WO2022001974A1 - 一种拱形网架节点球转动固定装置及拱形网架安装系统 - Google Patents

一种拱形网架节点球转动固定装置及拱形网架安装系统 Download PDF

Info

Publication number
WO2022001974A1
WO2022001974A1 PCT/CN2021/102814 CN2021102814W WO2022001974A1 WO 2022001974 A1 WO2022001974 A1 WO 2022001974A1 CN 2021102814 W CN2021102814 W CN 2021102814W WO 2022001974 A1 WO2022001974 A1 WO 2022001974A1
Authority
WO
WIPO (PCT)
Prior art keywords
vertical plate
ball
arched
rotating
hole
Prior art date
Application number
PCT/CN2021/102814
Other languages
English (en)
French (fr)
Inventor
李庆同
铁木热
陈文军
张天琴
Original Assignee
中建新疆安装工程有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中建新疆安装工程有限公司 filed Critical 中建新疆安装工程有限公司
Priority to US17/780,625 priority Critical patent/US20230358033A1/en
Publication of WO2022001974A1 publication Critical patent/WO2022001974A1/zh

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B1/1903Connecting nodes specially adapted therefor
    • E04B1/1906Connecting nodes specially adapted therefor with central spherical, semispherical or polyhedral connecting element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/32Arched structures; Vaulted structures; Folded structures
    • E04B1/3205Structures with a longitudinal horizontal axis, e.g. cylindrical or prismatic structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/38Arched girders or portal frames
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/163Jacks specially adapted for working-up building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B2001/1924Struts specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B2001/1957Details of connections between nodes and struts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B2001/1993Details of framework supporting structure, e.g. posts or walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/32Arched structures; Vaulted structures; Folded structures
    • E04B2001/3217Auxiliary supporting devices used during erection of the arched structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/32Arched structures; Vaulted structures; Folded structures
    • E04B2001/3235Arched structures; Vaulted structures; Folded structures having a grid frame
    • E04B2001/3241Frame connection details
    • E04B2001/3247Nodes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/08Vaulted roofs
    • E04B7/10Shell structures, e.g. of hyperbolic-parabolic shape; Grid-like formations acting as shell structures; Folded structures
    • E04B7/105Grid-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0486Truss like structures composed of separate truss elements
    • E04C2003/0491Truss like structures composed of separate truss elements the truss elements being located in one single surface or in several parallel surfaces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0486Truss like structures composed of separate truss elements
    • E04C2003/0495Truss like structures composed of separate truss elements the truss elements being located in several non-parallel surfaces

Definitions

  • the invention relates to the technical field of construction engineering, in particular to an arched mesh frame node ball rotation fixing device and an arched mesh frame installation system.
  • the highest point is usually 10-20 meters from the ground.
  • the grid frame is installed by conventional methods. The installation process will be carried out at high altitude, and the risk of personnel construction is relatively high. Large, and the construction progress is slow, so it affects the construction period.
  • the grid is dislocated and assembled on the ground into a whole (that is, the assembly position is staggered from the installation axis by a certain distance, avoiding the basic position), and then multiple lifting equipment is used to lift it. It is hoisted to the design position.
  • This method also needs to work at high altitude when welding the starting spanning grid to the middle of the span, and the starting spanning grid is heavy after the overall assembly on the ground, so four large cranes are required to hoist it to the design position, that is The four cranes are respectively located at the opposite corners of the starting span.
  • the crane arm rotates at the same time to complete the aerial displacement of the grid frame until it reaches the design position. At this time, the lifting speed of the four cranes must be consistent. Otherwise, it will cause overloading of individual cranes and damage to the grid, and the risk factor is relatively high. In particular, if the above-mentioned method is used to install the arched mesh frame, the risk factor is higher, and the above-mentioned method cannot be used to install it.
  • the purpose of the present invention is to provide an arched grid node ball rotation fixing device and an arched grid installation system, so as to solve the above-mentioned problems in the prior art and reduce the risk factor of the installation and construction of the arched grid.
  • the present invention provides the following scheme:
  • the invention provides a rotating fixing device for a node ball of an arched grid frame, comprising a base, a fixing part and a rotating part;
  • the fixing part includes a groove body, a first vertical plate and a second vertical plate, the groove body, the first vertical plate and the second vertical plate are respectively connected to the base, the groove body The notch is inclined upward, the first vertical plate and the second vertical plate are respectively located on the opposite sides of the groove body, the first vertical plate is provided with a first through hole, and the second vertical plate is provided with a first through hole. A second through hole is provided, and the first through hole and the second through hole are arranged oppositely;
  • the rotating part includes a first rod member, a rotating ball and a second rod member that are fixedly connected in sequence, the rotating ball is placed in the groove body, and the first rod member is rotatably connected to the first through hole, The second rod is rotatably connected to the second through hole.
  • the groove body includes a side cross rib plate and a bottom cross rib plate, the side cross rib plate and the bottom cross rib plate are respectively connected to the base, and the side cross rib plate and the bottom cross rib plate are respectively connected to the base.
  • Ribs are joined in sequence along a plane perpendicular to the first rod and the second rod, so as to form a groove that fits with the rotating spherical surface.
  • the distance between the first vertical plate and the second vertical plate is slightly larger than the diameter of the rotating ball.
  • the center of the rotating ball is located on the extension line of the central axis of the first rod and the extension of the central axis of the second rod.
  • the massage and percutaneous drug penetration device includes a drug solution delivery pipe joint, a sponge body, a massage head, a motor, and an outer casing whose inner side is fixedly connected to the mounting plane A or the mounting plane B.
  • the upper end of the base is provided with a vertical plane and a horizontal plane
  • the side cross rib is connected to the vertical plane
  • the bottom cross rib is connected to the horizontal plane
  • the present invention also provides an arched mesh frame installation system, comprising an arched mesh frame, a jacking mechanism, and any one of the aforementioned arched mesh frame node ball rotation fixing devices, wherein the rotating ball is located on the arched mesh On one axial side of the lower chord surface of the frame, the jacking mechanism is abutted against the node ball on the other axial side of the lower chord surface of the arched grid frame.
  • the upper end of the jacking mechanism is connected to a carrier body, and the carrier body is provided with a hemispherical groove for matching the spherical surface of the node ball.
  • the node ball rotation fixing device for the arched grid frame and the installation system for the arched grid frame provided by the present invention are because the overall weight of the arched grid frame is relatively large, the length is relatively long, and the span is relatively wide. Therefore, a section of three-grade grid (starting grid) is first assembled and welded on the ground, and a plurality of rotating balls are arranged in sequence along the axial side of the lower chord surface of the three-grade grid, and a set of arched grid is assembled and welded at each rotating ball. The node ball rotates the fixture. And along the axial direction of the arched grid to be erected, a plurality of concrete foundations are cast in turn, and an arched grid node ball is fixed to the upper end of each concrete foundation.
  • the rotating ball can rotate in the groove body, so the other axial side of the three-product mesh frame can be jacked up by the jacking mechanism, so that the axial direction of the three-product mesh frame can be One side is at a suitable height from the ground, which is convenient for multiple node balls on the other side of the axial direction of the third-grade grid frame to weld the fourth-grade grid frame at the same time.
  • the appropriate height can be adjusted by the above method, so that the construction personnel can weld the node balls and the fourth product grid on the ground; Fifth product grid.
  • the area and weight of the three-product mesh frame are small, and a smaller number of jacking mechanisms can be set along the other side of the three-product mesh frame axially (for example, the 90-meter-long three-product mesh frame is erected 7 A jacking mechanism is enough to meet the construction requirements); with the increase of the span of the arched grid, the lifting and assembling area and weight of the arched grid gradually increase, and the number of jacking mechanisms of the lifting grid gradually increases (the axial nine The jacking mechanism used by the ten-meter-long arched grid was eventually increased to 12).
  • the lifting and welding are performed in sequence, and finally the assembly and welding of the entire span of the entire arched grid is completed.
  • the notch of the groove body faces the top of the arched grid after the span assembly and welding is completed, the rotating ball rotates in the groove body, the first rod rotates in the first through hole, and the second rod rotates in the first through hole.
  • the second through hole rotates, and when the jacking mechanism stops jacking up the node ball, the rotating ball, the first rod and the second rod also stop rotating respectively.
  • the first rod is limited in the first through hole
  • the second rod is limited in the second through hole, so that the rotating ball is confined in the groove body, so as to prevent the rotating ball from being perpendicular to the first rod or the first rod.
  • the direction of the two rods is away from the notch of the groove body. Because the first vertical plate and the second vertical plate are also fixed and welded to the base respectively, the first vertical plate, the second vertical plate and the groove body cooperate with each other, and the position of the center of the fixed rotating ball does not shift.
  • Fig. 1 is a front view of an arched grid node ball rotating fixing device in the present invention
  • Fig. 2 is the side view of the node ball rotation fixing device of the arched grid frame in the present invention
  • Fig. 3 is the structural representation of the arched grid installation system in the present invention.
  • Fig. 4 is the structural representation when the arched net frame of the complete span in the present invention is installed
  • the purpose of the present invention is to provide an arched mesh frame node ball rotation fixing device and an arched mesh frame installation system to solve the problems existing in the prior art.
  • the present embodiment provides a rotating and fixing device for a node ball of an arched grid frame, including a base 1, a fixing part and a rotating part;
  • the fixing part includes a groove body, a first vertical plate 3 and a second vertical plate 4, the groove body,
  • the first vertical plate 3 and the second vertical plate 4 are respectively connected to the base 1, the notch of the groove body is inclined upward, the first vertical plate 3 and the second vertical plate 4 are respectively located on the opposite sides of the groove body, the first vertical plate
  • the plate 3 is provided with a first through hole
  • the second vertical plate 4 is provided with a second through hole
  • the first through hole and the second through hole are arranged opposite to each other.
  • the rotating part includes a first rod 5, a rotating ball 6 and a second rod 7 that are fixedly connected in sequence.
  • the rotating ball 6 is placed in the groove, the first rod 5 is rotatably connected to the first through hole, and the second rod 7 rotatably connected to the second through hole.
  • a section of three-grade mesh frame (starting mesh frame) is first assembled and welded on the ground, and a plurality of rotating balls 6 are arranged in sequence along the axial side of the lower chord surface of this section of three-grade mesh frame, and each rotating ball 6 is assembled and welded with a set of arches Grid node ball rotation fixing device.
  • a plurality of concrete foundations 11 are cast in turn, and the upper end of each concrete foundation 11 is fixed with a base 1 of the arched grid node ball rotating fixing device, so that the upper end of each concrete foundation 11 is fixed.
  • the rotating ball 6 can rotate in the groove body, so the three-product grid can be rotated centered on the upper end of the concrete foundation 11, so the shaft of this section of the three-product grid can be lifted by the jacking mechanism 2 To the other side, so that the other axial side of the third-grade mesh frame is at a suitable height from the ground, so that the plurality of node balls 13 on the other axial side of the third-grade mesh frame can simultaneously weld the fourth-grade mesh frame.
  • the appropriate height can be adjusted by adjusting the jacking mechanism 2, so that the construction personnel can weld the node balls 13 and the fourth product grid on the ground; and then jack up the plurality of node balls 13 on the other axial side of the fourth product grid again. , and weld the node ball 13 and the fifth product grid.
  • the area and weight of the three-product mesh frame are small, and a smaller number of jacking mechanisms can be set along the other side of the three-product mesh frame axially (for example, the 90-meter-long three-product mesh frame is erected 7 A jacking mechanism is enough to meet the construction requirements); with the increase of the span of the arched grid, the lifting and assembling area and weight of the arched grid gradually increase, and the number of jacking mechanisms of the lifting grid gradually increases (the axial nine The jacking mechanism used by the ten-meter-long arched grid was eventually increased to 12).
  • jacking and welding are performed in sequence, and finally the assembly and welding of the entire span of the entire arched grid 10 is completed.
  • the notch of the groove body faces the top of the arched grid 10 after the span assembly and welding is completed, the rotating ball 6 rotates in the groove body, the first rod 5 rotates in the first through hole, the second The rod member 7 rotates in the second through hole, and when the jacking mechanism 2 stops lifting the node ball 13, the rotating ball 6, the first rod member 5 and the second rod member 7 also stop rotating respectively.
  • the first rod member 5 is limited in the first through hole, and the second rod member 7 is limited in the second through hole, so that the rotating ball 6 is limited in the groove body to prevent the rotating ball 6 from being perpendicular to the first through hole.
  • the rod 5 or the second rod 7 is oriented away from the notch of the groove body.
  • first vertical plate 3 and the second vertical plate 4 are also fixed and welded to the base 1 respectively, the first vertical plate 3, the second vertical plate 4 and the groove body cooperate with each other, and the position of the center of the fixed rotating ball 6 does not shift. .
  • the stability of the rotating ball 6 above the base 1 is improved.
  • the arched mesh frame 10 completes the assembly and welding of the entire span, and the last product mesh frame is fixedly welded to the upper end of the concrete foundation 11 opposite the rotating ball 6, the rotating ball 6 and the edge of the groove body are welded together to fix the rotation.
  • the positional relationship between the ball 6 and the groove body at this time, there is a fixed mechanical strength between the rotating ball 6 and the groove body, and then the first vertical plate 3 and the second vertical plate 4 are cut off, and the rotating ball 6 will not be separated.
  • the groove body is used to ensure that the arched grid 10 is stably supported by the concrete foundation 11 as a whole.
  • the jacking mechanism 2 adopts a hydraulic jacking mechanism, and controls the lifting speed and height of the hydraulic cylinder through PLC numerical control technology.
  • the jacking mechanism 2 specifically adopts the 1150 type hydraulic jack (with a 650KN hydraulic jack).
  • the jacking mechanism 2 is installed in the jacking frame 14, and the jacking frame 14 is formed by stacking up and down a plurality of standard sections. When the jacking mechanism is jacked up, a horizontal displacement will occur at the jacking point.
  • the maximum horizontal displacement adjustment of the jacking frame 14 itself is 200mm (100mm on the left and right). When the horizontal displacement exceeds this displacement, it is necessary to replace the jacking frame. 14 to adjust.
  • the specific method is as follows: when the jacking frame 14 is initially installed, place the jacking frame 14 in the opposite direction of horizontal displacement by 100 mm in advance, and then raise and lower the jacking mechanism 2 in the jacking frame 14 and cooperate to increase the standard section of the jacking frame 14
  • To adjust the horizontal displacement that is, the horizontal displacement is adjusted by the eccentric pressure of the jacking frame 14
  • the principle of replacing the jacking frame 14 is to replace the original jacking frame 14 by adding a jacking frame 14, and the original jacking frame 14 moves horizontally after unloading , re-lift the force, and use two sets of jacking frames 14 to change the top back and forth to eliminate the horizontal displacement.
  • the hydraulic cylinder of the jacking mechanism 2 extends out of the jacking frame 14 to lift the arched grid frame higher than the height of a standard section of the jacking frame;
  • the groove body includes a side cross rib plate 8 and a bottom cross rib plate 9, the side cross rib plate 8 and the bottom cross rib plate 9 are respectively connected to the base 1, and the side cross rib plate 9
  • the rib plate 8 and the bottom cross rib plate 9 are joined in sequence along a plane perpendicular to the first rod 5 and the second rod 7 to form a groove that fits the spherical surface of the rotating ball 6 .
  • the side cross rib plate 8 and the bottom cross rib plate 9 are respectively connected to the base 1 by bolts.
  • the side cross rib plate 8 and the third cross rib plate are respectively connected with the rotating ball 6 .
  • the contour line of the contact surface is long, that is, the gap where the spherical surface of the rotating ball 6 can be welded by electric welding is long, thereby further ensuring the strength of the mechanical structure for the stable connection of the rotating ball 6, the groove body, the base 1 and the concrete foundation 11.
  • the distance between the first vertical plate 3 and the second vertical plate 4 is slightly larger than the diameter of the rotating ball 6 .
  • the distance between the first vertical plate 3 and the second vertical plate 4 is slightly larger than the diameter of the rotating ball 6 .
  • the rotating ball 6 is prevented from swinging back and forth along the axis direction of its own rotation, which improves the stability of the arched grid 10 when it is lifted.
  • the center of the rotating ball 6 is located on the extension line of the central axis of the first rod member 5 and the extension line of the central axis of the second rod member 7 .
  • the rotating ball 6, the first rod member 5 and the second rod member 7 rotate coaxially.
  • the rotating ball 6 is prevented from being affected by the first vertical plate 3 and the second rod. Torque resistance of the second vertical plate 4 .
  • the upper end of the base 1 is provided with a vertical surface and a horizontal surface
  • the side cross rib plate 8 is connected to the vertical surface
  • the bottom cross rib plate 9 is connected to the horizontal surface.
  • the side cross ribs 8 are connected to the vertical surface by bolts, and the bottom cross ribs 9 are connected to the horizontal surface by bolts.
  • the side cross rib plate 8 is supported by the vertical surface, which plays a side supporting force on the rotating ball 6, and the bottom cross rib plate 9 is supported by the horizontal plane, and plays a vertical upward supporting force on the rotating ball 6, so that the rotating ball 6 is supported. 6.
  • the direction of the resultant force received is always consistent with the direction of the groove body notch, and the direction of the groove body notch and the direction of the supporting force of the jacking mechanism 2 to the arched grid 10 are inclined and opposite, that is, the groove body is opposite to the arch.
  • the direction of the resultant force of the supporting force of the shaped grid 10 and the supporting force of the jacking mechanism 2 to the arched grid 10 is vertically upward, which meets the requirements for the installation and construction of the arched grid 10 .
  • Embodiment 2 is a diagrammatic representation of Embodiment 1:
  • this embodiment provides an arched mesh frame installation system, which includes: an arched mesh frame 10 , a jacking mechanism 2 , and any one of the aforementioned arched mesh frame node balls that are rotated and fixed
  • the rotating ball 6 is located on the axial side of the lower chord surface of the arched mesh frame 10
  • the jacking mechanism 2 is abutted against the node ball 13 on the other axial side of the lower chord surface of the arched mesh frame 10 .
  • the jacking mechanism 2 and the node ball rotating and fixing device of the arched grid frame cooperate with each other, and the jacking mechanism 2 sequentially jacks up the node balls 13 along the span direction of the arched grid frame, which is convenient for on-site construction personnel to The single-product grid and the node balls 13 are sequentially welded on the ground, and finally the overall assembly and welding of the arched grid 10 is completed.
  • the upper end of the jacking mechanism 2 is connected to the carrier 12 , and the carrier 12 is provided with a hemispherical groove for matching the spherical surface of the node ball 13 .
  • the upper end of the hydraulic cylinder of the jacking mechanism 2 is welded to the carrier body 12, the upper end surface of the carrier body 12 is concavely provided with a hemispherical groove, and the lower hemispherical surface of the node ball 13 is concavely embedded in the hemispherical groove.
  • the node ball 13 revolves at a certain angle with the rotating ball 6 as the center, so the spherical surface of the node ball 13 slides relative to the hemispherical groove, but the node ball 13 will not leave the hemispherical groove to ensure that The jacking mechanism 2 continuously jacks up the node ball 13 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种拱形网架节点球转动固定装置及拱形网架安装系统,涉及建筑工程技术领域,主要目的是降低拱形网架安装施工的危险系数。本发明的主要技术方案为:拱形网架节点球转动固定装置,该装置包括:底座、固定部和转动部;固定部包括凹槽体、第一立板和第二立板,凹槽体、第一立板和第二立板分别连接于底座,凹槽体的槽口倾斜朝上,第一立板和第二立板分别位于凹槽体的相对侧,第一立板设有第一通孔,第二立板设有第二通孔,第一通孔和第二通孔相对设置;转动部包括依次固定连接的第一杆件、转动球和第二杆件,转动球放置于凹槽体内,第一杆件转动连接于第一通孔,第二杆件转动连接于第二通孔。

Description

一种拱形网架节点球转动固定装置及拱形网架安装系统 技术领域
本发明涉及建筑工程技术领域,特别是涉及一种拱形网架节点球转动固定装置及拱形网架安装系统。
背景技术
偏在拱形网架制作安装工程中,由于网架拱度较大,通常最高点离地面有10-20米,该网架用常规方法安装,安装作业过程将在高空进行,人员施工危险性较大,且施工进度慢,所以影响施工工期。
在网架安装的过程中,也有采用整体安装的,先将网架在地面上错位拼装成整体(即拼装位置同安装轴线错开一定距离,避开基础位置),然后用多台起重设备将其吊装至设计位置。这种方法组焊起步跨网架到跨度中部位置时,也需要在高空进行作业,而且起步跨网架在地面整体拼装完成后重量较大,需要四台大型吊车将其吊装至设计位置,即四台吊车分别站位于起步跨的对角处,先将网架起步跨垂直吊装至高空后,吊车臂再同时回转完成网架空中位移直至到达设计位置,此时四台起重机起吊速度必须保持一致,否则会引起个别起重机超负荷、网架受损的情况发生,危险系数也比较高。特别是拱形网架如果使用上述方法安装危险系数更大,不能使用上述方法安装。
综上所述,需要提供一种用于拱形网架安装的装置,以提高拱形网架安装的安全系数。
发明内容
本发明的目的是提供一种拱形网架节点球转动固定装置及拱形网架安装系统,以解决上述现有技术存在的问题,能够降低拱形网架安装施工的危险系数。
为实现上述目的,本发明提供了如下方案:
本发明提供一种拱形网架节点球转动固定装置,包括底座、固定部和转动部;
所述固定部包括凹槽体、第一立板和第二立板,所述凹槽体、所述第一立板和所述第二立板分别连接于所述底座,所述凹槽体的槽口倾斜朝上,所述第一立板和所述第二立板分别位于所述凹槽体的相对侧,所述第一立板设有第一通孔,所述第二立板设有第二通孔,所述第一通孔和所述第二通孔相对设置;
所述转动部包括依次固定连接的第一杆件、转动球和第二杆件,所述转动球放置于所述凹槽体内,所述第一杆件转动连接于所述第一通孔,所述第二杆件转动连接于所述第二通孔。
优选地,所述凹槽体包括侧十字筋板和底十字筋板,所述侧十字筋板和所述底十字筋板分别连接于所述底座,所述侧十字筋板和所述底十字筋板沿垂直于所述第一杆件和所述第二杆件的平面依次拼接,用于形成吻合于所述转动球球面的凹槽。
优选地,所述第一立板和所述第二立板之间的距离略大于所述转动球的直径。
优选地,所述转动球的球心位于所述第一杆件的中心轴延长线和所述第二杆件的中心轴延长线上。
优选地,所述按摩与经皮渗药装置包括药液输送管接头、海绵体、按摩头、电机和内侧与所述安装平面A或所述安装平面B固定连接的外壳体。
优选地,所述底座的上端设有竖立面和水平面,所述侧十字筋板连接于所述竖立面,所述底十字筋板连接于所述水平面。
本发明还提供一种拱形网架安装系统,包括拱形网架、顶升机构和前述任一项所述的拱形网架节点球转动固定装置,所述转动球位于所述拱形网架下弦面的轴向一侧,所述顶升机构顶接于所述拱形网架下弦面的轴向另一侧的节点球。
优选地,所述顶升机构的上端连接于承载体,所述承载体设有半球槽,用于吻合所述节点球的球面。
本发明相对于现有技术取得了以下有益技术效果:
本发明提供的拱形网架节点球转动固定装置及拱形网架安装系统,因为拱形网架整体重量较大、长度较长、跨度较宽。所以先在地面上组焊一段三品网架(起步网架),多个转动球沿该段三品网架下弦面的轴向一侧依次排列,每一个转动球处组装焊接一套拱形网架节点球转动固定装置。并沿所要搭设的拱形网架的轴向依次浇铸多个混凝土基础,每一个混凝土基础上端固定一个拱形网架节点球转动固定装置的底座,以使每一个混凝土基础上端安装一个拱形网架节点球转动固定装置。通过上述组装,该段三品网架的轴向一侧同时转动连接于多个混凝土基础的上端,该段三品网架的轴向另一侧自由搭接于临时支撑架上。这时,先完成顶升机构调试、检查、试运转,在三品网架下弦面的轴向另一侧的多个节点球(每一个节点球对应一个转动球)的下方分别放置顶升机构。因为转动球放置于凹槽体内,所以转动球可以在凹槽体内转动,所以可以通过顶升机构顶起该段三品网架的轴向另一侧,以使该段三品网架的轴向另一侧距离地面适宜高度,便于该段三品网架的轴向另一侧的多个节点球同时焊接第四品网架。通过上述方法可以调整该适宜高度,以便于施工人员在地面上焊接节点球和第四品网架;然后顶升四品网架的轴向另一侧的多个节点球,并焊接节点球和第五品网架。其中,顶升三品网架时,三品网架面积、重量较小,可以沿三品网架轴向另一侧设置较少数量的顶升机构(例如,轴向九十米长的三品网架设7个顶升机构足以满足施工要求);随着拱形网架跨度的增加,拱形网架的顶升拼装面积、重量逐渐增加,同时顶升网架的顶升机构数量逐渐增加(轴向九十米长的拱形网架所使用的顶升机构最终增加为12个)。按照上述方式,依次顶升和焊接,最终完成整个拱形网架完整跨度的组装焊接。在上述过程中,凹槽体的槽口朝向完成跨度组装焊接后的拱形网架的顶端,转动球在凹槽体内转动,第一杆件在第一通孔内转动,第二杆件在第二通孔内转动,顶升机构停止顶升节点球时,转动球、第一杆件和第二杆件也分别停止转动。第一杆件被限位于第一通孔中,第二杆件被限位于第二通孔中,以使转动球被限位于凹槽体中,避免转动球沿垂直于第一杆件或者第二杆件的方向脱离凹槽体的槽口。因为第一立板和第二立板也分别固定焊接于底座,第一立板、第二立板和凹槽体相互配合,固定转动球球心的位置不发生偏移。当拱形网架完成整个跨度的组装焊 接,并将最后一品网架固定于转动焊接于转动球对面的混凝土基础上时,将转动球和凹槽体的边缘焊接在一起,以固定转动球和凹槽体的位置关系,这时转动球和凹槽体之间就有了固定的机械强度,然后割除第一立板和第二立板,转动球也不会脱离凹槽体,以保证拱形网架整体受到混凝土基础的稳定支撑。综上,因为现场施工人员在地面完成拱形网架的整体跨度组装焊接过程,避免了高空焊接作业,降低了施工的危险系数,保证了人员生命财产安全。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。
图1为本发明中拱形网架节点球转动固定装置正视图;
图2为本发明中拱形网架节点球转动固定装置的侧视图;
图3为本发明中拱形网架安装系统的结构示意图;
图4为本发明中完整跨度的拱形网架安装完毕时的结构示意图;
图中:1-底座、2-顶升机构、3-第一立板、4-第二立板、5-第一杆件、6-转动球、7-第二杆件、8-侧十字筋板、9-底十字筋板、10-拱形网架、11-混凝土基础、12-承载体、13-节点球、14-顶升架。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明的目的是提供一种拱形网架节点球转动固定装置及拱形网架安装系统,以解决现有技术存在的问题。
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。
实施例一:
本实施例提供的一种拱形网架节点球转动固定装置,包括底座1、固定部和转动部;固定部包括凹槽体、第一立板3和第二立板4,凹槽体、第一立板3和第二立板4分别连接于底座1,凹槽体的槽口倾斜朝上,第一立板3和第二立板4分别位于凹槽体的相对侧,第一立板3设有第一通孔,第二立板4设有第二通孔,第一通孔和第二通孔相对设置。
转动部包括依次固定连接的第一杆件5、转动球6和第二杆件7,转动球6放置于凹槽体内,第一杆件5转动连接于第一通孔,第二杆件7转动连接于第二通孔。
如图1-4所示,拱形网架节点球转动固定装置的工作过程如下:
因为拱形网架10整体重量较大,长度较长,跨度较宽。所以先在地面上组焊一段三品网架(起步网架),多个转动球6沿该段三品网架下弦面的轴向一侧依次排列,每一个转动球6处组装焊接一套拱形网架节点球转动固定装置。并沿所要搭设的拱形网架10的轴向依次浇铸多个混凝土基础11,每一个混凝土基础11上端固定一个拱形网架节点球转动固定装置的底座1,以使每一个混凝土基础11上端安装一个拱形网架节点球转动固定装置。通过上述组装,该段三品网架的轴向一侧同时转动连接于多个混凝土基础11的上端,该段三品网架的轴向另一侧自由搭接于地面。
这时,先完成顶升机构调试、检查、试运转,在三品网架下弦面的轴向另一侧的多个节点球13(每一个节点球13对应一个转动球6)的下方分别放置顶升机构2。因为转动球6放置于凹槽体内,所以转动球6可以在凹槽体内转动,所以三品网架可以混凝土基础11的上端为中心转动,所以通过顶升机构2顶起该段三品网架的轴向另一侧,以使该段三品网架的轴向另一侧距地面适宜高度,便于该段三品网架的轴向另一侧的多个节点球13同时焊接第四品网架。通过调整顶升机构2可以调整该适宜高度,以便于施工人员在地面上焊接节点球13和第四品网架;然后再次顶升四品网架的轴向另一侧的多个节点球13,并焊接节点球13和第五品网架。
其中,顶升三品网架时,三品网架面积、重量较小,可以沿三品网架轴向另一侧设置较少数量的顶升机构(例如,轴向九十米长的三品网架设7个顶升机构足以满足施工要求);随着拱形网架跨度的增加,拱形网架 的顶升拼装面积、重量逐渐增加,同时顶升网架的顶升机构数量逐渐增加(轴向九十米长的拱形网架所使用的顶升机构最终增加为12个)。</p><p>按照上述方式,依次顶升和焊接,最终完成整个拱形网架10完整跨度的组装焊接。
在上述过程中,凹槽体的槽口朝向完成跨度组装焊接后的拱形网架10的顶端,转动球6在凹槽体内转动,第一杆件5在第一通孔内转动,第二杆件7在第二通孔内转动,顶升机构2停止顶升节点球13时,转动球6、第一杆件5和第二杆件7也分别停止转动。第一杆件5被限位于第一通孔中,第二杆件7被限位于第二通孔中,以使转动球6被限位于凹槽体中,避免转动球6沿垂直于第一杆件5或者第二杆件7的方向脱离凹槽体的槽口。因为第一立板3和第二立板4也分别固定焊接于底座1,第一立板3、第二立板4和凹槽体相互配合,固定转动球6球心的位置不发生偏移。提高了转动球6在底座1上方的稳定性。
当拱形网架10完成整个跨度的组装焊接,并将最后一品网架固定焊接于转动球6对面的混凝土基础11上端时,将转动球6和凹槽体的边缘焊接在一起,以固定转动球6和凹槽体的位置关系,这时转动球6和凹槽体之间就有了固定的机械强度,然后割除第一立板3和第二立板4,转动球6也不会脱离凹槽体,以保证拱形网架10整体受到混凝土基础11的稳定支撑。
在本发明的技术方案中,因为现场施工人员在地面完成拱形网架10的整体跨度组装焊接过程,避免了高空焊接作业,降低了施工的危险系数,保证了人员生命财产安全。
具体的,顶升机构2采用液压顶升机构,通过PLC数控技术控制液压缸升降的速度和高度。顶升机构2具体采用1150型液压顶升机(配650KN液压千斤顶)。顶升机构2安装于顶升架14中,顶升架14由多个标准节上下叠加而成。当顶升机构顶升时,顶升点处将产生水平位移,顶升架14自身最大水平位移调节量为200mm(左右各100mm),当水平位移超出此位移量时,需要通过置换顶升架14来调节。具体方法为:顶升架14初始安装时,预先将顶升架14向水平位移相反方向放置100mm,然后通过顶升架14中的顶升机构2的升降并配合增加顶升架14的标准节来 调节水平位移,即通过顶升架14偏心受压来调节水平位移;顶升架14置换的原则是利用增加顶升架14来替换原顶升架14,原顶升架14卸载后水平移动,重新顶升受力,利用两组顶升架14来回换顶将水平位移消除掉。
顶升架14自身消除水平位移的步骤如下:
(1)顶升机构2的液压缸伸出顶升架14,将拱形网架顶升大于一个顶升架标准节的高度;
(2)增加一个标准节,顶升机构2的液压缸下落,使顶升上托架落在新增标准节的上部横杆上,并使上托架受力;
(3)顶升机构2的液压缸继续下落,将顶升下托架提升,此时顶升机构2不受力,将顶升机构2向水平位移方向移动;顶升机构2的液压缸向上顶起拱形网架,上托架不受力,将上托架向水平位移方向移动;
(4)重复上述步骤,不停的边顶升拱形网架10,边消除水平位移,直至顶升架自身不能继续消除水平位移为止。
如图1和图2所示,在具体实施方式中,凹槽体包括侧十字筋板8和底十字筋板9,侧十字筋板8和底十字筋板9分别连接于底座1,侧十字筋板8和底十字筋板9沿垂直于第一杆件5和第二杆件7的平面依次拼接,用于形成吻合于转动球6球面的凹槽。
在本实施方式中,具体的,侧十字筋板8和底十字筋板9分别通过螺栓连接于底座1。当拱形网架10完成整体跨度组装,需要焊接固定转动球6和凹槽体的相对位置时,相对于其他形式的凹槽体,侧十字筋板8和第十字筋板分别与转动球6接触的面的轮廓线较长,即转动球6球面可以电焊焊接的缝隙较长,从而进一步保证转动球6、凹槽体、底座1和混凝土基础11稳定连接的机械结构的强度。
如图1所示,在具体实施方式中,第一立板3和第二立板4之间的距离略大于转动球6的直径。
在本实施方式中,具体的,第一立板3和第二立板4的间距略大于转动球6的直径。在转动球6转动过程中,避免转动球6沿其本身转动的轴线方向往复摆动,提高了拱形网架10被顶升时的稳定性。
如图1所示,在具体实施方式中,转动球6的球心位于第一杆件5的中心轴延长线和第二杆件7的中心轴延长线上。
在本实施方式中,具体的,转动球6、第一杆件5和第二杆件7同轴心转动,当转动球6转动的过程中,避免转动球6受到来自第一立板3和第二立板4的扭矩阻力。
如图1和图2所示,在具体实施方式中,底座1的上端设有竖立面和水平面,侧十字筋板8连接于竖立面,底十字筋板9连接于水平面。
在本实施方式中,具体的,侧十字筋板8通过螺栓连接于竖立面,底十字筋板9通过螺栓连接于水平面。侧十字筋板8受到竖立面的支撑力,对转动球6起到侧面支撑力,底十字筋板9受到水平面的支撑力,对转动球6起到竖直向上的支撑力,从而使转动球6所受到的合力方向和凹槽体槽口的方向始终保持一致,而凹槽体槽口的方向和顶升机构2对拱形网架10支撑力的方向倾斜相对,即凹槽体对拱形网架10的支撑力和顶升机构2对拱形网架10的支撑力的合力方向就竖直朝上了,符合拱形网架10安装施工的要求。
实施例二:
如图1至图3所示,本实施例提供一种拱形网架安装系统,该系统包括:拱形网架10、顶升机构2和如前述任一项拱形网架节点球转动固定装置,转动球6位于拱形网架10下弦面的轴向一侧,顶升机构2顶接于拱形网架10下弦面的轴向另一侧的节点球13。
在本实施方式中,具体的,顶升机构2和拱形网架节点球转动固定装置相互协同,顶升机构2沿拱形网架的跨度方向依次顶接节点球13,便于现场施工人员在地面上依次焊接单品网架和节点球13,最终完成拱形网架10的整体组装焊接。
如图3所示,在具体实施方式中,顶升机构2的上端连接于承载体12,承载体12设有半球槽,用于吻合节点球13的球面。
在本实施方式中,具体的,顶升机构2的液压缸的上端焊接于承载体12,承载体12的上端面凹设有半球槽,节点球13的下半球面凹嵌于半球槽内。在顶升机构2顶升节点球13的过程中,节点球13以转动球6为中 心公转一定角度,所以节点球13的球面相对于半球槽滑动,但是节点球13不会脱离半球槽,保证顶升机构2持续顶升节点球13。
本发明应用了具体个例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的方法及其核心思想;同时,对于本领域的一般技术人员,依据本发明的思想,在具体实施方式及应用范围上均会有改变之处。综上,本说明书内容不应理解为对本发明的限制。

Claims (7)

  1. 一种拱形网架节点球转动固定装置,其特征在于:包括底座、固定部和转动部;
    所述固定部包括凹槽体、第一立板和第二立板,所述凹槽体、所述第一立板和所述第二立板分别连接于所述底座,所述凹槽体的槽口倾斜朝上,所述第一立板和所述第二立板分别位于所述凹槽体的相对侧,所述第一立板设有第一通孔,所述第二立板设有第二通孔,所述第一通孔和所述第二通孔相对设置;
    所述转动部包括依次固定连接的第一杆件、转动球和第二杆件,所述转动球放置于所述凹槽体内,所述第一杆件转动连接于所述第一通孔,所述第二杆件转动连接于所述第二通孔。
  2. 根据权利要求1所述的拱形网架节点球转动固定装置,其特征在于:所述凹槽体包括侧十字筋板和底十字筋板,所述侧十字筋板和所述底十字筋板分别连接于所述底座,所述侧十字筋板和所述底十字筋板沿垂直于所述第一杆件和所述第二杆件的平面依次拼接,用于形成吻合于所述转动球球面的凹槽。
  3. 根据权利要求1所述的拱形网架节点球转动固定装置,其特征在于:所述第一立板和所述第二立板之间的距离略大于所述转动球的直径。
  4. 根据权利要求1-3任一项所述的拱形网架节点球转动固定装置,其特征在于:所述转动球的球心位于所述第一杆件的中心轴延长线和所述第二杆件的中心轴延长线上。
  5. 根据权利要求2所述的拱形网架节点球转动固定装置,其特征在于:所述底座的上端设有竖立面和水平面,所述侧十字筋板连接于所述竖立面,所述底十字筋板连接于所述水平面。
  6. 一种拱形网架安装系统,其特征在于:包括拱形网架、顶升机构和如权利要求1至5任一项所述的拱形网架节点球转动固定装置,所述转动球位于所述拱形网架下弦面的轴向一侧,所述顶升机构顶接于所述拱形网架下弦面的轴向另一侧的节点球。
  7. 根据权利要求6所述的拱形网架安装系统,其特征在于:所述顶 升机构的上端连接于承载体,所述承载体设有半球槽,用于吻合所述节点球的球面。
PCT/CN2021/102814 2020-06-28 2021-06-28 一种拱形网架节点球转动固定装置及拱形网架安装系统 WO2022001974A1 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US17/780,625 US20230358033A1 (en) 2020-06-28 2021-06-28 Arch Grid Bolted Sphere Node Rotating and Fixing Device and Arch Grid Mounting System

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010597493.7A CN111733968A (zh) 2020-06-28 2020-06-28 拱形网架节点球转动固定装置及拱形网架安装系统
CN202010597493.7 2020-06-28

Publications (1)

Publication Number Publication Date
WO2022001974A1 true WO2022001974A1 (zh) 2022-01-06

Family

ID=72651317

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/102814 WO2022001974A1 (zh) 2020-06-28 2021-06-28 一种拱形网架节点球转动固定装置及拱形网架安装系统

Country Status (3)

Country Link
US (1) US20230358033A1 (zh)
CN (1) CN111733968A (zh)
WO (1) WO2022001974A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118128183A (zh) * 2024-04-30 2024-06-04 山西四建集团有限公司 一种大跨度网壳结构以及空间竖向转体安装方法

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733968A (zh) * 2020-06-28 2020-10-02 中建新疆安装工程有限公司 拱形网架节点球转动固定装置及拱形网架安装系统
CN113321146B (zh) * 2021-06-09 2022-07-12 中国二十冶集团有限公司 大跨度网壳结构单边顶升安全保护装置及安全顶升方法
CN115781580B (zh) * 2022-12-08 2023-06-20 中建材(合肥)钢构科技有限公司 一种便于弦杆安装的拼接装置
CN116275993B (zh) * 2022-12-08 2023-12-01 中建材(合肥)钢构科技有限公司 一种网架拼装装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2257173A (en) * 1991-07-03 1993-01-06 Ali Ziari Space frame joint system.
CN205857384U (zh) * 2016-06-29 2017-01-04 铁道第三勘察设计院集团有限公司 一种大跨度柱面网壳封闭罩棚结构
CN206681155U (zh) * 2017-05-02 2017-11-28 中建城市建设发展有限公司 一种钢网架顶升球点整体旋转装置及顶升系统
CN208733825U (zh) * 2018-08-29 2019-04-12 河南天泽经典建筑科技有限公司 一种新型的h型钢网架支座
CN109881897A (zh) * 2019-03-13 2019-06-14 徐州中煤百甲重钢科技股份有限公司 一种单边起拱的起步单元施工方法
CN211369036U (zh) * 2020-06-28 2020-08-28 中建新疆安装工程有限公司 拱形网架节点球转动固定装置及拱形网架安装系统
CN111733968A (zh) * 2020-06-28 2020-10-02 中建新疆安装工程有限公司 拱形网架节点球转动固定装置及拱形网架安装系统

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2257173A (en) * 1991-07-03 1993-01-06 Ali Ziari Space frame joint system.
CN205857384U (zh) * 2016-06-29 2017-01-04 铁道第三勘察设计院集团有限公司 一种大跨度柱面网壳封闭罩棚结构
CN206681155U (zh) * 2017-05-02 2017-11-28 中建城市建设发展有限公司 一种钢网架顶升球点整体旋转装置及顶升系统
CN208733825U (zh) * 2018-08-29 2019-04-12 河南天泽经典建筑科技有限公司 一种新型的h型钢网架支座
CN109881897A (zh) * 2019-03-13 2019-06-14 徐州中煤百甲重钢科技股份有限公司 一种单边起拱的起步单元施工方法
CN211369036U (zh) * 2020-06-28 2020-08-28 中建新疆安装工程有限公司 拱形网架节点球转动固定装置及拱形网架安装系统
CN111733968A (zh) * 2020-06-28 2020-10-02 中建新疆安装工程有限公司 拱形网架节点球转动固定装置及拱形网架安装系统

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118128183A (zh) * 2024-04-30 2024-06-04 山西四建集团有限公司 一种大跨度网壳结构以及空间竖向转体安装方法

Also Published As

Publication number Publication date
US20230358033A1 (en) 2023-11-09
CN111733968A (zh) 2020-10-02

Similar Documents

Publication Publication Date Title
WO2022001974A1 (zh) 一种拱形网架节点球转动固定装置及拱形网架安装系统
CN113622576B (zh) 一种超大型体育场馆钢罩棚屋盖结构空间转体施工方法
CN112324160A (zh) 一种装配格构式钢结构安装用临时支撑架及使用方法
CN202577588U (zh) 球节点空间钢结构可调式安装定位支座
CN211369036U (zh) 拱形网架节点球转动固定装置及拱形网架安装系统
CN107476560B (zh) 风电塔施工平台及方法
CN214402806U (zh) 一种装配格构式钢结构安装用临时支撑架
CN103276907A (zh) 大跨度铰接式人字形钢拱架的吊装方法
CN114319935A (zh) 一种临时回顶支撑施工方法
CN107816209A (zh) 跨外两侧抬吊安装大型钢桁架屋盖施工工艺
CN208008368U (zh) 一种用于二层台绞车的新型可旋转支座
CN213174204U (zh) 一种钢结构厂房用安装定位结构
JP2002097819A (ja) 送電鉄塔の組立て方法および送電鉄塔組立て装置
CN113047666A (zh) 一种装配式pc墙安装支撑限位装置
CN113023588A (zh) 一种用于交通建设的超高高架桥架设吊装设备及其吊装方法
CN216377270U (zh) 一种塔吊安装用升降支撑底座
CN111946556A (zh) 预制混凝土筒节的施工定位方法
CN215803080U (zh) 一种悬挑结构用支撑装置
CN216740834U (zh) 一种临时回顶支撑装置
CN220059032U (zh) 一种干煤棚桁架安装支撑装置
CN220285354U (zh) 一种用于双稳态钢结构安装的靠板装置
CN220223275U (zh) 一种桩基钻芯取样垂直度定位提升支架
CN219060948U (zh) 一种钢结构斜立柱安装装置
CN219860190U (zh) 一种桥梁工程预制箱梁湿接缝底模安装提升装置
CN216807760U (zh) 装配式建筑施工吊装侧向支撑体系

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21833586

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21833586

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 21833586

Country of ref document: EP

Kind code of ref document: A1