WO2021068498A1 - Railway vehicle sleeper beam, underframe and underframe welding method - Google Patents

Railway vehicle sleeper beam, underframe and underframe welding method Download PDF

Info

Publication number
WO2021068498A1
WO2021068498A1 PCT/CN2020/088909 CN2020088909W WO2021068498A1 WO 2021068498 A1 WO2021068498 A1 WO 2021068498A1 CN 2020088909 W CN2020088909 W CN 2020088909W WO 2021068498 A1 WO2021068498 A1 WO 2021068498A1
Authority
WO
WIPO (PCT)
Prior art keywords
corbel
bolster
underframe
main body
mounting seat
Prior art date
Application number
PCT/CN2020/088909
Other languages
French (fr)
Chinese (zh)
Inventor
李丽
苏柯
刘永强
钟磊
王国军
张长庚
Original Assignee
中车株洲电力机车有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中车株洲电力机车有限公司 filed Critical 中车株洲电力机车有限公司
Publication of WO2021068498A1 publication Critical patent/WO2021068498A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/047Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work moving work to adjust its position between soldering, welding or cutting steps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61FRAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
    • B61F1/00Underframes
    • B61F1/08Details

Definitions

  • the invention relates to the technical field of rail vehicle underframes, in particular to a welding method for rail vehicle bolsters, underframes and underframes made of aluminum composite materials.
  • the bolster is the main force-bearing component of the underframe structure of the car body. It connects the bogie and transmits the longitudinal compression force and traction force. It is a key structure for power transmission to realize the safe driving of the vehicle.
  • the upper plane of the bolster is directly contacted and installed with the lower surface of the full-length floor.
  • the connection between the corbel and the side beam of the underframe is realized through the vertical welds on the inner plane of the corbel and the side beam of the underframe, and the welds along the longitudinal connection of the car body are connected by the longitudinal welding seam of the lower plane of the corbel and the side beam of the underframe.
  • the lower plane of the corbel and the longitudinal weld of the side beam of the underframe can only be partially connected. With a long floor structure, the welds between the corbel and the underframe floor are concentrated on one side, which is easy to cause welding deformation.
  • the process gap is usually set on the lower plane of the bolster. After the cover plate and the bolster are welded, the welds on the lower plane need to be flattened and the flatness requirements of the plane need to be improved.
  • the frame is machined as a whole, which takes up a long time for a large platform of the underframe and consumes more manpower.
  • the first object of the present invention is to provide a rail car bolster, the process gap is set on the top surface of the rail car bolster, which can avoid the welding of the cover plate and the rail car bolster, due to the need to weld the seam
  • the processing of flatness requires the overall machining of the car body underframe to take up a large work station; at the same time, it helps to control the flatness of the bottom surface of the rail vehicle corbel.
  • the second object of the present invention is to provide a chassis.
  • the third object of the present invention is to provide a method for welding the underframe.
  • the present invention provides the following solutions:
  • a rail vehicle bolster comprising a bolster body, an end cover, and floor connecting profiles welded on both longitudinal sides of the bolster body;
  • the longitudinal welds at both ends of the top surface of the corbel body and the longitudinal welds at both ends of the bottom surface of the corbel body are respectively longitudinally welded to the side beams of the underframe;
  • the main body of the corbel and the side beam of the underframe are welded to the inner side of the side beam of the underframe through the vertical ribs on the main body of the corbel in the vertical direction;
  • the inner side of the floor connecting profile is welded to the corbel main body, the outer side of the floor connecting profile is welded to the underframe floor, and the top surface of the corbel main body is flush with the top surface of the underframe floor;
  • the two ends of the top surface of the corbel main body are provided with process gaps, and the end cover plates are sealed on the process gaps.
  • the corbel body includes a first side corbel, a second side corbel and a middle corbel;
  • the first side bolster and the second side bolster are respectively welded on both longitudinal sides of the middle bolster.
  • the rail vehicle bolster further includes an anti-rolling structure
  • the anti-rolling structure includes an anti-rolling mounting seat and a positioning threaded block;
  • An installation notch is provided on the bottom surface of the first side bolster, the anti-rolling mounting seat is welded in the mounting notch, and the top surface of the anti-rolling mounting seat is flat with the bottom surface of the bolster body Qi
  • the positioning threaded block can be slidably inserted into the anti-rolling mounting seat, the positioning threaded block is provided with a threaded hole, and the anti-rolling mounting seat is provided with a thread coaxial with the threaded hole.
  • Through holes, bolts can pass through the through holes to connect with the threaded holes, and the anti-side-rolling torsion rod mounting seat is installed on the anti-side-rolling mounting seat.
  • the positioning threaded block is a T-shaped block, and the head of the T-shaped block is clamped on the top surface of the anti-rolling mounting seat.
  • the anti-rolling mounting seat is a square box-shaped hollow structure, and the circumferential direction of the anti-rolling mounting seat is provided with a first welding groove inclined inward, and the first Welding grooves are welded to the installation notches and the outer vertical ribs of the main body of the corbel;
  • a second welding groove is provided in the circumferential direction of the process gap at both ends of the corbel main body for welding with the end cover plate.
  • the bottom surface of the corbel body is flush with the bottom surface of the side beam of the underframe.
  • the process gap is provided on the top surface of the main body of the bolster, which prevents the process gap from being set on the bottom surface of the bolster of the rail vehicle to block the bolster. Concentration of welds caused by gaps and poor flatness of the plane.
  • the underframe floor is welded on both sides of the main body of the bolster by floor connecting profiles, and the top surface of the main body of the bolster is flush with the top surface of the underframe floor.
  • the welding seam of the rail vehicle bolster and the underframe floor is concentrated on one side, which reduces the welding deformation and at the same time improves the connection strength of the rail vehicle bolster.
  • the invention can avoid the traditional process gap being set on the bottom surface of the rail car bolster. After the cover plate and the rail car bolster are welded, the car body underframe needs to be machined as a whole, which takes up a large platform due to the need to flatten the welding seam. Bit work hours consume more manpower.
  • the present invention provides the following solutions:
  • An underframe includes the rail vehicle bolster as described in any one of the above.
  • the underframe disclosed in the present invention includes any one of the above-mentioned rail vehicle bolsters, the beneficial effects of the above-mentioned rail vehicle bolsters are all included in the underframe disclosed in the present invention.
  • the present invention provides the following solutions:
  • a method for welding an underframe includes the following steps:
  • Step A Fabricate the corbel main body, and open process gaps at both ends of the top surface of the corbel main body;
  • Step B The corbel main body, the traction beam and the buffer beam are welded together to form an end structure, that is, the end structure corbel;
  • Step C Weld the vertical weld between the inner side rib of the end structure bolster and the inner side of the side beam of the underframe through the process gap;
  • Step D Cover the end cover plate on the process gap, and weld the periphery of the end cover plate and the weld seam of the end structural bolster;
  • Step E Weld the longitudinal weld between the top surface of the end structure corbel and the side beam of the underframe;
  • Step F Turn the bottom frame over, and weld the vertical weld between the corbel outer plate of the end structure corbel and the side beam of the bottom frame;
  • Step G Weld the longitudinal weld between the bottom surface of the end structure corbel and the side beam of the underframe;
  • Step H Place the floor connecting profile and the floor profile in sequence on both sides of the end structure bolster, and weld the floor connecting profile to both sides of the main body of the bolster, and then weld it with the floor profile, and the The top surface of the end structure corbel is flush with the top surface of the floor.
  • the step A specifically includes the following steps:
  • Step A1 The first side bolster and the second side bolster are respectively placed on both longitudinal sides of the middle bolster, and the welds and the welds between the first side bolster and the middle bolster are respectively welded through butt joints. The weld between the second side bolster and the middle bolster;
  • Step A2 A process notch matching with the end cover is machined at the middle position of the top surface of the corbel body along the longitudinal direction of the corbel body.
  • the bottom surface of the first side bolster in the step A1 is provided with installation notches along the two lateral ends of the vehicle body;
  • the step A1 and the step A2 further include a step I: the top surface of the anti-side-rolling mounting seat and the bottom surface of the corbel body are installed flush in the installation notch, and welded to the installation notch Inside;
  • step J installing and fixing the bottom surface of the corbel body or the bottom surface of the end structure corbel upwards, Machining the bottom surface of the bolster body to remove the reserved thickness, and partially adjust it to ensure that the bottom surface of the bolster body meets the flatness requirements required for installing the bogie air spring;
  • the bottom frame welding method further includes step K: inserting the positioning threaded block into the anti-rolling mounting seat, and the threaded hole on the positioning threaded block is tapped and matched with the threaded hole on the anti-rolling mounting seat ;
  • step J When the step J is located between the step A2 and the step B, the step K is located between the step J and the step C;
  • the step K is located between the step J and the step H.
  • Figure 1 is a schematic diagram of the structure of the first side bolster provided by the present invention.
  • Figure 2 is a schematic diagram of the structure of the corbel body provided by the present invention.
  • Figure 3 is a schematic diagram of the external structure of the anti-rolling mounting seat provided by the present invention.
  • Figure 4 is a schematic diagram of the internal structure of the anti-rolling mounting seat provided by the present invention.
  • Figure 5 is an exploded schematic diagram of the anti-rolling structure provided by the present invention.
  • Figure 6 is a schematic structural diagram of the anti-rolling mounting structure provided by the present invention.
  • Figure 7 is a schematic diagram of the top surface structure of the rail vehicle corbel provided by the present invention.
  • FIG. 8 is a schematic diagram of the bottom surface structure of the rail vehicle bolster provided by the present invention.
  • FIG. 9 is a schematic diagram of the structure of the front side of the rail vehicle bolster installed on the bottom frame provided by the present invention.
  • Figure 10 is a structural schematic diagram of the rail vehicle bolster installed on the bottom surface of the bottom frame provided by the present invention.
  • FIG. 11 is a schematic sectional view of the structure of FIG. 10;
  • Figure 12 is a schematic diagram of the installation structure of the anti-rolling structure provided by the present invention.
  • FIG. 13 is a schematic diagram of a partial enlarged structure of the underframe provided by the present invention.
  • the present invention discloses a rail vehicle bolster, wherein the rail vehicle bolster includes a bolster body, an end cover 302 and a floor connecting profile 307.
  • the floor connecting profile 307 is welded to the longitudinal sides of the main body of the corbel, and the outer side of the floor connecting profile 307 is welded to the short floor 305 and the long floor 306 of the underframe respectively.
  • the top surface of the main body of the bolster is flush with the top surface of the underframe floor.
  • the raised floor adopts a non-full-length floor structure, that is, the floor is disconnected at the bolster of the rail vehicle.
  • the floor connecting profile is welded to the main body of the bolster inward, and welded to the floor of the underframe outward. They are connected in sequence in the order of the underframe floor, the floor connecting profile, and the main body of the bolster.
  • the top surface of the main body of the corbel is provided with a process gap at both lateral ends, and the end cover is sealed on the process gap. Specifically, the process gap is opened in the middle part of the lateral ends of the top surface of the corbel main body.
  • the process gap is used to weld the inner vertical ribs of the main body of the corbel with the vertical welds on the inner side of the side beam of the underframe, and then the end cover is used to seal the process gap.
  • the longitudinal welding seam at the end of the top surface of the bolster body and the longitudinal welding seam at the end of the bottom surface of the bolster body are respectively longitudinally welded to the side beam of the underframe.
  • the main body of the corbel and the side beam of the underframe are welded to the inner side of the side beam of the underframe through the vertical ribs on the main body of the corbel in the vertical direction.
  • the entire underframe floor is disconnected at the corbel of the rail vehicle, and is arranged in blocks.
  • the longitudinal and vertical welds between the main body of the corbel and the side beam of the underframe can be welded to, which greatly enhances the corbel of the rail vehicle.
  • the connection strength of this critical load-bearing structure is provided.
  • the process gap is provided on the top surface of the main body of the bolster, which avoids the process gap being arranged on the lower plane of the rail vehicle bolster, and blocking the gap leads to poor flatness of the lower plane and difficult to control deformation.
  • the underframe floor is welded on both sides of the main body of the bolster, and the top surface of the main body of the bolster is flush with the top surface of the underframe floor, that is, the underframe floor is arranged in blocks instead of a full-length structure, which avoids rail vehicle sleepers.
  • the welding seams between the beam and the underframe floor are concentrated on one side, reducing welding distortion.
  • the invention can avoid the traditional process gap being set on the bottom surface of the rail car bolster. After the cover plate and the rail car bolster are welded, the car body underframe needs to be machined as a whole, which takes up a large platform due to the need to flatten the welding seam. Bit work hours consume more manpower.
  • the structure of the rail vehicle bolster in this embodiment is similar to that of the rail vehicle bolster in Embodiment 1. The similarities are not repeated here, and only the differences are introduced.
  • the present invention discloses that the main body of the bolster includes a first side bolster 101, a second side bolster 102, and a middle bolster 103.
  • the first side bolster 101 and the second side bolster 102 are welded in the middle, respectively.
  • the rail vehicle bolster further includes an anti-rolling structure 104
  • the anti-rolling structure 104 includes an anti-rolling mounting seat 201 and a positioning thread block 202.
  • An installation notch is formed on the bottom surface of the first side bolster 101, the anti-rolling mounting seat 201 is welded in the mounting notch, and the top surface of the anti-rolling mounting seat 201 is flush with the bottom surface of the body of the bolster.
  • the positioning threaded block 202 can be slidably inserted into the anti-rolling mounting seat 201.
  • the positioning threaded block 202 is provided with a threaded hole
  • the anti-rolling mounting seat 201 is provided with a through hole coaxial with the threaded hole.
  • the bolt can pass through Through the through hole and the threaded hole on the positioning threaded block 202, the bolt and the threaded hole are connected, and then the anti-rolling torsion rod mounting seat 401 is installed on the anti-rolling mounting seat 201.
  • the positioning screw block 202 is a T-shaped block, and the head of the T-shaped block is clamped on the top surface of the anti-rolling mounting seat 201.
  • the anti-rolling mounting seat 201 is a hollow structure, and the anti-rolling mounting seat 201 is provided with a first welding groove inclined inward in the circumferential direction, and the first welding groove is welded to the mounting notch and the pillow
  • the outer vertical ribs of the beam main body are provided with second welding grooves in the circumferential direction of the process gaps at both ends of the top surface of the corbel main body for welding with the end cover 302.
  • the anti-rolling mounting seat 201 is first welded to the outside of the main structure of the corbel. When the bottom surface of the rail vehicle bolster is machined with the reserved amount of machining, the top surface of the anti-rolling mounting seat 201 is processed to a certain thickness at the same time.
  • the positioning thread block 202 is installed on the anti-rolling mounting seat 201 .
  • the positioning screw block 202 is installed in the anti-rolling mounting seat 201 through a waist-shaped hole provided on the upper surface of the anti-rolling mounting seat 201.
  • the threaded hole on the positioning thread block 202 is processed after the positioning thread block 202 is installed inside the anti-rolling mounting seat 201.
  • the anti-rolling mounting seat 201 has a square box structure.
  • m1 is the front surface of the anti-rolling mounting seat 201.
  • the plane is preliminarily set with a certain number of circular through holes according to the installation requirements for connecting with the anti-rolling torsion rod mounting seat 401;
  • m2 is the anti-rolling mounting seat 201
  • the mounting edges of the anti-rolling mounting seat 201 are respectively named: the first mounting edge 2011, the second mounting edge 2012, the third mounting edge 2013 and the fourth mounting edge 2014, all of which are processed with welding grooves.
  • the upper part of the positioning screw block 202 is provided with a step m3, which is larger than the width of the lower bolt mounting surface m4.
  • a threaded hole is designed on the lower bolt mounting surface m4, and the hole is arranged coaxially with the hole on the front surface m1 of the anti-rolling mounting seat 201 when the positioning threaded block 202 is mounted to the anti-rolling mounting seat 201.
  • the length H1 of the lower bolt mounting surface m4 of the positioning screw block 202 is adapted to the length H2 of the inner height H2 of the anti-rolling mounting seat 201.
  • the profile cross-sections of the first side bolster 101 and the second side bolster 102 are the same.
  • the first side bolster 101 is provided with installation notches on both sides along the longitudinal direction of the profile.
  • the installation notches are square Notch, the installation notch is matched with the external dimension of the anti-rolling mounting seat 201.
  • the first side bolster 101, the second side bolster 102 and the middle bolster 103 are all an integrated aluminum alloy extruded profile structure composed of an upper plate, a lower plate and a plurality of reinforcing rib plates located between the upper and lower plates.
  • the first side bolster 101 and the second side bolster 102 are provided with welding backing plates, which are simple to weld and the quality of the weld seam is easy to control.
  • the lower plates of the first side bolster 101, the second side bolster 102 and the middle bolster 103 are all thicker than the upper plate.
  • the structure of the first side bolster 101 is shown in FIG.
  • S1 is the upper plate plane of the first side bolster 101
  • S2 is the lower plate plane of the first side bolster 101
  • S3 is the track of the first side bolster 101
  • S4 is the vertical ribs on the outer side of the rail vehicle bolster of the first side bolster 101
  • the rib structure in the middle can be flexibly designed according to actual rigidity requirements.
  • Square notches q1 ie, installation notches
  • the thickness of the S2 plate is thicker than that of the S1 plate.
  • the first side bolster 101, the middle bolster 103, and the second side bolster 102 are assembled in the manner shown in FIG. 2.
  • the three profiles are respectively butt welded by the butt joint W1 on the upper surface and the butt joint W2 on the lower surface.
  • the first side bolster 101 near the outer side of the car body is pre-processed along its lengthwise ends with square notches q1 matching the anti-rolling mounting seat 201; the profile is in accordance with the first side bolster 101, the middle bolster 103,
  • the arrangement sequence of the second side bolster 102 is fixedly welded together to form the main structure of the bolster.
  • the present invention discloses that the bottom surface of the main body of the corbel is flush with the bottom surface of the side beam of the underframe after machining a certain reserved thickness.
  • the aluminum alloy rail vehicle bolster profile is first processed according to their respective usage requirements, and then the profile is tailor-welded into the corbel body, and then the anti-rolling mounting seat 201 is welded to the outer side rail
  • the top surface of the assembled rail vehicle bolster is processed into a U-shaped process gap; the rail vehicle bolster is fixed on the platform, and the thickness reserved for the bottom surface of the rail vehicle bolster is processed as required.
  • the positioning screw block 202 is assembled into the anti-rolling mounting seat 201 and fixed, and finally constitutes the rail vehicle corbel in this article.
  • the reserved thickness of the bottom surface of the rail vehicle bolster can also be adjusted to the end structure after the welding is completed.
  • the corbel main body, the traction beam and the buffer beam are assembled and welded into the end structure, and finally the end structure, the underframe side beam, the underframe floor, and the floor connecting profile 307 are assembled together to form the car body underframe.
  • the specific implementation process is as follows:
  • Aluminum alloy rail vehicle corbel beam profiles are mainly extruded from the upper plate, lower plate and stiffener plate.
  • the thickness of the lower plate of the profile is thicker than the upper plate, and the upper surface of the upper plate is flush with the upper surface of the underframe floor.
  • the plane of the board should be processed to the reserved thickness, and finally flush with the lower surface of the side beam of the underframe.
  • the main structure of the aluminum alloy bolster is welded by the middle bolster 103, the first side bolster 101 and the second side bolster 102, among which the first side bolster 101, the middle bolster 103 and the second side bolster 102 are sequentially distributed along the longitudinal direction of the vehicle body; the middle bolster 103 is an integrated structure, and the first side bolster 101 and the second side bolster 102 are an integrated structure.
  • the main welding seam of the main body of the bolster along the transverse direction of the car body is welded through the butt joint W1 and the butt joint W2.
  • the positioning threaded block 202 passes through the top surface m2 of the anti-rolling mounting seat 201, while ensuring that the upper structure m3 bottom surface of the positioning threaded block 202 and The top surface m2 of the anti-rolling mounting seat 201 is in contact with the side m4 of the positioning threaded block 202 and the inner surface of the front m1 of the anti-rolling mounting seat 201 is in contact with each other.
  • the threaded hole on the side m4 of the threaded block 202 will be positioned Tap it out and match the threaded hole on the front face m1 of the anti-rolling mounting seat 201.
  • the bolster is assembled and welded into the end structure, and then the welded end structure is assembled and welded into the underframe.
  • the welding seam W4 on the vertical plane inside the side beam is spot-welded and fixed to the end cover 302 of the rail vehicle bolster, and the welding seam W5 connecting the end cover 302 and the rail vehicle bolster is welded, and finally the rail vehicle bolster and the underframe are welded
  • the longitudinal welding seam W6 of the side beam, the upper surface of the rail vehicle corbel 304 of the end structure and the side beam of the underframe are welded.
  • the underframe is turned over to weld the welding seam on the lower plane of the rail vehicle corbel.
  • weld the end structure rail vehicle bolster 304 outer vertical rib plate S4 and the underframe side beam weld W7 weld the end structure rail vehicle bolster 304 and the underframe side beam longitudinal weld W8, after the welding is completed, the rail vehicle
  • the flatness of the bottom surface of the corbel is measured and locally adjusted to ensure that the flatness of the plane reaches within 0.5. At the same time, it is ensured that the plane of the lower cover of the corbel of the rail vehicle is flush with the lower plane of the side beam of the underframe.
  • a bogie anti-rolling torsion rod seat is installed on the anti-rolling mounting seat 201 so as to connect the bogie anti-rolling torsion rod.
  • the length H1 of the positioning screw block 202 is adapted to the length H2 of the inner height H2 of the anti-rolling mounting seat 401.
  • the present invention provides an underframe including the rail vehicle corbel as in any one of the above embodiments.
  • the underframe disclosed in the present invention includes the rail vehicle bolster in any one of the above embodiments, the beneficial effects of the above-mentioned rail vehicle bolster are included in the underframe disclosed in the present invention.
  • the present invention provides a method for welding a chassis, including the following steps:
  • Step S1 Fabricate the corbel main body, and open process gaps at both ends of the top surface of the corbel main body.
  • the process gap is a U-shaped gap.
  • Step S2 welding the main body of the corbel with the traction beam and the buffer beam together to form the end structure, that is, the end structure corbel;
  • Step S3 Weld the vertical weld between the inner side rib of the end structure bolster and the inner side of the side beam of the underframe through the process notch.
  • Step S4 Cover the end cover 302 on the process gap, and weld the periphery of the end cover 302 and the weld of the end structural bolster.
  • Step S5 Weld the longitudinal welding seam between the top surface of the end structural corbel and the side beam of the underframe.
  • Step S6 Turn the bottom frame over, and weld the vertical welds between the outer plates of the end structure bolsters and the side beams of the bottom frame.
  • Step S7 Weld the longitudinal welds between the bottom surface of the end structural corbel and the side beam of the underframe.
  • Step S8 Place the underframe floor and the floor connecting profile 307 in sequence on both sides of the corbel of the end structure, and weld the floor connecting profile 307 to both sides of the corbel body, and then weld it with the floor profile, and the corbel body
  • the top surface is flush with the top surface of the underframe floor.
  • the process gap is provided on the top surface of the main body of the corbel, it is avoided that the process gap is arranged on the lower plane of the rail vehicle bolster, and the problem of poor flatness of the lower plane caused by blocking the gap is avoided.
  • the underframe floor and the floor connecting profile 307 are welded on both sides of the main body of the bolster, and the top surface of the main body of the bolster is flush with the top surface of the underframe, that is, the underframe is arranged in blocks instead of a full-length structure. It avoids that the welding seam between the rail vehicle bolster and the underframe floor is concentrated on one side, reducing the welding deformation.
  • the invention can avoid the traditional process gap being set on the bottom surface of the rail car bolster. After the cover plate and the rail car bolster are welded, the car body underframe needs to be machined as a whole, which takes up a large platform due to the need to flatten the welding seam. Bit work hours consume more manpower.
  • the rail vehicle bolster welding method in this embodiment is similar to the rail vehicle bolster welding method in the fourth embodiment. The similarities are not repeated here, and only the differences are introduced. Place.
  • step S1 specifically includes the following steps:
  • Step S1-1 The first side bolster 101 and the second side bolster 102 are respectively placed on both longitudinal sides of the middle bolster 103, and the joints between the first side bolster 101 and the middle bolster 103 are respectively welded through butt joints. The weld and the weld between the second side bolster 102 and the middle bolster 103.
  • Step S1-2 A process notch matching the end cover plate is processed at the middle position of the top surface of the corbel body along the longitudinal direction of the corbel body.
  • the present invention discloses that the bottom surface of the first side bolster 101 in step S1-1 is provided with installation notches along the two lateral ends of the vehicle body.
  • Step S1-1 and step S1-2 also include step S9: install the top surface of the anti-rolling mounting seat 201 flush with the bottom surface of the main body of the corbel in the installation notch, and weld it in the installation notch.
  • Step S1-2 and step S2 also include step S10: install and fix the bottom surface of the corbel body upwards, machine the bottom surface of the corbel body to remove the reserved thickness, and partially adjust it to ensure the bottom surface of the corbel body Meet the flatness requirements for installing the bogie air spring.
  • Step S9 and step S2 also include step S11: insert the positioning threaded block into the anti-rolling mounting seat 201, and tap the threaded hole on the positioning threaded block to match the threaded hole on the anti-rolling mounting seat 201.
  • processing the reserved thickness of the bottom surface of the rail vehicle bolster can also be adjusted to the end structure after the body of the bolster is welded. That is, step S10 is set between steps S2 and S3: install and fix the bottom surface of the end structure corbel upwards, machine the bottom surface of the corbel body to remove the reserved thickness, and partially adjust it to ensure that the bottom surface of the corbel body reaches The flatness required for the installation of the bogie air spring.
  • step S11 is provided between step S7 and step S8.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Body Structure For Vehicles (AREA)

Abstract

A railway vehicle sleeper beam, comprising a sleeper beam main body, end portion cover plates (302), and floor connecting profiles (307) welded on two longitudinal sides of the sleeper beam main body; the outer sides of the floor connecting profiles at the two longitudinal ends of the sleeper beam main body are respectively welded to floors (305, 306), and the top surface of the sleeper beam main body is flush with the top surfaces of the floors; process notches (q2) are provided at two sides of the top surface of the sleeper beam main body; a rib plate at the inner side of the sleeper beam main body and the inner side of a side beam of an underframe are welded by means of a vertical welding seam therebetween, the end portion cover plates cover the process notches, the peripheries of the end portion cover plates are welded to the sleeper beam main body, the top surface of the sleeper beam main body and the side beam of the underframe are welded by means of a longitudinal welding seam therebetween, a rib plate at the outer side of a sleeper beam of the sleeper beam main body and the side beam of the underframe are welded by means of a vertical welding seam therebetween, and the bottom surface of the sleeper beam main body and the side beam of the underframe are welded by means of a longitudinal welding seam therebetween. Further disclosed are an underframe and an underframe welding method.

Description

一种轨道车辆枕梁、底架及底架焊接方法Method for welding rail vehicle bolster, underframe and underframe
本申请要求于2019年10月08日提交中国专利局、申请号为201910949278.6、发明名称为“一种轨道车辆枕梁、底架及底架焊接方法”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。This application claims the priority of a Chinese patent application filed with the Chinese Patent Office on October 08, 2019, the application number is 201910949278.6, and the invention title is "A method for welding rail vehicle bolsters, underframes and underframes", and its entire contents Incorporated in this application by reference.
技术领域Technical field
本发明涉及轨道交通车底架技术领域,尤其是涉及一种铝合材料的轨道车辆枕梁、底架及底架焊接方法。The invention relates to the technical field of rail vehicle underframes, in particular to a welding method for rail vehicle bolsters, underframes and underframes made of aluminum composite materials.
背景技术Background technique
枕梁是车体底架结构的主要受力部件,它起到连接转向架并传递纵向压缩力及牵引力的作用,是实现车辆安全行驶的动力传输关键结构。The bolster is the main force-bearing component of the underframe structure of the car body. It connects the bogie and transmits the longitudinal compression force and traction force. It is a key structure for power transmission to realize the safe driving of the vehicle.
目前,枕梁与底架的地板连接时,将枕梁的上平面直接与通长地板的下表面直接接触安装。通过枕梁和底架边梁内侧平面的竖直焊缝实现枕梁与底架边梁的连接,沿车体纵向连接的焊缝通过枕梁下平面与底架边梁的纵向焊缝连接起来,枕梁下平面与底架边梁纵向焊缝仅能实现部分连接。采用通长地板结构形式,枕梁与底架地板的焊缝集中在一侧,容易引起焊接变形。此外,通常将工艺缺口设置在枕梁下平面,将盖板与枕梁焊完后,由于要把下平面集中的焊缝处理平整且保证该平面较高的平面度要求而需要对车体底架进行整体机加工,这样占用底架大台位的工时长,且花费较多的人力。At present, when the bolster is connected to the floor of the underframe, the upper plane of the bolster is directly contacted and installed with the lower surface of the full-length floor. The connection between the corbel and the side beam of the underframe is realized through the vertical welds on the inner plane of the corbel and the side beam of the underframe, and the welds along the longitudinal connection of the car body are connected by the longitudinal welding seam of the lower plane of the corbel and the side beam of the underframe. , The lower plane of the corbel and the longitudinal weld of the side beam of the underframe can only be partially connected. With a long floor structure, the welds between the corbel and the underframe floor are concentrated on one side, which is easy to cause welding deformation. In addition, the process gap is usually set on the lower plane of the bolster. After the cover plate and the bolster are welded, the welds on the lower plane need to be flattened and the flatness requirements of the plane need to be improved. The frame is machined as a whole, which takes up a long time for a large platform of the underframe and consumes more manpower.
因此,如何提高枕梁与底架的连接强度,减少枕梁这一关键结构的焊接变形量,避免在大台位上整体加工枕梁下平面占用较多的工时是本领域技术人员亟待解决的技术问题。Therefore, how to improve the connection strength between the corbel and the underframe, reduce the welding deformation of the key structure of the corbel, and avoid the overall processing of the corbel lower plane on a large platform, which takes up a lot of man-hours is an urgent problem for those skilled in the art. technical problem.
发明内容Summary of the invention
有鉴于此,本发明的第一个目的是提供一种轨道车辆枕梁,将工艺缺口设置在轨道车辆枕梁顶面,可避免盖板与轨道车辆枕梁焊完后,由于要把焊缝处理平整而需要对车体底架进行整体机加工需占用大工位的时间;同时,有助于控制轨道车辆枕梁底面的平面度。In view of this, the first object of the present invention is to provide a rail car bolster, the process gap is set on the top surface of the rail car bolster, which can avoid the welding of the cover plate and the rail car bolster, due to the need to weld the seam The processing of flatness requires the overall machining of the car body underframe to take up a large work station; at the same time, it helps to control the flatness of the bottom surface of the rail vehicle corbel.
本发明的第二个目的是提供一种底架。The second object of the present invention is to provide a chassis.
本发明的第三个目的是提供一种底架焊接方法。The third object of the present invention is to provide a method for welding the underframe.
为了实现上述第一个目的,本发明提供了如下方案:In order to achieve the above-mentioned first objective, the present invention provides the following solutions:
一种轨道车辆枕梁,包括枕梁主体、端部盖板和焊接在所述枕梁主体纵向两侧的地板连接型材;A rail vehicle bolster, comprising a bolster body, an end cover, and floor connecting profiles welded on both longitudinal sides of the bolster body;
所述枕梁主体顶面两端的纵向焊缝与所述枕梁主体底面两端的纵向焊缝分别与所述底架边梁纵向焊接;The longitudinal welds at both ends of the top surface of the corbel body and the longitudinal welds at both ends of the bottom surface of the corbel body are respectively longitudinally welded to the side beams of the underframe;
所述枕梁主体与底架边梁在竖向上通过所述枕梁主体上的竖向筋板与所述底架边梁内侧焊接;The main body of the corbel and the side beam of the underframe are welded to the inner side of the side beam of the underframe through the vertical ribs on the main body of the corbel in the vertical direction;
所述地板连接型材的内侧与所述枕梁主体焊接,所述地板连接型材的外侧与底架地板焊接,且所述枕梁主体的顶面与所述底架地板的顶面平齐;The inner side of the floor connecting profile is welded to the corbel main body, the outer side of the floor connecting profile is welded to the underframe floor, and the top surface of the corbel main body is flush with the top surface of the underframe floor;
所述枕梁主体顶面的两端开设有工艺缺口,所述端部盖板封堵在所述工艺缺口上。The two ends of the top surface of the corbel main body are provided with process gaps, and the end cover plates are sealed on the process gaps.
在一个具体实施方案中,所述枕梁主体包括第一边枕梁、第二边枕梁和中间枕梁;In a specific embodiment, the corbel body includes a first side corbel, a second side corbel and a middle corbel;
所述第一边枕梁和所述第二边枕梁分别焊接在所述中间枕梁的纵向两侧。The first side bolster and the second side bolster are respectively welded on both longitudinal sides of the middle bolster.
在另一个具体实施方案中,所述轨道车辆枕梁还包括抗侧滚结构;In another specific embodiment, the rail vehicle bolster further includes an anti-rolling structure;
所述抗侧滚结构包括抗侧滚安装座和定位螺纹块;The anti-rolling structure includes an anti-rolling mounting seat and a positioning threaded block;
所述第一边枕梁的底面上开设有安装缺口,所述抗侧滚安装座焊接在所述安装缺口内,且所述抗侧滚安装座的顶面与所述枕梁主体的底面平齐;An installation notch is provided on the bottom surface of the first side bolster, the anti-rolling mounting seat is welded in the mounting notch, and the top surface of the anti-rolling mounting seat is flat with the bottom surface of the bolster body Qi
所述定位螺纹块可滑移插接在所述抗侧滚安装座内,所述定位螺纹块上开设有螺纹孔,所述抗侧滚安装座上开设有与所述螺纹孔同轴心的通孔,螺栓能够穿过所述通孔与所述螺纹孔连接,将抗侧滚扭杆安装座安装在所述抗侧滚安装座上。The positioning threaded block can be slidably inserted into the anti-rolling mounting seat, the positioning threaded block is provided with a threaded hole, and the anti-rolling mounting seat is provided with a thread coaxial with the threaded hole. Through holes, bolts can pass through the through holes to connect with the threaded holes, and the anti-side-rolling torsion rod mounting seat is installed on the anti-side-rolling mounting seat.
在另一个具体实施方案中,所述定位螺纹块为T型块,所述T型块的头部卡在所述抗侧滚安装座的顶面上。In another specific embodiment, the positioning threaded block is a T-shaped block, and the head of the T-shaped block is clamped on the top surface of the anti-rolling mounting seat.
在另一个具体实施方案中,所述抗侧滚安装座为方形箱体式中空结构,且所述抗侧滚安装座的周向上设置有向内倾斜的第一焊接坡口,所述第一焊接坡口焊接在所述安装缺口和所述枕梁主体的外侧竖筋板上;In another specific embodiment, the anti-rolling mounting seat is a square box-shaped hollow structure, and the circumferential direction of the anti-rolling mounting seat is provided with a first welding groove inclined inward, and the first Welding grooves are welded to the installation notches and the outer vertical ribs of the main body of the corbel;
所述枕梁主体两端的工艺缺口的周向上设置有第二焊接坡口,用于与所述端部盖板焊接。在另一个具体实施方案中,所述枕梁主体的底面与所述底架边梁的底面平齐。A second welding groove is provided in the circumferential direction of the process gap at both ends of the corbel main body for welding with the end cover plate. In another specific embodiment, the bottom surface of the corbel body is flush with the bottom surface of the side beam of the underframe.
根据本发明的各个实施方案可以根据需要任意组合,这些组合之后所得的实施方案也在本发明范围内,是本发明具体实施方式的一部分。The various embodiments according to the present invention can be combined arbitrarily as required, and the embodiments obtained after these combinations are also within the scope of the present invention and are part of the specific embodiments of the present invention.
不限于任何理论,从以上公开内容可以看出,本发明公开的轨道车辆枕梁,由于工艺缺口开设在枕梁主体的顶面上,避免了工艺缺口设置在轨道车辆枕梁底面,封堵该缺口造成的焊缝集中、该平面的平面度差的问题。此外,底架地板通过地板连接型材焊接在枕梁主体的两侧,且枕梁主体的顶面与底架地板的顶面平齐,即将底架地板分块设置,而非通长结构,避免了轨道车辆枕梁与底 架地板的焊缝集中在一侧,减小了焊接变形,同时提高了轨道车辆枕梁的连接强度。本发明可避免传统的将工艺缺口设置在轨道车辆枕梁底面,盖板与轨道车辆枕梁焊完后,由于要把焊缝处理平整而需要对车体底架进行整体机加工而占用大台位的工时,耗费较多的人力。Without being limited to any theory, it can be seen from the above disclosure that the process gap is provided on the top surface of the main body of the bolster, which prevents the process gap from being set on the bottom surface of the bolster of the rail vehicle to block the bolster. Concentration of welds caused by gaps and poor flatness of the plane. In addition, the underframe floor is welded on both sides of the main body of the bolster by floor connecting profiles, and the top surface of the main body of the bolster is flush with the top surface of the underframe floor. The welding seam of the rail vehicle bolster and the underframe floor is concentrated on one side, which reduces the welding deformation and at the same time improves the connection strength of the rail vehicle bolster. The invention can avoid the traditional process gap being set on the bottom surface of the rail car bolster. After the cover plate and the rail car bolster are welded, the car body underframe needs to be machined as a whole, which takes up a large platform due to the need to flatten the welding seam. Bit work hours consume more manpower.
为了实现上述第二个目的,本发明提供了如下方案:In order to achieve the above-mentioned second objective, the present invention provides the following solutions:
一种底架,包括如上述任意一项所述的轨道车辆枕梁。An underframe includes the rail vehicle bolster as described in any one of the above.
由于本发明公开的底架包括上述任意一项中的轨道车辆枕梁,因此,上述轨道车辆枕梁所具有的有益效果均是本发明公开的底架所包含的。Since the underframe disclosed in the present invention includes any one of the above-mentioned rail vehicle bolsters, the beneficial effects of the above-mentioned rail vehicle bolsters are all included in the underframe disclosed in the present invention.
为了实现上述第三个目的,本发明提供了如下方案:In order to achieve the above-mentioned third objective, the present invention provides the following solutions:
一种底架焊接方法,包括以下步骤:A method for welding an underframe includes the following steps:
步骤A:制出枕梁主体,并在所述枕梁主体顶面的两端开设工艺缺口;Step A: Fabricate the corbel main body, and open process gaps at both ends of the top surface of the corbel main body;
步骤B:将所述枕梁主体、牵引梁和缓冲梁共同焊接在一起构成端部结构,即为端部结构枕梁;Step B: The corbel main body, the traction beam and the buffer beam are welded together to form an end structure, that is, the end structure corbel;
步骤C:通过所述工艺缺口焊接所述端部结构枕梁的内侧筋板与底架边梁内侧之间的竖直焊缝;Step C: Weld the vertical weld between the inner side rib of the end structure bolster and the inner side of the side beam of the underframe through the process gap;
步骤D:将端部盖板盖设于所述工艺缺口上,并焊接所述端部盖板的周边与所述端部结构枕梁的焊缝;Step D: Cover the end cover plate on the process gap, and weld the periphery of the end cover plate and the weld seam of the end structural bolster;
步骤E:焊接所述端部结构枕梁的顶面与所述底架边梁之间的纵向焊缝;Step E: Weld the longitudinal weld between the top surface of the end structure corbel and the side beam of the underframe;
步骤F:将底架翻转,焊接所述端部结构枕梁的枕梁外侧板与所述底架边梁之间的竖直焊缝;Step F: Turn the bottom frame over, and weld the vertical weld between the corbel outer plate of the end structure corbel and the side beam of the bottom frame;
步骤G:焊接所述端部结构枕梁的底面与所述底架边梁之间的纵向焊缝;Step G: Weld the longitudinal weld between the bottom surface of the end structure corbel and the side beam of the underframe;
步骤H:在端部结构枕梁两侧均依次摆放地板连接型材和地板型材,并将所述地板连接型材焊接在所述枕梁主体的两侧,再与地板型材焊接起来,且所述端部结构枕梁的顶面与所述地板的顶面平齐。Step H: Place the floor connecting profile and the floor profile in sequence on both sides of the end structure bolster, and weld the floor connecting profile to both sides of the main body of the bolster, and then weld it with the floor profile, and the The top surface of the end structure corbel is flush with the top surface of the floor.
在一个具体实施方案中,所述步骤A具体包括以下步骤:In a specific embodiment, the step A specifically includes the following steps:
步骤A1:第一边枕梁和第二边枕梁分别置于中间枕梁的纵向两侧,并通过对接接头分别焊接所述第一边枕梁与所述中间枕梁之间的焊缝及所述第二边枕梁与所述中间枕梁之间的焊缝;Step A1: The first side bolster and the second side bolster are respectively placed on both longitudinal sides of the middle bolster, and the welds and the welds between the first side bolster and the middle bolster are respectively welded through butt joints. The weld between the second side bolster and the middle bolster;
步骤A2:沿着所述枕梁主体的纵向方向在所述枕梁主体的顶面中间位置加工出与所述端部盖板匹配的工艺缺口。Step A2: A process notch matching with the end cover is machined at the middle position of the top surface of the corbel body along the longitudinal direction of the corbel body.
在另一个具体实施方案中,所述步骤A1中的第一边枕梁底面沿着车体横向两端开设有安装缺口;In another specific embodiment, the bottom surface of the first side bolster in the step A1 is provided with installation notches along the two lateral ends of the vehicle body;
所述步骤A1和所述步骤A2之间还包括步骤I:将抗侧滚安装座的顶面与所述枕梁主体的底面平齐安装在所述安装缺口内,并焊接在所述安装缺口内;The step A1 and the step A2 further include a step I: the top surface of the anti-side-rolling mounting seat and the bottom surface of the corbel body are installed flush in the installation notch, and welded to the installation notch Inside;
所述步骤A2和所述步骤B之间或者所述步骤G和所述步骤H之间还包括步骤J:将所述枕梁主体的底面或者所述端部结构枕梁底面朝上安装固定,将所述枕梁主体的底面机加工掉预留的厚度,并局部调修,保证所述枕梁主体的底面达到安装转向架空气簧所需的平面度要求;Between the step A2 and the step B or between the step G and the step H, further includes a step J: installing and fixing the bottom surface of the corbel body or the bottom surface of the end structure corbel upwards, Machining the bottom surface of the bolster body to remove the reserved thickness, and partially adjust it to ensure that the bottom surface of the bolster body meets the flatness requirements required for installing the bogie air spring;
所述底架焊接方法还包括步骤K:将定位螺纹块插入抗侧滚安装座内,所述定位螺纹块上的螺纹孔攻丝出来并与所述抗侧滚安装座上的螺纹孔相匹配;The bottom frame welding method further includes step K: inserting the positioning threaded block into the anti-rolling mounting seat, and the threaded hole on the positioning threaded block is tapped and matched with the threaded hole on the anti-rolling mounting seat ;
当所述步骤J位于所述步骤A2和所述步骤B之间时,所述步骤K位于所述步骤J和所述步骤C之间;When the step J is located between the step A2 and the step B, the step K is located between the step J and the step C;
当所述步骤J位于所述步骤G和所述步骤H之间时,所述步骤K位于所述步骤J和所述步骤H之间。When the step J is located between the step G and the step H, the step K is located between the step J and the step H.
根据本发明的各个实施方案可以根据需要任意组合,这些组合之后所得的实施方案也在本发明范围内,是本发明具体实施方式的一部分。The various embodiments according to the present invention can be combined arbitrarily as required, and the embodiments obtained after these combinations are also within the scope of the present invention and are part of the specific embodiments of the present invention.
附图说明Description of the drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the drawings in the following description are only These are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative work.
图1为本发明提供的第一边枕梁的结构示意图;Figure 1 is a schematic diagram of the structure of the first side bolster provided by the present invention;
图2为本发明提供的枕梁主体的结构示意图;Figure 2 is a schematic diagram of the structure of the corbel body provided by the present invention;
图3为本发明提供的抗侧滚安装座外部结构示意图;Figure 3 is a schematic diagram of the external structure of the anti-rolling mounting seat provided by the present invention;
图4为本发明提供的抗侧滚安装座内部结构示意图;Figure 4 is a schematic diagram of the internal structure of the anti-rolling mounting seat provided by the present invention;
图5为本发明提供的抗侧滚结构的爆炸示意图;Figure 5 is an exploded schematic diagram of the anti-rolling structure provided by the present invention;
图6为本发明提供的抗侧滚安装结构的结构示意图;Figure 6 is a schematic structural diagram of the anti-rolling mounting structure provided by the present invention;
图7为本发明提供的轨道车辆枕梁顶面结构示意图;Figure 7 is a schematic diagram of the top surface structure of the rail vehicle corbel provided by the present invention;
图8为本发明提供的轨道车辆枕梁底面结构示意图;FIG. 8 is a schematic diagram of the bottom surface structure of the rail vehicle bolster provided by the present invention;
图9为本发明提供的轨道车辆枕梁安装到底架上正面的结构示意图;FIG. 9 is a schematic diagram of the structure of the front side of the rail vehicle bolster installed on the bottom frame provided by the present invention;
图10为本发明提供的轨道车辆枕梁安装到底架上底面的结构示意图;Figure 10 is a structural schematic diagram of the rail vehicle bolster installed on the bottom surface of the bottom frame provided by the present invention;
图11为图10的剖视结构示意图;FIG. 11 is a schematic sectional view of the structure of FIG. 10;
图12为本发明提供的抗侧滚结构的安装结构示意图;Figure 12 is a schematic diagram of the installation structure of the anti-rolling structure provided by the present invention;
图13为本发明提供的底架局部放大结构示意图。FIG. 13 is a schematic diagram of a partial enlarged structure of the underframe provided by the present invention.
其中,图1-13中:Among them, in Figure 1-13:
第一边枕梁101、第二边枕梁102、中间枕梁103、抗侧滚结构104、抗侧滚安装座201、定位螺纹块202、第一安装边2011、第二安装边2012、第三安装边2013、第四安装边2014、左侧底架边梁301、端部盖板302、右侧底架边梁303、端部结构枕梁304、短地板305、长地板306、地板连接型材307、抗侧滚扭杆安装座401、螺栓402。The first side bolster 101, the second side bolster 102, the middle bolster 103, the anti-rolling structure 104, the anti-rolling mounting seat 201, the positioning thread block 202, the first mounting side 2011, the second mounting side 2012, the first Three installation sides 2013, fourth installation side 2014, left underframe side beam 301, end cover 302, right underframe side beam 303, end structural corbel 304, short floor 305, long floor 306, floor connection Profile 307, anti-side-rolling torsion rod mounting seat 401, and bolts 402.
具体实施方式Detailed ways
为了使本领域的技术人员更好的理解本发明的技术方案,下面结合附图1-13和具体实施方式对本发明作进一步的详细说明。In order to enable those skilled in the art to better understand the technical solutions of the present invention, the present invention will be further described in detail below in conjunction with accompanying drawings 1-13 and specific embodiments.
实施例一Example one
本发明公开了一种轨道车辆枕梁,其中,轨道车辆枕梁包括枕梁主体、端部盖板302和地板连接型材307。The present invention discloses a rail vehicle bolster, wherein the rail vehicle bolster includes a bolster body, an end cover 302 and a floor connecting profile 307.
地板连接型材307分别焊接在枕梁主体的纵向两侧,且地板连接型材307外侧分别焊接底架短地板305和长地板306,枕梁主体的顶面与底架地板的顶面平齐,底架地板采用非通长地板结构,即地板在轨道车辆枕梁部位断开。The floor connecting profile 307 is welded to the longitudinal sides of the main body of the corbel, and the outer side of the floor connecting profile 307 is welded to the short floor 305 and the long floor 306 of the underframe respectively. The top surface of the main body of the bolster is flush with the top surface of the underframe floor. The raised floor adopts a non-full-length floor structure, that is, the floor is disconnected at the bolster of the rail vehicle.
即地板连接型材向内与枕梁主体焊接,向外与底架地板焊接。按照底架地 板、地板连接型材、枕梁主体的顺序依次连接起来。That is, the floor connecting profile is welded to the main body of the bolster inward, and welded to the floor of the underframe outward. They are connected in sequence in the order of the underframe floor, the floor connecting profile, and the main body of the bolster.
枕梁主体顶面的横向两端开设有工艺缺口,端部盖板封堵在工艺缺口上。具体地,工艺缺口开在枕梁主体顶面的横向两端的中间部位。The top surface of the main body of the corbel is provided with a process gap at both lateral ends, and the end cover is sealed on the process gap. Specifically, the process gap is opened in the middle part of the lateral ends of the top surface of the corbel main body.
工艺缺口用于焊接枕梁主体的内侧竖向筋板与底架边梁内侧竖直焊缝,然后用端部盖板来封堵该工艺缺口。The process gap is used to weld the inner vertical ribs of the main body of the corbel with the vertical welds on the inner side of the side beam of the underframe, and then the end cover is used to seal the process gap.
枕梁主体顶面端部的纵向焊缝与枕梁主体底面端部的纵向焊缝分别与底架边梁纵向焊接。枕梁主体与底架边梁在竖向上通过枕梁主体上的竖向筋板与底架边梁内侧焊接。The longitudinal welding seam at the end of the top surface of the bolster body and the longitudinal welding seam at the end of the bottom surface of the bolster body are respectively longitudinally welded to the side beam of the underframe. The main body of the corbel and the side beam of the underframe are welded to the inner side of the side beam of the underframe through the vertical ribs on the main body of the corbel in the vertical direction.
本发明整个底架地板在轨道车辆枕梁处断开,采用分块设置,枕梁主体与底架边梁的纵向焊缝和竖向焊缝均可以被焊接到,大大增强了轨道车辆枕梁这一关键承载结构的连接强度。In the present invention, the entire underframe floor is disconnected at the corbel of the rail vehicle, and is arranged in blocks. The longitudinal and vertical welds between the main body of the corbel and the side beam of the underframe can be welded to, which greatly enhances the corbel of the rail vehicle. The connection strength of this critical load-bearing structure.
本发明公开的轨道车辆枕梁,由于工艺缺口开设在枕梁主体的顶面上,避免了工艺缺口设置在轨道车辆枕梁下平面,封堵该缺口导致下平面的平面度差、变形不易控制的问题。此外,底架地板焊接在枕梁主体的两侧,且枕梁主体的顶面与底架地板的顶面平齐,即将底架地板分块设置,而非通长结构,避免了轨道车辆枕梁与底架地板的焊缝集中在一侧,减小了焊接变形。本发明可避免传统的将工艺缺口设置在轨道车辆枕梁底面,盖板与轨道车辆枕梁焊完后,由于要把焊缝处理平整而需要对车体底架进行整体机加工而占用大台位的工时,耗费较多的人力。In the rail vehicle bolster disclosed in the present invention, the process gap is provided on the top surface of the main body of the bolster, which avoids the process gap being arranged on the lower plane of the rail vehicle bolster, and blocking the gap leads to poor flatness of the lower plane and difficult to control deformation. The problem. In addition, the underframe floor is welded on both sides of the main body of the bolster, and the top surface of the main body of the bolster is flush with the top surface of the underframe floor, that is, the underframe floor is arranged in blocks instead of a full-length structure, which avoids rail vehicle sleepers. The welding seams between the beam and the underframe floor are concentrated on one side, reducing welding distortion. The invention can avoid the traditional process gap being set on the bottom surface of the rail car bolster. After the cover plate and the rail car bolster are welded, the car body underframe needs to be machined as a whole, which takes up a large platform due to the need to flatten the welding seam. Bit work hours consume more manpower.
实施例二Example two
在本发明提供的第二实施例中,本实施例中的轨道车辆枕梁和实施例一中的轨道车辆枕梁的结构类似,对相同之处就不再赘述了,仅介绍不同之处。In the second embodiment provided by the present invention, the structure of the rail vehicle bolster in this embodiment is similar to that of the rail vehicle bolster in Embodiment 1. The similarities are not repeated here, and only the differences are introduced.
在本实施例中,本发明公开了枕梁主体包括第一边枕梁101、第二边枕梁102和中间枕梁103,第一边枕梁101和第二边枕梁102分别焊接在中间枕梁103的纵向两侧。In this embodiment, the present invention discloses that the main body of the bolster includes a first side bolster 101, a second side bolster 102, and a middle bolster 103. The first side bolster 101 and the second side bolster 102 are welded in the middle, respectively. The longitudinal sides of the corbel 103.
进一步地,本发明公开了轨道车辆枕梁还包括抗侧滚结构104,抗侧滚结构104包括抗侧滚安装座201和定位螺纹块202。Furthermore, the present invention discloses that the rail vehicle bolster further includes an anti-rolling structure 104, and the anti-rolling structure 104 includes an anti-rolling mounting seat 201 and a positioning thread block 202.
第一边枕梁101的底面上开设有安装缺口,抗侧滚安装座201焊接在安装缺口内,且抗侧滚安装座201的顶面与枕梁主体的底面平齐。An installation notch is formed on the bottom surface of the first side bolster 101, the anti-rolling mounting seat 201 is welded in the mounting notch, and the top surface of the anti-rolling mounting seat 201 is flush with the bottom surface of the body of the bolster.
定位螺纹块202可滑移插接在抗侧滚安装座201内,定位螺纹块202上开设有螺纹孔,抗侧滚安装座201上开设有与螺纹孔同轴心的通孔,螺栓能够穿过通孔与定位螺纹块202上的螺纹孔,实现螺栓与螺纹孔的连接,进而实现将抗侧滚扭杆安装座401安装在抗侧滚安装座201上。The positioning threaded block 202 can be slidably inserted into the anti-rolling mounting seat 201. The positioning threaded block 202 is provided with a threaded hole, and the anti-rolling mounting seat 201 is provided with a through hole coaxial with the threaded hole. The bolt can pass through Through the through hole and the threaded hole on the positioning threaded block 202, the bolt and the threaded hole are connected, and then the anti-rolling torsion rod mounting seat 401 is installed on the anti-rolling mounting seat 201.
进一步地,本发明公开了定位螺纹块202为T型块,T型块的头部卡在抗侧滚安装座201的顶面上。Further, the present invention discloses that the positioning screw block 202 is a T-shaped block, and the head of the T-shaped block is clamped on the top surface of the anti-rolling mounting seat 201.
进一步地,本发明公开了抗侧滚安装座201为中空结构,且抗侧滚安装座201的周向上设置有向内倾斜的第一焊接坡口,第一焊接坡口焊接在安装缺口和枕梁主体的外侧竖筋板上内,位于枕梁主体顶面两端的工艺缺口周向上设置有第二焊接坡口,用于与端部盖板302焊接。抗侧滚安装座201首先焊接于枕梁主体结构外侧。轨道车辆枕梁的底面在机加工预留的加工量时,抗侧滚安装座201的顶面同时被加工掉一定的厚度,加工完成后将定位螺纹块202安装于抗侧滚安装座201上。定位螺纹块202通过设置于抗侧滚安装座201上表面的 腰型孔安装于抗侧滚安装座201内。定位螺纹块202上的螺纹孔在定位螺纹块202安装到抗侧滚安装座201内部后配作加工出来。在车辆运行时,若定位螺纹块202损坏,可以便捷的拆卸和更换。Further, the present invention discloses that the anti-rolling mounting seat 201 is a hollow structure, and the anti-rolling mounting seat 201 is provided with a first welding groove inclined inward in the circumferential direction, and the first welding groove is welded to the mounting notch and the pillow The outer vertical ribs of the beam main body are provided with second welding grooves in the circumferential direction of the process gaps at both ends of the top surface of the corbel main body for welding with the end cover 302. The anti-rolling mounting seat 201 is first welded to the outside of the main structure of the corbel. When the bottom surface of the rail vehicle bolster is machined with the reserved amount of machining, the top surface of the anti-rolling mounting seat 201 is processed to a certain thickness at the same time. After the processing is completed, the positioning thread block 202 is installed on the anti-rolling mounting seat 201 . The positioning screw block 202 is installed in the anti-rolling mounting seat 201 through a waist-shaped hole provided on the upper surface of the anti-rolling mounting seat 201. The threaded hole on the positioning thread block 202 is processed after the positioning thread block 202 is installed inside the anti-rolling mounting seat 201. When the vehicle is running, if the positioning screw block 202 is damaged, it can be easily disassembled and replaced.
如图3所示,抗侧滚安装座201为方形的箱体结构。其中,m1为抗侧滚安装座201的正面,该平面预先按照安装要求设置值若干数量的圆形通孔,用于和抗侧滚扭杆安装座401连接;m2为抗侧滚安装座201的顶面,上面开有若干数量的腰型孔。在抗侧滚安装座201的安装边,分别命名为:第一安装边2011、第二安装边2012、第三安装边2013和第四安装边2014,均加工出焊接坡口。定位螺纹块202的上部设置有台阶m3,较下部螺栓安装面m4的宽度尺寸要大。在下部螺栓安装面m4上设计有螺纹孔,该孔在定位螺纹块202安装到抗侧滚安装座201时与抗侧滚安装座201的正面m1上的孔同轴心设置。定位螺纹块202的下部螺栓安装面m4的长度H1与抗侧滚安装座201内高H2长度相适应。As shown in Figure 3, the anti-rolling mounting seat 201 has a square box structure. Among them, m1 is the front surface of the anti-rolling mounting seat 201. The plane is preliminarily set with a certain number of circular through holes according to the installation requirements for connecting with the anti-rolling torsion rod mounting seat 401; m2 is the anti-rolling mounting seat 201 There are a number of waist-shaped holes on the top surface. The mounting edges of the anti-rolling mounting seat 201 are respectively named: the first mounting edge 2011, the second mounting edge 2012, the third mounting edge 2013 and the fourth mounting edge 2014, all of which are processed with welding grooves. The upper part of the positioning screw block 202 is provided with a step m3, which is larger than the width of the lower bolt mounting surface m4. A threaded hole is designed on the lower bolt mounting surface m4, and the hole is arranged coaxially with the hole on the front surface m1 of the anti-rolling mounting seat 201 when the positioning threaded block 202 is mounted to the anti-rolling mounting seat 201. The length H1 of the lower bolt mounting surface m4 of the positioning screw block 202 is adapted to the length H2 of the inner height H2 of the anti-rolling mounting seat 201.
具体地,第一边枕梁101和第二边枕梁102的型材断面相同,不同的是,第一边枕梁101沿着型材纵向方向两侧设置有安装缺口,具体地,安装缺口为方形缺口,安装缺口与抗侧滚安装座201的外形尺寸相匹配。第一边枕梁101、第二边枕梁102和中间枕梁103均由上板、下板和位于上、下板中间的多个加强筋板所构成的一体式铝合金挤压型材结构。第一边枕梁101和第二边枕梁102自带焊接垫板,焊接简单,焊缝质量容易控制。第一边枕梁101、第二边枕梁102和中间枕梁103的下板均比上板厚。第一边枕梁101的结构如图1所示,S1为第一边枕梁101的上板平面,S2为第一边枕梁101的下板平面,S3为第一边枕梁101的轨道车辆枕梁内侧竖向筋板,S4为第一边枕梁101的 轨道车辆枕梁外侧竖向筋板,中间的加强筋结构可根据实际的刚度需要灵活设计。在S2上两端加工出方形缺口q1(即安装缺口),S2板厚比S1板厚厚。Specifically, the profile cross-sections of the first side bolster 101 and the second side bolster 102 are the same. The difference is that the first side bolster 101 is provided with installation notches on both sides along the longitudinal direction of the profile. Specifically, the installation notches are square Notch, the installation notch is matched with the external dimension of the anti-rolling mounting seat 201. The first side bolster 101, the second side bolster 102 and the middle bolster 103 are all an integrated aluminum alloy extruded profile structure composed of an upper plate, a lower plate and a plurality of reinforcing rib plates located between the upper and lower plates. The first side bolster 101 and the second side bolster 102 are provided with welding backing plates, which are simple to weld and the quality of the weld seam is easy to control. The lower plates of the first side bolster 101, the second side bolster 102 and the middle bolster 103 are all thicker than the upper plate. The structure of the first side bolster 101 is shown in FIG. 1, S1 is the upper plate plane of the first side bolster 101, S2 is the lower plate plane of the first side bolster 101, and S3 is the track of the first side bolster 101 The vertical ribs on the inner side of the vehicle bolster, S4 is the vertical ribs on the outer side of the rail vehicle bolster of the first side bolster 101, and the rib structure in the middle can be flexibly designed according to actual rigidity requirements. Square notches q1 (ie, installation notches) are processed on both ends of S2, and the thickness of the S2 plate is thicker than that of the S1 plate.
将第一边枕梁101、中间枕梁103和第二边枕梁102按照图2所示的方式组装,三个型材分别通过上表面的对接接头W1和下表面的对接接头W2对接焊接起来,构成枕梁主体。靠近车体外侧的第一边枕梁101沿其长度方向两端预先加工好了与抗侧滚安装座201相匹配的方形缺口q1;将型材按照第一边枕梁101、中间枕梁103、第二边枕梁102的排布顺序固定焊接在一起构成枕梁主体结构。The first side bolster 101, the middle bolster 103, and the second side bolster 102 are assembled in the manner shown in FIG. 2. The three profiles are respectively butt welded by the butt joint W1 on the upper surface and the butt joint W2 on the lower surface. Form the main body of the corbel. The first side bolster 101 near the outer side of the car body is pre-processed along its lengthwise ends with square notches q1 matching the anti-rolling mounting seat 201; the profile is in accordance with the first side bolster 101, the middle bolster 103, The arrangement sequence of the second side bolster 102 is fixedly welded together to form the main structure of the bolster.
进一步地,本发明公开了枕梁主体的底面在机加工一定预留厚度后与底架边梁的底面平齐。Further, the present invention discloses that the bottom surface of the main body of the corbel is flush with the bottom surface of the side beam of the underframe after machining a certain reserved thickness.
本发明焊接轨道车辆枕梁时,先将铝合金轨道车辆枕梁型材按照各自的使用要求加工好,再将型材拼焊为枕梁主体,然后将抗侧滚安装座201焊接于外侧边轨道车辆枕梁的侧面,将组装好的轨道车辆枕梁的顶面加工出U形的工艺缺口;将轨道车辆枕梁固定在台位上,按照要求加工掉轨道车辆枕梁底面预留的厚度,然后将定位螺纹块202装配到抗侧滚安装座201里固定好,最终构成本文中的轨道车辆枕梁。需要说明的是,加工轨道车辆枕梁底面预留厚度也可以调整到端部结构组焊完成后进行。将枕梁主体、牵引梁及缓冲梁组焊为端部结构,最后将端部结构、底架边梁、底架地板、地板连接型材307等共同组焊为车体底架。具体实施过程如下:When welding the rail vehicle bolster according to the present invention, the aluminum alloy rail vehicle bolster profile is first processed according to their respective usage requirements, and then the profile is tailor-welded into the corbel body, and then the anti-rolling mounting seat 201 is welded to the outer side rail On the side of the vehicle bolster, the top surface of the assembled rail vehicle bolster is processed into a U-shaped process gap; the rail vehicle bolster is fixed on the platform, and the thickness reserved for the bottom surface of the rail vehicle bolster is processed as required. Then, the positioning screw block 202 is assembled into the anti-rolling mounting seat 201 and fixed, and finally constitutes the rail vehicle corbel in this article. It should be noted that the reserved thickness of the bottom surface of the rail vehicle bolster can also be adjusted to the end structure after the welding is completed. The corbel main body, the traction beam and the buffer beam are assembled and welded into the end structure, and finally the end structure, the underframe side beam, the underframe floor, and the floor connecting profile 307 are assembled together to form the car body underframe. The specific implementation process is as follows:
1)铝合金轨道车辆枕梁型材主要由上板、下板和加强筋板一体挤压而成,型材的下板厚度比上板厚,上板上表面与底架地板上表面平齐,下板的平面要加工预留的厚度,最终与底架边梁下表面平齐。1) Aluminum alloy rail vehicle corbel beam profiles are mainly extruded from the upper plate, lower plate and stiffener plate. The thickness of the lower plate of the profile is thicker than the upper plate, and the upper surface of the upper plate is flush with the upper surface of the underframe floor. The plane of the board should be processed to the reserved thickness, and finally flush with the lower surface of the side beam of the underframe.
2)铝合金枕梁主体结构由中间枕梁103、第一边枕梁101和第二边枕梁102焊接而成,其中,第一边枕梁101、中间枕梁103和第二边枕梁102沿车体的纵向方向依次分布;中间枕梁103为一体式结构,第一边枕梁101和第二边枕梁102为一体式结构。焊接时,枕梁主体沿车体横向的主焊缝通过对接接头W1和对接接头W2进行焊接。2) The main structure of the aluminum alloy bolster is welded by the middle bolster 103, the first side bolster 101 and the second side bolster 102, among which the first side bolster 101, the middle bolster 103 and the second side bolster 102 are sequentially distributed along the longitudinal direction of the vehicle body; the middle bolster 103 is an integrated structure, and the first side bolster 101 and the second side bolster 102 are an integrated structure. When welding, the main welding seam of the main body of the bolster along the transverse direction of the car body is welded through the butt joint W1 and the butt joint W2.
3)将抗侧滚安装座201的顶面m2与枕梁主体的底面平齐安装,且与第一边枕梁101上所开的方形缺口匹配安装;第一安装边2011与方形缺口的横边对齐,第二安装边2012和第三安装边2013分别与第一边枕梁101的外侧筋板S4垂直安装,然后通过焊缝W3将两端的抗侧滚安装座201焊接于第一边枕梁101的外侧。3) Install the top surface m2 of the anti-rolling mounting seat 201 flush with the bottom surface of the main body of the corbel, and install it in matching with the square notch opened on the first side corbel 101; the first mounting side 2011 and the horizontal of the square notch The second installation side 2012 and the third installation side 2013 are respectively installed perpendicularly to the outer rib S4 of the first side bolster 101, and then the anti-rolling mounting seats 201 at both ends are welded to the first side bolster through the welding seam W3. The outside of beam 101.
4)将焊接完成的轨道车辆枕梁组装结构进行加工:沿着轨道车辆枕梁纵向方向在轨道车辆枕梁组装的顶面中间位置与底架边梁连接的两端各加工出U形的工艺缺口q2,用于轨道车辆枕梁组装内部竖筋板与底架边梁焊接,加工时,U形的工艺缺口q2的开口大小不超过轨道车辆枕梁内部竖筋板位置。4) Process the welded rail car bolster assembly structure: along the longitudinal direction of the rail car bolster, a U-shaped process is processed at the middle position of the top surface of the rail car bolster assembly and the two ends of the underframe side beam connected to the bottom frame. The gap q2 is used for welding the internal vertical ribs of the rail vehicle bolster assembly and the side beam of the underframe. During processing, the opening size of the U-shaped process gap q2 does not exceed the position of the vertical ribs inside the rail vehicle bolster.
5)将枕梁主体底面S32机加工掉预留的厚度,并局部调修,保证该平面达到所需的平面度要求。5) Machining the reserved thickness S32 on the bottom surface of the main body of the corbel, and partially adjust it to ensure that the plane meets the required flatness requirements.
6)将定位螺纹块202装配到已焊好的抗侧滚安装座201中,定位螺纹块202穿过抗侧滚安装座201的顶面m2,同时保证定位螺纹块202的上部结构m3底面与抗侧滚安装座201顶面m2接触,定位螺纹块202的侧面m4与抗侧滚安装座201的正面m1的内表面贴合接触,安装完成后将定位螺纹块202的侧面m4上的螺纹孔攻丝出来并与抗侧滚安装座201的正面m1上的螺纹孔相匹配。6) Assemble the positioning threaded block 202 into the welded anti-rolling mounting seat 201. The positioning threaded block 202 passes through the top surface m2 of the anti-rolling mounting seat 201, while ensuring that the upper structure m3 bottom surface of the positioning threaded block 202 and The top surface m2 of the anti-rolling mounting seat 201 is in contact with the side m4 of the positioning threaded block 202 and the inner surface of the front m1 of the anti-rolling mounting seat 201 is in contact with each other. After the installation is completed, the threaded hole on the side m4 of the threaded block 202 will be positioned Tap it out and match the threaded hole on the front face m1 of the anti-rolling mounting seat 201.
7)将枕梁组焊为端部结构,再将焊接完成的端部结构组焊为底架。将端部结构枕梁304上盖板平面朝上点焊固定到左侧底架边梁301和右侧底架边梁303上,先焊接轨道车辆枕梁组装内侧的竖筋板S3与底架边梁内侧竖平面的焊缝W4,将轨道车辆枕梁端部盖板302点焊固定,焊接端部盖板302与轨道车辆枕梁连接的焊缝W5,最后焊接轨道车辆枕梁与底架边梁的纵向焊缝W6,端部结构轨道车辆枕梁304上表面与底架边梁焊接完成。7) The bolster is assembled and welded into the end structure, and then the welded end structure is assembled and welded into the underframe. Fix the upper cover plate of the end structural corbel 304 to the left side frame side beam 301 and the right side frame side beam 303 by spot welding with the plane facing upwards, and first weld the rail vehicle corbel to assemble the vertical rib plate S3 on the inner side and the underframe The welding seam W4 on the vertical plane inside the side beam is spot-welded and fixed to the end cover 302 of the rail vehicle bolster, and the welding seam W5 connecting the end cover 302 and the rail vehicle bolster is welded, and finally the rail vehicle bolster and the underframe are welded The longitudinal welding seam W6 of the side beam, the upper surface of the rail vehicle corbel 304 of the end structure and the side beam of the underframe are welded.
8)待底架组装顶面的主要焊缝焊接完毕,将底架翻边,焊接轨道车辆枕梁下平面的焊缝。先焊接端部结构轨道车辆枕梁304外侧竖筋板S4与底架边梁焊缝W7,再焊接端部结构轨道车辆枕梁304与底架边梁纵向焊缝W8,焊接完成后对轨道车辆枕梁底面的平面度进行测量和局部调校,保证该平面的平面度达到0.5以内,同时,保证轨道车辆枕梁下盖板平面与底架边梁下平面平齐。8) After the main welding seam on the top surface of the underframe assembly is completed, the underframe is turned over to weld the welding seam on the lower plane of the rail vehicle corbel. First, weld the end structure rail vehicle bolster 304 outer vertical rib plate S4 and the underframe side beam weld W7, then weld the end structure rail vehicle bolster 304 and the underframe side beam longitudinal weld W8, after the welding is completed, the rail vehicle The flatness of the bottom surface of the corbel is measured and locally adjusted to ensure that the flatness of the plane reaches within 0.5. At the same time, it is ensured that the plane of the lower cover of the corbel of the rail vehicle is flush with the lower plane of the side beam of the underframe.
9)将底架短地板305、地板连接型材307、端部结构轨道车辆枕梁304、地板连接型材307、底架长地板306沿车体纵向排布,并焊接起来共同构成本文所述的非通长底架地板的底架结构。9) Arrange the underframe short floor 305, the floor connection profile 307, the end structure rail car bolster 304, the floor connection profile 307, and the underframe long floor 306 in the longitudinal direction of the car body, and weld them together to form the non-standard structure described in this article. The underframe structure of the long underframe floor.
10)底架组装完成后,进一步阐述抗侧滚扭杆安装座401和抗侧滚安装座201的连接。在抗侧滚安装座201上安装转向架抗侧滚扭杆座,以便连接转向架抗侧滚扭杆。将螺栓402从外侧依次穿过抗侧滚扭杆座安装面、抗侧滚扭杆安装座401的平面、定位螺纹块202下部m4上的螺栓孔安装固定,用于后续与转向架抗侧滚扭杆连接。具体地,定位螺纹块202的长度H1与抗侧滚安装座401内高H2长度相适应。10) After the bottom frame is assembled, the connection between the anti-rolling torsion rod mounting seat 401 and the anti-rolling mounting seat 201 is further explained. A bogie anti-rolling torsion rod seat is installed on the anti-rolling mounting seat 201 so as to connect the bogie anti-rolling torsion rod. Install and fix the bolts 402 from the outside through the anti-side-rolling torsion rod seat installation surface, the plane of the anti-side-rolling torsion rod installation seat 401, and the bolt holes on the lower part m4 of the positioning thread block 202 for subsequent anti-rolling of the bogie Torsion bar connection. Specifically, the length H1 of the positioning screw block 202 is adapted to the length H2 of the inner height H2 of the anti-rolling mounting seat 401.
实施例三Example three
本发明提供了一种底架,包括如上述任意一项实施例中的轨道车辆枕梁。The present invention provides an underframe including the rail vehicle corbel as in any one of the above embodiments.
由于本发明公开的底架包括上述任意一项实施例中的轨道车辆枕梁,因此,上述轨道车辆枕梁所具有的有益效果均是本发明公开的底架所包含的。Since the underframe disclosed in the present invention includes the rail vehicle bolster in any one of the above embodiments, the beneficial effects of the above-mentioned rail vehicle bolster are included in the underframe disclosed in the present invention.
实施例四Example four
本发明提供了一种底架焊接方法,包括以下步骤:The present invention provides a method for welding a chassis, including the following steps:
步骤S1:制出枕梁主体,并在枕梁主体的顶面的两端开设工艺缺口。Step S1: Fabricate the corbel main body, and open process gaps at both ends of the top surface of the corbel main body.
具体地,工艺缺口为U形缺口。Specifically, the process gap is a U-shaped gap.
步骤S2:将枕梁主体与牵引梁和缓冲梁共同焊接在一起构成端部结构,即为端部结构枕梁;Step S2: welding the main body of the corbel with the traction beam and the buffer beam together to form the end structure, that is, the end structure corbel;
步骤S3:通过工艺缺口焊接端部结构枕梁内侧筋板与底架边梁内侧之间的竖直焊缝。Step S3: Weld the vertical weld between the inner side rib of the end structure bolster and the inner side of the side beam of the underframe through the process notch.
步骤S4:将端部盖板302盖设于工艺缺口上,并焊接端部盖板302的周边与端部结构枕梁的焊缝。Step S4: Cover the end cover 302 on the process gap, and weld the periphery of the end cover 302 and the weld of the end structural bolster.
步骤S5:焊接端部结构枕梁顶面与底架边梁之间的纵向焊缝。Step S5: Weld the longitudinal welding seam between the top surface of the end structural corbel and the side beam of the underframe.
步骤S6:将底架翻转,焊接端部结构枕梁的外侧板与底架边梁之间的竖直焊缝。Step S6: Turn the bottom frame over, and weld the vertical welds between the outer plates of the end structure bolsters and the side beams of the bottom frame.
步骤S7:焊接端部结构枕梁的底面与底架边梁之间的纵向焊缝。Step S7: Weld the longitudinal welds between the bottom surface of the end structural corbel and the side beam of the underframe.
步骤S8:在端部结构枕梁两侧均依次摆放底架地板和地板连接型材307, 并将地板连接型材307焊接在枕梁主体的两侧,再与地板型材焊接起来,且枕梁主体的顶面与底架地板的顶面平齐。Step S8: Place the underframe floor and the floor connecting profile 307 in sequence on both sides of the corbel of the end structure, and weld the floor connecting profile 307 to both sides of the corbel body, and then weld it with the floor profile, and the corbel body The top surface is flush with the top surface of the underframe floor.
本发明中,由于工艺缺口开设在枕梁主体的顶面上,避免了工艺缺口设置在轨道车辆枕梁下平面,封堵该缺口导致下平面的平面度差的问题。此外,底架地板和地板连接型材307焊接在枕梁主体的两侧,且枕梁主体的顶面与底架地板的顶面平齐,即将底架地板分块设置,而非通长结构,避免了轨道车辆枕梁与底架地板的焊缝集中在一侧,减小了焊接变形。本发明可避免传统的将工艺缺口设置在轨道车辆枕梁底面,盖板与轨道车辆枕梁焊完后,由于要把焊缝处理平整而需要对车体底架进行整体机加工而占用大台位的工时,耗费较多的人力。In the present invention, since the process gap is provided on the top surface of the main body of the corbel, it is avoided that the process gap is arranged on the lower plane of the rail vehicle bolster, and the problem of poor flatness of the lower plane caused by blocking the gap is avoided. In addition, the underframe floor and the floor connecting profile 307 are welded on both sides of the main body of the bolster, and the top surface of the main body of the bolster is flush with the top surface of the underframe, that is, the underframe is arranged in blocks instead of a full-length structure. It avoids that the welding seam between the rail vehicle bolster and the underframe floor is concentrated on one side, reducing the welding deformation. The invention can avoid the traditional process gap being set on the bottom surface of the rail car bolster. After the cover plate and the rail car bolster are welded, the car body underframe needs to be machined as a whole, which takes up a large platform due to the need to flatten the welding seam. Bit work hours consume more manpower.
实施例五Example five
在本发明提供的第五实施例中,本实施例中的轨道车辆枕梁焊接方法和实施例四中的轨道车辆枕梁焊接方法类似,对相同之处就不再赘述了,仅介绍不同之处。In the fifth embodiment provided by the present invention, the rail vehicle bolster welding method in this embodiment is similar to the rail vehicle bolster welding method in the fourth embodiment. The similarities are not repeated here, and only the differences are introduced. Place.
本实施例中,本发明公开了步骤S1具体包括以下步骤:In this embodiment, the present invention discloses that step S1 specifically includes the following steps:
步骤S1-1:第一边枕梁101和第二边枕梁102分别置于中间枕梁103的纵向两侧,并通过对接接头分别焊接第一边枕梁101与中间枕梁103之间的焊缝及第二边枕梁102与中间枕梁103之间的焊缝。Step S1-1: The first side bolster 101 and the second side bolster 102 are respectively placed on both longitudinal sides of the middle bolster 103, and the joints between the first side bolster 101 and the middle bolster 103 are respectively welded through butt joints. The weld and the weld between the second side bolster 102 and the middle bolster 103.
步骤S1-2:沿着枕梁主体的纵向方向在枕梁主体的顶面中间位置加工出与端部盖板匹配的工艺缺口。Step S1-2: A process notch matching the end cover plate is processed at the middle position of the top surface of the corbel body along the longitudinal direction of the corbel body.
进一步地,本发明公开了步骤S1-1中的第一边枕梁101的底面沿着车体 横向两端开设有安装缺口。Further, the present invention discloses that the bottom surface of the first side bolster 101 in step S1-1 is provided with installation notches along the two lateral ends of the vehicle body.
步骤S1-1和步骤S1-2之间还包括步骤S9:将抗侧滚安装座201的顶面与枕梁主体的底面平齐安装在安装缺口内,并焊接在安装缺口内。Step S1-1 and step S1-2 also include step S9: install the top surface of the anti-rolling mounting seat 201 flush with the bottom surface of the main body of the corbel in the installation notch, and weld it in the installation notch.
步骤S1-2和步骤S2之间还包括步骤S10:将枕梁主体的底面朝上安装固定,将枕梁主体的底面机加工掉预留的厚度,并局部调修,保证枕梁主体的底面达到安装转向架空气簧所需的平面度要求。Step S1-2 and step S2 also include step S10: install and fix the bottom surface of the corbel body upwards, machine the bottom surface of the corbel body to remove the reserved thickness, and partially adjust it to ensure the bottom surface of the corbel body Meet the flatness requirements for installing the bogie air spring.
步骤S9和步骤S2之间还包括步骤S11:将定位螺纹块插入抗侧滚安装座201内,定位螺纹块上的螺纹孔攻丝出来并与抗侧滚安装座201上的螺纹孔相匹配。Step S9 and step S2 also include step S11: insert the positioning threaded block into the anti-rolling mounting seat 201, and tap the threaded hole on the positioning threaded block to match the threaded hole on the anti-rolling mounting seat 201.
需要说明的是,加工轨道车辆枕梁底面预留厚度也可以调整到枕梁主体焊接成端部结构后进行。即在步骤S2和S3之间设置步骤S10:将端部结构枕梁底面朝上安装固定,将枕梁主体的底面机加工掉预留的厚度,并局部调修,保证枕梁主体的底面达到安装转向架空气簧所需的平面度要求。对应地,步骤S11设置在步骤S7和步骤S8之间。It should be noted that processing the reserved thickness of the bottom surface of the rail vehicle bolster can also be adjusted to the end structure after the body of the bolster is welded. That is, step S10 is set between steps S2 and S3: install and fix the bottom surface of the end structure corbel upwards, machine the bottom surface of the corbel body to remove the reserved thickness, and partially adjust it to ensure that the bottom surface of the corbel body reaches The flatness required for the installation of the bogie air spring. Correspondingly, step S11 is provided between step S7 and step S8.
在本发明的描述中,术语定义的方向仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, the direction of the term definition is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood. To limit the present invention.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而 是要符合与本文所公开的原理和创造性特点相一致的最宽的范围。The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be obvious to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown in this document, but should conform to the widest scope consistent with the principles and creative features disclosed in this document.

Claims (10)

  1. 一种轨道车辆枕梁,其特征在于,包括枕梁主体、端部盖板和焊接在所述枕梁主体纵向两侧的地板连接型材;A rail vehicle corbel, which is characterized by comprising a corbel body, an end cover, and floor connecting profiles welded on both longitudinal sides of the corbel body;
    所述枕梁主体顶面两端的纵向焊缝与所述枕梁主体底面两端的纵向焊缝分别与所述底架边梁纵向焊接;The longitudinal welds at both ends of the top surface of the corbel body and the longitudinal welds at both ends of the bottom surface of the corbel body are respectively longitudinally welded to the side beams of the underframe;
    所述枕梁主体与底架边梁在竖向上通过所述枕梁主体上的竖向筋板与所述底架边梁内侧焊接;The main body of the corbel and the side beam of the underframe are welded to the inner side of the side beam of the underframe through the vertical ribs on the main body of the corbel in the vertical direction;
    所述地板连接型材的内侧与所述枕梁主体焊接,所述地板连接型材的外侧与底架地板焊接,且所述枕梁主体的顶面与所述底架地板的顶面平齐;The inner side of the floor connecting profile is welded to the corbel main body, the outer side of the floor connecting profile is welded to the underframe floor, and the top surface of the corbel main body is flush with the top surface of the underframe floor;
    所述枕梁主体顶面的两端开设有工艺缺口,所述端部盖板封堵在所述工艺缺口上。The two ends of the top surface of the corbel main body are provided with process gaps, and the end cover plates are sealed on the process gaps.
  2. 根据权利要求1所述的轨道车辆枕梁,其特征在于,所述枕梁主体包括第一边枕梁、第二边枕梁和中间枕梁;The rail vehicle bolster according to claim 1, wherein the bolster body includes a first side bolster, a second side bolster, and a middle bolster;
    所述第一边枕梁和所述第二边枕梁分别焊接在所述中间枕梁的纵向两侧。The first side bolster and the second side bolster are respectively welded on both longitudinal sides of the middle bolster.
  3. 根据权利要求2所述的轨道车辆枕梁,其特征在于,还包括抗侧滚结构;The rail vehicle bolster according to claim 2, further comprising an anti-rolling structure;
    所述抗侧滚结构包括抗侧滚安装座和定位螺纹块;The anti-rolling structure includes an anti-rolling mounting seat and a positioning threaded block;
    所述第一边枕梁的底面上开设有安装缺口,所述抗侧滚安装座焊接在所述安装缺口内,且所述抗侧滚安装座的顶面与所述枕梁主体的底面平齐;An installation notch is provided on the bottom surface of the first side bolster, the anti-rolling mounting seat is welded in the mounting notch, and the top surface of the anti-rolling mounting seat is flat with the bottom surface of the bolster body Qi
    所述定位螺纹块可滑移插接在所述抗侧滚安装座内,所述定位螺纹块上开设有螺纹孔,所述抗侧滚安装座上开设有与所述螺纹孔同轴心的通孔,螺栓能够穿过所述通孔与所述螺纹孔连接,将抗侧滚扭杆安装座安装在所述抗侧滚安 装座上。The positioning threaded block can be slidably inserted into the anti-rolling mounting seat, the positioning threaded block is provided with a threaded hole, and the anti-rolling mounting seat is provided with a thread coaxial with the threaded hole. Through holes, bolts can pass through the through holes to be connected with the threaded holes, and the anti-rolling torsion rod mounting seat is installed on the anti-rolling mounting seat.
  4. 根据权利要求3所述的轨道车辆枕梁,其特征在于,所述定位螺纹块为T型块,所述T型块的头部卡在所述抗侧滚安装座的顶面上。The rail vehicle bolster according to claim 3, wherein the positioning threaded block is a T-shaped block, and the head of the T-shaped block is clamped on the top surface of the anti-rolling mounting seat.
  5. 根据权利要求3所述的轨道车辆枕梁,其特征在于,所述抗侧滚安装座为方形箱体式中空结构,且所述抗侧滚安装座的周向上设置有向内倾斜的第一焊接坡口,所述第一焊接坡口焊接在所述安装缺口和所述枕梁主体的外侧竖筋板上;The rail vehicle bolster according to claim 3, wherein the anti-rolling mounting seat is a square box-shaped hollow structure, and the circumference of the anti-rolling mounting seat is provided with an inwardly inclined first Welding groove, the first welding groove is welded to the installation notch and the outer vertical rib plate of the corbel body;
    所述枕梁主体顶面两端的工艺缺口的周向上设置有第二焊接坡口,用于与所述端部盖板焊接。The circumferential direction of the process gaps at both ends of the top surface of the main body of the corbel is provided with a second welding groove for welding with the end cover plate.
  6. 根据权利要求1-5中任意一项所述的轨道车辆枕梁,其特征在于,所述枕梁主体的底面机加工后与所述底架边梁的底面平齐。The rail vehicle corbel according to any one of claims 1 to 5, wherein the bottom surface of the corbel body is flush with the bottom surface of the side beam of the underframe after machining.
  7. 一种底架,其特征在于,包括如权利要求1-6中任意一项所述的轨道车辆枕梁。An underframe, characterized by comprising the rail vehicle corbel according to any one of claims 1-6.
  8. 一种底架焊接方法,其特征在于,包括以下步骤:A method for welding an underframe is characterized in that it comprises the following steps:
    步骤A:制出枕梁主体,并在所述枕梁主体顶面的两端开设工艺缺口;Step A: Fabricate the corbel main body, and open process gaps at both ends of the top surface of the corbel main body;
    步骤B:将所述枕梁主体与牵引梁和缓冲梁共同焊接在一起构成端部结构,即为端部结构枕梁;Step B: welding the main body of the corbel with the traction beam and the buffer beam together to form an end structure, that is, the end structure corbel;
    步骤C:通过所述工艺缺口焊接所述端部结构枕梁主体的内侧筋板与底架边梁内侧之间的竖直焊缝;Step C: Weld the vertical weld between the inner side rib of the end structure bolster body and the inner side of the side beam of the underframe through the process gap;
    步骤D:将端部盖板盖设于所述工艺缺口上,并焊接所述端部盖板的周边与所述端部结构枕梁焊缝;Step D: Set the end cover plate on the process gap, and weld the periphery of the end cover plate and the weld seam of the end structure bolster;
    步骤E:焊接所述端部结构枕梁顶面与所述底架边梁之间的纵向焊缝;Step E: Weld the longitudinal weld between the top surface of the end structure corbel and the side beam of the underframe;
    步骤F:将底架翻转,焊接所述端部结构枕梁外侧板与所述底架边梁之间的竖直焊缝;Step F: Turn the bottom frame over, and weld the vertical welds between the outer plate of the end structure corbel and the side beam of the bottom frame;
    步骤G:焊接所述端部结构枕梁底面与所述底架边梁之间的纵向焊缝;Step G: Weld the longitudinal weld between the bottom surface of the end structure corbel and the side beam of the underframe;
    步骤H:在所述端部结构枕梁的两侧均依次摆放地板连接型材和地板型材,并将所述地板连接型材焊接在所述枕梁主体的两侧,再与地板型材焊接起来,且所述枕梁主体的顶面与所述地板的顶面平齐。Step H: Place floor connection profiles and floor profiles in sequence on both sides of the end structure corbel, and weld the floor connection profiles on both sides of the corbel body, and then weld them with the floor profiles, And the top surface of the main body of the corbel is flush with the top surface of the floor.
  9. 根据权利要求8所述的底架焊接方法,其特征在于,所述步骤A具体包括以下步骤:The underframe welding method according to claim 8, wherein the step A specifically includes the following steps:
    步骤A1:第一边枕梁和第二边枕梁分别置于中间枕梁的纵向两侧,并通过对接接头分别焊接所述第一边枕梁与所述中间枕梁之间的焊缝及所述第二边枕梁与所述中间枕梁之间的焊缝;Step A1: The first side bolster and the second side bolster are respectively placed on both longitudinal sides of the middle bolster, and the welds and the welds between the first side bolster and the middle bolster are respectively welded through butt joints. The weld between the second side bolster and the middle bolster;
    步骤A2:沿着所述枕梁主体的纵向方向在所述枕梁主体的顶面中间位置加工出与所述端部盖板匹配的工艺缺口。Step A2: A process notch matching with the end cover is machined at the middle position of the top surface of the corbel body along the longitudinal direction of the corbel body.
  10. 根据权利要求9所述的底架焊接方法,其特征在于,所述步骤A1中的第一边枕梁底面沿着车体横向两端开设有安装缺口;The underframe welding method according to claim 9, wherein the bottom surface of the first side bolster in the step A1 is provided with installation notches along the lateral ends of the vehicle body;
    所述步骤A1和所述步骤A2之间还包括步骤I:将抗侧滚安装座的顶面与所述枕梁主体的底面平齐安装在所述安装缺口内,并焊接在所述安装缺口内;The step A1 and the step A2 further include a step I: the top surface of the anti-side-rolling mounting seat and the bottom surface of the corbel body are installed flush in the installation notch, and welded to the installation notch Inside;
    所述步骤A2和所述步骤B之间或者所述步骤G和所述步骤H之间还包括步骤J:将所述枕梁主体的底面朝上安装固定,将所述枕梁主体的底面机加工掉预留的厚度,并局部调修,保证所述枕梁主体的底面达到安装转向架空气簧所需的平面度要求;Between the step A2 and the step B or between the step G and the step H, the method further includes a step J: installing and fixing the bottom surface of the corbel body upward, and fixing the bottom surface of the corbel body Process the reserved thickness and partially adjust it to ensure that the bottom surface of the main body of the bolster meets the flatness requirements required for the installation of the bogie air spring;
    所述底架焊接方法还包括步骤K:将定位螺纹块插入抗侧滚安装座内,所 述定位螺纹块上的螺纹孔攻丝出来并与所述抗侧滚安装座上的螺纹孔相匹配;The bottom frame welding method further includes step K: inserting the positioning threaded block into the anti-rolling mounting seat, and the threaded hole on the positioning threaded block is tapped and matched with the threaded hole on the anti-rolling mounting seat ;
    当所述步骤J位于所述步骤A2和所述步骤B之间时,所述步骤K位于所述步骤J和所述步骤B之间;When the step J is located between the step A2 and the step B, the step K is located between the step J and the step B;
    当所述步骤J位于所述步骤G和所述步骤H之间时,所述步骤K位于所述步骤J和所述步骤H之间。When the step J is located between the step G and the step H, the step K is located between the step J and the step H.
PCT/CN2020/088909 2019-10-08 2020-05-07 Railway vehicle sleeper beam, underframe and underframe welding method WO2021068498A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910949278.6A CN110588693B (en) 2019-10-08 2019-10-08 Railway vehicle sleeper beam, underframe and underframe welding method
CN201910949278.6 2019-10-08

Publications (1)

Publication Number Publication Date
WO2021068498A1 true WO2021068498A1 (en) 2021-04-15

Family

ID=68865673

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/088909 WO2021068498A1 (en) 2019-10-08 2020-05-07 Railway vehicle sleeper beam, underframe and underframe welding method

Country Status (2)

Country Link
CN (1) CN110588693B (en)
WO (1) WO2021068498A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110588693B (en) * 2019-10-08 2021-07-16 中车株洲电力机车有限公司 Railway vehicle sleeper beam, underframe and underframe welding method
CN113442966B (en) * 2020-03-27 2022-10-18 比亚迪股份有限公司 Bogie for railway vehicle and railway vehicle with same
CN113500320B (en) * 2021-07-29 2022-04-19 中车长春轨道客车股份有限公司 Assembly welding process for front-end module of underframe of corrugated plate plug-in type box structure
CN113602308B (en) * 2021-08-20 2023-07-07 中车株洲电力机车有限公司 Rail vehicle chassis
CN114148363B (en) * 2021-12-29 2023-09-19 中车青岛四方机车车辆股份有限公司 Rail vehicle and end underframe thereof
CN117922624B (en) * 2024-03-21 2024-06-11 成都中车长客轨道车辆有限公司 Rail transit vehicle underframe structure and processing method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0796835A (en) * 1993-09-30 1995-04-11 Hitachi Ltd Underframe structure for railroad rolling stock
CN104354709A (en) * 2014-11-11 2015-02-18 南车青岛四方机车车辆股份有限公司 Aluminum alloy sleeper beam structure
CN104354710A (en) * 2014-11-11 2015-02-18 南车青岛四方机车车辆股份有限公司 Aluminum alloy sleeper beam structure and mounting method thereof
JP2017105239A (en) * 2015-12-07 2017-06-15 川崎重工業株式会社 Underframe structure of railroad carriage
CN107628050A (en) * 2017-08-29 2018-01-26 中车大连机车车辆有限公司 Bolster formula bogie articulated car sleeper beam structure
CN109352203A (en) * 2018-12-06 2019-02-19 通号轨道车辆有限公司 A kind of welding procedure of open type structure sleeper beam
JP2019131090A (en) * 2018-02-01 2019-08-08 株式会社日立製作所 Rail vehicle body structure
CN110588693A (en) * 2019-10-08 2019-12-20 中车株洲电力机车有限公司 Railway vehicle sleeper beam, underframe and underframe welding method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7434519B2 (en) * 2005-11-10 2008-10-14 National Steel Car Limited Rail road freight car
JP2010254162A (en) * 2009-04-27 2010-11-11 Hitachi Ltd Rolling stock structure, floor structure provided to rolling stock structure, and its manufacturing method
JP5685494B2 (en) * 2011-06-14 2015-03-18 株式会社日立製作所 Railway vehicle body structure with wiring and piping modules
CN102991520B (en) * 2012-11-21 2015-06-03 南车南京浦镇车辆有限公司 Mounting structure for anti-side-rolling torsion bar base of railway vehicle
CN102991521B (en) * 2012-11-21 2015-03-04 南车南京浦镇车辆有限公司 Installation method for anti-side-rolling twisted rod seat of rail car
CN103935372B (en) * 2014-04-21 2017-03-29 中车青岛四方机车车辆股份有限公司 A kind of chassis of rail vehicle structure
CN105667531B (en) * 2016-01-05 2018-01-09 中车株洲电力机车有限公司 A kind of rail vehicle aluminium alloy sleeper beam structure
CN109835359B (en) * 2019-03-07 2020-04-28 中车株洲电力机车有限公司 Aluminum-based composite material rail vehicle

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0796835A (en) * 1993-09-30 1995-04-11 Hitachi Ltd Underframe structure for railroad rolling stock
CN104354709A (en) * 2014-11-11 2015-02-18 南车青岛四方机车车辆股份有限公司 Aluminum alloy sleeper beam structure
CN104354710A (en) * 2014-11-11 2015-02-18 南车青岛四方机车车辆股份有限公司 Aluminum alloy sleeper beam structure and mounting method thereof
JP2017105239A (en) * 2015-12-07 2017-06-15 川崎重工業株式会社 Underframe structure of railroad carriage
CN107628050A (en) * 2017-08-29 2018-01-26 中车大连机车车辆有限公司 Bolster formula bogie articulated car sleeper beam structure
JP2019131090A (en) * 2018-02-01 2019-08-08 株式会社日立製作所 Rail vehicle body structure
CN109352203A (en) * 2018-12-06 2019-02-19 通号轨道车辆有限公司 A kind of welding procedure of open type structure sleeper beam
CN110588693A (en) * 2019-10-08 2019-12-20 中车株洲电力机车有限公司 Railway vehicle sleeper beam, underframe and underframe welding method

Also Published As

Publication number Publication date
CN110588693B (en) 2021-07-16
CN110588693A (en) 2019-12-20

Similar Documents

Publication Publication Date Title
WO2021068498A1 (en) Railway vehicle sleeper beam, underframe and underframe welding method
WO2021143355A1 (en) Modular rail vehicle body
CN110027586B (en) Car body chassis boundary beam structure and car body with same
CN204172921U (en) Vehicle body of railway vehicle floor Undercarriage structure
CN109178009B (en) 100% low-floor rail vehicle underframe and 100% low-floor rail vehicle
CN114194227B (en) Rail vehicle based on modularized design
CN112605548B (en) Assembly welding method for box-type center sill of railway wagon
CN104354710A (en) Aluminum alloy sleeper beam structure and mounting method thereof
WO2020015616A1 (en) Light rail vehicle bogie
WO2020134001A1 (en) Double-layer rail vehicle and underframe thereof
JP6462534B2 (en) Rail vehicle structure
WO2020133934A1 (en) Railway car, car body thereof, and end underframe
CN113184001B (en) Rail vehicle and car body chassis structure thereof
CN204279467U (en) A kind of guideway vehicle aluminum alloy sleeper beam structure
KR100365954B1 (en) Railroad car structure and manufacture method
CN211759496U (en) Lead and tie down group welding frock of buffering assembly sharing in aluminum alloy subway head
US11807281B2 (en) Cab roof structure, cab and rail train
KR100383563B1 (en) Underframe for railway rolling stock and manufacture method
CN204279465U (en) A kind of aluminum alloy sleeper beam structure
WO2022062110A1 (en) Connecting structure for chassis side beam of rail vehicle having drum-shaped vehicle body
CN114312887B (en) Car body underframe and rail vehicle
CN220262762U (en) Intelligent tramcar underframe suitable for telescopic pedal installation
CN204279466U (en) A kind of aluminum alloy sleeper beam structure
CN117300428A (en) Welding method of bogie frame, bogie frame and railway vehicle
JP7495839B2 (en) Rail vehicles

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20875134

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20875134

Country of ref document: EP

Kind code of ref document: A1