部サーバから取得した情報でもよい。スケジュール情報51には、少なくとも当日分のスケジュールに関する情報が含まれていればよい。例えば、判定部21は、スケジュール情報51と時刻情報とに基づいて、通信方式の異なる複数の通信部10から1つの通信部10を選択する。これにより、スケジュールに合わせた適切な通信性能を有する通信部10が選択される。よって、十分な通信品質を担保しつつ電力消費を抑制することができる。
スケジュール通信情報52は、スケジュール項目と要求通信性能との対応関係を示す情報である。要求通信性能は、例えば、通信容量および許容可能な遅延量に関する性能を含む。スケジュール通信情報52には、複数のスケジュール項目が登録されている。スケジュール通信情報52には、スケジュール項目ごとに要求通信性能が登録されている。例えば、判定部21は、スケジュール項目ごとの要求通信性能を登録したスケジュール通信情報52に基づいて通信部10の選択を行う。この構成によれば、スケジュール項目ごとに適切な通信部を選択することができる。
例えば、テレビ会議などの双方向会議における許容遅延量は500ms程度である。一方的な動画視聴やWebによる講演聴講などで求められる要求遅延量は、双方向会議で求められる許容遅延量よりも大きい。よって、要求遅延量が高くないスケジュールの場合には、通信性能は低いが消費電力の小さい通信部10を利用することで、消費電力を抑制することができる。
なお、要求通信性能は、予めユーザによって設定されてもよいが、過去のスケジュール項目の実施期間に取得された通信情報およびユーザの行動履歴などに基づいて推測されてもよい。例えば、要求通信性能として登録される通信容量は、過去の平均通信容量や利用するアプリとの関係などから推測することができる。あるいは、ユーザの過去の設定情報とその時の通信情報(通信容量)を学習し、学習結果に基づいて要求通信性能が随時更新されてもよい。
スケジュール通信情報52は、スケジュール項目ごとの通信部の使用開始タイミングを示す情報を含むことができる。例えば、スケジュールが、会議などのように相手を有する場合には、通信部10の切り替え直後の通信の遅延が許容されない場合がある。その場合には、スケジュールの開始時刻よりも所定時間前に通信部10の切り替えを実施することが好ましい。相手を要しない作業の場合には、切り替え直後の通信の遅延が許容される場合もある。この場合には、スケジュールの開始時刻になったタイミングで通信部10の切り替えが行われてもよい。予定時刻ちょうどに切り替えの制御を行うと、通信部10の切り替えに伴う遅延が発生する可能性がある。その場合、事前に通信部10の切り替えを行うことで、十分な通信品質が担保される。
時刻管理部30は、現在の通信ユニットCUの時刻情報を管理する。時刻管理部30は、定期的に外部サーバと通信して時刻同期を行ってもよい。
電源部40は、通信ユニットCUのバッテリを管理する。電源部40は、処理部20に残電源容量を通知する。また、電源部40は、外部電源との接続に関する外部電源情報を処理部20に通知する。外部電源情報によって、バッテリの持続力が推定される。例えば、判定部21は、外部電源情報に基づいて通信部10の切り替えの可否を判定する。
外部電源情報は、通信ユニットCUと外部電源との接続状態に関する情報(接続情報)および外部電源との接続可能性を示す情報(接続環境情報)を含む。接続情報は、通信ユニットCUが現在外部電源に接続されているか否かを示す情報である。接続環境情報は、通信ユニットCUが現在外部電源と接続しうる環境にあるか否かを示す情報である。
例えば、判定部21は、接続情報に基づいて、通信ユニットCUが現在外部電源と接続されている状態にあると判定した場合、通信部10の切り替えは不要であると判定する。通信ユニットCUが現在外部電源と接続されている状態にあり、且つ、残電池容量が所定値以上である状態にあると判定した場合にも、判定部21は、通信部10の切り替えは不要であると判定する。また、判定部21は、GPSセンサなどで検出されたセンサ情報に基づいて、通信ユニットCUの現在地に関する位置情報を検出する。判定部21は、通信ユニットCUの位置情報に基づいて、外部電源と接続しうる環境(オフィスなど)にあるか否かを判定する。
判定部21は、スケジュール情報51に含まれるスケジュール項目の実施状況を監視する。判定部21は、スケジュール項目の実施が終了したことを示す情報を検出した場合に、終了したスケジュール項目の次のスケジュールに基づいて通信部10の選択を行う。例えば、判定部21は、現在時刻によらずにスケジュールが終了したことを示す情報(会議の退出ボタンの操作やアプリを閉じる操作を示す情報など)に基づいて通信部10を切り替えることができる。これにより、例えば、会議が予定よりも早く終了した場合は通信部10を通信性能の低い通信部に切り替えることで、電力消費を抑えることができる。また、会議が予定よりも長引いた場合には、通信部10の切り替えを行わないことにより、通信品質を十分に担保することができる。
登録部23は、スケジュール通信情報52に登録されていない未登録スケジュール項目の要求通信性能を、未登録スケジュール項目の実施期間に取得された通信情報(通信容量)またはユーザの行動履歴(ユーザが手動で通信方式を切り替えたなど)に基づいて判定する。登録部23は、判定された要求通信性能を未登録スケジュール項目と関連付けてスケジュール通信情報52に登録する。
登録部23は、スケジュール通信情報52に登録済みの要求通信性能を過去の通信情報(通信容量)の学習結果に基づいて更新する。例えば、特定のスケジュール項目名で設定されたスケジュールが、外部の機器をリモートで操作するような作業であり、登録済みの要求通信性能が4G/LTEに対応する通信性能であるとする。登録部23は、過去に同じスケジュール項目名で設定されたスケジュールの通信結果から、このスケジュール項目名に対応するスケジュールが所定容量以上の通信容量を必要とすると判定した場合には、このスケジュール項目名に対応するスケジュール項目の要求通信性能を5Gに対応する通信性能に修正する。
通知部24は、使用中の通信部10を、選択結果に基づいて他の通信部10に切り替える場合には、通信部10の切り替え前に、切り替えの可否に関する通知をユーザに行う。例えば、通信部10の切り替えが必要なスケジュールの前に、別のスケジュールが予定されている場合、あるいは、切り替え前の通信部10に対して通信作業が行われていることが検知された場合には、通知部24は、通信部10の切り替え前にユーザへ通知を行う。これにより、ユーザへの作業を阻害せずに適したタイミングで通信部10の切り替えを促すことができる。
記憶部50は、例えば、スケジュール情報51と、スケジュール通信情報52と、処理部20が実行するプログラム59と、を記憶する。プログラム59は、本開示に係る情報処理をコンピュータに実行させるプログラムである。処理部20は、記憶部50に記憶されているプログラム59にしたがって各種の処理を行う。記憶部50は、処理部20の処理結果を一時的に記憶する作業領域として利用されてもよい。記憶部50は、例えば、半導体記憶媒体および磁気記憶媒体などの任意の非一過的な記憶媒体を含む。記憶部50は、例えば、光ディスク、光磁気ディスクまたはフラッシュメモリを含んで構成される。プログラム59は、例えば、コンピュータにより読み取り可能な非一過的な記憶媒体に記憶されている。
処理部20は、例えば、プロセッサとメモリとで構成されるコンピュータである。処理部20のメモリには、RAM(Random Access Memory)およびROM(Read Only Memory)が含まれる。処理部20は、プログラム59を実行することにより、判定部21、通信制御部22、登録部23および通知部24として機能する。
[3.情報処理方法]
図3は、通信ユニットCUが行う情報処理方法の一例を示すフローチャートである。通信ユニットCUでは、例えば、デフォルトの通信方式として、通信性能の低い通信方式(第2通信部12)が採用される。
図3は、通信ユニットCUが行う情報処理方法の一例を示すフローチャートである。通信ユニットCUでは、例えば、デフォルトの通信方式として、通信性能の低い通信方式(第2通信部12)が採用される。
ステップS101において、判定部21は、記憶部50から、少なくとも当日のユーザのスケジュールを示すスケジュール情報51を取得する。ステップS102において、判定部21は、現在の時刻情報と取得したスケジュール情報51とから現在の設定すべき通信方式を決定する。通信方式を切り替えるタイミングは、高い通信性能を要求するスケジュールが予定された時刻になったタイミングでもよいし、このスケジュールが予定される時刻の所定時間前(例えば、2、3分前)でもよい。
ステップS103において、判定部21は、S102の判定結果から、通信方式を変更するかどうかを判定する。ステップS103において、通信方式を変更すると判定された場合には(ステップS103:Yes)、ステップS104に進む。ステップS103において、通信方式を変更しないと判定された場合には(ステップS103:No)、ステップS102に戻り、通信方式を変更すると判定されるまで上述の処理が繰り返される。
ステップS104において、判定部21は、通信方式を通信性能の高い(消費電力の大きい)方式に変更する。通信制御部22は、変更後の通信方式に対応する通信部10(第1通信部11)を制御して通信を行う。
ステップS105において、判定部21は、スケジュール終了に関する情報があるか否かを判定する。ステップS105において、スケジュール終了に関する情報があると判定された場合には(ステップS105:Yes)、ステップS107に進む。ステップS105において、スケジュール終了に関する情報がないと判定された場合には(ステップS105:No)、ステップS106に進む。
ステップS106において、判定部21は、スケジュールが終了する時刻になったかどうかを判定する。ステップS106において、スケジュールが終了する時刻になったと判定された場合には、(ステップS106:Yes)、ステップS107に進む。ステップS106において、スケジュールが終了する時刻になっていないと判定された場合には、(ステップS106:No)、ステップS105に戻り、スケジュールが終了する時刻になったと判定されるまで上述の処理が繰り返される。
なお、スケジュールが終了する時刻になった場合、いきなり通信方式を変更するのではなく、事前に通知部24がユーザに変更する旨を通知し、その応答を受けてステップS107に進むようにしてもよい。会議が長引いている場合などでは、いきなり通信方式を変更すると、会議に支障をきたす可能性がある。その場合、ユーザに通信方式の切り替えの可否に関する通知を行うことで、ユーザは通信方式の切り替え時刻になったことを認識することができ、且つ、通信方式の切り替えの可否についての判断を行うことができる。
ステップS107において、判定部21は、通信方式を通信性能の低い(消費電力の低い)方式に変更する。通信制御部22は、変更後の通信方式に対応する通信部10(第2通信部12)を制御して通信を行う。
ステップS108において、判定部21は、現在時刻の後に他のスケジュールが設定されているかを判定する。ステップS108において、現在時刻の後に他のスケジュールが予定されていると判定された場合には(ステップS108:Yes)、ステップS102に戻り、上述の処理が繰り返される。ステップS108において、現在時刻の後に他のスケジュールが予定されていないと判定された場合には(ステップS108:No)、判定部21は処理を終了する。
図4は、実際のスケジュールに即した通信部10の切り替え制御の具体例を示す図である。図4には、スケジュールの一例として、月曜日と火曜日のスケジュールが示されている。通信ユニットCUでは、例えば、デフォルトの通信方式として、通信性能の低い通信方式(第2通信部12)が採用される。
<<月曜日>>
<9時28分:第2通信部12→第1通信部11>
9:30から外出先(電源接続不可)にて、Web会議(所定以上の大きな通信容量が必要なスケジュール)が予定されている。そのため、判定部21は、第2通信部12から通信性能の高い(消費力の大きい)第1通信部11に切り替える。
<9時28分:第2通信部12→第1通信部11>
9:30から外出先(電源接続不可)にて、Web会議(所定以上の大きな通信容量が必要なスケジュール)が予定されている。そのため、判定部21は、第2通信部12から通信性能の高い(消費力の大きい)第1通信部11に切り替える。
<10時45分:第1通信部11→第2通信部12>
判定部21は、会議の終了を示す会議終了情報(終了ボタンの操作を示す情報など)を取得する。判定部21は、会議終了情報に基づいて第1通信部11から第2通信部12に切り替える。11時からWebを介した講演が予定されているが、ユーザからの通信は質問Boxにチャットするくらいであり、高い遅延要求精度は求められない。そのため、判定部21は、現行の通信方式(第2通信部12)を維持する。
判定部21は、会議の終了を示す会議終了情報(終了ボタンの操作を示す情報など)を取得する。判定部21は、会議終了情報に基づいて第1通信部11から第2通信部12に切り替える。11時からWebを介した講演が予定されているが、ユーザからの通信は質問Boxにチャットするくらいであり、高い遅延要求精度は求められない。そのため、判定部21は、現行の通信方式(第2通信部12)を維持する。
<13時:第2通信部12→第1通信部11>
外部装置との通信を必要とする作業Aが予定されている。この時点では過去に登録のない作業のため、判定部21は、現行の通信方式(第2通信部12)を維持する。しかし、リモート作業により所定以上の大きな通信容量が必要となり、ユーザは手動で第2通信部12から第1通信部11に切り替える。
外部装置との通信を必要とする作業Aが予定されている。この時点では過去に登録のない作業のため、判定部21は、現行の通信方式(第2通信部12)を維持する。しかし、リモート作業により所定以上の大きな通信容量が必要となり、ユーザは手動で第2通信部12から第1通信部11に切り替える。
登録部23は、作業Aに要した通信容量またはユーザの行動履歴(ユーザによる手動での通信部10の切り替え実績)に基づいて、スケジュール通信情報52に作業Aの要求通信性能を登録する。登録部23は、更新されたスケジュール通信情報52を記憶部50に格納する。以降、作業Aに対しては、判定部21により第1通信部11が自動的に選択される。
<15時:第2通信部12>
通常の会議(所定以上の大きい通信容量が必要なスケジュールではない)が予定されている。そのため、判定部21は、現行の通信方式(第2通信部12)を維持する。
通常の会議(所定以上の大きい通信容量が必要なスケジュールではない)が予定されている。そのため、判定部21は、現行の通信方式(第2通信部12)を維持する。
<15時58分:第2通信部12→第1通信部11>
Web会議(所定以上の大きい通信容量が必要なスケジュール)が予定されている。そのため、判定部21は、第2通信部12から第1通信部11へ切り替える。
Web会議(所定以上の大きい通信容量が必要なスケジュール)が予定されている。そのため、判定部21は、第2通信部12から第1通信部11へ切り替える。
<16時55分:第1通信部11>
判定部21は、会議の終了を示す情報を取得する。しかし、判定部21は、位置情報から特定される自機の位置が電源接続可能な場所であると判定したため、現行の通信方式(第1通信部11)を維持する。
判定部21は、会議の終了を示す情報を取得する。しかし、判定部21は、位置情報から特定される自機の位置が電源接続可能な場所であると判定したため、現行の通信方式(第1通信部11)を維持する。
<17時:第1通信部11>
登録部23は、作業Bに要した通信容量から、作業Bの要求通信性能を判定し、スケジュール通信情報52に登録する。登録部23は、更新されたスケジュール通信情報52を記憶部50に格納する。例えば、作業Bの通信容量が小さく、第2通信部12でも対応可能である場合には、登録部23は、作業Bの要求通信性能を、第2通信部12に対応する通信性能として登録する。
登録部23は、作業Bに要した通信容量から、作業Bの要求通信性能を判定し、スケジュール通信情報52に登録する。登録部23は、更新されたスケジュール通信情報52を記憶部50に格納する。例えば、作業Bの通信容量が小さく、第2通信部12でも対応可能である場合には、登録部23は、作業Bの要求通信性能を、第2通信部12に対応する通信性能として登録する。
<<火曜日>>
<10時28分:第2通信部12→第1通信部11>
10時30分から外出先(電源接続不可)にて、Web会議(所定以上の大きい通信容量が必要なスケジュール)が予定されている。そのため、判定部21は、第2通信部12から第1通信部11に切り替える。
<10時28分:第2通信部12→第1通信部11>
10時30分から外出先(電源接続不可)にて、Web会議(所定以上の大きい通信容量が必要なスケジュール)が予定されている。そのため、判定部21は、第2通信部12から第1通信部11に切り替える。
<11時59分:第1通信部11→第2通信部12>
判定部21は、会議の終了を示す会議終了情報を取得する。判定部21は、会議終了情報に基づいて第1通信部11から第2通信部12に切り替える。
判定部21は、会議の終了を示す会議終了情報を取得する。判定部21は、会議終了情報に基づいて第1通信部11から第2通信部12に切り替える。
<13時:第2通信部12>
作業Cのスケジュールが予定されている。作業Cの通信容量は、第2通信部12でも対応可能な通信容量である。作業Cの実施期間中に、ユーザによる手動の通信部10の切り替え操作も行われていない。
作業Cのスケジュールが予定されている。作業Cの通信容量は、第2通信部12でも対応可能な通信容量である。作業Cの実施期間中に、ユーザによる手動の通信部10の切り替え操作も行われていない。
登録部23は、作業Cに要した通信容量またはユーザによる手動での通信部10の切り替え実績に基づいて、スケジュール通信情報52に作業Cの要求通信性能を登録する。登録部23は、更新されたスケジュール通信情報52を記憶部50に格納する。以降、作業Cに対しては、判定部21により第2通信部12が自動的に選択される。
<14時:第2通信部12→第1通信部11>
作業Aの開始時刻になったため、判定部21は、第2通信部12から第1通信部11に切り替える。
作業Aの開始時刻になったため、判定部21は、第2通信部12から第1通信部11に切り替える。
<15時:第1通信部11→第2通信部12>
作業Aのスケジュール終了時刻になったため、判定部21は、通知部24を介して、第1通信部11から第2通信部12に切り替える旨をユーザに通知する。判定部21は、通知に対するユーザの同意を受けて、第1通信部11から第2通信部12に切り替える。
作業Aのスケジュール終了時刻になったため、判定部21は、通知部24を介して、第1通信部11から第2通信部12に切り替える旨をユーザに通知する。判定部21は、通知に対するユーザの同意を受けて、第1通信部11から第2通信部12に切り替える。
<15時58分:第2通信部12→第1通信部11>
Web会議(所定以上の大きい通信容量が必要なスケジュール)が予定されている。そのため、判定部21は、第2通信部12から第1通信部11へ切り替える。
Web会議(所定以上の大きい通信容量が必要なスケジュール)が予定されている。そのため、判定部21は、第2通信部12から第1通信部11へ切り替える。
なお、判定部21は、各作業の終了とともに通信部10を切り替える場合、通知部24を介して一旦通知をユーザに送り、その通知に対して切り替えの同意を受けてから通信方式の切り替えを実行してもよい。作業はスケジュールに組み込まれるが、必ずしも予定通りに終わるわけではなく、予想していたよりも伸びてしまうケースもある。上記のような通知を行えば、勝手に通信部10が切り替えられて作業の邪魔になることが抑制される。
[4.ハードウェア構成例]
図5は、通信ユニットCUのハードウェア構成例を示すブロック図である。
図5は、通信ユニットCUのハードウェア構成例を示すブロック図である。
通信ユニットCUは、例えば、プロセッサ871と、ROM872と、RAM873と、ホストバス874と、ブリッジ875と、外部バス876と、インターフェース877と、入力装置878と、出力装置879と、ストレージ880と、ドライブ881と、接続ポート882と、通信装置883と、を有する。なお、ここで示すハードウェア構成は一例であり、構成要素の一部が省略されてもよい。また、ここで示される構成要素以外の構成要素をさらに含んでもよい。
プロセッサ871は、例えば、演算処理装置又は制御装置として機能し、ROM872、RAM873、ストレージ880、又はリムーバブル記録媒体901に記録された各種プログラムに基づいて各構成要素の動作全般又はその一部を制御する。
ROM872は、プロセッサ871に読み込まれるプログラムや演算に用いるデータ等を格納する手段である。RAM873には、例えば、プロセッサ871に読み込まれるプログラムや、そのプログラムを実行する際に適宜変化する各種パラメータ等が一時的又は永続的に格納される。
プロセッサ871、ROM872、RAM873は、例えば、高速なデータ伝送が可能なホストバス874を介して相互に接続される。一方、ホストバス874は、例えば、ブリッジ875を介して比較的データ伝送速度が低速な外部バス876に接続される。また、外部バス876は、インターフェース877を介して種々の構成要素と接続される。
入力装置878には、例えば、マウス、キーボード、タッチパネル、ボタン、スイッチ、及びレバー等が用いられる。さらに、入力装置878としては、赤外線やその他の電波を利用して制御信号を送信することが可能なリモートコントローラ(以下、リモコン)が用いられることもある。また、入力装置878には、マイクロフォンなどの音声入力装置が含まれる。
出力装置879は、例えば、CRT(Cathode Ray Tube)、LCD、又は有機EL等のディスプレイ装置、スピーカ、ヘッドホン等のオーディオ出力装置、プリンタ、携帯電話、又はファクシミリ等、取得した情報を利用者に対して視覚的又は聴覚的に通知することが可能な装置である。また、本開示に係る出力装置879は、触覚刺激を出力することが可能な種々の振動デバイスを含む。
ストレージ880は、各種のデータを格納するための装置である。ストレージ880としては、例えば、ハードディスクドライブ(HDD)等の磁気記憶デバイス、半導体記憶デバイス、光記憶デバイス、又は光磁気記憶デバイス等が用いられる。
ドライブ881は、例えば、磁気ディスク、光ディスク、光磁気ディスク、又は半導体メモリ等のリムーバブル記録媒体901に記録された情報を読み出し、又はリムーバブル記録媒体901に情報を書き込む装置である。
リムーバブル記録媒体901は、例えば、DVDメディア、Blu-ray(登録商標)メディア、HD DVDメディア、各種の半導体記憶メディア等である。もちろん、リムーバブル記録媒体901は、例えば、非接触型ICチップを搭載したICカード、又は電子機器等であってもよい。
接続ポート882は、例えば、USB(Universal Serial Bus)ポート、IEEE1394ポート、SCSI(Small Computer System Interface)、RS-232Cポート、又は光オーディオ端子等のような外部接続機器902を接続するためのポートである。
外部接続機器902は、例えば、プリンタ、携帯音楽プレーヤ、デジタルカメラ、デジタルビデオカメラ、又はICレコーダ等である。
通信装置883は、ネットワークに接続するための通信デバイスであり、例えば、有線又は無線LAN、Bluetooth(登録商標)、又はWUSB(Wireless USB)用の通信カード、光通信用のルータ、ADSL(Asymmetric Digital SubscriberLine)用のルータ、又は各種通信用のモデム等である。
また、通信装置883は、5G-NRやLTE、LTE-Advancedなどの無線通信方式などをサポートする通信インターフェースを備える。具体的には、通信装置883は、符号化や復号、変復調などの信号処理を実行するベースバンドプロセッサを含み得る。また、通信装置883は、RF回路を含み得る。また、通信装置883は、電波として空間に放射し、また空間の電波を信号に変換するアンテナを備えてよい。
[5.効果]
通信ユニットCUは、処理部20を有する。処理部20は、スケジュール情報51と時刻情報とに基づいて、通信方式の異なる複数の通信部10から1つの通信部10を選択する。本実施形態の情報処理方法は、上述した通信ユニットCUの処理がコンピュータにより実行される。本実施形態のプログラム59は、上述した通信ユニットCUの処理をコンピュータに実現させる。
通信ユニットCUは、処理部20を有する。処理部20は、スケジュール情報51と時刻情報とに基づいて、通信方式の異なる複数の通信部10から1つの通信部10を選択する。本実施形態の情報処理方法は、上述した通信ユニットCUの処理がコンピュータにより実行される。本実施形態のプログラム59は、上述した通信ユニットCUの処理をコンピュータに実現させる。
この構成によれば、十分な通信品質を担保しつつ電力消費を抑制することができる。
処理部20は、スケジュール項目ごとの要求通信性能を登録したスケジュール通信情報52に基づいて通信部10の選択を行う。
この構成によれば、スケジュール項目ごとに適切な通信部10が選択される。
処理部20は、スケジュール通信情報52に登録されていない未登録スケジュール項目の要求通信性能を、未登録スケジュール項目の実施期間に取得された通信情報またはユーザの行動履歴に基づいて判定する。処理部20は、判定された要求通信性能を未登録スケジュール項目と関連付けてスケジュール通信情報52に登録する。
この構成によれば、未登録スケジュール項目の実施期間における実際の通信の状況に応じて、未登録スケジュール項目の要求通信性能が適切に設定される。
要求通信性能は、通信容量または許容可能な遅延量に関する性能を含む。
この構成によれば、通信容量および許容可能な遅延量に基づいて適切な通信部10が選択される。
スケジュール通信情報52は、スケジュール項目ごとの通信部10の使用開始タイミングを示す情報を含む。
この構成によれば、スケジュール項目ごとに、選択された通信部10を適切なタイミングで使用し始めることができる。
処理部20は、外部電源との接続状態に関する情報または外部電源との接続可能性を示す情報に基づいて通信部10の切り替えの可否を判定する。
この構成によれば、外部電源との接続状態または外部電源との接続可能性に基づいて、バッテリの持続力が推定される。各通信部10における電力消費量とバッテリの持続力とを比較することで、バッテリの持続力に応じた適切な通信部10が選択される。
処理部20は、バッテリの持続力が高い状況では、通信部10の切り替えは不要であると判定する。例えば、処理部20は、接続状態に関する情報に基づいて、現在外部電源と接続されている状態にあると判定された場合、あるいは、現在外部電源と接続されている状態にあり、且つ、残電池容量が所定値以上である状態にあると判定された場合には、通信部10の切り替えは不要であると判定する。
この構成によれば、通信部10の切り替え制御が簡略化される。
処理部20は、使用中の通信部10を、選択結果に基づいて他の通信部10に切り替える場合には、通信部10の切り替え前に、切り替えの可否に関する通知をユーザに行う。
この構成によれば、通信部10の切り替えによって切り替え前に行っていた作業に支障が生じることが抑制される。
処理部20は、スケジュール情報51に含まれるスケジュール項目の実施状況を監視する。処理部20は、スケジュール項目の実施が終了したことを示す情報を検出した場合に、終了したスケジュール項目の次のスケジュールに基づいて通信部10の選択を行う。
この構成によれば、スケジュールが予定時刻からずれたタイミングで終了した場合でも、実際のスケジュールの終了タイミングに合わせて通信部10の切り替えが適切に行われる。
なお、本明細書に記載された効果はあくまで例示であって限定されるものでは無く、また他の効果があってもよい。
[6.変形例]
上述の実施形態では、通信性能の異なる通信方式の組み合わせとして、5Gと4G/LTEが例示された。5Gと4G/LTEとの間で通信方式の切り替えが行われたが、通信方式の組み合わせはこれに限られない。Wi-Fi(登録商標)(Wireless Fidelity)と3Gとの間で通信方式の切り替えが行われてもよい。
上述の実施形態では、通信性能の異なる通信方式の組み合わせとして、5Gと4G/LTEが例示された。5Gと4G/LTEとの間で通信方式の切り替えが行われたが、通信方式の組み合わせはこれに限られない。Wi-Fi(登録商標)(Wireless Fidelity)と3Gとの間で通信方式の切り替えが行われてもよい。
[付記]
なお、本技術は以下のような構成も取ることができる。
(1)
スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択する処理部を有する、情報処理装置。
(2)
前記処理部は、スケジュール項目ごとの要求通信性能を登録したスケジュール通信情報に基づいて前記通信部の選択を行う、
上記(1)に記載の情報処理装置。
(3)
前記処理部は、前記スケジュール通信情報に登録されていない未登録スケジュール項目の要求通信性能を、前記未登録スケジュール項目の実施期間に取得された通信情報に基づいて判定し、判定された前記要求通信性能を前記未登録スケジュール項目と関連付けて前記スケジュール通信情報に登録する、
上記(2)に記載の情報処理装置。
(4)
前記処理部は、前記スケジュール通信情報に登録されていない未登録スケジュール項目の要求通信性能を、前記未登録スケジュール項目の実施期間に取得されたユーザの行動履歴に基づいて判定し、判定された前記要求通信性能を前記未登録スケジュール項目と関連付けて前記スケジュール通信情報に登録する、
上記(2)に記載の情報処理装置。
(5)
前記要求通信性能は、通信容量に関する性能を含む、
上記(2)ないし(4)のいずれか1つに記載の情報処理装置。
(6)
前記要求通信性能は、許容可能な遅延量に関する性能を含む、
上記(2)ないし(4)のいずれか1つに記載の情報処理装置。
(7)
前記スケジュール通信情報は、前記スケジュール項目ごとの前記通信部の使用開始タイミングを示す情報を含む、
上記(2)ないし(6)のいずれか1つに記載の情報処理装置。
(8)
前記処理部は、外部電源との接続状態に関する情報に基づいて前記通信部の切り替えの可否を判定する、
上記(1)ないし(7)のいずれか1つに記載の情報処理装置。
(9)
前記処理部は、前記接続状態に関する情報に基づいて、現在外部電源と接続されている状態にあると判定された場合には、前記通信部の切り替えは不要であると判定する、
上記(8)に記載の情報処理装置。
(10)
前記処理部は、前記接続状態に関する情報に基づいて、現在外部電源と接続されている状態にあり、且つ、残電池容量が所定値以上である状態にあると判定された場合には、前記通信部の切り替えは不要であると判定する、
上記(8)に記載の情報処理装置。
(11)
前記処理部は、外部電源との接続可能性を示す情報に基づいて前記通信部の切り替えの可否を判定する、
上記(1)ないし(7)のいずれか1つに記載の情報処理装置。
(12)
前記処理部は、使用中の通信部を、選択結果に基づいて他の通信部に切り替える場合には、前記通信部の切り替え前に、切り替えの可否に関する通知をユーザに行う、
上記(1)ないし(11)のいずれか1つに記載の情報処理装置。
(13)
前記処理部は、スケジュール情報に含まれるスケジュール項目の実施状況を監視し、前記スケジュール項目の実施が終了したことを示す情報を検出した場合に、終了した前記スケジュール項目の次のスケジュールに基づいて前記通信部の選択を行う、
上記(1)ないし(12)のいずれか1つに記載の情報処理装置。
(14)
スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択することを有する、コンピュータにより実行される情報処理方法。
(15)
スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択することをコンピュータに実現させるプログラム。
なお、本技術は以下のような構成も取ることができる。
(1)
スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択する処理部を有する、情報処理装置。
(2)
前記処理部は、スケジュール項目ごとの要求通信性能を登録したスケジュール通信情報に基づいて前記通信部の選択を行う、
上記(1)に記載の情報処理装置。
(3)
前記処理部は、前記スケジュール通信情報に登録されていない未登録スケジュール項目の要求通信性能を、前記未登録スケジュール項目の実施期間に取得された通信情報に基づいて判定し、判定された前記要求通信性能を前記未登録スケジュール項目と関連付けて前記スケジュール通信情報に登録する、
上記(2)に記載の情報処理装置。
(4)
前記処理部は、前記スケジュール通信情報に登録されていない未登録スケジュール項目の要求通信性能を、前記未登録スケジュール項目の実施期間に取得されたユーザの行動履歴に基づいて判定し、判定された前記要求通信性能を前記未登録スケジュール項目と関連付けて前記スケジュール通信情報に登録する、
上記(2)に記載の情報処理装置。
(5)
前記要求通信性能は、通信容量に関する性能を含む、
上記(2)ないし(4)のいずれか1つに記載の情報処理装置。
(6)
前記要求通信性能は、許容可能な遅延量に関する性能を含む、
上記(2)ないし(4)のいずれか1つに記載の情報処理装置。
(7)
前記スケジュール通信情報は、前記スケジュール項目ごとの前記通信部の使用開始タイミングを示す情報を含む、
上記(2)ないし(6)のいずれか1つに記載の情報処理装置。
(8)
前記処理部は、外部電源との接続状態に関する情報に基づいて前記通信部の切り替えの可否を判定する、
上記(1)ないし(7)のいずれか1つに記載の情報処理装置。
(9)
前記処理部は、前記接続状態に関する情報に基づいて、現在外部電源と接続されている状態にあると判定された場合には、前記通信部の切り替えは不要であると判定する、
上記(8)に記載の情報処理装置。
(10)
前記処理部は、前記接続状態に関する情報に基づいて、現在外部電源と接続されている状態にあり、且つ、残電池容量が所定値以上である状態にあると判定された場合には、前記通信部の切り替えは不要であると判定する、
上記(8)に記載の情報処理装置。
(11)
前記処理部は、外部電源との接続可能性を示す情報に基づいて前記通信部の切り替えの可否を判定する、
上記(1)ないし(7)のいずれか1つに記載の情報処理装置。
(12)
前記処理部は、使用中の通信部を、選択結果に基づいて他の通信部に切り替える場合には、前記通信部の切り替え前に、切り替えの可否に関する通知をユーザに行う、
上記(1)ないし(11)のいずれか1つに記載の情報処理装置。
(13)
前記処理部は、スケジュール情報に含まれるスケジュール項目の実施状況を監視し、前記スケジュール項目の実施が終了したことを示す情報を検出した場合に、終了した前記スケジュール項目の次のスケジュールに基づいて前記通信部の選択を行う、
上記(1)ないし(12)のいずれか1つに記載の情報処理装置。
(14)
スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択することを有する、コンピュータにより実行される情報処理方法。
(15)
スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択することをコンピュータに実現させるプログラム。
10 通信部
20 処理部
51 スケジュール情報
52 スケジュール通信情報
CU 通信ユニット(情報処理装置)
20 処理部
51 スケジュール情報
52 スケジュール通信情報
CU 通信ユニット(情報処理装置)
Claims (15)
- スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択する処理部を有する、情報処理装置。
- 前記処理部は、スケジュール項目ごとの要求通信性能を登録したスケジュール通信情報に基づいて前記通信部の選択を行う、
請求項1に記載の情報処理装置。 - 前記処理部は、前記スケジュール通信情報に登録されていない未登録スケジュール項目の要求通信性能を、前記未登録スケジュール項目の実施期間に取得された通信情報に基づいて判定し、判定された前記要求通信性能を前記未登録スケジュール項目と関連付けて前記スケジュール通信情報に登録する、
請求項2に記載の情報処理装置。 - 前記処理部は、前記スケジュール通信情報に登録されていない未登録スケジュール項目の要求通信性能を、前記未登録スケジュール項目の実施期間に取得されたユーザの行動履歴に基づいて判定し、判定された前記要求通信性能を前記未登録スケジュール項目と関連付けて前記スケジュール通信情報に登録する、
請求項2に記載の情報処理装置。 - 前記要求通信性能は、通信容量に関する性能を含む、
請求項2に記載の情報処理装置。 - 前記要求通信性能は、許容可能な遅延量に関する性能を含む、
請求項2に記載の情報処理装置。 - 前記スケジュール通信情報は、前記スケジュール項目ごとの前記通信部の使用開始タイミングを示す情報を含む、
請求項2に記載の情報処理装置。 - 前記処理部は、外部電源との接続状態に関する情報に基づいて前記通信部の切り替えの可否を判定する、
請求項1に記載の情報処理装置。 - 前記処理部は、前記接続状態に関する情報に基づいて、現在外部電源と接続されている状態にあると判定された場合には、前記通信部の切り替えは不要であると判定する、
請求項8に記載の情報処理装置。 - 前記処理部は、前記接続状態に関する情報に基づいて、現在外部電源と接続されている状態にあり、且つ、残電池容量が所定値以上である状態にあると判定された場合には、前記通信部の切り替えは不要であると判定する、
請求項8に記載の情報処理装置。 - 前記処理部は、外部電源との接続可能性を示す情報に基づいて前記通信部の切り替えの可否を判定する、
請求項1に記載の情報処理装置。 - 前記処理部は、使用中の通信部を、選択結果に基づいて他の通信部に切り替える場合には、前記通信部の切り替え前に、切り替えの可否に関する通知をユーザに行う、
請求項1に記載の情報処理装置。 - 前記処理部は、スケジュール情報に含まれるスケジュール項目の実施状況を監視し、前記スケジュール項目の実施が終了したことを示す情報を検出した場合に、終了した前記スケジュール項目の次のスケジュールに基づいて前記通信部の選択を行う、
請求項1に記載の情報処理装置。 - スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択することを有する、コンピュータにより実行される情報処理方法。
- スケジュール情報と時刻情報とに基づいて、通信方式の異なる複数の通信部から1つの通信部を選択することをコンピュータに実現させるプログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US18/548,188 US20240147510A1 (en) | 2021-03-05 | 2022-01-26 | Information processing apparatus, information processing method, and program |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2021-035214 | 2021-03-05 | ||
JP2021035214 | 2021-03-05 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022185794A1 true WO2022185794A1 (ja) | 2022-09-09 |
Family
ID=83154966
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2022/002819 WO2022185794A1 (ja) | 2021-03-05 | 2022-01-26 | 情報処理装置、情報処理方法およびプログラム |
Country Status (2)
Country | Link |
---|---|
US (1) | US20240147510A1 (ja) |
WO (1) | WO2022185794A1 (ja) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004159139A (ja) * | 2002-11-07 | 2004-06-03 | Casio Comput Co Ltd | 携帯情報端末およびその制御プログラム |
JP2011045102A (ja) * | 2006-09-11 | 2011-03-03 | Sharp Corp | 通信機器 |
JP2013239979A (ja) * | 2012-05-16 | 2013-11-28 | Kyocera Corp | 通信装置、通信方法、及び通信プログラム |
JP2014027450A (ja) * | 2012-07-26 | 2014-02-06 | Kyocera Corp | 無線通信端末、方法、プログラム |
-
2022
- 2022-01-26 WO PCT/JP2022/002819 patent/WO2022185794A1/ja active Application Filing
- 2022-01-26 US US18/548,188 patent/US20240147510A1/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004159139A (ja) * | 2002-11-07 | 2004-06-03 | Casio Comput Co Ltd | 携帯情報端末およびその制御プログラム |
JP2011045102A (ja) * | 2006-09-11 | 2011-03-03 | Sharp Corp | 通信機器 |
JP2013239979A (ja) * | 2012-05-16 | 2013-11-28 | Kyocera Corp | 通信装置、通信方法、及び通信プログラム |
JP2014027450A (ja) * | 2012-07-26 | 2014-02-06 | Kyocera Corp | 無線通信端末、方法、プログラム |
Also Published As
Publication number | Publication date |
---|---|
US20240147510A1 (en) | 2024-05-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2723108B1 (en) | Wi-Fi P2P communication terminal device and communication method thereof | |
US12069577B2 (en) | Method of management of a wireless interface of a device and corresponding wireless device | |
JP6406249B2 (ja) | 情報処理装置および情報処理方法 | |
JP5342022B2 (ja) | アップリンクキャリアに優先順位を付けるための方法、装置、及び、コンピュータプログラム製品 | |
US8798019B2 (en) | Wireless communication device, wireless communication method, program, and wireless communication system | |
US8305958B2 (en) | Delegated network connection management and power management in a wireless device | |
CN102104839B (zh) | 与一组无线通信单元同时进行通信的设备、系统和方法 | |
KR20170057285A (ko) | 무선 전력 및 성능을 최적화하기 위한 협업 요구 기반 듀얼 모드 Wi-Fi 네트워크 제어 | |
CN110446235B (zh) | 通话模式确定方法及装置、电子设备、存储介质 | |
KR20080051104A (ko) | 전력 절약을 위한 중계 디바이스를 구비한 비압축 비디오에대한 무선 통신을 위한 시스템 및 그 방법 | |
US20110194489A1 (en) | Wireless communication device, wireless communication system, program, and wireless communication method | |
WO2014192414A1 (ja) | 情報処理装置および情報処理方法 | |
US20120051403A1 (en) | Method and apparatus for supporting communication service of communication terminal having relay function | |
US7890779B2 (en) | Method and apparatus for providing updated information using power control in portable terminal device | |
JP2010045536A (ja) | 無線通信装置 | |
WO2022185794A1 (ja) | 情報処理装置、情報処理方法およびプログラム | |
JP7124884B2 (ja) | 端末装置及び方法 | |
JP2009182656A (ja) | 無線通信端末、プログラム及び無線通信端末の通信機能の制御方法 | |
CN115396407A (zh) | 一种无线音频/视频装置和无线通信方法 | |
CN115426341A (zh) | 一种无线音频/视频装置和无线通信方法 | |
JP6728216B2 (ja) | 端末設定を調整するための方法、および装置 | |
WO2024001985A1 (zh) | 通信方法及终端 | |
WO2023198026A1 (zh) | 发射功率确定方法、装置、终端、网络侧设备及存储介质 | |
WO2023165393A1 (zh) | 传输方法、装置、终端和存储介质 | |
WO2024007961A1 (zh) | 中继控制方法、装置、终端及网络侧设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22762853 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 18548188 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 22762853 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: JP |