WO2021184815A1 - Elevator guide rail fixing device - Google Patents

Elevator guide rail fixing device Download PDF

Info

Publication number
WO2021184815A1
WO2021184815A1 PCT/CN2020/131341 CN2020131341W WO2021184815A1 WO 2021184815 A1 WO2021184815 A1 WO 2021184815A1 CN 2020131341 W CN2020131341 W CN 2020131341W WO 2021184815 A1 WO2021184815 A1 WO 2021184815A1
Authority
WO
WIPO (PCT)
Prior art keywords
guide rail
plate
elevator
pressing plate
fixing device
Prior art date
Application number
PCT/CN2020/131341
Other languages
French (fr)
Chinese (zh)
Inventor
樊湘毅
顾垣杰
Original Assignee
迅达(中国)电梯有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 迅达(中国)电梯有限公司 filed Critical 迅达(中国)电梯有限公司
Publication of WO2021184815A1 publication Critical patent/WO2021184815A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor

Definitions

  • the invention relates to an elevator guide rail fixing device.
  • an elevator guide rail extending in the vertical direction is usually installed on the elevator shaft wall, and the elevator guide rail is connected to the elevator car or elevator counterweight.
  • the upper sliding shoes cooperate to ensure the smooth movement of the elevator car or elevator counterweight in the elevator shaft.
  • a guide rail bracket is fixed on the wall of the elevator hoistway, and a guide rail pressing plate is fixed on the guide rail bracket.
  • the guide rail pressing plate is pressed on both sides of the elevator guide rail to fix the elevator guide rail on the guide rail support.
  • the guide rail pressing plates there are two types of guide rail pressing plates, one is a guide rail pressing plate used in non-seismic conditions, and the other is a guide rail pressing plate used in seismic conditions. Since the force of the guide rail support under seismic conditions is much higher than the force under non-seismic conditions, the mechanical strength of the guide rail press plate used in seismic conditions should be much higher than that of the guide rail used in non-seismic conditions Pressure plate. In the prior art, in order to improve the mechanical strength of the guide rail pressing plate used in seismic conditions, it is necessary to use thicker materials and better steel materials. Therefore, the guide rail clamp used for seismic conditions is usually thicker and heavier than the guide rail clamp used for non-seismic conditions, and the two cannot be used mutually, which reduces the versatility of the guide rail clamp.
  • the purpose of the present invention is to solve at least one aspect of the above-mentioned problems and defects in the prior art.
  • an elevator guide rail fixing device including: a guide rail pressing plate having a first pressing arm for pressing and fixing the guide rail of the elevator on the guide rail support of the elevator; and a bolt connection assembly for Fix the rail pressing plate to the rail bracket.
  • the elevator guide rail fixing device further includes a reinforced pressing plate, the reinforced pressing plate is fixed on the guide rail pressing plate by the bolt connection assembly; the reinforced pressing plate has a second pressing arm portion formed on the first pressing arm portion There is an opening for accommodating the second pressing arm; when the rail pressing plate is in an earthquake working condition that is deformed due to an earthquake impact, the first pressing arm of the rail pressing plate and the second pressing of the reinforcing pressing plate The arms press and fix the guide rail together.
  • the second pressing arm portion of the reinforced pressing plate does not contact the guide rail, and the guide rail is only moved by the guide rail.
  • the guide rail pressing plate is pressed and fixed.
  • the thickness of the reinforced press plate is greater than the thickness of the rail press plate, so that the mechanical strength of the reinforced press plate is greater than the mechanical strength of the rail press plate.
  • the bolt connection assembly includes a bolt and a nut, and the screw rod of the bolt passes through the reinforcing plate, the guide rail pressure plate, and the guide rail bracket in sequence, and is threaded with the nut. connect.
  • the bolt connection assembly further includes an anti-loosening washer, the screw rod of the bolt passes through the anti-loosing washer, and the anti-loosing washer is squeezed on the Between the nut and the guide rail bracket.
  • the head of the bolt abuts against the reinforcing pressure plate, and the guide rail pressure plate is squeezed between the reinforcing pressure plate and the guide rail bracket.
  • a through hole for allowing the screw of the bolt to pass is formed on the reinforcing press plate.
  • the guide rail pressing plate has a rectangular plate-shaped first fixing base, and the first pressing arm is corrugated and extends outward from one side of the first fixing base .
  • the reinforcing pressing plate has a rectangular plate-shaped second fixing base, and the second pressing arm is in the shape of a flat plate and extends from a middle part of one side of the second fixing base. Extend outwards so that the reinforced pressing plate has a T-shape.
  • the first fixing base is supported on the surface of the rail bracket, and the second fixing base is supported on the surface of the first fixing base.
  • the area of the covering area of the guide rail pressing plate is larger than the area of the covering area of the reinforcing pressing plate.
  • the elevator guide rail fixing device can be applied to both seismic and non-seismic conditions, which improves the versatility of the elevator guide rail fixing device, and the elevator of the present invention
  • the guide rail fixing device is light in weight, can reduce the vertical force caused by the settlement of the building, and is beneficial to simplify the design of the guide rail system.
  • Figure 1 shows a schematic diagram of an elevator guide rail fixing device according to an exemplary embodiment of the present invention
  • Figure 2 shows a three-dimensional schematic diagram of the elevator guide rail fixing device shown in Figure 1;
  • Fig. 3 shows a three-dimensional schematic diagram of the reinforced pressing plate of the elevator guide rail fixing device shown in Fig. 2.
  • an elevator guide rail fixing device comprising: a guide rail pressing plate having a first pressing arm for pressing and fixing the guide rail of the elevator on the guide rail support of the elevator; and a bolt connection assembly, It is used to fix the guide rail pressing plate to the guide rail bracket.
  • the elevator guide rail fixing device further includes a reinforced pressing plate, the reinforced pressing plate is fixed on the guide rail pressing plate by the bolt connection assembly; the reinforced pressing plate has a second pressing arm portion formed on the first pressing arm portion There is an opening for accommodating the second pressing arm; when the rail pressing plate is in an earthquake working condition that is deformed due to an earthquake impact, the first pressing arm of the rail pressing plate and the second pressing of the reinforcing pressing plate The arms press and fix the guide rail together.
  • Fig. 1 shows a schematic diagram of an elevator guide rail fixing device according to an exemplary embodiment of the present invention.
  • Fig. 2 shows a three-dimensional schematic diagram of the elevator guide rail fixing device shown in Fig. 1.
  • the elevator guide rail fixing device mainly includes a guide rail pressing plate 110, a reinforcing pressing plate 120 and bolt connection components 130, 140, and 150.
  • the guide rail pressing plate 110 has a first pressing arm 110a, which presses on the base 11 of the guide rail 10 of the elevator, and is used to press the elevator
  • the guide rail 10 is pressed and fixed on the guide rail bracket 20 of the elevator.
  • the bolt connection components 130, 140, and 150 are used to fix the rail pressing plate 110 to the rail bracket 20.
  • the reinforcement pressing plate 120 is fixed on the rail pressing plate 110 by bolt connection components 130, 140, and 150.
  • the reinforcing pressing plate 120 has a second pressing arm 120a.
  • An opening 111 for receiving the second pressing arm 120a is formed on the first pressing arm 110a, and the second pressing arm 120a is received in the opening 111 on the first pressing arm 110a.
  • the guide rail pressing plate 110 when the guide rail pressing plate 110 is in an earthquake condition that is deformed due to an earthquake impact, the first pressing arm portion 110a of the guide rail pressing plate 110 and the first pressing arm portion 110a of the reinforcing pressing plate 120 The two pressing arms 120a press and fix the guide rail 10 of the elevator together. In this way, the guide rail 10 of the elevator can be prevented from separating from the guide rail bracket 20, and the safe operation of the elevator can be ensured.
  • the thickness of the reinforced pressing plate 120 is greater than the thickness of the rail pressing plate 110, so that the mechanical strength of the reinforced pressing plate 120 is greater than that of the rail pressing plate 110.
  • the bolt connection components 130, 140, 150 include a bolt 130 and a nut 140, and the screw 130a of the bolt 130 passes through the reinforcing plate 120, the guide rail 110, and the guide bracket in turn. 20 and screwed with nut 140.
  • the bolt connection components 130, 140, 150 further include an anti-loosening washer 150, the screw 130a of the bolt 130 passes through the anti-loosing washer 150, and the anti-loosening washer 150 The sheet 150 is squeezed between the nut 140 and the rail bracket 20.
  • the screw head 130 b of the bolt 130 abuts on the reinforcing plate 120, and the rail pressing plate 110 is squeezed between the reinforcing plate 120 and the guide rail bracket 20.
  • FIG. 3 shows a three-dimensional schematic diagram of the reinforced pressing plate 120 of the elevator guide rail fixing device shown in FIG. 2.
  • a through hole 121 that allows the screw 130 a of the bolt 130 to pass is formed on the reinforcing plate 120.
  • the guide rail pressing plate 110 and the guide rail bracket 20 are also formed with through holes that allow the screw 130a of the bolt 130 to pass through.
  • the guide rail pressing plate 110 has a rectangular plate-shaped first fixed base 110b, and the first pressing arm 110a is corrugated and extends from one side of the first fixed base 110b. Extend outward.
  • the reinforced pressing plate 120 has a rectangular plate-shaped second fixing base 120b, and the second pressing arm 120a is in the shape of a flat plate and extends from one side of the second fixing base 120b.
  • the middle part of the bracket extends outwards, so that the reinforcing plate 120 has a T-shape.
  • the first fixing base 110b is supported on the surface of the rail bracket 20, and the second fixing base 120b is supported on the surface of the first fixing base 110b.
  • the area of the coverage area of the guide rail pressing plate 110 is larger than the area of the coverage area of the reinforcement pressing plate 120.
  • the area of the coverage area of the reinforced press plate 120 is smaller than the area of the covered area of the guide rail press plate 110, so that the volume and total amount of the reinforced press plate 120 can be reduced.

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

An elevator guide rail fixing device, comprising: guide rail pressuring plates (110), comprising first pressuring arm portions (110a) used for pressing and fixing a guide rail (10) of an elevator onto a guide rail holder (20) of the elevator; and bolt connecting components (130, 140, 150), used for fixing the guide rail pressuring plates (110) onto the guide rail holder (20), and further comprising reinforcing pressuring plates (120), fixed by the bolt connecting components (130, 140, 150) onto the guide rail pressuring plates (110), and comprising a second pressuring arm portion (120a). An opening (111) used for accommodating the second pressuring arm portion (120a) is formed on the first pressuring arm portions (110a); when the guide rail pressuring plates (110) are in a seismic working condition that the guide rail pressuring plates (110) are deformed due to an earthquake impact, the first pressuring arm portions (110a) of the guide rail pressuring plates (110) and the second pressuring arm portion (120a) of the reinforcing pressuring plates (120) press and fix the guide rail (10) together. The elevator guide rail fixing device is suitable for both a seismic condition and a non-seismic condition, which improves the universality of the elevator guide rail fixing device.

Description

电梯导轨固定装置Elevator guide rail fixing device 技术领域Technical field
本发明涉及一种电梯导轨固定装置。The invention relates to an elevator guide rail fixing device.
背景技术Background technique
在现有技术中,为了保证电梯轿厢或电梯配重在电梯井道中平稳移动,通常在电梯井道壁上安装有沿竖直方向延伸的电梯导轨,该电梯导轨与电梯轿厢或电梯配重上的滑靴配合,从而可保证电梯轿厢或电梯配重在电梯井道中平稳移动。In the prior art, in order to ensure that the elevator car or elevator counterweight moves smoothly in the elevator shaft, an elevator guide rail extending in the vertical direction is usually installed on the elevator shaft wall, and the elevator guide rail is connected to the elevator car or elevator counterweight. The upper sliding shoes cooperate to ensure the smooth movement of the elevator car or elevator counterweight in the elevator shaft.
在现有技术中,在电梯井道壁上固定有导轨支架,在导轨支架上固定有导轨压板,导轨压板按压在电梯导轨的两侧,从而将电梯导轨固定在导轨支架上。In the prior art, a guide rail bracket is fixed on the wall of the elevator hoistway, and a guide rail pressing plate is fixed on the guide rail bracket. The guide rail pressing plate is pressed on both sides of the elevator guide rail to fix the elevator guide rail on the guide rail support.
在现有技术中,导轨压板有两种,一种是用于非地震工况的导轨压板,另一种是用于地震工况的导轨压板。由于在地震工况时导轨支架所受力大大高于在非地震工况时所受力,因此,用于地震工况的导轨压板的机械强度应当远远高于用于非地震工况的导轨压板。在现有技术中,为了提高用于地震工况的导轨压板的机械强度,需要使用更厚的材料和更优良的钢材。因此,用于地震工况的导轨压板通常比用于非地震工况的导轨压板更厚更重,两者不可互用,这降低了导轨压板的通用性。In the prior art, there are two types of guide rail pressing plates, one is a guide rail pressing plate used in non-seismic conditions, and the other is a guide rail pressing plate used in seismic conditions. Since the force of the guide rail support under seismic conditions is much higher than the force under non-seismic conditions, the mechanical strength of the guide rail press plate used in seismic conditions should be much higher than that of the guide rail used in non-seismic conditions Pressure plate. In the prior art, in order to improve the mechanical strength of the guide rail pressing plate used in seismic conditions, it is necessary to use thicker materials and better steel materials. Therefore, the guide rail clamp used for seismic conditions is usually thicker and heavier than the guide rail clamp used for non-seismic conditions, and the two cannot be used mutually, which reduces the versatility of the guide rail clamp.
此外,在现有技术中,由于用于地震工况的导轨压板非常厚重,这会增加因建筑沉降带来的垂直力,导致导轨系统的设计更加复杂化。In addition, in the prior art, since the guide rail pressing plate used in seismic conditions is very heavy, this will increase the vertical force caused by the settlement of the building, and cause the design of the guide rail system to be more complicated.
发明内容Summary of the invention
本发明的目的旨在解决现有技术中存在的上述问题和缺陷的至少一个方面。The purpose of the present invention is to solve at least one aspect of the above-mentioned problems and defects in the prior art.
根据本发明的一个方面,提供一种电梯导轨固定装置,包括:导轨压板,具有用于将电梯的导轨按压和固定在电梯的导轨支架上的第一按压臂部;和螺栓连接组件,用于将所述导轨压板固定到所述导轨支架上。所述电梯导轨固定装置还包括加强压板,所述加强压板被所述螺栓连接组件固定在所述导轨压板上;所述加强压板具有第二按压臂部,在所述第一按压臂部上形成有用于容纳所述第二按压臂部的开口;在所述导轨压板处于因受地震冲击发生变形的地震工况时,所述导轨压板的第一按压臂部和所述加强压板的第二按压臂部一起按压和固定所述导轨。According to one aspect of the present invention, there is provided an elevator guide rail fixing device, including: a guide rail pressing plate having a first pressing arm for pressing and fixing the guide rail of the elevator on the guide rail support of the elevator; and a bolt connection assembly for Fix the rail pressing plate to the rail bracket. The elevator guide rail fixing device further includes a reinforced pressing plate, the reinforced pressing plate is fixed on the guide rail pressing plate by the bolt connection assembly; the reinforced pressing plate has a second pressing arm portion formed on the first pressing arm portion There is an opening for accommodating the second pressing arm; when the rail pressing plate is in an earthquake working condition that is deformed due to an earthquake impact, the first pressing arm of the rail pressing plate and the second pressing of the reinforcing pressing plate The arms press and fix the guide rail together.
根据本发明的一个实例性的实施例,在所述导轨压板处于未发生变形的非地震工况时,所述加强压板的第二按压臂部与所述导轨不接触,所述导轨仅由所述导轨压板按压和固定。According to an exemplary embodiment of the present invention, when the guide rail pressing plate is in a non-seismic working condition without deformation, the second pressing arm portion of the reinforced pressing plate does not contact the guide rail, and the guide rail is only moved by the guide rail. The guide rail pressing plate is pressed and fixed.
根据本发明的另一个实例性的实施例,所述加强压板的厚度大于所述导轨压板的厚度,使得所述加强压板的机械强度大于所述导轨压板的机械强度。According to another exemplary embodiment of the present invention, the thickness of the reinforced press plate is greater than the thickness of the rail press plate, so that the mechanical strength of the reinforced press plate is greater than the mechanical strength of the rail press plate.
根据本发明的另一个实例性的实施例,所述螺栓连接组件包括螺栓和螺母,所述螺栓的螺杆依次穿过所述加强压板、所述导轨压板和所述导轨支架并与所述螺母螺纹连接。According to another exemplary embodiment of the present invention, the bolt connection assembly includes a bolt and a nut, and the screw rod of the bolt passes through the reinforcing plate, the guide rail pressure plate, and the guide rail bracket in sequence, and is threaded with the nut. connect.
根据本发明的另一个实例性的实施例,所述螺栓连接组件还包括防松垫片,所述螺栓的螺杆穿过所述防松垫片,并且所述防松垫片被挤压在所述螺母和所述导轨支架之间。According to another exemplary embodiment of the present invention, the bolt connection assembly further includes an anti-loosening washer, the screw rod of the bolt passes through the anti-loosing washer, and the anti-loosing washer is squeezed on the Between the nut and the guide rail bracket.
根据本发明的另一个实例性的实施例,所述螺栓的螺头抵靠在所述加强压板上,所述导轨压板被挤压在所述加强压板和所述导轨支架之间。According to another exemplary embodiment of the present invention, the head of the bolt abuts against the reinforcing pressure plate, and the guide rail pressure plate is squeezed between the reinforcing pressure plate and the guide rail bracket.
根据本发明的另一个实例性的实施例,在所述加强压板上形成有允许所述螺栓的螺杆穿过的通孔。According to another exemplary embodiment of the present invention, a through hole for allowing the screw of the bolt to pass is formed on the reinforcing press plate.
根据本发明的另一个实例性的实施例,所述导轨压板具有矩形板状的第一固定基部,所述第一按压臂部呈波纹状并从所述第一固定基部的一侧 向外延伸。According to another exemplary embodiment of the present invention, the guide rail pressing plate has a rectangular plate-shaped first fixing base, and the first pressing arm is corrugated and extends outward from one side of the first fixing base .
根据本发明的另一个实例性的实施例,所述加强压板具有矩形板状的第二固定基部,所述第二按压臂部呈平板状并从所述第二固定基部的一侧的中间部位向外延伸,使得所述加强压板呈T字形。According to another exemplary embodiment of the present invention, the reinforcing pressing plate has a rectangular plate-shaped second fixing base, and the second pressing arm is in the shape of a flat plate and extends from a middle part of one side of the second fixing base. Extend outwards so that the reinforced pressing plate has a T-shape.
根据本发明的另一个实例性的实施例,所述第一固定基部被支撑在所述导轨支架的表面上,所述第二固定基部被支撑在所述第一固定基部的表面上。According to another exemplary embodiment of the present invention, the first fixing base is supported on the surface of the rail bracket, and the second fixing base is supported on the surface of the first fixing base.
根据本发明的另一个实例性的实施例,在沿厚度方向的投影图中,所述导轨压板的覆盖区域的面积大于所述加强压板的覆盖区域的面积。According to another exemplary embodiment of the present invention, in the projection view along the thickness direction, the area of the covering area of the guide rail pressing plate is larger than the area of the covering area of the reinforcing pressing plate.
在根据本发明的前述各个实例性的实施例中,电梯导轨固定装置既可以适用于地震工况,也可以适用于非地震工况,提高了电梯导轨固定装置的通用性,而且本发明的电梯导轨固定装置重量轻,能够减小因建筑沉降带来的垂直力,有利于简化导轨系统的设计。In each of the foregoing exemplary embodiments according to the present invention, the elevator guide rail fixing device can be applied to both seismic and non-seismic conditions, which improves the versatility of the elevator guide rail fixing device, and the elevator of the present invention The guide rail fixing device is light in weight, can reduce the vertical force caused by the settlement of the building, and is beneficial to simplify the design of the guide rail system.
通过下文中参照附图对本发明所作的描述,本发明的其它目的和优点将显而易见,并可帮助对本发明有全面的理解。Through the following description of the present invention with reference to the accompanying drawings, other objects and advantages of the present invention will be apparent and can help a comprehensive understanding of the present invention.
附图说明Description of the drawings
图1显示根据本发明的一个实例性的实施例的电梯导轨固定装置的示意图;Figure 1 shows a schematic diagram of an elevator guide rail fixing device according to an exemplary embodiment of the present invention;
图2显示图1所示的电梯导轨固定装置的立体示意图;Figure 2 shows a three-dimensional schematic diagram of the elevator guide rail fixing device shown in Figure 1;
图3显示图2所示的电梯导轨固定装置的加强压板的立体示意图。Fig. 3 shows a three-dimensional schematic diagram of the reinforced pressing plate of the elevator guide rail fixing device shown in Fig. 2.
具体实施方式Detailed ways
下面通过实施例,并结合附图,对本发明的技术方案作进一步具体的说明。在说明书中,相同或相似的附图标号指示相同或相似的部件。下述参照附图对本发明实施方式的说明旨在对本发明的总体发明构思进行解 释,而不应当理解为对本发明的一种限制。The technical solutions of the present invention will be further specifically described below through embodiments and in conjunction with the drawings. In the specification, the same or similar reference numerals indicate the same or similar components. The following description of the embodiments of the present invention with reference to the accompanying drawings is intended to explain the general inventive concept of the present invention, and should not be construed as a limitation to the present invention.
另外,在下面的详细描述中,为便于解释,阐述了许多具体的细节以提供对本披露实施例的全面理解。然而明显地,一个或多个实施例在没有这些具体细节的情况下也可以被实施。在其他情况下,公知的结构和装置以图示的方式体现以简化附图。In addition, in the following detailed description, for the convenience of explanation, many specific details are set forth to provide a comprehensive understanding of the embodiments of the present disclosure. However, obviously, one or more embodiments can also be implemented without these specific details. In other cases, well-known structures and devices are embodied in an illustrative manner to simplify the drawings.
根据本发明的一个总体技术构思,提供一种电梯导轨固定装置,包括:导轨压板,具有用于将电梯的导轨按压和固定在电梯的导轨支架上的第一按压臂部;和螺栓连接组件,用于将所述导轨压板固定到所述导轨支架上。所述电梯导轨固定装置还包括加强压板,所述加强压板被所述螺栓连接组件固定在所述导轨压板上;所述加强压板具有第二按压臂部,在所述第一按压臂部上形成有用于容纳所述第二按压臂部的开口;在所述导轨压板处于因受地震冲击发生变形的地震工况时,所述导轨压板的第一按压臂部和所述加强压板的第二按压臂部一起按压和固定所述导轨。According to a general technical concept of the present invention, there is provided an elevator guide rail fixing device, comprising: a guide rail pressing plate having a first pressing arm for pressing and fixing the guide rail of the elevator on the guide rail support of the elevator; and a bolt connection assembly, It is used to fix the guide rail pressing plate to the guide rail bracket. The elevator guide rail fixing device further includes a reinforced pressing plate, the reinforced pressing plate is fixed on the guide rail pressing plate by the bolt connection assembly; the reinforced pressing plate has a second pressing arm portion formed on the first pressing arm portion There is an opening for accommodating the second pressing arm; when the rail pressing plate is in an earthquake working condition that is deformed due to an earthquake impact, the first pressing arm of the rail pressing plate and the second pressing of the reinforcing pressing plate The arms press and fix the guide rail together.
图1显示根据本发明的一个实例性的实施例的电梯导轨固定装置的示意图。图2显示图1所示的电梯导轨固定装置的立体示意图。Fig. 1 shows a schematic diagram of an elevator guide rail fixing device according to an exemplary embodiment of the present invention. Fig. 2 shows a three-dimensional schematic diagram of the elevator guide rail fixing device shown in Fig. 1.
如图1和图2所示,在图示的实施例中,该电梯导轨固定装置主要包括导轨压板110、加强压板120和螺栓连接组件130、140、150。As shown in FIGS. 1 and 2, in the illustrated embodiment, the elevator guide rail fixing device mainly includes a guide rail pressing plate 110, a reinforcing pressing plate 120 and bolt connection components 130, 140, and 150.
如图1和图2所示,在图示的实施例中,导轨压板110具有第一按压臂部110a,该第一按压臂部110a按压在电梯的导轨10的基部11上,用于将电梯的导轨10按压和固定在电梯的导轨支架20上。As shown in Figures 1 and 2, in the illustrated embodiment, the guide rail pressing plate 110 has a first pressing arm 110a, which presses on the base 11 of the guide rail 10 of the elevator, and is used to press the elevator The guide rail 10 is pressed and fixed on the guide rail bracket 20 of the elevator.
如图1和图2所示,在图示的实施例中,螺栓连接组件130、140、150用于将导轨压板110固定到导轨支架20上。加强压板120被螺栓连接组件130、140、150固定在导轨压板110上。As shown in FIGS. 1 and 2, in the illustrated embodiment, the bolt connection components 130, 140, and 150 are used to fix the rail pressing plate 110 to the rail bracket 20. The reinforcement pressing plate 120 is fixed on the rail pressing plate 110 by bolt connection components 130, 140, and 150.
如图1和图2所示,在图示的实施例中,加强压板120具有第二按压臂部120a。在第一按压臂部110a上形成有用于容纳第二按压臂部120a的开口111,第二按压臂部120a容纳在第一按压臂部110a上的开口111 中。As shown in FIGS. 1 and 2, in the illustrated embodiment, the reinforcing pressing plate 120 has a second pressing arm 120a. An opening 111 for receiving the second pressing arm 120a is formed on the first pressing arm 110a, and the second pressing arm 120a is received in the opening 111 on the first pressing arm 110a.
如图1和图2所示,在图示的实施例中,在导轨压板110处于因受地震冲击发生变形的地震工况时,导轨压板110的第一按压臂部110a和加强压板120的第二按压臂部120a一起按压和固定电梯的导轨10。这样,可以防止电梯的导轨10与导轨支架20脱离,保证电梯仍然能够安全运行。As shown in Figures 1 and 2, in the illustrated embodiment, when the guide rail pressing plate 110 is in an earthquake condition that is deformed due to an earthquake impact, the first pressing arm portion 110a of the guide rail pressing plate 110 and the first pressing arm portion 110a of the reinforcing pressing plate 120 The two pressing arms 120a press and fix the guide rail 10 of the elevator together. In this way, the guide rail 10 of the elevator can be prevented from separating from the guide rail bracket 20, and the safe operation of the elevator can be ensured.
如图1和图2所示,在图示的实施例中,在导轨压板110处于未发生变形的非地震工况时,加强压板120的第二按压臂部120a与导轨10不接触,导轨10仅由导轨压板110按压和固定。As shown in Figures 1 and 2, in the illustrated embodiment, when the guide rail pressing plate 110 is in a non-seismic operating condition without deformation, the second pressing arm 120a of the reinforced pressing plate 120 does not contact the guide rail 10, and the guide rail 10 Only the guide rail pressing plate 110 is pressed and fixed.
如图1和图2所示,在图示的实施例中,加强压板120的厚度大于导轨压板110的厚度,使得加强压板120的机械强度大于导轨压板110的机械强度。As shown in FIGS. 1 and 2, in the illustrated embodiment, the thickness of the reinforced pressing plate 120 is greater than the thickness of the rail pressing plate 110, so that the mechanical strength of the reinforced pressing plate 120 is greater than that of the rail pressing plate 110.
如图1和图2所示,在图示的实施例中,螺栓连接组件130、140、150包括螺栓130和螺母140,螺栓130的螺杆130a依次穿过加强压板120、导轨压板110和导轨支架20并与螺母140螺纹连接。As shown in Figures 1 and 2, in the illustrated embodiment, the bolt connection components 130, 140, 150 include a bolt 130 and a nut 140, and the screw 130a of the bolt 130 passes through the reinforcing plate 120, the guide rail 110, and the guide bracket in turn. 20 and screwed with nut 140.
如图1和图2所示,在图示的实施例中,螺栓连接组件130、140、150还包括防松垫片150,螺栓130的螺杆130a穿过防松垫片150,并且防松垫片150被挤压在螺母140和导轨支架20之间。As shown in FIGS. 1 and 2, in the illustrated embodiment, the bolt connection components 130, 140, 150 further include an anti-loosening washer 150, the screw 130a of the bolt 130 passes through the anti-loosing washer 150, and the anti-loosening washer 150 The sheet 150 is squeezed between the nut 140 and the rail bracket 20.
如图1和图2所示,在图示的实施例中,螺栓130的螺头130b抵靠在加强压板120上,导轨压板110被挤压在加强压板120和导轨支架20之间。As shown in FIGS. 1 and 2, in the illustrated embodiment, the screw head 130 b of the bolt 130 abuts on the reinforcing plate 120, and the rail pressing plate 110 is squeezed between the reinforcing plate 120 and the guide rail bracket 20.
图3显示图2所示的电梯导轨固定装置的加强压板120的立体示意图。FIG. 3 shows a three-dimensional schematic diagram of the reinforced pressing plate 120 of the elevator guide rail fixing device shown in FIG. 2.
如图1至图3所示,在图示的实施例中,在加强压板120上形成有允许螺栓130的螺杆130a穿过的通孔121。类似地,在导轨压板110和导轨支架20上也形成有允许螺栓130的螺杆130a穿过的通孔。As shown in FIGS. 1 to 3, in the illustrated embodiment, a through hole 121 that allows the screw 130 a of the bolt 130 to pass is formed on the reinforcing plate 120. Similarly, the guide rail pressing plate 110 and the guide rail bracket 20 are also formed with through holes that allow the screw 130a of the bolt 130 to pass through.
如图1至图3所示,在图示的实施例中,导轨压板110具有矩形板状的第一固定基部110b,第一按压臂部110a呈波纹状并从第一固定基部 110b的一侧向外延伸。As shown in FIGS. 1 to 3, in the illustrated embodiment, the guide rail pressing plate 110 has a rectangular plate-shaped first fixed base 110b, and the first pressing arm 110a is corrugated and extends from one side of the first fixed base 110b. Extend outward.
如图1至图3所示,在图示的实施例中,加强压板120具有矩形板状的第二固定基部120b,第二按压臂部120a呈平板状并从第二固定基部120b的一侧的中间部位向外延伸,使得加强压板120呈T字形。As shown in FIGS. 1 to 3, in the illustrated embodiment, the reinforced pressing plate 120 has a rectangular plate-shaped second fixing base 120b, and the second pressing arm 120a is in the shape of a flat plate and extends from one side of the second fixing base 120b. The middle part of the bracket extends outwards, so that the reinforcing plate 120 has a T-shape.
如图1至图3所示,在图示的实施例中,第一固定基部110b被支撑在导轨支架20的表面上,第二固定基部120b被支撑在第一固定基部110b的表面上。As shown in FIGS. 1 to 3, in the illustrated embodiment, the first fixing base 110b is supported on the surface of the rail bracket 20, and the second fixing base 120b is supported on the surface of the first fixing base 110b.
如图1和图2所示,在图示的实施例中,在沿厚度方向的投影图中,导轨压板110的覆盖区域的面积大于加强压板120的覆盖区域的面积。也就是说,加强压板120的覆盖区域的面积小于导轨压板110的覆盖区域的面积,这样可以减小加强压板120的体积和总量。As shown in FIGS. 1 and 2, in the illustrated embodiment, in the projection view along the thickness direction, the area of the coverage area of the guide rail pressing plate 110 is larger than the area of the coverage area of the reinforcement pressing plate 120. In other words, the area of the coverage area of the reinforced press plate 120 is smaller than the area of the covered area of the guide rail press plate 110, so that the volume and total amount of the reinforced press plate 120 can be reduced.
本领域的技术人员可以理解,上面所描述的实施例都是示例性的,并且本领域的技术人员可以对其进行改进,各种实施例中所描述的结构在不发生结构或者原理方面的冲突的情况下可以进行自由组合。Those skilled in the art can understand that the embodiments described above are all exemplary, and those skilled in the art can improve them, and the structures described in the various embodiments do not conflict in terms of structure or principle. In the case of free combination.
虽然结合附图对本发明进行了说明,但是附图中公开的实施例旨在对本发明优选实施方式进行示例性说明,而不能理解为对本发明的一种限制。Although the present invention has been described with reference to the accompanying drawings, the embodiments disclosed in the accompanying drawings are intended to exemplify the preferred embodiments of the present invention, and should not be understood as a limitation to the present invention.
虽然本总体发明构思的一些实施例已被显示和说明,本领域普通技术人员将理解,在不背离本总体发明构思的原则和精神的情况下,可对这些实施例做出改变,本发明的范围以权利要求和它们的等同物限定。Although some embodiments of the present general inventive concept have been shown and described, those of ordinary skill in the art will understand that changes can be made to these embodiments without departing from the principle and spirit of the present general inventive concept. The scope is defined by the claims and their equivalents.
应注意,措词“包括”不排除其它元件或步骤,措词“一”或“一个”不排除多个。另外,权利要求的任何元件标号不应理解为限制本发明的范围。It should be noted that the word "comprising" does not exclude other elements or steps, and the word "a" or "an" does not exclude a plurality. In addition, any element reference signs in the claims should not be construed as limiting the scope of the present invention.

Claims (11)

  1. 一种电梯导轨固定装置,包括:An elevator guide rail fixing device includes:
    导轨压板(110),具有用于将电梯的导轨(10)按压和固定在电梯的导轨支架(20)上的第一按压臂部(110a);和The guide rail pressing plate (110) has a first pressing arm portion (110a) for pressing and fixing the guide rail (10) of the elevator on the guide rail bracket (20) of the elevator; and
    螺栓连接组件(130、140、150),用于将所述导轨压板(110)固定到所述导轨支架(20)上,Bolt connection components (130, 140, 150) are used to fix the guide rail pressing plate (110) to the guide rail bracket (20),
    其特征在于:Its characteristics are:
    所述电梯导轨固定装置还包括加强压板(120),所述加强压板(120)被所述螺栓连接组件(130、140、150)固定在所述导轨压板(110)上;The elevator guide rail fixing device further includes a reinforced pressure plate (120), and the reinforced pressure plate (120) is fixed on the guide rail pressure plate (110) by the bolt connection components (130, 140, 150);
    所述加强压板(120)具有第二按压臂部(120a),在所述第一按压臂部(110a)上形成有用于容纳所述第二按压臂部(120a)的开口(111);The reinforced pressing plate (120) has a second pressing arm portion (120a), and an opening (111) for accommodating the second pressing arm portion (120a) is formed on the first pressing arm portion (110a);
    在所述导轨压板(110)处于因受地震冲击发生变形的地震工况时,所述导轨压板(110)的第一按压臂部(110a)和所述加强压板(120)的第二按压臂部(120a)一起按压和固定所述导轨(10)。When the guide rail pressing plate (110) is in an earthquake working condition that is deformed due to an earthquake impact, the first pressing arm portion (110a) of the guide rail pressing plate (110) and the second pressing arm of the reinforced pressing plate (120) The parts (120a) press and fix the guide rail (10) together.
  2. 根据权利要求1所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to claim 1, characterized in that:
    在所述导轨压板(110)处于未发生变形的非地震工况时,所述加强压板(120)的第二按压臂部(120a)与所述导轨(10)不接触,所述导轨(10)仅由所述导轨压板(110)按压和固定。When the guide rail pressing plate (110) is in a non-seismic working condition without deformation, the second pressing arm portion (120a) of the reinforced pressing plate (120) does not contact the guide rail (10), and the guide rail (10) ) Is only pressed and fixed by the guide rail pressing plate (110).
  3. 根据权利要求1所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to claim 1, characterized in that:
    所述加强压板(120)的厚度大于所述导轨压板(110)的厚度,使得所述加强压板(120)的机械强度大于所述导轨压板(110)的机械强度。The thickness of the reinforced press plate (120) is greater than the thickness of the guide rail press plate (110), so that the mechanical strength of the reinforced press plate (120) is greater than the mechanical strength of the rail press plate (110).
  4. 根据权利要求1-3中任一项所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to any one of claims 1-3, characterized in that:
    所述螺栓连接组件(130、140、150)包括螺栓(130)和螺母(140),所述螺栓(130)的螺杆(130a)依次穿过所述加强压板(120)、所述导轨压板(110)和所述导轨支架(20)并与所述螺母(140)螺纹连接。The bolt connection assembly (130, 140, 150) includes a bolt (130) and a nut (140), and the screw (130a) of the bolt (130) passes through the reinforcing plate (120) and the guide rail pressing plate ( 110) and the guide rail bracket (20) are screwed with the nut (140).
  5. 根据权利要求4所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to claim 4, characterized in that:
    所述螺栓连接组件(130、140、150)还包括防松垫片(150),所述螺栓(130)的螺杆(130a)穿过所述防松垫片(150),并且所述防松垫片(150)被挤压在所述螺母(140)和所述导轨支架(20)之间。The bolt connection assembly (130, 140, 150) further includes an anti-loosening washer (150), the screw (130a) of the bolt (130) passes through the anti-loosing washer (150), and the anti-loosening The washer (150) is squeezed between the nut (140) and the rail bracket (20).
  6. 根据权利要求5所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to claim 5, characterized in that:
    所述螺栓(130)的螺头(130b)抵靠在所述加强压板(120)上,所述导轨压板(110)被挤压在所述加强压板(120)和所述导轨支架(20)之间。The screw head (130b) of the bolt (130) abuts on the reinforced pressure plate (120), and the guide rail pressure plate (110) is squeezed on the reinforced pressure plate (120) and the guide rail bracket (20) between.
  7. 根据权利要求1所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to claim 1, characterized in that:
    在所述加强压板(120)上形成有允许所述螺栓(130)的螺杆(130a)穿过的通孔(121)。A through hole (121) that allows the screw (130a) of the bolt (130) to pass is formed on the reinforcing plate (120).
  8. 根据权利要求1所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to claim 1, characterized in that:
    所述导轨压板(110)具有矩形板状的第一固定基部(110b),所述第一按压臂部(110a)呈波纹状并从所述第一固定基部(110b)的一侧向外延伸。The guide rail pressing plate (110) has a rectangular plate-shaped first fixing base (110b), and the first pressing arm portion (110a) is corrugated and extends outward from one side of the first fixing base (110b) .
  9. 根据权利要求8所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to claim 8, characterized in that:
    所述加强压板(120)具有矩形板状的第二固定基部(120b),所述第二按压臂部(120a)呈平板状并从所述第二固定基部(120b)的一侧的中间部位向外延伸,使得所述加强压板(120)呈T字形。The reinforced pressing plate (120) has a rectangular plate-shaped second fixing base (120b), and the second pressing arm portion (120a) is in the shape of a flat plate and extends from the middle part of one side of the second fixing base (120b). Extend outwards so that the reinforced pressing plate (120) has a T-shape.
  10. 根据权利要求9所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to claim 9, characterized in that:
    所述第一固定基部(110b)被支撑在所述导轨支架(20)的表面上,所述第二固定基部(120b)被支撑在所述第一固定基部(110b)的表面上。The first fixing base (110b) is supported on the surface of the rail bracket (20), and the second fixing base (120b) is supported on the surface of the first fixing base (110b).
  11. 根据权利要求1所述的电梯导轨固定装置,其特征在于:The elevator guide rail fixing device according to claim 1, characterized in that:
    在沿厚度方向的投影图中,所述导轨压板(110)的覆盖区域的面积大于所述加强压板(120)的覆盖区域的面积。In the projection view along the thickness direction, the area of the covering area of the guide rail pressing plate (110) is larger than the area of the covering area of the reinforcing pressing plate (120).
PCT/CN2020/131341 2020-03-18 2020-11-25 Elevator guide rail fixing device WO2021184815A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010190507.3A CN111196541A (en) 2020-03-18 2020-03-18 Elevator guide rail fixing device
CN202010190507.3 2020-03-18

Publications (1)

Publication Number Publication Date
WO2021184815A1 true WO2021184815A1 (en) 2021-09-23

Family

ID=70745304

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/131341 WO2021184815A1 (en) 2020-03-18 2020-11-25 Elevator guide rail fixing device

Country Status (2)

Country Link
CN (1) CN111196541A (en)
WO (1) WO2021184815A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111196541A (en) * 2020-03-18 2020-05-26 迅达(中国)电梯有限公司 Elevator guide rail fixing device

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000211848A (en) * 1999-01-25 2000-08-02 Hitachi Ltd Guide rail holding device for obliquely traveling elevator
CN1338423A (en) * 2000-08-16 2002-03-06 奥蒂斯电梯公司 Railway clamp
JP2012086960A (en) * 2010-10-21 2012-05-10 Mitsubishi Electric Building Techno Service Co Ltd Fastening jig of guide rail clip for elevator
JP2016078998A (en) * 2014-10-20 2016-05-16 三菱電機株式会社 Elevator rail retainer
CN106185538A (en) * 2016-09-14 2016-12-07 长江润发机械股份有限公司 A kind of for high speed, the cage guide fixture of high rise elevator car
CN107428504A (en) * 2015-03-26 2017-12-01 三菱电机株式会社 Guide rail for elevator supporting arrangement
CN108367893A (en) * 2015-12-17 2018-08-03 因温特奥股份公司 Fixing device for fixing elevator rail
CN109502452A (en) * 2018-12-31 2019-03-22 天津桑瑞斯电梯部件有限公司 A kind of cage guide
CN110388376A (en) * 2018-04-16 2019-10-29 S.A.德贝拉(萨贝拉)公司 A kind of flange that can be adjusted according to the thickness of the wing of elevator guides
CN111196541A (en) * 2020-03-18 2020-05-26 迅达(中国)电梯有限公司 Elevator guide rail fixing device
CN211812904U (en) * 2020-03-18 2020-10-30 迅达(中国)电梯有限公司 Elevator guide rail fixing device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000211848A (en) * 1999-01-25 2000-08-02 Hitachi Ltd Guide rail holding device for obliquely traveling elevator
CN1338423A (en) * 2000-08-16 2002-03-06 奥蒂斯电梯公司 Railway clamp
JP2012086960A (en) * 2010-10-21 2012-05-10 Mitsubishi Electric Building Techno Service Co Ltd Fastening jig of guide rail clip for elevator
JP2016078998A (en) * 2014-10-20 2016-05-16 三菱電機株式会社 Elevator rail retainer
CN107428504A (en) * 2015-03-26 2017-12-01 三菱电机株式会社 Guide rail for elevator supporting arrangement
CN108367893A (en) * 2015-12-17 2018-08-03 因温特奥股份公司 Fixing device for fixing elevator rail
CN106185538A (en) * 2016-09-14 2016-12-07 长江润发机械股份有限公司 A kind of for high speed, the cage guide fixture of high rise elevator car
CN110388376A (en) * 2018-04-16 2019-10-29 S.A.德贝拉(萨贝拉)公司 A kind of flange that can be adjusted according to the thickness of the wing of elevator guides
CN109502452A (en) * 2018-12-31 2019-03-22 天津桑瑞斯电梯部件有限公司 A kind of cage guide
CN111196541A (en) * 2020-03-18 2020-05-26 迅达(中国)电梯有限公司 Elevator guide rail fixing device
CN211812904U (en) * 2020-03-18 2020-10-30 迅达(中国)电梯有限公司 Elevator guide rail fixing device

Also Published As

Publication number Publication date
CN111196541A (en) 2020-05-26

Similar Documents

Publication Publication Date Title
WO2021184815A1 (en) Elevator guide rail fixing device
JPH11241750A (en) Sliding type elastic support device for structure and high supporting pressure load supporting member
CN211812904U (en) Elevator guide rail fixing device
JP2000026041A (en) Elevator device
JP4488383B1 (en) Bridge bearing device
JP6564731B2 (en) Car mounting equipment
CN212377167U (en) Brake ring of pumping unit speed reducer and brake structure of pumping unit speed reducer
CN218968589U (en) Simple and easy staircase tip bearing structure
JP6278667B2 (en) Bonding hardware for structural members
CN217172857U (en) Frame type elevator attaching and fixing device
CN218843732U (en) Suspension device and creeping formwork
JP3018288B2 (en) Sliding elastic bearing device for structures
CN110759208B (en) Elevator device for inhibiting vibration of traction machine and elevator
CN214692781U (en) Guide rail for elevator
CN112173915B (en) Rope head combined structure for indoor construction elevator
JP6716038B2 (en) Elevator counterweight device
JP3427599B2 (en) Hydraulic jack support device for hydraulic elevator
CN211254929U (en) Escalator unloading guide rail connecting device
CN210393353U (en) Elevator car bottom without lower beam
CN211812903U (en) Elevator guide rail mounting device
US11639284B1 (en) Wedge brake elevator safety system
CN216276318U (en) Vibration damping pad for ceiling keel
JPH02265891A (en) Braking device of elevator
CN215710965U (en) Elevator car bottom suitable for shallow shaft way pit
WO2023053181A1 (en) Elevator

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20925774

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20925774

Country of ref document: EP

Kind code of ref document: A1