WO2020255719A1 PCT/JP2020/021961 JP2020021961W WO2020255719A1 WO 2020255719 A1 WO2020255719 A1 WO 2020255719A1 JP 2020021961 W JP2020021961 W JP 2020021961W WO 2020255719 A1 WO2020255719 A1 WO 2020255719A1
Authority
WO
WIPO (PCT)
Prior art keywords
water
valve
steam
power plant
make
Prior art date
Application number
PCT/JP2020/021961
Other languages
English (en)
Japanese (ja)
Inventor
山本 健次郎
▲祥▼三 金子
裕二 行木
俊一 那須
佐々木 健次
大二郎 平崎
小阪 健一郎
眞二 中村
瞭介 菅
優太 小林
Original Assignee
三菱パワー株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱パワー株式会社 filed Critical 三菱パワー株式会社
Publication of WO2020255719A1 publication Critical patent/WO2020255719A1/fr

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • F01D21/14Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for responsive to other specific conditions
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B35/00Control systems for steam boilers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D11/00Feed-water supply not provided for in other main groups

Definitions

  • the present invention relates to a power plant, and particularly to a fast cutback technology in a steam power plant that utilizes the heat of combustion of various fuels.
  • Patent Document 1 when a load cutoff is detected, the steam control valve provided between the boiler and the high-pressure steam turbine and the intercept valve provided between the high-pressure steam turbine and the low-pressure steam turbine are suddenly closed.
  • the protection circuit of the above, the second protection circuit that suddenly closes the intercept valve and suddenly opens the low-pressure steam turbine bypass valve, the phase difference angle detection device of the generator, and the phase difference angle detected by the phase difference angle detection device are on the deceleration side.
  • a steam turbine provided with a step-out prevention device that suddenly opens the intercept valve until the predetermined set opening or phase difference angle reverses to the speed-increasing side and rapidly closes the low-pressure steam turbine bypass valve.
  • Patent Document 2 is provided with a steam control valve and an emergency release valve that is always closed in the main steam pipe through which steam generated in the boiler flows, and is fully opened in response to an open signal from the control unit to release the steam generated in the boiler. The function of promptly discharging from the main steam pipe to the outside is disclosed.
  • FCB Fast Cut Back
  • the boiler has a time lag before it is narrowed down to the minimum load. That is, the amount of steam generated from the boiler cannot be instantly narrowed down to the amount required for the in-house single load operation immediately after the FCB operation, and during that time, surplus steam is generated based on the in-house single load operation level.
  • Patent Document 1 since this excess steam flows from the high-pressure steam turbine bypass provided between the boiler and the steam control valve to the condenser, it is relatively easy to perform FCB operation smoothly and responsively. A large condenser is required.
  • Patent Document 1 since a certain amount of water is circulated in the steam circulation system from the boiler to the turbine, when it is opened to the atmosphere, it is necessary to operate with the amount of water equivalent to the open to the atmosphere reduced during single load operation in the facility. A new problem arises. Therefore, a smooth transition from the start of FCB operation to the in-house single load operation cannot be achieved by simply combining Patent Document 1 with Patent Document 2.
  • the present invention has been made in view of the above circumstances, and an object of the present invention is to provide a technique for efficiently performing FCB operation and smoothly performing subsequent in-house single load operation.
  • a boiler that heats supplied water to generate superheated steam and steam that is rotationally driven by the superheated steam heated by the boiler to drive a generator.
  • a water supply line that supplies the boiler to the boiler via a turbine and a water recovery device that returns the exhaust steam from the steam turbine to water, and superheated steam generated by the boiler returns to the boiler via the water supply line.
  • a pressure control valve for releasing the superheated steam to the atmosphere
  • a make-up water line for supplying make-up water to the flow path through which the superheated steam generated by the boiler returns to the boiler via the water supply line
  • a make-up water line for supplying make-up water to the flow path through which the superheated steam generated by the boiler returns to the boiler via the water supply line.
  • a make-up water on-off valve that opens and closes the make-up water line, and a control device that controls the opening and closing of the pressure control valve and the make-up water on-off valve are provided, and the control device connects the power generation plant to a power transmission system.
  • the pressure control valve and the make-up water on-off valve are controlled to be closed, and the fast cutback operation performed when the power plant is shut off from the transmission system is started from the transmission system. It is characterized in that the pressure control valve and the make-up water on-off valve are controlled to be in an open state in the initial stage up to the in-house single load operation in which the in-house auxiliary power of the power plant is generated in a shut-off state.
  • FCB operation can be efficiently performed, and subsequent in-house single load operation can be smoothly performed. Issues, configurations and effects other than those described above will be clarified by the description of the following embodiments.
  • Fluid system diagram of the power plant of this embodiment Configuration diagram of control device Flowchart showing the operation flow of a power plant
  • the figure which shows the opening degree of each control valve in normal operation, FCB operation, and in-house single load operation The figure which shows the opening degree of each spray valve in normal operation, FCB operation, and in-house single load operation
  • System configuration diagram of power plant during normal operation System configuration diagram of power plant in the first half of the initial stage of FCB operation
  • System configuration diagram of power plant in the latter half of the initial stage of FCB operation System configuration diagram of the power plant during single load operation in the facility
  • FIG. 1 is a fluid system diagram of the power plant 100 of the present embodiment.
  • the power generation plant 100 has a boiler 110 that burns fuel and generates steam by the heat of the combustion, and a steam turbine that drives a generator 101 by rotating a turbine using the steam generated by the boiler 110 to generate power.
  • a high-pressure steam turbine (HPT) 121 a medium-pressure steam turbine (IPT) 122, a low-pressure steam turbine (LPT) 123, a water supply line 130 for supplying water to the boiler 110, and a control device 150 (FIG. 2).
  • HPT high-pressure steam turbine
  • IPT medium-pressure steam turbine
  • LPT low-pressure steam turbine
  • the boiler 110 includes an economizer (ECO) 111, a fireplace water cooling wall 112, a brackish water separator 113, a superheater 114, and a reheater 115.
  • the superheater 114 may be provided in a plurality of stages from the downstream to the upstream.
  • the reheater 115 may also be provided in a plurality of stages from the downstream to the upstream.
  • a condenser 131 On the water supply line 130, there are a condenser 131, a condenser pump 132, a low pressure water supply superheater (low pressure heater) 133, a deaerator 134, a water supply pump 135, and a high pressure water supply superheater (high pressure heater) 136. And are provided.
  • a make-up water line 221 that supplies make-up water to the water supply line 130 is connected to the condenser 131. Further, the make-up water line 221 is provided with a make-up water on-off valve 231 for switching between supply / stop of make-up water.
  • the economizer 111 preheats the supplied water by heat exchange with the combustion gas.
  • the water preheated by the economizer 111 produces a water-steam two-phase fluid in the furnace water cooling wall 112 by passing through a furnace wall pipe (not shown) formed on the wall.
  • the water-steam two-phase fluid generated in the furnace water cooling wall 112 is sent to the brackish water separator 113 and separated into saturated steam and saturated water.
  • the saturated steam is guided to the superheater 114, and the saturated water is guided to the condenser 131 through the first pipe 161.
  • the saturated steam separated by the steam water separator 113 is superheated by the superheater 114 by heat exchange with the combustion gas, and is supplied to the high-pressure steam turbine 121 via the main steam pipe 162.
  • the outlet of the high pressure steam turbine 121 is connected to the low temperature reheat steam pipe 163.
  • the low temperature reheat steam pipe 163 is connected to the reheater 115.
  • the low temperature reheat steam pipe 163 is branched and connected to the ventilator line 199 at the first connection point 191 in front of the reheater 115.
  • the ventilator line 199 is connected to the condenser 131.
  • an exhaust forced check valve 192 for suppressing the backflow of steam to the high pressure steam turbine 121 is provided between the first connection point 191 and the reheater 115.
  • a ventilator valve 193 is provided between the first connection point 191 and the condenser 131.
  • the ventilator valve 193 is in a constantly closed state, and is fully opened during FCB operation, and fully closed during normal operation and in-house single load operation.
  • the steam that has performed the predetermined work in the high-pressure steam turbine 121 is guided to the reheater 115 via the low-temperature reheat steam pipe 163 during normal operation.
  • the normal operation here means an operation in a state of being connected to a power transmission system.
  • the reheater 115 the steam that has performed the predetermined work in the high-pressure steam turbine 121 is reheated.
  • the steam superheated by the reheater 115 is supplied to the medium-pressure steam turbine 122 and the low-pressure steam turbine 123 via the high-temperature reheat steam pipe 164, where they perform work and drive the generator 101.
  • the main steam pipe 162 is provided with a first shutoff valve 176 that is always open.
  • the high temperature reheat steam pipe 164 is provided with a pressure control valve 197 that is always closed and a second shutoff valve 177 that is always open along the order from the reheater 115 to the medium pressure steam turbine 122.
  • the first high-pressure bypass steam pipe 165 is provided with a first bypass on-off valve 171 that is always closed.
  • the fourth connecting point 196 between the superheater 114 and the second connecting point 194 and the condenser 131 are connected by the second high-pressure bypass steam pipe 167.
  • the second high-pressure bypass steam pipe 167 is provided with a second bypass on-off valve 172 that is always closed.
  • the steam that has finished its work in the low-pressure steam turbine 123 is supplied to the condenser 131 by the first exhaust steam pipe 166.
  • the condensate condensed by the condenser 131 is sent to the deaerator 134 after passing through the low pressure heater 133 by the condensate pump 132 together with the saturated water sent from the brackish water separator 113, and the gas component in the condensate is removed. Will be done.
  • the condensate that has passed through the deaerator 134 is further boosted by the water supply pump 135, then fed to the high-pressure heater 136 to be heated, and finally returned to the boiler 110.
  • the power generation facility 100 is provided with four sprays for controlling the temperature of superheated steam.
  • the flow path in the superheater 114 having a plurality of stages is provided with a first water supply port 201 into which the water supply from the preheater spray 211 flows in.
  • the front superheater water supply line 215, which serves as a flow path for water supply from the front superheater spray 211 to the first water supply port 201, is provided with a front superheater spray valve 202.
  • the outlet of the superheater 114 is provided with a second water supply port 203 into which the spray from the subsequent superheater spray 212 flows in.
  • a rear-stage superheater spray valve 204 is provided in the rear-stage superheater water supply line 216, which is a flow path for water supply from the rear-stage superheater spray 212 to the second water supply port 203.
  • the flow path in the reheater 115 composed of a plurality of stages is provided with a third water supply port 205 into which the spray flows from the previous stage reheater spray 213.
  • the preheater spray valve 206 is provided in the preheater water supply line 217, which is a flow path for water supply from the preheater spray 213 to the third water supply port 205.
  • the outlet of the reheater 115 is provided with a fourth water supply port 207 into which the spray from the subsequent reheater spray 214 flows in.
  • the signal line connecting the control device 150 (see FIG. 2) and each control valve is shown in a simplified manner, but each control valve and the control device 150 are connected to each other via a signal line. Connected electrically or by communication. Then, the opening degree control signal of the control device 150 is transmitted to each control valve, and the opening / closing control of each control valve is executed.
  • FIG. 2 is a configuration diagram of the control device 150.
  • the control device 150 includes a CPU (Central Processing Unit) 301, a RAM (Random Access Memory) 302, a ROM (Read Only Memory) 303, an HDD (Hard Disk Drive) 304, an input I / F 305, and an input I / F 305.
  • a CPU Central Processing Unit
  • RAM Random Access Memory
  • ROM Read Only Memory
  • HDD Hard Disk Drive
  • the hardware configuration of the control device 150 is not limited to the above, and may be configured by a combination of a control circuit and a storage device. Further, the control device 150 is configured by executing an operation program by a computer (hardware). The control device 150 controls the opening and closing of each control valve according to an instruction from the outside (a control console or the like placed in the power plant) or signals from various sensors installed in the power plant 100.
  • System 1 is a system used in the stage from immediately after the start of FCB operation to the in-house single load operation (initial stage of opening to the atmosphere).
  • System 2 is a system used for in-house single load operation. It is conceivable that the steam temperature rises during FCB operation in any of the systems, but the effect of the system 1 is relatively smaller than that of the system 2. Therefore, since it is easy to make FCB successful from the viewpoint of controllability such as steam temperature, FCB operation is first performed using system 1.
  • FCB operation is performed by opening to the atmosphere.
  • the load drops at once, the amount of work in the steam turbine is reduced, and the heat drop is reduced, so that the steam temperature rises.
  • the steam temperature exceeds the set temperature. Therefore, a spray is blown to lower the steam temperature.
  • the temperature sensor T1 measures the outlet temperature of the superheater 114, that is, the main steam temperature.
  • the temperature sensor T2 measures the outlet temperature of the reheater 115, that is, the reheated steam temperature.
  • the circulating water is reduced by the amount released to the atmosphere. Therefore, the make-up water on-off valve 231 is switched from the closed state to the open state, and water is supplied from the make-up water line 221 to the condenser 131.
  • the amount that can be replenished is limited, it is desirable to stop the release to the atmosphere as soon as possible, that is, to close the pressure control valve 197.
  • the power plant 100 shifts to system 2 and continues the in-house single load operation.
  • the opening to the atmosphere is completed and the pressure control valve 107 is closed.
  • the make-up water on-off valve 231 switches from the open state to the closed state.
  • the reheated steam temperature tends to rise. Therefore, since it is necessary to blow the spray further, the front stage spray is almost fully opened on both the superheater 114 side and the reheater 115 side. Since it may not be possible to deal with this alone, a subsequent spray will be added and used as appropriate. The details will be described below.
  • FIG. 3 is a flowchart showing the operation flow of the power plant 100.
  • the power plant 100 supplies steam to the high-pressure steam turbine 121, the medium-pressure steam turbine 122, and the low-pressure steam turbine 123 in a state of being connected to the power transmission system, and performs a normal operation to drive the generator 101 (S1). ..
  • the control device 150 receives a system cutoff signal indicating that the power transmission system has been cut off during normal operation (S2: Yes)
  • the power plant 100 shifts to FCB operation to be performed in the case of a system accident (S3). .. If the system cutoff signal is not received (S2: No), the normal operation is continued (S1).
  • FCB operation will be continued until the conditions for transition to single load operation in the facility are satisfied (S4: No).
  • S4: No the operation performed to maintain the function of the power plant 100 while shut off from the power transmission system, that is, the transition condition to the so-called in-house single load operation is satisfied (S4: Yes)
  • S5 the in-house single load operation is started.
  • FIG. 4 is a diagram showing the opening degree of each control valve in normal operation, FCB operation, and in-house single load operation.
  • FIG. 5 is a diagram showing the opening degree of each spray valve in normal operation, FCB operation, and in-house single load operation.
  • FIG. 6 is a system configuration diagram of the power plant 100 during normal operation.
  • the pressure control valve 197, the make-up water on-off valve 231 and the first bypass on-off valve 171, the second bypass on-off valve 172, and the ventilator valve 193 are all in the closed state.
  • the front stage superheater spray valve 202 is in the open state (opening less than 100%) and the rear stage superheater, as shown in FIGS. 4 and 5.
  • the instrument spray valve 204, the front stage reheater spray valve 206, and the rear stage reheater spray valve 208 are in the closed state.
  • the spray is sprayed from the superheater spray 211 in the previous stage to the flow path in the superheater 114 via the first water supply port 201.
  • the main steam flowing into the main steam pipe 162 discharged from the superheater 114 is because the first shutoff valve 176 is always open and the first bypass on-off valve 171 and the second bypass on-off valve 172 are always closed. , It is supplied to the high pressure steam turbine 121 through the first shutoff valve 176 without passing through the first high pressure bypass steam pipe 165 and the second high pressure bypass steam pipe 167.
  • the ventilator valve 193 is always closed, the discharged steam discharged from the high-pressure steam turbine 121 is supplied from the low-temperature reheat steam pipe 163 to the reheater 115.
  • the pressure control valve 197 is closed and the second shutoff valve 177 is open, so that the total amount of reheated steam reheated by the reheater 115 is from the high temperature reheated steam pipe 164 to the medium pressure steam turbine. It is supplied in the order of 122 and the low pressure steam turbine 123. Further, since the make-up water on-off valve 231 is closed, the supply of make-up water is stopped.
  • the exhaust steam discharged from the low-pressure steam turbine 123 is supplied from the first exhaust steam pipe 166 to the condenser 131. After that, it returns to the boiler 110 via the water supply line 130.
  • FIG. 7 is a system configuration diagram of the power plant 100 in the first half of the initial stage of FCB operation.
  • FIG. 8 is a system configuration diagram of the power plant 100 in the latter half of the initial stage of FCB operation.
  • the pressure control valve 197, the make-up water on-off valve 231 and the first bypass on-off valve 171 and the ventilator valve 193 are in the open state, as shown in FIGS. 4 and 7. Further, the second bypass on-off valve 172 is in a closed state immediately after the FCB operation and then in an open state. Further, during FCB operation, as shown in FIGS. 5 and 7, all spray valves are closed (see FIG. 7). Then, when the steam temperature measured by the temperature sensors T1 or T2 exceeds the set temperature after a certain period of time has passed after the FCB operation, the preheater spray valve 206 of the previous stage is first opened (opening less than 100%), and after a while. The preheater spray valve 202 is fully opened (see FIG. 8). The post-stage superheater spray valve 204 and the post-stage reheater spray valve 208 operate in an auxiliary operation, for example, during a sudden temperature change.
  • the main steam branched to the first high-pressure bypass steam pipe 165 and the exhaust steam from the high-pressure steam turbine 121 are supplied to the reheater 115 via the low-temperature reheat steam pipe 163.
  • the reheated steam discharged from the reheater 115 flows through the high-temperature reheated steam pipe 164, and a part of it is released to the atmosphere from the pressure control valve 197. As a result, excess steam during FCB operation is released to the outside of the steam circulation system.
  • the reheated steam that has not been released to the atmosphere is supplied to the condenser 131 via the high-temperature reheated steam pipe 164 via the medium-pressure steam turbine 122 and the low-pressure steam turbine 123. Since the make-up water on-off valve 231 is in the open state, make-up water is supplied near the condenser 131. As a result, water corresponding to the reduced amount of steam as a result of being released to the atmosphere can be supplied to the steam circulation system of the power plant 100. Then, the make-up water and the water from the condenser 131 are returned to the boiler 110 via the water supply line 130.
  • the control device 150 acquires the measured values from the temperature sensors T1 and T2, and when it is determined that the steam temperature is equal to or higher than the set temperature, controls the preheater spray valve 206 in the open state. Subsequently, the front stage superheater spray valve 202 is controlled to be in the open state (see FIG. 8).
  • FIG. 9 is a system configuration diagram of the power plant 100 during single load operation in the facility.
  • the pressure control valve 197 and the make-up water on-off valve 231 are in the closed state during the in-house single load operation. Further, the first bypass on-off valve 171 and the ventilator valve 193 are also in the closed state. Further, the second bypass on-off valve 172 is in the open state. Further, during single load operation in the facility, as shown in FIGS. 5 and 9, the front stage superheater spray valve 202 and the front stage reheater spray valve 206 are in the open state, the rear stage superheater spray valve 204 is closed, and the rear stage reheater spray is closed.
  • the valve 208 is an auxiliary operation, that is, it opens or closes according to the steam temperature measured by the temperature sensors T1 and T2 (see FIG. 4).
  • the water supply to the steam circulation system of the power plant 100 is stopped, that is, the make-up water on-off valve 231 is controlled to be closed.
  • the main steam flowing into the main steam pipe 162 discharged from the superheater 114 is the first because the first shutoff valve 176 is open, the first bypass on-off valve 171 is closed, and the second bypass on-off valve 172 is open.
  • a part of the main steam passes through the second high-pressure bypass steam pipe 167 and the rest passes through the first shutoff valve 176 and is supplied to the high-pressure steam turbine 121.
  • the amount of main steam supplied to the high-pressure steam turbine 121 is smaller in the in-house single load operation than in the normal operation.
  • the exhaust steam of the high-pressure steam turbine 121 is supplied to the reheater 115 via the low-temperature reheat steam pipe 163.
  • the ventilator valve 193 since the ventilator valve 193 is closed, the discharged steam discharged from the high-pressure steam turbine 121 is supplied from the low-temperature reheat steam pipe 163 to the reheater 115.
  • the main steam branched from the fourth connection point 196 to the second high-pressure bypass steam pipe 167 is supplied to the condenser 131. After that, it returns to the boiler 110 via the water supply line 130.
  • FCB Fast Cut Back
  • the power plant 100 restores the excess steam generated during FCB operation by releasing the excess steam from the pressure control valve 197 to the atmosphere, as compared with the case where the entire amount of the surplus steam is supplied to the condenser 131.
  • the capacity of the condenser 131 can be reduced. Therefore, it is possible to avoid the enlargement of the condenser 131 and contribute to the realization of the miniaturization of the power plant 100.
  • the make-up water on-off valve 231 is opened to supply make-up water. This makes it possible to compensate for the loss of water from the steam circulation system caused by the opening to the atmosphere.
  • the amount of steam required during the in-house single load operation following the FCB operation can be supplemented, and a smooth transition to the in-house single load operation becomes possible.
  • the adjustment of the amount of water supply such as water supply / stoppage of make-up water is realized by sending a control signal from the control device 150 to the make-up water on-off valve 231 in the above embodiment.
  • the make-up water pump is provided in the make-up water line 221 instead of the make-up water on-off valve 231, and the rotation speed of the make-up water pump (rotation speed per unit time: rpm) is variably controlled by the control device 150 to make make-up water.
  • the amount of make-up water discharged from the pump may be adjusted.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Control Of Turbines (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

Selon la présente invention, une opération FCB est effectuée de manière efficace et une opération de charge unique en interne ultérieure est également effectuée sans à-coups. L'invention concerne une centrale électrique comprenant : une chaudière (110); des turbines à vapeur (121, 122, 123); une conduite d'alimentation en eau (130) qui fournit de la vapeur d'échappement des turbines à vapeur à la chaudière par l'intermédiaire d'un condenseur de vapeur (131) qui retransforme la vapeur d'échappement en eau; une conduite d'eau d'appoint (221) qui fournit de l'eau d'appoint sur un trajet d'écoulement à travers lequel de la vapeur chauffée générée par la chaudière retourne vers la chaudière par l'intermédiaire d'une conduite d'alimentation en eau et une soupape d'ouverture/fermeture d'eau d'appoint (231) qui ouvre et ferme la conduite d'eau d'appoint; et un dispositif de commande (150) qui commande les degrés d'ouverture d'une soupape de commande de pression et de la soupape d'ouverture/fermeture d'eau d'appoint (231), dans une étape initiale à partir du début d'une opération de coupure rapide effectuée lorsque la centrale électrique est coupée de la centrale électrique à une opération de charge unique en interne qui génère une puissance auxiliaire en interne de la centrale électrique dans un état dans lequel la centrale électrique est coupée du système de transmission de puissance, la soupape de commande de pression et la soupape d'ouverture/fermeture d'eau d'appoint étant commandées à un état ouvert.
PCT/JP2020/021961 2019-06-19 2020-06-03 Centrale électrique WO2020255719A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019114144A JP7291010B2 (ja) 2019-06-19 2019-06-19 発電プラント
JP2019-114144 2019-06-19

Publications (1)

Publication Number Publication Date
WO2020255719A1 true WO2020255719A1 (fr) 2020-12-24

Family

ID=73993845

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/021961 WO2020255719A1 (fr) 2019-06-19 2020-06-03 Centrale électrique

Country Status (2)

Country Link
JP (1) JP7291010B2 (fr)
WO (1) WO2020255719A1 (fr)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5419803A (en) * 1977-07-12 1979-02-14 Hoechst Ag Method of making printing plate
JPS57104004A (en) * 1980-12-18 1982-06-28 Babcock Hitachi Kk Quick choke control operation of super critical pressure once-through boiler
JPS59203812A (ja) * 1983-05-02 1984-11-19 Hitachi Ltd 脱気器への補給水システム
JP2003148111A (ja) * 2001-11-07 2003-05-21 Mitsubishi Heavy Ind Ltd 蒸気タービンプラント

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5419803U (fr) * 1977-07-13 1979-02-08
JP5419803B2 (ja) 2010-06-03 2014-02-19 三菱電機ビルテクノサービス株式会社 エレベータの乗場ドア装置の養生器具

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5419803A (en) * 1977-07-12 1979-02-14 Hoechst Ag Method of making printing plate
JPS57104004A (en) * 1980-12-18 1982-06-28 Babcock Hitachi Kk Quick choke control operation of super critical pressure once-through boiler
JPS59203812A (ja) * 1983-05-02 1984-11-19 Hitachi Ltd 脱気器への補給水システム
JP2003148111A (ja) * 2001-11-07 2003-05-21 Mitsubishi Heavy Ind Ltd 蒸気タービンプラント

Also Published As

Publication number Publication date
JP2021001551A (ja) 2021-01-07
JP7291010B2 (ja) 2023-06-14

Similar Documents

Publication Publication Date Title
JP5221443B2 (ja) 一軸型複合サイクル発電プラントの起動方法および一軸型複合サイクル発電プラント
JP5450642B2 (ja) 排熱回収ボイラの運転方法
WO2020158941A1 (fr) Dispositif de stockage de chaleur, centrale de production d'énergie et procédé de commande de fonctionnement pendant une compression rapide
JP2000199407A (ja) コンバインドサイクルシステムにおいて補助蒸気を供給するための装置及び方法
JP2000161014A (ja) コンバインド発電設備
JP2010090894A (ja) 給水ポンプサイズを縮小するために燃料ガス加熱器の排水を使用する蒸気温度調節用装置
US5435138A (en) Reduction in turbine/boiler thermal stress during bypass operation
JPH0353443B2 (fr)
US10287921B2 (en) Combined cycle plant, method for controlling same, and device for controlling same
US7827793B2 (en) Power generation system
WO2020255719A1 (fr) Centrale électrique
JP4718333B2 (ja) 貫流式排熱回収ボイラ
JPH10292902A (ja) 主蒸気温度制御装置
JP7043382B2 (ja) 火力発電プラント
JP2006063886A (ja) 火力発電プラント
JP4560481B2 (ja) 蒸気タービンプラント
JP2002115807A (ja) ボイラ給水ポンプ用駆動タービン運転方法およびその運転装置
JP3641518B2 (ja) コンバインドサイクルプラントの蒸気温度制御方法及び装置
JP2999122B2 (ja) 複合プラントの制御装置
JP2531801B2 (ja) 排熱回収熱交換器の制御装置
JP2007285220A (ja) コンバインドサイクル発電設備
JP3650277B2 (ja) 火力プラントの制御装置及び火力プラントの制御方法
JPH09195718A (ja) 主蒸気温度制御装置
JPS6334402A (ja) 火力プラントの起動方法
JPH0486304A (ja) タービンバイパスシステムを有するクロスコンパウンド形蒸気タービンの制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20825948

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20825948

Country of ref document: EP

Kind code of ref document: A1