CN204538568U - A kind of cable laying servicing unit - Google Patents
A kind of cable laying servicing unit Download PDFInfo
- Publication number
- CN204538568U CN204538568U CN201520260962.0U CN201520260962U CN204538568U CN 204538568 U CN204538568 U CN 204538568U CN 201520260962 U CN201520260962 U CN 201520260962U CN 204538568 U CN204538568 U CN 204538568U
- Authority
- CN
- China
- Prior art keywords
- cable
- cable laying
- servicing unit
- frame body
- unit according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型公开了一种电缆敷设辅助装置,包括电缆承力托槽架、井外固定机构和井内固定机构,所述井外固定装置设置在电缆承力托槽架一端的下方,所述井内固定机构设置在电缆承力托槽架中间的下方;所述电缆承力托槽架包括架本体、导向机构和传输机构,所述导向机构位于架本体的两端,所述传输机构位于导向机构之间的架本体上。该电缆敷设辅助装置不仅可以保证高效和高质量的电缆敷设施工,还能省时省力,保护好电缆不受损坏。
The utility model discloses an auxiliary device for cable laying, which comprises a cable bearing bracket, a fixing mechanism outside a well and an inside fixing mechanism. The mechanism is arranged below the middle of the cable load-bearing bracket frame; the cable load-bearing bracket frame includes a frame body, a guide mechanism and a transmission mechanism, the guide mechanism is located at both ends of the frame body, and the transmission mechanism is located between the guide mechanism on the frame body between. The cable laying auxiliary device can not only ensure efficient and high-quality cable laying construction, but also save time and effort, and protect the cables from damage.
Description
技术领域technical field
本实用新型涉及电缆敷领域,具体涉及一种电缆敷设辅助装置。The utility model relates to the field of cable laying, in particular to an auxiliary device for cable laying.
背景技术Background technique
在城区配网自动化改造过程中,会有大量的电缆敷设工作。在进行电缆敷设时,如果电缆与电缆井口以及管道口直接接触会产生很大阻力,造成电缆外皮磨损以及电缆井口损坏,给施工质量和施工效率造成很大影响。In the process of urban distribution network automation transformation, there will be a lot of cable laying work. During cable laying, if the cable is in direct contact with the cable wellhead and the pipe mouth, great resistance will be generated, resulting in wear of the cable sheath and damage to the cable wellhead, which will have a great impact on the construction quality and efficiency.
目前在施工过程中,施工人员普遍应用DLHC06型电缆处理工具。但此工具不好控制电缆方向,电缆很容易脱离辅助车,需要有人不断用撬杠纠正电缆的方向,这样就明显减慢了电缆的敷设速度;如果敷设速度太快,调整人员不好把控,电缆就会直接与井口接触,造成电缆外皮磨损以及电缆井口损坏。另外,在电缆进入管道时,也没有任何防护措施,电缆与管道上沿直接接触摩擦,很容易造成电缆的损坏。At present, in the construction process, construction workers generally use DLHC06 cable handling tools. But this tool is not easy to control the direction of the cable, the cable is easy to get out of the auxiliary vehicle, and someone needs to constantly use the crowbar to correct the direction of the cable, which obviously slows down the speed of cable laying; if the laying speed is too fast, it is difficult for the adjustment personnel to control , the cable will be in direct contact with the wellhead, resulting in abrasion of the cable sheath and damage to the cable wellhead. In addition, when the cable enters the pipeline, there is no protective measure, and the cable directly contacts and rubs against the upper edge of the pipeline, which may easily cause damage to the cable.
发明内容Contents of the invention
针对上述问题,本实用新型提供了一种电缆敷设辅助装置,不仅可以保证高效和高质量的电缆敷设施工,还能省时省力,保护好电缆不受损坏。In view of the above problems, the utility model provides a cable laying auxiliary device, which can not only ensure efficient and high-quality cable laying construction, but also save time and effort, and protect the cables from damage.
本实用新型提供的一种电缆敷设辅助装置,包括电缆承力托槽架、井外固定机构和井内固定机构,所述井外固定装置设置在电缆承力托槽架一端的下方,所述井内固定机构设置在电缆承力托槽架中间的下方;所述电缆承力托槽架包括架本体、导向机构和传输机构,所述导向机构位于架本体的两端,所述传输机构位于导向机构之间的架本体上。The utility model provides an auxiliary device for laying cables, which includes a cable bearing bracket, an outside fixing mechanism and an inside fixing mechanism. The outside fixing device is arranged under one end of the cable bearing bracket, and the inside fixing The mechanism is arranged below the middle of the cable load-bearing bracket; the cable load-bearing bracket includes a frame body, a guide mechanism and a transmission mechanism, the guide mechanism is located at both ends of the frame body, and the transmission mechanism is located between the guide mechanism on the frame body between.
在进一步的技术方案中,所述传输机构包括多个横向轴和横向滚轮,所述横向轴沿着架本体的横向、间隔设置,所述横向滚轮可转动地设置在横向轴上,所述架本体的上表面为弧面。In a further technical solution, the transmission mechanism includes a plurality of transverse shafts and transverse rollers, the transverse shafts are arranged at intervals along the transverse direction of the rack body, the transverse rollers are rotatably arranged on the transverse shafts, and the rack The upper surface of the body is an arc surface.
在进一步的技术方案中,所述导向机构包括四个竖向轴和四个竖向滚轮,所述架本体的两端分别设置两个竖向轴和竖向滚轮,且位于同一端的竖向轴间隔设置,所述竖向滚轮可转动的设置在竖向轴上。In a further technical solution, the guide mechanism includes four vertical shafts and four vertical rollers, two vertical shafts and vertical rollers are respectively provided at both ends of the frame body, and the vertical shafts at the same end Arranged at intervals, the vertical rollers are rotatably arranged on the vertical shaft.
在进一步的技术方案中,所述横向轴和竖向轴都为螺杆,架本体上设有与螺杆配合的螺纹孔,横向滚轮和竖向滚轮可转动地套在与各自相对应的螺杆外周。In a further technical solution, both the horizontal axis and the vertical axis are screw rods, threaded holes matching with the screw rods are provided on the frame body, and the horizontal rollers and vertical rollers are rotatably sleeved on the outer circumferences of the corresponding screw rods.
在进一步的技术方案中,所述井外固定机构包括两个长度可调节的组合支腿,两个所述组合支腿张开设置。In a further technical solution, the outside fixing mechanism includes two length-adjustable combined legs, and the two combined legs are set apart.
在进一步的技术方案中,所述井内固定机构包括至少一个定位稳定支腿,所述定位稳定支腿用于卡接在电缆井的内壁。In a further technical solution, the fixing mechanism in the well includes at least one positioning and stabilizing leg, and the positioning and stabilizing leg is used for clamping on the inner wall of the cable well.
在进一步的技术方案中,所述定位稳定支腿为L形。In a further technical solution, the positioning and stabilizing legs are L-shaped.
在进一步的技术方案中,所述电缆敷设辅助装置还包括导向架,所述导向架用于设置在电缆井内的管道口。In a further technical solution, the auxiliary cable laying device further includes a guide frame, and the guide frame is used for the pipe opening arranged in the cable shaft.
在进一步的技术方案中,所述导向架包括固定架、承载滚轮和L形挡柄,所述承载滚轮套设在L形挡柄上,且L形挡柄的一端与固定架固定连接。In a further technical solution, the guide frame includes a fixed frame, load rollers and an L-shaped handle, the load roller is sleeved on the L-shaped handle, and one end of the L-shaped handle is fixedly connected to the fixed frame.
在进一步的技术方案中,所述固定架包括上连杆和下连杆,上连杆与下连杆之间通过螺纹可拆卸连接,下连杆的下端设有插孔,所述L形挡柄的端部可插入所述插孔。In a further technical solution, the fixed frame includes an upper link and a lower link, the upper link and the lower link are detachably connected by threads, the lower end of the lower link is provided with a socket, and the L-shaped stop The end of the handle is insertable into the socket.
本实用新型提出的一种电缆敷设辅助装置,与现有技术相比,由于设置了井外固定机构和井内固定机构,可以同时卡接在电缆井的井缘和电缆井的内壁上,有利于电缆敷设过程的可靠和稳定性;另外,由于导向机构和传输机构的设置,使得电缆的传输过程省时省力,并且在导向机构的作用下,电缆不会轻易跑偏,综上所述,该电缆敷设辅助装置既稳定,又能将电缆与电缆井的边缘隔开,还能省力传输以及定向导向,因此可以保证高效和高质量的电缆敷设施工,还能省时省力,保护好电缆不受损坏。Compared with the prior art, the auxiliary device for cable laying proposed by the utility model can be clamped on the edge of the cable well and the inner wall of the cable well at the same time due to the setting of the fixing mechanism outside the well and the fixing mechanism inside the well. The reliability and stability of the laying process; in addition, due to the setting of the guide mechanism and the transmission mechanism, the cable transmission process saves time and effort, and under the action of the guide mechanism, the cable will not easily deviate. In summary, the cable The laying auxiliary device is not only stable, but also can separate the cable from the edge of the cable well, and can also save labor transmission and directional guidance, so it can ensure efficient and high-quality cable laying construction, save time and effort, and protect the cable from damage .
附图说明Description of drawings
图1为本实用新型电缆敷设辅助装置的俯视图;Fig. 1 is the top view of the utility model cable laying auxiliary device;
图2为本实用新型电缆敷设辅助装置的主视图;Fig. 2 is the front view of the utility model cable laying auxiliary device;
图3为本实用新型电缆敷设辅助装置的仰视图;Fig. 3 is a bottom view of the utility model cable laying auxiliary device;
图4为本实用新型电缆敷设辅助装置的侧视图;Fig. 4 is a side view of the utility model cable laying auxiliary device;
图5为本实用新型电缆的敷设施工图;Fig. 5 is the laying construction drawing of cable of the present invention;
图6为本实用新型导向架的爆炸结构示意图。Fig. 6 is a schematic diagram of the exploded structure of the guide frame of the present invention.
具体实施方式Detailed ways
本实用新型具体实施例提供了一种电缆敷设辅助装置,如图1-6所示,包括电缆承力托槽架、井外固定机构4和井内固定机构5,井外固定装置设置在电缆承力托槽架一端的下方,井内固定机构5设置在电缆承力托槽架中间的下方。具体地,井外固定机构4包括两个长度可调节的组合支腿,两个组合支腿张开设置,组合支腿用于卡接在电缆井8的外缘;井内固定机构5包括至少一个定位稳定支腿,且定位稳定支腿为L形,定位稳定支腿用于卡接在电缆井8的内壁。电缆承力托槽架包括架本体1、导向机构2和传输机构3,导向机构2位于架本体1的两端,位于架本体1的上方,传输机构3位于导向机构2之间的架本体1上,用于电缆7的传输;传输机构3包括多个横向轴和横向滚轮,横向轴沿着架本体1的横向、间隔设置,横向滚轮可转动地设置在横向轴上,这样可以减小电缆7拖动时的阻力,降低劳动强度;导向机构2包括四个竖向轴和四个竖向滚轮,架本体1的两端分别设置两个竖向轴和竖向滚轮,且位于同一端的竖向轴间隔设置,竖向滚轮可转动的设置在竖向轴上,电缆7从两个竖向滚轮之间穿过,不仅起到导向的作用,还能进一步的减小电缆7在输送过程中的阻力。更为具体地,横向轴和竖向轴都为螺杆,架本体1上设有与螺杆配合的螺纹孔6,横向滚轮和竖向滚轮可转动地套在与各自相对应的螺杆外周。The specific embodiment of the utility model provides a cable laying auxiliary device, as shown in Figure 1-6, including a cable load-bearing bracket, an external fixing mechanism 4 and an internal fixing mechanism 5, and the external fixing device is arranged on the cable bearing bracket. Below one end of the bracket frame, the fixing mechanism 5 in the well is arranged below the middle of the cable load-bearing bracket frame. Specifically, the fixing mechanism 4 outside the well includes two combined legs with adjustable length, the two combined legs are set apart, and the combined legs are used to be clamped on the outer edge of the cable well 8; the fixing mechanism 5 in the well includes at least one The positioning and stabilizing legs are L-shaped, and the positioning and stabilizing legs are used to be clamped on the inner wall of the cable well 8 . The cable load-bearing bracket frame includes a frame body 1, a guide mechanism 2 and a transmission mechanism 3. The guide mechanism 2 is located at both ends of the frame body 1 and above the frame body 1, and the transmission mechanism 3 is located on the frame body 1 between the guide mechanisms 2. It is used for the transmission of cables 7; the transmission mechanism 3 includes a plurality of transverse shafts and transverse rollers, the transverse axes are arranged at intervals along the transverse direction of the frame body 1, and the transverse rollers are rotatably arranged on the transverse shafts, which can reduce the size of the cables. 7 The resistance when dragging reduces the labor intensity; the guide mechanism 2 includes four vertical shafts and four vertical rollers, two vertical shafts and vertical rollers are respectively arranged at the two ends of the frame body 1, and the vertical rollers at the same end The vertical rollers are rotatably arranged on the vertical axis, and the cable 7 passes between the two vertical rollers, which not only plays a guiding role, but also further reduces the speed of the cable 7 during the transportation process. resistance. More specifically, both the horizontal axis and the vertical axis are screw rods, the frame body 1 is provided with threaded holes 6 matching with the screw rods, and the horizontal rollers and vertical rollers are rotatably sleeved on the outer circumferences of the corresponding screw rods.
另外,为了防止电缆7在进入管道9时与管道9口发生摩擦而损坏,该电缆敷设辅助装置还包括设置在电缆井8内管道9口的导向架。该导向架包括固定架、承载滚轮15和L形挡柄14,承载滚轮15套设在L形挡柄14上,且L形挡柄14的一端与固定架固定连接。具体地,固定架包括上连杆10和下连杆11,上连杆10与下连杆11之间通过螺纹可拆卸连接,下连杆11的下端设有插孔12,L形挡柄14的端部13可用于插入插孔12。In addition, in order to prevent the cable 7 from being damaged due to friction with the mouth of the pipe 9 when it enters the pipe 9, the auxiliary cable laying device also includes a guide frame arranged at the mouth of the pipe 9 in the cable well 8. The guide frame includes a fixed frame, a carrying roller 15 and an L-shaped retaining handle 14. The carrying roller 15 is sleeved on the L-shaped retaining handle 14, and one end of the L-shaped retaining handle 14 is fixedly connected to the fixed frame. Specifically, the fixed frame includes an upper link 10 and a lower link 11, the upper link 10 and the lower link 11 are detachably connected by threads, the lower end of the lower link 11 is provided with a socket 12, and an L-shaped stop handle 14 The end 13 can be used to insert the socket 12.
施工前将电缆承力托槽架置于电缆井8口,可调节组合支腿卡住电缆井8外缘,定位稳定组合支腿卡住电缆井8内壁将电缆承力托槽架固定住。电缆承力托槽架四个角的竖向滚轮用以控制电缆7方向和减小电缆7前进阻力,电缆承力托槽架采用斜面设计,弯曲方向与电缆7前进方向一致,减小施工阻力。电缆承力托槽架两侧面分别有六个螺纹孔6,螺纹孔6上分别安装有横向轴,在电缆7拖动过程中,承力部分主要是传输机构3,因此采用滚轮设计大大降低了施工阻力,起到了省时省力的效果。同时,避免了电缆7与电缆井8口的直接接触,防止电缆7外皮的磨损和对电缆井8口的损坏。Before construction, the cable load-bearing bracket frame is placed in the mouth of the cable well 8, and the adjustable combined support leg is stuck on the outer edge of the cable well 8, and the positioning stable combined support leg is stuck on the inner wall of the cable well 8 to fix the cable load-bearing bracket frame. The vertical rollers at the four corners of the cable bearing bracket are used to control the direction of the cable 7 and reduce the forward resistance of the cable 7. The cable bearing bracket adopts a slope design, and the bending direction is consistent with the forward direction of the cable 7 to reduce construction resistance. . There are six threaded holes 6 on both sides of the cable load-bearing bracket, and horizontal shafts are respectively installed on the threaded holes 6. During the dragging process of the cable 7, the load-bearing part is mainly the transmission mechanism 3, so the roller design greatly reduces the The construction resistance has the effect of saving time and effort. Simultaneously, the direct contact between the cable 7 and the mouth of the cable well 8 is avoided, and the abrasion of the outer skin of the cable 7 and the damage to the mouth of the cable well 8 are prevented.
施工完成后将可调节组合支腿伸展,将电缆承力托槽架取下,可调节组合支腿与定位稳定支腿一起,起到稳定放置电缆承力托槽架的作用。After the construction is completed, the adjustable combined outriggers are stretched, and the cable load-bearing bracket is removed. The adjustable combined outriggers together with the positioning and stabilizing outriggers play the role of stably placing the cable load-bearing bracket.
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to fall within the scope of the claims All changes within the meaning and range of equivalents of the required elements are included in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520260962.0U CN204538568U (en) | 2015-04-27 | 2015-04-27 | A kind of cable laying servicing unit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520260962.0U CN204538568U (en) | 2015-04-27 | 2015-04-27 | A kind of cable laying servicing unit |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204538568U true CN204538568U (en) | 2015-08-05 |
Family
ID=53752528
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520260962.0U Expired - Fee Related CN204538568U (en) | 2015-04-27 | 2015-04-27 | A kind of cable laying servicing unit |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204538568U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107069569A (en) * | 2017-06-07 | 2017-08-18 | 国网山东省电力公司济南市章丘区供电公司 | A kind of cable aids in installation apparatus |
| CN108365575A (en) * | 2018-05-14 | 2018-08-03 | 国网黑龙江省电力有限公司牡丹江供电公司 | A kind of cable wellhead cabling device |
| CN111740352A (en) * | 2020-08-26 | 2020-10-02 | 国网山东省电力公司临朐县供电公司 | A cable well cable laying device and method |
| WO2022127303A1 (en) * | 2021-08-24 | 2022-06-23 | 中铁九局集团电务工程有限公司 | Cable laying apparatus |
| CN116937431A (en) * | 2023-09-12 | 2023-10-24 | 国网山西省电力公司晋中供电公司 | Ground wire hanging point connecting device |
-
2015
- 2015-04-27 CN CN201520260962.0U patent/CN204538568U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107069569A (en) * | 2017-06-07 | 2017-08-18 | 国网山东省电力公司济南市章丘区供电公司 | A kind of cable aids in installation apparatus |
| CN108365575A (en) * | 2018-05-14 | 2018-08-03 | 国网黑龙江省电力有限公司牡丹江供电公司 | A kind of cable wellhead cabling device |
| CN111740352A (en) * | 2020-08-26 | 2020-10-02 | 国网山东省电力公司临朐县供电公司 | A cable well cable laying device and method |
| CN111740352B (en) * | 2020-08-26 | 2020-11-24 | 国网山东省电力公司临朐县供电公司 | A cable well cable laying device and method |
| WO2022127303A1 (en) * | 2021-08-24 | 2022-06-23 | 中铁九局集团电务工程有限公司 | Cable laying apparatus |
| CN116937431A (en) * | 2023-09-12 | 2023-10-24 | 国网山西省电力公司晋中供电公司 | Ground wire hanging point connecting device |
| CN116937431B (en) * | 2023-09-12 | 2024-01-19 | 国网山西省电力公司晋中供电公司 | A ground conductor hanging point connection device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204538568U (en) | A kind of cable laying servicing unit | |
| CN203092062U (en) | Auxiliary supporting device for pipeline welding | |
| CN204835375U (en) | Column cable wire rack | |
| CN201360119Y (en) | A guide bracket for cable laying | |
| CN105610090B (en) | A kind of electric power first-aid wire tensioning device | |
| CN203740777U (en) | Power line winding and straightening device | |
| CN106185022A (en) | A kind of tube support arrangement | |
| CN203635810U (en) | Steel-bar bending device | |
| CN205583536U (en) | Electrical power rush -repair tensioner bullwheel | |
| CN206513300U (en) | Safety inspection ladder | |
| CN202726064U (en) | Automatic lathe with convenient discharge chute | |
| CN203406562U (en) | Novel drum carriage | |
| CN206665839U (en) | Novel heavy duty pay off rack | |
| CN204576386U (en) | Computer cables fixes draw off gear automatically | |
| CN203734222U (en) | Portable cable folding and unfolding bracket | |
| CN204858905U (en) | Portable electric motor rotor rule device | |
| CN204809741U (en) | Hold in palm bottleholder | |
| CN109230810A (en) | A kind of cable laying assistant conveyance device | |
| CN204603692U (en) | For repairing the maintenance means for correcting of all steel cord roller spindle nose distortion | |
| CN203998436U (en) | Portable grounding jumper dedicated box | |
| CN204290237U (en) | A kind of adjustable cable pay off rack | |
| CN203728335U (en) | Winding mechanism | |
| CN203392618U (en) | Manual pay-off rack | |
| CN109733942B (en) | A cable handling and pay-off device | |
| CN206388343U (en) | Financial Teaching curve data Graphic Panel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 Termination date: 20160427 |