WO2022127303A1 - Cable laying apparatus - Google Patents

Cable laying apparatus Download PDF

Info

Publication number
WO2022127303A1
WO2022127303A1 PCT/CN2021/122371 CN2021122371W WO2022127303A1 WO 2022127303 A1 WO2022127303 A1 WO 2022127303A1 CN 2021122371 W CN2021122371 W CN 2021122371W WO 2022127303 A1 WO2022127303 A1 WO 2022127303A1
Authority
WO
WIPO (PCT)
Prior art keywords
rope
conveying
conveying roller
long
cable
Prior art date
Application number
PCT/CN2021/122371
Other languages
French (fr)
Chinese (zh)
Inventor
王大伟
冀晓莹
赵刚
齐孟星
徐士彬
邱晓杰
程爽
孟祥久
Original Assignee
中铁九局集团电务工程有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁九局集团电务工程有限公司 filed Critical 中铁九局集团电务工程有限公司
Priority to JP2022545795A priority Critical patent/JP7266929B2/en
Publication of WO2022127303A1 publication Critical patent/WO2022127303A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle

Definitions

  • the application belongs to the technical field of cable laying, and in particular relates to a cable laying device.
  • the cables are usually laid by mechanical traction or manual traction.
  • the friction between the cable skin and the ground due to the friction between the cable skin and the ground, it is easy to cause blurred writing on the cable skin and axial scratches, etc. , the blurred handwriting is not conducive to the later maintenance of the cable, and the deep scratches can easily lead to the rupture of the cable skin, which affects the safe use of the cable.
  • the purpose of the present application is to provide a cable laying device to at least solve the above-mentioned problems in the background art.
  • a cable laying device comprising:
  • the adjustment device includes a fixed plate, an installation component and a fixed component, the installation component and the fixed component are both arranged on the fixed plate, and each of the fixed plates is respectively provided with four fixed components, the fixed plate Fixed on the ground by fixing components;
  • the rope groups include two long ropes and a plurality of short ropes arranged in parallel. The ends are respectively connected to two long ropes, and the interval between the positions of adjacent short ropes on one of the long ropes is equal to the interval between the positions on the other long rope;
  • the inclined conveying member comprises an inclined hollow rod, a plurality of first conveying roller shafts, and a plurality of first conveying rollers;
  • the oblique hollow rod is sleeved on the short rope, and both ends of the oblique hollow rod are provided with first annular end plates;
  • Both ends of the first conveying roller shaft are respectively fixed on two first annular end plates, and are evenly distributed along the circumferential direction of the oblique hollow rod;
  • the first conveying roller is sleeved on the first conveying roller shaft and rotates around the first conveying roller shaft to support and convey the cable.
  • the fixing plate of the device is fixed on the ground where the cables are laid.
  • the cables are made to pass over the device.
  • the cables are pulled and moved, the cables roll with the positive roller shaft and the inclined roller shaft. Friction, to avoid sliding friction with the ground, the friction of rolling friction is small, avoiding the problems of wear and blurring caused by the contact friction between the cable skin and the ground, and the friction force is small, the labor intensity of the operator is low, and the laying efficiency is low. high.
  • the locking device is in the form of a set screw, with a simple structure and convenient processing.
  • the positive conveying member partially overlaps with the oblique conveying member in the extending direction of the long rope, which can prevent the cable from falling into the gap between the positive conveying member and the inclined conveying member, thereby avoiding the cable jam and affecting the laying.
  • the device can adjust the rope group by changing the position of the moving blocks on the two adjustment structures, so that the direction of the inclined roller shaft changes, so as to change the cable pulling and laying direction suitable for the device, so that the cables need to be laid in opposite directions. Under the circumstance, the labor intensity of the operator is low and the laying efficiency is high.
  • U-shaped parts can protect the lead screw, avoid damage to the thread on the lead screw, and ensure the reliable fixation of the sealing plate.
  • the axis of the light hole is parallel to the extension direction of the long rope, which reduces the wear of the long rope.
  • the anchoring cone has a simple structure and can be disassembled and assembled quickly.
  • Fig. 1 is a structural schematic diagram of a cable laying device
  • Fig. 2 is a schematic structural diagram of the oblique conveying member and the positive conveying member in Fig. 1;
  • Fig. 3 is the enlarged view of A place in Fig. 2;
  • Figure 4 is a schematic structural diagram of an inclined roller shaft
  • Figure 5 is a schematic diagram of the structure of the positive roller shaft.
  • Adjusting device 101, Fixing plate; 102, U-shaped piece; 103, Lead screw; 104, Moving block; 105, Second set screw; Rope group; 201, long rope; 202, short rope; 3, inclined conveying member; 301, inclined hollow rod; 302, first conveying roller; 4, positive conveying member; 401, positive rod; 402, pass hole; 403, the first set screw; 404, the second conveying roller.
  • a cable laying device comprising two adjustment devices 1 arranged opposite to each other, and two rope groups 2 arranged between the two adjustment devices 1 , The rope sets 2 are arranged in parallel.
  • the adjusting device 1 includes a fixing plate 101, an installation component and a fixing component.
  • Each fixing plate 101 is provided with four fixing components respectively.
  • An anchoring hole 107 is opened on the fixing plate 101, and an anchoring cone is used to penetrate the anchoring hole 107 and smash into the ground.
  • the fixing plate 101 can be fixed on the ground, and the anchoring hole 107 and the anchoring cone constitute a fixing component.
  • the number of installation components is four, corresponding to a total of four long ropes 201 in the two rope groups 2 .
  • the mounting assembly is arranged on the upper surface of the fixing plate 101.
  • the mounting assembly includes a U-shaped piece 102, a lead screw 103, a moving block 104, a second set screw 105 and a crank handle 106.
  • the U-shaped piece 102 has a groove, and the U-shaped piece Both ends of the 102 are respectively provided with sealing plates, and the sealing plates block the sides of the groove.
  • the lead screw 103 is arranged in the groove and its axis is parallel to the extending direction of the long rope 202.
  • the two ends respectively penetrate through two sealing plates, and are rotatably arranged on the sealing plates.
  • At least a part of the displacement block 104 is arranged in the groove and is located in the groove. move in the groove.
  • the displacement block 104 is provided with a threaded hole, and the moving block 104 is threadedly connected to the lead screw 103 and forms a lead screw nut mechanism with the lead screw 103 .
  • the lead screw 103 is located outside the U-shaped member 102 and is away from one end of the inclined conveying member, and is fixedly connected with a crank handle 106 for rotating the lead screw 103. By rotating the crank handle 106, the position of the moving block 104 in the groove is adjusted to achieve The adjustment corresponds to the purpose of the long rope 201 .
  • the rope set 2 includes two long ropes 201 and a plurality of short ropes 202 evenly distributed between the two long ropes 201. Both ends of the short ropes 202 are detachably connected to the long ropes 201, and both ends of the long ropes 201 are fixed respectively.
  • the corresponding moving blocks 104 are connected to the two adjusting devices 1. Specifically, the portion of the moving blocks 104 protruding from the groove is provided with a light hole, and the long rope 201 passes through the light hole and is fixed in the light hole by a locking device.
  • the locking device includes a tightening threaded hole provided on the hole wall of the light hole, a second tightening screw 105 set in the tightening threaded hole, and the second tightening screw 105 is used to press the long rope 201 in the hole of the light hole. on the wall. After the long rope 201 is fixed in the light hole, when the moving block 104 moves in the groove along the extending direction of the groove, it can drive the corresponding long rope 201 to move.
  • the short rope 202 is sheathed with an oblique conveying member 3 for carrying and transporting cables.
  • the adjacent long ropes 201 between the two rope groups 2 are provided with a plurality of ortho-position conveying elements 4 that are parallel to each other and alternately distributed with the oblique-position conveying elements 3 , and the ortho-position conveying elements 4 are also used to carry and transport cables.
  • the oblique conveying member 3 includes an oblique hollow rod 301 sleeved on the short rope 202. Both ends of the oblique hollow rod 301 are respectively provided with first annular end plates. Roller, the axis of the first conveying roller is parallel to the axis of the inclined hollow rod 301, the two ends of the first conveying roller are respectively fixed on the first annular end plate, and the first conveying roller is sleeved with the first conveying roller. Roller 302, the first conveying roller 302 rotates around the first conveying roller shaft to support and convey the cable.
  • the inclined hollow rod 301 After the inclined hollow rod 301 is placed on the ground, due to the frictional force between the inclined hollow rod 301 and the ground, it is difficult for the inclined hollow rod 301 to rotate on the short rope 202, and the plurality of first conveying rollers 302 are evenly distributed. It is arranged on the inclined hollow rod 301, so that the first conveying roller 302 located on the top of the inclined hollow rod 301 can rotate normally without being affected by the ground, so that the resistance during cable transportation is small, so as to achieve the purpose of carrying and conveying the cable.
  • the positive position conveying member 4 includes a positive position rod 401, and the radial direction of the positive position rod 401 is provided with two sets of through holes 402 (when the positive position rod 401 is a solid rod, a set of through holes 402 is a single hole, and the positive position rod 402 is hollow.
  • a set of through holes 402 are two symmetrical holes
  • the two adjacent long ropes 201 between the two sets of rope groups 2 pass through the through holes 402 respectively to fix the alignment rod 401 on the long rope 201 .
  • Both ends of the alignment rod 401 are screwed with first set screws 403 , and the long rope 201 is fixed in the through hole 402 by the first set screws 403 .
  • Both ends of the alignment rod 401 are provided with second annular end plates, and the circumferential direction of the second annular end plate is distributed with a second conveying roller shaft parallel to the axis of the alignment rod 401; both ends of the second conveying roller shaft are respectively fixed on the two second annular end plates.
  • the second conveying roller 404 is sleeved on the second conveying roller shaft, and the second conveying roller 404 rotates around the second conveying roller shaft to support and convey the cable.
  • the positive conveying member 4 When installing the positive conveying member 4 on the long rope 201, first remove the short rope 202 from the long rope 201, pass the long rope 201 through the through hole in the positive conveying member 4, and then rotate the first
  • the set screw 403 is tightened, and the first set screw 403 presses the long rope 201 on the hole wall of the through hole, and the installation of the positive position conveying member 4 can be completed.
  • the ortho-position conveying member 4 is displaced on the long rope 201 under the influence of external force, the first set screw 403 can be loosened, and after adjusting the position of the ortho-position conveying member 4, the first set screw 403 can be tightened again.
  • the position adjustment of the aligning conveying member 4 can be completed by fixing the ortho-positioning conveying member 4 at the preset position of the long rope 201 .
  • the oblique hollow rod 301 is evenly distributed with first conveying rollers 302 in the circumferential direction, and the aligning rod 401 is circumferentially distributed with second conveying rollers 404, so that when laying the rope group 2, it is not necessary to consider the front and back of the rope group 2, It is convenient to carry out the actual laying work.
  • the axial direction of the oblique conveying member 3 is inclined to the length direction of the long rope 201, and its inclination angle is 30°-60°.
  • the extension direction of the long rope 201 partially overlaps with the oblique conveying member 3 .
  • the length of the positive conveying member 4 is greater than the distance between the two sets of inclined conveying members 3 , and the height of the second conveying roller 404 at the top of the positive conveying member 4 corresponds to the height of the first conveying roller 302 at the top of the inclined conveying member 3 ;
  • the height of the second conveying roller 404 corresponds to the height of the first conveying roller 302 on the top of the inclined conveying member 3; it can prevent the cable from falling in the gap between the normal conveying member 4 and the inclined conveying member 3, and avoid the cable It gets stuck and affects the laying.
  • the part of the moving block 104 protruding from the groove is provided with a light hole along the length direction of the U-shaped member 102.
  • the end of the long rope 201 penetrates the moving block 104 through the light hole, and the second set screw 105 is screwed on the top of the moving block 104.
  • the rope 201 is fixedly connected inside the light hole by the second set screw 105 .
  • the lengths of the two long ropes 201 in the rope set 2 are different, at this time, the longer long rope 201 can be extended a part from the light hole, so that the rope set 2 can be located between two Parts of the section of the adjusting device 1 have the same length, that is, by adjusting the extension length of the long rope 201 in the moving block 104 , the problem of different lengths of the long rope 201 between the fixed plates 101 is solved.
  • the short rope 202 is bound or fixed on the long rope 201 by a fixing fixture. No matter which fixing method is adopted, it is necessary to ensure that the short rope 202 can be re-fixed on the long rope 201 after being separated from the long rope 201.
  • the above fixing method is as follows: The conventional technology will not be described in detail. When the inclined conveying member 3 is damaged, one end of the short rope 202 running through the interior of the inclined conveying member 3 can be separated from the long rope 201, and the inclined conveying member 3 can be removed, and then sleeved.
  • the short rope 202 can be re-fixed on the long rope 201 according to the original position, so as to facilitate the replacement of the oblique conveying member 3 when the oblique conveying member 3 is damaged.
  • the operator adjusts the adjusting device 1: rotate the two crank handles 106 corresponding to a long rope 201, so that the two moving blocks 104 on the adjusting device move in the same direction, so that one of the rope groups 2 is moved in the same direction.
  • the long rope 201 moves along its own extension direction
  • the other long rope 201 does not move or moves in the opposite direction
  • the inclination direction of the inclined conveying member 3 on the rope group 2 is changed.
  • the other rope group 2 is adjusted in the same way to change the inclination direction of the upper inclined conveying member 3, so that the purpose of adjusting the inclination angle of the inclined conveying member 3 through the adjusting device 1 can be realized, thereby changing the cable conveying suitable for this device. direction.
  • the laying device When the laying device is laid in a straight section and the cables need to be laid in opposite directions (for example, when laying in a subway tunnel, due to space constraints, multiple cable reels cannot all be placed at one end of the straight section, and multiple cable reels need to be divided into The two parts are placed at both ends of the straight section, so when the cable is laid, it needs to be routed from both ends and laid in opposite directions), and it is not necessary to exchange the positions of the two adjustment devices 1.
  • the crank 106 By turning the crank 106, the The device is adjusted to be suitable for reverse laying, which is convenient for laying work.
  • the sliding length range of the moving block 104 in the groove should be greater than the length of the inclined conveying member 3; it is ensured that when the cable laying direction adapted to the laying device is adjusted through the above steps, it can be adjusted in place.
  • the rope group 2 can be removed from the adjusting device 1, and the rope group 2 can be rolled up and stored.
  • the adjustment device 1 can be provided at the end, that is, the adjustment device 1 is applied to the rope groups 2 with different lengths but the same interval between adjacent long ropes, which improves the versatility of the adjustment device 1, reduces the required quantity of the adjustment device 1, and thus reduces the cost.

Landscapes

  • Electric Cable Installation (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A cable laying apparatus, comprising: two adjustment apparatuses (1), each adjustment apparatus (1) comprising a fixed plate (101), mounting assemblies and fixing assemblies, the mounting assemblies and the fixing assemblies being arranged on the fixed plate (101), the fixed plate (101) being fixed on the ground by the fixing assemblies; two rope sets (2), each rope set (2) comprising two long ropes (201) arranged in parallel and a plurality of short ropes (202); inclined conveying pieces (3), each inclined conveying piece (3) comprising an inclined hollow rod (301), a plurality of first conveying roller shafts and a plurality of first conveying rollers (302), the first conveying rollers (302) being sleeved on the first conveying roller shafts and rotating around the first conveying roller shafts so as to support and convey a cable. Sliding friction with the ground is avoided, the friction force of the rolling friction is small, the problems of abrasion and unclear handwriting caused by contact friction between the cable skin and the ground are avoided, the friction force is small, the labour intensity of operators is low, and the laying efficiency is high.

Description

电缆敷设装置cable laying device 技术领域technical field
本申请属于电缆敷设技术领域,具体涉及一种电缆敷设装置。The application belongs to the technical field of cable laying, and in particular relates to a cable laying device.
背景技术Background technique
在长距离的电缆敷设施工中,通常使用机械牵引或人工牵引对电缆进行敷设,在敷设过程中,由于电缆表皮与地面发生的摩擦,导致容易出现电缆表皮字迹模糊,产生轴向划痕等情况,字迹模糊不利于后期对电缆进行检修,深度的划痕易导致电缆表皮发生破裂,影响电缆的安全使用。In the long-distance cable laying construction, the cables are usually laid by mechanical traction or manual traction. During the laying process, due to the friction between the cable skin and the ground, it is easy to cause blurred writing on the cable skin and axial scratches, etc. , the blurred handwriting is not conducive to the later maintenance of the cable, and the deep scratches can easily lead to the rupture of the cable skin, which affects the safe use of the cable.
并且,在实际使用时往往需平行敷设较多的电缆,无论选用机械牵引还是人工牵引的方式,都只能同时牵引一根电缆,在一根电缆牵引敷设完毕后,如果采用人工敷设,则工作人员需要折返至电缆盘存放处牵引另外的电缆再次进行敷设,操作人员的劳动强度较高,如果采用机械牵引,则需将牵引装置移动至电缆盘存放处,才能开始下次的牵引,导致敷设工作的效率较低。Moreover, in actual use, it is often necessary to lay more cables in parallel. No matter whether mechanical traction or manual traction is used, only one cable can be pulled at the same time. Personnel need to return to the cable reel storage place to pull another cable for laying again. The labor intensity of the operator is high. If mechanical traction is used, the pulling device needs to be moved to the cable reel storage place before the next traction can be started, resulting in laying. Work less efficiently.
发明内容SUMMARY OF THE INVENTION
本申请的目的在于提供一种电缆敷设装置,以至少解决上述背景技术中所提出的问题。The purpose of the present application is to provide a cable laying device to at least solve the above-mentioned problems in the background art.
为了实现上述目的,本申请提供如下技术方案:一种电缆敷设装置,包括:In order to achieve the above purpose, the application provides the following technical solutions: a cable laying device, comprising:
两个相对设置的调节装置,调节装置包括固定板、安装组件和固定组件,安装组件和固定组件均设置在固定板上,各所述固定板上分别设有四个固定组件,所述固定板通过固定组件固定在地面上;Two oppositely arranged adjustment devices, the adjustment device includes a fixed plate, an installation component and a fixed component, the installation component and the fixed component are both arranged on the fixed plate, and each of the fixed plates is respectively provided with four fixed components, the fixed plate Fixed on the ground by fixing components;
两个平行的绳组,所述绳组包括平行设置的两根长绳和多根短绳,长绳的两端分别固定在两个所述调节装置的所述安装组件上,短绳的两端分别连接在两根长绳上,相邻短绳在其中一根长绳上的位置之间的间隔,与在另一根长绳上的位置之间的间隔相等;Two parallel rope groups, the rope groups include two long ropes and a plurality of short ropes arranged in parallel. The ends are respectively connected to two long ropes, and the interval between the positions of adjacent short ropes on one of the long ropes is equal to the interval between the positions on the other long rope;
斜位输送件,所述斜位输送件包括斜位空心杆、多个第一输送辊轴、多个第一输送辊;an inclined conveying member, the inclined conveying member comprises an inclined hollow rod, a plurality of first conveying roller shafts, and a plurality of first conveying rollers;
所述斜位空心杆套设在所述短绳上,所述斜位空心杆的两端均具有第一环形端板;The oblique hollow rod is sleeved on the short rope, and both ends of the oblique hollow rod are provided with first annular end plates;
所述第一输送辊轴的两端分别固定在两处第一环形端板上,并沿所述斜位空心杆的周向均布;Both ends of the first conveying roller shaft are respectively fixed on two first annular end plates, and are evenly distributed along the circumferential direction of the oblique hollow rod;
所述第一输送辊套设在所述第一输送辊轴上,绕所述第一输送辊轴转动,以支撑并输送电缆。The first conveying roller is sleeved on the first conveying roller shaft and rotates around the first conveying roller shaft to support and convey the cable.
有益效果:Beneficial effects:
1)本装置的固定板固定在进行敷设电缆的地面上,在敷设电缆时,使电缆从本装置的上方经过,当电缆被牵引移动时,电缆与正位辊轴、斜位辊轴进行滚动摩擦,避免与地面发生滑动摩擦,滚动摩擦的摩擦力较小,避免了电缆表皮与地面发生接触摩擦后产生的磨损和字迹模糊的问题,并且摩擦力小,操作人员的劳动强度低、敷设效率高。1) The fixing plate of the device is fixed on the ground where the cables are laid. When the cables are laid, the cables are made to pass over the device. When the cables are pulled and moved, the cables roll with the positive roller shaft and the inclined roller shaft. Friction, to avoid sliding friction with the ground, the friction of rolling friction is small, avoiding the problems of wear and blurring caused by the contact friction between the cable skin and the ground, and the friction force is small, the labor intensity of the operator is low, and the laying efficiency is low. high.
2)设置正位输送件,能够增大对电缆的支撑面积,能够一次敷设较多电缆,并能够较好地防止电缆掉落。2) The installation of positive conveying parts can increase the supporting area for the cables, lay more cables at one time, and can better prevent the cables from falling.
3)锁紧装置采用紧定螺钉的形式,结构简单,加工方便。3) The locking device is in the form of a set screw, with a simple structure and convenient processing.
4)正位输送件在长绳的延伸方向上与斜位输送件部分重合,能够避免电缆掉落至正位输送件与斜位输送件之间的间隙,从而避免电缆卡死影响敷设。4) The positive conveying member partially overlaps with the oblique conveying member in the extending direction of the long rope, which can prevent the cable from falling into the gap between the positive conveying member and the inclined conveying member, thereby avoiding the cable jam and affecting the laying.
5)本装置可通过改变两个调节结构上的移动块位置对绳组进行调整,使斜位辊轴的方向发生改变,从而改变本装置适用的电缆牵引敷设方向,使得在需要对向敷设电缆的情况下,操作人员的劳动强度低、敷设效率高。5) The device can adjust the rope group by changing the position of the moving blocks on the two adjustment structures, so that the direction of the inclined roller shaft changes, so as to change the cable pulling and laying direction suitable for the device, so that the cables need to be laid in opposite directions. Under the circumstance, the labor intensity of the operator is low and the laying efficiency is high.
6)丝杠螺母机构技术成熟,既实现将位移块固定在固定板上,又能实现位移块的位移。6) The technology of the screw nut mechanism is mature, which can not only fix the displacement block on the fixed plate, but also realize the displacement of the displacement block.
7)设置U形件的能够对丝杠进行保护,避免丝杠上的螺纹受损,另外保证封板的可靠固定。7) U-shaped parts can protect the lead screw, avoid damage to the thread on the lead screw, and ensure the reliable fixation of the sealing plate.
8)短绳与长绳可拆连接,便于斜向输送件的维修和更换。8) The short rope and the long rope are detachably connected, which is convenient for the maintenance and replacement of the oblique conveying parts.
9)光孔的轴线与长绳的延伸方向平行,减小长绳的磨损。9) The axis of the light hole is parallel to the extension direction of the long rope, which reduces the wear of the long rope.
10)锚定锥结构简单,拆装快速。10) The anchoring cone has a simple structure and can be disassembled and assembled quickly.
附图说明Description of drawings
图1为一种电缆敷设装置的结构示意图;Fig. 1 is a structural schematic diagram of a cable laying device;
图2为图1中除斜位输送件和正位输送件的结构示意图;Fig. 2 is a schematic structural diagram of the oblique conveying member and the positive conveying member in Fig. 1;
图3为图2中A处的放大图;Fig. 3 is the enlarged view of A place in Fig. 2;
图4为斜位辊轴的结构示意图;Figure 4 is a schematic structural diagram of an inclined roller shaft;
图5为正位辊轴的结构示意图。Figure 5 is a schematic diagram of the structure of the positive roller shaft.
图中:1、调节装置;101、固定板;102、U形件;103、丝杠;104、移动块;105、第二紧定螺钉;106、摇把;107、锚定孔;2、绳组;201、长绳;202、短绳;3、斜位输送件;301、斜位空心杆;302、第一输送辊;4、正位输送件;401、正位杆;402、通孔;403、第一紧定螺钉;404、第二输送辊。In the figure: 1. Adjusting device; 101, Fixing plate; 102, U-shaped piece; 103, Lead screw; 104, Moving block; 105, Second set screw; Rope group; 201, long rope; 202, short rope; 3, inclined conveying member; 301, inclined hollow rod; 302, first conveying roller; 4, positive conveying member; 401, positive rod; 402, pass hole; 403, the first set screw; 404, the second conveying roller.
具体实施方式Detailed ways
如图1至图5所示,根据本申请的实施例,提供了一种电缆敷设装置,包括两个相对设置的调节装置1、两个设置在两个调节装置1之间的绳组2,绳组2平行设置。As shown in FIG. 1 to FIG. 5 , according to an embodiment of the present application, a cable laying device is provided, comprising two adjustment devices 1 arranged opposite to each other, and two rope groups 2 arranged between the two adjustment devices 1 , The rope sets 2 are arranged in parallel.
调节装置1包括固定板101、安装组件和固定组件,各固定板101上分别设有四个固定组件,固定板101上开设有锚定孔107,使用锚定锥贯穿锚定孔107砸入地面,即可将固定板101固定在地面上,锚定孔107和锚定锥构成固定组件。安装组件的数量为四,对应两个绳组2中共四根长绳201。安装组件设置在固定板101的上板面,安装组件包括U形件102、丝杠103、移动块104、第二紧定螺钉105和摇把106,U形件102具有凹槽,U形件102的两端分别设有封板,封板封堵凹槽的侧部。丝杠103设置在凹槽中且轴线与长绳202的延伸方向平行,两端分别贯穿两处封板,并转动设置在封板上,位移块104的至少一部分设置在凹槽中,并在凹槽中移动。位移块104上设有螺纹孔,移动块104螺纹连接在丝杠103上,并与丝杠103形成丝杠螺母机构。丝杠103位于U形件102外部且远离斜位输送件的一端,固定连接有用于转动丝杠103的摇把106,通过转动摇把106来调节移动块104在凹槽中的位置,从而达到调节对应长绳201的目的。The adjusting device 1 includes a fixing plate 101, an installation component and a fixing component. Each fixing plate 101 is provided with four fixing components respectively. An anchoring hole 107 is opened on the fixing plate 101, and an anchoring cone is used to penetrate the anchoring hole 107 and smash into the ground. , the fixing plate 101 can be fixed on the ground, and the anchoring hole 107 and the anchoring cone constitute a fixing component. The number of installation components is four, corresponding to a total of four long ropes 201 in the two rope groups 2 . The mounting assembly is arranged on the upper surface of the fixing plate 101. The mounting assembly includes a U-shaped piece 102, a lead screw 103, a moving block 104, a second set screw 105 and a crank handle 106. The U-shaped piece 102 has a groove, and the U-shaped piece Both ends of the 102 are respectively provided with sealing plates, and the sealing plates block the sides of the groove. The lead screw 103 is arranged in the groove and its axis is parallel to the extending direction of the long rope 202. The two ends respectively penetrate through two sealing plates, and are rotatably arranged on the sealing plates. At least a part of the displacement block 104 is arranged in the groove and is located in the groove. move in the groove. The displacement block 104 is provided with a threaded hole, and the moving block 104 is threadedly connected to the lead screw 103 and forms a lead screw nut mechanism with the lead screw 103 . The lead screw 103 is located outside the U-shaped member 102 and is away from one end of the inclined conveying member, and is fixedly connected with a crank handle 106 for rotating the lead screw 103. By rotating the crank handle 106, the position of the moving block 104 in the groove is adjusted to achieve The adjustment corresponds to the purpose of the long rope 201 .
绳组2包括两根长绳201、多根均匀分布在两根长绳201之间的短绳202,短绳202的两端可拆连接在长绳201上,长绳201的两端分别固定连接在两个调节装置1上的对应移动块104上,具体的,移动块104凸出凹槽的部分设有光孔,长绳201穿过光孔并通过锁止装置固定在光孔中。锁止装置包括光孔的孔壁上设置的紧定螺纹孔、紧定螺纹孔中设置的第二紧定螺钉105, 第二紧定螺钉105用于将长绳201压紧在光孔的孔壁上。长绳201固定在光孔中后,移动块104在凹槽中沿凹槽的延伸方向移动时,可带动对应的长绳201移动。The rope set 2 includes two long ropes 201 and a plurality of short ropes 202 evenly distributed between the two long ropes 201. Both ends of the short ropes 202 are detachably connected to the long ropes 201, and both ends of the long ropes 201 are fixed respectively. The corresponding moving blocks 104 are connected to the two adjusting devices 1. Specifically, the portion of the moving blocks 104 protruding from the groove is provided with a light hole, and the long rope 201 passes through the light hole and is fixed in the light hole by a locking device. The locking device includes a tightening threaded hole provided on the hole wall of the light hole, a second tightening screw 105 set in the tightening threaded hole, and the second tightening screw 105 is used to press the long rope 201 in the hole of the light hole. on the wall. After the long rope 201 is fixed in the light hole, when the moving block 104 moves in the groove along the extending direction of the groove, it can drive the corresponding long rope 201 to move.
短绳202上套设有用于承载并运输电缆的斜位输送件3。两个绳组2之间相邻的长绳201上穿设有多个互相平行且与斜位输送件3交错分布的正位输送件4,正位输送件4也用于承载并运输电缆。The short rope 202 is sheathed with an oblique conveying member 3 for carrying and transporting cables. The adjacent long ropes 201 between the two rope groups 2 are provided with a plurality of ortho-position conveying elements 4 that are parallel to each other and alternately distributed with the oblique-position conveying elements 3 , and the ortho-position conveying elements 4 are also used to carry and transport cables.
斜位输送件3包括套设在短绳202上的斜位空心杆301,斜位空心杆301的两端分别具有第一环形端板,第一环形端板上周向均匀分布有第一输送辊轴,第一输送辊轴的轴线与斜位空心杆301的轴线平行,第一输送辊轴的两端分别固定在第一环形端板上,第一输送辊轴上套设有第一输送辊302,第一输送辊302绕第一输送辊轴转动,以支撑并输送电缆。The oblique conveying member 3 includes an oblique hollow rod 301 sleeved on the short rope 202. Both ends of the oblique hollow rod 301 are respectively provided with first annular end plates. Roller, the axis of the first conveying roller is parallel to the axis of the inclined hollow rod 301, the two ends of the first conveying roller are respectively fixed on the first annular end plate, and the first conveying roller is sleeved with the first conveying roller. Roller 302, the first conveying roller 302 rotates around the first conveying roller shaft to support and convey the cable.
斜位空心杆301放置在地面上后,由于斜位空心杆301与地面之间摩擦力的作用,导致斜位空心杆301较难在短绳202上进行转动,多个第一输送辊302均匀设置在斜位空心杆301上,使位于斜位空心杆301顶部的第一输送辊302可不受地面影响进行正常转动,使电缆输送时的阻力较小,从而达到承载电缆并输送电缆的目的。After the inclined hollow rod 301 is placed on the ground, due to the frictional force between the inclined hollow rod 301 and the ground, it is difficult for the inclined hollow rod 301 to rotate on the short rope 202, and the plurality of first conveying rollers 302 are evenly distributed. It is arranged on the inclined hollow rod 301, so that the first conveying roller 302 located on the top of the inclined hollow rod 301 can rotate normally without being affected by the ground, so that the resistance during cable transportation is small, so as to achieve the purpose of carrying and conveying the cable.
正位输送件4包括正位杆401,正位杆401的径向开设有两组通孔402(正位杆401为实心杆时,一组通孔402为单个孔,正位杆402为空心杆时,一组通孔402为对称的两个孔),两组绳组2之间相邻的两根长绳201分别穿过通孔402,将正位杆401固定在长绳201上。正位杆401两端螺纹连接有第一紧定螺钉403,长绳201通过第一紧定螺钉403固定在通孔402中。正位杆401的两端均设有第二环形端板,第二环形端板的周向分布有与正位杆401轴线平行的第二输送辊轴;第二输送辊轴的两端分别固定在两个第二环形端板上。第二输送辊404套设在第二输送辊轴上,第二输送辊404绕第二输送辊轴转动,以支撑并输送电缆。The positive position conveying member 4 includes a positive position rod 401, and the radial direction of the positive position rod 401 is provided with two sets of through holes 402 (when the positive position rod 401 is a solid rod, a set of through holes 402 is a single hole, and the positive position rod 402 is hollow. When the rod is used, a set of through holes 402 are two symmetrical holes), and the two adjacent long ropes 201 between the two sets of rope groups 2 pass through the through holes 402 respectively to fix the alignment rod 401 on the long rope 201 . Both ends of the alignment rod 401 are screwed with first set screws 403 , and the long rope 201 is fixed in the through hole 402 by the first set screws 403 . Both ends of the alignment rod 401 are provided with second annular end plates, and the circumferential direction of the second annular end plate is distributed with a second conveying roller shaft parallel to the axis of the alignment rod 401; both ends of the second conveying roller shaft are respectively fixed on the two second annular end plates. The second conveying roller 404 is sleeved on the second conveying roller shaft, and the second conveying roller 404 rotates around the second conveying roller shaft to support and convey the cable.
在将正位输送件4安装在长绳201上时,先将短绳202从长绳201上拆下,将长绳201从正位输送件4中的通孔中穿过,然后转动第一紧定螺钉403,第一紧定螺钉403将长绳201压紧在通孔的孔壁上,即可完成正位输送件4的安装。当正位输送件4受外力影响在长绳201上发生偏移后,可拧松第一紧定螺钉403,然后调整好正位输送件4的位置后,再次拧紧第一紧定螺钉 403,将正位输送件4固定在长绳201的预设位置,即可完成对正位输送件4的位置调节。When installing the positive conveying member 4 on the long rope 201, first remove the short rope 202 from the long rope 201, pass the long rope 201 through the through hole in the positive conveying member 4, and then rotate the first The set screw 403 is tightened, and the first set screw 403 presses the long rope 201 on the hole wall of the through hole, and the installation of the positive position conveying member 4 can be completed. When the ortho-position conveying member 4 is displaced on the long rope 201 under the influence of external force, the first set screw 403 can be loosened, and after adjusting the position of the ortho-position conveying member 4, the first set screw 403 can be tightened again. The position adjustment of the aligning conveying member 4 can be completed by fixing the ortho-positioning conveying member 4 at the preset position of the long rope 201 .
斜位空心杆301上周向均匀分布有第一输送辊302,正位杆401的周向分布有第二输送辊404,使得在铺设绳组2时,不需要考虑绳组2的正反面,便于实际铺设工作的进行。且在需要沿长绳201的方向移动本装置时,两人配合将调节装置1抬起,然后直接移动调节装置1即可,由于绳组上的第一输送辊302和第二输送辊404是与地面接触的部分,与地面是滚动摩擦,敷设装置与地面之间的摩擦力较小,便于沿长绳201方向移动本装置,并且能够减小斜位输送件3和正位输送件4的磨损。The oblique hollow rod 301 is evenly distributed with first conveying rollers 302 in the circumferential direction, and the aligning rod 401 is circumferentially distributed with second conveying rollers 404, so that when laying the rope group 2, it is not necessary to consider the front and back of the rope group 2, It is convenient to carry out the actual laying work. And when the device needs to be moved in the direction of the long rope 201, two people cooperate to lift the adjusting device 1, and then move the adjusting device 1 directly, because the first conveying roller 302 and the second conveying roller 404 on the rope group are The part in contact with the ground has rolling friction with the ground, and the friction between the laying device and the ground is small, which is convenient to move the device along the direction of the long rope 201, and can reduce the wear of the inclined conveyor 3 and the normal conveyor 4. .
斜位输送件3的轴向倾斜于长绳201的长度方向,其倾斜角度为30°-60°,正位输送件4位于两组斜位输送件3之间,且正位输送件4在长绳201的延伸方向上与斜位输送件3部分重合。当电缆在斜位输送件3上移动时,会带动斜位输送件3上的第一输送辊302进行转动,由于斜位输送件3与长绳201之间存在一定倾斜角度,所以第一输送辊302向电缆施加朝向正位输送件4的力,从而使得电缆在第一输送辊302转动的作用下向正位输送件4处进行移动,即可防止电缆偏移至敷设装置的两侧发生掉落,减少了人工看护的工作量。The axial direction of the oblique conveying member 3 is inclined to the length direction of the long rope 201, and its inclination angle is 30°-60°. The extension direction of the long rope 201 partially overlaps with the oblique conveying member 3 . When the cable moves on the inclined conveying member 3, it will drive the first conveying roller 302 on the inclined conveying member 3 to rotate. The roller 302 applies a force towards the positive conveying member 4 to the cable, so that the cable moves to the positive conveying member 4 under the action of the rotation of the first conveying roller 302, which can prevent the cable from shifting to both sides of the laying device. fall, reducing the workload of manual care.
当斜位输送件3和长绳201之间的倾斜角度过大或过小时均会产生不良影响,当夹角过小时,电缆在斜位输送件3上拖动时受到的阻力大,在夹角过大时:第一输送辊302在通过其自转带动电缆进行移动时,对电缆的扶正作用较小,较难良好的带动电缆移动至正位输送件4上,导致容易产生电缆掉落的情况,采用30°-60°的夹角范围,可避免上述不良影响。When the inclination angle between the oblique conveying member 3 and the long rope 201 is too large or too small, adverse effects will be produced. When the angle is too large: when the first conveying roller 302 drives the cable to move through its rotation, the righting effect on the cable is small, and it is difficult to drive the cable to move to the positive conveying member 4. In some cases, using an included angle range of 30°-60° can avoid the above adverse effects.
正位输送件4的长度大于两组斜位输送件3之间的间距,正位输送件4顶部的第二输送辊404的高度与斜位输送件3顶部的第一输送辊302的高度对应;当电缆在第一输送辊302的作用下移动至正位输送件4上时,由于正位输送件4的长度大于两组斜位输送件3之间的间距,且正位输送件4顶部的第二输送辊404的高度与斜位输送件3顶部的第一输送辊302的高度对应;能够避免电缆落在正位输送件4与斜位输送件3之间的缝隙中,避免因电缆卡死而影响敷设。The length of the positive conveying member 4 is greater than the distance between the two sets of inclined conveying members 3 , and the height of the second conveying roller 404 at the top of the positive conveying member 4 corresponds to the height of the first conveying roller 302 at the top of the inclined conveying member 3 ; When the cable moves to the positive position conveying member 4 under the action of the first conveying roller 302, because the length of the positive position conveying member 4 is greater than the distance between the two sets of inclined position conveying members 3, and the top of the positive position conveying member 4 is The height of the second conveying roller 404 corresponds to the height of the first conveying roller 302 on the top of the inclined conveying member 3; it can prevent the cable from falling in the gap between the normal conveying member 4 and the inclined conveying member 3, and avoid the cable It gets stuck and affects the laying.
移动块104凸出凹槽的部分沿U形件102长度方向设置有光孔,长绳201 的端部通过光孔贯穿移动块104,第二紧定螺钉105螺纹连接在移动块104顶部,长绳201通过第二紧定螺钉105固定连接在光孔的内部。在将长绳201安装至移动块104内部的光孔时,首先将长绳201穿过光孔,然后将第二紧定螺钉105拧紧,使第二紧定螺钉105将长绳201压紧在光孔的孔壁上即可。在出现特殊情况时,例如绳组2中两根长绳201的长度不一,此时便可将较长的长绳201从光孔中多伸出一部分,即可使得绳组2位于两个调节装置1区间的部分长度一致,即通过调节长绳201在移动块104中的伸出长度,解决长绳201位于固定板101之间的部分长度不一的问题。The part of the moving block 104 protruding from the groove is provided with a light hole along the length direction of the U-shaped member 102. The end of the long rope 201 penetrates the moving block 104 through the light hole, and the second set screw 105 is screwed on the top of the moving block 104. The rope 201 is fixedly connected inside the light hole by the second set screw 105 . When installing the long rope 201 to the light hole inside the moving block 104, first pass the long rope 201 through the light hole, and then tighten the second set screw 105, so that the second set screw 105 presses the long rope 201 on the light hole. on the hole wall of the light hole. In special circumstances, for example, the lengths of the two long ropes 201 in the rope set 2 are different, at this time, the longer long rope 201 can be extended a part from the light hole, so that the rope set 2 can be located between two Parts of the section of the adjusting device 1 have the same length, that is, by adjusting the extension length of the long rope 201 in the moving block 104 , the problem of different lengths of the long rope 201 between the fixed plates 101 is solved.
短绳202绑扎或通过固定卡具固定在长绳201上,无论采用何种固定方式,需保证短绳202在从长绳201上分离后仍可重新固定在长绳201上,上述固定方式为常规技术,不再作具体赘述。当出现斜位输送件3损坏的情况时,可将该斜位输送件3内部贯穿的短绳202的一端从长绳201上分离,便可将该斜位输送件3取下,然后套设新的斜位输送件3后将短绳202上按照原有位置重新固定在长绳201上即可,便于在斜位输送件3损坏的情况下对斜位输送件3进行更换。The short rope 202 is bound or fixed on the long rope 201 by a fixing fixture. No matter which fixing method is adopted, it is necessary to ensure that the short rope 202 can be re-fixed on the long rope 201 after being separated from the long rope 201. The above fixing method is as follows: The conventional technology will not be described in detail. When the inclined conveying member 3 is damaged, one end of the short rope 202 running through the interior of the inclined conveying member 3 can be separated from the long rope 201, and the inclined conveying member 3 can be removed, and then sleeved. After the new oblique conveying member 3 , the short rope 202 can be re-fixed on the long rope 201 according to the original position, so as to facilitate the replacement of the oblique conveying member 3 when the oblique conveying member 3 is damaged.
操作人员对调节装置1进行调整:转动一根长绳201对应的两个摇把106,使该调节装置上的两个移动块104沿相同方向进行移动,使得该绳组2上的其中一根长绳201沿自身延伸方向移动,另一根长绳201不动或沿相反方向移动时,改变该绳组2上斜位输送件3的倾斜方向,在对该绳组2调节完成后,对另一绳组2进行同样的调节以改变其上斜位输送件3的倾斜方向,即可实现通过调节装置1来调节斜位输送件3的倾斜角度的目的,从而改变本装置适用的电缆输送方向。The operator adjusts the adjusting device 1: rotate the two crank handles 106 corresponding to a long rope 201, so that the two moving blocks 104 on the adjusting device move in the same direction, so that one of the rope groups 2 is moved in the same direction. When the long rope 201 moves along its own extension direction, when the other long rope 201 does not move or moves in the opposite direction, the inclination direction of the inclined conveying member 3 on the rope group 2 is changed. The other rope group 2 is adjusted in the same way to change the inclination direction of the upper inclined conveying member 3, so that the purpose of adjusting the inclination angle of the inclined conveying member 3 through the adjusting device 1 can be realized, thereby changing the cable conveying suitable for this device. direction.
在本敷设装置布设在直线路段中且电缆需要对向敷设时(例如,在地铁隧道中敷设时,因空间限制,多个电缆盘无法全部放置在直线路段的一端,需将多个电缆盘分成两部分,分别放置在直线路段的两端,因此电缆在进行敷设时,需要从两端出线,对向敷设),不需要将两个调节装置1的位置互换,通过转动摇把106,将本装置调整为适用于反向敷设,便于敷设工作的进行。特别的,移动块104可在凹槽内的滑动长度范围应大于斜位输送件3的长度;保证在通过上述步骤调整敷设装置适应的电缆敷设方向时,能够调整到位。When the laying device is laid in a straight section and the cables need to be laid in opposite directions (for example, when laying in a subway tunnel, due to space constraints, multiple cable reels cannot all be placed at one end of the straight section, and multiple cable reels need to be divided into The two parts are placed at both ends of the straight section, so when the cable is laid, it needs to be routed from both ends and laid in opposite directions), and it is not necessary to exchange the positions of the two adjustment devices 1. By turning the crank 106, the The device is adjusted to be suitable for reverse laying, which is convenient for laying work. In particular, the sliding length range of the moving block 104 in the groove should be greater than the length of the inclined conveying member 3; it is ensured that when the cable laying direction adapted to the laying device is adjusted through the above steps, it can be adjusted in place.
本装置在使用完成后,可将绳组2从调节装置1上取下,将绳组2卷叠 进行存放,在使用时,选择合适长度的绳组2后进行敷设,然后在绳组2两端设置调节装置1即可,即调节装置1应用于不同长度但相邻长绳的间隔相同的绳组2中,提高调节装置1的通用性,减少调节装置1的需求数量,从而降低成本。After the device is used, the rope group 2 can be removed from the adjusting device 1, and the rope group 2 can be rolled up and stored. The adjustment device 1 can be provided at the end, that is, the adjustment device 1 is applied to the rope groups 2 with different lengths but the same interval between adjacent long ropes, which improves the versatility of the adjustment device 1, reduces the required quantity of the adjustment device 1, and thus reduces the cost.
采用上述实施例的电缆敷设施工方法如下:Adopt the cable laying construction method of the above-mentioned embodiment as follows:
1.根据现场直线路段的敷设长度选择合适长度的绳组2,并将绳组2铺设在现场直线路段中;1. According to the laying length of the straight line section of the site, select the rope group 2 of the appropriate length, and lay the rope group 2 in the straight line section of the site;
2.将两个调节装置1分别放置在两个绳组2的两端,然后将两个绳组2的端部固定在对应的移动块104中;2. Place the two adjusting devices 1 on the two ends of the two rope groups 2 respectively, and then fix the ends of the two rope groups 2 in the corresponding moving blocks 104;
3.根据电缆的牵引敷设方向来调节两个绳组2中斜位滑轮的倾斜方向;3. Adjust the inclination direction of the inclined pulleys in the two rope groups 2 according to the traction and laying direction of the cables;
4.在本装置上放置牵引绳,将电缆通过细绳固定在牵引绳上,通过牵引绳带动电缆在斜位输送件3、正位输送件4上移动,从而进行牵引敷设。4. Place a traction rope on the device, fix the cable on the traction rope through a thin rope, and drive the cable to move on the inclined conveying member 3 and the positive conveying member 4 through the traction rope, so as to carry out traction laying.

Claims (10)

  1. 一种电缆敷设装置,其特征在于,包括A cable laying device, characterized in that it includes
    两个相对设置的调节装置,调节装置包括固定板、安装组件和固定组件,安装组件和固定组件均设置在固定板上,各所述固定板上分别设有四个固定组件,所述固定板通过固定组件固定在地面上;Two oppositely arranged adjustment devices, the adjustment device includes a fixed plate, an installation component and a fixed component, the installation component and the fixed component are both arranged on the fixed plate, and each of the fixed plates is respectively provided with four fixed components, the fixed plate Fixed on the ground by fixing components;
    两个平行的绳组,所述绳组包括平行设置的两根长绳和多根短绳,长绳的两端分别固定在两个所述调节装置的所述安装组件上,短绳的两端分别连接在两根长绳上,相邻短绳在其中一根长绳上的位置之间的间隔,与在另一根长绳上的位置之间的间隔相等;Two parallel rope groups, the rope groups include two long ropes and a plurality of short ropes arranged in parallel. The ends are respectively connected to two long ropes, and the interval between the positions of adjacent short ropes on one of the long ropes is equal to the interval between the positions on the other long rope;
    斜位输送件,所述斜位输送件包括斜位空心杆、多个第一输送辊轴、多个第一输送辊;an inclined conveying member, the inclined conveying member comprises an inclined hollow rod, a plurality of first conveying roller shafts, and a plurality of first conveying rollers;
    所述斜位空心杆套设在所述短绳上,所述斜位空心杆的两端均具有第一环形端板;The oblique hollow rod is sleeved on the short rope, and both ends of the oblique hollow rod are provided with first annular end plates;
    所述第一输送辊轴的两端分别固定在两处第一环形端板上,并沿所述斜位空心杆的周向均布;Both ends of the first conveying roller shaft are respectively fixed on two first annular end plates, and are evenly distributed along the circumferential direction of the oblique hollow rod;
    所述第一输送辊套设在所述第一输送辊轴上,绕所述第一输送辊轴转动,以支撑并输送电缆。The first conveying roller is sleeved on the first conveying roller shaft and rotates around the first conveying roller shaft to support and convey the cable.
  2. 如权利要求1所述的电缆敷设装置,其特征在于,还包括正位输送件,所述正位输送件包括正位杆、多个第二输送辊轴、多个第二输送辊;The cable laying device according to claim 1, further comprising a positive position conveying member, the positive position conveying member comprising a positive position rod, a plurality of second conveying roller shafts, and a plurality of second conveying rollers;
    所述正位杆的轴线垂直于所述长绳的延伸方向,所述正位杆沿垂直于轴向的方向设有两组通孔,两个所述绳组之间相邻的两根所述长绳分别穿过两组所述通孔,所述正位杆上对应通孔设有锁紧装置,所述锁紧装置将正位杆固定在所述长绳上,正位杆的两端具有第二环形端板;The axis of the alignment rod is perpendicular to the extending direction of the long rope, the alignment rod is provided with two groups of through holes along the direction perpendicular to the axial direction, and the two adjacent rope groups between the two rope groups are provided with two groups of through holes. The long ropes respectively pass through the two sets of the through holes, and the corresponding through holes on the alignment rods are provided with locking devices, and the locking devices fix the alignment rods on the long ropes. the end has a second annular end plate;
    所述第二输送辊轴的两端分别固定在两处第二环形端板上,并沿正位杆的周向分布;Both ends of the second conveying roller shaft are respectively fixed on two second annular end plates and distributed along the circumferential direction of the alignment rod;
    所述第二输送辊套设在所述第二输送辊轴上,绕所述第二输送辊轴转动以支撑并输送电缆。The second conveying roller is sleeved on the second conveying roller shaft, and rotates around the second conveying roller shaft to support and convey the cable.
  3. 如权利要求2所述的电缆敷设装置,其特征在于,所述锁紧装置为第一紧定螺钉。The cable laying device according to claim 2, wherein the locking device is a first set screw.
  4. 如权利要求2所述的电缆敷设装置,其特征在于,所述正位输送件的两端部在长绳的延伸方向上,与斜位输送件部分重合。The cable laying device according to claim 2, wherein the two ends of the ortho-position conveying member partially overlap with the oblique-position conveying member in the extending direction of the long rope.
  5. 如权利要求1所述的电缆敷设装置,其特征在于,安装组件包括位移块;The cable laying device of claim 1, wherein the mounting assembly includes a displacement block;
    所述位移块上设有光孔,所述长绳穿过所述光孔并通过锁止装置固定在所述光孔中;The displacement block is provided with a light hole, and the long rope passes through the light hole and is fixed in the light hole by a locking device;
    所述锁止装置包括所述光孔的孔壁上设置的紧定螺纹孔、所述紧定螺纹孔中设置的第二紧定螺钉,所述第二紧定螺钉用于将所述长绳压紧在所述光孔的孔壁上。The locking device includes a tightening threaded hole set on the hole wall of the light hole, and a second tightening screw set in the tightening threaded hole, and the second tightening screw is used to lock the long rope. Pressed on the hole wall of the light hole.
  6. 如权利要求5所述的电缆敷设装置,其特征在于,所述安装组件还包括丝杠,所述丝杠转动设置在所述固定板上,所述丝杠的轴线与所述长绳的延伸方向平行,所述位移块与所述丝杠形成丝杠螺母机构。The cable laying device according to claim 5, wherein the installation assembly further comprises a lead screw, the lead screw is rotatably arranged on the fixing plate, the axis of the lead screw is connected to the extension of the long rope The directions are parallel, and the displacement block and the lead screw form a lead screw nut mechanism.
  7. 如权利要求6所述的电缆敷设装置,其特征在于,所述安装组件还包括开口向上的U形件,U形件具有凹槽,所述U形件的两端分别设有封板,所述封板封堵所述凹槽的侧部;The cable laying device according to claim 6, wherein the installation assembly further comprises a U-shaped member with an upward opening, the U-shaped member has a groove, and the two ends of the U-shaped member are respectively provided with sealing plates, so the sealing plate blocks the side of the groove;
    所述丝杠设置在所述凹槽中,所述丝杠的两端分别贯穿两处所述封板,并转动设置在所述封板上;The lead screw is arranged in the groove, and both ends of the lead screw penetrate through the two sealing plates respectively, and are rotatably arranged on the sealing plates;
    所述位移块的至少一部分设置在所述凹槽中,并在所述凹槽中移动。At least a part of the displacement block is disposed in the groove and moves in the groove.
  8. 如权利要求7所述的电缆敷设装置,其特征在于,所述短绳与所述长绳可拆连接。The cable laying device according to claim 7, wherein the short rope and the long rope are detachably connected.
  9. 如权利要求5所述的电缆敷设装置,其特征在于,光孔的轴线与所述长绳的延伸方向平行。The cable laying device according to claim 5, wherein the axis of the light hole is parallel to the extending direction of the long rope.
  10. 如权利要求1所述的电缆敷设装置,其特征在于,所述安装组件包括设置在固定板上的锚定孔和锚定孔中设置的锚定锥。The cable laying device of claim 1, wherein the mounting assembly comprises an anchor hole provided on the fixing plate and an anchor cone provided in the anchor hole.
PCT/CN2021/122371 2021-08-24 2021-09-30 Cable laying apparatus WO2022127303A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022545795A JP7266929B2 (en) 2021-08-24 2021-09-30 cable laying equipment

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202110975277.6 2021-08-24
CN202110975277.6A CN113594969B (en) 2021-08-24 2021-08-24 Cable laying device

Publications (1)

Publication Number Publication Date
WO2022127303A1 true WO2022127303A1 (en) 2022-06-23

Family

ID=78239213

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/122371 WO2022127303A1 (en) 2021-08-24 2021-09-30 Cable laying apparatus

Country Status (3)

Country Link
JP (1) JP7266929B2 (en)
CN (1) CN113594969B (en)
WO (1) WO2022127303A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU220041U1 (en) * 2023-06-02 2023-08-22 Открытое Акционерное Общество "Российские Железные Дороги" Device for fixing the cable during the installation of underground cable boxes

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000324641A (en) * 1999-05-06 2000-11-24 Mirai Ind Co Ltd Roller member for wiring and piping materials receiving apparatus, and wiring and piping member receiving device
CN204538568U (en) * 2015-04-27 2015-08-05 国家电网公司 A kind of cable laying servicing unit
CN110601084A (en) * 2019-09-29 2019-12-20 中国电建集团重庆工程有限公司 Cable turns to device and cable laying equipment
CN111740352A (en) * 2020-08-26 2020-10-02 国网山东省电力公司临朐县供电公司 Cable well cable laying device and method
CN213484378U (en) * 2020-08-17 2021-06-18 中铁十七局集团电气化工程有限公司 Cable laying device used in bridge

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5630515U (en) * 1979-08-16 1981-03-24
JPH0614442A (en) * 1992-06-23 1994-01-21 Hitachi Cable Ltd Prevention method of undulation of flat cable
US8246009B2 (en) * 2007-09-20 2012-08-21 Greenlee Textron Inc. Cable puller with pivot adjuster for converting between upward and downward cable pulling
SG11201600796WA (en) * 2013-08-21 2016-03-30 Daewoo Shipbuilding & Marine Transport device for laying power lines
CN110401145B (en) * 2019-06-24 2021-01-19 国网山西电力勘测设计研究院有限公司 Cable laying method
CN212449205U (en) * 2020-03-20 2021-02-02 淮矿西部煤矿投资管理有限公司 Movable belt conveyor
CN113178815B (en) * 2021-04-02 2023-03-31 中国神华煤制油化工有限公司 Cable laying device
CN112952661B (en) * 2021-04-08 2021-12-21 北京市第三建筑工程有限公司 Installation structure and construction method for laying cable in narrow space
CN113161924B (en) * 2021-04-25 2022-04-19 湖南华鑫美好公路环境建设有限公司 Multi-point type bridge cable laying system and laying method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000324641A (en) * 1999-05-06 2000-11-24 Mirai Ind Co Ltd Roller member for wiring and piping materials receiving apparatus, and wiring and piping member receiving device
CN204538568U (en) * 2015-04-27 2015-08-05 国家电网公司 A kind of cable laying servicing unit
CN110601084A (en) * 2019-09-29 2019-12-20 中国电建集团重庆工程有限公司 Cable turns to device and cable laying equipment
CN213484378U (en) * 2020-08-17 2021-06-18 中铁十七局集团电气化工程有限公司 Cable laying device used in bridge
CN111740352A (en) * 2020-08-26 2020-10-02 国网山东省电力公司临朐县供电公司 Cable well cable laying device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU220041U1 (en) * 2023-06-02 2023-08-22 Открытое Акционерное Общество "Российские Железные Дороги" Device for fixing the cable during the installation of underground cable boxes

Also Published As

Publication number Publication date
CN113594969A (en) 2021-11-02
CN113594969B (en) 2022-03-29
JP2023504299A (en) 2023-02-02
JP7266929B2 (en) 2023-05-01

Similar Documents

Publication Publication Date Title
CN110061451B (en) Cable pay-off is used in electric power construction
CN210468611U (en) Cable laying device
CN110668299B (en) Steel structure hoisting and conveying equipment for steel structure factory building
CN111003592A (en) Winding device for super-length soft rubber hose
CN218057898U (en) Cable winding device for building engineering
WO2022127303A1 (en) Cable laying apparatus
CN110589543B (en) Cloth reel bundling mechanism
CN108963869B (en) Clamp for assisting cable erection and wire drawing device using same
CN110773480B (en) Deslagging scraper device of oven return roller
CN218216379U (en) Cable laying auxiliary device for electromechanical equipment installation
CN216737357U (en) Hoist equipment for decorative external wall construction
CN105926458A (en) Double-drive device and method automatic in rubber rod penetrating
CN115402728A (en) A self-adjusting device of quick clamping V type gyro wheel for pipeline transportation
CN111064115B (en) Rod porcelain insulator replacing device
CN105908634A (en) Dual-drive device and method for automatic poling
CN219567099U (en) Cable paying-off device for construction site
CN105970827A (en) Device and method for automatically threading pipe
CN209889929U (en) Coating machine loading attachment
CN210230157U (en) Change welt conveyer of ball-milling welt
CN212333711U (en) Belt feeder off tracking adjusting device for coal mine
CN220976137U (en) High-speed cage type cabling device for reliable cable
CN211444511U (en) Tower crane cable auxiliary device
CN111003596B (en) Cable rack convenient to use for cable laying
CN212425238U (en) Winch for traction pipeline gyroscope
CN215047379U (en) Aluminum strip conveying device

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2022545795

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21905232

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE