WO2022021829A1 - Automatic weighing method for rubber parts - Google Patents

Automatic weighing method for rubber parts Download PDF

Info

Publication number
WO2022021829A1
WO2022021829A1 PCT/CN2021/074782 CN2021074782W WO2022021829A1 WO 2022021829 A1 WO2022021829 A1 WO 2022021829A1 CN 2021074782 W CN2021074782 W CN 2021074782W WO 2022021829 A1 WO2022021829 A1 WO 2022021829A1
Authority
WO
WIPO (PCT)
Prior art keywords
discharging
pipe
conveying
discharge
batching
Prior art date
Application number
PCT/CN2021/074782
Other languages
French (fr)
Chinese (zh)
Inventor
汤啸
杨君平
汤克红
范淑贞
Original Assignee
浙江天台祥和实业股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 浙江天台祥和实业股份有限公司 filed Critical 浙江天台祥和实业股份有限公司
Publication of WO2022021829A1 publication Critical patent/WO2022021829A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/02Mixing; Kneading non-continuous, with mechanical mixing or kneading devices, i.e. batch type
    • B29B7/22Component parts, details or accessories; Auxiliary operations
    • B29B7/24Component parts, details or accessories; Auxiliary operations for feeding
    • B29B7/242Component parts, details or accessories; Auxiliary operations for feeding in measured doses
    • B29B7/244Component parts, details or accessories; Auxiliary operations for feeding in measured doses of several materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/02Mixing; Kneading non-continuous, with mechanical mixing or kneading devices, i.e. batch type
    • B29B7/22Component parts, details or accessories; Auxiliary operations
    • B29B7/28Component parts, details or accessories; Auxiliary operations for measuring, controlling or regulating, e.g. viscosity control

Definitions

  • the invention belongs to the technical field of rubber parts batching, in particular to an automatic weighing method for rubber parts.
  • the ratio of the mixture is a very important production process.
  • the speed and accuracy of the batching have a very important impact on the quality of the mixture.
  • the current method of reclaiming materials generally adopts manual weighing. It is troublesome, not only takes up manpower, but also has large errors. The existence of human factors makes the batching process prone to quality accidents; in order to solve the above problems, some automated batching weighing has also appeared in recent years.
  • the Chinese patent discloses an automatic material weighing device, its application and automatic material weighing method.
  • the patent application number is 2015104456338, which includes a feeding device, a weighing device and an electrical control system.
  • the feeding device includes a fast feeding device, a feeding device Plate, baffle plate, sieve plate, vibrating feeder, weighing device including weighing steel frame, load cell, weighing hopper, discharge sealing cover, hopper door assembly and receiving bucket.
  • the present invention proposes an automatic weighing method for rubber parts.
  • the present invention is mainly used to solve the problem that when there are many types of ingredients and the weight of each ingredient is different, multiple automatic weighing methods are required. This method also needs to manually calculate the total weight of the ingredients. At the same time, if there is an error in the weight of the ingredients, it will affect the normal and stable batching of the subsequent ingredients, and then affect the rubber parts.
  • the phenomenon of automatic, efficient and accurate weighing of ingredients is mainly used to solve the problem that when there are many types of ingredients and the weight of each ingredient is different, multiple automatic weighing methods are required. This method also needs to manually calculate the total weight of the ingredients. At the same time, if there is an error in the weight of the ingredients, it will affect the normal and stable batching of the subsequent ingredients, and then affect the rubber parts.
  • the phenomenon of automatic, efficient and accurate weighing of ingredients are mainly used to solve the problem that when there are many types of ingredients and the weight of each ingredient is different, multiple automatic weighing methods are required. This method
  • the technical solution adopted by the present invention to solve the technical problem is: an automatic weighing method for rubber parts according to the present invention, and the method comprises the following steps:
  • S1 Startup preparation: Turn on the required equipment switch, turn on the upper computer, double-click the automatic weighing and batching system icon on the display desktop, and log in to enter the automatic weighing and batching system to check the rubber mixing production plan; check whether the corresponding raw materials of each material tank are sufficient; Prepare the raw materials required for batching; the work of this step is to confirm whether the communication between the 8802 weight instrument, the upper computer system, the man-machine control cabinet and the PLC is normal: whether the corresponding communication status indicator is normal; check the batching line and the independent weighing machine.
  • Architecture material storage tank, metering and controlled discharge equipment and tank scales, automatic shift assembly line are in normal state;
  • On-site confirmation Confirm that the relevant conditions at the site are normal, including the supply of compressed air source; put the material bucket on the feeding bag and set it at the first position of the conveyor belt at the inlet of the ingredient; the tank scale and the connection motor power supply entering the assembly line Whether the supply is normal; in this step, if the bucket is not on the weighing platform of the tank at the inlet of the ingredients, the ingredients will not be carried out; and the tank itself has a maximum weighing capacity of 30KG and a sense of 0.005KG. Avoid items and personnel that exceed the rated weight. Or push the scale platform left and right;
  • step S5 it also includes a step S5': automatic alarm: when the unloading weight does not meet the tolerance value of the target value, the next bin number will not be unloaded, and the buckets will be directly transferred away.
  • the operation of the batching line will stop, and at the same time, the "alarm" light of the man-machine control cabinet will sound; the batching personnel will re-inspect the scale.
  • the barrels that meet the weight standards are removed, placed in the "unqualified product area", and reported to the supervisor for confirmation and then discarded for disposal.
  • step S5 after the step S5 is executed, it also includes a step S5": ingredient verification: when the number of ingredients is nearing the end, in order to prevent over-mixing of ingredients, the current formula number of the upper computer is checked, and when the last batching operation is completed, No more feeding buckets, it will stop automatically after finishing the number of recipes.
  • the metering controlled discharging equipment includes a discharging bin, a discharging screw blade, a conveying shaft, a discharging plate, a conveying pipe, a screw conveying blade, a discharging pipe and a sealing slide; the discharging The upper end of the bin is provided with a discharging pipe, and a discharging spiral leaf is arranged in the discharging bin through vertical rotation of the conveying shaft; the outer edge of the discharging spiral leaf is in rotational contact with the inner bin wall of the discharging bin; A discharge plate is arranged below the discharge spiral blade, and the discharge plate is sleeved on the conveying shaft through a bearing; a discharge port is opened on the discharge plate; the lower side wall of the discharge bin is fixed with a conveying shaft.
  • the conveying pipe is connected with the inner silo of the discharging bin; a spiral conveying blade is arranged in the conveying pipe through the horizontal rotation of the conveying shaft, and a discharging pipe is communicated directly under the conveying pipe; the lower pipe of the discharging pipe The mouth is located directly above the conveyor belt; a sealing slide plate is slidably inserted in the discharge pipe, and a metering scale is arranged on the sealing slide plate; a sealing frame is fixed on the side of the discharging pipe, and a sealing frame is slidably arranged in the sealing frame through a cylinder.
  • the bottom of the discharge port is connected to one end of the conveying pipe through a material guide pipe; the bottom end face of the discharge bin is provided with a No.
  • the No. 1 motor and the output end of the No. 1 motor is connected with a vertically arranged conveying shaft;
  • the side end face of the conveying pipe is provided with the No. 2 motor, and the No. 2 motor is connected with the horizontally arranged conveying shaft;
  • the air cylinder, the No. 1 motor, the No. 2 motor and the measuring scale are connected to the human-machine control cabinet control system PLC. ;
  • the PLC When working, when the barrel is transported to the position of the first warehouse, the PLC will control the No. 1 motor and the No. 2 motor to rotate synchronously, and the No. 1 motor will drive the vertical discharge spiral blade to rotate. After the bottom end of the feeder is aligned with the discharge port on the discharge plate, the ingredients on the discharge spiral blade will fall into the discharge pipe through the discharge port, and then the PLC can control the speed and the number of turns of the No. 1 motor, and then Each turn of the discharging spiral blade will make the ingredients dropped from the discharging pipe to the discharging spiral blade into the discharging pipe through the discharging port, so that the spiral metering operation of the ingredients can be realized.
  • the spiral conveying blade set in the conveying pipe can be conveyed to the connection between the conveying pipe and the discharging pipe by the rotation of the No. 2 motor, so that the ingredients can fall into the sealing slide plate which is slidably inserted inside the discharging pipe. Then the weighing scale set on the sealing slide plate can re-weigh the ingredients. If the weight of the weighing ingredients and the target value set in the system for the ingredients are within the tolerance value range, the PLC controls the cylinder to shrink.
  • the telescopic end of the cylinder will drive the sealing slide to slide into the sealing frame, and the ingredients falling on the sealing slide will fall into the corresponding barrel from the lower nozzle of the discharging tube by the extrusion force of the side wall of the discharging tube. , so that the ingredients can be accurately and automatically weighed; if the weight of the weighing ingredients is less than the target value set in the system, the No. 1 motor will continue to rotate, and the ingredients on the discharge spiral blade will pass through the discharge.
  • the mouth is put into the material guide pipe, and then conveyed into the discharge pipe through the screw conveying blade.
  • the weighing scale on the sealing slide plate will continue to weigh to reach the target value range, and then the cylinder shrinks to put the ingredients on the sealing slide plate into the material barrel.
  • the ingredients in the barrel will be checked by the re-inspection scale to improve the accuracy and efficiency of the automatic weighing of rubber parts; if the weight of the weighing ingredients is greater than the target set in the system for the ingredients
  • the telescopic end of the cylinder will shrink and the ingredients will be put into the bucket accordingly, and then step S5' will work.
  • Non-conforming product area report to the supervisor for confirmation and scrap it for disposal.
  • an arc-shaped elastic bag is arranged under one end of the conveying pipe, and a spring is arranged inside the arc-shaped elastic bag; the upper surface of the arc-shaped elastic bag is aligned with the nozzle of the material guide pipe;
  • the vertically arranged conveying shaft is sleeved with a rotating disk, and the rotating disk is located below the arc-shaped elastic bag; the upper end surface of the rotating disk is evenly provided with a plurality of extrusion protrusions, and the extrusion protrusions are connected with the arc-shaped elastic bag.
  • the lower surface of the bag is in squeeze contact; when working, when the No.
  • a plurality of elastic guide plates are arranged inside the material guide tube, and the plurality of elastic guide plates are arranged in a dislocation up and down; an expansion cavity is opened inside the elastic guide plate, and the expansion cavity passes through the air guide tube It is connected to the arc-shaped elastic bag; when working, the elastic baffles arranged in the dislocation of the material guide pipe can guide the flow of the ingredients falling from the discharge port, which can effectively prevent the impact force of the weight when the ingredients fall from being too large.
  • the elastic expansion vibration of the upper surface of the elastic deflector plate can not only reduce the effect of gravity impact when the ingredients fall, but also can elastically vibrate and crush the agglomerated or agglomerated ingredients.
  • the air source inside the arc-shaped elastic bag can not only make multiple elastic baffles have the effect of elastic expansion at the same time, but also retain the inside of the arc-shaped elastic bag
  • one end of the conveying pipe is provided with an elastic arc-shaped plate, and the elastic arc-shaped plate is located at the position of the nozzle on one side of the discharging pipe;
  • the outer ring wall of the horizontally arranged conveying shaft in the conveying pipe is inclined and provided with elastic Extrusion rod, and the elastic extrusion rod rotates and squeezes to the side wall of the elastic arc plate;
  • the inner side wall of the elastic arc plate is elastically connected to the side wall of the discharge pipe through the spring; when working, when the No.
  • the spiral conveying blade can convey the ingredients in the conveying pipe to the discharging pipe, and the elastic arc plate set at the same time can play the effect of elastic vibration guiding for the other end of the conveying pipe.
  • the elastic extrusion rod is rotated, the elastic arc-shaped plate will be squeezed, and the elastic arc-shaped plate will be dented, and the spring provided on the side wall of the elastic arc-shaped plate will be compressed.
  • the elastic thrust of the spring will cause the elastic arc plate to produce elastic vibration, and the elastic vibration of the elastic arc plate can make the ingredients gathered on the surface vibrate and shake off into the discharge pipe, preventing There is a cavity between it and the discharge pipe, which causes the ingredients conveyed by the screw conveyor to accumulate and fall into the cavity, which in turn affects the accurate and efficient weighing of the ingredients by the metering-controlled discharge equipment.
  • each warehouse number is provided with a metering-controlled discharging device, and the metering-controlled discharging device set at the warehouse number will automatically unload the weighed ingredients.
  • each bin number corresponds to each barrel for automatic unloading, and directly to the re-inspection scale for total review.
  • the weight of various ingredients can be checked and checked, so as to realize the function of fast, efficient and accurate automatic batching of rubber parts.
  • the PLC can control the rotation speed and the number of turns of the No. 1 motor, so that each turn of the discharge spiral blade will pass the ingredients that fall from the discharge pipe to the discharge spiral blade through the discharge spiral.
  • the discharge port is put into the discharge pipe, and then the spiral metering operation of the ingredients can be realized.
  • the weighing scale set on the sealing slide plate can re-weigh the ingredients, so that the metering-controlled discharging equipment can accurately set the target value of the system. Efficiently put it into the barrel, which improves the precise discharge function of the metered and controlled discharge equipment.
  • Fig. 1 is the method flow chart of the present invention
  • Fig. 2 is the assembly drawing of conveyor belt of the present invention and a plurality of position numbers
  • Fig. 3 is the assembly drawing of a plurality of position numbers of the present invention.
  • Fig. 4 is an enlarged view of the metered controlled discharge device in Fig. 2 of the present invention.
  • Fig. 5 is the perspective view of the metering-controlled discharging device of the present invention.
  • Fig. 6 is the sectional view of the metering controlled discharging device of the present invention.
  • Fig. 7 is the enlarged view of the arc-shaped elastic bag in Fig. 6 of the present invention.
  • an automatic weighing method for rubber parts includes the following steps:
  • S1 Startup preparation: Turn on the required equipment switch, turn on the upper computer, double-click the automatic weighing and batching system icon on the display desktop, and log in to enter the automatic weighing and batching system to check the rubber mixing production plan; check whether the corresponding raw materials of each material tank are sufficient; Prepare the raw materials required for batching; the work of this step is to confirm whether the communication between the 8802 weight instrument, the upper computer system, the man-machine control cabinet and the PLC is normal: whether the corresponding communication status indicator is normal; check the batching line and the independent weighing machine.
  • Structure material storage tank, metering controlled discharge equipment 5 and tank scale 2, automatic shift assembly line are in normal state;
  • S3 On-site confirmation: Confirm that the relevant conditions at the site are normal, including the supply of compressed air sources; put the material bucket on the feeding bag, and set it at the first position of the conveyor belt 1 at the ingredient inlet; the tank scale 2, the connection into the assembly line Check whether the power supply of the motor is normal; in this step, if the material bucket is not on the weighing platform of the tank scale at the inlet of the batching, the batching will not be carried out; and the maximum weighing capacity of the tank scale 2 itself is 30KG, and the inductance is 0.005KG, and items exceeding the rated weight should be avoided. , Personnel presses or pushes the scale platform left and right;
  • step S5 it also includes a step S5': automatic alarm: when the blanking weight does not meet the target value tolerance value, the next bin number 3 will not be blanked,
  • step S5' automatic alarm: when the blanking weight does not meet the target value tolerance value, the next bin number 3 will not be blanked.
  • each material barrel is directly transferred to the final total amount re-inspection scale, it will stop because the weight does not meet the tolerance value of the target value, and the operation of the batching line will stop, and at the same time, the "alarm" light of the man-machine control cabinet will sound; The personnel will remove the barrels that do not meet the weight standard on the re-inspection scale, put them in the "unqualified product area", and report to the supervisor for confirmation and scrap them for disposal.
  • step S5 after the step S5 is completed, it also includes step S5": ingredient verification: when the number of ingredients is nearing the end, in order to prevent over-mixing of ingredients, the current formula number of the upper computer is checked. When the last batching operation is performed, the bucket will no longer be discharged, and it will automatically stop after completing the batching of the number of recipes.
  • the metering-controlled discharging device 5 includes a discharging bin 51, a discharging screw blade 52, a conveying shaft 53, a discharging plate 54, a conveying pipe 55, and a screw conveying blade 56.
  • the discharge plate 54 is provided with a discharge port 541; the lower side wall of the discharge bin 51 is fixed with a conveying pipe 55, and the conveying pipe 55 is communicated with the inner warehouse of the discharging bin 51; the conveying pipe 55 A spiral conveying leaf 56 is arranged inside the conveying shaft 53 to rotate in the horizontal direction, and a discharging pipe 57 is communicated directly below the conveying pipe 55; the lower nozzle of the discharging pipe 57 is located directly above the conveyor belt 1; A sealing slide 58 is slidably inserted into the tube 57, and a metering scale is arranged on the sealing slide 58; a sealing frame is fixed on the side of the discharging tube 57, and a sealing slide 58 is slidably arranged in the sealing frame through a cylinder; The bottom of the material port 541 is connected to one end of the conveying pipe 55 through the material guiding pipe 59; the bottom end face of the discharging bin 51 is provided with a No.
  • the PLC will control the No. 1 motor and the No. 2 motor to rotate synchronously, and the No. 1 motor will drive the vertical discharge screw blade 52 to rotate.
  • the ingredients on the discharge spiral blade 52 will fall into the discharge pipe 57 through the discharge port 541, and then the PLC can control the No. 1 motor.
  • the rotation speed and the number of turns, so that each turn of the discharging spiral blade 52 will drop the ingredients from the discharging pipe to the discharging helical blade 52 into the discharging pipe 57 through the discharging port 541, and then the ingredients can be realized.
  • the spiral conveying blade 56 set in the conveying pipe 55 can be conveyed to the conveying pipe 55 and the discharging pipe 57 by the rotation of the No. 2 motor.
  • the ingredients can fall on the sealing slide 58 that is slidably inserted inside the discharge pipe 57, and then the weighing scale set on the sealing slide 58 can re-weigh the ingredients.
  • the PLC controls the cylinder to shrink, the telescopic end of the cylinder will drive the sealing slide 58 to slide into the sealing frame, and the ingredients falling on the sealing slide 58 will be placed on the The extrusion force of the side wall of the material pipe 57 falls into the corresponding material barrel from the lower nozzle of the discharge pipe 57, so that the ingredients can be accurately and automatically weighed; if the weight of the weighing ingredients is less than the ingredients
  • the No. 1 motor will continue to rotate, and the ingredients on the discharge screw blade 52 will be put into the material guide pipe 59 through the discharge port 541, and then transported to the discharge pipe through the screw conveying blade 56.
  • the weighing scale on the sealing slide 58 will continue to weigh, and then reach the target value range, and then the cylinder shrinks to put the ingredients on the sealing slide 58 into the barrel; then the ingredients in the barrel will be rechecked.
  • the total amount is checked to improve the accuracy and efficiency of automatic weighing of rubber parts; if the weight of the weighing ingredients is greater than the target value set in the system, the telescopic end of the cylinder will shrink and then the ingredients will be added.
  • step S5' will work.
  • the batching personnel will remove the bucket that does not meet the weight standard on the re-inspection scale, put it in the "unqualified product area", and report it to the supervisor for confirmation and scrap it for disposal.
  • an arc-shaped elastic bag 6 is provided under one end of the conveying tube 55, and a spring is arranged inside the arc-shaped elastic bag 6;
  • the nozzles are aligned;
  • the conveying shaft 53 vertically arranged in the discharging bin 51 is sleeved with a rotating disk 7, and the rotating disk 7 is located below the arc-shaped elastic bag 6;
  • the upper end surface of the rotating disk 7 is evenly arranged
  • There are a plurality of extrusion protrusions 8, and the extrusion protrusions 8 are in extrusion contact with the lower surface of the arc-shaped elastic bag 6; during operation, when the No. 1 motor drives the conveying shaft 53 to rotate, the rotation of the conveying shaft 53 will drive the rotating disk 7.
  • the vibration of the upper surface of the arc-shaped elastic bag 6 will prevent the wet ingredients from adhering to the inner wall of the bottom end of the conveying pipe 55 due to the falling gravity;
  • the metered and controlled discharge device 5 discharges wet ingredients, because the discharge tray and the conveying pipe 55 are connected through the conveying pipe 59 and have a certain height difference, when the wet ingredients fall into the bottom end of the conveying pipe 55
  • the gravitational force hits the bottom end of the conveying pipe 55, the ingredients will stick to the pipe wall of the conveying pipe 55, thereby affecting the accurate and efficient automatic weighing of the ingredients.
  • a plurality of elastic baffles 9 are arranged inside the material guide pipe 59 , and the plurality of elastic baffles 9 are arranged in a dislocation up and down; There is an expansion cavity 91, and the expansion cavity 91 is connected to the arc-shaped elastic bag 6 through the air guide tube 10; during operation, the elastic baffle 9 arranged in a dislocation inside the guide tube 59 can guide the ingredients falling from the discharge port 541.
  • the effect of flow can effectively prevent the phenomenon that the impact force of the weight when the ingredients fall is too large, which leads to the phenomenon of sticking to the inner wall of the conveying pipe 55;
  • the gas inside the elastic bag 6 will enter the expansion cavity 91 through the air guide 10, so that the upper end face of the elastic deflector 9 produces elastic expansion vibration.
  • the agglomerated or agglomerated ingredients can be elastically vibrated and crushed, and at the same time, it can also reduce the phenomenon of ingredients sticking on the upper surface of the elastic baffle 9;
  • the source can not only make the multiple elastic baffles 9 have the effect of elastic expansion at the same time, but also some air sources will remain inside the arc-shaped elastic bag 6 to prevent the arc-shaped elastic bag 6 from pressing the extrusion force of the protrusion 8. If the lower deformation is too large, the upper surface of the arc-shaped elastic bag 6 is bulged, which affects the safe and stable rotation of the screw conveyor blade 56 .
  • one end of the conveying pipe 55 is provided with an elastic arc-shaped plate 11, and the elastic arc-shaped plate 11 is located at the nozzle position on one side of the discharging pipe 57;
  • the conveying pipe 55 is arranged horizontally inside
  • the outer ring wall of the conveying shaft 53 is inclined with an elastic extrusion rod 12, and the elastic extrusion rod 12 is rotated and squeezed to the side wall of the elastic arc plate 11;
  • the inner side wall of the elastic arc plate 11 is elastically elasticized by a spring Connected to the side wall of the discharge pipe 57; during operation, when the No.
  • the 2 motor drives the horizontally arranged conveying shaft 53 to rotate, the screw conveying blade 56 can transport the ingredients in the conveying pipe 55 into the discharging pipe 57, and the set at the same time
  • the elastic arc-shaped plate 11 can play the effect of elastic vibration guide for the other end of the conveying pipe 55, and the elastic extrusion rod 12 arranged on the outer wall of the conveying shaft 53 will squeeze the elastic arc-shaped plate 11 when it rotates, and make the elastic arc plate 11 squeezed.
  • the elastic arc-shaped plate 11 is concave, and the spring provided on the side wall of the elastic arc-shaped plate 11 will be compressed.
  • the elastic vibration of the elastic arc-shaped plate 11 can make the ingredients gathered on the surface vibrate and shake off into the discharge pipe 57 to prevent the existence of a cavity between the other end of the conveying pipe 55 and the discharge pipe 57, and then As a result, the ingredients conveyed by the screw conveyor blades 56 are piled up and fall into the cavity, thereby affecting the accurate and efficient weighing of the ingredients by the metering-controlled discharging device 5 .
  • the PLC will control the No. 1 motor and the No. 2 motor to rotate synchronously, and the No. 1 motor will drive the vertical discharge screw blade 52 to rotate.
  • the ingredients on the discharge spiral blade 52 will fall into the discharge pipe 57 through the discharge port 541, and then the PLC can control the No. 1 motor.
  • the rotation speed and the number of turns, so that each turn of the discharging spiral blade 52 will drop the ingredients from the discharging pipe to the discharging helical blade 52 into the discharging pipe 57 through the discharging port 541, and then the ingredients can be realized.
  • the spiral conveying blade 56 set in the conveying pipe 55 can be conveyed to the conveying pipe 55 and the discharging pipe 57 by the rotation of the No. 2 motor.
  • the ingredients can fall on the sealing slide 58 that is slidably inserted inside the discharge pipe 57, and then the weighing scale set on the sealing slide 58 can re-weigh the ingredients.
  • the PLC controls the cylinder to shrink, the telescopic end of the cylinder will drive the sealing slide 58 to slide into the sealing frame, and the ingredients falling on the sealing slide 58 will be placed on the The extrusion force of the side wall of the material pipe 57 falls into the corresponding material barrel from the lower nozzle of the material discharge pipe 57, so that the ingredients can be accurately and automatically weighed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Weight Measurement For Supplying Or Discharging Of Specified Amounts Of Material (AREA)

Abstract

An automatic weighing method for rubber parts. The method comprises the following steps: S1: start-up preparation; S2: formula preparation; S3: on-site confirmation; S4: formula download; S5': automatic alarm; S5: weighing and discharge; S5": ingredient check; and S6: ingredient collection. A feeding pipe is provided at an upper opening of a discharge compartment (51); a discharge helical blade (52) is rotatably provided in the discharge compartment (51) by means of a conveying shaft (53); a discharge plate (54) is provided below the discharge helical blade (52); a discharge port (541) is formed in the discharge plate (54); a conveying pipe (55) is fixed on the lower side wall of the discharge compartment (51), and the conveying pipe (55) is in communication with the inner compartment of the discharge compartment (51); a helical conveying blade (56) is rotatably provided in the conveying pipe (55) by means of the conveying shaft (53), and a discharge pipe (57) located right under the conveying pipe is connected to the conveying pipe (55); and a sealing slide plate (58) is slidingly inserted into the discharge pipe (57), and a metering scale is provided on the sealing slide plate (58), such that weight check of various ingredients can be performed, thereby achieving the function of rapid, efficient, and accurate automatic preparation of ingredients of rubber parts.

Description

一种橡胶件自动称量方法A kind of automatic weighing method of rubber parts 技术领域technical field
本发明属于橡胶件配料技术领域,具体的说是一种橡胶件自动称量方法。The invention belongs to the technical field of rubber parts batching, in particular to an automatic weighing method for rubber parts.
背景技术Background technique
在化工行业的生产过程中,混合料的配比是非常重要的生产工序,配料的速度以及精确度对混合料质量有着非常重要的影响,目前的取料方式一般采用人工称量,整个操作过程麻烦,不仅占用人力,而且误差比较大,人为因素的存在,使配料过程容易出现质量事故;为了解决上述问题,近年来也出现了一些自动化的配料称量。In the production process of the chemical industry, the ratio of the mixture is a very important production process. The speed and accuracy of the batching have a very important impact on the quality of the mixture. The current method of reclaiming materials generally adopts manual weighing. It is troublesome, not only takes up manpower, but also has large errors. The existence of human factors makes the batching process prone to quality accidents; in order to solve the above problems, some automated batching weighing has also appeared in recent years.
中国专利公开了一种物料自动称量装置、其应用及物料自动称量方法,专利申请号为2015104456338,包括进料装置、称量装置及电气控制系统,进料装置包括快速给料装置、送料板、挡料板、筛板、振动给料器,称量装置包括称量钢架、称重传感器、称量斗、排料密封罩、料斗门组件和接料桶。The Chinese patent discloses an automatic material weighing device, its application and automatic material weighing method. The patent application number is 2015104456338, which includes a feeding device, a weighing device and an electrical control system. The feeding device includes a fast feeding device, a feeding device Plate, baffle plate, sieve plate, vibrating feeder, weighing device including weighing steel frame, load cell, weighing hopper, discharge sealing cover, hopper door assembly and receiving bucket.
上述内容虽然能够实现配料自动称量的作用;但当配料的种类较多,且每一种配料的重量不同时,需要多个自动自动称量装置对多种配料进行单独称量作业,该种方式同样需要人工计算配料的总重量,同时若出现配料的重量有误差时,则会影响后续配料的正常稳定配料的现象,进而影响橡胶件的配料的自动高效准确称量的现象。Although the above content can realize the function of automatic weighing of ingredients; but when there are many types of ingredients and the weight of each ingredient is different, multiple automatic weighing devices are needed to individually weigh multiple ingredients. The method also requires manual calculation of the total weight of the ingredients. At the same time, if there is an error in the weight of the ingredients, it will affect the normal and stable batching of the subsequent ingredients, and then affect the automatic, efficient and accurate weighing of the ingredients of the rubber parts.
鉴于此,为了克服上述技术问题,本公司设计研发了一种橡胶件自动称量方法,制作了特殊的橡胶件的配料自动称量方法,解决了上述技术问题。In view of this, in order to overcome the above technical problems, our company designed and developed an automatic weighing method for rubber parts, and made a special automatic weighing method for ingredients of rubber parts, which solved the above technical problems.
发明内容SUMMARY OF THE INVENTION
为了弥补现有技术的不足,本发明提出的一种橡胶件自动称量方法,本发明主要用于解决当配料的种类较多,且每一种配料的重量不同时,需要多个自动自动称量装置对多种配料进行单独称量作业,该种方式同样需要人工计算配料的总重量,同时若出现配料的重量有误差时,则会影响后续配料的正常稳定配料的现象,进而影响橡胶件的配料的自动高效准确称量的现象。In order to make up for the deficiencies of the prior art, the present invention proposes an automatic weighing method for rubber parts. The present invention is mainly used to solve the problem that when there are many types of ingredients and the weight of each ingredient is different, multiple automatic weighing methods are required. This method also needs to manually calculate the total weight of the ingredients. At the same time, if there is an error in the weight of the ingredients, it will affect the normal and stable batching of the subsequent ingredients, and then affect the rubber parts. The phenomenon of automatic, efficient and accurate weighing of ingredients.
本发明解决其技术问题所采用的技术方案是:本发明所述的一种橡胶件自动称量方法,该方法包括如下步骤:The technical solution adopted by the present invention to solve the technical problem is: an automatic weighing method for rubber parts according to the present invention, and the method comprises the following steps:
S1:启动准备:打开所需设备开关,开启上位计算机双击显示屏桌面的自动称量配料系统图标,并登陆进入自动称量配料系统,核对炼胶生产计划;检查各料罐相应原材料是 否充足;准备配料所需的原材料;该步骤的工作是为了确认8802重量仪表、上位计算机系统、人机控制柜与PLC的通讯是否正常:相应的通讯状态指示灯是否正常;检查配料线和独立称的机械架构:物料储存槽、计量受控出料设备及槽秤、自动化移位流水线处于正常状态;S1: Startup preparation: Turn on the required equipment switch, turn on the upper computer, double-click the automatic weighing and batching system icon on the display desktop, and log in to enter the automatic weighing and batching system to check the rubber mixing production plan; check whether the corresponding raw materials of each material tank are sufficient; Prepare the raw materials required for batching; the work of this step is to confirm whether the communication between the 8802 weight instrument, the upper computer system, the man-machine control cabinet and the PLC is normal: whether the corresponding communication status indicator is normal; check the batching line and the independent weighing machine. Architecture: material storage tank, metering and controlled discharge equipment and tank scales, automatic shift assembly line are in normal state;
S2:配方准备:进入上位计算机界面后点击“配方管理”,进入配方管理画面,配方列表中正常情况下已有可以选择的配方名称,点击配方列表中的任一配方名称,进入“修改配方”页面,确认配方名称、配方总数、确认仓位及对应的原料名称,原料备注,目标值和允差值,设定确认物料信息满足作业需求;然后保存,退出;S2: Recipe preparation: After entering the host computer interface, click "Recipe Management" to enter the recipe management screen. Normally, there are formula names that can be selected in the formula list. Click any formula name in the formula list to enter "Modify formula" page, confirm the recipe name, the total number of recipes, confirm the position and the corresponding raw material name, raw material remarks, target value and tolerance value, set the confirmation material information to meet the job requirements; then save and exit;
S3:现场确认:确认现场的相关情况为正常,包括压缩气源供给;将料桶套上投料袋、并定置在配料入口处输送带的第一台位置;槽秤、进入流水线的衔接马达电源供给是否正常;该步骤若料桶不在配料入口处槽称的秤台上,配料不会进行;且槽本身最大秤量为30KG,感量为0.005KG,应避免超出额定重量之物品、人员重压或左右推挤磅台;S3: On-site confirmation: Confirm that the relevant conditions at the site are normal, including the supply of compressed air source; put the material bucket on the feeding bag and set it at the first position of the conveyor belt at the inlet of the ingredient; the tank scale and the connection motor power supply entering the assembly line Whether the supply is normal; in this step, if the bucket is not on the weighing platform of the tank at the inlet of the ingredients, the ingredients will not be carried out; and the tank itself has a maximum weighing capacity of 30KG and a sense of 0.005KG. Avoid items and personnel that exceed the rated weight. Or push the scale platform left and right;
S4:配方下载:在上位计算机界面点击“实时监控”按钮,进入实时监控画面,确认“自动秤量配料系统”下每仓位号料罐上的目标值与设定满足作业需求;当上位计算机界面显示“通信”和“允许下载”是绿色时表示可以下载,点绿色“允许下载”,下载配方到PLC;S4: Recipe download: Click the "Real-time monitoring" button on the host computer interface to enter the real-time monitoring screen, and confirm that the target value and setting on each bin number under the "Automatic weighing and batching system" meet the job requirements; when the host computer interface displays When "communication" and "allow download" are green, it means download is available, click the green "allow download" to download the recipe to the PLC;
S5:称量下料:按下主控制电箱面板上的“启动系统”按钮,各线输送带将对料桶进行传送,设备自动感应到料桶时输送链条拉杆将料桶往前拉推进入到第一个仓位号处设置的计量受控出料设备的正下方后,链条拉杆自动停止,第一个仓位号处设置的计量受控出料设备会将称量后的配料自动下料到对应的料桶内,依次每个仓位号对应每个料桶进行自动下料,下料完成后直接到复检秤进行总量复核,无误后正常传送到尾端,整条线配料完成;S5: Weighing and unloading: Press the "Start System" button on the panel of the main control electric box, the conveyor belts of each line will transmit the material barrel, and when the equipment automatically senses the material barrel, the conveyor chain pull rod will pull the material barrel forward. After entering directly below the metering-controlled discharging device set at the first bin number, the chain pull rod automatically stops, and the metering-controlled discharging device set at the first bin number will automatically unload the weighed ingredients. In the corresponding barrel, each bin number corresponds to each barrel for automatic unloading. After the unloading is completed, it goes directly to the re-inspection scale to check the total amount. If there is no error, it will be sent to the end normally, and the batching of the whole line is completed;
S6:原料收集:配料线配料完成后,输送带将料桶传送到尾端时,红外线自动感应器感应到料桶后,臂手自动伸出将带料的料桶推送到传送带的尾端,由配料人员即时将整袋料取出,并在投料袋外标上车次顺序号,扎好袋口,定放在对应配料塑料框或塑料桶放置区,投料袋再套上空料桶,放在空桶定置区,备用。S6: Raw material collection: After the batching line is completed, when the conveyor belt transfers the material barrel to the end, the infrared automatic sensor senses the material barrel, and the arm automatically extends to push the material barrel to the end of the conveyor belt. The batching personnel will immediately take out the whole bag of materials, and mark the train sequence number on the outside of the feeding bag, tie the bag mouth, and place it in the corresponding batching plastic frame or plastic bucket storage area. Empty barrel fixed area, spare.
优选的,在所述步骤S5中,还包括步骤S5′:自动报警:当出现下料重量不符合目标值允差值时,则下一个仓位号不再下料,当个料桶直接流转走到最后总量复检秤,则会因重量不满足目标值允差值而停止不前,配料线作业传送停止,同时人机控制柜“警报”灯亮鸣响;配料人员将复检秤上不符合重量标准的料桶取下,放在“不合格品区”,报主 管确认后报废处置。Preferably, in the step S5, it also includes a step S5': automatic alarm: when the unloading weight does not meet the tolerance value of the target value, the next bin number will not be unloaded, and the buckets will be directly transferred away. At the end of the total re-inspection of the scale, it will stop because the weight does not meet the tolerance value of the target value, the operation of the batching line will stop, and at the same time, the "alarm" light of the man-machine control cabinet will sound; the batching personnel will re-inspect the scale. The barrels that meet the weight standards are removed, placed in the "unqualified product area", and reported to the supervisor for confirmation and then discarded for disposal.
优选的,在所述步骤S5执行完成后,还包括步骤S5″:配料核检:在配料数量接近尾声时,为防止配料多配,核对上位计算机当前配方数,在完成最后一个配料作业时,不再放料桶,完成配方数配料后自动停止。Preferably, after the step S5 is executed, it also includes a step S5": ingredient verification: when the number of ingredients is nearing the end, in order to prevent over-mixing of ingredients, the current formula number of the upper computer is checked, and when the last batching operation is completed, No more feeding buckets, it will stop automatically after finishing the number of recipes.
优选的,其中S5步骤,所述计量受控出料设备包括放料仓、放料螺旋叶、输送轴、放料板、输送管、螺旋输送叶、放料管和密封滑板;所述放料仓的上端仓口设置有落料管,且放料仓内通过输送轴竖直转动设置有放料螺旋叶;所述放料螺旋叶的外边缘与放料仓的内仓壁转动接触;所述放料螺旋叶的下方设置有放料板,且放料板通过轴承套接到输送轴上;所述放料板上开设有放料口;所述放料仓的下方侧壁固定有输送管,且输送管与放料仓的内仓连通;所述输送管内通过输送轴水平方向转动设置有螺旋输送叶,且输送管的正下方连通有放料管;所述放料管的下方管口位于输送带正上方;所述放料管内滑动插接有密封滑板,且密封滑板上设置有计量称;所述放料管的侧面固定有密封框架,且密封框架内通过气缸滑动设置有密封滑板;所述放料口的下方通过导料管连通到输送管的一端;所述放料仓的底端面设置有一号电机,且一号电机的输出端与竖直设置的输送轴连接;所述输送管的侧端面设置有二号电机,且二号电机与水平设置的输送轴连接;所述气缸、一号电机、二号电机和计量称均电信号连接到人机控制柜控制系统PLC;Preferably, in step S5, the metering controlled discharging equipment includes a discharging bin, a discharging screw blade, a conveying shaft, a discharging plate, a conveying pipe, a screw conveying blade, a discharging pipe and a sealing slide; the discharging The upper end of the bin is provided with a discharging pipe, and a discharging spiral leaf is arranged in the discharging bin through vertical rotation of the conveying shaft; the outer edge of the discharging spiral leaf is in rotational contact with the inner bin wall of the discharging bin; A discharge plate is arranged below the discharge spiral blade, and the discharge plate is sleeved on the conveying shaft through a bearing; a discharge port is opened on the discharge plate; the lower side wall of the discharge bin is fixed with a conveying shaft. The conveying pipe is connected with the inner silo of the discharging bin; a spiral conveying blade is arranged in the conveying pipe through the horizontal rotation of the conveying shaft, and a discharging pipe is communicated directly under the conveying pipe; the lower pipe of the discharging pipe The mouth is located directly above the conveyor belt; a sealing slide plate is slidably inserted in the discharge pipe, and a metering scale is arranged on the sealing slide plate; a sealing frame is fixed on the side of the discharging pipe, and a sealing frame is slidably arranged in the sealing frame through a cylinder. The bottom of the discharge port is connected to one end of the conveying pipe through a material guide pipe; the bottom end face of the discharge bin is provided with a No. 1 motor, and the output end of the No. 1 motor is connected with a vertically arranged conveying shaft; The side end face of the conveying pipe is provided with the No. 2 motor, and the No. 2 motor is connected with the horizontally arranged conveying shaft; the air cylinder, the No. 1 motor, the No. 2 motor and the measuring scale are connected to the human-machine control cabinet control system PLC. ;
工作时,当料桶输送到第一仓号位置处后,PLC会控制一号电机和二号电机同步转动,一号电机会带动竖直方向设置的放料螺旋叶转动,当放料螺旋叶的底端与放料板上的放料口对齐后,放料螺旋叶上的配料会通过放料口落入到放料管内,进而PLC可以控制一号电机的转速和转动的圈数,进而使得放料螺旋叶每转动一圈会将落料管下落到放料螺旋叶的配料通过放料口放入到放料管内,进而可以实现配料的螺旋计量作业,当配料通过放料管落入到输送管的端部时,输送管内设置的螺旋输送叶可以通过二号电机的转动输送到输送管与放料管的连接处,使得配料能够落入到放料管内部滑动插接的密封滑板上,进而密封滑板上设置的计量称可以对配料进行再次称重,若计量称称量配料的重量与该配料在系统中设定的目标值在允差值范围内后,PLC控制气缸收缩,气缸的伸缩端会带动密封滑板滑动到密封框架内,且密封滑板上落入到配料会在放料管侧壁的挤压力从放料管的下方管口处落入到对应的料桶内,进而可以对配料进行准确自动称量作业;若计量称称量配料的重量小于该配料在系统中设定的目标值时,一号电机继续转动,会将放料螺旋叶上配料通过放料口放入到导料管内,再通过螺旋输送叶输送到放料管内,密封滑板上的计量称会持续称量,进而达到目标值范围,然后气缸收缩将密封滑板上的配料放入到料桶内;然后料桶 内的配料会经过复检秤进行总量复核,提高橡胶件配料自动称量的准确性和高效性;若计量称称量配料的重量大于该配料在系统中设定的目标值时,则气缸的伸缩端会收缩后会将配料对应放入到料桶内,然后步骤S5′会进行工作,配料人员将复检秤上不符合重量标准的料桶取下,放在“不合格品区”,报主管确认后报废处置。When working, when the barrel is transported to the position of the first warehouse, the PLC will control the No. 1 motor and the No. 2 motor to rotate synchronously, and the No. 1 motor will drive the vertical discharge spiral blade to rotate. After the bottom end of the feeder is aligned with the discharge port on the discharge plate, the ingredients on the discharge spiral blade will fall into the discharge pipe through the discharge port, and then the PLC can control the speed and the number of turns of the No. 1 motor, and then Each turn of the discharging spiral blade will make the ingredients dropped from the discharging pipe to the discharging spiral blade into the discharging pipe through the discharging port, so that the spiral metering operation of the ingredients can be realized. When the ingredients fall into the discharging pipe through the discharging pipe When reaching the end of the conveying pipe, the spiral conveying blade set in the conveying pipe can be conveyed to the connection between the conveying pipe and the discharging pipe by the rotation of the No. 2 motor, so that the ingredients can fall into the sealing slide plate which is slidably inserted inside the discharging pipe. Then the weighing scale set on the sealing slide plate can re-weigh the ingredients. If the weight of the weighing ingredients and the target value set in the system for the ingredients are within the tolerance value range, the PLC controls the cylinder to shrink. The telescopic end of the cylinder will drive the sealing slide to slide into the sealing frame, and the ingredients falling on the sealing slide will fall into the corresponding barrel from the lower nozzle of the discharging tube by the extrusion force of the side wall of the discharging tube. , so that the ingredients can be accurately and automatically weighed; if the weight of the weighing ingredients is less than the target value set in the system, the No. 1 motor will continue to rotate, and the ingredients on the discharge spiral blade will pass through the discharge. The mouth is put into the material guide pipe, and then conveyed into the discharge pipe through the screw conveying blade. The weighing scale on the sealing slide plate will continue to weigh to reach the target value range, and then the cylinder shrinks to put the ingredients on the sealing slide plate into the material barrel. Then, the ingredients in the barrel will be checked by the re-inspection scale to improve the accuracy and efficiency of the automatic weighing of rubber parts; if the weight of the weighing ingredients is greater than the target set in the system for the ingredients When the value is set, the telescopic end of the cylinder will shrink and the ingredients will be put into the bucket accordingly, and then step S5' will work. Non-conforming product area”, report to the supervisor for confirmation and scrap it for disposal.
优选的,所述输送管一端下方设置有弧形弹性囊,且弧形弹性囊内部设置有弹簧;所述弧形弹性囊的上表面与导料管的管口对齐;所述放料仓内竖直设置的输送轴上套接有转动盘,且转动盘位于弧形弹性囊的下方;所述转动盘的上端面均匀设置有多个挤压凸起,且挤压凸起与弧形弹性囊的下表面挤压接触;工作时,当一号电机带动输送轴转动时,输送轴转动会带动转动盘在输送管的底端面转动,转动盘上端面设置的多个挤压凸起会转动挤压到弧形弹性囊的下端面,设置的弹簧在挤压凸起的挤压力下会使得弧形弹性囊上表面产生振动,且设置的弧形弹性囊与导料管的管口对齐,进而导料管下落的配料会落入到弧形弹性囊的上表面,弧形弹性囊上表面的振动会防止潮湿配料由于下落的重力粘合到输送管的底端内壁的现象;设置的弧形弹性囊和挤压凸起的转动配合,当计量受控出料设备放出为潮湿配料时,由于放料盘与输送管之间通过导料管连通,且具有一定高度差,进而当潮湿配料落入到输送管的底端时,由于重力作用撞击到输送管的底端会造成配料粘结到输送管的管壁上,进而影响配料的准确高效自动称量的效果。Preferably, an arc-shaped elastic bag is arranged under one end of the conveying pipe, and a spring is arranged inside the arc-shaped elastic bag; the upper surface of the arc-shaped elastic bag is aligned with the nozzle of the material guide pipe; The vertically arranged conveying shaft is sleeved with a rotating disk, and the rotating disk is located below the arc-shaped elastic bag; the upper end surface of the rotating disk is evenly provided with a plurality of extrusion protrusions, and the extrusion protrusions are connected with the arc-shaped elastic bag. The lower surface of the bag is in squeeze contact; when working, when the No. 1 motor drives the conveyor shaft to rotate, the rotation of the conveyor shaft will drive the rotating disc to rotate on the bottom end face of the conveying pipe, and the multiple extrusion protrusions set on the upper end face of the rotating disc will rotate. Squeeze to the lower end surface of the arc-shaped elastic bag, the spring set will make the upper surface of the arc-shaped elastic bag vibrate under the pressing force of the extrusion protrusion, and the set arc-shaped elastic bag is aligned with the nozzle of the material guide tube. , and then the ingredients falling from the guide tube will fall on the upper surface of the arc-shaped elastic bag, and the vibration of the upper surface of the arc-shaped elastic bag will prevent the wet ingredients from adhering to the inner wall of the bottom end of the conveying pipe due to the falling gravity. The rotation of the arc-shaped elastic bag and the extrusion protrusion cooperates. When the metered and controlled discharge equipment discharges wet ingredients, because the discharge tray and the conveying pipe are connected through the material guide pipe, and there is a certain height difference, and when the wet ingredients are discharged When the ingredients fall into the bottom end of the conveying pipe, the impact of gravity on the bottom end of the conveying pipe will cause the ingredients to stick to the pipe wall of the conveying pipe, thereby affecting the accurate and efficient automatic weighing of the ingredients.
优选的,所述导料管的内部设置有多个弹性导流板,且多个弹性导流板均上下错位设置;所述弹性导流板的内部开设有膨胀腔,且膨胀腔通过导气管连通到弧形弹性囊内;工作时,导料管内部错位设置的弹性导流板可以对放料口下落的配料起到导流的作用,有效防止由于配料下落时重量的冲击力过大,进而导致粘结到输送管内壁上的现象;同时当弧形弹性囊受到挤压凸起的挤压力时,弧形弹性囊内部的气体会通过导气管进入到膨胀腔内,使得弹性导流板的上端面产生弹性膨胀振动,弹性导流板上表面的弹性膨胀振动不仅可以降低配料下落时重力冲击的效果,同时可以将结块或结团的配料进行弹性振动粉碎的效果,同时也可以降低弹性导流板上表面出现配料粘结的现象;设置的弧形弹性囊内部的气源不仅可以使得多个弹性导流板同时起到弹性膨胀的效果,且弧形弹性囊内部还会留存有部分气源,防止弧形弹性囊在挤压凸起的挤压力下变形过大,进而导致弧形弹性囊的上表面产生凸起的现象,进而影响螺旋输送叶的安全稳定转动。Preferably, a plurality of elastic guide plates are arranged inside the material guide tube, and the plurality of elastic guide plates are arranged in a dislocation up and down; an expansion cavity is opened inside the elastic guide plate, and the expansion cavity passes through the air guide tube It is connected to the arc-shaped elastic bag; when working, the elastic baffles arranged in the dislocation of the material guide pipe can guide the flow of the ingredients falling from the discharge port, which can effectively prevent the impact force of the weight when the ingredients fall from being too large. This will lead to the phenomenon of sticking to the inner wall of the delivery tube; at the same time, when the arc-shaped elastic bag is subjected to the extrusion force of the extrusion protrusion, the gas inside the arc-shaped elastic bag will enter the inflation cavity through the airway, so that the elastic diversion The upper end face of the plate produces elastic expansion vibration. The elastic expansion vibration of the upper surface of the elastic deflector plate can not only reduce the effect of gravity impact when the ingredients fall, but also can elastically vibrate and crush the agglomerated or agglomerated ingredients. Reduce the phenomenon of ingredients sticking on the surface of the elastic baffle; the air source inside the arc-shaped elastic bag can not only make multiple elastic baffles have the effect of elastic expansion at the same time, but also retain the inside of the arc-shaped elastic bag There are some air sources to prevent the arc-shaped elastic bag from being deformed too much under the extrusion force of the extrusion protrusion, which in turn causes the upper surface of the arc-shaped elastic bag to bulge, which in turn affects the safe and stable rotation of the screw conveyor blade.
优选的,所述输送管一端部设置有弹性弧形板,且弹性弧形板位于放料管一侧的管口位置;所述输送管内水平设置的输送轴的外圈壁上倾斜设置有弹性挤压杆,且弹性挤压杆转动挤压到弹性弧形板的侧壁;所述弹性弧形板的内侧壁通过弹簧弹性连接到放料管的侧 壁;工作时,当二号电机带动水平设置的输送轴转动时,螺旋输送叶可以将输送管内的配料输送到放料管内,同时设置的弹性弧形板可以对输送管另一端起到弹性振动导料的效果,输送轴外圈壁设置的弹性挤压杆在转动时会对弹性弧形板进行挤压,且使得弹性弧形板产生凹陷,且弹性弧形板侧壁设置的弹簧会受到压缩,当弹性挤压杆脱离对弹性弧形板挤压后,弹簧的弹性推力会使得弹性弧形板产生弹性振动,弹性弧形板的弹性振动可以使得表面聚集的配料进行振动抖落到放料管内,防止由于输送管的另一端与放料管之间存在空腔,进而导致螺旋输送叶输送的配料堆积落入到空腔中,进而影响计量受控出料设备的准确高效的对配料进行称量作业。Preferably, one end of the conveying pipe is provided with an elastic arc-shaped plate, and the elastic arc-shaped plate is located at the position of the nozzle on one side of the discharging pipe; the outer ring wall of the horizontally arranged conveying shaft in the conveying pipe is inclined and provided with elastic Extrusion rod, and the elastic extrusion rod rotates and squeezes to the side wall of the elastic arc plate; the inner side wall of the elastic arc plate is elastically connected to the side wall of the discharge pipe through the spring; when working, when the No. 2 motor drives When the horizontally arranged conveying shaft rotates, the spiral conveying blade can convey the ingredients in the conveying pipe to the discharging pipe, and the elastic arc plate set at the same time can play the effect of elastic vibration guiding for the other end of the conveying pipe. When the elastic extrusion rod is rotated, the elastic arc-shaped plate will be squeezed, and the elastic arc-shaped plate will be dented, and the spring provided on the side wall of the elastic arc-shaped plate will be compressed. After the arc plate is squeezed, the elastic thrust of the spring will cause the elastic arc plate to produce elastic vibration, and the elastic vibration of the elastic arc plate can make the ingredients gathered on the surface vibrate and shake off into the discharge pipe, preventing There is a cavity between it and the discharge pipe, which causes the ingredients conveyed by the screw conveyor to accumulate and fall into the cavity, which in turn affects the accurate and efficient weighing of the ingredients by the metering-controlled discharge equipment.
本发明的有益效果如下:The beneficial effects of the present invention are as follows:
1.本发明通过设置的多个仓号位,且每个仓号位均设置有计量受控出料设备,仓位号处设置的计量受控出料设备会将称量后的配料自动下料到对应的料桶内,依次每个仓位号对应每个料桶进行自动下料,直接到复检秤进行总量复核,无误后正常传送到尾端不仅可以实现多种配料的同步自动称量下料的效果,同时可以对多种配料进行重量复核检查,进而实现了橡胶件的配料快速高效准确自动配料的功能。1. In the present invention, a plurality of warehouse numbers are set, and each warehouse number is provided with a metering-controlled discharging device, and the metering-controlled discharging device set at the warehouse number will automatically unload the weighed ingredients. In the corresponding barrel, each bin number corresponds to each barrel for automatic unloading, and directly to the re-inspection scale for total review. At the same time, the weight of various ingredients can be checked and checked, so as to realize the function of fast, efficient and accurate automatic batching of rubber parts.
2.本发明通过计量受控出料设备,PLC可以控制一号电机的转速和转动的圈数,进而使得放料螺旋叶每转动一圈会将落料管下落到放料螺旋叶的配料通过放料口放入到放料管内,进而可以实现配料的螺旋计量作业,密封滑板上设置的计量称可以对配料进行再次称重,使得计量受控出料设备能够将系统设置的目标值将准确高效放入到料桶内,提高了计量受控出料设备精准放料的功能。2. In the present invention, by measuring the controlled discharge equipment, the PLC can control the rotation speed and the number of turns of the No. 1 motor, so that each turn of the discharge spiral blade will pass the ingredients that fall from the discharge pipe to the discharge spiral blade through the discharge spiral. The discharge port is put into the discharge pipe, and then the spiral metering operation of the ingredients can be realized. The weighing scale set on the sealing slide plate can re-weigh the ingredients, so that the metering-controlled discharging equipment can accurately set the target value of the system. Efficiently put it into the barrel, which improves the precise discharge function of the metered and controlled discharge equipment.
3.本发明通过设置的弧形弹性囊和挤压凸起的转动配合,当计量受控出料设备放出为潮湿配料时,由于放料盘与输送管之间通过导料管连通,且具有一定高度差,进而当潮湿配料落入到输送管的底端时,由于重力作用撞击到输送管的底端会造成配料粘结到输送管的管壁上,进而影响配料的准确高效自动称量的效果。3. In the present invention, through the rotation of the arc-shaped elastic bag and the extrusion protrusion, when the metered and controlled discharge equipment is discharged into wet ingredients, because the discharge tray and the conveying pipe are connected through the material guide pipe, and have There is a certain height difference, and when the wet ingredients fall into the bottom end of the conveying pipe, the impact of gravity on the bottom end of the conveying pipe will cause the ingredients to stick to the pipe wall of the conveying pipe, thereby affecting the accurate and efficient automatic weighing of the ingredients. Effect.
附图说明Description of drawings
下面结合附图对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings.
图1是本发明的方法流程图;Fig. 1 is the method flow chart of the present invention;
图2是本发明的输送带和多个仓位号的装配图;Fig. 2 is the assembly drawing of conveyor belt of the present invention and a plurality of position numbers;
图3是本发明的多个仓位号的装配图;Fig. 3 is the assembly drawing of a plurality of position numbers of the present invention;
图4是本发明的图2中计量受控出料设备的放大图;Fig. 4 is an enlarged view of the metered controlled discharge device in Fig. 2 of the present invention;
图5是本发明的计量受控出料设备的立体图;Fig. 5 is the perspective view of the metering-controlled discharging device of the present invention;
图6是本发明的计量受控出料设备的剖视图;Fig. 6 is the sectional view of the metering controlled discharging device of the present invention;
图7是本发明的图6中弧形弹性囊的放大图;Fig. 7 is the enlarged view of the arc-shaped elastic bag in Fig. 6 of the present invention;
图中:输送带1、槽秤2、仓位号3、链条拉杆4、计量受控出料设备5、放料仓51、放料螺旋叶52、输送轴53、放料板54、放料口541、输送管55、螺旋输送叶56、放料管57、密封滑板58、导料管59、弧形弹性囊6、转动盘7、挤压凸起8、弹性导流板9、膨胀腔91、导气管10、弹性弧形板11、弹性挤压杆12。In the figure: conveyor belt 1, tank scale 2, bin number 3, chain pull rod 4, metering controlled discharge equipment 5, discharge bin 51, discharge spiral blade 52, conveying shaft 53, discharge plate 54, discharge port 541, conveying pipe 55, screw conveying blade 56, discharging pipe 57, sealing slide plate 58, material guiding pipe 59, curved elastic bag 6, rotating disc 7, extrusion protrusion 8, elastic deflector 9, expansion cavity 91 , Air guide tube 10 , elastic arc plate 11 , elastic extrusion rod 12 .
具体实施方式detailed description
使用图1-图7对本发明一实施方式的一种橡胶件自动称量方法进行如下说明。An automatic weighing method for rubber parts according to an embodiment of the present invention will be described as follows using FIG. 1 to FIG. 7 .
如图1-图7所示,本发明所述的一种橡胶件自动称量方法,该方法包括如下步骤:As shown in Fig. 1-Fig. 7, an automatic weighing method for rubber parts according to the present invention includes the following steps:
S1:启动准备:打开所需设备开关,开启上位计算机双击显示屏桌面的自动称量配料系统图标,并登陆进入自动称量配料系统,核对炼胶生产计划;检查各料罐相应原材料是否充足;准备配料所需的原材料;该步骤的工作是为了确认8802重量仪表、上位计算机系统、人机控制柜与PLC的通讯是否正常:相应的通讯状态指示灯是否正常;检查配料线和独立称的机械架构:物料储存槽、计量受控出料设备5及槽秤2、自动化移位流水线处于正常状态;S1: Startup preparation: Turn on the required equipment switch, turn on the upper computer, double-click the automatic weighing and batching system icon on the display desktop, and log in to enter the automatic weighing and batching system to check the rubber mixing production plan; check whether the corresponding raw materials of each material tank are sufficient; Prepare the raw materials required for batching; the work of this step is to confirm whether the communication between the 8802 weight instrument, the upper computer system, the man-machine control cabinet and the PLC is normal: whether the corresponding communication status indicator is normal; check the batching line and the independent weighing machine. Structure: material storage tank, metering controlled discharge equipment 5 and tank scale 2, automatic shift assembly line are in normal state;
S2:配方准备:进入上位计算机界面后点击“配方管理”,进入配方管理画面,配方列表中正常情况下已有可以选择的配方名称,点击配方列表中的任一配方名称,进入“修改配方”页面,确认配方名称、配方总数、确认仓位及对应的原料名称,原料备注,目标值和允差值,设定确认物料信息满足作业需求;然后保存,退出;S2: Recipe preparation: After entering the host computer interface, click "Recipe Management" to enter the recipe management screen. Normally, there are formula names that can be selected in the formula list. Click any formula name in the formula list to enter "Modify formula" page, confirm the recipe name, the total number of recipes, confirm the position and the corresponding raw material name, raw material remarks, target value and tolerance value, set the confirmation material information to meet the job requirements; then save and exit;
S3:现场确认:确认现场的相关情况为正常,包括压缩气源供给;将料桶套上投料袋、并定置在配料入口处输送带1的第一台位置;槽秤2、进入流水线的衔接马达电源供给是否正常;该步骤若料桶不在配料入口处槽称的秤台上,配料不会进行;且槽秤2本身最大秤量为30KG,感量为0.005KG,应避免超出额定重量之物品、人员重压或左右推挤磅台;S3: On-site confirmation: Confirm that the relevant conditions at the site are normal, including the supply of compressed air sources; put the material bucket on the feeding bag, and set it at the first position of the conveyor belt 1 at the ingredient inlet; the tank scale 2, the connection into the assembly line Check whether the power supply of the motor is normal; in this step, if the material bucket is not on the weighing platform of the tank scale at the inlet of the batching, the batching will not be carried out; and the maximum weighing capacity of the tank scale 2 itself is 30KG, and the inductance is 0.005KG, and items exceeding the rated weight should be avoided. , Personnel presses or pushes the scale platform left and right;
S4:配方下载:在上位计算机界面点击“实时监控”按钮,进入实时监控画面,确认“自动秤量配料系统”下每仓位号3料罐上的目标值与设定满足作业需求;当上位计算机界面显示“通信”和“允许下载”是绿色时表示可以下载,点绿色“允许下载”,下载配方到PLC;S4: Recipe download: Click the "real-time monitoring" button on the host computer interface to enter the real-time monitoring screen, and confirm that the target value and setting on the 3 material tanks of each bin number under the "automatic weighing and batching system" meet the operation requirements; when the host computer interface When "Communication" and "Download Allowed" are displayed in green, it means download is available, click the green "Allow Download" to download the recipe to the PLC;
S5:称量下料:按下主控制电箱面板上的“启动系统”按钮,各线输送带1将对料桶 进行传送,设备自动感应到料桶时输送链条拉杆4将料桶往前拉推进入到第一个仓位号3处设置的计量受控出料设备5的正下方后,链条拉杆4自动停止,第一个仓位号3处设置的计量受控出料设备5会将称量后的配料自动下料到对应的料桶内,依次每个仓位号3对应每个料桶进行自动下料,下料完成后直接到复检秤进行总量复核,无误后正常传送到尾端,整条线配料完成;S5: Weighing and unloading: Press the "Start System" button on the panel of the main control electric box, the conveyor belt 1 of each line will convey the material barrel, and when the equipment automatically senses the material barrel, the conveyor chain pull rod 4 will move the material barrel forward After pulling and pushing into the right under the metering controlled discharging device 5 set at the first bin number 3, the chain pull rod 4 stops automatically, and the metering controlled discharging device 5 set at the first bin number 3 will weigh. The measured ingredients are automatically unloaded into the corresponding buckets, and each bin number 3 is automatically unloaded for each bucket in turn. After the unloading is completed, it goes directly to the re-inspection scale to check the total amount. end, the whole line ingredients are completed;
S6:原料收集:配料线配料完成后,输送带1将料桶传送到尾端时,红外线自动感应器感应到料桶后,臂手自动伸出将带料的料桶推送到传送带的尾端,由配料人员即时将整袋料取出,并在投料袋外标上车次顺序号,扎好袋口,定放在对应配料塑料框或塑料桶放置区,投料袋再套上空料桶,放在空桶定置区,备用。S6: Raw material collection: After the batching line is completed, when the conveyor belt 1 transfers the barrel to the end, the infrared automatic sensor senses the barrel, and the arm automatically extends to push the barrel with material to the end of the conveyor belt. , the batching personnel will immediately take out the whole bag of materials, and mark the train sequence number on the outside of the feeding bag, tie the bag mouth, and place it in the corresponding batching plastic frame or plastic bucket storage area. In the empty barrel setting area, spare.
作为本发明的一种实施方式,在所述步骤S5中,还包括步骤S5′:自动报警:当出现下料重量不符合目标值允差值时,则下一个仓位号3不再下料,当个料桶直接流转走到最后总量复检秤,则会因重量不满足目标值允差值而停止不前,配料线作业传送停止,同时人机控制柜“警报”灯亮鸣响;配料人员将复检秤上不符合重量标准的料桶取下,放在“不合格品区”,报主管确认后报废处置。As an embodiment of the present invention, in the step S5, it also includes a step S5': automatic alarm: when the blanking weight does not meet the target value tolerance value, the next bin number 3 will not be blanked, When each material barrel is directly transferred to the final total amount re-inspection scale, it will stop because the weight does not meet the tolerance value of the target value, and the operation of the batching line will stop, and at the same time, the "alarm" light of the man-machine control cabinet will sound; The personnel will remove the barrels that do not meet the weight standard on the re-inspection scale, put them in the "unqualified product area", and report to the supervisor for confirmation and scrap them for disposal.
作为本发明的一种实施方式,在所述步骤S5执行完成后,还包括步骤S5″:配料核检:在配料数量接近尾声时,为防止配料多配,核对上位计算机当前配方数,在完成最后一个配料作业时,不再放料桶,完成配方数配料后自动停止。As an embodiment of the present invention, after the step S5 is completed, it also includes step S5": ingredient verification: when the number of ingredients is nearing the end, in order to prevent over-mixing of ingredients, the current formula number of the upper computer is checked. When the last batching operation is performed, the bucket will no longer be discharged, and it will automatically stop after completing the batching of the number of recipes.
作为本发明的一种实施方式,其中S5步骤,所述计量受控出料设备5包括放料仓51、放料螺旋叶52、输送轴53、放料板54、输送管55、螺旋输送叶56、放料管57和密封滑板58;所述放料仓51的上端仓口设置有落料管,且放料仓51内通过输送轴53竖直转动设置有放料螺旋叶52;所述放料螺旋叶52的外边缘与放料仓51的内仓壁转动接触;所述放料螺旋叶52的下方设置有放料板54,且放料板54通过轴承套接到输送轴53上;所述放料板54上开设有放料口541;所述放料仓51的下方侧壁固定有输送管55,且输送管55与放料仓51的内仓连通;所述输送管55内通过输送轴53水平方向转动设置有螺旋输送叶56,且输送管55的正下方连通有放料管57;所述放料管57的下方管口位于输送带1正上方;所述放料管57内滑动插接有密封滑板58,且密封滑板58上设置有计量称;所述放料管57的侧面固定有密封框架,且密封框架内通过气缸滑动设置有密封滑板58;所述放料口541的下方通过导料管59连通到输送管55的一端;所述放料仓51的底端面设置有一号电机,且一号电机的输出端与竖直设置的输送轴53连接;所述输送管55的侧端面设置有二号电机,且二号电机与水平设置的输送轴53连接;所述气缸、一号电机、二号 电机和计量称均电信号连接到人机控制柜控制系统PLC;As an embodiment of the present invention, in step S5, the metering-controlled discharging device 5 includes a discharging bin 51, a discharging screw blade 52, a conveying shaft 53, a discharging plate 54, a conveying pipe 55, and a screw conveying blade 56. The discharging pipe 57 and the sealing slide plate 58; the upper end of the discharging bin 51 is provided with a discharging pipe, and the discharging spiral blade 52 is arranged in the discharging bin 51 through the vertical rotation of the conveying shaft 53; The outer edge of the discharging spiral blade 52 is in rotational contact with the inner warehouse wall of the discharging bin 51; a discharging plate 54 is provided below the discharging spiral blade 52, and the discharging plate 54 is sleeved on the conveying shaft 53 through a bearing. ; The discharge plate 54 is provided with a discharge port 541; the lower side wall of the discharge bin 51 is fixed with a conveying pipe 55, and the conveying pipe 55 is communicated with the inner warehouse of the discharging bin 51; the conveying pipe 55 A spiral conveying leaf 56 is arranged inside the conveying shaft 53 to rotate in the horizontal direction, and a discharging pipe 57 is communicated directly below the conveying pipe 55; the lower nozzle of the discharging pipe 57 is located directly above the conveyor belt 1; A sealing slide 58 is slidably inserted into the tube 57, and a metering scale is arranged on the sealing slide 58; a sealing frame is fixed on the side of the discharging tube 57, and a sealing slide 58 is slidably arranged in the sealing frame through a cylinder; The bottom of the material port 541 is connected to one end of the conveying pipe 55 through the material guiding pipe 59; the bottom end face of the discharging bin 51 is provided with a No. 1 motor, and the output end of the No. 1 motor is connected with the vertically arranged conveying shaft 53; The side end face of the conveying pipe 55 is provided with the No. 2 motor, and the No. 2 motor is connected with the horizontally arranged conveying shaft 53; the air cylinder, the No. 1 motor, the No. 2 motor and the measuring scale are all connected to the man-machine control cabinet control. System PLC;
工作时,当料桶输送到第一仓号位置处后,PLC会控制一号电机和二号电机同步转动,一号电机会带动竖直方向设置的放料螺旋叶52转动,当放料螺旋叶52的底端与放料板54上的放料口541对齐后,放料螺旋叶52上的配料会通过放料口541落入到放料管57内,进而PLC可以控制一号电机的转速和转动的圈数,进而使得放料螺旋叶52每转动一圈会将落料管下落到放料螺旋叶52的配料通过放料口541放入到放料管57内,进而可以实现配料的螺旋计量作业,当配料通过放料管57落入到输送管55的端部时,输送管55内设置的螺旋输送叶56可以通过二号电机的转动输送到输送管55与放料管57的连接处,使得配料能够落入到放料管57内部滑动插接的密封滑板58上,进而密封滑板58上设置的计量称可以对配料进行再次称重,若计量称称量配料的重量与该配料在系统中设定的目标值在允差值范围内后,PLC控制气缸收缩,气缸的伸缩端会带动密封滑板58滑动到密封框架内,且密封滑板58上落入到配料会在放料管57侧壁的挤压力从放料管57的下方管口处落入到对应的料桶内,进而可以对配料进行准确自动称量作业;若计量称称量配料的重量小于该配料在系统中设定的目标值时,一号电机继续转动,会将放料螺旋叶52上配料通过放料口541放入到导料管59内,再通过螺旋输送叶56输送到放料管57内,密封滑板58上的计量称会持续称量,进而达到目标值范围,然后气缸收缩将密封滑板58上的配料放入到料桶内;然后料桶内的配料会经过复检秤进行总量复核,提高橡胶件配料自动称量的准确性和高效性;若计量称称量配料的重量大于该配料在系统中设定的目标值时,则气缸的伸缩端会收缩后会将配料对应放入到料桶内,然后步骤S5′会进行工作,配料人员将复检秤上不符合重量标准的料桶取下,放在“不合格品区”,报主管确认后报废处置。During operation, when the barrel is transported to the position of the first warehouse, the PLC will control the No. 1 motor and the No. 2 motor to rotate synchronously, and the No. 1 motor will drive the vertical discharge screw blade 52 to rotate. After the bottom end of the leaf 52 is aligned with the discharge port 541 on the discharge plate 54, the ingredients on the discharge spiral blade 52 will fall into the discharge pipe 57 through the discharge port 541, and then the PLC can control the No. 1 motor. The rotation speed and the number of turns, so that each turn of the discharging spiral blade 52 will drop the ingredients from the discharging pipe to the discharging helical blade 52 into the discharging pipe 57 through the discharging port 541, and then the ingredients can be realized. When the ingredients fall into the end of the conveying pipe 55 through the discharging pipe 57, the spiral conveying blade 56 set in the conveying pipe 55 can be conveyed to the conveying pipe 55 and the discharging pipe 57 by the rotation of the No. 2 motor. At the connection point, the ingredients can fall on the sealing slide 58 that is slidably inserted inside the discharge pipe 57, and then the weighing scale set on the sealing slide 58 can re-weigh the ingredients. After the target value of the ingredients set in the system is within the tolerance range, the PLC controls the cylinder to shrink, the telescopic end of the cylinder will drive the sealing slide 58 to slide into the sealing frame, and the ingredients falling on the sealing slide 58 will be placed on the The extrusion force of the side wall of the material pipe 57 falls into the corresponding material barrel from the lower nozzle of the discharge pipe 57, so that the ingredients can be accurately and automatically weighed; if the weight of the weighing ingredients is less than the ingredients When the target value is set in the system, the No. 1 motor will continue to rotate, and the ingredients on the discharge screw blade 52 will be put into the material guide pipe 59 through the discharge port 541, and then transported to the discharge pipe through the screw conveying blade 56. In 57, the weighing scale on the sealing slide 58 will continue to weigh, and then reach the target value range, and then the cylinder shrinks to put the ingredients on the sealing slide 58 into the barrel; then the ingredients in the barrel will be rechecked. The total amount is checked to improve the accuracy and efficiency of automatic weighing of rubber parts; if the weight of the weighing ingredients is greater than the target value set in the system, the telescopic end of the cylinder will shrink and then the ingredients will be added. Correspondingly, put them into the bucket, and then step S5' will work. The batching personnel will remove the bucket that does not meet the weight standard on the re-inspection scale, put it in the "unqualified product area", and report it to the supervisor for confirmation and scrap it for disposal.
作为本发明的一种实施方式,所述输送管55一端下方设置有弧形弹性囊6,且弧形弹性囊6内部设置有弹簧;所述弧形弹性囊6的上表面与导料管59的管口对齐;所述放料仓51内竖直设置的输送轴53上套接有转动盘7,且转动盘7位于弧形弹性囊6的下方;所述转动盘7的上端面均匀设置有多个挤压凸起8,且挤压凸起8与弧形弹性囊6的下表面挤压接触;工作时,当一号电机带动输送轴53转动时,输送轴53转动会带动转动盘7在输送管55的底端面转动,转动盘7上端面设置的多个挤压凸起8会转动挤压到弧形弹性囊6的下端面,设置的弹簧在挤压凸起8的挤压力下会使得弧形弹性囊6上表面产生振动,且设置的弧形弹性囊6与导料管59的管口对齐,进而导料管59下落的配料会落入到弧形弹性囊6的上表面,弧形弹性囊6上表面的振动会防止潮湿配料由于下落的重力粘合到输送管55的底端内壁的现象;设置的弧形弹性囊6和挤压凸起8的转动配合,当计量 受控出料设备5放出为潮湿配料时,由于放料盘与输送管55之间通过导料管59连通,且具有一定高度差,进而当潮湿配料落入到输送管55的底端时,由于重力作用撞击到输送管55的底端会造成配料粘结到输送管55的管壁上,进而影响配料的准确高效自动称量的效果。As an embodiment of the present invention, an arc-shaped elastic bag 6 is provided under one end of the conveying tube 55, and a spring is arranged inside the arc-shaped elastic bag 6; The nozzles are aligned; the conveying shaft 53 vertically arranged in the discharging bin 51 is sleeved with a rotating disk 7, and the rotating disk 7 is located below the arc-shaped elastic bag 6; the upper end surface of the rotating disk 7 is evenly arranged There are a plurality of extrusion protrusions 8, and the extrusion protrusions 8 are in extrusion contact with the lower surface of the arc-shaped elastic bag 6; during operation, when the No. 1 motor drives the conveying shaft 53 to rotate, the rotation of the conveying shaft 53 will drive the rotating disk 7. When the bottom end face of the conveying pipe 55 rotates, the plurality of extrusion protrusions 8 provided on the upper end surface of the rotating plate 7 will rotate and squeeze to the lower end face of the arc-shaped elastic bag 6, and the springs provided are pressed by the extrusion protrusions 8. Under the force, the upper surface of the arc-shaped elastic bag 6 will vibrate, and the set arc-shaped elastic bag 6 is aligned with the nozzle of the material guide pipe 59, and then the ingredients falling from the material guide pipe 59 will fall into the arc-shaped elastic bag 6. On the upper surface, the vibration of the upper surface of the arc-shaped elastic bag 6 will prevent the wet ingredients from adhering to the inner wall of the bottom end of the conveying pipe 55 due to the falling gravity; When the metered and controlled discharge device 5 discharges wet ingredients, because the discharge tray and the conveying pipe 55 are connected through the conveying pipe 59 and have a certain height difference, when the wet ingredients fall into the bottom end of the conveying pipe 55 When the gravitational force hits the bottom end of the conveying pipe 55, the ingredients will stick to the pipe wall of the conveying pipe 55, thereby affecting the accurate and efficient automatic weighing of the ingredients.
作为本发明的一种实施方式,所述导料管59的内部设置有多个弹性导流板9,且多个弹性导流板9均上下错位设置;所述弹性导流板9的内部开设有膨胀腔91,且膨胀腔91通过导气管10连通到弧形弹性囊6内;工作时,导料管59内部错位设置的弹性导流板9可以对放料口541下落的配料起到导流的作用,有效防止由于配料下落时重量的冲击力过大,进而导致粘结到输送管55内壁上的现象;同时当弧形弹性囊6受到挤压凸起8的挤压力时,弧形弹性囊6内部的气体会通过导气管10进入到膨胀腔91内,使得弹性导流板9的上端面产生弹性膨胀振动,弹性导流板9上表面的弹性膨胀振动不仅可以降低配料下落时重力冲击的效果,同时可以将结块或结团的配料进行弹性振动粉碎的效果,同时也可以降低弹性导流板9上表面出现配料粘结的现象;设置的弧形弹性囊6内部的气源不仅可以使得多个弹性导流板9同时起到弹性膨胀的效果,且弧形弹性囊6内部还会留存有部分气源,防止弧形弹性囊6在挤压凸起8的挤压力下变形过大,进而导致弧形弹性囊6的上表面产生凸起的现象,进而影响螺旋输送叶56的安全稳定转动。As an embodiment of the present invention, a plurality of elastic baffles 9 are arranged inside the material guide pipe 59 , and the plurality of elastic baffles 9 are arranged in a dislocation up and down; There is an expansion cavity 91, and the expansion cavity 91 is connected to the arc-shaped elastic bag 6 through the air guide tube 10; during operation, the elastic baffle 9 arranged in a dislocation inside the guide tube 59 can guide the ingredients falling from the discharge port 541. The effect of flow can effectively prevent the phenomenon that the impact force of the weight when the ingredients fall is too large, which leads to the phenomenon of sticking to the inner wall of the conveying pipe 55; The gas inside the elastic bag 6 will enter the expansion cavity 91 through the air guide 10, so that the upper end face of the elastic deflector 9 produces elastic expansion vibration. The effect of gravity impact, at the same time, the agglomerated or agglomerated ingredients can be elastically vibrated and crushed, and at the same time, it can also reduce the phenomenon of ingredients sticking on the upper surface of the elastic baffle 9; The source can not only make the multiple elastic baffles 9 have the effect of elastic expansion at the same time, but also some air sources will remain inside the arc-shaped elastic bag 6 to prevent the arc-shaped elastic bag 6 from pressing the extrusion force of the protrusion 8. If the lower deformation is too large, the upper surface of the arc-shaped elastic bag 6 is bulged, which affects the safe and stable rotation of the screw conveyor blade 56 .
作为本发明的一种实施方式,所述输送管55一端部设置有弹性弧形板11,且弹性弧形板11位于放料管57一侧的管口位置;所述输送管55内水平设置的输送轴53的外圈壁上倾斜设置有弹性挤压杆12,且弹性挤压杆12转动挤压到弹性弧形板11的侧壁;所述弹性弧形板11的内侧壁通过弹簧弹性连接到放料管57的侧壁;工作时,当二号电机带动水平设置的输送轴53转动时,螺旋输送叶56可以将输送管55内的配料输送到放料管57内,同时设置的弹性弧形板11可以对输送管55另一端起到弹性振动导料的效果,输送轴53外圈壁设置的弹性挤压杆12在转动时会对弹性弧形板11进行挤压,且使得弹性弧形板11产生凹陷,且弹性弧形板11侧壁设置的弹簧会受到压缩,当弹性挤压杆12脱离对弹性弧形板11挤压后,弹簧的弹性推力会使得弹性弧形板11产生弹性振动,弹性弧形板11的弹性振动可以使得表面聚集的配料进行振动抖落到放料管57内,防止由于输送管55的另一端与放料管57之间存在空腔,进而导致螺旋输送叶56输送的配料堆积落入到空腔中,进而影响计量受控出料设备5的准确高效的对配料进行称量作业。As an embodiment of the present invention, one end of the conveying pipe 55 is provided with an elastic arc-shaped plate 11, and the elastic arc-shaped plate 11 is located at the nozzle position on one side of the discharging pipe 57; the conveying pipe 55 is arranged horizontally inside The outer ring wall of the conveying shaft 53 is inclined with an elastic extrusion rod 12, and the elastic extrusion rod 12 is rotated and squeezed to the side wall of the elastic arc plate 11; the inner side wall of the elastic arc plate 11 is elastically elasticized by a spring Connected to the side wall of the discharge pipe 57; during operation, when the No. 2 motor drives the horizontally arranged conveying shaft 53 to rotate, the screw conveying blade 56 can transport the ingredients in the conveying pipe 55 into the discharging pipe 57, and the set at the same time The elastic arc-shaped plate 11 can play the effect of elastic vibration guide for the other end of the conveying pipe 55, and the elastic extrusion rod 12 arranged on the outer wall of the conveying shaft 53 will squeeze the elastic arc-shaped plate 11 when it rotates, and make the elastic arc plate 11 squeezed. The elastic arc-shaped plate 11 is concave, and the spring provided on the side wall of the elastic arc-shaped plate 11 will be compressed. 11 produces elastic vibration, and the elastic vibration of the elastic arc-shaped plate 11 can make the ingredients gathered on the surface vibrate and shake off into the discharge pipe 57 to prevent the existence of a cavity between the other end of the conveying pipe 55 and the discharge pipe 57, and then As a result, the ingredients conveyed by the screw conveyor blades 56 are piled up and fall into the cavity, thereby affecting the accurate and efficient weighing of the ingredients by the metering-controlled discharging device 5 .
具体工作流程如下:The specific workflow is as follows:
工作时,当料桶输送到第一仓号位置处后,PLC会控制一号电机和二号电机同步转动, 一号电机会带动竖直方向设置的放料螺旋叶52转动,当放料螺旋叶52的底端与放料板54上的放料口541对齐后,放料螺旋叶52上的配料会通过放料口541落入到放料管57内,进而PLC可以控制一号电机的转速和转动的圈数,进而使得放料螺旋叶52每转动一圈会将落料管下落到放料螺旋叶52的配料通过放料口541放入到放料管57内,进而可以实现配料的螺旋计量作业,当配料通过放料管57落入到输送管55的端部时,输送管55内设置的螺旋输送叶56可以通过二号电机的转动输送到输送管55与放料管57的连接处,使得配料能够落入到放料管57内部滑动插接的密封滑板58上,进而密封滑板58上设置的计量称可以对配料进行再次称重,若计量称称量配料的重量与该配料在系统中设定的目标值在允差值范围内后,PLC控制气缸收缩,气缸的伸缩端会带动密封滑板58滑动到密封框架内,且密封滑板58上落入到配料会在放料管57侧壁的挤压力从放料管57的下方管口处落入到对应的料桶内,进而可以对配料进行准确自动称量作业。During operation, when the barrel is transported to the position of the first warehouse, the PLC will control the No. 1 motor and the No. 2 motor to rotate synchronously, and the No. 1 motor will drive the vertical discharge screw blade 52 to rotate. After the bottom end of the leaf 52 is aligned with the discharge port 541 on the discharge plate 54, the ingredients on the discharge spiral blade 52 will fall into the discharge pipe 57 through the discharge port 541, and then the PLC can control the No. 1 motor. The rotation speed and the number of turns, so that each turn of the discharging spiral blade 52 will drop the ingredients from the discharging pipe to the discharging helical blade 52 into the discharging pipe 57 through the discharging port 541, and then the ingredients can be realized. When the ingredients fall into the end of the conveying pipe 55 through the discharging pipe 57, the spiral conveying blade 56 set in the conveying pipe 55 can be conveyed to the conveying pipe 55 and the discharging pipe 57 by the rotation of the No. 2 motor. At the connection point, the ingredients can fall on the sealing slide 58 that is slidably inserted inside the discharge pipe 57, and then the weighing scale set on the sealing slide 58 can re-weigh the ingredients. After the target value of the ingredients set in the system is within the tolerance range, the PLC controls the cylinder to shrink, the telescopic end of the cylinder will drive the sealing slide 58 to slide into the sealing frame, and the ingredients falling on the sealing slide 58 will be placed on the The extrusion force of the side wall of the material pipe 57 falls into the corresponding material barrel from the lower nozzle of the material discharge pipe 57, so that the ingredients can be accurately and automatically weighed.
在本发明的描述中,需要理解的是,术语“中心”、“前”、“后”、“竖直”、“水平”、“顶”、“底”“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明保护范围的限制。In the description of the present invention, it is to be understood that the terms "center", "front", "rear", "vertical", "horizontal", "top", "bottom", "inner", "outer" and the like indicate The orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation or be constructed in a specific orientation. and operation, and therefore should not be construed as limiting the protection scope of the present invention.
虽然本发明是通过具体实施例进行说明的,本领域技术人员应当明白,在不脱离本发明范围的情况下,还可以对本发明进行各种变换及等同替代。另外,针对特定情形或材料,可以对本发明做各种修改,而不脱离本发明的范围。因此,本发明不局限于所公开的具体实施例,而应当包括落入本发明权利要求范围内的全部实施方式。Although the present invention is described through specific embodiments, those skilled in the art should understand that various changes and equivalent substitutions can be made to the present invention without departing from the scope of the present invention. In addition, various modifications may be made to adapt a particular situation or material to the invention without departing from the scope of the invention. Therefore, the inventions are not to be limited to the specific embodiments disclosed, but are to include all embodiments falling within the scope of the claims of this invention.

Claims (7)

  1. 一种橡胶件自动称量方法,其特征在于:该方法包括如下步骤:An automatic weighing method for rubber parts, characterized in that: the method comprises the following steps:
    S1:启动准备:打开所需设备开关,开启上位计算机双击显示屏桌面的自动称量配料系统图标,并登陆进入自动称量配料系统,核对炼胶生产计划;检查各料罐相应原材料是否充足;准备配料所需的原材料;S1: Startup preparation: turn on the required equipment switch, turn on the upper computer, double-click the automatic weighing and batching system icon on the desktop of the display screen, and log in to enter the automatic weighing and batching system, check the rubber mixing production plan; check whether the corresponding raw materials of each material tank are sufficient; Raw materials for preparing ingredients;
    S2:配方准备:进入上位计算机界面后点击“配方管理”,进入配方管理画面,配方列表中正常情况下已有可以选择的配方名称,点击配方列表中的任一配方名称,进入“修改配方”页面,确认配方名称、配方总数、确认仓位及对应的原料名称,原料备注,目标值和允差值,设定确认物料信息满足作业需求;然后保存,退出;S2: Recipe preparation: After entering the host computer interface, click "Recipe Management" to enter the recipe management screen. Normally, there are formula names that can be selected in the formula list. Click any formula name in the formula list to enter "Modify formula" page, confirm the recipe name, the total number of recipes, confirm the position and the corresponding raw material name, raw material remarks, target value and tolerance value, set the confirmation material information to meet the job requirements; then save and exit;
    S3:现场确认:确认现场的相关情况为正常,包括压缩气源供给;将料桶套上投料袋、并定置在配料入口处输送带(1)的第一台位置;槽秤(2)、进入流水线的衔接马达电源供给是否正常;S3: On-site confirmation: confirm that the relevant conditions at the site are normal, including the supply of compressed air sources; put the material barrel on the feeding bag, and set it at the first position of the conveyor belt (1) at the ingredient inlet; tank scales (2), Whether the power supply of the connecting motor entering the assembly line is normal;
    S4:配方下载:在上位计算机界面点击“实时监控”按钮,进入实时监控画面,确认“自动秤量配料系统”下每个仓位号(3)料罐上的目标值与设定满足作业需求;当上位计算机界面显示“通信”和“允许下载”是绿色时表示可以下载,点绿色“允许下载”,下载配方到PLC;S4: Recipe download: Click the "Real-time monitoring" button on the upper computer interface to enter the real-time monitoring screen, and confirm that the target value and setting on the material tank of each position number (3) under the "Automatic weighing and batching system" meet the operation requirements; when When the interface of the host computer shows that "communication" and "allow download" are green, it means that download is available, click the green "allow download" to download the recipe to the PLC;
    S5:称量下料:按下主控制电箱面板上的“启动系统”按钮,各线输送带(1)将对料桶进行传送,设备自动感应到料桶时输送链条拉杆(4)将料桶往前拉推进入到第一个仓位号(3)处设置的计量受控出料设备(5)的正下方后,链条拉杆(4)自动退回后第一个仓位号(3)处设置的计量受控出料设备(5)会将称量后的配料自动下料到对应的料桶内,依次每个仓位号(3)对应每个料桶进行自动下料,下料完成后直接到复检秤进行总量复核,无误后正常传送到尾端,整条线配料完成;S5: Weighing and unloading: Press the "Start System" button on the panel of the main control electric box, the conveyor belt (1) of each line will convey the material barrel, and when the equipment automatically senses the material barrel, the conveyor chain lever (4) will After the barrel is pulled forward and pushed into the right under the metering controlled discharge device (5) set at the first bin number (3), the chain rod (4) automatically returns to the first bin number (3). The set metering and controlled discharging equipment (5) will automatically unload the weighed ingredients into the corresponding buckets, and then each bin number (3) will automatically unload corresponding to each bucket in turn. After the unloading is completed Go directly to the re-inspection scale to check the total amount, and if there is no error, it will be sent to the end normally, and the batching of the whole line will be completed;
    S6:原料收集:配料线配料完成后,输送带(1)将料桶传送到尾端时,红外线自动感应器感应到料桶后,臂手自动伸出将带料的料桶推送到传送带的尾端,由配料人员即时将整袋料取出,并在投料袋外标上车次顺序号,扎好袋口,定放在对应配料塑料框或塑料桶放置区,投料袋再套上空料桶,放在空桶定置区,备用。S6: Raw material collection: After the batching of the batching line is completed, when the conveyor belt (1) conveys the material barrel to the end, after the infrared automatic sensor senses the material barrel, the arm automatically extends to push the material barrel to the conveyor belt. At the end, the batching personnel will immediately take out the whole bag of materials, and mark the train sequence number on the outside of the feeding bag, tie the bag mouth, and place it in the corresponding batching plastic frame or plastic bucket placement area, and then cover the feeding bag with the empty material barrel. , put it in the empty bucket set-up area for spare.
  2. 根据权利要求1所述的一种橡胶件自动称量方法,其特征在于:在所述步骤S5中,还包括步骤S5′:自动报警:当出现下料重量不符合目标值允差值时,则下一个仓位号(3)不再下料,当个料桶直接流转走到最后总量复检秤,则会因重量不满足目标值允差值而停止不前,配料线作业传送停止,同时人机控制柜“警报”灯亮鸣响;配料人员将复检秤上不符合重量标准的料桶取下,放在“不合格品区”,报主管确认后报废处置。An automatic weighing method for rubber parts according to claim 1, characterized in that: in the step S5, it also includes a step S5': automatic alarm: when the blanking weight does not meet the tolerance value of the target value, Then the next bin number (3) will no longer be unloaded. When each material bucket directly flows to the final total amount re-inspection scale, it will stop because the weight does not meet the target value tolerance value, and the batching line operation transmission will stop. At the same time, the "alarm" light of the man-machine control cabinet is on and sounding; the batching personnel will remove the barrels that do not meet the weight standard on the re-inspection scale, put them in the "unqualified product area", and report to the supervisor for confirmation and scrap them for disposal.
  3. 根据权利要求2所述的一种橡胶件自动称量方法,其特征在于:在所述步骤S5执行完成后,还包括步骤S5″:配料核检:在配料数量接近尾声时,为防止配料多配,核对上位计算机当前配方数,在完成最后一个配料作业时,不再放料桶,完成配方数配料后自动停止。An automatic weighing method for rubber parts according to claim 2, characterized in that: after the execution of the step S5 is completed, it further comprises a step S5": batching verification: when the batching quantity is nearing the end, in order to prevent excessive batching Matching, check the current recipe number of the host computer, when the last batching operation is completed, the bucket will no longer be discharged, and it will automatically stop after completing the recipe number batching.
  4. 根据权利要求3所述的一种橡胶件自动称量方法,其特征在于:其中S5步骤,所述计量受控出料设备(5)包括放料仓(51)、放料螺旋叶(52)、输送轴(53)、放料板(54)、输送管(55)、螺旋输送叶(56)、放料管(57)和密封滑板(58);所述放料仓(51)的上端仓口设置有落料管,且放料仓(51)内通过输送轴(53)竖直转动设置有放料螺旋叶(52);所述放料螺旋叶(52)的外边缘与放料仓(51)的内仓壁转动接触;所述放料螺旋叶(52)的下方设置有放料板(54),且放料板(54)通过轴承套接到输送轴(53)上;所述放料板(54)上开设有放料口(541);所述放料仓(51)的下方侧壁固定有输送管(55),且输送管(55)与放料仓(51)的内仓连通;所述输送管(55)内通过输送轴(53)水平方向转动设置有螺旋输送叶(56),且输送管(55)的正下方连通有放料管(57);所述放料管(57)的下方管口位于输送带(1)正上方;所述放料管(57)内滑动插接有密封滑板(58),且密封滑板(58)上设置有计量称;所述放料管(57)的侧面固定有密封框架,且密封框架内通过气缸滑动设置有密封滑板(58);所述放料口(541)的下方通过导料管(59)连通到输送管(55)的一端;所述放料仓(51)的底端面设置有一号电机,且一号电机的输出端与竖直设置的输送轴(53)连接;所述输送管(55)的侧端面设置有二号电机,且二号电机与水平设置的输送轴(53)连接;所述气缸、一号电机、二号电机和计量称均电信号连接到人机控制柜控制系统PLC。An automatic weighing method for rubber parts according to claim 3, characterized in that: in step S5, the metering-controlled discharging device (5) comprises a discharging bin (51), a discharging spiral blade (52) , conveying shaft (53), discharging plate (54), conveying pipe (55), screw conveying blade (56), discharging pipe (57) and sealing slide plate (58); the upper end of the discharging bin (51) A discharging pipe is arranged at the mouth of the bin, and a discharging screw blade (52) is arranged in the discharging bin (51) through vertical rotation of the conveying shaft (53); the outer edge of the discharging screw blade (52) is connected with the discharging screw The inner bin wall of the bin (51) is in rotational contact; a discharging plate (54) is arranged below the discharging spiral blade (52), and the discharging plate (54) is sleeved on the conveying shaft (53) through a bearing; A discharging port (541) is opened on the discharging plate (54); a conveying pipe (55) is fixed on the lower side wall of the discharging bin (51), and the conveying pipe (55) is connected to the discharging bin (51). ) is communicated with the inner warehouse; the conveying pipe (55) is provided with a spiral conveying blade (56) through the horizontal rotation of the conveying shaft (53), and a discharging pipe (57) is communicated directly below the conveying pipe (55); The lower nozzle of the discharge pipe (57) is located directly above the conveyor belt (1); a sealing slide plate (58) is slidably inserted into the discharge pipe (57), and a metering slide plate (58) is provided on the sealing slide plate (58). A sealing frame is fixed on the side of the discharging pipe (57), and a sealing slide plate (58) is slidably arranged in the sealing frame through a cylinder; to one end of the conveying pipe (55); the bottom end face of the discharging bin (51) is provided with a No. 1 motor, and the output end of the No. 1 motor is connected with a vertically arranged conveying shaft (53); the conveying pipe (55) The side end face of ) is provided with No. 2 motor, and the No. 2 motor is connected with the horizontally arranged conveying shaft (53); the air cylinder, No. 1 motor, No. 2 motor and the measuring scale are connected to the man-machine control cabinet control system PLC.
  5. 根据权利要求4所述的一种橡胶件自动称量方法,其特征在于:所述输送管(55)一端下方设置有弧形弹性囊(6),且弧形弹性囊(6)内部设置有弹簧;所述弧形弹性囊(6)的上表面与导料管(59)的管口对齐;所述放料仓(51)内竖直设置的输送轴(53)上套接有转动盘(7),且转动盘(7)位于弧形弹性囊(6)的下方;所述转动盘(7)的上端面均匀设置有多个挤压凸起(8),且挤压凸起(8)与弧形弹性囊(6)的下表面挤压接触。An automatic weighing method for rubber parts according to claim 4, characterized in that: an arc-shaped elastic bag (6) is arranged under one end of the conveying pipe (55), and an arc-shaped elastic bag (6) is internally provided with an arc-shaped elastic bag (6). a spring; the upper surface of the arc-shaped elastic bag (6) is aligned with the nozzle of the material guide pipe (59); a rotating disk is sleeved on the conveying shaft (53) vertically arranged in the discharging bin (51) (7), and the rotating disk (7) is located below the arc-shaped elastic bag (6); the upper end surface of the rotating disk (7) is evenly provided with a plurality of extrusion protrusions (8), and the extrusion protrusions ( 8) Press contact with the lower surface of the arc-shaped elastic bag (6).
  6. 根据权利要求5所述的一种橡胶件自动称量方法,其特征在于:所述导料管(59)的内部设置有多个弹性导流板(9),且多个弹性导流板(9)均上下错位设置;所述弹性导流板(9)的内部开设有膨胀腔(91),且膨胀腔(91)通过导气管(10)连通到弧形弹性囊(6)内。An automatic weighing method for rubber parts according to claim 5, characterized in that: a plurality of elastic baffles (9) are arranged inside the material guide pipe (59), and a plurality of elastic baffles ( 9) Both are arranged up and down dislocation; an expansion cavity (91) is opened inside the elastic baffle (9), and the expansion cavity (91) is connected to the arc-shaped elastic bag (6) through the air conduit (10).
  7. 根据权利要求4所述的一种橡胶件自动称量方法,其特征在于:所述输送管(55)一端部设置有弹性弧形板(11),且弹性弧形板(11)位于放料管(57)一侧的管口位置;所述输送管(55)内水平设置的输送轴(53)的外圈壁上倾斜设置有弹性挤压杆(12),且弹性挤压杆 (12)转动挤压到弹性弧形板(11)的侧壁;所述弹性弧形板(11)的内侧壁通过弹簧弹性连接到放料管(57)的侧壁。An automatic weighing method for rubber parts according to claim 4, characterized in that: one end of the conveying pipe (55) is provided with an elastic arc-shaped plate (11), and the elastic arc-shaped plate (11) is located at the discharging position. The position of the nozzle on one side of the pipe (57); an elastic extrusion rod (12) is obliquely arranged on the outer ring wall of the horizontally arranged conveying shaft (53) in the conveying pipe (55), and the elastic extrusion rod (12) ) is rotated and squeezed to the side wall of the elastic arc-shaped plate (11); the inner side wall of the elastic arc-shaped plate (11) is elastically connected to the side wall of the discharge pipe (57) through a spring.
PCT/CN2021/074782 2020-07-31 2021-02-02 Automatic weighing method for rubber parts WO2022021829A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010763051.5A CN111823432B (en) 2020-07-31 2020-07-31 Automatic weighing method for rubber parts
CN202010763051.5 2020-07-31

Publications (1)

Publication Number Publication Date
WO2022021829A1 true WO2022021829A1 (en) 2022-02-03

Family

ID=72919220

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/074782 WO2022021829A1 (en) 2020-07-31 2021-02-02 Automatic weighing method for rubber parts

Country Status (2)

Country Link
CN (1) CN111823432B (en)
WO (1) WO2022021829A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116236951A (en) * 2023-03-08 2023-06-09 黄山钛可磨工业介质有限公司 Rust-proof oil preparation equipment and process thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111823432B (en) * 2020-07-31 2021-07-06 浙江天台祥和实业股份有限公司 Automatic weighing method for rubber parts

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0697179B2 (en) * 1986-12-24 1994-11-30 赤武エンジニアリング株式会社 Powder feeder
CN102285012A (en) * 2011-05-10 2011-12-21 青岛海威集团有限公司 Measurement transportation system and measurement transportation method of Poly Vinyl Chloride (PVC) ingredient
CN105067092A (en) * 2015-07-27 2015-11-18 中国化学工业桂林工程有限公司 Automatic material weighing device and application thereof, and automatic material weighing method
CN108745196A (en) * 2018-07-05 2018-11-06 江苏金发科技新材料有限公司 Small powder Automatic batching equipment
CN208615276U (en) * 2018-08-14 2019-03-19 海宁市现代五金有限公司 A kind of double screw extruder
CN109605640A (en) * 2018-12-20 2019-04-12 中绿新材料(江苏)有限公司 A kind of novel process units of rubber parts
CN208812316U (en) * 2018-09-28 2019-05-03 湖北冠泰建材有限公司 A kind of resin quantitative feeding device in quartzite slate production
CN111823432A (en) * 2020-07-31 2020-10-27 汤啸 Automatic weighing method for rubber parts

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1170518A (en) * 1997-06-19 1999-03-16 Nippon Kasei Kk Simple type automatic mortar kneading apparatus
JP2005350504A (en) * 2004-06-08 2005-12-22 Eiwa:Kk Decomposition treatment method of polymer resin and decomposition treatment apparatus
CN2732691Y (en) * 2004-08-20 2005-10-12 常州市荣创自动化设备厂 Device for feeding wet and viscous materials
CN201458292U (en) * 2009-06-04 2010-05-12 浙江兰亭高科有限公司 Weighing and conveying device for artificial asphalt production
CN202590734U (en) * 2012-02-27 2012-12-12 上海张江中药现代制剂技术工程研究中心 Vertical and horizontal two-way spiral power supply device used for centrifugal pelleting coating machine
CN104043376B (en) * 2014-05-27 2016-04-13 泰安德普自动化设备有限公司 A kind of automatic proportioning device and distribution
CN205255304U (en) * 2015-12-03 2016-05-25 重庆台圆橡塑科技有限公司 Special intelligent dosing unit of rubber seal
CN205659642U (en) * 2016-06-10 2016-10-26 河北吉玛自动化科技有限公司 Upper auxiliary machine aniseed dosing unit
CN107297835A (en) * 2017-06-15 2017-10-27 浙江普利特新材料有限公司 A kind of full-automatic plastic proportioner
CN208694928U (en) * 2018-07-05 2019-04-05 江苏金发科技新材料有限公司 Small powder Automatic batching equipment
CN209079174U (en) * 2018-10-23 2019-07-09 苏州大樟树塑胶科技有限公司 A kind of blanking delivery apparatus of PVC micelle
CN209848831U (en) * 2019-04-17 2019-12-27 三斯达(福建)塑胶有限公司 Automatic metering and batching system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0697179B2 (en) * 1986-12-24 1994-11-30 赤武エンジニアリング株式会社 Powder feeder
CN102285012A (en) * 2011-05-10 2011-12-21 青岛海威集团有限公司 Measurement transportation system and measurement transportation method of Poly Vinyl Chloride (PVC) ingredient
CN105067092A (en) * 2015-07-27 2015-11-18 中国化学工业桂林工程有限公司 Automatic material weighing device and application thereof, and automatic material weighing method
CN108745196A (en) * 2018-07-05 2018-11-06 江苏金发科技新材料有限公司 Small powder Automatic batching equipment
CN208615276U (en) * 2018-08-14 2019-03-19 海宁市现代五金有限公司 A kind of double screw extruder
CN208812316U (en) * 2018-09-28 2019-05-03 湖北冠泰建材有限公司 A kind of resin quantitative feeding device in quartzite slate production
CN109605640A (en) * 2018-12-20 2019-04-12 中绿新材料(江苏)有限公司 A kind of novel process units of rubber parts
CN111823432A (en) * 2020-07-31 2020-10-27 汤啸 Automatic weighing method for rubber parts

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116236951A (en) * 2023-03-08 2023-06-09 黄山钛可磨工业介质有限公司 Rust-proof oil preparation equipment and process thereof
CN116236951B (en) * 2023-03-08 2024-01-09 黄山钛可磨工业介质有限公司 Rust-proof oil preparation equipment and process thereof

Also Published As

Publication number Publication date
CN111823432B (en) 2021-07-06
CN111823432A (en) 2020-10-27

Similar Documents

Publication Publication Date Title
WO2022021829A1 (en) Automatic weighing method for rubber parts
CN107966195B (en) Weighing method and weighing device for powder material
JP2011219157A (en) Granular powder feeding apparatus
CN105083603B (en) Lead-acid storage battery composite additive production device
CN207401389U (en) Feed mix station
CN206500048U (en) A kind of vertical fertilizer compounding machine
CN210943689U (en) Quantitative material taking and feeding automation device
CN206969753U (en) A kind of explosion-proof feeding system of aluminium powder automatic ration
CN215399429U (en) Novel automatic material metering and distributing system
CN102424124A (en) High-speed automatic quantitative packaging machine for friction material
CN205469926U (en) A metering device for nylon materials
CN209956980U (en) Full-automatic auxiliary agent batching system
CN209064447U (en) It is anti-sticking glutinous without extruding brown sugar quantitative racking machine
CN207107937U (en) The more bricks of continous way used for refractory material weigh charging gear surely
CN207929076U (en) Numerical control proportioner
CN219149952U (en) Pharmacy room dispensing device
CN211306939U (en) Efficient, environment-friendly and energy-saving dry powder mortar production equipment
CN111238612A (en) Powder grading automatic measuring device
CN218087545U (en) Automatic raw material metering device
CN109571770A (en) A kind of feed proportioning system and distribution of concrete
CN216736600U (en) Material conveyor capable of metering discharge
CN220885526U (en) Full-automatic counting and feeding equipment
CN220906544U (en) Dangerous useless feed bin of weighing of handling
CN207717203U (en) Rubber powder automatic material weighing machine
CN216186219U (en) Granular fertilizer and powdery fertilizer's partial shipment system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21849746

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21849746

Country of ref document: EP

Kind code of ref document: A1