WO2022044780A1 - Système d'alimentation électrique - Google Patents

Système d'alimentation électrique Download PDF

Info

Publication number
WO2022044780A1
WO2022044780A1 PCT/JP2021/029362 JP2021029362W WO2022044780A1 WO 2022044780 A1 WO2022044780 A1 WO 2022044780A1 JP 2021029362 W JP2021029362 W JP 2021029362W WO 2022044780 A1 WO2022044780 A1 WO 2022044780A1
Authority
WO
WIPO (PCT)
Prior art keywords
storage battery
power supply
state
switch
path
Prior art date
Application number
PCT/JP2021/029362
Other languages
English (en)
Japanese (ja)
Inventor
哲生 森田
Original Assignee
株式会社デンソー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社デンソー filed Critical 株式会社デンソー
Publication of WO2022044780A1 publication Critical patent/WO2022044780A1/fr

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60RVEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR
    • B60R16/00Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for
    • B60R16/02Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems

Definitions

  • This disclosure relates to a power supply system.
  • a power supply system that is applied to a vehicle and supplies electric power to various devices of this vehicle is known.
  • this power supply system when the vehicle is driven, an abnormality occurs in the system that supplies electric power to the electric load that performs the functions necessary for driving the vehicle, such as the electric brake device and the electric steering device, and the function is lost due to this. If you do, you will not be able to continue driving the vehicle.
  • a device having a first power source and a second power source as a power source for supplying electric power to an electric load is known so as not to lose its function even when an abnormality occurs while the vehicle is in operation.
  • a first power supply having a first load and a second load as an electric load for performing one function and including a first power supply connected to the first load is included.
  • Those having a system and a second system including a second power source connected to the second load are known.
  • an inter-system switch is provided in the connection path connecting each system, and the inter-system switch is opened when the controller determines that an abnormality has occurred in one system.
  • a configuration in which the second power supply of the second system is used as a storage battery can be considered.
  • the inter-system switch is opened due to an abnormality in the first system
  • power is supplied from the storage battery which is the second power source, but in a low temperature state or a high load state, for example, the first system is used.
  • the electric load will not operate properly at the start of power supply from the storage battery in the two systems.
  • the present disclosure has been made to solve the above problems, and an object thereof is to provide a power supply system capable of appropriately supplying electric power to an electric load in a power supply system having a plurality of power supply systems. ..
  • the first means for solving the above-mentioned problems is an electric load, a first system including a first power source connected to the electric load, and a second system including a second power source connected to the electric load.
  • a power supply system including an inter-system switch provided in a connection path connecting the first system and the second system to each other, wherein the first power supply is a power supply that enables driving of the electric load.
  • the second power supply includes a plurality of storage batteries that can be charged by the power supply voltage of the first power supply, and has an abnormality determination unit for determining that an abnormality has occurred in the first system and an abnormality determination unit.
  • the state control unit that opens the inter-system switch and the plurality of storage batteries are connected in parallel when charging the plurality of storage batteries, and the plurality of storage batteries are connected in parallel from the first power source.
  • the first control unit in the first state of supplying power to the storage batteries of the above and the plurality of storage batteries are connected in series, and the voltage is higher than the power supply voltage of the first power supply.
  • it includes a second control unit that is in a second state of supplying power to the electric load from the plurality of storage batteries at a voltage higher than the required voltage of the electric load.
  • a first system including a first power supply and a second system including a second power supply are provided. Therefore, redundant power supply by the first power supply and the second power supply becomes possible for the electric load. Further, an inter-system switch is provided in the connection path connecting the first and second systems to each other. Therefore, if it is determined that an abnormality has occurred in one of the systems, the switch between the systems is opened to operate the electric load by supplying power from the power supply of the other system in which the abnormality has not occurred. It is possible to continue.
  • the inter-system switch when the inter-system switch is opened due to the occurrence of an abnormality in the first system, power is supplied from a plurality of storage batteries in the second power supply in the second system, and at that time, for example, in a low temperature state. It is desirable to keep the storage battery voltage of the second power supply high, considering that it may be in a high load state.
  • the configuration of charging the storage battery voltage to a high voltage there is a concern that the power supply burden from the first power supply and the cost burden of the power supply system will increase.
  • a plurality of storage batteries when a plurality of storage batteries are charged, a plurality of storage batteries are connected in parallel, and when a plurality of storage batteries are discharged, a plurality of storage batteries are connected in series.
  • the plurality of storage batteries when the plurality of storage batteries are charged, the plurality of storage batteries are connected in parallel, so that the power supply burden for charging and the cost burden of the power supply system can be reduced.
  • a plurality of storage batteries are connected in series to have a voltage or an electric load higher than the power supply voltage of the first power supply.
  • the electric load Since the electric load is supplied with a voltage higher than the required voltage, the electric load can be operated properly even in a low temperature state or a high load state. As a result, it is possible to properly supply electric power to an electric load in a power supply system having a plurality of power supply systems.
  • the second means is provided between the connection point with the connection path in the second system and the second power source, and includes a discharge control unit that regulates the discharge of the plurality of storage batteries in a series state.
  • a discharge control unit is provided between the connection point with the connection path in the second system and the second power supply, and the discharge control unit regulates the discharge of a plurality of storage batteries in a series state.
  • the total voltage of the plurality of storage batteries becomes a voltage higher than the power supply voltage of the first power supply or a voltage higher than the required voltage of the electric load, and is in a fully charged state.
  • a charge determination unit for determining that the battery is charged is provided, and the discharge regulation unit regulates the discharge of the plurality of storage batteries in a series state when the charge determination unit determines that the charge is fully charged.
  • the discharge control unit regulates the discharge of multiple storage batteries in a series state and in a fully charged state.
  • the discharge control unit includes a battery switch that opens or closes a path between the connection point with the connection path and the second power supply in the second system
  • the state control unit includes the state control unit.
  • a battery switch is provided as a discharge control unit, and the inter-system switch and the battery switch are linked to open and close each based on the presence or absence of an abnormality in the first system.
  • the fifth means is a power supply system mounted on a vehicle, wherein the electric load is a load that performs at least one function necessary for driving in the vehicle, and also performs a driving support function of the vehicle.
  • the vehicle is capable of traveling in the first mode using the driving support function and traveling in the second mode without using the driving support function, and the first control unit is in the second mode.
  • the state control unit permits switching to the first mode when the discharge of the plurality of storage batteries is restricted by the discharge control unit.
  • a power supply system applied to a vehicle having a first load and a second load as a function necessary for driving and performing a driving support function, driving and driving in the first mode using the driving support function and driving. Some can switch between driving in the second mode without using the support function.
  • the first state is set in the second mode, and when a plurality of storage batteries are fully charged in the second mode and discharge is restricted, switching to the first mode is permitted. As a result, even if an abnormality occurs in the first system in the first mode in which the driving support function is used, it is possible to continue driving the electric load using a plurality of fully charged storage batteries, and the driving support function Can be used continuously.
  • the discharge control unit includes a charging unit that charges a plurality of storage batteries connected in parallel to a voltage lower than the power supply voltage of the first power source by supplying power from the first power source, and the discharge regulating unit has the second path. To regulate the discharge of the plurality of storage batteries in the second system.
  • the first path and the second path are provided in parallel with each other between the connection point with the connection path in the second system and the second power supply, and in the first path, the first path is provided by the charging unit.
  • Multiple storage batteries are charged at a voltage lower than the power supply voltage of the power supply.
  • the discharge regulating unit regulates the discharge of a plurality of storage batteries in the second system.
  • the seventh means the first path and the second path provided in parallel with each other between the connection point with the connection path and the second power supply in the second system, and the first path are provided.
  • An open / close switch for opening or closing the first path is provided, and the discharge regulating unit is provided in the second path to regulate the flow of current from the connection point to the plurality of storage batteries in the second path. It also includes a rectifying element that causes a predetermined voltage difference between the voltage of the plurality of storage batteries connected in series and the power supply voltage.
  • the first path and the second path are provided in parallel with each other between the connection point with the connection path in the second system and the second power supply, and the battery switch is closed in the first path.
  • the plurality of storage batteries are charged, and when the battery switch is opened, the charging of the plurality of storage batteries is stopped.
  • a rectifying element as a discharge regulating unit is provided in the second path, and the rectifying element regulates the flow of current from the connection point to the plurality of storage batteries in the second path, and a plurality of connected in series. A predetermined voltage difference is created between the voltage of the storage battery and the voltage of the power supply.
  • the state in which the voltage is higher than the power supply voltage of the first power supply is maintained.
  • the voltage on the electric load side in the second system drops, and the batteries are discharged from a plurality of storage batteries connected in series, enabling early power supply to the electric load. It has become.
  • the first control unit acquires the drive amount information indicating the drive amount of the electric load, and the second control unit has the drive amount indicated by the drive amount information more than a predetermined threshold value.
  • the second state is set.
  • the second state is set when the drive amount of the electric load is switched from the state smaller than the threshold value to the state larger than the threshold value.
  • the ninth means when the first control unit switches from a state in which the drive amount indicated by the drive amount information is smaller than the threshold value to a state in which the drive amount is larger than the threshold value, and then from a state in which the drive amount is larger than the threshold value to a state in which the drive amount is smaller than the threshold value. In addition, the second state is switched to the first state, and the plurality of storage batteries are charged.
  • the second state is switched to the first state. Changed to charge multiple storage batteries. Therefore, even when a plurality of storage batteries are temporarily discharged in the normal state of the first system, the plurality of storage batteries can be fully charged thereafter. Therefore, when an abnormality occurs in the first system, it is possible to continue driving the electric load by using a plurality of storage batteries in a fully charged state.
  • the first control unit acquires the driving amount information indicating the driving amount of the electric load, and when the driving amount indicated by the driving amount information is smaller than a predetermined specified value, the plurality of said.
  • the plurality of storage batteries are connected in parallel to charge the plurality of storage batteries individually, and when the drive amount indicated by the drive amount information is larger than the specified value, the plurality of storage batteries are connected in parallel to the plurality of storage batteries. Charge the storage battery at the same time.
  • the plurality of storage batteries include a first specific battery and a second specific battery provided between a predetermined first potential point and a second potential point, and the positive electrode of the first specific battery.
  • the terminal is connected to the first potential point by the first positive electrode side path and is connected to the second potential point by the first negative electrode side path, and the positive electrode terminal of the second specific battery is the second positive electrode.
  • a first changeover switch provided in the first negative electrode side path, which is connected to the first potential point by the side path and is connected to the second potential point by the second negative electrode side path, and the second changeover switch.
  • the second changeover switch provided in the positive electrode side path, the first connection point on the first specific battery side of the first negative electrode side path from the first changeover switch, and the second positive electrode side path.
  • the first control unit includes, in the first state, the third changeover switch provided in the conduction path between the second changeover switch and the second connection point on the second potential point side.
  • the first changeover switch and the second changeover switch are closed, the third changeover switch is opened, and the second control unit opens the first changeover switch and the second changeover switch in the second state.
  • the third changeover switch is closed, and the first control unit and the second control unit change the first changeover switch and the second changeover switch at the time of switching between the first state and the second state.
  • the opening and closing of each changeover switch is controlled so that at least one of the switches and the third changeover switch are not closed at the same time.
  • each changeover switch when switching between the first state and the second state, each changeover switch is opened and closed so that at least one of the first changeover switch and the second changeover switch and the third changeover switch are not closed at the same time. I tried to control it. Thereby, the short circuit of the first specific battery and the second specific battery can be suppressed, and the first state and the second state can be appropriately switched.
  • FIG. 1 is an overall configuration diagram of the power supply system of the first embodiment.
  • FIG. 2 is a flowchart showing the procedure of the control process of the first embodiment.
  • FIG. 3 is a time chart showing an example of the control process of the first embodiment.
  • FIG. 4 is an overall configuration diagram of the power supply system of the second embodiment.
  • FIG. 5 is a flowchart showing the procedure of the control process of the second embodiment.
  • FIG. 6 is an overall configuration diagram of the power supply system according to the third embodiment.
  • FIG. 7 is a flowchart showing the procedure of the control process of the third embodiment.
  • FIG. 8 is a flowchart showing the procedure of the control process of the fourth embodiment.
  • the power supply system 100 is a system that supplies electric power to a general load 30 and a specific load 32.
  • the power supply system 100 includes a high-pressure storage battery 10, a DCDC converter (hereinafter referred to as a converter) 12, a first storage battery 14, a second storage battery 16 as a first specific battery, and a third storage battery 18 as a second specific battery. It includes a first switch unit 20, a relay switch SMR (system main relay switch), and a control device 40.
  • the high-voltage storage battery 10 has a rated voltage (for example, several hundred volts) higher than that of the first to third storage batteries 14 to 18, and is, for example, a lithium ion storage battery.
  • the converter 12 is a voltage generation unit that converts the electric power supplied from the high-voltage storage battery 10 into the electric power of the power supply voltage VA and supplies it to the general load 30 and the specific load 32.
  • the power supply voltage VA is a voltage that enables driving of the general load 30 and the specific load 32.
  • the general load 30 is an electric load (hereinafter, simply a load) that is not used for operation control in a vehicle as a mobile body, and is, for example, an air conditioner, an audio device, a power window, or the like.
  • the specific load 32 is a load that performs at least one function used for driving control of the vehicle, for example, an electric power steering device 50 that controls the steering of the vehicle, an electric brake device 51 that applies a braking force to the wheels, and the like. It is a traveling control device 52 or the like that monitors the situation around the vehicle.
  • the specific load 32 corresponds to the "electrical load”.
  • the specific load 32 has a first load 34 and a second load 36 redundantly provided for each function so that all the functions are not lost even if an abnormality occurs.
  • the electric power steering device 50 has a first steering motor 50A and a second steering motor 50B.
  • the electric brake device 51 has a first brake device 51A and a second brake device 51B.
  • the travel control device 52 has a camera 52A and a laser radar 52B.
  • the first steering motor 50A, the first brake device 51A, and the camera 52A correspond to the first load 34
  • the second steering motor 50B, the second brake device 51B, and the laser radar 52B correspond to the second load 36. ..
  • the first load 34 and the second load 36 together realize one function, but each of them can realize a part of the function by itself.
  • the first steering motor 50A and the second steering motor 50B allow the vehicle to be freely steered, and each steering motor 50A is subject to certain restrictions such as steering speed and steering range. , 50B enables steering of the vehicle.
  • Each specific load 32 realizes a function of supporting control by the driver in manual operation. Further, each specific load 32 realizes a function required for automatic driving in automatic driving that automatically controls behavior such as running and stopping of the vehicle. Therefore, the specific load 32 can also be said to be a load that performs at least one function necessary for driving the vehicle.
  • the first load 34 is connected to the converter 12 via the path LA1 in the first system, and the first storage battery 14 and the general load 30 are connected to the path LA1 in the first system.
  • the first storage battery 14 is, for example, a lead storage battery.
  • the first system ES1 is configured by the converter 12, the first storage battery 14, the general load 30, and the first load 34 connected by the path LA1 in the first system.
  • the high-voltage storage battery 10 and the converter 12 correspond to the "first power source".
  • the second load 36 is connected to the second storage battery 16 and the third storage battery 18 via the path LA2 in the second system.
  • the second storage battery 16 and the third storage battery 18 are, for example, lithium ion storage batteries.
  • the second system ES2 is configured by the second storage battery 16, the third storage battery 18, and the second load 36 connected by the path LA2 in the second system.
  • the second storage battery 16 and the third storage battery 18 correspond to "a second power source and a plurality of storage batteries".
  • the first switch unit 20 is provided in the connection path LB that connects each system to each other. One end of the connection path LB is connected to the first intra-system path LA1 at the connection point PA, and the other end of the connection path LB is connected to the second intra-system path LA2 at the connection point PB.
  • the first switch unit 20 includes a first switching element (hereinafter, simply the first switch) SW1.
  • a first switching element hereinafter, simply MOSFET
  • an N-channel MOSFET hereinafter, simply MOSFET
  • the first switch SW1 corresponds to an "intersystem switch".
  • the first current detection unit 27 is provided in the path LA1 in the first system, and the second current detection unit 28 is provided in the connection path LB.
  • the first current detection unit 27 is provided in a portion of the path LA1 in the first system between the connection point PA and the first load 34, and detects the magnitude and direction of the current IA in the system flowing through the portion. do.
  • the second current detection unit 28 is provided in the portion of the connection path LB on the first system ES1 side of the first switch unit 20, and detects the magnitude and direction of the inter-system current IB flowing through the portion.
  • the relay switch SMR is provided in a portion between the connection point PB in the path LA2 in the second system and the second storage battery 16 and the third storage battery 18, and the portion is opened or closed. By opening and closing the relay switch SMR, the second storage battery 16 and the third storage battery 18 can be switched between energization and energization cutoff.
  • the relay switch SMR corresponds to the "discharge control unit, battery switch".
  • the second storage battery 16 and the third storage battery 18 are configured to be rechargeable by the power supply from the converter 12. Specifically, by closing the first switching element SW1 and the relay switch SMR, the second storage battery 16 and the third storage battery 18 are charged by the power supply voltage VA.
  • the control device 40 generates a first switching signal SC1 in order to switch the first switch SW1 based on the detection values of the first and second current detection units 27 and 28, and issues a command by the first switching signal SC1. Output to the first switch SW1. Further, the control device 40 generates a relay switching signal SR in order to switch the relay switch SMR, and outputs a command by the relay switching signal SR to the relay switch SMR. Further, the control device 40 generates a control signal SD in order to control the operation of the converter 12, and outputs a command by the control signal SD to the converter 12. The operation state and the operation stop state of the converter 12 are switched by the control signal SD.
  • control device 40 is connected to the notification unit 44, the IG switch 45, and the input unit 46, and controls these.
  • the notification unit 44 is a device that visually or audibly notifies the driver, and is, for example, a display or a speaker installed in a vehicle interior.
  • the IG switch 45 is a vehicle start switch.
  • the control device 40 monitors the opening or closing of the IG switch 45.
  • the input unit 46 is a device that accepts the operation of the driver, for example, a handle, a lever, a button, a pedal, and a voice input device.
  • the control device 40 manually drives and automatically drives the vehicle using the above-mentioned specific load 32.
  • the control device 40 includes a well-known microcomputer including a CPU, ROM, RAM, flash memory, and the like.
  • the CPU realizes various functions for manual operation and automatic operation by referring to the arithmetic program and control data in the ROM.
  • manual driving represents a state in which the vehicle is controlled by the operation of the driver.
  • automatic driving represents a state in which the vehicle is driven and controlled by the control content by the control device 40 regardless of the operation of the driver.
  • automatic driving refers to automatic driving of level 3 or higher among the automatic driving levels from level 0 to level 5 defined by the National Highway Traffic Safety Administration (NHTSA).
  • Level 3 is a level at which the control device 40 controls both steering wheel operation and acceleration / deceleration while observing the traveling environment.
  • control device 40 can implement driving support functions such as LKA (Lane Keeping Assist), LCA (Lane Change Assist), and PCS (Pre-Crash Safety) by using the specific load 32 described above.
  • the control device 40 can switch the driving mode of the vehicle between a first mode in which the driving support function is used and a second mode in which the driving support function is not used, and the vehicle can travel in each driving mode. ..
  • the control device 40 switches between the first mode and the second mode according to the driver switching instruction via the input unit 46.
  • the first mode includes a mode in which the driver manually drives the vehicle using the driving support function, and a mode in which the vehicle is automatically driven.
  • the second mode is a mode in which the driver manually drives the vehicle without using the driving support function.
  • the control device 40 determines whether or not an abnormality has occurred in the first system ES1 and the second system ES2, and if it is determined that no abnormality has occurred in any of the systems ES1 and ES2, Automatic driving and driving support of the vehicle are performed using the first load 34 and the second load 36.
  • the first and second loads 34 and 36 cooperate to carry out one function necessary for automatic driving and driving support.
  • the abnormality is a power failure abnormality such as a ground fault or a disconnection.
  • the first switch SW1 is opened to electrically insulate the first system ES1 and the second system ES2.
  • the loads 34 and 36 of the other system ES1 and ES2 in which the abnormality has not occurred can be driven.
  • the second storage battery 16 and the third storage battery 18 can be switched between a state in which they are connected in series and a state in which they are connected in parallel.
  • the positive electrode terminal of the second storage battery 16 is connected to the relay switch SMR by the first positive electrode side path LC1
  • the negative electrode terminal of the second storage battery 16 is connected to the ground by the first negative electrode side path LD1.
  • the positive electrode terminal of the third storage battery 18 is connected to the first positive electrode side path LC1 at the connection point PC by the second positive electrode side path LC2, and the negative electrode terminal of the second storage battery 16 is connected to the connection point by the second negative electrode side path LD2. In PD, it is connected to the first negative electrode side path LD1.
  • connection point PC corresponds to the "first potential point”
  • connection point PD corresponds to the "second potential point”.
  • the second switch unit 22 is provided on the second storage battery 16 and the third storage battery 18 side of the relay switch SMR.
  • the second switch unit 22 includes second to fourth switching elements (hereinafter, simply second to fourth switches) SW2 to SW4.
  • the second switch SW2 is provided in the first negative electrode side path LD1
  • the third switch SW3 is provided in the second positive electrode side path LC2.
  • the fourth switch SW4 is provided in the conduction path LE connecting the second positive electrode side path LC2 and the first negative electrode side path LD1.
  • One end of the conduction path LE is connected between the second storage battery 16 and the second switch SW2 of the first negative electrode side path LD1 at the connection point PE, and the other end of the conduction path LE is at the connection point PF. 2 Of the positive electrode side paths LC2, the third switch SW3 and the third storage battery 18 are connected to each other.
  • the connection point PE corresponds to the "first connection point”
  • the connection point PF corresponds to the "second connection point”.
  • MOSFETs are used as the second to fourth switches SW2 to SW4.
  • the control device 40 generates the second to fourth switching signals SC2 to SC4 in order to switch the second to fourth switches SW2 to SW4, and issues commands from the second to fourth switching signals SC2 to SC4 to the second to the second.
  • the second switch SW2 corresponds to the "first changeover switch”
  • the third switch SW3 corresponds to the "second changeover switch”
  • the fourth switch SW4 corresponds to the "third changeover switch”. do.
  • the control device 40 switches between a state in which the second storage battery 16 and the third storage battery 18 are connected in parallel and a state in which they are connected in series by the second to fourth switching signals SC2 to SC4. Specifically, the second and third switches SW2 and SW3 are closed, and the fourth switch SW4 is opened, so that the second storage battery 16 and the third storage battery 18 are connected in parallel. On the other hand, when the second and third switches SW2 and SW3 are opened and the fourth switch SW4 is opened, the second storage battery 16 and the third storage battery 18 are connected in series.
  • the second storage battery 16 and the third storage battery 18 are charged by the power supply from the converter 12, the second storage battery 16 and the third storage battery 18 are connected in parallel. Further, when the second storage battery 16 and the third storage battery 18 are discharged, the opening or closing of the second to fourth switches SW2 to SW4 is controlled so that the second storage battery 16 and the third storage battery 18 are connected in series. The control process is now executed.
  • the second storage battery 16 and the third storage battery 18 are charged, the second storage battery 16 and the third storage battery 18 are connected in parallel, and the second storage battery 16 and the third storage battery 18 are connected without boosting the power supply voltage VA. 18 is charged.
  • This makes it possible to reduce, for example, the power supply burden of the converter 12 in charging and the cost burden of the power supply system 100 by providing the boost converter in the second system ES2.
  • the second storage battery 16 and the third storage battery 18 are connected in series. Power is supplied to the loads 34 and 36 at a voltage higher than the power supply voltage VA. As a result, the second load 36 can be properly operated even in a low temperature state or a high load state.
  • FIG. 2 shows a flowchart of the control process of the present embodiment.
  • the control device 40 When the IG switch 45 is closed, the control device 40 repeatedly executes the control process at predetermined control cycles. At the beginning of closing the IG switch 45, the operation mode of the vehicle is set to the second mode, the first switch SW1 is closed, and the converter 12 is in the operating state.
  • step S10 it is determined whether or not the driving mode of the vehicle is the second mode. If affirmative determination is made in step S10, the remaining capacity SA of the second storage battery 16 and the third storage battery 18 is calculated in step S12.
  • the remaining capacity SA is, for example, the total value of SOC (State Of Charge) indicating the state of charge of each of the storage batteries 16 and 18.
  • SOC State Of Charge
  • the remaining capacity SA uses the current integrated value which is the time integrated value of the charge / discharge current of each of the storage batteries 16 and 18. Is calculated.
  • step S14 it is determined whether or not the remaining capacity SA calculated in step S12 is larger than the predetermined capacity threshold value Sth.
  • the capacity threshold Sth is a capacity at which the total voltage of the second storage battery 16 and the third storage battery 18 becomes a voltage higher than the power supply voltage VA by a predetermined value.
  • the remaining capacity SA is smaller than the capacity threshold Sth, the total voltage of the second storage battery 16 and the third storage battery 18 is not higher than a predetermined value than the power supply voltage VA, and the second storage battery 16 and the third storage battery 18 are fully charged. Not in a state. In this case, since the precondition for executing the first mode is not satisfied, a negative determination is made in step S14, and the process proceeds to steps S42 and S44.
  • step S14 the relay switch SMR is opened to stop the charging of the second storage battery 16 and the third storage battery 18.
  • the relay switch SMR is closed.
  • the process of step S14 corresponds to the "charge determination unit".
  • step S17 the second storage battery 16 and the third storage battery 18 are switched to the series connection by opening the second and third switches SW2 and SW3 and closing the fourth switch SW4.
  • the 4th switch SW4 is closed after opening the 2nd and 3rd switches SW2 and SW3, and at least one of the 2nd and 3rd switches SW2 and SW3 and the 4th switch SW4 are not closed at the same time. To do so.
  • the storage battery voltage VB of the second storage battery 16 and the third storage battery 18 is substantially doubled.
  • the relay switch SMR is opened prior to the series connection of the second storage battery 16 and the third storage battery 18, so that the discharge of the second storage battery 16 and the third storage battery 18 in the series connection is restricted. Will be done.
  • step S18 the operation mode of the vehicle is allowed to be switched from the second mode to the first mode, and the control process is terminated.
  • the switching to the first mode is performed, for example, when a switching instruction such as an instruction to use the driving support function or an instruction for automatic driving is input from the driver via the input unit 46.
  • step S10 it is determined in step S20 whether the driver is being notified.
  • the driver notification notifies the driver that an abnormality has occurred in either the first system ES1 or the second system ES2, informs the driver that the first mode is to be canceled, and switches to the second mode. Is to encourage.
  • step S20 If a negative determination is made in step S20, it is determined that an abnormality has occurred in either the first system ES1 or the second system ES2 in steps S22 and S24. Specifically, in step S22, it is determined whether or not an abnormality has occurred in the first system ES1. If a negative determination is made in step S22, it is determined in step S24 whether or not an abnormality has occurred in the second system ES2. In this embodiment, the process of step S22 corresponds to the "abnormality determination unit".
  • the occurrence of an abnormality can be determined by the magnitude of each of the currents IA and IB detected by the first and second current detection units 27 and 28. For example, when a ground fault occurs in the first system ES1, the magnitude of the in-system current IA detected by the first current detection unit 27 is equal to or larger than a predetermined current threshold value Is for determining the ground fault. Further, for example, when a ground fault occurs in the second system ES2, the magnitude of the inter-system current IB detected by the second current detection unit 28 becomes equal to or larger than the current threshold value Is. Therefore, it is possible to determine which system ES1 or ES2 the abnormality has occurred based on the magnitude of each of the currents IA and IB detected by the first and second current detection units 27 and 28.
  • step S24 If it is determined that no abnormality has occurred in any of the systems ES1 and ES2, a negative determination is made in step S24. In this case, the control process is terminated. As a result, the power supply from the converter 12 to the first and second loads 34 and 36 is continued, and the relay switch SMR is maintained in an open state. That is, when it is determined that no abnormality has occurred in any of the systems ES1 and ES2, and it is determined that the second storage battery 16 and the third storage battery 18 are in a fully charged state, the first switch SW1 is closed and the relay is relayed. The switch SMR is released. As a result, unnecessary discharge from the second storage battery 16 and the third storage battery 18 is suppressed.
  • step S26 the first switch SW1 is opened.
  • step S28 the relay switch SMR is closed to release the discharge suppression of the second storage battery 16 and the third storage battery 18.
  • the process of step S26 corresponds to the "state control unit”
  • the process of steps S26 and 28 corresponds to the "second control unit”.
  • step S30 a command to put the converter 12 into the operation stop state is output.
  • step S24 the first switch SW1 is opened in step S32. As a result, the power supply from the converter 12 in the first system ES1 to the first load 34 is continued.
  • step S36 the driver is notified via the notification unit 44 that the first mode is to be stopped, and the control process is terminated.
  • step S38 If an affirmative determination is made in step S20, it is determined in step S38 whether or not a switching instruction to the second mode has been input from the driver via the input unit 46. That is, it is determined whether or not there is a response from the driver in response to the notification. If a negative determination is made in step S38, the control process is terminated, and the vehicle runs in the first mode using the loads 34 and 36 on the system side where no abnormality has occurred.
  • step S38 the driving mode of the vehicle is switched from the first mode to the second mode in step S40, and the control process is terminated.
  • steps S42 and S44 that is, when the driving mode of the vehicle is the second mode, it is determined that an abnormality has occurred in either the first system ES1 or the second system ES2. Specifically, in step S42, it is determined whether or not an abnormality has occurred in the first system ES1. If a negative determination is made in step S42, it is determined in step S44 whether or not an abnormality has occurred in the second system ES2.
  • step S44 If it is determined that no abnormality has occurred in any of the systems ES1 and ES2, a negative determination is made in step S44.
  • step S45 the second storage battery 16 and the third storage battery 18 are switched to parallel connection by closing the second and third switches SW2 and SW3 and opening the fourth switch SW4.
  • the second and third switches SW2 and SW3 are closed after the fourth switch SW4 is opened, and at least one of the second and third switches SW2 and SW3 and the fourth switch SW4 are not closed at the same time. To do so.
  • step S46 the relay switch SMR is closed and the control process is terminated.
  • the processes of steps S45 and S46 correspond to the "first control unit".
  • the second storage battery 16 and the third storage battery 18 connected in parallel, power is supplied from the converter 12 to the second storage battery 16 and the third storage battery 18, and the second storage battery 16 and the third storage battery 18 are charged. It becomes the first state to be done. That is, when the driving mode of the vehicle is the second mode, the first state is set, and the process of step S14 described above is also performed in the first state.
  • step S42 if an affirmative determination is made in step S42, first, in step S47, the first switch SW1 is opened. In the following step S48, the second storage battery 16 and the third storage battery 18 are connected in series. As a result, a higher voltage can be discharged as compared with the case where the second storage battery 16 and the third storage battery 18 are connected in parallel. In the following step S50, a command to put the converter 12 into the operation stop state is output.
  • step S44 the first switch SW1 is opened in step S52.
  • step S54 the relay switch SMR is opened.
  • step S56 the driver is notified via the notification unit 44 that an abnormality has occurred in either the first system ES1 or the second system ES2, and the control process is terminated.
  • FIG. 3 shows an example of control processing.
  • FIG. 3 shows the transition between the load voltage VD and the storage battery voltage VB when a ground fault abnormality (hereinafter, simply ground fault) occurs in the first system ES1 while the vehicle is running in the first mode.
  • the load voltage VD indicates the voltage applied to the second load 36, specifically, the voltage of the connection point PB in the second system ES2.
  • the storage battery voltage VB indicates the voltage between the terminals of the second storage battery 16 and the third storage battery 18, and specifically, the connection point PC between the first positive electrode side path LC1 and the second positive electrode side path LC2 in the second system ES2. Indicates the voltage of. Therefore, the storage battery voltage VB when the second storage battery 16 and the third storage battery 18 are connected in series is twice the voltage of the storage battery voltage VB when the second storage battery 16 and the third storage battery 18 are connected in parallel. Become.
  • FIG. 3 shows the transition of the state of the IG switch 45
  • (B) shows the transition of the operation mode of the vehicle
  • (C) shows the transition of the open / closed state of the first switch SW1.
  • (D) shows the transition of the open / closed state of the relay switch SMR
  • (E) shows the transition of the open / closed state of the second and third switches SW2 and SW3,
  • (F) shows the transition of the open / closed state of the fourth switch SW4. Shows the transition of.
  • G shows the transition of the connection state of the second storage battery 16 and the third storage battery 18,
  • (H) shows the transition of the load voltage VD, and
  • (I) shows the transition of the storage battery voltage VB.
  • (J) shows the transition of the in-system current IA in the first system ES1.
  • the first to fourth switches SW1 to SW4 and the relay switch SMR are open, and the converter 12 operates. It has been switched to the stopped state. Therefore, during the opening period of the IG switch 45, the load voltage VD and the in-system current IA become zero.
  • the first switch SW1 When the IG switch 45 is closed at time t1, the first switch SW1 is closed and a command for switching the converter 12 to the operating state is output. As a result, the converter 12 is switched to the operating state, the load voltage VD rises to a predetermined operating voltage VM as the power supply voltage VA rises, and the vehicle can run in the second mode.
  • the operating voltage VM is a voltage within the drive voltage range of the first and second loads 34 and 36.
  • the second and third switches SW2 and SW3 are closed, and the relay switch SMR is closed.
  • the first state is set in which the converter 12 is charged by the power supply voltage VA.
  • the storage battery voltage VB rises to a predetermined boosted voltage VH (see FIG. 3 (I)).
  • the boosted voltage VH is a voltage at which the second storage battery 16 and the third storage battery 18 are in a fully charged state, and is a voltage lower than the operating voltage VM and higher than half of the operating voltage VM.
  • the relay switch SMR When the storage battery voltage VB rises to the boost voltage VH at time t2 and the second storage battery 16 and the third storage battery 18 are in a fully charged state, the relay switch SMR is released. Further, the second and third switches SW2 and SW3 are opened at time t3 after the relay switch SMR is opened. As a result, the second storage battery 16 and the third storage battery 18 are in a disconnected state in which all of the second to fourth switches SW2 to SW4 are open.
  • the fourth switch SW4 is closed at time t4 after the second and third switches SW2 and SW3 are opened.
  • the 4th switch SW4 is closed after the 2nd and 3rd switches SW2 and SW3 are opened, at least one of the 2nd and 3rd switches SW2 and SW3 and the 4th switch SW4 are erroneously closed at the same time. It is possible to prevent short-circuiting of at least one of the second storage battery 16 and the third storage battery 18.
  • the fourth switch SW4 when the fourth switch SW4 is closed, the second storage battery 16 and the third storage battery 18 are connected in series, and in the state of being connected in series, the discharge is regulated by the relay switch SMR.
  • the storage battery voltage VB becomes an additional voltage of 2 VH, which is the sum of the boosted voltages VH of the storage batteries 16 and 18.
  • the operation mode of the vehicle can be switched from the second mode to the first mode.
  • the driving mode of the vehicle is switched from the second mode to the first mode at time t4.
  • the first switch SW1 is closed.
  • a ground fault occurs in the first system ES1 at time t5.
  • the power supply voltage VA and the load voltage VD decrease.
  • the in-system current IA increases, and at the subsequent time t6, the in-system current IA becomes equal to or higher than the current threshold value Is. As a result, it is determined that a ground fault has occurred in the first system ES1. In this case, at time t6, the first switch SW1 is opened and the converter 12 is switched to the operation stop state. This reduces the in-system current IA.
  • the relay switch SMR is closed.
  • the load voltage VD rises due to the power supply from the second storage battery 16 and the third storage battery 18 to the second load 36.
  • the storage battery voltage VB rises to an added voltage of 2 VH higher than the boosted voltage VH, so that the load voltage VD rises to an added voltage of 2 VH. Therefore, a predetermined voltage difference ⁇ V can be secured between the load voltage VD and the threshold voltage Vth which is the lower limit of the drive voltage of the first and second loads 34 and 36.
  • the second load 36 can be properly operated even in a low temperature state or a high load state.
  • the second storage battery 16 and the third storage battery 18 are connected in series. Therefore, when a ground fault occurs in the first system ES1, power can be supplied to the second load 36 at an early stage.
  • the driving mode of the vehicle is switched from the first mode to the second mode at time t7.
  • the second storage battery 16 and the third storage battery 18 when the second storage battery 16 and the third storage battery 18 are charged, the second storage battery 16 and the third storage battery 18 are connected in parallel, and the second storage battery 16 and the third storage battery 18 are discharged.
  • the second storage battery 16 and the third storage battery 18 are connected in series.
  • the second storage battery 16 and the third storage battery 18 when the second storage battery 16 and the third storage battery 18 are charged, the second storage battery 16 and the third storage battery 18 are connected in parallel, so that the power supply burden for charging and the cost of the power supply system 100 are set. The burden can be reduced.
  • the second storage battery 16 and the third storage battery 18 when the power is supplied from the second storage battery 16 and the third storage battery 18 in the second system ES2 due to the occurrence of an abnormality in the first system ES1, the second storage battery 16 and the third storage battery 18 are connected in series.
  • the second load 36 can be properly operated even in a low temperature state or a high load state.
  • power can be appropriately supplied to the loads 34 and 36.
  • a second state in which the second storage battery 16 and the second storage battery 18 are connected in parallel when the first state in which the second storage battery 16 and the second storage battery 18 are connected in parallel and the second state in which the second storage battery 18 is connected in series can be switched.
  • At least one of the second storage battery 16 and the second storage battery 18 when at least one of the third switches SW2 and SW3 and the fourth switch SW4 for connecting the second storage battery 16 and the second storage battery 18 in series are closed at the same time. Is concerned that it will be short-circuited.
  • the present embodiment when switching between the first state and the second state, at least one of the second and third switches SW2 and SW3 and the fourth switch SW4 are not closed at the same time, so that the switches SW2 to SW4 are not closed at the same time. Changed to control the opening and closing of. As a result, it is possible to suppress a short circuit between the second storage battery 16 and the second storage battery 18 and appropriately switch between the first state and the second state.
  • a relay switch SMR is provided between the connection point PB in the second system ES2 and the second storage battery 16 and the third storage battery 18, and the second storage battery 16 and the second storage battery 16 in a series state are provided by the relay switch SMR.
  • the discharge of the third storage battery 18 is regulated. As a result, even if the second storage battery 16 and the third storage battery 18 are in a series state, the electric charge stored in the second storage battery 16 and the third storage battery 18 can be maintained. Further, by keeping the second storage battery 16 and the third storage battery 18 in series, electric power can be supplied from the second storage battery 16 and the third storage battery 18 to the loads 34 and 36 at an early stage as needed.
  • the relay switch SMR is configured to regulate the discharge of a plurality of storage batteries in a series state and a fully charged state.
  • the relay switch SMR is configured to regulate the discharge of a plurality of storage batteries in a series state and a fully charged state.
  • the first switch SW1 and the relay switch SMR are linked to open and close each of them based on the presence or absence of an abnormality in the first system ES1.
  • the discharges of the second storage battery 16 and the third storage battery 18 can be properly managed both when the first system ES1 is normal and when an abnormality occurs in the first system ES1.
  • the power supply system 100 is applied to a vehicle having a first load 34 and a second load 36 as a specific load 32 that is a function necessary for driving and implements a driving support function, and is a first method that uses the driving support function. It is possible to switch between driving in a mode and driving in a second mode that does not use the driving support function.
  • the second storage battery 16 and the third storage battery 18 are connected in parallel, and in the state of being connected in parallel, the first state is set to be charged by the power supply voltage VA of the converter 12. Then, when the second storage battery 16 and the third storage battery 18 are fully charged in the second mode and the discharge is restricted, the switching to the first mode is permitted.
  • the second load 36 can be driven by using the second storage battery 16 and the third storage battery 18 in the fully charged state. It can be continued, and the driving support function can be used continuously.
  • the relay switch SMR may not be provided in the second system ES2.
  • the control device 40 can control the charging / discharging of the second storage battery 16 and the third storage battery 18 by controlling the second to fourth switches SW2 to SW4 instead of the relay switch SMR.
  • the second and third switches SW2 and SW3 are opened, and the fourth switch SW4 is closed.
  • the second and third switches SW2 and SW3 are closed and the fourth switch SW4 is opened.
  • the second to fourth switches SW2 to SW4 are opened. This makes it possible to simplify the configuration of the power supply system 100.
  • This embodiment differs from the first embodiment in that a third switch unit 24 is provided in place of the relay switch SMR.
  • the first path LF1 and the second path LF2 provided in parallel with each other are provided between the connection point PB in the second system ES2 and the second storage battery 16 and the third storage battery 18.
  • a third switch unit 24 is provided in the first path LF1 and the second path LF2.
  • the first path LF1 is provided with a fifth switching element (hereinafter, simply the fifth switch) SW5.
  • the fifth switch SW5 opens or closes the first path LF1.
  • the fifth switch SW5 corresponds to an "open / close switch”.
  • the second path LF2 is provided with first to third diodes DA1 to DA3 and a sixth switching element (hereinafter, simply the sixth switch) SW6 connected in series.
  • the diodes DA1 to DA3 are arranged so that the cathode is on the connection point PB side and the anode is on the second storage battery 16 and the third storage battery 18 side, and the second storage battery 16 and the second storage battery 16 and the second diode are arranged from the connection point PB in the second path LF2. 3 Regulate the flow of current to the storage battery 18.
  • each diode DA1 to DA3 has a predetermined forward voltage drop amount (for example, 0.7V). Therefore, the storage battery voltage VB of the connection point PC located closer to the second storage battery 16 and the third storage battery 18 than the third switch unit 24, and the power supply voltage of the converter 12 applied to the connection point PB side of the third switch unit 24.
  • a voltage difference due to the total value of the forward voltage drops of the first to third diodes DA1 to DA3 (hereinafter, voltage difference due to the first to third diodes DA1 to DA3) is generated between the VA and the VA.
  • the sixth switch SW6 is provided on the second storage battery 16 and the third storage battery 18 side of the first to third diodes DA1 to DA3 in the second path LF2.
  • the first to third diodes DA1 to DA3 correspond to the "discharge control unit and rectifying element".
  • MOSFETs are used as the 5th and 6th switches SW5 and SW6.
  • a fifth diode DA5 is connected in parallel to the fifth switch SW5 as a parasitic diode
  • a sixth diode DA6 is connected in parallel to the sixth switch SW6 as a parasitic diode.
  • the diodes DA5 and DA6 are arranged so that the cathode is on the second storage battery 16 and the third storage battery 18 side and the anode is on the connection path LB side in each path LF1 and LF2. Therefore, in the second path LF2, the first to third diodes DA1 to DA3 and the sixth diode DA6 are provided so as to be in opposite directions.
  • the fifth diode DA5 regulates the flow of current from the second storage battery 16 and the third storage battery 18 to the connection point PB, and also regulates the current flow from the connection point PB to the second storage battery 16 and the third storage battery 18. It is provided to allow the flow of current to.
  • the third switch unit 24 is composed of the first to third diodes DA1 to DA3 and the fifth and sixth switches SW5 and SW6.
  • the control device 40 In the control process, the control device 40 generates the fifth and sixth switching signals SC5 and SC6 in order to switch the fifth and sixth switches SW5 and SW6, and commands the fifth and sixth switching signals SC5 and SC6. Is output to the 5th and 6th switches SW5 and SW6. In the control process, the control device 40 closes the fifth switch SW5 in the first state in which the second storage battery 16 and the third storage battery 18 are connected in parallel and is charged by the power supply voltage VA of the converter 12. The second storage battery 16 and the third storage battery 18 are charged via the one-path LF1.
  • the second storage battery 16 and the third storage battery 18 are discharged via the first to third diodes DA1 to DA3.
  • the voltage difference between the first to third diodes DA1 to DA3 applies to the second load 36.
  • the voltage to be applied drops.
  • the power consumption of the second storage battery 16 and the third storage battery 18 will increase due to the voltage difference between the first to third diodes DA1 to DA3. Therefore, in the present embodiment, in the control process, the fifth switch SW5 is closed after the abnormality occurs in the first system ES1.
  • FIG. 5 shows a flowchart of the control process of the present embodiment.
  • the same processing as that shown in FIG. 2 above is given the same step number for convenience, and the description thereof will be omitted.
  • step S14 if affirmative determination is made in step S14, the fifth switch SW5 is opened, charging of the second storage battery 16 and the third storage battery 18 is stopped in step S60, and the process proceeds to step S17.
  • the fifth and sixth switches SW5 and SW6 are closed.
  • step S62 determines whether or not the first switch SW1 is open. If a negative determination is made in step S62, the first switch SW1 is opened in step S64. As a result, the discharge of the second storage battery 16 and the third storage battery 18 is started via the first to third diodes DA1 to DA3. In the following step S66, the fifth switch SW5 is closed. As a result, the second storage battery 16 and the third storage battery 18 are discharged by the first path LF1 and the second path LF2. In the following step S68, a command to put the converter 12 into the operation stop state is output, and the control process is terminated.
  • step S62 determines whether the processes of steps S64 to S68 have already been performed. If an affirmative determination is made in step S62, that is, if the processes of steps S64 to S68 have already been performed, the sixth switch SW6 is released in step S70, and the process proceeds to step S36. As a result, the discharge of the second storage battery 16 and the third storage battery 18 via the first to third diodes DA1 to DA3 is stopped, and the second storage battery 16 and the third storage battery 18 are discharged by the second path LF2.
  • step S24 if an affirmative determination is made in step S24, that is, if it is determined that an abnormality has occurred in the second system ES2, the first switch SW1 is released in step S32. In the following step S72, the sixth switch SW6 is released, and the process proceeds to step S36. As a result, the discharge of the second storage battery 16 and the third storage battery 18 is stopped.
  • step S44 the first switch SW1 is opened in step S52.
  • step S74 the fifth and sixth switches SW5 and SW6 are opened, and the process proceeds to step S56.
  • step S44 the second storage battery 16 and the third storage battery 18 are connected in parallel in step S45.
  • step S74 the fifth and sixth switches SW5 and SW6 are closed to end the control process.
  • the first path LF1 and the second path LF2 are provided in parallel with each other between the connection point PB in the second system ES2 and the second storage battery 16 and the third storage battery 18.
  • the first path LF1 the second storage battery 16 and the third storage battery 18 are charged by closing the fifth switch SW5, and the second storage battery 16 and the third storage battery 18 are charged by opening the fifth switch SW5. Is stopped.
  • the first to third diodes DA1 to DA3 are provided in the second path LF2, and the second storage battery 16 and the third storage battery are provided from the connection point PB in the second path LF2 by the first to third diodes DA1 to DA3.
  • the flow of current to 18 is regulated.
  • the first to third diodes DA1 to DA3 are used to cause a voltage difference between the storage battery voltage VB and the power supply voltage VA of the second storage battery 16 and the third storage battery 18 connected in series.
  • the second storage battery 16 and the third storage battery 18 in the series state are maintained in a state where the voltage is higher than the power supply voltage VA.
  • the second storage battery 16 and the third storage battery 18 connected in series are discharged as the storage battery voltage VB drops in the second system ES2, and the second load 36 is performed. Early power supply to is possible.
  • the fifth switch SW5 is opened after an abnormality occurs in the first system ES1.
  • the load applied to the second load 36 due to the voltage difference between the first to third diodes DA1 to DA3 while enabling the early power supply to the second load 36 by the first to third diodes DA1 to DA3. It is possible to suppress a decrease in the voltage VD.
  • the load voltage VD may increase excessively.
  • the load voltage VD rises excessively, it is desired that the overvoltage be absorbed by the second storage battery 16 and the third storage battery 18.
  • the fifth diode DA5 connected in parallel to the fifth switch SW5 in the first path LF1 is provided.
  • the fifth diode DA5 regulates the flow of current from the second storage battery 16 and the third storage battery 18 to the connection point PB in the first path LF1, and the current from the connection point PB to the second storage battery 16 and the third storage battery 18. It is provided to allow the flow of. Therefore, when the load voltage VD rises excessively while the fifth switch SW5 is closed, the overvoltage can be absorbed by the second storage battery 16 and the third storage battery 18 via the fifth diode DA5.
  • the converter 26 is provided in the first path LF1.
  • the converter 12 is referred to as a first converter 12
  • the converter 26 is referred to as a second converter 26.
  • the second converter 26 charges the second storage battery 16 by converting the power into a voltage lower than the power supply voltage VA by supplying power from the first converter 12.
  • the second converter 26 corresponds to the "charging unit”.
  • the second path LF2 is provided with a seventh switching element (hereinafter, simply the seventh switch) SW7.
  • the seventh switch SW7 opens or closes the second path LF2.
  • a MOSFET is used as the seventh switch SW7.
  • a seventh diode DA7 is connected in parallel to the seventh switch SW7 as a parasitic diode.
  • the seventh diode DA7 is arranged so that the cathode is on the second storage battery 16 and the third storage battery 18 side and the anode is on the connection path LB side in the second path LF2.
  • the third switch unit 24 is configured by the second converter 26 and the seventh switch SW7.
  • the seventh switch SW7 corresponds to the "discharge control unit, battery switch".
  • the control device 40 In the control process, the control device 40 generates the 7th switching signal SC7 in order to switch the 7th switch SW7, and outputs a command from the 7th switching signal SC7 to the 7th switch SW7. Further, the control device 40 generates a control signal SD in order to control the operation of the second converter 26, and outputs a command by the control signal SD to the converter 26.
  • the control signal SD to the first converter 12 is referred to as a first control signal SD1
  • the control signal SD to the second converter 26 is referred to as a second control signal SD2.
  • the control device 40 opens the seventh switch SW7 in the first state in which the second storage battery 16 and the third storage battery 18 are connected in parallel and is charged by the power supply voltage VA of the converter 12.
  • the second storage battery 16 and the third storage battery 18 connected in parallel by the two converters 26 are constantly charged with a constant current or charged with a constant voltage.
  • charging by the second converter 26 is stopped, and the second storage battery 16 and the third storage battery 18 connected in series by the opened seventh switch SW7. Regulate discharge.
  • the seventh switch SW7 is closed, and the second storage battery 16 and the third storage battery 18 are discharged via the second path LF2.
  • FIG. 7 shows a flowchart of the control process of the present embodiment.
  • the same processing as that shown in FIG. 2 above is given the same step number for convenience, and the description thereof will be omitted.
  • step S14 if an affirmative determination is made in step S14, the operation of the second converter 26 is set to the stopped state in step S80, and the process proceeds to step S17.
  • the affirmative determination is made in step S14, the second converter 26 is in the operating state, and the seventh switch SW7 is open.
  • step S22 if an affirmative determination is made in step S22, that is, if it is determined that an abnormality has occurred in the first system ES1, the first switch SW1 is released in step S26.
  • step S82 the seventh switch SW7 is closed, and the process proceeds to step S30.
  • the second storage battery 16 and the third storage battery 18 are discharged via the seventh switch SW7.
  • step S42 If an affirmative determination is made in step S42, the first switch SW1 is opened in step S46. In the following step S48, the second storage battery 16 and the third storage battery 18 are connected in series. In the following step S84, the operation of the first converter 12 and the second converter 26 is stopped, and the process proceeds to step S56.
  • step S44 if an affirmative determination is made in step S44, the first switch SW1 is opened in step S52. In the following step S86, the seventh switch SW7 is released. In the following step S88, the operation of the second converter 26 is stopped, and the process proceeds to step S56. On the other hand, if a negative determination is made in step S44, the second storage battery 16 and the third storage battery 18 are connected in parallel in step S45. In the following step S89, the second converter 26 is put into an operating state, and the control process is terminated.
  • the first path LF1 and the second path LF2 are provided in parallel with each other between the connection point PB in the second system ES2 and the second storage battery 16 and the third storage battery 18.
  • the second converter 26 charges the second storage battery 16 and the third storage battery 18 at a voltage lower than the power supply voltage VA.
  • the discharge of the second storage battery 16 and the third storage battery 18 in the second system ES2 is regulated by the seventh switch SW7.
  • the present embodiment is different from the first embodiment in that in the control process, the second storage battery 16 and the third storage battery 18 are charged and discharged when the first and second systems ES1 and ES2 in the first mode are normal. Specifically, the control device 40 acquires the drive amount information in the loads 34 and 36, and charges and discharges the second storage battery 16 and the third storage battery 18 based on the drive amount TR indicated by the drive amount information.
  • a voltage drop occurs in the second load 36 due to the occurrence of a ground fault in the first system ES1.
  • an excessive voltage drop of the loads 34 and 36 may occur due to a change in the drive amount TR of the loads 34 and 36.
  • the voltage of the excessive loads 34 and 36 drops, it is desirable to increase the load voltage VD.
  • the control process when the drive amount TR is switched from a state smaller than a predetermined first drive amount threshold Tth1 to a state larger than the predetermined first drive amount threshold Tth1 when the first and second systems ES1 and ES2 in the first mode are normal.
  • the second state the second storage battery 16 and the third storage battery 18 are discharged while the second storage battery 16 and the third storage battery 18 are connected in series.
  • the drive amount TR is subsequently switched from a state larger than the first drive amount threshold Tth1 to a state smaller than the first drive amount threshold value Tth1
  • the second storage battery 16 and the third storage battery 18 are discharged when the first and second systems ES1 and ES2 are normal.
  • the second state is switched to the first state, and the second storage battery 16 and the third storage battery 18 are charged in a state where the second storage battery 16 and the third storage battery 18 are connected in parallel.
  • FIG. 8 shows a flowchart of the control process of the present embodiment.
  • the same processing as that shown in FIG. 2 above is given the same step number for convenience, and the description thereof will be omitted.
  • step S20 determines whether or not the relay switch SMR is closed in step S90 when the first and second systems ES1 and ES2 in the first mode are normal. ..
  • the relay switch SMR is closed. In this case, a negative determination is made in step S90, and the process proceeds to step S22.
  • the relay switch SMR is open.
  • an affirmative determination is made in step S90, and in step S92, the drive amount information in the loads 34 and 36 is acquired, and it is determined whether or not the drive amount TR indicated by the drive amount information is smaller than the first drive amount threshold Tth1.
  • the first drive amount threshold value Tth1 is a drive amount corresponding to the maximum value of electric power that can be stably supplied from the high-voltage storage battery 10 to the loads 34 and 36.
  • the acquired drive amount information is stored in a storage unit (not shown) of the control device 40.
  • step S92 When the second storage battery 16 and the third storage battery 18 are in the discharged state, the drive amount TR is larger than the first drive amount threshold Tth1. In this case, a negative determination is made in step S92, and the process proceeds to step S22. On the other hand, when the second storage battery 16 and the third storage battery 18 are in the charged state, the drive amount TR is smaller than the first drive amount threshold Tth1. In this case, an affirmative determination is made in step S92, and the remaining capacity SA of the second storage battery 16 and the third storage battery 18 is calculated in step S94. In the following step S96, it is determined whether or not the remaining capacity SA calculated in step S94 is larger than the capacity threshold value Sth.
  • step S96 When the second storage battery 16 and the third storage battery 18 are in a fully charged state, a positive determination is made in step S96. In this case, in step S98, the relay switch SMR is released and the process proceeds to step S22. On the other hand, when the second storage battery 16 and the third storage battery 18 are not in a fully charged state, a negative determination is made in step S96. In this case, in step S100, it is determined whether or not the drive amount TR is smaller than the second drive amount threshold value Tth2.
  • the second drive amount threshold Tth2 is a threshold for switching the charging method of the second storage battery 16 and the third storage battery 18, and is set to a drive amount smaller than the first drive amount threshold Tth1. In this embodiment, the second drive amount threshold value Tth2 corresponds to a “predetermined specified value”.
  • step S100 a charging method for simultaneously charging the second storage battery 16 and the third storage battery 18 is adopted in step S102, and the process proceeds to step S22.
  • the charging method of simultaneous charging the second storage battery 16 and the third storage battery 18 are charged at the same time by closing the second and third switches SW2 and SW3 at the same time with the fourth switch SW4 open.
  • step S104 a charging method for individually charging the second storage battery 16 and the third storage battery 18 is adopted in step S104, and the process proceeds to step S22.
  • the charging method for individually charging the second storage battery 16 and the third storage battery 18 are individually charged by alternately closing the second and third switches SW2 and SW3 with the fourth switch SW4 open.
  • step S22 if an affirmative determination is made in step S22, that is, if it is determined that an abnormality has occurred in the first system ES1, the first switch SW1 is released in step S26. In the following step S116, the second storage battery 16 and the third storage battery 18 are switched to the series connection, and the process proceeds to step S28. Further, if an affirmative determination is made in step S24, that is, if it is determined that an abnormality has occurred in the second system ES2, the first switch SW1 is opened in step S32. In the following step S118, the relay switch SMR is released and the process proceeds to step S36.
  • step S110 it is determined in step S110 whether or not the drive amount TR is larger than the first drive amount threshold Tth1.
  • the drive amount TR acquired in the previous control process is smaller than the first drive amount threshold Tth1, and the drive amount TR is smaller than the first drive amount threshold Tth1 in the current control process to be smaller than the first drive amount threshold Tth1.
  • an affirmative determination is made in step S110.
  • step S112 the second storage battery 16 and the third storage battery 18 are switched to the series connection.
  • step S114 the relay switch SMR is closed and the control process is terminated. As a result, the second storage battery 16 and the third storage battery 18 are discharged in the second state in which the second storage battery 16 and the third storage battery 18 are connected in series.
  • step S110 it is determined in step S116 whether or not the drive amount TR is smaller than the first drive amount threshold Tth1.
  • the drive amount TR acquired in the previous control process is larger than the first drive amount threshold Tth1, and the drive amount TR is larger than the first drive amount threshold Tth1 in the current control process to be larger than the first drive amount threshold Tth1.
  • an affirmative determination is made in step S116.
  • step S118 the second storage battery 16 and the third storage battery 18 are switched to parallel connection, and the control process is terminated.
  • the first state is set in which the converter 12 is charged by the power supply voltage VA. That is, the second storage battery 16 and the third storage battery 18 are switched from the second state to the first state.
  • step S116 a negative determination is made in step S116. In this case, the control process is terminated.
  • the second state is set when the drive amount TR of the loads 34 and 36 is switched from a state smaller than the first drive amount threshold Tth1 to a state larger than the first drive amount threshold Tth1. Therefore, even if the drive amount TR of the loads 34 and 36 temporarily increases in the normal state of the first and second systems ES1 and ES2, the power from the second storage battery 16 and the third storage battery 18 connected in series Supply is done. As a result, power can be supplied to the loads 34 and 36 at a voltage higher than the power supply voltage VA, and the loads 34 and 36 can be operated properly.
  • the drive amount TR of the loads 34 and 36 is from a state larger than the first drive amount threshold Tth1 to a smaller state.
  • the second state is switched to the first state, and the second storage battery 16 and the third storage battery 18 are charged. Therefore, even if the second storage battery 16 and the third storage battery 18 are temporarily discharged in the normal state of the first and second systems ES1 and ES2, the second storage battery 16 and the third storage battery 18 are subsequently fully charged. be able to. Therefore, it is possible to continue driving the second load 36 by using the second storage battery 16 and the third storage battery 18 that are fully charged when an abnormality occurs in the first system ES1.
  • the power supply to the loads 34 and 36 and the power supply to the second storage battery 16 and the third storage battery 18 are performed at the same time, so it is necessary to properly supply these powers.
  • the drive amount TR of the loads 34 and 36 is smaller than the second drive amount threshold Tth2
  • the second storage battery 16 and the third storage battery 18 are charged at the same time
  • the drive amount TR is the second drive.
  • the amount threshold value is larger than Tth2
  • the second storage battery 16 and the third storage battery 18 are individually charged.
  • the load related to the power supply of the converter 12 is adjusted, and the power supply to the loads 34 and 36 and the power supply to the second storage battery 16 and the third storage battery 18 are performed. Can be properly implemented.
  • Each load 34, 36 may be, for example, the following device.
  • each of the first and second loads 34 and 36 is, for example, a three-phase permanent magnet synchronous motor and a three-phase inverter device.
  • each of the first and second loads 34 and 36 is, for example, an ABS actuator that can independently adjust the brake hydraulic pressure during braking.
  • each of the first and second loads 34 and 36 is, for example, a millimeter wave radar.
  • the loads 34 and 36 do not necessarily have to be a combination having the same configuration, and may be a combination that realizes the same function with devices of different types. Further, the first and second loads 34 and 36 may not be different loads but may be the same load. That is, the first and second loads 34 and 36 may be the same load that receives power from both the first in-system path LA1 and the second in-system path LA2.
  • the first power supply is not limited to the converter, but may be an alternator. Further, the first power supply may not have a converter, and may have, for example, only the first storage battery 14.
  • the plurality of storage batteries included in the second power source are not limited to two, and may be three or more. In this case, when connecting a plurality of storage batteries in series in the second state, the number of storage batteries connected in series may be switched based on the driving amount of the electric load.
  • the voltage applied to the electric load from the plurality of storage batteries is not limited to a voltage higher than the power supply voltage of the first power supply.
  • the voltage may be set higher than this required voltage.
  • the rectifying element provided in the second path LF2 is not limited to the diode, but may be a thyristor.
  • the relay switch SMR may be closed after the first switch SW1 is opened.
  • the first switch SW1 may be opened after the relay switch SMR is closed.
  • the relay switch SMR is closed.
  • the charging of the second storage battery 16 and the third storage battery 18 may be controlled by the relay switch SMR.
  • the charging of the second storage battery 16 and the third storage battery 18 is controlled by controlling the duty ratio of the relay switch SMR.
  • the duty ratio means the ratio of the closing time of the relay switch SMR to the specified period of the relay switch SMR controlled to be opened and closed.
  • a resistance element is provided between the relay switch SMR in the path LA2 in the second system and the second storage battery 16 and the third storage battery 18, and the resistance element charges and discharges the second storage battery 16 and the third storage battery 18. May be controlled.
  • the power supply system 100 is applied to a vehicle capable of traveling by manual driving and automatic driving, but the present invention is not limited to this. It may be applied to a vehicle that can only be driven by automatic driving, such as a fully autonomous vehicle, or may be applied to a vehicle that can only be driven by manual driving.
  • the loads 34 and 36 of the other system ES1 and ES2 in which the abnormality has not occurred are applied. It may be used to stop the running of the vehicle by automatic driving, or to stop the vehicle after moving it to a safe place.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Mechanical Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Stand-By Power Supply Arrangements (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

La présente invention concerne des charges électriques (34, 36), un premier système (ES1) qui comprend une première alimentation électrique (10, 12), un second système (ES2) qui comprend une seconde alimentation électrique (16, 18), et un commutateur inter-système (SW1) qui est disposé sur un trajet de connexion (LB) qui connecte le premier système et le second système. La première alimentation électrique délivre une tension d'alimentation électrique. La seconde alimentation électrique comprend une pluralité de batteries de stockage (16, 18). La présente invention comprend une unité de détermination d'anomalie qui détermine si une anomalie s'est produite au niveau du premier système, une unité de commande d'état qui ouvre le commutateur inter-système lorsque l'unité de détermination d'anomalie a déterminé qu'une anomalie s'est produite, une première unité de commande qui, lorsque la pluralité de batteries de stockage doivent être chargées, produit un premier état dans lequel la pluralité de batteries de stockage sont connectées en parallèle et de l'électricité est fournie de la première alimentation électrique à la pluralité de batteries de stockage, et une seconde unité de commande qui, lorsque la pluralité de batteries de stockage doivent être déchargées, produit un second état dans lequel la pluralité de batteries de stockage sont connectées en série et de l'électricité est fournie de la pluralité de batteries de stockage aux charges électriques à une tension qui est supérieure à la tension d'alimentation électrique de la première alimentation électrique ou à une tension qui est supérieure à une tension requise pour les charges électriques.
PCT/JP2021/029362 2020-08-25 2021-08-06 Système d'alimentation électrique WO2022044780A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020-141761 2020-08-25
JP2020141761A JP7342819B2 (ja) 2020-08-25 2020-08-25 電源システム

Publications (1)

Publication Number Publication Date
WO2022044780A1 true WO2022044780A1 (fr) 2022-03-03

Family

ID=80353164

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/029362 WO2022044780A1 (fr) 2020-08-25 2021-08-06 Système d'alimentation électrique

Country Status (2)

Country Link
JP (1) JP7342819B2 (fr)
WO (1) WO2022044780A1 (fr)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01248935A (ja) * 1988-03-28 1989-10-04 Toshiba Corp バッテリーバックアップ装置
JP2002142375A (ja) * 2000-10-30 2002-05-17 Nippon Telegr & Teleph Corp <Ntt> 蓄電装置およびその制御方法
WO2018123391A1 (fr) * 2016-12-28 2018-07-05 本田技研工業株式会社 Circuit électrique et procédé de diagnostic
JP2018182864A (ja) * 2017-04-10 2018-11-15 株式会社デンソー 電力制御装置および電力制御方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01248935A (ja) * 1988-03-28 1989-10-04 Toshiba Corp バッテリーバックアップ装置
JP2002142375A (ja) * 2000-10-30 2002-05-17 Nippon Telegr & Teleph Corp <Ntt> 蓄電装置およびその制御方法
WO2018123391A1 (fr) * 2016-12-28 2018-07-05 本田技研工業株式会社 Circuit électrique et procédé de diagnostic
JP2018182864A (ja) * 2017-04-10 2018-11-15 株式会社デンソー 電力制御装置および電力制御方法

Also Published As

Publication number Publication date
JP2022037563A (ja) 2022-03-09
JP7342819B2 (ja) 2023-09-12

Similar Documents

Publication Publication Date Title
US10710469B2 (en) Automotive dual voltage battery charging system
WO2021230129A1 (fr) Système d&#39;alimentation électrique
US20230104265A1 (en) Power system
US20230075428A1 (en) Control apparatus and power supply system
US11949260B2 (en) Power supply system
US11505144B2 (en) Power supply system
WO2022044780A1 (fr) Système d&#39;alimentation électrique
WO2023085130A1 (fr) Dispositif de surveillance d&#39;alimentation électrique et système de commande
WO2021075408A1 (fr) Système d&#39;alimentation électrique
JP7276291B2 (ja) 電源システム
WO2022091738A1 (fr) Système d&#39;alimentation électrique
WO2022131006A1 (fr) Système d&#39;alimentation électrique
JP2023007922A (ja) 電源システム
JP7392629B2 (ja) 電源システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21861208

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21861208

Country of ref document: EP

Kind code of ref document: A1