WO2022090886A1 - Engin de construction de fondations et procédé de commande dudit engin - Google Patents

Engin de construction de fondations et procédé de commande dudit engin Download PDF

Info

Publication number
WO2022090886A1
WO2022090886A1 PCT/IB2021/059809 IB2021059809W WO2022090886A1 WO 2022090886 A1 WO2022090886 A1 WO 2022090886A1 IB 2021059809 W IB2021059809 W IB 2021059809W WO 2022090886 A1 WO2022090886 A1 WO 2022090886A1
Authority
WO
WIPO (PCT)
Prior art keywords
data
foundation construction
construction machine
machine
operator
Prior art date
Application number
PCT/IB2021/059809
Other languages
English (en)
Inventor
Alessandro Ditillo
Francesco MANTOVANI
Original Assignee
Soilmec Spa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Soilmec Spa filed Critical Soilmec Spa
Priority to EP21802429.7A priority Critical patent/EP4232681A1/fr
Priority to US18/249,538 priority patent/US20230383603A1/en
Priority to AU2021371091A priority patent/AU2021371091A1/en
Priority to CA3194429A priority patent/CA3194429A1/fr
Publication of WO2022090886A1 publication Critical patent/WO2022090886A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/022Control of the drilling operation; Hydraulic or pneumatic means for activation or operation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/024Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting having means for adapting to inclined terrain; having means for stabilizing the vehicle while drilling

Definitions

  • TITLE "Foundation construction machine and method for controlling such machine"
  • the present invention relates to a foundation construction machine and a method for controlling such machine .
  • Such type of machine is typically configured for working the soil, generally in order to build structural foundation elements, e.g. piles for a new deep foundation or piles for propping up an existing foundation or the support layer of a shallow foundation, or in order to make retaining elements in the ground, e.g. earth retaining walls or waterproofing bulkheads, or for soil consolidating purposes through the use of appropriate injection and mixing techniques.
  • structural foundation elements e.g. piles for a new deep foundation or piles for propping up an existing foundation or the support layer of a shallow foundation
  • retaining elements in the ground e.g. earth retaining walls or waterproofing bulkheads
  • Machines employed for building foundations are generally called “foundation construction machines”. They are typically used in a building yard environment and comprise a base machine, a mast or boom supported by the base machine, and an operating equipment carried by the mast. Such machines are typically controlled by means of commands, i.e. control signals, issued by an operator placed in a control station e.g. a cabin or a control board, or by an operator placed at a distance from the machine, e.g. using a radio control unit or a remote control station.
  • commands i.e. control signals
  • the base machine generally comprises an upper structure and a self-moving or mobile assembly mechanically connected to each other in a fixed or, via a slewing ring, rotatable manner; the self-moving or mobile assembly, which is typically a tracked undercarriage, allows the foundation construction machine to move on the ground and supports it thereon.
  • the upper structure is generally provided with a structural frame housing several components, e.g. a prime mover, typically a Diesel engine, supplying the necessary power to all the devices and the hydraulic and electric systems of the machine.
  • the structural frame also houses one or more control units, typically PLCs, which, together with suitable input/output modules, sensors, limit switches and electromechanical devices, permit controlling the machine.
  • the mast (also called "boom" when, for example, it is derived from a base machine of a foundation construction crane) is commonly a structural element having a lattice or boxed construction and a long extension, even in excess of forty meters. Said mast is mechanically connected to the frame on the side opposite to the ballast by means of a kinematic mechanism or a pin hinge to make a traverse movement in order to switch from a horizontal position to a substantially vertical position and/or, whenever necessary, in order to change the working radius of the machine. Furthermore, the mast performs the function of mechanically supporting and also - in some types of foundation construction machines - guiding an operating equipment designed to work the soil according to a given processing technology .
  • the upper structure and/or the mast and/or the kinematic mechanism also house winches adapted to move the operating equipment by means of a rope, typically driven by hydraulic gear motors and braked by overcentre valves and mechanical brakes, and also ballast elements ensuring machine stability during the work.
  • the winches may also have an electrically controlled drive, and therefore may be equipped with an electric motor imparting the rope winding/unwinding motion.
  • the winches may also be driven by a hydraulic unit combined with an electric command.
  • the foundation construction machines known in the art include the so-called “drilling machines", wherein the operating equipment comprises, in particular consists of, interchangeable equipment and a drill or consolidation head or a driving head.
  • the interchangeable equipment may be, merely by way of example, a drilling tool (e.g. a bucket, a drill bit, a core sampler) mechanically connected to telescopic rods called “kelly bars", a single “continuous flight auger” or “soil displacement” drilling tool, or else it may be ground consolidation equipment (e.g. of the "jet grouting", “soil mixing”, “deep mixing”, “Turbojet”, “vibro compaction", “stone column”, “bottom feed system” types) .
  • the operating equipment may also be a vibro-drive equipment, e.g. a hammer or a vibrator, constituting a drive head configured to impart ground driving motion to a structural foundation element (e.g. a sheet pile, a pipe, a metal section, etc. ) .
  • the drill head also referred to as "rotary" is mechanically connected to the mast and can be guidedly made to translate along the mast by means of a rope driven by a winch installed on the upper structure or, as an alternative, by means of a hydraulic cylinder or a rack-type drive system.
  • the drill head is mechanically connected to the interchangeable equipment in order to transfer thereto a rotary motion and a torque of such intensity as to overcome the resistance of the soil and make a hole.
  • the interchangeable equipment may be mechanically associated with the mast in a direct manner by means of a rope of a winch installed on the upper structure (or on the mast) , which supports the interchangeable equipment on the pulleys installed at the top of the mast and moves the interchangeable equipment relative to the mast along the longitudinal direction of the hole.
  • the interchangeable equipment may be mechanically associated with the mast in an indirect manner, being moved by the drill head (in this case, for example, hydraulic cylinders or chain-type gear motor systems or winches equipped with ropes or pinion-rack systems, or the like, are used) .
  • the drive head may be associated with the mast either directly or indirectly, and an additional winch installed on the upper structure, called “service winch", moves an auxiliary rope which, supported by additional pulleys installed at the top of the mast, can be used in order to move foundation elements, such as reinforcement cages, near the hole being made .
  • Drilling machines also include the so-called "micropile and tunnel machines", i.e. small to medium size machines employed for making foundations, subfoundations, tie beams, anchors, borings or consolidation works both outdoors (e.g. on a construction site) and indoors (e.g. in buildings, tunnels , etc . ) .
  • the foundation construction machines known in the art also include the so-called “diaphragm wall excavation machines", wherein the operating equipment may be, by way of example, a cutter module, i.e. a frame to which rotary drums equipped with teeth and driven by gear motors are connected in order to make the excavation.
  • the operating equipment may be a grab module, i.e.
  • the operating equipment of a diaphragm wall excavation machine may be a dynamic compaction mass or a drive head.
  • Said operating equipment may be mechanically connected in a direct manner along the mast, in which case they preferably exert a thrust force that facilitates soil penetration, or may be simply suspended by gravity from the mast head by means of a rope in order to work the soil in a substantially vertical direction.
  • the operating equipment is mechanically associated with the mast in a direct manner to be moved relative to the mast along the longitudinal direction of the excavation to be made in the soil.
  • foundation construction machine may comprise not only those machine types mentioned above merely by way of non-limiting example, but also other machine types (e.g. also those typically included in the EN16228:2014 product standard series) .
  • action could be taken by changing at least one of the three characteristic parameters: the first one is the machine setup, another one is the geometric configuration of the machine, and the last one consists of modifying the type and maximum intensity of the working forces and loads acting upon the machine.
  • the adopted setup may simply concern any part of the machine that affects the weight thereof and/or the position of its centre of gravity.
  • lighter or heavier machine parts can be selected, such as: the drill head (as aforementioned, also referred to as "rotary") , the “kelly” bars, the mast (which, as previously mentioned, may have a variable length and may be fitted with boxed or lattice extensions) , the head at the top of the mast, the mast supporting foot, the working tools (screws, drill bits, casings, etc.
  • ballast (which may either be reduced, in order to lower the weight thereof and reduce the maximum value of the pressure distribution on the ground, or increased, in order to reduce the eccentricity of the centre of gravity and improve the uniformity of the spatial distribution of the pressure under the tracks of the undercarriage, compared with a typically triangular distribution) .
  • the main parameters of the geometric configuration of the machine that mostly affect its stability in operation and the pressure generated on the soil comprise: the working radius of the tool (i.e. the "overhang” of the tool from the base machine, particularly relative to the front and lateral overturning lines defined by the undercarriage and/or by stabilizers or by the mast supporting foot, if present) and the angle of rotation of the upper structure relative to the undercarriage, if the upper structure is a rotary one.
  • the working radius of the tool i.e. the "overhang" of the tool from the base machine, particularly relative to the front and lateral overturning lines defined by the undercarriage and/or by stabilizers or by the mast supporting foot, if present
  • the angle of rotation of the upper structure relative to the undercarriage if the upper structure is a rotary one.
  • further geometric parameters affecting stability and soil pressure include the lateral tilting angle of the mast (i.e.
  • the working radius of the tool is typically changed by actuating, by means of a jack, a kinematic mechanism (e.g. a parallelogram mechanism) that mechanically connects the upper structure to the mast; or in diaphragm wall excavation machines, this is achieved by causing the mast, by means of a winch, to make a traverse movement.
  • a kinematic mechanism e.g. a parallelogram mechanism
  • the angle of rotation of the upper structure relative to the undercarriage can simply be adjusted by controlling a slewing ring via one or more gear motors.
  • the lateral tilting angle of the mast and the degrees of freedom of the kinematic mechanism can preferably be modified by means of hydraulic cylinders and/or a slewing ring and gear motor pair.
  • the maximum value of the working forces acting upon the machine i.e. the forces originated during the drilling/excavat ion process (e.g. the drilling torque of the drill head or the thrust or extraction force acting upon the tool)
  • the extraction force of a "continuous flight auger" (CFA) excavation tool is generally exerted according to a ratio of multiplication of the pulling force of a winch (e.g.
  • x2 or x4 thus reaching values even in excess of 100 tons, and in many cases similar to or higher than the weight of the whole foundation construction machine) , and therefore has a considerable impact on the intensity of the loads transmitted to the soil by the machine, e.g. via the mast supporting foot.
  • Such forces and loads can be decreased and limited, for example, by means of the machine's control system, by limiting the value of the working pressure of the hydraulic actuators or the value of the current of the electric actuators, or by mechanically modifying the multiplication ratio, as in the above-described case.
  • Other forces acting upon the machine and not directly caused by the soil processing activity e.g. wind force or the centrifugal force generated during the rotation of the upper structure, are considered as fixed values specified in the product standards.
  • the stability of the machine and the pressure exerted by it on the soil also depend on the operating condition in which the machine is (e.g. normal operation, transportation, manoeuvers, etc. ) , since its geometric configuration is different in the various operating conditions.
  • ground slope has an impact on the value and distribution of the pressure generated by the machine on the soil, because such slope affects the relative position of the centre of gravity. In fact, the resultant weight force applied to the general centre of gravity of the machine always remains vertical, while the machine supporting plane takes the inclination of the ground.
  • a decisive factor affecting the stability of the foundation construction machine and the pressure generated by it on the soil consists of the overturning moments caused by the various forces acting upon the machine parts (weights of the parts and external loads) , i.e. the product of the intensity of the force and the distance of the point of application of such force from a line of possible overturning of the machine: for example, the overturning effect caused by the weight force of the equipment in use is strongly affected by the product of the value of such weight (and also, in working conditions, the resultant of the applied loads) and the value of the current working radius of the machine.
  • the foundation construction machines known in the art suffer from a few drawbacks.
  • One of such drawbacks lies in the fact that in priorart foundation construction machines it is not straightforward to modify the above-described three characteristic parameters so that the maximum value of the pressure generated by the machine on the ground will not exceed a new allowable limit value, e.g. following the use of a working platform having different load-bearing capacity values .
  • One advantage lies in the fact that no machine configuration can be created wherein the value of the pressure exerted on the soil may become critical for the working platform whereon the machine will have to work.
  • Another advantage lies in the fact that the invention simplifies the selection of that setup modification which will provide the most effective and fastest reduction of the soil pressure values.
  • a further advantage lies in the fact that the determination of the soil pressure values is verified and certain .
  • the invention also offers the advantage of making it easier to ascertain which one of the three parameters (machine setup, geometric configuration of the machine, and maximum intensity of the working forces and loads acting upon the machine) will provide the best and optimal reduction of the soil pressure value.
  • Figure 1 is a side view of a foundation construction machine obtained in accordance with an exemplary embodiment of the present invention.
  • Figure 2 is a block diagram referring to a control station and a control system applicable to the foundation construction machine shown in Figure 1.
  • FIG. 3 is a block diagram referring to a method applicable to the foundation construction machine represented in the preceding figures. Detailed description of the invention
  • FIG. 1 With reference to Figure 1, there is shown a foundation construction machine, designated as a whole as 1, made in accordance with an exemplary embodiment of the present invention .
  • Foundation construction machine 1 comprises a tracked undercarriage 2 configured for moving on the soil, thus moving the rest of said foundation construction machine 1, and configured for withstanding the forces and loads acting upon the rest of foundation construction machine 1 and for transmitting them to soil S whereon the machine lies, i.e. to the working platform.
  • Foundation construction machine 1 also comprises an upper structure 3 mechanically connected, in a rotatable manner, to tracked undercarriage 2, in particular supported by the latter.
  • upper structure 3 is mechanically connected, in a rotatable manner, to tracked undercarriage 2 by means of a slewing ring, not shown in the drawing, driven by a gear motor, for rotating upper structure 3 relative to tracked undercarriage 2 about an axis of rotation R of the slewing ring itself .
  • foundation construction machine 1 comprises a mast or boom 4 mechanically connected to upper structure 3.
  • Foundation construction machine 1 further comprises a kinematic mechanism 6 that connects mast 4 to upper structure 3.
  • Kinematic mechanism 6 is configured for varying the distance between mast 4 and upper structure 3, in particular for changing the working radius of the machine.
  • foundation construction machine 1 comprises an operating equipment 5 configured to be mounted on mast 4 and adapted to drill the soil.
  • kinematic mechanism 6 shown therein is typically an articulated parallelogram, but it may alternatively be, for example, a telescopic (or extensible) connection or a pin-type connection.
  • Such kinematic mechanism 6 is driven by at least one actuator for varying the working radius of foundation construction machine 1, i.e. for moving mast 4 in such a way as to change the "overhang" distance of the tool from upper structure 3.
  • Foundation construction machine 1 comprises a control station 7, in particular a cabin mechanically connected to upper structure 3.
  • Control station 7 is operationally connected to a control system 8 of the machine, and is configured to be used by an operator, in particular to accommodate an operator, so that, from there, the latter can issue commands aimed at controlling foundation construction machine 1 and display and/or input information about the operation of foundation construction machine 1.
  • control station 7 comprises control devices 10, such as joysticks and/or control panels and/or pedals and/or levers and/or touchscreen displays and/or push-buttons and/or potentiometers, which are physically operated by the machine operator in order to control the movements of the machine and display and/or input information about the operation of the machine.
  • foundation construction machine 1 is, in particular, a so-called “drilling machine” configured for drilling the soil for building foundation piles, but it may nevertheless be any other foundation construction machine among those previously described herein.
  • drilling machine configured for drilling the soil for building foundation piles, but it may nevertheless be any other foundation construction machine among those previously described herein.
  • foundation construction machine 1 shown in the exemplary embodiment of Figure 1 is equipped with control system 8, which is configured for controlling and driving the rest of the machine and comprises, for example, an electronic processing system 9, typically a PLC, in particular mechanically installed on upper structure 3.
  • control system 8 of foundation construction machine 1 may not be physically installed in the machine, but in a remote location, e.g. it may operate on cloud.
  • control system 8 particularly electronic processing system 9, comprises at least one memory unit 11 in which a data archive, e.g. a database, is stored.
  • a data archive e.g. a database
  • any type of data archive may be profitably employed in foundation construction machine 1 of the present invention, e.g. data tables and/or maps.
  • the data archive or database contains at least the maximum values of the pressure distribution generated by the machine on soil S as a function of (i.e. depending on) the above-described three characteristic parameters, i.e. setup, geometric configuration and working forces acting upon the machine.
  • the data archive contains maximum pressure data representative of the maximum values of the pressure generated by the machine on the soil; such maximum pressure data are determined as a function of corresponding: setup data representative of the possible setups of the machine, geometric configuration data representative of the possible geometric configurations of the machine, and working force data representative of the working forces acting upon the machine.
  • said data archive or database correlates the maximum values of the pressure generated by the machine on soil S with the characteristic parameters of the machine's setup, the machine's geometric configuration and the working forces acting upon the machine.
  • the geometric configuration data comprise the working radius of operating equipment 5 and/or the angle of rotation of upper structure 3 relative to undercarriage 2.
  • the working radius is defined by the distance between the axis of rotation and operating equipment 5, while the angle of rotation is defined between upper structure 3 and undercarriage 2 in a plane substantially orthogonal to the axis of rotation R.
  • the setup data comprise, for example, the adopted tool type and/or the length of mast 4 and/or the weight of the installed ballast.
  • the working force data comprise, for example, the maximum value of the drilling torque and/or the maximum value of the extraction force acting upon the tool.
  • such maximum pressure data are preloaded in the database contained in the above-mentioned memory unit 11, i.e. such maximum pressure data are loaded before foundation construction machine 1 is actually used on a construction site by the operator and, preferably, also before it is transported and delivered to the customer.
  • control devices 10 preferably a control panel installed in control station 7 (in particular, the cabin) , e.g. a touchscreen display, and display them on a display installed in control station 7, possibly the same touchscreen display.
  • the maximum pressure data preloaded in the database are preferably representative of values measured during a preliminary machine calibration phase, i.e. values obtained by using suitable sensors positioned under the tracks of undercarriage 2, possibly buried in the soil at an appropriate depth underneath the tracks, or by using anchor points suitably arranged in a test area, through which it is possible to simulate operating conditions and exert maximum working forces.
  • suitable sensors positioned under the tracks of undercarriage 2, possibly buried in the soil at an appropriate depth underneath the tracks, or by using anchor points suitably arranged in a test area, through which it is possible to simulate operating conditions and exert maximum working forces.
  • measurements of the pressure generated by the machine according to its setup, its geometric configuration and the working forces can be taken during a calibration phase before the machine is put in operation on a construction site, so that it will already have the values preloaded in the database.
  • such measurements may be taken by the machine manufacturer during the calibration phase by executing a specific test with variable operating parameters.
  • foundation construction machine 1 may automatically preload the measured maximum pressure values into the data archive.
  • the sensors used for measuring the maximum pressure data may be operatively connected to machine's control system 8 and transfer the measured values to electronic processing system 9 substantially in real time, so that said electronic processing system 9 will store them into its own database during the measurement phase.
  • the measured values may be preloaded manually.
  • the maximum pressure data preloaded in the database are representative of calculated values, i.e. values obtained by using suitable formulae instead of sensors, e.g. calculated by means of formulae specified in the reference technical standards, and then manually preloaded into the database.
  • the maximum pressure data are calculated according to a plurality of different calculation methods or criteria.
  • each one of such calculation methods or criteria may use a different formula, e.g. obtained from a respective reference technical standard.
  • Each one of such calculation methods or criteria produces a respective data table and/or map, which is stored into said data archive or database; therefore, in this case, the data archive will contain a plurality of data tables and/or maps obtained by applying the above-mentioned plurality of different calculation methods or criteria.
  • control station 7 can preferably be used by the operator of foundation construction machine 1 for selecting the desired calculation method or criterion.
  • electronic processing system 9 may be configured for interrogating the data archive and accessing the respective data table and/or map obtained according to the operator- selected calculation method or criterion.
  • the operator may select the desired calculation method or criterion by means of the above-described control devices 10 (in particular, by interacting with a graphic interface, such as a menu, a touchscreen display, or by operating a mechanical push-button and/or selector) .
  • the selection of the desired calculation method or criterion may occur under the protection of physical security means, such as a key, and/or computer security means, e.g. authentication by username and password.
  • the maximum pressure data may be preloaded into the database, in particular in accordance with any one of the following options: according to one option, only the maximum pressure data obtained by measurement are preloaded; according to another option, only the maximum pressure data obtained by calculation are preloaded; according to yet another option, the maximum pressure data obtained by measurement and by calculation may both be preloaded, e.g. so that they can be compared .
  • each one of the maximum pressure data and/or each one of the pressure distribution data is always associated in the database with corresponding data representative of the setup, data representative of the working forces and data representative of the geometric configuration that originated such determined maximum pressure data and/or pressure distribution data.
  • foundation construction machine 1 of the present invention the operator can manually enter into electronic processing system 9, by selection and/or input via one or more of the above-described control devices 10, actual setup data representative of the setup actually adopted by foundation construction machine 1 (e.g. the weight of the tool and/or ballast in use) and allowable pressure limit values representative of the maximum pressure that can be exerted by the machine on the soil whereon it lies, in particular specific for the working platform in use .
  • actual setup data representative of the setup actually adopted by foundation construction machine 1 (e.g. the weight of the tool and/or ballast in use)
  • allowable pressure limit values representative of the maximum pressure that can be exerted by the machine on the soil whereon it lies, in particular specific for the working platform in use .
  • the actual setup data representative of the machine's setup may be automatically inputted to (or entered into) electronic processing system 9 and, in particular, may be detected automatically through the use of one or more sensors installed on machine 1.
  • foundation construction machine 1 may be equipped with a proximity sensor detecting the presence or absence of an auxiliary ballast or a mast extension, or may be equipped with a load cell detecting the weight of the installed operating equipment.
  • electronic processing system 9 interrogates the data preloaded in its own database and outputs all the admissible combinations, among the preloaded (i.e. measured and/or calculated) ones, of geometrical configuration data and working force data that correspond to maximum pressure data contained in the data archive (in particular, preloaded therein) .
  • the maximum pressure data are smaller than or equal to the allowable pressure limit value data.
  • the maximum pressure data coincide with, or are lower than, the allowable pressure limit value data specific for the working platform in use, thus ensuring a certain safety coefficient .
  • Electronic processing system 9 can show said admissible combinations to the operator, whether in numerical and/or graphical form, e.g. by means of a display installed in control station 7, e.g. in the cabin.
  • electronic processing system 9 can show one or more two- dimensional tables containing the allowable values of the geometric configuration data (e.g. working radius of operating equipment 5 and/or angle of rotation of upper structure 3 relative to undercarriage 2) for certain allowable values of the working forces.
  • the operator can select a predefined and limited number of parameters whose values may vary and, based on such variable values only, determine the corresponding preloaded (i.e. measured and/or calculated) maximum pressures. If the number of such parameters does not exceed three, soil pressures can be shown in graphic form.
  • such admissible combinations may be shown on the display via one or more three-dimensional graphs, each one representing, by means of a surface, the allowable values of the working radius for different values of the maximum intensity of a given working force and of the angle of rotation of the upper structure.
  • such admissible combinations may be shown on the display via a representation exemplifying a top view of the foundation construction machine, around which the trend of the maximum allowable value of the working radius throughout the 360° degrees of rotation of the upper structure is indicated, e.g. by one or more lines, for different values of the maximum intensity of a given working force.
  • the display may show a two-dimensional graph with the preloaded soil pressure values, possibly compared with the allowable pressure limit value entered by the operator, and a pull-down menu through which the operator can intuitively and quickly select the allowable values of the parameters that affect soil pressure, so as to facilitate and simplify the choice of the best values of such parameters .
  • control system 8 is configured for selecting and outputting said admissible combinations when the latter comply with one or more user-defined constraint conditions.
  • electronic processing system 9 may adopt a number of selection criteria, e.g. priority and/or optimization criteria, in order to return only a few of said admissible combinations, thus proposing only those admissible combinations which meet particular additional constraints that can be selectively set by the operator. For example, such selection may be done considering also a predefined value of the working force data concerning a particular force (e.g.
  • a predefined value of the maximum force that can be exerted by means of the maximum hydraulic force, or limited to a lower value in order to reduce the pressure on the soil and/or considering the existence of a sufficient angle of stability and/or that the geometric configuration data are limited to a given range of parameter values (e.g. limited to the front configuration, without turning the upper structure or without tilting the mast laterally) and/or considering only the most conservative values of the admissible combinations, limited to a given range of values of the geometric configuration data.
  • the operator may select, via the control panel, one or more parameters that must be considered as variable, and may also define a range within which the value of such parameters can change; in this case, electronic processing system 9 will only return those admissible combinations wherein those parameters which have been considered as variable have mutually different values that fall within the operator-defined range, while all other characteristic parameters have, for example, identical values.
  • electronic processing system 9 will propose some alternative combinations that will still be admissible for the maximum pressure data and/or the angle of stability of the machine although, for example, they minimize the error with respect to said constraint conditions, and will preferably indicate on the display the amount of such error for each one of said constraint conditions.
  • the operator can select a certain admissible combination, e.g. a certain value of the working radius and a certain value of the maximum intensity of the tool extraction force, and view on the display the trend of the maximum pressure data, preloaded in the database, throughout the 360° of rotation of the upper structure, possibly comparing such maximum value with the allowable pressure limit value data inputted or entered by the operator.
  • a certain admissible combination e.g. a certain value of the working radius and a certain value of the maximum intensity of the tool extraction force
  • the trend of the maximum pressure data preloaded in the database, throughout the 360° of rotation of the upper structure, possibly comparing such maximum value with the allowable pressure limit value data inputted or entered by the operator.
  • both the maximum pressure data and the pressure distribution data shown on the display are preloaded values obtained by measurement; if no measured values are present in the database, electronic processing system 9 will show the preloaded data obtained by calculation.
  • the maximum pressure data obtained by measurement and the pressure distribution data obtained by measurement shown on the display are compared with the corresponding values obtained by calculation and, should they differ, such difference will be shown to the operator, possibly signalling it in different ways as its percent value increases.
  • Electronic processing system 9 may also determine, for any particular combination of the above-described three characteristic parameters, the position of the static and/or dynamic centre of gravity of the machine (i.e. the resultant position of the static centre of gravity only due to the weights of the parts and/or the resultant position of the dynamic centre of gravity due to both the weights of such parts and any other external force acting upon the machine) , obtaining it on the basis of the preloaded measured and/or calculated maximum pressure data values, and may show such position on the display both in digital numeric form and in graphic form. Furthermore, electronic processing system 9 may also determine the position of the static and/or dynamic centre of gravity of the machine, for any particular combination of the three characteristic parameters, on the basis of the actual geometric configuration data and the actual setup data. By determining the static and/or dynamic centre of gravity, it is possible to know how close the admissible limit condition is, and then compare the maximum values with the allowable ones and decide if the working condition is sufficiently safe, even before putting the machine in operation.
  • electronic processing system 9 may compare the position of the static and/or dynamic centre of gravity of the machine obtained from the preloaded values of the maximum pressure data with the corresponding position obtained from the actual geometric configuration data and the actual setup data, for the purpose of comparing the two positions thus determined and return a signal to the operator should they differ considerably.
  • electronic processing system 9 is also configured for determining the angle of stability of the machine both in static conditions (i.e. the angle of stability of the machine when it is only subject to the weights of its own parts) and in dynamic conditions (i.e.
  • the angle of stability of the machine when it is subject to the weights of its own parts and to external forces and for showing on the display the value of such angle of stability both in digital numeric form and in graphic form, possibly compared with the minimum value specified in the standards, issuing a signal when the value of the angle of stability approaches such minimum value.
  • the operator can rapidly and intuitively choose the correct geometric configuration and maximum working force intensity for processing the soil by using a given setup of foundation construction machine 1, so that the pressure generated by it on the soil will not exceed a specific allowable limit value.
  • the operator may, without distinction, enter into electronic processing system 9 data representative of any one of the above-described three characteristic parameters.
  • the operator may enter the maximum working force data or the actual geometric configuration data that the machine should adopt, thereby obtaining, respectively, the allowable setup data to be complied with in order to remain below the specific value of the allowable pressure limit value data with certain geometric configurations.
  • the operator will obtain the allowable geometric configuration data to be complied with in order to remain below the specific value of the allowable pressure limit value data with certain maximum working force data.
  • the operator may also enter into electronic processing system 9 data representative of two of the above-described three characteristic parameters; for example, he may enter the actual setup data and the maximum working force data, and obtain therefrom the allowable geometric configuration data to be complied with in order to remain below the specific value of the allowable pressure limit value data.
  • the operator may enter the maximum working force data and the actual geometric configuration data, and obtain therefrom the allowable setup data that the machine will have to adopt.
  • the data representative of the characteristic parameters may also represent a range of values of such parameters; for example, it is possible to enter a range of values of the angle of rotation of the upper structure, comprised between a maximum value and a minimum value, and electronic processing system 9 will return only those admissible combinations which fall within that range of values .
  • the admissible combinations outputted by electronic processing system 9 - following the entry of the actual setup data and/or the actual geometric configuration data and/or the maximum working force data - are stored into electronic processing system 9, possibly upon confirmation requested to the operator through the display installed in the cabin.
  • foundation construction machine 1 comprises at least one sensor, operationally connected to control system 8 and installed on foundation construction machine 1, which detects, whether directly or indirectly, the actual value of at least one parameter of the geometric configuration of the machine and sends to electronic processing system 9 a signal representative of such actual value; for example, it may be a sensor directly measuring the actual value of the working radius and/or a sensor directly measuring the actual value of the angle of rotation of the upper structure.
  • said sensor may indirectly detect the actual value of a parameter of the geometric configuration; for example, it may be a proximity sensor configured for detecting when a movement of a part of the machine reaches a given extension, or it may comprise a plurality of proximity sensors configured for detecting the extension of the movement of a part in a plurality of intermediate positions taken by such part during its movement.
  • Such proximity sensors are configured for sending a signal to electronic processing system 9 when the corresponding movement of a part of the machine reaches a given extension, e.g. when the working radius reaches a certain limit extension or when the rotation of the upper structure reaches a certain limit angle.
  • the operator inputs or enters the machine's actual setup data and selects the maximum working force data that are representative of the maximum value of the intensity of the working forces; in this manner, while the machine is in operation, electronic processing system 9 will compare the actual values of the geometric configuration of the operating machine with the maximum allowable values of the geometric configuration data referred to the selected maximum value of the working forces, and will have foundation construction machine 1 execute at least one predetermined function when the detected actual values of the geometric configuration are too close (below a predefined threshold value) to the maximum allowable values, so that the actual value can never exceed the maximum allowable values.
  • Such predetermined functions may be one or more functions selected from: emitting at least one audible and/or visual alarm signal, stopping at least one motion of parts of the machine, activating at least one motion of parts of the machine, providing at least one recommendation concerning a necessary change in the setup and/or geometric configuration and/or working forces, in particular aimed at maintaining a given safety coefficient or level as to the allowable pressure limit value and/or the stability of the machine.
  • the operator may also enter or select in electronic processing system 9, via the control panel, maximum limit values for the main parameters of the geometric configuration that the machine may assume in operation, e.g. maximum limit values of the working radius of the tool and of the angle of rotation of upper structure 3.
  • maximum limit values of the working radius and of the angle of rotation of upper structure 3 are those values of foundation construction machine 1 which the operator does not intend to exceed in operation.
  • entering such maximum limit values creates a range of values that can be used in operation; for example, if the operator enters a maximum limit value of 3 meters for the working radius, this means that foundation construction machine 1 may assume, in operation, any working radius value between the minimum physically possible value and the maximum limit value of 3 meters entered by the operator.
  • the limit values that can be set by the operator are selectable among those values which can be detected, whether directly or indirectly, by control system 8 of the machine by means of the sensors.
  • minimum limit values of the main parameters of the geometric configuration of the machine i.e. values below which the operator does not want to go in operation, can be entered or selected by the operator. If the operator enters both a maximum limit value and a minimum limit value for one parameter of the geometric configuration, that parameter may assume, in operation, any value between such limit values entered by the operator. If the two limit values coincide, then such geometric configuration parameter will be a fixed value and control system 8 will vary the other parameters only. In this case, the admissible geometric configurations returned by electronic processing system 9 will be simultaneously limited by the limit values of the geometric configuration entered by the operator and by the allowable pressure limit value.
  • foundation construction machine 1 also comprises, in addition to what has been described herein with reference to the first variant, at least one sensor, operationally connected to control system 8 and installed on foundation construction machine 1, which detects, whether directly or indirectly, the actual value of at least one working force acting upon the machine, e.g. a load cell mounted at the top of mast 4.
  • the operator only enters the machine's actual setup data; in this manner, when the machine is in operation, electronic processing system 9 will compare the actual values of the geometric configuration assumed by the machine in operation with the maximum allowable values of the geometric configuration referred to the actual value of the working forces, and will compare the actual value of the at least one working force with the maximum allowable value of such force referred to the actual values of the geometric configuration.
  • Electronic processing system 9 will have foundation construction machine 1 execute at least one of the previously described predetermined functions when the actual values of the geometric configuration and/or the actual value of at least one working force turn out to be too close (below a predefined threshold value) to the respective maximum allowable values, so that the actual values of the geometric configuration and/or the actual values of the working forces can never exceed the respective maximum allowable values.
  • the second construction variant of foundation construction machine 1 of the present invention always comprises at least one sensor reading the actual value of at least one working force, while it may not comprise a sensor reading the actual value of at least one parameter of the geometric configuration of the machine.
  • control system 8 may be set with the maximum allowable force values obtained from an admissible combination, so that the intensity of the force will never exceed such maximum values; for example, machines equipped with electro-proportional systems have settings that can be automatically entered by control system 8, or on electro- hydraulic machines suggestions may be shown on a display concerning the settings that need to be made (e.g. adjustment of a pressure relief valve of the hydraulic system) . In this latter case, it will be advantageous to monitor in real time the value of the actual hydraulic pressure of the drive outputting the force that needs to be limited, so as to constantly verify that the set value is not exceeded, in which case an alarm signal will be sent to the operator.
  • control system 8 can make a comparison between the actual resultant loads acting upon the machine and measured by the sensors arranged in proximity to undercarriage 2 and the resultant loads that should be acting upon the machine as calculated on the basis of the actual setup data entered by the operator and of the measured actual values of the working forces.
  • the comparison shows negligible differences, this means that the actual setup data manually entered by the operator via the control panel correspond to the real setup adopted by the machine. If the differences are substantial, i.e. greater than a predefined threshold value, this means that the actual setup data entered by the operator differ from those of the setup actually adopted, and the control system will issue a signal to warn the operator that some selected options and/or some input data are incorrect, requiring him to verify them again. Should the operator confirm the correctness of the entered data, control system 8 will issue a further signal to warn the operator that the proper operation of the sensors should be checked because the comparison has shown substantial differences .
  • foundation construction machine 1 comprises:
  • a tracked undercarriage 2 configured for moving on the soil, thus also moving the rest of said foundation construction machine 1, and configured for withstanding the forces and loads acting upon foundation construction machine 1 and for transmitting them to the soil whereon the machine lies;
  • an operating equipment 5 is configured to be mounted in order to drill the soil
  • a kinematic mechanism 6 which mechanically connects said mast 4 to said upper structure 3 and which is configured for varying the working radius of operating equipment 5;
  • control station 7 configured to be used by an operator, so that the latter can issue commands aimed at controlling the foundation construction machine and display and/or input information about the operation of the machine;
  • control system 8 operationally connected to control station 7 and configured for controlling and driving foundation construction machine 1 as a function of the commands issued by the operator, and comprising at least one memory unit 11 in which a data archive is stored.
  • Said method further comprises the following steps:
  • control station 7 controls and driving foundation construction machine 1, from control station 7 and by means of control system 8, as a function of the interrogation of the data archive.
  • the method further comprises the step of entering into control system 8, by an operator and by means of said control station 7, actual setup data representative of the setup adopted by the foundation construction machine, and maximum allowable pressure limit value data representative of the maximum pressure that can be exerted on the soil whereon the machine lies.
  • the interrogation is carried out as a function of the actual setup data and the maximum allowable pressure limit value data.
  • the method further comprises the step of outputting, through control system 8, at least one admissible combination of the geometrical configuration data and/or working force data.
  • at least one admissible combination is correlated with corresponding preloaded maximum pressure data contained in the data archive, which are smaller than or equal to the entered allowable pressure limit value data.
  • any other parameter of the geometric configuration of the machine that affects its stability in operation and the value of the pressure exerted on the soil e.g. one may consider any mast tilting angle and/or any degree of freedom of the kinematic mechanism of the machine
  • the mast may be tilted laterally, forward and/or backward to execute the necessary drilling operations, and such angles of inclination may be either fixed or variable according to specific conditions (e.g. when it is necessary to switch from vertical drilling to a next translation with the mast tilted backward to improve the stability of the machine) .
  • variations in these parameters may also be taken into account when determining the pressures exerted on the soil.
  • those machines which are equipped with a fixed, as opposed to rotary, upper structure may have a mast that can be traversed laterally; therefore, depending on the positions taken by the latter, it is possible to determine the trend of the maximum pressure exerted on the soil.
  • the mast may be moved by rotary arms describing circles at the front, with the mast in a sub-horizontal condition.
  • the machines may have a control station 7 consisting of a cabin fixed to upper structure 3, or they may have a remote control station 7 (drilling and/or positioning and/or translation control board) that an operator can use from the ground to control the machine while remaining in a more visible and safer condition, depending on the commands to be issued.
  • a control station 7 consisting of a cabin fixed to upper structure 3, or they may have a remote control station 7 (drilling and/or positioning and/or translation control board) that an operator can use from the ground to control the machine while remaining in a more visible and safer condition, depending on the commands to be issued.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Earth Drilling (AREA)
  • Operation Control Of Excavators (AREA)
  • Lifting Devices For Agricultural Implements (AREA)
  • Foundations (AREA)
  • Control By Computers (AREA)
  • Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)

Abstract

La présente invention concerne un engin de construction de fondations (1) comprenant un train roulant à chenilles (2), une structure supérieure (3) raccordée mécaniquement au train roulant à chenilles (2), et un mât (4), sur lequel un équipement d'exploitation (5) est conçu pour être monté afin de forer le sol. Un mécanisme cinématique (6) raccorde mécaniquement le mât (4) à la structure supérieure (3), et est conçu pour faire varier la distance entre eux. Une station de commande (7) est conçue pour être utilisée par un opérateur pour émettre des instructions visant à commander l'engin de construction de fondations (1), et pour afficher et/ou entrer des informations concernant le fonctionnement de l'engin. Un système de commande (8) est raccordé fonctionnellement à ladite station de commande (7) et est conçu pour commander et entraîner l'engin de construction de fondations (1) en fonction des instructions émises par l'opérateur. Le système de commande comprend au moins une unité de mémoire (11) stockant une archive de données qui contient les valeurs maximales de la pression générée par l'engin sur le sol, obtenues en fonction de données correspondantes. De telles données comprennent également : des données de configuration représentatives des configurations possibles de l'engin ; des données de configuration géométrique représentatives des configurations géométriques possibles de l'engin ; et des données de force de travail représentatives des forces de travail agissant sur l'engin.
PCT/IB2021/059809 2020-10-26 2021-10-25 Engin de construction de fondations et procédé de commande dudit engin WO2022090886A1 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP21802429.7A EP4232681A1 (fr) 2020-10-26 2021-10-25 Engin de construction de fondations et procédé de commande dudit engin
US18/249,538 US20230383603A1 (en) 2020-10-26 2021-10-25 Foundation construction machine and method for controlling such machine
AU2021371091A AU2021371091A1 (en) 2020-10-26 2021-10-25 Foundation construction machine and method for controlling such machine
CA3194429A CA3194429A1 (fr) 2020-10-26 2021-10-25 Engin de construction de fondations et procede de commande dudit engin

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT102020000025255A IT202000025255A1 (it) 2020-10-26 2020-10-26 Macchina da fondazioni e metodo per il controllo di tale macchina
IT102020000025255 2020-10-26

Publications (1)

Publication Number Publication Date
WO2022090886A1 true WO2022090886A1 (fr) 2022-05-05

Family

ID=74141748

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2021/059809 WO2022090886A1 (fr) 2020-10-26 2021-10-25 Engin de construction de fondations et procédé de commande dudit engin

Country Status (6)

Country Link
US (1) US20230383603A1 (fr)
EP (1) EP4232681A1 (fr)
AU (1) AU2021371091A1 (fr)
CA (1) CA3194429A1 (fr)
IT (1) IT202000025255A1 (fr)
WO (1) WO2022090886A1 (fr)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5826666A (en) * 1996-02-21 1998-10-27 Shin Caterpillar Mitsubishi, Ltd. Apparatus and method for controlling a contruction machine
US20120072081A1 (en) * 2010-04-16 2012-03-22 Bauer Maschinen Gmbh Contruction machine having a computer unit for determining an adjustment range
EP2982829A1 (fr) * 2014-08-06 2016-02-10 Soilmec S.p.A. Système de sécurité permettant de contrôler une zone dangereuse d'une machine de forage
US20160090707A1 (en) * 2014-09-25 2016-03-31 Bauer Maschinen Gmbh Pile-driving apparatus and method for driving a pile element into the ground
EP3613903A1 (fr) * 2018-07-31 2020-02-26 Liebherr-Werk Nenzing GmbH Procédé de surveillance des charges structurelles d'une machine support pourvue d'appareil de forage et de battage ainsi que machine de travail pourvue d'appareil de battage et de forage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5826666A (en) * 1996-02-21 1998-10-27 Shin Caterpillar Mitsubishi, Ltd. Apparatus and method for controlling a contruction machine
US20120072081A1 (en) * 2010-04-16 2012-03-22 Bauer Maschinen Gmbh Contruction machine having a computer unit for determining an adjustment range
EP2982829A1 (fr) * 2014-08-06 2016-02-10 Soilmec S.p.A. Système de sécurité permettant de contrôler une zone dangereuse d'une machine de forage
US20160090707A1 (en) * 2014-09-25 2016-03-31 Bauer Maschinen Gmbh Pile-driving apparatus and method for driving a pile element into the ground
EP3613903A1 (fr) * 2018-07-31 2020-02-26 Liebherr-Werk Nenzing GmbH Procédé de surveillance des charges structurelles d'une machine support pourvue d'appareil de forage et de battage ainsi que machine de travail pourvue d'appareil de battage et de forage

Also Published As

Publication number Publication date
CA3194429A1 (fr) 2022-05-05
US20230383603A1 (en) 2023-11-30
IT202000025255A1 (it) 2022-04-26
EP4232681A1 (fr) 2023-08-30
AU2021371091A1 (en) 2023-06-08

Similar Documents

Publication Publication Date Title
RU2471981C2 (ru) Строительная машина с вычислительным устройством для определения диапазона регулирования
US4752012A (en) Crane control means employing load sensing devices
EP0154069A2 (fr) Système de commande pour une structure redressable et extensible
US20230383603A1 (en) Foundation construction machine and method for controlling such machine
JP4558456B2 (ja) ケーソンの構造
RU2466241C1 (ru) Устройство обеспечения безопасности для строительной машины
US5975805A (en) Oil drilling rig system
CN114599600A (zh) 用于确定自升式平台单元上的起重机或悬臂操作包络线的方法、自升式平台单元
CN205116145U (zh) 一种强夯机配套自动施工系统
JP2020169496A (ja) 杭打機の制御装置
KR101186968B1 (ko) 지능형 굴삭 시스템의 로컬지형 3차원 모델링을 위한 회전형 레이저 센서 시스템
KR20110073639A (ko) 건설기계의 주행 감지 장치 및 방법
RU2196893C1 (ru) Способ автоматического горизонтирования несущей платформы с буровым агрегатом и устройство для его реализации
US11225862B2 (en) Virtual hoist stop for mobile drilling machine
CN221053224U (zh) 基于逆作法预埋柱安装的空间姿态高精度控制装置
RU2791628C1 (ru) Телескопический погрузчик с системой управления
CN117108198A (zh) 灌注桩施工装置
US20230323628A1 (en) Machine for performing excavations, in particular for drilling, and method associated to such machine
JP2024053367A (ja) 杭打機の制御装置
US20240210954A1 (en) System and method for operating a mining machine with respect to a geofence using a dynamic operation zone
CN115704219A (zh) 振冲碎石桩机施工形成桩体的方法
JP2024064320A (ja) 杭打機の制御システム
JP2003226492A (ja) 高所作業車における作業台の水平制御装置
JP2022180140A (ja) アースドリル機およびアースドリル機用の表示装置
JP2023032960A (ja) 作業機械

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21802429

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 3194429

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 18249538

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2021802429

Country of ref document: EP

Effective date: 20230526

ENP Entry into the national phase

Ref document number: 2021371091

Country of ref document: AU

Date of ref document: 20211025

Kind code of ref document: A