WO2022149509A1 - 建設機械 - Google Patents

建設機械 Download PDF

Info

Publication number
WO2022149509A1
WO2022149509A1 PCT/JP2021/048407 JP2021048407W WO2022149509A1 WO 2022149509 A1 WO2022149509 A1 WO 2022149509A1 JP 2021048407 W JP2021048407 W JP 2021048407W WO 2022149509 A1 WO2022149509 A1 WO 2022149509A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction machine
environment information
work
surrounding environment
measurement
Prior art date
Application number
PCT/JP2021/048407
Other languages
English (en)
French (fr)
Inventor
自由理 清水
進也 井村
慎二郎 山本
Original Assignee
日立建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立建機株式会社 filed Critical 日立建機株式会社
Priority to JP2022574015A priority Critical patent/JP7392178B2/ja
Publication of WO2022149509A1 publication Critical patent/WO2022149509A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices

Definitions

  • the present invention relates to construction machinery.
  • Patent Document 1 describes an operation state detection unit that detects a physical quantity output in response to an operation of an operation lever, a time integration unit that calculates a time integration value obtained by time-integrating the physical quantity, and the time integration value. It is determined that the operation of the operation lever is determined to be performed when the time integration value becomes equal to or more than the predetermined integration value by associating it with the predetermined operation angle of the excavation loading mechanism unit accompanying the operation of the operation lever.
  • the operation of the series of excavation and loading mechanism units performed in the predetermined order is regarded as one operation.
  • a counting means for counting the number of times of a series of excavation and loading operations is provided, and the operation of the series of excavation and loading mechanism is performed in the order of excavation operation, going turning operation, soil discharge operation, and returning turning operation. It is a loading operation, and when a specific state occurs in which the order of operations of the series of excavation and loading mechanism units is stagnant or jumps, the counting unit counts the number of times of the series of excavation and loading operations according to the specific state.
  • Working machines that modify the process are disclosed.
  • the excavation loading work is discriminated from the order of operation lever input, and the number of executions of the excavation loading work is measured.
  • the method of determining the work content selected and executed by the operator is mentioned, the measurement of the information on which the operator selects the work is not mentioned.
  • the present invention has been made in view of the above problems, and an object of the present invention is to provide a construction machine capable of efficiently collecting data used for simulating the work contents of the construction machine and the judgment tendency of the operator.
  • the present application includes a plurality of means for solving the above problems.
  • a load information detecting device for detecting the load on the working arm and an operator.
  • An operation device that outputs an operation signal for driving the vehicle body and the work arm, an attitude information measuring device that measures the attitude information of the vehicle body and the work arm, and the periphery of the construction machine according to the operation state of the vehicle body and the work arm.
  • the control device includes a peripheral environment information measuring device that measures the shape of the terrain as peripheral environment information indicating the environment, a storage device that stores the peripheral environment information, and a control device that controls the vehicle body and the working arm.
  • the operation locus of the working arm is calculated in time series based on the measurement result from the posture information measuring device, the load of the working arm detected by the load information detecting device is calculated in time series, and the operating device is calculated.
  • the operation state of the construction machine by the operator is detected in time series based on the operation signal output from, and the operation state of the construction machine is based on the operation locus of the work arm, the load of the work arm, and the operation state.
  • the work pattern shall be determined, and after the execution of the predetermined work pattern is completed, the measurement of the surrounding environment information by the peripheral environment information measuring device shall be executed.
  • FIG. 1 is a diagram schematically showing the appearance of a hydraulic excavator, which is an example of a construction machine according to the present embodiment.
  • FIG. 2 is a diagram showing the processing function of the operator judgment measuring device extracted from the control functions of the construction machine together with the related configurations.
  • the hydraulic excavator 100 includes a lower traveling body 101 equipped with a crawler type traveling device 8, an upper rotating body 102 mounted on the lower traveling body 101 so as to be able to turn via a turning device 7, and an upper turning body.
  • a front working device 103 (working arm) rotatably attached to the front portion of the body 102 in the vertical direction is provided.
  • a cab 104 on which the operator rides during manned work is provided on the upper swivel body 102.
  • the front work device 103 is composed of a plurality of front members provided so as to be rotatable with each other. That is, the front working device 103 has a boom 2 rotatably attached to the front portion of the upper swivel body 102 in the vertical direction and an arm 4 rotatably connected to the tip end portion of the boom 2 in the vertical or longitudinal direction. And a bucket 6 rotatably connected to the tip of the arm 4 in the vertical or front-back direction. Further, the front working device 103 is provided with a boom cylinder 1 for driving the boom 2, an arm cylinder 3 for driving the arm 4, and a bucket cylinder 5 for driving the bucket 6.
  • the hydraulic excavator 100 is a backhoe excavator, and is configured so that the bucket 6 is pulled back backward by extending the arm cylinder 3 or the bucket cylinder 5.
  • the boom cylinder 1, arm cylinder 3, bucket cylinder 5, swivel device 7, and lower traveling body 101 are provided with a plurality of pressure sensors 36 (see FIG. 2) as load information detection devices for detecting information related to each load. Has been done.
  • the boom cylinder 1, the arm cylinder 3, and the bucket cylinder 5 are provided with a pressure sensor 36 (see FIG. 2) on at least one of the bottom side and the rod side.
  • the swivel device 7 and the lower traveling body 101 are provided with a pressure sensor 36 that detects the pressure of the pressure oil that drives the swivel device 7 and the lower traveling body 101.
  • FIG. 2 one of a plurality of pressure sensors is shown as a representative.
  • the boom 2, arm 4, bucket 6, and upper swivel body 102 have an inertial measurement unit (IMU: Inertial Measurement Unit) 12, 14, 16 as a posture information measuring device that detects posture information, which is information about each posture. , 17 are arranged. Since the relative mounting positions of the inertial measurement units 12, 14, 16 and 17 with respect to each member can be obtained from design information and the like, based on the detection results (angular velocity and acceleration) of the inertial measurement units 12, 14, 16 and 17. The relative rotation angles of the boom 2, the arm 4, the bucket 6, and the upper swivel body 102 (including the swivel angle of the upper swivel body 102 with respect to the lower traveling body 101) can be estimated.
  • IMU Inertial Measurement Unit
  • the inertial measurement unit is used as the posture information measuring device
  • the working arm the posture sensor for detecting the relative angles of the plurality of front members of the front working device 103 is used as the posture. It may be used as an information measuring device.
  • an operation device 32 (see FIG. 2) that outputs a drive signal for driving the vehicle body (lower traveling body 101, upper turning body 102) and the working arm according to the operation state by the operator.
  • a controller that is a control device that controls the overall operation of the hydraulic excavator 100, a storage device 34 that stores various information, and a display for displaying information to be presented to the operator and inputting information by the operator's operation.
  • the input device is arranged.
  • at least a part of the functions of the controller constitutes the operator determination measurement device 30 described later
  • at least a part of the functions of the display input device constitutes the measurement environment condition input device 33 described later.
  • the operating device 32 is composed of, for example, two operating levers (not shown) that can swing back and forth and left and right, respectively, and for each of the operating levers, the operating amount of swinging in a total of four axes in the front-back and left-right directions can be measured. It is configured to be inputtable.
  • the controller By generating a drive signal with the controller based on the operation signal generated according to the operation amount by the swing operation of the operation lever, the boom cylinder 1, the arm cylinder 3, and the bucket cylinder correspond to the operation in the operation lever. 5 and the swivel device 7 can be driven, respectively.
  • the controller is composed of a central processing unit (CPU), a memory, and an interface.
  • a program stored in advance in the memory is executed by the central processing unit (CPU), and the setting values and the interface stored in the memory are input.
  • the central processing unit (CPU) performs processing based on the signal, and outputs the signal from the interface.
  • the display input device is, for example, a pointing device such as a touch panel, and has a configuration in which information is displayed and instructions from an operator are input by a graphical user interface (GUI) displayed on the screen. It has become.
  • GUI graphical user interface
  • Peripheral environment information measuring devices 20a and 20b for measuring the topographic shape as peripheral environment information indicating the surrounding environment of the hydraulic excavator 100 are arranged on the upper left and right of the upper swivel body 102.
  • the surrounding environment information measuring devices 20a and 20b are, for example, three-dimensional scanning sensors such as LIDAR (Light Detection and Ringing, Laser Imaging Detection and Ringing).
  • the operator judgment measuring device 30 realized by the function of the controller operates together with the related configuration, so that the data (periphery) used for simulating the work contents of the hydraulic excavator 100 (construction machine) and the judgment tendency of the operator. Efficiently collect environmental information).
  • the operator judgment measuring device 30 executes measurement of the surrounding environment information by the surrounding environment information measuring devices 20a and 20b (three-dimensional scanning sensor) after the execution of the predetermined work pattern is completed, and measures the measured surrounding environment information. It is stored in the storage device 34 in chronological order together with the work pattern information, and has a work discrimination unit 31 for discriminating the work pattern of the hydraulic excavator 100 operated by the operator.
  • the work pattern is the work content by the hydraulic excavator 100, and the excavation operation for excavating the earth and sand at the construction site, the transportation for moving the earth and sand contained in the bucket 6 to the loading platform of the truck by the excavation operation and the like.
  • the work discriminating unit 31 calculates the operation locus of the front work device 103 (working arm) in time series based on the measurement results from the inertial measuring devices 12, 14, 16, 17 (attitude information measuring device). 31a, the vehicle body load calculation unit 31b that calculates the load of the front work device 103 (working arm) in time series based on the measurement results from the pressure sensor 36, and the operator based on the operation signal output from the operation device 32. It has an operation input detection unit 31c that detects the operation state (operation direction and operation amount) of the hydraulic excavator 100 (construction machine) in chronological order.
  • the calculation result of the operation locus calculation unit 31a, the calculation result of the vehicle body load calculation unit 31b, and the detection result of the operation input detection unit 31c are stored in the storage device 34 in chronological order.
  • the work determination unit 31 has the operation locus of the front work device 103, which is the calculation result of the operation locus calculation unit 31a, stored in the storage device 34, and the load of the front work device 103, which is the calculation result of the vehicle body load calculation unit 31b.
  • the work pattern of the hydraulic excavator 100 is determined based on the load information) and the operation state which is the detection result of the operation input detection unit, and is stored in the storage device 34 in chronological order.
  • the measurement environment condition input device 33 (display input device) has an input function for inputting an environment and conditions at the time of measurement, and a recording function for storing the input information in the storage device 34.
  • the conditions for data collection operation by the operator judgment measurement device 30 are input to the measurement environment condition input device 33.
  • the conditions input to the operator judgment measuring device 30 include, for example, operator information, execution work content, excavation target information, excavator model used, bucket type, and the like.
  • FIGS. 3 and 4 are diagrams showing an example of excavation loading work as an example of hydraulic excavator work at a construction site, FIG. 3 shows a state immediately before excavation operation, and FIG. 4 shows a state during loading operation. It is a figure which shows each.
  • the hydraulic excavator 100 is arranged on the upper part of the excavation surface 300 to be excavated at the construction site, and the position where the front work device 103 can be reached by the turning operation of the upper turning body 102 (for example, upper turning).
  • An example is illustrated in which a truck 200 capable of loading and transporting earth and sand on a loading platform is arranged on the left side when the body 102 faces the excavation surface 300.
  • the hydraulic excavator 100 first moves to the upper part of the excavation surface 300 by the operation of the traveling device 8 of the lower traveling body 101 and the turning device 7 of the vehicle body and stops (moving operation). ).
  • the surrounding environment information measuring device 20a arranged on the upper left side of the upper swivel body 102 can measure the three-dimensional shape (topographical shape) of the lower left side (direction of the truck 200) of the upper swivel body 102.
  • the bucket 6 excavates the earth and sand of the excavation surface 300 by the operation of the front work device 103 in response to the operation of the operation device 32 by the operator (excavation operation).
  • the operation of the front work device 103 in response to the operation of the operation device 32 by the operator, and the earth and sand stored in the bucket 6 by the excavation operation due to the rotation of the upper swivel body 102, etc. Is moved above the loading platform of the truck 200 (transportation operation).
  • the surrounding environment information measuring device 20b arranged on the upper right side of the upper swivel body 102 can measure the three-dimensional shape (topographical shape) of the lower right side (direction of the excavation surface 300) of the upper swivel body 102.
  • the measured surrounding environment information (topographic shape) is stored in the storage device 34 in chronological order.
  • the earth and sand in the bucket 6 are discharged to the loading platform of the truck 200 (soil discharge operation).
  • the bucket 6 after the soil discharge operation is returned to the work posture such as the excavation position by the operation of the front work device 103 in response to the operation of the operation device 32 by the operator and the rotation of the upper swivel body 102 (return operation). Further, as necessary, the hydraulic excavator 100 and the front work device 103 are moved by the traveling device 8 of the lower traveling body 101 and the turning device 7 of the vehicle body (moving operation).
  • FIG. 5 is a flowchart showing the processing contents of the operator judgment measuring device.
  • the operator judgment measurement device 30 first requests the operator of the hydraulic excavator 100 to input the environment and conditions at the time of measurement by the measurement environment condition input device 33 (display input device). (Step S100).
  • the peripheral environment information (topography shape) of the hydraulic excavator 100 is measured by the peripheral environment information measuring devices 20a and 20b (three-dimensional scanning sensor) and stored in the storage device 34 (step S110).
  • the work discriminating unit 31 discriminates the work content to be executed by the hydraulic excavator 100 and stores it in the storage device 34 (step S120).
  • step S130 it is determined whether or not the work content of the hydraulic excavator determined by the work determination unit 31 matches any preset work, and whether or not the work is completed.
  • step S130 If the determination result in step S130 is YES, the process returns to step S110. If the determination result in step S130 is NO, the process returns to step S120.
  • FIG. 6 is a diagram showing an example of a discrimination table used for discrimination processing of work contents in the work discrimination unit.
  • the completion of the work is automatically determined from the input of the operation lever, but the operator of the hydraulic excavator 100 may input the completion of any predetermined work.
  • the operator of the hydraulic excavator 100 may input the completion of any predetermined work.
  • the work determination unit 31 is an operation input detection unit 31c, which has an input (boom increase input) for extending the boom cylinder 1 by the operation lever (boom lever) of the boom 2 to raise the boom 2 and an arm.
  • the thrust calculated by the vehicle body load calculation unit 31b based on the pressure sensor of the boom cylinder 1 exceeds the threshold value by detecting the input holding the bucket 6 (input of the bucket cloud), and based on the pressure sensor of the arm cylinder 3.
  • the work content of the hydraulic excavator 100 is determined to be excavation.
  • the work determination unit 31 is an operation input detection unit 31c, which is used to extend the boom cylinder 1 by the operation lever (boom lever) of the boom 2 to raise the boom 2 (input for raising the boom) and to input the operation lever of the swivel device 7.
  • the thrust calculated by the vehicle body load calculation unit 31b based on the pressure sensor of the boom cylinder 1 by detecting the input of turning the upper turning body 102 to the left (input of turning left) by the (turning lever) is a predetermined threshold value.
  • the work determination unit 31 is an operation input detection unit 31c, which is an input (arm push input) for contracting the arm cylinder 3 by the operation lever (arm lever) of the arm 4 and pushing the arm 4 to the front of the vehicle body of the hydraulic excavator 100.
  • an operation input detection unit 31c which is an input (arm push input) for contracting the arm cylinder 3 by the operation lever (arm lever) of the arm 4 and pushing the arm 4 to the front of the vehicle body of the hydraulic excavator 100.
  • the work determination unit 31 is an operation input detection unit 31c, which has an input for contracting the boom cylinder 1 by the operation lever (boom lever) of the boom 2 to lower the boom 2 (input for lowering the boom) and an operation lever for the arm 4 (input for lowering the boom).
  • the arm cylinder 3 is contracted by the arm lever) to push the arm 4 forward of the vehicle body of the hydraulic excavator 100 (arm push input), and the bucket cylinder 5 is contracted by the operation lever (bucket lever) of the bucket 6 to open the bucket 6.
  • the work determination unit 31 determines that the work content of the hydraulic excavator 100 is moving. do.
  • FIG. 7 is a diagram showing the timing of measurement and data storage in the surrounding environment information measuring device controlled by the operator judgment measuring device.
  • the soil discharge operation and the return operation are set as optional operations in step S130 of FIG.
  • the front work device 130 faces the truck 200 direction. Therefore (see FIG. 4), the surrounding environment information (topography shape), that is, the topography shape of the excavation surface 300 can be measured by the surrounding environment information measuring device 20b (three-dimensional scanning sensor) after the excavation operation (time t4 to t5).
  • the surrounding environment information measuring device 20b three-dimensional scanning sensor
  • the topographical shape around the hydraulic excavator 100 is measured by the surrounding environment information measuring devices 20a and 20b before the start of the excavation operation, and stored in the storage device 34.
  • the operator of the hydraulic excavator 100 executes the excavation operation by the operation of the operation device 32, and the work determination unit 31 determines that the work content is the excavation operation by the operation signal from the operation device 32. , The determination result is stored in the storage device 34.
  • the operator of the hydraulic excavator 100 executes the carrying operation by operating the operating device 32, and the work discriminating unit 31 performs the operation signal from the operating device 32 and the measurement result from the attitude information measuring device 17.
  • the work content is determined to be a transportation operation based on (turning speed), and the determination result is stored in the storage device 34.
  • the operator of the hydraulic excavator 100 executes the soil discharge operation by the operation of the operation device 32, and the work determination unit 31 determines that the work content is the soil discharge operation by the operation signal from the operation device 32. Then, the determination result is stored in the storage device 34.
  • the operation signal from the operation device 32 disappears, and the posture information measurement device 17 is used.
  • the measurement result (turning speed) becomes 0 (zero)
  • the operator judgment measuring device 30 measures the topographical shape around the hydraulic excavator 100 by the surrounding environment information measuring devices 20a and 20b, and stores it in the storage device 34. ..
  • the upper part is displayed. Since the angle of the swivel body 102 with respect to the lower traveling body 101 is as shown in FIG. 2A, the terrain of the loading range of the truck 200 is measured by the surrounding environment information measuring device 20a by measuring the surrounding environment information after the return operation. Can be measured (time t7 to t8).
  • the operator of the hydraulic excavator 100 executes a moving operation by operating the operating device 32, and the work determining unit 31 determines that the work content is a moving operation based on the operation signal from the operating device 32, and the determination result is obtained. Is stored in the storage device 34.
  • the operator of the hydraulic excavator 100 executes a return operation by operating the operation device 32, and the work determination unit 31 performs an operation signal from the operation device 32 and a measurement result from the attitude information measurement device 17.
  • the work content is determined to be a return operation based on (turning speed), and the determination result is stored in the storage device 34.
  • the operation signal from the operation device 32 disappears, and the measurement from the attitude information measurement device 17 is performed.
  • the operator judgment measuring device 30 measures the topographical shape around the hydraulic excavator 100 by the surrounding environment information measuring devices 20a and 20b, and stores the topographical shape in the storage device 34.
  • the excavation loading work is determined from the order of operation lever input, and the number of executions of the excavation loading work is measured.
  • the method of determining the work content selected and executed by the operator is mentioned, the measurement of the information on which the operator selects the work is not mentioned.
  • the work content which is the result of the judgment of the operator and the information which is the basis for making the judgment such as the information about the environment around the excavator.
  • a construction machine for example, a hydraulic excavator 100 having a working arm (for example, a front working device 103) provided on a vehicle body (for example, a lower traveling body 101 and an upper turning body 102).
  • a load information detection device for example, pressure sensor 36
  • the operation device 32 that outputs an operation signal for driving the vehicle body and the work arm according to the operation state by the operator.
  • Attitude information measuring devices for example, inertial measuring devices 12, 14, 16, 17
  • surrounding environment information measurement that measures the topographical shape as peripheral environment information that indicates the surrounding environment of construction machinery.
  • It has devices 20a and 20b, a storage device 34 for storing surrounding environment information, and a control device (for example, an operator judgment measuring device 30) for controlling the vehicle body and the working arm, and the control device is a posture information measuring device.
  • the operation locus of the work arm is calculated in time series based on the measurement result from, the load of the work arm detected by the load information detection device is calculated in time series, and based on the operation signal output from the operation device.
  • the operation state of the construction machine by the operator is detected in chronological order, the work pattern of the construction machine is determined based on the movement trajectory of the work arm, the load of the work arm, and the operation state, and the execution of the predetermined work pattern is completed. Since it was configured to measure the surrounding environment information later by the surrounding environment information measuring device, it is possible to efficiently collect the work contents of the construction machine and the data used for simulating the judgment tendency of the operator.
  • the data capacity increases as the number of measurement points increases, but in the present embodiment, the data storage area of the storage device 34 is occupied by limiting the measurement timing. You can save.
  • the timing of measurement by the peripheral environment information measuring devices 20a and 20b and data storage in the storage device 34 is set after the completion of any work. Therefore, for example, by setting measurement and data storage after the excavation operation, the measurement of the terrain shape by the surrounding environment information measuring devices 20a and 20b is shielded by the boom 2, arm 4, bucket 6 and the like of the hydraulic excavator 100. It can be set so as not to be performed, and the shape of the excavated surface 300 can be measured with high accuracy.
  • the vehicle body load calculation unit 31b calculates the load according to the detection result of the pressure sensor 36 has been described as an example.
  • the fuel consumption of the hydraulic excavator 100 is measured and the data is obtained.
  • a means for storing may be provided.
  • LIDAR is used as the surrounding environment information measuring devices 20a and 20b
  • a stereo camera or the like using a parallax image may be used.
  • the surrounding environment information measuring devices 20a and 20b are installed on the hydraulic excavator 100 has been described as an example, but the peripheral environment information measuring devices 20a and 20b may be arranged in the vicinity of the hydraulic excavator 100.
  • the information stored in the storage device in the first embodiment is stored in the server, and the information stored in the server is read out and used to realize the automatic operation of the construction machine. ..
  • the same reference numerals are used for the same members as in the first embodiment in the drawings and the like, and the description thereof will be omitted as appropriate.
  • FIG. 8 is a diagram showing the processing function of the operator judgment measuring device extracted from the control functions of the construction machine together with the related configuration.
  • the operator judgment measuring device 30 executes measurement of the surrounding environment information by the surrounding environment information measuring devices 20a and 20b (three-dimensional scanning sensor) after the execution of the predetermined work pattern is completed, and measures the measured surrounding environment information. It is stored in the storage device 34 in chronological order together with the work pattern information, and has a work discrimination unit 31 for discriminating the work pattern of the hydraulic excavator 100 operated by the operator.
  • the work pattern is the work content by the hydraulic excavator 100, and the excavation operation for excavating the earth and sand at the construction site, the transportation for moving the earth and sand contained in the bucket 6 to the loading platform of the truck by the excavation operation and the like.
  • the work discriminating unit 31 calculates the operation locus of the front work device 103 (working arm) in time series based on the measurement results from the inertial measuring devices 12, 14, 16, 17 (attitude information measuring device). 31a, the vehicle body load calculation unit 31b that calculates the load of the front work device 103 (working arm) in time series based on the measurement results from the pressure sensor 36, and the operator based on the operation signal output from the operation device 32. It has an operation input detection unit 31c that detects the operation state (operation direction and operation amount) of the hydraulic excavator 100 (construction machine) in chronological order.
  • the calculation result of the operation locus calculation unit 31a, the calculation result of the vehicle body load calculation unit 31b, and the detection result of the operation input detection unit 31c are stored in the storage device 34 in chronological order.
  • the work determination unit 31 has the operation locus of the front work device 103, which is the calculation result of the operation locus calculation unit 31a, stored in the storage device 34, and the load of the front work device 103, which is the calculation result of the vehicle body load calculation unit 31b.
  • the work pattern of the hydraulic excavator 100 is determined based on the load information) and the operation state which is the detection result of the operation input detection unit, and is stored in the storage device 34 in chronological order.
  • the measurement environment condition input device 33 (display input device) has an input function for inputting an environment and conditions at the time of measurement, and a recording function for storing the input information in the storage device 34.
  • the conditions for data collection operation by the operator judgment measurement device 30 are input to the measurement environment condition input device 33.
  • the conditions input to the operator judgment measuring device 30 include, for example, operator information, execution work content, excavation target information, excavator model used, bucket type, and the like.
  • Various information stored in the storage device 34 is transmitted and stored in a server 37 installed outside the hydraulic excavator 100 (for example, in a management office provided at a work site) by a communication device (not shown) or the like.
  • the hydraulic excavator 400 is another construction machine different from the hydraulic excavator 100, and is an automatic operation control device 38 that automatically operates the hydraulic excavator 400 in response to various information and commands, and information on the surrounding environment of the hydraulic excavator 400 ( It has at least the surrounding environment information measuring devices 20c and 20d for measuring the topographical shape).
  • the surrounding environment information measuring devices 20c and 20d have the same configuration as the surrounding environment information measuring devices 20a and 20b (three-dimensional scanning sensor) of the hydraulic excavator 100. That is, the surrounding environment information measuring devices 20c and 20d are arranged on the upper left and right of the upper swivel body of the hydraulic excavator 400, and measure the topographical shape as the peripheral environment information indicating the surrounding environment of the hydraulic excavator 400, for example, LIDAR. It is a three-dimensional scanning sensor such as (Light Detection and Ranging, Laser Imaging Detection and Ranging).
  • the automatic operation control device 38 reads out the information stored in the server 37, that is, the information in which the surrounding environment information and the work pattern are stored in time series, and automatically operates the hydraulic excavator 400 using the read information. ..
  • the automatic operation control device 38 when the automatic operation control device 38 performs automatic operation according to the work content to be executed, it first obtains the surrounding environment information (topography shape) measured by the surrounding environment information measuring devices 20c and 20d.
  • the work pattern information that is input and stored in time series together with the surrounding environment information that matches (or is similar to) the surrounding environment information is selected and read from the server 37, and the operation of the read work pattern is automatically operated. Execute as the operation of.
  • the automated operation control device 38 reads out a plurality of work pattern information and surrounding environment information (topography shape) that are predicted to be related in advance from the server 37 according to the design information of the work site and the current surrounding environment information.
  • automatic operation may be performed by selecting (similar) a work pattern that matches (similarly) the surrounding environment information (topography shape) from this information and reading it out.
  • FIG. 9 is a flowchart showing the processing contents of the automatic operation control device according to the present embodiment.
  • the work manager of the hydraulic excavator 400 first inputs the environment and conditions during automatic operation by the measurement environment condition input device 33 (display input device). Request (may be an operator or the like) (step S200).
  • the surrounding environment (topography shape) of the hydraulic excavator 100 is measured by the surrounding environment information measuring devices 20a and 20b (three-dimensional scanning sensor) (step S210).
  • the automatic operation control device 38 selects and executes the work content (work pattern) to be executed by the hydraulic excavator 400 (step S220).
  • step S230 If the determination result in step S230 is YES, the process returns to step S210. If the determination result in step S230 is NO, the process returns to step S220.
  • the construction machine 400 provided with the automatic operation control device 38 for automatic operation has been described by way of example, but is limited to the case where the construction machine 400 is another construction machine different from the hydraulic excavator 100.
  • the hydraulic excavator 100 is provided with an automatic operation control device 38, and information acquired by itself or other construction machinery stored in the server 37 (combination information of surrounding environment information and work pattern) is acquired to acquire the surrounding environment. It may be configured to perform automatic operation by using it together with the surrounding environment information (topography shape) acquired by the information measuring devices 20a and 20b.
  • the automatic operation control device 38 is configured to select a work pattern that matches (similarly) to the input surrounding environment information, but the present invention is not limited to this, and the input surrounding environment information is not limited to this. Based on the data stored on the server and the data stored on the server, the work pattern most suitable for AI is calculated and executed, that is, the AI determines how to move the hydraulic excavator at the work site and executes automatic operation. It may be configured as follows.
  • the present invention is not limited to the above-described embodiment, and includes various modifications and combinations of embodiments within a range that does not deviate from the gist thereof. Further, the present invention is not limited to the one including all the configurations described in the above-described embodiment, and includes the one in which a part of the configurations is deleted. Further, each of the above configurations, functions and the like may be realized by designing a part or all of them by, for example, an integrated circuit. Further, each of the above configurations, functions, and the like may be realized by software by the processor interpreting and executing a program that realizes each function.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Component Parts Of Construction Machinery (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

車体及び作業腕を駆動するための操作信号を出力する操作装置と、車体及び作業腕の姿勢情報を時系列で計測する姿勢情報計測装置と、建設機械の周辺環境を示す周辺環境情報を計測する周辺環境情報計測装置と、周辺環境情報を記憶する記憶装置と、制御装置とを有し、制御装置は、姿勢情報計測装置からの計測結果に基づいて作業腕の動作軌跡を時系列で演算し、作業腕の負荷を時系列で演算し、操作装置から出力される操作信号に基づいてオペレータによる建設機械の操作状態を時系列で検出し、作業腕の動作軌跡と、作業腕の負荷と、操作状態とに基づいて建設機械の作業パターンを判別し、予め定めた作業パターンの実行終了後に周辺環境情報計測装置による周辺環境情報の計測を実行する。これにより、建設機械の作業内容とオペレータの判断傾向の模擬に用いるデータとを効率的に収集することができる。

Description

建設機械
 本発明は、建設機械に関する。
 近年、油圧ショベルなどの建設機械においては、オペレータによる搭乗や操作によらず、自律的に作業を行う無人ショベルの開発が進められている。無人ショベルには、実行すべき作業の内容をオペレータと同等の精度で判断することが求められる。連続する作業において次に行う作業を判断し選択するためには、無人ショベルの周辺環境や、それまで実行した作業内容などの情報が必要になる。このように、周辺環境や作業履歴から次に行う作業内容を決定するロジックを実現するアプローチの1つとして、オペレータの判断傾向を計測し、その判断傾向を模擬する方法がある。
 例えば、特許文献1には、操作レバーの操作に応じて出力される物理量を検出する操作状態検出部と、前記物理量を時間積分した時間積分値を算出する時間積分部と、前記時間積分値と前記操作レバーの操作に伴う掘削積込機構部の所定動作角とを対応させておき、前記時間積分値が所定積分値以上となった場合に、前記操作レバーの操作が行われたと判定する判定部と、前記判定部によって判定された掘削積込機構部の各操作が所定の順序で行われた場合、該所定の順序で行われた一連の掘削積込機構部の操作を一回として該一連の掘削積込作業の回数を計数する計数手段と、を備え、前記一連の掘削積込機構部の操作は、掘削操作、行き旋回操作、排土操作、戻り旋回操作の順に行われる掘削積込操作であり、前記計数部は、前記一連の掘削積込機構部の操作の順序を停滞あるいは飛び越す特定状態が発生した場合、該特定状態に応じて前記一連の掘削積込作業の回数の計数処理を修正する作業機械が開示されている。
特開2014-101696号公報
 上記従来技術においては、操作レバー入力の順番から掘削積込作業を判別し、掘削積込作業の実行回数を計測している。しかしながら、オペレータが選択し実行した作業内容の判別方法については言及しているものの、オペレータがその作業を選択した根拠となる情報の計測について言及されていない。実際にオペレータの判断傾向を模擬するためには、オペレータが判断した結果である作業内容とともに、例えば、ショベル周辺の環境に関する情報のような判断を行う根拠となる情報が必要である。
 本発明は上記課題に鑑みてなされたものであり、建設機械の作業内容とオペレータの判断傾向の模擬に用いるデータとを効率的に収集することができる建設機械を提供することを目的とする。
 本願は上記課題を解決する手段を複数含んでいるが、その一例を挙げるならば、車体に設けられた作業腕を有する建設機械において、前記作業腕の負荷を検出する負荷情報検出装置と、オペレータによる操作状態に応じて、前記車体及び前記作業腕を駆動するための操作信号を出力する操作装置と、前記車体及び前記作業腕の姿勢情報を計測する姿勢情報計測装置と、前記建設機械の周辺環境を示す周辺環境情報として地形形状を計測する周辺環境情報計測装置と、前記周辺環境情報を記憶する記憶装置と、前記車体及び前記作業腕を制御する制御装置とを有し、前記制御装置は、前記姿勢情報計測装置からの計測結果に基づいて前記作業腕の動作軌跡を時系列で演算し、前記負荷情報検出装置で検出される前記作業腕の負荷を時系列で演算し、前記操作装置から出力される操作信号に基づいてオペレータによる前記建設機械の操作状態を時系列で検出し、前記作業腕の動作軌跡と、前記作業腕の負荷と、前記操作状態とに基づいて前記建設機械の作業パターンを判別し、予め定めた前記作業パターンの実行終了後に前記周辺環境情報計測装置による周辺環境情報の計測を実行するものとする。
 本発明によれば、建設機械の作業内容とオペレータの判断傾向の模擬に用いるデータとを効率的に収集することができる。
建設機械の一例である油圧ショベルの外観を模式的に示す図である。 第1の実施の形態における建設機械の制御機能のうち、オペレータ判断計測装置の処理機能を関連構成とともに抜き出して示す図である。 施工現場における油圧ショベルの作業の一例として掘削積込作業の様子を例示す図であり、掘削動作直前の様子を示す図である。 施工現場における油圧ショベルの作業の一例として掘削積込作業の様子を例示す図であり、積込動作時の様子を示す図である。 第1の実施の形態におけるオペレータ判断計測装置の処理内容を示すフローチャートである。 作業判別部における作業内容の判別処理に用いる判別テーブルの一例を示す図である。 オペレータ判断計測装置の制御による周辺環境情報計測装置での計測およびデータ保存のタイミングを示す図である。 第2の実施の形態における建設機械の制御機能のうち、オペレータ判断計測装置の処理機能を関連構成とともに抜き出して示す図である。 第2の実施の形態における自動運転制御装置の処理内容を示すフローチャートである。
 <第1の実施の形態>
  以下、本発明の第1の実施の形態を図1~図7を参照しつつ説明する。なお、本実施の形態では、建設機械の一例として、多関節型のフロント作業機を搭載した油圧ショベルを例示して説明するが、フロント作業機を備える他の建設機械においても本発明を適用することも可能である。
 図1は、本実施の形態に係る建設機械の一例である油圧ショベルの外観を模式的に示す図である。また、図2は、建設機械の制御機能のうち、オペレータ判断計測装置の処理機能を関連構成とともに抜き出して示す図である。
 図1において、油圧ショベル100は、クローラ式の走行装置8を装備した下部走行体101と、下部走行体101上に旋回装置7を介して旋回可能に取り付けられた上部旋回体102と、上部旋回体102の前部に上下方向に回動可能に取り付けられたフロント作業装置103(作業腕)とを備えている。上部旋回体102上には、有人作業時にオペレータが搭乗するキャブ104が設けられている。
 フロント作業装置103は互いに回動可能に設けられた複数のフロント部材から構成されている。すなわち、フロント作業装置103は、上部旋回体102の前部に上下方向に回動可能に取り付けられたブーム2と、ブーム2の先端部に上下または前後方向に回動可能に連結されたアーム4と、アーム4の先端部に上下または前後方向に回動可能に連結されたバケット6とから構成されている。また、フロント作業装置103には、ブーム2を駆動するブームシリンダ1と、アーム4を駆動するアームシリンダ3と、バケット6を駆動するバケットシリンダ5とが備えられている。油圧ショベル100は、バックホウショベルであり、アームシリンダ3またはバケットシリンダ5を伸長させることにより、バケット6が後方に引き戻されるように構成されている。
 ブームシリンダ1、アームシリンダ3、バケットシリンダ5、旋回装置7、及び下部走行体101には、それぞれの負荷に係る情報を検出する負荷情報検出装置として複数の圧力センサ36(図2参照)が設けられている。ブームシリンダ1、アームシリンダ3、及びバケットシリンダ5には、圧力センサ36(図2参照)がボトム側とロッド側の少なくとも一方に設けられている。同様に、旋回装置7、及び下部走行体101には、旋回装置7及び下部走行体101を駆動する圧油の圧力を検出する圧力センサ36が設けられている。なお、図2においては、複数の圧力センサのうちの1つを代表して図示する。
 ブーム2、アーム4、バケット6、及び上部旋回体102には、それぞれの姿勢に関する情報である姿勢情報を検出する姿勢情報計測装置としての慣性計測装置(IMU: Inertial Measurement Unit)12,14,16,17が配置されている。慣性計測装置12,14,16,17の各部材に対する相対的な取り付け位置は設計情報などから求められるので、慣性計測装置12,14,16,17の検出結果(角速度と加速度)に基づいて、ブーム2、アーム4、バケット6、及び、上部旋回体102の相対的な回動角度(下部走行体101に対する上部旋回体102の旋回角度を含む)を推定することができる。
 なお、本実施の形態においては、姿勢情報計測装置として慣性計測装置を用いる場合を例示して説明したが、作業腕(フロント作業装置103の複数のフロント部材の相対角を検出する角度センサを姿勢情報計測装置として用いても良い。
 キャブ104の内部には、オペレータによる操作状態に応じて、車体(下部走行体101、上部旋回体102)及び作業腕を駆動するための駆動信号を出力する操作装置32(図2参照)と、油圧ショベル100の全体の動作を制御する制御装置であるコントローラと、種々の情報を記憶する記憶装置34と、オペレータに提示する情報を表示するとともに、オペレータの操作による情報の入力を行うための表示入力装置とが配置されている。ここで、コントローラの機能の少なくとも一部は、後述するオペレータ判断計測装置30を構成し、表示入力装置の機能の少なくとも一部は後述する計測環境条件入力装置33を構成している。
 操作装置32は、例えば、それぞれ前後左右に揺動可能な2つの操作レバー(図示せず)によって構成されており、操作レバーのそれぞれについて、前後左右方向の計4軸の揺動の操作量を入力可能に構成されている。操作レバーの揺動操作により操作量に応じて生成される操作信号に基づいて、コントローラで駆動信号を生成することにより、操作レバーにおける操作に対応して、ブームシリンダ1、アームシリンダ3、バケットシリンダ5、及び旋回装置7をそれぞれ駆動することができる。
 コントローラは中央演算装置(CPU)、メモリ、インタフェースによって構成され、メモリ内に予め保存されているプログラムを中央演算装置(CPU)で実行し、メモリ内に保存されている設定値とインタフェースから入力された信号に基づいて中央演算装置(CPU)が処理を行い、インタフェースから信号を出力する。
 表示入力装置(計測環境条件入力装置33)は、例えば、タッチパネル等のポインティングデバイスであり、画面上に表示されるグラフィカルユーザインターフェース(GUI)により情報の表示と操作者からの指示を入力する構成となっている。
 上部旋回体102の上部左右には、油圧ショベル100の周辺環境を示す周辺環境情報として地形形状を計測する周辺環境情報計測装置20a,20bが配置されている。周辺環境情報計測装置20a,20bは、例えば、LIDAR(Light Detection and Ranging、Laser Imaging Detection and Ranging)などの3次元走査センサである。
 本実施の形態においては、コントローラの機能により実現されるオペレータ判断計測装置30が関連構成とともに動作することにより、油圧ショベル100(建設機械)の作業内容とオペレータの判断傾向の模擬に用いるデータ(周辺環境情報)とを効率的に収集する。
 図2において、オペレータ判断計測装置30は、予め定めた作業パターンの実行終了後に周辺環境情報計測装置20a,20b(3次元走査センサ)による周辺環境情報の計測を実行し、計測した周辺環境情報を作業パターンの情報とともに時系列で記憶装置34に記憶するものであり、オペレータの操作による油圧ショベル100の作業パターンを判別する作業判別部31を有している。ここで、作業パターンとは、油圧ショベル100による作業内容であり、施工現場における土砂などの掘削を行う掘削動作、掘削動作などでバケット6内に収容した土砂などをトラックの荷台上に移動する運搬動作、運搬動作により移動したバケット6内の土砂などを放土する放土動作、放土動作後のバケット6を掘削位置などの作業姿勢にもどす戻り動作、下部走行体101や旋回装置7によって油圧ショベル100やフロント作業装置103の移動を行う移動動作などがある。
 作業判別部31は、慣性計測装置12,14,16,17(姿勢情報計測装置)からの計測結果に基づいてフロン作業装置103(作業腕)の動作軌跡を時系列で演算する動作軌跡演算部31aと、圧力センサ36からの計測結果に基づいてフロント作業装置103(作業腕)の負荷を時系列で演算する車体負荷演算部31bと、操作装置32から出力される操作信号に基づいてオペレータによる油圧ショベル100(建設機械)の操作状態(操作方向および操作量)を時系列で検出する操作入力検出部31cとを有している。動作軌跡演算部31aの演算結果、車体負荷演算部31bの演算結果、及び操作入力検出部31cの検出結果は、時系列で記憶装置34に記憶される。作業判別部31は、記憶装置34に記憶された、動作軌跡演算部31aの演算結果であるフロント作業装置103の動作軌跡と、車体負荷演算部31bの演算結果であるフロント作業装置103の負荷(負荷情報)と、操作入力検出部の検出結果である操作状態とに基づいて油圧ショベル100の作業パターンを判別し、時系列で記憶装置34に記憶する。
 計測環境条件入力装置33(表示入力装置)は、計測時の環境や条件を入力するための入力機能と、入力された情報を記憶装置34に保存する記録機能とを有している。計測環境条件入力装置33には、オペレータ判断計測装置30によるデータ収集動作の条件が入力される。オペレータ判断計測装置30に入力される条件としては、例えば、オペレータの情報、実施作業内容、掘削対象物の情報、使用したショベルの型式、バケットの種類などがある。
 以上のように構成したオペレータ判断計測装置30の動作について説明する。
 図3及び図4は、施工現場における油圧ショベルの作業の一例として掘削積込作業の様子を例示す図であり、図3は掘削動作直前の様子を、図4は積込動作時の様子をそれぞれ示す図である。図3及び図4においては、施工現場の掘削対象である掘削面300の上部に油圧ショベル100を配置し、上部旋回体102の旋回動作によってフロント作業装置103が到達可能な位置(例えば、上部旋回体102が掘削面300方向を向いたときの左側側方)に荷台に土砂を積載して運搬可能なトラック200を配置する場合を例示している。
 図3に示すように、掘削作業においては、油圧ショベル100は、まず、下部走行体101の走行装置8及び車体の旋回装置7の動作により掘削面300の上部に移動して停車する(移動動作)。ことのき、上部旋回体102の上部左側に配置された周辺環境情報計測装置20aは、上部旋回体102の左下方(トラック200の方向)の3次元形状(地形形状)を計測可能である。
 続いて、オペレータによる操作装置32の操作に応じたフロント作業装置103の動作の動作により、バケット6で掘削面300の土砂などの掘削を行う(掘削動作)。
 続いて、図4に示すように、オペレータによる操作装置32の操作に応じたフロント作業装置103の動作の動作、及び、上部旋回体102の旋回により、掘削動作によってバケット6内に収容した土砂などをトラック200の荷台上方に移動する(運搬動作)。ことのき、上部旋回体102の上部右側に配置された周辺環境情報計測装置20bは、上部旋回体102の右下方(掘削面300の方向)の3次元形状(地形形状)を計測可能であり、計測した周辺環境情報(地形形状)を時系列で記憶装置34に記憶する。
 続いて、オペレータによる操作装置32の操作に応じたフロント作業装置103の動作の動作により、バケット6内の土砂などをトラック200の荷台に放土する(放土動作)。
 続いて、オペレータによる操作装置32の操作に応じたフロント作業装置103の動作、及び、上部旋回体102の旋回により、放土動作後のバケット6を掘削位置などの作業姿勢にもどす(戻り動作)
 また、必要に応じて、下部走行体101の走行装置8や車体の旋回装置7によって油圧ショベル100やフロント作業装置103の移動を行う(移動動作)。
 図5は、オペレータ判断計測装置の処理内容を示すフローチャートである。
 図5において、オペレータ判断計測装置30は、計測が開始されると、まず、計測環境条件入力装置33(表示入力装置)により、計測時の環境や条件の入力を油圧ショベル100のオペレータに要求する(ステップS100)。
 続いて、周辺環境情報計測装置20a,20b(3次元走査センサ)により、油圧ショベル100の周辺環境情報(地形形状)を計測し、記憶装置34に記憶する(ステップS110)。
 続いて、作業判別部31により、油圧ショベル100が実行する作業内容を判別し、記憶装置34に記憶する(ステップS120)。
 続いて、作業判別部31で判別された油圧ショベルの作業内容が予め設定した任意の作業に一致したか否か、及び、その作業が完了したか否かを判定する(ステップS130)。
 ステップS130での判定結果がYESの場合には、ステップS110に戻る。また、ステップS130での判定結果がNOの場合には、ステップS120に戻る。
 図6は、作業判別部における作業内容の判別処理に用いる判別テーブルの一例を示す図である。
 本実施の形態では、作業の完了を操作レバーの入力から自動で判断するが、予め定めた任意の作業の完了を油圧ショベル100のオペレータに入力させてもよい。自動で判断する場合,オペレータの入力忘れを防ぐことができる。オペレータに作業完了を入力してもらう場合は,オペレータの意図を確実に計測することができる。
 図6に示すように、作業判別部31は、操作入力検出部31cで、ブーム2の操作レバー(ブームレバー)によるブームシリンダ1を伸長させブーム2を上げる入力(ブーム上げの入力)と、アーム4の操作レバー(アームレバー)によるアームシリンダ3を伸長させアーム4を油圧ショベル100の車体に引き寄せる入力(アーム引きの入力)と、バケット6の操作レバー(バケットレバー)によるバケットシリンダ5を伸長させバケット6を抱え込む入力(バケットクラウドの入力)とを検出し、車体負荷演算部31bがブームシリンダ1の圧力センサに基づき計算される推力が閾値を越えたことと、アームシリンダ3の圧力センサに基づき計算される推力が閾値を越えたことと、バケットシリンダ5の圧力センサに基づき計算される推力が閾値を越えたこととを検出した場合に、油圧ショベル100の作業内容を掘削と判断する。
 また、作業判別部31は、操作入力検出部31cで、ブーム2の操作レバー(ブームレバー)によるブームシリンダ1を伸長させブーム2を上げる(ブーム上げの入力)入力と、旋回装置7の操作レバー(旋回レバー)による上部旋回体102を左方向に旋回する入力(左旋回の入力)とを検出し、車体負荷演算部31bがブームシリンダ1の圧力センサに基づき計算される推力が予め定めた閾値を越えたことを検出し、動作軌跡演算部31aが旋回速度が発生していることとを検出した場合に、油圧ショベル100の作業内容を運搬と判断する。
 また、作業判別部31は、操作入力検出部31cで、アーム4の操作レバー(アームレバー)によるアームシリンダ3を収縮させアーム4を油圧ショベル100の車体前方へ押し出す入力(アーム押しの入力)と、バケット6の操作レバー(バケットレバー)によるバケットシリンダ5を収縮させバケット6の開口面を地面側に向ける入力(バケットダンプの入力)とを検出した場合に、油圧ショベル100の作業内容を放土と判断する。
 また、作業判別部31は、操作入力検出部31cで、ブーム2の操作レバー(ブームレバー)によるブームシリンダ1を収縮させブーム2を下げる入力(ブーム下げの入力)と、アーム4の操作レバー(アームレバー)によるアームシリンダ3を収縮させアーム4を油圧ショベル100の車体前方へ押し出す入力(アーム押しの入力)と、バケット6の操作レバー(バケットレバー)によるバケットシリンダ5を収縮させバケット6の開口面を地面側に向ける入力(バケットダンプの入力)と、旋回装置7の操作レバー(旋回レバー)による上部旋回体102を右方向に旋回する入力(右旋回の入力)とを検出し、動作軌跡演算部31aが旋回速度が発生していることを検出した場合に、油圧ショベル100の作業内容を戻りと判断する。
 また、作業判別部31は、操作入力検出部31cで、走行装置8の操作レバー(走行レバー)による入力(走行レバーのON状態)を検出した場合に、油圧ショベル100の作業内容を移動と判断する。
 図7は、オペレータ判断計測装置の制御による周辺環境情報計測装置での計測およびデータ保存のタイミングを示す図である。なお、図7では、図5のステップS130における任意作業として、放土動作と戻り動作とを設定する。
 図7に示すように、掘削動作(時刻t1~t2)及び運搬動作(時刻t2~t3)に続く放土動作(時刻t3~t4)の実行後は、フロント作業装置130がトラック200方向を向くため(図4参照)、放土動作後に周辺環境情報計測装置20b(3次元走査センサ)によって周辺環境情報(地形形状)、すなわち、掘削面300の地形形状を計測することができる(時刻t4~t5)。
 時刻t0から時刻t1において、掘削動作の開始前に周辺環境情報計測装置20a,20bにより油圧ショベル100周辺の地形形状を計測し、記憶装置34に保存する。
 続いて、時刻t1から時刻t2において、油圧ショベル100のオペレータは操作装置32の操作により掘削動作を実行し、作業判別部31は操作装置32からの操作信号により作業内容を掘削動作と判断して、判断結果を記憶装置34に保存する。
 続いて、時刻t2から時刻t3において、油圧ショベル100のオペレータは操作装置32の操作により運搬動作を実行し、作業判別部31は操作装置32からの操作信号と姿勢情報計測装置17からの計測結果(旋回速度)により作業内容を運搬動作と判断して、判断結果を記憶装置34に保存する。
 続いて、時刻t3から時刻t4において、油圧ショベル100のオペレータは操作装置32の操作により放土動作を実行し、作業判別部31は操作装置32からの操作信号により作業内容を放土動作と判断して、判断結果を記憶装置34に存する。
 続いて、時刻t4から時刻t5、すなわち、作業判別部31が作業内容を予め設定した放土動作と判断した後において、操作装置32からの操作信号が無くなり、かつ、姿勢情報計測装置17からの計測結果(旋回速度)が0(ゼロ)となった場合には、オペレータ判断計測装置30は周辺環境情報計測装置20a,20bにより油圧ショベル100周辺の地形形状を計測し、記憶装置34に保存する。
 また、図7に示すように、周辺環境情報(地形形状)の計測動作(時刻t4~t5)及び移動動作(時刻t5~t6)に続く戻り動作(時刻t6~t7)の実行後は、上部旋回体102の下部走行体101に対する角度が図2(a)に示す通りとなるため、戻り動作後に周辺環境情報を計測することにより、周辺環境情報計測装置20aでトラック200の積込範囲の地形を計測可能である(時刻t7~t8)。
 時刻t5から時刻t6において、油圧ショベル100のオペレータは操作装置32の操作により移動動作を実行し、作業判別部31は操作装置32からの操作信号により作業内容を移動動作と判断して、判断結果を記憶装置34に保存する。
 続いて、時刻t6から時刻t7において、油圧ショベル100のオペレータは操作装置32の操作により戻り動作を実行し、作業判別部31は操作装置32からの操作信号と姿勢情報計測装置17からの計測結果(旋回速度)により作業内容を戻り動作と判断して、判断結果を記憶装置34に保存する。
 続いて、時刻t7から時刻t8、すなわち、作業判別部31が作業内容を予め設定した戻り動作と判断した後において、操作装置32からの操作信号が無くなり、かつ、姿勢情報計測装置17からの計測結果(旋回速度)が0(ゼロ)となった場合には、オペレータ判断計測装置30は周辺環境情報計測装置20a,20bにより油圧ショベル100周辺の地形形状を計測し、記憶装置34に保存する。
 続いて、時刻t8以降は、時刻t1~時刻t8までの処理を繰り返す。
 以上のように構成した本実施の形態における効果を説明する。
 従来技術においては、操作レバー入力の順番から掘削積込作業を判別し、掘削積込作業の実行回数を計測している。しかしながら、オペレータが選択し実行した作業内容の判別方法については言及しているものの、オペレータがその作業を選択した根拠となる情報の計測について言及されていない。実際にオペレータの判断傾向を模擬するためには、オペレータが判断した結果である作業内容とともに、例えば、ショベル周辺の環境に関する情報のような判断を行う根拠となる情報が必要である。
 これに対して本実施の形態においては、車体(例えば、下部走行体101、上部旋回体102)に設けられた作業腕(例えば、フロント作業装置103)を有する建設機械(例えば、油圧ショベル100)において、前記作業腕の負荷を検出する負荷情報検出装置(例えば、圧力センサ36)と、オペレータによる操作状態に応じて、車体及び作業腕を駆動するための操作信号を出力する操作装置32と、車体及び作業腕の姿勢情報を計測する姿勢情報計測装置(例えば、慣性計測装置12,14,16,17)と、建設機械の周辺環境を示す周辺環境情報として地形形状を計測する周辺環境情報計測装置20a,20bと、周辺環境情報を記憶する記憶装置34と、前記車体及び前記作業腕を制御する制御装置(例えば、オペレータ判断計測装置30)とを有し、制御装置は、姿勢情報計測装置からの計測結果に基づいて作業腕の動作軌跡を時系列で演算し、前記負荷情報検出装置で検出される作業腕の負荷を時系列で演算し、操作装置から出力される操作信号に基づいてオペレータによる建設機械の操作状態を時系列で検出し、作業腕の動作軌跡と、作業腕の負荷と、操作状態とに基づいて建設機械の作業パターンを判別し、予め定めた作業パターンの実行終了後に周辺環境情報計測装置による周辺環境情報の計測を実行するように構成したので、建設機械の作業内容とオペレータの判断傾向の模擬に用いるデータとを効率的に収集することができる。
 また、操作レバー入力がなく旋回速度が検出されないような油圧ショベル100が静止した状態で周辺環境情報(地形形状)を計測することにより、油圧ショベル100が動作中に計測する場合と比較して、地形形状の計測精度を向上することができる。
 また、周辺環境情報計測装置20a,20bによる計測においては、計測点数が増えるとデータ容量が増えるが、本実施の形態においては、計測するタイミングを限定することにより、記憶装置34のデータ保存領域を節約することができる。
 また、周辺環境情報計測装置20a,20bを油圧ショベル100の周辺に配置する場合に、周辺環境情報計測装置20a,20bによる計測および記憶装置34へのデータ保存のタイミングを任意の作業完了後に設定することができるので、例えば、計測およびデータ保存を放土動作後に設定することにより、周辺環境情報計測装置20a,20bによる地形形状の計測が油圧ショベル100のブーム2、アーム4、バケット6等に遮蔽されないように設定することができ、掘削面300の形状を精度良く計測することができる。
 なお、本実施の形態において、車体負荷演算部31bは圧力センサ36の検出結果に応じて負荷を演算する場合を例示して説明したが、例えば、油圧ショベル100の燃料消費量を計測しデータを保存する手段を設けても良い。この場合、オペレータの判断傾向のデータ計測後の分析を行う際に、特定の作業内容に対して燃料消費量が低い場合のオペレータの判断傾向のデータを抽出することができる。
 また、本実施の形態においては、周辺環境情報計測装置20a,20bとしてLIDARを用いる場合を例示して説明したが、視差画像を利用するステレオカメラ等を用いても良い。
 また、本実施の形態においては、周辺環境情報計測装置20a,20bを油圧ショベル100上に設置する場合を例示して説明したが、油圧ショベル100の周辺に配置してもよい。
 <第2の実施の形態>
  本発明の第2の実施の形態を図8及び図9を参照しつつ説明する。
 本実施の形態は、第1の実施の形態で記憶装置に記憶した情報をサーバに格納し、また、サーバに格納された情報を読み出して用いることで建設機械の自動運転を実現するものである。なお、本実施の形態においては、図面等における第1の実施の形態と同様の部材には同じ符号を用いるものとし、適宜説明を省略する。
 図8は、建設機械の制御機能のうち、オペレータ判断計測装置の処理機能を関連構成とともに抜き出して示す図である。
 図8において、オペレータ判断計測装置30は、予め定めた作業パターンの実行終了後に周辺環境情報計測装置20a,20b(3次元走査センサ)による周辺環境情報の計測を実行し、計測した周辺環境情報を作業パターンの情報とともに時系列で記憶装置34に記憶するものであり、オペレータの操作による油圧ショベル100の作業パターンを判別する作業判別部31を有している。ここで、作業パターンとは、油圧ショベル100による作業内容であり、施工現場における土砂などの掘削を行う掘削動作、掘削動作などでバケット6内に収容した土砂などをトラックの荷台上に移動する運搬動作、運搬動作により移動したバケット6内の土砂などを放土する放土動作、放土動作後のバケット6を掘削位置などの作業姿勢にもどす戻り動作、下部走行体101や旋回装置7によって油圧ショベル100やフロント作業装置103の移動を行う移動動作などがある。
 作業判別部31は、慣性計測装置12,14,16,17(姿勢情報計測装置)からの計測結果に基づいてフロン作業装置103(作業腕)の動作軌跡を時系列で演算する動作軌跡演算部31aと、圧力センサ36からの計測結果に基づいてフロント作業装置103(作業腕)の負荷を時系列で演算する車体負荷演算部31bと、操作装置32から出力される操作信号に基づいてオペレータによる油圧ショベル100(建設機械)の操作状態(操作方向および操作量)を時系列で検出する操作入力検出部31cとを有している。動作軌跡演算部31aの演算結果、車体負荷演算部31bの演算結果、及び操作入力検出部31cの検出結果は、時系列で記憶装置34に記憶される。作業判別部31は、記憶装置34に記憶された、動作軌跡演算部31aの演算結果であるフロント作業装置103の動作軌跡と、車体負荷演算部31bの演算結果であるフロント作業装置103の負荷(負荷情報)と、操作入力検出部の検出結果である操作状態とに基づいて油圧ショベル100の作業パターンを判別し、時系列で記憶装置34に記憶する。
 計測環境条件入力装置33(表示入力装置)は、計測時の環境や条件を入力するための入力機能と、入力された情報を記憶装置34に保存する記録機能とを有している。計測環境条件入力装置33には、オペレータ判断計測装置30によるデータ収集動作の条件が入力される。オペレータ判断計測装置30に入力される条件としては、例えば、オペレータの情報、実施作業内容、掘削対象物の情報、使用したショベルの型式、バケットの種類などがある。
 記憶装置34に記憶された各種情報は、図示しない通信装置などによって油圧ショベル100の外部(例えば、作業現場に設けられた管理事務所内)に設置されたサーバ37に送信し格納される。
 油圧ショベル400は、油圧ショベル100とは異なる他の建設機械であり、種々の情報や指令に応じて油圧ショベル400の自動運転動作を行う自動運転制御装置38と、油圧ショベル400の周辺環境情報(地形形状)を計測する周辺環境情報計測装置20c,20dとを少なくとも有している。
 周辺環境情報計測装置20c,20dは、油圧ショベル100の周辺環境情報計測装置20a,20b(3次元走査センサ)と同様の構成を有するものである。すなわち、周辺環境情報計測装置20c,20dは、油圧ショベル400の上部旋回体の上部左右に配置され、油圧ショベル400の周辺環境を示す周辺環境情報として地形形状を計測するものであり、例えば、LIDAR(Light Detection and Ranging、Laser Imaging Detection and Ranging)などの3次元走査センサである。
 自動運転制御装置38は、サーバ37に格納された情報、すなわち、周辺環境情報と作業パターンとが時系列で記憶された情報を読み出し、読みだした情報を用いて油圧ショベル400の自動運転を行う。
 具体例には、自動運転制御装置38は、実行するべき作業内容に応じた自動運転を行う際には、まず、周辺環境情報計測装置20c,20dにより計測された周辺環境情報(地形形状)を入力し、その周辺環境情報に合致する(又は、類似する)周辺環境情報とともに時系列で記憶された作業パターンの情報をサーバ37から選択して読み出して、読みだした作業パターンの動作を自動運転の動作として実行する。
 なお、自動運転制御装置38は、作業現場の設計情報や現状の周辺環境情報に応じて、関連すると予測される作業パターンの情報や周辺環境情報(地形形状)を複数事前にサーバ37から読み出しておき、この情報の中から周辺環境情報(地形形状)に合致(類似)する作業パターンを選択して読み出すことで自動運転を行うようにしても良い。
 図9は、本実施の形態における自動運転制御装置の処理内容を示すフローチャートである。
 図9において、自動運転制御装置38は、運転が開始されると、まず、計測環境条件入力装置33(表示入力装置)により、自動運転時の環境や条件の入力を油圧ショベル400の作業管理者(オペレータ等でも良い)に要求する(ステップS200)。
 続いて、周辺環境情報計測装置20a,20b(3次元走査センサ)により、油圧ショベル100の周辺環境(地形形状)を計測する(ステップS210)。
 続いて、自動運転制御装置38は、油圧ショベル400が実行する作業内容(作業パターン)を選択し、実行する(ステップS220)。
 続いて、自動運転制御装置38により自動運転として油圧ショベル400で実行された作業内容が予め設定した任意の作業に一致したか否か、及び、その作業が完了したか否かを判定する(ステップS230)。
 ステップS230での判定結果がYESの場合には、ステップS210に戻る。また、ステップS230での判定結果がNOの場合には、ステップS220に戻る。
 その他の構成は第1の実施の形態と同様である。
 以上のように構成した本実施の形態においても第1の実施の形態と同様の効果を得ることができる。
 また、特定の地形形状に対するオペレータの実際の動作に則して、作業現場の地形形状に適した作業内容の自動運転を行うことができる。
 なお、本実施の形態においては、自動運転制御装置38を設けて自動運転を行う建設機械400は、油圧ショベル100とは異なる他の建設機械である場合を例示して説明したが、これに限られず、例えば、油圧ショベル100に自動運転制御装置38を設け、サーバ37に格納された自身や他の建設機械により取得された情報(周辺環境情報と作業パターンの組情報)を取得し、周辺環境情報計測装置20a,20bにより取得した周辺環境情報(地形形状)と併せて用いることで自動運転を行うように構成してもよい。
 また、本実施の形態においては、自動運転制御装置38において、入力された周辺環境情報に合致(類似)する作業パターンを選択するように構成したが、これに限られず、入力された周辺環境情報とサーバ上に蓄積されたデータとに基づいてAIにより最も適した作業パターンを演算して実行する、すなわち、当該作業現場において油圧ショベルをどう動かすべきかをAIにより判断して自動運転を実行するように構成してもよい。
 <付記>
 なお、本発明は上記の実施の形態に限定されるものではなく、その要旨を逸脱しない範囲内の様々な変形例や実施の形態の組み合わせが含まれる。また、本発明は、上記の実施の形態で説明した全ての構成を備えるものに限定されず、その構成の一部を削除したものも含まれる。また、上記の各構成、機能等は、それらの一部又は全部を、例えば集積回路で設計する等により実現してもよい。また、上記の各構成、機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウェアで実現してもよい。
1…ブームシリンダ、2…ブーム、3…アームシリンダ、4…アーム、5…バケットシリンダ、6…バケット、7…旋回装置、8…走行装置、12,14,16,17…慣性計測装置、20a,20b,20c,20d…周辺環境情報計測装置、30…オペレータ判断計測装置、31…作業判別部、31a…動作軌跡演算部、31b…車体負荷演算部、31c…操作入力検出部、32…操作装置、33…計測環境条件入力装置、34…記憶装置、36…圧力センサ、37…サーバ、38…自動運転制御装置、100,400…油圧ショベル、101…下部走行体、102…上部旋回体、103…フロント作業装置、104…キャブ、130…フロント作業装置、200…トラック、300…掘削面

Claims (7)

  1.  車体に設けられた作業腕を有する建設機械において、
     前記作業腕の負荷を検出する負荷情報検出装置と、
     オペレータによる操作状態に応じて、前記車体及び前記作業腕を駆動するための操作信号を出力する操作装置と、
     前記車体及び前記作業腕の姿勢情報を計測する姿勢情報計測装置と、
     前記建設機械の周辺環境を示す周辺環境情報として地形形状を計測する周辺環境情報計測装置と、
     前記周辺環境情報を記憶する記憶装置と、
     前記車体及び前記作業腕を制御する制御装置とを有し、
     前記制御装置は、
     前記姿勢情報計測装置からの計測結果に基づいて前記作業腕の動作軌跡を時系列で演算し、
     前記負荷情報検出装置で検出される前記作業腕の負荷を時系列で演算し、
     前記操作装置から出力される操作信号に基づいてオペレータによる前記建設機械の操作状態を時系列で検出し、
     前記作業腕の動作軌跡と、前記作業腕の負荷と、前記操作状態とに基づいて前記建設機械の作業パターンを判別し、
     予め定めた前記作業パターンの実行終了後に前記周辺環境情報計測装置による周辺環境情報の計測を実行することを特徴とする建設機械。
  2.  請求項1記載の建設機械において、
     前記制御装置は、予め定めた前記作業パターンの実行終了後であって、前記建設機械の動作停止中に前記周辺環境情報計測装置による周辺環境情報の計測を実行することを特徴とする建設機械。
  3.  請求項1に記載の建設機械において、
     前記車体は、下部走行体と、前記下部走行体に対して旋回可能な上部旋回体とを有し、
     前記制御装置は、予め定めた前記作業パターンの実行終了後であって、前記下部走行体に対する前記上部旋回体の旋回動作の停止中に前記周辺環境情報計測装置による前記周辺環境情報の計測を実行することを特徴とする建設機械。
  4.  請求項1に記載の建設機械において、
     前記制御装置は、予め定めた前記作業パターンの実行終了後であって、前記作業腕による掘削動作の停止中に前記周辺環境情報計測装置による前記周辺環境情報の計測を実行することを特徴とする建設機械。
  5.  請求項1に記載の建設機械において、
     前記姿勢情報計測装置は、前記作業腕を構成する複数のフロント部材の相対角を計測する角度センサであり、
     前記負荷情報検出装置は、前記操作装置からの操作信号に応じて前記作業腕を駆動する油圧アクチュエータの負荷圧を計測する圧力センサであることを特徴とする建設機械。
  6.  請求項1に記載の建設機械において、
     前記周辺環境情報計測装置は、3次元走査センサであることを特徴とする建設機械。
  7.  請求項1に記載の建設機械において、
     周辺環境情報の計測を実行した際のオペレータの情報と、周辺環境情報の計測を実行する直前の作業パターンおよび作業対象物の情報とを入力可能な計測環境条件入力装置を有することを特徴とする建設機械。
PCT/JP2021/048407 2021-01-08 2021-12-24 建設機械 WO2022149509A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022574015A JP7392178B2 (ja) 2021-01-08 2021-12-24 建設機械

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021002402 2021-01-08
JP2021-002402 2021-01-08

Publications (1)

Publication Number Publication Date
WO2022149509A1 true WO2022149509A1 (ja) 2022-07-14

Family

ID=82357726

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/048407 WO2022149509A1 (ja) 2021-01-08 2021-12-24 建設機械

Country Status (2)

Country Link
JP (1) JP7392178B2 (ja)
WO (1) WO2022149509A1 (ja)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020026522A1 (ja) * 2018-07-31 2020-02-06 株式会社小松製作所 作業機械

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3024910B2 (ja) * 1994-07-18 2000-03-27 新キャタピラー三菱株式会社 掘削用建設機械における自動掘削制御装置
JP3973803B2 (ja) 1999-09-17 2007-09-12 日立建機株式会社 自動運転システム

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020026522A1 (ja) * 2018-07-31 2020-02-06 株式会社小松製作所 作業機械

Also Published As

Publication number Publication date
JP7392178B2 (ja) 2023-12-05
JPWO2022149509A1 (ja) 2022-07-14

Similar Documents

Publication Publication Date Title
CN107794967B (zh) 机器的控制系统
KR102126772B1 (ko) 작업 기계
CN112639210B (zh) 装载机械的控制装置及控制方法
US20170073935A1 (en) Control System for a Rotating Machine
CN112424430B (zh) 控制装置、装载机械及控制方法
US20170073925A1 (en) Control System for a Rotating Machine
US9454147B1 (en) Control system for a rotating machine
EP3896231B1 (en) System and method for automatically performing an earthmoving operation
JP2019163669A (ja) 作業車両
CN113529833A (zh) 用于挖掘机的设备和方法
CN112602120A (zh) 再现装置、分析支援系统及再现方法
CN115298632A (zh) 作业机械
WO2022149509A1 (ja) 建設機械
WO2022244832A1 (ja) 積込機械の制御システム及び制御方法
WO2022230980A1 (ja) 積込機械の制御装置及び制御方法
JP7036351B2 (ja) 自動停止位置制御システム及び方法、プログラム
JP7197315B2 (ja) ホイールローダの表示システムおよびその制御方法
EP3779073A1 (en) Display system for work machine, and method for controlling display system
EP3770345B1 (en) Display system of work machine and method of controlling the same
WO2022244830A1 (ja) 積込機械の制御システム及び制御方法
JP7416769B2 (ja) 作業車両、作業車両の制御装置、および作業車両の方向特定方法
CN115030243A (zh) 对自推进式作业车辆进行基于地形的控制的系统和方法
JP2023074395A (ja) 作業システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21917729

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022574015

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21917729

Country of ref document: EP

Kind code of ref document: A1