WO2021147323A1 - Procédé complet de commande d'optimisation d'énergie pour parc - Google Patents

Procédé complet de commande d'optimisation d'énergie pour parc Download PDF

Info

Publication number
WO2021147323A1
WO2021147323A1 PCT/CN2020/112473 CN2020112473W WO2021147323A1 WO 2021147323 A1 WO2021147323 A1 WO 2021147323A1 CN 2020112473 W CN2020112473 W CN 2020112473W WO 2021147323 A1 WO2021147323 A1 WO 2021147323A1
Authority
WO
WIPO (PCT)
Prior art keywords
heating
bath
water
value
pipe network
Prior art date
Application number
PCT/CN2020/112473
Other languages
English (en)
Chinese (zh)
Inventor
张化光
周博文
杨东升
刘鑫蕊
杨波
罗艳红
夏继雨
孙振奥
金硕巍
梁雪
刘振伟
王智良
杨珺
Original Assignee
东北大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 东北大学 filed Critical 东北大学
Publication of WO2021147323A1 publication Critical patent/WO2021147323A1/fr

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/02Hot-water central heating systems with forced circulation, e.g. by pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1066Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/08Hot-water central heating systems in combination with systems for domestic hot-water supply
    • F24D3/082Hot water storage tanks specially adapted therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/10Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system
    • F24D3/1058Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system disposition of pipes and pipe connections
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/10Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system
    • F24D3/1083Filling valves or arrangements for filling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/08Electric heater

Definitions

  • the invention relates to the technical field of energy control, in particular to a comprehensive energy optimization control method for a park.
  • Energy is a material resource in nature that can provide some form of energy for centuries. At present, the world is in a state of energy shortage. Today, when global energy is increasingly depleted, energy conservation and emission reduction have always been the top priority of the country’s work. Energy conservation is of great significance to China’s sustainable development. Parks are energy-consuming. As a public area, whether it is a teaching park or a family area, whether the large households can maximize the use of energy and improve the utilization rate of energy has become a matter of great concern to many units. On the other hand, haze weather has become a common phenomenon of urban pollution, especially in winter, and coal-fired heating is the most important source of pollution. The heating capacity of northern cities is insufficient in winter.
  • the heating is mainly coal-fired, and the proportion of clean heating is low, which affects the urban landscape phenomenon. Therefore, energy conservation and environmental protection are equally important when optimizing the energy control system of the park. Most of the existing integrated energy control systems in the park are unable to not only maximize the use of energy to improve system functions, but also protect the environment and reduce air pollution.
  • the invention patent with application number CN105299733A discloses an integrated heating system and hot water supply system composed of an electric boiler as a common heat source. Although it can obtain two independent hot water systems for heating and domestic water supply, the The patent has the following shortcomings: First, there is no corresponding bath water replenishment control, heating pipe network replenishment control, only hot water heating, insufficient function, systematization, and insufficient use of energy; second, heating When the water is heated and supplied, the pressure value in the heat preservation hot water tank is not monitored, and the function is not safe enough.
  • the utility model patent with the application number CN206958985U discloses an energy-saving coal-fired heating stove. Although it can quickly heat and save energy, the patent does not meet the environmental protection requirements, burns a large amount of coal, and seriously pollutes the atmospheric environment.
  • an electric boiler is used as a heat source, it has the following advantages: no pollution to the environment, no emissions of three wastes, clean and no noise, simple operation, convenient maintenance, high degree of automation, normal pressure operation, safe and reliable, easy to control, etc. advantage.
  • the electric boiler uses a metal tubular electric heater to heat the water so that electric energy is directly converted into thermal energy (to produce hot water or steam). There is no need to use combustion to convert chemical energy into heat, and there is no need to supply air and fuel for combustion, and no harmful gases and ash are emitted, which fully meets environmental protection requirements.
  • the present invention provides a comprehensive energy optimization control method for the park.
  • This method can not only provide heating, but also provide better bath hot water, bath water replenishment, heating water replenishment and circulating heating, which can optimize the existing
  • the park's integrated energy control system is also energy-saving and environmentally friendly.
  • a comprehensive energy optimization control method for the park includes bath water replenishment control method, bath heating cycle control method, primary pipe network cycle heating control method, heating pipe network cycle Heating control method and heating pipe network water supplement control method;
  • the bath water replenishment control method controls the start and stop of the bath circulation pump and the bath water replenishment solenoid valve switch to realize the bath water replenishment control by reading the value of the liquid level of the bath replenishing tank, and the process is as follows:
  • the bath water replenishment control module is activated by the remote control platform, which is set with the upper and lower limits of the bath water replenishment tank liquid level; read the bath water replenishment tank liquid level value, if the bath water replenishment tank liquid level value is lower than the upper limit, start bathing Replenish water circulation pump, open the bath water replenishment solenoid valve to replenish the bath water replenishment tank, read the water replenishment tank level value again after replenishing water, if the water replenishment tank level value is higher than the upper limit, close the bath water replenishment solenoid valve; if bathing water replenishment If the tank liquid level value is lower than the upper limit value, continue bathing water replenishment; if the bath water replenishing tank liquid level value is lower than the lower limit value, stop the bath water replenishing circulating pump, turn off the bath water replenishing solenoid valve, issue an alarm and wait for the system to reset.
  • the bath heating cycle control method controls the start and stop of the bath circulation pump and the bath heating solenoid valve switch by reading the temperature value of the heat preservation hot water tank and the pressure value of the heat preservation hot water tank to realize bath heating cycle control and heat preservation hot water tank pressure monitoring.
  • the process is as follows:
  • the bath heating cycle control module is started by the remote control platform.
  • the module is set with the upper and lower limits of the temperature of the heat preservation hot water tank and the upper and lower limits and lower values of the pressure of the heat preservation hot water tank; read the temperature of the heat preservation hot water tank, if the temperature If the temperature is higher than the set upper limit, the bath circulation pump will be stopped, and the bath heating solenoid valve will be closed; if the temperature is lower than the set lower limit, the pressure value of the heat preservation hot water tank will be read, if the pressure value is lower than the set low value Turn on the bath heating solenoid valve and start the bath circulating pump; if the pressure value exceeds the set upper limit, stop the bath heating circulating pump and close the bath heating solenoid valve; if the pressure value is lower than the set lower limit, stop the bath circulating pump. Raise an alarm and wait for the system to reset.
  • the primary pipe network circulating heating control method controls the start and stop of the primary heating pump by reading the state of the bath circulating pump, and at the same time monitors the operating temperature value of the primary pipe network, the operating state of the direct heating furnace, and the operating state of the regenerator to realize the circulating heating of the pipe network.
  • the control process is as follows:
  • the remote control platform starts a pipe network circulating heating control module to detect whether the bath circulating pump is running. If the bath circulating pump is not running, stop the heating pump once, otherwise it is judged that the system is in water supplement mode or heating mode at this time; if it is in heating mode Read the operating temperature of the pipe network, read the operating status of the direct heating furnace and the regenerative furnace; send the above-mentioned sampling record data to the remote control platform to monitor the data in real time , To avoid the failure of the entire system.
  • the heating pipe network circulating heating control method controls the heating heating circulating pump state and the heating pipe valve opening degree by reading the three parameter variables of the inlet water temperature value, the return water temperature value and the operating parameters of the regenerator to perform heating. Circulating heating control of pipe network, the process is as follows:
  • the remote control platform starts the heating pipe network circulating heating control module, which is equipped with an energy-saving program; reads the secondary side inlet water temperature, return water temperature and flow value, and calculates the actual heat consumption value on the user side; according to the average outdoor temperature And the operating curve diagram of the heating system (the corresponding value of the specific curve, different parks can adjust the setting), obtain the size of the water supply temperature required by the actual operation, and reset the water supply temperature; according to the set temperature,
  • the energy-saving program controls the valve opening of the heating pipeline and the rotation speed of the heating pipe network circulating heat pump; and transmits the collected inlet water temperature value, return water temperature value, and operating parameters of the regenerator to the remote control platform to perform real-time data monitor.
  • the heating pipe network water replenishment control method controls the state of the heating water replenishing circulating pump by reading the two parameter variables of the inlet water pressure value and the return water pressure value, and performs the heating pipe network water replenishment control, and the process is as follows:
  • the remote control platform starts the heating pipe network water replenishment control module, and the pressure transmitter installed at the return pipe of the heating pipe network feeds back the measured return water pressure value to the controller in the frequency converter, and the pressure set value signal
  • the control unit calculates and outputs the signal to the inverter, and the inverter increases or decreases the frequency accordingly according to the signal, and automatically outputs the voltage frequency required by the heating and water circulation pump, and changes the rotation speed of the heating and water circulation pump to make The water supply volume changes accordingly; the two parameter variables of the collected water inlet pressure value and the return water pressure value are transmitted to the remote control platform to monitor the data in real time.
  • the present invention uses an electric boiler as the shared heat source of the integrated bathing hot water supply system and the heating system.
  • the solenoid valve, make-up pump, circulating pump, and frequency converter can be set up to fully utilize and perform the system functions. Bathing water replenishment, heating water replenishment function, when the liquid level and pressure are lower than the limit value, an alarm will be issued.
  • This integrated structure facility better optimizes the park's integrated energy control system, saves equipment costs and saves energy;
  • the number of electric boilers connected in series can be determined according to the amount of hot water supply and the size of the heating area.
  • Each electric boiler is equipped with an automatic controller to automatically control electricity consumption and save resources;
  • the electric boiler does not need to use combustion to convert chemical energy into heat, and it does not need to supply air and fuel required for combustion, and will not emit harmful gases and ash, protect the environment and reduce air pollution.
  • Figure 1 is a structural diagram of a park integrated energy control system in an embodiment of the present invention
  • Figure 2 is a topological diagram of the park integrated energy control system in the embodiment of the present invention.
  • FIG. 3 is a flowchart of a bath water replenishment control method in an embodiment of the present invention.
  • FIG. 4 is a flowchart of a bath heating cycle control method in an embodiment of the present invention.
  • Fig. 5 is a flow chart of a method for controlling heating in a cycle of a pipe network in an embodiment of the present invention
  • Fig. 6 is a flowchart of a method for circulating heating control of a heating pipe network in an embodiment of the present invention
  • Fig. 7 is a flowchart of a method for controlling water replenishment of a heating pipe network in an embodiment of the present invention.
  • the structure diagram of the park integrated energy control system of this embodiment is shown in Figure 1, and its topology is shown in Figure 2.
  • the control system structure includes an electric boiler, bathing board exchange, heating board exchange, heat preservation hot water tank, and bathing water supply tank.
  • the electric heating boiler is connected to the bathing plate exchange and the heating plate exchange through a circulating pipeline, and the return water pipeline of the electric heating boiler is equipped with primary heating pumps B3-1 and B3-2, and a primary make-up pump B3-3
  • the bath plate changer is connected to the heat preservation hot water tank through a pipeline, the heat preservation hot water tank is respectively connected to the heating plate changer and bath water supplement tank through the pipeline, and the heat preservation hot water tank is connected to the heat preservation hot water tank.
  • Bathing circulation pumps B4-1 and B4-2 are arranged in the pipeline connected to the heating plate, and the hot water supply pipeline connected to the terminal water equipment is arranged on the heat preservation hot water tank.
  • the 1# furnace is dedicated to For heating, 2# and 3# furnaces are used for both heating and domestic hot water supply control, that is, bathing system.
  • the 1# board is replaced by domestic hot water board, and the 2# board is replaced by heating board.
  • the electric boiler has the characteristics of high thermal efficiency, no pollution, and low energy consumption. It is composed of at least one electric boiler connected in series, and an electric heater is installed in the electric boiler tank. The electric heater is connected with an automatic control circuit and a power supply. Powered by the control circuit, all the heat converted by the electricity is supplied to the water. There is no heat loss, no three wastes, no pollution, and at the same time it has the characteristics of safety and reliability, convenient maintenance, long service life, and wide application range.
  • a comprehensive energy optimization control method for a park includes a bath water replenishment control method, a bath heating cycle control method, a primary pipe network cycle heating control method, a heating pipe network cycle heating control method, and a heating pipe network water replenishment control method;
  • the tap water of the bath water replenishment control part flows through the cold water meter and is stored in the bath water replenishment tank.
  • the water outlet pipe of the bath water replenishment tank is connected to the bath heating cycle control part, and is respectively connected to the bath cycle through solenoid valves D4-1 and D4-2.
  • the pump and the heat preservation hot water tank constitute the bath water replenishment control part.
  • the process of this part of the control method is shown in Figure 3. The process is as follows:
  • the remote control platform activates the bath water replenishment control module, which is set with the upper and lower limits of the bath water replenishment tank; the pressure sensor P5-1 reads the pressure value of the bath water replenishment tank to calculate the liquid level value of the bath water replenishment tank. If the liquid level value of the bath make-up tank is lower than the upper limit, start the bath make-up circulation pump B4-1, turn on the bath make-up solenoid valve D4-2 and close D4-1 to make up the bath make-up tank, and read the make-up again after making up the water Tank liquid level value.
  • the bath water replenishment solenoid valve 4-2 will be closed and D4-1 will be opened; if the bath water replenishment tank liquid level value is lower than the upper limit value, continue bathing replenishment; If the liquid level value of the bath make-up tank is lower than the lower limit, stop the bath make-up circulation pump, close the bath make-up solenoid valve, issue an alarm and wait for the system to reset.
  • the 2# furnace and the 3# furnace in the bath heating cycle control part are exchanged through the 1# plate. After the heat exchange, the user of the bath hot water is supplied. When the 1# plate exchange fails, the valve is switched and used for heating. 2# plate replacement, switch to domestic hot water, and cut off and cancel the 2# plate replacement heating function.
  • the 1# plate changer is connected to the bathing circulating pumps B4-1 and B4-2, the connection is equipped with a pressure gauge, the bathing circulating pump is connected to the thermal insulation hot water tank with a pipeline, and solenoid valves D4-1 and D4-2 are provided on the pipeline, A temperature sensor T5-1 and a pressure sensor P5-1 are arranged in the heat preservation hot water tank, which are respectively used to measure the temperature and pressure in the heat preservation hot water tank, thereby forming a bath heating cycle control part.
  • the process of this part of the control method is shown in Figure 4, and the process is as follows:
  • the bath heating cycle control module is started by the remote control platform.
  • the module is set with the upper and lower limits of the temperature of the heat preservation hot water tank and the upper and lower limits and lower values of the pressure of the heat preservation hot water tank; the temperature sensor T5-1 reads the heat preservation hot water If the temperature of the tank is higher than the set upper limit, stop the bath circulation pumps B4-1 and B4-2, and close the bath heating solenoid valve D4-1; if the temperature is lower than the set lower limit, the pressure sensor P5-1 reads the pressure value of the heat preservation hot water tank, if the pressure value is lower than the set low value, open the bath heating solenoid valve D4-1 and close D4-2, start the bath circulation pump; if the pressure value exceeds the set upper limit Value, stop bath heating circulating pumps B4-1 and B4-2, and close bath heating solenoid valve D4-1; if the pressure value is lower than the set lower limit, stop bathing circulating pumps B4-1 and B4-2, send out an alarm and Wait for the system to reset.
  • the electric boiler of the circulating heating control part of the primary pipe network is equipped with a temperature sensor T3-1 on the outlet pipe connected to the plate changer, and the return pipe is equipped with primary heat pumps B3-1 and B3-2, and a primary water supply Pump B3-3, a pressure sensor P3-1 is connected to the primary water make-up pump to monitor the pressure value in real time, thereby forming the primary pipe network circulating heating control part.
  • the process of this part of the control method is shown in Figure 5, and the process is as follows:
  • the remote control platform starts a pipe network circulation heating control module to detect whether the bath circulating pumps B4-1 and B4-2 are running. If the bath circulating pumps are not running, stop the heating pumps B3-1 and B3-2 once, otherwise judge this When the system is in water supply mode or heating mode; if in heating mode, start the heat pumps B3-1 and B3-2 once, otherwise stop the heat pumps B3-1 and B3-2 once; read by the temperature sensor T3-1 Once the operating temperature of the pipe network, read the operating status of the direct heating furnace and the regenerative furnace, including: phase current, phase voltage, fan frequency and furnace temperature; transmit the above-mentioned sampling record data to the remote control platform to monitor the data in real time, Avoid failure of the entire system.
  • the water outlet pipe of the regenerative furnace controlled by the circulation heating of the heating pipe network is connected to the water separator through a pipeline, and the pipeline is respectively provided with a temperature sensor T2-1 and a pressure sensor P2-1.
  • the outlet pipe is equipped with multiple pressure gauges, temperature gauges, exhaust valves and safety valves in the downstream direction.
  • the branch loop water supply and return pipes are equipped with copper ball valves and other shut-off valves.
  • the heat storage furnace return pipe is equipped with a collector.
  • the water tank is connected with a filter and a voltage stabilizing device before the water collector.
  • the purpose of the filter is to prevent impurities from clogging the heating tube.
  • the purpose of the voltage stabilizing device is to prevent the water pressure from being affected by the expansion and contraction of the water pressure.
  • the pressure device is connected to the heating and heating circulation pumps B2-1 and B2-2 through pipelines.
  • the pipelines are respectively equipped with pressure sensors P2-2 and temperature sensors T2-2.
  • the water flow first flows through the circulation pump, and then flows into the supply from the water return port.
  • the water collector and divider play the role of distributing the water flow to each branch, and the water collector plays the role of collecting the water flow from each branch and loop.
  • the water divider and the water collector are used to facilitate the connection of the various water loops.
  • Parallel pipelines are set up to have a pressure equalizing effect to make the flow distribution evenly, thus forming the cyclic heating control part of the heating pipe network.
  • the process of this part of the control method is shown in Figure 6, and the process is as follows:
  • the remote control platform starts the heating pipe network circulating heating control module, which is equipped with an energy-saving program; reads the secondary side inlet water temperature, return water temperature and flow value, and calculates the actual heat consumption value on the user side; according to the average outdoor temperature And the operation curve diagram of the heating system in the park, obtain the size of the water supply temperature required for actual operation, and reset the water supply temperature; according to the set temperature, the energy-saving program controls the opening of the heating pipe valve and the heating pipe.
  • the speed of the grid circulation heat pump B2-1 and B2-2; and the temperature sensor T2-1 and the temperature sensor T2-2 collect the inlet water temperature value and the return water temperature value, and the operating parameters of the regenerator and transmit them to the remote control platform. , Real-time monitoring of data.
  • the tap water controlled by the water supply of the heating pipe network is stored in the softened water make-up tank through the pipeline.
  • the pipeline is equipped with a gate valve, a cold water meter, and a pressure gauge.
  • the gate valve is closed, the tap water flows into the make-up tank, and the softened make-up tank passes through the pipeline.
  • It is connected with the heating and make-up pumps B2-3 and B2-4, and a ball valve is installed on the pipeline. Keep the system pressure stable. If the system is lower than the set pressure, the constant-pressure water replenishment device water replenishment pump will run to increase the system pressure. If the pressure reaches the set pressure of the system, the water replenishment pump will stop running to form the water replenishment control part of the heating network.
  • the process of this part of the control method is shown in Figure 7, and the process is as follows:
  • the heating pipe network water replenishment control module is activated by the remote control platform, and the pressure sensor P2-2 installed at the return pipe of the heating pipe network feeds back the measured return water pressure value to the controller in the inverter, and the pressure setting value
  • the signal is compared, and if the pressure is lower than the set pressure after calculation by the control unit, the output signal is sent to the inverter, and the frequency is increased by the inverter, and it is automatically output to the voltage frequency required by the heating and water circulating pumps B2-3 and B2-4.
  • the heating and supplementary water circulation pumps B2-3 and B2-4 Increase the rotational speed of the heating and supplementary water circulation pumps B2-3 and B2-4 to increase the water supplement; if the backwater pressure measured by the pressure sensor P2-2 at the return pipe reaches the pressure set by the system, the supplementary water circulation pump B2-3 and B2-4 stop running. And the pressure sensors P2-1 and P2-2 collect the two parameter variables of the inlet water pressure value and the return water pressure value respectively and send them to the remote control platform to monitor the data in real time.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Control For Baths (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

L'invention concerne un procédé complet de commande d'optimisation d'énergie pour un parc. Le procédé comprend cinq procédés de commande, à savoir une commande de supplément d'eau de bain, une commande de circulation de chauffage de bain, une commande de chauffage primaire par circulation en réseau de tuyaux, une commande de chauffage par circulation en réseau de tuyaux de chauffage et une commande de supplément d'eau de réseau de tuyaux de chauffage respectivement. Une électrovanne, une pompe de supplément d'eau, une pompe de circulation et un convertisseur de fréquence sont disposés dans un système, tandis que le système présente en outre des fonctions de supplément d'eau de bain et de supplément d'eau de chauffage et peut émettre une alarme lorsque le niveau de liquide et la pression tombent sous des valeurs limites. Une chaudière électrique sert de source de chaleur commune d'un système intégré d'alimentation en eau chaude de bain et d'un système de chauffage, ce qui permet d'économiser des dépenses d'équipement et d'économiser de l'énergie.
PCT/CN2020/112473 2020-01-20 2020-08-31 Procédé complet de commande d'optimisation d'énergie pour parc WO2021147323A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010066792.8 2020-01-20
CN202010066792.8A CN111174265B (zh) 2020-01-20 2020-01-20 一种园区综合能源优化控制方法

Publications (1)

Publication Number Publication Date
WO2021147323A1 true WO2021147323A1 (fr) 2021-07-29

Family

ID=70647678

Family Applications (2)

Application Number Title Priority Date Filing Date
PCT/CN2020/112473 WO2021147323A1 (fr) 2020-01-20 2020-08-31 Procédé complet de commande d'optimisation d'énergie pour parc
PCT/CN2020/139261 WO2021147611A1 (fr) 2020-01-20 2020-12-25 Procédé de commande d'optimisation d'énergie complet de parc

Family Applications After (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/139261 WO2021147611A1 (fr) 2020-01-20 2020-12-25 Procédé de commande d'optimisation d'énergie complet de parc

Country Status (2)

Country Link
CN (1) CN111174265B (fr)
WO (2) WO2021147323A1 (fr)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111174265B (zh) * 2020-01-20 2021-08-17 东北大学 一种园区综合能源优化控制方法
EP4261511A1 (fr) * 2022-04-14 2023-10-18 Kamstrup A/S Procédé de monitorage de réseau et réseau de chauffage

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201340011Y (zh) * 2008-12-22 2009-11-04 杭州华源前线能源设备有限公司 微压电蓄热系统
CN201368525Y (zh) * 2009-02-13 2009-12-23 上海华电源牌环境工程有限公司 生活热水及采暖用水共用热源的蓄热装置
CN204176721U (zh) * 2014-10-28 2015-02-25 周世敏 半导体加热多功能电锅炉
GB2531023A (en) * 2014-10-07 2016-04-13 Bdr Thermea Group B V Improvements in water heating systems
CN205536053U (zh) * 2016-02-04 2016-08-31 崔宇航 一种低能耗高效率采暖装置
CN106439989A (zh) * 2016-11-14 2017-02-22 中国华电科工集团有限公司 一种分布式能源站的生活热水智能控制系统
CN111174265A (zh) * 2020-01-20 2020-05-19 东北大学 一种园区综合能源优化控制方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012013293A (ja) * 2010-06-30 2012-01-19 Osaka Gas Co Ltd 熱供給システム
CN202024403U (zh) * 2010-11-30 2011-11-02 罗益龙 采暖与热水合用型太阳能换热机组
CN203215856U (zh) * 2013-02-28 2013-09-25 潍坊海纳尔电气有限公司 一种换热站自动控制系统
CN103438503A (zh) * 2013-07-31 2013-12-11 洛阳双瑞精铸钛业有限公司 一种换热站无人值守的智能控制方法及控制系统
CN105299733A (zh) * 2015-01-18 2016-02-03 陆炳照 电热锅炉为共用热源组成的一体化采暖系统和热水供给系统
CN106123107A (zh) * 2016-07-08 2016-11-16 工大科雅(天津)能源科技有限公司 具备计量功能的用于集中供热热交换站的节能控制装置
CN106439984A (zh) * 2016-10-24 2017-02-22 中国市政工程华北设计研究总院有限公司 应用于独立供热采暖系统的多能互补供热系统
JP2018185120A (ja) * 2017-04-27 2018-11-22 株式会社ノーリツ 暖房給湯装置およびその制御方法
KR101944815B1 (ko) * 2017-07-28 2019-02-07 (주)명보에너지 열효율을 극대화한 전극보일러를 사용한 난방 시스템
CN109959043A (zh) * 2017-12-24 2019-07-02 株洲新奥燃气有限公司 一种具有供热水及供暖功能的锅炉供热系统
CN208936265U (zh) * 2018-08-30 2019-06-04 侯建军 一种带有节能自控装置的热水供水系统
CN209295258U (zh) * 2018-12-07 2019-08-23 山东中瑞新能源科技有限公司 一种多能互补深度利用洗浴废水的热能利用系统
CN209688988U (zh) * 2018-12-29 2019-11-26 渤海船舶职业学院 太阳能热水与电锅炉热水混合采暖与淋浴装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201340011Y (zh) * 2008-12-22 2009-11-04 杭州华源前线能源设备有限公司 微压电蓄热系统
CN201368525Y (zh) * 2009-02-13 2009-12-23 上海华电源牌环境工程有限公司 生活热水及采暖用水共用热源的蓄热装置
GB2531023A (en) * 2014-10-07 2016-04-13 Bdr Thermea Group B V Improvements in water heating systems
CN204176721U (zh) * 2014-10-28 2015-02-25 周世敏 半导体加热多功能电锅炉
CN205536053U (zh) * 2016-02-04 2016-08-31 崔宇航 一种低能耗高效率采暖装置
CN106439989A (zh) * 2016-11-14 2017-02-22 中国华电科工集团有限公司 一种分布式能源站的生活热水智能控制系统
CN111174265A (zh) * 2020-01-20 2020-05-19 东北大学 一种园区综合能源优化控制方法

Also Published As

Publication number Publication date
CN111174265B (zh) 2021-08-17
WO2021147611A1 (fr) 2021-07-29
CN111174265A (zh) 2020-05-19

Similar Documents

Publication Publication Date Title
CN201488394U (zh) 一种太阳能-地源热泵自平衡综合应用系统
CN103438503A (zh) 一种换热站无人值守的智能控制方法及控制系统
CN104390260B (zh) 一种生物质采暖锅炉系统
WO2021147323A1 (fr) Procédé complet de commande d'optimisation d'énergie pour parc
CN203024251U (zh) 一种多能源集成热水系统
CN204693564U (zh) 一种具有太阳能、低谷电加热蓄能的热水供热装置
CN208382326U (zh) 一种太阳能与空气源热泵复合的供热装置
CN106440902A (zh) 一种基于冷热电联产的储热调节系统及其调节方法
CN202328524U (zh) 供热系统节能装置
CN206398827U (zh) 兆瓦级高电压大型单体混合蓄热自供热机组
CN206346831U (zh) 一种能源节约型电热联动发电机组
CN219389683U (zh) 一种热电联产机组调控装置
CN216281625U (zh) 一种太阳能水电一体供暖系统
CN219045768U (zh) 一种供暖装置
CN217763604U (zh) 一种多模分布式供热系统
CN201897260U (zh) 一种新型太阳能供热采暖系统
CN103148534A (zh) 集中供热控制系统
CN217011533U (zh) 一种基于数据中心废热利用的综合能源供冷、供热系统
CN211903027U (zh) 社区清洁新能源综合利用供暖系统
CN218523590U (zh) 燃气热水锅炉烟气余热回收热泵自耦合供热系统
CN215175449U (zh) 一种无人值守的智能供热站系统
CN201764655U (zh) 自控式无压热水器
CN201811493U (zh) 烟气-热回收制热系统
CN206361780U (zh) 电厂自动化供热装置
CN217402876U (zh) 一种高层住宅小区集中供热太阳能热水系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20914977

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20914977

Country of ref document: EP

Kind code of ref document: A1