WO2022082830A1 - Tool system and method of using same - Google Patents

Tool system and method of using same Download PDF

Info

Publication number
WO2022082830A1
WO2022082830A1 PCT/CN2020/124019 CN2020124019W WO2022082830A1 WO 2022082830 A1 WO2022082830 A1 WO 2022082830A1 CN 2020124019 W CN2020124019 W CN 2020124019W WO 2022082830 A1 WO2022082830 A1 WO 2022082830A1
Authority
WO
WIPO (PCT)
Prior art keywords
mold
groove
tooling
tool
tooling system
Prior art date
Application number
PCT/CN2020/124019
Other languages
French (fr)
Chinese (zh)
Inventor
贾娈娈
陈艾骎
Original Assignee
苏州润迈德医疗科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 苏州润迈德医疗科技有限公司 filed Critical 苏州润迈德医疗科技有限公司
Publication of WO2022082830A1 publication Critical patent/WO2022082830A1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B11/00Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding
    • F16B11/006Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding by gluing

Definitions

  • the invention relates to the technical field of medical instruments, in particular to a tooling system and a method for using the same.
  • Medical devices have high and strict requirements for production, such as high precision and high degree of automation.
  • the present application provides a tooling system and a method for using the same, so as to solve the problems in the prior art that the fixation is not firm, the installation is inconvenient, the qualification rate is low, and the work efficiency is low.
  • a tooling system which is characterized by comprising: a base, a control device, a power device, a first mold and a second mold;
  • the control device is mounted on the base and connected with the power device
  • the first mold is installed on the base for installing the first tool
  • the second mold is installed on the power device for installing the second tool, and the second tool is installed in the first tool by sliding up and down.
  • the base includes: a base and a mounting plate, and the corresponding mounting plate is vertically arranged on the base.
  • control device is mounted on the mounting plate.
  • the power device includes: a drive unit, a support plate, a moving unit and a slide rail, the support plate is mounted on the top of the mounting plate, and the drive unit is connected to the control device,
  • the moving unit is installed on the sliding rail, the driving unit is connected with the moving unit, and the second mold is arranged on the moving unit.
  • the first mold is a three-way valve mold
  • the second mold is an insert mold
  • the three-way valve mold is installed on the base, and the three-way valve mold is At least one groove is set on it, and the groove is used to install the three-way valve
  • the insert mold is installed on the power unit, and at least one installation hole is set on the insert mold, and the installation hole is used for installation
  • the insert is placed inside the three-way valve by sliding it up and down.
  • the above-mentioned tooling system is directed toward the first mold, the second mold is provided with positioning posts, the first mold is provided with positioning holes, and the positioning posts are provided in the positioning holes.
  • the first mold is an elastic sheet mold
  • the second mold is a pressing mold
  • the elastic sheet mold includes a body and a first installation groove provided on the body, the The first installation groove is used to set the device for installing the elastic sheet
  • the pressing die includes a pressing unit and a loading unit, the loading unit is arranged at the bottom of the pressing unit, and the bottom of the loading unit is provided with the top of the elastic sheet Loading slot of the same shape.
  • the first installation groove includes a groove body and a socket provided in the groove body, the socket protrudes upward along the direction from the elastic sheet die to the pressing die, and the socket A second groove is arranged in the protrusion, and at least one elastic piece installation groove is arranged in the second groove.
  • the loading unit includes the loading groove and the connecting piece that are cross-connected in sequence, and the connecting piece is a protrusion along the pressing unit to the elastic piece mold, and the loading The groove is a groove along the elastic sheet mold to the pressing unit.
  • the above-mentioned tooling system further includes: a connecting device arranged on the base, the connecting device, the mounting plate, and the control device are arranged in sequence, and the connecting device is used to connect the control device The device is arranged on the mounting plate, and the connecting device is connected with the first mold.
  • feet are provided at the bottom of the base.
  • the drive unit is a hydraulic cylinder; and/or the control device includes a controller and a drive motor, and the drive motor is connected to the controller and the hydraulic cylinder.
  • the application provides a method for using a tooling system, including:
  • the second mold is controlled to move upward and away from the first mold.
  • the application provides a tooling system, which includes installing a first tooling in a first mold; starting the tooling system; controlling the second mold to move downward until the second mold is connected with the first mold; Second tooling; the first tooling and the second tooling are fixedly connected to realize the automatic installation of the first tooling and the second tooling, which solves the problems of inconvenient manual installation, weak fixing, low qualification rate and low work efficiency .
  • FIG. 1 is a schematic structural diagram of an embodiment of a tooling system
  • FIG. 2 is a schematic structural diagram of another embodiment of a tooling system
  • FIG. 3 is a flow chart of a method of using a tooling system.
  • the present application provides a tooling system, including: a base 300 , a control device 400 , a power device 500 , a first mold 100 and a second mold 200 ; the control device 400 is mounted on the base 300 , and The power device 500 is connected; the first mold 100 is installed on the base 300 for installing the first tool; the second mold 200 is installed on the power device 500 for installing the second tool, and the second tool is installed by sliding up and down. in the first tooling.
  • the first tooling is installed in the first mold; the tooling system is started; the second mold is controlled to move downward until the second mold is connected with the first mold; the second tooling is put into the second mold; The first tooling is fixedly connected with the second tooling, which realizes the automatic installation of the first tooling and the second tooling, and solves the problems of inconvenient manual installation, weak fixing, low qualification rate and low work efficiency.
  • the base 300 includes: a base 310 and a mounting plate 320 , and the corresponding mounting plate 320 is vertically disposed on the base 300 .
  • control device 400 is mounted on the mounting plate 320 .
  • the power device 500 includes: a drive unit 510, a support plate 520, a moving unit 530 and a slide rail 540, the support plate 520 is mounted on the top of the mounting plate 320, the drive unit 510 is connected to the control device 400, and the moving unit
  • the 530 is installed on the slide rail 540 , the driving unit 510 is connected with the moving unit 530 , and the second mold 200 is arranged on the moving unit 530 .
  • the first mold 100 is a three-way valve mold
  • the second mold 200 is an insert mold
  • the three-way valve mold is installed on the base 300 , and the three-way valve mold is set on the At least one first groove 110, the first groove 110 is used to install the three-way valve
  • the insert mold is installed on the power unit 500, and at least one installation hole 210 is provided on the insert mold, and the installation hole 210 is used to install the insert 600 , by sliding up and down, the insert 600 is placed in the three-way valve.
  • the automatic installation of the three-way valve and the insert is realized, and the installation of a plurality of three-way valves can be completed at one time, which improves the work efficiency and has a high degree of automation.
  • the second mold 200 facing the first mold 100 , the second mold 200 is provided with positioning posts 220 , the first mold 100 is provided with positioning holes 120 , and the positioning posts 220 are provided in the positioning holes 120 .
  • the first mold 100 is an elastic sheet mold
  • the second mold 200 is a pressing mold
  • the elastic sheet mold includes a main body 130 and a first installation groove 140 disposed on the main body 130 .
  • the first installation groove 140 is used to set the device to be installed with the elastic piece;
  • the pressing die includes a pressing unit 230 and a loading unit 240, the loading unit 240 is arranged at the bottom of the pressing unit 230, and the bottom of the loading unit 240 is provided with the same shape as the top of the elastic piece the loading slot 241.
  • the shrapnel is placed in the shrapnel mold, the loading slot 241 is inserted on the shrapnel, the pressing unit 230 is driven downward by the power device 500 to realize the automatic pressing of the shrapnel, and the movement of the pressing unit 230 is controlled by the control device 400
  • the distance and setting are scientific, which solves the problems that too much force can easily damage components, too little force can easily cause unstable signal transmission and difficult manual operation, and multiple shrapnel can be compressed at one time, which improves work efficiency and improves qualification. Rate.
  • the first installation groove 140 includes a groove body 141 and a socket 142 disposed in the groove body 141 .
  • the socket 142 protrudes upward along the direction from the elastic sheet mold to the pressing mold, and a second concave is arranged in the protrusion.
  • the groove 143 is provided with at least one elastic piece mounting groove 144 in the second groove 143 .
  • the loading unit 240 includes a loading groove 241 and a connecting piece 242 that are cross-connected in sequence.
  • the connecting piece 242 is a protrusion along the pressing unit 230 to the elastic sheet mold
  • the loading groove 241 is a protrusion along the elastic sheet mold to the elastic sheet mold.
  • the groove of the pressing unit 230 This setting can ensure that there is a corresponding interval between the shrapnel, and can clamp the shrapnel at the same time, and the design is scientific.
  • the top of the loading slot 241 is an arc structure, and the arc structure is consistent with the top structure of the elastic piece, so as to ensure that the elastic piece can be tightly clamped; and/or the width of the loading slot 241 is greater than or equal to two symmetrically arranged
  • the distance between the two shrapnel is set in this way, which can not only ensure that both rows of shrapnel can be clamped by the loading slot 241, but also ensure that the force is uniform.
  • it further includes: a connecting device 700 disposed on the base 300 , the connecting device 700 , the mounting plate 320 , and the control device 400 are arranged in sequence, and the connecting device 700 is used for disposing the control device 400 on the mounting plate 320 Above, the connecting device 700 is connected with the first mold 100 .
  • the bottom of the base 300 is provided with a supporting foot 330 .
  • the driving unit 510 is a hydraulic cylinder; and/or the control device 400 includes a controller and a driving motor, and the driving motor is connected with the controller and the hydraulic cylinder.
  • the present application provides a method of using a tooling system, including:

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

A tool system and a method of using same. The tool system comprises a base, a control device, a power device, a first mold, and a second mold. The control device is installed on the base, and is connected to the power device. The first mold is installed on the base, and is used for installation of a first tool. The second mold is installed on the power device, and is used for installation of a second tool. The second mold can slide up and down to place the second tool in the first tool. The method of using the tool system comprises: installing the first tool in the first mold; starting the tool system; controlling the second mold to move downward until the second mold is connected to the first mold; placing the second tool in the second mold; and causing the first tool and the second tool to be fixedly connected. The invention realizes automatic installation of the first tool and the second tool, and solves the problems of inconvenient manual installation, low fixing reliability, a low yield, and low work efficiency.

Description

一种工装系统及其使用方法A tooling system and method of using the same 技术领域technical field
本发明涉及医学器械技术领域,特别是涉及一种工装系统及其使用方法。The invention relates to the technical field of medical instruments, in particular to a tooling system and a method for using the same.
背景技术Background technique
医疗器械对生产具有较高和严格的要求,例如:精确度高、自动化程度高等特点。Medical devices have high and strict requirements for production, such as high precision and high degree of automation.
但是现有技术缺乏自动安装医疗器械的设备,尤其是:缺乏三通阀和弹针自动安装设备,人为安装存在固定不牢固、安装不便,合格率低、工作效率低的问题。However, the prior art lacks equipment for automatic installation of medical devices, especially: lack of automatic installation equipment for three-way valves and spring needles, and manual installation has the problems of unstable fixation, inconvenient installation, low qualification rate and low work efficiency.
发明内容SUMMARY OF THE INVENTION
本申请提供了一种工装系统及其使用方法,以解决现有技术中存在固定不牢固、安装不便,合格率低、工作效率低的问题。The present application provides a tooling system and a method for using the same, so as to solve the problems in the prior art that the fixation is not firm, the installation is inconvenient, the qualification rate is low, and the work efficiency is low.
为实现上述目的,本申请提供了一种工装系统,其特征在于,包括:基座、控制装置、动力装置、第一模具和第二模具;In order to achieve the above object, the present application provides a tooling system, which is characterized by comprising: a base, a control device, a power device, a first mold and a second mold;
所述控制装置安装于所述基座上,与所述动力装置连接;The control device is mounted on the base and connected with the power device;
所述第一模具安装于所述基座上,用于安装第一工装;The first mold is installed on the base for installing the first tool;
所述第二模具安装于所述动力装置上,用于安装第二工装,通过上下滑动,将第二工装置于所述第一工装内。The second mold is installed on the power device for installing the second tool, and the second tool is installed in the first tool by sliding up and down.
可选地,上述的工装系统,所述基座包括:底座和安装板,所属安装板垂直设置于所述基座上。Optionally, in the above-mentioned tooling system, the base includes: a base and a mounting plate, and the corresponding mounting plate is vertically arranged on the base.
可选地,上述的工装系统,所述控制装置安装于所述安装板上。Optionally, in the above-mentioned tooling system, the control device is mounted on the mounting plate.
可选地,上述的工装系统,所述动力装置包括:驱动单元、支撑板、移动单元和滑轨,所述支撑板安装于所述安装板顶部,所述驱动单元与所述控制装置连接,所述移动单元安装于所述滑轨上,所述驱动单元与所述移动单元连接,所述第二模具设置于所述移动单元上。Optionally, in the above-mentioned tooling system, the power device includes: a drive unit, a support plate, a moving unit and a slide rail, the support plate is mounted on the top of the mounting plate, and the drive unit is connected to the control device, The moving unit is installed on the sliding rail, the driving unit is connected with the moving unit, and the second mold is arranged on the moving unit.
可选地,上述的工装系统,所述第一模具为三通阀模具,所述第二模具为嵌件模具;所述三通阀模具安装于所述基座上,所述三通阀模具上设置至少一个凹槽,所述凹槽用于安装三通阀;所述嵌件模具安装于所述动力装置上,所述嵌件模具上设置至少一个安装孔,所述安装孔用于安装嵌件,通过上下滑动,将嵌件置于所述三通阀内。Optionally, in the above-mentioned tooling system, the first mold is a three-way valve mold, and the second mold is an insert mold; the three-way valve mold is installed on the base, and the three-way valve mold is At least one groove is set on it, and the groove is used to install the three-way valve; the insert mold is installed on the power unit, and at least one installation hole is set on the insert mold, and the installation hole is used for installation The insert is placed inside the three-way valve by sliding it up and down.
可选地,上述的工装系统,朝向所述第一模具方向,所述第二模具上设置定位柱,所述第一模具上设置定位孔,所述定位柱设置于所述定位孔内。Optionally, the above-mentioned tooling system is directed toward the first mold, the second mold is provided with positioning posts, the first mold is provided with positioning holes, and the positioning posts are provided in the positioning holes.
可选地,上述的工装系统,所述第一模具为弹片模具,所述第二模具为压置模具,所述弹片模具包括本体、以及设置于所述本体上的第一安装槽,所述第一安装槽用于设置待安装弹片的装置;所述压置模具包括压置单元和加载单元,所述加载单元设置于所述压置单元的底部,所述加载单元底部设置有与弹片顶部形状相同的加载槽。Optionally, in the above-mentioned tooling system, the first mold is an elastic sheet mold, the second mold is a pressing mold, and the elastic sheet mold includes a body and a first installation groove provided on the body, the The first installation groove is used to set the device for installing the elastic sheet; the pressing die includes a pressing unit and a loading unit, the loading unit is arranged at the bottom of the pressing unit, and the bottom of the loading unit is provided with the top of the elastic sheet Loading slot of the same shape.
可选地,上述的工装系统,所述第一安装槽包括槽体以及设置于所述槽体内的插座,所述插座沿着所述弹片模具至所述压置模具方向向上凸起,所述凸起内设置第二凹槽,在所述第二凹槽内设置至少一个弹片安装槽。Optionally, in the above-mentioned tooling system, the first installation groove includes a groove body and a socket provided in the groove body, the socket protrudes upward along the direction from the elastic sheet die to the pressing die, and the socket A second groove is arranged in the protrusion, and at least one elastic piece installation groove is arranged in the second groove.
可选地,上述的工装系统,所述加载单元包括依次交叉连接的所述加载槽和连接件,所述连接件为沿着所述压置单元至所述弹片模具的凸起,所述加载槽为沿着所述弹片模具至所述压置单元的凹槽。Optionally, in the above-mentioned tooling system, the loading unit includes the loading groove and the connecting piece that are cross-connected in sequence, and the connecting piece is a protrusion along the pressing unit to the elastic piece mold, and the loading The groove is a groove along the elastic sheet mold to the pressing unit.
可选地,上述的工装系统,还包括:设置于所述基座上的连接装置,所述连接装置、所述安装板、所述控制装置依次设置,所述连接装置用于将所述控 制装置设置于所述安装板上,所述连接装置与所述第一模具连接。Optionally, the above-mentioned tooling system further includes: a connecting device arranged on the base, the connecting device, the mounting plate, and the control device are arranged in sequence, and the connecting device is used to connect the control device The device is arranged on the mounting plate, and the connecting device is connected with the first mold.
可选地,上述的工装系统,所述基座底部设置支脚。Optionally, in the above-mentioned tooling system, feet are provided at the bottom of the base.
可选地,上述的工装系统,所述驱动单元为液压气缸;和/或所述控制装置包括控制器和驱动电机,所述驱动电机与所述控制器、所述液压气缸连接。Optionally, in the above-mentioned tooling system, the drive unit is a hydraulic cylinder; and/or the control device includes a controller and a drive motor, and the drive motor is connected to the controller and the hydraulic cylinder.
第二方面,本申请提供了一种工装系统的使用方法,包括:In a second aspect, the application provides a method for using a tooling system, including:
将第一工装安装于第一模具内;installing the first tooling in the first mold;
启动工装系统;Start the tooling system;
控制第二模具向下运动,直至第二模具与第一模具连接;control the second mold to move downward until the second mold is connected with the first mold;
向第二模具内放入第二工装;Put the second tool into the second mold;
使所述第一工装和所述第二工装固定连接;making the first tooling and the second tooling fixedly connected;
控制所述第二模具向上运动,离开所述第一模具。The second mold is controlled to move upward and away from the first mold.
本申请实施例提供的方案带来的有益效果至少包括:The beneficial effects brought by the solutions provided in the embodiments of the present application include at least:
本申请提供了一种工装系统,将第一工装安装于第一模具内;启动工装系统;控制第二模具向下运动,直至第二模具与第一模具连接;向第二模具内放入第二工装;使所述第一工装和所述第二工装固定连接,实现了第一工装和第二工装的自动安装,解决了人工安装不便,固定不牢固,合格率低,工作效率低的问题。The application provides a tooling system, which includes installing a first tooling in a first mold; starting the tooling system; controlling the second mold to move downward until the second mold is connected with the first mold; Second tooling; the first tooling and the second tooling are fixedly connected to realize the automatic installation of the first tooling and the second tooling, which solves the problems of inconvenient manual installation, weak fixing, low qualification rate and low work efficiency .
附图说明Description of drawings
此处所说明的附图用来提供对本发明的进一步理解,构成本发明的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The accompanying drawings described herein are used to provide further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the attached image:
图1为工装系统的一个实施例的结构示意图;1 is a schematic structural diagram of an embodiment of a tooling system;
图2为工装系统的另一实施例的结构示意图;2 is a schematic structural diagram of another embodiment of a tooling system;
图3为一种工装系统的使用方法的流程图。FIG. 3 is a flow chart of a method of using a tooling system.
具体实施方式Detailed ways
为使本发明的目的、技术方案和优点更加清楚,下面将结合本发明具体实施例及相应的附图对本发明技术方案进行清楚、完整地描述。显然,所描述的实施例仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the objectives, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the specific embodiments of the present invention and the corresponding drawings. Obviously, the described embodiments are only some, but not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
以下将以图式揭露本发明的多个实施方式,为明确说明起见,许多实务上的细节将在以下叙述中一并说明。然而,应了解到,这些实务上的细节不应用以限制本发明。也就是说,在本发明的部分实施方式中,这些实务上的细节是非必要的。此外,为简化图式起见,一些习知惯用的结构与组件在图式中将以简单的示意的方式绘示之。Various embodiments of the present invention will be disclosed in the drawings below, and for the sake of clarity, many practical details will be described together in the following description. It should be understood, however, that these practical details should not be used to limit the invention. That is, in some embodiments of the invention, these practical details are unnecessary. In addition, for the purpose of simplifying the drawings, some well-known structures and components are shown in a simple schematic manner in the drawings.
如图1所示,本申请提供了一种工装系统,包括:基座300、控制装置400、动力装置500、第一模具100和第二模具200;控制装置400安装于基座300上,与动力装置500连接;第一模具100安装于基座300上,用于安装第一工装;第二模具200安装于动力装置500上,用于安装第二工装,通过上下滑动,将第二工装置于第一工装内。本申请将第一工装安装于第一模具内;启动工装系统;控制第二模具向下运动,直至第二模具与第一模具连接;向第二模具内放入第二工装;使所述第一工装和所述第二工装固定连接,实现了第一工装和第二工装的自动安装,解决了人工安装不便,固定不牢固,合格率低,工作效率低的问题。As shown in FIG. 1 , the present application provides a tooling system, including: a base 300 , a control device 400 , a power device 500 , a first mold 100 and a second mold 200 ; the control device 400 is mounted on the base 300 , and The power device 500 is connected; the first mold 100 is installed on the base 300 for installing the first tool; the second mold 200 is installed on the power device 500 for installing the second tool, and the second tool is installed by sliding up and down. in the first tooling. In this application, the first tooling is installed in the first mold; the tooling system is started; the second mold is controlled to move downward until the second mold is connected with the first mold; the second tooling is put into the second mold; The first tooling is fixedly connected with the second tooling, which realizes the automatic installation of the first tooling and the second tooling, and solves the problems of inconvenient manual installation, weak fixing, low qualification rate and low work efficiency.
本申请的一个实施例中,基座300包括:底座310和安装板320,所属安装板320垂直设置于基座300上。In an embodiment of the present application, the base 300 includes: a base 310 and a mounting plate 320 , and the corresponding mounting plate 320 is vertically disposed on the base 300 .
本申请的一个实施例中,控制装置400安装于安装板320上。In one embodiment of the present application, the control device 400 is mounted on the mounting plate 320 .
本申请的一个实施例中,动力装置500包括:驱动单元510、支撑板520、 移动单元530和滑轨540,支撑板520安装于安装板320顶部,驱动单元510与控制装置400连接,移动单元530安装于滑轨540上,驱动单元510与移动单元530连接,第二模具200设置于移动单元530上。In one embodiment of the present application, the power device 500 includes: a drive unit 510, a support plate 520, a moving unit 530 and a slide rail 540, the support plate 520 is mounted on the top of the mounting plate 320, the drive unit 510 is connected to the control device 400, and the moving unit The 530 is installed on the slide rail 540 , the driving unit 510 is connected with the moving unit 530 , and the second mold 200 is arranged on the moving unit 530 .
如图1所示,本申请的一个实施例中,第一模具100为三通阀模具,第二模具200为嵌件模具;三通阀模具安装于基座300上,三通阀模具上设置至少一个第一凹槽110,第一凹槽110用于安装三通阀;嵌件模具安装于动力装置500上,嵌件模具上设置至少一个安装孔210,安装孔210用于安装嵌件600,通过上下滑动,将嵌件600置于三通阀内。实现了三通阀和嵌件的自动安装,且一次性可以完成多个数量的三通阀安装,提高了工作效率,自动化程度高。As shown in FIG. 1 , in one embodiment of the present application, the first mold 100 is a three-way valve mold, and the second mold 200 is an insert mold; the three-way valve mold is installed on the base 300 , and the three-way valve mold is set on the At least one first groove 110, the first groove 110 is used to install the three-way valve; the insert mold is installed on the power unit 500, and at least one installation hole 210 is provided on the insert mold, and the installation hole 210 is used to install the insert 600 , by sliding up and down, the insert 600 is placed in the three-way valve. The automatic installation of the three-way valve and the insert is realized, and the installation of a plurality of three-way valves can be completed at one time, which improves the work efficiency and has a high degree of automation.
本申请的一个实施例中,朝向第一模具100方向,第二模具200上设置定位柱220,第一模具100上设置定位孔120,定位柱220设置于定位孔120内。In an embodiment of the present application, facing the first mold 100 , the second mold 200 is provided with positioning posts 220 , the first mold 100 is provided with positioning holes 120 , and the positioning posts 220 are provided in the positioning holes 120 .
如图2所示,本申请的一个实施例中,第一模具100为弹片模具,第二模具200为压置模具,弹片模具包括本体130、以及设置于本体130上的第一安装槽140,第一安装槽140用于设置待安装弹片的装置;压置模具包括压置单元230和加载单元240,加载单元240设置于压置单元230的底部,加载单元240底部设置有与弹片顶部形状相同的加载槽241。本申请将弹片放置于弹片模具内,加载槽241插接于弹片上,通过动力装置500带动压置单元230向下运动,实现弹片的自动压紧,通过控制装置400控制压置单元230的行进距离,设定科学,解决了用力过大容易损坏元器件,用力过小容易造成信号传输不稳定,人工操作困难的问题,且一次性可以压紧多个弹片,提高了工作效率,提高了合格率。As shown in FIG. 2 , in one embodiment of the present application, the first mold 100 is an elastic sheet mold, the second mold 200 is a pressing mold, and the elastic sheet mold includes a main body 130 and a first installation groove 140 disposed on the main body 130 . The first installation groove 140 is used to set the device to be installed with the elastic piece; the pressing die includes a pressing unit 230 and a loading unit 240, the loading unit 240 is arranged at the bottom of the pressing unit 230, and the bottom of the loading unit 240 is provided with the same shape as the top of the elastic piece the loading slot 241. In this application, the shrapnel is placed in the shrapnel mold, the loading slot 241 is inserted on the shrapnel, the pressing unit 230 is driven downward by the power device 500 to realize the automatic pressing of the shrapnel, and the movement of the pressing unit 230 is controlled by the control device 400 The distance and setting are scientific, which solves the problems that too much force can easily damage components, too little force can easily cause unstable signal transmission and difficult manual operation, and multiple shrapnel can be compressed at one time, which improves work efficiency and improves qualification. Rate.
本申请的一个实施例中,第一安装槽140包括槽体141以及设置于槽体141内的插座142,插座142沿着弹片模具至压置模具方向向上凸起,凸起内设置第二凹槽143,在第二凹槽143内设置至少一个弹片安装槽144。In an embodiment of the present application, the first installation groove 140 includes a groove body 141 and a socket 142 disposed in the groove body 141 . The socket 142 protrudes upward along the direction from the elastic sheet mold to the pressing mold, and a second concave is arranged in the protrusion. The groove 143 is provided with at least one elastic piece mounting groove 144 in the second groove 143 .
本申请的一个实施例中,加载单元240包括依次交叉连接的加载槽241和连接件242,连接件242为沿着压置单元230至弹片模具的凸起,加载槽241为沿着弹片模具至压置单元230的凹槽。如此设置能够保证弹片之间既有相应的间隔,又能够同时夹紧弹片,设计科学。本申请的一个实施例中,加载槽241顶部为弧形结构,弧形结构与弹片顶端结构相一致,保证弹片能够被紧密的夹紧;和/或加载槽241的宽度大于等于对称设置的两个弹片的距离,如此设置既能保证两排弹片均能够被加载槽241夹紧,又能够保证受力均匀。In one embodiment of the present application, the loading unit 240 includes a loading groove 241 and a connecting piece 242 that are cross-connected in sequence. The connecting piece 242 is a protrusion along the pressing unit 230 to the elastic sheet mold, and the loading groove 241 is a protrusion along the elastic sheet mold to the elastic sheet mold. The groove of the pressing unit 230. This setting can ensure that there is a corresponding interval between the shrapnel, and can clamp the shrapnel at the same time, and the design is scientific. In an embodiment of the present application, the top of the loading slot 241 is an arc structure, and the arc structure is consistent with the top structure of the elastic piece, so as to ensure that the elastic piece can be tightly clamped; and/or the width of the loading slot 241 is greater than or equal to two symmetrically arranged The distance between the two shrapnel is set in this way, which can not only ensure that both rows of shrapnel can be clamped by the loading slot 241, but also ensure that the force is uniform.
本申请的一个实施例中,还包括:设置于基座300上的连接装置700,连接装置700、安装板320、控制装置400依次设置,连接装置700用于将控制装置400设置于安装板320上,连接装置700与第一模具100连接。In an embodiment of the present application, it further includes: a connecting device 700 disposed on the base 300 , the connecting device 700 , the mounting plate 320 , and the control device 400 are arranged in sequence, and the connecting device 700 is used for disposing the control device 400 on the mounting plate 320 Above, the connecting device 700 is connected with the first mold 100 .
本申请的一个实施例中,基座300底部设置支脚330。In one embodiment of the present application, the bottom of the base 300 is provided with a supporting foot 330 .
本申请的一个实施例中,驱动单元510为液压气缸;和/或控制装置400包括控制器和驱动电机,驱动电机与控制器、液压气缸连接。In one embodiment of the present application, the driving unit 510 is a hydraulic cylinder; and/or the control device 400 includes a controller and a driving motor, and the driving motor is connected with the controller and the hydraulic cylinder.
如图3所示,本申请提供了一种工装系统的使用方法,包括:As shown in Figure 3, the present application provides a method of using a tooling system, including:
S100,将第一工装安装于第一模具100内;S100, installing the first tooling in the first mold 100;
S200,向第一工装滴入粘结剂;S200, dripping the binder into the first tooling;
S300,启动工装系统;S300, start the tooling system;
S400,控制第二模具200向下运动,直至第二模具200与第一模具100连接;S400, controlling the second mold 200 to move downward until the second mold 200 is connected to the first mold 100;
S500,向第二模具200内放入第二工装;S500, putting a second tooling into the second mold 200;
S600,使第一工装和第二工装固定连接;S600, the first tooling and the second tooling are fixedly connected;
S700,控制第二模具200向上运动,离开第一模具100。S700 , control the second mold 200 to move upward and leave the first mold 100 .
本发明的以上所述的具体实例,对本发明的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施例而已, 并不用于限制本发明,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The specific examples of the present invention described above further describe the purpose, technical solutions and beneficial effects of the present invention in detail. invention, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.

Claims (13)

  1. 一种工装系统,其特征在于,包括:基座、控制装置、动力装置、第一模具和第二模具;A tooling system, comprising: a base, a control device, a power device, a first mold and a second mold;
    所述控制装置安装于所述基座上,与所述动力装置连接;The control device is mounted on the base and connected with the power device;
    所述第一模具安装于所述基座上,用于安装第一工装;The first mold is installed on the base for installing the first tool;
    所述第二模具安装于所述动力装置上,用于安装第二工装,通过上下滑动,将第二工装置于所述第一工装内。The second mold is installed on the power device for installing the second tool, and the second tool is installed in the first tool by sliding up and down.
  2. 根据权利要求1所述的工装系统,其特征在于,所述基座包括:底座和安装板,所属安装板垂直设置于所述基座上。The tooling system according to claim 1, wherein the base comprises: a base and a mounting plate, and the corresponding mounting plate is vertically arranged on the base.
  3. 根据权利要求1所述的工装系统,其特征在于,所述控制装置安装于所述安装板上。The tooling system of claim 1, wherein the control device is mounted on the mounting plate.
  4. 根据权利要求2所述的工装系统,其特征在于,所述动力装置包括:驱动单元、支撑板、移动单元和滑轨,所述支撑板安装于所述安装板顶部,所述驱动单元与所述控制装置连接,所述移动单元安装于所述滑轨上,所述驱动单元与所述移动单元连接,所述第二模具设置于所述移动单元上。The tooling system according to claim 2, wherein the power device comprises: a driving unit, a supporting plate, a moving unit and a sliding rail, the supporting plate is mounted on the top of the mounting plate, and the driving unit is connected to the The control device is connected, the moving unit is installed on the sliding rail, the driving unit is connected with the moving unit, and the second mold is arranged on the moving unit.
  5. 根据权利要求2所述的工装系统,其特征在于,所述第一模具为三通阀模具,所述第二模具为嵌件模具;所述三通阀模具安装于所述基座上,所述三通阀模具上设置至少一个凹槽,所述凹槽用于安装三通阀;所述嵌件模具安装于所述动力装置上,所述嵌件模具上设置至少一个安装孔,所述安装孔用于安装嵌件,通过上下滑动,将嵌件置于所述三通阀内。The tooling system according to claim 2, wherein the first mold is a three-way valve mold, and the second mold is an insert mold; the three-way valve mold is mounted on the base, and the The three-way valve mold is provided with at least one groove, and the groove is used for installing the three-way valve; the insert mold is installed on the power device, and at least one installation hole is provided on the insert mold, and the insert mold is provided with at least one mounting hole. The mounting hole is used to install the insert, and the insert is placed in the three-way valve by sliding up and down.
  6. 根据权利要求5所述的工装系统,其特征在于,朝向所述第一模具方向,所述第二模具上设置定位柱,所述第一模具上设置定位孔,所述定位柱设置于所述定位孔内。The tooling system according to claim 5, wherein in the direction of the first mold, a positioning column is provided on the second mold, a positioning hole is provided on the first mold, and the positioning column is provided on the in the positioning hole.
  7. 根据权利要求2所述的工装系统,其特征在于,所述第一模具为弹片模具,所述第二模具为压置模具,所述弹片模具包括本体、以及设置于所述本体上的第一安装槽,所述第一安装槽用于设置待安装弹片的装置;所述压置模具包括压置单元和加载单元,所述加载单元设置于所述压置单元的底部,所述加载单元底部设置有与弹片顶部形状相同的加载槽。The tooling system according to claim 2, wherein the first mold is an elastic sheet mold, the second mold is a pressing mold, and the elastic sheet mold comprises a body and a first mold disposed on the body. an installation groove, the first installation groove is used to set a device to be installed with an elastic sheet; the pressing die includes a pressing unit and a loading unit, the loading unit is arranged at the bottom of the pressing unit, and the bottom of the loading unit is There is a loading slot with the same shape as the top of the shrapnel.
  8. 根据权利要求7所述的工装系统,其特征在于,所述第一安装槽包括槽体以及设置于所述槽体内的插座,所述插座沿着所述弹片模具至所述压置模具方向向上凸起,所述凸起内设置第二凹槽,在所述第二凹槽内设置至少一个弹片安装槽。The tooling system according to claim 7, wherein the first installation groove comprises a groove body and a socket provided in the groove body, and the socket is upward along the direction from the elastic sheet die to the pressing die The protrusion is provided with a second groove, and at least one elastic piece installation groove is provided in the second groove.
  9. 根据权利要求7所述的工装系统,其特征在于,所述加载单元包括依次交叉连接的所述加载槽和连接件,所述连接件为沿着所述压置单元至所述弹片模具的凸起,所述加载槽为沿着所述弹片模具至所述压置单元的凹槽。The tooling system according to claim 7, wherein the loading unit comprises the loading groove and the connecting piece which are cross-connected in sequence, and the connecting piece is a protrusion extending from the pressing unit to the elastic piece mold. From now on, the loading groove is a groove along the elastic sheet mold to the pressing unit.
  10. 根据权利要求2所述的工装系统,其特征在于,还包括:设置于所述基座上的连接装置,所述连接装置、所述安装板、所述控制装置依次设置,所述连接装置用于将所述控制装置设置于所述安装板上,所述连接装置与所述第一模具连接。The tooling system according to claim 2, further comprising: a connecting device arranged on the base, wherein the connecting device, the mounting plate and the control device are arranged in sequence, and the connecting device uses After the control device is arranged on the mounting plate, the connection device is connected to the first mold.
  11. 根据权利要求1所述的工装系统,其特征在于,所述基座底部设置支脚。The tooling system according to claim 1, wherein the bottom of the base is provided with feet.
  12. 根据权利要求4所述的工装系统,其特征在于,所述驱动单元为液压气缸;和/或所述控制装置包括控制器和驱动电机,所述驱动电机与所述控制器、所述液压气缸连接。The tooling system according to claim 4, wherein the drive unit is a hydraulic cylinder; and/or the control device comprises a controller and a drive motor, the drive motor is connected with the controller and the hydraulic cylinder connect.
  13. 一种工装系统的使用方法,其特征在于,包括:A method of using a tooling system, comprising:
    将第一工装安装于第一模具内;installing the first tooling in the first mold;
    向第一工装滴入粘结剂;Drop the binder into the first tooling;
    启动工装系统;Start the tooling system;
    控制第二模具向下运动,直至第二模具与第一模具连接;control the second mold to move downward until the second mold is connected with the first mold;
    向第二模具内放入第二工装;Put the second tool into the second mold;
    使所述第一工装和所述第二工装固定连接;making the first tooling and the second tooling fixedly connected;
    控制所述第二模具向上运动,离开所述第一模具。The second mold is controlled to move upward and away from the first mold.
PCT/CN2020/124019 2020-10-23 2020-10-27 Tool system and method of using same WO2022082830A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202011144856.8 2020-10-23
CN202011144856.8A CN112178025A (en) 2020-10-23 2020-10-23 Tool system and using method thereof

Publications (1)

Publication Number Publication Date
WO2022082830A1 true WO2022082830A1 (en) 2022-04-28

Family

ID=73922661

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/124019 WO2022082830A1 (en) 2020-10-23 2020-10-27 Tool system and method of using same

Country Status (2)

Country Link
CN (1) CN112178025A (en)
WO (1) WO2022082830A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112207545A (en) * 2020-10-23 2021-01-12 苏州润迈德医疗科技有限公司 Tool system and method for assembling three-way valve

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110059270A (en) * 2009-11-27 2011-06-02 주식회사 지엠에스 Apparatus for assembling sleeve of a normal close type solenoid valve in vehicle's abs and the method thereof
CN104185133A (en) * 2014-08-09 2014-12-03 歌尔声学股份有限公司 Elastic piece assembling device
CN106625292A (en) * 2015-10-29 2017-05-10 青岛博利尔机械设备有限公司 Novel character pasting tool
CN207788809U (en) * 2018-01-31 2018-08-31 厦门普锐实业有限公司 A kind of lower shrapnel assembling fixture
CN109434401A (en) * 2018-10-24 2019-03-08 大族激光科技产业集团股份有限公司 Assembling device and elastic slice fitting machine
CN109434447A (en) * 2018-11-21 2019-03-08 博众精工科技股份有限公司 Pin assembles device and diverter production system
CN111761353A (en) * 2020-07-16 2020-10-13 昌辉汽车电器(黄山)股份公司 Shifting fork assembly press-fitting device
CN112139796A (en) * 2020-10-23 2020-12-29 苏州润迈德医疗科技有限公司 Tool system and method for automatically pressing elastic sheet
CN213438160U (en) * 2020-10-23 2021-06-15 苏州润迈德医疗科技有限公司 Tool system for assembling three-way valve

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110059270A (en) * 2009-11-27 2011-06-02 주식회사 지엠에스 Apparatus for assembling sleeve of a normal close type solenoid valve in vehicle's abs and the method thereof
CN104185133A (en) * 2014-08-09 2014-12-03 歌尔声学股份有限公司 Elastic piece assembling device
CN106625292A (en) * 2015-10-29 2017-05-10 青岛博利尔机械设备有限公司 Novel character pasting tool
CN207788809U (en) * 2018-01-31 2018-08-31 厦门普锐实业有限公司 A kind of lower shrapnel assembling fixture
CN109434401A (en) * 2018-10-24 2019-03-08 大族激光科技产业集团股份有限公司 Assembling device and elastic slice fitting machine
CN109434447A (en) * 2018-11-21 2019-03-08 博众精工科技股份有限公司 Pin assembles device and diverter production system
CN111761353A (en) * 2020-07-16 2020-10-13 昌辉汽车电器(黄山)股份公司 Shifting fork assembly press-fitting device
CN112139796A (en) * 2020-10-23 2020-12-29 苏州润迈德医疗科技有限公司 Tool system and method for automatically pressing elastic sheet
CN213438160U (en) * 2020-10-23 2021-06-15 苏州润迈德医疗科技有限公司 Tool system for assembling three-way valve

Also Published As

Publication number Publication date
CN112178025A (en) 2021-01-05

Similar Documents

Publication Publication Date Title
WO2022082830A1 (en) Tool system and method of using same
CN112846757A (en) Press mounting mechanism
CN108934333B (en) Rice seedling transplanting device
CN213438160U (en) Tool system for assembling three-way valve
CN209998707U (en) automatic nut dismounting device
CN218964413U (en) Continuous nickel sheet laser welding and pressing mechanism of cylindrical battery
CN103586808B (en) Seat cushion positioning mechanism and control method thereof
WO2022082833A1 (en) Mounting system and method for automatically pressing elastic piece
CN213628349U (en) Tool system
CN217831572U (en) Stabilizer bar support riveting set
WO2022082831A1 (en) Tooling system and method for assembling three-way valve
CN212328758U (en) Speaker assembling apparatus
CN211136200U (en) Servo pressure equipment machine processing platform
CN113967828A (en) Robot flexible press-fitting mechanism and press-fitting method
CN213290167U (en) Automatic frock of implanting of support
CN209062491U (en) A kind of assemble mechanism of sprigging machine
CN113001174A (en) Engine thermostat assembly assembling device and method
JPH1071493A (en) Press machine
CN219074823U (en) Automatic pump body pin pressing device
CN220029299U (en) Copper sheet assembly fixture
CN107984207B (en) The mounting tool structure and its installation method of electric equipment products control assembly
CN218888353U (en) Motor rotor butt-joint assembling equipment
CN219771516U (en) Steam conduit installs with increaseing equipment
CN220761075U (en) Surface tapping machine for building templates
CN216760296U (en) Positioning fixture for cement tile production

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20958411

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20958411

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 20958411

Country of ref document: EP

Kind code of ref document: A1