WO2022142189A1 - Intelligent track laying method and intelligent track laying apparatus - Google Patents

Intelligent track laying method and intelligent track laying apparatus Download PDF

Info

Publication number
WO2022142189A1
WO2022142189A1 PCT/CN2021/101709 CN2021101709W WO2022142189A1 WO 2022142189 A1 WO2022142189 A1 WO 2022142189A1 CN 2021101709 W CN2021101709 W CN 2021101709W WO 2022142189 A1 WO2022142189 A1 WO 2022142189A1
Authority
WO
WIPO (PCT)
Prior art keywords
rail
roller
vehicle
frame
drum
Prior art date
Application number
PCT/CN2021/101709
Other languages
French (fr)
Chinese (zh)
Inventor
管新权
沈光华
陈志远
段启楠
邓建华
喻国梁
杨永洲
王道成
华正兴
周双强
翟长青
陈治亚
廖耘
Original Assignee
中铁四局集团有限公司
株洲旭阳机电科技开发有限公司
中南大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁四局集团有限公司, 株洲旭阳机电科技开发有限公司, 中南大学 filed Critical 中铁四局集团有限公司
Priority to EP21851787.8A priority Critical patent/EP4273321A1/en
Publication of WO2022142189A1 publication Critical patent/WO2022142189A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor

Abstract

An intelligent track laying method and an intelligent track laying apparatus. The intelligent track laying apparatus comprises a steel rail sorting vehicle having a steel rail sorting apparatus, a steel rail pushing vehicle having a steel rail pushing apparatus, and a steel rail tractor having a steel rail traction apparatus which are located in front of a steel rail conveying vehicle; a roller clamping claw apparatus is provided on the steel rail tractor; a special roller recycling vehicle is provided behind the steel rail tractor and is provided with the roller clamping claw apparatus and a roller dragging-out apparatus; and a fastener fastening vehicle is provided behind the steel rail conveying vehicle and is provided with a fastening apparatus for mounting fasteners to fix steel rails. In the whole operation process of the whole track laying apparatus, other operations do not need manual participation any more except that a driver needs to drive some operation vehicles, a process monitoring person needs to monitor the working conditions of the operation vehicles, and sleeper-mounted steel rails need to be manually and preliminarily fixed, such that the operation efficiency of the whole apparatus is remarkably improved, and the quality standard of the operation completed under the control of an automatic control system can be completely guaranteed.

Description

一种智能铺轨方法及智能铺轨装备A kind of intelligent track laying method and intelligent track laying equipment 技术领域technical field
本发明涉及一种智能铺轨方法及智能铺轨装备,属于轨道交通铁路铺轨技术领域。The invention relates to an intelligent track laying method and intelligent track laying equipment, belonging to the technical field of railway track laying for rail transit.
背景技术Background technique
随着轨道交通的高速发展,人工铺轨和半机械化铺轨在进度和质量上都已经不能满足铁路建设的要求,自能化自动化铺轨成为铁路建设发展的趋势。With the rapid development of rail transit, manual track laying and semi-mechanized track laying can no longer meet the requirements of railway construction in terms of schedule and quality. Self-energy automatic track laying has become the trend of railway construction development.
在自动化铺轨的整个流程中,如何自动放置、回收滚筒,如何快速抓握锁紧钢轨,对钢轨实施牵引推送,以及如何快速放置、紧固轨道扣件是业内不断研究的问题,至今还存在作业速度慢、部分作业依然需要人工参与、人工补救等缺陷。In the whole process of automatic track laying, how to automatically place and recycle the rollers, how to quickly grasp and lock the rail, how to pull and push the rail, and how to quickly place and fasten the rail fasteners are issues that are continuously researched in the industry, and there are still operations The speed is slow, and some operations still require manual participation and manual remediation.
其主要表现为:Its main manifestations are:
一、存在于滚筒放置与钢轨牵引作业车和钢轨钢轨分拣车的钢轨抓握机械手,其主要问题在于,钢轨抓握后不易于锁紧,推送钢轨时容易打滑,需要人工打入楔形块来锁紧钢轨,放开钢轨时又需要花费时间将打入楔形块退出。1. The main problem of the rail gripping manipulator that exists in the roller placement, rail traction vehicle and rail sorting vehicle is that it is not easy to lock the rail after gripping, and it is easy to slip when pushing the rail, and it is necessary to manually drive the wedge block to Tighten the rail, and it will take time to withdraw the drive wedge when the rail is released.
二、存在于滚筒回收作业车的滚筒夹手装置,其主要问题在于回收机构设置不完善,回收到作业车上的滚筒需要事先人工在道床外从钢轨下方向道床中间推出,并按规定位置和姿态摆放将滚筒摆放好,这要耗费大量时间和劳动力成本。2. The main problem of the roller gripping device in the roller recovery vehicle is that the setting of the recovery mechanism is not perfect. The rollers recovered on the operation vehicle need to be manually pushed out of the track bed from the bottom of the rail to the middle of the track bed, and the rollers should be pushed out of the track bed according to the specified position and Posture Positioning the rollers is time-consuming and labor-intensive.
三、存在于滚筒放置与钢轨牵引作业车和滚筒回收车的滚筒抓取机械手,其主要问题在于,在不当操作使抓具强力碰撞物件或受过载冲击时机械手的部分执行部件易于受损,停工维修需要耽误大量时间。3. The main problem of the roller grabbing manipulator that exists in the roller placement and the rail traction vehicle and the roller recovery vehicle is that some of the executive parts of the manipulator are easily damaged when improper operation causes the gripper to strongly collide with the object or is subjected to overload and impact, resulting in stoppage of work. Repairs take a lot of time.
四、存在于滚筒放置与钢轨牵引作业车的滚筒夹手装置,其主要问题在于只设有一套放置滚筒的装置,导致放置滚筒的速度慢。4. The main problem of the roller gripping device that exists in the roller placement and rail traction vehicle is that there is only one set of roller placement devices, resulting in slow placement of the rollers.
五、扣件紧固作业车仅限于机械装置拧紧道钉,钢轨固定流程中绝缘块的插装,弹条的归置依然需要人工配合完成,也要延长作业时间和增加劳动成本。5. The fastener tightening operation vehicle is limited to the mechanical device tightening the road stud, the insertion of the insulating block in the rail fixing process, and the placement of the elastic strip still need manual cooperation, which also prolongs the operation time and increases the labor cost.
通过国内检索,我们发现申请号为201811510758 .4,名称为一种铺轨用滚筒收放装置及钢轨牵引车及铺轨作业方法的实用新型专利与本实用新型最接近。但该专利所述方案存在以下缺陷:Through domestic search, we found that the application number is 201811510758.4, and the utility model patent with the name of a roller retractable device for track laying, a rail tractor and a track laying operation method is the closest to this utility model. However, the solution described in this patent has the following defects:
1、只有一组自动放置滚筒的装置,由于抓取滚筒到放置滚筒的移动行程远,使得单位时间内放置滚筒的数量少,导致整过铺轨流程的作业速度慢,效率低。1. There is only one set of devices for automatically placing rollers. Due to the long moving distance from grabbing the rollers to placing the rollers, the number of rollers placed per unit time is small, resulting in slow and low efficiency in the entire track laying process.
2、在抓握锁紧钢轨时,该方案有一个需要人工打入楔形块来锁紧钢轨的过程,这不仅延误锁紧铁轨的时间,而且在放开钢轨时又需要花费时间将打入楔形块退出。2. When grasping and locking the rail, this scheme has a process of manually driving the wedge block to lock the rail, which not only delays the time for locking the rail, but also takes time to drive the wedge when releasing the rail. block exit.
3、放置滚筒的装置走行纵向轨、横向轨、垂向轨,其轨道走行方式采用丝杆——螺母相对转动的推进方式,需要丝杆或螺母中的一方高速旋转才能在轨道上快速移动,导致推进丝杆、螺母磨耗快、能耗高。3. The device for placing the drum runs on longitudinal rails, transverse rails, and vertical rails. Its orbital running method adopts the propulsion method of the relative rotation of the screw rod and the nut. It needs high-speed rotation of one of the screw rod or the nut to move quickly on the rail. This leads to fast wear of the advancing screw and nut and high energy consumption.
通过国内检索,我们还发现申请号为201420327443.7 ,名称为一种抓轨装置与本发明有相似之处。其主要技术特征:该专利涉及一种抓轨装置,包括抓钩、链 环、调解机构,抓钩、链环、调解机通过销轴铰接,所述的抓钩用于抓紧钢轨。抓钩括钩爪、 定位销轴、滑动锁铁、连接板,连接板通位销轴与两个钩爪铰接,滑动锁铁在连接板上的滑槽 内滑动,钩爪通过滑动锁铁限位。调解机构包括 吊杆、调螺母手柄、固定座、调解螺母,吊杆与固 定座滑动连接,吊杆端部设有与调解螺母相匹配 的螺纹,调解螺母旋转带动吊杆上下移动。Through domestic search, we also found that the application number is 201420327443.7, and the name is a rail grabbing device that is similar to the present invention. Its main technical features: The patent relates to a rail grab device, including a grab hook, a chain ring, and an adjustment mechanism. The grab hook, the chain ring, and the adjustment mechanism are hinged through a pin, and the grab hook is used to grasp the rail. grappling hook including claws, The positioning pin, the sliding lock iron and the connecting plate are hinged with the two hook claws. The adjustment mechanism includes a boom, an adjustment nut handle, a fixed seat, an adjustment nut, a boom and a fixed The fixed seat is slidingly connected, and the end of the boom is provided with a thread that matches the adjustment nut, and the rotation of the adjustment nut drives the boom to move up and down.
该专利方案只用于将钢轨抓握并向上吊起,整个结构为柔性结构,无法即时向钢轨传导横向力、纵向力和向下的垂向力,无法利用装置快速抓握锁紧钢轨,难以即时对钢轨传导纵向力实现对钢轨的纵向推送,且在钢轨被抓握锁紧后又无法快速松开钢轨。The patented solution is only used to grasp and hoist the rail, the whole structure is a flexible structure, it cannot transmit lateral force, longitudinal force and downward vertical force to the rail in real time, and the device cannot be used to quickly grasp and lock the rail. The longitudinal force is immediately transmitted to the rail to achieve longitudinal push to the rail, and the rail cannot be quickly released after the rail is gripped and locked.
通过国内检索,还发现其它铺设钢轨的专利,由于这些专利的发明目的及解决的问题不同,没有一件铺设钢轨的装备能够满足智能化、自动化、高标准、高速度铺轨系统的要求。Through domestic search, other patents for laying rails were also found. Due to the different purposes of the invention and the problems solved by these patents, none of the equipment for laying rails can meet the requirements of intelligent, automated, high-standard, and high-speed rail laying systems.
发明内容SUMMARY OF THE INVENTION
本发明要解决的技术问题主要是:现有铺轨作业的执行机构的功能缺失和结构缺陷需要人工参与的作业太多,导致作业效率低,质量标准不易掌控的问题。The technical problems to be solved by the present invention are mainly: the existing actuators of the track laying operation have too many operations requiring manual participation due to the lack of functions and structural defects, resulting in the problems of low operation efficiency and difficult control of quality standards.
针对上述问题,本发明提出的技术方案是:In view of the above problems, the technical scheme proposed by the present invention is:
一种智能铺轨方法,是设置由智能控制系统控制的由多种作业车组成的成套铺轨装备,利用装备中的钢轨分拣车自动从装备中的钢轨输送车上左右各一抓住两根钢轨的前端,将两根钢轨定向推送至装备中的钢轨推送车,由钢轨推送车自动将两根钢轨推向装备中的滚筒回收车,由滚筒回收车自动将两根钢轨递向装备中的钢轨牵引车,由钢轨牵引车自动抓住两根钢轨前端并使钢轨牵引车前行,同时,设在钢轨牵引车上的滚筒夹手装置在道床两侧设定位置随车不断向前放置滚筒,使后面两根钢轨不断放落在道床两侧的滚筒上并不断在滚筒上随车向前拖行,再利用次后设置的滚筒回收车自动将压在钢轨下的滚筒回收到滚筒回收车上使钢轨落枕,通过人工对落枕钢轨实施间隔式初固定,最后由扣件紧固车自动完成对钢轨的紧固作业,从而实现智能铺轨。An intelligent track laying method is to set up a complete set of track laying equipment composed of various operating vehicles controlled by an intelligent control system, and use the rail sorting vehicles in the equipment to automatically grab two rails from the left and right of the rail conveying vehicles in the equipment. At the front end of the equipment, the two rails are directionally pushed to the rail pusher in the equipment, the rail pusher automatically pushes the two rails to the roller recovery vehicle in the equipment, and the roller recovery vehicle automatically delivers the two rails to the equipment. Tractor, the rail tractor automatically grabs the front ends of the two rails and makes the rail tractor move forward. At the same time, the roller gripping device installed on the rail tractor sets the position on both sides of the track bed to continuously place the rollers forward with the vehicle. The latter two steel rails are continuously placed on the rollers on both sides of the ballast bed and continuously dragged forward with the vehicle on the rollers, and then the rollers that are pressed under the rails are automatically recovered to the roller recovery vehicle by the roller recovery vehicle set up after the second time. To make the rail stiffener, the stiffened rail is manually fixed at intervals, and finally the fastener tightening car automatically completes the tightening of the rail, thereby realizing intelligent track laying.
进一步,所述由滚筒回收车将两根钢轨递向钢轨牵引车,是在滚筒回收车的两侧设置导轨装置,使两根钢轨分别经两侧设置的导轨装置,由钢轨推送车出力将两根钢轨推向装备中的钢轨牵引车。Further, in the process of delivering the two rails to the rail tractor by the roller recovery vehicle, guide rail devices are arranged on both sides of the roller recovery vehicle, so that the two rails pass through the guide rail devices provided on both sides respectively, and the rail pusher outputs force to push the two rails. The rail is pushed towards the rail tractor in the equipment.
进一步,所述两根钢轨不断放落在道床两侧的滚筒上并不断在滚筒上随车向前拖行,是滚筒回收车保持静止,钢轨牵引车牵引钢轨不断前行,使钢轨在滚筒回收车与钢轨牵引车之间的长度不断加长,利用钢轨的自重使加长的钢轨的中段变形下沉落放到滚筒的滚轮上,并利用滚轮转动使钢轨随钢轨牵引车的前行而能够在滚轮拖行。Further, the two steel rails are continuously placed on the rollers on both sides of the ballast bed and continuously dragged forward with the vehicle on the rollers. The length between the car and the rail tractor is continuously lengthened, and the middle section of the elongated rail is deformed and dropped onto the rollers of the drum by the self-weight of the rail, and the rollers are rotated to make the rail move forward with the rail tractor. drag.
进一步,所述将压在钢轨下的滚筒回收到滚筒回收车上,是在滚筒回收车上设置受智能控制系统控制的滚筒拖出装置和滚筒夹手装置,并再次利用滚筒回收车两侧设置的导轨装置,通过滚筒回收车的前行将钢轨从后向前不断抬起,同时由滚筒拖出装置从抬起的钢轨下将滚筒拖出并由滚筒夹手装置转移到滚筒回收车上,使后面的钢轨不断向前落枕。Further, to recover the roller pressed under the steel rail to the roller recovery vehicle, a roller pulling device and a roller gripping device controlled by an intelligent control system are set on the roller recovery vehicle, and the two sides of the roller recovery vehicle are again used. The guide rail device is used to continuously lift the rail from the back to the front through the forward movement of the roller recovery vehicle. The rails behind keep stuttering forward.
进一步,所述再次利用滚筒回收车两侧设置的导轨装置,通过滚筒回收车的前行将钢轨从后向前不断抬起,是滚筒回收车处于离后方已经铺好的钢轨L的前端端部一段距离的位置,当钢轨牵引车拖行钢轨至钢轨后端端部与后方已经铺好的钢轨L的前端端部并齐时停止前行,位于滚筒回收车后的一段钢轨的后端端部下垂,与已经铺好的钢轨L的前端端部连接固定,然后滚筒回收车根据回收滚筒的速度不断向前行驶。Further, the described reusing of the guide rail devices provided on both sides of the roller recovery vehicle continuously lifts the steel rail from the back to the front through the forward movement of the roller recovery vehicle. The distance position, when the rail tractor drags the rail to the rear end of the rail and the front end of the rail L that has been laid at the rear, stop moving forward, and the rear end of a section of rail located behind the roller recovery vehicle sags. , which is connected and fixed with the front end of the rail L that has been laid, and then the drum recycling vehicle continuously moves forward according to the speed of the recycling drum.
进一步,所述由滚筒拖出装置和滚筒夹手装置从抬起的钢轨下将滚筒拖出并转移到滚筒回收车上,是由滚筒拖出装置在滚筒回收车不断前行的情形下将滚筒从两侧抬起的钢轨下将滚筒向道床中间横向拖出并规整的摆放在道床的中间两侧,再由滚筒夹手装置将滚筒从道床转移到滚筒回收车上设置的滚筒回收区内的滚筒篮内。Further, the drum pulling out device and the drum gripping device pull the drum out from under the raised rail and transfer it to the drum recovery vehicle, and the drum pulling device removes the drum under the condition that the drum recovery vehicle continues to move forward. The rollers are pulled out laterally to the middle of the track bed from the rails lifted from both sides and placed on both sides of the track bed regularly, and then the roller gripping device transfers the rollers from the track bed to the roller recovery area set on the roller recovery vehicle. inside the drum basket.
进一步,所述滚筒拖出装置在滚筒回收车不断前行的情形下将滚筒从两侧抬起的钢轨下将滚筒向道床中间横向拖出,是将滚筒拖出装置整体设置为能够在轨道车上逆向走行的逆行性滚筒拖出装置,并在逆行性滚筒拖出装置上设置能够与滑行在导轨装置上的钢轨临时固定的临时固定器,作业时,由临时固定器将逆行性滚筒拖出装置与钢轨实施临时固定,使逆行性滚筒拖出装置在前行的滚筒回收车上逆行,同时又与道床保持一段时间的相对静止,利用这一段时间将滚筒从抬起的钢轨下拖出。Further, the roller pulling-out device pulls the drum laterally out to the middle of the track bed under the steel rails raised on both sides under the condition that the drum recovery vehicle is continuously moving forward, so that the roller pulling-out device is set as a whole so as to be able to be used in the rail car. A retrograde roller pulling out device running in the opposite direction is installed, and a temporary fixing device that can be temporarily fixed with the steel rail sliding on the guide rail device is arranged on the retrograde roller pulling device. During operation, the retrograde roller is pulled out by the temporary fixing device. The device and the rail are temporarily fixed, so that the retrograde roller pull-out device is retrograde on the forward roller recovery vehicle, and at the same time, it remains relatively stationary with the ballast bed for a period of time, and the roller is pulled out from the lifted rail during this period of time.
如上所述方法,是在滚筒回收车上的滚筒夹手装置分设为升井滚筒夹手装置和装篮滚筒夹手装置,同时,还在滚筒回收车底架上的升井口与滚筒回收区之间设置滚筒传输装置,由升井滚筒夹手装置将放置在道床上的滚筒通过设置在滚筒回收车底架上的升井口将滚筒从道床转移到传输装置,由传输装置将滚筒传输到滚筒回收区,再由装篮滚筒夹手装置将传输装置上的滚筒转放到滚筒回收区中的滚筒篮内。In the above method, the roller gripping device on the roller recovery vehicle is divided into a well-lifting roller gripping device and a basket-loading roller gripping device, and at the same time, it is also set between the well-lifting head and the roller recovery area on the underframe of the roller recovery vehicle. Roller transfer device, the rollers placed on the track bed are transferred from the track bed to the transfer device by the lifting well roller gripper device through the lift well head set on the bottom frame of the roller recovery vehicle, and the rollers are transferred to the roller recovery area by the transfer device. The drum on the conveyor is transferred to the drum basket in the drum recovery area by the basket-loading drum gripping device.
如上所述方法,是在钢轨分拣车和钢轨牵引车上设置一种受智能控制系统控制的用于抓取钢轨的能够自动双向锁紧的钢轨双向锁紧机械手,在钢轨双向锁紧机械手上设置夹握部件和能够使钢轨双向锁紧机械手倾斜的倾斜机构,作业时,由夹握部件夹在钢轨两侧的轨头与轨底之间,然后通过倾斜机构转动钢轨双向锁紧机械手使钢轨双向锁紧机械手向前或向后倾斜,迫使夹握部件向上分别抵紧轨头两侧的底面,向下分别抵紧两侧轨底的顶面,能够使钢轨双向锁紧机械手前倾或后倾实现对钢轨的双向锁紧。The method as described above is to set a rail two-way locking manipulator controlled by an intelligent control system for grabbing the rail and capable of automatic two-way locking on the rail sorting vehicle and the rail tractor, and on the rail two-way locking manipulator Set up a gripping part and a tilting mechanism that can tilt the two-way locking manipulator of the rail. During operation, the gripping part is clamped between the rail head and the bottom of the rail on both sides of the rail, and then the two-way locking manipulator of the rail is rotated by the tilting mechanism to make the rail. The two-way locking manipulator tilts forward or backward, forcing the gripping parts to press up against the bottom surfaces on both sides of the rail head and down against the top surfaces of the rail bottoms on both sides respectively, which can make the rail two-way locking manipulator lean forward or backward. Tilt to achieve two-way locking on the rail.
进一步,所述通过人工对落枕钢轨实施间隔式初固定是平均每隔N个预装轨枕取一个,在钢轨轨底两侧与所取的预装轨枕上的铁垫板的限位凸台之间插装绝缘块,将弹条归置到位,再将道钉拧紧,完成对铺设钢轨的初步固定。Further, the interval-type initial fixation of the sleeper rails by manual means is to take one every N pre-installed sleepers on average, and the distance between the two sides of the rail bottom and the limit bosses of the iron pads on the pre-installed sleepers is taken. Insert insulating blocks in between, place the spring bars in place, and then tighten the road studs to complete the preliminary fixation of the laying rails.
进一步,所述由扣件紧固车自动完成对钢轨的紧固作业,是在扣件紧固车上设置绝缘块夹装机构、拧钉机构、弹条归置机构,作业时,先由绝缘块夹装机构夹取绝缘块,将绝缘块插装在钢轨两侧的轨底与铁垫板的限位凸台之间并使绝缘块的压块压住钢轨轨底,再由拧钉机构将道钉拧松,使先前前端下颚预压在限位凸台上的弹条松动,由弹条归置机构夹住弹条两侧,将弹条前移,使弹条的前端下颚压住绝缘块,最后再用拧钉机构将道钉拧紧,使弹条紧压绝缘块,并通过绝缘块压紧钢轨。Further, the fastening operation of the rail is automatically completed by the fastener fastening vehicle, and the insulating block clamping mechanism, the screwing mechanism, and the elastic strip placement mechanism are set on the fastener fastening vehicle. The block clamping mechanism clamps the insulating block, inserts the insulating block between the rail bottom on both sides of the rail and the limit boss of the iron backing plate, and makes the pressing block of the insulating block press the bottom of the rail, and then the screwing mechanism Unscrew the road stud to loosen the elastic strip that was pre-pressed on the limit boss by the front-end lower jaw, clamp both sides of the elastic strip by the elastic strip placement mechanism, move the elastic strip forward, and press the front-end lower jaw of the elastic strip. Insulation block, and finally use the screwing mechanism to tighten the road stud, so that the elastic strip presses the insulating block tightly, and the rail is pressed through the insulating block.
一种智能铺轨装备,包括钢轨输送车,依次位于钢轨输送车前面的具有钢轨分拣装置的钢轨分拣车、具有钢轨推送装置的钢轨推送车、具有钢轨牵引装置的钢轨牵引车,在钢轨牵引车上依然设有滚筒夹手装置,在钢轨牵引车后面设有专用滚筒回收车,其具有滚筒夹手装置和滚筒拖出装置;在钢轨输送车后面设有扣件紧固车,扣件紧固车具有安装扣件固定钢轨的紧固装置。An intelligent track laying equipment includes a rail conveying vehicle, a rail sorting vehicle having a rail sorting device, a rail pushing vehicle having a rail pushing device, and a rail tractor having a rail pulling device, which are sequentially located in front of the rail conveying vehicle. There is still a roller gripping device on the car, and a special roller recovery car is installed behind the rail tractor, which has a roller gripping device and a roller pulling out device; behind the rail conveying car is a fastener tightening car, and the fasteners are tightened. The fixing car has a fastening device for installing fasteners to fix the rail.
进一步地,所述钢轨分拣装置及钢轨牵引装置均具有钢轨双向锁紧机械手,所述钢轨双向锁紧机械手包括固定在分拣装置或钢轨牵引装置上的安装体、通过转轴安装在安装体上的转架、一端作用在转架上推进转架转动的倾斜推进器、安装在转架上的夹持组件;所述夹持组件下方具有能够握住钢轨的抓握部件;所述夹持组件包括安装在转架内的夹持架,夹持架具有夹板一和夹板二;所述夹板一和夹板二上分别具有挂销孔一和挂销孔二,挂销孔一和挂销孔二内分别具有挂销一和挂销二,抓握钢轨时,夹板一和夹板二下端能够分别插在轨头两侧的底面一和底面二的下面;所述夹持架的夹板一和夹板二的底端分别分化为前脚一、后脚一和前脚二、后脚二;当挂销一和挂销二分别挂住轨头的底面一和底面二时,前脚一和后脚一均与钢轨轨底的顶面一有间隙,前脚二和后脚二均与钢轨轨底的顶面二有间隙;Further, both the rail sorting device and the rail traction device have a rail bidirectional locking manipulator, and the rail bidirectional locking manipulator includes a mounting body fixed on the sorting device or the rail traction device, and is mounted on the mounting body through a rotating shaft. A turret, an inclined propeller whose one end acts on the turret to push the turret to rotate, and a clamping assembly installed on the turret; a gripping member capable of holding the rail is provided below the clamping assembly; the clamping assembly Including a clamping frame installed in the turret, the clamping frame has a clamping plate 1 and a clamping plate 2; the clamping plate 1 and the clamping plate 2 are respectively provided with a hanging pin hole 1 and a hanging pin hole 2, the hanging pin hole 1 and the hanging pin hole 2 There are hanging pin 1 and hanging pin 2 respectively. When grasping the rail, the lower ends of plywood 1 and plywood 2 can be respectively inserted under the bottom surface 1 and bottom surface 2 on both sides of the rail head; plywood 1 and plywood 2 of the clamping frame The bottom ends are respectively divided into front foot 1, rear foot 1, front foot 2, rear foot 2; when hanging pin 1 and hanging pin 2 hang on the bottom surface 1 and bottom surface 2 of the rail head respectively, the front foot 1 and rear foot 1 are both connected with the bottom of the rail. There is a gap on the top surface 1, and the front foot 2 and the rear foot 2 have a gap with the top surface 2 of the rail bottom;
当夹持架下端随转架向前倾斜时,挂销一和后脚一分别撑住底面一和顶面一,挂销二和后脚二分别撑住底面二和顶面二,夹持组件将钢轨锁紧;When the lower end of the clamping frame tilts forward with the turret, the hanging pin 1 and the rear foot 1 support the bottom surface 1 and the top surface 1 respectively. lock;
当夹持架下端随转架向后倾斜时,挂销一和前脚一分别撑住底面一和顶面一,挂销二和前脚二分别撑住底面二和顶面二,夹持组件同样将钢轨锁紧;When the lower end of the clamping frame is inclined backward with the turret, the hanging pin 1 and the front foot 1 support the bottom surface 1 and the top surface 1 respectively, and the hanging pin 2 and the front foot 2 support the bottom surface 2 and the top surface 2 respectively. Rail locking;
当夹持架随转架回复到垂向位置时,夹持组件对钢轨的锁紧解除。When the clamping frame returns to the vertical position with the turn frame, the locking of the clamping assembly to the rail is released.
进一步地,所述滚筒回收车还具有配合滚筒拖出装置和滚筒夹手装置作业的导轨装置,所述导轨装置具有两个水平对称设置能够在钢轨轨头两侧底面抬起钢轨并能够沿钢轨滚动式滑行的抬滑轮;所述滚筒拖出装置为一种能够在抬起的钢轨下面将滚筒横向拖出的逆行性滚筒拖出装置,其具有悬挂式固定在滚筒回收车底架中部下方的总装架、设在总装架上的逆行架、设置在逆行架与总装架之间的逆行定驻器、设置在逆行架上的横向驱动机构、设在横向驱动机构上的纵向微调机构、设在纵向微调机构上的升降机构以及设在升降机构下端的横向挂钩部件; 所述逆行定驻器包括设在总装架上供逆行架沿列车运行方向顺逆双向走行的双向轨、安装在总装架上推动逆行架向前顺向走行的单向推进机构和设在逆行架上控制逆行架向车后逆行而相对于道床保持静止的临时固定器;所述单向推进机构包括纵向固定在逆行架中间的推进管和电缸推进杆,推进管是后段的下面与逆行架固定,电缸推进杆位于推进管内,能够从推进管后端伸出,电缸推进杆后端的推进头能够顶住总装架后部架体并向总装架施加向后的推力。Further, the roller recovery vehicle also has a guide rail device that cooperates with the roller pull-out device and the roller gripping device. The guide rail device has two horizontally symmetrical settings that can lift the rail on the bottom surfaces of both sides of the rail head and can move along the rail. Rolling sliding pulley; the roller pulling out device is a retrograde roller pulling out device capable of pulling out the drum laterally under the lifted steel rail, which has a hanging type fixed under the middle of the bottom frame of the drum recovery vehicle The final assembly frame, the retrograde frame arranged on the final assembly frame, the retrograde stopper disposed between the retrograde frame and the final assembly frame, the lateral drive mechanism disposed on the retrograde frame, the longitudinal fine-tuning mechanism disposed on the lateral drive mechanism, and the The lifting mechanism on the vertical fine-tuning mechanism and the horizontal hook member arranged at the lower end of the lifting mechanism; The retrograde stopper includes a two-way rail arranged on the assembly frame for the retrograde frame to run in both directions along the running direction of the train, a one-way propulsion mechanism installed on the assembly frame to push the retrograde frame to run forward and in the same direction, and a unidirectional propulsion mechanism provided on the retrograde frame. A temporary fixer that controls the retrograde frame to go backwards and remains stationary relative to the track bed; the one-way propulsion mechanism includes a propulsion tube and an electric cylinder propulsion rod longitudinally fixed in the middle of the retrograde frame, and the propulsion tube is the lower part of the rear section and the retrograde The frame is fixed, the electric cylinder propulsion rod is located in the propulsion tube and can extend from the rear end of the propulsion tube, and the propulsion head at the rear end of the electric cylinder propulsion rod can withstand the rear frame body of the assembly frame and apply a backward thrust to the assembly frame.
进一步地,所述扣件紧固车的紧固装置包括绝缘块分供机构、绝缘块拣装机构、拧钉机构、弹条归置机构,所述绝缘块分供机构设置在扣件紧固车前部的架体上,其具有振动盘,振动盘具有向外输出绝缘块的振道一和振道二,还具有向两侧钢轨上方分送绝缘块的分供板;所述绝缘块拣装机构设置在绝缘块分供机构后部的架体上,其具有走行在纵向轨道上的横移导轨模组、走行在横移导轨模组的垂向导轨模组和钳口向下安装在垂向导轨模组上的绝缘块夹钳;所述弹条归置机构具有弹条夹手;所述拧钉机构具有拧钉套筒;所述紧固装置还包括走行在纵向轨上的纵移架、设在纵移架上的升降架、升降架上设有横移滑板,所述弹条夹手和拧钉套筒均安装在横移滑板的下面。Further, the fastening device of the fastener fastening vehicle includes an insulating block distribution mechanism, an insulating block picking and assembling mechanism, a screwing mechanism, and an elastic strip placement mechanism, and the insulating block distribution mechanism is arranged in the fastener fastening mechanism. On the frame body at the front of the car, there is a vibrating plate, and the vibrating plate has a vibrating channel 1 and a vibrating channel 2 for outputting insulating blocks to the outside, and also has a sub-supply plate for distributing the insulating blocks to the top of the rails on both sides; the insulating blocks The picking and assembling mechanism is arranged on the frame body at the rear of the insulating block distribution mechanism, which has a traverse guide rail module running on the longitudinal track, a vertical guide rail module running on the traverse guide rail module, and the jaws are installed downward. The insulating block clamp on the vertical guide rail module; the elastic strip placement mechanism has an elastic strip clamp; the screwing mechanism has a screwing sleeve; the fastening device also includes a screw running on the longitudinal rail. The vertical moving frame, the lifting frame arranged on the vertical moving frame, and the horizontal moving sliding plate are arranged on the lifting frame.
本发明的优点是:整个铺轨装备在全作业流程中,除了需要驾驶人员驾驶部分作业车、流程监控人员监护各作业车工况以及人工对落枕钢轨进行初步固定外,其他作业不再需要人工参与,显著提高了整个装备的作业效率,且在自动控制系统控制下完成的操作,其质量标准能够完全得到保障。The advantages of the present invention are: in the whole operation process of the whole track laying equipment, except that the driver needs to drive some operation vehicles, the process monitoring personnel monitor the working conditions of each operation vehicle, and manually fix the stiffened rails, other operations no longer require manual participation. , which significantly improves the operation efficiency of the entire equipment, and the quality standards of the operations completed under the control of the automatic control system can be fully guaranteed.
附图说明Description of drawings
图1为本发明所述一种智能铺轨装备中所有作业车位置关系的立体示意图;Fig. 1 is a three-dimensional schematic diagram of the positional relationship of all working vehicles in a kind of intelligent track laying equipment according to the present invention;
图2为所述钢轨牵引车的立体示意图;Fig. 2 is the three-dimensional schematic diagram of described rail tractor;
图3为所述滚筒回收车的立体示意图;Fig. 3 is the three-dimensional schematic diagram of described roller recovery vehicle;
图4为所述滚筒夹手装置立体结构示意图;Fig. 4 is a three-dimensional schematic diagram of the drum gripping device;
图5为所述滚筒机械手的立体结构示意图;Fig. 5 is the three-dimensional structure schematic diagram of described roller manipulator;
图6为所述钢轨双向锁紧机械手的立体结构示意图;Fig. 6 is the three-dimensional structure schematic diagram of described rail bidirectional locking manipulator;
图7为所述钢轨双向锁紧机械手的局部结构示意图;Fig. 7 is the partial structure schematic diagram of described rail bidirectional locking manipulator;
图8为所述钢轨双向锁紧机械手的夹持架下端向前倾斜时撑住轨头底面和轨底顶面实现锁紧钢轨的平面示意图;8 is a schematic plan view of the bottom surface of the rail head and the top surface of the rail bottom when the lower end of the clamping frame of the rail bidirectional locking manipulator is tilted forward to realize the locking of the rail;
图9为所述钢轨双向锁紧机械手的夹持架下端向前倾斜时撑住轨头底面和轨底顶面实现锁紧钢轨的平面示意图;9 is a schematic plan view of the bottom surface of the rail head and the top surface of the rail bottom when the lower end of the clamping frame of the rail bidirectional locking manipulator is tilted forward to realize the locking of the rail;
图10为所述滚筒回收车的侧视示意图;Figure 10 is a schematic side view of the drum recycling vehicle;
图11为部分逆行性滚筒拖出装置的立体示意图;Figure 11 is a perspective view of a part of the retrograde roller pulling device;
图12为部分逆行性滚筒拖出装置的立体示意图,图中主要示出电缸推进杆与轨式加强杆的结构关系;Figure 12 is a schematic perspective view of a part of the retrograde roller pulling out device, the figure mainly shows the structural relationship between the electric cylinder propulsion rod and the rail-type reinforcement rod;
图13为所述钢轨推送车的立体示意图;Fig. 13 is the three-dimensional schematic diagram of described rail pushing vehicle;
图14为所述钢轨分拣车与钢轨输送车、钢轨推送车的位置关系的立体示意图;14 is a perspective view of the positional relationship between the rail sorting vehicle, the rail conveying vehicle, and the rail pushing vehicle;
图15为钢轨分拣车的钢轨分拣装置的立体示意图;Fig. 15 is a three-dimensional schematic diagram of the rail sorting device of the rail sorting vehicle;
图16为扣件紧固车的立体结构示意图,图中隐去了部分设置;FIG. 16 is a schematic three-dimensional structure diagram of a fastener fastening vehicle, and some settings are hidden in the figure;
图17为所述弹条夹手和拧钉套筒在纵移架内的装配关系示意图;Figure 17 is a schematic diagram of the assembly relationship of the elastic clip gripper and the screwing sleeve in the longitudinal shift frame;
图18为扣件紧固车的局部示意图;Figure 18 is a partial schematic view of a fastener fastening vehicle;
图19为振动盘及相关部件的俯视示意图;Figure 19 is a schematic top view of a vibrating plate and related components;
图20为铁垫板的立体示意图;Figure 20 is a perspective view of an iron backing plate;
图21为绝缘块的立体示意图;Figure 21 is a perspective view of an insulating block;
图22为未紧固前钢轨放置在预装轨枕的贴铁垫板的两个限位凸台之间,此时弹条的前端下颚暂时压在限位凸台上;Fig. 22 shows that the unfastened front rail is placed between the two limit bosses of the iron backing plate of the pre-installed sleeper, and the lower jaw of the front end of the elastic bar is temporarily pressed on the limit boss;
图23为紧固后绝缘块放置到位,弹条的前端下颚已经压在钢轨轨底的顶面上;Figure 23 shows that the insulating block is placed in place after tightening, and the front lower jaw of the elastic strip has been pressed on the top surface of the rail bottom;
图24为截面示意图;Figure 24 is a schematic cross-sectional view;
图25为滚筒的立体示意图。Figure 25 is a schematic perspective view of the drum.
图中:1、扣件紧固车;2、钢轨输送车;3、钢轨分拣车;4、钢轨推送车;5、滚筒回收车;6、钢轨牵引车;7、滚筒;8、滚轮;9、导轨装置;11、滚筒回收区;12、滚筒篮;13、纵向轨;14、横向轨;15、垂向轨;16、纵向驱动座;17、双联驱动座;18、滚筒机械手;19、夹臂;20、夹掌;21、自损块;22、断槽;23、钢轨双向锁紧机械手;231、左牵引钢轨双向锁紧机械手;232、右牵引钢轨双向锁紧机械手;233、左分拣钢轨双向锁紧机械手;234、右分拣钢轨双向锁紧机械手;24、滚筒夹手装置;241、左转放滚筒夹手装置;242、右转放滚筒夹手装置;243、左下放滚筒夹手装置;244、右下放滚筒夹手装置;245、左升井滚筒夹手装置;246、右升井滚筒夹手装置;247、左装篮滚筒夹手装置;248、右装篮滚筒夹手装置;25、安装体;251、倾斜推进器;26、转架;27、夹持架;28、夹板一;29、夹板二;30、挂销一;31、挂销二;32、前脚一;33、后脚一;34、前脚二;35、后脚二;36、滚筒存放区;37、左下放口;38、右下放口;39、左中转台;40、右中转台;41、左升井口;42、右升井口;43、滚筒回收区;44、左传输带;45、右传输带;46、吊运装置;47、逆行性滚筒拖出装置;48、总装架;49、逆行架;50、横向挂钩部件;51、双向轨;52、临时固定器;53、推进管;54、电缸推进杆;541、轨式加强杆;542、滑块;543、连接板;544、支持板;55、推进头;56、导向装置;57、推送装置;58、左伸缩臂;59、右伸缩臂;60、导向框;61、推进框;62、架体;63、振动盘;64、振道一;65、振道二;66、分供板;67、分供槽一;68、分供槽二;69、纵向轨道;70、横移导轨模组;71、垂向导轨模组;72、绝缘块夹钳;73、弹条夹手;74、拧钉套筒;75、纵移架;76、升降架;77、横移滑板;78、异向绝缘块挡板;81、钢轨;82、轨头;83、底面一;84、底面二;85、轨底;86、顶面一;87、顶面二;89、预装轨枕;90、铁垫板;91、限位凸台;92、轨下垫板;93、绝缘块;94、插块;95、压块;96、弹条;97、前端下颚;98、道钉;99、道床。In the picture: 1. Fastening vehicle; 2. Rail conveying vehicle; 3. Rail sorting vehicle; 4. Rail pushing vehicle; 5. Roller recycling vehicle; 6. Rail tractor; 7. Roller; 8. Roller; 9. Guide rail device; 11. Roller recovery area; 12. Roller basket; 13. Longitudinal rail; 14. Transverse rail; 15. Vertical rail; 16. Longitudinal driving seat; 17. Double driving seat; 18. Roller manipulator; 19. Clamping arm; 20. Clamping palm; 21. Self-damaging block; 22. Slotting; 23. Rail two-way locking manipulator; 231, Left traction rail two-way locking manipulator; 232, Right traction rail two-way locking manipulator; 233 , Left sorting rail two-way locking manipulator; 234, Right sorting rail two-way locking manipulator; 24, Drum gripping device; 241, Left turning and releasing roller gripping device; 242, Right turning and releasing roller gripping device; 243, Left lower roller clamping device; 244, right lowering roller clamping device; 245, left lifting well roller clamping device; 246, right lifting well roller clamping device; 247, left basket loading roller clamping device; 248, right basket loading roller Hand clamping device; 25. Mounting body; 251. Inclined propeller; 26. Turn frame; 27. Clamping frame; 28. Plywood one; 29. Plywood two; 30. Hanging pin one; 31. Hanging pin two; 32. Front foot one; 33. Rear foot one; 34. Front foot two; 35. Back foot two; Left lift wellhead; 42, Right lift wellhead; 43, Roller recovery area; 44, Left conveyor belt; 45, Right conveyor belt; 46, Lifting device; 47, Retrograde roller pull-out device; 48, Assembly rack; 49, Retrograde frame; 50, horizontal hook part; 51, two-way rail; 52, temporary fixer; 53, push pipe; 54, electric cylinder push rod; 541, rail-type reinforcement rod; 542, slider; 543, connecting plate; 544 , support plate; 55, push head; 56, guide device; 57, push device; 58, left telescopic arm; 59, right telescopic arm; 60, guide frame; 61, push frame; 62, frame body; 63, vibrating plate ;64, vibrating channel one; 65, vibrating channel two; 66, sub-supply plate; 67, sub-supply slot one; 68, sub-supply slot two; 69, longitudinal rail; 70, traverse rail module; 71, vertical Guide rail module; 72, insulating block clamp; 73, spring clip grip; 74, screwing sleeve; 75, vertical shift frame; 76, lift frame; 77, traverse slide plate; ;81, steel rail; 82, rail head; 83, bottom surface one; 84, bottom surface two; 85, rail bottom; 86, top surface one; 87, top surface two; 89, pre-installed sleeper; 90, iron backing plate; 91 , Limit boss; 92, Under-rail pad; 93, Insulation block; 94, Insert block; 95, Press block; 96, Spring bar; 97, Front jaw;
具体实施方式Detailed ways
下面结合附图对本发明做进一步的描述:The present invention will be further described below in conjunction with the accompanying drawings:
如图20—23所示,本发明应用于高速铁路无砟轨道铺轨,之前做好的工作包括:已经在无砟道床两侧按照设定位安装好轨枕;轨枕的附属安装件,包括调高垫板、铁垫板90、轨距挡板、轨下微调垫板、轨下垫板已完成安装,弹条96和道钉98等已经作了非正式固定的预装。As shown in Figures 20-23, the present invention is applied to high-speed railway ballastless track laying, and the work done before includes: the sleepers have been installed on both sides of the ballastless bed according to the set positions; the auxiliary installation parts of the sleepers, including the height adjustment The backing plate, iron backing plate 90, gauge baffle plate, under-rail fine-tuning backing plate, and under-rail backing plate have been installed, and the spring bars 96 and spikes 98 have been pre-installed informally.
由于轨枕所属附件已完成预装,在下文中将轨枕称为预装轨枕89。Since the accessories to which the sleepers belong have been pre-installed, the sleepers are hereinafter referred to as pre-installed sleepers 89 .
与本发明关联的作业对象包括钢轨81、预装轨枕89、铁垫板90、弹条96和道钉98。The working objects associated with the present invention include steel rails 81 , pre-installed sleepers 89 , iron backing plates 90 , elastic bars 96 and road studs 98 .
钢轨81:位于钢轨上部的轨头82、位于钢轨底部的轨底85、轨头82两侧的下底面分别为底面一83和底面二84;Rail 81: the rail head 82 located at the upper part of the rail, the rail bottom 85 located at the bottom of the rail, and the lower bottom surfaces on both sides of the rail head 82 are the bottom surface one 83 and the bottom surface two 84;
预装轨枕89:铺轨前已安装在道床两侧,所有附件以预装到位,待最后固定;Pre-installed sleeper 89: It has been installed on both sides of the track bed before laying the track, and all accessories are pre-installed in place and will be fixed at the end;
铁垫板90:两端有向上的限位凸台91,铺轨前已安装在预装轨枕89上,在两端的限位凸台91之间放置有轨下垫板92;Iron backing plate 90: There are upward limiting bosses 91 at both ends, which have been installed on the pre-installed sleepers 89 before rail laying, and a rail lower pad 92 is placed between the limiting bosses 91 at both ends;
绝缘块93:由插块94和压块95构成L形,插块94和压块95一体成型;Insulation block 93: an L-shape is formed by the insert block 94 and the pressure block 95, and the insert block 94 and the pressure block 95 are integrally formed;
弹条96:具有前端下颚97。在铺轨前,前端下颚97已暂时压在铁垫板90的限位凸台91上;Spring bar 96: has a front lower jaw 97. Before laying the track, the front lower jaw 97 has been temporarily pressed on the limiting boss 91 of the iron backing plate 90;
道钉98:具有柄头,应用时道钉穿过弹条96,其柄头压在弹条96上。The spike 98: has a handle, the spike passes through the elastic bar 96 when applied, and the handle is pressed on the spring bar 96.
本发明依靠各种作业车实现智能铺轨的过程主要包括:将钢轨81铺放到道床两侧的预装轨枕89上,使钢轨81的轨底85底面压在铁垫板90两端的限位凸台91之间的轨下垫板92上;用弹条96、道钉98等将钢轨81固定。The process of realizing intelligent track laying by means of various operating vehicles in the present invention mainly includes: laying the steel rail 81 on the pre-installed sleepers 89 on both sides of the track bed, so that the bottom surface of the rail bottom 85 of the steel rail 81 is pressed against the limit protrusions at both ends of the iron backing plate 90 The rails 92 between the platforms 91; the rails 81 are fixed with elastic bars 96, road pins 98, etc.
下面对本发明方法进行详细描述:The method of the present invention is described in detail below:
如图1、10、20、21、22、23、24所示,一种智能铺轨方法,是设置由智能控制系统控制的由多种作业车组成的成套铺轨装备,利用装备中的钢轨分拣车3自动从装备中的钢轨输送车2上左右各一抓住两根钢轨81的前端,将两根钢轨81定向推送至装备中的钢轨推送车4,由钢轨推送车4自动将两根钢轨81推向装备中的滚筒回收车5,由滚筒回收车5自动将两根钢轨81递向装备中的钢轨牵引车6,由钢轨牵引车6自动抓住两根钢轨81前端并使钢轨牵引车6前行,同时,设在钢轨牵引车6上的滚筒夹手装置24在道床两侧设定位置随车不断向前放置滚筒7,使后面两根钢轨81不断放落在道床两侧的滚筒7上并不断在滚筒上随车向前拖行,再利用后面的滚筒回收车自动将压在钢轨81下的滚筒7回收到滚筒回收车5上,使钢轨放到预装轨枕89的铁垫板90的两个限位凸台91之间,通过人工对落枕钢轨81实施间隔式初固定,最后由扣件紧固车1自动完成对钢轨81的紧固作业,从而实现智能铺轨。As shown in Figures 1, 10, 20, 21, 22, 23, and 24, an intelligent track laying method is to set up a complete set of track laying equipment composed of various operating vehicles controlled by an intelligent control system, and use the rails in the equipment to sort rails. The car 3 automatically grabs the front ends of the two steel rails 81 from the rail conveying car 2 in the equipment, and pushes the two steel rails 81 to the rail pushing car 4 in the equipment. The rail pushing car 4 automatically pushes the two steel rails. 81 is pushed to the roller recovery vehicle 5 in the equipment, and the roller recovery vehicle 5 automatically delivers the two rails 81 to the rail tractor 6 in the equipment, and the rail tractor 6 automatically grabs the front end of the two rails 81 and makes the rail tractor 6 move forward, and at the same time, the roller gripping device 24 provided on the rail tractor 6 is placed on the two sides of the track bed with the rollers 7 moving forward continuously, so that the two rails 81 behind are continuously placed on the rollers on both sides of the track bed. 7 and continuously drag it forward with the vehicle on the roller, and then use the roller recovery vehicle behind to automatically recover the roller 7 pressed under the rail 81 to the roller recovery vehicle 5, so that the rail is placed on the iron pad of the pre-installed sleeper 89 Between the two limiting bosses 91 of the plate 90, the stiffener rails 81 are manually fixed at intervals, and finally, the fastener fastening vehicle 1 automatically completes the fastening of the rails 81, thereby realizing intelligent track laying.
所述间隔式初固定,是每间隔N个一般2—6个预装轨枕取一个预装轨枕的方式,由人工将钢轨与这一个预装轨枕完成放置绝缘块和紧固扣件的作业,实现对两侧钢轨81的初步固定。The interval-type initial fixation is a method of taking a pre-installed sleeper at an interval of N generally 2-6 pre-installed sleepers, and manually placing the rail and this pre-installed sleeper to complete the operation of placing insulating blocks and fastening fasteners. Preliminary fixing of the rails 81 on both sides is achieved.
上述方法所述的钢轨81的长度,目前一般为500米,钢轨输送车2前方的所有作业车以将道床两侧各一根钢轨放置到位为一个作业流程。钢轨输送车2后方的扣件紧固车1可以认为是一直跟随钢轨输送车2向前实施紧固作业,直到钢轨输送车2上的钢轨铺完。The length of the steel rail 81 described in the above method is generally 500 meters at present, and all the working vehicles in front of the rail conveying vehicle 2 place one steel rail on each side of the ballast bed as a working process. The fastener fastening vehicle 1 behind the rail conveying vehicle 2 can be considered to follow the rail conveying vehicle 2 forward to perform the fastening operation until the rails on the rail conveying vehicle 2 are finished.
这样,整个铺轨装备在全作业流程中,除了需要驾驶人员驾驶部分作业车、流程监控人员需要监护各作业车工况以及人工对落枕钢轨进行初步固定外,其他作业不再需要人工参与,显著提高了整个装备的作业效率,且在自动控制系统控制下完成的操作,其质量标准能够完全得到保障。In this way, in the whole operation process of the entire track laying equipment, except that the driver needs to drive some operation vehicles, the process monitoring personnel need to monitor the working conditions of each operation vehicle, and manually fix the stiffened rails, other operations no longer require manual participation, which significantly improves the performance. The operation efficiency of the whole equipment is improved, and the quality standard of the operation completed under the control of the automatic control system can be completely guaranteed.
如图1、2、3、4、10、11、20、21、22、24、25所示,所述由滚筒回收车5将两根钢轨81递向钢轨牵引车6,是在滚筒回收车5的两侧设置导轨装置9,使两根钢轨81分别经两侧设置的导轨装置9,由钢轨推送车4出力将两根钢轨81推向装备中的钢轨牵引车6。As shown in Figures 1, 2, 3, 4, 10, 11, 20, 21, 22, 24, and 25, the two steel rails 81 are delivered by the roller recovery vehicle 5 to the rail tractor 6, and the roller recovery vehicle Rail devices 9 are provided on both sides of 5, so that the two rails 81 are respectively pushed through the rail devices 9 provided on both sides by the rail pusher 4 to push the two rails 81 to the rail tractor 6 in the equipment.
所述两根钢轨81不断放落在道床两侧的滚筒上并不断在滚筒上随车向前拖行,是滚筒回收车5保持静止,钢轨牵引车6牵引钢轨不断前行,使钢轨81在滚筒回收车5与钢轨牵引车6之间的长度不断加长,利用钢轨81的自重使加长的钢轨的中段变形下沉落放到滚筒的滚轮8上,并利用滚轮8转动使钢轨随钢轨牵引车6的前行而能够在滚轮8拖行。The two steel rails 81 are continuously placed on the rollers on both sides of the ballast bed and continuously dragged forward with the vehicle on the rollers. The length between the roller recovery vehicle 5 and the rail tractor 6 is continuously lengthened, and the middle section of the elongated rail is deformed and dropped onto the roller 8 of the roller by the self-weight of the steel rail 81, and the roller 8 is rotated to make the rail follow the rail tractor. 6 and can drag on the wheel 8.
所述将压在钢轨81下的滚筒7回收到滚筒回收车5上,是在滚筒回收车5上设置受智能控制系统控制的滚筒拖出装置和滚筒夹手装置24,并再次利用滚筒回收车5两侧设置的导轨装置9,通过滚筒回收车5的前行将钢轨81从后向前不断抬起,同时由滚筒拖出装置从抬起的钢轨81下将滚筒7拖出并由滚筒夹手装置24转移到滚筒回收车5上,使后面的钢轨81不断向前落枕。The described recycling of the roller 7 pressed under the steel rail 81 to the roller recovery vehicle 5 is to set the roller pulling device and the roller gripping device 24 controlled by the intelligent control system on the roller recovery vehicle 5, and use the roller recovery vehicle again. 5. The guide rail devices 9 provided on both sides of the rollers 5 continuously lift the steel rails 81 from the back to the front through the forward movement of the roller recovery vehicle 5. At the same time, the roller pull-out device pulls the rollers 7 out from the lifted steel rails 81 and clamps the hands by the rollers. The device 24 is transferred to the drum recovery vehicle 5, so that the rear rail 81 is continuously stiffened forward.
所述再次利用滚筒回收车5两侧设置的导轨装置9,通过滚筒回收车5的前行将钢轨81从后向前不断抬起,是滚筒回收车5处于离后方已经铺好的钢轨L的前端端部一段距离的位置,当钢轨牵引车6拖行钢轨81至钢轨81后端端部与后方已经铺好的钢轨L的前端端部并齐时停止前行,位于滚筒回收车5后的一段钢轨81的后端端部下垂,与已经铺好的钢轨L的前端端部连接固定,然后滚筒回收车5根据回收滚筒的速度不断向前行驶。The rail device 9 provided on both sides of the roller recovery vehicle 5 is used again, and the steel rail 81 is continuously lifted from the back to the front by the forward movement of the roller recovery vehicle 5, and the roller recovery vehicle 5 is located away from the rear. At a distance from the end, when the rail tractor 6 drags the rail 81 to the point where the rear end of the rail 81 is in line with the front end of the rail L that has been laid in the rear, it stops moving, and it is located in a section behind the roller recovery vehicle 5. The rear end of the steel rail 81 hangs down and is connected to the front end of the already laid steel rail L to be fixed, and then the drum recovery vehicle 5 continuously travels forward according to the speed of the recovery drum.
所述由滚筒拖出装置和滚筒夹手装置24从抬起的钢轨81下将滚筒7拖出并转移到滚筒回收车5上,是由滚筒拖出装置在滚筒回收车5不断前行的情形下将滚筒7从两侧抬起的钢轨81下将滚筒7向道床99中间横向拖出并规整的摆放在道床99的中间两侧,再由滚筒夹手装置24将滚筒7从道床99转移到滚筒回收车上设置的滚筒回收区11内的滚筒篮12内。The drum 7 is pulled out from the raised rail 81 by the drum pulling device and the drum gripping device 24 and transferred to the drum recovery vehicle 5, which is the situation that the drum pulling device is continuously moving forward in the drum recovery vehicle 5. Pull the roller 7 out of the rail 81 which is lifted from both sides and pull the roller 7 out to the middle of the track bed 99 and place it on both sides of the middle of the track bed 99, and then transfer the roller 7 from the track bed 99 by the roller gripping device 24. into the drum basket 12 in the drum recovery area 11 provided on the drum recovery vehicle.
所述滚筒拖出装置在滚筒回收车5不断前行的情形下将滚筒7从两侧抬起的钢轨81下将滚筒7向道床99中间横向拖出,是将滚筒拖出装置整体设置为能够在轨道车上逆向走行的逆行性滚筒拖出装置47,并在逆行性滚筒拖出装置47上设置能够与滑行在导轨装置9上的钢轨81临时固定的临时固定器52,作业时,由临时固定器52将逆行性滚筒拖出装置47与钢轨81实施临时固定,使逆行性滚筒拖出装置47在前行的滚筒回收车5上逆行,同时又与道床保持一段时间的相对静止,利用这一段时间将滚筒从抬起的钢轨81下拖出。The drum pulling out device pulls the drum 7 laterally out to the middle of the track bed 99 under the steel rails 81 lifted from both sides under the condition that the drum recovery vehicle 5 keeps moving forward. The retrograde roller pull-out device 47 running in the reverse direction on the rail car is provided with a temporary fixer 52 that can be temporarily fixed with the rail 81 sliding on the guide rail device 9 on the retrograde roller pull-out device 47. The fixer 52 temporarily fixes the retrograde roller pull-out device 47 and the rail 81, so that the retrograde roller pull-out device 47 runs in the reverse direction on the forward roller recovery vehicle 5, and at the same time remains relatively stationary with the ballast bed for a period of time. The drum is pulled out from under the raised rail 81 for a while.
如上所述方法,是在滚筒回收车5上的滚筒夹手装置分设为升井滚筒夹手装置和装篮滚筒夹手装置,同时,还在滚筒回收车5底架上的升井口与滚筒回收区11之间设置滚筒传输装置,由升井滚筒夹手装置将放置在道床99上的滚筒7通过设置在滚筒回收车5底架上的升井口将滚筒7从道床转移到传输装置,由传输装置将滚筒7传输到滚筒回收区11,再由装篮滚筒夹手装置将传输装置上的滚筒7转放到滚筒回收区11中的滚筒篮12内。In the method as described above, the roller gripping device on the roller recovery vehicle 5 is divided into a well-lifting roller gripping device and a basket-loading roller gripping device, and at the same time, the well-lifting and roller recovery area 11 on the bottom frame of the roller recovery vehicle 5 is also A roller transfer device is set between them, and the roller 7 placed on the track bed 99 is transferred from the track bed to the transfer device by the well-lifting roller gripper device through the well-lift head set on the bottom frame of the roller recovery vehicle 5, and the roller is transferred by the transfer device. 7 is transferred to the drum recovery area 11, and then the drum 7 on the transfer device is transferred to the drum basket 12 in the drum recovery area 11 by the basket loading drum gripping device.
如图1、6、7、8、9、20、21、22、23、所示,如上所述方法,是在钢轨分拣车3和钢轨牵引车6上设置一种受智能控制系统控制的用于抓取钢轨81的能够自动双向锁紧的钢轨双向锁紧机械手23,在钢轨双向锁紧机械手23上设置夹握部件和能够使钢轨双向锁紧机械手倾斜的倾斜机构,作业时,由夹握部件夹在钢轨81两侧的轨头82与轨底85之间,然后通过倾斜机构转动钢轨双向锁紧机械手23使钢轨双向锁紧机械手23向前或向后倾斜,迫使夹握部件向上分别抵紧轨头82两侧的底面,向下分别抵紧两侧轨底85的顶面,能够使钢轨双向锁紧机械手23前倾或后倾实现对钢轨81的双向锁紧。As shown in Figures 1, 6, 7, 8, 9, 20, 21, 22, and 23, the method described above is to set up a kind of control system controlled by the intelligent control system on the rail sorting vehicle 3 and the rail tractor 6 The rail bidirectional locking manipulator 23 capable of automatic bidirectional locking for grabbing the rail 81 is provided with a gripping part and a tilting mechanism capable of tilting the rail bidirectional locking manipulator 23. The gripping member is clamped between the rail head 82 and the rail bottom 85 on both sides of the rail 81, and then the rail bidirectional locking manipulator 23 is rotated by the tilting mechanism to tilt the rail bidirectional locking manipulator 23 forward or backward, forcing the gripping member upwards respectively. Pressing the bottom surfaces of both sides of the rail head 82 and the top surfaces of the rail bottoms 85 on both sides downward can make the rail bidirectional locking manipulator 23 tilt forward or backward to realize bidirectional locking of the rail 81 .
所述通过人工对落枕钢轨81实施间隔式初固定是平均每隔N个预装轨枕89取一个,在钢轨81轨底85两侧与所取的预装轨枕89上的铁垫板90的限位凸台91之间插装绝缘块93,将弹条96归置到位,再将道钉98拧紧,完成对铺设钢轨的初步固定。The interval-type initial fixation of the sleeper rails 81 by hand is to take one every N pre-installed sleepers 89 on average, and the iron pads 90 on both sides of the rail bottom 85 of the rail 81 and the pre-installed sleepers 89 are limited. An insulating block 93 is inserted between the position bosses 91, the elastic bars 96 are placed in place, and the road studs 98 are tightened to complete the preliminary fixing of the laying rails.
所述由扣件紧固车1自动完成对钢轨81的紧固作业,是在扣件紧固车1上设置绝缘块夹装机构、拧钉机构、弹条归置机构,作业时,先由绝缘块夹装机构夹取绝缘块93,将绝缘块93插装在钢轨81两侧的轨底85与铁垫板90的限位凸台91之间并使绝缘块93的压块95压住钢轨轨底85,再由拧钉机构将道钉98拧松,使先前前端下颚97预压在限位凸台91上的弹条96松动,由弹条归置机构夹住弹条96两侧,将弹条96前移,使弹条96的前端下颚97压住绝缘块93,最后再用拧钉机构将道钉98拧紧,使弹条96紧压绝缘块93,并通过绝缘块93压紧钢轨。The fastening operation of the steel rail 81 is automatically completed by the fastener fastening vehicle 1, and an insulating block clamping mechanism, a screwing mechanism, and an elastic strip placement mechanism are provided on the fastener fastening vehicle 1. The insulating block clamping mechanism clamps the insulating block 93, inserts the insulating block 93 between the rail bottom 85 on both sides of the rail 81 and the limit boss 91 of the iron backing plate 90, and presses the pressing block 95 of the insulating block 93 The rail bottom 85, and then the screw 98 is loosened by the screwing mechanism, so that the elastic strip 96 pre-pressed on the limit boss 91 by the front lower jaw 97 is loosened, and the elastic strip placement mechanism clamps both sides of the elastic strip 96 , move the spring bar 96 forward, so that the front jaw 97 of the spring bar 96 presses the insulating block 93, and finally tighten the spike 98 with the screwing mechanism, so that the spring bar 96 presses the insulating block 93 tightly, and presses the insulating block 93 Tighten the rails.
下面对本发明装备进行详细描述:The equipment of the present invention is described in detail below:
为简化描述和便于理解,首先对下文出现较多的具有共同特征的装置或部件的结构和作用进行描述:In order to simplify the description and facilitate understanding, the structure and function of the following devices or components with more common features will be described first:
滚筒夹手装置24:如图4、5所示,其具有纵向轨13、走行在纵向轨13上的横向轨14、走行在横向轨14上的垂向轨15;其走行方式均采用齿轮与齿条配合的走行方式,所述齿条包括纵向齿条、横向齿条和垂向齿条,分别设置在纵向轨13、横向轨14和垂向轨15上;Roller gripping device 24: As shown in Figures 4 and 5, it has longitudinal rails 13, transverse rails 14 running on the longitudinal rails 13, and vertical rails 15 running on the transverse rails 14; The running mode of the rack matching, the rack includes a longitudinal rack, a transverse rack and a vertical rack, which are respectively arranged on the longitudinal rail 13, the transverse rail 14 and the vertical rail 15;
还具有固定在横向轨14一侧的纵向驱动座16,纵向驱动座16设有由电机驱动的纵向驱动齿轮,纵向驱动齿轮的轮齿与纵向齿条的条齿相啮合,纵向驱动齿轮转动能够驱动横向轨14纵向移动;There is also a longitudinal driving seat 16 fixed on one side of the transverse rail 14, the longitudinal driving seat 16 is provided with a longitudinal driving gear driven by a motor, the teeth of the longitudinal driving gear mesh with the rack teeth of the longitudinal rack, and the longitudinal driving gear can rotate. Drive the transverse rail 14 to move longitudinally;
还具有走行在横向轨14的纵向双联驱动座17,垂向轨15走行在纵向双联驱动座17上;There is also a longitudinal double drive seat 17 running on the transverse rail 14, and the vertical rail 15 runs on the longitudinal double drive seat 17;
纵向双联驱动座17设置有由电机驱动的横向驱动齿轮,横向驱动齿轮的轮齿与横向齿条的条齿啮合,横向驱动齿轮转动驱动纵向双联驱动座17和垂向轨15横向移动;The longitudinal double drive base 17 is provided with a transverse drive gear driven by a motor, the teeth of the transverse drive gear mesh with the rack teeth of the transverse rack, and the transverse drive gear rotates to drive the longitudinal double drive base 17 and the vertical rail 15 to move laterally;
纵向双联驱动座17设置有由电机驱动的垂向驱动齿轮,垂向驱动齿轮的轮齿与垂向齿条的条齿啮合,垂向驱动齿轮转动驱动垂向轨15垂向移动;The vertical double drive base 17 is provided with a vertical drive gear driven by a motor, the teeth of the vertical drive gear mesh with the rack teeth of the vertical rack, and the vertical drive gear rotates to drive the vertical rail 15 to move vertically;
滚筒夹手装置24具有安装在垂向轨15下端的滚筒机械手18。The roller gripper device 24 has a roller manipulator 18 mounted on the lower end of the vertical rail 15 .
滚筒机械手18:如图5所示,其具有左、右对称设置的两个夹臂19及两个夹臂19下方各自所属的夹掌20。两个夹臂19上方是具有推进缸使两个夹臂19开合的执行机构,两个夹掌20用于随两个夹臂19开合来夹取或放开滚筒7。在本发明中,滚筒机械手18作了碰撞或过载时防损毁重要部件的安全设计,即:将在上的夹臂19与在下的夹掌20断开,在夹臂19与夹掌20之间设置自损块21,由自损块21将夹臂19和夹掌20固定连接;在所述自损块21上开设有易于断脱的断槽22。Roller manipulator 18 : as shown in FIG. 5 , it has two gripping arms 19 symmetrically arranged on the left and right, and gripping palms 20 under the two gripping arms 19 , respectively. Above the two gripping arms 19 is an actuator with a push cylinder to open and close the two gripping arms 19 , and the two gripping arms 20 are used to grip or release the drum 7 with the opening and closing of the two gripping arms 19 . In the present invention, the roller manipulator 18 has a safety design to prevent damage to important parts when it is collided or overloaded, that is, the upper clamping arm 19 is disconnected from the lower clamping palm 20, and the clamping arm 19 and the clamping palm 20 are between the clamping arm 19 and the clamping palm 20. A self-damaging block 21 is provided, and the clamping arm 19 and the clamping palm 20 are fixedly connected by the self-damaging block 21 ; a breaking groove 22 that is easy to break off is provided on the self-damaging block 21 .
滚筒机械手18设置在钢轨牵引车6的滚筒夹手装置24中和滚筒回收车5的滚筒夹手装置24中,用于抓住滚筒的滚轮8。The drum manipulator 18 is arranged in the drum gripping device 24 of the rail tractor 6 and in the drum gripping device 24 of the drum recovery vehicle 5 for grasping the rollers 8 of the drum.
钢轨双向锁紧机械手:如图6、7、8、9所示,所述钢轨双向锁紧机械手23包括固定在分拣装置或钢轨牵引装置上的安装体25、通过转轴安装在安装体25上的转架26、一端作用在转架26上推进转架26转动的倾斜推进器251、安装在转架26上的夹持组件;所述夹持组件包括安装在转架26内的夹持架27,夹持架27具有夹板一28和夹板二29;所述夹板一28和夹板二29上分别具有挂销孔一和挂销孔二,挂销孔一和挂销孔二内分别具有挂销一30和挂销二31,抓握钢轨81时,夹板一28和夹板二29下端能够分别插在轨头82两侧的底面一83和底面二84的下面;所述夹持架27的夹板一28和夹板二29的底端分别分化为前脚一32、后脚一33和前脚二34、后脚二35;当挂销一30和挂销二31分别挂住轨头的底面一83和底面二84时,前脚一32和后脚一33均与钢轨轨底85的顶面一86有间隙,前脚二34和后脚二35均与钢轨轨底85的顶面二87有间隙;Rail bidirectional locking manipulator: As shown in Figures 6, 7, 8, and 9, the rail bidirectional locking manipulator 23 includes a mounting body 25 fixed on the sorting device or the rail traction device, and is mounted on the mounting body 25 through a rotating shaft The turret 26, one end acting on the turret 26 to push the turret 26 to rotate, the tilting pusher 251, the clamping assembly installed on the turret 26; the clamping assembly includes the clamping frame installed in the turret 26 27. The clamping frame 27 has a first plywood 28 and a second plywood 29; the first plywood 28 and the second plywood 29 respectively have a hanging pin hole 1 and a hanging pin hole two, and the first hanging pin hole and the second hanging pin hole are respectively provided with a hanging pin hole. The first pin 30 and the second hanging pin 31, when grasping the rail 81, the lower ends of the first splint 28 and the second splint 29 can be inserted under the bottom surface one 83 and the bottom surface two 84 on both sides of the rail head 82 respectively; The bottom ends of splint one 28 and splint two 29 are respectively differentiated into front foot one 32, rear foot one 33, front foot two 34, rear foot two 35; At two 84 hours, the front foot one 32 and the rear foot one 33 have a gap with the top surface one 86 of the rail bottom 85, and both the front foot two 34 and the rear foot two 35 have a gap with the top surface two 87 of the rail bottom 85;
当夹持架27下端随转架26向前倾斜时,挂销一30和后脚一33分别撑住底面一83和顶面一86,挂销二31和后脚二35分别撑住底面二84和顶面二87,夹持组件将钢轨81锁紧;When the lower end of the clamping frame 27 is inclined forward with the turn frame 26, the hanging pin one 30 and the rear foot one 33 support the bottom surface one 83 and the top surface one 86 respectively, and the hanging pin two 31 and the rear foot two 35 support the bottom surface two 84 and 86 respectively. The top surface two 87, the clamping assembly locks the rail 81;
当夹持架27下端随转架26向后倾斜时,挂销一30和前脚一32分别撑住底面一83和顶面一86,挂销二31和前脚二34分别撑住底面二84和顶面二87,夹持组件同样将钢轨81锁紧;When the lower end of the clamping frame 27 is inclined backward with the turret 26, the hanging pin 1 30 and the front foot 32 support the bottom surface 1 83 and the top surface 1 86 respectively, and the hanging pin 2 31 and the front foot 2 34 respectively support the bottom surface 84 and 86. On the top surface two 87, the clamping assembly also locks the rail 81;
当夹持架27随转架26回复到垂向位置时,夹持组件对钢轨81的锁紧解除。When the clamping frame 27 returns to the vertical position along with the turn frame 26, the locking of the clamping assembly to the rail 81 is released.
钢轨双向锁紧机械手23另一个重要特征是,转架26倾斜锁紧钢轨后,只要钢轨81不是绝对的水平姿态,即钢轨81与水平面形成夹角,当钢轨双向锁紧机械手23沿水平方向对钢轨施加水平方向的力时,就会产生一个垂直于钢轨的分力,使钢轨双向锁紧机械手23将钢轨锁得更紧,这非常有利于对钢轨81进行水平推拉。Another important feature of the rail bidirectional locking manipulator 23 is that after the turret 26 tilts and locks the rail, as long as the rail 81 is not in an absolute horizontal posture, that is, the rail 81 forms an included angle with the horizontal plane, when the rail bidirectional locking manipulator 23 is aligned in the horizontal direction. When a horizontal force is applied to the rail, a component force perpendicular to the rail will be generated, so that the rail two-way locking manipulator 23 can lock the rail more tightly, which is very beneficial for horizontally pushing and pulling the rail 81 .
推进缸:本发明在许多机构中使用了推进缸,尤其是在钢轨双向锁紧机械手中,这些推进缸可以是油缸、气缸,也可能是电缸。Propulsion cylinder: The present invention uses propulsion cylinders in many mechanisms, especially in the rail bidirectional locking manipulator. These propulsion cylinders can be oil cylinders, air cylinders, or electric cylinders.
如图1、22、23、24所示,一种智能铺轨装备,包括钢轨输送车2,依次位于钢轨输送车2前面的具有钢轨分拣装置的钢轨分拣车3、具有钢轨推送装置的钢轨推送车4、具有钢轨牵引装置的钢轨牵引车6,在钢轨牵引车6上依然设置滚筒夹手装置24,在钢轨推送车4与钢轨牵引车6之间增设专用滚筒回收车5,其具有滚筒夹手装置24和滚筒拖出装置;在钢轨输送车2后面设有扣件紧固车1,扣件紧固车1具有安装扣件固定钢轨81的紧固装置。As shown in Figures 1, 22, 23, and 24, an intelligent track laying equipment includes a rail conveying vehicle 2, a rail sorting vehicle 3 with a rail sorting device located in front of the rail conveying vehicle 2, and a rail having a rail pushing device. Pushing vehicle 4, a rail tractor 6 with a rail traction device, the roller gripping device 24 is still provided on the rail tractor 6, and a special roller recovery vehicle 5 is added between the rail pushing vehicle 4 and the rail tractor 6, which has a roller The gripping device 24 and the roller pulling-out device; behind the rail conveying vehicle 2, a fastener tightening vehicle 1 is provided, and the fastener tightening vehicle 1 has a fastener for installing a fastener to fix the rail 81.
下面阐述各作业车结构:The structure of each work vehicle is described below:
一、钢轨牵引车6。如图1、2、4、6、22、23所示,作业时通过履带轮和橡胶轮走行在道床99上。1. Rail tractor 6. As shown in Figures 1, 2, 4, 6, 22, and 23, the track bed 99 is run on the track bed 99 by the crawler wheel and the rubber wheel during operation.
钢轨牵引车6的牵引装置设在钢轨牵引车6的后端,其具有左右设置的左牵引钢轨双向锁紧机械手231和右牵引钢轨双向锁紧机械手232,分别用于抓紧后面滚筒回收车5传递的左右两根钢轨81的前端,并使左右两根钢轨81随钢轨牵引车6的前行而向前拖行。两个钢轨双向锁紧机械手23之间的间距与铁路两根钢轨的轨距一致。The traction device of the rail tractor 6 is located at the rear end of the rail tractor 6, and it has a left and right traction rail bidirectional locking manipulator 231 and a right traction rail bidirectional locking manipulator 232, which are respectively used to grasp the rear roller recovery vehicle 5 for transmission. the front ends of the left and right steel rails 81 , and make the left and right steel rails 81 drag forward with the forward movement of the rail tractor 6 . The distance between the two steel rail bidirectional locking manipulators 23 is consistent with the gauge of the two steel rails of the railway.
钢轨牵引车6包括设在底架中部的滚筒存放区36、设在滚筒存放区36前方的左下放口37和右下放口38,分别设在左下放口37和右下放口38区域的左中转台39和右中转台40。The rail tractor 6 includes a drum storage area 36 arranged in the middle of the underframe, a left lower release port 37 and a right lower release port 38 arranged in front of the drum storage area 36, and are respectively arranged in the left transfer area of the left lower release port 37 and the right lower release port 38 area. Stage 39 and right turntable 40.
钢轨牵引车6的滚筒夹手装置24分两个组,其中一个组包括位于滚筒存放区36的左转放滚筒夹手装置241、右转放滚筒夹手装置242,分别用于将滚筒存放区36的滚筒7转放到左中转台39和右中转台40上;另一个组包括分别位于左下放口37和右下放口38区域的左下放滚筒夹手装置243、右下放滚筒夹手装置244,分别用于将左中转台39和右中转台40的滚筒7经左下放口37和右下放口38下放到道床两侧。The roller gripping device 24 of the rail tractor 6 is divided into two groups, one of which includes a left turning roller gripping device 241 and a right turning roller gripping device 242 located in the roller storage area 36, which are respectively used for the roller storage area. The drum 7 of 36 is transferred to the left transfer table 39 and the right transfer table 40; the other group includes the left lower drum clamping device 243 and the right lower drum clamping device 244 located in the areas of the left lower opening 37 and the right lower opening 38 respectively. , which are respectively used to lower the rollers 7 of the left transfer table 39 and the right transfer table 40 to the two sides of the track bed through the left lower discharge port 37 and the right lower discharge port 38 respectively.
二、滚筒回收车5。如图1、3、4、5、10、11、12、22、23所示,作业时通过履带轮和橡胶轮走行在道床99上。2. Roller recycling vehicle 5. As shown in Figures 1, 3, 4, 5, 10, 11, 12, 22, and 23, the track bed 99 is run on the track bed 99 by the crawler wheel and the rubber wheel during operation.
在滚筒回收车5底架两侧下方设置有配合滚筒拖出装置和滚筒夹手装置24作业的导轨装置9;在滚筒回收车5底架中后部位置设有左升井口41和右升井口42,在左升井口41和右升井口42前方的底架上设有滚筒回收区11,滚筒回收区11放置有滚筒篮12,在左升井口41和右升井口42与滚筒回收区11之间分别设有左传输带44和右传输带45,在滚筒回收区11上方设有向前方钢轨牵引车6转运滚筒篮12的吊运装置46。所述滚筒拖出装置为设在滚筒回收车5底架下面的逆行性滚筒拖出装置47,滚筒夹手装置24分为设置在左升井口41和右升井口42区域的左升井滚筒夹手装置245和右升井滚筒夹手装置246,以及设置在滚筒回收区11的左装篮滚筒夹手装置247和右装篮滚筒夹手装置248。A guide rail device 9 is arranged under both sides of the bottom frame of the drum recovery vehicle 5 to cooperate with the operation of the drum pulling out device and the drum gripping device 24; in the middle and rear position of the bottom frame of the drum recovery vehicle 5, a left lift wellhead 41 and a right lift wellhead are arranged 42. There is a drum recovery area 11 on the chassis in front of the left lift wellhead 41 and the right lift wellhead 42. The drum recovery area 11 is placed with a drum basket 12. A left conveyor belt 44 and a right conveyor belt 45 are respectively arranged between them, and a hoisting device 46 for transferring the drum basket 12 to the front rail tractor 6 is provided above the drum recovery area 11 . The roller pulling-out device is a retrograde roller pulling-out device 47 located under the bottom frame of the drum recovery vehicle 5, and the roller gripping device 24 is divided into a left-lifting well roller gripping hand arranged in the area of the left-lifting wellhead 41 and the right-lifting wellhead 42. The device 245 and the right lifting shaft drum gripping device 246 , and the left basket loading drum gripping device 247 and the right basket loading drum gripping device 248 disposed in the drum recovery area 11 .
所述导轨装置9具有两个水平对称设置能够在钢轨轨头82两侧底面抬起钢轨并能够沿钢轨滚动式滑行的抬滑轮。所述逆行性滚筒拖出装置47设置在回收车底架的下方,其具有悬挂式固定在滚筒回收车底架中部下方的总装架48、设在总装架48上的逆行架49、设置在逆行架49与总装架48之间的逆行定驻器、设置在逆行架49上的横向驱动机构、设在横向驱动机构上的纵向微调机构、设在纵向微调机构上的升降机构以及设在升降机构下端的横向挂钩部件50。横向挂钩部件50能够作前后向、左右向及垂向移动。所述逆行定驻器包括设在总装架48上供逆行架49沿列车运行方向顺逆双向走行的双向轨51、安装在总装架48上推动逆行架49向前顺向走行的单向推进机构和设在逆行架49上控制逆行架49向车后逆行而相对于道床99保持静止的临时固定器52。临时固定器52具有临时夹固部件,作业时,滚筒回收车5在不断向前行驶,临时夹固部件将滚筒回收车5底架下的钢轨81夹住,迫使逆行架49与道床99保持相对静止而在双向轨51上相对于滚筒回收车5作逆向滑行。所述单向推进机构包括纵向固定在逆行架49中间的推进管53和电缸推进杆54,推进管53是后段的下面与逆行架49固定,电缸推进杆54位于推进管53内,能够从推进管53后端伸出,电缸推进杆54后端的推进头55能够顶住总装架48后部架体并向总装架48施加向后的推力,从而使逆行架49获得向前的反作用力,使整个逆行性滚筒拖出装置47在完成一次横向拖出滚筒7动作后能够快速向前滑行,执行下一次横向拖出滚筒7的任务。The guide rail device 9 has two horizontally symmetrical lifting pulleys that can lift the rail on the bottom surfaces of both sides of the rail head 82 and can slide along the rail in a rolling manner. The retrograde roller pulling-out device 47 is arranged below the bottom frame of the recovery vehicle, and has a general assembly frame 48 suspended and fixed under the middle of the bottom frame of the roller recovery vehicle, a retrograde frame 49 provided on the final assembly frame 48, The retrograde stopper between the frame 49 and the assembly frame 48, the lateral drive mechanism provided on the retrograde frame 49, the longitudinal fine-tuning mechanism provided on the lateral drive mechanism, the lifting mechanism provided on the longitudinal fine-tuning mechanism, and the lifting mechanism provided on the Lateral hook member 50 at the lower end. The lateral hook member 50 can move forward and backward, left and right, and vertically. The retrograde stopper includes a two-way rail 51 installed on the general assembly frame 48 for the retrograde frame 49 to run in both directions along the running direction of the train, and a one-way propulsion mechanism installed on the general assembly frame 48 to push the retrograde frame 49 forward and forward. And the temporary fixer 52 provided on the retrograde frame 49 to control the retrograde frame 49 to run backwards to the rear of the vehicle and to remain stationary relative to the track bed 99 . The temporary fixing device 52 has a temporary clamping part. During the operation, the roller recovery vehicle 5 is constantly traveling forward. It is stationary and slides in the opposite direction relative to the roller recovery vehicle 5 on the two-way rail 51 . The one-way propulsion mechanism includes a propulsion tube 53 and an electric cylinder propulsion rod 54 fixed longitudinally in the middle of the retrograde frame 49. The propulsion tube 53 is fixed to the retrograde frame 49 at the bottom of the rear section, and the electric cylinder propulsion rod 54 is located in the propulsion tube 53. It can protrude from the rear end of the propulsion tube 53, and the propulsion head 55 at the rear end of the electric cylinder propulsion rod 54 can bear against the rear frame body of the assembly frame 48 and apply a backward thrust to the assembly frame 48, so that the retrograde frame 49 can obtain a forward movement. The reaction force enables the entire retrograde roller pulling-out device 47 to slide forward quickly after completing one lateral pulling-out action of the drum 7 to perform the task of pulling out the drum 7 laterally next time.
所述电缸推进杆54还具有推进延伸时随电缸推进杆54延伸的为电缸推进杆54伸出段分担重力的轨式加强杆541,轨式加强杆541的下方设有至少两个供轨式加强杆541滑行的滑块542,滑块542固定设置在推进管53上方的与逆行架49固定连接的水平设置的支持板544上;轨式加强杆541的后端端部通过连接板543与电缸推进杆54后部的推进头55连接;受两个以上供轨式加强杆541滑行的滑块542的限制,轨式加强杆541保持水平姿态。The electric cylinder propulsion rod 54 also has a rail-type reinforcing rod 541 extending along with the electric-cylinder propulsion rod 54 to share the gravity for the extended section of the electric-cylinder propulsion rod 54 when the electric cylinder propulsion rod 54 is extended. The slider 542 for sliding the rail-type reinforcement rod 541 is fixed on the horizontally arranged support plate 544 fixedly connected with the retrograde frame 49 above the propelling tube 53; the rear end of the rail-type reinforcement rod 541 is connected by The plate 543 is connected with the propelling head 55 at the rear of the electric cylinder propelling rod 54; restricted by the sliding blocks 542 of two or more rail-type reinforcement rods 541, the rail-type reinforcement rods 541 maintain a horizontal posture.
上述前、后方向以滚筒回收车5向前行驶方向为前向。The above-mentioned front and rear directions take the forward travel direction of the drum recovery vehicle 5 as the forward direction.
逆行性滚筒拖出装置47利用横向挂钩部件50将滚筒7从两侧钢轨81下的滚筒横向拖到道床99的中间并规整摆放在道床99中间两侧,分别由左升井滚筒夹手装置245和右升井滚筒夹手装置246将两侧滚筒7经左升井口41和右升井口42转放到左传输带44和右传输带45上,分别由左传输带44和右传输带45将滚筒7传输到滚筒回收区11,再分别由左装篮滚筒夹手装置247和右装篮滚筒夹手装置248将滚筒7转放到滚筒回收区11的滚筒篮12内。The retrograde roller pulling-out device 47 uses the lateral hook member 50 to drag the roller 7 laterally from the rollers under the rails 81 on both sides to the middle of the track bed 99 and arrange them on both sides of the middle of the track bed 99. and the right lifting well drum gripping device 246 to transfer the rollers 7 on both sides to the left conveyor belt 44 and the right conveyor belt 45 through the left lifting wellhead 41 and the right lifting wellhead 42, respectively. 7 is transferred to the drum recovery area 11, and then the drum 7 is transferred to the drum basket 12 of the drum recovery area 11 by the left basket loading drum gripping device 247 and the right basket loading drum gripping device 248 respectively.
放置滚筒7的滚筒篮12由吊运装置转运到前方的钢轨牵引车6上。The drum basket 12 on which the drum 7 is placed is transferred by the hoisting device to the front rail tractor 6 .
三、钢轨推送车4。如图1、13、14、23、24所示,由轮对轮走行在经过人工初步固定的两侧钢轨81上。3. Rail push car 4. As shown in Figures 1 , 13 , 14 , 23 and 24 , wheel-to-wheel runs on the rails 81 on both sides that have been preliminarily fixed manually.
钢轨推送车4为一种较常规的作业车,在本发明中只做了适应性改进,其作用是利用两侧设置的导向装置56,具有推送轮的推送装置57将两侧的钢轨向前推送给滚筒回收车5。The rail pusher 4 is a relatively conventional work vehicle, and only adaptive improvement is made in the present invention. Its function is to use the guide devices 56 provided on both sides, and the pusher 57 with push wheels to push the rails on both sides forward. Push it to the roller recycling cart 5.
四、钢轨分拣车3。如图14、15、23、24所示,由轮对轮走行在经过人工初步固定的两侧钢轨81上。4. Rail sorting vehicle 3. As shown in Figures 14, 15, 23, and 24, the wheel-to-wheel runs on the rails 81 on both sides that have been preliminarily fixed manually.
钢轨分拣装置设置在钢轨分拣车3底架上,其后端两侧分别设置具有升降机构的左伸缩臂58和右伸缩臂59,以及分别设在左伸缩臂58和右伸缩臂59后端的左分拣钢轨双向锁紧机械手233和右分拣钢轨双向锁紧机械手234。钢轨分拣装置还包括设置在左伸缩臂58和右伸缩臂59前段下方的若干导向框60和推进框61,推进框61具有推进轮,导向框60前面具有导向板和导向滑轮。The rail sorting device is arranged on the bottom frame of the rail sorting vehicle 3, and the left telescopic arm 58 and the right telescopic arm 59 with the lifting mechanism are respectively arranged on both sides of the rear end, and are respectively arranged behind the left telescopic arm 58 and the right telescopic arm 59 The left sorting rail two-way locking manipulator 233 and the right sorting rail two-way locking manipulator 234 at the end. The rail sorting device also includes several guide frames 60 and push frames 61 arranged under the front sections of the left telescopic arm 58 and the right telescopic arm 59.
作业时,左分拣钢轨双向锁紧机械手233和右分拣钢轨双向锁紧机械手234分别从后面的钢轨输送车2上左右各抓取一根钢轨81的前端,利用左伸缩臂58和右伸缩臂59的收缩,分别将左侧的钢轨81和右侧的钢轨81插入两侧的导向框60和推进框61中,由推进框61中的推进轮将钢轨81向前方的钢轨推送车4推送。During operation, the left sorting rail two-way locking manipulator 233 and the right sorting rail two-way locking manipulator 234 respectively grab the front end of one rail 81 from the left and right of the rear rail conveying vehicle 2, and use the left telescopic arm 58 and the right telescopic arm. When the arm 59 is retracted, the left rail 81 and the right rail 81 are respectively inserted into the guide frame 60 and the push frame 61 on both sides, and the push wheel in the push frame 61 pushes the rail 81 to the front rail pusher 4 .
五、钢轨输送车2。如图1、14、23、24所示,利用轮对轮走行在经人工初步固定的两侧钢轨81上。5. Rail transport vehicle 2. As shown in Figures 1, 14, 23, and 24, the wheel-to-wheel is used to run on the steel rails 81 on both sides that have been preliminarily fixed manually.
钢轨输送车2上装有多根钢轨81,多根钢轨81在钢轨输送车2上分层摆放,每一层摆放的钢轨81之间有间隔,便于钢轨双向锁紧机械手23抓取。The rail conveying vehicle 2 is equipped with a plurality of rails 81 , which are arranged in layers on the rail conveying vehicle 2 , and there are intervals between the rails 81 placed on each layer, which is convenient for the bidirectional locking manipulator 23 to grasp the rails.
六、扣件紧固车1。如图16、17、18、19、20、21、22、23、24所示,利用轮对轮走行在经人工初步固定的两侧钢轨81上。6. Fastener fastening car 1. As shown in Figures 16, 17, 18, 19, 20, 21, 22, 23, and 24, the wheel-to-wheel is used to run on the rails 81 on both sides that are preliminarily fixed manually.
扣件紧固车1的紧固装置包括设置在扣件紧固车1两侧的绝缘块分供机构、绝缘块拣装机构、拧钉机构、弹条归置机构,绝缘块分供机构设置在扣件紧固车1前部的架体62上,其具有振动盘63,振动盘63具有向外输出绝缘块93的振道一64和振道二65,还具有向两侧钢轨81上方分送绝缘块93的分供板66,分供板66上设置两条平行的分供槽一67和分供槽二68;绝缘块拣装机构设置在绝缘块分供机构后部的架体62上,其具有走行在纵向轨道69上的横移导轨模组70、走行在横移导轨模组70的垂向导轨模组71和钳口向下安装在垂向导轨模组71上的绝缘块夹钳72;弹条归置机构具有弹条夹手73;拧钉机构具有拧钉套筒74;紧固装置还包括走行在纵向轨13上的纵移架75、设在纵移架75上的升降架76、升降架76上设有横移滑板77,所述弹条夹手73和拧钉套筒74均安装在横移滑板77的下面。The fastening device of the fastener fastening vehicle 1 includes an insulating block distribution mechanism, an insulating block picking and assembling mechanism, a screwing mechanism, an elastic strip placement mechanism, and an insulating block distribution mechanism arranged on both sides of the fastener fastening vehicle 1 . On the frame body 62 at the front of the fastener fastening vehicle 1, there is a vibrating plate 63. The vibrating plate 63 has a vibrating channel 64 and a vibrating channel 2 65 that output the insulating block 93 to the outside. The distribution board 66 for distributing the insulating block 93, the distribution board 66 is provided with two parallel distribution grooves 1 67 and 2 68; the insulating block sorting mechanism is arranged on the frame body at the rear of the insulating block distribution mechanism 62, it has a traverse guide rail module 70 running on the longitudinal rail 69, a vertical guide rail module 71 running on the traverse guide rail module 70, and an insulation whose jaws are downwardly mounted on the vertical guide rail module 71 The block clamp 72; the clip placement mechanism has a clip grip 73; the screwing mechanism has a screwing sleeve 74; The upper lift frame 76 and the lift frame 76 are provided with a traverse sliding plate 77 , and the elastic clip gripper 73 and the screwing sleeve 74 are installed under the traverse sliding plate 77 .
作业时,振动盘63装入许多无序状态的绝缘块93,振动盘63按顺时针方向或逆时针方向振动,一部分绝缘块93将以正确姿态进入振道一64和振道二65,一部分以异向姿态进入振道一64和振道二65的绝缘块93将被设置在振动盘内振道一64和振道二65上方的异向绝缘块挡板78剔除。以正确姿态进入振道一64和振道二65的绝缘块93分别进入分供板66上设置的分供槽一67和分供槽二68中,分供板向所在一侧的绝缘块夹钳72方向滑移,其分供槽一67和分供槽二68内的绝缘块93由绝缘块夹钳72夹取,并将两块绝缘块93的插块94分别插入到所在一侧的钢轨81两侧的轨底85与铁垫板限位凸台91之间的插缝中,使两块绝缘块93的压块95分别压住钢轨两侧的轨底85的顶面,然后由拧钉套筒74拧松道钉98,再由弹条夹手73将弹条96夹住并向前移动,使弹条96的前端下颚97压在绝缘块93上,最后用拧钉套筒74将道钉98拧紧,从而完成对钢轨扣件的紧固作业。During operation, the vibrating plate 63 is loaded with many insulating blocks 93 in disordered state, and the vibrating plate 63 vibrates in a clockwise or counterclockwise direction. The insulating blocks 93 entering the vibration channel one 64 and the vibration channel two 65 in a different direction will be rejected by the isotropic insulating block baffles 78 arranged above the vibration channel one 64 and the vibration channel two 65 in the vibration plate. The insulating blocks 93 entering the vibration channel 1 64 and the vibration channel 2 65 with the correct attitude enter into the distribution slot 1 67 and the distribution slot 2 68 set on the sub-supply plate 66 respectively, and the sub-supply plate is clamped to the insulating block on the side where it is located. The clamp 72 slides in the direction, and the insulating blocks 93 in the first supply slot 67 and the second supply slot 68 are clamped by the insulating block clamp 72, and the insert blocks 94 of the two insulating blocks 93 are respectively inserted into the one side. In the insertion slot between the rail bottom 85 on both sides of the rail 81 and the iron pad limiting boss 91, the pressing blocks 95 of the two insulating blocks 93 are pressed against the top surfaces of the rail bottom 85 on both sides of the rail, and then the The screwing sleeve 74 loosens the spike 98, and then the elastic strip 96 is clamped and moved forward by the elastic clip gripper 73, so that the lower jaw 97 of the front end of the elastic strip 96 is pressed on the insulating block 93, and finally the screwing sleeve is used. 74 Tighten the spikes 98 to complete the tightening of the rail fasteners.
需要说明的是,左牵引钢轨双向锁紧机械手231、右牵引钢轨双向锁紧机械手232、左分拣钢轨双向锁紧机械手233和右分拣钢轨双向锁紧机械手234与钢轨双向锁紧机械手23具有相同的结构和功能,只是由于左牵引钢轨双向锁紧机械手231、右牵引钢轨双向锁紧机械手232、左分拣钢轨双向锁紧机械手233和右分拣钢轨双向锁紧机械手234各自所处的位置和承担的任务有所不同。左转放滚筒夹手装置241、右转放滚筒夹手装置242、左下放滚筒夹手装置243、右下放滚筒夹手装置244、左升井滚筒夹手装置245、右升井滚筒夹手装置246、左装篮滚筒夹手装置247和右装篮滚筒夹手装置248与滚筒夹手装置24具有相同的结构和功能,只是由于左转放滚筒夹手装置241、右转放滚筒夹手装置242、左下放滚筒夹手装置243、右下放滚筒夹手装置244、左升井滚筒夹手装置245、右升井滚筒夹手装置246、左装篮滚筒夹手装置247和右装篮滚筒夹手装置248各自所处的位置和承担的任务有所不同。It should be noted that the left traction rail bidirectional locking manipulator 231, the right traction rail bidirectional locking manipulator 232, the left sorting rail bidirectional locking manipulator 233, the right sorting rail bidirectional locking manipulator 234 and the rail bidirectional locking manipulator 23 have The same structure and function are only due to the positions of the left traction rail bidirectional locking manipulator 231, the right traction rail bidirectional locking manipulator 232, the left sorting rail bidirectional locking manipulator 233 and the right sorting rail bidirectional locking manipulator 234. different from the tasks undertaken. Left turn-and-release roller gripping device 241, right-turn roller gripping device 242, left lower-releasing roller gripping device 243, right-lowering roller gripping device 244, left-hoisting roller gripping device 245, right-hoisting roller gripping device 246, The left basket-loading drum gripping device 247 and the right basket-loading drum gripping device 248 have the same structure and function as the drum gripping device 24, except that the drum gripping device 241 is rotated to the left, the drum gripping device 242 is rotated to the right, and The left lower roller gripping device 243, the right lowering roller gripping device 244, the left lifting well roller gripping device 245, the right lifting well roller gripping device 246, the left basket loading roller gripping device 247 and the right basket loading roller gripping device 248 are respectively The location and the tasks undertaken are different.
上述实施例只用于更清楚的描述本发明,而不能视为限制本发明涵盖的保护范围,任何等价形式的修改都应视为落入本发明涵盖的保护范围之中。The above-mentioned embodiments are only used to describe the present invention more clearly, and should not be regarded as limiting the protection scope covered by the present invention, and any modification in equivalent form should be regarded as falling into the protection scope covered by the present invention.

Claims (15)

  1. 一种智能铺轨方法,其特征在于:是设置由智能控制系统控制的由多种作业车组成的成套铺轨装备,利用装备中的钢轨分拣车(3)自动从装备中的钢轨输送车(2)上左右各一抓住两根钢轨(81)的前端,将两根钢轨(81)定向推送至装备中的钢轨推送车(4),由钢轨推送车(4)自动将两根钢轨(81)推向装备中的滚筒回收车(5),由滚筒回收车(5)自动将两根钢轨(81)递向装备中的钢轨牵引车(6),由钢轨牵引车(6)自动抓住两根钢轨(81)前端并使钢轨牵引车(6)前行,同时,设在钢轨牵引车(6)上的滚筒夹手装置(24)在道床两侧设定位置随车不断向前放置滚筒(7),使后面两根钢轨(81)不断放落在道床两侧的滚筒上并不断在滚筒()上随车向前拖行,再利用次后设置的滚筒回收车自动将压在钢轨(81)下的滚筒(7)回收到滚筒回收车(5)上使钢轨(81)落枕,通过人工对落枕钢轨(81)实施间隔式初固定,最后由扣件紧固车(1)自动完成对钢轨(81)的紧固作业,从而实现智能铺轨。An intelligent track laying method, which is characterized in that: a complete set of track laying equipment composed of various operation vehicles controlled by an intelligent control system is set up, and a rail sorting vehicle (3) in the equipment is used to automatically transfer a rail from the equipment (2). ), grab the front ends of the two rails (81), and push the two rails (81) to the rail pusher (4) in the equipment, and the rail pusher (4) automatically pushes the two rails (81). ) to the roller recovery vehicle (5) in the equipment, the roller recovery vehicle (5) automatically delivers the two rails (81) to the rail tractor (6) in the equipment, and the rail tractor (6) automatically grabs it The front ends of the two rails (81) make the rail tractor (6) move forward, and at the same time, the roller gripping device (24) provided on the rail tractor (6) is placed at the set positions on both sides of the track bed and is continuously placed forward with the vehicle Roller (7), so that the following two steel rails (81) are continuously placed on the rollers on both sides of the ballast bed and continuously dragged forward with the vehicle on the roller (), and then the roller recovery vehicle set up after the second time is used to automatically press on the roller. The roller (7) under the rail (81) is recovered to the roller recovery vehicle (5) to make the rail (81) stiff, and the stiffened rail (81) is manually fixed at intervals, and finally the vehicle (1) is fastened by fasteners. The fastening operation of the steel rail (81) is automatically completed, thereby realizing intelligent track laying.
  2. 如权利要求1所述的智能铺轨方法,其特征在于:所述由滚筒回收车(5)将两根钢轨(81)递向钢轨牵引车(6),是在滚筒回收车(5)的两侧设置导轨装置(9),使两根钢轨(81)分别经两侧设置的导轨装置(9),由钢轨推送车(4)出力将两根钢轨(81)推向装备中的钢轨牵引车(6)。The intelligent track laying method according to claim 1, characterized in that: the two steel rails (81) are delivered to the rail tractor (6) by the roller recovery vehicle (5), which is carried out on two sides of the roller recovery vehicle (5). A guide rail device (9) is provided on the side, so that the two steel rails (81) are respectively pushed through the guide rail device (9) arranged on both sides by the rail pusher (4) to push the two steel rails (81) to the rail tractor in the equipment. (6).
  3. 如权利要求2所述的智能铺轨方法,其特征在于:所述两根钢轨(81)不断放落在道床两侧的滚筒上并不断在滚筒上随车向前拖行,是滚筒回收车(5)保持静止,钢轨牵引车(6)牵引钢轨不断前行,使钢轨(81)在滚筒回收车(5)与钢轨牵引车(6)之间的长度不断加长,利用钢轨(81)的自重使加长的钢轨的中段变形下沉落放到滚筒的滚轮(8)上,并利用滚轮(8)转动使钢轨随钢轨牵引车(6)的前行而能够在滚轮(8)拖行。The intelligent track laying method according to claim 2, characterized in that: the two steel rails (81) are continuously placed on the rollers on both sides of the track bed and continuously dragged forward with the vehicle on the rollers, which are roller recovery vehicles (81). 5) Keep still, the rail tractor (6) pulls the rail forward continuously, so that the length of the rail (81) between the drum recovery vehicle (5) and the rail tractor (6) is continuously lengthened, and the self-weight of the rail (81) is used. The middle section of the elongated rail is deformed and dropped onto the roller (8) of the drum, and the roller (8) is used to rotate so that the rail can be dragged on the roller (8) as the rail tractor (6) moves forward.
  4. 如权利要求3的智能铺轨方法,其特征在于:所述将压在钢轨(81)下的滚筒(7)回收到滚筒回收车(5)上,是在滚筒回收车(5)上设置受智能控制系统控制的滚筒拖出装置和滚筒夹手装置(24),并再次利用滚筒回收车(5)两侧设置的导轨装置(9),通过滚筒回收车(5)的前行将钢轨(81)从后向前不断抬起,同时由滚筒拖出装置从抬起的钢轨(81)下将滚筒(7)拖出并由滚筒夹手装置(24)转移到滚筒回收车(5)上,使后面的钢轨(81)不断向前落枕。The intelligent track laying method according to claim 3, characterized in that: the method of recycling the roller (7) pressed under the steel rail (81) to the roller recovery vehicle (5) is to set an intelligent receiving device on the roller recovery vehicle (5). The roller pulling out device and the roller gripping device (24) controlled by the control system, and the guide rail devices (9) provided on both sides of the roller recovery vehicle (5) are used again to move the steel rail (81) through the forward travel of the roller recovery vehicle (5). It is continuously lifted from the back to the front, and at the same time, the roller (7) is pulled out from under the raised rail (81) by the roller pulling device and transferred to the roller recovery vehicle (5) by the roller gripping device (24), so that the The rear rails (81) keep stiffening forward.
  5. 如权利要求4所述的智能铺轨方法,其特征在于:所述再次利用滚筒回收车(5)两侧设置的导轨装置(9),通过滚筒回收车(5)的前行将钢轨(81)从后向前不断抬起,是滚筒回收车(5)处于离后方已经铺好的钢轨L的前端端部一段距离的位置,当钢轨牵引车(6)拖行钢轨(81)至钢轨(81)后端端部与后方已经铺好的钢轨L的前端端部并齐时停止前行,位于滚筒回收车(5)后的一段钢轨(81)的后端端部下垂,与已经铺好的钢轨L的前端端部连接固定,然后滚筒回收车(5)根据回收滚筒的速度不断向前行驶。The intelligent track laying method according to claim 4, characterized in that: the guide rail devices (9) provided on both sides of the roller recovery vehicle (5) are reused to remove the rail (81) from the roller recovery vehicle (5) through the forward movement of the roller recovery vehicle (5). When the roller recovery vehicle (5) is at a distance from the front end of the rail L that has been laid at the rear, it keeps lifting backward and forward. When the rail tractor (6) drags the rail (81) to the rail (81) The rear end and the front end of the rail L that has been laid at the rear stop at the same time, and the rear end of the section of rail (81) located behind the drum recovery vehicle (5) hangs down, and the rail that has already been laid. The front end of the L is connected and fixed, and then the drum recovery vehicle (5) continuously travels forward according to the speed of the recovery drum.
  6. 如权利要求4所述的智能铺轨方法,其特征在于:所述由滚筒拖出装置和滚筒夹手装置(24)从抬起的钢轨(81)下将滚筒(7)拖出并转移到滚筒回收车(5)上,是由滚筒拖出装置在滚筒回收车(5)不断前行的情形下将滚筒(7)从两侧抬起的钢轨(81)下将滚筒(7)向道床(99)中间横向拖出并规整的摆放在道床(99)的中间两侧,再由滚筒夹手装置(24)将滚筒(7)从道床(99)转移到滚筒回收车上设置的滚筒回收区(11)内的滚筒篮(12)内。The intelligent track laying method according to claim 4, characterized in that: the drum (7) is pulled out from the lifted rail (81) by the drum pulling device and the drum gripping device (24) and transferred to the drum On the recovery vehicle (5), the roller (7) is lifted to the track bed (81) by the roller pulling device under the condition that the roller recovery vehicle (5) keeps moving forward. 99) The middle is pulled out horizontally and placed on both sides of the middle of the track bed (99), and then the roller (7) is transferred from the track bed (99) to the roller recovery set on the roller recovery vehicle by the roller gripper device (24). in the drum basket (12) in the zone (11).
  7. 如权利要求6所述的智能铺轨方法,其特征在于:所述滚筒拖出装置在滚筒回收车(5)不断前行的情形下将滚筒(7)从两侧抬起的钢轨(81)下将滚筒(7)向道床(99)中间横向拖出,是将滚筒拖出装置整体设置为能够在轨道车上逆向走行的逆行性滚筒拖出装置(47),并在逆行性滚筒拖出装置(47)上设置能够与滑行在导轨装置(9)上的钢轨(81)临时固定的临时固定器(52),作业时,由临时固定器(52)将逆行性滚筒拖出装置(47)与钢轨(81)实施临时固定,使逆行性滚筒拖出装置(47)在前行的滚筒回收车(5)上逆行,同时又与道床保持一段时间的相对静止,利用这一段时间将滚筒从抬起的钢轨(81)下拖出。The intelligent track laying method according to claim 6, characterized in that: the roller pulling device pulls the roller (7) under the rails (81) lifted from both sides under the condition that the roller recovery vehicle (5) keeps moving forward. To pull the drum (7) laterally out of the middle of the track bed (99) is to set the drum pull-out device as a whole as a retrograde pull-out device (47) that can run in the reverse direction on the rail car, and the retrograde pull-out device (47) is provided with a temporary fixer (52) that can be temporarily fixed with the rail (81) sliding on the guide rail device (9). During operation, the retrograde roller is pulled out of the device (47) by the temporary fixer (52). It is temporarily fixed with the rail (81), so that the retrograde roller pulling device (47) is reversed on the forward roller recovery vehicle (5), and at the same time, it remains relatively stationary with the ballast bed for a period of time. Pull out under the raised rails (81).
  8. 如权利要求6所述的智能铺轨方法,其特征在于:是在滚筒回收车(5)上的滚筒夹手装置分设为升井滚筒夹手装置和装篮滚筒夹手装置,同时,还在滚筒回收车(5)底架上的升井口与滚筒回收区(11)之间设置滚筒传输装置,由升井滚筒夹手装置将放置在道床(99)上的滚筒(7)通过设置在滚筒回收车(5)底架上的升井口将滚筒(7)从道床转移到传输装置,由传输装置将滚筒(7)传输到滚筒回收区(11),再由装篮滚筒夹手装置将传输装置上的滚筒(7)转放到滚筒回收区(11)中的滚筒篮(12)内。The intelligent track laying method according to claim 6, characterized in that the roller gripping device on the roller recovery vehicle (5) is divided into a well-lifting roller gripping device and a basket loading roller gripping device, and at the same time, the roller gripping device on the roller recovery vehicle (5) is divided into a well-lifting roller gripping device and a basket loading roller gripping device. (5) A roller transfer device is set between the well-lifting head on the underframe and the roller recovery area (11), and the roller (7) placed on the ballast bed (99) is passed through the roller (7) set on the roller recovery vehicle (5) by the well-lifting roller gripper device. ) The lifting wellhead on the bottom frame transfers the drum (7) from the track bed to the conveying device, and the conveying device transfers the drum (7) to the drum recovery area (11), and then the basket-loading drum gripping device transfers the drum on the conveying device. (7) Transfer to the drum basket (12) in the drum recovery area (11).
  9. 如权利要求1—6所述的智能铺轨方法,其特征在于:是在钢轨分拣车(3)和钢轨牵引车(6)上设置一种受智能控制系统控制的用于抓取钢轨(81)的能够自动双向锁紧的钢轨双向锁紧机械手(23),在钢轨双向锁紧机械手(23)上设置夹握部件和能够使钢轨双向锁紧机械手倾斜的倾斜机构,作业时,由夹握部件夹在钢轨(81)两侧的轨头(82)与轨底(85)之间,然后通过倾斜机构转动钢轨双向锁紧机械手(23)使钢轨双向锁紧机械手(23)向前或向后倾斜,迫使夹握部件向上分别抵紧轨头(82)两侧的底面,向下分别抵紧两侧轨底(85)的顶面,能够使钢轨双向锁紧机械手(23)前倾或后倾实现对钢轨(81)的双向锁紧。The intelligent track laying method according to claims 1-6, characterized in that: a rail sorting vehicle (3) and a rail tractor (6) are provided with an intelligent control system controlled by an intelligent control system for grabbing the rails (81). ) of the two-way rail locking manipulator (23) capable of automatic two-way locking, on the rail two-way locking manipulator (23) is provided with a gripping part and a tilting mechanism capable of tilting the rail two-way locking manipulator. The components are clamped between the rail head (82) and the rail bottom (85) on both sides of the rail (81), and then the rail bidirectional locking manipulator (23) is rotated by the tilting mechanism to make the rail bidirectional locking manipulator (23) move forward or toward the rail. Rear tilt, forcing the gripping parts to press up against the bottom surfaces of both sides of the rail head (82) respectively, and down against the top surfaces of the rail bottoms (85) on both sides respectively, so that the rail bidirectional locking manipulator (23) can be tilted forward or Tilting backwards realizes two-way locking of the rail (81).
  10. 如权利要求1所述的智能铺轨方法,其特征在于:所述通过人工对落枕钢轨(81)实施间隔式初固定是平均每隔N个预装轨枕(89)取一个,在钢轨(81)轨底(85)两侧与所取的预装轨枕(89)上的铁垫板(90)的限位凸台(91)之间插装绝缘块(93),将弹条(96)归置到位,再将道钉(98)拧紧,完成对铺设钢轨的初步固定。The intelligent track laying method according to claim 1, characterized in that: the interval-type initial fixation of the stiffener rails (81) by manual means is to take one every N pre-installed sleepers (89) on average, and the rails (81) Insert insulating blocks (93) between the two sides of the rail bottom (85) and the limiting bosses (91) of the iron backing plate (90) on the pre-installed sleeper (89), and place the spring strips (96) into place. After placing it in place, tighten the road stud (98) to complete the preliminary fixation of the laying rail.
  11. 如权利要求10所述的智能铺轨方法,其特征在于:所述由扣件紧固车(1)自动完成对钢轨(81)的紧固作业,是在扣件紧固车(1)上设置绝缘块夹装机构、拧钉机构、弹条归置机构,作业时,先由绝缘块夹装机构夹取绝缘块(93),将绝缘块(93)插装在钢轨(81)两侧的轨底(85)与铁垫板(90)的限位凸台(91)之间并使绝缘块(93)的压块压住钢轨轨底(85),再由拧钉机构将道钉拧松,使先前前端下颚(97)预压在限位凸台(91)上的弹条(96)松动,由弹条归置机构夹住弹条(96)两侧,将弹条(96)前移,使弹条(96)的前端下颚(97)压住绝缘块(93),最后再用拧钉机构将道钉(98)拧紧,使弹条(96)紧压绝缘块(93),并通过绝缘块(93)压紧钢轨。 The intelligent track laying method according to claim 10, characterized in that: the fastening operation of the rail (81) is automatically completed by the fastener fastening vehicle (1), which is set on the fastener fastening vehicle (1). Insulation block clamping mechanism, screwing mechanism, and elastic strip placement mechanism. During operation, the insulating block clamping mechanism first clamps the insulating block (93), and inserts the insulating block (93) on both sides of the rail (81). Between the rail bottom (85) and the limit boss (91) of the iron backing plate (90), make the pressing block of the insulating block (93) press the rail bottom (85), and then screw the road nail by the screwing mechanism To loosen, loosen the elastic strip (96) pre-pressed on the limiting boss (91) by the front lower jaw (97), clamp the two sides of the elastic strip (96) by the elastic strip placement mechanism, and place the elastic strip (96) Move forward so that the lower jaw (97) of the front end of the elastic strip (96) presses the insulating block (93), and finally use the screwing mechanism to tighten the spike (98), so that the elastic strip (96) presses the insulating block (93) tightly , and press the rail through the insulating block (93).
  12. 一种智能铺轨装备,包括钢轨输送车(2),依次位于钢轨输送车(2)前面的具有钢轨分拣装置的钢轨分拣车(3)、具有钢轨推送装置的钢轨推送车(4)、具有钢轨牵引装置的钢轨牵引车(6),其特征在于,在钢轨牵引车(6)上依然设有滚筒夹手装置(24),在钢轨牵引车(6)后面设有专用滚筒回收车(5),其具有滚筒夹手装置(24)和滚筒拖出装置;在钢轨输送车(2)后面设有扣件紧固车(1),扣件紧固车(1)具有安装扣件固定钢轨(81)的紧固装置。An intelligent track laying equipment comprises a rail conveying vehicle (2), a rail sorting vehicle (3) with a rail sorting device, a rail pushing vehicle (4) having a rail pushing device, and a rail sorting vehicle (3) having a rail sorting device located in sequence in front of the rail conveying vehicle (2), A rail tractor (6) with a rail tractor is characterized in that a roller gripping device (24) is still provided on the rail tractor (6), and a special roller recovery vehicle ( 5), which has a roller gripping device (24) and a roller pulling out device; a fastener tightening vehicle (1) is provided behind the rail conveying vehicle (2), and the fastener tightening vehicle (1) is provided with an installation fastener for fixing Fastening device for rail (81).
  13. 根据权利要求12所述一种智能铺轨装备,其特征在于:所述钢轨分拣装置及钢轨牵引装置均具有钢轨双向锁紧机械手(23),所述钢轨双向锁紧机械手(23)包括固定在分拣装置或钢轨牵引装置上的安装体(25)、通过转轴安装在安装体(25)上的转架(26)、一端作用在转架(26)上推进转架(26)转动的倾斜推进器(251)、安装在转架(26)上的夹持组件;所述夹持组件下方具有能够握住钢轨(81)的抓握部件;所述夹持组件包括安装在转架(26)内的夹持架(27),夹持架(27)具有夹板一(28)和夹板二(29);所述夹板一(28)和夹板二(29)上分别具有挂销孔一和挂销孔二,挂销孔一和挂销孔二内分别具有挂销一(30)和挂销二(31),抓握钢轨(81)时,夹板一(28)和夹板二(29)下端能够分别插在轨头(82)两侧的底面一(83)和底面二(84)的下面;所述夹持架(27)的夹板一(28)和夹板二(29)的底端分别分化为前脚一(32)、后脚一(33)和前脚二(34)、后脚二(35);当挂销一(30)和挂销二(31)分别挂住轨头的底面一(83)和底面二(84)时,前脚一(32)和后脚一(33)均与钢轨轨底(85)的顶面一(86)有间隙,前脚二(34)和后脚二(35)均与钢轨轨底(85)的顶面二(87)有间隙;The intelligent rail laying equipment according to claim 12, characterized in that the rail sorting device and the rail pulling device both have a rail bidirectional locking manipulator (23), and the rail bidirectional locking manipulator (23) comprises a The mounting body (25) on the sorting device or the rail traction device, the turret (26) mounted on the mounting body (25) through the rotating shaft, and the tilt of one end acting on the turret (26) to push the turret (26) to rotate A pusher (251), a clamping assembly mounted on the turret (26); a gripping member capable of holding the steel rail (81) is provided below the clamping assembly; the clamping assembly includes a clamping component mounted on the turret (26) The clamping frame (27) in the ), the clamping frame (27) has a clamping plate one (28) and a clamping plate two (29); Hanging pin hole two, hanging pin hole one and hanging pin hole two are respectively provided with hanging pin one (30) and hanging pin two (31). The lower ends can be respectively inserted under the bottom surface one (83) and bottom surface two (84) on both sides of the rail head (82); They are divided into front foot one (32), rear foot one (33), front foot two (34), rear foot two (35); 83) and the bottom surface two (84), the front foot one (32) and the rear foot one (33) have a gap with the top surface one (86) of the rail bottom (85), the front foot two (34) and the rear foot two (35) There is a gap with the top surface two (87) of the rail bottom (85);
    当夹持架(27)下端随转架(26)向前倾斜时,挂销一(30)和后脚一(33)分别撑住底面一(83)和顶面一(86),挂销二(31)和后脚二(35)分别撑住底面二(84)和顶面二(87),夹持组件将钢轨(81)锁紧;When the lower end of the clamping frame (27) is inclined forward with the turret (26), the hanging pin one (30) and the rear foot one (33) support the bottom surface one (83) and the top surface one (86) respectively, and the hanging pin two (31) and the second rear foot (35) support the bottom surface two (84) and the top surface two (87) respectively, and the clamping assembly locks the rail (81);
    当夹持架(27)下端随转架(26)向后倾斜时,挂销一(30)和前脚一(32)分别撑住底面一(83)和顶面一(86),挂销二(31)和前脚二(34)分别撑住底面二(84)和顶面二(87),夹持组件同样将钢轨(81)锁紧;When the lower end of the clamping frame (27) is inclined backward with the turn frame (26), the first hanging pin (30) and the first front foot (32) support the bottom surface one (83) and the top surface one (86), respectively, and the second hanging pin (31) and the second front foot (34) support the bottom surface two (84) and the top surface two (87) respectively, and the clamping assembly also locks the rail (81);
    当夹持架(27)随转架(26)回复到垂向位置时,夹持组件对钢轨(81)的锁紧解除。When the clamping frame (27) returns to the vertical position along with the turn frame (26), the locking of the clamping assembly to the rail (81) is released.
  14. 根据权利要求12所述一种智能铺轨装备,其特征在于:所述滚筒回收车(5)还具有配合滚筒拖出装置和滚筒夹手装置(24)作业的导轨装置(9),所述导轨装置(9)具有两个水平对称设置能够在钢轨轨头(82)两侧底面抬起钢轨并能够沿钢轨滚动式滑行的抬滑轮;所述滚筒拖出装置为一种能够在抬起的钢轨(81)下面将滚筒(7)横向拖出的逆行性滚筒拖出装置(47),其具有悬挂式固定在滚筒回收车底架()中部下方的总装架(48)、设在总装架(48)上的逆行架(49)、设置在逆行架(49)与总装架(48)之间的逆行定驻器、设置在逆行架(49)上的横向驱动机构、设在横向驱动机构上的纵向微调机构、设在纵向微调机构上的升降机构以及设在升降机构下端的横向挂钩部件(50); 所述逆行定驻器包括设在总装架(48)上供逆行架(49)沿列车运行方向顺逆双向走行的双向轨(51)、安装在总装架(48)上推动逆行架(49)向前顺向走行的单向推进机构和设在逆行架(49)上控制逆行架(49)向车后逆行而相对于道床(99)保持静止的临时固定器(52);所述单向推进机构包括纵向固定在逆行架(49)中间的推进管(53)和电缸推进杆(54),推进管(53)是后段的下面与逆行架(49)固定,电缸推进杆(54)位于推进管(53)内,能够从推进管(53)后端伸出,电缸推进杆(54)后端的推进头(55)能够顶住总装架(48)后部架体并向总装架(48)施加向后的推力。The intelligent track laying equipment according to claim 12, characterized in that: the roller recovery vehicle (5) further has a guide rail device (9) that cooperates with the roller pulling out device and the roller gripping device (24). The device (9) has two horizontally symmetrical lifting pulleys that can lift the rail on the bottom surfaces of both sides of the rail head (82) and can roll and slide along the rail; the roller pulling out device is a rail that can be lifted (81) A retrograde roller pull-out device (47) for pulling out the roller (7) laterally below, which has an assembly frame (48) that is suspended and fixed under the middle of the bottom frame () of the drum recovery vehicle, and is provided on the assembly frame ( 48) on the retrograde frame (49), the retrograde stopper provided between the retrograde frame (49) and the assembly frame (48), the lateral drive mechanism provided on the retrograde frame (49), and the lateral drive mechanism The longitudinal fine-tuning mechanism, the lifting mechanism provided on the longitudinal fine-tuning mechanism, and the transverse hook member (50) provided at the lower end of the lifting mechanism; A two-way rail (51) that runs in both directions in the running direction of the train, a one-way propulsion mechanism installed on the general assembly frame (48) to push the retrograde frame (49) to run forward and in the opposite direction, and a one-way propulsion mechanism installed on the retrograde frame (49) to control the retrograde frame (49) A temporary fixer (52) that reverses backward and remains stationary relative to the track bed (99); the one-way propulsion mechanism includes a propulsion tube (53) and an electric cylinder propulsion longitudinally fixed in the middle of the retrograde frame (49). The rod (54), the propulsion tube (53) is fixed to the retrograde frame (49) under the rear section, the electric cylinder propulsion rod (54) is located in the propulsion tube (53), and can extend from the rear end of the propulsion tube (53), The propulsion head (55) at the rear end of the electric cylinder propulsion rod (54) can bear against the rear frame body of the assembly frame (48) and exert a backward thrust on the assembly frame (48).
  15. 根据权利要求12所述一种智能铺轨装备,其特征在于:所述扣件紧固车(1)的紧固装置包括绝缘块分供机构、绝缘块拣装机构()、拧钉机构、弹条归置机构,所述绝缘块分供机构设置在扣件紧固车(1)前部的架体(62)上,其具有振动盘(63),振动盘(63)具有向外输出绝缘块(93)的振道一(64)和振道二(65),还具有向两侧钢轨(81)上方分送绝缘块(93)的分供板(66);所述绝缘块拣装机构设置在绝缘块分供机构后部的架体(62)上,其具有走行在纵向轨道(69)上的横移导轨模组(70)、走行在横移导轨模组(70)的垂向导轨模组(71)和钳口向下安装在垂向导轨模组(71)上的绝缘块夹钳(72);所述弹条归置机构具有弹条夹手(73);所述拧钉机构具有拧钉套筒(74);所述紧固装置还包括走行在纵向轨(13)上的纵移架(75)、设在纵移架(75)上的升降架(76)、升降架(76)上设有横移滑板(77),所述弹条夹手(73)和拧钉套筒(74)均安装在横移滑板(77)的下面。The intelligent track laying equipment according to claim 12, characterized in that: the fastening device of the fastener fastening vehicle (1) comprises an insulating block distribution mechanism, an insulating block picking and assembling mechanism (), a screwing mechanism, a spring The strip placement mechanism, the insulating block distribution mechanism is arranged on the frame body (62) at the front of the fastener fastening vehicle (1), which has a vibration plate (63), and the vibration plate (63) has an external output insulation The vibration channel one (64) and vibration channel two (65) of the block (93) also have a distribution board (66) for distributing the insulating block (93) to the upper side of the rails (81) on both sides; The mechanism is arranged on the frame body (62) at the rear of the insulating block distribution mechanism, which has a traverse guide rail module (70) running on the longitudinal rail (69), and a vertical rail module (70) running on the traverse guide rail module (70). The insulating block clamp (72) is installed on the vertical guide rail module (71) toward the guide rail module (71) and the jaws downward; the elastic strip placement mechanism has an elastic strip clamping hand (73); the The screwing mechanism has a screwing sleeve (74); the fastening device further comprises a longitudinal moving frame (75) running on the longitudinal rail (13), and a lifting frame (76) arranged on the longitudinal moving frame (75) . The lifting frame (76) is provided with a traverse slide plate (77), and the elastic clip gripper (73) and the screwing sleeve (74) are installed under the traverse slide plate (77).
PCT/CN2021/101709 2021-01-04 2021-06-23 Intelligent track laying method and intelligent track laying apparatus WO2022142189A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP21851787.8A EP4273321A1 (en) 2021-01-04 2021-06-23 Intelligent track laying method and intelligent track laying apparatus

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202110003463.3 2021-01-04
CN202110003463.3A CN112813745B (en) 2021-01-04 2021-01-04 Intelligent track laying method and intelligent track laying equipment

Publications (1)

Publication Number Publication Date
WO2022142189A1 true WO2022142189A1 (en) 2022-07-07

Family

ID=75857009

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/101709 WO2022142189A1 (en) 2021-01-04 2021-06-23 Intelligent track laying method and intelligent track laying apparatus

Country Status (3)

Country Link
EP (1) EP4273321A1 (en)
CN (1) CN112813745B (en)
WO (1) WO2022142189A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813745B (en) * 2021-01-04 2022-04-08 中铁四局集团有限公司 Intelligent track laying method and intelligent track laying equipment
CN115262303B (en) * 2022-09-29 2022-12-20 中建安装集团有限公司 Intelligent control-based automatic track panel assembling system and method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101050615A (en) * 2007-04-28 2007-10-10 中铁四局集团有限公司 Constructing method for laying seamless line track of CPG 500 type seamless line long rail laying machine set
US20100320280A1 (en) * 2009-06-23 2010-12-23 Miguelez Tapia Francisco Javier Method for the Installation of Railway Tracks on Ballast, Without an Auxiliary Track
CN105625118A (en) * 2014-10-31 2016-06-01 胡德令 Multi-functional intelligent vehicle for laying high-speed rail ballastless double tracks
CN207404711U (en) * 2017-10-24 2018-05-25 舞阳钢铁有限责任公司 A kind of rail special hanger
CN111501429A (en) * 2020-05-20 2020-08-07 中铁隆昌铁路器材有限公司 Tram track fastener
CN112012057A (en) * 2020-08-12 2020-12-01 湖南长院悦诚装备有限公司 Intelligent control method for ballastless track steel rail laying process
CN112779828A (en) * 2021-01-04 2021-05-11 中铁四局集团有限公司 Automatic place operation car of insulating block and fastening fastener
CN112813745A (en) * 2021-01-04 2021-05-18 中铁四局集团有限公司 Intelligent track laying method and intelligent track laying equipment
CN112853833A (en) * 2021-01-04 2021-05-28 株洲旭阳机电科技开发有限公司 Method and device for dragging out roller used for dragging steel rail under steel rail
CN112853830A (en) * 2021-01-04 2021-05-28 株洲旭阳机电科技开发有限公司 Automatic two-way locking mechanism of rail
CN112850128A (en) * 2021-01-04 2021-05-28 中铁四局集团有限公司 Automatic sorting and pushing device and method for steel rails
CN112853834A (en) * 2021-01-04 2021-05-28 株洲旭阳机电科技开发有限公司 Tractor capable of automatically placing rollers for track laying and method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2648105B2 (en) * 1994-11-04 1997-08-27 鉄友工業株式会社 Rail exchange device for railway and rail exchange method using the same
US8936300B2 (en) * 2012-05-31 2015-01-20 Progress Rail Services Corp Tiltable cab assembly
CN108842541A (en) * 2018-07-20 2018-11-20 中铁二十局集团有限公司 The long rail of Ballast track draws method laying construction method and Ballast track construction method
CN109629354B (en) * 2018-12-11 2023-10-20 株洲旭阳机电科技开发有限公司 Roller retraction device for rail laying, tractor and rail laying operation method
CN210458788U (en) * 2019-07-19 2020-05-05 开原五洲起重机有限公司 Track fixing device
CN111733644A (en) * 2020-07-07 2020-10-02 河南成坤铁路工程有限公司 Precise adjustment method for Forskow 300-1 type fastener of high-speed railway

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101050615A (en) * 2007-04-28 2007-10-10 中铁四局集团有限公司 Constructing method for laying seamless line track of CPG 500 type seamless line long rail laying machine set
US20100320280A1 (en) * 2009-06-23 2010-12-23 Miguelez Tapia Francisco Javier Method for the Installation of Railway Tracks on Ballast, Without an Auxiliary Track
CN105625118A (en) * 2014-10-31 2016-06-01 胡德令 Multi-functional intelligent vehicle for laying high-speed rail ballastless double tracks
CN207404711U (en) * 2017-10-24 2018-05-25 舞阳钢铁有限责任公司 A kind of rail special hanger
CN111501429A (en) * 2020-05-20 2020-08-07 中铁隆昌铁路器材有限公司 Tram track fastener
CN112012057A (en) * 2020-08-12 2020-12-01 湖南长院悦诚装备有限公司 Intelligent control method for ballastless track steel rail laying process
CN112779828A (en) * 2021-01-04 2021-05-11 中铁四局集团有限公司 Automatic place operation car of insulating block and fastening fastener
CN112813745A (en) * 2021-01-04 2021-05-18 中铁四局集团有限公司 Intelligent track laying method and intelligent track laying equipment
CN112853833A (en) * 2021-01-04 2021-05-28 株洲旭阳机电科技开发有限公司 Method and device for dragging out roller used for dragging steel rail under steel rail
CN112853830A (en) * 2021-01-04 2021-05-28 株洲旭阳机电科技开发有限公司 Automatic two-way locking mechanism of rail
CN112850128A (en) * 2021-01-04 2021-05-28 中铁四局集团有限公司 Automatic sorting and pushing device and method for steel rails
CN112853834A (en) * 2021-01-04 2021-05-28 株洲旭阳机电科技开发有限公司 Tractor capable of automatically placing rollers for track laying and method

Also Published As

Publication number Publication date
EP4273321A1 (en) 2023-11-08
CN112813745A (en) 2021-05-18
CN112813745B (en) 2022-04-08

Similar Documents

Publication Publication Date Title
WO2022142189A1 (en) Intelligent track laying method and intelligent track laying apparatus
CA1290618C (en) Mobile installation for loading, transporting and unloading as well as exchanging railroad ties
CN101718066B (en) Fast rail-exchanging vehicle for jointless track and rail-exchanging method
CN111674421B (en) Full-automatic pin-chain picking and hanging system and method for rail transportation
US4955301A (en) Tie exchange machine
CN107298289B (en) Air conveying system for main clamp of main welding wire of automobile welding device
CN211617712U (en) Railway hump operation unhooking robot system
CN102002897A (en) Long rail laying device and method
PL159571B1 (en) Moving machine for railroad building
CN112853834A (en) Tractor capable of automatically placing rollers for track laying and method
CN112850128B (en) Automatic sorting and pushing device and method for steel rails
CN112853830B (en) Automatic two-way locking mechanism of rail
CN203625734U (en) Standard rail bulk storage recovery device
CN211617713U (en) Railway hump operation unhooking robot traveling system
CN213740369U (en) Full-automatic laying device of track sleeper
CN112850302B (en) Roller recovery vehicle and method for enabling steel rail to be stiff in automatic rail paving system
CN215714304U (en) Tractor capable of automatically placing roller for track laying
CN211592577U (en) Monorail bidirectional mine field car pusher
CN210454799U (en) Endless rope winch
CN112158225A (en) Automatic hook picking system and method for mine car
US4571825A (en) Railroad track removing apparatus
CN208515604U (en) A kind of anti-skid device for shield tunnel battery truck
CN108327734B (en) Traction method of track tractor
CN104097954A (en) Piling machine
CN213502296U (en) Automatic hook picking system for mine car

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21851787

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2021851787

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2021851787

Country of ref document: EP

Effective date: 20230804