WO2021166015A1 - 光通信ネットワーク管理装置 - Google Patents

光通信ネットワーク管理装置 Download PDF

Info

Publication number
WO2021166015A1
WO2021166015A1 PCT/JP2020/005952 JP2020005952W WO2021166015A1 WO 2021166015 A1 WO2021166015 A1 WO 2021166015A1 JP 2020005952 W JP2020005952 W JP 2020005952W WO 2021166015 A1 WO2021166015 A1 WO 2021166015A1
Authority
WO
WIPO (PCT)
Prior art keywords
optical path
unit
communication network
virtual environment
optical communication
Prior art date
Application number
PCT/JP2020/005952
Other languages
English (en)
French (fr)
Inventor
貴章 田中
秀樹 西沢
乾 哲郎
世輝 桑原
山本 秀人
聖司 岡本
Original Assignee
日本電信電話株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電信電話株式会社 filed Critical 日本電信電話株式会社
Priority to PCT/JP2020/005952 priority Critical patent/WO2021166015A1/ja
Priority to US17/797,743 priority patent/US20230076671A1/en
Priority to JP2022501395A priority patent/JP7299551B2/ja
Publication of WO2021166015A1 publication Critical patent/WO2021166015A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B10/00Transmission systems employing electromagnetic waves other than radio-waves, e.g. infrared, visible or ultraviolet light, or employing corpuscular radiation, e.g. quantum communication
    • H04B10/27Arrangements for networking
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B10/00Transmission systems employing electromagnetic waves other than radio-waves, e.g. infrared, visible or ultraviolet light, or employing corpuscular radiation, e.g. quantum communication
    • H04B10/07Arrangements for monitoring or testing transmission systems; Arrangements for fault measurement of transmission systems
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/14Network analysis or design
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/40Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks using virtualisation of network functions or resources, e.g. SDN or NFV entities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2213/00Indexing scheme relating to selecting arrangements in general and for multiplex systems
    • H04Q2213/1301Optical transmission, optical switches

Definitions

  • the present invention relates to an optical communication network management device that manages an optical communication network in a virtual environment and a real environment.
  • the measured physical parameters are input to the simulator to design the optical path, and the config command to be set in the physical package of the communication device is generated from the value obtained by the design. Then, a communication device is installed in the field, a config command is set in the physical package of the communication device, and a test is performed.
  • Non-Patent Document 1 a device or system is virtually realized by a computer program using a technology called a digital twin, and a failure is intentionally caused in the realized virtual environment. Attempts have been made to construct an actual device or system after performing the above tests and improving the quality of the parameters to be set (see, for example, Non-Patent Document 1).
  • an optical communication network As mentioned above, in the construction of an optical communication network, a trial is performed using a simulator or the like before setting the actual communication device.
  • an actual optical communication network is configured by connecting a plurality of communication devices to each other. Therefore, there is a problem that an unexpected failure that cannot be detected in advance by the simulator occurs by actually setting the plurality of communication devices.
  • an object of the present invention is to provide a technique capable of maintaining the state of the virtual environment optical communication network so as to be close to the state of the real environment optical communication network.
  • One aspect of the present invention is a configuration of the physical package with respect to a package emulator in which the physical package of a real environment optical communication network composed of a plurality of node devices on which a physical package is mounted is virtually configured by a computer program.
  • a config generation unit that generates configuration data based on resource data, and a virtual environment optical path setting that sets the optical path in the virtual environment optical communication network based on the configuration data generated by the config generation unit.
  • An optical communication network management device including a unit and a real environment optical path setting unit that sets the optical path in the real environment optical communication network based on the configuration data used for setting the optical path.
  • the state of the virtual environment optical communication network can be maintained so as to be close to the state of the real environment optical communication network.
  • FIG. 1 is a block diagram showing a configuration of an optical communication network management system S according to the first embodiment.
  • the optical communication network management system S includes an optical communication network management device 1, a real environment optical communication network 3, and a virtual environment construction device 4.
  • the real environment optical communication network 3 is an optical communication network in which communication services are actually operated.
  • the real environment optical communication network 3 includes, for example, a plurality of node devices 61 to 64 as shown in FIG. 2 and optical fiber transmission lines 71 to 75 connecting the node devices 61 to 64.
  • FIG. 1 only the physical packages 31-1, 31-2, ..., 32-n including hardware such as transponders and amplifiers mounted on the plurality of node devices 61 to 64 of the real environment optical communication network 3 are shown. Shown.
  • n is an integer of at least 2 or more.
  • Each of the physical packages 31-1 to 31-n includes a control unit 311-1 to 311-n and a performance monitor unit 312-1 to 312-n.
  • the control units 311-1 to 311-n control the processing performed on the hardware included in the physical packages 31-1 to 31-n.
  • the control units 311-1 to 311-n control the process of setting the optical path and the process of changing the amplification factor of the amplifier.
  • the control units 311-1 to 311-n include CPUs (Central Processing Units) and FPGAs in which so-called manager application programs that control the processing of physical packages 31-1 to 31-n are included in physical packages 31-1 to 31-n. It is a functional part configured by being executed in a processing circuit such as (Field Programmable Gate Array).
  • the performance monitoring units 312-1 to 312-n include a loss (hereinafter referred to as "loss") in the optical path set in the physical packages 31-1 to 31-n, an OSNR (Optical Signal to Noise Ratio), and a physical package.
  • the communication quality such as the light level of the input / output, the excitation current of the optical amplifier, and the light level of each wavelength is measured.
  • the branch number is omitted and the physical package 31 is shown.
  • the branch number is omitted and the control unit 311 is shown.
  • the branch number is omitted and the performance monitor unit 312 is shown.
  • the virtual environment construction device 4 is, for example, a server device provided with a CPU, memory, and the like.
  • the CPU executes a computer program that virtually realizes each of the physical packages 31-1 to 31-n.
  • the computer program includes a manager application program that constitutes control units 311-1 to 311-n of physical packages 31-1 to 31-n.
  • the virtual environment construction device 4 is provided with package emulators 41-1 to 41-n that virtually realize the physical packages 31-1 to 31-n.
  • the package emulators 41-1 to 41-n construct a virtual environment optical communication network 40 that virtually realizes the real environment optical communication network 3 shown in FIG.
  • Package emulators 41-1 to 41-n include control units 411-1 to 411-n.
  • the control units 411-1 to 411-n are functional units configured by executing the manager application program included in the computer program that virtually realizes each of the physical packages 31-1 to 31-n. Yes, it is a functional unit that virtually realizes the control units 311-1 to 311-n.
  • the control units 411-1 to 411-n control the processes performed by the package emulators 41-1 to 11-n, for example, the process of setting the optical path. In the following description, when any one of the package emulators 41-1 to 41-n is shown, the branch number is omitted and the package emulator 41 is shown. Similarly, when any one of the control units 411-1 to 411-n is shown, the branch number is omitted and the control unit 411 is shown.
  • the optical communication network management device 1 includes a real environment communication unit 11, a network configuration acquisition unit 12, a real environment utilization optimization unit 13, a configuration parameter storage unit 14, an optical path design unit 15, a resource data storage unit 16, and a config generation unit 17. , Optical path config storage unit 18, real environment optical path setting unit 19, orchestration function unit 20, virtual environment communication unit 21, and test result storage unit 22.
  • the real environment communication unit 11 transmits / receives data between each of the control units 311-1 to 311-n and each of the performance monitor units 312-1 to 312-n.
  • the network configuration acquisition unit 12 connects to each of the control units 311-1 to 311-n via the real environment communication unit 11.
  • the network configuration acquisition unit 12 acquires the configuration parameters of the physical packages 31-1 to 31-n collected by each of the control units 311-1 to 311-n.
  • the real environment use optimization unit 13 is connected to each of the performance monitor units 312-1 to 312-n via the real environment communication unit 11.
  • the real environment utilization optimization unit 13 receives communication quality data indicating the communication quality measured and output by each of the performance monitoring units 312-1 to 312-n.
  • the real environment utilization optimization unit 13 optimizes the configuration parameters by changing the configuration parameters stored in the configuration parameter storage unit 14 as necessary based on the received communication quality data.
  • the configuration parameter storage unit 14 stores the configuration parameter table 141 in which the configuration parameters acquired by the network configuration acquisition unit 12 are recorded.
  • the configuration parameter table 141 has, for example, the data format shown in FIG. 3, and includes "installation point”, “node name”, “package number”, “package type”, “capacity / amplification factor”, and “resource allocation”. It has items of "capacity”, “connection destination”, and "section loss”.
  • the configuration parameter table 141 shown in FIG. 3 shows, as an example, an example in which configuration parameters acquired from the physical packages 31-1 to 31-n constituting the real environment optical communication network 3 shown in FIG. 2 are recorded. ing.
  • the real environment optical communication network 3 shown in FIG. 2 includes four node devices 61 to 64. Names of “node A”, “node B”, “node C”, and “node D” are given to each of the node devices 61 to 64 in advance.
  • Each of the node devices 61 to 64 is installed at points 51 to 54, and each of the points 51 to 54 has the names of "point A”, “point B”, “point C”, and “point D”. It is given in advance.
  • the names of points 51 to 54 such as points A and B are written in the item of "installation point”.
  • the names given to the node devices 61 to 64 such as node A and node B are written.
  • the package number the package number assigned to each of the physical packages 31-1 to 31-n included in the node devices 61 to 64 is written. As the package number, for example, an independent serial number is assigned in advance for each of the node devices 61 to 64.
  • each type of physical packages 31-1 to 31-n for example, "TPND” for the physical package 31 of the transponder for transmitting and receiving optical signals, and the physical package 31 for amplification.
  • TPND physical package 31 of the transponder for transmitting and receiving optical signals
  • the physical package 31 for amplification For example, a type such as "Amp” is written.
  • capacity / amplification factor if it is the physical package 31 of the transponder, the total usable communication capacity is written in gigabit / second units such as 400G (Gigabit / second) for amplification.
  • the amplification factor is written in units of dB.
  • optical switches such as a wavelength selection switch (Wavelength Selective Switch (WSS)) for optical branch insertion, optical couplers for optical branching, optical attenuators for optical level adjustment, and optical signal distortion correction.
  • WSS Wavelength Selective Switch
  • Distributed compensation device OSC (Optical Supervisory Channel) monitoring and control equipment, etc. shall be included.
  • sensors for measuring the environment in which devices such as temperature sensors, humidity sensors, and acceleration sensors are placed shall also be included in the physical package.
  • the communication capacity secured as a resource is written in units of gigabit / sec, and in the case of the physical package 31 for amplification, it is blank.
  • the names of the node devices 61 to 64 of the connection destination connected by the optical fiber transmission lines 71 to 75 are written in the item of "connection destination", and the physical package 31 for amplification is written. If so, it will be blank.
  • the optical path design unit 15 extracts the path of the optical path based on the configuration parameters stored in the configuration parameter table 141 and the transmission mode data given from the outside, and the resource required to accommodate the extracted path. Is detected.
  • the optical path design unit 15 includes a transmission design unit 151, a transmission design data storage unit 152, and an accommodation design unit 153.
  • the transmission design unit 151 performs transmission design processing for the optical path based on the transmission mode data given from the outside and the configuration parameters stored in the configuration parameter table 141, and generates transmission design data for each route.
  • the transmission mode data is, for example, data in the data format shown in FIG. 4, and is composed of data of “transmission mode”, “start point”, “end point”, and “capacity”.
  • the "transmission mode” data includes transmission mode identification information such as "transmission mode 1" and "transmission mode 2" that can identify each of the transmission modes.
  • the "transmission mode” includes a modulation method, a baud rate, an error correction code, a number of carriers, and the like, which are parameters related to optical transmission (Reference: Japanese Patent Application Laid-Open No.
  • the "starting point” data includes the name of the starting point of the optical path.
  • the "end point” data includes the name of the end point of the optical path.
  • the "capacity” data includes the communication capacity expressed in gigabit / second units.
  • the transmission design data storage unit 152 stores the transmission design table 1521 in which the transmission design data generated by the transmission design unit 151 is recorded.
  • the transmission design table 1521 has, for example, the data structure shown in FIG. 5, and has items of "route identification information", "transmission mode”, "start point”, “end point”, and "route”.
  • route identification information In the item of "route identification information”, route identification information that can identify each of the routes detected by the transmission design unit 151 by the transmission design process is written.
  • the transmission mode identification information corresponding to the transmission design data is written in the item of "transmission mode”.
  • start point the name of the start point of the optical path corresponding to the transmission design data is written.
  • Terminal point the name of the terminal point of the optical path corresponding to the transmission design data is written.
  • route the route data indicated by the names of the node devices 61 to 64 constituting the route from the start end to the end detected by the transmission design unit 151 by the transmission design process is written.
  • the accommodation design unit 153 stores the transmission stored in the transmission design table 1521 based on the configuration parameters stored in the configuration parameter table 141 of the configuration parameter storage unit 14 and the resources already secured recorded in the resource data storage unit 16.
  • the accommodation design process is performed to detect the resources required for each of the design data.
  • the accommodation design unit 153 generates resource data indicating the resources detected by the accommodation design process.
  • the resource data storage unit 16 stores the resource table 161 in which the resource data generated by the accommodation design unit 153 is recorded.
  • the resource table 161 has, for example, the data structure shown in FIG. 6, and has items of “route identification information”, “resource data”, “cost”, and “state”.
  • Route identification information is written in the "Route identification information" item.
  • resource data the resource data required for setting the optical path of the route corresponding to the route identification information is written.
  • the resource data indicates, for example, as shown in FIG. 6, the names of the required node devices 61 to 64 and the physical packages 31-1 to 31-n required for each of the required node devices 61 to 64.
  • the data is a combination of the information indicating the package number and the type and the values of the communication capacity and the amplification factor required for each of the required physical packages 31-1 to 31-n.
  • the cost is a value represented by, for example, the number of relay node devices 61 to 64 in the route from the start node devices 61 to 64 to the terminal node devices 61 to 64.
  • “Status” item information indicating the usage status of the optical path corresponding to the route identification information is written.
  • “free state” is written. If the optical path is in use, the “usage state” is written. If the optical path cannot be used due to an obstacle or the like, "unusable” is written.
  • the config generation unit 17 applies configuration data to the physical packages 31-1 to 31-n and the package emulators 41-1 to 41-n based on the resource data stored by the resource data storage unit 16 for each route identification information. To generate.
  • the configuration data for setting the physical packages 31-1 to 31-n and the package emulators 41-1 to 41-n the setting order data indicating the setting order of the config commands, and the config command are set in the configuration data. Includes test confirmation procedure data showing the tests to be performed and the procedure for confirming the test results.
  • the test and the confirmation for the test are, for example, a test in which a test is made to determine whether the optical path is conducting, and if the optical path is conducting, the OSNR or the like is measured.
  • the config command included in the configuration data is also used to cancel the optical path.
  • the config generation unit 17 stores templates for various config commands such as optical path settings for each type of physical packages 31-1 to 31-n in advance in the internal storage area.
  • the config generation unit 17 selects a config command template corresponding to the physical packages 31-1 to 31-n included in the resource data from the config command template, and sets the communication capacity for the selected config command template. And the amplification factor is applied to generate a config command.
  • the config generation unit 17 stores data indicating the conditions of such a setting order in advance in the internal storage area.
  • the config generation unit 17 generates setting order data for each generated config command based on the data indicating the setting order condition.
  • the config generation unit 17 stores in advance in the internal storage area the test applied for each config command and the test confirmation procedure data showing the confirmation procedure of the test.
  • the config generation unit 17 selects the test confirmation procedure data corresponding to the generated config command.
  • the config generation unit 17 generates configuration data by combining the generated config command, the generated setting order data, and the selected test confirmation procedure data.
  • the optical path config storage unit 18 stores the optical path config table 181 in which the optical path configuration data generated by the config generation unit 17 is recorded.
  • the optical path config table 181 has, for example, the data structure shown in FIG. 7, and has items of "route identification information" and "configuration data". Route identification information is written in the item of "route identification information”.
  • the "configuration data” item includes the config command used to set the optical path corresponding to the route identification information, the setting order data indicating the setting order of the config command, and the test confirmation procedure data corresponding to the config command. Data is written.
  • the real environment optical path setting unit 19 sets an optical path for the real environment optical communication network 3 based on the configuration data stored in the optical path config table 181 of the optical path config storage unit 18, and if necessary. Performs operation check test processing for the set optical path.
  • the virtual environment communication unit 21 transmits / receives data to / from the virtual environment construction device 4.
  • the orchestration function unit 20 includes a request reception unit 203, a virtual environment configuration management unit 201, and a virtual environment optical path setting unit 202.
  • the request receiving unit 203 receives the request data requesting the setting of the optical path given from the outside, and detects the route identification information of the empty optical path matching the conditions specified in the request data from the resource table 161.
  • the virtual environment configuration management unit 201 connects to the virtual environment communication unit 21 and sets the package emulators 41-1 to 41-n in the virtual environment construction device based on the configuration parameters stored in the configuration parameter table 141 of the configuration parameter storage unit 14. By generating in 4, the virtual environment optical communication network 40 is constructed.
  • the virtual environment optical path setting unit 202 sets an optical path for the virtual environment optical communication network 40 based on the configuration data stored in the optical path config table 181 of the optical path config storage unit 18, and if necessary. Performs operation check test processing for the set optical path.
  • the test result storage unit 22 stores the actual environment test result table 221.
  • the actual environment test result table 221 has the data structure shown in FIG. 8, and has items of "route identification information", "test result of operation confirmation test processing in the actual environment", and "processing time". Route identification information is written in the item of "route identification information”.
  • the test result of operation confirmation test processing in actual environment the test result of operation confirmation test processing performed by the actual environment optical path setting unit 19 based on the test confirmation procedure data included in the configuration data is written.
  • processing time the processing time when the operation confirmation test process performed by the actual environment optical path setting unit 19 based on the test confirmation procedure data included in the configuration data is written.
  • FIGS. 9 and 10 are flowcharts showing a processing flow by the optical communication network management device 1 of the first embodiment.
  • the network configuration acquisition unit 12 connects to the control units 311-1 to 311-n of the physical packages 31-1 to 31-n of the real environment optical communication network 3 via the real environment communication unit 11 and requests the configuration parameters. Send a request signal.
  • the control units 311-1 to 311-n receive the request signal from the network configuration acquisition unit 12, they collect the configuration parameters from the corresponding physical packages 31-1 to 31-n, and the collected configuration parameters are used for the network configuration. It is transmitted to the acquisition unit 12.
  • the network configuration acquisition unit 12 When the network configuration acquisition unit 12 receives the configuration parameters from the control units 311-1 to 311-n, the network configuration acquisition unit 12 writes the received configuration parameters in the configuration parameter table 141 (step S1).
  • the virtual environment configuration management unit 201 When the virtual environment configuration management unit 201 detects that the configuration parameter has been written in the configuration parameter table 141, the virtual environment configuration management unit 201 reads out the configuration parameter from the configuration parameter table 141.
  • the virtual environment configuration management unit 201 constructs the virtual environment optical communication network 40 by generating the package emulators 41-1 to 41-n in the virtual environment construction device 4 based on the read configuration parameters (step S2). ..
  • the transmission design unit 151 takes in the transmission mode data given from the outside (step S3).
  • the processing of steps S4 to S11 shown below is repeatedly performed for each combination of the transmission mode identification information included in the transmission mode data captured by the transmission design unit 151, the start point, the end point, and the capacitance (loop L1s). ⁇ L1e).
  • the transmission design unit 151 takes in the transmission mode data shown in FIG. 4, for example, and selects the first combination of "transmission mode 1".
  • the "transmission mode 1" is a transmission mode in which the start point is the "A point” and the end point is the "D point", and a communication capacity of 100 G is required.
  • the transmission design unit 151 is a route having a start point of "point A” and an end point of "point D” based on the configuration parameters stored in the configuration parameter table 141, and has a communication capacity of 100 G. Is detected.
  • optical communication network 3 there are the following four routes that can secure a communication capacity of 100 G from the point A to the point D. That is, a route from node A to node D via node B, a route from node A to node D via node C, and a route from node A to node D via node B and node C. There is a route and a route from node A to node D via node C and node B.
  • the transmission design unit 151 When performing a transmission design process in which the routes are dispersed, the transmission design unit 151 detects all the above four routes in the transmission design process. The transmission design unit 151 generates and assigns route identification information that can identify each of the routes to each of the route data indicating the four detected routes, and further, the transmission mode identification information, the name of the start point, and the end. Generate transmission design data by associating the names of points. As shown in FIG. 5, the transmission design unit 151 writes and stores each of the transmission design data indicating the four routes in the transmission design table 1521 of the transmission design data storage unit 152 (step S4).
  • the accommodation design unit 153 When new transmission design data is generated in the transmission design table 1521, the accommodation design unit 153 obtains the resources required for the route corresponding to the new transmission design data based on the configuration parameters stored in the configuration parameter table 141. Perform the containment design process to detect. If a record has already been generated in the resource table 161, it is necessary to consider the reserved resources. Therefore, the accommodation design unit 153 stores the configuration parameters stored in the configuration parameter table 141 and the resource table 161. Accommodation design processing is performed based on the resource data to be generated.
  • the accommodation design unit 153 generates resource data indicating the resources detected by the accommodation design process, and calculates the cost value based on the generated resource data.
  • the accommodation design unit 153 generates a new record in the resource table 161 of the resource data storage unit 16, and associates the generated record with the resource data, the cost, and the route identification information corresponding to the resource data, and FIG. Write and memorize as shown in.
  • the accommodation design unit 153 writes the "vacant state" as an initial value in the "state” item of the resource table 161 (step S5).
  • the config generation unit 17 When a new record is generated in the resource table 161, the config generation unit 17 generates the configuration data of the optical path corresponding to the generated record. The config generation unit 17 associates the generated configuration data with the route identification information included in the generation source record, and writes the route identification information in the optical path config table 181 of the optical path config storage unit 18 as shown in FIG. To memorize in (step S6).
  • step S6 When the process of step S6 is completed, the processes of steps S5 and S6 are performed for the next new route identification information (loop L2e).
  • the config generation unit 17 When the config generation unit 17 completes writing the configuration data corresponding to all the newly generated records in the resource table 161 to the optical path config table 181, the config generation unit 17 temporarily provides an optical path to the real environment optical communication network 3. In order to set, a path temporary setting instruction signal including the route identification information corresponding to all the generated configuration data is output to the actual environment optical path setting unit 19.
  • the optical path config table 181 When the real environment optical path setting unit 19 receives the path temporary setting instruction signal from the config generation unit 17, the optical path config table 181 outputs the configuration data corresponding to all the route identification information included in the path temporary setting instruction signal. Read from.
  • the real environment optical path setting unit 19 refers to the config command and the setting order data included in the read configuration data, and corresponds to the config command via the real environment communication unit 11 in the setting order indicated by the setting order data.
  • An optical path is set in the real environment optical communication network 3 by applying it to the control units 311-1 to 311-n of the physical packages 31-1 to 31-n (step S7).
  • the actual environment optical path setting unit 19 performs an operation confirmation test process on the optical path set as necessary based on the test confirmation procedure data included in the read configuration data.
  • the real environment optical path setting unit 19 acquires the time when the operation confirmation test process is performed from a time measuring means such as a clock provided inside.
  • the real environment optical path setting unit 19 associates the route identification information corresponding to the configuration data used in the operation confirmation test process with the test result of the operation confirmation test process and the acquired time, as shown in FIG. Is written and stored in the actual environment test result table 221 of the test result storage unit 22.
  • the real environment optical path setting unit 19 completes all the route identification information included in the path temporary setting instruction signal.
  • a completion notification signal including the above is output to the real environment utilization optimization unit 13 (step S8).
  • step S7 If the setting of the optical path for the actual environment optical communication network 3 fails in step S7, the actual environment optical path setting unit 19 does not perform the operation confirmation test process in step S8, and the actual environment test result table 221 shows. Write that the optical path setting failed in the item of "test processing of operation confirmation test processing in the actual environment", and write the time acquired from the internal measuring means at that time in the item of "processing time”.
  • the performance monitor units 312-1 to 312 of the physical packages 31-1 to 31-n pass through the real environment communication unit 11. It is connected to -n and transmits a request signal requesting measurement of communication quality to each of the performance monitoring units 312-1 to 312-n.
  • the performance monitoring units 312-1 to 312-n receive the request signal from the actual environment use optimization unit 13, they measure the communication quality of each physical package 311-1 to 31-n and generate communication quality data. Then, the generated communication quality data is transmitted to the actual environment utilization optimization unit 13.
  • the actual environment utilization optimization unit 13 receives various communication quality data from the performance monitoring units 312-1 to 312-n, the actual environment utilization optimization unit 13 receives various communication quality data and a predetermined threshold value for the various communication quality data. Based on the above, it is determined whether or not it is necessary to change the configuration parameters stored in the configuration parameter table 141 (step S9).
  • the threshold value of fiber loss which is one of the measurement items measured by the performance monitoring units 312-1 to 312-n, is set to 25 dB or less in advance.
  • the loss of the optical path set in the optical fiber transmission line 71 connecting the node device 61 of the node A and the node device 62 of the node B is lost.
  • the actual environment utilization optimization unit 13 actually describes the items of the section loss between the node A and the node B in the first row of the configuration parameter table 141 and the section loss between the node B and the node A in the fourth row. It is determined that it is necessary to rewrite and change to "30 dB" according to.
  • step S9 the configuration parameters need to be changed
  • the configuration parameters that need to be changed make changes.
  • the virtual environment configuration management unit 201 When the virtual environment configuration management unit 201 detects that the configuration parameters in the configuration parameter table 141 have been changed after the package emulators 41-1 to 41-n are generated, the virtual environment configuration management unit 201 identifies the changed configuration parameters. Then, the virtual environment configuration management unit 201 generates a config command necessary for setting the changed configuration parameters. Similar to the config generation unit 17, the virtual environment configuration management unit 201 stores the config command template for each configuration parameter in the internal storage area in advance for each type of physical packages 31-1 to 31-n. .. The virtual environment configuration management unit 201 selects a config command template corresponding to the configuration parameter from the config command template, applies the changed configuration parameter to the selected config command template, and generates a config command. ..
  • the virtual environment configuration management unit 201 connects to the control units 411-1 to 411-n of the package emulators 41-1 to 41-n corresponding to the changed configuration parameters via the virtual environment communication unit 21.
  • the virtual environment configuration management unit 201 applies the generated config command to the connected control units 411-1 to 411-n to change the configuration parameters.
  • the real environment utilization optimization unit 13 tells the real environment optical path setting unit 19 a path including the path identification information of the optical path set in the real environment optical communication network 3 in step S7. Outputs a release instruction signal.
  • the real environment optical path setting unit 19 When the real environment optical path setting unit 19 receives the pass release instruction signal from the real environment use optimization unit 13, the real environment optical path setting unit 19 releases the optical path corresponding to all the route identification information included in the pass release instruction signal.
  • the real environment utilization optimization unit 13 identifies all the routes included in the completion notification signal so that the transmission design unit 151 can perform the transmission design process for the same transmission mode again based on the changed configuration parameters.
  • a redesign instruction signal including information is output to the transmission design unit 151 (step S10).
  • the transmission design unit 151 receives the redesign instruction signal from the real environment utilization optimization unit 13, the transmission design unit 151 deletes the record of the transmission design table 1521 corresponding to the route identification information included in the completion notification signal, and performs the same transmission.
  • step S4 for the mode here, “transmission mode 1” is started.
  • the accommodation design unit 153 deletes the record corresponding to the route identification information deleted from the transmission design table 1521 from the resource table 161 and then deletes the new route identification information generated in the transmission design table 1521.
  • the accommodation design process is performed based on the transmission design data of.
  • the optimization unit 13 determines the value of the section loss item between node A and node B in the first row of the configuration parameter table 141 and the section loss between node B and node A in the fourth row. Rewrite the item value to "35 dB".
  • the transmission design unit 151 shows a large loss of "35 dB" in the section loss between the node A and the node B. Therefore, for example, between the node A and the node B.
  • the route between the node A and the node B is selected as in the previous step S4.
  • the transmission design unit 151 describes the physical packages 31-1 to 31-n (third and seventh rows of the configuration parameter table 141) for amplifying the nodes A and B of the configuration parameter table 141. Rewrite the item "Capacity / Amplification Rate" so as to increase the amplification factor.
  • the accommodation design unit 153 performs a process of detecting the resource, and in step S6, the config generation unit 17 generates configuration data.
  • the real environment optical path setting unit 19 sets the optical path based on the generated configuration data, so that the physical packages 31-1 to 31-n for amplification of the node A and the node B are set.
  • the optical path is set with the amplification factor of. As a result, the section loss between the node A and the node B is reduced.
  • step S9 when the real environment utilization optimization unit 13 determines that it is not necessary to change the configuration parameters (step S9, no change is required), the real environment optical communication network is transmitted to the network configuration acquisition unit 12. Outputs a configuration parameter update instruction signal for updating the configuration parameters related to the optical path set in 3.
  • the network configuration acquisition unit 12 receives the configuration parameter update instruction signal from the actual environment utilization optimization unit 13, the network configuration acquisition unit 12 performs the same processing as in step S1 and configures the configuration parameters received from the control units 311-1 to 311-n. Write the configuration parameters in the parameter table 141. As a result, the value of the communication capacity of the "resource reserved capacity" in the configuration parameter table 141 is updated.
  • step S4 the transmission design process is performed in consideration of the communication capacity secured as a resource.
  • the real environment utilization optimization unit 13 outputs a process continuation instruction signal for causing the transmission design unit 151 to perform the transmission design process for the next transmission mode (step S11).
  • the transmission design unit 151 When the transmission design unit 151 receives the processing continuation instruction signal from the real environment utilization optimization unit 13, the transmission design unit 151 starts the processing of step S4 for the next transmission mode in the transmission mode data, here, the “transmission mode 2” (loop L1e). ).
  • the real environment utilization optimization unit 13 performs all of the real environment optical path setting units 19 with respect to the real environment optical path setting unit 19. Outputs a pass release instruction signal.
  • the real environment optical path setting unit 19 receives the all pass release instruction signal from the real environment use optimization unit 13, all the optical paths set in the real environment optical communication network 3 are canceled (step S12). After that, the process of setting the optical path to be actually operated is started (the process continues from the reference numeral A in FIG. 9 to the reference numeral A in FIG. 10).
  • the request reception unit 203 takes in the request data given from the outside (step S20).
  • the request data indicating the request for setting two 100G optical paths at the points A and D is captured.
  • the processes of steps S21 to S29 shown below are repeated according to the number of optical paths included in the request data (loops L3s to L3e).
  • the request reception unit 203 refers to the resource table 161, detects a free resource corresponding to the optical path specified in the request data, and reads out the route identification information corresponding to the detected resource (step S21).
  • the optical path specified by the request data given to the request receiving unit 203 is an optical path corresponding to any of the transmission mode conditions of the transmission mode data given to the transmission design unit 151. It is assumed. Therefore, in the first step S21, the following description will be made assuming that the request receiving unit 203 can always detect the route identification information of the free resource corresponding to the optical path specified by the request data.
  • the request reception unit 203 refers to the actual environment test result table 221 and determines whether or not the test result corresponding to the read route identification information is good (step S22). When the request receiving unit 203 determines that the test result corresponding to the read route identification information is not good (step S22, No), the process proceeds to step S28.
  • the fact that the test result by the operation confirmation test process is not good means that, for example, the test result does not satisfy a predetermined predetermined condition, and the predetermined condition is, for example, various predetermined conditions. Communication quality data threshold value, etc. For example, if the loss from the start point to the end point measured by the test exceeds a predetermined threshold value, it means that the predetermined condition is not satisfied. In addition, if the optical path setting fails, it shall be included when the test result is not good.
  • the request reception unit 203 determines that the test result corresponding to the read route identification information is good (step S22, Yes)
  • the request reception unit 203 sets the path setting request signal including the route identification information as the virtual environment optical path. Output to unit 202.
  • the virtual environment optical path setting unit 202 When the virtual environment optical path setting unit 202 receives the path setting request signal from the request reception unit 203, the virtual environment optical path setting unit 202 reads the configuration data corresponding to the route identification information included in the path setting request signal from the optical path config table 181.
  • the virtual environment optical path setting unit 202 refers to the config command and the setting order data included in the read configuration data, and issues the config command to the corresponding package emulators 41-1 to 41-n in the setting order indicated by the setting order data. It is set in the control units 411-1 to 411-n of. As a result, an optical path is set in the virtual environment optical communication network 40 (step S23).
  • the virtual environment optical path setting unit 202 performs an operation confirmation test process on the set optical path according to the test confirmation procedure data included in the read configuration data (step S24).
  • the virtual environment optical path setting unit 202 determines whether or not the result of the operation confirmation test process is good (step S25).
  • the virtual environment optical path setting unit 202 outputs a path setting completion response signal including the route identification information to the request reception unit 203. do.
  • the request receiving unit 203 When the request receiving unit 203 receives the path setting completion response signal from the virtual environment optical path setting unit 202, the request receiving unit 203 transmits the path setting request signal including the route identification information included in the path setting completion response signal to the actual environment optical path setting unit 19 Output to.
  • the actual environment optical path setting unit 19 When the real environment optical path setting unit 19 receives the path setting request signal from the request reception unit 203, the actual environment optical path setting unit 19 reads the configuration data corresponding to the route identification information included in the path setting request signal from the optical path config table 181.
  • the real environment optical path setting unit 19 refers to the config command and the setting order data included in the read configuration data, and issues the config command to the corresponding physical package 31-1 to 31-n in the setting order indicated by the setting order data. It is set in the control units 311-1 to 311-n of. As a result, an optical path is set in the real environment optical communication network 3.
  • the actual environment optical path setting unit 19 performs an operation confirmation test process on the set optical path according to the test confirmation procedure data included in the read configuration data.
  • the real environment optical path setting unit 19 acquires the time when the operation confirmation test process is performed from the internal timing means.
  • the real environment optical path setting unit 19 associates the route identification information corresponding to the configuration data used in the operation confirmation test process with the test result of the operation confirmation test process and the acquired time, as shown in FIG. Is written and stored in the actual environment test result table 221 of the test result storage unit 22.
  • the actual environment optical path setting unit 19 outputs a path setting completion response signal including the route identification information included in the path setting request signal to the request reception unit 203.
  • the request reception unit 203 displays the "state" item of the resource table 161 corresponding to the route identification information included in the path setting completion response signal. Rewrite to "use state" (step S26).
  • step S25 when the virtual environment optical path setting unit 202 determines that the result of the operation confirmation test process is not good (step S25, No), the virtual environment optical path setting unit 202 is set in the virtual environment optical communication network 40. Cancel the optical path. If the virtual environment optical path setting unit 202 fails to set the optical path in step S23, the operation confirmation test process in step S24 is not performed, and the virtual environment optical path setting unit 202 determines in step S25 that it is not good.
  • the virtual environment optical path setting unit 202 outputs a resource data confirmation instruction signal instructing to confirm whether another free resource exists to the request reception unit 203 (step S27).
  • the request receiving unit 203 When the request receiving unit 203 receives the resource data confirmation instruction signal from the virtual environment optical path setting unit 202 or determines No in step S22, the request receiving unit 203 refers to the resource table 161 and refers to another free resource. That is, it is determined whether or not there is a resource that has not yet been determined in step S22 (step S28).
  • step S28 determines that another free resource exists (step S28, Yes)
  • the request receiving unit 203 performs the process from step S21 again.
  • step S28, No determines that there is no other free resource (step S28, No)
  • the request receiving unit 203 notifies the outside that the path cannot be set (step S29).
  • the request receiving unit 203 After the processing of step S26 and step S29, the request receiving unit 203 repeatedly processes the next optical path included in the request data (loop L3e), and when the processing of the optical path included in all the request data is completed, End the process.
  • step S21 it is assumed that the request receiving unit 203 detects the resource data in ascending order of the numerical value of the item of "cost" in the resource table 161.
  • the route identification information "in the resource table 161" is set in the real environment optical communication network 3.
  • the optical path 81 corresponding to "1” and the optical path 82 corresponding to the route identification information "2" are set.
  • the item of "state” corresponding to the route identification information "1” and "2" in the resource table 161 is rewritten to "use state".
  • step S21 described above when a plurality of resource data corresponding to the optical path specified by the request data exists, the resource data to be detected by the request receiving unit 203 can be arbitrarily determined, as described above. It may be detected from resource data having a small cost value, or it may be detected randomly.
  • step S4 above an example of the transmission design process performed by the transmission design unit 151 is shown as a process of detecting a route that can secure the communication capacity specified in the transmission mode data at the start point and the end point. , Received OSNR, etc. may be taken into consideration.
  • the transmission design unit 151 calculates the reception OSNR of each detected route in the transmission design process, and when the calculated reception OSNR is equal to or less than a predetermined threshold value, the physical package 31-1 for communication having a large TxOSNR. Transmission design is performed so that the received OSNR exceeds the threshold value by selecting a route that can use ⁇ 31-n or selecting a route that can use physical packages 31-1 to 31-n for amplification with good NF. You may do so.
  • the transmission design unit 151 is supposed to perform the transmission design process so that the routes are dispersed, but the transmission design detects only the number of the node devices 61 to 64 to be relayed, that is, the route that minimizes the cost. The process may be performed.
  • the transmission design unit 151 detects two routes, a route of node A, node B, and node D, and a route of node A, node C, and node D.
  • the accommodation design unit 153 performs the accommodation design process for securing one line for each route.
  • the accommodation design process for securing a predetermined number of lines for each route is performed. It may be.
  • the optical path set by the actual environment optical path setting unit 19 in step S26 is an optical path for which the test result of the operation confirmation test process in the actual environment optical communication network 3 is determined to be good in step S22. .. Therefore, in the process of step S26, it is unlikely that the optical path setting fails, and it is assumed that the optical path setting does not fail.
  • step S26 If the failure of setting the optical path in step S26 is taken into consideration, the following processing will be performed. If the actual environment optical path setting unit 19 fails to set the optical path, the operation confirmation test process is not performed, and the optical path is set in the item of "test process of operation confirmation test process in the actual environment" in the actual environment test result table 221. Write that the setting of is unsuccessful, and write the time acquired from the internal timekeeping means at that time in the "Processing time" item. The real environment optical path setting unit 19 outputs a path setting impossible response signal including the route identification information included in the path setting request signal to the request reception unit 203. When the request receiving unit 203 receives the path setting impossible response signal from the actual environment optical path setting unit 19, it notifies the outside that the path could not be set and ends the process.
  • the control units 311-1 to 311-n of the physical packages 31-1 to 31-n shown above realize the functions of, for example, the config execution unit, the state transition management unit, the error detection unit, and the log recording unit.
  • the config execution unit acquires config commands from the optical communication network management device 1, and executes the acquired config commands in physical packages 31-1 to 31-n.
  • the state transition management unit manages changes in the states of the physical packages 31-1 to 31-n due to the execution of the config command.
  • the error detection unit detects an error or the like when executing a config command.
  • the error detection unit outputs the detected error to the optical communication network management device 1.
  • the log recording unit records the log data of the physical packages 31-1 to 31-n.
  • the log recording unit outputs log data to the optical communication network management device 1 as needed.
  • the control units 411-1 to 411-n of the package emulators 41-1 to 41-n have the same functions as the control units 311-1 to 311-n of the physical packages 31-1 to 31-n. That is, the control units 411-1 to 411-n of the package emulators 41-1 to 41-n execute and log the config commands executed by the control units 311-1 to 311-n of the physical packages 31-1 to 31-n. Has functions such as output and error detection. In this way, the control units 411-1 to 411-n of the package emulators 41-1 to 41-n can simulate not only the quality and design of the transmission line but also the defects that occur at the time of config execution.
  • the network configuration acquisition unit 12 is an actual environment light composed of a plurality of node devices 61 to 64 on which physical packages 31-1 to 31-n are mounted.
  • the configuration parameters are acquired from the physical packages 31-1 to 31-n of the communication network 3.
  • the configuration parameter storage unit 14 stores the configuration parameters acquired by the network configuration acquisition unit 12.
  • the virtual environment configuration management unit 201 sets the configuration parameters stored in the configuration parameter storage unit 14 for the package emulators 41-1 to 41-n in which the physical packages 31-1 to 31-n are virtually configured by a computer program. By doing so, the virtual environment optical communication network 40 is generated.
  • the optical path design unit 15 detects the optical path route based on the configuration parameters stored in the configuration parameter storage unit 14 and the required transmission mode, and resource data indicating the resources required for each detected route. To generate.
  • the resource data storage unit 16 stores the resource data generated by the optical path design unit 15 in association with each of the routes with identifiable route identification information.
  • the config generation unit 17 generates configuration data based on the resource data stored in the resource data storage unit 16.
  • the optical path config storage unit 18 stores the configuration data generated by the config generation unit 17 in association with the route identification information.
  • the virtual environment optical path setting unit 202 sets an optical path in the virtual environment optical communication network 40 based on the configuration data stored in the optical path config storage unit 18.
  • the real environment optical path setting unit 19 sets an optical path in the real environment optical communication network 3 based on the configuration data used by the virtual environment optical path setting unit 202 for setting the optical path.
  • the optical communication network management device 1 manages both the real environment optical communication network 3 and the virtual environment optical communication network 40 that virtually realizes the real environment optical communication network 3, and the virtual environment optical communication network 40. Can be maintained so as to approach the state of the real environment optical communication network 3.
  • various failure states and optical path configuration changes can be simulated using the virtual environment optical communication network 40.
  • problems in the real environment optical communication network 3 can be identified without affecting the optical path during operation, so that the real environment optical communication network can be identified. It becomes easy to improve the quality of No. 3, and it becomes possible to reduce the OPEX (Operating Expese) required for the operation of the real environment optical communication network 3, that is, the business cost and the operating cost.
  • the real environment utilization optimization unit 13 causes the real environment optical path setting unit 19 to temporarily set the optical path in the real environment optical communication network 3.
  • the configuration parameters stored in the configuration parameter table 141 are optimized. By optimizing the configuration parameters in this way, it is possible to maintain the state of the virtual environment optical communication network 40 so as to be close to the state of the real environment optical communication network 3.
  • the configuration data stored in the optical path config storage unit 18 includes config commands, setting order data indicating the setting order of config commands, and a test confirmation procedure.
  • the virtual environment optical path setting unit 202 applies the config commands in the order indicated by the setting order data included in the configuration data stored in the optical path config storage unit 18.
  • An optical path is set in the virtual environment optical communication network 40, and an operation confirmation test process is performed on the optical path for which the setting is successful based on the test confirmation procedure data.
  • the real environment optical path setting unit 19 is applied by the virtual environment optical path setting unit 202 to the virtual environment optical communication network 40.
  • An optical path is set in the real environment optical communication network 3 using the configuration data. As a result, it was possible to confirm the accuracy of the config command and the accuracy of the setting order in the virtual environment optical communication network 40 in advance, and further, it was confirmed by the operation confirmation test process that there was no problem in the set optical path. Above, an optical path can be set in the real environment optical communication network 3. Therefore, it is possible to prevent an unexpected failure from occurring during the optical path to the real environment optical communication network 3.
  • FIG. 12 is a block diagram showing a configuration of the optical communication network management system Sa according to the second embodiment.
  • the optical communication network management system S of the first embodiment a process of temporarily setting an optical path for the real environment optical communication network 3 and the real environment utilization optimization unit 13 optimizing the configuration parameters. After that, the operation confirmation test process by the virtual environment optical communication network 40 was performed.
  • the optical communication network management system Sa of the second embodiment is different from the first embodiment in that the operation confirmation test process is first performed in the virtual environment optical communication network 40.
  • the optical communication network management system Sa includes an optical communication network management device 1a, a real environment optical communication network 3, and a virtual environment construction device 4.
  • the optical communication network management device 1a includes a real environment communication unit 11, a network configuration acquisition unit 12, a real environment utilization optimization unit 13, a configuration parameter storage unit 14, an optical path design unit 15, a resource data storage unit 16, and a config generation unit 17a. , Optical path config storage unit 18, real environment optical path setting unit 19a, orchestration function unit 20a, virtual environment communication unit 21, and test result storage unit 22a.
  • the config generation unit 17a has the same configuration as the config generation unit 17 of the first embodiment except for the following points.
  • the config generation unit 17 of the first embodiment temporarily sets the path including all the route identification information corresponding to all the generated configuration data.
  • the instruction signal was output to the actual environment optical path setting unit 19.
  • the config generation unit 17a of the second embodiment sends a path temporary setting instruction signal including the route identification information corresponding to the generated configuration data to the virtual environment optical path setting unit 202a of the orchestration function unit 20a. Output to.
  • the test result storage unit 22a stores the actual environment test result table 221 shown in FIG. 8 and the virtual environment test result table 222 shown in FIG.
  • the virtual environment test result table 222 has items of "route identification information” and "test result of operation confirmation test process in virtual environment”. Route identification information is written in the item of "route identification information”. In the item of "test result of operation confirmation test processing in virtual environment”, the test result of operation confirmation test processing performed by the virtual environment optical path setting unit 202a based on the test confirmation procedure data included in the configuration data is written.
  • the real environment optical path setting unit 19a receives a pass temporary setting instruction signal from the virtual environment optical path setting unit 202a.
  • the real environment optical path setting unit 19a receives the path temporary setting instruction signal from the virtual environment optical path setting unit 202a
  • the real environment optical path setting unit 19a refers to the virtual environment test result table 222 of the test result storage unit 22a and operates in the virtual environment optical communication network 40. Extract the route identification information for which the test result of the confirmation test process is good.
  • the real environment optical path setting unit 19a temporarily sets the optical path corresponding to the extracted route identification information in the real environment optical communication network 3.
  • the actual environment optical path setting unit 19a sets an optical path corresponding to the route identification information included in the path setting request signal.
  • the orchestration function unit 20a includes a virtual environment configuration management unit 201, a virtual environment optical path setting unit 202a, and a request reception unit 203a.
  • the virtual environment optical path setting unit 202a has the following configurations in addition to the configuration of the virtual environment optical path setting unit 202 of the first embodiment.
  • the virtual environment optical path setting unit 202a of the second embodiment virtually associates the test result of the operation confirmation test process with the route identification information corresponding to the optical path. Write in the environmental test result table 222.
  • the virtual environment optical path setting unit 202a when the virtual environment optical path setting unit 202a receives the path temporary setting instruction signal from the config generation unit 17a, the virtual environment optical path setting unit 202a temporarily sets the optical path corresponding to the route identification information included in the path temporary setting instruction signal in the virtual environment. Set to the optical communication network 40.
  • the request receiving unit 203a When the request receiving unit 203a receives the request data requesting the setting of the optical path given from the outside, the request receiving unit 203a is an optical path that matches the conditions specified in the request data, is in a free state, and is in the real environment optical communication network 3. And the path identification information of the optical path for which the test result of the operation confirmation test process in the virtual environment optical communication network 40 is good is detected from the resource table 161 of the resource data storage unit 16.
  • FIG. 14 and 15 are flowcharts showing the flow of processing by the optical communication network management device 1 of the second embodiment.
  • step Sa1 the same processing as step S1 in FIG. 9 is performed by the network configuration acquisition unit 12.
  • step Sa2 the same processing as in step S2 of FIG. 9 is performed by the virtual environment configuration management unit 201.
  • the transmission design unit 151 takes in the transmission mode data given from the outside (step Sa3).
  • the processes of steps Sa4 to Sa15 shown below are repeatedly performed for each combination of the transmission mode identification information included in the transmission mode data, the start point, the end point, and the capacitance (loops La1s to La1e).
  • step Sa4 the same processing as in step S4 of FIG. 9 is performed by the transmission design unit 151.
  • the number of route identification information generated by the transmission design unit 151 is repeated, and the following processes of steps Sa5 to Sa9 are performed (loops La2s to La2e).
  • step Sa5 the same processing as in step S5 of FIG. 9 is performed by the accommodation design unit 153.
  • the config generation unit 17a When a new record is generated in the resource table 161, the config generation unit 17a generates the configuration data of the optical path corresponding to the generated record. The config generation unit 17a associates the generated configuration data with the corresponding route identification information, writes it in the optical path config table 181 and stores it as shown in FIG. 7. When the writing of the generated configuration data to the optical path config table 181 is completed, the config generation unit 17a sends a path temporary setting instruction signal including the route identification information corresponding to the generated configuration data to the virtual environment optical path setting unit 202a. Is output to (step Sa6).
  • the virtual environment optical path setting unit 202a When the virtual environment optical path setting unit 202a receives the path temporary setting instruction signal from the config generation unit 17a, the virtual environment optical path setting unit 202a reads the configuration data corresponding to the route identification information included in the path temporary setting instruction signal from the optical path config table 181. ..
  • the virtual environment optical path setting unit 202a refers to the config command and the setting order data included in the read configuration data, and issues the config command in the setting order indicated by the setting order data to the corresponding package emulators 41-1 to 41-n. It is set in the control units 411-1 to 411-n of.
  • the optical path corresponding to the route identification information included in the path temporary setting instruction signal is set in the virtual environment optical communication network 40 (step Sa7).
  • the virtual environment optical path setting unit 202a performs an operation confirmation test process on the set optical path based on the test confirmation procedure data included in the configuration data corresponding to the optical path (step Sa8).
  • the virtual environment optical path setting unit 202a associates the route identification information corresponding to the configuration data used in the operation confirmation test process with the test result of the operation confirmation test process, and as shown in FIG. 13, the test result storage unit. It is written and stored in the virtual environment test result table 222 of 22 (step Sa9).
  • step Sa7 If the setting of the optical path for the virtual environment optical communication network 40 fails in step Sa7, the virtual environment optical path setting unit 202a does not perform the operation confirmation test process in step Sa8, and the virtual environment test result table in step Sa9. Write that the optical path setting failed in the item of "Test process of operation check test process in virtual environment" of 222.
  • step Sa9 When the processing up to step Sa9 is completed, the processing after step Sa5 is performed for the next new route identification information (loop La2e).
  • the virtual environment optical path setting unit 202a When the processing up to step Sa9 for all the route identification information is completed, the virtual environment optical path setting unit 202a outputs a path temporary setting instruction signal including all the route identification information targeted for processing to the real environment optical path setting unit 19a. do.
  • the real environment optical path setting unit 19a When the real environment optical path setting unit 19a receives the path temporary setting instruction signal from the virtual environment optical path setting unit 202a, the real environment optical path setting unit 19a refers to the virtual environment test result table 222 of the test result storage unit 22a and is included in the path temporary setting instruction signal. From the route identification information, all the route identification information for which the test result of the operation confirmation test process is good is extracted. The real environment optical path setting unit 19a reads the configuration data corresponding to all the extracted route identification information from the optical path config table 181. The real environment optical path setting unit 19a refers to the setting order data and the config command included in the read configuration data, and applies the config command via the real environment communication unit 11 in the setting order indicated by the setting order data. An optical path is set in the real environment optical communication network 3 by applying it to the control units 311-1 to 311-n of the physical packages 31-1 to 31-n (step Sa11).
  • the actual environment optical path setting unit 19a performs an operation confirmation test process for each of the set optical paths based on the test confirmation procedure data included in the configuration data corresponding to each optical path.
  • the real environment optical path setting unit 19a acquires the processing time when the operation confirmation test processing is performed from the internal timing means.
  • the real environment optical path setting unit 19a shows in FIG. 8 the route identification information corresponding to the configuration data used in the operation confirmation test process, the test result of the operation confirmation test process, and the acquired processing time in association with each other.
  • the test result storage unit 22 writes and stores the actual environment test result table 221 (step Sa12).
  • the real environment optical path setting unit 19a does not perform the operation confirmation test process in step Sa12 for the optical path whose setting has failed in step Sa11, and does not perform the operation check test process in the actual environment test result table 221. Write that the optical path setting failed in the "test process” item, and write the time obtained from the internal timekeeping means at that time in the "process time” item.
  • step Sa12 When the processing of step Sa12 is completed for all the route identification information extracted in step Sa11, the real environment optical path setting unit 19a sends a completion notification signal including all the route identification information included in the path temporary setting instruction signal. Output to the real environment utilization optimization unit 13.
  • step Sa13 the same processing as step S9 in FIG. 9 is performed by the actual environment utilization optimization unit 13.
  • step Sa13 change is required
  • the virtual environment configuration management unit 201 When the virtual environment configuration management unit 201 detects that the configuration parameters in the configuration parameter table 141 have been changed after the package emulators 41-1 to 41-n are generated, the virtual environment configuration management unit 201 identifies the changed configuration parameters and configures the changed configuration. Generate the config commands needed to set the parameters. The virtual environment configuration management unit 201 connects to the control units 411-1 to 411-n of the package emulators 41-1 to 41-n corresponding to the changed configuration parameters via the virtual environment communication unit 21. The virtual environment configuration management unit 201 applies the generated config command to the connected control units 411-1 to 411-n to change the configuration parameters.
  • the real environment utilization optimization unit 13 sets all of the real environment optical path setting unit 19a and the virtual environment optical path setting unit 202a in the real environment optical communication network 3 in step Sa11. Outputs a path release instruction signal including the path identification information of the optical path of.
  • the real environment optical path setting unit 19a When the real environment optical path setting unit 19a receives the pass release instruction signal from the real environment use optimization unit 13, the real environment optical path setting unit 19a releases the optical path corresponding to all the route identification information included in the pass release instruction signal.
  • the virtual environment optical path setting unit 202a receives the path release instruction signal from the real environment use optimization unit 13, the virtual environment optical path setting unit 202a releases the optical path corresponding to the route identification information included in the path release instruction signal.
  • the real environment utilization optimization unit 13 identifies all the routes included in the completion notification signal so that the transmission design unit 151 can perform the transmission design process for the same transmission mode again based on the changed configuration parameters.
  • a redesign instruction signal including information is output to the transmission design unit 151 (step Sa14).
  • the transmission design unit 151 When the transmission design unit 151 receives the redesign instruction signal from the real environment utilization optimization unit 13, the transmission design unit 151 deletes the record of the transmission design table 1521 corresponding to the route identification information included in the completion notification signal, and performs the same transmission.
  • the process of step S4 for the mode, here, “transmission mode 1” is started.
  • the accommodation design unit 153 deletes the record corresponding to the route identification information deleted from the transmission design table 1521 from the resource table 161 and then deletes the new route identification information generated in the transmission design table 1521.
  • the accommodation design process is performed based on the transmission design data of.
  • step Sa13 when the real environment utilization optimization unit 13 determines that it is not necessary to change the configuration parameters (step Sa13, no change is necessary), the same process as the process of step S11 of FIG. 9 is performed (step Sa15).
  • the transmission design unit 151 receives the processing continuation instruction signal from the real environment utilization optimization unit 13, the transmission design unit 151 starts the processing of step S4 for the next transmission mode in the transmission mode data, here, the “transmission mode 2” (loop La1e). ).
  • the real environment utilization optimization unit 13 sets the real environment optical path setting unit 19a and the virtual environment optical path.
  • An all-pass release instruction signal is output to the setting unit 202a.
  • the real environment optical path setting unit 19a receives the all pass release instruction signal from the real environment use optimization unit 13
  • all the optical paths set in the real environment optical communication network 3 are canceled.
  • the virtual environment optical path setting unit 202a receives the all-path release instruction signal from the real environment use optimization unit 13, all the optical paths set in the virtual environment optical communication network 40 are released (step Sa16). After that, the process of setting the optical path to be actually operated is started.
  • the request reception unit 203a takes in the request data given from the outside (step Sa20).
  • the request data indicating the request for setting two 100G optical paths at the points A and D is taken in as in the first embodiment.
  • the processes of steps Sa21 to Sa23 shown below are repeated according to the number of optical paths included in the request data (loops La3s to La3e).
  • the request reception unit 203a refers to the resource table 161 and the actual environment test result table 221 and the virtual environment test result table 222.
  • the request reception unit 203a is the route identification information corresponding to the optical path specified in the request data, and is used for operation confirmation test processing in both the real environment optical communication network 3 and the virtual environment optical communication network 40 in a free state. It is determined whether or not there is route identification information that matches the condition that the test result is good (step Sa21).
  • the request receiving unit 203a determines that the route identification information matching the condition does not exist (step Sa21, No).
  • the request receiving unit 203a notifies the outside that the path could not be set (step Sa22).
  • the request receiving unit 203a determines that the route identification information matching the condition exists (steps Sa21, Yes)
  • the request receiving unit 203a outputs a path setting request signal including the corresponding route identification information to the virtual environment optical path setting unit 202a. do.
  • the virtual environment optical path setting unit 202a When the virtual environment optical path setting unit 202a receives the path setting request signal from the request reception unit 203a, the virtual environment optical path setting unit 202a reads the configuration data corresponding to the route identification information included in the path setting request signal from the optical path config table 181.
  • the virtual environment optical path setting unit 202a refers to the setting order data and the config command included in the read configuration data, and applies the config command via the virtual environment communication unit 21 in the setting order indicated by the setting order data.
  • the optical path is set in the virtual environment optical communication network 40 by setting the control units 411-1 to 411-n of the package emulators 41-1 to 41-n.
  • the virtual environment optical path setting unit 202a performs an operation confirmation test process on the set optical path based on the test confirmation procedure data included in the read configuration data.
  • the virtual environment optical path setting unit 202a associates the route identification information corresponding to the configuration data used in the operation confirmation test process with the test result of the operation confirmation test process, and as shown in FIG. 13, the test result storage unit. It is written and stored in the virtual environment test result table 222 of 22.
  • the virtual environment optical path setting unit 202a After writing to the virtual environment test result table 222, the virtual environment optical path setting unit 202a outputs a path setting completion response signal including the route identification information included in the path setting request signal to the request reception unit 203a.
  • the request receiving unit 203a receives the path setting completion response signal from the virtual environment optical path setting unit 202a, the request receiving unit 203a transmits the path setting request signal including the route identification information included in the path setting completion response signal to the actual environment optical path setting unit 19a. Output to.
  • the actual environment optical path setting unit 19a When the real environment optical path setting unit 19a receives the path setting request signal from the request reception unit 203a, the actual environment optical path setting unit 19a reads the configuration data corresponding to the route identification information included in the path setting request signal from the optical path config table 181. The real environment optical path setting unit 19a issues config commands to the corresponding physical packages 31-1 to 31-n via the real environment communication unit 11 in the setting order indicated by the setting order data included in the read configuration data. The optical path is set in the real environment optical communication network 3 by setting the control units 311-1 to 311-n.
  • the actual environment optical path setting unit 19a performs the operation confirmation test process for the set optical path according to the test confirmation procedure data included in the read configuration data.
  • the real environment optical path setting unit 19a acquires the time when the operation confirmation test process is performed from the internal timing means.
  • the real environment optical path setting unit 19a associates the route identification information corresponding to the configuration data used in the operation confirmation test process with the test result of the operation confirmation test process and the acquired time, as shown in FIG. Is written and stored in the actual environment test result table 221 of the test result storage unit 22.
  • the actual environment optical path setting unit 19a outputs a path setting completion response signal including the route identification information included in the path setting request signal to the request reception unit 203a.
  • the request reception unit 203a receives the path setting completion response signal from the real environment optical path setting unit 19a, the request reception unit 203a sets the "state" item of the resource table 161 corresponding to the route identification information included in the path setting completion response signal to "state”. Rewrite to "Usage state" (step Sa23).
  • step Sa22 and step Sa23 the request receiving unit 203a repeats the processing for the next optical path included in the request data (loop La3e), and the processing for the optical path included in all the request data is completed. Then, the process ends.
  • the optical path set by the virtual environment optical path setting unit 202a in step Sa23 is an optical path for which the test result has already been determined to be good in the virtual environment optical communication network 40. Therefore, in the second embodiment, as in step S25 of the first embodiment, it is determined whether or not the test result of the operation confirmation test process of the optical path in the virtual environment optical communication network 40 is good. However, the determination process of step S25 may be performed as in the first embodiment. In that case, if the determination result in step S25 is good, the optical path for the real environment optical communication network 3 shown in step S26 is set, and if the determination result is not good, the processes of steps S27 to S29 are performed. Will be told.
  • the optical path set by the real environment optical path setting unit 19a in step Sa23 is an optical path that has already been determined to have good test results in the real environment optical communication network 3. Therefore, as in step S26 of the first embodiment, it is unlikely that the optical path setting for the real environment optical communication network 3 fails in step Sa23, and it is assumed that the optical path setting does not fail. ..
  • step Sa23 If the failure of setting the optical path for the actual environment optical path setting unit 19a in step Sa23 is taken into consideration, the following processing is performed. If the actual environment optical path setting unit 19a fails to set the optical path, the operation confirmation test process is not performed, and the optical path is displayed in the item of "test process of operation confirmation test process in the actual environment" in the actual environment test result table 221. Write that the setting of is unsuccessful, and write the time acquired from the internal timekeeping means at that time in the "Processing time" item. The real environment optical path setting unit 19a outputs a path setting impossible response signal including the route identification information included in the path setting request signal to the request reception unit 203a. When the request receiving unit 203a receives the path setting impossible response signal from the actual environment optical path setting unit 19a, the request receiving unit 203a notifies the outside that the path could not be set and ends the process.
  • the configuration of the second embodiment described above in addition to obtaining the same effect as that of the first embodiment, the following effects can be obtained. That is, in the configuration of the second embodiment, after performing the operation confirmation test processing in the virtual environment optical communication network 40, only the optical path having a good test result by the operation confirmation test processing is sent to the real environment optical communication network 3. Set. Therefore, in the configuration of the second embodiment, it is possible to perform the optimization processing of the configuration parameters while minimizing the setting processing of the config command in the real environment optical communication network 3, and the real environment optical communication network 3 The effect on the above can be reduced as compared with the configuration of the first embodiment.
  • FIG. 16 is a block diagram showing a configuration of the optical communication network management system Sb according to the third embodiment.
  • the request data given to the request receiving unit 203 requests the setting of an optical path matching any of the modes shown in the transmission mode data given to the transmission design unit 151. It was used as data to be used. In actual operation, an optical path other than the mode indicated by the transmission mode data may be urgently required.
  • the third embodiment includes a configuration in which an optical path other than the mode indicated by the transmission mode data given in advance is set.
  • the optical communication network management system Sb includes an optical communication network management device 1b, a real environment optical communication network 3, and a virtual environment construction device 4.
  • the optical communication network management device 1b includes a real environment communication unit 11, a network configuration acquisition unit 12, a real environment utilization optimization unit 13, a configuration parameter storage unit 14, an optical path design unit 15b, a resource data storage unit 16, and a config generation unit 17b. , Optical path config storage unit 18, real environment optical path setting unit 19, orchestration function unit 20b, virtual environment communication unit 21, and test result storage unit 22.
  • the orchestration function unit 20b includes a virtual environment configuration management unit 201, a virtual environment optical path setting unit 202, and a request reception unit 203b.
  • the request receiving unit 203b When the request receiving unit 203b receives the request data requesting the setting of the optical path given from the outside, the request receiving unit 203b refers to the resource table 161 of the resource data storage unit 16 and is a free resource that matches the conditions specified in the request data. Determines if is present. If there is no free resource in the resource table 161 that matches the conditions specified in the request data, the request reception unit 203b generates transmission mode data indicating the conditions specified in the request data, and the generated transmission mode. An additional transmission design instruction signal including data is output to the transmission design unit 151b. Further, when the request reception unit 203b outputs the additional transmission design instruction signal to the transmission design unit 151b, the request reception unit 203b transmits the transmission mode addition state setting instruction signal for setting the transmission mode addition state to the config generation unit 17b.
  • the config generation unit 17b has the same configuration as the config generation unit 17 of the first embodiment except for the following points.
  • the config generation unit 17b Upon receiving the transmission mode addition state setting instruction signal from the request reception unit 203b, the config generation unit 17b sets a flag indicating the transmission mode addition state in the internal storage area.
  • the flag indicating the transmission mode addition state is set in the internal storage area, the config generation unit 17b actually writes the configuration data to the optical path config storage unit 18 and stores the configuration data, and then outputs the path temporary setting instruction signal.
  • the configuration generation notification signal for notifying that new configuration data has been generated is output to the request reception unit 203b without outputting to the ambient light path setting unit 19.
  • the optical path design unit 15b includes a transmission design unit 151b, a transmission design data storage unit 152, and an accommodation design unit 153.
  • the transmission design unit 151b has the same configuration as the transmission design unit 151 of the first embodiment, and further receives an additional transmission design instruction signal including transmission mode data from the request reception unit 203b.
  • the transmission design unit 151b receives the additional transmission design instruction signal from the request reception unit 203b, the transmission design unit 151b performs the transmission design process based on the transmission mode data included in the additional transmission design instruction signal.
  • FIG. 17 is a flowchart showing a processing flow by the optical communication network management device 1b according to the third embodiment.
  • the request reception unit 203b takes in the request data given from the outside (step Sb1).
  • the request receiving unit 203b refers to the resource table 161 and determines whether or not there is a free resource that matches the condition specified in the imported request data (step Sb2).
  • the resource table 161 sets the condition specified in the request data. Detect route identification information corresponding to matching free resources.
  • the request receiving unit 203b outputs a path setting request signal including the detected route identification information to the virtual environment optical path setting unit 202 (step Sb5).
  • step Sb3 when the request receiving unit 203b determines that there is no free resource in the resource table 161 that matches the condition specified in the request data (steps Sb2, No), the transmission indicating the condition specified in the request data is transmitted. Mode data is generated, an additional transmission design instruction signal including the generated transmission mode data is output to the transmission design unit 151b, and the process waits for a certain period of time (step Sb3).
  • the condition specified in the request data is an optical path of 200 G from the point A to the point B, and this condition is not included in the transmission mode data given to the transmission design unit 151b. Since it is not included in the transmission mode data, there is no resource data that matches the condition in the resource table 161. Therefore, the request receiving unit 203b determines "No" in the process of step Sb2. In step Sb3, the request receiving unit 203b generates transmission mode identification information that indicates that the transmission mode is to be added, for example, transmission mode identification information called “additional transmission mode 1”, and uses the generated transmission mode identification information as the generated transmission mode identification information.
  • Transmission mode data is generated by associating data with a start point of "A point", an end point of "B point”, and a capacity of "200G".
  • the request reception unit 203b outputs an additional transmission design instruction signal including the generated transmission mode data to the transmission design unit 151b.
  • the request reception unit 203b transmits the transmission mode addition state setting instruction signal for setting the transmission mode addition state to the config generation unit 17b.
  • the config generation unit 17b When the config generation unit 17b receives the transmission mode addition state setting instruction signal from the request reception unit 203b, the config generation unit 17b sets a flag indicating the transmission mode addition state in the internal storage area.
  • step Sb3 the subroutine of transmission / accommodation design processing shown in FIG. 18 is started (step Sb4).
  • the transmission design unit 151b When the transmission design unit 151b receives the additional transmission design instruction signal from the request reception unit 203b, the transmission design unit 151b reads out the transmission mode data included in the additional transmission design instruction signal. The transmission design unit 151b detects a route that satisfies the conditions indicated by the transmission mode data based on the configuration parameters stored in the configuration parameter table 141. The transmission design unit 151b generates route identification information by generating and adding route identification information to the data indicating the detected route to generate transmission design data, and writes the generated transmission design data in the transmission design table 1521 of the transmission design data storage unit 152. Store it (step Sb4-1).
  • the number of route identification information generated by the transmission design unit 151b is repeated, and the following processes of steps Sb4-2 and Sb4-3 are performed (loops Lb1s to Lb1e).
  • step Sb4-2 the same processing as in step S5 of FIG. 9 is performed by the accommodation design unit 153.
  • step Sb4-3 the same processing as in step S6 of FIG. 9 is performed by the config generation unit 17b.
  • the processes of steps S5 and S6 are performed for the next new route identification information (loop L2e). If the processing of the loops Lb1s to Lb1e is completed and the resource of the condition specified in the request data is detected by the accommodation design unit 153, a free record is generated in the resource table 161.
  • the config generation unit 17b refers to the internal storage area when the writing of the configuration data corresponding to all the newly generated records in the resource table 161 to the optical path config table 181 is completed. Since the config generation unit 17b has a flag indicating the transmission mode addition state set in the internal storage area, the path temporary setting instruction signal is not output to the actual environment optical path setting unit 19, and the config generation unit 17b configures the request reception unit 203b. Output the generation completion notification signal.
  • the request receiving unit 203b determines whether or not the config generation notification signal is received from the config generation unit 17b (step Sb4-4).
  • the request reception unit 203b determines that the config generation notification signal has been received from the config generation unit 17b (steps Sb4-4, Yes)
  • the request reception unit 203b detects the route identification information corresponding to the free resource from the resource table 161 and detects the route identification information.
  • the path setting request signal including the detected route identification information is output to the virtual environment optical path setting unit 202.
  • the request reception unit 203b transmits a transmission mode addition state release instruction signal for canceling the transmission mode addition state to the config generation unit 17b.
  • the config generation unit 17b receives the transmission mode addition state release instruction signal from the request reception unit 203b, the config generation unit 17b deletes the flag indicating the transmission mode addition state of the internal storage area (step Sb4-5). After that, the processing of the transmission / accommodation design subroutine is completed, and the processing proceeds to step Sb6 of FIG.
  • the request receiving unit 203b determines that the config generation notification signal has not been received from the config generation unit 17b (step Sb4-4, No)
  • the request receiving unit 203b notifies the outside that the resource could not be secured.
  • the request receiving unit 203b transmits a transmission mode addition state release instruction signal for canceling the transmission mode addition state to the config generation unit 17b.
  • the config generation unit 17b receives the transmission mode addition state release instruction signal from the request reception unit 203b, the config generation unit 17b deletes the flag indicating the transmission mode addition state of the internal storage area (step Sb4-6). After that, the process ends without returning to the process of FIG.
  • the virtual environment optical path setting unit 202 receives the path setting request signal from the request reception unit 203b, and performs the same processing as in step S23 of FIG. 10 based on the path setting request signal (step Sb6). Regarding the processes of steps Sb7 and Sb8, the same processes as those of steps S24 and S25 of FIG. 10 are performed by the virtual environment optical path setting unit 202.
  • step Sb8 when the virtual environment optical path setting unit 202 determines that the result of the operation confirmation test process is not good (step Sb8, No), the virtual environment optical path setting unit 202 releases the optical path set in the virtual environment optical communication network 40. If the virtual environment optical path setting unit 202 fails to set the optical path in step Sb6, the operation confirmation test process in step Sb7 is not performed, and it is determined in step Sb8 that it is not good.
  • the virtual environment optical path setting unit 202 outputs a resource data confirmation instruction signal instructing to confirm whether or not another free resource exists to the request reception unit 203b (step Sb13).
  • step Sb8 when the virtual environment optical path setting unit 202 determines that the result of the operation confirmation test process is good (step Sb8, Yes), the path setting including the route identification information is completed for the request reception unit 203b. Output a response signal.
  • the request receiving unit 203b receives the path setting completion response signal from the virtual environment optical path setting unit 202, the request receiving unit 203b transmits the path setting request signal including the route identification information included in the path setting completion response signal to the actual environment optical path setting unit 19 Output to.
  • the actual environment optical path setting unit 19 When the real environment optical path setting unit 19 receives the path setting request signal from the request reception unit 203b, the actual environment optical path setting unit 19 reads the configuration data corresponding to the route identification information included in the path setting request signal from the optical path config table 181.
  • the real environment optical path setting unit 19 refers to the config command and the setting order data included in the read configuration data, and issues the config command to the corresponding physical package 31-1 to 31-n in the setting order indicated by the setting order data. It is set in the control units 311-1 to 311-n of.
  • the operation confirmation test process is performed on the set optical path according to the test confirmation procedure data included in the read configuration data. I do.
  • the real environment optical path setting unit 19 acquires the time when the operation confirmation test process is performed from the internal timing means.
  • the real environment optical path setting unit 19 associates the route identification information corresponding to the configuration data used in the operation confirmation test process with the test result of the operation confirmation test process and the acquired time, as shown in FIG. Is written and stored in the actual environment test result table 221 of the test result storage unit 22.
  • the real environment optical path setting unit 19 When the setting of the optical path for the real environment optical communication network 3 fails, the real environment optical path setting unit 19 does not perform the operation confirmation test process, and the “test of the operation check test process in the real environment” of the real environment test result table 221 is performed. Write that the optical path setting failed in the "Processing" item, and write the time acquired from the internal timing means at that time in the "Processing time” item.
  • the actual environment optical path setting unit 19 When the optical path setting is successful, the actual environment optical path setting unit 19 outputs a path setting completion response signal including the route identification information included in the path setting request signal to the request reception unit 203b. On the other hand, when the optical path setting fails, the real environment optical path setting unit 19 sends a path setting impossible response signal including the route identification information included in the path setting request signal to the request reception unit 203b. Output (step Sb9).
  • Step Sb10 When the request receiving unit 203b receives the path setting completion response signal or the path setting impossible response signal from the real environment optical path setting unit 19, the path included in the path setting completion response signal or the path setting impossible response signal. Whether or not the test result of the operation confirmation test process in the actual environment optical communication network 3 is good by referring to the item of "Test result of the operation confirmation test in the actual environment" of the actual environment test result table 221 corresponding to the identification information. (Step Sb10).
  • the request reception unit 203b determines that the test result of the operation confirmation test process in the real environment optical communication network 3 is good (step Sb10, Yes)
  • the request reception unit 203b indicates that the resource table 161 "corresponds to the route identification information to be processed".
  • the item of "status” is rewritten to "usage status" (step Sb11), and the process ends.
  • the request reception unit 203b determines that the test result of the operation confirmation test process in the real environment optical communication network 3 is not good (step Sb10, No)
  • the request reception unit 203b outputs a path release instruction signal including the route identification information of the processing target.
  • the output is output to the real environment optical path setting unit 19 and the virtual environment optical path setting unit 202, and the process proceeds to step Sb14.
  • the real environment optical path setting unit 19 receives the pass release instruction signal from the request reception unit 203b
  • the real environment optical path setting unit 19 releases the optical path corresponding to the route identification information included in the path release instruction signal.
  • the virtual environment optical path setting unit 202 receives the path release instruction signal from the request reception unit 203b
  • the virtual environment optical path setting unit 202 releases the optical path corresponding to the route identification information included in the path release instruction signal (step Sb12).
  • the request receiving unit 203b refers to the resource table 161 and is in another free state. It is determined whether or not the resource exists (step Sb14). When the request receiving unit 203b determines that another free state resource exists (step Sb14, Yes), the request receiving unit 203b proceeds to the process in step Sb5. On the other hand, when the request receiving unit 203b determines that there is no other free state resource (step Sb14, No), the request receiving unit 203b notifies the outside that the path could not be set and ends the process (step Sb15).
  • the request data given to the request reception unit 203b may include information on the setting start time and the setting end time of the optical path in addition to the start point, the end point, and the communication capacity of the optical path.
  • the resource table 161 is provided with an item named "period” for recording the setting start time and the setting end time of the optical path, and the request receiving unit 203b changes the item of "status" to "usage status”.
  • the data of the setting start date and time and the setting end date and time of the optical path will be written in the item of "period".
  • the request reception unit 203b periodically acquires time information from a time measuring means such as a clock provided inside, and for an optical path whose acquired time is the setting end date and time, a path including the route identification information of the optical path.
  • the release instruction signal is output to the virtual environment optical path setting unit 202 and the real environment optical path setting unit 19, and the optical path is canceled.
  • the request receiving unit 203b outputs an additional transmission design instruction signal for adding a new transmission mode, and the additional transmission design instruction signal indicates the setting start date and time and the setting end date and time of the optical path.
  • the accommodation design unit 153 refers to the resource table 161 and limits the period when it can detect the resources that can be secured between the setting start date and time and the setting end date and time of the optical path to be added. Records for free resources can be generated in resource table 161. Thereby, in the real environment optical communication network 3, the required optical path can be set for the required period.
  • the optical path design unit 15b Since the transmission design process and the accommodation design process are additionally performed for the requested optical path, it is possible to set an optical path other than the mode shown in the transmission mode data.
  • the request data given to the request receiving units 203 and 203a in the first embodiment and the second embodiment matches any mode of the transmission mode data given to the transmission design unit 151, and is an arbitrary request.
  • the processing after step S20 of the first embodiment and the processing after step Sa20 of the second embodiment are replaced with the processing of the third embodiment shown in FIG. You may.
  • FIG. 19 is a block diagram showing a configuration of the optical communication network management system Sc according to the fourth embodiment.
  • a failure determined arbitrarily is generated, and the configuration parameters are optimized based on the result of the failure that has occurred.
  • the optical communication network management system Sc includes an optical communication network management device 1c, a real environment optical communication network 3, and a virtual environment construction device 4.
  • the optical communication network management device 1c includes a real environment communication unit 11, a network configuration acquisition unit 12, a real environment utilization optimization unit 13, a configuration parameter storage unit 14, an optical path design unit 15, a resource data storage unit 16, and a config generation unit 17. , Optical path config storage unit 18, real environment optical path setting unit 19, orchestration function unit 20c, virtual environment communication unit 21, test result storage unit 22, and actual environment configuration parameter update unit 23.
  • the real environment configuration parameter update unit 23 When the real environment configuration parameter update unit 23 detects that the configuration parameter of the configuration parameter table 141 stored in the configuration parameter storage unit 14 has been changed, the real environment configuration parameter update unit 23 identifies the changed configuration parameter and controls corresponding to the specified configuration parameter.
  • the configuration parameters of parts 311-1 to 311-n are rewritten and updated with the specified configuration parameters.
  • the orchestration function unit 20c includes a virtual environment configuration management unit 201, a virtual environment optical path setting unit 202, a request reception unit 203, and a virtual environment utilization optimization unit 204.
  • the virtual environment utilization optimization unit 204 causes an arbitrarily determined failure in the virtual environment optical communication network 40.
  • the arbitrarily defined failure is, for example, a virtual optical fiber transmission that causes the arbitrarily defined package emulators 41-1 to 41-n to be in a failed state or is connected to the package emulators 41-1 to 41-n. It is an obstacle that cuts the path, increases the loss of the virtual optical fiber transmission line, or rotates the polarization of light at high speed to cause polarization fluctuation.
  • the arbitrarily defined fault may be any fault as long as it can be detected by the control units 411-1 to 411-n.
  • the virtual environment utilization optimization unit 204 receives the failure notification signal transmitted by the control units 411-1 to 411-n of the package emulators 41-1 to 41-n.
  • the failure causes a change in the configuration parameter or changes the configuration parameter based on the cause of the failure generated and the result of the failure included in the failure notification signal. , Determine whether it is an obstacle that can be avoided by changing the path of the optical path.
  • the virtual environment utilization optimization unit 204 specifies the configuration parameter to be changed, generates the changed configuration parameter, and generates the configuration parameter specified in the configuration parameter table 141. Rewrite to parameter.
  • the virtual environment utilization optimization unit 204 refers to the resource table 161 of the resource data storage unit 16 and switches the optical path route identification information of the switching source and the switching. Detects the path identification information of the previous optical path. The virtual environment utilization optimization unit 204 switches the optical path between the virtual environment optical communication network 40 and the real environment optical communication network 3 when the switching is possible.
  • FIG. 20 is a flowchart showing a processing flow by the optical communication network management device 1c according to the fourth embodiment.
  • the virtual environment utilization optimization unit 204 connects to the control units 411-1 to 411-n of the package emulators 41-1 to 41-n via the virtual environment communication unit 21, and is arbitrarily used in the virtual environment optical communication network 40. (Step Sc1).
  • the control units 411-1 to 411-n detect a failure and transmit a failure notification signal including the content of the detected failure to the virtual environment utilization optimization unit 204 via the virtual environment communication unit 21.
  • the virtual environment utilization optimization unit 204 receives the failure notification signal transmitted by the control units 411-1 to 411-n (step Sc2).
  • the virtual environment utilization optimization unit 204 changes the configuration parameter or the path of the optical path. It is determined whether or not the obstacle can be avoided by changing the above (step Sc3). When the virtual environment utilization optimization unit 204 determines that the failure cannot be avoided by any means (step Sc3, neither means can be avoided), the virtual environment utilization optimization unit 204 notifies the outside that the generated failure cannot be avoided. (Step Sc4), the process is terminated.
  • the virtual environment utilization optimization unit 204 determines that the failure can be avoided by changing the configuration parameter (step Sc3, it can be avoided by changing the configuration parameter)
  • the virtual environment utilization optimization unit 204 specifies and specifies the configuration parameter to be changed. Generate the configuration parameter after changing the configuration parameter.
  • the virtual environment utilization optimization unit 204 rewrites the configuration parameter specified in the configuration parameter table 141 with the generated modified configuration parameter (step Sc5).
  • the virtual environment configuration management unit 201 When the virtual environment configuration management unit 201 detects that the configuration parameter in the configuration parameter table 141 has been changed, it identifies the changed configuration parameter and generates a config command necessary for setting the specified configuration parameter.
  • the virtual environment configuration management unit 201 connects to the control units 411-1 to 411-n of the package emulators 41-1 to 41-n via the virtual environment communication unit 21.
  • the virtual environment configuration management unit 201 applies the generated config command to the connected control units 411-1 to 411-n to change the configuration parameters (step Sc6).
  • the real environment configuration parameter update unit 23 When the real environment configuration parameter update unit 23 detects that the configuration parameter table 141 has been changed, it identifies the changed configuration parameter and generates a config command necessary for setting the specified configuration parameter. Similar to the config generation unit 17, the actual environment configuration parameter update unit 23 stores the config command template for each configuration parameter in the internal storage area in advance for each type of physical packages 31-1 to 31-n. I'm letting you. The real environment configuration parameter update unit 23 selects a config command template corresponding to the configuration parameter from the config command template, applies the configuration parameter set to the selected config command template, and generates a config command. ..
  • the real environment configuration parameter update unit 23 connects to the control units 311-1 to 311-n of the physical packages 31-1 to 31-n via the real environment communication unit 11.
  • the real environment configuration parameter update unit 23 applies the generated config command to the connected control units 311-1 to 311-n to change the configuration parameters (step Sc7), and ends the process.
  • the virtual environment utilization optimization unit 204 determines that the failure can be avoided by changing the optical path route (step Sc3, it can be avoided by changing the optical path route)
  • the virtual environment utilization optimization unit 204 refers to the resource table 161. Then, the route identification information corresponding to the free resource that is a candidate for the optical path of the switching destination and the route identification information of the optical path of the switching source during operation are detected (step Sc8).
  • the virtual environment utilization optimization unit 204 performs a subroutine of the switching destination optical path setting process shown in FIG. 21 based on the path identification information of the switching destination optical path (step Sc9).
  • the virtual environment utilization optimization unit 204 refers to the actual environment test result table 221 and determines whether or not the test result of the operation confirmation test process corresponding to the path identification information of the switching destination optical path is good (step). Sc9-1). When the virtual environment utilization optimization unit 204 determines that the test result corresponding to the read route identification information is not good (step Sc9-1, No), the process proceeds to step Sc9-10.
  • the route identification The path setting request signal including the information is output to the virtual environment optical path setting unit 202.
  • the virtual environment optical path setting unit 202 receives the path setting request signal from the virtual environment utilization optimization unit 204, and performs the same processing as in step S23 of FIG. 10 based on the path setting request signal (step Sc9-2). .. Regarding the processing of step Sc9-3 and step Sc9-4, the same processing as in step S24 and step S25 of FIG. 10 is performed by the virtual environment optical path setting unit 202.
  • step Sc9-4 when the virtual environment optical path setting unit 202 determines that the result of the operation confirmation test process is not good (step Sc9-4, No), the virtual environment optical path setting unit 202 sets the virtual environment optical path setting unit 202 in step Sc9-.
  • the optical path set in the virtual environment optical communication network 40 in 2 is canceled. If the virtual environment optical path setting unit 202 fails to set the optical path in step Sc9-2, the operation confirmation test process of step Sc9-3 is not performed, and it is not good in step Sc9-4. It will be judged.
  • the virtual environment optical path setting unit 202 outputs a resource data confirmation instruction signal instructing to confirm whether or not another free resource exists to the virtual environment utilization optimization unit 204 (step Sc9-8).
  • step Sc9-4 when the virtual environment optical path setting unit 202 determines that the result of the operation confirmation test process is good (step Sc9-4, Yes), the virtual environment utilization optimization unit 204 is referred to. Outputs a path setting completion response signal including route identification information.
  • the virtual environment utilization optimization unit 204 receives the path setting completion response signal from the virtual environment optical path setting unit 202, the virtual environment utilization optimization unit 204 transmits the path setting request signal including the route identification information included in the path setting completion response signal to the actual environment optical path. Output to the setting unit 19.
  • the process is the same as step Sb9 shown in FIG. 17 of the third embodiment based on the path design request. (Step Sc9-5). However, in the case of the process of step Sc9-5, the real environment optical path setting unit 19 outputs the path setting completion response signal or the path setting impossible response signal to the virtual environment utilization optimization unit 204.
  • the virtual environment utilization optimization unit 204 When the virtual environment utilization optimization unit 204 receives the path setting completion response signal or the path setting impossible response signal from the real environment optical path setting unit 19, the virtual environment utilization optimization unit 204 is included in the path setting completion response signal or the path setting impossible response signal.
  • the test result of the operation confirmation test processing in the actual environment optical communication network 3 is good by referring to the item of "Test result of the operation confirmation test in the actual environment" of the actual environment test result table 221 corresponding to the route identification information. It is determined whether or not there is (step Sc9-6).
  • step Sc9-6 When the virtual environment utilization optimization unit 204 determines that the test result of the operation confirmation test process in the real environment optical communication network 3 is good (step Sc9-6, Yes), it corresponds to the route identification information of the processing target.
  • the item of "status" in the resource table 161 is rewritten to "usage status", and it is recorded that the optical path of the switching destination can be set in the internal storage area (step Sc9-7).
  • the virtual environment utilization optimization unit 204 determines that the test result of the operation confirmation test process in the real environment optical communication network 3 is not good (step Sc9-6, No)
  • the virtual environment utilization optimization unit 204 includes the route identification information of the processing target.
  • the path release instruction signal is output to the real environment optical path setting unit 19 and the virtual environment optical path setting unit 202, and the process proceeds to step Sc9-10.
  • the real environment optical path setting unit 19 receives the path release instruction signal from the virtual environment use optimization unit 204
  • the real environment optical path setting unit 19 releases the optical path corresponding to the route identification information included in the path release instruction signal.
  • the virtual environment optical path setting unit 202 receives the path release instruction signal from the virtual environment use optimization unit 204
  • the virtual environment optical path setting unit 202 releases the optical path corresponding to the route identification information included in the path release instruction signal (step Sc9-9). ).
  • step Sc9-1 the virtual environment utilization optimization unit 204 determines "No" in step Sc9-1, or by the process of step Sc9-8, the virtual environment utilization optimization unit 204 confirms the resource data from the virtual environment optical path setting unit 202.
  • the virtual environment utilization optimization unit 204 refers to the resource table 161 and identifies a free route that is a candidate for another optical path of the switching destination. It is determined whether or not the information exists (step Sc9-10).
  • step Sc9-10 When the virtual environment utilization optimization unit 204 determines that there is free route identification information that is a candidate for another optical path of the switching destination (step Sc9-10, Yes), the optical path of the switching destination is determined from the resource table 161.
  • the route identification information corresponding to the free resource that is a candidate for is read out (step Sc9-11), and the processing after step Sc9-1 is performed.
  • the virtual environment utilization optimization unit 204 determines that there is no free resource that is a candidate for another optical path of the switching destination (step Sc9-10, No).
  • the optical path of the switching destination can be set. It is recorded in the internal storage area (step Sc9-12), and the subroutine is terminated.
  • the virtual environment utilization optimization unit 204 refers to the internal storage area and determines whether or not the optical path of the switching destination can be set (step Sc10).
  • the virtual environment optical path setting unit sends a path release instruction signal including the path identification information of the optical path of the switching source. It is output to 202 and the actual environment optical path setting unit 19, and the item of "state" corresponding to the path identification information of the optical path of the switching source of the resource table 161 is rewritten to "free state".
  • the virtual environment optical path setting unit 202 When the virtual environment optical path setting unit 202 receives the path release instruction signal from the virtual environment use optimization unit 204, the virtual environment optical path setting unit 202 releases the optical path of the route identification information included in the path release instruction signal in the virtual environment optical communication network 40. ..
  • the real environment optical path setting unit 19 receives the path release instruction signal from the virtual environment use optimization unit 204, the real environment optical path setting unit 19 cancels the optical path of the route identification information included in the path release instruction signal in the real environment optical communication network 3. (Step Sc11), the process ends.
  • step Sc10 determines that the optical path of the switching destination cannot be set (step Sc10, No)
  • the virtual environment utilization optimization unit 204 notifies the outside that the optical path path cannot be switched (step Sc12). ), End the process.
  • the virtual environment utilization optimization unit 204 causes an arbitrarily determined failure in the virtual environment optical communication network 40, and causes the failure and the cause of the failure. Based on the result of the failure, the configuration parameter stored in the configuration parameter storage unit 14 is changed so that the failure can be avoided, or the optimization process of changing the path of the optical path is performed so that the failure can be avoided. As a result, the configuration of the optical path route operated in the real environment optical communication network 3 is optimized, and the state of the virtual environment optical communication network 40 can be adjusted by the optimized configuration parameters. It is possible to maintain it so that it approaches the state of.
  • the virtual environment configuration management unit 201 constructs a plurality of virtual environment optical communication networks 40 in the virtual environment construction device 4, and the virtual environment utilization optimization unit 204 performs a plurality of virtual environment optical communications.
  • the network 40 different failures may occur and the processing shown in FIG. 20 may be performed.
  • step Sc6 when the virtual environment configuration management unit 201 sets the configuration parameters in the control units 411-1 to 411-n of the package emulators 41-1 to 41-n in step Sc6, something is done. When a problem occurs, the configuration parameters set in step Sc6 may be restored so that the processing of step Sc7 by the actual environment configuration parameter update unit 23 may not be performed. By doing so, it is possible to prevent an unexpected failure from occurring in the real environment optical communication network 3 in which the optical path in operation exists.
  • FIG. 22 is a block diagram showing a configuration of the optical communication network management system Sd according to the fifth embodiment.
  • the configuration parameters of the real environment optical communication network 3 are optimized by setting the optical path on a trial basis using the resources in the free state in the real environment optical communication network 3.
  • the optical communication network management system Sd includes an optical communication network management device 1d, a real environment optical communication network 3, and a virtual environment construction device 4.
  • the optical communication network management device 1d includes a real environment communication unit 11, a network configuration acquisition unit 12, a real environment utilization optimization unit 13, a configuration parameter storage unit 14, an optical path design unit 15, a resource data storage unit 16, and a config generation unit 17. , Optical path config storage unit 18, real environment optical path setting unit 19, orchestration function unit 20, virtual environment communication unit 21, test result storage unit 22, and network test unit 24.
  • the network test unit 24 is equipped with a time measuring means such as a clock inside, and periodically acquires time information from the time measuring means.
  • the network test unit 24 refers to the resource table 161 of the resource data storage unit 16 and the actual environment test result table 221 of the test result storage unit 22, and performs an operation confirmation test in the actual environment optical communication network 3 for a predetermined fixed time. Detects unprocessed free route identification information.
  • the network test unit 24 outputs an optical path to the virtual environment optical communication network 40 and the real environment optical communication network 3 by outputting the path temporary setting instruction signal including the detected route identification information to the virtual environment optical path setting unit 202.
  • the operation confirmation test process of the set and set optical path is performed, and the configuration parameters are updated.
  • FIG. 23 is a flowchart showing a processing flow by the optical communication network management device 1d according to the fifth embodiment. Before the processing according to the flowchart of FIG. 23 is started, the processing shown in the flowcharts of FIGS. 9 and 10 of the first embodiment has already been completed, and the optical path in operation is set. And.
  • the network test unit 24 periodically acquires time information from the internal timekeeping means.
  • the network test unit 24 detects the route identification information in which the item of "state” is empty from the resource table 161.
  • the network test unit 24 refers to the actual environment test result table 221 and adds a predetermined time to the time of the item of “processing time” in the detected route identification information to obtain the time obtained from the timekeeping means. Select the route identification information that exceeds (step Sd1).
  • the network test unit 24 selects any one of the route identification information and outputs a path temporary setting instruction signal including the selected route identification information to the virtual environment optical path setting unit 202.
  • the virtual environment optical path setting unit 202 receives the path temporary setting instruction signal from the network test unit 24, the virtual environment optical path setting unit 202 reads the configuration data corresponding to the route identification information included in the path temporary setting instruction signal from the optical path config table 181. ..
  • the virtual environment optical path setting unit 202 refers to the config command and the setting order data included in the read configuration data, and issues the config command to the corresponding package emulators 41-1 to 41-n in the setting order indicated by the setting order data. It is set in the control units 411-1 to 411-n of. As a result, an optical path is set in the virtual environment optical communication network 40 (step Sd2).
  • steps Sd3 and Sd4 the same processing as steps S24 and S25 in FIG. 10 is performed by the virtual environment optical path setting unit 202.
  • step Sd4 when the virtual environment optical path setting unit 202 determines that the result of the operation confirmation test process is good (step Sd4, Yes), it is included in the path temporary setting instruction signal received from the network test unit 24.
  • the path temporary setting instruction signal including the route identification information that has been used is output to the real environment optical path setting unit 19.
  • the real environment optical path setting unit 19 receives the path temporary setting instruction signal from the network test unit 24, the real environment optical path setting unit 19 performs the same processing as in step S7 of FIG. 9 based on the received path temporary setting instruction signal (step Sd5).
  • step Sd6 the same processing as in step S8 of FIG. 9 is performed by the actual environment optical path setting unit 19.
  • the real environment optical path setting unit 19 optimizes the use of the completion notification signal including the route identification information included in the path temporary setting instruction signal received from the virtual environment optical path setting unit 202 in the real environment. Output to the conversion unit 13.
  • the real environment utilization optimization unit 13 receives the completion notification signal from the real environment optical path setting unit 19 and performs the same processing as in step S9 of FIG. 9 (step Sd7).
  • step Sd7 the configuration needs to be changed
  • the configuration parameters that need to be changed make changes.
  • the virtual environment configuration management unit 201 detects that the configuration parameter in the configuration parameter table 141 has been changed, the package emulators 41-1 to 41-n corresponding to the changed configuration parameter via the virtual environment communication unit 21. It is connected to the control units 411-1 to 411-n of.
  • the virtual environment configuration management unit 201 rewrites the configuration parameters corresponding to the changed configuration parameters in the connected control units 411-1 to 411-n (step Sd8), and the process proceeds to step Sd9.
  • step Sd7 when the real environment utilization optimization unit 13 determines that it is not necessary to change the configuration parameters (step Sd7, no change is necessary), or after the processing of step Sd8, the real environment optical path setting unit 19 is contacted. On the other hand, a path release instruction signal including the route identification information included in the completion notification signal is output (step Sd9).
  • the real environment optical path setting unit 19 When the real environment optical path setting unit 19 receives the path release instruction signal from the real environment use optimization unit 13, the real environment optical path setting unit 19 transmits an optical path corresponding to the route identification information included in the path release instruction signal in the real environment optical communication network 3. The signal is released, and a path release instruction signal including the route identification information is output to the virtual environment optical path setting unit 202 (step Sd9).
  • Step Sd10 is processed in two ways.
  • step Sd4 when the virtual environment optical path setting unit 202 determines that the result of the operation confirmation test process is not good (steps Sd4, No), the virtual environment optical path setting unit 202 releases the optical path set in the virtual environment optical communication network 40 in step Sd2. (Step Sd10). Further, when the virtual environment optical path setting unit 202 receives the path release instruction signal from the real environment optical path setting unit 19, the virtual environment optical path communicates the optical path corresponding to the route identification information included in the path release instruction signal. It is released in the network 40 (step Sd10).
  • step Sd10 When the processing up to step Sd10 is completed, the processing after step Sd2 is repeated for the next route identification information (loop Ld1e), and then the processing after step Sd1 is repeated.
  • the route identification information in the vacant state is selected in step Sd1 based on the processing time of the operation confirmation test process in the real environment optical communication network 3 performed in the past, and is shown in FIG.
  • the configuration is such that the processing after step Sd1 is performed, the configuration of the present invention is not limited to the embodiment. Rather than using the processing time as a reference, all the free route identification information stored in the resource table 161 is selected in step Sd1 periodically, for example, every day at midnight, and after step Sd1 shown in FIG. 23. May be performed.
  • the network test unit 24 has not been subjected to the operation confirmation test process by the actual environment optical path setting unit 19 on a regular basis or for a certain period of time. , Select the route identification information corresponding to the free resource.
  • the real environment optical path setting unit 19 reads the configuration data corresponding to the route identification information selected by the network test unit 24 from the optical path config table 181 and temporarily performs real environment optical communication based on the read configuration data.
  • An optical path is set in the network 3, and an operation confirmation test process is performed on the set optical path according to the test confirmation procedure included in the configuration data.
  • the configuration parameters of the real environment optical communication network 3 and the configuration parameters of the virtual environment optical communication network 40 can be continuously matched, so that the state of the virtual environment optical communication network 40 can be changed to the actual environment. It is possible to maintain the state of the optical communication network 3 so as to approach the state of the optical communication network 3.
  • FIG. 24 is a block diagram showing a configuration of the optical communication network management system Se according to the sixth embodiment.
  • the sixth embodiment includes a configuration in which the main line in operation is switched to a redundant line when a failure occurs in the real environment optical communication network 3.
  • the optical communication network management system Se includes an optical communication network management device 1e, a real environment optical communication network 3, and a virtual environment construction device 4.
  • the optical communication network management device 1e includes a real environment communication unit 11, a network configuration acquisition unit 12, a real environment utilization optimization unit 13, a configuration parameter storage unit 14, an optical path design unit 15e, a resource data storage unit 16e, and a config generation unit 17. , Optical path config storage unit 18, real environment optical path setting unit 19, orchestration function unit 20e, virtual environment communication unit 21, and test result storage unit 22.
  • the resource data storage unit 16e stores the resource table 161 shown in FIG. 6 and the redundant line table 162 shown in FIG. 25.
  • the redundant line table 162 has items of “main line route identification information”, “redundant line route identification information”, and “weight”.
  • the same route identification information as the route identification information written in the item of "route identification information” of the resource table 161 is written.
  • the route identification corresponding to the route that becomes the redundant line when the route of the route identification information written in the corresponding item of "main line route identification information” is used as the main line. Information is written.
  • weight a value indicating the weight for the route identification information of the corresponding redundant line is written, for example, as an integer value in the range of 0 to 10.
  • the weight value is set so that the closer the transmission delay time is, the larger the value is.
  • FIG. 25 shows an example of a redundant line in the real environment optical communication network 3 shown in FIG. 2, and when the route identification information “1” is used as the main line, the route identification information “2”, Since the routes "3" and "4" are both routes from point A to point D, they are candidates for redundant lines. From the viewpoint of transmission delay, as shown in the resource table 161 of FIG. 6, the cost of the route of the route identification information “1” is “1”, and the cost of the route of the route identification information “2” is also “1”. Therefore, it is considered that the transmission delay time is near.
  • the weight corresponding to the route identification information "2", which is a redundant line for the route identification information "1”, is set to "10".
  • the cost of the routes of the route identification information "3" and “4" is "2". Therefore, the weight corresponding to the route identification information "3” and "4", which is a redundant line for the route identification information "1”, is set to "5", which is smaller than "10".
  • the optical path design unit 15e includes a transmission design unit 151, a transmission design data storage unit 152, and an accommodation design unit 153e.
  • the accommodation design unit 153e has the same configuration as the accommodation design unit 153 of the first embodiment, and further has the following configuration.
  • the accommodation design unit 153e generates all the records of the resource table 161 in the process of step S5 shown in FIG. 9, and then based on the data stored in the resource table 161 and the data stored in the transmission design table 1521. Detects the route identification information of the redundant line with respect to the route identification information of the main line.
  • the accommodation design unit 153e specifies the weight value for each redundant line based on the value of the “cost” item in the resource table 161.
  • the weight value is specified, for example, by storing a table showing the weight value with respect to the cost in the internal storage area of the accommodation design unit 153e in advance, and the accommodation design unit 153e refers to the table.
  • the accommodation design unit 153e generates the redundant line table 162 in the resource data storage unit 16e based on the combination of the detected main line route identification information and the redundant line route identification information and the specified weight value.
  • the orchestration function unit 20e includes a virtual environment configuration management unit 201, a virtual environment optical path setting unit 202, a request reception unit 203, and a failure reception unit 205.
  • the failure reception unit 205 indicates that a failure has occurred in which the control units 311-1 to 311-n of the physical packages 31-1 to 31-n of the real environment optical communication network 3 transmit via the real environment communication unit 11.
  • the fault receiving unit 205 refers to the redundant line table 162 and sets the redundant line route identification information with respect to the faulty optical path route identification information included in the received fault notification signal from the one with the larger weight value. It detects in order and performs a process of switching the optical path of the main line to the optical path of the redundant line.
  • FIG. 26 is a flowchart showing a processing flow by the optical communication network management device 1e according to the fifth embodiment.
  • the processing shown in the flowcharts of FIGS. 9 and 10 of the first embodiment has already been completed, and the optical path in operation is set.
  • the accommodation design unit 153e generates the redundant line table 162 in the resource data storage unit 16e.
  • the control units 311-1 to 311-n of the physical packages 31-1 to 31-n in which the failure has occurred send a failure notification signal including the path identification information of the optical path affected by the failure to the real environment communication unit 11. It is transmitted to the failure reception unit 205 via.
  • the failure reception unit 205 receives the failure notification signal (step Se1).
  • the failure reception unit 205 refers to the resource table 161, the redundant line table 162, and the actual environment test result table 221 to identify the route of the redundant line corresponding to the route identification information of the main line included in the failure notification signal. It is determined whether or not there is route identification information that is free and matches the condition that the test result of the operation confirmation test process in the real environment optical communication network 3 is good (step Se2). When the failure receiving unit 205 determines that the route identification information matching the condition does not exist (step Se2, No), it notifies the outside that the redundant line cannot be secured (step Se3), and ends the process.
  • the failure reception unit 205 determines that the route identification information matching the condition exists (step Se2, Yes)
  • the fault reception unit 205 is included in the route identification information that is not processed, that is, is not selected as the redundant line of the switching destination. Select the route identification information with the largest weight value in.
  • the failure reception unit 205 outputs a path setting request signal including the selected route identification information to the virtual environment optical path setting unit 202 (step Se4).
  • not all of the route identification information matching the conditions is the processing target, so that the route identification information having the largest weight value among the route identification information matching the conditions is used. Will be selected.
  • the virtual environment optical path setting unit 202 receives the path setting request signal from the failure reception unit 205, and performs the same processing as in step S23 of FIG. 10 based on the path setting request signal (step Se5). Regarding the processing of step Se6 and step Se7, the same processing as in step S24 and step S25 of FIG. 10 is performed by the virtual environment optical path setting unit 202.
  • step Se7 when the virtual environment optical path setting unit 202 determines that the result of the operation confirmation test process is not good (step Se7, No), the virtual environment optical path setting unit 202 releases the optical path set in the virtual environment optical communication network 40. If the virtual environment optical path setting unit 202 fails to set the optical path in step Se5, the operation confirmation test process in step Se6 is not performed, and it is determined in step Se7 that it is not good.
  • the virtual environment optical path setting unit 202 outputs a redundant line confirmation instruction signal including the route identification information of the redundant line included in the path setting request to the failure reception unit 205 (step Se8).
  • step Se7 when the virtual environment optical path setting unit 202 determines that the result of the operation confirmation test process is good (step Se7, Yes), the path including the route identification information for the failure reception unit 205. Output the setting completion response signal.
  • the failure reception unit 205 receives the path setting completion response signal from the virtual environment optical path setting unit 202, the failure reception unit 205 sends the path setting request signal including the route identification information included in the path setting completion response signal to the real environment optical path setting unit 19 Output to.
  • the real environment optical path setting unit 19 When the real environment optical path setting unit 19 receives the path setting request signal from the failure reception unit 205, the real environment optical path setting unit 19 performs the same process as step Sb9 shown in FIG. 17 of the third embodiment based on the path design request (the same process as step Sb9 shown in FIG. 17 of the third embodiment). Step Se9). However, in the case of the process of step Se9, the real environment optical path setting unit 19 outputs the path setting completion response signal or the path setting impossible response signal to the failure reception unit 205.
  • Step Se10 When the fault receiving unit 205 receives the path setting completion response signal or the path setting impossible response signal from the real environment optical path setting unit 19, the path included in the path setting completion response signal or the path setting impossible response signal. Whether or not the test result of the operation confirmation test process in the actual environment optical communication network 3 is good by referring to the item of "Test result of the operation confirmation test in the actual environment" of the actual environment test result table 221 corresponding to the identification information. (Step Se10).
  • the failure reception unit 205 determines that the test result of the operation confirmation test process in the real environment optical communication network 3 is good (steps Se10, Yes)
  • the failure reception unit 205 has set "1" in the resource table 161 corresponding to the route identification information of the redundant line.
  • the item of "status” is rewritten to "used status”
  • the item of "status” of the corresponding resource table 161 corresponding to the route identification information of the main line is rewritten to "unusable”.
  • the failure reception unit 205 outputs a path cancellation instruction signal including the route identification information of the main line to the real environment optical path setting unit 19 and the virtual environment optical path setting unit 202.
  • the real environment optical path setting unit 19 receives the path release instruction signal from the failure reception unit 205
  • the real environment optical path setting unit 19 releases the optical path corresponding to the route identification information included in the path release instruction signal.
  • the virtual environment optical path setting unit 202 receives the path release instruction signal from the failure reception unit 205
  • the virtual environment optical path setting unit 202 releases the optical path corresponding to the route identification information included in the path release instruction signal (step Se12), and ends. ..
  • the optical path can be switched from the main line to the redundant line.
  • the failure reception unit 205 determines that the test result of the operation confirmation test process in the real environment optical communication network 3 is not good (step Se10, No)
  • the failure reception unit 205 issues a path release instruction signal including the route identification information of the processing target.
  • Output to the real environment optical path setting unit 19 and the virtual environment optical path setting unit 202, and the process proceeds to step Se2.
  • the real environment optical path setting unit 19 receives the path release instruction signal from the virtual environment use optimization unit 204
  • the real environment optical path setting unit 19 releases the optical path corresponding to the route identification information included in the path release instruction signal.
  • the virtual environment optical path setting unit 202 receives the path release instruction signal from the virtual environment use optimization unit 204
  • the virtual environment optical path setting unit 202 releases the optical path corresponding to the route identification information included in the path release instruction signal (step Se11).
  • the fault receiving unit 205 When the fault receiving unit 205 receives the redundant line confirmation instruction signal from the virtual environment optical path setting unit 202 by the processing of step Se8, or after the processing of step Se11, the route identification information of the redundant line to be processed. For the route identification information other than the above, the processing after step Se2 is performed. When the route identification information of another redundant line exists in the redundant line table 162, the fault receiving unit 205 selects the route identification information of the redundant line having the next largest weight value in step Se4.
  • the weight is set so that the closer the transmission delay time is, the larger the value is.
  • the weight value may be set to be larger as the overlap is smaller.
  • the failure reception unit 205 refers to the resource table 161 and fails.
  • the path identification information of the optical path affected by the above may be specified.
  • the optical path design unit 15e detects an optical path that is a redundant line with respect to the optical path that is the main line for each route identification information, and detects the optical path that is a redundant line with respect to the optical path that is the main line.
  • the optical path that serves as an optical path and the optical path that serves as a redundant line are associated with each other and stored in the resource data storage unit 16e.
  • the failure reception unit 205 refers to the resource data storage unit 16e and identifies the route corresponding to the optical path which is the main line affected by the failure.
  • the information and the route identification information of the redundant line corresponding to the optical path of the main line are selected.
  • the virtual environment optical path setting unit 202 reads and reads the configuration data corresponding to each of the route identification information of the main line selected by the failure reception unit 205 and the route identification information of the redundant line from the optical path config table 181. Based on the configuration data, the optical path is switched from the main line to the redundant line in the virtual environment optical communication network 40.
  • the real environment optical path setting unit 19 is based on the configuration data used when the virtual environment optical path setting unit 202 switches from the main line to the redundant line optical path in the virtual environment optical communication network 40, based on the real environment optical communication network.
  • the optical path is switched from the main line to the redundant line.
  • step Sb3 and step Sb4 of FIG. 17 of the third embodiment are applied to the sixth embodiment and there is no resource for the redundant line in the resource table 161, the resource for the redundant line is present.
  • the transmission design process and the accommodation design process may be performed again so that the above can be secured.
  • the resource table 161 shown supplementarily is provided with the item of "period”, and the resource table 161 is set with the setting start date and time of the optical path. By recording the end date and time, when a redundant line is needed, the resource period for the redundant line may be limited and secured.
  • FIG. 27 is a block diagram showing a configuration of the optical communication network management system Sf according to the seventh embodiment.
  • the optical communication network management system Sf includes an optical communication network management device 1f, a real environment optical communication network 3, and a virtual environment construction device 4.
  • the optical communication network management device 1f includes a real environment communication unit 11, a network configuration acquisition unit 12, a real environment utilization optimization unit 13, a configuration parameter storage unit 14, an optical path design unit 15, a resource data storage unit 16, and a config generation unit 17. , Optical path config storage unit 18, real environment optical path setting unit 19, orchestration function unit 20, virtual environment communication unit 21, test result storage unit 22, and parameter estimation unit 25.
  • the parameter estimation unit 25 When a new configuration parameter is written in the configuration parameter table 141 stored in the configuration parameter storage unit 14, the parameter estimation unit 25 performs the following processing. That is, when the configuration parameter of the configuration parameter table 141 is deficient, the parameter estimation unit 25 estimates the approximate value of the deficient configuration parameter and rewrites the deficiency configuration parameter to the approximate value.
  • the configuration parameters are inadequate, for example, the configuration parameters required when the virtual environment configuration management unit 201 generates the package emulators 41-1 to 41-n in the virtual environment construction device 4 are insufficient. This is the case, or there is a deviation from the permissible range of the physical values of the predetermined realistic configuration parameters.
  • the parameter estimation unit 25 configures the physical values of realistic configuration parameters that are known in advance and the configurations of physical packages 31-1 to 31-n other than the physical packages 31-1 to 31-n that have deficiencies in the configuration parameters. Estimate the approximate value of the constituent parameters by performing simulation and machine learning from the physical values of the parameters.
  • the parameter estimation unit 25 receives communication quality data indicating the communication quality received from the performance monitoring units 312-1 to 312-n by the actual environment utilization optimization unit 13 from the actual environment utilization optimization unit 13, and the communication quality data. Is compared with the configuration parameters stored in the configuration parameter table 141 corresponding to the communication quality data, and even if there is a discrepancy, an approximate value is estimated and the estimated approximate value is written in the configuration parameter table 141. You may do so.
  • the parameter estimation unit 25 is insufficient to generate the virtual environment optical communication network 40 in the configuration parameters stored in the configuration parameter storage unit 14.
  • an appropriate configuration parameter for the configuration parameter is estimated, and the configuration parameter stored in the configuration parameter storage unit 14 is estimated. Rewrite to the configuration parameter.
  • the virtual environment construction device 4 is shown as a device different from the optical communication network management devices 1 to 1f, but is incorporated in the optical communication network management devices 1 to 1f. It may be configured as one.
  • the accommodation design units 153 and 153e perform the accommodation design processing for the logical optical paths set in the optical fiber transmission lines 71 to 75.
  • the node devices 61 to 64 are WDM (Wavelength Division Multiplexing) devices
  • the optical path corresponds to a wavelength.
  • the accommodation design unit 153, 153e may perform the accommodation design process in consideration of multiplexing wavelengths.
  • the transmission mode data given to the transmission design units 151 and 151b includes the start point, the end point, and the communication capacity, but the required light is used. Power, amplification degree, modulation method, etc. may be included.
  • the number of relay node devices 61 to 64 is set as the value to be recorded in the "cost" item of the resource table 161 shown in FIG. 6, but for example, the actual route.
  • Other indicators, such as the distance of, may be used as the cost value.
  • the configuration of the real environment optical communication network 3 shown in FIG. 2 above is an example, and the number of node devices 61 to 64 may be any number as long as it is at least two or more. Further, in FIG. 2, one node device 61 to 64 is installed at each of the points 51 to 54, but a plurality of node devices 61 to 64 are installed at one point 51 to 54.
  • the configuration may be.
  • the performance monitoring units 312-1 to 312-n are supposed to measure loss and OSNR, but they are made to measure light power, BER (Bit Error Rate), and the like. You may.
  • control units 411-1 to 411-n of the package emulators 41-1 to 41-n are the control units 311-1 to 311 of the physical packages 31-1 to 31-n. Although it is assumed that it is composed of the same manager application program as the manager application program constituting -n, it does not have to be exactly the same manager application program.
  • the third to seventh embodiments are configured on the basis of the configuration of the first embodiment, and for example, the configuration of the first embodiment is applied in combination with the third and fourth embodiments.
  • the configurations of the third to seventh embodiments may be arbitrarily combined and added to the configuration of the first embodiment.
  • the configurations of the third to seventh embodiments may be arbitrarily combined and applied to the second embodiment.
  • the network configuration acquisition unit 12 is configured to acquire the configuration parameters of the physical packages 31-1 to 31-n from the actual environment.
  • the configuration parameters of the physical packages 31-1 to 31-n may be acquired by other means.
  • the optical communication network management devices 1 to 1f in the first to seventh embodiments described the configuration parameters of the physical packages 31-1 to 31-n in the configuration parameter storage unit 14 manually or by a program from an external device. It may be configured to be memorized. In this case, the optical communication network management devices 1 to 1f do not have to include the network configuration acquisition unit 12.
  • the optical path design units 15, 15b, 15e of the optical communication network management devices 1 to 1f in the first to seventh embodiments described above may be provided in an external device.
  • the external device including the optical path design units 15, 15b, 15e acquires at least the configuration parameters from the optical communication network management devices 1 to 1f, extracts the optical path path, and extracts the extracted path. Detect the resources needed to accommodate the.
  • the external device including the optical path design units 15, 15b, 15e records the resource table 161 generated based on the detected resource in the resource data storage unit 16 of the optical communication network management devices 1 to 1f.
  • the optical communication network management devices 1 to 1f according to the first to seventh embodiments may be configured to realize a desired function in cooperation with an external device. In this case, the optical communication network management devices 1 to 1f do not have to include the optical path design units 15, 15b, 15e.
  • processing based on the threshold value for example, processing such as whether the value is below the threshold value or exceeds the threshold value is performed.
  • the present invention is not limited to the embodiment, and based on the threshold value, "whether or not it exceeds", “whether or not it is less than", “whether or not it is greater than or equal to", and “whether or not it is greater than or equal to”
  • the judgment process of "whether or not there is” is only an example, and “whether or not it is greater than or equal to”, “whether or not it is less than or equal to”, “whether or not it exceeds", and “whether or not it is exceeded", respectively, depending on how the threshold value is determined. It may be replaced with the determination process of "whether or not it is less than”.
  • the optical communication network management devices 1 to 1f and the virtual environment construction device 4 in the above-described embodiment may be realized by a computer.
  • the program for realizing this function may be recorded on a computer-readable recording medium, and the program recorded on the recording medium may be read by the computer system and executed.
  • the term "computer system” as used herein includes hardware such as an OS and peripheral devices.
  • the "computer-readable recording medium” refers to a portable medium such as a flexible disk, a magneto-optical disk, a ROM, or a CD-ROM, or a storage device such as a hard disk built in a computer system.
  • a "computer-readable recording medium” is a communication line for transmitting a program via a network such as the Internet or a communication line such as a telephone line, and dynamically holds the program for a short period of time. It may also include a program that holds a program for a certain period of time, such as a volatile memory inside a computer system that serves as a server or a client in that case. Further, the above program may be for realizing a part of the above-mentioned functions, and may be further realized for realizing the above-mentioned functions in combination with a program already recorded in the computer system. It may be realized by using a programmable logic device such as FPGA (Field Programmable Gate Array).
  • FPGA Field Programmable Gate Array
  • Optical communication network management device 3 ... Real environment optical communication network, 4 ... Virtual environment construction device, 11 ... Real environment communication unit, 12 ... Network configuration acquisition unit, 13 ... Real environment utilization optimization unit, 14 ... Configuration parameters Storage unit, 15 ... Optical path design unit, 16 ... Resource data storage unit, 17 ... Config generation unit, 18 ... Optical path config storage unit, 19 ... Real environment optical path setting unit, 20 ... Orchestration function unit, 21 ... Virtual Environmental communication unit, 22 ... Test result storage unit, 31-1 to 31-n ... Physical package, 41-1 to 41-1 ... Package emulator, 151 ... Transmission design unit, 152 ... Transmission design data storage unit, 153 ... Storage Design unit, 201 ... Virtual environment configuration management unit, 202 ... Virtual environment optical path setting unit, 203 ... Request reception unit, 311-1 to 311-n ... Control unit, 312-1 to 312-n ... Performance monitoring unit, 411 -1 to 411-n ... Control unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Computing Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Optical Communication System (AREA)

Abstract

物理パッケージが搭載される複数のノード装置によって構成される実環境光通信ネットワークの物理パッケージをコンピュータプログラムによって仮想的に構成したパッケージエミュレータに対して物理パッケージの構成パラメータを設定することにより仮想環境光通信ネットワークを生成し、取得した構成パラメータと、要求される伝送モードとに基づいて検出される光パスの経路ごとに必要となるリソースを示すリソースデータに基づいて、コンフィグレーションデータを生成し、生成したコンフィグレーションデータに基づいて、仮想環境光通信ネットワークに光パスを設定し、仮想環境光通信ネットワークの光パスの設定に用いたコンフィグレーションデータに基づいて、実環境光通信ネットワークに光パスを設定する。

Description

光通信ネットワーク管理装置
 本発明は、仮想環境と実環境の光通信ネットワークを管理する光通信ネットワーク管理装置に関する。
 光通信ネットワークの立ち上げや保守管理を行うためには、光通信ネットワークの接続構成の把握、伝送設計、収容設計を行う必要がある。まず、測定した物理パラメータをシミュレータに入力して光パスを設計し、設計により得られた値から通信装置の物理パッケージに設定するコンフィグコマンドなどを生成する。そして、現地において通信装置を設置して、通信装置の物理パッケージにコンフィグコマンドを設定して、試験を行うといったことが行われる。
 ところで、上記のように実際の装置を用いるのではなく、デジタルツインという技術を用いて、コンピュータプログラムにより装置やシステムを仮想的に実現し、実現した仮想環境において、意図的に故障を発生させるなどの試験を行い、設定するパラメータ等の品質を向上させた上で実際の装置やシステムを構築するという試みが行われている(例えば、非特許文献1参照)。
国立研究開発法人、科学技術推進機構、研究開発戦略センター、環境・エネルギーユニット、「戦略プロポーザル 革新的デジタルツイン ~ものづくりの未来を担う複合現象モデリングとその先進設計・製造基盤技術確立~」、国立研究開発法人、科学技術推進機構、研究開発戦略センター、2018年3月、[令和2年1月13日検索]、インターネット(URL: https://www.jst.go.jp/crds/pdf/2017/SP/CRDS-FY2017-SP-01.pdf)
 上述したように、光通信ネットワークの構築においては、実際の通信装置に設定を行う前にシミュレータなどを用いて試行するようなことは行われている。しかし、実際の光通信ネットワークは、複数の通信装置が相互に接続することにより構成される。そのため、複数の通信装置に実際に設定を行うことでシミュレータでは予め検出できないような不測の障害が発生してしまう等の問題がある。
 品質向上のために、運用中の光パスに影響が出ないように実際の光通信ネットワークに意図的に故障を発生させて構成を最適化するといったことも考えられる。しかし、複数の通信装置が相互に接続している光通信ネットワークでは、不測の障害が発生して運用中の光パスに影響することがあり得る。そのため、安易に実際の光通信ネットワークを用いて最適化を行うことが難しいという問題がある。
 上記のような問題を解決する手段として、光通信ネットワークにおいて、上述したようなデジタルツインの技術を導入することが望まれており、そのためには、仮想環境の光通信ネットワークの状態を、実環境の光通信ネットワークの状態に近づけるように維持することができる管理装置が必要とされている。
 上記事情に鑑み、本発明は、仮想環境光通信ネットワークの状態を、実環境光通信ネットワークの状態に近づけるように維持することができる技術の提供を目的としている。
 本発明の一態様は、物理パッケージが搭載される複数のノード装置によって構成される実環境光通信ネットワークの前記物理パッケージをコンピュータプログラムによって仮想的に構成したパッケージエミュレータに対して、前記物理パッケージの構成パラメータを設定することにより仮想環境光通信ネットワークを生成する仮想環境構成管理部と、前記構成パラメータと、要求される伝送モードとに基づいて検出される光パスの経路ごとに必要となるリソースを示すリソースデータに基づいて、コンフィグレーションデータを生成するコンフィグ生成部と、前記コンフィグ生成部が生成する前記コンフィグレーションデータに基づいて、前記仮想環境光通信ネットワークに前記光パスを設定する仮想環境光パス設定部と、前記光パスの設定に用いた前記コンフィグレーションデータに基づいて、前記実環境光通信ネットワークに前記光パスを設定する実環境光パス設定部と、を備える光通信ネットワーク管理装置である。
 本発明により、仮想環境光通信ネットワークの状態を、実環境光通信ネットワークの状態に近づけるように維持することができる。
第1の実施形態の光通信ネットワーク管理システムの構成を示すブロック図である。 第1の実施形態の実環境光通信ネットワークの構成の一例を示すブロック図(その1)である。 第1の実施形態の構成パラメータテーブルの構成を示す図である。 第1の実施形態の伝送モードデータの構成を示す図である。 第1の実施形態の伝送設計テーブルの構成を示す図である。 第1の実施形態のリソーステーブルの構成を示す図である。 第1の実施形態の光パスコンフィグテーブルの構成を示す図である。 第1の実施形態の実環境試験結果テーブルの構成を示す図である。 第1の実施形態の光通信ネットワーク管理装置による処理の流れを示すフローチャート(その1)である。 第1の実施形態の光通信ネットワーク管理装置による処理の流れを示すフローチャート(その2)である。 第1の実施形態の実環境光通信ネットワークの構成の一例を示すブロック図(その2)である。 第2の実施形態の光通信ネットワーク管理システムの構成を示すブロック図である。 第2の実施形態の仮想環境試験結果テーブルの構成を示す図である。 第2の実施形態の光通信ネットワーク管理装置による処理の流れを示すフローチャート(その1)である。 第2の実施形態の光通信ネットワーク管理装置による処理の流れを示すフローチャート(その2)である。 第3の実施形態の光通信ネットワーク管理システムの構成を示すブロック図である。 第3の実施形態の光通信ネットワーク管理装置による処理の流れを示すフローチャートである。 第3の実施形態の光通信ネットワーク管理装置による処理における伝送・収容設計処理のサブルーチンのフローチャートである。 第4の実施形態の光通信ネットワーク管理システムの構成を示すブロック図である。 第4の実施形態の光通信ネットワーク管理装置による処理の流れを示すフローチャートである。 第4の実施形態の光通信ネットワーク管理装置による処理における切り替え先光パスの設定処理のサブルーチンのフローチャートである。 第5の実施形態の光通信ネットワーク管理システムの構成を示すブロック図である。 第5の実施形態の光通信ネットワーク管理装置による処理の流れを示すフローチャートである。 第6の実施形態の光通信ネットワーク管理システムの構成を示すブロック図である。 第6の実施形態の冗長回線テーブルの構成を示す図である。 第6の実施形態の光通信ネットワーク管理装置による処理の流れを示すフローチャートである。 第7の実施形態の光通信ネットワーク管理システムの構成を示すブロック図である。
(第1の実施形態)
 以下、本発明の実施形態について図面を参照して説明する。図1は、第1の実施形態による光通信ネットワーク管理システムSの構成を示すブロック図である。光通信ネットワーク管理システムSは、光通信ネットワーク管理装置1と、実環境光通信ネットワーク3と、仮想環境構築装置4とを備える。
 実環境光通信ネットワーク3は、実際に通信サービスが運用される光通信ネットワークである。実環境光通信ネットワーク3は、例えば、図2に示すような複数のノード装置61~64と、ノード装置61~64を接続する光ファイバ伝送路71~75とを備える。なお、図1では、実環境光通信ネットワーク3の複数のノード装置61~64に搭載されるトランスポンダや増幅器等のハードウェアを含む物理パッケージ31-1,31-2,…,32-nのみを示している。ここで、nは、少なくとも2以上の整数である。
 物理パッケージ31-1~31-nの各々は、制御部311-1~311-nと、性能モニタ部312-1~312-nを備える。制御部311-1~311-nは、物理パッケージ31-1~31-nに含まれるハードウェアに対して行う処理を制御する。例えば、制御部311-1~311-nは、光パスを設定する処理や増幅器の増幅率を変化させる処理を制御する。制御部311-1~311-nは、物理パッケージ31-1~31-nの処理を制御するいわゆるマネージャアプリケーションプログラムが物理パッケージ31-1~31-nに含まれるCPU(Central Processing Unit)やFPGA(Field Programmable Gate Array)などの処理回路において実行されることにより構成される機能部である。
 性能モニタ部312-1~312-nは、物理パッケージ31-1~31-nに設定されている光パスにおける損失(以下「ロス」という。)、OSNR(Optical Signal to Noise Ratio)、物理パッケージにおける入出力の光レベル、光増幅器の励起電流及び各波長の光レベルなどの通信品質を測定する。なお、以下の説明において、物理パッケージ31-1~31-nの中のいずれか1つを示す場合、枝番号を省略して物理パッケージ31として示す。同様に、制御部311-1~311-nの中のいずれか1つを示す場合、枝番号を省略して制御部311として示す。同様に、性能モニタ部312-1~312-nの中のいずれか1つを示す場合、枝番号を省略して性能モニタ部312として示す。
 仮想環境構築装置4は、例えば、CPUやメモリ等を備えたサーバ装置である。CPUにより、物理パッケージ31-1~31-nの各々を仮想的に実現するコンピュータプログラムが実行される。当該コンピュータプログラムには、物理パッケージ31-1~31-nの制御部311-1~311-nを構成するマネージャアプリケーションプログラムが含まれている。当該コンピュータプログラムの実行により、仮想環境構築装置4において、物理パッケージ31-1~31-nを仮想的に実現したパッケージエミュレータ41-1~41-nが備えられることになる。パッケージエミュレータ41-1~41-nにより、図2に示す実環境光通信ネットワーク3を仮想的に実現した仮想環境光通信ネットワーク40が構築される。
 パッケージエミュレータ41-1~41-nは、制御部411-1~411-nを備える。制御部411-1~411-nは、物理パッケージ31-1~31-nの各々を仮想的に実現するコンピュータプログラムに含まれているマネージャアプリケーションプログラムが実行されることにより構成される機能部であり、制御部311-1~311-nを仮想的に実現した機能部となる。制御部411-1~411-nは、パッケージエミュレータ41-1~11-nが行う処理、例えば、光パスを設定する処理等を制御する。なお、以下の説明において、パッケージエミュレータ41-1~41-nの中のいずれか1つを示す場合、枝番号を省略してパッケージエミュレータ41として示す。同様に、制御部411-1~411-nの中のいずれか1つを示す場合、枝番号を省略して制御部411として示す。
 光通信ネットワーク管理装置1は、実環境通信部11、ネットワーク構成取得部12、実環境利用最適化部13、構成パラメータ記憶部14、光パス設計部15、リソースデータ記憶部16、コンフィグ生成部17、光パスコンフィグ記憶部18、実環境光パス設定部19、オーケストレーション機能部20、仮想環境通信部21及び試験結果記憶部22を備える。
 実環境通信部11は、制御部311-1~311-nの各々と、性能モニタ部312-1~312-nの各々との間でデータの送受信を行う。ネットワーク構成取得部12は、実環境通信部11を介して制御部311-1~311-nの各々に接続する。ネットワーク構成取得部12は、制御部311-1~311-nの各々が収集する物理パッケージ31-1~31-nの構成パラメータを取得する。
 実環境利用最適化部13は、実環境通信部11を介して性能モニタ部312-1~312-nの各々に接続する。実環境利用最適化部13は、性能モニタ部312-1~312-nの各々が測定して出力する通信品質を示す通信品質データを受信する。実環境利用最適化部13は、受信した通信品質データに基づいて、構成パラメータ記憶部14が記憶する構成パラメータを必要に応じて変更し、構成パラメータを最適化する。
 構成パラメータ記憶部14は、ネットワーク構成取得部12が取得する構成パラメータが記録される構成パラメータテーブル141を記憶する。構成パラメータテーブル141は、例えば、図3に示すデータ形式を有しており、「設置地点」、「ノード名」、「パッケージ番号」、「パッケージ種別」、「容量/増幅率」、「リソース確保容量」、「接続先」、「区間ロス」の項目を有する。
 なお、図3に示す構成パラメータテーブル141は、一例として、図2に示した実環境光通信ネットワーク3を構成する物理パッケージ31-1~31-nから取得した構成パラメータが記録された例を示している。
 上述したように、図2に示す実環境光通信ネットワーク3は、4台のノード装置61~64を備えている。ノード装置61~64の各々には、「ノードA」、「ノードB」、「ノードC」、「ノードD」の名称が予め付与されている。ノード装置61~64の各々は、地点51~54に設置されており、地点51~54の各々には、「A地点」、「B地点」、「C地点」、「D地点」の名称が予め付与されている。
 構成パラメータテーブル141において、「設置地点」の項目には、A地点、B地点などの地点51~54の名称が書き込まれる。「ノード名」の項目には、ノードA、ノードBなどのノード装置61~64に付与されている名称が書き込まれる。「パッケージ番号」の項目には、ノード装置61~64が備える物理パッケージ31-1~31-nの各々に付与されるパッケージ番号が書き込まれる。パッケージ番号は、例えば、ノード装置61~64ごとに、独立した通し番号が予め付与される。
 「パッケージ種別」の項目には、物理パッケージ31-1~31-nの各々の種別、例えば、光信号を送受信するトランスポンダの物理パッケージ31であれば「TPND」、増幅用の物理パッケージ31であれば「Amp」といった種別が書き込まれる。「容量/増幅率」の項目には、トランスポンダの物理パッケージ31であれば、使用可能な総通信容量が、例えば、400G(Gigabit/second)のようにギガビット/秒の単位で書き込まれ、増幅用の物理パッケージ31であれば、増幅率がdBの単位で書き込まれる。物理パッケージには、その他にも光分岐挿入用の波長選択スイッチ(Wavelength Selective Switch (WSS))等の光スイッチ、光分岐のための光カプラ、光レベル調節用の光アッテネータ、光信号歪み補正用の分散補償デバイス、OSC(Optical Supervisory Channel)監視制御用品などが含まれるものとする。また、温度センサ、湿度センサ、加速度センサなどの装置が置かれた環境を測定するためのセンサ類も物理パッケージに含まれるものとする。
 「リソース確保容量」の項目には、トランスポンダの物理パッケージ31の場合、リソースとして確保されている通信容量がギガビット/秒の単位で書き込まれ、増幅用の物理パッケージ31の場合は、空欄となる。「接続先」の項目には、トランスポンダの物理パッケージ31の場合、光ファイバ伝送路71~75によって接続されている接続先のノード装置61~64の名称が書き込まれ、増幅用の物理パッケージ31の場合は、空欄となる。
 「区間ロス」の項目には、トランスポンダの物理パッケージ31の場合、光ファイバ伝送路71~75によって接続される接続先の他のトランスポンダの物理パッケージ31との間における伝送損失がdBの単位で書き込まれる。
 光パス設計部15は、構成パラメータテーブル141が記憶する構成パラメータと、外部から与えられる伝送モードデータとに基づいて、光パスの経路を抽出し、抽出した経路を収容するのに必要となるリソースを検出する。光パス設計部15は、伝送設計部151、伝送設計データ記憶部152及び収容設計部153を備える。
 伝送設計部151は、外部から与えられる伝送モードデータと、構成パラメータテーブル141が記憶する構成パラメータとに基づいて、光パスについての伝送設計処理を行って経路ごとの伝送設計データを生成する。伝送モードデータは、例えば、図4に示すデータ形式のデータであり、「伝送モード」、「始端地点」、「終端地点」、「容量」のデータから構成されている。「伝送モード」のデータには、伝送モードの各々を識別可能な「伝送モード1」、「伝送モード2」等の伝送モード識別情報が含まれる。ここで、「伝送モード」には、光伝送に関わるパラメータである変調方式、ボーレート、誤り訂正符号、キャリア数などが含まれる(参考文献:特願2018-148920「光伝送システム及び伝送モード選択方法」)。「始端地点」のデータには、光パスの始端地点の名称が含まれる。「終端地点」のデータには、光パスの終端地点の名称が含まれる。「容量」のデータには、ギガビット/秒の単位で示された通信容量が含まれる。
 伝送設計データ記憶部152は、伝送設計部151が生成する伝送設計データが記録される伝送設計テーブル1521を記憶する。伝送設計テーブル1521は、例えば、図5に示すデータ構成を有しており、「経路識別情報」、「伝送モード」、「始端地点」、「終端地点」、「経路」の項目を有する。
 「経路識別情報」の項目には、伝送設計部151が伝送設計処理により検出した経路の各々を識別可能な経路識別情報が書き込まれる。「伝送モード」の項目には、伝送設計データに対応する伝送モード識別情報が書き込まれる。「始端地点」の項目には、伝送設計データに対応する光パスの始端地点の名称が書き込まれる。「終端地点」の項目には、伝送設計データに対応する光パスの終端地点の名称が書き込まれる。「経路」の項目には、伝送設計部151が伝送設計処理により検出した始端から終端までの経路を構成するノード装置61~64の名称で示される経路データが書き込まれる。
 収容設計部153は、構成パラメータ記憶部14の構成パラメータテーブル141が記憶する構成パラメータと、リソースデータ記憶部16に記録されている既に確保したリソースとに基づいて、伝送設計テーブル1521が記憶する伝送設計データの各々に必要となるリソースを検出する収容設計処理を行う。収容設計部153は、収容設計処理によって検出したリソースを示すリソースデータを生成する。
 リソースデータ記憶部16は、収容設計部153が生成するリソースデータが記録されるリソーステーブル161を記憶する。リソーステーブル161は、例えば、図6に示すデータ構成を有しており、「経路識別情報」、「リソースデータ」、「コスト」、「状態」の項目を有する。
 「経路識別情報」の項目には、経路識別情報が書き込まれる。「リソースデータ」の項目には、経路識別情報に対応する経路の光パスを設定するために必要となるリソースデータが書き込まれる。リソースデータは、例えば、図6に示すように、必要となるノード装置61~64の名称と、必要となるノード装置61~64の各々において必要となる物理パッケージ31-1~31-nを示すパッケージ番号及び種別を示す情報と、必要となる物理パッケージ31-1~31-nの各々において必要となる通信容量や増幅率の値が組み合わされたデータである。
 「コスト」の項目には、経路識別情報に対応する経路のコストを示す値が書き込まれる。ここで、コストとは、例えば、始端のノード装置61~64から終端のノード装置61~64に至る経路における中継のノード装置61~64の数で示される値である。
 「状態」の項目には、経路識別情報に対応する光パスの利用状態を示す情報が書き込まれる。光パスが利用されていない状態の場合には、「空き状態」が書き込まれる。また、光パスが利用されている状態の場合には、「使用状態」が書き込まれる。また、光パスが障害などで利用できない場合には、「使用不可」が書き込まれる。
 コンフィグ生成部17は、リソースデータ記憶部16が経路識別情報ごとに記憶するリソースデータに基づいて、物理パッケージ31-1~31-n及びパッケージエミュレータ41-1~41-nに適用するコンフィグレーションデータを生成する。コンフィグレーションデータには、物理パッケージ31-1~31-n及びパッケージエミュレータ41-1~41-nに設定を行うコンフィグコマンド、コンフィグコマンドの設定順序を示す設定順序データ及びコンフィグコマンドを設定した際に行う試験及び試験結果の確認を行う手順を示す試験確認手順データが含まれる。
 ここで、試験及び試験に対する確認とは、例えば、光パスが導通しているかを試験して判定したり、光パスが導通している場合、そのOSNRなどを測定したりする試験である。コンフィグレーションデータに含まれるコンフィグコマンドは、光パスの解除を行う際にも用いられる。
 なお、コンフィグ生成部17は、予め内部の記憶領域に、物理パッケージ31-1~31-nの種別ごとに光パスの設定などの各種のコンフィグコマンドのテンプレートを記憶させている。コンフィグ生成部17は、コンフィグコマンドのテンプレートから、リソースデータに含まれる物理パッケージ31-1~31-nに対応するコンフィグコマンドのテンプレートを選択し、選択したコンフィグコマンドのテンプレートに対して設定する通信容量や増幅率を適用してコンフィグコマンドを生成する。
 例えば、ノード装置61とノード装置62の間に光パスを設定する場合、ノード装置61に対して、あるコンフィグコマンドを設定した後に、次のコンフィグコマンドをノード装置62に対して設定しなければならない等、ノード装置61~64の間でのコンフィグコマンドの設定順序を予め定めておく必要がある。コンフィグ生成部17は、予め内部の記憶領域に、このような設定順序の条件を示すデータを記憶している。コンフィグ生成部17は、設定順序の条件を示すデータに基づいて、生成したコンフィグコマンドごとの設定順序データを生成する。
 コンフィグ生成部17は、予め内部の記憶領域に、コンフィグコマンドごとに適用される試験と、当該試験の確認の手順を示した試験確認手順データを記憶している。コンフィグ生成部17は、生成したコンフィグコマンドに対応する試験確認手順データを選択する。コンフィグ生成部17は、生成したコンフィグコマンド、生成した設定順序データ及び選択した試験確認手順データを組み合わせることによりコンフィグレーションデータを生成する。
 光パスコンフィグ記憶部18は、コンフィグ生成部17が生成する光パスのコンフィグレーションデータが記録される光パスコンフィグテーブル181を記憶する。光パスコンフィグテーブル181は、例えば、図7に示すデータ構成を有しており、「経路識別情報」、「コンフィグレーションデータ」の項目を有する。「経路識別情報」の項目には、経路識別情報が書き込まれる。「コンフィグレーションデータ」の項目には、経路識別情報に対応する光パスの設定に用いられるコンフィグコマンド、コンフィグコマンドの設定順序を示す設定順序データ及びコンフィグコマンドに対応する試験確認手順データを含むコンフィグレーションデータが書き込まれる。
 実環境光パス設定部19は、光パスコンフィグ記憶部18の光パスコンフィグテーブル181が記憶するコンフィグレーションデータに基づいて、実環境光通信ネットワーク3に対して光パスを設定し、必要に応じて設定した光パスに対して動作確認試験処理を行う。
 仮想環境通信部21は、仮想環境構築装置4との間でデータの送受信を行う。オーケストレーション機能部20は、要求受付部203、仮想環境構成管理部201及び仮想環境光パス設定部202を備える。要求受付部203は、外部から与えられる光パスの設定を要求する要求データを受けて、要求データにおいて指定される条件に一致する空き状態の光パスの経路識別情報をリソーステーブル161から検出する。
 仮想環境構成管理部201は、仮想環境通信部21に接続し、構成パラメータ記憶部14の構成パラメータテーブル141が記憶する構成パラメータに基づいて、パッケージエミュレータ41-1~41-nを仮想環境構築装置4に生成することにより、仮想環境光通信ネットワーク40を構築する。
 仮想環境光パス設定部202は、光パスコンフィグ記憶部18の光パスコンフィグテーブル181が記憶するコンフィグレーションデータに基づいて、仮想環境光通信ネットワーク40に対して光パスを設定し、必要に応じて設定した光パスに対して動作確認試験処理を行う。
 試験結果記憶部22は、実環境試験結果テーブル221を記憶する。実環境試験結果テーブル221は、図8に示すデータ構成を有しており、「経路識別情報」、「実環境における動作確認試験処理の試験結果」、「処理時刻」の項目を有する。「経路識別情報」の項目には、経路識別情報が書き込まれる。「実環境における動作確認試験処理の試験結果」の項目には、実環境光パス設定部19がコンフィグレーションデータに含まれる試験確認手順データに基づいて行う動作確認試験処理の試験結果が書き込まれる。「処理時刻」の項目には、実環境光パス設定部19がコンフィグレーションデータに含まれる試験確認手順データに基づいて行う動作確認試験処理が行われた処理時刻が書き込まれる。
(第1の実施形態の光通信ネットワーク管理装置の処理)
 以下、第1の実施形態の光通信ネットワーク管理装置1による処理について説明する。図9及び図10は、第1の実施形態の光通信ネットワーク管理装置1による処理の流れを示すフローチャートである。
 ネットワーク構成取得部12は、実環境通信部11を介して実環境光通信ネットワーク3の物理パッケージ31-1~31-nの制御部311-1~311-nに接続して構成パラメータを要求する要求信号を送信する。制御部311-1~311-nは、ネットワーク構成取得部12から要求信号を受信すると、各々に対応する物理パッケージ31-1~31-nから構成パラメータを収集し、収集した構成パラメータをネットワーク構成取得部12に送信する。ネットワーク構成取得部12は、制御部311-1~311-nから構成パラメータを受信すると、構成パラメータテーブル141に受信した構成パラメータを書き込む(ステップS1)。
 仮想環境構成管理部201は、構成パラメータテーブル141に構成パラメータが書き込まれたことを検出すると、構成パラメータテーブル141から構成パラメータを読み出す。仮想環境構成管理部201は、読み出した構成パラメータに基づいて、パッケージエミュレータ41-1~41-nを仮想環境構築装置4に生成することにより、仮想環境光通信ネットワーク40を構築する(ステップS2)。
 伝送設計部151は、外部から与えられる伝送モードデータを取り込む(ステップS3)。伝送設計部151が取り込んだ伝送モードデータに含まれる伝送モード識別情報と、始端地点と、終端地点と、容量の組み合わせごとに、以下に示すステップS4~ステップS11の処理が繰り返し行われる(ループL1s~L1e)。
 伝送設計部151は、例えば、図4に示す伝送モードデータを取り込み、最初の「伝送モード1」の組み合わせを選択する。「伝送モード1」は、始端地点が「A地点」であり、終端地点が「D地点」となる経路であって、100Gの通信容量を要求する伝送モードである。伝送設計部151は、構成パラメータテーブル141が記憶する構成パラメータに基づいて、始端地点が「A地点」であり、終端地点が「D地点」となる経路であって、100Gの通信容量を有する経路を検出する。
 図2から分かるように、実環境光通信ネットワーク3において、A地点からD地点への100Gの通信容量が確保できる経路は、以下の4通りの経路が存在する。すなわち、ノードAからノードBを経由してノードDに至る経路と、ノードAからノードCを経由してノードDに至る経路と、ノードAからノードBとノードCを経由してノードDに至る経路と、ノードAからノードCとノードBを経由してノードDに至る経路とが存在する。
 経路が分散するような伝送設計処理を行う場合、伝送設計部151は、伝送設計処理において、上記の4通りの全ての経路を検出する。伝送設計部151は、検出した4通りの経路を示す経路データの各々に、経路の各々を識別可能な経路識別情報を生成して付与し、更に、伝送モード識別情報、始端地点の名称、終端地点の名称を関連付けて伝送設計データを生成する。伝送設計部151は、図5に示すように、伝送設計データ記憶部152の伝送設計テーブル1521に、4通りの経路を示す伝送設計データの各々を書き込んで記憶させる(ステップS4)。
 伝送設計部151が新たに生成した経路識別情報の全てについて、以下のステップS5及びステップS6の処理が繰り返し行われる(ループL2s~L2e)。
 収容設計部153は、伝送設計テーブル1521に新たな伝送設計データが生成されると、構成パラメータテーブル141が記憶する構成パラメータに基づいて、新たな伝送設計データに対応する経路に必要となるリソースを検出する収容設計処理を行う。なお、リソーステーブル161に既にレコードが生成されている場合、確保されているリソースを考慮する必要があるため、収容設計部153は、構成パラメータテーブル141が記憶する構成パラメータと、リソーステーブル161が記憶するリソースデータとに基づいて、収容設計処理を行う。
 収容設計部153は、収容設計処理によって検出したリソースを示すリソースデータを生成し、生成したリソースデータに基づいて、コストの値を算出する。収容設計部153は、リソースデータ記憶部16のリソーステーブル161に新たなレコードを生成し、生成したレコードに、リソースデータと、コストと、当該リソースデータに対応する経路識別情報を関連付けて、図6に示すように書き込んで記憶させる。このとき、収容設計部153は、リソーステーブル161の「状態」の項目には、初期値として「空き状態」を書き込む(ステップS5)。
 コンフィグ生成部17は、リソーステーブル161に新たなレコードが生成されると、生成されたレコードに対応する光パスのコンフィグレーションデータを生成する。コンフィグ生成部17は、生成したコンフィグレーションデータに対して、生成元のレコードに含まれる経路識別情報を関連付けて、図7に示すように、光パスコンフィグ記憶部18の光パスコンフィグテーブル181に書き込んで記憶させる(ステップS6)。
 ステップS6の処理が完了すると、次の新たな経路識別情報について、ステップS5及びステップS6の処理が行われる(ループL2e)。
 コンフィグ生成部17は、リソーステーブル161に新たに生成された全てのレコードに対応するコンフィグレーションデータの光パスコンフィグテーブル181への書き込みが完了すると、実環境光通信ネットワーク3に一時的に光パスを設定させるため、生成した全てのコンフィグレーションデータに対応する経路識別情報を含むパス一時設定指示信号を実環境光パス設定部19に出力する。
 実環境光パス設定部19は、コンフィグ生成部17からパス一時設定指示信号を受けると、パス一時設定指示信号に含まれている全ての経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出す。実環境光パス設定部19は、読み出したコンフィグレーションデータに含まれるコンフィグコマンド及び設定順序データを参照し、設定順序データが示す設定順序で、実環境通信部11を介して、コンフィグコマンドを該当する物理パッケージ31-1~31-nの制御部311-1~311-nに適用して実環境光通信ネットワーク3に光パスを設定する(ステップS7)。
 実環境光パス設定部19は、必要に応じて設定した光パスに対して、読み出したコンフィグレーションデータに含まれる試験確認手順データに基づいて、動作確認試験処理を行う。実環境光パス設定部19は、内部に備える時計等の計時手段から動作確認試験処理を行った時刻を取得する。実環境光パス設定部19は、動作確認試験処理に用いたコンフィグレーションデータに対応する経路識別情報と、当該動作確認試験処理の試験結果と、取得した時刻とを関連付けて、図8に示すように、試験結果記憶部22の実環境試験結果テーブル221に書き込んで記憶させる。実環境光パス設定部19は、パス一時設定指示信号に含まれている全ての経路識別情報に対応する光パスの設定が完了すると、パス一時設定指示信号に含まれていた全ての経路識別情報を含む完了通知信号を実環境利用最適化部13に出力する(ステップS8)。
 なお、実環境光パス設定部19は、ステップS7において、実環境光通信ネットワーク3に対する光パスの設定が失敗した場合、ステップS8において、動作確認試験処理を行わず、実環境試験結果テーブル221の「実環境における動作確認試験処理の試験処理」の項目に光パスの設定が失敗したことを書き込み、その時点で内部に備える計時手段から取得した時刻を「処理時刻」の項目に書き込む。
 実環境利用最適化部13は、実環境光パス設定部19から完了通知信号を受けると、実環境通信部11を介して物理パッケージ31-1~31-nの性能モニタ部312-1~312-nに接続し、性能モニタ部312-1~312-nの各々に対して通信品質の測定を要求する要求信号を送信する。性能モニタ部312-1~312-nは、実環境利用最適化部13から要求信号を受信すると、各々の物理パッケージ31-1~31-nに関する通信品質の測定を行って通信品質データを生成し、生成した通信品質データを実環境利用最適化部13に送信する。
 実環境利用最適化部13は、性能モニタ部312-1~312-nから各種の通信品質データを受信すると、受信した各種の通信品質データと、各種の通信品質データに対して予め定められる閾値とに基づいて、構成パラメータテーブル141が記憶する構成パラメータを変更する必要があるか否かを判定する(ステップS9)。
 例えば、性能モニタ部312-1~312-nが測定する測定項目の1つであるファイバロスの閾値として、25dB以下であることが予め定められているとする。このとき、性能モニタ部312-1~312-nから受信した通信品質データにおいて、ノードAのノード装置61と、ノードBのノード装置62を接続する光ファイバ伝送路71に設定した光パスの損失が「30dB」を示していた場合、閾値以下となる。そのため、実環境利用最適化部13は、構成パラメータテーブル141の1行目のノードAとノードBの間の区間ロスと、4行目のノードBとノードAの間の区間ロスの項目を実態に合わせて「30dB」に書き替えて変更する必要があると判定する。
 実環境利用最適化部13は、構成パラメータの変更をする必要があると判定した場合(ステップS9、変更が必要)、構成パラメータテーブル141が記憶する構成パラメータのうち、変更が必要な構成パラメータの変更を行う。
 仮想環境構成管理部201は、パッケージエミュレータ41-1~41-nの生成後に、構成パラメータテーブル141の構成パラメータが変更されたことを検出すると、変更された構成パラメータを特定する。そして、仮想環境構成管理部201は、変更後の構成パラメータを設定するのに必要なコンフィグコマンドを生成する。仮想環境構成管理部201は、コンフィグ生成部17と同様に、予め内部の記憶領域に、物理パッケージ31-1~31-nの種別ごとに、構成パラメータごとのコンフィグコマンドのテンプレートを記憶させている。仮想環境構成管理部201は、コンフィグコマンドのテンプレートから、構成パラメータに対応するコンフィグコマンドのテンプレートを選択し、選択したコンフィグコマンドのテンプレートに対して変更後の構成パラメータを適用してコンフィグコマンドを生成する。
 仮想環境構成管理部201は、仮想環境通信部21を介して、変更された構成パラメータに対応するパッケージエミュレータ41-1~41-nの制御部411-1~411-nに接続する。仮想環境構成管理部201は、接続した制御部411-1~411-nに対して、生成したコンフィグコマンドを適用して構成パラメータを変更する。実環境利用最適化部13は、構成パラメータの変更を行った後、実環境光パス設定部19に対して、ステップS7において実環境光通信ネットワーク3に設定した光パスの経路識別情報を含むパス解除指示信号を出力する。
 実環境光パス設定部19は、実環境利用最適化部13からパス解除指示信号を受けると、パス解除指示信号に含まれている全ての経路識別情報に対応する光パスを解除する。実環境利用最適化部13は、変更した構成パラメータに基づいて、伝送設計部151に改めて同一の伝送モードについての伝送設計処理を行わせるために、完了通知信号に含まれていた全ての経路識別情報を含む再設計指示信号を伝送設計部151に出力する(ステップS10)。伝送設計部151は、実環境利用最適化部13から再設計指示信号を受けると、完了通知信号に含まれている経路識別情報に対応する伝送設計テーブル1521のレコードを削除して、同一の伝送モード、ここでは、「伝送モード1」に対するステップS4の処理を開始する。その後のステップS5において、収容設計部153は、伝送設計テーブル1521から削除された経路識別情報に対応するレコードをリソーステーブル161から削除した上で、伝送設計テーブル1521に生成された新たな経路識別情報の伝送設計データに基づいて、収容設計処理を行う。
 例えば、上記したように、ノードAと、ノードBを接続する光ファイバ伝送路71に設定した光パスの損失が「35dB」を示しており、閾値である30dBを超えていた場合、実環境利用最適化部13は、ステップS10において、構成パラメータテーブル141の1行目のノードAとノードBの間の区間ロスの項目の値と、4行目のノードBとノードAの間の区間ロスの項目の値を「35dB」に書き替える。
 再び行われるステップS4の処理において、伝送設計部151は、ノードAとノードBとの間の区間ロスが「35dB」という大きな損失を示しているため、例えば、ノードAとノードBとの間の経路を避ける伝送設計処理を行うか、または、以下のような伝送設計処理を行う。すなわち、伝送設計部151は、予め定められている増幅用の物理パッケージ31-1~31-nの増幅率の仕様に基づいて、ノードAとノードBの増幅用の物理パッケージ31-1~31-nの増幅率を増加させることが可能であると判定した場合、前回のステップS4と同様にノードAとノードBとの間の経路を選択する。伝送設計部151は、伝送設計処理において、構成パラメータテーブル141のノードAとノードBの増幅用の物理パッケージ31-1~31-n(構成パラメータテーブル141の3行目と7行目)の「容量/増幅率」の項目の増幅率を増加させるように書き替える。その後、ステップS5において、収容設計部153がリソースを検出する処理を行い、ステップS6において、コンフィグ生成部17がコンフィグレーションデータを生成する。ステップS7において、実環境光パス設定部19が、生成されたコンフィグレーションデータに基づいて、光パスの設定を行うことで、ノードAとノードBの増幅用の物理パッケージ31-1~31-nの増幅率が増加された状態で光パスが設定されることになる。これにより、ノードAとノードBとの間の区間ロスが軽減されることになる。
 ステップS9に戻り、実環境利用最適化部13は、構成パラメータの変更をする必要がないと判定した場合(ステップS9、変更が不要)、ネットワーク構成取得部12に対して、実環境光通信ネットワーク3に設定した光パスに関係する構成パラメータを更新させる構成パラメータ更新指示信号を出力する。ネットワーク構成取得部12は、実環境利用最適化部13から構成パラメータ更新指示信号を受けると、ステップS1と同一の処理を行い、制御部311-1~311-nからから受信した構成パラメータを構成パラメータテーブル141に構成パラメータを書き込む。これにより、構成パラメータテーブル141の「リソース確保容量」の通信容量の値が更新されることになる。その後に伝送設計部151によって行われるステップS4の処理において、リソースとして確保された通信容量が考慮されて伝送設計処理が行われることになる。実環境利用最適化部13は、次の伝送モードについての伝送設計処理を伝送設計部151に行わせる処理続行指示信号を出力する(ステップS11)。
 伝送設計部151は、処理続行指示信号を実環境利用最適化部13から受けると、伝送モードデータにおける次の伝送モード、ここでは、「伝送モード2」に対するステップS4の処理を開始する(ループL1e)。
 伝送設計部151に与えられた伝送モードデータに含まれる全ての伝送モードについてループL1s~L1eの処理が完了すると、実環境利用最適化部13は、実環境光パス設定部19に対して、全パス解除指示信号を出力する。実環境光パス設定部19は、実環境利用最適化部13から全パス解除指示信号を受けると、実環境光通信ネットワーク3に設定されている全ての光パスを解除する(ステップS12)。その後、実際に運用する光パスの設定を行う処理が開始される(図9の符号Aから図10の符号Aへ処理が継続する)。
 要求受付部203は、外部から与えられる要求データを取り込む(ステップS20)。ここでは、A地点とD地点に100Gの光パスを2本設定する要求を示した要求データと取り込んだとする。要求データに含まれる光パスの数に応じて、以下に示すステップS21~ステップS29の処理が繰り返し行われる(ループL3s~L3e)。
 要求受付部203は、リソーステーブル161を参照し、要求データにおいて指定されている光パスに対応する空き状態のリソースを検出し、検出したリソースに対応する経路識別情報を読み出す(ステップS21)。
 なお、ここでは、要求受付部203に与えられる要求データによって指定される光パスは、伝送設計部151に与えられた伝送モードデータのいずれかの伝送モードの条件に該当する光パスであることを前提としている。そのため、初回のステップS21において、要求受付部203が、要求データによって指定される光パスに対応する空き状態のリソースの経路識別情報を必ず検出することができるものとして以下の説明を行う。
 要求受付部203は、実環境試験結果テーブル221を参照し、読み出した経路識別情報に対応する試験結果が良好であるか否かを判定する(ステップS22)。要求受付部203は、読み出した経路識別情報に対応する試験結果が良好でないと判定した場合(ステップS22、No)、処理をステップS28に進める。
 ここで、動作確認試験処理による試験結果が良好でないとは、例えば、試験結果が、予め定められる所定の条件を満たしていないことを示しており、所定の条件とは、例えば、予め定められる様々な通信品質データの閾値等である。例えば、試験により測定した始端地点から終端地点までのロスが、予め定められる閾値を超えている場合、所定の条件を満たしていないことになる。また、光パスの設定が失敗した場合は、試験結果が良好でない場合に含まれるものとする。
 一方、要求受付部203は、読み出した経路識別情報に対応する試験結果が良好であると判定した場合(ステップS22、Yes)、当該経路識別情報を含んだパス設定要求信号を仮想環境光パス設定部202に出力する。
 仮想環境光パス設定部202は、要求受付部203から当該パス設定要求信号を受けると、パス設定要求信号に含まれている経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出す。仮想環境光パス設定部202は、読み出したコンフィグレーションデータに含まれるコンフィグコマンド及び設定順序データを参照し、設定順序データが示す設定順序で、コンフィグコマンドを該当するパッケージエミュレータ41-1~41-nの制御部411-1~411-nに設定する。これにより、仮想環境光通信ネットワーク40に光パスが設定されることになる(ステップS23)。
 仮想環境光パス設定部202は、読み出したコンフィグレーションデータに含まれる試験確認手順データにしたがって、設定した光パスに対して動作確認試験処理を行う(ステップS24)。仮想環境光パス設定部202は、動作確認試験処理の結果が、良好であるか否かを判定する(ステップS25)。仮想環境光パス設定部202は、動作確認試験処理の結果が、良好であると判定した場合(ステップS25、Yes)、要求受付部203に対して経路識別情報を含むパス設定完了応答信号を出力する。要求受付部203は、仮想環境光パス設定部202からパス設定完了応答信号を受けると、パス設定完了応答信号に含まれている経路識別情報を含むパス設定要求信号を実環境光パス設定部19に対して出力する。
 実環境光パス設定部19は、要求受付部203からパス設定要求信号を受けると、パス設定要求信号に含まれている経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出す。実環境光パス設定部19は、読み出したコンフィグレーションデータに含まれるコンフィグコマンド及び設定順序データを参照し、設定順序データが示す設定順序で、コンフィグコマンドを該当する物理パッケージ31-1~31-nの制御部311-1~311-nに設定する。これにより、実環境光通信ネットワーク3に光パスが設定されることになる。
 実環境光パス設定部19は、読み出したコンフィグレーションデータに含まれる試験確認手順データにしたがって、設定した光パスに対して動作確認試験処理を行う。実環境光パス設定部19は、内部に備える計時手段から動作確認試験処理を行った時刻を取得する。実環境光パス設定部19は、動作確認試験処理に用いたコンフィグレーションデータに対応する経路識別情報と、当該動作確認試験処理の試験結果と、取得した時刻とを関連付けて、図8に示すように、試験結果記憶部22の実環境試験結果テーブル221に書き込んで記憶させる。
 実環境光パス設定部19は、パス設定要求信号に含まれていた経路識別情報を含むパス設定完了応答信号を要求受付部203に出力する。要求受付部203は、実環境光パス設定部19からパス設定完了応答信号を受けると、当該パス設定完了応答信号に含まれている経路識別情報に対応するリソーステーブル161の「状態」の項目を「使用状態」に書き替える(ステップS26)。
 一方、仮想環境光パス設定部202は、動作確認試験処理の結果が、良好でないと判定した場合(ステップS25、No)、仮想環境光パス設定部202は、仮想環境光通信ネットワーク40に設定した光パスを解除する。なお、ステップS23において、仮想環境光パス設定部202は、光パスの設定に失敗している場合、ステップS24の動作確認試験処理は行わず、ステップS25において、良好でないと判定することになる。
 仮想環境光パス設定部202は、他の空き状態のリソースが存在するかを確認させることを指示するリソースデータ確認指示信号を要求受付部203に出力する(ステップS27)。
 要求受付部203は、仮想環境光パス設定部202からリソースデータ確認指示信号を受けた場合、または、ステップS22においてNoの判定を行った場合、リソーステーブル161を参照し、他の空き状態のリソース、すなわち未だステップS22の判定対象としていないリソースが存在するか否かを判定する(ステップS28)。
 要求受付部203は、他の空き状態のリソースが存在すると判定した場合(ステップS28、Yes)、再びステップS21からの処理を行う。一方、要求受付部203は、他の空き状態のリソースが存在しないと判定した場合(ステップS28、No)、パスが設定できなかったことを外部に通知する(ステップS29)。
 ステップS26及びステップS29の処理の後、要求受付部203は、要求データに含まれる次の光パスの処理を繰り返し行い(ループL3e)、全ての要求データに含まれる光パスの処理が完了すると、処理を終了する。
 例えば、ステップS21において、要求受付部203が、リソーステーブル161における「コスト」の項目の数値が小さい方から順にリソースデータを検出する処理を行ったとする。この場合、要求データによって指定されるA地点とD地点に100Gの光パスが2本設定されると、図11に示すように、実環境光通信ネットワーク3に、リソーステーブル161における経路識別情報「1」に対応する光パス81と、経路識別情報「2」に対応する光パス82が設定されることになる。このとき、リソーステーブル161の経路識別情報「1」及び「2」に対応する「状態」の項目は「使用状態」に書き替えられていることになる。
 上記のステップS21において、要求受付部203が、要求データが指定する光パスに該当するリソースデータが複数存在する場合、どのリソースデータから検出するかは、任意に定められることであり、上記のようにコストの値が小さいリソースデータから検出してもよいし、ランダムに検出するようにしてもよい。
 上記のステップS4において、伝送設計部151が行う伝送設計処理の例は、始端地点と終端地点において、伝送モードデータにおいて指定された通信容量を確保できる経路を検出する処理として示しているが、更に、受信OSNRなどを考慮するようにしてもよい。例えば、伝送設計部151は、伝送設計処理において、検出した各経路の受信OSNRを算出し、算出した受信OSNRが、予め定められる閾値以下である場合、TxOSNRが大きい通信用の物理パッケージ31-1~31-nを利用できる経路を選択したり、NFが良い増幅用の物理パッケージ31-1~31-nを利用できる経路を選択したりして受信OSNRが閾値を超えるように伝送設計を行うようにしてもよい。
 上記のステップS4では、伝送設計部151は、経路が分散するような伝送設計処理を行うとしていたが、中継するノード装置61~64の台数、すなわちコストが最小となる経路のみを検出する伝送設計処理を行うようにしてもよい。このような伝送設計処理を行う場合、伝送設計部151は、ノードA、ノードB、ノードDの経路と、ノードA、ノードC、ノードDの経路の2つ経路を検出することになる。
 上記のステップS5では、収容設計部153は、経路ごとに1回線ずつを確保する収容設計処理を行っているが、例えば、経路ごとに予め定められる数の回線を確保する収容設計処理を行うようにしてもよい。
 上記のステップS26において、実環境光パス設定部19が設定する光パスは、ステップS22において実環境光通信ネットワーク3における動作確認試験処理の試験結果が良好であると判定されている光パスである。そのため、ステップS26の処理において、光パスの設定に失敗する可能性が低いため、光パスの設定が失敗しないことを前提としている。
 仮に、ステップS26における光パスの設定の失敗を考慮する場合、以下のような処理が行われることになる。実環境光パス設定部19は、光パスの設定に失敗した場合、動作確認試験処理を行わず、実環境試験結果テーブル221の「実環境における動作確認試験処理の試験処理」の項目に光パスの設定が失敗したことを書き込み、その時点で内部に備える計時手段から取得した時刻を「処理時刻」の項目に書き込む。実環境光パス設定部19は、パス設定要求信号に含まれていた経路識別情報を含むパス設定不可応答信号を要求受付部203に出力する。要求受付部203は、実環境光パス設定部19からパス設定不可応答信号を受けると、パス設定できかったことを外部に通知して処理を終了する。
 上記に示した物理パッケージ31-1~31-nの制御部311-1~311-nは、例えばコンフィグ実行部、状態遷移管理部、エラー検出部及びログ記録部の機能を実現する。コンフィグ実行部は、光通信ネットワーク管理装置1からコンフィグコマンドを取得し、取得したコンフィグコマンドを物理パッケージ31-1~31-nを実行する。状態遷移管理部は、コンフィグコマンドの実行による物理パッケージ31-1~31-nの状態の変化を管理する。エラー検出部は、コンフィグコマンド実行時のエラー等を検出する。エラー検出部は、検出したエラーを光通信ネットワーク管理装置1に出力する。ログ記録部は、物理パッケージ31-1~31-nのログデータを記録する。ログ記録部は、必要に応じてログデータを光通信ネットワーク管理装置1に出力する。また、パッケージエミュレータ41-1~41-nの制御部411-1~411-nは、物理パッケージ31-1~31-nの制御部311-1~311-nと同様の機能を有する。すなわち、パッケージエミュレータ41-1~41-nの制御部411-1~411-nは、物理パッケージ31-1~31-nの制御部311-1~311-nが行うコンフィグコマンドの実行、ログの出力及びエラー検出の機能等を有する。このように、パッケージエミュレータ41-1~41-nの制御部411-1~411-nは、伝送路の品質・設計のみでなくコンフィグ実行時に発生する不具合までを模擬することができる。
 上記の第1の実施形態の光通信ネットワーク管理装置1において、ネットワーク構成取得部12は、物理パッケージ31-1~31-nが搭載される複数のノード装置61~64によって構成される実環境光通信ネットワーク3の物理パッケージ31-1~31-nから構成パラメータを取得する。構成パラメータ記憶部14は、ネットワーク構成取得部12が取得する構成パラメータを記憶する。仮想環境構成管理部201は、物理パッケージ31-1~31-nをコンピュータプログラムによって仮想的に構成したパッケージエミュレータ41-1~41-nに対して構成パラメータ記憶部14が記憶する構成パラメータを設定することにより仮想環境光通信ネットワーク40を生成する。光パス設計部15は、構成パラメータ記憶部14が記憶する構成パラメータと、要求される伝送モードとに基づいて、光パスの経路を検出し、検出した経路ごとに必要となるリソースを示すリソースデータを生成する。リソースデータ記憶部16は、光パス設計部15が生成するリソースデータを、経路の各々を識別可能な経路識別情報に関連付けて記憶する。コンフィグ生成部17は、リソースデータ記憶部16が記憶するリソースデータに基づいて、コンフィグレーションデータを生成する。光パスコンフィグ記憶部18は、コンフィグ生成部17が生成するコンフィグレーションデータを、経路識別情報に関連付けて記憶する。仮想環境光パス設定部202は、光パスコンフィグ記憶部18が記憶するコンフィグレーションデータに基づいて、仮想環境光通信ネットワーク40に光パスを設定する。実環境光パス設定部19は、仮想環境光パス設定部202が光パスの設定に用いたコンフィグレーションデータに基づいて、実環境光通信ネットワーク3に光パスを設定する。
 これにより、光通信ネットワーク管理装置1は、実環境光通信ネットワーク3と、実環境光通信ネットワーク3を仮想的に実現した仮想環境光通信ネットワーク40の両方を管理しつつ、仮想環境光通信ネットワーク40の状態を、実環境光通信ネットワーク3の状態に近づけるように維持することができる。このような管理を行うことで、例えば、仮想環境光通信ネットワーク40を用いて、様々な故障状態や光パスの構成変更などを模擬することができる。また、このような模擬に対する耐障害性の検証を行うことで、運用中の光パスに影響を与えることなく、実環境光通信ネットワーク3における問題点を洗い出すことができるので、実環境光通信ネットワーク3の品質向上を図ることが容易になり、また、実環境光通信ネットワーク3の運用に要するOPEX(Operating Expese)、すなわち、業務費や運営費を軽減することが可能となる。
 上記の第1の実施形態の光通信ネットワーク管理装置1において、実環境利用最適化部13は、実環境光パス設定部19に実環境光通信ネットワーク3に光パスを一時的に設定させて、実環境光通信ネットワーク3から通信品質データを得ることにより、構成パラメータテーブル141が記憶する構成パラメータを最適化する。このようにして、構成パラメータを最適化することにより、仮想環境光通信ネットワーク40の状態を、実環境光通信ネットワーク3の状態に近づけるように維持することが可能となる。
 上記の第1の実施形態の光通信ネットワーク管理装置1において、光パスコンフィグ記憶部18が記憶するコンフィグレーションデータには、コンフィグコマンドと、コンフィグコマンドの設定順序を示す設定順序データと、試験確認手順を示す試験確認手順データとが含まれており、仮想環境光パス設定部202は、光パスコンフィグ記憶部18が記憶するコンフィグレーションデータに含まれる設定順序データが示す順序で、コンフィグコマンドを適用して仮想環境光通信ネットワーク40に光パスを設定し、設定が成功した光パスに対して、試験確認手順データに基づいて動作確認試験処理を行う。実環境光パス設定部19は、仮想環境光パス設定部202による動作確認試験処理の試験結果が、良好である場合、仮想環境光パス設定部202が仮想環境光通信ネットワーク40に対して適用したコンフィグレーションデータを用いて、実環境光通信ネットワーク3に光パスを設定する。これにより、事前に仮想環境光通信ネットワーク40において、コンフィグコマンドの正確性、設定順序の正確性を確かめることができ、更に、動作確認試験処理により、設定した光パスに不具合がないことを確認した上で、実環境光通信ネットワーク3に光パスを設定することができる。そのため、実環境光通信ネットワーク3に対する光パスの際に、不測の障害が発生することを防ぐことが可能になる。
(第2の実施形態)
 図12は、第2の実施形態による光通信ネットワーク管理システムSaの構成を示すブロック図である。第1の実施形態の光通信ネットワーク管理システムSでは、実環境光通信ネットワーク3に対して、一時的に光パスを設定し、実環境利用最適化部13が、構成パラメータの最適化を行う処理を行った後に、仮想環境光通信ネットワーク40による動作確認試験処理を行っていた。これに対して、第2の実施形態の光通信ネットワーク管理システムSaでは、先に仮想環境光通信ネットワーク40において動作確認試験処理を行う点で、第1の実施形態とは異なる。
 第2の実施形態において、第1の実施形態と同一の構成については、同一の符号を付し、以下、異なる構成について説明する。光通信ネットワーク管理システムSaは、光通信ネットワーク管理装置1aと、実環境光通信ネットワーク3と、仮想環境構築装置4とを備える。
 光通信ネットワーク管理装置1aは、実環境通信部11、ネットワーク構成取得部12、実環境利用最適化部13、構成パラメータ記憶部14、光パス設計部15、リソースデータ記憶部16、コンフィグ生成部17a、光パスコンフィグ記憶部18、実環境光パス設定部19a、オーケストレーション機能部20a、仮想環境通信部21及び試験結果記憶部22aを備える。
 コンフィグ生成部17aは、第1の実施形態のコンフィグ生成部17と、以下の点を除いて、同一の構成を備えている。第1の実施形態のコンフィグ生成部17は、生成したコンフィグレーションデータの光パスコンフィグテーブル181への書き込みが完了すると、生成した全てのコンフィグレーションデータに対応する全ての経路識別情報を含むパス一時設定指示信号を実環境光パス設定部19に出力していた。これに対して、第2の実施形態のコンフィグ生成部17aは、生成したコンフィグレーションデータに対応する経路識別情報を含むパス一時設定指示信号をオーケストレーション機能部20aの仮想環境光パス設定部202aに対して出力する。
 試験結果記憶部22aは、図8に示した実環境試験結果テーブル221と、図13に示す仮想環境試験結果テーブル222を記憶する。仮想環境試験結果テーブル222は、「経路識別情報」と「仮想環境における動作確認試験処理の試験結果」の項目を有する。「経路識別情報」の項目には、経路識別情報が書き込まれる。「仮想環境における動作確認試験処理の試験結果」の項目には、仮想環境光パス設定部202aがコンフィグレーションデータに含まれる試験確認手順データに基づいて行う動作確認試験処理の試験結果が書き込まれる。
 実環境光パス設定部19aは、第1の実施形態の実環境光パス設定部19と異なり、パス一時設定指示信号を仮想環境光パス設定部202aから受ける。実環境光パス設定部19aは、仮想環境光パス設定部202aからパス一時設定指示信号を受けると、試験結果記憶部22aの仮想環境試験結果テーブル222を参照し、仮想環境光通信ネットワーク40における動作確認試験処理の試験結果が良好である経路識別情報を抽出する。実環境光パス設定部19aは、抽出した経路識別情報に対応する光パスを実環境光通信ネットワーク3に一時的に設定する。また、実環境光パス設定部19aは、要求受付部203aからパス設定要求信号を受けた場合、パス設定要求信号に含まれている経路識別情報に対応する光パスを設定する。
 オーケストレーション機能部20aは、仮想環境構成管理部201、仮想環境光パス設定部202a及び要求受付部203aを備える。仮想環境光パス設定部202aは、第1の実施形態の仮想環境光パス設定部202の構成に加えて、以下の構成を備える。第2の実施形態の仮想環境光パス設定部202aは、光パスに対して動作確認試験処理を行った際、動作確認試験処理の試験結果に、光パスに対応する経路識別情報を関連付けて仮想環境試験結果テーブル222に書き込む。また、仮想環境光パス設定部202aは、コンフィグ生成部17aからパス一時設定指示信号を受けた場合、パス一時設定指示信号に含まれている経路識別情報に対応する光パスを一時的に仮想環境光通信ネットワーク40に設定する。
 要求受付部203aは、外部から与えられる光パスの設定を要求する要求データを受けた場合、要求データにおいて指定される条件に一致する光パスであって、空き状態、かつ実環境光通信ネットワーク3及び仮想環境光通信ネットワーク40における動作確認試験処理の試験結果が良好である光パスの経路識別情報をリソースデータ記憶部16のリソーステーブル161から検出する。
(第2の実施形態の光通信ネットワーク管理装置の処理)
 以下、第2の実施形態の光通信ネットワーク管理装置1による処理について説明する。図14及び図15は、第2の実施形態の光通信ネットワーク管理装置1による処理の流れを示すフローチャートである。
 ステップSa1については、図9のステップS1と同一の処理が、ネットワーク構成取得部12によって行われる。ステップSa2については、図9のステップS2と同一の処理が、仮想環境構成管理部201によって行われる。
 伝送設計部151は、外部から与えられる伝送モードデータを取り込む(ステップSa3)。伝送モードデータに含まれる伝送モード識別情報と、始端地点と、終端地点と、容量の組み合わせごとに、以下に示すステップSa4~ステップSa15の処理が繰り返し行われる(ループLa1s~La1e)。
 ステップSa4については、図9のステップS4と同一の処理が、伝送設計部151によって行われる。伝送設計部151が生成した経路識別情報の数、繰り返して、以下のステップSa5~Sa9の処理が行われる(ループLa2s~La2e)。ステップSa5については、図9のステップS5と同一の処理が、収容設計部153によって行われる。
 コンフィグ生成部17aは、リソーステーブル161に新たなレコードが生成されると、生成されたレコードに対応する光パスのコンフィグレーションデータを生成する。コンフィグ生成部17aは、生成したコンフィグレーションデータに対して、対応する経路識別情報を関連付けて、図7に示すように、光パスコンフィグテーブル181に書き込んで記憶させる。コンフィグ生成部17aは、生成したコンフィグレーションデータの光パスコンフィグテーブル181への書き込みが完了すると、生成したコンフィグレーションデータに対応する経路識別情報を含むパス一時設定指示信号を仮想環境光パス設定部202aに出力する(ステップSa6)。
 仮想環境光パス設定部202aは、コンフィグ生成部17aからパス一時設定指示信号を受けると、パス一時設定指示信号に含まれている経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出す。仮想環境光パス設定部202aは、読み出したコンフィグレーションデータに含まれるコンフィグコマンド及び設定順序データを参照し、設定順序データが示す設定順序で、コンフィグコマンドを該当するパッケージエミュレータ41-1~41-nの制御部411-1~411-nに設定する。これにより、仮想環境光通信ネットワーク40にパス一時設定指示信号に含まれている経路識別情報に対応する光パスが設定されることになる(ステップSa7)。
 仮想環境光パス設定部202aは、設定した光パスに対して、光パスに対応するコンフィグレーションデータに含まれる試験確認手順データに基づいて、動作確認試験処理を行う(ステップSa8)。仮想環境光パス設定部202aは、動作確認試験処理に用いたコンフィグレーションデータに対応する経路識別情報と、当該動作確認試験処理の試験結果を関連付けて、図13に示すように、試験結果記憶部22の仮想環境試験結果テーブル222に書き込んで記憶させる(ステップSa9)。
 仮想環境光パス設定部202aは、ステップSa7において、仮想環境光通信ネットワーク40に対する光パスの設定が失敗した場合、ステップSa8において、動作確認試験処理を行わず、ステップSa9において、仮想環境試験結果テーブル222の「仮想環境における動作確認試験処理の試験処理」の項目に光パスの設定が失敗したことを書き込む。
 ステップSa9までの処理が完了すると、次の新たな経路識別情報について、ステップSa5以降の処理が行われる(ループLa2e)。
 全ての経路識別情報についてループLa2s~La2eの処理が完了すると(図14のフローチャートの符号B)、実環境光通信ネットワーク3に対して光パスの設定を行う処理が開始される(図15のフローチャートの符号B)。
 仮想環境光パス設定部202aは、全ての経路識別情報についてステップSa9まで処理が終了すると、処理の対象とした全ての経路識別情報を含むパス一時設定指示信号を実環境光パス設定部19aに出力する。
 実環境光パス設定部19aは、仮想環境光パス設定部202aからパス一時設定指示信号を受けると、試験結果記憶部22aの仮想環境試験結果テーブル222を参照し、パス一時設定指示信号に含まれている経路識別情報の中で、動作確認試験処理の試験結果が良好である全ての経路識別情報を抽出する。実環境光パス設定部19aは、抽出した全ての経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出す。実環境光パス設定部19aは、読み出したコンフィグレーションデータに含まれる設定順序データ及びコンフィグコマンドを参照し、設定順序データが示す設定順序で、実環境通信部11を介して、コンフィグコマンドを該当する物理パッケージ31-1~31-nの制御部311-1~311-nに適用して実環境光通信ネットワーク3に光パスを設定する(ステップSa11)。
 実環境光パス設定部19aは、設定した光パスの各々に対して、各々の光パスに対応するコンフィグレーションデータに含まれる試験確認手順データに基づいて、動作確認試験処理を行う。実環境光パス設定部19aは、内部に備える計時手段から動作確認試験処理を行った処理時刻を取得する。実環境光パス設定部19aは、動作確認試験処理に用いたコンフィグレーションデータに対応する経路識別情報と、当該動作確認試験処理の試験結果と、取得した処理時刻とを関連付けて、図8に示すように、試験結果記憶部22の実環境試験結果テーブル221に書き込んで記憶させる(ステップSa12)。
 実環境光パス設定部19aは、ステップSa11において、設定が失敗した光パスについては、ステップSa12において、動作確認試験処理を行わず、実環境試験結果テーブル221の「実環境における動作確認試験処理の試験処理」の項目に光パスの設定が失敗したことを書き込み、その時点で内部に備える計時手段から取得した時刻を「処理時刻」の項目に書き込む。
 実環境光パス設定部19aは、ステップSa11において抽出した全ての経路識別情報について、ステップSa12の処理が完了すると、パス一時設定指示信号に含まれていた全ての経路識別情報を含む完了通知信号を実環境利用最適化部13に出力する。
 ステップSa13については、図9のステップS9と同一の処理が、実環境利用最適化部13によって行われる。実環境利用最適化部13は、構成パラメータの変更をする必要があると判定した場合(ステップSa13、変更が必要)、構成パラメータテーブル141が記憶する構成パラメータのうち、変更が必要な構成パラメータの変更を行う。
 仮想環境構成管理部201は、パッケージエミュレータ41-1~41-nの生成後に、構成パラメータテーブル141の構成パラメータが変更されたことを検出すると、変更された構成パラメータを特定し、変更後の構成パラメータを設定するのに必要なコンフィグコマンドを生成する。仮想環境構成管理部201は、仮想環境通信部21を介して、変更された構成パラメータに対応するパッケージエミュレータ41-1~41-nの制御部411-1~411-nに接続する。仮想環境構成管理部201は、接続した制御部411-1~411-nに対して、生成したコンフィグコマンドを適用して構成パラメータを変更する。実環境利用最適化部13は、構成パラメータの変更を行った後、実環境光パス設定部19aと仮想環境光パス設定部202aに対して、ステップSa11において実環境光通信ネットワーク3に設定した全ての光パスの経路識別情報を含むパス解除指示信号を出力する。
 実環境光パス設定部19aは、実環境利用最適化部13からパス解除指示信号を受けると、パス解除指示信号に含まれている全て経路識別情報に対応する光パスを解除する。仮想環境光パス設定部202aは、実環境利用最適化部13からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを解除する。実環境利用最適化部13は、変更した構成パラメータに基づいて、伝送設計部151に改めて同一の伝送モードについての伝送設計処理を行わせるために、完了通知信号に含まれていた全ての経路識別情報を含む再設計指示信号を伝送設計部151に出力する(ステップSa14)。伝送設計部151は、実環境利用最適化部13から再設計指示信号を受けると、完了通知信号に含まれている経路識別情報に対応する伝送設計テーブル1521のレコードを削除して、同一の伝送モード、ここでは、「伝送モード1」に対するステップS4の処理を開始する。その後のステップS5において、収容設計部153は、伝送設計テーブル1521から削除された経路識別情報に対応するレコードをリソーステーブル161から削除した上で、伝送設計テーブル1521に生成された新たな経路識別情報の伝送設計データに基づいて、収容設計処理を行う。
 一方、実環境利用最適化部13は、構成パラメータの変更をする必要がないと判定した場合(ステップSa13、変更が不要)、図9のステップS11の処理と同一の処理が行われる(ステップSa15)。伝送設計部151は、処理続行指示信号を実環境利用最適化部13から受けると、伝送モードデータにおける次の伝送モード、ここでは、「伝送モード2」に対するステップS4の処理を開始する(ループLa1e)。
 伝送設計部151に与えられた伝送モードデータに含まれる全ての伝送モードについてループLa1s~La1eの処理が完了すると、実環境利用最適化部13は、実環境光パス設定部19aと仮想環境光パス設定部202aに対して、全パス解除指示信号を出力する。実環境光パス設定部19aは、実環境利用最適化部13から全パス解除指示信号を受けると、実環境光通信ネットワーク3に設定されている全ての光パスを解除する。仮想環境光パス設定部202aは、実環境利用最適化部13から全パス解除指示信号を受けると、仮想環境光通信ネットワーク40に設定されている全ての光パスを解除する(ステップSa16)。その後、実際に運用する光パスの設定を行う処理が開始される。
 要求受付部203aは、外部から与えられる要求データを取り込む(ステップSa20)。ここでは、第1の実施形態と同様にA地点とD地点に100Gの光パスを2本設定する要求を示した要求データと取り込んだとする。要求データに含まれる光パスの数に応じて、以下に示すステップSa21~ステップSa23の処理が繰り返し行われる(ループLa3s~La3e)。
 要求受付部203aは、リソーステーブル161と、実環境試験結果テーブル221及び仮想環境試験結果テーブル222とを参照する。要求受付部203aは、要求データにおいて指定されている光パスに対応する経路識別情報であって、空き状態、かつ実環境光通信ネットワーク3と仮想環境光通信ネットワーク40の両方における動作確認試験処理の試験結果が良好であるという条件に一致する経路識別情報が存在するか否かを判定する(ステップSa21)。
 要求受付部203aは、当該条件に一致する経路識別情報が存在しないと判定した場合(ステップSa21、No)、パスが設定できなかったことを外部に通知する(ステップSa22)。一方、要求受付部203aは、当該条件に一致する経路識別情報が存在すると判定した場合(ステップSa21、Yes)、該当する経路識別情報を含むパス設定要求信号を仮想環境光パス設定部202aに出力する。
 仮想環境光パス設定部202aは、要求受付部203aからパス設定要求信号を受けると、パス設定要求信号に含まれている経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出す。仮想環境光パス設定部202aは、読み出したコンフィグレーションデータに含まれる設定順序データ及びコンフィグコマンドを参照し、設定順序データが示す設定順序で、仮想環境通信部21を介して、コンフィグコマンドを該当するパッケージエミュレータ41-1~41-nの制御部411-1~411-nに設定して仮想環境光通信ネットワーク40に光パスを設定する。
 仮想環境光パス設定部202aは、設定した光パスに対して、読み出したコンフィグレーションデータに含まれる試験確認手順データに基づいて、動作確認試験処理を行う。仮想環境光パス設定部202aは、動作確認試験処理に用いたコンフィグレーションデータに対応する経路識別情報と、当該動作確認試験処理の試験結果を関連付けて、図13に示すように、試験結果記憶部22の仮想環境試験結果テーブル222に書き込んで記憶させる。
 仮想環境光パス設定部202aは、仮想環境試験結果テーブル222に書き込みを行った後、パス設定要求信号に含まれていた経路識別情報を含むパス設定完了応答信号を要求受付部203aに出力する。要求受付部203aは、仮想環境光パス設定部202aからパス設定完了応答信号を受けると、パス設定完了応答信号に含まれている経路識別情報を含むパス設定要求信号を実環境光パス設定部19aに対して出力する。
 実環境光パス設定部19aは、要求受付部203aからパス設定要求信号を受けると、パス設定要求信号に含まれている経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出す。実環境光パス設定部19aは、読み出したコンフィグレーションデータに含まれる設定順序データが示す設定順序で、実環境通信部11を介して、コンフィグコマンドを該当する物理パッケージ31-1~31-nの制御部311-1~311-nに設定して実環境光通信ネットワーク3に光パスを設定する。
 実環境光パス設定部19aは、読み出したコンフィグレーションデータに含まれる試験確認手順データにしたがって、設定した光パスに対して動作確認試験処理を行う。実環境光パス設定部19aは、内部に備える計時手段から動作確認試験処理を行った時刻を取得する。実環境光パス設定部19aは、動作確認試験処理に用いたコンフィグレーションデータに対応する経路識別情報と、当該動作確認試験処理の試験結果と、取得した時刻とを関連付けて、図8に示すように、試験結果記憶部22の実環境試験結果テーブル221に書き込んで記憶させる。
 実環境光パス設定部19aは、パス設定要求信号に含まれていた経路識別情報を含むパス設定完了応答信号を要求受付部203aに出力する。要求受付部203aは、実環境光パス設定部19aからパス設定完了応答信号を受けると、パス設定完了応答信号に含まれている経路識別情報に対応するリソーステーブル161の「状態」の項目を「使用状態」に書き替える(ステップSa23)。
 ステップSa22及びステップSa23の処理の後、要求受付部203aは、要求データに含まれる次の光パスについての処理を繰り返し行い(ループLa3e)、全ての要求データに含まれる光パスについての処理が完了すると、処理を終了する。
 第2の実施形態では、ステップSa23において、仮想環境光パス設定部202aが設定する光パスは、既に仮想環境光通信ネットワーク40において試験結果が良好であると判定されている光パスである。そのため、第2の実施形態では、第1の実施形態のステップS25のように、仮想環境光通信ネットワーク40における光パスの動作確認試験処理の試験結果が良好であるか否かの判定を行っていないが、第1の実施形態と同様に、ステップS25の判定処理を行うようにしてもよい。その場合、ステップS25の判定結果が良好の場合に、ステップS26に示した実環境光通信ネットワーク3に対する光パスの設定を行い、判定結果が良好でない場合には、ステップS27~S29の処理が行われることになる。
 ステップSa23において、実環境光パス設定部19aが設定する光パスは、既に実環境光通信ネットワーク3において試験結果が良好であると判定されている光パスである。そのため、第1の実施形態のステップS26と同様に、ステップSa23において、実環境光通信ネットワーク3に対する光パスの設定に失敗する可能性が低いため、光パスの設定が失敗しないことを前提としている。
 仮に、ステップSa23における実環境光パス設定部19aに対する光パスの設定の失敗を考慮する場合、以下のような処理が行われることになる。実環境光パス設定部19aは、光パスの設定に失敗した場合、動作確認試験処理を行わず、実環境試験結果テーブル221の「実環境における動作確認試験処理の試験処理」の項目に光パスの設定が失敗したことを書き込み、その時点で内部に備える計時手段から取得した時刻を「処理時刻」の項目に書き込む。実環境光パス設定部19aは、パス設定要求信号に含まれていた経路識別情報を含むパス設定不可応答信号を要求受付部203aに出力する。要求受付部203aは、実環境光パス設定部19aからパス設定不可応答信号を受けると、パス設定できかったことを外部に通知して処理を終了する。
 上記の第2の実施形態の構成により、第1の実施形態と同様の効果が得られることに加えて、以下のような効果が得られる。すなわち、第2の実施形態の構成では、仮想環境光通信ネットワーク40における動作確認試験処理を行った上で、当該動作確認試験処理による試験結果が良好な光パスのみを実環境光通信ネットワーク3に設定する。そのため、第2の実施形態の構成では、実環境光通信ネットワーク3へのコンフィグコマンドの設定処理を最小限に留めて構成パラメータの最適化処理を行うことが可能になり、実環境光通信ネットワーク3に対する影響を、第1の実施形態の構成に比べて少なくすることができる。
(第3の実施形態)
 図16は、第3の実施形態による光通信ネットワーク管理システムSbの構成を示すブロック図である。第1の実施形態の光通信ネットワーク管理システムSでは、要求受付部203に与える要求データは、伝送設計部151に与えられる伝送モードデータに示されるいずれかのモードに一致する光パスの設定を要求するデータとしていた。実際の運用では、伝送モードデータによって示されるモード以外の光パスが緊急的に要求される場合がある。第3の実施形態は、予め与えられる伝送モードデータによって示されるモード以外の光パスの設定を行う構成を備える。
 第3の実施形態において、第1の実施形態と同一の構成については、同一の符号を付し、以下、異なる構成について説明する。光通信ネットワーク管理システムSbは、光通信ネットワーク管理装置1bと、実環境光通信ネットワーク3と、仮想環境構築装置4とを備える。
 光通信ネットワーク管理装置1bは、実環境通信部11、ネットワーク構成取得部12、実環境利用最適化部13、構成パラメータ記憶部14、光パス設計部15b、リソースデータ記憶部16、コンフィグ生成部17b、光パスコンフィグ記憶部18、実環境光パス設定部19、オーケストレーション機能部20b、仮想環境通信部21及び試験結果記憶部22を備える。
 オーケストレーション機能部20bは、仮想環境構成管理部201、仮想環境光パス設定部202及び要求受付部203bを備える。
 要求受付部203bは、外部から与えられる光パスの設定を要求する要求データを受けると、リソースデータ記憶部16のリソーステーブル161を参照し、要求データにおいて指定される条件に一致する空き状態のリソースが存在するか否かを判定する。要求受付部203bは、要求データにおいて指定される条件に一致する空き状態のリソースがリソーステーブル161に存在しない場合は、要求データにおいて指定される条件を示す伝送モードデータを生成し、生成した伝送モードデータを含む追加伝送設計指示信号を伝送設計部151bに出力する。また、要求受付部203bは、追加伝送設計指示信号を伝送設計部151bに出力する際、コンフィグ生成部17bに伝送モード追加状態にする伝送モード追加状態設定指示信号を送信する。
 コンフィグ生成部17bは、第1の実施形態のコンフィグ生成部17と以下の点を除いて、同一の構成を備える。コンフィグ生成部17bは、要求受付部203bから伝送モード追加状態設定指示信号を受けると、内部の記憶領域に伝送モード追加状態を示すフラグを設定する。コンフィグ生成部17bは、内部の記憶領域に伝送モード追加状態を示すフラグが設定されている場合、コンフィグレーションデータを光パスコンフィグ記憶部18に書き込んで記憶させた後に、パス一時設定指示信号を実環境光パス設定部19に対して出力せず、要求受付部203bに対して、新たなコンフィグレーションデータを生成したことを通知するコンフィグ生成通知信号を出力する。
 光パス設計部15bは、伝送設計部151b、伝送設計データ記憶部152及び収容設計部153を備える。伝送設計部151bは、第1の実施形態の伝送設計部151と同一の構成を備えており、更に、要求受付部203bから伝送モードデータを含む追加伝送設計指示信号を受ける。伝送設計部151bは、要求受付部203bから追加伝送設計指示信号を受けると、追加伝送設計指示信号に含まれている伝送モードデータに基づいて伝送設計処理を行う。
(第3の実施形態の光通信ネットワーク管理装置の処理)
 以下、第3の実施形態の光通信ネットワーク管理装置1bによる処理について説明する。図17は、第3の実施形態の光通信ネットワーク管理装置1bによる処理の流れを示すフローチャートである。なお、図17のフローチャートによる処理が開始される前に、第1の実施形態の図9及び図10のフローチャートに示した処理が既に完了しており、運用中の光パスが設定されているものとする。
 要求受付部203bは、外部から与えられる要求データを取り込む(ステップSb1)。要求受付部203bは、リソーステーブル161を参照し、取り込んだ要求データにおいて指定される条件に一致する空き状態のリソースが存在するか否かを判定する(ステップSb2)。
 要求受付部203bは、要求データにおいて指定される条件に一致する空き状態のリソースがリソーステーブル161に存在すると判定した場合(ステップSb2、Yes)、リソーステーブル161から、要求データにおいて指定される条件に一致する空き状態のリソースに対応する経路識別情報を検出する。要求受付部203bは、検出した経路識別情報を含むパス設定要求信号を仮想環境光パス設定部202に出力する(ステップSb5)。
 一方、要求受付部203bは、要求データにおいて指定される条件に一致する空き状態のリソースがリソーステーブル161に存在しないと判定した場合(ステップSb2、No)、要求データにおいて指定される条件を示す伝送モードデータを生成し、生成した伝送モードデータを含む追加伝送設計指示信号を伝送設計部151bに出力し、一定時間、待機する(ステップSb3)。
 例えば、要求データにおいて指定される条件が、A地点からB地点に200Gの光パスであり、この条件が、伝送設計部151bに与えられた伝送モードデータに含まれていないとする。伝送モードデータに含まれていないので、リソーステーブル161において、当該条件に一致するリソースデータは存在しないことになる。そのため、要求受付部203bは、ステップSb2の処理において「No」の判定をする。要求受付部203bは、ステップSb3において、追加する伝送モードであることが分かるような伝送モード識別情報、例えば、「追加伝送モード1」という伝送モード識別情報を生成し、生成した伝送モード識別情報に始端地点が「A地点」、終端地点が「B地点」、容量が「200G」のデータを関連付けて伝送モードデータを生成する。
 要求受付部203bは、生成した伝送モードデータを含む追加伝送設計指示信号を伝送設計部151bに出力する。要求受付部203bは、追加伝送設計指示信号を伝送設計部151bに出力する際、コンフィグ生成部17bに伝送モード追加状態にする伝送モード追加状態設定指示信号を送信する。
 コンフィグ生成部17bは、要求受付部203bから伝送モード追加状態設定指示信号を受けると、内部の記憶領域に伝送モード追加状態を示すフラグを設定する。
ステップSb3の後、図18に示す伝送・収容設計処理のサブルーチンが開始される(ステップSb4)。
 伝送設計部151bは、要求受付部203bから追加伝送設計指示信号を受けると、追加伝送設計指示信号に含まれている伝送モードデータを読み出す。伝送設計部151bは、構成パラメータテーブル141が記憶する構成パラメータに基づいて、伝送モードデータが示す条件を満たす経路を検出する。伝送設計部151bは、検出した経路を示すデータに経路識別情報を生成して付与して伝送設計データを生成し、生成した伝送設計データを伝送設計データ記憶部152の伝送設計テーブル1521に書き込んで記憶させる(ステップSb4-1)。
 伝送設計部151bが生成した経路識別情報の数、繰り返して、以下のステップSb4-2、ステップSb4-3の処理が行われる(ループLb1s~Lb1e)。
 ステップSb4-2については、図9のステップS5と同一の処理が、収容設計部153によって行われる。ステップSb4-3については、図9のステップS6と同一の処理が、コンフィグ生成部17bによって行われる。ステップS6の処理が完了すると、次の新たな経路識別情報について、ステップS5及びステップS6の処理が行われる(ループL2e)。ループLb1s~Lb1eの処理が終了し、収容設計部153によって要求データにおいて指定される条件のリソースが検出されていれば、空き状態のレコードがリソーステーブル161に生成されることになる。
 コンフィグ生成部17bは、リソーステーブル161に新たに生成された全てのレコードに対応するコンフィグレーションデータの光パスコンフィグテーブル181への書き込みが完了すると、内部の記憶領域を参照する。コンフィグ生成部17bは、内部の記憶領域に伝送モード追加状態を示すフラグが設定されているためパス一時設定指示信号を実環境光パス設定部19に出力せず、要求受付部203bに対してコンフィグ生成完了通知信号を出力する。
 要求受付部203bは、一定時間待機した後、コンフィグ生成部17bからコンフィグ生成通知信号を受けているか否かを判定する(ステップSb4-4)。要求受付部203bは、コンフィグ生成部17bからコンフィグ生成通知信号を受けていると判定した場合(ステップSb4-4、Yes)、リソーステーブル161から空き状態のリソースに対応する経路識別情報を検出し、検出した経路識別情報を含むパス設定要求信号を仮想環境光パス設定部202に出力する。
 要求受付部203bは、コンフィグ生成部17bに伝送モード追加状態を解除する伝送モード追加状態解除指示信号を送信する。コンフィグ生成部17bは、要求受付部203bから伝送モード追加状態解除指示信号を受けると、内部の記憶領域の伝送モード追加状態を示すフラグを削除する(ステップSb4-5)。その後、伝送・収容設計のサブルーチンの処理が終了して、処理が、図17のステップSb6に進められる。
 一方、要求受付部203bは、コンフィグ生成部17bからコンフィグ生成通知信号を受けていないと判定した場合(ステップSb4-4、No)、リソースが確保できなかったことを外部に通知する。要求受付部203bは、コンフィグ生成部17bに伝送モード追加状態を解除する伝送モード追加状態解除指示信号を送信する。コンフィグ生成部17bは、要求受付部203bから伝送モード追加状態解除指示信号を受けると、内部の記憶領域の伝送モード追加状態を示すフラグを削除する(ステップSb4-6)。その後、図17の処理に戻ることなく、処理は、終了する。
 仮想環境光パス設定部202は、要求受付部203bからパス設定要求信号を受け、当該パス設定要求信号に基づいて、図10のステップS23と同一の処理を行う(ステップSb6)。ステップSb7、ステップSb8の処理については、図10のステップS24、ステップS25と同一の処理が、仮想環境光パス設定部202によって行われる。
 ステップSb8において、仮想環境光パス設定部202は、動作確認試験処理の結果が、良好でないと判定した場合(ステップSb8、No)、仮想環境光通信ネットワーク40に設定した光パスを解除する。なお、ステップSb6において、仮想環境光パス設定部202が、光パスの設定に失敗している場合、ステップSb7の動作確認試験処理は行わず、ステップSb8において、良好でないと判定することになる。仮想環境光パス設定部202は、他の空き状態のリソースが存在するかを確認させることを指示するリソースデータ確認指示信号を要求受付部203bに出力する(ステップSb13)。
 ステップSb8において、仮想環境光パス設定部202は、動作確認試験処理の結果が、良好であると判定した場合(ステップSb8、Yes)、要求受付部203bに対して経路識別情報を含むパス設定完了応答信号を出力する。要求受付部203bは、仮想環境光パス設定部202からパス設定完了応答信号を受けると、パス設定完了応答信号に含まれている経路識別情報を含むパス設定要求信号を実環境光パス設定部19に対して出力する。
 実環境光パス設定部19は、要求受付部203bからパス設定要求信号を受けると、パス設定要求信号に含まれている経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出す。実環境光パス設定部19は、読み出したコンフィグレーションデータに含まれるコンフィグコマンド及び設定順序データを参照し、設定順序データが示す設定順序で、コンフィグコマンドを該当する物理パッケージ31-1~31-nの制御部311-1~311-nに設定する。
 実環境光パス設定部19は、実環境光通信ネットワーク3において光パスの設定を行うと、読み出したコンフィグレーションデータに含まれる試験確認手順データにしたがって、設定した光パスに対して動作確認試験処理を行う。実環境光パス設定部19は、内部に備える計時手段から動作確認試験処理を行った時刻を取得する。実環境光パス設定部19は、動作確認試験処理に用いたコンフィグレーションデータに対応する経路識別情報と、当該動作確認試験処理の試験結果と、取得した時刻とを関連付けて、図8に示すように、試験結果記憶部22の実環境試験結果テーブル221に書き込んで記憶させる。
 実環境光パス設定部19は、実環境光通信ネットワーク3に対する光パスの設定が失敗した場合、動作確認試験処理を行わず、実環境試験結果テーブル221の「実環境における動作確認試験処理の試験処理」の項目に光パスの設定が失敗したことを書き込み、その時点で内部に備える計時手段から取得した時刻を「処理時刻」の項目に書き込む。
 実環境光パス設定部19は、光パスの設定が成功している場合、パス設定要求信号に含まれていた経路識別情報を含むパス設定完了応答信号を要求受付部203bに出力する。これに対して、実環境光パス設定部19は、光パスの設定が失敗している場合、パス設定要求信号に含まれていた経路識別情報を含むパス設定不可応答信号を要求受付部203bに出力する(ステップSb9)。
 要求受付部203bは、実環境光パス設定部19からパス設定完了応答信号、または、パス設定不可応答信号を受けると、パス設定完了応答信号、または、パス設定不可応答信号に含まれている経路識別情報に対応する実環境試験結果テーブル221の「実環境における動作確認試験の試験結果」の項目を参照し、実環境光通信ネットワーク3における動作確認試験処理の試験結果が、良好であるか否かを判定する(ステップSb10)。
 要求受付部203bは、実環境光通信ネットワーク3における動作確認試験処理の試験結果が、良好であると判定した場合(ステップSb10、Yes)、処理対象の経路識別情報に対応するリソーステーブル161の「状態」の項目を「使用状態」に書き替えて(ステップSb11)、処理を終了する。
 一方、要求受付部203bは、実環境光通信ネットワーク3における動作確認試験処理の試験結果が、良好でないと判定した場合(ステップSb10、No)、処理対象の経路識別情報を含むパス解除指示信号を実環境光パス設定部19と仮想環境光パス設定部202に出力し、処理をステップSb14に進める。実環境光パス設定部19は、要求受付部203bからパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを解除する。仮想環境光パス設定部202は、要求受付部203bからパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを解除する(ステップSb12)。
 ステップSb12の処理の後、または、ステップSb13の処理によりリソースデータ確認指示信号を仮想環境光パス設定部202から受けている場合、要求受付部203bは、リソーステーブル161を参照し、他の空き状態リソースが存在するか否かを判定する(ステップSb14)。要求受付部203bは、他の空き状態リソースが存在すると判定した場合(ステップSb14、Yes)、ステップSb5に処理を進める。一方、要求受付部203bは、他の空き状態リソースが存在しないと判定した場合(ステップSb14、No)、パス設定できなかったことを外部に通知して処理を終了する(ステップSb15)。
 要求受付部203bに与えられる要求データにおいて、光パスの始端地点と、終端地点と、通信容量とに加えて、光パスの設定開始時刻と設定終了時刻の情報が含まれるようにしてもよい。この場合、リソーステーブル161に、光パスの設定開始時刻と設定終了時刻を記録する「期間」という名称の項目を設けておき、要求受付部203bが、「状態」の項目を「使用状態」に書き替えるとともに、光パスの設定開始日時と設定終了日時のデータを「期間」の項目に書き込むことになる。要求受付部203bは、内部に備える時計等の計時手段から定期的に時刻の情報を取得し、取得した時刻が、設定終了日時になった光パスについて、当該光パスの経路識別情報を含むパス解除指示信号を仮想環境光パス設定部202と、実環境光パス設定部19に出力して、光パスを解除させることになる。
 上記のように光パスの設定期間のデータをリソーステーブル161に含めることで、第3の実施形態において以下のような処理を行うことが可能になる。すなわち、要求受付部203bより新たな伝送モードを追加する追加伝送設計指示信号が出力され、当該追加伝送設計指示信号に光パスの設定開始日時と設定終了日時とが示されているとする。このとき、収容設計部153は、リソーステーブル161を参照し、追加する光パスの設定開始日時と設定終了日時の間、確保することができるリソースを検出することができる場合、期間を限定して、空き状態のリソースについてのレコードをリソーステーブル161に生成することができる。それにより、実環境光通信ネットワーク3において、要求される光パスを、要求される期間の間、設定することが可能になる。
 上記の第3の実施形態の構成により、要求受付部203が、伝送設計部151bに与えられる伝送モードデータに示されるモード以外の光パスの要求を受けたとしても、光パス設計部15bが、要求を受けた光パスについて伝送設計処理と収容設計処理を追加的に行うので、伝送モードデータに示されるモード以外の光パスを設定することが可能となる。
 第1の実施形態及び第2の実施形態において要求受付部203,203aに与えられる要求データは、伝送設計部151に与えられる伝送モードデータのいずれかのモードに一致するものであり、任意の要求データに対応する構成にする場合、第1の実施形態のステップS20以降の処理及び第2の実施形態のステップSa20以降の処理を、図17に示した第3の実施形態の処理に置き換えるようにしてもよい。
(第4の実施形態)
 図19は、第4の実施形態による光通信ネットワーク管理システムScの構成を示すブロック図である。第4の実施形態では、仮想環境光通信ネットワーク40において、任意に定められる障害を発生させ、発生した障害の結果に基づいて、構成パラメータを最適化する。
 第4の実施形態において、第1の実施形態と同一の構成については、同一の符号を付し、以下、異なる構成について説明する。光通信ネットワーク管理システムScは、光通信ネットワーク管理装置1cと、実環境光通信ネットワーク3と、仮想環境構築装置4とを備える。
 光通信ネットワーク管理装置1cは、実環境通信部11、ネットワーク構成取得部12、実環境利用最適化部13、構成パラメータ記憶部14、光パス設計部15、リソースデータ記憶部16、コンフィグ生成部17、光パスコンフィグ記憶部18、実環境光パス設定部19、オーケストレーション機能部20c、仮想環境通信部21、試験結果記憶部22及び実環境構成パラメータ更新部23を備える。
 実環境構成パラメータ更新部23は、構成パラメータ記憶部14が記憶する構成パラメータテーブル141の構成パラメータが変更されたことを検出すると、変更された構成パラメータを特定し、特定した構成パラメータに該当する制御部311-1~311-nの構成パラメータを、特定した構成パラメータに書き替えて更新する。
 オーケストレーション機能部20cは、仮想環境構成管理部201、仮想環境光パス設定部202、要求受付部203及び仮想環境利用最適化部204を備える。仮想環境利用最適化部204は、任意に定められる障害を仮想環境光通信ネットワーク40に発生させる。
 ここで、任意に定められる障害とは、例えば、任意に定めるパッケージエミュレータ41-1~41-nを故障状態にしたり、パッケージエミュレータ41-1~41-nに接続される仮想的な光ファイバ伝送路を切断するか、または、仮想的な光ファイバ伝送路の損失を大きくしたり、光の偏波を高速に回転させて偏波変動を起こさせたりする障害である。なお、任意に定められる障害は、制御部411-1~411-nが検出することができる障害であればどのような障害であってもよい。
 仮想環境利用最適化部204は、パッケージエミュレータ41-1~41-nの制御部411-1~411-nが送信する障害通知信号を受信する。仮想環境利用最適化部204は、障害通知信号を受信すると、発生させた障害の要因と、障害通知信号に含まれている障害の結果とに基づいて、当該障害が、構成パラメータの変更、または、光パスの経路を変更することにより回避できる障害であるか否かを判定する。
 仮想環境利用最適化部204は、構成パラメータの変更により障害を回避できる場合、変更する構成パラメータを特定し、変更後の構成パラメータを生成し、構成パラメータテーブル141において特定した構成パラメータを生成した構成パラメータに書き替える。
 仮想環境利用最適化部204は、光パスの経路を変更することにより障害を回避できる場合、リソースデータ記憶部16のリソーステーブル161を参照して、切り替え元の光パスの経路識別情報と、切り替え先の光パスの経路識別情報を検出する。仮想環境利用最適化部204は、切り替えが可能である場合、仮想環境光通信ネットワーク40と、実環境光通信ネットワーク3において、光パスの切り替えを行う。
(第4の実施形態の光通信ネットワーク管理装置の処理)
 以下、第4の実施形態の光通信ネットワーク管理装置1cによる処理について説明する。図20は、第4の実施形態の光通信ネットワーク管理装置1cによる処理の流れを示すフローチャートである。なお、図20のフローチャートによる処理が開始される前に、第1の実施形態の図9及び図10のフローチャートに示した処理が既に完了しており、運用中の光パスが設定されているものとする。
 仮想環境利用最適化部204は、仮想環境通信部21を介して、パッケージエミュレータ41-1~41-nの制御部411-1~411-nに接続し、仮想環境光通信ネットワーク40において、任意に定められる障害を発生させる(ステップSc1)。制御部411-1~411-nは、障害を検出し、検出した障害の内容を含む障害通知信号を、仮想環境通信部21を介して仮想環境利用最適化部204に送信する。仮想環境利用最適化部204は、制御部411-1~411-nが送信する障害通知信号を受信する(ステップSc2)。
 仮想環境利用最適化部204は、発生させた障害の要因と、障害通知信号に含まれている発生した障害の結果とに基づいて、当該障害が、構成パラメータの変更、または、光パスの経路の変更によって回避できる障害であるか否かを判定する(ステップSc3)。仮想環境利用最適化部204は、いずれの手段によっても障害を回避できないと判定した場合(ステップSc3、いずれの手段でも回避できない)、発生させた障害を回避することができないことを外部に通知し(ステップSc4)、処理を終了する。
 一方、仮想環境利用最適化部204は、構成パラメータの変更によって障害を回避することができると判定した場合(ステップSc3、構成パラメータの変更で回避可能)、変更する構成パラメータを特定し、特定した構成パラメータの変更後の構成パラメータを生成する。仮想環境利用最適化部204は、構成パラメータテーブル141において特定した構成パラメータを、生成した変更後の構成パラメータに書き替える(ステップSc5)。
 仮想環境構成管理部201は、構成パラメータテーブル141の構成パラメータが変更されたことを検出すると、変更された構成パラメータを特定し、特定した構成パラメータを設定するのに必要なコンフィグコマンドを生成する。仮想環境構成管理部201は、仮想環境通信部21を介して、パッケージエミュレータ41-1~41-nの制御部411-1~411-nに接続する。仮想環境構成管理部201は、接続した制御部411-1~411-nに対して、生成したコンフィグコマンドを適用して構成パラメータを変更する(ステップSc6)。
 実環境構成パラメータ更新部23は、構成パラメータテーブル141が変更されたことを検出すると、変更された構成パラメータを特定し、特定した構成パラメータを設定するのに必要なコンフィグコマンドを生成する。なお、実環境構成パラメータ更新部23は、コンフィグ生成部17と同様に、予め内部の記憶領域に、物理パッケージ31-1~31-nの種別ごとに、構成パラメータごとのコンフィグコマンドのテンプレートを記憶させている。実環境構成パラメータ更新部23は、コンフィグコマンドのテンプレートから、構成パラメータに対応するコンフィグコマンドのテンプレートを選択し、選択したコンフィグコマンドのテンプレートに対して設定する構成パラメータを適用してコンフィグコマンドを生成する。
 実環境構成パラメータ更新部23は、実環境通信部11を介して、物理パッケージ31-1~31-nの制御部311-1~311-nに接続する。実環境構成パラメータ更新部23は、接続した制御部311-1~311-nに対して、生成したコンフィグコマンドを適用して構成パラメータを変更し(ステップSc7)、処理を終了する。
 一方、仮想環境利用最適化部204は、光パスの経路の変更によって障害を回避することができると判定した場合(ステップSc3、光パスの経路の変更で回避可能)、リソーステーブル161を参照して、切り替え先の光パスの候補となる空き状態のリソースに対応する経路識別情報と、運用中の切り替え元の光パスの経路識別情報とを検出する(ステップSc8)。
 仮想環境利用最適化部204は、切り替え先の光パスの経路識別情報に基づいて、図21に示す切り替え先光パスの設定処理のサブルーチンを行う(ステップSc9)。
 仮想環境利用最適化部204は、実環境試験結果テーブル221を参照し、切り替え先の光パスの経路識別情報に対応する動作確認試験処理の試験結果が良好であるか否かを判定する(ステップSc9-1)。仮想環境利用最適化部204は、読み出した経路識別情報に対応する試験結果が良好でないと判定した場合(ステップSc9-1、No)、処理をステップSc9-10に進める。
 一方、仮想環境利用最適化部204は、切り替え先の光パスの経路識別情報に対応する動作確認試験処理の試験結果が良好であると判定した場合(ステップSc9-1、Yes)、当該経路識別情報を含んだパス設定要求信号を仮想環境光パス設定部202に出力する。
 仮想環境光パス設定部202は、仮想環境利用最適化部204からパス設定要求信号を受け、当該パス設定要求信号に基づいて、図10のステップS23と同一の処理を行う(ステップSc9-2)。ステップSc9-3、ステップSc9-4の処理については、図10のステップS24、ステップS25と同一の処理が、仮想環境光パス設定部202によって行われる。
 ステップSc9-4において、仮想環境光パス設定部202は、動作確認試験処理の結果が、良好でないと判定した場合(ステップSc9-4、No)、仮想環境光パス設定部202は、ステップSc9-2において仮想環境光通信ネットワーク40に設定した光パスを解除する。なお、ステップSc9-2において、仮想環境光パス設定部202が、光パスの設定に失敗している場合、ステップSc9-3の動作確認試験処理は行わず、ステップSc9-4において、良好でないと判定することになる。仮想環境光パス設定部202は、他の空き状態のリソースが存在するかを確認させることを指示するリソースデータ確認指示信号を仮想環境利用最適化部204に出力する(ステップSc9-8)。
 一方、ステップSc9-4において、仮想環境光パス設定部202は、動作確認試験処理の結果が、良好であると判定した場合(ステップSc9-4、Yes)、仮想環境利用最適化部204に対して経路識別情報を含むパス設定完了応答信号を出力する。仮想環境利用最適化部204は、仮想環境光パス設定部202からパス設定完了応答信号を受けると、パス設定完了応答信号に含まれている経路識別情報を含むパス設定要求信号を実環境光パス設定部19に対して出力する。
 実環境光パス設定部19は、仮想環境利用最適化部204からパス設定要求信号を受けると、当該パス設計要求に基づいて、第3の実施形態の図17に示したステップSb9と同一の処理を行う(ステップSc9-5)。ただし、ステップSc9-5の処理の場合、実環境光パス設定部19は、パス設定完了応答信号、または、パス設定不可応答信号を仮想環境利用最適化部204に対して出力する。
 仮想環境利用最適化部204は、実環境光パス設定部19からパス設定完了応答信号、または、パス設定不可応答信号を受けると、パス設定完了応答信号、または、パス設定不可応答信号に含まれている経路識別情報に対応する実環境試験結果テーブル221の「実環境における動作確認試験の試験結果」の項目を参照し、実環境光通信ネットワーク3における動作確認試験処理の試験結果が、良好であるか否かを判定する(ステップSc9-6)。
 仮想環境利用最適化部204は、実環境光通信ネットワーク3における動作確認試験処理の試験結果が、良好であると判定した場合(ステップSc9-6、Yes)、処理対象の経路識別情報に対応するリソーステーブル161の「状態」の項目を「使用状態」に書き替え、内部の記憶領域に切り替え先の光パスを設定できたことを記録する(ステップSc9-7)。
 一方、仮想環境利用最適化部204は、実環境光通信ネットワーク3における動作確認試験処理の試験結果が、良好でないと判定した場合(ステップSc9-6、No)、処理対象の経路識別情報を含むパス解除指示信号を実環境光パス設定部19と仮想環境光パス設定部202に出力し、処理をステップSc9-10に進める。実環境光パス設定部19は、仮想環境利用最適化部204からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを解除する。仮想環境光パス設定部202は、仮想環境利用最適化部204からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを解除する(ステップSc9-9)。
 仮想環境利用最適化部204がステップSc9-1において「No」の判定をした場合、または、ステップSc9-8の処理により仮想環境利用最適化部204が仮想環境光パス設定部202からリソースデータ確認指示信号を受けた場合、または、ステップSc9-9の処理の後、仮想環境利用最適化部204は、リソーステーブル161を参照し、他の切り替え先の光パスの候補となる空き状態の経路識別情報が存在するか否かを判定する(ステップSc9-10)。
 仮想環境利用最適化部204は、他の切り替え先の光パスの候補となる空き状態の経路識別情報が存在すると判定した場合(ステップSc9-10、Yes)、リソーステーブル161から切り替え先の光パスの候補となる空き状態のリソースに対応する経路識別情報を読み出し(ステップSc9-11)、ステップSc9-1以降の処理を行う。
 一方、仮想環境利用最適化部204は、他の切り替え先の光パスの候補となる空き状態のリソースが存在しないと判定した場合(ステップSc9-10、No)、切り替え先の光パスを設定できなかったこと内部の記憶領域に記録し(ステップSc9-12)、サブルーチンを終了する。
 仮想環境利用最適化部204は、内部の記憶領域を参照し、切り替え先の光パスが設定できたか否かを判定する(ステップSc10)。仮想環境利用最適化部204は、切り替え先の光パスが設定できたと判定した場合(ステップSc10、Yes)、切り替え元の光パスの経路識別情報を含むパス解除指示信号を仮想環境光パス設定部202と実環境光パス設定部19に出力し、リソーステーブル161の切り替え元の光パスの経路識別情報に対応する「状態」の項目を「空き状態」に書き替える。仮想環境光パス設定部202は、仮想環境利用最適化部204からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報の光パスを仮想環境光通信ネットワーク40において解除する。実環境光パス設定部19は、仮想環境利用最適化部204からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報の光パスを実環境光通信ネットワーク3において解除して(ステップSc11)、処理を終了する。
 一方、仮想環境利用最適化部204は、切り替え先の光パスが設定できなかったと判定した場合(ステップSc10、No)、光パスの経路の切り替えができかったことを外部に通知し(ステップSc12)、処理を終了する。
 上記の第4の実施形態の光通信ネットワーク管理装置1cにおいて、仮想環境利用最適化部204は、仮想環境光通信ネットワーク40において、任意に定められる障害を発生させ、発生させた障害の要因と、障害の結果とに基づいて、障害を回避できるように構成パラメータ記憶部14が記憶する構成パラメータを変更するか、または、障害を回避できるように光パスの経路を変更する最適化処理を行う。これにより、実環境光通信ネットワーク3において運用されている光パスの経路の構成を最適化したり、また、最適化した構成パラメータにより、仮想環境光通信ネットワーク40の状態を、実環境光通信ネットワーク3の状態に近づけるように維持したりすることが可能となる。換言すると、第4の実施形態では、様々な故障状態や光パスの構成変更などを模擬し、模擬に対する耐障害性の検証を行うことで、運用中の光パスに影響を与えることなく、実環境光通信ネットワーク3における問題点を洗い出すことができる。それにより、実環境光通信ネットワーク3の品質向上を図ることが容易になり、また、実環境光通信ネットワーク3の運用に要するOPEXを軽減することが可能となる。
 上記の第4の実施形態において、仮想環境構成管理部201は、仮想環境構築装置4に複数の仮想環境光通信ネットワーク40を構築し、仮想環境利用最適化部204が、複数の仮想環境光通信ネットワーク40において、異なる障害を発生させて、図20に示す処理を行うようにしてもよい。複数の仮想環境光通信ネットワーク40において異なる障害を発生させることで、より速く構成パラメータの最適化を行うことが可能になる。
 上記の第4の実施形態において、仮想環境構成管理部201が、ステップSc6において、構成パラメータをパッケージエミュレータ41-1~41-nの制御部411-1~411-nに設定した際に、何らかの不具合が発生した場合、ステップSc6において設定した構成パラメータを元に戻して、実環境構成パラメータ更新部23によるステップSc7の処理を行わないようにしてもよい。このようにすることで、運用中の光パスが存在する実環境光通信ネットワーク3において、不測の障害が発生してしまうようなことを防ぐことが可能になる。
(第5の実施形態)
 図22は、第5の実施形態による光通信ネットワーク管理システムSdの構成を示すブロック図である。第5の実施形態は、実環境光通信ネットワーク3において空き状態のリソースを用いて、光パスを試験的に設定することにより、実環境光通信ネットワーク3の構成パラメータを最適化する。
 第5の実施形態において、第1の実施形態と同一の構成については、同一の符号を付し、以下、異なる構成について説明する。光通信ネットワーク管理システムSdは、光通信ネットワーク管理装置1dと、実環境光通信ネットワーク3と、仮想環境構築装置4とを備える。
 光通信ネットワーク管理装置1dは、実環境通信部11、ネットワーク構成取得部12、実環境利用最適化部13、構成パラメータ記憶部14、光パス設計部15、リソースデータ記憶部16、コンフィグ生成部17、光パスコンフィグ記憶部18、実環境光パス設定部19、オーケストレーション機能部20、仮想環境通信部21、試験結果記憶部22及びネットワーク試験部24を備える。
 ネットワーク試験部24は、内部に時計等の計時手段を備えており、計時手段から定期的に時刻の情報を取得する。ネットワーク試験部24は、リソースデータ記憶部16のリソーステーブル161と、試験結果記憶部22の実環境試験結果テーブル221とを参照し、予め定められる一定時間、実環境光通信ネットワーク3における動作確認試験処理が行われていない空き状態の経路識別情報を検出する。ネットワーク試験部24は、検出した経路識別情報を含むパス一時設定指示信号を仮想環境光パス設定部202に出力することにより、仮想環境光通信ネットワーク40と実環境光通信ネットワーク3とに光パスを設定し、設定した光パスの動作確認試験処理を行うとともに、構成パラメータの更新を行う。
(第5の実施形態の光通信ネットワーク管理装置の処理)
 以下、第5の実施形態の光通信ネットワーク管理装置1dによる処理について説明する。図23は、第5の実施形態の光通信ネットワーク管理装置1dによる処理の流れを示すフローチャートである。なお、図23のフローチャートによる処理が開始される前に、第1の実施形態の図9及び図10のフローチャートに示した処理が既に完了しており、運用中の光パスが設定されているものとする。
 ネットワーク試験部24は、内部の計時手段から定期的に時刻の情報を取得する。ネットワーク試験部24は、リソーステーブル161から「状態」の項目が空き状態である経路識別情報を検出する。ネットワーク試験部24は、実環境試験結果テーブル221を参照し、検出した経路識別情報の中で「処理時刻」の項目の時刻に予め定められる一定時間を加えた時刻が、計時手段から取得した時刻を超えている経路識別情報を選択する(ステップSd1)。
 ネットワーク試験部24が選択した経路識別情報ごとに、以下のステップSd2~Sd10の処理が繰り返し行われる(ループLd1s~Ld1e)。
 ネットワーク試験部24は、経路識別情報のいずれか1つを選択し、選択した経路識別情報を含むパス一時設定指示信号を仮想環境光パス設定部202に出力する。仮想環境光パス設定部202は、ネットワーク試験部24からパス一時設定指示信号を受けると、パス一時設定指示信号に含まれている経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出す。仮想環境光パス設定部202は、読み出したコンフィグレーションデータに含まれるコンフィグコマンド及び設定順序データを参照し、設定順序データが示す設定順序で、コンフィグコマンドを該当するパッケージエミュレータ41-1~41-nの制御部411-1~411-nに設定する。これにより、仮想環境光通信ネットワーク40に光パスが設定されることになる(ステップSd2)。
 ステップSd3,Sd4については、図10のステップS24,S25と同一の処理が、仮想環境光パス設定部202によって行われる。
 ステップSd4において、仮想環境光パス設定部202は、動作確認試験処理の結果が、良好であると判定した場合(ステップSd4、Yes)、ネットワーク試験部24から受けたパス一時設定指示信号に含まれていた経路識別情報を含むパス一時設定指示信号を実環境光パス設定部19に対して出力する。実環境光パス設定部19は、ネットワーク試験部24からパス一時設定指示信号を受けると、受けたパス一時設定指示信号に基づいて、図9のステップS7と同一の処理を行う(ステップSd5)。ステップSd6については、図9のステップS8と同一の処理が実環境光パス設定部19によって行われる。
 実環境光パス設定部19は、ステップSd6の処理が完了すると、仮想環境光パス設定部202から受けたパス一時設定指示信号に含まれている経路識別情報を含む完了通知信号を実環境利用最適化部13に出力する。実環境利用最適化部13は、実環境光パス設定部19から完了通知信号を受けて、図9のステップS9と同一の処理を行う(ステップSd7)。
 実環境利用最適化部13は、構成パラメータの変更をする必要があると判定した場合(ステップSd7、変更が必要)、構成パラメータテーブル141が記憶する構成パラメータのうち、変更が必要な構成パラメータの変更を行う。仮想環境構成管理部201は、構成パラメータテーブル141の構成パラメータが変更されたことを検出すると、仮想環境通信部21を介して、変更された構成パラメータに対応するパッケージエミュレータ41-1~41-nの制御部411-1~411-nに接続する。仮想環境構成管理部201は、接続した制御部411-1~411-nにおいて、変更された構成パラメータに該当する構成パラメータを書き替え(ステップSd8)、処理は、ステップSd9に進められる。
 一方、実環境利用最適化部13は、構成パラメータの変更をする必要がないと判定した場合(ステップSd7、変更が不要)、または、ステップSd8の処理の後、実環境光パス設定部19に対して、完了通知信号に含まれている経路識別情報を含むパス解除指示信号を出力する(ステップSd9)。
 実環境光パス設定部19は、実環境利用最適化部13からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを実環境光通信ネットワーク3において解除し、当該経路識別情報を含むパス解除指示信号を仮想環境光パス設定部202に出力する(ステップSd9)。
 ステップSd10は、2通りの処理が行われる。ステップSd4において、仮想環境光パス設定部202は、動作確認試験処理の結果が、良好でないと判定した場合(ステップSd4、No)、ステップSd2において仮想環境光通信ネットワーク40に設定した光パスを解除する(ステップSd10)。また、仮想環境光パス設定部202は、実環境光パス設定部19からパス解除指示信号を受けた場合、パス解除指示信号に含まれている経路識別情報に対応する光パスを仮想環境光通信ネットワーク40において解除する(ステップSd10)。
 ステップSd10までの処理が完了すると、次の経路識別情報についてステップSd2以降の処理が繰り返し行われ(ループLd1e)、その後、ステップSd1以降の処理が繰り返し行われる。
 上記の第5の実施形態では、過去に行われた実環境光通信ネットワーク3における動作確認試験処理の処理時刻を基準として、ステップSd1において、空き状態の経路識別情報を選択し、図23に示すステップSd1以降の処理を行う構成になっているが、本発明の構成は、当該実施の形態に限られない。処理時刻を基準とするのではなく、定期的に、例えば、毎日、午前0時に、リソーステーブル161が記憶する全ての空き状態の経路識別情報をステップSd1において選択し、図23に示すステップSd1以降の処理を行うようにしてもよい。
 上記の第5の実施形態の光通信ネットワーク管理装置1dにおいて、ネットワーク試験部24は、定期的に、または、一定期間の間に実環境光パス設定部19による動作確認試験処理が行われていない、空き状態のリソースに対応する経路識別情報を選択する。実環境光パス設定部19は、ネットワーク試験部24が選択した経路識別情報に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出し、読み出したコンフィグレーションデータに基づいて、一時的に実環境光通信ネットワーク3に光パスを設定し、設定した光パスに対してコンフィグレーションデータに含まれる試験確認手順にしたがって動作確認試験処理を行う。これにより、継続的に、実環境光通信ネットワーク3の構成パラメータと、仮想環境光通信ネットワーク40の構成パラメータを一致させるようにすることができるので、仮想環境光通信ネットワーク40の状態を、実環境光通信ネットワーク3の状態に近づけるように維持することが可能となる。
(第6の実施形態)
 図24は、第6の実施形態による光通信ネットワーク管理システムSeの構成を示すブロック図である。第6の実施形態は、実環境光通信ネットワーク3において障害が発生した場合に、運用中の主回線を冗長回線に切り替える構成を備える。
 第6の実施形態において、第1の実施形態と同一の構成については、同一の符号を付し、以下、異なる構成について説明する。光通信ネットワーク管理システムSeは、光通信ネットワーク管理装置1eと、実環境光通信ネットワーク3と、仮想環境構築装置4とを備える。
 光通信ネットワーク管理装置1eは、実環境通信部11、ネットワーク構成取得部12、実環境利用最適化部13、構成パラメータ記憶部14、光パス設計部15e、リソースデータ記憶部16e、コンフィグ生成部17、光パスコンフィグ記憶部18、実環境光パス設定部19、オーケストレーション機能部20e、仮想環境通信部21及び試験結果記憶部22を備える。
 リソースデータ記憶部16eは、図6に示すリソーステーブル161と、図25に示す冗長回線テーブル162を記憶する。図25に示すように、冗長回線テーブル162は、「主回線経路識別情報」、「冗長回線経路識別情報」、「重み」の項目を有している。「主回線経路識別情報」の項目には、リソーステーブル161の「経路識別情報」の項目に書き込まれている経路識別情報と同一の経路識別情報が書き込まれる。「冗長回線経路識別情報」の項目には、対応する「主回線経路識別情報」の項目に書き込まれている経路識別情報の経路を主回線とした場合の冗長回線となる経路に対応する経路識別情報が書き込まれる。「重み」の項目には、対応する冗長回線の経路識別情報に対する重みを示す値が、例えば、0~10の範囲の整数値で書き込まれる。
 例えば、重みの値は、伝送遅延の時間が近いほど、大きな値になるように定められる。図25に示す例は、図2に示した実環境光通信ネットワーク3における冗長回線の例を示したものであり、経路識別情報「1」を主回線とした場合、経路識別情報「2」,「3」,「4」の経路が、いずれもA地点からD地点に至る経路であるため冗長回線の候補となる。伝送遅延の観点でみると、図6のリソーステーブル161に示したように、経路識別情報「1」の経路のコストが「1」であり、経路識別情報「2」の経路のコストも「1」であるため、伝送遅延の時間が近いと考えられる。そのため、経路識別情報「1」に対する冗長回線である経路識別情報「2」に対応する重みを「10」としている。これに対して経路識別情報「3」,「4」の経路は、コストが「2」である。そのため、経路識別情報「1」に対する冗長回線である経路識別情報「3」,「4」に対応する重みを「10」よりも小さい「5」としている。
 光パス設計部15eは、伝送設計部151、伝送設計データ記憶部152及び収容設計部153eを備える。収容設計部153eは、第1の実施形態の収容設計部153の構成と同一の構成を備えており、更に、以下の構成を備える。収容設計部153eは、図9に示すステップS5の処理においてリソーステーブル161のレコードを全て生成した後、リソーステーブル161に記憶されているデータと、伝送設計テーブル1521が記憶するデータとに基づいて、主回線の経路識別情報に対する冗長回線の経路識別情報を検出する。収容設計部153eは、リソーステーブル161の「コスト」の項目の値に基づいて、冗長回線ごとの重みの値を特定する。重みの値の特定は、例えば、コストに対する重みの値を示したテーブルを収容設計部153eの内部の記憶領域に予め記憶させておき、収容設計部153eが、当該テーブルを参照することによって行う。収容設計部153eは、検出した主回線の経路識別情報と冗長回線の経路識別情報の組み合わせと、特定した重みの値とに基づいて、リソースデータ記憶部16eに、冗長回線テーブル162を生成する。
 オーケストレーション機能部20eは、仮想環境構成管理部201、仮想環境光パス設定部202、要求受付部203及び障害受付部205を備える。障害受付部205は、実環境通信部11を介して、実環境光通信ネットワーク3の物理パッケージ31-1~31-nの制御部311-1~311-nが送信する障害が発生したことを通知する障害通知信号を受信する。障害受付部205は、冗長回線テーブル162を参照して、受信した障害通知信号に含まれている障害が発生した光パスの経路識別情報に対する冗長回線の経路識別情報を重みの値が大きい方から順に検出し、主回線の光パスを冗長回線の光パスに切り替える処理を行う。
(第6の実施形態の光通信ネットワーク管理装置による処理)
 以下、第5の実施形態の光通信ネットワーク管理装置1eによる処理について説明する。図26は、第5の実施形態の光通信ネットワーク管理装置1eによる処理の流れを示すフローチャートである。なお、図26のフローチャートによる処理が開始される前に、第1の実施形態の図9及び図10のフローチャートに示した処理が既に完了しており、運用中の光パスが設定されているものとする。また、収容設計部153eは、リソースデータ記憶部16eに冗長回線テーブル162を生成しているものとする。
 実環境光通信ネットワーク3のいずれかの物理パッケージ31-1~31-nにおいて障害が発生したとする。障害が発生した物理パッケージ31-1~31-nの制御部311-1~311-nは、障害の影響を受けた光パスの経路識別情報を含む障害通知信号を、実環境通信部11を介して障害受付部205に送信する。障害受付部205は、障害通知信号を受信する(ステップSe1)。
 障害受付部205は、リソーステーブル161と、冗長回線テーブル162と、実環境試験結果テーブル221とを参照し、障害通知信号に含まれている主回線の経路識別情報に対応する冗長回線の経路識別情報であって、空き状態で、かつ実環境光通信ネットワーク3における動作確認試験処理の試験結果が良好であるという条件に一致する経路識別情報が存在するか否かを判定する(ステップSe2)。障害受付部205は、当該条件に一致する経路識別情報が存在しないと判定した場合(ステップSe2、No)、冗長回線が確保できないことを外部に通知し(ステップSe3)、処理を終了する。
 一方、障害受付部205は、当該条件に一致する経路識別情報が存在すると判定した場合(ステップSe2、Yes)、処理対象としていない、すなわち切り替え先の冗長回線として選択していない経路識別情報の中で最も重みの値が大きい経路識別情報を選択する。障害受付部205は、選択した経路識別情報を含むパス設定要求信号を仮想環境光パス設定部202に出力する(ステップSe4)。なお、初回のステップSe4の処理では、条件に一致する経路識別情報の全てが、処理対象にはなっていないため、条件に一致する経路識別情報の中で最も重みの値が大きい経路識別情報が選択されることになる。
 仮想環境光パス設定部202は、障害受付部205からパス設定要求信号を受け、当該パス設定要求信号に基づいて、図10のステップS23と同一の処理を行う(ステップSe5)。ステップSe6、ステップSe7の処理については、図10のステップS24、ステップS25と同一の処理が、仮想環境光パス設定部202によって行われる。
 ステップSe7において、仮想環境光パス設定部202は、動作確認試験処理の結果が、良好でないと判定した場合(ステップSe7、No)、仮想環境光通信ネットワーク40に設定した光パスを解除する。なお、ステップSe5において、仮想環境光パス設定部202が、光パスの設定に失敗している場合、ステップSe6の動作確認試験処理は行わず、ステップSe7において、良好でないと判定することになる。仮想環境光パス設定部202は、パス設定要求に含まれていた冗長回線の経路識別情報を含む冗長回線確認指示信号を障害受付部205に出力する(ステップSe8)。
 一方、ステップSe7において、仮想環境光パス設定部202は、動作確認試験処理の結果が、良好であると判定した場合(ステップSe7、Yes)、障害受付部205に対して経路識別情報を含むパス設定完了応答信号を出力する。障害受付部205は、仮想環境光パス設定部202からパス設定完了応答信号を受けると、パス設定完了応答信号に含まれている経路識別情報を含むパス設定要求信号を実環境光パス設定部19に対して出力する。
 実環境光パス設定部19は、障害受付部205からパス設定要求信号を受けると、当該パス設計要求に基づいて、第3の実施形態の図17に示したステップSb9と同一の処理を行う(ステップSe9)。ただし、ステップSe9の処理の場合、実環境光パス設定部19は、パス設定完了応答信号、または、パス設定不可応答信号を障害受付部205に対して出力する。
 障害受付部205は、実環境光パス設定部19からパス設定完了応答信号、または、パス設定不可応答信号を受けると、パス設定完了応答信号、または、パス設定不可応答信号に含まれている経路識別情報に対応する実環境試験結果テーブル221の「実環境における動作確認試験の試験結果」の項目を参照し、実環境光通信ネットワーク3における動作確認試験処理の試験結果が、良好であるか否かを判定する(ステップSe10)。
 障害受付部205は、実環境光通信ネットワーク3における動作確認試験処理の試験結果が、良好であると判定した場合(ステップSe10、Yes)、冗長回線の経路識別情報に対応するリソーステーブル161の「状態」の項目を「使用状態」に書き替え、主回線の経路識別情報に対応する対応するリソーステーブル161の「状態」の項目を「使用不可」に書き替える。
 障害受付部205は、主回線の経路識別情報を含むパス解除指示信号を実環境光パス設定部19と、仮想環境光パス設定部202に出力する。実環境光パス設定部19は、障害受付部205からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを解除する。仮想環境光パス設定部202は、障害受付部205からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを解除して(ステップSe12)、終了する。これにより、主回線から冗長回線へ光パスが切り替えられることになる。
 一方、障害受付部205は、実環境光通信ネットワーク3における動作確認試験処理の試験結果が、良好でないと判定した場合(ステップSe10、No)、処理対象の経路識別情報を含むパス解除指示信号を実環境光パス設定部19と仮想環境光パス設定部202に出力し、処理をステップSe2に進める。実環境光パス設定部19は、仮想環境利用最適化部204からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを解除する。仮想環境光パス設定部202は、仮想環境利用最適化部204からパス解除指示信号を受けると、パス解除指示信号に含まれている経路識別情報に対応する光パスを解除する(ステップSe11)。
 障害受付部205は、ステップSe8の処理により、仮想環境光パス設定部202から冗長回線確認指示信号を受けている場合、または、ステップSe11の処理の後、処理対象とした冗長回線の経路識別情報以外の経路識別情報について、ステップSe2以降の処理を行う。冗長回線テーブル162に他の冗長回線の経路識別情報が存在する場合、障害受付部205は、ステップSe4において、次に重みの値が大きい冗長回線の経路識別情報を選択する。
 上記の第6の実施形態の例では重みとして伝送遅延の時間が近いほど、大きな値になるように定めているが、光ファイバ伝送路71~75の各々を経由する際に他の経路との重複が少ない経路ほど、重みの値が、大きな値になるように定めるようにしてもよい。
 障害通知信号に経路識別情報ではなく、障害の影響を受けたノードの名称、または、ノードの名称とパッケージ番号が含まれるような場合、障害受付部205は、リソーステーブル161を参照して、障害の影響を受けた光パスの経路識別情報を特定するようにしてもよい。
 上記の第6の実施形態の光通信ネットワーク管理装置1eにおいて、光パス設計部15eは、経路識別情報ごとに、主回線となる光パスに対して冗長回線となる光パスを検出し、主回線となる光パスと、冗長回線となる光パスとを関連付けてリソースデータ記憶部16eに記憶させる。障害受付部205は、実環境光通信ネットワーク3から障害を示す障害データが通知された場合、リソースデータ記憶部16eを参照し、障害により影響を受けた主回線である光パスに対応する経路識別情報と、当該主回線の光パスに対応する冗長回線の経路識別情報とを選択する。仮想環境光パス設定部202は、障害受付部205が選択する主回線の経路識別情報と、冗長回線の経路識別情報との各々に対応するコンフィグレーションデータを光パスコンフィグテーブル181から読み出し、読み出したコンフィグレーションデータに基づいて、仮想環境光通信ネットワーク40において主回線から冗長回線への光パスの切り替えを行う。実環境光パス設定部19は、仮想環境光パス設定部202が仮想環境光通信ネットワーク40において主回線から冗長回線の光パスに切り替える際に用いたコンフィグレーションデータに基づいて、実環境光通信ネットワーク3において主回線から冗長回線への光パスの切り替えを行う。これにより、仮想環境光通信ネットワーク40において、事前に冗長回線への切り替えを検証することができ、実環境光通信ネットワーク3における冗長回線への切り替えによる不測の障害の発生を防ぐことが可能になる。
 なお、上記の第6の実施形態に対して、第3の実施形態の図17のステップSb3及びステップSb4を適用し、リソーステーブル161に冗長回線用のリソースが存在しない場合、冗長回線用のリソースが確保できるように伝送設計処理及び収容設計処理をあらためて行わせるようにしてもよい。また、第6の実施形態において、第3の実施形態において、補足的に示したリソーステーブル161に「期間」の項目を設ける構成を加えて、リソーステーブル161に光パスの設定開始日時と、設定終了日時とを記録しておくことで、冗長回線が必要になった場合に、冗長回線用のリソースの期間を限定して確保するようにしてもよい。
(第7の実施形態)
 図27は、第7の実施形態による光通信ネットワーク管理システムSfの構成を示すブロック図である。
 第7の実施形態において、第1の実施形態と同一の構成については、同一の符号を付し、以下、異なる構成について説明する。光通信ネットワーク管理システムSfは、光通信ネットワーク管理装置1fと、実環境光通信ネットワーク3と、仮想環境構築装置4とを備える。
 光通信ネットワーク管理装置1fは、実環境通信部11、ネットワーク構成取得部12、実環境利用最適化部13、構成パラメータ記憶部14、光パス設計部15、リソースデータ記憶部16、コンフィグ生成部17、光パスコンフィグ記憶部18、実環境光パス設定部19、オーケストレーション機能部20、仮想環境通信部21、試験結果記憶部22及びパラメータ推定部25を備える。
 パラメータ推定部25は、構成パラメータ記憶部14が記憶する構成パラメータテーブル141に、新たな構成パラメータが書き込まれると、以下の処理を行う。すなわち、パラメータ推定部25は、構成パラメータテーブル141の構成パラメータに不備がある場合に、不備のある構成パラメータの近似値を推定し、不備のある構成パラメータを近似値に書き換える。ここで、構成パラメータに不備がある場合とは、例えば、仮想環境構成管理部201がパッケージエミュレータ41-1~41-nを仮想環境構築装置4に生成する際に必要となる構成パラメータが不足しているような場合や、予め定められている現実的な構成パラメータの物理値の許容範囲からの乖離が見られるような場合である。
 パラメータ推定部25は、予め既知である現実的な構成パラメータの物理値や、構成パラメータに不備がある物理パッケージ31-1~31-n以外の他の物理パッケージ31-1~31-nの構成パラメータの物理値等からシミュレーションや機械学習を行って構成パラメータの近似値を推定する。
 パラメータ推定部25は、実環境利用最適化部13より、実環境利用最適化部13が性能モニタ部312-1~312-nから受信する通信品質を示す通信品質データを受けて、通信品質データと、当該通信品質データに対応する構成パラメータテーブル141が記憶する構成パラメータとを比較し、乖離が存在するような場合にも、近似値を推定し、推定した近似値を構成パラメータテーブル141に書き込むようにしてもよい。
 上記の第7の実施形態の光通信ネットワーク管理装置1fにおいて、パラメータ推定部25は、構成パラメータ記憶部14が記憶する構成パラメータにおいて、仮想環境光通信ネットワーク40を生成するのに不足している構成パラメータが存在するか、または、構成パラメータが、予め定められる許容範囲に存在していない場合、当該構成パラメータに対する適切な構成パラメータを推定し、構成パラメータ記憶部14が記憶する構成パラメータを、推定した構成パラメータに書き替える。これにより、構成パラメータの不足を補ったり、構成パラメータの精度を高めたりすることができるため、仮想環境光通信ネットワーク40の状態を更に、実環境光通信ネットワーク3の状態に近づけることが可能となる。
 上記の第1から第7の実施形態において、仮想環境構築装置4は、光通信ネットワーク管理装置1~1fとは別の装置として示していたが、光通信ネットワーク管理装置1~1fに組み込まれて一体として構成されていてもよい。
 上記の第1から第7の実施形態の構成において、収容設計部153,153eは、光ファイバ伝送路71~75に設定する論理的な光パスについての収容設計処理を行っているが、例えば、ノード装置61~64が、WDM(Wavelength Division Multiplexing)の装置である場合、当該光パスは、波長に相当することになる。この場合、収容設計部153,153eは、波長を多重化することも踏まえて収容設計処理を行うようにしてもよい。
 上記の第1から第7の実施形態の構成において、伝送設計部151,151bに与えられる伝送モードデータには、始端地点と、終端地点と、通信容量とが含まれていたが、要求する光のパワー、増幅度、変調方式などが含まれていてもよい。
 上記の第1から第7の実施形態において、図6に示したリソーステーブル161の「コスト」の項目に記録する値として、中継のノード装置61~64の台数としていたが、例えば、実際の経路の距離など、他の指標をコストの値としてもよい。
 上記の図2に示した実環境光通信ネットワーク3の構成は一例であり、ノード装置61~64の台数は、少なくとも2台以上あれば、どのような台数であってもよい。また、図2では、各々の地点51~54には、1台のノード装置61~64が設置されているが、1つの地点51~54に、複数のノード装置61~64が設置されるような構成であってもよい。
 上記の第1から第7の実施形態において、性能モニタ部312-1~312-nは、ロスやOSNRを測定するとしていたが、光のパワー、BER(Bit Error Rate)等を測定するようにしてもよい。
 上記の第1から第7の実施形態において、パッケージエミュレータ41-1~41-nの制御部411-1~411-nは、物理パッケージ31-1~31-nの制御部311-1~311-nを構成するマネージャアプリケーションプログラムと同一のマネージャアプリケーションプログラムにより構成されるとしているが、完全に同一のマネージャアプリケーションプログラムでなくてもよい。
 第3から第7の実施形態は、第1の実施形態の構成を基礎として構成されているが、例えば、第1の実施形態の構成に、第3と第4の実施形態を組み合わせて適用するなど、第3から第7の実施形態の構成を任意に組み合わせて第1の実施形態の構成に加えるような構成にしてもよい。また、上記の第2の実施形態に対して、第3から第7の実施形態の構成を任意に組み合わせて適用するようにしてもよい。
 上記の第1から第7の実施形態における光通信ネットワーク管理装置1~1fでは、ネットワーク構成取得部12により実環境から物理パッケージ31-1~31-nの構成パラメータを取得するように構成されているが、物理パッケージ31-1~31-nの構成パラメータは他の手段により取得されてもよい。例えば、上記の第1から第7の実施形態における光通信ネットワーク管理装置1~1fは、外部装置から手動又はプログラムにより、物理パッケージ31-1~31-nの構成パラメータを構成パラメータ記憶部14に記憶させるように構成されてもよい。このように構成される場合、光通信ネットワーク管理装置1~1fは、ネットワーク構成取得部12を備えなくてもよい。
 上記の第1から第7の実施形態における光通信ネットワーク管理装置1~1fの光パス設計部15,15b,15eは、外部装置に備えられてもよい。このように構成される場合、光パス設計部15,15b,15eを備える外部装置は、光通信ネットワーク管理装置1~1fから少なくとも構成パラメータを取得し、光パスの経路を抽出し、抽出した経路を収容するのに必要となるリソースを検出する。光パス設計部15,15b,15eを備える外部装置は、検出したリソースに基づいて生成されるリソーステーブル161を光通信ネットワーク管理装置1~1fのリソースデータ記憶部16に記録する。第1から第7の実施形態における光通信ネットワーク管理装置1~1fでは、外部装置と連携して所望の機能を実現するように構成されてもよい。このように構成される場合、光通信ネットワーク管理装置1~1fは、光パス設計部15,15b,15eを備えなくてもよい。
 上記の第1及び第6の実施形態において、閾値に基づく処理、例えば、閾値以下であるか、または、閾値を超えるかといった処理を行っている。しかしながら、本発明は、当該実施の形態に限られるものではなく、閾値に基づいて「超過するか否か」、「未満であるか否か」、「以上であるか否か」、「以下であるか否か」という判定処理は一例に過ぎず、閾値の定め方に応じて、それぞれ「以上であるか否か」、「以下であるか否か」、「超過するか否か」、「未満であるか否か」という判定処理に置き換えられてもよい。
 上述した実施形態における光通信ネットワーク管理装置1~1f及び仮想環境構築装置4をコンピュータで実現するようにしてもよい。その場合、この機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することによって実現してもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD-ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムを送信する場合の通信線のように、短時間の間、動的にプログラムを保持するもの、その場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリのように、一定時間プログラムを保持しているものも含んでもよい。また上記プログラムは、前述した機能の一部を実現するためのものであってもよく、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよく、FPGA(Field Programmable Gate Array)等のプログラマブルロジックデバイスを用いて実現されるものであってもよい。
 以上、この発明の実施形態について図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。
 実環境の光通信ネットワークと、仮想環境の光通信ネットワークの両方を管理することができるので、実環境の光通信ネットワークの通信品質の向上を図ることが可能となる。
1…光通信ネットワーク管理装置、3…実環境光通信ネットワーク、4…仮想環境構築装置、11…実環境通信部、12…ネットワーク構成取得部、13…実環境利用最適化部、14…構成パラメータ記憶部、15…光パス設計部、16…リソースデータ記憶部、17…コンフィグ生成部、18…光パスコンフィグ記憶部、19…実環境光パス設定部、20…オーケストレーション機能部、21…仮想環境通信部、22…試験結果記憶部、31-1~31-n…物理パッケージ、41-1~41-1…パッケージエミュレータ、151…伝送設計部、152…伝送設計データ記憶部、153…収容設計部、201…仮想環境構成管理部、202…仮想環境光パス設定部、203…要求受付部、311-1~311-n…制御部、312-1~312-n…性能モニタ部、411-1~411-n…制御部

Claims (10)

  1.  物理パッケージが搭載される複数のノード装置によって構成される実環境光通信ネットワークの前記物理パッケージをコンピュータプログラムによって仮想的に構成したパッケージエミュレータに対して、前記物理パッケージの構成パラメータを設定することにより仮想環境光通信ネットワークを生成する仮想環境構成管理部と、
     前記構成パラメータと、要求される伝送モードとに基づいて検出される光パスの経路ごとに必要となるリソースを示すリソースデータに基づいて、コンフィグレーションデータを生成するコンフィグ生成部と、
     前記コンフィグ生成部が生成する前記コンフィグレーションデータに基づいて、前記仮想環境光通信ネットワークに前記光パスを設定する仮想環境光パス設定部と、
     前記光パスの設定に用いた前記コンフィグレーションデータに基づいて、前記実環境光通信ネットワークに前記光パスを設定する実環境光パス設定部と、
     を備える光通信ネットワーク管理装置。
  2.  前記物理パッケージから構成パラメータを取得するネットワーク構成取得部をさらに備え、
     前記仮想環境構成管理部は、前記パッケージエミュレータに対して、前記ネットワーク構成取得部によって取得された前記構成パラメータを設定することにより仮想環境光通信ネットワークを生成する、請求項1に記載の光通信ネットワーク管理装置。
  3.  前記構成パラメータと、要求される伝送モードとに基づいて、光パスの経路を検出し、検出した前記光パスの経路ごとに前記リソースデータを生成する光パス設計部をさらに備え、
     前記コンフィグ生成部は、前記光パス設計部が生成する前記リソースデータに基づいて前記コンフィグレーションデータを生成する、請求項1又は2に記載の光通信ネットワーク管理装置。
  4.  前記実環境光パス設定部は、一時的に前記実環境光通信ネットワークに前記光パスを設定することにより前記実環境光通信ネットワークから通知される通信品質を示す通信品質データに基づいて、前記構成パラメータを変更することにより前記構成パラメータを最適化する、
     請求項1から3のいずれか一項に記載の光通信ネットワーク管理装置。
  5.  前記コンフィグレーションデータには、コンフィグコマンドと、前記コンフィグコマンドの設定順序を示す設定順序データと、試験確認手順を示す試験確認手順データとが含まれており、
     前記仮想環境光パス設定部は、
     前記コンフィグレーションデータに含まれる前記設定順序データが示す順序で、前記コンフィグコマンドを適用して前記仮想環境光通信ネットワークに前記光パスを設定し、設定が成功した前記光パスに対して、前記試験確認手順データに基づいて動作確認試験処理を行い、
     前記実環境光パス設定部は、
     前記動作確認試験処理の試験結果が、予め定められる所定の条件を満たす場合、前記仮想環境光パス設定部が前記仮想環境光通信ネットワークに対して適用した前記コンフィグレーションデータを用いて、前記実環境光通信ネットワークに前記光パスを設定する、
     請求項1から4のいずれか一項に記載の光通信ネットワーク管理装置。
  6.  前記仮想環境光通信ネットワークにおいて、任意に定められる障害を発生させ、発生させた前記障害の要因と、前記障害の結果とに基づいて、前記障害を回避できるように前記構成パラメータを変更するか、または、前記障害を回避できるように前記光パスの経路を変更する最適化処理を行う仮想環境利用最適化部、
     を備える請求項1から5のいずれか一項に記載の光通信ネットワーク管理装置。
  7.  前記仮想環境構成管理部は、複数の前記仮想環境光通信ネットワークを生成し、
     前記仮想環境利用最適化部は、複数の前記仮想環境光通信ネットワークの各々において異なる前記障害を発生させて前記最適化処理を行う、
     請求項6に記載の光通信ネットワーク管理装置。
  8.  前記実環境光パス設定部は、前記コンフィグレーションデータに基づいて、前記実環境光通信ネットワークに前記光パスの設定する際、前記コンフィグレーションデータに含まれる試験確認手順にしたがって設定した前記光パスの動作確認試験処理を行っており、
     定期的に、または、一定期間の間に前記動作確認試験処理が行われていない、空き状態のリソースに対応する経路識別情報を選択するネットワーク試験部を備え、
     前記実環境光パス設定部は、
     前記ネットワーク試験部が選択した前記経路識別情報に対応する前記コンフィグレーションデータに基づいて一時的に前記実環境光通信ネットワークに前記光パスを設定し、設定した前記光パスに対して前記コンフィグレーションデータに含まれる試験確認手順にしたがって前記動作確認試験処理を行う、
     請求項1から7のいずれか一項に記載の光通信ネットワーク管理装置。
  9.  経路識別情報ごとに、主回線となる光パスと、前記主回線となる光パスに対して冗長回線となる光パスとを関連付けてリソースデータ記憶部をさらに備え、
     前記実環境光通信ネットワークから障害を示す障害データが通知された場合、前記リソースデータ記憶部を参照し、前記障害により影響を受けた主回線である光パスに対応する前記経路識別情報と、当該主回線の光パスに対応する冗長回線の経路識別情報とを選択する障害受付部を備え、
     前記仮想環境光パス設定部は、
     前記障害受付部が選択する主回線の前記経路識別情報と、冗長回線の前記経路識別情報との各々に対応する前記コンフィグレーションデータに基づいて、前記仮想環境光通信ネットワークにおいて主回線から冗長回線への光パスの切り替えを行い、
     前記実環境光パス設定部は、
     前記仮想環境光パス設定部が前記仮想環境光通信ネットワークにおいて主回線から冗長回線の光パスに切り替える際に用いた前記コンフィグレーションデータに基づいて、前記実環境光通信ネットワークにおいて主回線から冗長回線への光パスの切り替えを行う、
     請求項1から8のいずれか一項に記載の光通信ネットワーク管理装置。
  10.  前記構成パラメータにおいて、前記仮想環境光通信ネットワークを生成するのに不足している前記構成パラメータが存在するか、または、前記構成パラメータが、予め定められる許容範囲に存在していない場合、当該構成パラメータに対する適切な構成パラメータを推定し、構成パラメータを、推定した前記構成パラメータに書き替えるパラメータ推定部
     を備える請求項1から9のいずれか一項に記載の光通信ネットワーク管理装置。
PCT/JP2020/005952 2020-02-17 2020-02-17 光通信ネットワーク管理装置 WO2021166015A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/JP2020/005952 WO2021166015A1 (ja) 2020-02-17 2020-02-17 光通信ネットワーク管理装置
US17/797,743 US20230076671A1 (en) 2020-02-17 2020-02-17 Optical communication network management apparatus
JP2022501395A JP7299551B2 (ja) 2020-02-17 2020-02-17 光通信ネットワーク管理装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/005952 WO2021166015A1 (ja) 2020-02-17 2020-02-17 光通信ネットワーク管理装置

Publications (1)

Publication Number Publication Date
WO2021166015A1 true WO2021166015A1 (ja) 2021-08-26

Family

ID=77391490

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/005952 WO2021166015A1 (ja) 2020-02-17 2020-02-17 光通信ネットワーク管理装置

Country Status (3)

Country Link
US (1) US20230076671A1 (ja)
JP (1) JP7299551B2 (ja)
WO (1) WO2021166015A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023238273A1 (ja) * 2022-06-08 2023-12-14 日本電信電話株式会社 光パス設計装置、光パス設計方法およびプログラム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007208633A (ja) * 2006-02-01 2007-08-16 Mitsubishi Electric Corp ネットワーク設計装置、ネットワーク設計方法およびネットワーク設計プログラム
JP2011101140A (ja) * 2009-11-05 2011-05-19 Univ Of Electro-Communications ネットワークエミュレータ装置、ネットワークエミュレータ装置の制御方法、およびプログラム
JP2017034427A (ja) * 2015-07-31 2017-02-09 富士通株式会社 通信システムのネットワーク設定方法および通信システム

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2239032A1 (en) * 1998-05-28 1999-11-28 Newbridge Networks Corporation Operator directed routing of soft permanent virtual circuits in a connection-orientated network
US6856627B2 (en) * 1999-01-15 2005-02-15 Cisco Technology, Inc. Method for routing information over a network
US9258238B2 (en) * 2013-08-30 2016-02-09 Juniper Networks, Inc. Dynamic end-to-end network path setup across multiple network layers
US10148578B2 (en) * 2014-10-17 2018-12-04 Ciena Corporation Optical and packet path computation and selection systems and methods
US11044161B2 (en) * 2019-10-11 2021-06-22 Huawei Technologies Canada Co., Ltd. Method and system for latency-aware embedding of a virtual network onto a substrate optical network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007208633A (ja) * 2006-02-01 2007-08-16 Mitsubishi Electric Corp ネットワーク設計装置、ネットワーク設計方法およびネットワーク設計プログラム
JP2011101140A (ja) * 2009-11-05 2011-05-19 Univ Of Electro-Communications ネットワークエミュレータ装置、ネットワークエミュレータ装置の制御方法、およびプログラム
JP2017034427A (ja) * 2015-07-31 2017-02-09 富士通株式会社 通信システムのネットワーク設定方法および通信システム

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023238273A1 (ja) * 2022-06-08 2023-12-14 日本電信電話株式会社 光パス設計装置、光パス設計方法およびプログラム

Also Published As

Publication number Publication date
US20230076671A1 (en) 2023-03-09
JPWO2021166015A1 (ja) 2021-08-26
JP7299551B2 (ja) 2023-06-28

Similar Documents

Publication Publication Date Title
US6782210B1 (en) Optical packet routing network system based on optical label switching technique
JP4025674B2 (ja) 迂回通信経路設計方法
WO2021166015A1 (ja) 光通信ネットワーク管理装置
JP6784290B2 (ja) 管理装置、特定方法とそのプログラム
EP2093906B1 (en) Optical transceiver, its communication method, and communication system
JP5376055B2 (ja) 光伝送ネットワークシステム、光信号の伝送経路の選択方法、および光伝送装置
JP4024265B2 (ja) ノード、光通信ネットワーク、光パス予約方法及びプログラム
WO2011058925A1 (ja) 無線通信状態取得方法および無線局
Schluter et al. Optical fiber bus protection network to multiplex sensors: Dedicated line and dedicated path operation
CN104521159A (zh) 波长复用装置,故障发生位置识别方法和程序
US20100098409A1 (en) Communication path setting method, communication system, optical propagation apparatus and optical transmission/reception device
KR101618819B1 (ko) 네트워크 검사 방법 및 시스템
JP4024266B2 (ja) 光パス配置検索方法、光パス配置検索装置及びプログラム
US20220182168A1 (en) Wavelength cross connect device, branch ratio variable method, and program
JP5634136B2 (ja) 光スイッチシステム、光スイッチシステム管理制御装置、及び管理制御方法
EP4333328A1 (en) Connection node device, optical transmission system, and connection method
US9825728B2 (en) Demand accommodation changing order determination method
JP5483715B2 (ja) 光伝送システム
JP2014165818A (ja) 光伝送システム
US20240223925A1 (en) Optical path route design device and optical path route design method
Colapinto et al. Scalability in IoT Sensor Networks for Smart Buildings
WO2020217299A1 (ja) 故障判定システム及び故障判定方法
JPH06244796A (ja) 光通信網
JP2020043447A (ja) 制御装置、送信ノードおよび信号試験方法
JP2022165539A (ja) 光通信装置、光空間通信システム、光通信方法、及び光通信プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20919476

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022501395

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20919476

Country of ref document: EP

Kind code of ref document: A1