WO2022084796A1 - 基于lidar技术对建筑进度管理的系统 - Google Patents

基于lidar技术对建筑进度管理的系统 Download PDF

Info

Publication number
WO2022084796A1
WO2022084796A1 PCT/IB2021/059273 IB2021059273W WO2022084796A1 WO 2022084796 A1 WO2022084796 A1 WO 2022084796A1 IB 2021059273 W IB2021059273 W IB 2021059273W WO 2022084796 A1 WO2022084796 A1 WO 2022084796A1
Authority
WO
WIPO (PCT)
Prior art keywords
data
building
measurement
handheld
server
Prior art date
Application number
PCT/IB2021/059273
Other languages
English (en)
French (fr)
Inventor
刘卫敏
Original Assignee
刘卫敏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 刘卫敏 filed Critical 刘卫敏
Priority to US18/015,255 priority Critical patent/US20230267240A1/en
Priority to CA3192840A priority patent/CA3192840A1/en
Priority to GB2303312.9A priority patent/GB2613303A/en
Priority to CN202180044871.1A priority patent/CN115867927A/zh
Publication of WO2022084796A1 publication Critical patent/WO2022084796A1/zh

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S17/00Systems using the reflection or reradiation of electromagnetic waves other than radio waves, e.g. lidar systems
    • G01S17/88Lidar systems specially adapted for specific applications
    • G01S17/89Lidar systems specially adapted for specific applications for mapping or imaging
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Definitions

  • the invention relates to a system that utilizes LiDAR technology to measure buildings and compare them with BIM to realize the management of construction progress and builders, property managers and operators.
  • BIM Building Information Modeling
  • the core of BIM is to establish a virtual three-dimensional model of construction engineering and use digital technology to provide a complete and actual construction engineering information database for this model.
  • the information base not only contains the geometric information, professional attributes and state information describing building components, but also the state information of non-component objects (such as space and motion behavior).
  • this three-dimensional model containing construction engineering information the information integration degree of construction engineering is greatly improved, thereby providing a platform for the exchange and sharing of engineering information for the stakeholders of the construction engineering project.
  • the present invention provides a system for building progress management based on LiDAR technology. Users can scan the building site in real time by using a handheld LiDAR device to obtain measurement data, and then compare the real-time measurement data with historical data. The measurement data is compared to realize the real-time inspection of the project progress.
  • the present invention achieves the above object in this way:
  • a system for managing construction progress based on LiDAR technology including a cloud-based server and a handheld measuring device, the handheld measuring device is provided with LiDAR and a positioning device; the method for managing the construction progress of a building using the above device includes the following steps:
  • the handheld measurement device transmits the measurement data and positioning data to the server in the cloud in real time, and the server records the measurement data, positioning data and measurement time;
  • the measurement data is compared with the historical measurement data, and the comparison result data is generated;
  • the server transmits the comparison result data to the handheld measurement device in real time, and the handheld measurement device realizes the augmented/mixed reality display of the comparison result data through the display device.
  • the handheld measuring device is further provided with a camera device, and the camera device records image data synchronously when the LiDAR measures the building, and transmits the image data to the server in the cloud.
  • step S3 the handheld measurement device converts the comparison result data into graphic data and superimposes it into the image data of the camera device, and then sends it to the display device to realize augmented/mixed reality display.
  • the specific steps are: the server sets the specified error value, Compare the measurement data with the historical measurement data recorded in the past and calculate the deviation value. If the deviation value is within the error value, the measurement data is considered to be consistent with the historical measurement data recorded in the past; otherwise, the measurement data is considered to be consistent with the historical measurement data recorded in the past. The data is inconsistent, and the deviation value is formed into the quality inspection data, and the quality inspection data is highlighted on the display device.
  • the server is also loaded with the BIM of the building under construction, and the real-time measurement data is compared with the BIM data to carry out building quality management, which specifically includes the following steps: the handheld measurement device transmits the measurement data and positioning data in real time to The server in the cloud, the server obtains the BIM data in the building BIM corresponding to the positioning data according to the positioning data, compares the measurement data with the BIM data, and generates quality inspection data; the server transmits the quality inspection data to the handheld measuring device in real time, The handheld measuring device displays the quality inspection data through the display device to realize augmented/mixed reality display.
  • the server sets the specified error value, compares the measurement data with the BIM data and calculates the deviation value. If the deviation value is within the error value, the measurement data is considered to be consistent with the BIM data; otherwise, the measurement data is considered inconsistent with the BIM data, and the deviation
  • the values form quality inspection data and the quality inspection data are highlighted in the display device.
  • the building BIM stores attribute data of building components
  • the server in the cloud transmits the attribute data of the building components to the hand-held measuring device in real time
  • the display device of the hand-held measuring device displays the attribute data in real time.
  • the hand-held measurement device displays the graphic data formed by the measurement data in real time on the display device and highlights it and issues a warning.
  • the positioning device includes a visible light wireless communication device that is distributed and installed in a building and is arranged in a handheld measurement device for communication.
  • the visible light wireless communication device in the handheld measurement device is communicated with one of the visible light wireless communication devices in the building,
  • the handheld measurement device is positioned according to the setting position of the visible light wireless communication device in the building; at the same time, the handheld measurement device is connected to the server in the cloud through the visible light wireless communication device.
  • the positioning device is an iBeacon positioning device or a QR Code, Barcode, RFID and indoor mobile network, such as 4G, 5G and other positioning devices set in the building site.
  • the cloud server uses blockchain-based data storage, including measurement records and time series database, building component attribute database, building BIM database, user authority and data database.
  • the user scans the building structure, components and equipment at the designated position of the building through the handheld LiDAR, and obtains the 3D measurement data of the building structure, components and equipment on site in real time, that is, the point cloud Data (point cloud data) is transmitted to the server in the cloud through the network. Because every time a building is scanned with LiDAR, the measurement data at that time will be formed in the server, and the construction progress of the building can be clearly obtained by comparing the measurement data at different times.
  • users scan building structures, components and equipment in real time, they can obtain real-time comparison results by comparing real-time measurement data with historical measurement data.
  • Mixed Reality will display the comparison results, for example, use different colors to display real-time scanning acquisition and identify completed building components and building components that have been completed in the past, or display the storage quantity and location of the equipment in real time, so that users can Quickly, directly and clearly understand the information of those projects that have been completed and the properties of intermediate building components, so as to more easily understand the construction progress, record and report the project progress, and automatically or manually notify the relevant personnel through the cloud system to follow up. Enter.
  • a system for building progress management based on LiDAR includes a cloud-based server, which is loaded with the equipment under construction. Building BIM; and hand-held surveying equipment with LiDAR 1 and positioning devices.
  • the handheld measuring device may be a laptop computer, a mobile phone or a tablet computer, etc., such as the iPad Pro2020 of Apple Inc., a LiDAR 1 module is set at the position of its camera.
  • GPS signals cannot be accepted in the building, its positioning device needs to adopt the corresponding technology that can realize the indoor positioning function, such as QRCode, RFID, Wifi, UWB, Bluetooth, infrared, ultrasonic, ZigBee, indoor mobile network such as 4G, 5G and other indoor positioning technologies, among which Apple's iBeacon positioning technology directly uses the Bluetooth module in the mobile phone or tablet to communicate and locate with the external iBeacon communication module.
  • the indoor positioning function such as QRCode, RFID, Wifi, UWB, Bluetooth, infrared, ultrasonic, ZigBee
  • indoor mobile network such as 4G, 5G and other indoor positioning technologies, among which Apple's iBeacon positioning technology directly uses the Bluetooth module in the mobile phone or tablet to communicate and locate with the external iBeacon communication module.
  • the visible light wireless communication Visual Light Communication, VLC for short
  • VLC Visual Light Communication
  • the working principle of VLC is to use LED lights to convert data into high-frequency light and dark flickering signals through PWM technology to achieve communication. Due to the high frequency, the human eye cannot detect the flickering of LED lights, which does not affect normal lighting, and communication can only be It is valid within the range covered by the visible light emitted by the LED lights.
  • the corresponding handheld measuring equipment is also equipped with a VLC device. When the handheld device enters the light range of a VLC device for communication, it can location to locate. At the same time, the handheld measuring equipment can also be connected to the server in the cloud through the VLC device for data transmission.
  • the user's position when measuring the building with LiDAR 1 can be recorded in real time, and the positioning data and the point cloud data measured by LiDAR 1 can be transmitted to the server in the cloud, so that the server can find the BIM based on the positioning data.
  • the model data at the corresponding location is compared with the point cloud data.
  • the server also records the measurement time, and realizes the management of the project progress through time recording.
  • the method for managing the construction progress of a building using the above device includes the following steps:
  • the user enters the designated detection position of the building with the handheld measurement device according to the predetermined supervision progress, and uses the LiDAR 1 of the handheld measurement device to measure the engineering construction at the position to form point cloud data, and the positioning device records the positioning data of the measurement position.
  • the handheld measuring device transmits the point cloud data and positioning data to the server in the cloud in real time through wireless network, such as mobile data network, Wifi, Bluetooth, etc., and records the measurement time.
  • wireless network such as mobile data network, Wifi, Bluetooth, etc.
  • the construction can be carried out. Progress management and construction quality management.
  • the cloud server will firstly retrieve the historical measurement data recorded in the past from the database according to the positioning data, which is generally the measurement data completed last time, and compare the real-time measurement data with the historical measurement data. In order to find the difference between the real-time measurement data and the historical measurement data, and the difference is the construction progress completed during this period; then the server will record these differences and form comparison result data.
  • the server obtains the BIM data of the corresponding location from the BIM of the building according to the positioning data, and the cloud server uses the point cloud data to construct a real-time 3D building model on site, and compares the 3D building model with the BIM data. Specifically, the point cloud data is compared with the BIM data and the deviation value is calculated. If the deviation value is within the error range, it is considered that the point cloud data of the building component is consistent with the BIM data, and the specifications of the building component meet the requirements of BIM design. However, if the deviation value exceeds the error range, it may be that the building components are not completed or the specifications of the building components exceed the requirements of the BIM design, and the server will record the deviation value to form the comparison result data.
  • the server also transmits the comparison result data to the handheld measuring device in real time.
  • the handheld measuring device is also equipped with a camera 2, such as a shooting lens, etc., which are used to record the image information of the building components measured by the LiDAR 1 in real time and display the image information on its display screen. real-time display.
  • the comparative structural data is converted into graphic data and superimposed on the real-time image of the shooting lens for display, realizing the display of augmented/mixed reality technology and issuing warnings.
  • building BIM also stores attribute data of building components. Since the building components on the construction site may not be completed and have no identification labels, the user may not be able to identify the building components through direct observation, but by comparing the point cloud data with BIM, the server can intelligently identify different building components in the point cloud data, and then Then, the attribute data of the identified building components are transmitted to the hand-held measuring device in real time, including the name, specifications, requirements, etc. of the building components.
  • the display device of the hand-held measuring device can display the attribute data of various building components to the user in real time, so that the user can Can be quickly identified and checked.
  • the construction progress management and quality management mentioned above are not limited to the construction of buildings or building components, but may also involve the installation and arrangement of other objects in the building’s BIM design, such as the laying of building pipelines, fire-fighting items, and lighting. , the placement, quantity and specifications of the indicator signs, etc.
  • BIM design such as the laying of building pipelines, fire-fighting items, and lighting. , the placement, quantity and specifications of the indicator signs, etc.
  • the system and method provided by the present invention can be used to effectively manage the construction progress and quality.
  • This function is not limited to use in buildings under construction, but can also be extended to buildings already in operation, giving property management personnel more convenient and efficient management.
  • the cloud server adopts blockchain-based data storage, including the database of measurement record data and the database of building BIM. reliability and legal validity.
  • the system can also set users with different permissions for different people.
  • Each user scans data with LiDAR 1 as reference data for other related and/or project users.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Geometry (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Mathematical Analysis (AREA)
  • Remote Sensing (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Electromagnetism (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Engineering & Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Pure & Applied Mathematics (AREA)
  • Mathematical Optimization (AREA)
  • Computational Mathematics (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

基于LiDAR技术对建筑进度管理的系统,包括基于云端服务器,服务器中装载有正在施工建设或已运营中的建筑物BIM;以及设有LiDAR以及定位装置的手持测量设备。用户通过手持LiDAR到建筑物指定位置进行扫描,实时获得现场建筑结构的点云数据,通过网络传送至云端服务器,云端服务器将实时测量数据与历史测量数据或建筑物BIM进行对比获取对比结果及建筑构件属性数据,采用增强/混合现实显示技术将对比结果显示于手持测量设备显示屏幕上,以便用户可以快速、直接、清晰的了解到工程进度及质量。

Description

基于LiDAR技术对建筑进度管理的系统
本发明涉及一种利用LiDAR技术对建筑物进行测量并与BIM进行对比以实现对建筑进度及建筑商,物业管理商,及运营商进行管理的系统。
BIM(Building Information Modeling建筑信息模型)可以帮助实现建筑信息的集成,从建筑的设计、施工、运行直至建筑全寿命周期的终结,各种信息始终整合于一个三维模型信息数据库中,设计团队、施工单位、设施运营部门和业主等各方人员可以基于BIM进行协同工作,有效提高工作效率、节省资源、降低成本、以实现可持续发展。
BIM的核心是通过建立虚拟的建筑工程三维模型,利用数字化技术,为这个模型提供完整的、与实际情况一致的建筑工程信息库。该信息库不仅包含描述建筑物构件的几何信息、专业属性及状态信息,还包含了非构件对象(如空间、运动行为)的状态信息。借助这个包含建筑工程信息的三维模型,大大提高了建筑工程的信息集成化程度,从而为建筑工程项目的相关利益方提供了一个工程信息交换和共享的平台。
在使用BIM等软件对建筑模型进行管理外,在建筑物的施工过程中为了保证大型建筑工程能够按照既定的工程建设进度安排进行实施,需要对建筑工程进度进行监理,其中工程质量是最为重要的部分。但现有对建筑工程进度监理的过程是指派监理人员定期到施工现场对已完成的工程进度进行度量及检查,看是否符合施工要求。但是传统的监理过程无法实时利用BIM模型对工程的质量及进度进行跟进。
针对上述现有技术的不足,本发明提供了一种基于LiDAR技术对建筑进度管理的系统,用户可以通过使用手持LiDAR设备对建筑现场进行实时扫描以获取测量数据,然后将实时的测量数据与历史测量数据进行比对,以实现工程进度的实时检查。
本发明是这样实现上述目的的:
基于LiDAR技术对建筑进度管理的系统,包括基于云端的服务器以及手持测量设备,手持测量设备中设有LiDAR以及定位装置;使用上述装置对建筑物的建筑进度的管理方法包括以下步骤:
S1.持手持测量设备进入建筑物中,利用手持测量设备的LiDAR对建筑物进行测量并记录测量数据,同时定位装置记录测量位置的定位数据;
S2.手持测量设备实时将测量数据及定位数据传输至云端的服务器,服务器记录下测量数据、定位数据以及测量时间;并根据定位数据调取该定位位置过往所记录的历史测量数据,将实时的测量数据与历史测量数据进行比对,生成比对结果数据;
S3.服务器将对比结果数据实时传输至手持测量设备,手持测量设备将对比结果数据通过显示装置实现增强/混合现实显示。
其中,所述手持测量设备还设有摄像装置,摄像装置在LiDAR对建筑物进行测量时同步记录图像数据,并传输至云端的服务器。
其中,步骤S3中,手持测量设备将对比结果数据转换为图形数据并迭加至摄像装置的图像数据中,再送至显示装置实现增强/混合现实显示,具体步骤为:服务器设置指定的误差值,将测量数据与过往所记录的历史测量数据对比并计算偏差值,如偏差值在误差值内,则认为测量数据与过往所记录的历史测量数据一致;否则认为测量数据与过往所记录的历史测量数据不一致,并将偏差值形成质量检测数据,并将质量检测数据在显示装置中突出显示。
其中,所述服务器中还装载有正在施工建设的建筑物BIM,将实时的测量数据与BIM数据进行对比,进行建筑质量管理,具体包括以下步骤:手持测量设备实时将测量数据及定位数据传输至云端的服务器,服务器根据定位数据取得建筑物BIM中与定位数据相对应位置的BIM数据,将测量数据与BIM数据进行比对,生成质量检测数据;服务器将质量检测数据实时传输至手持测量设备,手持测量设备将质量检测数据通过显示装置实现增强/混合现实显示。
其中,服务器设置指定的误差值,将测量数据与BIM数据对比并计算偏差值,如偏差值在误差值内,则认为测量数据与BIM数据一致;否则认为测量数据与BIM数据不一致,并将偏差值形成质量检测数据,并将质量检测数据在显示装置中突出显示。
其中,所述建筑物BIM中存储有建筑构件的属性数据,云端的服务器实时将建筑构件的属性数据传输给手持测量设备,手持测量设备的显示装置实时展示属性数据。
其中,测量数据与BIM数据不一致,手持测量设备实时将测量数据所形成的图形数据在显示装置显示突出显示并发出警示。
其中,所述定位装置包括分布安装于建筑物中以及设置于手持测量设备中进行通信的可见光无线通信装置,手持测量设备中的可见光无线通信装置与建筑物的其中一可见光无线通信装置连通时,根据建筑物可见光无线通信装置的设置位置对手持测量设备进行定位;同时手持测量设备通过可见光无线通信装置连接至云端的服务器。
其中,所述定位装置为iBeacon定位设备或为设置于建筑物现场中的QR Code, Barcode,RFID及室内移动网络,如4G、5G等定位设备。
其中,所述云端的服务器运用基于区块链的数据存储,包括测量记录及时序数据库、建筑物构件属性数据库、建筑物BIM数据库、用户权限及资料数据库。
本发明的有益效果:用户通过手持式LiDAR到建筑物的指定位置对该处的建筑结构、构件及设备等进行扫描,并实时获得现场的建筑结构、构件及设备的3D测量数据,即点云数据(point cloud data),通过网络传送至云端的服务器。因每次对使用LiDAR对建筑物进行扫描时都会在服务器中形成当时的测量数据,将不同时间的测量数据进行比对即可以清晰的获取建筑物的建筑进度。用户对建筑结构、构件及设备进行实时扫描时,通过实时测量数据与历史测量数据进行对比即可实时获取对比结果,然后再通过手持测量设备的显示屏幕采用增强/混合现实显示技术(Augmented Reality/Mixed Reality)将对比结果进行显示,例如用不同的颜色显示实时扫描获取并识别已经完成建筑物构件以及以往完成的建筑物构件等,或实时显示应有设备的存放数量及位置等,使得用户可以快速、直接、清晰的了解到那些工程已经完成、进行中等建筑构件属性等资讯,用以更加方便的了解到建筑进度,并进行项目进度记录及汇报,并通过云端系统自动或手动通知有关人员跟进。
图1
是手持测量设备正面示意图;
图2
是手持测量设备背面示意图;
图3
是手持测量设备背面示意图。
实施例
参照图1至图3所示,基于LiDAR(Light Detection and Ranging,光学探测与测量,又称光学雷达)对建筑进度管理的系统,包括基于云端的服务器,所述服务器中装载有正在施工建设的建筑物BIM;以及手持测量设备,手持测量设备中设有LiDAR 1以及定位装置。其中所述手持测量设备可以是手提电脑、手机或平板电脑等,如苹果公司的iPad Pro2020,在其摄像头的位置设置了LiDAR 1模块。由于建筑物内无法接受GPS信号,因此其定位装置需要采用可以实现室内定位功能的相应技术,如目前市面上常见的QRCode、RFID、Wifi、UWB、蓝牙、红外、超声波、ZigBee、室内移动网络如4G、5G等室内定位技术,其中苹果公司的iBeacon定位技术是直接采用手机或平板电脑内的蓝牙模块,与外置的iBeacon通信模块进行通信并定位。
除上述定位装置外,还可以采用可见光无线通信(Visual Light Communication,简称VLC)技术实现室内定位,需要在建筑物内按照需要将VLC装置分布设置与建筑物内。VLC的工作原理是利用LED灯通过PWM技术将数据转化为高频的明暗闪烁信号实现通讯,由于频率较高,人眼无法察觉到LED灯的闪烁,并不影响正常的照明,而且通信只能在LED灯所发出的可见光所覆盖的范围内有效,相应的手持测量设备中也设置VLC装置,当手持设备进入某VLC装置的光范围内进行通信时,即可根据建筑物中该VLC装置的位置进行定位。同时手持测量设备还可以通过VLC装置连接至云端的服务器进行数据传输。
通过室内定位装置,能够实时记录用户使用LiDAR 1对建筑物进行测量时的位置,并将定位数据和LiDAR 1测量的点云数据传输至云端的服务器,以便于服务器能够将根据定位数据找到BIM中相应位置的模型数据与点云数据进行对比。同时服务器也记录下测量时间,通过时间记录实现工程进度的管理。
使用上述装置对建筑物的建筑进度的管理方法包括以下步骤:
S1.用户按照预定的监理进度持手持测量设备进入建筑物的指定检测位置,利用手持测量设备的LiDAR 1对该位置的工程构建进行测量形成点云数据,同时定位装置记录测量位置的定位数据。
S2. 手持测量设备通过无线网络,如移动数据网络、Wifi、蓝牙等,实时将点云数据以及定位数据传输至云端的服务器并记录测量时间,服务器获取到点云数据及定位数据后可进行建筑进度管理及建筑质量管理。
其中建筑进度管理:云服务器首先会根据定位数据从数据库中调取该定位位置过往所记录的历史测量数据,一般为上一次完成的测量数据,将实时的测量数据与历史测量数据进行比对,以发现实时测量的数据与历史测量数据的差别,而该差别就是此段时间完成的施工进度;然后服务器会记录这些差别并形成比对结果数据。
其中建筑质量管理:服务器根据定位数据从建筑物的BIM中取得该应位置的BIM数据,云端服务器利用点云数据构建出现场实时的3D建筑模型,将3D建筑模型与BIM数据进行比对。具体为将点云数据与BIM数据对比并计算偏差值,如偏差值在误差范围内,则认为该建筑构件的点云数据与BIM数据一致,建筑构件的规格符合BIM设计的要求。但如果偏差值超出误差范围,则可能是建筑构件没有完成或建筑构件的规格超出BIM设计的要求,服务器将记录偏差值形成对比结果数据。
S3.服务器也实时的将对比结果数据实时传输至手持测量设备。手持测量设备除了设有LiDAR 1对建筑物进行测量外还会设有摄像装置2,如拍摄镜头等,用于实时记录LiDAR 1所测量的建筑构件的图像信息同时将图像信息在其显示屏上实时显示。同时将对比结构数据转换为图形数据迭加在拍摄镜头的实时图像上进行显示,实现增强/混合现实技术的显示并发出警示,例如建筑构件规格符合BIM内的设计,则可在实时拍摄的建筑构件外渲染不同的确认颜色,如绿色、蓝色等的外轮廓;如建筑构件规格不符合BIM设计的要求,则将BIM内的设计数据用警报颜色,如红色、橙色、黄色等外轮廓线进行显示,用户可通过上述技术从手持测量设备直观的观察测量位置的所有建筑构件是否符合BIM内的设计,以便于用户可以方便地实时观察到建筑物中各个建筑构件的工程进度及质量等等。
另外,建筑物BIM中还会存储有建筑构件的属性数据。由于建筑现场的建筑构件可能未有完成且没有识别标签,用户可能无法通过直接观察来识别建筑构件,而通过点云数据与BIM对比,服务器可智能识别出点云数据中的不同建筑构件,然后再实时将识别的建筑构件的属性数据传输给手持测量设备,如包括建筑构件的名称、规格、要求等等,手持测量设备的显示装置可以实时向用户展示各种建筑构件的属性数据,以便用户可以快速识别并进行检查。
上面提及的建筑进度管理及质量管理并不只限定于建筑物或建筑构件的施工,还可能涉及到建筑物BIM设计中其他物件的安装与布置,例如建筑物管道的铺设,消防物品、照明灯、指示标志的放置、数量及规格等等。只要BIM设计中所涉及的所有物件,均可以利用本发明所提供的系统及方法对建筑进度及质量进行有效的管理。此功能不只限于施工中的建筑物内使用,更可延展至已运营中的建筑物上,给予物管人员更方便快捷的管理。
为了保证云端数据的可靠性,云端的服务器采用基于区块链的数据存储,包括测量记录数据的数据库、建筑物BIM的数据库,区块链技术能够确保数据被保存后不被修改,从而确保数据的可靠性及法律效力。
系统还可以针对不同的人员,设置不同权限的用户。每一个用户利用LiDAR 1扫描资料都可以作为其他相关及/或项目用户的参考数据。

Claims (10)

  1. 基于LiDAR技术对建筑进度管理的系统,其特征在于:包括基于云端的服务器以及手持测量设备,手持测量设备中设有LiDAR(1)以及定位装置;使用上述装置对建筑物的建筑进度的管理方法包括以下步骤:
    S1.持手持测量设备进入建筑物中,利用手持测量设备的LiDAR(1)对建筑物进行测量并记录测量数据,同时定位装置记录测量位置的定位数据;
    S2.手持测量设备实时将测量数据及定位数据传输至云端的服务器,服务器记录下测量数据、定位数据以及测量时间;并根据定位数据调取该定位位置过往所记录的历史测量数据,将实时的测量数据与历史测量数据进行比对,生成比对结果数据;
    S3.服务器将对比结果数据实时传输至手持测量设备,手持测量设备将对比结果数据通过显示装置实现增强/混合现实显示。
  2. 根据权利要求1所述基于LiDAR技术对建筑进度管理的系统,其特征在于:所述手持测量设备还设有摄像装置(2),摄像装置在LiDAR(1)对建筑物进行测量时同步记录图像数据,并传输至云端的服务器。
  3. 根据权利要求2所述基于LiDAR技术对建筑进度管理的系统,其特征在于:步骤S3中,手持测量设备将对比结果数据转换为图形数据并迭加至摄像装置(2)的图像数据中,再送至显示装置实现增强/混合现实显示;具体步骤为:服务器设置指定的误差值,将测量数据与过往所记录的历史测量数据对比并计算偏差值,如偏差值在误差值内,则认为测量数据与过往所记录的历史测量数据一致;否则认为测量数据与过往所记录的历史测量数据不一致,并将偏差值形成质量检测数据,并将质量检测数据在显示装置中突出显示。
  4. 根据权利要求1所述基于LiDAR技术对建筑进度管理的系统,其特征在于:所述服务器中还装载有正在施工建设的建筑物BIM,将实时的测量数据与BIM数据进行对比,进行建筑质量管理,具体包括以下步骤:
    手持测量设备实时将测量数据及定位数据传输至云端的服务器,服务器根据定位数据取得建筑物BIM中与定位数据相对应位置的BIM数据,将测量数据与BIM数据进行比对,生成质量检测数据;服务器将质量检测数据实时传输至手持测量设备,手持测量设备将质量检测数据通过显示装置实现增强/混合现实显示。
  5. 根据权利要求4所述基于LiDAR技术对建筑进度管理的系统,其特征在于:服务器设置指定的误差值,将测量数据与BIM数据对比并计算偏差值,如偏差值在误差值内,则认为测量数据与BIM数据一致;否则认为测量数据与BIM数据不一致,并将偏差值形成质量检测数据,并将质量检测数据在显示装置中突出显示。
  6. 根据权利要求4所述基于LiDAR技术对建筑进度管理的系统,其特征在于:所述建筑物BIM中存储有建筑构件的属性数据,云端的服务器实时将建筑构件的属性数据传输给手持测量设备,手持测量设备的显示装置实时展示属性数据。
  7. 根据权利要求4所述基于LiDAR技术对建筑进度管理的系统,其特征在于:测量数据与BIM数据不一致,手持测量设备实时将测量数据所形成的图形数据在显示装置显示突出显示并发出警示。
  8. 根据权利要求1所述基于LiDAR技术对建筑进度管理的系统,其特征在于:所述定位装置包括分布安装于建筑物中以及设置于手持测量设备中进行通信的可见光无线通信装置,手持测量设备中的可见光无线通信装置与建筑物的其中一可见光无线通信装置连通时,根据建筑物可见光无线通信装置的设置位置对手持测量设备进行定位;同时手持测量设备通过可见光无线通信装置连接至云端的服务器。
  9. 根据权利要求1所述基于LiDAR技术对建筑进度管理的系统,其特征在于:所述定位装置为iBeacon定位设备或为设置于建筑物现场中的QR Code, Barcode,RFID及室内移动网络定位设备。
  10. 根据权利要求1所述基于LiDAR技术对建筑进度管理的系统,其特征在于:所述云端的服务器运用基于区块链的数据存储,包括测量记录及时序数据库、建筑物构件属性数据库、建筑物BIM数据库、用户权限及资料数据库。
PCT/IB2021/059273 2020-10-19 2021-10-11 基于lidar技术对建筑进度管理的系统 WO2022084796A1 (zh)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US18/015,255 US20230267240A1 (en) 2020-10-19 2021-10-11 A system for managing the progress of construction based on lidar technology
CA3192840A CA3192840A1 (en) 2020-10-19 2021-10-11 System for managing building progress on basis of lidar technology
GB2303312.9A GB2613303A (en) 2020-10-19 2021-10-11 System for managing building progress on basis of LiDAR technology
CN202180044871.1A CN115867927A (zh) 2020-10-19 2021-10-11 基于LiDAR技术对建筑进度管理的系统

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
HK32020018290 2020-10-19
HK32020018290.7 2020-10-19

Publications (1)

Publication Number Publication Date
WO2022084796A1 true WO2022084796A1 (zh) 2022-04-28

Family

ID=81291851

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2021/059273 WO2022084796A1 (zh) 2020-10-19 2021-10-11 基于lidar技术对建筑进度管理的系统

Country Status (5)

Country Link
US (1) US20230267240A1 (zh)
CN (1) CN115867927A (zh)
CA (1) CA3192840A1 (zh)
GB (1) GB2613303A (zh)
WO (1) WO2022084796A1 (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114997606A (zh) * 2022-05-17 2022-09-02 中建二局第三建筑工程有限公司 一种建筑工程实体智能检测、数据处理与监控系统和方法
CN115827816A (zh) * 2023-02-21 2023-03-21 山东铁路投资控股集团有限公司 一种基于区块链的bim构件数据存证确权方法及装置
CN116091723A (zh) * 2022-12-29 2023-05-09 上海网罗电子科技有限公司 一种基于无人机的消防应急救援实景三维建模方法及系统
CN116109080A (zh) * 2022-12-29 2023-05-12 无锡泰禾宏科技有限公司 一种基于bim与ar的建筑综合管理平台

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117709884A (zh) * 2023-12-18 2024-03-15 承德市工程建设造价管理站 一种基于bim和rfid技术的工程施工进度管理系统
CN117952479A (zh) * 2024-03-26 2024-04-30 广州珠江装修工程有限公司 一种基于bim室内装饰工程监管方法及系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110287519A (zh) * 2019-05-14 2019-09-27 深圳大学 一种集成bim的建筑工程施工进度监测方法及系统
CN110807571A (zh) * 2019-09-19 2020-02-18 同济大学 基于3d激光传感与BIM结合的建筑工程质量控制系统
US20200082168A1 (en) * 2018-09-11 2020-03-12 Pointivo, Inc. In data acquistion, processing, and output generation for use in analysis of one or a collection of physical assets of interest
CN111033536A (zh) * 2017-06-14 2020-04-17 莱泰克斯系统有限公司 用于在施工现场生成自适应投射现实的方法和系统
CN111199066A (zh) * 2019-12-16 2020-05-26 福建建工集团有限责任公司 一种基于bim+gis的施工场地虚拟构建复原方法
CN111432197A (zh) * 2020-03-19 2020-07-17 上海建工四建集团有限公司 施工监测方法及系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111033536A (zh) * 2017-06-14 2020-04-17 莱泰克斯系统有限公司 用于在施工现场生成自适应投射现实的方法和系统
US20200082168A1 (en) * 2018-09-11 2020-03-12 Pointivo, Inc. In data acquistion, processing, and output generation for use in analysis of one or a collection of physical assets of interest
CN110287519A (zh) * 2019-05-14 2019-09-27 深圳大学 一种集成bim的建筑工程施工进度监测方法及系统
CN110807571A (zh) * 2019-09-19 2020-02-18 同济大学 基于3d激光传感与BIM结合的建筑工程质量控制系统
CN111199066A (zh) * 2019-12-16 2020-05-26 福建建工集团有限责任公司 一种基于bim+gis的施工场地虚拟构建复原方法
CN111432197A (zh) * 2020-03-19 2020-07-17 上海建工四建集团有限公司 施工监测方法及系统

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114997606A (zh) * 2022-05-17 2022-09-02 中建二局第三建筑工程有限公司 一种建筑工程实体智能检测、数据处理与监控系统和方法
CN116091723A (zh) * 2022-12-29 2023-05-09 上海网罗电子科技有限公司 一种基于无人机的消防应急救援实景三维建模方法及系统
CN116109080A (zh) * 2022-12-29 2023-05-12 无锡泰禾宏科技有限公司 一种基于bim与ar的建筑综合管理平台
CN116109080B (zh) * 2022-12-29 2023-09-12 无锡泰禾宏科技有限公司 一种基于bim与ar的建筑综合管理平台
CN116091723B (zh) * 2022-12-29 2024-01-05 上海网罗电子科技有限公司 一种基于无人机的消防应急救援实景三维建模方法及系统
CN115827816A (zh) * 2023-02-21 2023-03-21 山东铁路投资控股集团有限公司 一种基于区块链的bim构件数据存证确权方法及装置

Also Published As

Publication number Publication date
GB202303312D0 (en) 2023-04-19
GB2613303A (en) 2023-05-31
CA3192840A1 (en) 2022-04-28
US20230267240A1 (en) 2023-08-24
CN115867927A (zh) 2023-03-28

Similar Documents

Publication Publication Date Title
WO2022084796A1 (zh) 基于lidar技术对建筑进度管理的系统
CN106595565B (zh) 一种基于bim的智能化监测系统
CN106408861B (zh) 一种变电站检修监控预警系统
US11867816B2 (en) Laser gas detector and laser gas detection system
CN110287519A (zh) 一种集成bim的建筑工程施工进度监测方法及系统
CN106368247A (zh) 基于bim的基坑智能监测及主动预警方法和系统
CN109472483A (zh) 一种基于bim模型及航拍技术的工地现场建模方法和系统
CN105976563A (zh) 一种消防救援系统
CN110080951B (zh) 风电机组塔架、塔筒连接监测方法、终端及可读存储介质
CN110363878A (zh) 一种基于图像处理技术的机房巡检方法
CN109191577B (zh) 一种分布式bim协同平台
CN110366098A (zh) 一种目标定位方法和用于目标定位的服务器、基站
CN107748959A (zh) 一种建筑工程管理信息服务系统
CN109902409A (zh) 基于uwb技术构建平面图的方法和装置
CN108469752A (zh) 一种基于gps定位和bim模型的安全管控系统及方法
CN111222190B (zh) 一种古建筑管理系统
CN108875273A (zh) 基于bim的基坑工程正向设计与运维管理系统
CN110543700A (zh) 使用ar技术将复杂精装bim工艺模型与施工现场结合的方法
CN110826981A (zh) 基于物联网的输电铁塔施工进度管控系统及方法
US20210029497A1 (en) Field cooperation system and management device
CN208705222U (zh) 用于激光气体检测仪的数据管理终端及其系统
CN111669544B (zh) 基于bim的对象视频调用方法及系统
JP2012252477A (ja) 画像検索装置及び画像検索システム
CN107219825A (zh) 自我控制
CN116091690A (zh) 基于RedBat定位系统的三维可视化安全监管方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21882259

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 202303312

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20211011

ENP Entry into the national phase

Ref document number: 3192840

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21882259

Country of ref document: EP

Kind code of ref document: A1